Loading...
HomeMy WebLinkAbout6221 180th St Ne_BLD1792 - Reports_2026 741 Marine Drive, Bellingham, WA 98225 www.geotest-inc.com 20611 67th Ave. NE. Unit A.Arlington, WA 98223 GG'OTeST phone:(360) 733.7318 toll free:(888)251.5276 fax:(360) 733.7418 ADHESIVE ANCHOR INSPECTION REPORT PROJECT: Dantrawl JOB#: 18-0376 ADDRESS: 6221 180th Street NE, Arlington, WA REPORT#: AA001 PERMIT#: BLD-1792 DATE: 1/11/2019 CLIENT: Coast Construction Group PAGE#: 1 of 1 CONTRACTOR: Coast Construction Group INSPECTOR: Sean Rogerson Item(s) Inspected Location Slab Dowels Into Top of Footing Along Grid 2 Reference Drawing(s): Approved Structural Drawings, SK-1 Items) Inspected Comments Base Material Condition Sound Concrete Drill Bit Type Concrete Rotohammer Hole Diameter/Depth /� 3/4"X F Hole Cleanliness Good Anchor Spacing/Edge Distance /� 16"On Center Anchor Type /� #5 Deformed Rebar Anchor Diameter/Length /� 5/8"X 45"w/15"Hook Anchor Embedment Y Adhesive Type Simpson SET-XP Adhesive Expiration Date 6-12-20 Adhesive ICC-ES Report 2508 Other ❑ The above items were conforming V Nonconforming Items(see below) ❑ Comments: GeoTest was on site to provide special inspection of epoxied anchors. Items inspected were slab dowels into the footing along 2 line. Weather conditions were the 50s, partly sunny. All installation appeared to be completed per project requirements and manufacturer's recommendations. COPIES:chumphrey@safebuilt.com,dspencer@safebuilt.com,Elias@dantrawl.com,jake.l@coast-group.com, Reviewed by kolander@adingtonwa.gov,Ipeterson@arlingtonwa.gov This report shall not be reproduced except in full,without the written approval of GeoTest Services,Inc. 741 Marine Drive, Bellingham, WA 98225 www.geotest-inc.com 20611 67th Ave. NE. Unit A.Arlington, WA 98223 CyeOTeST phone:(360) 733.7318 toll free:(888)251.5276 fax:(360) 733.7418 ADHESIVE ANCHOR INSPECTION REPORT PROJECT: Dantrawl JOB#: 18-0376 ADDRESS: 6221 180th Street NE, Arlington, WA REPORT#: AA002 PERMIT#: BLD-1792 DATE: 1/14/2019 CLIENT: Coast Construction Group PAGE#: 1 of 2 CONTRACTOR: Coast Construction Group INSPECTOR: Joel Morder Item(s) Inspected Location Concrete Footing Grid C/12,East Half Reference Drawing(s): SDA Letter 8163 Item(s) Inspected Comments Base Material Condition Concrete Footing,Dry Drill Bit Type Concrete Rotohammer Hole Diameter/Depth /� 3/4"X 6" Hole Cleanliness Clean Anchor Spacing/Edge Distance /� 12"On Center Anchor Type /� #5 Rebar L's Anchor Diameter/Length 5/8" Anchor Embedment 6" Adhesive Type Simpson Set-XP Adhesive Expiration Date 8-4-20 Adhesive ICC-ES Report 2508 Other ❑ The above items were conforming /0 Nonconforming Items(see below) ❑ Comments: GeoTest inspected epoxied anchor installation of#5 bent rebar for the west half of the footing located at grid C/12. Hole depth and cleanliness were verified in accordance with SDA letter 8163. COPIES:chumphrey@safebuilt.com,dspencer@safebuilt.com,Elias@dantrawl.com,jake.l@coast-group.com, Reviewed by kolander@adingtonwa.gov,Ipeterson@arlingtonwa.gov This report shall not be reproduced except in full,without the written approval of GeoTest Services,Inc. 741 Marine Drive,Bellingham, WA 98225 www.geotest-inc.com 00Y GG OTG ST 20611 67th Ave. NE. Unit A.Arlington, WA 98223 phone:(360) 733.7318 toll free:(888)251.5276 fax:(360) 733.7418 lqft ADHESIVE ANCHOR INSPECTION REPORT PROJECT: Dantrawl JOB M 18-0376 CLIENT: Coast Construction Group REPORT M AA002 CONTRACTOR: Coast Construction Group PAGE M 2 of 2 While on-site Coast provided video documentation of epoxy activities for the west half of the C/12 footing, completed on Saturday, 1-12-19. The contractor appeared to install anchors correctly and in accordance with SDA letter 8163. However, the adhesive used was Sika Pro Select epoxy, with an expiration date of 7-25-19. Acceptance of the use of this epoxy in place of Simpson Set-XP from the engineer is required for conformance. Installation of#5 Bent Bar for the west half of the footing at Grid C/12. i r .x M 1 fra 741 Marine Drive, Bellingham, WA 98225 www.geotest-inc.com 20611 67th Ave. NE. Unit A.Arlington, WA 98223 CyeOTeST phone:(360) 733.7318 toll free:(888)251.5276 fax:(360) 733.7418 ADHESIVE ANCHOR INSPECTION REPORT PROJECT: Dantrawl JOB#: 18-0376 ADDRESS: 6221 180th Street NE, Arlington, WA REPORT#: AA003 PERMIT#: BLD-1792 DATE: 3/1/2019 CLIENT: Coast Construction Group PAGE#: 1 of 2 CONTRACTOR: Coast Construction Group INSPECTOR: Joel Morder Item(s) Inspected Location A-Repar Dowels SOG Connection Office to Warehouse SOG B-Plinth Repair D/2,B/2,D/14 Reference Drawing(s): SDA letter, Dated 2-1-19& Plinth Repair Drawings Item(s) Inspected Comments Base Material Condition f7 A&B-Concrete,dry Drill Bit Type A&B-Rotohammer Hole Diameter/Depth /� A&B-3/4"X 8" Hole Cleanliness A&B-Clean Anchor Spacing/Edge Distance /� A-18"OC for the SOG Connections,B-Per Plinth Repair Drawings Anchor Type /� A-#5 Reber,B-Per Plinth Repair Drawings Anchor Diameter/Length A&B-5/8"-Varies Anchor Embedment A&B-8" Adhesive Type A&B-Hilti RE 500 V3(Approved in lieu of SET-XP by SDA) Adhesive Expiration Date A&B-12/2019 Adhesive ICC-ES Report Qr A&B-3814 Other ❑ The above items were conforming ❑ Nonconforming Items(see below) [� Comments: GeoTest on site for inspection of epoxy installation at the above referenced locations. The contractor carried out fixes as noted in SDA's letter, dated February 1, 2019 and the plinth repair drawings. Work was found to conform with the Plinth Repair Drawings, except one item noted on page two (Figure 1). COPIES:chumphrey@safebuilt.com,dnhannam@frontier.com,dspencer@safebuilt.com,Elias@dantrawl.com,jake.l@coast- Reviewed by group.com,jasper@sdaeverett.com,kolander@arlingtonwa.gov,Ipeterson@arlingtonwa.gov,Tom@finneyneill.com This report shall not be reproduced except in full,without the written approval of GeoTest Services,Inc. 741 Marine Drive,Bellingham, WA 98225 www.geotest-inc.com 00Y GG OTG ST 20611 67th Ave. NE. Unit A.Arlington, WA 98223 phone:(360) 733.7318 toll free:(888)251.5276 fax:(360) 733.7418 lqft ADHESIVE ANCHOR INSPECTION REPORT PROJECT: Dantrawl JOB M 18-0376 CLIENT: Coast Construction Group REPORT M AA003 CONTRACTOR: Coast Construction Group PAGE M 2 of 2 � - w Figure 1: Conduit Piping Blocking Installation of (1) #5 Bar for slab connection. Engineer review required. + � AMENDED 3/12/19- GeoTest 1 was provided acceptance of EY` this item as-constructed via SDA letter dated 3/8/19. / i 3 I I nf>++n7 Figure 2: Installation of Epoxied Dowels in Progress. 1�v y. y� 51.5276 GEOT E S T I O' @k Harbor Bellingham I Arlington Oak Harborr vvww.geotest-i nc.com i� ADHESIVE ANCHOR INSPECTION REPORT PROJECT: Dantrawl JOB#: 18-0376 ADDRESS: 6221 180th Street NE, Arlington, WA REPORT#: AA004 PERMIT#: BLD-1792 DATE: 4/11/2019 CLIENT: Coast Construction Group PAGE#: 1 of 2 CONTRACTOR: Coast Construction Group INSPECTOR: Tim Martin Item(s) Inspected Location #4 Reinforcing Steel Dowels Load Dock Retaining Wall/Footing Tie-In to Building Reference Drawing(s): Detail 1 on S2.0, Project Architect Email Dated 4/11/19 Item(s) Inspected Comments Base Material Condition Fully Cured Concrete Drill Bit Type Carbide Tip,Rotor Hammer Hole Diameter/Depth /� 5/8,6" Hole Cleanliness Blown,Brushed,Blown Anchor Spacing/Edge Distance /� 12"On Center Anchor Type /� Grade 60 Deformed Reinforcing Steel Anchor Diameter/Length 1/2",34" Anchor Embedment 6" Adhesive Type Simpson Set XP Adhesive Expiration Date 7/2020 Adhesive ICC-ES Report [� 2508 Other ❑ The above items were conforming V Nonconforming Items(see below) ❑ Comments: GeoTest was on site as requested to inspect the installation of the epoxied dowels. COPIES:chumphrey@safebuilt.com,dnhannam@frontier.com,dspencer@safebuilt.com,Elias@dantrawl.com,jake.l@coast- Reviewed by group.com,jasper@sdaeverett.com,kolander@arlingtonwa.gov,Ipeterson@arlingtonwa.gov,stever@coast-group.com, Tom@finneyneill.com This report shall not be reproduced except in full,without the written approval of GeoTest Services,Inc. 51.5276 G EOT E S T I O' @k Harbor Bellingham I Arlington Oak Harborr www.geotest-inc.com ADHESIVE ANCHOR INSPECTION REPORT PROJECT: Dantrawl JOB M 18-0376 CLIENT: Coast Construction Group REPORT#: AA004 CONTRACTOR: Coast Construction Group PAGE M 2 of 2 a Photo of the contractor installing the epoxy and the dowels. o� wit I A / Photo shows the two continuous footings with the retaining wall dowels in place. _ — - ' The reinforcing steel for the . two footings was in place and was found to conform with the t ' retaining wall schedule and detail on S2.0 as well as the x email, dated 4/11/19. 51.5276 GEOT E S T I O' @k Harbor Bellingham I Arlington Oak Harborr vvww.geotest-i nc.com i� ADHESIVE ANCHOR INSPECTION REPORT PROJECT: Dantrawl JOB#: 18-0376 ADDRESS: 6221 180th Street NE, Arlington, WA REPORT#: AA006 PERMIT#: BLD-1792 DATE: 6/3/2019 CLIENT: Coast Construction Group PAGE#: 1 of 2 CONTRACTOR: Coast Construction Group INSPECTOR: Tim Martin Items) Inspected Location Anchor Bolts for Holdowns 27 Locations in the Office Area(Slab on Grade) Reference Drawing(s): Mezzanine Holdown Detail and Schedule Page 7 of 7 Item(s) Inspected Comments Base Material Condition Fully Cured Concrete Drill Bit Type Drilled Prior Hole Diameter/Depth /� 3/4"X 9" Hole Cleanliness Clean Anchor Spacing/Edge Distance /� Per Plan Anchor Type F1554,GR60 Threaded Rod Anchor Diameter/Length 5/8"X 16" Anchor Embedment 9" Adhesive Type Simpson Set-3G Adhesive Expiration Date 12-19 Adhesive ICC-ES Report [� 4057 Other ❑ The above items were conforming V Nonconforming Items(see below) ❑ Comments: GeoTest was on site as requested to inspect the above items. The epoxied anchor bolts were found to conform with the above detail and were installed as recommended by the manufacturer's published recommendations. COPIES:chumphrey@safebuilt.com,dnhannam@frontier.com,dspencer@safebuilt.com,Elias@dantrawl.com,jake.l@coast- Reviewed by group.com,jasper@sdaeverett.com,kolander@arlingtonwa.gov,Ipeterson@arlingtonwa.gov,stever@coast-group.com, Tom@finneyneill.com This report shall not be reproduced except in full,without the written approval of GeoTest Services,Inc. C*O S T ,.8$$.z5,.5��6 Bellingham Arlington I Oak Harbor www.geotest-inc-com M ADHESIVE ANCHOR INSPECTION REPORT PROJECT: Dantrawl JOB M 18-0376 CLIENT: Coast Construction Group REPORT#: AA006 CONTRACTOR: Coast Construction Group PAGE M 2 of 2 Drilled Hole for Holdown Anchor Bolt - ' 51.5276 GEOT E S T I O' @k Harbor Bellingham I Arlington Oak Harborr vvww.geotest-i nc.com i� ADHESIVE ANCHOR INSPECTION REPORT PROJECT: Dantrawl JOB#: 18-0376 ADDRESS: 6221 180th Street NE, Arlington, WA REPORT#: AA007 PERMIT#: BLD-1792 DATE: 6/26/2019 CLIENT: Coast Construction Group PAGE#: 1 of 1 CONTRACTOR: Coast Construction Group INSPECTOR: Dan Weaver Item(s) Inspected Location 7/8"X 10" F1554 Grade 36 Threaded Rod Column to Panel at 14/C(2 Locations) Reference Drawing(s): Engineer Drawing Detail on#8163 Item(s) Inspected -16 Comments Base Material Condition Dry&Sound Concrete Drill Bit Type Hilti Roto Hammer Hole Diameter/Depth /� 1"X 4" Hole Cleanliness Blow,Brush&Blow Anchor Spacing/Edge Distance /� 2 Per Connection Anchor Type F1554 Grade 35 Threaded Rod Anchor Diameter/Length 7/8"X 10" Anchor Embedment 4" Adhesive Type Simpson Set 3G Adhesive Expiration Date 6-2020 Adhesive ICC-ES Report [� 4057 Other ❑ The above items were conforming V/ Nonconforming Items(see below) ❑ Comments: GeoTest was on site to perform a special inspection at the above location. The post installed type 'A' retrofit anchors were found to conform with approved engineered details and the manufacturers published instructions. COPIES:chumphrey@safebuilt.com,dnhannam@frontier.com,dspencer@safebuilt.com,Elias@dantrawl.com,jake.l@coast- Reviewed by group.com,jasper@sdaeverett.com,kolander@arlingtonwa.gov,Ipeterson@arlingtonwa.gov,stever@coast-group.com, Tom@finneyneill.com This report shall not be reproduced except in full,without the written approval of GeoTest Services,Inc. 51.5276 GEOT E S T I O' @k Harbor Bellingham I Arlington Oak Harborr vvww.geotest-i nc.com i� ADHESIVE ANCHOR INSPECTION REPORT PROJECT: Dantrawl JOB#: 18-0376 ADDRESS: 6221 180th Street NE, Arlington, WA REPORT#: AA008 PERMIT#: BLD-1792 DATE: 6/28/2019 CLIENT: Coast Construction Group PAGE#: 1 of 2 CONTRACTOR: Coast Construction Group INSPECTOR: Tim Martin Item(s) Inspected Location Anchor Bolts for Type A Panel Connections to Rigid Frame East Elevation at Line B/2,6 and 11 Reference Drawing(s): SDA Ref. #8163- Panel Connection Type 'A' Details Item(s) Inspected Comments Base Material Condition Fully Cured Concrete, Dry,670 Drill Bit Type Carbide Tip Roto-Hammer Hole Diameter/Depth /� 1",3-3/4"to 4-1/4" Hole Cleanliness Blown,Brushed and Blown Clean Anchor Spacing/Edge Distance /� Per Plan Anchor Type Threaded Rod Anchor Diameter/Length 7/8",9" Anchor Embedment 3-3/4"to 4-1/4" Adhesive Type Simpson Set G3 Adhesive Expiration Date 7/2020 Adhesive ICC-ES Report [� 2508 Other ❑ The above items were conforming V Nonconforming Items(see below) ❑ Comments: GeoTest was on-site as requested to inspect the above items. The 7/8" bolts for the Burke Inserts were found to conform to the type 'A' Retrofit Panel Connection Detail. {vim COPIES:chumphrey@safebuilt.com,dnhannam@frontier.com,dspencer@safebuilt.com,Elias@dantrawl.com,jake.l@coast- Reviewed by group.com,jasper@sdaeverett.com,kolander@arlingtonwa.gov,Ipeterson@arlingtonwa.gov,stever@coast-group.com, Tom@finneyneill.com This report shall not be reproduced except in full,without the written approval of GeoTest Services,Inc. C*O S T ,.8$$.z5,.5��6 Bellingham I Arlington I Oak Harbor www.geotest-inc.com M ADHESIVE ANCHOR INSPECTION REPORT PROJECT: Dantrawl JOB M 18-0376 CLIENT: Coast Construction Group REPORT#: AA008 CONTRACTOR: Coast Construction Group PAGE M 2 of 2 qk. 4 The photo shows the I, contractor using a drill with a stiff bottle-brush to clean the holes. This process was followed by blowing the holes with compressed air. 51.5276 GEOT E S T I O' @k Harbor Bellingham I Arlington Oak Harborr vm w.geotest-inc.com i� ADHESIVE ANCHOR INSPECTION REPORT PROJECT: Dantrawl JOB#: 18-0376 ADDRESS: 6221 180th Street NE, Arlington, WA REPORT#: AA009 PERMIT#: BLD-1792 DATE: 7/11/2019 CLIENT: Coast Construction Group PAGE#: 1 of 1 CONTRACTOR: Coast Construction Group INSPECTOR: Noah Griffin Item(s) Inspected Location Anchor Bolts for Type A Panel Connections to Rigid Frame North,South,and West Elevations Reference Drawing(s): SDA Ref. #8163- Panel Connection Type'A' Details Item(s) Inspected Comments Base Material Condition Sound Concrete Drill Bit Type Rotohammer Hole Diameter/Depth /� 1",3-3/4"-4-1/4" Hole Cleanliness Good-Blow,Brush,Blow Anchor Spacing/Edge Distance /� Per Plan Anchor Type F1554 Threaded Rod Anchor Diameter/Length 7/8"/9" Anchor Embedment 3-3/4"-4-1/4" Adhesive Type Simpson Set 3G Adhesive Expiration Date 07/2020 Adhesive ICC-ES Report [� 2508 Other ❑ The above items were conforming &f Nonconforming Items(see below) ❑ Comments: GeoTest was on-site as requested to inspect the above items. The 7/8" bolts for the Burke Inserts were found to conform to the type 'A' Retrofit Panel Connection Detail. COPIES:chumphrey@safebuilt.com,dnhannam@frontier.com,dspencer@safebuilt.com,Elias@dantrawl.com,jake.l@coast- Reviewed by group.com,jasper@sdaeverett.com,kolander@arlingtonwa.gov,Ipeterson@arlingtonwa.gov,stever@coast-group.com, Tom@finneyneill.com This report shall not be reproduced except in full,without the written approval of GeoTest Services,Inc. 51.5276 GEOT E S T I O' @k Harbor Bellingham I Arlington Oak Harborr vvww.geotest-i nc.com i� ADHESIVE ANCHOR INSPECTION REPORT PROJECT: Dantrawl JOB#: 18-0376 ADDRESS: 6221 180th Street NE, Arlington, WA REPORT#: AA010 PERMIT#: BLD-1792 DATE: 7/17/2019 CLIENT: Coast Construction Group PAGE#: 1 of 2 CONTRACTOR: Coast Construction Group INSPECTOR: Ben Fox Item(s) Inspected Location #4 Rebar Dowels Building Slab to Apron Connection at Overhead Doors on all Sides of Building Reference Drawing(s): 4/A3 Item(s) Inspected Comments Base Material Condition Sound Concrete Drill Bit Type ANSI SDS Roto-Hammer Hole Diameter/Depth /� 5/8"by 4" Hole Cleanliness ❑ Blown,Brushed,Blown Anchor Spacing/Edge Distance /� Per Plan, 18"on Center Anchor Type /� Rebar Anchor Diameter/Length /� 1/2"by 12"or 36" Anchor Embedment 4" Adhesive Type Simpson Set-XP Adhesive Expiration Date 9/13/2020 and 8/4/2020 Adhesive ICC-ES Report [� 2508 Other ❑ The above items were conforming V Nonconforming Items(see below) ❑ Comments: GeoTest performed a special inspection of the installation of the epoxied rebar dowels for the apron to building slab connection in front of the overhead doors on the east (1 door), north (3 doors), west (1 door), and south (1 door) sides of the building. All items conformed to the approved project drawings and manufacturer's installation instructions. COPIES:chumphrey@safebuilt.com,dnhannam@frontier.com,dspencer@safebuilt.com,Elias@dantrawl.com,jake.l@coast- Reviewed by group.com,jasper@sdaeverett.com,kolander@arlingtonwa.gov,Ipeterson@arlingtonwa.gov,stever@coast-group.com, Tom@finneyneill.com This report shall not be reproduced except in full,without the written approval of GeoTest Services,Inc. 51.5276 G EOT E S T I O' @k Harbor Bellingham I Arlington Oak Harborr www.geotest-inc-com ADHESIVE ANCHOR INSPECTION REPORT PROJECT: Dantrawl JOB M 18-0376 CLIENT: Coast Construction Group REPORT#: AA010 CONTRACTOR: Coast Construction Group PAGE M 2 of 2 A photo during the blowing out of a hole using an air compressor. The photo k1L was taken on the east side of the building at the overhead door and facing ,, Ali:- west. - A,.. ilk ` yar k i ' , .. A photo after the _ installation of the rebar - - dowels/Simpson Set XP epoxy. The photo was - - taken on the north side of the building and facing southeast. 