Loading...
HomeMy WebLinkAbout17802 Topper Ct_BLD73_2026 (3) lv� RESIDENTIAL MECHANICAL 9 SY' S r 2- PERMIT APPLICATION Department of Community Development City of Arlington• 238.N Olympic Ave. •Arlington,WA 98223• Phone(360)403 3551 •FAX--(3tI0)#C "34-48-" THIS APPLICATION MUST BE ACCOMPANIED BY TWO(2) SETS OF CONSTRUCTION DRAWINGS, TWO(2) SETS OF SPECIFICATION SHEETS AND TWO(2) SETS OF WASHINGTON STATE ENERGY CODE(if applicable). Project Valuation: �� -FoProject Address: ( 7 C _ Parcel ID#: Lot#: -- rr� 4"7 , Subdivision: C J Project Description:--_vh �— 000 _5 ` (no Ct Oviner: JI�J� - G�U Phone Number:Address: _�7�-1 Dr N C -City: All VM00 State: -L��1__ Zip Code: Contact Person: Kc4) Sa 4 Phone Number: Call Phone: / Fax: E-mail: Address: 2120 F46 ftl \Ve City: State: 7.(p Code:, �Zp Please List quantity of fixtures below: FURNACE UP TO 100K BTU _ CLOTHES DRYER ,_ OAS OUTLETS FURNACE OVER 100K FLOOR FURNACE SUSPENDEDNTR/UNIT HTR BOILER UP TO 3 HP fv APPLIANCE REPAIR SOLID-FUEL APPLIANCE _ BOILER UP TO 4-15 HP AIR HANDLING UP TO 10K CFM FIREPLACE INSERT BOILER UP TO 16-30 HP AIR'HANDLING OVER 1OK CFM _ VENTILATION SYSTEM HEAT PUMP _ VENTILATION FANS OTHER VENT HOOD DOMESTIC INCINERATOR ALL OTHER UNITS c F R EESTANDING STOVE Contractor: Sa .a-r 7!�s l , Phone Number: QY AcirlrngS; ---- Cfty: State: WA ZI Code: Contractor's License Number: EVERGiSS022 D Imot- Expiration: IO' 'C)/zo� I hereby certify that the abov �formallon is correct and that the construction on, and the occupancy and the use of the above- described pr per y will he ac ordance with the laws,rules and regulation of the State of Washington. TO r!3 M rlts>Varture Date td Print Applicants Name RECEIVED FOR STAFF USE ONLY 6l6 773 �� COA PERMIT CENTER Permit it Acceplod By Amount Received Receipt# Date Received 2010 CJY TIi1AWE� TDD213060MV-SUB-1 TAG: : A Downflow/ Horizontal Gas Furnace - Variable Speed - 2 Stage Heat TDD2B060A9V3VA 5/8' 17-1/2' 28' 16-1l4' 24-1/2' 19-5/8` 5/8' SIDE PANEL 1/2' CUTOUT FOR 5"(6 SIDE PANEL CUTOUT HORIZONTAL FOR HORIZONTAL VENTING ' VENTING THROUGH THE CABINET 9-518' THROUGH / 4-1/8' —' THE CABINET 7/8"DIA. HOLES i ELECTRICAL 3-V2 5' CONNECTION I 40` 7/8" DIA.K.O. 3-3/8 ELECTRICAL 7° CONNECTION r FLUE � (ALTERNATE) OPENING 31 3 4 \ ` \ \ 2 1/8' 29.1 2' 1-1/2" DIA. Q 20 1/ ' CONNECTION ' 0 (ALTERNATE) OpOp�� `3-15/16' 3/4 j 10° 12.3/8' 19' 5-5/16' 1/2' 2 t/ts' 1-1/2"DIA.HOLE GAS CONNECTION 0 2011 Trane 'DD2B060A9V3VA FURNACE HEATING AIRFLOW(CFM)AND POWER(WATTS)VS,EXTERNAL STATIC PRESSURE WITH FILTER AIRFLOW DIP SWITCH SETTING EXTERNAL STATIC PRESSURE SETTING SW7 SWB 01 0.3 0.5 0.7 0,9 CFM 547 593 571 567 544 LOW ON ON TEMP.RISE 53 49 51 51 63 WATTS 48 80 107 143 170 CFM 658 664 658 658 652 HEATING iST MEDIUM" ON OFF TEMP.RISE 44 44 44 44 44 STAGE WATTS 65 92 122 155 197 CFM 735 761 761 764 762 HIGH OFF OFF TEMP.RISE 39 35 38 38 36 WATTS 75 120 155 190 230 CFM 743 777 776 783 772 LOW ON ON TEMP.RISE 60 57 67 57 58 WATTS 75 120 155 195 230 CFM 874 887 881 694 894 HEATING 2ND MEDIUM" ON OFF TEMP.RISE 51 50 50 50 50 STAGE WATTS 105 160 165 230 270 CFM 996 1013 1041 1058 1069 HIGH OFF OFF TEMP.RISE 45 44 43 42 42 WATTS 143 192 250 307 337 'DD2B060ASV3VA FURNACE COOLING AIRFLOW(CFM)AND POWER(WATTS)VS.EXTERNAL