Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
19702 PEAK PL_003983_2026
INSPECTION REPORT - ZNG /� Permit No..l,(, - S ) Lot#: Q Address: f cf 7 012 Contractor. -y Owner: �? - ,S y 7 O IN G� Date: 1/—,227 -00 ROVAL ❑ PARTIAL APPROVAL ❑ VIOLATION ❑ CORRECTION REQUESTED ❑ Corrections listed below MUST BE MADE before work can be approved. ❑ Please contact inspector. ❑ Was not able to perform inspection. ❑ CALL 435-0674 FOR RE-INSPECTION - 24 hour notice required. v v V / t � Inspector: Date: TYPE OF INSPECTION REQUESTED ❑ Under-floor ❑ Framing ❑ Gas Piping ❑ Footing ❑ Drywall, Nailing ❑ Consultation ❑ Foundation ❑ Shear Nailing ❑ Groundwork ❑ Mechanical ❑ Grid ❑ truct. Slab ElWood Stove El Rough-in nal ❑ Masonry ❑ Drainage ❑ Fi Insulation ❑ Other: 4 INSPECTION REPORT 4ti1N G?,0 Permit No.:00' I9 3 Lot#: � Address: /g7102 -Ann. " Al Contractor: O Owner: IN C'� Date: P"PPROVAL ❑ PARTIAL APPROVAL ❑ VIOLATION ❑ CORRECTION REQUESTED ❑ Corrections listed below MUST BE MADE before work can be approved. ❑ Please contact inspector. ❑ Was not able to perform inspection. ❑ CALL 435-0674 FOR RE-INSPECTION - 24 hour notice required. t Inspector: Date: fi — -�© -fYPE OF INSPECTION REQUESTED ❑ Under-floor 0l Framing ❑ Gas Piping ❑ Footing ❑ Drywall, Nailing ❑ Consultation ❑ Foundation ❑ Shear Nailing ❑ Groundwork Z Mechanical ❑ Grid ❑ Struct. Slab ❑ Wood Stove ❑ Rough-in ❑ Final ❑ Masonry ❑ Drainage ❑ Insulation ❑ Other: INSPECTION REPORT --k 4tiZN G TO Permit No.: 00- -9"T93 Lot #: Q Address: Contractor:,, u Owner: LINO Date: C'Zi" S_ APPROVAL ❑ PARTIAL APPROVAL ❑ VIOLATION ❑ CORRECTION REQUESTED ❑ Corrections listed below MUST BE MADE before work can be approved. ❑ Please contact inspector. ❑ Was not able to perform inspection. ❑ CALL 435-0674 FOR RE-INSPECTION - 24 hour notice required. Inspector: Date: TYPE OF INSPECTION REQUESTED ❑ Under-floor ❑ Framing ❑ Gas Piping ❑ Footing ❑ Drywall, Nailing ❑ Consultation ❑ Foundation ❑ Shear Nailing ❑ Groundwork ❑ Mechanical ❑ Grid ❑ Struct. Slab ❑ Wood Stove ❑ Rough-in ❑ Final ❑ Masonry ❑ Drainage Insulation ❑ Other: Q�n INSPECTION REPORT 1 NG ¢yi ?'O Permit No.Z-,399-3 #: Q" Address: lg70a 0 Contractor: O Owner: _Q IN G Date: /6— /�—fl ❑ APPROVAL ❑ PARTIAL APPROVAL ❑ VIOLATION ❑ CORRECTION REQUESTED ❑ Corrections listed below MUST BE MADE before work can be approved. ❑ Please contact inspector. ❑ Was not able to perform inspection. ❑ CALL 435-0674 FOR RE-INSPECTION -24 hour notice required. Inspector: Date: TYPE OF INSPECTION REQUESTED ❑ Under-floor ❑ Framing ❑ Gas Piping ❑ Footing ywall, Nailing ❑ Consultation ❑ Foundation �Ck ear Nailing ❑ Groundwork ❑ Mechanical ❑ Grid ❑ Struct. Slab ❑ Wood Stove ❑ Rough-in ❑ Final ❑ Masonry ❑ Drainage ❑ Insulation ❑ Other: M INSPECTION REPORT ii ?' Permit NoAO- Lot#: aCOAddress: /c1 Z� GBC Contractor: 04 Owner:IN Date: 400 ❑ APPROVAL ,�RTIAL APPROVAL ❑ VIOLATION ❑ CORRECTION REQUESTED ❑ Corrections listed below MUST BE MADE before work can be approved. ❑ Please contact inspector. ❑ Was not able to perform inspection. ❑ CALL 435 674 FOR RE-INSPECTION - 24 hour notice required. Inspector: Da : TYPE OF INSPECTION REQUESTED ❑ Under-floor ❑ Framing Gas Piping ❑ Footing ❑ Drywall, Nailing ❑ Consultation ❑'Foundation ❑ Shear Nailing ❑ Groundwork Mechanical ❑ Grid ❑ Struct. Slab ❑ Wood Stove ❑ Rough-in ❑ Final ❑ Masonry ❑ Drainage ❑ Insulation ❑ Other: INSPECTION REPORT IN G?' Permit No.: �� Lot #: Q— ti Q" O� Address: Contractor: 7 ,SO Owner: �I N O Date: APPROVAL ❑ PARTIAL APPROVAL ❑ VIOLATION ❑ CORRECTION REQUESTED ❑ Corrections listed below MUST BE MADE before work can be approved. ❑ Please contact inspector. ❑ Was not able to perform inspection. ❑ CALL 435-0674 FOR RE-INSPECTION - 24 ho notice required. Inspector: Date: TYPE OF INSPECTION REQUESTED ❑ Under-floor ❑ Framing Gas Piping ❑ Footing ❑ Drywall, Nailing ❑ onsultation ❑ Foundation ❑ Shear Nailing ❑ Groundwork ❑ Mechanical ❑ Grid ❑ Struct. Slab ❑ Wood Stove ❑ Rough-in ❑ Final ❑ Masonry ❑ Drainage ❑ Insulation ❑ Other: INSPECTION REPORT ¢ 1N G TO Permit No.: 399,3 Lot #: Q" Address: _������ P.�� Contractors' -e 9s �O Owner: � � .—G j O I; Date: ❑ APPROVAL ❑ PARTIAL APPROVAL ❑ VIOLATION CORRECTION REQUESTED ❑ Corrections listed below MUST BE DE before work can be approved. ❑ Please contact inspector. ❑ Was not able to perform inspection. ❑ CALL 435-0674 FOR RE-INSPECTION - 24 hour notice required. r L� M-ko / _J/ Inspector: Date: ' TYPE OF INSPECTION REQUESTED ❑ Under-floor ❑ Framing ❑ Gas Piping ❑ Footing ❑ Drywall, Nailing ❑ Consultation ❑ Foundation ❑ Shear Nailing ❑ Groundwork ❑ Mechanical ❑ ❑ Struct. Slab ❑ Wood Stove Rough-in ❑ Final ❑ Masonry O Drainage ❑ Insulation ❑ Other: �( r ' INSPECTION REPORT 4y�N GAO Permit No.: 4AV '__398.3 Lot #: e1AC1 Address: l 9 70 0 eAk_� PL Contractor: Owner: I N G Date: PPROVAL ❑ PARTIAL APPROVAL ❑ VIO ION ❑ CORRECTION REQUESTED ❑ Corrections listed below MUST BE MADE before work can be approved. ❑ Please contact inspector. ❑ Was not able to perform inspection. ❑ CALL 435-0674 FOR RE-INSPECTION - 24 hour notice required. v inspector: Date: �. TYPE OF INSPECTION REQUESTED ❑ Under-floor ❑ Framing ❑ Gas Piping ❑ Footing ❑ Drywall, Nailing ❑ Consultation ❑ Foundation ❑ Shear Nailing ❑ Groundwork ❑ Mechanical ❑ Grid ❑ Struct. Slab ❑ Wood Stove Rough-in ❑ Final ❑ Masonry ❑ Drainage ❑ Insulation ❑ Other: -x INSPECTION REPORT IN G T ,&,�- 4ti p Permit No.i� 3 Lot#: IT, Address: _0—CA.L Contractor: ~� O Owner: — 7 s7 N G f� Date: 7 -DID APPROVAL ❑ PARTIAL APPROVAL VIOLATION ❑ CORRECTION REQUESTED ❑ Corrections listed below MUST BE MADE before work can be approved. ❑ Please contact inspector. ❑ Was not able to perform inspection. ❑ CALL 435-0674 FOR RE-INSPECTION - 24 hour notice required. � 1 Inspector: �/ Date: TYPE OF INSPECTION REQUESTED ❑ Under-floor ❑ Framing ❑ Gas Piping ❑ Footing ❑ Drywall, Nailing ❑ Consultation ❑ Foundation hear Nailing ❑ Groundwork ❑ Mechanical AL, rid ❑ Struct. Slab ❑ Wood Stove ❑ Rough-in ❑ Final ❑ Masonry ❑ Drainage ❑ Insulation ❑ Other: INSPECTION • i Address: ", • • • . .tom • wner:IN •>,'APPROVAL LJ PARTIAL APPROVAL Q VIOLATION ORRECTION REQUESTED El Corrections listed below MUST BE MADE before work can be approved. ■ Please contact inspector. ■ Was not able . perform ■ 0. FOR • required. Inspector: Date(;�_i2_ n6- 'iYPE OF INSPECTION REQUESTED ■ Under-floor ■ Framing ■ Gas Piping Q Footing 0 Drywall, Nailing LJ Consultation Ll Foundation El Shear Nailing 4 Groundwork ■ Mechanical ■ Grid ■ Struct. Slab El Wood Stove L11 Rough-in L) Final ■ Masonry ■ Drainage L1 Insulation ■ Other: INSPECTION REPORT 4�'N G rO Permit No.: V �! Lot#: 4' Address: Contractor: ys, ,S4 Owner: S G �IN Date: ❑ APPROVAL ❑ PARTIAL APPROVAL ❑ VIOLATION — RRECTION REQUESTED ❑ Corrections listed below MUST BE MADE before work can be approved. ❑ Please contact inspector. ❑ Was not able to perform inspection. ❑ CALL 435-0674 FOR RE-INSPECTION - 24 hour notice required. Inspector: Date. T PE OF INSPECTION REQUESTED ❑ Under-floor ❑ Framing ❑ Gas Piping ❑ Footing ❑ Drywall, Nailing ❑ Consultation ❑ Foundation ❑ Shear Nailing ndwork ❑ Mechanical ❑ Grid ❑ Struct. Slab ❑ Wood Stove ❑ Rough-in ❑ Final ❑ Masonry ❑ Drainage ❑ Insulation ❑ Other: INSPECTION REPORT ¢tiIN G?'O Permit No.���J Lot* Address: AZ Contractor: N ��-t,� _ .-L;a 4 Owner: 9`r4ING� Date: O APPROVAL ❑ PARTIAL APPROVAL ❑ VIOLATION ❑ CORRECTION REQUESTED ❑ Corrections listed below MUST BE MADE before work can be approved. ❑ Please contact inspector. ❑ Was not able to perform inspection. ❑ CALL 435-0674 FOR RE-INSPECTION - 24 hour notice required. /Z Inspector: Date: —� PE OF INSPECTION REQUESTED ❑ Under-floor ❑ Framing ❑ Gas Piping ❑ Footing ❑ Drywall, Nailing ❑ Consultation Foundation ❑ Shear Nailing ❑ Groundwork echanical ❑ Grid ❑ Struct. Slab ❑ Wood Stove ❑ Rough-in ❑ Final ❑ Masonry ❑ Drainage ❑ Insulation ❑ Other: (� INSPECTION REPORT ¢ti1N G?'Q Permit No.: 00 "J 773Lot#: Address: Z Contractor: I y\ l ' O Owner: N G� Date: e 17 " C� *APPROVAL ❑ PARTIAL