51.5276 GEOT E S T I O' @k Harbor Bellingham I Arlington Oak Harborr vvww.geotest-i nc.com i� Hot Mix Asphalt Compaction Report PROJECT: Dantrawl JOB#: 18-0376 ADDRESS: 6221 180th Street NE, Arlington, WA REPORT#: AC001 PERMIT#: BLD-1792 DATE: 8/1/2019 CLIENT: Coast Construction Group PAGE#: 1 of 2 CONTRACTOR: Coast Construction Group INSPECTOR: Jacob Rector HMA Class: J V 3/8" Source Smith Island Plan Depth,in. 4.00 3/4" Other 0 Leveling ❑Wearing &fBase Rice Density,pcf 159.7 1/2" 3/4"ATB Weather Sunny 70s Correlation Factor 1.000 Gauge Make/Model/Serial#Troxler/3440/29778 Calibration Date/Source: April 20,2019/NITS MID Standard Count#: 676/1710 Test Method: T355 Lot# Quantity,tons Beginning Sta. Ending Sta. Lot Length,ft. Lot Width,ft. Lane HMA Test Temp.,°F 1 410 U Lt. U EB L-*NB U Other NT LJ Rt. LJ WB IIIeSB t Station Offset Density Corrected Compaction% d"Mpcf Density, pcf Attained Required 1 STA 5+00 Center of NB Lane 142.4 142.4 89.2 80.0 2 STA 2+00 Center of NB Lane 145.5 145.5 91.1 80.0 3 STA 6+00 Center of SB Lane 142.0 142.0 88.9 80.0 4 STA 3+00 Center of SB Lane 145.3 145.3 91.0 80.0 5 STA 1+00 Center of SB Lane 141.7 141.7 88.7 80.0 Lot# Quantity,tons Beginning Sta. Ending Sta. Lot Length,ft. Lot Width,ft. Lane HMA Test Temp.,°F 0 Lt. D EB 0 NB D Other DRt. DWB [I SB est Station Offset Density Corrected Compaction% No. pcf Density, pcf Attained Required Comments: GeoTest was on site as requested to provide compaction testing and observation of asphalt placement on 63rd Ave. All locations are approximate. A 4" lift of 3/4" ATB was placed and compacted using a large vibratory roller. A total of 410 tons of ATB was placed on this date. Compaction at test locations met project requirements. COPIES:chumphrey@safebuilt.com,dnhannam@frontier.com,dspencer@safebuilt.com,Elias@dantrawl.com,jake.l@coast- Reviewed by group.com,jasper@sdaeverett.com,kolander@arlingtonwa.gov,Ipeterson@arlingtonwa.gov,stever@coast-group.com, Tom@finneyneill.com This report shall not be reproduced except in full,without the written approval of GeoTest Services,Inc. The above test results relate only to the sample(or location)tested. C*O S T ,.8$$.z5,.5��6 Bellingham Arlington I Oak Harbor www.geotest-inc.com Hot Mix Asphalt Compaction Report PROJECT: Dantrawl JOB#: 18-0376 CLIENT: Coast Construction Group REPORT#: AC001 CONTRACTOR: Coast Construction Group PAGE#: 2 of 2 ATB placement on 63rd Ave looking NE. i 51.5276 GEOT E S T I O' @k Harbor Bellingham I Arlington Oak Harborr vvww.geotest-i nc.com i� Hot Mix Asphalt Compaction Report PROJECT: Dantrawl JOB#: 18-0376 ADDRESS: 6221 180th Street NE, Arlington, WA REPORT#: AC002 PERMIT#: BLD-1792 DATE: 8/1/2019 CLIENT: Coast Construction Group PAGE#: 1 of 2 CONTRACTOR: Coast Construction Group INSPECTOR: Jacob Rector HMA Class: Ej V ❑ 3/8" Source Smith Island Plan Depth,in. 3.00 Ej 3/4" ❑ Other 0 Leveling IVWearing ❑Base Rice Density,pcf 158.2 Rr 1/2" Weather Sunny 70s Correlation Factor 1.000 Gauge Make/Model/Serial#Troxler/3440/29778 Calibration Date/Source: April 20,2019/NITS MID Standard Count#: 676/1710 Test Method: T355 Lot# Quantity,tons Beginning Sta. Ending Sta. Lot Length,ft. Lot Width,ft. Lane HMA Test Temp.,°F 1 316.63 U Lt. U EB L40'N13 U Other LJ Rt. Lj WB ileSI3 st Station Offset Density Corrected Compaction% pcf Density, pcf Attained Required 1 STA 6+00 Center of NB Lane 146.4 146.4 92.5 92.0 2 STA 3+00 Center of NB Lane 145.6 145.6 92.0 92.0 3 STA 1+00 Center of NB Lane 145.5 145.5 92.0 92.0 4 STA 5+00 Center of SB Lane 145.9 145.9 92.2 92.0 5 STA 2+00 Center of SB Lane 145.7 145.7 92.1 92.0 Lot# Quantity,tons Beginning Sta. Ending Sta. Lot Length,ft. Lot Width,ft. Lane HMA Test Temp.,°F 17 Lt. D EB [1 NB D Other DRt. DWB DSB est Station Offset Density Corrected Compaction% No. pcf Density, pcf Attained Required Comments: GeoTest was on site as requested to provide hot mix asphalt compaction testing and placement observation on the 63rd Ave roadway. All locations are approximate. A 3" wearing lift of 1/2" HMA was placed and compacted using dual drum vibratory rollers. A total of 316.63 tons was placed on this date. Compaction at test locations met requirements established by the approved plans. COPIES:chumphrey@safebuilt.com,dnhannam@frontier.com,dspencer@safebuilt.com,Elias@dantrawl.com,jake.l@coast- Reviewed by group.com,jasper@sdaeverett.com,kolander@arlingtonwa.gov,Ipeterson@arlingtonwa.gov,stever@coast-group.com, Tom@finneyneill.com This report shall not be reproduced except in full,without the written approval of GeoTest Services,Inc. The above test results relate only to the sample(or location)tested. C*O S T ,.8$$.z5,.5��6 Bellingham I Arlington I Oak Harbor www.geotest-inc.com Hot Mix Asphalt Compaction Report PROJECT: Dantrawl JOB#: 18-0376 CLIENT: Coast Construction Group REPORT#: AC002 CONTRACTOR: Coast Construction Group PAGE#: 2 of 2 Placement and compaction on ; NB lane (looking SE). �� •�.�� �': � Yam. _ r 741 Marine Drive, Bellingham, WA 98225 www.geotest-inc.com 0�jp Gy OTG ST 20611 67th Ave.NE. Unit A.Arlington, WA 98223 phone:(360) 733.7318 toll free:(888)251.5276 fax:(360) 733.7418 Concrete Inspection & Compressive Strength Test Report PROJECT: Dantrawl JOB#: 18-0376 ADDRESS: 6321 180th Street NE,Arlington, WA REPORT#: CB002 PERMIT M BLD-1792 DATE: 11/30/2018 CLIENT: Coast Construction Group PAGE#: 1 of 2 CONTRACTOR: Coast Construction INSPECTOR: Dan Weaver Placement Location: Interior Spread Footings at C&3-11, Exterior Wall and Spread Footings at B&2-13 Sample Location: 1st Truck 10 Cubic Yard Load Field Data: Eq. No. Supplier Stanwood Redi-Mix Slump, in.(C143) 3.50 25 Mix# 50420C Air Content, %(C231) N/T Mix Description 5Sk, Fly Ash, Pozz 80&3/4"Aggregate Unit Weight,pcf(C138) N/T Truck/Ticket# 82/155037 Air/Mix Temp.,°F(C1064) 49/57 DW06 Strength Required 3000 psi at 28 days Field Cure Temperature,°F 40/67 Quantity Placed,cy 120 Cure Method-Initial/Final Container/Water Tank Time Batched 7:37 AM Water Added on Job,gals 0 Time Sampled 8:15 AM Water Requested by Laboratory Data: Lab Test Age Test Total Load Avg.D Area Compressive No. (Days) Date (Ibs) (in) (in 2) Strength (psi) Remarks 89918 7 12-07 31100 4.01 12.63 2460 TYPE 2: 89919 28 12-28 53870 4.01 12.63 4270 TYPE 2: 89920 28 12-28 54040 4.01 12.63 4280 TYPE 2: 89921 28 12-28 57210 4.01 12.63 4530 TYPE 2: 89922 Hold 00-00 0 0.00 0.00 0 Reinforcement Inspection Yes n/a: not applicable Specimen Size 4"X 8" Reinforcement Conforms Yes n/t: not tested Test Reference ASTM C31/C39/C1231 Comments: GeoTest was on site to perform reinforced concrete special inspection at the above location. The reinforcing steel and anchor bolts were in place and found to conform to the approved plans. Concrete was placed directly from truck chute and internally vibrated. COPIES:chumphrey@safebuilt.com,dspencer@safebuilt.com,Elias@dantrawl.com,ericflones@stanwoodredi-mix.com, Reviewed by jake.l@coast-group.com,kolander@arlingtonwa.gov,Ipeterson@arlingtonwa.gov This report shall not be reproduced except in full,without the written approval of GeoTest Services,Inc. The above test results relate to the sample(or location)tested. 741 Marine Drive,Bellingham, WA 98225 www.geotest-inc.com 00Y GG OTG ST 20611 67th Ave. NE. Unit A.Arlington, WA 98223 NSI phone:(360) 733.7318 toll free:(888)251.5276 fax:(360) 733.7418 Concrete Inspection & Compressive Strength Test Report PROJECT: Dantrawl JOB M 18-0376 CLIENT: Coast Construction Group REPORT M CB002 CONTRACTOR: Coast Construction PAGE#: 2 of 2 View Looking South of Exterior Perimeter Footing , Line r' L i 741 Marine Drive, Bellingham, WA 98225 www.geotest-inc.com 0�jp Gy OTG ST 20611 67th Ave.NE. Unit A.Arlington, WA 98223 phone:(360) 733.7318 toll free:(888)251.5276 fax:(360) 733.7418 Concrete Inspection & Compressive Strength Test Report PROJECT: Dantrawl JOB#: 18-0376 ADDRESS: 6321 180th Street NE,Arlington, WA REPORT#: CB003 PERMIT M BLD-1792 DATE: 12/7/2018 CLIENT: Coast Construction Group PAGE#: 1 of 3 CONTRACTOR: Coast Construction Group INSPECTOR: Noah Griffin Placement Location: Continuous and Spread Footings(See Images 1 &2) Sample Location: 2nd Truck, 10 Cubic Yard Load Field Data: Eq. No. Supplier Stanwood Redi-Mix Slump, in.(C143) 6.00 24 Mix# 50420C Air Content, %(C231) NT Mix Description 5 Sack,3/4"Agg., Hot Water Unit Weight,pcf(C138) NT Truck/Ticket# 95/155276 Air/Mix Temp.,°F(C1064) 45/60 NG2 Strength Required 3000 psi at 28 days Field Cure Temperature,°F 52-77 Quantity Placed,cy 40 Cure Method-Initial/Final Temp.Control/Water Tank Time Batched 1:31 PM Water Added on Job,gals 0 Time Sampled 2:00 PM Water Requested by Laboratory Data: Lab Test Age Test Total Load Avg.D Area Compressive No. (Days) Date (Ibs) (in) (in 2) Strength (psi) Remarks 90139 7 12-14 34760 4.01 12.63 2750 TYPE 2: 90140 28 01-04 48670 4.01 12.63 3850 TYPE 2: 90141 28 01-04 54300 4.01 12.63 4300 TYPE 2: 90142 28 01-04 53080 4.01 12.63 4200 TYPE 2: 90143 Hold 00-00 0 0.00 0.00 0 Reinforcement Inspection Yes n/a: not applicable Specimen Size 4"X 8" Reinforcement Conforms Yes n/t: not tested Test Reference ASTM C31/C39/C1231 Comments: GeoTest was on-site as requested to provide special inspection of new foundation elements at the locations shown in images 1 and 2. Concrete was delivered via pump truck and received mechanical consolidation. Reinforcement was inspected and was found to conform to the approved structural plans. COPIES:chumphrey@safebuilt.com,dspencer@safebuilt.com,Elias@dantrawl.com,ericflones@stanwoodredi-mix.com, Reviewed by jake.l@coast-group.com,kolander@arlingtonwa.gov,Ipeterson@arlingtonwa.gov This report shall not be reproduced except in full,without the written approval of GeoTest Services,Inc. The above test results relate to the sample(or location)tested. 741 Marine Drive,Bellingham, WA 98225 www.geotest-inc.com CMG OTG'ST 20611 67th Ave. NE. Unit A.Arlington, WA 98223 phone:(360) 733.7318 toll free:(888)251.5276 fax:(360) 733.7418 Concrete Inspection & Compressive Strength Test Report PROJECT: Dantrawl JOB M 18-0376 CLIENT: Coast Construction Group REPORT M CB003 CONTRACTOR: Coast Construction Group PAGE#: 2 of6 3 4 Y Y 111GCm ear Y Y Y Y Image 1: Footings poured on 72722 _, 2{N r_ti, 2424 -,-_,L�J- -12424 r_F, 2424 r-ti, 2411 r'-7-1 this date (1 of 2). -_o r-- -' -- '- - ' ' - -, r-- -, r-- - _J L_ J L_ J I _J r 7Z7221 unu nn" nn24 nn21 nnu I I I - B.2 EOC LEVELER PIT r 1 SEE FAILOR I I 1 -44 aws 2411 10N I I I I I I e L' J L__J L__J 78782/ I 127211 1 n722/ 31Mn 24 17272R 1 n7 2121 I � I I I I I I I I I I I I I ly I I 1 2/N g 1 727221 11 111 t,1 11127221 r- 72772/L_ 2424 L - Image 2: Footings poured on s�ss2 this date (2 of 2). ,�--,--- 2424 -- --; �%1 2424 - -�-�LL :414 '• t I-- ._,._. _.� �� .J 4=:•T,•-� "�• SEE 57.2 L__ o11 k,l L__ __J- L J _•�., 22.x V;• Cut [,i IL o_J I_-J L_J pc 5151I1 666618 7J7319 2� "� l•• SEE 51.2 k; 424'2 545412 _ l .1 r-- PIN � •11L I ' I ' I (� 1;• pF 74'.n'oa rYc 66661A 7J798 2474 •.•i l - ®, r Lj�- 9' S15412 24241 ]] {{ L_J YIY _ .1 S4q t - I L---�-� - - -- —=— - - L J <2412 L J 2411 H J VIM S71 2tl 1 T S3.2 ^P 5f1 r 2424 FOUNDATION PLAN AT OFFICE —�v _ ----- 11r-1-T SEE Fl SHEET 741 Marine Drive,Bellingham, WA 98225 www.geotest-inc.com 00Y GG OTG ST 20611 67th Ave. NE. Unit A.Arlington, WA 98223 phone:(360) 733.7318 toll free:(888)251.5276 fax:(360) 733.7418 Concrete Inspection & Compressive Strength Test Report PROJECT: Dantrawl JOB M 18-0376 CLIENT: Coast Construction Group REPORT M CB003 CONTRACTOR: Coast Construction Group PAGE M 3 of 3 Image 3: Interior spread 1%1 footings in the office area. r�t 741 Marine Drive, Bellingham, WA 98225 www.geotest-inc.com 0�jp Gy OTG ST 20611 67th Ave.NE. Unit A.Arlington, WA 98223 phone:(360) 733.7318 toll free:(888)251.5276 fax:(360) 733.7418 Concrete Inspection & Compressive Strength Test Report PROJECT: Dantrawl JOB#: 18-0376 ADDRESS: 6221 180th Street NE,Arlington, WA REPORT#: CB004 PERMIT M BLD-1792 DATE: 12/13/2018 CLIENT: Coast Construction Group PAGE#: 1 of 2 CONTRACTOR: Coast Construction Group INSPECTOR: Tristan Coragiulo Placement Location: Spread and Continuous Footings(Outside Perimeter of Gridline Area B-C/13-14) Sample Location: First Truck, Mid-Pour, Directly from Chute Field Data: Eq. No. Supplier Stanwood Redi-Mix Slump, in.(C143) 3.00 9 Mix# 50420C Air Content, %(C231) NT Mix Description 4.3 Sack, Pozz 80, Fly Ash Unit Weight,pcf(C138) NT Truck/Ticket# 87/155419 Air/Mix Temp.,°F(C1064) 47/57 TC5 Strength Required 3000 psi at 28 days Field Cure Temperature,°F 45/57 Quantity Placed,cy 40 Cure Method-Initial/Final Container/Water Tank Time Batched 9:34 AM Water Added on Job,gals 10 Time Sampled 10:30 AM Water Requested by Contractor Laboratory Data: Lab Test Age Test Total Load Avg.D Area Compressive No. (Days) Date (Ibs) (in) (in 2) Strength (psi) Remarks 90329 8 12-21 37430 4.01 12.63 2960 TYPE 2: 90330 28 01-10 58910 4.01 12.63 4660 TYPE 2: 90331 28 01-10 57010 4.01 12.63 4510 TYPE 2: 90332 28 01-10 58270 4.01 12.63 4610 TYPE 2: 90333 Hold 00-00 0 0.00 0.00 0 Possible Cylinder Damage Reinforcement Inspection Yes n/a: not applicable Specimen Size 4"X 8" Reinforcement Conforms Yes n/t: not tested Test Reference ASTM C31/C39/C1231 Comments: GeoTest was on-site as requested to provide concrete placement, reinforcement inspection, and concrete testing for the above locations. Spread, continuous, and elevator footing reinforcement was found to conform with details referenced on pages S3, S4, ST Concrete was placed directly from the truck chute, mechanically consolidated, and was hand finished. GeoTest will return for further inspection and observation as requested. COPIES:chumphrey@safebuilt.com,dspencer@safebuilt.com,Elias@dantrawl.com,ericflones@stanwoodredi-mix.com, Reviewed by jake.l@coast-group.com,kolander@arlingtonwa.gov,Ipeterson@arlingtonwa.gov This report shall not be reproduced except in full,without the written approval of GeoTest Services,Inc. The above test results relate to the sample(or location)tested. 741 Marine Drive,Bellingham, WA 98225 www.geotest-inc.com 00Y GG OTG ST 20611 67th Ave. NE. Unit A.Arlington, WA 98223 phone:(360) 733.7318 toll free:(888)251.5276 fax:(360) 733.7418 Concrete Inspection & Compressive Strength Test Report PROJECT: Dantrawl JOB M 18-0376 CLIENT: Coast Construction Group REPORT M CB004 CONTRACTOR: Coast Construction Group PAGE M 2 of 2 ., - Figure 1. Inspected concrete reinforcement as well as � `` -'' concrete placement within the elevator pit (looking south). - - - 741 Marine Drive, Bellingham, WA 98225 www.geotest-inc.com 0�jp Gy OTG ST 20611 67th Ave.NE. Unit A.Arlington, WA 98223 phone:(360) 733.7318 toll free:(888)251.5276 fax:(360) 733.7418 Concrete Inspection & Compressive Strength Test Report PROJECT: Dantrawl JOB#: 18-0376 ADDRESS: 6221 180th Street NE,Arlington, WA REPORT#: CB005 PERMIT M BLD-1792 DATE: 1/5/2019 CLIENT: Coast Construction Group PAGE#: 1 of 3 CONTRACTOR: Coast Construction Group INSPECTOR: Paul Jackson Placement Location: Dock Leveler Slab, Elevator Pit Walls, 18 X 18 Column, Footing on North Side of Office Sample Location: Middle of 36th Load at 389-CY Total at the Smartcap Project Field Data: Eq. No. Supplier Stanwood Redi-Mix Slump, in.(C143) 5.25 23 Mix# 65120 Air Content, %(C231) NT Mix Description 6.5 Sack,3/4", No Air,2%AC 534 Unit Weight,pcf(C138) NT Truck/Ticket# 95/156078 Air/Mix Temp.,°F(C1064) 51 /57 PJ009 Strength Required 3000 psi at 28 days Field Cure Temperature,°F 40/68 Quantity Placed,cy —7-CY Cure Method-Initial/Final Water Immersed/Water Tank Time Batched 11:30 AM Water Added on Job,gals 0 Time Sampled 12:30 PM Water Requested by Laboratory Data: Lab Test Age Test Total Load Avg.D Area Compressive No. (Days) Date (Ibs) (in) (in 2) Strength (psi) Remarks 90926 7 01-12 60590 4.01 12.63 4800 TYPE 2: Piggbacked Sample#90921 90927 28 02-02 83590 4.00 12.57 6650 TYPE 2: Piggbacked Sample#90922 90928 28 02-02 78970 4.00 12.57 6280 TYPE 2: Piggbacked Sample#90923 90929 28 02-02 81040 4.00 12.57 6450 TYPE 2: Piggbacked Sample#90924 90930 Hold 00-00 0 0.00 0.00 0 Piggbacked Sample#90925 Reinforcement Inspection NT n/a: not applicable Specimen Size 4"X 8" Reinforcement Conforms NT n/t: not tested Test Reference ASTM C31/C39/C1231 Comments: GeoTest was onsite as requested by the contractor to provide concrete testing and to cast concrete test cylinders for the concrete placed at the above-referenced location. Steel reinforcement was inspected prior to placement (See GeoTest report IR003, dated 1/4/2019). Concrete was placed via truck chute and was hand finished. This pour occurred concurrently with 18-0734 Smartcap (See GeoTest report C13005, dated 1/5/2019). One set of cylinders was made for both reports. COPIES:chumphrey@safebuilt.com,dspencer@safebuilt.com,Elias@dantrawl.com,ericflones@stanwoodredi-mix.com, Reviewed by jake.l@coast-group.com,kolander@arlingtonwa.gov,Ipeterson@arlingtonwa.gov This report shall not be reproduced except in full,without the written approval of GeoTest Services,Inc. The above test results relate to the sample(or location)tested. 741 Marine Drive,Bellingham, WA 98225 www.geotest-inc.com 00Y GG OTG ST 20611 67th Ave. NE. Unit A.Arlington, WA 98223 phone:(360) 733.7318 toll free:(888)251.5276 fax:(360) 733.7418 Concrete Inspection & Compressive Strength Test Report PROJECT: Dantrawl JOB M 18-0376 CLIENT: Coast Construction Group REPORT M CB005 CONTRACTOR: Coast Construction Group PAGE#: 2 of 3 �`k' t t ♦ ' 11 I.1'd 11 ' Photo 1: Looking at elevator pit walls and 18" � _- r •r is X 18" column. :. i J { f . 1 - - Photo 2: Looking at the footing placed on the north side of the office. _ ` i r 741 Marine Drive,Bellingham, WA 98225 www.geotest-inc.com 00Y GG OTG ST 20611 67th Ave. NE. Unit A.Arlington, WA 98223 phone:(360) 733.7318 toll free:(888)251.5276 fax:(360) 733.7418 lqft Concrete Inspection & Compressive Strength Test Report PROJECT: Dantrawl JOB M 18-0376 CLIENT: Coast Construction Group REPORT M CB005 CONTRACTOR: Coast Construction Group PAGE#: 3 of 3 r-- - Photo 3: Looking at the dock leveler slab. wf.::. r_. Pw y Q" 741 Marine Drive, Bellingham, WA 98225 www.geotest-inc.com 0�jp Gy OTG ST 20611 67th Ave.NE. Unit A.Arlington, WA 98223 phone:(360) 733.7318 toll free:(888)251.5276 fax:(360) 733.7418 Concrete Inspection & Compressive Strength Test Report PROJECT: Dantrawl JOB#: 18-0376 ADDRESS: 6221 180th Street NE,Arlington, WA REPORT#: CB006 PERMIT M BLD-1792 DATE: 1/8/2019 CLIENT: Coast Construction Group PAGE#: 1 of 2 CONTRACTOR: Coast Construction Group INSPECTOR: Paul Jackson Placement Location: Dock Leveler Wall at 2&6.3-13.5 and Footing at C& 12-14, 14&C-D Sample Location: Dock Leveler Wall, 1 st Truck, Mid Load Field Data: Eq. No. Supplier Stanwood Redi-Mix Slump, in.(C143) 5.00 23 Mix# 65120 Air Content, %(C231) NT Mix Description 6.5 Sack,3/4", No Air,2%AC 534 Unit Weight,pcf(C138) NT Truck/Ticket# 83/156162 Air/Mix Temp.,°F(C1064) 49/53 PJO Strength Required 3000 psi at 28 days Field Cure Temperature,°F 42/63 Quantity Placed,cy —14 Cure Method-Initial/Final Container/Water Tank Time Batched 1:38 PM Water Added on Job,gals 0 Time Sampled 2:16 PM Water Requested by Laboratory Data: Lab Test Age Test Total Load Avg.D Area Compressive No. (Days) Date (Ibs) (in) (in 2) Strength (psi) Remarks 91016 7 01-15 33740 4.01 12.63 2670 TYPE 2: 91017 28 02-05 51700 4.01 12.63 4090 TYPE 2: 91018 28 02-05 53140 4.01 12.63 4210 TYPE 2: 91019 28 02-05 47700 4.01 12.63 3780 TYPE 2: 91020 Hold 00-00 0 0.00 0.00 0 Reinforcement Inspection Yes n/a: not applicable Specimen Size 4"X 8" Reinforcement Conforms Yes n/t: not tested Test Reference ASTM C31/C39/C1231 Comments: GeoTest was onsite as requested by the contractor to provide concrete testing and to cast concrete test cylinders for the concrete placed at the above-referenced location. Steel reinforcement was inspected immediately prior to placement (See GeoTest Inspection report IR004, dated 1/8/2019). Concrete was placed via truck chute and was hand finished. COPIES:chumphrey@safebuilt.com,dspencer@safebuilt.com,Elias@dantrawl.com,ericflones@stanwoodredi-mix.com, Reviewed by jake.l@coast-group.com,kolander@arlingtonwa.gov,Ipeterson@arlingtonwa.gov This report shall not be reproduced except in full,without the written approval of GeoTest Services,Inc. The above test results relate to the sample(or location)tested. 741 Marine Drive,Bellingham, WA 98225 www.geotest-inc.com 00Y GG OTG ST 20611 67th Ave. NE. Unit A.Arlington, WA 98223 phone:(360) 733.7318 toll free:(888)251.5276 fax:(360) 733.7418 Concrete Inspection & Compressive Strength Test Report PROJECT: Dantrawl JOB M 18-0376 CLIENT: Coast Construction Group REPORT M CB006 CONTRACTOR: Coast Construction Group PAGE M 2 of 2 83 Photo 1: Looking at the contractor placing t concrete for the dock leveler stem walls at 2 & B.3-B.5. c" it Photo 2: Looking at the contractor placing concrete for footings at C & 12-14, 14 & C-D. 741 Marine Drive, Bellingham, WA 98225 www.geotest-inc.com 0�jp Gy OTG ST 20611 67th Ave.NE. Unit A.Arlington, WA 98223 phone:(360) 733.7318 toll free:(888)251.5276 fax:(360) 733.7418 Concrete Inspection & Compressive Strength Test Report PROJECT: Dantrawl JOB#: 18-0376 ADDRESS: 6221 180th Street NE,Arlington, WA REPORT#: CB007 PERMIT M BLD-1792 DATE: 1/14/2019 CLIENT: Coast Construction Group PAGE#: 1 of 3 CONTRACTOR: Coast Construction Group INSPECTOR: Joel Morder Placement Location: Slab-On-Grade Located at Grids B-D/8-11.3 and C-D/11.3-14 Sample Location: Slab-On-Grade Beginning at Approximate Grid C.3/8.2 Field Data: Eq. No. Supplier Stanwood Redi-Mix Slump, in.