STATIC PRESSURE WITH FILTER OUTDOOR AIRFLOW DIP SWITCH SETTING EXTERNAL STATIC PRESSURE UNIT SIZE SETTING (TONS) SWi SW2 SW3 5W4 0.1 0.3 O.b 0.7 09 LOW CFM 533 563 640 634 515 (350 CF?N ON ON OFF ON — TON) WATTS 45 75 100 130 160 NORI,(AL CFM 609 627 624 606 607 15 (400 CF6V ON ON OFF OFF TON) WATTS 55 90 116 150 180 HIGH OFF CFM 664 6" 600 687 680 (450 CFMI ON ON ON TON) WATTS 65 95 135 165 200 LOW CFM 693 714 708 700 712 (350 CFW OFF ON OFF ON TON) WATTS 65 105 135 170 210 NORMAL CFM 780 821 813 810 816 2 (400 CFW OFF ON OFF OFF TON) WATTS 85 130 165 205 245 HIGH CFM BB6 89B 901 926 930 (450 CFW OFF ON ON OFF TON) WATTS 110 150 200 250 285 LOW CFf,1 865 682 869 884 885 (350 CFM/ ON OFF OFF ON TON) WATTS 105 145 185 275 265 NORMAL CFM 977 983 1014 1035 1019 2.6 (400 CFW ON OFF OFF OFF TON) WATTS 135 180 235 290 330 HIGH CFM 1097 1125 1165 1169 1169 (450 CFM! ON OFF ON OFF TON) WATTS 170 235 305 350 405 LOW CFI,1 1006 1034 1056 1072 1087 (350 CFf.I/ OFF OFF OFF ON TON) WATTS 145 200 255 315 352 NORMAL CFf{ 1169 1202 1226 1221 1217 3.. +CFM OFF OFF OFF OFF (400 WATTS 215 285 355 300 440 TON) _ HIGH CF1.1 1313 1339 1360 1369 1357 (450 CFf,V OFF OFF ON OFF TON) WATTS 290 Y 370 425 600 525 NOTES: 1. 'FIRST LETTER MAY BE'A'OR'T' %!. "FACTORY SETTING. :1.CONTINUOUS FAN SETTING:HEATING OR COOLING AIRFLOW IS APPROXIMATELY 60%OF SELECTED COOLING VALUE. 4. FOR VARIABLE SPEED:LOW SPEED AIRFLOWS ARE APPROXIMATELY 30%OF LISTED VALUES. 5. LOW 350 CFIAITON IS RECOLWENDED FOR VARIABLE SPEED APPLICATION FOR COMFORT&HUMID CLIMATE SETTING: NORMAL IS 400 MVTON: HIGH 450 CFWON IS FOR DRY CLIPIATE SETTING. INDOOR BLOWE,RTIMING COOLING OFF - DELAY OPTIONS Heating: The ECM Fan Control controls the variable speed SWITCH SETTINGS SELECTION NOMINAL indoor blower. The blower"on"time is fixed at 45 seconds after AIRFLOW ignition.The FAN-OFF periodis field selectable by dip switches 5-OFF 6-OFF NONE SAME #2 and#3 on the Integrated Furnace Control at 60,100,140,or 5-ON 6-OFF 1.5 MINUTES 100% ' 180seconds. The factory setting is 100 seconds,(See unit wiring 5-OFF 6 ON 3 MINUTES 50% diagram). Cooling:Tire fan delay-off period is set by dip switches on the 5 O N e-0 N `• 50-100% ECM Farr Control board connected to the Integrated Furnace -This setting Is equivalent to BAY24XO45 relay benefit Control. The options for cooling delay off is field selectable by dip switches #5 and #6. However, dip switch #1 on the This selection provides ENHANCED MODE,which is a Integrated Furnace Control must be set to "ON" for cooling ramping up and ramping down of the dower speed to provide improved comfort, quietness,and potential energy mode to function properly. savings.See Wiring Diagram notes on the unit or In the The following table and graph explain the delay-off settings: Service Facts for complete wiring setup for ENHANCED MODE. The graph which follows,show$ the ramping -This selection provides a ramping up and ramping down process. of the blower speed to provide improved comfort,quietness,and potential energy savings. The graph below shows the ramping 100%It necossnry process. Dehunildlfy 60!; 50% Fast Coll Cooling ENlclenoy OFF Orr"F 1 I 7.5 I I 3 minute minutes minutes General Data o TYPE Downflow/Horizontal VENT COLLAR—Size in. 4Round RATINGS 2 HEATEXCHANGER 1 st Stage Input BTUH 39.000 Type-Fired Alum,Steel 1st Stage Capacity BTUH(ICS) 3 31,200 -Unfired 2nd Stage Input BTUH 60,000 Gauge(Fred) 20 2nd Stage Capacity BTUH(ICS) 3 48,000 Temp.rise(Mtn.