APPROVAL ❑ VIOLATION ❑ CORRECTION REQUESTED ❑ Corrections listed below MUST BE MADE before work can be approved. ❑ Please contact inspector. ❑ Was not able to perform inspection. ❑ CALL 435-0674 FOR RE-INSPECTION -24 hour notice required. Ate/ �. f Inspector `— Date: '4 TYP OF INSPECTION REQUESTED ❑ Under-floor ❑ Framing ❑ Gas Piping Footing ❑ Drywall, Nailing ❑ Consultation ❑ Foundation ❑ Shear Nailing ❑ Groundwork ❑ Mechanical ❑ Grid ❑ Struct. Slab ❑ Wood Stove ❑ Rough-in ❑ Final ❑ Masonry ❑ Drainage ❑ Insulation ❑ Other: C I TY OF= A RL I N0-F0N CONO-rRUCT 10N BERM I T 9:31ERMI T NO_ 00-3S83 Owner: HIMALAYA HOMES 10217 19TH AVE SE EVERETT 98E08 Value of Work: $81,537.00 Tax ID: CRE DIV S LOT E0 Phone: 425-338-1944 Describe Work: NEW CONSTRUCTION Proposed Use: SFR Legal Description: CROWN RIDGE ESTATES DIV 8 LOT 80 Job Address: 19702 PEAK PL Contractor's Na-ie Type Address License# HIMALAYA HOMES G 10217 19TH AVE SE HIMALHI161DE OLYMPIC MECHANICAL M PO BOX 5326 OLYMPMI1700 SOUNDVIEW PLUMBING 25E4 W CASIN❑ RD SOUNDVP033NF P E R M I T F E E S Equipment and Fixtures Number Fee Total Charge PLUMBING FIXTURES 14 $7.00 $98.00 FURNACE/UNIT HEATER 1 $14.80 $14.80 f RANGE 1 $10.65 $10.65 VENTILATION FANS 4 $7.25 $E9.00 I DRYER 1 $10.65 $10.65 METAL FIREPLACE & CHIMNEY 1 $10.65 $10. 65 f WATER HEATER 1 $10.65 $10.65 GAS PIPING 1-4 OUTLETS 1 $4.75 $4.75 S U B T 0 T A L...... $189. 15 TOTALS Fee Permit Fee $867.75 Equipment $91. 15 Fixture $98.00 Mech Permit $E3.50 Plan Fee $564.04 Plumb Permit $E5.00 State fee $4.50 SIGNATURE: TOTAL FEE. - - - $1,673.94 I HEREBY CERTIFY THAT I HAVE READ AND EXAMINED THIS APPLICATION AND PAYMENTS........ . ......... $495.79 KNOW THE SAME TO BE TRUE AND COR- RECT ALL PROVISIONS OF LAWS AND TOTAL DUE................ . $1, 178. 15 ORDINANCES GOVERNING THIS OF WORK WILLEw. WI ;_ �1H,_ is =.t SPECIFIEDOT. DATE RECEIPT #^ jjq77 BUILDING OFFICIAL 70' _9 r 103' - � >;DESK ?ATi3 � 4{J 103' N p 1�r i J N � m !v 10' Utility Easement 70' RECEIVED MAR 2 4 2000 P"K Place CITY OF ARLINGTON 1"=209 Lot Area = 7210 s-f. Job # Lot 20 Crown Ridge Estates II Tag# Fon-Olotplan Himalaya Homes, Inc. (425)338-1944 Address: 19702 Peak Place 10217-19th Ave SE,Everett WA 98208 Arlington WA, 98223 CITY OF ARLINGTON CONSTRUCTION PERMIT ❑ COMBINATION ❑ BUILDING ❑ MECHANICAL ❑ PLUMBING ❑ SIGN PERMIT NO. 3 CIO ,3 j OWNER MAIL ADDRESS CITY ZIP PHONE f-IimalaL,g Hc} meC 1=171- Iq+x five. St �vcret� G�208 y2S 1338• lC+yy ARCHITECT OR•'UESIGNER MAIL ADDRESS CITY ZIP PHONE Z�t -4:-I- c�Rhe� �e�r�rt�r� l�Jy4- NE -1q+,, Redrn g8b6Z ap t 1089 SPJClq, ���GENERAL CONTRACTOR u MAIL ADDRESS CITY 21P �hMCLIQ +FtI -neS met tt7 9(;�Sao$ ya.S 3�� l9�ly f}IMA�N�I(al �t MLCHANICAL ONTRACTOR MAIL ADDRESS CITY ZIP PHONE LICEn'�k 6lMmn;c jAecdmn cod Po Q, Sr-�Q<<, Lunn )n A qf�K„ �i�b ��y S8y1 OIL 12npm goo; PL BIND CONTRACTOR MAIL ADDRESS CITY ZIP ► f LICE, I,, a�x,dylc Pt��rn ,n� o�y W.