(C143) 5.00 15 Mix# 65120 Air Content, %(C231) NT Mix Description 6.5 SACK,3/4"Agg. NO AIR Unit Weight,pcf(C138) NT Truck/Ticket# 98/156296 Air/Mix Temp.,°F(C1064) 25/65 Strength Required 3000 psi at 28 days Field Cure Temperature,°F NT Quantity Placed,cy 250 Cure Method-Initial/Final Container/Water Tank Time Batched 4:45 AM Water Added on Job,gals 0 Time Sampled 5:20 AM Water Requested by Laboratory Data: Lab Test Age Test Total Load Avg.D Area Compressive No. (Days) Date (Ibs) (in) (in2) Strength (psi) Remarks 91241 7 01-21 56600 4.01 12.63 4480 TYPE 2: 91242 28 02-11 71430 4.00 12.57 5680 TYPE 5: 91243 28 02-11 71800 4.00 12.57 5710 TYPE 5: 91244 28 02-11 75080 4.00 12.57 5970 TYPE 5: 91245 Hold 00-00 0 0.00 0.00 0 Reinforcement Inspection Yes n/a: not applicable Specimen Size 4"X 8" Reinforcement Conforms Yes n/t: not tested Test Reference ASTM C31/C39/C1231 Comments: GeoTest on-site for inspection of the slab on grade located at grids B-D/8-11.3 and C-D/11.3-14. Performed final inspection of steel, which was in conformance with structural drawings except that hairpins at AB's did not have adequate coverage at the outer edge of forms. Concrete was placed by pump and consolidated through mechanical vibration, and mechanical screed. *The Stanwood Redi-Mix QC provided the thermometer for mix temperature readings. AMENDED 3/1/19: Error identified in Mix desc.; updated for accuracy. .f.esr COPIES:chumphrey@safebuilt.com,dspencer@safebuilt.com,Elias@dantrawl.com,ericflones@stanwoodredi-mix.com, Reviewed by jake.l@coast-group.com,kolander@arlingtonwa.gov,Ipeterson@arlingtonwa.gov This report shall not be reproduced except in full,without the written approval of GeoTest Services,Inc. The above test results relate to the sample(or location)tested. GEOTEST SERVICES, INC. 741 Marine Drive,Bellingham, WA 98225 2061167th Ave.NE, Unit A,Arlington, WA 98223 www.geotest-inc.com phone: (360)733-7318 fax: (360) 733-7418 Concrete Compressive Strength Test Report * Continuation PROJECT: Dantrawl JOB#: 18-0376 CLIENT: Coast Construction Group REPORT#: CB007 CONTRACTOR: Coast Construction Group PAGE #: 2 of 3 Sample Location: Approximate Grid D/11 Field Data: Truck/Ticket# 98/156309 Slump,in.(C143) 4.50 Time Batched 6:01 AM Air Content,%(C231) NT Time Sampled 7:20 AM Unit Weight,pcf(C138) NT Air Temperature,°F 25 Water Added on Job,gals 10 Mix Temp.°F(C1064) 60 Water Requested by Stanwood Redi-Mi Laboratory Data: Lab Test Age Test Total Load Avg.D Area Compressive No. (Days) Date (lbs) ML (in) (in 2) Strength (psi) Remarks 91246 7 01-21 55210 4.01 12.63 4370 TYPE 2: 91247 28 02-11 70600 4.00 12.57 5620 TYPE 5: 91248 28 02-11 69710 4.00 12.57 5550 TYPE 5: 91249 28 02-11 72940 4.00 12.57 5800 TYPE 3: 91250 Hold 00-00 0 0.00 0.00 0 Comments: Sample Location: Field Data: Truck/Ticket# / Slump,in.(C143) Time Batched Air Content,%(C231) Time Sampled Unit Weight,pcf(C138) Air Temperature,°F Water Added on Job,gals Mix Temp.°F(C1064) Water Requested by Laboratory Data: Lab Test Age Test Total Load Avg.D Area Compressive No. (Days) Date (lbs) (in) (in 2) Strength (psi) Remarks 741 Marine Drive,Bellingham, WA 98225 www.geotest-inc.com 00Y GG OTG ST 20611 67th Ave. NE. Unit A.Arlington, WA 98223 phone:(360) 733.7318 toll free:(888)251.5276 fax:(360) 733.7418 Concrete Compressive Strength Test Report * Continuation PROJECT: Dantrawl JOB M 18-0376 CLIENT: Coast Construction Group REPORT M CB007 CONTRACTOR: Coast Construction Group PAGE M 3 of 3 Mechanical screed in action during concrete placement. 741 Marine Drive, Bellingham, WA 98225 www.geotest-inc.com 0�jp Gy OTG ST 20611 67th Ave.NE. Unit A.Arlington, WA 98223 phone:(360) 733.7318 toll free:(888)251.5276 fax:(360) 733.7418 Concrete Inspection & Compressive Strength Test Report PROJECT: Dantrawl JOB#: 18-0376 ADDRESS: 6221 180th Street NE,Arlington, WA REPORT#: CB008 PERMIT M BLD-1792 DATE: 1/15/2019 CLIENT: Coast Construction Group PAGE#: 1 of 4 CONTRACTOR: Coast Construction Group INSPECTOR: Joel Morder Placement Location: Slab-on-Grade Located at Grids B-D/2-8.5 Sample Location: Grid 13.5/4 Field Data: Eq. No. Supplier Stanwood Redi-Mix Slump, in.(C143) 5.00 15 Mix# 65120 Air Content, %(C231) NT Mix Description 1/2 Sack 3/4 Agg,No Air Unit Weight,pcf(C138) NT Truck/Ticket# 95/156363 Air/Mix Temp.,°F(C1064) 28/62 Strength Required 3000 psi at 28 days Field Cure Temperature,°F NT Quantity Placed,cy 380 Cure Method-Initial/Final Container/Water Tank Time Batched 5:16 AM Water Added on Job,gals 10 Time Sampled 5:45 AM Water Requested by Stanwood Redi-Mi Laboratory Data: Lab Test Age Test Total Load Avg.D Area Compressive No. (Days) Date (Ibs) (in) (in 2) Strength (psi) Remarks 91284 7 01-22 56890 4.01 12.63 4500 TYPE 2: 91285 28 02-12 0 0.00 0.00 0 Set 1 91286 28 02-12 0 0.00 0.00 0 Set 1 91287 28 02-12 0 0.00 0.00 0 Set 1 91288 Hold 00-00 0 0.00 0.00 0 Set 1 Reinforcement Inspection Yes n/a: not applicable Specimen Size 4"X 8" Reinforcement Conforms Yes n/t: not tested Test Reference ASTM C31/C39/C1231 Comments: GeoTest on site for inspection of reinforced concrete for the slab-on-grade located at grids B-D/2-8.5. Reinforcing steel was in conformance with structural drawings. However the hairpins for the columns around the perimeter of the slab did not meet concrete cover requirements. Notified the contractor of the deficiency. Please see figure 2 below for reference to the hairpin coverage. *Used Stanwood Redi-Mix Q/C for mix temperature readings today. COPIES:chumphrey@safebuilt.com,dspencer@safebuilt.com,Elias@dantrawl.com,ericflones@stanwoodredi-mix.com, Reviewed by jake.l@coast-group.com,kolander@arlingtonwa.gov,Ipeterson@arlingtonwa.gov This report shall not be reproduced except in full,without the written approval of GeoTest Services,Inc. The above test results relate to the sample(or location)tested. GEOTEST SERVICES, INC. 741 Marine Drive,Bellingham, WA 98225 2061167th Ave.NE, Unit A,Arlington, WA 98223 www.geotest-inc.com phone: (360)733-7318 fax: (360) 733-7418 Concrete Compressive Strength Test Report * Continuation PROJECT: Dantrawl JOB#: 18-0376 CLIENT: Coast Construction Group REPORT#: CB008 CONTRACTOR: Coast Construction Group PAGE #: 2 of 4 Sample Location: Sampled from Grid C/4 Field Data: Truck/Ticket# 85/156372 Slump,in.(C143) 5.00 Time Batched 6:19 AM Air Content,%(C231) NT Time Sampled 6:55 AM Unit Weight,pcf(C138) NT Air Temperature,°F 28 Water Added on Job,gals 10 Mix Temp.°F(C1064) 60 Water Requested by Stanwood Redi-Mi Laboratory Data: Lab Test Age Test Total Load Avg.D Area Compressive No. (Days) Date (lbs) E&L (in) (in 2) Strength (psi) Remarks 91297 7 01-22 58550 4.01 12.63 4640 TYPE 2:Set 2 91298 28 02-12 0 0.00 0.00 0 Set 2 91299 28 02-12 0 0.00 0.00 0 Set 2 91300 28 02-12 0 0.00 0.00 0 Set 2 91301 Hold 00-00 0 0.00 0.00 0 Set 2 Comments: Sample Location: Sampled from Grid C.5/5.5 Field Data: Truck/Ticket# 87/156375 Slump,in.(C143) 5.50 Time Batched 6:35 AM Air Content,%(C231) NT Time Sampled 7:15 AM Unit Weight,pcf(C138) NT Air Temperature,°F 28 Water Added on Job,gals 10 Mix Temp.°F(C1064) 61 Water Requested by Stanwood Redi-Mi Laboratory Data: Lab Test Age Test Total Load Avg.D Area Compressive No. (Days) Date (lbs) (in) (in 2) Strength (psi) jL- Remarks 91302 7 01-22 54950 4.01 12.63 4350 TYPE 2:Set 3 91303 28 02-12 0 0.00 0.00 0 Set 3 91304 28 02-12 0 0.00 0.00 0 Set 3 91305 28 02-12 0 0.00 0.00 0 Set 3 91306 Hold 00-00 0 0.00 0.00 0 Set 3 GEOTEST SERVICES, INC. 741 Marine Drive,Bellingham, WA 98225 2061167th Ave.NE, Unit A,Arlington, WA 98223 www.geotest-inc.com phone: (360)733-7318 fax: (360) 733-7418 Concrete Compressive Strength Test Report * Continuation PROJECT: Dantrawl JOB#: 18-0376 CLIENT: Coast Construction Group REPORT#: CB008 CONTRACTOR: Coast Construction Group PAGE #: 3 of 4 Sample Location: Grid 6.5/7 Field Data: Truck/Ticket# 97/156384 Slump,in.(C143) 5.00 Time Batched 7:20 AM Air Content,%(C231) NT Time Sampled 7:55 AM Unit Weight,pcf(C138) NT Air Temperature,°F 29 Water Added on Job,gals 10 Mix Temp.°F(C1064) 63 Water Requested by Stanwood Redi-Mi Laboratory Data: Lab Test Age Test Total Load Avg.D Area Compressive No. (Days) Date (lbs) (in) (in 2) Strength (psi) Remarks 91307 7 01-22 49560 4.01 12.63 3920 TYPE 2:Set 4 91308 28 02-12 0 0.00 0.00 0 Set 4 91309 28 02-12 0 0.00 0.00 0 Set 4 91310 28 02-12 0 0.00 0.00 0 Set 4 91311 Hold 00-00 0 0.00 0.00 0 Set 4 Comments: Sample Location: Grid C/7.5 Field Data: Truck/Ticket# 84/156391 Slump,in.(C143) 5.50 Time Batched 7:56 AM Air Content,%(C231) NT Time Sampled 8:30 AM Unit Weight,pcf(C138) NT Air Temperature,°F 29 Water Added on Job,gals 10 Mix Temp.°F(C1064) 60 Water Requested by Stanwood Redi-Mi Laboratory Data: Lab Test Age Test Total Load Avg.D Area Compressive No. (Days) Date (lbs) (in) (in 2) Strength (psi) jL- Remarks 91312 7 01-22 58690 4.01 12.63 4650 TYPE 2:Set 5 91313 28 02-12 0 0.00 0.00 0 Set 5 91314 28 02-12 0 0.00 0.00 0 Set 5 91315 28 02-12 0 0.00 0.00 0 Set 5 91316 Hold 00-00 0 0.00 0.00 0 Set 5 741 Marine Drive,Bellingham, WA 98225 www.geotest-inc.com 00Y GG OTG ST 20611 67th Ave. NE. Unit A.Arlington, WA 98223 phone:(360) 733.7318 toll free:(888)251.5276 fax:(360) 733.7418 lqft Concrete Compressive Strength Test Report * Continuation PROJECT: Dantrawl JOB M 18-0376 CLIENT: Coast Construction Group REPORT M CB008 CONTRACTOR: Coast Construction Group PAGE#: 4 of 4 Figure 1: Concrete Screed Towards the End of the Placement Irk- Figure 2: Example of one of the hairpins that did not meet minimum concrete cover requirements. Contractor was notified, and indicated that the outer edge of the slab would 3i- be grouted for the tilt up panels at a later date. - s- 741 Marine Drive, Bellingham, WA 98225 www.geotest-inc.com 0�jp Gy OTG ST 20527 67th Ave NE,Arlington, WA 98223 phone:(360) 733.7318 toll free:(888)251.5276 fax:(360) 733.7418 Concrete Inspection & Compressive Strength Test Report PROJECT: Dantrawl JOB#: 18-0376 ADDRESS: 6221 180th Street NE,Arlington, WA REPORT#: CB009 PERMIT M BLD-1792 DATE: 2/25/2019 CLIENT: Coast Construction Group PAGE#: 1 of 4 CONTRACTOR: Coast Construction Group INSPECTOR: Joel Morder Placement Location: Tilt-Up Panels 1-33 Sample Location: Panel 32 Field Data: Eq. No. Supplier Stanwood Redi-Mix Slump, in.(C143) 6.00 15 Mix# 65123 Air Content, %(C231) 7.2 18 Mix Description 6.5 Sack,3/4"Aggregate and Pea Gravel Unit Weight,pcf(C138) NT Truck/Ticket# 88/157190 Air/Mix Temp.,°F(C1064) 29/60 JM6 Strength Required 5000 psi at 28 days Field Cure Temperature,°F 36/60 Quantity Placed,cy 263 Cure Method-Initial/Final Container/Water Tank Time Batched 7:30 AM Water Added on Job,gals 0 Time Sampled 8:05 AM Water Requested by Laboratory Data: Lab Test Age Test Total Load Avg.D Area Compressive No. (Days) Date (Ibs) (in) (in 2) Strength (psi) Remarks 92416 4 03-01 30640 4.01 12.63 2430 TYPE 2: Field Cure 92417 7 03-04 45500 4.01 12.63 3600 TYPE 2: Field Cure 92418 7 03-04 52570 4.01 12.63 4160 TYPE 2: 92419 28 03-25 68680 4.02 12.69 5410 TYPE 2: 92420 28 03-25 69980 4.02 12.69 5510 TYPE 2: 92421 28 03-25 65400 4.02 12.69 5150 TYPE 2: 92422 Hold 00-00 0 0.00 0.00 0 Reinforcement Inspection Yes n/a: not applicable Specimen Size 4"X 8" Reinforcement Conforms Yes n/t: not tested Test Reference ASTM C31/C39/C1231 Comments: GeoTest on site for inspection of concrete placed by a pump for Tilt-Up panels 1-33. Consolidation of the concrete was achieved by mechanical vibration. It was noted that panels 10, 18, and 31 had fixes applied to the embeds in accordance with drawing 3/3 of the Plinth Repair Drawings. Also, under engineer advisement, the contractor separated the rebar grids in panels with (2) faces. Please see figure 3 below for reference. COPIES:chumphrey@safebuilt.com,dnhannam@frontier.com,dspencer@safebuilt.com,Elias@dantrawl.com, Reviewed by ericflones@stanwoodredi-mix.com,jake.I@coast-group.com,jasper@sdaeverett.com,kolander@arlingtonwa.gov, Ipeterson@arlingtonwa.gov,Tom@finneyneill.com This report shall not be reproduced except in full,without the written approval of GeoTest Services,Inc. The above test results relate to the sample(or location)tested. GEOTEST SERVICES, INC. 741 Marine Drive,Bellingham, WA 98225 2061167th Ave.NE, Unit A,Arlington, WA 98223 www.geotest-inc.com phone: (360)733-7318 fax: (360) 733-7418 Concrete Compressive Strength Test Report * Continuation PROJECT: Dantrawl JOB#: 18-0376 CLIENT: Coast Construction Group REPORT#: CB009 CONTRACTOR: Coast Construction Group PAGE #: 2 of 4 Sample Location: Panel 15 Field Data: Truck/Ticket# 81 /157214 Slump,in.(C143) 5.50 Time Batched 10:19 AM Air Content,%(C231) 5.9 Time Sampled 11:15 AM Unit Weight,pcf(C138) NT Air Temperature,°F 40 Water Added on Job,gals 15 Mix Temp.°F(C1064) 60 Water Requested by Stanwood Redi-Mi Laboratory Data: Lab Test Age Test Total Load Avg.D Area Compressive No. (Days) Date (lbs) ML (in) (in 2) Strength (psi) Remarks 92424 4 03-01 31320 4.01 12.63 2480 TYPE 2: Field Cure 92425 7 03-04 44630 4.01 12.63 3530 TYPE 2:Field Cure 92426 7 03-04 53880 4.01 12.63 4270 TYPE 2: 92427 28 03-25 68440 4.02 12.69 5390 TYPE 2: 92428 28 03-25 66490 4.02 12.69 5240 TYPE 2: 92429 28 03-25 69990 4.02 12.69 5520 92430 Hold 00-00 0 0.00 0.00 0 Comments: Sample Location: Field Data: Truck/Ticket# / Slump,in.(C143) Time Batched Air Content,%(C231) Time Sampled Unit Weight,pcf(C138) Air Temperature,°F Water Added on Job,gals Mix Temp.°F(C1064) Water Requested by Laboratory Data: Lab Test Age Test Total Load Avg.D Area Compressive No. (Days) Date (lbs) (in) (in 2) Strength (psi) Remarks 741 Marine Drive, Bellingham, WA 98225 www.geotest-inc.com 20527 67th Ave NE,Arlington, WA 98223 CyeOTeST � phone:(360) 733.7318 toll free:(888)251.5276 fax:(360) 733.7418 Concrete Compressive Strength Test Report * Continuation PROJECT: Dantrawl JOB#: 18-0376 CLIENT: Coast Construction Group REPORT#: CB009 CONTRACTOR: Coast Construction Group PAGE#: 3 of 4 Figure 1: Placement and consolidation of concrete in progress. Figure 2: Note the embeds .� moved to the bottom and -_ added diagonal bar. a � 741 Marine Drive, Bellingham, WA 98225 www.geotest-inc.com 20527 67th Ave NE,Arlington, WA 98223 CyeOTeST � phone:(360) 733.7318 toll free:(888)251.5276 fax:(360) 733.7418 Concrete Compressive Strength Test Report * Continuation PROJECT: Dantrawl JOB#: 18-0376 CLIENT: Coast Construction Group REPORT#: CB009 CONTRACTOR: Coast Construction Group PAGE#: 4 of 4 Figure 3: Shifted rebar grid of a panel with (2) faces, done in order to provide more space � 5 between bars for concrete. i i . f' 741 Marine Drive, Bellingham, WA 98225 www.geotest-inc.com 0�jp Gy OTG ST 20527 67th Ave NE,Arlington, WA 98223 phone:(360) 733.7318 toll free:(888)251.5276 fax:(360) 733.7418 Concrete Inspection & Compressive Strength Test Report PROJECT: Dantrawl JOB#: 18-0376 ADDRESS: 6221 180th Street NE,Arlington, WA REPORT#: CB010 PERMIT M BLD-1792 DATE: 3/1/2019 CLIENT: Coast Construction Group PAGE#: 1 of 1 CONTRACTOR: Coast Construction Group INSPECTOR: Joel Morder Placement Location: Tilt-Up Panel 33(Replacement) Sample Location: Tilt-Up Panel 33(Replacement) Field Data: Eq. No. Supplier Stanwood Redi-Mix Slump, in.(C143) 5.00 15 Mix# 65123 Air Content, %(C231) 6.0 18 Mix Description 6.5 Sack,3/4"Aggregate Unit Weight,pcf(C138) NT Truck/Ticket# 88/157446 Air/Mix Temp.,°F(C1064) 35/62 JM6 Strength Required 5000 psi at 28 days Field Cure Temperature,°F Quantity Placed,cy 11 Cure Method-Initial/Final Container/Water Tank Time Batched 9:36 AM Water Added on Job,gals 0 Time Sampled 10:15 AM Water Requested by Laboratory Data: Lab Test Age Test Total Load Avg.D Area Compressive No. (Days) Date (Ibs) (in) (in 2) Strength (psi) Remarks 92667 4 03-05 33010 4.01 12.63 2610 TYPE 2: Field Cure 92668 7 03-08 42890 4.01 12.63 3400 TYPE 2: Field Cure 92669 7 03-08 52990 4.01 12.63 4200 TYPE 2: 92670 28 03-29 66090 4.01 12.63 5230 TYPE 2: 92671 28 03-29 63170 4.01 12.63 5000 TYPE 2: 92672 28 03-29 65120 4.01 12.63 5160 TYPE 2: 92673 Hold 00-00 0 0.00 0.00 0 Reinforcement Inspection Yes n/a: not applicable Specimen Size 4"X 8" Reinforcement Conforms Yes n/t: not tested Test Reference ASTM C31/C39/C1231 Comments: GeoTest on site for inspection of the tilt-up panel 33 replacement. This replacement was carried out by the contractor in response to SDA's letter dated February 26, 2019. Reviewed reinforcing steel in accordance with drawings on S6. Verified clearances prior to concrete placement. Reinforcing steel was found to conform with project drawings. COPIES:chumphrey@safebuilt.com,dnhannam@frontier.com,dspencer@safebuilt.com,Elias@dantrawl.com, Reviewed by ericflones@stanwoodredi-mix.com,jake.I@coast-group.com,jasper@sdaeverett.com,kolander@arlingtonwa.gov, Ipeterson@arlingtonwa.gov,Tom@finneyneill.com This report shall not be reproduced except in full,without the written approval of GeoTest Services,Inc. The above test results relate to the sample(or location)tested. 741 Marine Drive, Bellingham, WA 98225 www.geotest-inc.com 0�jp Gy OTG ST 20527 67th Ave NE,Arlington, WA 98223 phone:(360) 733.7318 toll free:(888)251.5276 fax:(360) 733.7418 Concrete Inspection & Compressive Strength Test Report PROJECT: Dantrawl JOB#: 18-0376 ADDRESS: 6221 180th Street NE,Arlington, WA REPORT#: CB011 PERMIT M BLD-1792 DATE: 3/4/2019 CLIENT: Coast Construction Group PAGE#: 1 of 2 CONTRACTOR: Coast Construction Group INSPECTOR: Joel Morder Placement Location: Office Interior Slab on Grade and Plinths Sample Location: NE Corner of Slab Field Data: Eq. No. Supplier Stanwood Redi-Mix Slump, in.(C143) 5.50 15 Mix# 65120 Air Content, %(C231) NT Mix Description 6.5 Sack,3/4"Aggregate Unit Weight,pcf(C138) NT Truck/Ticket# 97/157482 Air/Mix Temp.,°F(C1064) 29/64 JM4 Strength Required 3000 psi at 28 days Field Cure Temperature,°F 36/76 JM4 Quantity Placed,cy 100 Cure Method-Initial/Final Container/Water Tank Time Batched 7:34 AM Water Added on Job,gals 10 Time Sampled 8:05 AM Water Requested by Pump operator Laboratory Data: Lab Test Age Test Total Load Avg.D Area Compressive No. (Days) Date (Ibs) (in) (in 2) Strength (psi) Remarks 92740 7 03-11 57650 4.01 12.63 4560 TYPE 2: 92741 28 04-01 73660 4.00 12.57 5860 TYPE 2: 92742 28 04-01 72700 4.00 12.57 5780 TYPE 2: 92743 28 04-01 73660 4.00 12.57 5860 TYPE 2: 92744 Hold 00-00 0 0.00 0.00 0 Reinforcement Inspection Yes n/a: not applicable Specimen Size 4"X 8" Reinforcement Conforms Yes n/t: not tested Test Reference ASTM C31/C39/C1231 Comments: GeoTest on site for inspection of the interior slab on grade for the office. Reviewed reinforcing steel in accordance with the drawings on S4 of the structural plans. Concrete was placed for plinth repairs at grids D/2, D/14, and B/2. COPIES:chumphrey@safebuilt.com,dnhannam@frontier.com,dspencer@safebuilt.com,Elias@dantrawl.com, Reviewed by ericflones@stanwoodredi-mix.com,jake.I@coast-group.com,jasper@sdaeverett.com,kolander@arlingtonwa.gov, Ipeterson@arlingtonwa.gov,Tom@finneyneill.com This report shall not be reproduced except in full,without the written approval of GeoTest Services,Inc. The above test results relate to the sample(or location)tested. 741 Marine Drive,Bellingham, WA 98225 www.geotest-inc.com 00Y GG OTG ST 20527 67th Ave NE,Arlington, WA 98223 phone:(360) 733.7318 toll free:(888)251.5276 fax:(360) 733.7418 Concrete Inspection & Compressive Strength Test Report PROJECT: Dantrawl JOB M 18-0376 CLIENT: Coast Construction Group REPORT M CB011 CONTRACTOR: Coast Construction Group PAGE#: 2 of 2 Figure 1: Concrete Placement and Consolidation in Progress _ _ ,• y r- ff x_ Figure 2: Plinth Repair Form at Grid B/2 y p I 51.5276 GEOT E S T 'I Oak Harbor Bellingham I Arlington I Oak Harbor www.geotest-inc.com Concrete Inspection & Compressive Strength Test Report PROJECT: Dantrawl JOB#: 18-0376 ADDRESS: 6221 180th Street NE,Arlington, WA REPORT#: CB012 PERMIT M BLD-1792 DATE: 4/15/2019 CLIENT: Coast Construction Group PAGE#: 1 of 2 CONTRACTOR: Coast Construction Group INSPECTOR: Kevin Richardson Placement Location: Footings for Loading Dock(Cantilever Retaining Wall,4-6 ft. Height) Sample Location: Truck Chute Mid-Load Field Data: Eq. No. Supplier Stanwood Redi-Mix Slump, in.(C143) 4.00 9 Mix# 50420C Air Content, %(C231) NT Mix Description 5SK,3/4"Agg., Pea,WRA Unit Weight,pcf(C138) NT Truck/Ticket# 97/159030 Air/Mix Temp.,°F(C1064) 53/58 KR2 Strength Required 2500 psi at 28 days Field Cure Temperature,°F 46/72 KR2 Quantity Placed,cy 11 Cure Method-Initial/Final Container/Water Tank Time Batched 10:43 AM Water Added on Job,gals 10 Time Sampled 11:43 AM Water Requested by Contractor Laboratory Data: Lab Test Age Test Total Load Avg.D Area Compressive No. (Days) Date (Ibs) (in) (in 2) Strength (psi) Remarks 94520 7 04-22 33840 4.00 12.57 2690 TYPE 3: 94521 28 05-13 50880 4.01 12.63 4030 TYPE 2: 94522 28 05-13 49600 4.01 12.63 3930 TYPE 5: 94523 28 05-13 48750 4.01 12.63 3860 TYPE 5: 94524 Hold 00-00 0 0.00 0.00 0 Reinforcement Inspection Yes n/a: not applicable Specimen Size 4"X 8" Reinforcement Conforms Yes n/t: not tested Test Reference ASTM C31/C39/C1231 Comments: GeoTest was on site to perform a special inspection of footings for the loading dock. Reinforcement was found to conform to detail 1 on S-2.0 (4' - 6' Wall). Concrete was placed via truck chute and mechanically consolidated. Contractor was made aware our results prior to departing the site. See page 2 for a photo of the work. COPIES:chumphrey@safebuilt.com,dnhannam@frontier.com,dspencer@safebuilt.com,Elias@dantrawl.com, Reviewed by ericflones@stanwoodredi-mix.com,jake.I@coast-group.com,jasper@sdaeverett.com,kolander@arlingtonwa.gov, Ipeterson@arlingtonwa.gov,stever@coast-group.com,Tom@finneyneill.com This report shall not be reproduced except in full,without the written approval of GeoTest Services,Inc. The above test results relate to the sample(or location)tested. 