-Max.)°F _ss-6K Nat,Gas.Qly.—Drill Size 3--45 BLOWER DRIVE DIRECT L.P.Cas QI .—Drill Size 3—56 Dlameter-Width(In.) 10 x7 GAS V LVE Redundant-Two Stage No.Used 1 PILOT SAFETY DEVICE Speeds(No.) VARIABLE SPEED Type Hot Surface Ignition CFM vs.in.w.g. See Fan Performance BURNERS—Type Muitiport Inshot Motor HP 1/2 Number R.P.M. VARIABLE POWER CONN.—V/Ph/Hz * 115(1/60 V0110PIVH7. 116/1/60 _ Ampacily(In Amps) 10.5 COMBUSTION FAN-Type Centrifugal Max Overcurrenl Protection(amns) 15 Drive-No.Speeds Direct-2 PIPE CONN SIZE(IN) 1/2 Motor HP-RPM 1/100-2543/1727 DIMENSIONS H x W x D Volts/Ph/Hz 115/1/60 Crated(In.) 41-314 x 19-1/2 x 30-1/2 FL.Amps n 70/0.40 Uncraled(In) 40 x 17-1/2 x 26-1/2 FILTER—Furnlchod_? VBs WEIGHT TypoReconmonded High Velocity Shipping(Lbs.)I Net(Lbs) 1140/129 Hi Vel (No.-Sizo•Thk)Shipped 2- 14 x 20-tin. O Central Furnace heating designs are certified by the American Gas Association foe.Laboratories. O Ratings shown are for elevations up to 2000 feet.For elevations above 2000 feet;Ratings should be reduced at the rate of 4%for each 1 000 feet above sea level. O Based on U.S.Government Standard Tests. O The above wiring specifications are in accordance with National Electrical Code;however,Installations must comply with local codes. Mechanical Specifications NATURAL GAS MODELS—Central heat- BURNERS—Multi-port,In-shotburners will STYLING—Heavy gaugesteel and"wrap- ing furnace designs are certified by the give years of quiet and efficient service. All around" cabinet construction is used In American Gas Association for both natural models can be converted to L.P.gas without the cabinet with baked-on enamel finish for and L.P.gas. Limit setting and rating data changing burners. strength and beauty. The heat exchanger were established and approved under stan- INTEGRATED SYSTEM CONTROL—Ex- section of the cabinet is completely lined dard rating conditions using American Na- elusively designed operational program pro- with foil-faced fiberglass Insulation. This g vldes total control of furnace limit sensors, tional Standards Institute standards, results in uiet and efficient operation due to the excellent acoustical and Insulating quali- SAFE OPERATION—The Integrated Sys- blowers, gas valve, flame control and in- ties of fiberglass. tem Control has solid state devices,which eludes self diagnostics for ease of service. continuously monitor for presence of flame, AIR DELIVERY---The variable speed, dl- FEATURES AND GENERAL OPERATION when the system Is in the heating mode of rect-drive blower motor, with sufficient air- — These High Efficiency Gas Furnaces operation. Dual solenoid combination gas flow range for most heating and cooling employ a Hot Surface Ignition system,which valve and regulator provide extra safety. requirements, will switch from heating to eliminates the waste of a constantly burning QUICK HEATING---Durable,cycle tested, cooling speeds on demand from room ther- pilot. The Integrated system control lights heavy gauge aluminized steel heat ex- mostat. The