(�rt� no R� Evef2�t�ta�y y�S'• 1�� �112 Sok1.nAyPo,�31,[ 3 CLASS OF WORK --T - offNLW ❑AUDITION ❑ALTERATION ❑REPAIR ❑DEMOLI f ION ❑BUILDING RELOCATION rr... �ZQJ VALUATIONOF WORK W UE oo�♦ L ! / 5 3� SCRI �� Id c m PROPOSt U USE OF BUILDING W Q 1 HEREBY CERTIFY THAT I HAVE READ AND EXAMINED THIS APPLK- w Y TION AND KNOW THE SAME TO BE TRUE AND CORRECT ALL PRO. Z LLUAL UESCRIPI ION Of PROPLRTY(SHOWN BELOWOR ATTACH FOUR COPIES) 7 �•-��•, SIONS OF LAWS AND ORDINANCES GOVERNING THIS TYPE OF WO: LOIBLOCK Of - ( Q _ WILL BE COMPLIED WITH WHETHER SPECIFIED HERIN OR NOT -T! a GRANTING OF PERMIT DOES NOT PRESUME TO GIVE AUTHORITY W VIOLATE OR CANCEL THE PROVISIONS OF ANY OTHER STATE TAX ID NUMBER FROM PROPERTY TAX STATEMENT LOCAL LAW REGULATING CONSTRUCTION OF THE PERFORMANCE 0. CONSTRUCTION. PERMIT EXPIRES 1 YEAR FROM DATE OF ISSUANC 0 - o SIGNATURE OF CONTRACTOR OR AUTHORIZED AGENT DATE V 108AOURLSS X (OFFICE USE ONLY) PLUMBING MgIIAN kL NO. TYPE OP FIXTURE PEE x's PIXTURU NO. I TYPE OP EQUIPMI'T FES x's FIXTURES ATER CLOSET ILET IR CONM UNITS-H.P. PA. 7 W .II.- AT11TU8 IEPRIGERATION UNITS-H.P.EA W,,.Ilst•• VATORY ASII BASIN OILERS-1T.P.EA. tip.list** - HOWFR 3AS FIRED&C.UNITS—TONNAGE EA. 3qtip.list— HEN SINK R DISPOSAL ORCED AIR SYSTEMS—B.T.U. MBA ISHWASHER NALL HEATERS— B.T.U. M UNDRYTRAY ONIT HEATERS—B.T.U. M _ L0111PS WASHER .VAPORATIVECOOLERS IMP 11UNrER LOT11139 DRYERS RINAL �FNTI ION FAN KINKING FOUNTAIN 1ANGSHOOD COMMERCIAL LOOR DRAIN MR.IIANDLING UNIT- CPM VACUUM BREAKERS f7rova OOP DRAINS-RAINLFISDERS ErAL FIREPLACH&CHIMNEY INK ERVICE-BAR,9M.) WATBR HEATER AS PIPING •u to 5-$3.00,eddnl.-S.75 ul meat list must be provided SUB TOTAL SUB TOTAL PERMIT PERMIT TOTAL-FEE - TO'rAL FEE SIUL YARD SL 10 CK STRLLI SL[BACK REAR YARD,SETBACK; PLAN CHECK NUMBER PLAN CHECK FEE O 67- _ Di FEE /%/��% RECEIPT NO USf / N LOT AREA VACANT SIT I `�(-� �I�// (� 2�D O_cts la NO FEES L_--- VALUATION FEE TYPL OF CID I OCCUPANC �GROUP NO.OF DWELLING UNITS PLAN CHECKING NG ' (/ ©C/ lllffL// V/ 1 � SILL UI BLUG. NO.Or STURILS MA%.00C.LOAD BUILDING 4 7-5 4 2 PLUMBING FIRE SPRINKLERS REQUIRE')- DYES Q NO MECHANICAL COMMENTS j � STATE SLOG.CODE ENERGY CODE SURCHARGE I PENALTY uI C.303(+) RECEIVED WATER/SEWER FEES LIAR 2 4 2000 TOTAL PERMIT VALIDATION ICITY OF ARLING,TON PAID PROPERLY VALIDATED IIN C THIS SPACE)THIS IS YOUR PERMIT 6 RECEIPT A — BY cc:ASSESSOR,APPLICANT,TREASURER, BLDG. DEPT BUILDING OFFICIAL DATE RECORDS COPY