51.5276 GEOT E S T I O' @k Harbor Bellingham I Arlington Oak Harborr www.geotest-inc.com Concrete Inspection & Compressive Strength Test Report PROJECT: Dantrawl JOB M 18-0376 CLIENT: Coast Construction Group REPORT#: CB012 CONTRACTOR: Coast Construction Group PAGE#: 2 of 2 � I fir.. Figure 1: Contractor in �— process of finishing footings after placement. Vertical � � reinforcement was added prior ;� ` a', to the pour so that the lap — .T requirement of 42 bar - -- diameters would be achieved. _ f si r. II •�t' � GEOTEST I f a Oak Bellingham I Arlington Oak Harbor www.geotest-inc.com Concrete Inspection & Compressive Strength Test Report PROJECT: Dantrawl JOB#: 18-0376 ADDRESS: 6221 180th Street NE,Arlington, WA REPORT#: CB013 PERMIT M BLD-1792 DATE: 5/8/2019 CLIENT: Coast Construction Group PAGE#: 1 of 2 CONTRACTOR: Coast Construction Group INSPECTOR: Joel Morder Placement Location: Column Pour Backs at Grids C/3-13 and for the Office Sample Location: C/10, Middle of the Batch Field Data: Eq. No. Supplier Stanwood Redi-Mix Slump, in.(C143) 4.00 15 Mix# 65120 Air Content, %(C231) NT Mix Description 6.5 Sack,3/4"Aggregate Unit Weight,pcf(C138) NT Truck/Ticket# 80/160022 Air/Mix Temp.,°F(C1064) 53/63 JM1 Strength Required 3000 psi at 28 days Field Cure Temperature,°F 69.0/77.0 Quantity Placed,cy 5 Cure Method-Initial/Final Container/Water Tank Time Batched 6:17 AM Water Added on Job,gals 0 Time Sampled 7:00 AM Water Requested by Laboratory Data: Lab Test Age Test Total Load Avg.D Area Compressive No. (Days) Date (Ibs) (in) (in 2) Strength (psi) Remarks 95769 7 05-15 65070 4.00 12.57 5180 TYPE 3: 95770 28 06-05 82650 4.01 12.63 6540 TYPE 2: 95771 28 06-05 79350 4.01 12.63 6280 TYPE 2: 95772 28 06-05 78350 4.01 12.63 6200 TYPE 2: 95773 Hold 00-00 0 0.00 0.00 0 Reinforcement Inspection NT n/a: not applicable Specimen Size 4"X 8" Reinforcement Conforms NT n/t: not tested Test Reference ASTM C31/C39/C1231 Comments: GeoTest on site for inspection of concrete placed at the locations referenced above. Concrete was placed by truck chute and wheelbarrows. No rebar was in the pour backs. All items were in conformance with approved plans and drawings. COPIES:chumphrey@safebuilt.com,dnhannam@frontier.com,dspencer@safebuilt.com,Elias@dantrawl.com, Reviewed by ericflones@stanwoodredi-mix.com,jake.I@coast-group.com,jasper@sdaeverett.com,kolander@arlingtonwa.gov, Ipeterson@arlingtonwa.gov,stever@coast-group.com,Tom@finneyneill.com This report shall not be reproduced except in full,without the written approval of GeoTest Services,Inc. The above test results relate to the sample(or location)tested. Gf OW T I, O@k Harbor Bellingham�Arlington Oak Harbor www.geotest-inc.com M M Concrete Inspection & Compressive Strength Test Report PROJECT: Dantrawl JOB M 18-0376 CLIENT: Coast Construction Group REPORT#: CB013 CONTRACTOR: Coast Construction Group PAGE M 2 of 2 Concrete Placement in ,, - Progress pl. 1 R t GEOT E S T I 1 a Bellingham I Arlington Oakk Harbor www.geotest-inc.com Concrete Inspection & Compressive Strength Test Report PROJECT: Dantrawl JOB#: 18-0376 ADDRESS: 6221 180th Street NE,Arlington, WA REPORT#: CB014 PERMIT M BLD-1792 DATE: 5/15/2019 CLIENT: Coast Construction Group PAGE#: 1 of 2 CONTRACTOR: Coast Construction Group INSPECTOR: Tristan Coragiulo Placement Location: Northern Cantilever Retaining Walls and Southeastern Exterior Column Bases Sample Location: First Truck, Mid-Load, Directly from Truck Chute Field Data: Eq. No. Supplier Stanwood Redi-Mix Slump, in.(C143) 6.00 9 Mix# 65123 Air Content, %(C231) 5.2 1 Mix Description 6.5 sack,3/4"Agg,Pea Agg,Glen 7500,Pozz 80,AE 90 Unit Weight,pcf(C138) NT Truck/Ticket# 81 /160322 Air/Mix Temp.,°F(C1064) 76/74 DM5 Strength Required 3000 psi at 28 days Field Cure Temperature,°F 62-74 Quantity Placed,cy 15 Cure Method-Initial/Final Container/Water Tank Time Batched 12:03 PM Water Added on Job,gals 15 Time Sampled 12:45 PM Water Requested by Contractor Laboratory Data: Lab Test Age Test Total Load Avg.D Area Compressive No. (Days) Date (Ibs) (in) (in 2) Strength (psi) Remarks 96091 7 05-22 62890 4.00 12.57 5000 TYPE 2: 96092 28 06-12 70150 4.01 12.63 5550 TYPE 2: 96093 28 06-12 75910 4.01 12.63 6010 TYPE 2: 96094 28 06-12 68290 4.01 12.63 5410 TYPE 2: 96095 Hold 00-00 0 0.00 0.00 0 Reinforcement Inspection NT n/a: not applicable Specimen Size 4"X 8" Reinforcement Conforms NT n/t: not tested Test Reference ASTM C31/C39/C1231 Comments: GeoTest was on site as requested to provide concrete placement inspection and testing at the above locations. All concrete was placed via pump truck, mechanically consolidated, and hand finished. For reinforcement inspection, please refer to report IR010. Geotest will return for further testing and inspection as requested. COPIES:chumphrey@safebuilt.com,dnhannam@frontier.com,dspencer@safebuilt.com,Elias@dantrawl.com, Reviewed by ericflones@stanwoodredi-mix.com,jake.I@coast-group.com,jasper@sdaeverett.com,kolander@arlingtonwa.gov, Ipeterson@arlingtonwa.gov,stever@coast-group.com,Tom@finneyneill.com This report shall not be reproduced except in full,without the written approval of GeoTest Services,Inc. The above test results relate to the sample(or location)tested. 51.5276 GEOT E S T I O' @k Harbor Bellingham I Arlington Oak Harborr www.geotest-inc-com Concrete Inspection & Compressive Strength Test Report PROJECT: Dantrawl JOB M 18-0376 CLIENT: Coast Construction Group REPORT#: CB014 CONTRACTOR: Coast Construction Group PAGE#: 2 of 2 Figure 1. Formed exterior walls located on the northern - side of the building prior to i concrete placement via pump - 1 fi= 1�;p truck (looking northwest). Figure 2. Concrete placement within exterior column bases located on the southern and 4 southeastern sides of the =� building (looking northwest). PON - n • GEOTEST 'IOakHarbor www.geotest-inc.com Concrete Inspection & Compressive Strength Test Report PROJECT: Dantrawl JOB#: 18-0376 ADDRESS: 6221 180th Street NE,Arlington, WA REPORT#: CB015 PERMIT M BLD-1792 DATE: 7/19/2019 CLIENT: Coast Construction Group PAGE#: 1 of 1 CONTRACTOR: Coast Construction Group INSPECTOR: Matt Carver Placement Location: Slab on Grade, Base of Loading Ramp Sample Location: First Truck, Mid-Load, Directly from Truck Chute Field Data: Eq. No. Supplier Stanwood Redi-Mix Slump, in.(C143) 7.00 9 Mix# 601211 Air Content, %(C231) 6.5 13 Mix Description 5.5 Sack,3/4"Agg,Pea Agg,Glen 7500,Pozz 80,AE 90 Unit Weight,pcf(C138) NT Truck/Ticket# 81 /162825 Air/Mix Temp.,°F(C1064) 58/74 AS2 Strength Required 4000 psi at 28 days Field Cure Temperature,°F 46.4-126.3 Quantity Placed,cy 30.00 Cure Method-Initial/Final Container/Water Tank Time Batched 7:15 AM Water Added on Job,gals 20 Time Sampled 8:00 AM Water Requested by Contractor Laboratory Data: Lab Test Age Test Total Load Avg.D Area Compressive No. (Days) Date (Ibs) (in) (inz) Strength (psi) Remarks 99162 7 07-26 48320 4.00 12.57 3840 TYPE 2: 99163 28 08-16 60050 4.00 12.57 4780 TYPE 2: 99164 28 08-16 58740 4.00 12.57 4670 TYPE 2: 99165 28 08-16 53270 4.00 12.57 4240 TYPE 2: 99166 Hold 00-00 0 0.00 0.00 0 Reinforcement Inspection NT n/a: not applicable Specimen Size 4"X 8" Reinforcement Conforms NT n/t: not tested Test Reference ASTM C31/C39/C1231 Comments: GeoTest was on site as requested to provide concrete placement inspection and testing at the above location. All concrete was placed via truck chute, mechanically consolidated, and hand-finished. Reinforcement was inspected by special inspector Dave Bufalini prior to placement of concrete. COPIES:chumphrey@safebuilt.com,dnhannam@frontier.com,dspencer@safebuilt.com,Elias@dantrawl.com, Reviewed by ericflones@stanwoodredi-mix.com,jake.I@coast-group.com,jasper@sdaeverett.com,kolander@arlingtonwa.gov, Ipeterson@arlingtonwa.gov,stever@coast-group.com,Tom@finneyneill.com This report shall not be reproduced except in full,without the written approval of GeoTest Services,Inc. The above test results relate to the sample(or location)tested. 51.5276 GEOT E S T I O 1@k Harbor Bellingham I Arlington Oak Harborr vm w.geotest-inc.com FIELD DENSITY/MOISTURE REPORT Nuclear Gauge * ASTM D6938 PROJECT: Dantrawl JOB#: 18-0376 ADDRESS: 6221 180th Street NE,Arlington, WA REPORT#: FDO03 PERMIT#: BLD-1792 DATE: 6/27/2019 CLIENT: Coast Construction Group PAGE#: 1 of 2 CONTRACTOR: Coast Construction Group INSPECTOR: Tristan Coragiulo Compaction Of: Native Fill for Loading Ramp Field Data: Depth/ DT/ Wet Field Dry Compaction Test Location Elev BS Density Moisture Density Lab % Pass/ # (ft) (in) (pcf) (%) (pcf) # 1= Fail 1 Loading Ramp,15'N of Building -.5 DT/12 133.9 10.0 121.7 1 97 95 P 2 5'E of Retaining Wall,15'N of Building -.5 DT/12 133.5 10.6 120.7 1 96 95 P 3 5'W of Retaining Wall,15'N of Building -.5 DT/12 132.7 10.2 120.5 1 96 95 P Lab Max. Dry Optimum Retained Sample Soil Type Source Density Moisture On#4 Test 16 # (pcf) N N Method 1-4020A Structural Fill Imported Native-Site Stockpile 125.2 10.2 10 ASTM D1557/D4718 2- 0.0 None 3- 0.0 None Gauge Make/Model/Serial#: Instro/3500/3052 M/D Standard Count: 431/3092 Comments: GeoTest was on site as requested to provide in-place density testing at the above locations. All locations and elevations are approximate, with elevations relative to the top of finished grade prior to concrete or asphalt placement. Compaction was attained with a single drum vibratory roller prior to our arrival. All soils exhibited firm and unyielding conditions. GeoTest will return for further inspection and observation as requested. COPIES:chumphrey@safebuilt.com,dnhannam@frontier.com,dspencer@safebuilt.com,Elias@dantrawl.com,jake.l@coast- Reviewed by group.com,jasper@sdaeverett.com,kolander@arlingtonwa.gov,Ipeterson@arlingtonwa.gov,stever@coast-group.com, Tom@finneyneill.com This report shall not be reproduced except in full,without the written approval of GeoTest Services,Inc. The above test results relate only to the sample(or location)tested. GEOTEST 'IO@kHarb Bellingham I Arlington I Oak Harbor www.geotest-inc.com FIELD DENSITY/MOISTURE REPORT Nuclear Gauge * ASTM D6938 PROJECT: Dantrawl JOB#: 18-0376 CLIENT: Coast Construction Group REPORT M FDO03 CONTRACTOR: Coast Construction Group PAGE M 2 of 2 Figure 1. Native loading ramp and retaining wall fill (looking '° southeast). I _ aY J� r- -a - 51.5276 GEOT E S T I O 1@k Harbor Bellingham I Arlington Oak Harborr vvww.geotest-i nc.com FIELD DENSITY/MOISTURE REPORT Nuclear Gauge * ASTM D6938 PROJECT: Dantrawl JOB#: 18-0376 ADDRESS: 6221 180th Street NE,Arlington, WA REPORT#: FDO04 PERMIT#: BLD-1792 DATE: 6/28/2019 CLIENT: Coast Construction Group PAGE#: 1 of 3 CONTRACTOR: Coast Construction Group INSPECTOR: Ben Fox Compaction Of: Native Structural Fill around Loading Ramp Field Data: Depth/ DT/ Wet Field Dry Compaction Test Location Elev BS Density Moisture Density Lab % Pass/ # (ft) (in) (pcf) N (pcf) # - Fail 1 3.5'W of Ramp Wall&9'N of Building Wall,W Side of Ramp -2.5 DT/12 128.2 5.5 121.5 1 95 95 P 2 T W of Ramp Wall&40'N of Building Wall,W Side of Ramp -2.5 DT/12 127.8 5.6 121.0 1 95 95 P 3 10'N of End of Ramp Walls&Center of Ramp,N of Ramp -2 DT/12 126.4 5.0 120.4 2 96 95 P 4 T E of Ramp Wall&39'N of Building Wall,E Side of Ramp -2.5 DT/12 125.5 5.1 119.4 2 95 95 P 5 3.5'E of Ramp Wall&10'N of Building Wall,E Side of Ramp -2 DT/12 126.9 6.4 119.3 2 95 95 P 6 4.5'W of Ramp Wall&9'N of Building Wall,W Side of Ramp TOSG DT/12 132.7 7.5 123.4 1 97 95 P 7 5'W of Ramp Wall&40'N of Building Wall,W Side of Ramp TOSG DT/12 129.0 6.8 120.8 1 95 95 P 8 10'N of End of Ramp Walls&Center of Ramp,N of Ramp TOSG DT/12 129.1 6.0 121.8 1 95 95 P 9 T E of Ramp Wall&39'N of Building Wall,E Side of Ramp TOSG DT/12 131.9 7.8 122.4 1 96 95 P 10 3.5'E of Ramp Wall&10'N of Building Wall,E Side of Ramp TOSG DT/12 128.3 6.5 120.5 2 96 95 P Lab Max. Dry Optimum Retained Sample Soil Type Source Density Moisture On#4 Test # (pcf) M M Method 1-4565A poorly graded sand w/silt and grave Native 127.7 7.9 25 ASTM D1557/D4718 2-4020A Structural Fill Import Native 125.2 10.2 10 ASTM D1557/D4718 3- 0.0 None Gauge Make/Model/Serial#: Instrotek/3500/3502 M/D Standard Count: 425/3127 Comments: TOSG stands for top of subgrade. GeoTest was onsite as requested to perform density testing of the previously placed structural fill around the loading ramp on the north side of the building. Test results indicated adequate compaction of 95% or greater per ASTM D1557/D4718. Test locations and elevations are approximate. Elevations were referenced from the adjacent subgrade elevation. COPIES:chumphrey@safebuilt.com,dnhannam@frontier.com,dspencer@safebuilt.com,Elias@dantrawl.com,jake.l@coast- Reviewed by'✓ group.com,jasper@sdaeverett.com,kolander@arlingtonwa.gov,Ipeterson@arlingtonwa.gov,stever@coast-group.com, Tom@finneyneill.com This report shall not be reproduced except in full,without the written approval of GeoTest Services,Inc. The above test results relate only to the sample(or location)tested. GEOTEST 'IO@kHarb Bellingham I Arlington I Oak Harbor www.geotest-inc.com FIELD DENSITY/MOISTURE REPORT Nuclear Gauge * ASTM D6938 PROJECT: Dantrawl JOB#: 18-0376 CLIENT: Coast Construction Group REPORT M FDO04 CONTRACTOR: Coast Construction Group PAGE M 2 of 3 Upon GeoTest's arrival, five locations had been selected and potholed by the contractor to 2-3' from the adjacent grades. Two locations were potholed on both the west and east sides of the loading ramp retaining walls, with one test located north of the loading ramp. Tests 1 through 5 were taken at the base of the potholed locations. Additionally, tests were taken after backfilling those locations (tests 6 through 10). One sample of the material was taken beneath the gauge at test location #1 for a sieve/proctor laboratory test. After initial density testing at the base of the potholed locations, the areas were backfilled. The material was placed in 3 approximately equal lifts and compacted with a CAT excavator with a mounted hoe-pack. The top surface was also compacted with a single drum vibratory roller after the hoe-pack was completed. During placement and compaction, water was added to the material by a hose. A photo during the density `s testing on the east side of -the loading ramp at the location of Test #4. The ' photo was taken facing ;: southwest. in 3�- 01 GMYT 1.888.251.5276 Bellingham I Arlington I Oak Harbor www.geotest-inc-com FIELD DENSITY/MOISTURE REPORT Nuclear Gauge * ASTM D6938 PROJECT: Dantrawl JOB#: 18-0376 CLIENT: Coast Construction Group REPORT#: FDO04 CONTRACTOR: Coast Construction Group PAGE#: 3 of 3 A photo during the compaction of the structural fill at Test #4 using the excavator mounted hoe-pack. The photo was taken facing e�,` .. northeast. � _ - _ � �4ti I A photo during the compaction of the I subgrade on the east side of the loading dock using a single drum vibratory roller. `��► , ,' - The photo was taken facing southeast. - " .J 51.5276 GEOT E S T I O 1@k Harbor Bellingham I Arlington Oak Harborr vvww.geotest-i nc.com FIELD DENSITY/MOISTURE REPORT Nuclear Gauge * ASTM D6938 PROJECT: Dantrawl JOB#: 18-0376 ADDRESS: 6221 180th Street NE,Arlington, WA REPORT#: FDO05 PERMIT#: BLD-1792 DATE: 7/5/2019 CLIENT: Coast Construction Group PAGE#: 1 of 2 CONTRACTOR: Coast Construction Group INSPECTOR: Ben Fox Compaction Of: Native Structural Fill around Loading Ramp Field Data: Depth/ DT/ Wet Field Dry Compaction Test Location Elev BS Density Moisture Density Lab % Pass/ # (ft) (in) (pcf) N (pcf) # -- Fail 1 5'W&41'N of Building Wall,W Side of Ramp TOSG DT/12 131.6 5.0 125.4 1 98 95 P 2 2.5'W&42'N of Building Wall,W Side of Ramp TOSG DT/12 127.3 4.7 121.6 1 95 95 P 3 T E&10'N of Building Wall,E Side of Ramp TOSG DT/12 132.6 5.4 125.7 1 98 95 P Lab Max. Dry Optimum Retained Sample Soil Type Source Density Moisture On#4 Test 16 # (pcf) (%) (%) Method 1-4565A poorly graded sand w/silt and grave Native 127.7 7.9 25 ASTM D1557/D4718 2- 0.0 None 3- 0.0 None Gauge Make/Model/Serial#: Instrotek/3500/3502 M/D Standard Count: 420/3092 Comments: TOSG stands for top of the subgrade. GeoTest performed density testing of the Structural Fill material placed around the loading ramp on the north end of the building. All tests attained the minimum required compaction. Test locations are approximate. Tests #1 and #2 on this report were re-tests of the area from Test #2 & #7 from GeoTest's Field Density/Moisture Report FDO04 dated 6-28-19, while Test #3 on this report was a re-test of Test #10 on report FD004. COPIES:chumphrey@safebuilt.com,dnhannam@frontier.com,dspencer@safebuilt.com,Elias@dantrawl.com,jake.l@coast- Reviewed by'✓ group.com,jasper@sdaeverett.com,kolander@arlingtonwa.gov,Ipeterson@arlingtonwa.gov,stever@coast-group.com, Tom@finneyneill.com This report shall not be reproduced except in full,without the written approval of GeoTest Services,Inc. The above test results relate only to the sample(or location)tested. GEOTEST 'IO@kHarb Bellingham I Arlington I Oak Harbor www.geotest-inc.com FIELD DENSITY/MOISTURE REPORT Nuclear Gauge * ASTM D6938 PROJECT: Dantrawl JOB#: 18-0376 CLIENT: Coast Construction Group REPORT M FDO05 CONTRACTOR: Coast Construction Group PAGE M 2 of 2 While onsite, proof rolls were performed on the subgrade on either side of the ramps and on the overhead doors on the north/east sides of the building using a loaded dump truck. The subgrade was observed to be firm and unyielding. Some yielding was observed over the infiltration trench at the large overhead door on the east side of the building. This material consisted of drain rock - it's our understanding that some drain rock will be removed and replaced with crushed rock. The GeoTechnical Engineer was onsite and observed the proof rolls of the referenced areas. It is our understanding that the contractor will perform additional compactive effort at a later date next to the building. GeoTest will return when requested. 