blower door safety switch will the main burners upon a demand for heat changer quickly transfers heat to provide prevent orterminate furnace operation when from the room thermostat. Complete front warm conditioned air to the structure. Low the blower door Is removed. (Fan relay and service access. energy power vent blower, to increase 35VA control transformer Is standard). a. Low energy power venter. efficiency and provide discharge of gas b. Vent proving differential switch. fumes to the outside,allows common vent- ing with hot water heater. �NTFRTQk C( US IST9 SinceTrane has aWicyof contlnuous product and product Libre data improvement,it reserves the right to changespedrea- ProductSoction Furnaces tions and desrgmtiithout noke. Product Furnace Technical Literature-Printed In U.S.A. Model TDD2-A9V LiteratureType Submittal Trane Sequence - 6200 Troup Highway Date 06/11 Tyler,TX 75707 File No. TI)MB060MV-SUB-1 wwwArane.corn Supersedes TDD060R9V-SUB-1A Date: 04/27/2026 Permit#: 73 Permit Date: 04/23/2013 Review Date: 04/24/2013 Permit Type: RESIDENTIAL MECHANICAL Review Type: BLD Target Date: 04/24/2013 Scheduled Time: Completed Date: 04/24/2013 Description: Change out of gas furnace.Application states that furnace has a AFUE of 80%. Review Status: Assigned To: Time In: Time Out: Hours: Property Information Parcel#: 00870600009300 STACRUZ JOSE &JOSEPHINE STACRUZ JOSE & JOSEPHINE 17802 TOPPER COURT 17802 TOPPER CRT ARLINGTON, WA 98223 Zoning: 111 Single Family Residence - DetachedLot: Block: Permit#: 73 Permit Date: 04/23/13 Permit Type: RESIDENTIAL MECHANICAL Project Name: Jose & Josaphine Stacruz Applicant Name: Applicant Address: Applicant, City, State, Zip: Contact: Phone: Email: Scope of Work: Furnace Change Out Valuation: 3000.00 Square Feet: 0 Number of Stories: 0 Construction Type: Occupancy Group: ID Code: Permit Issued: 04/29/2013 Permit Expires: Form Permit Type: Status: COMPLETE Assigned To: Property Parcel# Address Legal Description Owner Name Owner Phone Zoning 00870600009300 17802 TOPPER CRT STACRUZ JOSE& 111 Single Family JOSEPHINE Residence-Detached Contractors Contractor Primary Contact Phone Address Contractor Type License License# EVERGREEN STATE Mark Payne 425-252-3114 2120 Pacific Ave CONSTRUCTION COA 601-724-357 HEAT&A/C CONTRACTOR EVERGREEN STATE Mark Payne 425-252-3114 2120 Pacific Ave CONSTRUCTION Labor&EVERGSS0220T HEAT&A/C CONTRACTOR Industries Inspections Date Inspection Type Description Scheduled Date Completed Date Inspector Status R00.FURNACE Furnace installed per plan.L OS/02/2013 FINAL &I finaled on 5/1/13 O5/02/2013 O5/02/2013 z.Christopher Young Approved Plan Reviews Date Review Type Description Assigned To Review Status 04/24/2013 BLD Change out of gas furnace.Application states that furnace has a AFUE of 80%. Fees Fee Description Notes Amount Forced Air Heat fee per Btu $25.00 Mechanical Base Permit Fee $25.00 Total $50.00 Attached Letters Date Letter Description 04/23/2013 Building Permit Payments Date Paid By Description Payment Type Accepted By Amount Stacruz Jose& 04/29/2013 Evergreen State Heat Josephine check 13241 Launa Black $50.00 17802 Topper Court Outstanding Balance $0.00 Uploaded Files Date File Name 04/23/2013 17802 Topper Apnlication.pdf