51.5276 GEOT E S T I O 1@k Harbor Bellingham I Arlington Oak Harborr vvww.geotest-i nc.com FIELD DENSITY/MOISTURE REPORT Nuclear Gauge * ASTM D6938 PROJECT: Dantrawl JOB#: 18-0376 ADDRESS: 6221 180th Street NE,Arlington, WA REPORT#: FDO06 PERMIT#: BLD-1792 DATE: 7/5/2019 CLIENT: Coast Construction Group PAGE#: 1 of 2 CONTRACTOR: Coast Construction Group INSPECTOR: John Silk Compaction Of: Sidewalk Subgrade Field Data: Depth/ DT/ Wet Field Dry Compaction Test Location Elev BS Density Moisture Density Lab % Pass/ # (ft) (in) (pcf) N (pcf) # - = Fail 1 25'South,45'East TOG 4 140.3 5.1 135.3 1 95 95 P 2 15'South,4'East TOG 4 140.0 5.3 134.7 1 95 95 P 3 40'South,1'West TOG 4 142.3 5.4 136.9 1 97 95 P Lab Max. Dry Optimum Retained Sample Soil Type Source Density Moisture On#4 Test 16 # (pcf) M M Method 1-4413A CSBC Smokey Point 141.8 4.7 15 ASTM D1557 2- 0.0 None 3- 0.0 None Gauge Make/Model/Serial#: Troxler/3430/21778 M/D Standard Count: 677/1718 Comments: GeoTest performed density testing of the structural fill placed at the south entrance for sidewalk subgrade. All tests attained the minimum required compaction. Test locations are approximate and are referenced from the south entrance door. COPIES:chumphrey@safebuilt.com,dnhannam@frontier.com,dspencer@safebuilt.com,Elias@dantrawl.com,jake.l@coast- Reviewed by group.com,jasper@sdaeverett.com,kolander@arlingtonwa.gov,Ipeterson@arlingtonwa.gov,stever@coast-group.com, Tom@finneyneill.com This report shall not be reproduced except in full,without the written approval of GeoTest Services,Inc. The above test results relate only to the sample(or location)tested. GMYT 1.888.251.5276 Bellingham I Arlington I Oak Harbor www.geotest-inc-com FIELD DENSITY/MOISTURE REPORT Nuclear Gauge * ASTM D6938 PROJECT: Dantrawl JOB#: 18-0376 CLIENT: Coast Construction Group REPORT#: FDO06 CONTRACTOR: Coast Construction Group PAGE#: 2 of 2 J f� 51.5276 GEOT E S T I O 1@k Harbor Bellingham I Arlington Oak Harborr www.geotest-inc.com FIELD DENSITY/MOISTURE REPORT Nuclear Gauge * ASTM D6938 PROJECT: Dantrawl JOB#: 18-0376 ADDRESS: 6221 180th Street NE,Arlington, WA REPORT#: FDO07 PERMIT#: BLD-1792 DATE: 7/8/2019 CLIENT: Coast Construction Group PAGE#: 1 of 2 CONTRACTOR: Coast Construction Group INSPECTOR: Gunnar Sterlington Compaction Of: Sidewalk Subgrade Field Data: Depth/ DT/ Wet Field Dry Compaction Test Location Elev BS Density Moisture Density Lab % Pass/ # (ft) (in) (pcf) N (pcf) # - = Fail 1 Figure 1 FG 4 141.0 4.1 135.5 1 96 95 P 2 Figure 1 FG 4 142.1 4.7 135.7 1 96 95 P 3 Figure 1 FG 4 141.5 4.8 135.0 1 95 95 P 4 Figure 1 FG 4 141.2 4.3 135.4 1 95 95 P Lab Max. Dry Optimum Retained Sample Soil Type Source Density Moisture On#4 Test 16 # IL (pcf) M M Method 1-4413A CSBC Smokey Point 141.8 4.7 15 ASTM D1557/D4718 2- 0.0 None 3- 0.0 None Gauge Make/Model/Serial#: InstroTek/3500/1505 M/D Standard Count: 719/2354 Comments: GeoTest was on site to density test crushed base course for the sidewalk subgrade along the eastern entrance. All test locations are approximate. All test met compaction requirement of 95 percent. COPIES:chumphrey@safebuilt.com,dnhannam@frontier.com,dspencer@safebuilt.com,Elias@dantrawl.com,jake.l@coast- Reviewed by group.com,jasper@sdaeverett.com,kolander@arlingtonwa.gov,Ipeterson@arlingtonwa.gov,stever@coast-group.com, Tom@finneyneill.com This report shall not be reproduced except in full,without the written approval of GeoTest Services,Inc. The above test results relate only to the sample(or location)tested. GMYT 1.888.251.5276 Bellingham I Arlington I Oak Harbor www.geotest-inc-com FIELD DENSITY/MOISTURE REPORT Nuclear Gauge * ASTM D6938 PROJECT: Dantrawl JOB#: 18-0376 CLIENT: Coast Construction Group REPORT#: FDO07 CONTRACTOR: Coast Construction Group PAGE#: 2 of 2 3 2 Figure 1 4 1 Test Locations ' Oil VI I I I I , — a.s .r Photo of Density Test Site l I %04W y .i 51.5276 GEOT E S T I Oak Hart Bellingham I Arlington Oak Harbor www.geotest-inc.com Grout Compressive Strength Test Report PROJECT: Dantrawl JOB#: 18-0376 ADDRESS: 6221 180th Street NE,Arlington, WA REPORT#: GB001 PERMIT#: BLD-1792 DATE: 5/7/2019 CLIENT: Coast Construction Group PAGE#: 1 of 1 CONTRACTOR: Coast Construction Group INSPECTOR: Tim Martin Placement Location: Column Base Plates-All Interior Column Locations Field Data: Eq. No. Supplier Bag Mix Slump, in.(C143) NT Mix# SC Multi Purpose Air Content, %(C231) NT Mix Description High-Strength Non-Shrink, Non-Metallic Unit Weight,pcf(C138) NT Truck/Ticket# NA/NA Air Temperature,°F 67 Strength Required 3000 psi at 28 days Mix Temperature,°F(C1064) 61 Quantity Placed,cy NA Field Cure Temperature,°F Time Batched 1:24 P.M Water Added on Job,gals 0 Time Sampled 1:26 P.M Water Requested by Laboratory Data: Lab Test Age Test Total Load Area Corr. Compressive No. (Days) Date (lbs) (in 2) Factor Strength (psi) Remarks 95660 3 05-10 14720 4.16 1.00 3540 95661 7 05-14 18620 4.08 1.00 4560 95662 28 06-04 27540 4.00 1.00 6890 95663 28 06-04 26290 3.86 1.00 6810 95664 28 06-04 30360 4.00 1.00 7590 95665 Hold 00-00 0 0.00 1.00 0 Reinforcement Inspection NT n/a: not applicable Specimen Size 2"X 2" Reinforcement Conforms NT n/t: not tested Test Reference C109 Comments: GeoTest was on site to inspect the grouting of the interior column base plates. The contractor followed the manufacturer published instruction when mixing and placing the grout. COPIES:chumphrey@safebuilt.com,dnhannam@frontier.com,dspencer@safebuilt.com,Elias@dantrawl.com,jake.l@coast- Reviewed by group.com,jasper@sdaeverett.com,kolander@arlingtonwa.gov,Ipeterson@arlingtonwa.gov,stever@coast-group.com, Tom@finneyneill.com This report shall not be reproduced except in full,without the written approval of GeoTest Services,Inc. The above test results relate to the sample(or location)tested. 51.5276 GEOT E S T I Oak Hart Bellingham I Arlington Oak Harbor www.geotest-inc.com Grout Compressive Strength Test Report PROJECT: Dantrawl JOB#: 18-0376 ADDRESS: 6221 180th Street NE,Arlington, WA REPORT#: GB002 PERMIT#: BLD-1792 DATE: 6/24/2019 CLIENT: Coast Construction Group PAGE#: 1 of 3 CONTRACTOR: Coast Construction Group INSPECTOR: Tim Martin Placement Location: Concrete Panels,All Locations at Base of Panels and Void Between Panels and Interior Slab on Grade Field Data: Eq. No. Supplier Stanwood Redi-Mix Slump, in.(C143) 1.00 19 Mix# 60101 Air Content, %(C231) 4.3 2 Mix Description 6sk.Sand Mix,AEA,Curb Mix,OK,BC 6/11 Unit Weight,pcf(C138) NT Truck/Ticket# NA/161836 Air Temperature,°F 58 Strength Required *2500 psi at 28 days Mix Temperature,°F(C1064) 63 TM06 Quantity Placed,cy 3 Field Cure Temperature,°F 56/76 TM06 Time Batched 8:33 A.M Water Added on Job,gals 0 Time Sampled 9:58 A.M Water Requested by Laboratory Data: Lab Test Age Test Total Load Area Corr. Compressive No. (Days) Date (lbs) (in2) Factor Strength (psi) Remarks 97951 7 07-01 8830 4.02 1.00 2200 2.00x1.99x2.01 97952 28 07-22 12030 3.96 1.00 3040 97953 28 07-22 14210 4.08 1.00 3480 97954 28 07-22 13500 4.16 1.00 3250 97955 Hold 00-00 0 0.00 1.00 0 Reinforcement Inspection NT n/a: not applicable Specimen Size 2"X 2" Reinforcement Conforms NT n/t: not tested Test Reference C109 Comments: GeoTest was on site as requested to inspect the placement and test the grout being placed between the buildings foundation and the bottom of the concrete tilt-up panels. *AMENDED 7/3/19: The strength required at 28 days was changed to 2,500 PSI. 2,500 PSI is listed as the strength requirement for non-shrink grout on the "Plinth Repair Reinforcement" details, dated 5/9/19 by SDA. Design team should review to ensure that 2,500 PSI is applicable to this report. COPIES:chumphrey@safebuilt.com,dnhannam@frontier.com,dspencer@safebuilt.com,Elias@dantrawl.com, Reviewed by ericflones@stanwoodredi-mix.com,jake.I@coast-group.com,jasper@sdaeverett.com,kolander@arlingtonwa.gov, Ipeterson@arlingtonwa.gov,stever@coast-group.com,Tom@finneyneill.com This report shall not be reproduced except in full,without the written approval of GeoTest Services,Inc. The above test results relate to the sample(or location)tested. GMYT 1.888.251.5276 Bellingham Arlington I Oak Harbor www.geotest-inc.com Grout Compressive Strength Test Report PROJECT: Dantrawl JOB M 18-0376 CLIENT: Coast Construction Group REPORT#: GB002 CONTRACTOR: Coast Construction Group PAGE M 2 of 3 i The grout was hand packed, filling the void between the interior slab and the panels .r inside the face. _ • i s r 1 ♦ ys } e 51.5276 G EOT E S T I O' @k Harbor Bellingham I Arlington Oak Harborr www.geotest-inc.com Grout Compressive Strength Test Report PROJECT: Dantrawl JOB M 18-0376 CLIENT: Coast Construction Group REPORT#: GB002 CONTRACTOR: Coast Construction Group PAGE#: 3 of 3 "WON The contractor placed the grout using a loading bucket, ,z shovels, and a spade was used to pack the grout under the panels. y'i V. 741 Marine Drive,Bellingham, WA 98225 www.geotest-inc.com CMG OTG`7T 20611 67th Ave. NE. Unit A.Arlington, WA 98223 phone:(360) 733.7318 toll free:(888)251.5276 fax:(360) 733.7418 Inspection Report PROJECT: Dantrawl JOB#: 18-0376 ADDRESS: 6321 180th Street NE,Arlington, WA REPORT#: IR002 PERMIT#: BLD-1792 DATE: 12/27/2018 CLIENT: Coast Construction Group PAGE#: 1 of 1 CONTRACTOR: Coast Construction Group INSPECTOR: Brandon Defibaugh INSPECTION OF:Stem Wall at Gridline 2/13.2-C GeoTest was on site as requested to inspect the reinforcement at the above location. At the time of inspection, all reinforcement was in place and was ready for inspection. Reinforcement was found to conform to detail 6 on A10. Following an inspection, the contractor decided to pour the remaining concrete available from an adjacent pour (approximately 2 yards). For concrete details, see GeoTest's Concrete Report CB003 for job 18-0734, dated 12/27/18. Figure 1: Reinforcement at the time of inspection. Picture was taken facing west. ,a � s I �' I1 3 }C 4 COPIES:chumphrey@safebuilt.com,dspencer@safebuilt.com,Elias@dantrawl.com,jake.l@coast-group.com, Reviewed by kolander@arlingtonwa.gov,Ipeterson@arlingtonwa.gov This report shall not be reproduced except in full,without the written approval of GeoTest Services,Inc. 741 Marine Drive,Bellingham, WA 98225 www.geotest-inc.com 00Y GG OTG ST 20611 67th Ave. NE. Unit A.Arlington, WA 98223 phone:(360) 733.7318 toll free:(888)251.5276 fax:(360) 733.7418 lqft Inspection Report PROJECT: Dantrawl JOB#: 18-0376 ADDRESS: 6221 180th Street NE,Arlington, WA REPORT#: IR003 PERMIT#: BLD-1792 DATE: 1/4/2019 CLIENT: Coast Construction Group PAGE#: 1 of 1 CONTRACTOR: Coast Construction Group INSPECTOR: Tim Martin INSPECTION OF: Reinforcing Steel Placement GeoTest was on site as requested to inspect the placement of the reinforcing steel at the following locations. Elevator walls (grade level to the base of elevator pit), plinth at the southwest corner of the elevator and loading dock leveler slab. At the above locations, the reinforcing steel was in place and was found to be in conformance with the project drawings and with the structural sketch. Note: A final check of bar clearances is needed prior to the placement of the concrete. Photo of the column plinth reinforcement and anchor bolts at the south side of the elevator. •d: °:�V ' L ,} COPIES:chumphrey@safebuilt.com,dspencer@safebuilt.com,Elias@dantrawl.com,jake.l@coast-group.com, Reviewed by kolander@arlingtonwa.gov,Ipeterson@arlingtonwa.gov This report shall not be reproduced except in full,without the written approval of GeoTest Services,Inc. 741 Marine Drive,Bellingham, WA 98225 www.geotest-inc.com 00Y GG OTG ST 20611 67th Ave. NE. Unit A.Arlington, WA 98223 phone:(360) 733.7318 toll free:(888)251.5276 fax:(360) 733.7418 lqft Inspection Report PROJECT: Dantrawl JOB#: 18-0376 ADDRESS: 6221 180th Street NE,Arlington, WA REPORT#: IR004 PERMIT#: BLD-1792 DATE: 1/8/2019 CLIENT: Coast Construction Group PAGE#: 1 of 1 CONTRACTOR: Coast Construction Group INSPECTOR: Dan Weaver INSPECTION OF: Footing Reinforcing Steel at C& 12-14, 14&C-D, Dock Leveler Wall at 2&B.3-B.5 Comments: GeoTest was on site to perform special inspection for the above reinforcing steel.The reinforcing steel and anchor bolts were in place and were found to conform with schedule and details on S3&S4. All laps, size, grade, cover, clearances, spacing and quantity were found to conform to the approved plans. See reinforced concrete report this date for results. COPIES:chumphrey@safebuilt.com,dspencer@safebuilt.com,Elias@dantrawl.com,jake.l@coast-group.com, Reviewed by kolander@arlingtonwa.gov,Ipeterson@arlingtonwa.gov This report shall not be reproduced except in full,without the written approval of GeoTest Services,Inc. 741 Marine Drive,Bellingham, WA 98225 www.geotest-inc.com 00Y GG OTG ST 20611 67th Ave. NE. Unit A.Arlington, WA 98223 phone:(360) 733.7318 toll free:(888)251.5276 fax:(360) 733.7418 lqft Inspection Report PROJECT: Dantrawl JOB#: 18-0376 ADDRESS: 6221 180th Street NE,Arlington, WA REPORT#: IR005 PERMIT#: BLD-1792 DATE: 1/11/2019 CLIENT: Coast Construction Group PAGE#: 1 of 2 CONTRACTOR: Coast Construction Group INSPECTOR: Sean Rogerson INSPECTION OF: Reinforcing Steel for Warehouse Area Slab on Grade GeoTest was on site as requested to observe reinforcing bar for the slab on grade for the warehouse area of the building. The office area did not have rebar installed at this time. Rebar was inspected and was found to be in progress at the time of the inspection. The mat reinforcing of#5 bar at 12" on center was generally complete, but the reinforcement around columns and at certain locations was not complete. A further inspection will be required prior to concrete placement. See photo captions below for details. The contractor was verbally notified of inspection results. _ At various column locations,the hairpin and hoop bars did " '� `•• not maintain clearance from formwork as seen in the ; photo. 1 COPIES:chumphrey@safebuilt.com,dspencer@safebuilt.com,Elias@dantrawl.com,jake.l@coast-group.com, Reviewed by kolander@arlingtonwa.gov,Ipeterson@arlingtonwa.gov This report shall not be reproduced except in full,without the written approval of GeoTest Services,Inc. 741 Marine Drive, Bellingham, WA 98225 www.geotest-inc.com 20611 67th Ave. NE. Unit A.Arlington, WA 98223 CyeOTeST � phone:(360) 733.7318 toll free:(888)251.5276 fax:(360) 733.7418 Inspection Report PROJECT: Dantrawl JOB#: 18-0376 CLIENT: Coast Construction Group REPORT#: IR005 CONTRACTOR: Coast Construction Group PAGE#: 2 of 2 At perimeter column locations : the vapor barrier needs to be cut back to allow concrete encasement of the reinforcement. Some column ur ! locations were missing the #3 y -y hoop tie bars at 4 on center. 4. r At grid B/7 the slab reinforcing was not complete due to the 1 water service excavation that = was not backfilled at the time of the inspection. c� At approximately grid B/8 the grade was too high, causing the reinforcement to protrude above the top of slab r elevation. The slab thickness was called out to be 5 1/2". - ` The contractor commented _ that they will remove the rebar ; and cut the subgrade to the correct elevation prior to concrete placement. r" . 741 Marine Drive,Bellingham, WA 98225 www.geotest-inc.com 20611 67th Ave. NE. Unit A.Arlington, WA 98223 CMG OTG'ST phone:(360) 733.7318 toll free:(888)251.5276 fax:(360) 733.7418 Inspection Report PROJECT: Dantrawl JOB#: 18-0376 ADDRESS: 6221 180th Street NE,Arlington, WA REPORT#: IR006 PERMIT#: BLD-1792 DATE: 2/23/2019 CLIENT: Coast Construction Group PAGE#: 1 of 1 CONTRACTOR: Coast Construction Group INSPECTOR: Joel Morder INSPECTION OF:Tilt-Up Panels 1-33 GeoTest on site for inspection of tilt-up panels 1-33. Reviewed reinforcing steel in accordance with the elevation drawings located on structural drawing pages S5 and S6 and found the inspected panels to be in conformance with reference documents. Tilt-Up Panel With Block Out for the Door r 7M ._04-06d COPIES:chumphrey@safebuilt.com,dspencer@safebuilt.com,Elias@dantrawl.com,jake.l@coast-group.com, Reviewed by kolander@arlingtonwa.gov,Ipeterson@arlingtonwa.gov This report shall not be reproduced except in full,without the written approval of GeoTest Services,Inc. 741 Marine Drive,Bellingham, WA 98225 www.geotest-inc.com 20611 67th Ave. NE. Unit A.Arlington, WA 98223 CMG OTG'ST phone:(360) 733.7318 toll free:(888)251.5276 fax:(360) 733.7418 Inspection Report PROJECT: Dantrawl JOB#: 18-0376 ADDRESS: 6221 180th Street NE,Arlington, WA REPORT#: IR007 PERMIT#: BLD-1792 DATE: 3/11/2019 CLIENT: Coast Construction Group PAGE#: 1 of 1 CONTRACTOR: Coast Construction Group INSPECTOR: Logan Senrud INSPECTION OF: Previously inspected items and items noted in FOR memo dated 3/8/19 Comments: GeoTest was on-site to review the as-built condition of the completed foundation connection points and review available information for the revised foundation connections at 13/2, D/14 and D/2. In response to the SDA letter provided to us dated 3/8/19 we can provide the following clarifications and verification: In regards to the first bullet point noted in SDA letter referenced above,we have amended our AA003 report to reflect conformance of this item. In regards to the 2nd bullet point,we can confirm that the reinforcement configuration and concrete were in conformance with the revised"plinth repair"drawings dated 1/24/19 as stated in our report CB011.Welding inspection was not conducted prior to concrete placement at these locations.We have been provided with applicable welder's certification, photos of the welded rebar to plate, and material sales report for the A706 rebar supplied. Review of these items does not constitute special inspection, but the provided information suggests that the welder was certified to complete the work, the A706 rebar supplied meets the grade requirements for welded rebar, and that the bars were welded to the plate with SMAW process in lieu of automatic stud welding. In regards to the third bullet point noted in SDA letter referenced above,we have independently verified each of the noted in-progress or discrepant items noted in IR005 and all were corrected per plan prior to concrete placement. The only exception being the first item noted in IR005, lack of coverage over hairpin ties. This specific item was noted in discrepant reports CB007 and C13008. COPIES:chumphrey@safebuilt.com,dnhannam@frontier.com,dspencer@safebuilt.com,Elias@dantrawl.com,jake.l@coast- Reviewed by group.com,jasper@sdaeverett.com,kolander@arlingtonwa.gov,Ipeterson@arlingtonwa.gov,Tom@finneyneill.com This report shall not be reproduced except in full,without the written approval of GeoTest Services,Inc. 51.5276 G EOT E S T I O' @k Harbor Bellingham I Arlington Oak Harborr vvww.geotest-i nc.com Inspection Report PROJECT: Dantrawl JOB#: 18-0376 ADDRESS: 6221 180th Street NE, Arlington, WA REPORT#: IR008 PERMIT#: BLD-1792 DATE: 4/4/2019 CLIENT: Coast Construction Group PAGE#: 1 of 8 CONTRACTOR: Coast Construction Group INSPECTOR: Tim Martin INSPECTION OF: Panel Cracking and Clip Inset Verification at all Exterior Panel/Foundation Connections Geotest was on site as requested by Coast Construction to inspect the extent of cracking at exterior foundation/panel clip connections. Additionally, we inspected all exterior foundation/panel clips for excessive inset into the tilt panels. While on site we reviewed the memoranum by Structural Design Associations, dated April 1, 2019, titled "Panel Deficiencies". Cracks in Panels: Per SDA's letter referenced above (2.E) - Panel cracks that are located more than 4" from the weld shall be reported to SDA in writing (reference sketch titled "Cracks at Foundation/Panel Clip"). GeoTest noted the following: • All exterior foundation/panel connections were measured from the top of the crack to the weld. Six locations exceeded 4" and are detailed on subsequent pages including three photos of each location. See figures 1 through 18. Foundation/Panel Clip Inset: SDA's letter, item 3, notes that at least one panel/foundation clip is inset into the panel. The letter states that, "the site condition is deemed to be structurally adequate if the inset is 2" or less from the exterior face of the panel." GeoTest noted the following: • All exterior foundation/panel connection clips were generally flush with the exterior face of the panel except one location which was inset. The inset was measured and found to be under the 2" criteria. See figures 19 and 20. Contractor was made aware of our findings while on site. COPIES:chumphrey@safebuilt.com,dnhannam@frontier.com,dspencer@safebuilt.com,Elias@dantrawl.com,jake.l@coast- Reviewed by group.com,jasper@sdaeverett.com,kolander@arlingtonwa.gov,Ipeterson@arlingtonwa.gov,Tom@finneyneill.com This report shall not be reproduced except in full,without the written approval of GeoTest Services,Inc. GMYT 1.888.251.5276 Bellingham I Arlington I Oak Harbor www.geotest-inc.com Inspection Report PROJECT: Dantrawl JOB M 18-0376 CLIENT: Coast Construction Group REPORT#: IR008 CONTRACTOR: Coast Construction Group PAGE M 2 of 8 Figure 1: Panel number one, third embed from the panel's south end. The crack extends 10 to 11 inches from the 1/4" =C fillet welded splice plate. v Figure 2: Photo two of crack off the embed plate at panel one. J 1�• f S P } Figure 3: Photo three at panel one. , e r �` ' a; �� 51.5276 G EOT E S T I O' @k Harbor Bellingham I Arlington Oak Harborr www.geotest-inc-com Inspection Report PROJECT: Dantrawl JOB M 18-0376 CLIENT: Coast Construction Group REPORT#: IR008 CONTRACTOR: Coast Construction Group PAGE M 3 of 8 �Aq Figure 4: Panel number one. North embed plate. Crack extends 4-3/4" from the 1/4" fillet weld. m_ L .o Figure 5: Photo two of panel number one's north embed plate. r t. r Figure 6: Photo three of panel number one's north embed plate. AEMWM&z A GMYT 1.888.251.5276 Bellingham I Arlington I Oak Harbor www.geotest-inc.com Inspection Report PROJECT: Dantrawl JOB M 18-0376 CLIENT: Coast Construction Group REPORT#: IR008 CONTRACTOR: Coast Construction Group PAGE M 4 of 8 Figure 7: Panel number two. At the panel's north end embed plate the crack extends 6 to 7" from the 1/4" fillet weld. h, Figure 8: Photo two of panel number two north end embed plate. s N, ,y, Figure 9: Photo three of panel number two north end embed plate. 51.5276 G EOT E S T I O' @k Harbor Bellingham I Arlington Oak Harborr www.geotest-inc-com Inspection Report PROJECT: Dantrawl JOB#: 18-0376 CLIENT: Coast Construction Group REPORT#: IR008 CONTRACTOR: Coast Construction Group PAGE#: 5 of 8 Figure 10: Panel number four. The second embed plate from the panel's south end - the crack extends 5 to 6" a from the 1/4" fillet weld. .01-- N Figure 11: Photo two of panel number four. The second embed plate from the panel's south end. ;: ;.-,,; Figure 12: Photo three of panel number four. The second embed plate from the panel's south end. m `F �� GMYT 1.888.251.5276 Bellingham I Arlington I Oak Harbor www.geotest-inc.com Inspection Report PROJECT: Dantrawl JOB M 18-0376 CLIENT: Coast Construction Group REPORT#: IR008 CONTRACTOR: Coast Construction Group PAGE M 6 of 8 Figure 13: Panel number six. Third embed from the TV panel's south end shows cracking 4 to 5" from the 1/4" fillet weld. Figure 14: Photo two of panel number six. Third embed ° from the panel's south end. ' s; ti Figure 15: Photo three of panel number six. Third m t' embed from the panel's south end. i V GMYT 1.888.251.5276 Bellingham I Arlington I Oak Harbor www.geotest-inc.com Inspection Report PROJECT: Dantrawl JOB M 18-0376 CLIENT: Coast Construction Group REPORT#: IR008 CONTRACTOR: Coast Construction Group PAGE M 7 of 8 Figure 16: Panel number six. The fourth embed from a the panel's south end shows cracking which extends 5" from the 1/4" fillet weld. 5- �14 A. x Figure 17: Photo two of panel number six. The fourth embed from the panel's south end. m t•o .: : r _ �s Figure 18: Photo three of panel number six. The fourth embed from the panel's south end. - _ a M 51.5276 G EOT E S T I O' @k Harbor Bellingham I Arlington Oak Harborr www.geotest-inc.com Inspection Report PROJECT: Dantrawl JOB M 18-0376 CLIENT: Coast Construction Group REPORT#: IR008 CONTRACTOR: Coast Construction Group PAGE#: 8 of 8 Figure 19: Inset Embed Plate. Panel 14 second embed plate from the panel's west end. Embed was inset 1-7/8". This is less than the maximum inset distance of two inches noted by the project's structural engineer. 4 p% p� r r Figure 20: Photo two of Inset Embed Plate at Panel 14, second embed plate from the panel's west. Embed was inset 1-7/8". This is less than the maximum inset distance of two inches noted by the project's structural engineer. w � d ri W 51.5276 GEOT E S T I O' @k Harbor Bellingham I Arlington Oak Harborr www.geotest-inc.com Inspection Report PROJECT: Dantrawl JOB#: 18-0376 ADDRESS: 6221 180th Street NE,Arlington, WA REPORT#: IR009 PERMIT#: BLD-1792 DATE: 4/19/2019 CLIENT: Coast Construction Group PAGE#: 1 of 2 CONTRACTOR: Coast Construction Group INSPECTOR: Dan Weaver INSPECTION OF: Loading Dock Retaining Wall Reinforcing Steel Geotest was on site to perform a special inspection for the above reinforcing steel. The retaining wall reinforcing steel was in place and was found to conform detail #1 on S2. Concrete was rescheduled for Monday 4-22-19. reinforcing steel size, grade, quantity, laps, spacing, clearances were all found to conform with the approved plans. View looking south at the north end of building retaining walls at the loading dock. 4 - COPIES:chumphrey@safebuilt.com,dnhannam@frontier.com,dspencer@safebuilt.com,Elias@dantrawl.com,jake.l@coast- Reviewed by group.com,jasper@sdaeverett.com,kolander@arlingtonwa.gov,Ipeterson@arlingtonwa.gov,stever@coast-group.com, Tom@finneyneill.com This report shall not be reproduced except in full,without the written approval of GeoTest Services,Inc. 51.5276 G EOT E S T I O' @k Harbor Bellingham I Arlington Oak Harborr www.geotest-inc.com Inspection Report PROJECT: Dantrawl JOB M 18-0376 CLIENT: Coast Construction Group REPORT#: IR009 CONTRACTOR: Coast Construction Group PAGE#: 2 of 2 View top down of retaining wall reinforcing steel. J t. J' +i s . f � 1 M 1 51.5276 G EOT E S T I O' @k Harbor Bellingham I Arlington Oak Harborr vvww.geotest-i nc.com Inspection Report PROJECT: Dantrawl JOB#: 18-0376 ADDRESS: 6221 180th Street NE, Arlington, WA REPORT#: IR010 PERMIT#: BLD-1792 DATE: 5/15/2019 CLIENT: Coast Construction Group PAGE#: 1 of 2 CONTRACTOR: Coast Construction Group INSPECTOR: Zach Click INSPECTION OF:Steel Reinforcement for Concrete Post Bases and Northern Retaining Wall GeoTest was on site, as requested, to inspect steel reinforcement for the above-noted locations. GeoTest found that reinforcement conformed with the approved project plans, specifically details on S2.0 and S3.0. Please see GeoTest's Concrete Break Report (CB014, dated 5/15/19) for details regarding concrete placement and testing. COPIES:chumphrey@safebuilt.com,dnhannam@frontier.com,dspencer@safebuilt.com,Elias@dantrawl.com,jake.l@coast- Reviewed by group.com,jasper@sdaeverett.com,kolander@arlingtonwa.gov,Ipeterson@arlingtonwa.gov,stever@coast-group.com, Tom@finneyneill.com This report shall not be reproduced except in full,without the written approval of GeoTest Services,Inc. GMYT 1.888.251.5276 Bellingham I Arlington I Oak Harbor www.geotest-inc-com Inspection Report PROJECT: Dantrawl JOB M 18-0376 CLIENT: Coast Construction Group REPORT#: IR010 CONTRACTOR: Coast Construction Group PAGE M 2 of 2 IF I _. a --t NOW. 46* 4� ", 51.5276 G EOT E S T I O' @k Harbor Bellingham I Arlington Oak Harborr vvww.geotest-i nc.com Inspection Report PROJECT: Dantrawl JOB#: 18-0376 ADDRESS: 6221 180th Street NE, Arlington, WA REPORT#: IR011 PERMIT#: BLD-1792 DATE: 6/17/2019 CLIENT: Coast Construction Group PAGE#: 1 of 3 CONTRACTOR: Coast Construction Group INSPECTOR: Tim Martin INSPECTION OF:Concrete Repair GeoTest was on site as requested to inspect the repair of the crack damage of concrete at the panel embed weld plates. The buildings bottom plates were coated with Armatec-110, bonding primer and corrosion inhibitor. Two coats were applied using a stiff brush (see photo) and the manufacturer's instructions were followed. The substrate prep, the mixing of the product, the application of the product and curing time and conditions all were as recommended by the manufacturer. At some locations, concrete appeared to have been saw cut to a depth of 1/2" around the plate and bushed hammered within the saw cut area to the same 1/2" depth. At these locations, the contractor applied Sika 123 Plus repair mortar in addition to the Armatec-110. The manufacturer's instructions were again followed with the application of this product. COPIES:chumphrey@safebuilt.com,dnhannam@frontier.com,dspencer@safebuilt.com,Elias@dantrawl.com,jake.l@coast- Reviewed by group.com,jasper@sdaeverett.com,kolander@arlingtonwa.gov,Ipeterson@arlingtonwa.gov,stever@coast-group.com, Tom@finneyneill.com This report shall not be reproduced except in full,without the written approval of GeoTest Services,Inc. 51.5276 G EOT E S T I O' @k Harbor Bellingham I Arlington Oak Harborr www.geotest-inc.com Inspection Report PROJECT: Dantrawl JOB M 18-0376 CLIENT: Coast Construction Group REPORT#: IR011 CONTRACTOR: Coast Construction Group PAGE M 2 of 3 Armatec 110 part B container. 57.6°Z This is one of the three parts B which make up the product. Mao Armatec 110 PUE�., em.Like Cement Water-based epoxy resin/ Portland cement bonding agent wat Pon Mir._ Photo of the contractor applying the Sika 123 repair mortar over the Armatec bonding material a 51.5276 G EOT E S T I O' @k Harbor Bellingham I Arlington Oak Harborr www.geotest-inc-com Inspection Report PROJECT: Dantrawl JOB M 18-0376 CLIENT: Coast Construction Group REPORT#: IR011 CONTRACTOR: Coast Construction Group PAGE#: 3 of 3 Applying the second coat of - the Armatec 110 coating r material. S 51.5276 G EOT E S T I O' @k Harbor Bellingham I Arlington Oak Harborr vvww.geotest-i nc.com Inspection Report PROJECT: Dantrawl JOB#: 18-0376 ADDRESS: 6221 180th Street NE, Arlington, WA REPORT#: IR012 PERMIT#: BLD-1792 DATE: 6/25/2019 CLIENT: Coast Construction Group PAGE#: 1 of 2 CONTRACTOR: Coast Construction Group INSPECTOR: Tim Martin INSPECTION OF:Concrete Crack Repair-Pressurized Epoxy Injection GeoTest was on site as requested to inspect the concrete repair of the tilt-up panels. The cracks were just above the bottom embed plates at six panels on the buildings north side. The contractor followed the "Panel Deficiencies" report (1st amendment) dated 5/23/19 while conducting the repairs. Location of the repairs: Line B, six locations, all were found at the bottom of the concrete panels and just off an embed plate. The cracks were cleaned using compressed air removing any loose material and concrete dust prior to conducting the repair. See photo below. The contractor installed injection ports over each crack spaced at approximately two inches on center. The ports were installed and the surface of the crack was sealed using Sikadur-31 Hi-Mod Gel. After the Hi-Mod Gel cured the contractor pressure injected the cracks using the ports (See photo) with Sikadur -35 Hi-Mod (low viscosity) epoxy. COPIES:chumphrey@safebuilt.com,dnhannam@frontier.com,dspencer@safebuilt.com,Elias@dantrawl.com,jake.l@coast- Reviewed by group.com,jasper@sdaeverett.com,kolander@arlingtonwa.gov,Ipeterson@arlingtonwa.gov,stever@coast-group.com, Tom@finneyneill.com This report shall not be reproduced except in full,without the written approval of GeoTest Services,Inc. 51.5276 G EOT E S T I O' @k Harbor Bellingham I Arlington Oak Harborr www.geotest-inc-com Inspection Report PROJECT: Dantrawl JOB M 18-0376 CLIENT: Coast Construction Group REPORT#: IR012 CONTRACTOR: Coast Construction Group PAGE#: 2 of 2 y The epoxy paste adhesive and the epoxy grout were both mixed as recommended by " the product manufacturers - published instructions. g_-- -M Injecting the crack through the ports. 51.5276 G EOT E S T I O' @k Harbor Bellingham I Arlington Oak Harborr www.geotest-inc.com Inspection Report PROJECT: Dantrawl JOB#: 18-0376 ADDRESS: 6221 180th Street NE, Arlington, WA REPORT#: IR013 PERMIT#: BLD-1792 DATE: 6/26/2019 CLIENT: Coast Construction Group PAGE#: 1 of 2 CONTRACTOR: Coast Construction Group INSPECTOR: Tim Martin INSPECTION OF:Concrete Crack Repair-Pressure Epoxy Injection GeoTest was on site as requested to inspect the repairing of an additional crack at the location noted below. The contractor repaired six other locations earlier and an additional crack was discovered at B/7. Location of crack: Grid Line B/7 (top south corner of the panel), panel number four. The contractor followed the "Panel Deficiencies" report (1st amendment) dated 5/23/19 while conducting this repair. The crack was cleaned with compressed air to remove any loose material as well as any concrete dust prior to applying the injection ports. The port was installed, and the surface of the crack was sealed using Sikadur-31 Hi-Mod Gel. See photo. After the Sikadur-31 had cured the contractor injected Sikadur-35 Hi-Mod (low viscosity) epoxy into the ports until all ports were full, capping each port after the epoxy was applied. COPIES:chumphrey@safebuilt.com,dnhannam@frontier.com,dspencer@safebuilt.com,Elias@dantrawl.com,jake.l@coast- Reviewed by group.com,jasper@sdaeverett.com,kolander@arlingtonwa.gov,Ipeterson@arlingtonwa.gov,stever@coast-group.com, Tom@finneyneill.com This report shall not be reproduced except in full,without the written approval of GeoTest Services,Inc. 51.5276 G EOT E S T I O' @k Harbor Bellingham I Arlington Oak Harborr www.geotest-inc-com Inspection Report PROJECT: Dantrawl JOB M 18-0376 CLIENT: Coast Construction Group REPORT#: IR013 CONTRACTOR: Coast Construction Group PAGE#: 2 of 2 r The photo shows the crack with the injection t! ports in place. j A closer view of the repair with the Sikadur-31 sealing the crack in between the ports. Photo of the contractor injecting the bottom port with the Sika-35 repair epoxy. J f i E� � l 51.5276 G EOT E S T I O' @k Harbor Bellingham I Arlington Oak Harborr www.geotest-inc.com Inspection Report PROJECT: Dantrawl JOB#: 18-0376 ADDRESS: 6221 180th Street NE, Arlington, WA REPORT#: IR014 PERMIT#: BLD-1792 DATE: 6/28/2019 CLIENT: Coast Construction Group PAGE#: 1 of 3 CONTRACTOR: Coast Construction Group INSPECTOR: Tim Martin INSPECTION OF: Insulation Installation Verification at the Office Walls and East Elevation Walls GeoTest was on-site as requested, to inspect the buildings wall insulation at the office and the east wall along Line B. The insulation has been installed as detailed on drawings A9 and All. The above walls were filled to their full depth and no gaps were observed. The contractor had installed R21 Batt Insulation at the exterior walls of the office in addition to the manufactured wall panels R19 insulation. COPIES:chumphrey@safebuilt.com,dnhannam@frontier.com,dspencer@safebuilt.com,Elias@dantrawl.com,jake.l@coast- Reviewed by group.com,jasper@sdaeverett.com,kolander@arlingtonwa.gov,Ipeterson@arlingtonwa.gov,stever@coast-group.com, Tom@finneyneill.com This report shall not be reproduced except in full,without the written approval of GeoTest Services,Inc. 51.5276 G EOT E S T I O' @k Harbor Bellingham I Arlington Oak Harborr www.geotest-inc.com Inspection Report PROJECT: Dantrawl JOB M 18-0376 CLIENT: Coast Construction Group REPORT#: IR014 CONTRACTOR: Coast Construction Group PAGE#: 2 of 3 The photo shows the insulated tall wall at the west side of the entry. �► t 1 E T GMYT 1.888.251.5276 Bellingham I Arlington I Oak Harbor www.geotest-inc.com Inspection Report PROJECT: Dantrawl JOB M 18-0376 CLIENT: Coast Construction Group REPORT#: IR014 CONTRACTOR: Coast Construction Group PAGE M 3 of 3 i r - 1 �M 51.5276 G EOT E S T I O' @k Harbor Bellingham I Arlington Oak Harborr www.geotest-inc.com Inspection Report PROJECT: Dantrawl JOB#: 18-0376 ADDRESS: 6221 180th Street NE, Arlington, WA REPORT#: IR015 PERMIT#: BLD-1792 DATE: 7/3/2019 CLIENT: Coast Construction Group PAGE#: 1 of 3 CONTRACTOR: Coast Construction Group INSPECTOR: Levi Woollen-Danner INSPECTION OF: Foundation Waterproofing/Dampproofing GeoTest was on-site to review the installation of Sika Sikalastic 320 NS installed along the foundation wall and footing along the building perimeter, Gridlines B/2-11, 2/13-D, D/2-14, and 14/C-D. The material was installed to an average 40-45 mil thickness and was installed without any observable voids, bubbling, pinholes or other gaps in coverage. Material installed extended from grade line down the foundation wall, over the top of the footing, and approximately 2-3" down the face of the footing. The material was installed in a monolithic, unbroken manner, except at entryways where it was not installed to accommodate pending pour-backs. Material application thickness was not specified, and the extents of the installation were not clearly defined in project documents, but work installed to date appeared consistent with manufacturer requirements. See photos and captions on the following pages. COPIES:chumphrey@safebuilt.com,dnhannam@frontier.com,dspencer@safebuilt.com,Elias@dantrawl.com,jake.l@coast- Reviewed by group.com,jasper@sdaeverett.com,kolander@arlingtonwa.gov,Ipeterson@arlingtonwa.gov,stever@coast-group.com, Tom@finneyneill.com This report shall not be reproduced except in full,without the written approval of GeoTest Services,Inc. GMYT 1.888.251.5276 Bellingham I Arlington I Oak Harbor www.geotest-inc.com Inspection Report PROJECT: Dantrawl JOB M 18-0376 CLIENT: Coast Construction Group REPORT#: IR015 CONTRACTOR: Coast Construction Group PAGE M 2 of 3 P" Overview of installation, - - typical conditions of waterproofing installed at footing and foundation wall. _ v� j - ,�t s The extent of installation at corner footings. ;as - F�- 1 Installation was broken at , entries to accomodate woo", pending pourbacks. g ` GMYT 1.888.251.5276 Bellingham I Arlington I Oak Harbor www.geotest-inc-com Inspection Report PROJECT: Dantrawl JOB#: 18-0376 CLIENT: Coast Construction Group REPORT#: IR015 CONTRACTOR: Coast Construction Group PAGE#: 3 of 3 Overview of a typical installation. i Overview of typical installation. -s r Material installed on site. -: Y— F f 51.5276 GEOT E S T I O' @k Harbor Bellingham I Arlington Oak Harborr www.geotest-inc-com Inspection Report PROJECT: Dantrawl JOB#: 18-0376 ADDRESS: 6221 180th Street NE,Arlington, WA REPORT#: IR016 PERMIT#: BLD-1792 DATE: 7/12/2019 CLIENT: Coast Construction Group PAGE#: 1 of 2 CONTRACTOR: Coast Construction Group INSPECTOR: Tim Martin INSPECTION OF: Reinforcing Steel Placement GeoTest was on site to inspect the placement of the reinforcing steel for the concrete cover at the following plinth repair locations. Northwest, southwest, and northeast corners of the building. The reinforcing steel was in place and was found to be in conformance with sheet 1 of 1 PR cover drawing. Y, Southwest corner of the building. COPIES:chumphrey@safebuilt.com,dnhannam@frontier.com,dspencer@safebuilt.com,Elias@dantrawl.com,jake.l@coast- Reviewed by group.com,jasper@sdaeverett.com,kolander@arlingtonwa.gov,Ipeterson@arlingtonwa.gov,stever@coast-group.com, Tom@finneyneill.com This report shall not be reproduced except in full,without the written approval of GeoTest Services,Inc. GMYT 1.888.251.5276 Bellingham I Arlington I Oak Harbor www.geotest-inc-com Inspection Report PROJECT: Dantrawl JOB M 18-0376 CLIENT: Coast Construction Group REPORT#: IR016 CONTRACTOR: Coast Construction Group PAGE M 2 of 2 51.5276 GEOT E S T I O' @k Harbor Bellingham I Arlington Oak Harborr www.geotest-inc.com Inspection Report PROJECT: Dantrawl JOB#: 18-0376 ADDRESS: 6221 180th Street NE,Arlington, WA REPORT#: IR017 PERMIT#: BLD-1792 DATE: 7/18/2019 CLIENT: Coast Construction Group PAGE#: 1 of 1 CONTRACTOR: Coast Construction Group INSPECTOR: Dave Bufalini INSPECTION OF: Reinforcement GeoTest was on-site to observe the reinforcement within the following locations: 1. North Side Loading Dock Slab-on-Grade 2. Concrete Aprons at Overhead Door Locations 3. Concrete Curb at Sidewalk/Asphalt Driveway At the time of concrete placement, all reinforcement was in-place, secure and found to conform to the approved contract documents. Loading Dock �a COPIES:chumphrey@safebuilt.com,dnhannam@frontier.com,dspencer@safebuilt.com,Elias@dantrawl.com,jake.l@coast- Reviewed by group.com,jasper@sdaeverett.com,kolander@arlingtonwa.gov,Ipeterson@arlingtonwa.gov,stever@coast-group.com, Tom@finneyneill.com This report shall not be reproduced except in full,without the written approval of GeoTest Services,Inc. 51.5276 GEOT E S T I O' @k Harbor Bellingham I Arlington Oak Harborr vvww.geotest-i nc.com LATERAL FRAMING INSPECTION REPORT PROJECT: Dantrawl JOB#: 18-0376 ADDRESS: 6221 180th Street NE, Arlington, WA REPORT#: LF001 PERMIT#: BLD-1792 DATE: 6/17/2019 CLIENT: Coast Construction Group PAGE#: 1 of 2 CONTRACTOR: Coast Construction Group INSPECTOR: Tim Martin Item(s) Inspected Location Diaphragm Sheathing and Fasteners Entry Canopy:Canopy at Roof and Canopy Below 6"Wide, 16 GA.Tension Straps HISS Columns at Structural Canopy at Line 14/13.4 and C Reference Drawings: Front Entry Frame Retrofit Details and Drawing S7 Items Insiecte IrComments Lumber grade,species,size ❑ Structural panel grade and thickness,glue CDX Plywood, 15/32",Exp.1 Shear wall/diaphragm length, location Per Above Details Panel edges bear on framing members At Structural Diaphragm Diaphragm chord,drag strut, braces and related /� 16 GA.Strap Fastened to HSS Columns w/Kwik-Cote Screws, 12-24 X 2' Connection of blocking to wall top plates ❑ Gypsum board with wood framing conforms ❑ 3"nom.framing in place, nails staggered where shown ❑ Foundation plates or sills on concrete are treated ❑ Base-plate bolting complies ❑ Nail diameter, length, number of lines, spacing ❑ Pneumatic or mechanically driven fasteners conform ❑ Nail heads driven flush ❑ Hold down,type, location ❑ Lag bolts/proper hole size ❑ Cold-formed framing-proper size,gage, spacing ❑ Screw type,spacing,driven flush V Hilti Kwik-Flex, 12-14 x V HWH3,6 and 12" Cold-formed welding conforms(AWS D1.1 and D1.3) ❑ Other ❑ The above items were conforming ❑ Nonconforming Items(see below) ❑ Comments: GeoTest was on site as requested to inspect the above items. The sheathing, straps, and fasteners were found to confirm with the engineer's revised details. COPIES:chumphrey@safebuilt.com,dnhannam@frontier.com,dspencer@safebuilt.com,Elias@dantrawl.com,jake.l@coast- Reviewed by group.com,jasper@sdaeverett.com,kolander@arlingtonwa.gov,Ipeterson@arlingtonwa.gov,stever@coast-group.com, Tom@finneyneill.com This report shall not be reproduced except in full,without the written approval of GeoTest Services,Inc. 51.5276 GEOT E S T I O' @k Harbor Bellingham I Arlington Oak Harborr www.geotest-inc.com LATERAL FRAMING INSPECTION REPORT PROJECT: Dantrawl JOB M 18-0376 CLIENT: Coast Construction Group REPORT M LF001 CONTRACTOR: Coast Construction Group PAGE#: 2 of 2 Photo of the Roof Canopy y 51.5276 GEOT E S T I O' @k Harbor Bellingham I Arlington Oak Harborr vvww.geotest-i nc.com LATERAL FRAMING INSPECTION REPORT PROJECT: Dantrawl JOB#: 18-0376 ADDRESS: 6221 180th Street NE, Arlington, WA REPORT#: LF002 PERMIT#: BLD-1792 DATE: 6/28/2019 CLIENT: Coast Construction Group PAGE#: 1 of 2 CONTRACTOR: Coast Construction Group INSPECTOR: Tim Martin Item(s) Inspected Location Floor Diaphragm Sheathing 2nd Level at Office Shear Wall Framing Office Reference Drawings: Structural Drawings Items Inspected Comments Lumber grade,species,size ❑ Structural panel grade and thickness,glue Rated Sturd-i-Floor,23/32"(SW-15/32"),T&G, Exp.1 Shear wall/diaphragm length, location Per Plan Panel edges bear on framing members SW's are Fully Blocked Diaphragm chord,drag strut, braces and related ❑ Connection of blocking to wall top plates R/ A35 Clips were Covered at Most SW Locations"City Inspected Clips" Gypsum board with wood framing conforms ❑ 3"nom.framing in place, nails staggered where shown Yes and Yes Foundation plates or sills on concrete are treated Where Required Base-plate bolting complies /� Yes Nail diameter, length, number of lines, spacing /� .131 X 3"(Per Plan) Pneumatic or mechanically driven fasteners conform ❑ Nail heads driven flush Q� Satisfactory Hold down,type, location Per Plan Lag bolts/proper hole size ❑ Cold-formed framing-proper size,gage, spacing ❑ Screw type,spacing,driven flush ❑ Cold-formed welding conforms(AWS D1.1 and D1.3) ❑ Other ❑ The above items were conforming V Nonconforming Items(see below) ❑ Comments: GeoTest was on site as requested to inspect the above-mentioned items. All items found were addressed prior to our leaving the job site. The above items were found to conform to the proiect drawings. COPIES:chumphrey@safebuilt.com,dnhannam@frontier.com,dspencer@safebuilt.com,Elias@dantrawl.com,jake.l@coast- Reviewed by group.com,jasper@sdaeverett.com,kolander@arlingtonwa.gov,Ipeterson@arlingtonwa.gov,stever@coast-group.com, Tom@finneyneill.com This report shall not be reproduced except in full,without the written approval of GeoTest Services,Inc. 51.5276 G EOT E S T I O' @k Harbor Bellingham I Arlington Oak Harborr www.geotest-inc.com LATERAL FRAMING INSPECTION REPORT PROJECT: Dantrawl JOB#: 18-0376 CLIENT: Coast Construction Group REPORT#: LF002 CONTRACTOR: Coast Construction Group PAGE#: 2 of 2 The contractor installed two SIDS screws connecting the roof ledger to each stud at the stair roof. i Photo of one of the HGA10 clips connecting the 4 X 12 plate to the upright 4 X 12 at the canopy drag connection. 51.5276 GEOT E S T I O' @k Harbor Bellingham I Arlington Oak Harborr vvww.geotest-i nc.com LATERAL FRAMING INSPECTION REPORT PROJECT: Dantrawl JOB#: 18-0376 ADDRESS: 6221 180th Street NE, Arlington, WA REPORT#: LF003 PERMIT#: BLD-1792 DATE: 6/29/2019 CLIENT: Coast Construction Group PAGE#: 1 of 2 CONTRACTOR: Coast Construction Group INSPECTOR: Tim Martin Item(s) Inspected Location Shear Wall Sheathing All Office Shear Wall Locations Reference Drawings: Structural Drawings Items Inspected Comments Lumber grade,species,size ❑ Structural panel grade and thickness,glue Rated Sheathing, 15/32", Exp.1 (See Photo) Shear wall/diaphragm length, location ❑ Panel edges bear on framing members V SW's are Fully Blocked Diaphragm chord,drag strut, braces and related ❑ Connection of blocking to wall top plates ❑ Gypsum board with wood framing conforms ❑ 3"nom.framing in place, nails staggered where shown ❑ Foundation plates or sills on concrete are treated ❑ Base-plate bolting complies ❑ Nail diameter, length, number of lines, spacing /� .131"X 3",2"or 4"and 12" Pneumatic or mechanically driven fasteners conform ❑ Nail heads driven flush Yes Hold down,type, location Lag bolts/proper hole size ❑ Cold-formed framing-proper size,gage, spacing ❑ Screw type,spacing,driven flush ❑ Cold-formed welding conforms(AWS D1.1 and D1.3) ❑ Other ❑ The above items were conforming V Nonconforming Items(see below) ❑ Comments: GeoTest was on site as requested to conduct an inspection of the sheathing at the above shear walls. The sheathing and fasteners were found to conform to the project drawings. COPIES:chumphrey@safebuilt.com,dnhannam@frontier.com,dspencer@safebuilt.com,Elias@dantrawl.com,jake.l@coast- Reviewed by group.com,jasper@sdaeverett.com,kolander@arlingtonwa.gov,Ipeterson@arlingtonwa.gov,stever@coast-group.com, Tom@finneyneill.com This report shall not be reproduced except in full,without the written approval of GeoTest Services,Inc. 51.5276 G EOT E S T I O' @k Harbor Bellingham I Arlington Oak Harborr www.geotest-inc.com LATERAL FRAMING INSPECTION REPORT PROJECT: Dantrawl JOB#: 18-0376 CLIENT: Coast Construction Group REPORT#: LF003 CONTRACTOR: Coast Construction Group PAGE#: 2 of 2 This picture shows the staggered nail pattern at the seam of this shear wall panel. -a ' f W" e / E ' 51.5276 GEOT E S T I O' @k Harbor Bellingham I Arlington Oak Harborr www.geotest-inc.com Soil Observation Report PROJECT: Dantrawl JOB#: 18-0376 ADDRESS: 6221 180th Street NE,Arlington, WA REPORT#: S0003 PERMIT#: BLD-1792 DATE: 7/24/2019 CLIENT: Coast Construction Group PAGE#: 1 of 1 CONTRACTOR: Coast Construction Group INSPECTOR: Joel Morder OBSERVATION OF: Future 63rd Street, East Perimeter of the Site GeoTest on site for observation of a proof roll for the location referenced above. A fully loaded water truck was used to roll over the native subgrade, at a slow pace. The subgrade appeared firm and unyielding during the inspection. J . Proof Roll in Progress � COASTe y I - COPIES:chumphrey@safebuilt.com,dnhannam@frontier.com,dspencer@safebuilt.com,Elias@dantrawl.com,jake.l@coast- Reviewed by group.com,jasper@sdaeverett.com,kolander@arlingtonwa.gov,Ipeterson@arlingtonwa.gov,stever@coast-group.com, Tom@finneyneill.com This report shall not be reproduced except in full,without the written approval of GeoTest Services,Inc. GeoTest's representatives are on-site to observe,test and provide recommendations. The Contractor retains sole responsibility for the methods, operations and sequences of construction,including obtaining approval from the design authority and owner prior to proceeding with any change in the work scope and/or any associated costs. 51.5276 GEOT E S T I O' @k Harbor Bellingham I Arlington Oak Harborr www.geotest-inc.com Soil Observation Report PROJECT: Dantrawl JOB#: 18-0376 ADDRESS: 6221 180th Street NE, Arlington, WA REPORT#: S0004 PERMIT#: BLD-1792 DATE: 7/31/2019 CLIENT: Coast Construction Group PAGE#: 1 of 2 CONTRACTOR: Coast Construction Group INSPECTOR: Sean Maloney OBSERVATION OF:Proof Roll Conducted on CSBC Material for Future Paving GeoTest was on site as requested to observe a proof roll at the future location of 63rd Ave, located on the east side of the project. The subgrade consisted of native sandy soils overlaid by approximately 6 inches of import CSBC. GeoTest witnessed Coast perform a proof roll utilizing a dump truck fully loaded with fill material. There were no signs of yielding or rutting during the proof roll on this date. The subgrade condition was found to be firm and unyielding. Based on the results of the proof roll, it's our opinion that the subgrade has been properly prepared. Coast was made aware of GeoTest's results. COPIES:chumphrey@safebuilt.com,dnhannam@frontier.com,dspencer@safebuilt.com,Elias@dantrawl.com,jake.l@coast- Reviewed by group.com,jasper@sdaeverett.com,kolander@arlingtonwa.gov,Ipeterson@arlingtonwa.gov,stever@coast-group.com, Tom@finneyneill.com This report shall not be reproduced except in full,without the written approval of GeoTest Services,Inc. Geo-rest's representatives are on-site to observe,test and provide recommendations. The Contractor retains sole responsibility for the methods, operations and sequences of construction,including obtaining approval from the design authority and owner prior to proceeding with any change in the work scope and/or any associated costs. 1.888.251.5276 GMYT Bellingham I Arlington I Oak Harbor vmw.geotest-inc-com Soil Observation Report PROJECT: Dantrawl JOB M 18-0376 CLIENT: Coast Construction Group REPORT#: S0004 ,CONTRACTOR: Coast Construction Group PAGE#: 2 of 2 Plan map showing the A/ iI approximate location of proof roll observation. T L a R r L 00 ii1h i 0i I AN ----- Proof roll in progress. 741 Marine Drive,Bellingham, WA 98225 www.geotest-inc.com 00Y GG OTG ST 20611 67th Ave. NE. Unit A.Arlington, WA 98223 phone:(360) 733.7318 toll free:(888)251.5276 fax:(360) 733.7418 STRUCTURAL STEEL INSPECTION REPORT PROJECT: Dantrawl JOB#: 18-0376 ADDRESS: 6221 180th Street NE,Arlington, WA REPORT#: SS001 PERMIT#: BLD-1792 DATE: 3/6/2019 CLIENT: Coast Construction Group PAGE#: 1 of 2 CONTRACTOR: Coast Construction Group INSPECTOR: Tim Martin Type of Inspection: Visual Field Welding Item(s) Inspected Location 1/2"Plates Welded to Panel/Foundation Embeds Grid Line B/5 to 11 Reference Drawing(s): S-5 and Panel Connection Type E and F Revision Dated 1-17-19 W Reference Welders Comments E Inspection Code Certification Welders Name/Cert. No. L AWS D1.1 V/ IBC U WABO Anthony S.Sciumbato W00008 2nd Welder Previously D AWS D1.3 AISC 360, N AWS-SMAW Verified I AWS D1.4 AISC 341,J AWS-FCAW N AWS D1.8 IJ AWS-GMAW ❑ G Procedures ❑ B Reference Type Verification Method Comments O Inspection Code L IBC J ASTM A307 U Turn-of-Nut ❑ T AISC 360, N ASTM A325 ❑ Cal.Torque Wrench ❑ I ASTM A490 ❑ Snug-Tight E17_ N DTI ❑ Other ❑ G Twist-Off ❑ The above items were conforming ❑ Nonconforming Items(see below) Q� Comments: Geotest was on site as requested to inspect the welding of the 1/2" connection plates (panel/footing) at the above locations. AMENDED 3/12/19 - This report has been revised to reflect our inspection results compared to the revised panel connection detail for type E and F panel connections (dated 1-17-19). Work was found to conform to the revised detail except the plate did not have a beveled edge. Engineer review is required. COPIES:chumphrey@safebuilt.com,dnhannam@frontier.com,dspencer@safebuilt.com,Elias@dantrawl.com,jake.l@coast- Reviewed by group.com,jasper@sdaeverett.com,kolander@arlingtonwa.gov,Ipeterson@arlingtonwa.gov,Tom@finneyneill.com This report shall not be reproduced except in full,without the written approval of GeoTest Services,Inc.(03-13-19) 741 Marine Drive, Bellingham, WA 98225 www.geotest-inc.com 20611 67th Ave. NE. Unit A.Arlington, WA 98223 CyeOTeST � phone:(360) 733.7318 toll free:(888)251.5276 fax:(360) 733.7418 STRUCTURAL STEEL INSPECTION REPORT PROJECT: Dantrawl JOB#: 18-0376 CLIENT: Coast Construction Group REPORT#: ss001 CONTRACTOR: Coast Construction Group PAGE#: 2 of 2 Photo of welding the connection plates at the perimeter foundation. Note: The project drawings for type E and F panel connections were revised per drawing J. ; dated 1-17-19. 1 r- 741 Marine Drive,Bellingham, WA 98225 www.geotest-inc.com 00Y GG OTG ST 20611 67th Ave. NE. Unit A.Arlington, WA 98223 phone:(360) 733.7318 toll free:(888)251.5276 fax:(360) 733.7418 lqft STRUCTURAL STEEL INSPECTION REPORT PROJECT: Dantrawl JOB#: 18-0376 ADDRESS: 6221 180th Street NE,Arlington, WA REPORT#: SS002 PERMIT#: BLD-1792 DATE: 3/11/2019 CLIENT: Coast Construction Group PAGE#: 1 of 2 CONTRACTOR: Coast Construction Group INSPECTOR: Tim Martin Type of Inspection: Bolting and Visual Field Welding Item(s) Inspected Location Ad Bolting:Pre-Installation Verification NA Panel to Footing Connection Plates Line D13 to 14,14IC to D Reference Drawing(s): S5 and S6 and Butler Drawings W Reference Welders Comments E Inspection Code Certification Welders Name/Cert. No. L AWS D1.1 V/ IBC WABO Previously Verified D AWS D1.3 AISC 360, N AWS-SMAW I AWS D1.4 AISC 341,J ❑ AWS-FCAW N AWS D1.8 IJ AWS-GMAW ❑ G Procedures ❑ B Reference Type Verification Method Comments O Inspection Code L IBC ASTM A307 U Turn-of-Nut U 325ft Ibs=Torque at Pre-Tension using a Cal.Torque T AISC 360, N ASTM A325 Cal.Torque Wrench Wrench I ASTM A490 ❑ Snug-Tight ❑ N DTI ❑ Other ❑ G Twist-Off ❑ The above items were conforming Qr Nonconforming Items(see below) ❑ Comments: GeoTest was on site as requested to conduct a pre-installation test using a tension measuring device of the A325 bolts being used for the building connections. The concrete panel to foundation connection plates mentioned above were visually inspected and were found to conform with the project drawings and the engineer's direction for the connection plate to the foundation embed plate (1/2" fillet on the outer side of the plate). COPIES:chumphrey@safebuilt.com,dnhannam@frontier.com,dspencer@safebuilt.com,Elias@dantrawl.com,jake.l@coast- Reviewed by group.com,jasper@sdaeverett.com,kolander@arlingtonwa.gov,Ipeterson@arlingtonwa.gov,Tom@finneyneill.com This report shall not be reproduced except in full,without the written approval of GeoTest Services,Inc.(03-18-19) 741 Marine Drive,Bellingham, WA 98225 www.geotest-inc.com 00Y GG OTG ST 20611 67th Ave. NE. Unit A.Arlington, WA 98223 phone:(360) 733.7318 toll free:(888)251.5276 fax:(360) 733.7418 STRUCTURAL STEEL INSPECTION REPORT PROJECT: Dantrawl JOB M 18-0376 CLIENT: Coast Construction Group REPORT M SS002 CONTRACTOR: Coast Construction Group PAGE#: 2 of 2 Revised panel to footing connection at line D/14. - ti Or_ 196* :r 741 Marine Drive,Bellingham, WA 98225 www.geotest-inc.com 00Y GG OTG ST 20611 67th Ave. NE. Unit A.Arlington, WA 98223 Nall phone:(360) 733.7318 toll free:(888)251.5276 fax:(360) 733.7418 lqft STRUCTURAL STEEL INSPECTION REPORT PROJECT: Dantrawl JOB#: 18-0376 ADDRESS: 6221 180th Street NE,Arlington, WA REPORT#: SS003 PERMIT#: BLD-1792 DATE: 3/12/2019 CLIENT: Coast Construction Group PAGE#: 1 of 2 CONTRACTOR: Coast Construction Group INSPECTOR: Tim Martin Type of Inspection: Visual Field Welding Item(s) Inspected Location Panel to Footing Connection Plates Line D/2 to 3,2/B to D,D/1 to 11 Panel to Panel Connection Plates Lines B,D,2 and 14 Reference Drawing(s): S5 and S6 W Reference Welders Comments E Inspection Code Certification Welders Name/Cert. No. L AWS D1.1 V/ IBC WABO Previously Verified D AWS D1.3 AISC 360, N AWS-SMAW I AWS D1.4 AISC 341,J AWS-FCAW N AWS D1.8 IJ AWS-GMAW G Procedures Ell B Reference Type Verification Method Comments O Inspection Code L IBC J ASTM A307 U Turn-of-Nut El T AISC 360, N ASTM A325 0 Cal.Torque Wrench I ASTM A490 0 Snug-Tight E17_ N DTI Other ❑ G Twist-Off ❑ The above items were conforming Qr Nonconforming Items(see below) Q� Comments: GeoTest was on site to visually inspect the above-welded panel connections. The welds to the connection plate to the embed plates were visually in conformance with the project drawings and acceptable per table 6.1 of the AWS D1.1 code. A discrepancy was noted in that at some locations the embed plates were missing or mislocated. COPIES:chumphrey@safebuilt.com,dnhannam@frontier.com,dspencer@safebuilt.com,Elias@dantrawl.com,jake.l@coast- Reviewed by group.com,jasper@sdaeverett.com,kolander@arlingtonwa.gov,Ipeterson@arlingtonwa.gov,Tom@finneyneill.com This report shall not be reproduced except in full,without the written approval of GeoTest Services,Inc.(03-18-19) 741 Marine Drive,Bellingham, WA 98225 www.geotest-inc.com 00Y GG OTG ST 20611 67th Ave. NE. Unit A.Arlington, WA 98223 phone:(360) 733.7318 toll free:(888)251.5276 fax:(360) 733.7418 STRUCTURAL STEEL INSPECTION REPORT PROJECT: Dantrawl JOB M 18-0376 CLIENT: Coast Construction Group REPORT M SS003 CONTRACTOR: Coast Construction Group PAGE#: 2 of 2 Photo of a type 'B' connection plate. Photo of an interior panel to slab connection plate. I +r 51.5276 GEOT E S T I O' @k Harbor Bellingham I Arlington Oak Harborr www.geotest-inc.com STRUCTURAL STEEL INSPECTION REPORT PROJECT: Dantrawl JOB#: 18-0376 ADDRESS: 6221 180th Street NE,Arlington, WA REPORT#: SS004 PERMIT#: BLD-1792 DATE: 4/1/2019 CLIENT: Coast Construction Group PAGE#: 1 of 2 CONTRACTOR: Coast Construction Group INSPECTOR: Tim Martin Type of Inspection: High-Strength Bolts Item(s) Inspected Location Bolt Torque Verification All Column to Beam,Beam Splice,Wind-Girt to Column Connections Reference Drawing(s): Butler Manufacturing Drawings W Reference Welders Comments E Inspection Code Certification Welders Name/Cert. No. L AWS D1.1 U IBC U WABO ❑ D AWS D1.3 AISC 360, N AWS-SMAW ❑ I AWS D1.4 AISC 341,J AWS-FCAW N AWS D1.8 L AWS-GMAW G Procedures ❑ B Reference Type Verification Method Comments O Inspection Code L IBC ASTM A307 U Turn-of-Nut U 3/4",A325 Torqued to 326ft.lbs 7/8",A325 Torqued to T AISC 360, N ASTM A325 (� Cal.Torque Wrench 600ft.lbs I ASTM A490 ❑ Snug-Tight ❑ N DTI ❑ Other ❑ G Twist-Off ❑ The above items were conforming Qr Nonconforming Items(see below) ❑ Comments: See comments on page 2. COPIES:chumphrey@safebuilt.com,dnhannam@frontier.com,dspencer@safebuilt.com,Elias@dantrawl.com,jake.l@coast- Reviewed by group.com,jasper@sdaeverett.com,kolander@arlingtonwa.gov,Ipeterson@arlingtonwa.gov,Tom@finneyneill.com This report shall not be reproduced except in full,without the written approval of GeoTest Services,Inc.(04-08-19) 51.5276 G EOT E S T I O' @k Harbor Bellingham I Arlington Oak Harborr www.geotest-inc.com STRUCTURAL STEEL INSPECTION REPORT PROJECT: Dantrawl JOB M 18-0376 CLIENT: Coast Construction Group REPORT#: SS004 CONTRACTOR: Coast Construction Group PAGE M 2 of 2 GeoTest was on site as requested to inspect the high-strength bolted connections. The bolts were checked using a calibrated torque wrench to determine if they were tightened to the predetermined torque values listed above. Except for the beam to column connection at line 2, which has not been installed, all high-strength bolted connections were tightened to a pretension condition per the manufacturer instructions and approved plans. Overview of Inspected Area 2. 51.5276 GEOT E S T I O' @k Harbor Bellingham I Arlington Oak Harborr www.geotest-inc.com STRUCTURAL STEEL INSPECTION REPORT PROJECT: Dantrawl JOB#: 18-0376 ADDRESS: 6221 180th Street NE,Arlington, WA REPORT#: SS005 PERMIT#: BLD-1792 DATE: 4/22/2019 CLIENT: Coast Construction Group PAGE#: 1 of 2 CONTRACTOR: Coast Construction Group INSPECTOR: Tim Martin Type of Inspection: Visual Field Welding Item(s) Inspected Location ir Fit-Up for Single&Flare Beveled Groove Welds HSS Entrance Frame Reference Drawing(s): 1 &6 on S7 W Reference Welders Comments E Inspection Code Certification Welders Name/Cert. No. L AWS D1.1 V/ IBC WABO h1 WABO Certification Verified D AWS D1.3 AISC 360, N b/ AWS-SMAW ❑ I AWS D1.4 AISC 341,J AWS-FCAW N AWS D1.8 IJ AWS-GMAW rJ G Procedures ❑ B Reference Type Verification Method Comments O Inspection Code L IBC J ASTM A307 U Turn-of-Nut ❑ T AISC 360, N ASTM A325 ❑ Cal.Torque Wrench ❑ I ASTM A490 ❑ Snug-Tight E17_ _ N DTI ❑ Other ❑ G Twist-Off ❑ The above items were conforming Qr Nonconforming Items(see below) ❑ Comments: GeoTest was on site as requested to inspect the above items. The tube steel tee/corner connection fit-up was complete at the time of GeoTest's arrival. The contractor plans to weld the connections using flux-core wire and a shielding gas (Duel-Shield). GeoTest will return to inspect the completed PJP groove welds. COPIES:chumphrey@safebuilt.com,dnhannam@frontier.com,dspencer@safebuilt.com,Elias@dantrawl.com,jake.l@coast- Reviewed by group.com,jasper@sdaeverett.com,kolander@arlingtonwa.gov,Ipeterson@arlingtonwa.gov,stever@coast-group.com, Tom@finneyneill.com This report shall not be reproduced except in full,without the written approval of GeoTest Services,Inc.(05-14-19) GMYT 1.888.251.5276 Bellingham I Arlington I Oak Harbor www.geotest-inc.com STRUCTURAL STEEL INSPECTION REPORT PROJECT: Dantrawl JOB M 18-0376 CLIENT: Coast Construction Group REPORT#: SS005 CONTRACTOR: Coast Construction Group PAGE M 2 of 2 The photo shows the fit-up for a vertical single bevel groove weld. T 1.888.251.5276 Go P Bellingham I Arlington I Oak Harbor vvww.geotest-i nc.com STRUCTURAL STEEL INSPECTION REPORT PROJECT: Dantrawl JOB#: 18-0376 ADDRESS: 6221 180th Street NE,Arlington,WA REPORT#: SS007 PERMIT#: BLD-1792 DATE: 5/20/2019 CLIENT: Coast Construction Group PAGE#: 1 of 2 CONTRACTOR: Coast Construction Group INSPECTOR: Tim Martin Type of Inspection: Visual Field Welding Item(s) Inspected Location Added HSS Knee Braces With Groove Welds Entry Frame South Section Reference Drawing(s): Revised Detail B on S7 W Reference Welders Comments E Inspection Code Certification Welders Name/Cent. No. L AWS D1.1 /V IBC WABO Mitchell A.Snyder W23414 1/1/20 p AWS D1.3 ❑ AISC 360, N /� AWS-SMAW El I AWS D1.4 AISC 341,J ❑ AWS-FCAW if N AWS D1.8 AWS-GMAW ❑ G Procedures Cl B Reference O Inspection Code Type Verification Method Comments L IBC ASTM A307 ❑ Turn-of-Nut ❑ T AISC 360,N U ASTM A325 Cal.Torque Wrench ❑ I ASTM A490 ❑ Snug-Tight ❑ N DTI ❑ Other ❑ G Twist-Off ❑ The above items were conforming Qr Nonconforming Items(see below) ❑ Comments: Geotest was on site to inspect the welding of the two added knee braces to the 6" X 6" X 5/8" HSS columns and 6" X 10" X 5/8" HSS beam at the south frame section. The joints were fit-up in accordance with figure 3.5 (prequalified joint detail for PJP T, Y, and K tubular connections) of the AWS D1.1 code. The welding of the flare/beveled connection was done in accordance with the revised detail and with the AWS D1.1 code. COPIES:chumphrey@safebuilt.com,dnhannam@frontier.com,dspencer@safebuilt.com,Elias@dantrawl.com,jake.l@coast- Reviewed by group.com,jasper@sdaeverett.com,kolander@arlingtonwa.gov,Ipeterson@arlingtonwa.gov,stever@coast-group.com, Tom@finneyneill.com This report shall not be reproduced except in full,without the written approval of GeoTest Services,Inc.(05-23-19) 51.5276 G EOT E S T I O' @k Harbor Bellingham I Arlington Oak Harborr www.geotest-inc.com STRUCTURAL STEEL INSPECTION REPORT PROJECT: Dantrawl JOB M 18-0376 CLIENT: Coast Construction Group REPORT#: SS007 CONTRACTOR: Coast Construction Group PAGE#: 2 of 2 Welder using a grinder to clean-up the beveled knee brace prior to welding to connection. ' ,x . T 1.888.251.5276 Go P Bellingham I Arlington I Oak Harbor vvww.geotest-i nc.com STRUCTURAL STEEL INSPECTION REPORT PROJECT: Dantrawl JOB#: 18-0376 ADDRESS: 6221 180th Street NE,Arlington,WA REPORT#: SS008 PERMIT#: BLD-1792 DATE: 5/23/2019 CLIENT: Coast Construction Group PAGE#: 1 of 2 CONTRACTOR: Coast Construction Group INSPECTOR: Tim Martin Type of Inspection: Visual Field Welding Item(s) Inspected Location GLB Bucket:Fillet Welded to HSS Beam Entry Frame Line 14.2/B.1 and B.3 Angle Plate:Fillet Welded to HSS Beam Entry Frame Line 14.2/B.1 and B.3 Splice Plates:Fillet Welded to Web of WF Beams Office Mezzanine Line 11.2 to 13.1/B to B.75 Angle Shear Plates:Fillet Welded to WF Beam Office,Mezzanine Line 13.1/B.5 and B.75 Reference Drawing(s): S7 W Reference Welders Comments E Inspection Code Certification Welders Name/Cert. No. L AWS D1.1 /V IBC be WABO he WABO Certified p AWS D1.3 ❑ AISC 360, N Fof AWS-SMAW El I AWS D1.4 AISC 341,J ❑ AWS-FCAW if N AWS D1.8 AWS-GMAW ❑ G Procedures ❑ B Reference O Inspection Code Type Verification Method Comments L IBC ASTM A307 ❑ Turn-of-Nut ❑ T AISC 360,N U ASTM A325 Cal.Torque Wrench ❑ I ASTM A490 ❑ Snug-Tight ❑ N DTI ❑ Other ❑ G Twist-Off ❑ The above items were conforming Qr Nonconforming Items(see below) ❑ Comments: GeoTest was on site as requested to inspect the above-welded connections. The welds at the connections listed on this report were found to conform with the project structural drawings and were visually acceptable per table 6.1 of the AWS D1.1 code. See the following page for a photo of the east side bucket. COPIES:chumphrey@safebuilt.com,dnhannam@frontier.com,dspencer@safebuilt.com,Elias@dantrawl.com,jake.l@coast- Reviewed by group.com,jasper@sdaeverett.com,kolander@arlingtonwa.gov,Ipeterson@arlingtonwa.gov,stever@coast-group.com, Tom@finneyneill.com This report shall not be reproduced except in full,without the written approval of GeoTest Services,Inc.(06-14-19) GMYT 1.888.251.5276 Bellingham Arlington I Oak Harbor www.geotest-inc.com STRUCTURAL STEEL INSPECTION REPORT PROJECT: Dantrawl JOB M 18-0376 CLIENT: Coast Construction Group REPORT#: SS008 CONTRACTOR: Coast Construction Group PAGE M 2 of 2 1 j+ t II > 1uI I' 0 T 1.888.251.5276 Go P Bellingham I Arlington I Oak Harbor www.geotest-inc.com STRUCTURAL STEEL INSPECTION REPORT PROJECT: Dantrawl JOB#: 18-0376 ADDRESS: 6221 180th Street NE,Arlington,WA REPORT#: SS009 PERMIT#: BLD-1792 DATE: 6/24/2019 CLIENT: Coast Construction Group PAGE#: 1 of 3 CONTRACTOR: Coast Construction Group INSPECTOR: Tim Martin Type of Inspection: Visual Field Welding Item(s) Inspected Location Panel to Foundation Revised Angle Plate Connection Line D/2.5 and 6.7,B/6.1 Panel Gusset Reinforcement Line B/2,D/2,D/14 Reference Drawing(s): Engineer Revised Details W Reference Welders Comments E Inspection Code Certification Welders Name/Cert. No. L AWS D1.1 /e IBC be WABO Previously Verified p AWS D1.3 ❑ AISC 360, N Fof AWS-SMAW El I AWS D1.4 AISC 341,J ❑ AWS-FCAW if N AWS D1.8 AWS-GMAW ❑ G Procedures Cl B Reference O Inspection Code Type Verification Method Comments L IBC ASTM A307 ❑ Turn-of-Nut ❑ T AISC 360,N U ASTM A325 Cal.Torque Wrench ❑ I ASTM A490 ❑ Snug-Tight ❑ N DTI ❑ Other ❑ G Twist-Off ❑ The above items were conforming Qr Nonconforming Items(see below) ❑ Comments: GeoTest was on site as requested to inspect the base metal preparation fit-up and the welding of the above connections. The contractor followed the revised details using the correct type and size of base metal, filler metal and connecting the individual parts with the correct type and size of welds. COPIES:chumphrey@safebuilt.com,dnhannam@frontier.com,dspencer@safebuilt.com,Elias@dantrawl.com,jake.l@coast- Reviewed by group.com,jasper@sdaeverett.com,kolander@arlingtonwa.gov,Ipeterson@arlingtonwa.gov,stever@coast-group.com, Tom@finneyneill.com This report shall not be reproduced except in full,without the written approval of GeoTest Services,Inc.(07-01-19) 51.5276 G EOT E S T I O' @k Harbor Bellingham I Arlington Oak Harborr www.geotest-inc-com STRUCTURAL STEEL INSPECTION REPORT PROJECT: Dantrawl JOB M 18-0376 CLIENT: Coast Construction Group REPORT#: SS009 CONTRACTOR: Coast Construction Group PAGE M 2 of 3 Welder fitting-up the gusset reinforcement connection at the building's northwest r; corner. ' Bent plate connection at one of the off-set embed plates. -- "f pi v y �! t GMYT 1.888.251.5276 Bellingham Arlington I Oak Harbor www.geotest-inc.com STRUCTURAL STEEL INSPECTION REPORT PROJECT: Dantrawl JOB M 18-0376 CLIENT: Coast Construction Group REPORT#: SS009 CONTRACTOR: Coast Construction Group PAGE M 3 of 3 Completed gusset reinforcement connection at the building's southwest > corner. 4;. A GEOTEST 'IOakHarb Bellingham I Arlington I Oak Harbor www.geotest-inc.com STRUCTURAL STEEL INSPECTION REPORT PROJECT: Dantrawl JOB#: 18-0376 ADDRESS: 6221 180th Street NE,Arlington, WA REPORT#: SS010 PERMIT#: BLD-1792 DATE: 6/28/2019 CLIENT: Coast Construction Group PAGE#: 1 of 2 CONTRACTOR: Coast Construction Group INSPECTOR: Tim Martin Type of Inspection: Visual Field Welding Item(s) Inspected Location Shim Plates for Type A&H Rigid Frame to Panel Connections Line B,Line 2 to 11 at Columns and Beams Reference Drawing(s): "Friction Plate Weld Alternative"Detail Dated 5/22/19 From SDA W Reference Welders Comments E Inspection Code Certification Welders Name/Cert. No. L AWS D1.1 V/ IBC WABO WABO Certification was Verified D AWS D1.3 AISC 360, N �/ AWS-SMAW I AWS D1.4 AISC 341,J ❑ AWS-FCAW lie N AWS D1.8 IJ AWS-GMAW ❑ G Procedures ❑ B Reference Type Verification Method Comments O Inspection Code L IBC 'J ASTM A307 U Turn-of-Nut ❑ T AISC 360, N ASTM A325 ❑ Cal.Torque Wrench ❑ I ASTM A490 ❑ Snug-Tight o7 N DTI ❑ Other ❑ G Twist-Off ❑ The above items were conforming Qr Nonconforming Items(see below) ❑ Comments: GeoTest was on site as requested to inspect the 1/4" fillet welds of the friction plate to shim plate connections at the locations mentioned above. The welding of the above connections was found to conform with the engineer directions, project drawings and table 6.1 of the AWS D1.1 code. COPIES:chumphrey@safebuilt.com,dnhannam@frontier.com,dspencer@safebuilt.com,Elias@dantrawl.com,jake.l@coast- Reviewed by'✓ group.com,jasper@sdaeverett.com,kolander@arlingtonwa.gov,Ipeterson@arlingtonwa.gov,stever@coast-group.com, Tom@finneyneill.com This report shall not be reproduced except in full,without the written approval of GeoTest Services,Inc.(07-05-19) 51.5276 G EOT E S T I O' @k Harbor Bellingham I Arlington Oak Harborr www.geotest-inc.com STRUCTURAL STEEL INSPECTION REPORT PROJECT: Dantrawl JOB M 18-0376 CLIENT: Coast Construction Group REPORT#: ss010 CONTRACTOR: Coast Construction Group PAGE M 2 of 2 1/4" fillet welds inspected on this date. T 1.888.251.5276 Go P Bellingham I Arlington I Oak Harbor vvww.geotest-i nc.com STRUCTURAL STEEL INSPECTION REPORT PROJECT: Dantrawl JOB#: 18-0376 ADDRESS: 6221 180th Street NE,Arlington,WA REPORT#: SS011 PERMIT#: BLD-1792 DATE: 7/22/2019 CLIENT: Coast Construction Group PAGE#: 1 of 1 CONTRACTOR: Coast Construction Group INSPECTOR: Dan Weaver Type of Inspection: Visual Field Welding&Bolted Connections Item(s) Inspected Location 1/4"Fillet Welds at Panel Bracket Shim Pack D&2-14,B-D&2,14&C-D,B&2-11 7/8"Heavy Hex Bolts at Panel Bracket D&2-14,B-D&2,14&C-D,B&2-11 Reference Drawing(s): Approved Structural Drawings W Reference Welders Comments E Inspection Code Certification Welders Name/Cert. No. L AWS D1.1 /V IBC WABO Mitchell A Snyder#W23414 Expires 1-2020 p AWS D1.3 ❑ AISC 360, N Fof AWS-SMAW Fmf I AWS D1.4 AISC 341,J ❑ AWS-FCAW N AWS D1.8 AWS-GMAW ❑ G Procedures ❑ B Reference O Inspection Code Type Verification Method Comments L IBC ASTM A307 ❑ Turn-of-Nut ❑ 125Ftlbs T AISC 360,N U ASTM A325 Cal.Torque Wrench I ASTM A490 Snug-Tight ❑ N DTI ❑ Other ❑ G Twist-Off ❑ The above items were conforming Qr Nonconforming Items(see below) ❑ Comments: GeoTest was on site to perform a special inspection for the above single pass fillet welds and the bolted bracket connection at column/beam to tilt-up wall panel. All the fillet welds were visually found to conform and the bolted connections were all torque tested to 125 ft./lbs. at the bolt to insert and epoxy bolt connection. COPIES:chumphrey@safebuilt.com,dnhannam@frontier.com,dspencer@safebuilt.com,Elias@dantrawl.com,jake.l@coast- Reviewed by group.com,jasper@sdaeverett.com,kolander@arlingtonwa.gov,Ipeterson@arlingtonwa.gov,stever@coast-group.com, Tom@finneyneill.com This report shall not be reproduced except in full,without the written approval of GeoTest Services,Inc.(08-08-19) 276 GEOT E S T Oak H Harbor Bellingham �Arlington �Oak Harbor www.geotest-inc.com MAXIMUM SPECIFIC GRAVITY OF BITUMINOUS PAVING MIXTURES REPORT PROJECT: Dantrawl JOB#: 18-0376 ADDRESS: 6221 180t1 Street NE REPORT#: AR001 PERMIT#: BLD-1792 DATE: 8/1/2019 CLIENT: Coast Construction Group PAGE#: 1 of 1 CONTRACTOR: Coast Construction Group LAB#: 4628A HMA Type: %" ATB HMA Source: Granite—Smith Island (Everett) Sample Location: Sampled at 6:39 AM from a truck at plant Test Date: 8/1/2019 Laboratory Test Data: Test Type Test Reference Test Result Maximum Specific Gravity @ 770 F ASTM D2041 2.566 Maximum Density @ 77' F, pcf ASTM D2041 159.7 Type of Container:Vacuum Flask Sample Size: <1587.4>g Number of Samples: 1 Comments: Copies: Coast Construction Group City of Arlington Safe Built Dantrawl Inc Reviewed by This report shall not be reproduced except in full,without the written approval of GeoTest Services,Inc.(2-15-11) 276 GEOT E S T Oak H Harbor Bellingham �Arlington �Oak Harbor www.geotest-inc.com MAXIMUM SPECIFIC GRAVITY OF BITUMINOUS PAVING MIXTURES REPORT PROJECT: Dantrawl JOB#: 18-0376 ADDRESS: 6221 180t1 Street NE REPORT#: AR002 PERMIT#: BLD-1792 DATE: 8/1/2019 CLIENT: Coast Construction Group PAGE#: 1 of 1 CONTRACTOR: Coast Construction Group LAB#: 4629A HMA Type: 1/2" ATB HMA Source: Granite—Smith Island (Everett) Sample Location: Sampled at 9:43 AM from a truck at plant Test Date: 8/1/2019 Laboratory Test Data: Test Type Test Reference Test Result Maximum Specific Gravity @ 770 F ASTM D2041 2.541 Maximum Density @ 77' F, pcf ASTM D2041 158.2 Type of Container:Vacuum Flask Sample Size: <1604.4>g Number of Samples: 1 Comments: Copies: Coast Construction Group City of Arlington Safe Built Dantrawl Inc Reviewed by This report shall not be reproduced except in full,without the written approval of GeoTest Services,Inc.(2-15-11) Sieve Analysis Test Report - ASTM C136/C117 _1� _ .. 100 I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I 90 I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I 80 I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I 70 I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I LU 60 Z I I I I I I I I I I I I I I I LL I I I I I I I I I I I I I I I I I I I I I I I I I I I I I Z 50 I I I I I I I I I I I I I I I IL U I I I I I I I I I I I I I I I C w 40 I I I I I I I I I I I I I I (� 30 i I I I I I I I I I I I I I I I I I I I I I I I I I I I I I 20 I I I I I I I I I I I I I I I I I I I I I I I I I I I I O rQ) 10 V Q 0 > 100 10 1 0.1 0 GRAIN SIZE-mm. %+3" %Gravel %Sand %Fines a� Coarse Fine Coarse Medium Fine Silt 5 9 6 6 22 48 4 SIEVE PERCENT SPEC.* PASS? Soil Description SIZE FINER PERCENT (X=NO) Fill for Site Grading 4" 100 Poorly graded sand with gravel 0 2" 89 1" 87 _ 86 Atterberg Limits 1/2" 86 PL= LL= PI= 3/8" 83 Coefficients c #4 80 D90= 54.8869 D85= 11.7395 D60= 0.5535 #10 74 D50= 0.4036 D30= 0.2498 D15= 0.1488 #20 68 D10= 0.1145 Cu= 4.84 CC= 0.99 a) #40 52 Classification #00 l0 USCS= SP AASHTO= :3 #200 3.6 Remarks oNo specification provided. a� ro e (no specification provided) 0 Location:Native-Sampled from site stockpile E Sample Number:4395A Date: 04-05-19 o Client: Coast Construction Group la °' CG 141 eOTe5T 81.Mgh n WA Project: Dantrawl soW��GoO w Ise. 6221 180th Street NE,Arlington,WA,98223 � .GooTyFlnci Project No: 18-0376 Figure SP002 Tested By: AH Checked By: BF Moisture-Density (Proctor) Test Report 130 125 ° 121.7 120 U Q _ y to � U _0 ) � 115 ° m 0 a� 0 > 110 0 ZAV for CU Sp.G._ 2.55 3 `0 1051 1 1#[ 1 6 8 10 12 14 16 18 Water content, % -Rock Corrected -Uncorrected 0 3 Test specification: ASTM D 1557-12 Method A Modified ASTM D4718-15 Oversize Corr.Applied to Each Test Point Elev/ Classification Nat. %> %< -= Depth USCS AASHTO Moist. Sp.G. LL PI #4 No.200 a� x SP 20 3.6 c0i ROCK CORRECTED TEST RESULTS UNCORRECTED MATERIAL DESCRIPTION 2 Maximum dry density= 121.7 pcf 114.1 pcf Fill for Site Grading Poorly graded sand with gravel 2 a) Optimum moisture=8.8% 10.8% o Project No. 18-0376 Client: Coast Construction Group Remarks: Project: Dantrawl SPG:Assumed E 6221 180th Street NE,Arlington,WA,98223 Date: 04-05-19 o 0 Loc.:Native-Sampled from site stockpile Sample No.:4395A 141 Mume Drive W (;e OTe 5T 9,11.Nh m WA"22t: H - www ,.,'1om Figure SP002 Tested By: AH Checked By: BF Sieve Analysis Test Report - ASTM C136/C117 O O O C C C C O O O O O O V O 100 90 80 70 W 60 LL 50 LLJ c W 40 i N c� 30 20 1 1 p U 10 0 0 ' > 10 1 0.1 G GRAIN SIZE-mm. +3" %Gravel %Sand %Fines % Coarse Fine Coarse Medium Fine Silt 0 5 20 12 34 24 5 SIEVE PERCENT SPEC.` PASS? Soil Description SIZE FINER PERCENT (X=NO) Structural Fill 2" 100 poorly graded sand with silt and gravel � 1-1/2" 99 1" 98 _ 95 Atterberg Limits 1/2" 90 PL= LL= PI= 3/8" 86 Coefficients c #4 75 D90= 12.7638 D85= 8.8927 D60= 1.6462 #10 63 D50= 0.9551 D30= 0.4369 D15= 0.2459 #20 47 D10= 0.1742 Cu= 9.45 Cc= 0.67 #40 29 Classification #00 19 USCS= AASHTO= #200 5.4 Remarks oNo specification provided. a� 2 (no specification provided) O C Location:Imported Native-Sampled from Site Stockpile E Sample Number:4565A Date: 6-28-19 o Client: Coast Construction Group 2 BelUnyhan�I At lington I Oak Hart GEOTEST It Project: Dantrawl H . rn AN"ge0rest,nCC1 6221 180th Street NE,Arlington,WA,98223 Project No: 18-0376 Figure SP003 Tested By: MC Checked By: BF Moisture-Density (Proctor) Test Report 130 128 ° 126 a _ y to � U 124 ° 12 2 ZAV for 0 Sp.G. 0 _ 2.60 0 > 122 0 CU c B 3 `0 120 6 7 8 9 10 11 12 ; Water content, % 1:5 --&---Rock Corrected -Uncorrected 0 3 Test specification: ASTM D 1557-12 Method B Modified ASTM D4718-15 Oversize Corr.Applied to Each Test Point Elev/ Classification Nat. %> %< -= Depth USCS AASHTO Moist. Sp.G. LL PI 3/8 in. No.200 a� X 2.65 14 5.4 c0i ROCK CORRECTED TEST RESULTS UNCORRECTED MATERIAL DESCRIPTION Structural Fill Maximum dry density= 127.7 pcf 123.2 pcf poorly graded sand with silt and gravel a� a) Optimum moisture=7.9% 9.0% o Project No. 18-0376 Client: Coast Construction Group Remarks: Project: Dantrawl SPG:Assumed E 6221 180th Street NE,Arlington,WA,98223 Date: 6-28-19 o Loc.:Imported Native-Sampled from Site Stockpile Sample No.:4565A a� I ssa.zs s. GEOTEST � iiellm9nam I�thngto�I Oao.than- j www geotest•inc corn H Figure SP003 Tested By: MC Checked By: BF 741 Marine Drive, Bellingham, WA 98225 www.geotest-inc.com 0�jp Gy OTG ST 20611 67th Ave.NE. Unit A.Arlington, WA 98223 phone:(360) 733.7318 toll free:(888)251.5276 fax:(360) 733.7418 Concrete Inspection & Compressive Strength Test Report PROJECT: Smartcap JOB#: 18-0734 ADDRESS: 6321 180th Street NE,Arlington, WA REPORT#: CB007 PERMIT M BLD-2016 DATE: 2/21/2019 CLIENT: Coast Construction Group PAGE#: 1 of 4 CONTRACTOR: Coast Construction Group INSPECTOR: Tristan Coragiulo Placement Location: Tilt-Up Panels 1-12, 21, 22, and 50-80 Sample Location: 19th Truck, Mid-Pour, Shoveled From Pump Truck Chute, Panel 2 Field Data: Eq. No. Supplier Stanwood Redi-Mix Slump, in.(C143) 6.00 9 Mix# 65120 Air Content, %(C231) NT Mix Description 6.5 Sk,3/4"Agg.,Pea,Pozz8O,AC534,Hot Water Unit Weight,pcf(C138) NT Truck/Ticket# 97/157112 Air/Mix Temp.,°F(C1064) 30/64 TC1 Strength Required 4000 psi at 28 days Field Cure Temperature,°F Dead battery Quantity Placed,cy 420 Cure Method-Initial/Final Container/Water Tank Time Batched 7:28 AM Water Added on Job,gals 10 Time Sampled 8:10 AM Water Requested by Contractor Laboratory Data: Lab Test Age Test Total Load Avg.D Area Compressive No. (Days) Date (Ibs) (in) (in 2) Strength (psi) Remarks 92257 7 02-28 56350 4.01 12.63 4460 TYPE 2:Set 1 92258 12 03-05 60820 4.01 12.63 4820 TYPE 2:Set 1, Field Cure 92259 28 03-21 0 0.00 0.00 0 Set 1 92260 28 03-21 0 0.00 0.00 0 Set 1 92261 28 03-21 0 0.00 0.00 0 Set 1 92262 Hold 00-00 0 0.00 0.00 0 Set 1 Reinforcement Inspection NT n/a: not applicable Specimen Size 4"X 8" Reinforcement Conforms NT n/t: not tested Test Reference ASTM C31/C39/C1231 Comments: GeoTest was on-site as requested to provide concrete testing and placement inspection. Concrete was placed via pump truck, mechanically consolidated, and was hand finished (Figure 1). All locations and elevations are approximate. For concrete reinforcement inspection, please see reports IR009 and IR010. AMENDED 2/28/19: Correction: reference reports IR008 and IR009 for reinforcement inspection. COPIES:chumphrey@safebuilt.com,dspencer@safebuilt.com,ericflones@stanwoodredi-mix.com,jake.l@coast-group.com, Reviewed by kfoster@arlingtonwa.gov,kolander@arlingtonwa.gov,Ipeterson@arlingtonwa.gov,rjones@arlingtonwa.gov, stever@coast-group.com This report shall not be reproduced except in full,without the written approval of GeoTest Services,Inc. The above test results relate to the sample(or location)tested. GEOTEST SERVICES, INC. 741 Marine Drive,Bellingham, WA 98225 2061167th Ave.NE, Unit A,Arlington, WA 98223 www.geotest-inc.com phone: (360)733-7318 fax: (360) 733-7418 Concrete Compressive Strength Test Report * Continuation PROJECT: Smartcap JOB#: 18-0734 CLIENT: Coast Construction Group REPORT#: CB007 CONTRACTOR: Coast Construction Group PAGE #: 2 of 4 Sample Location: 22nd Truck, Mid-Pour,Shoveled From Pump Truck Chute, Panel 22 Field Data: Truck/Ticket# 96/157115 Slump,in.(C143) 6.00 Time Batched 7:45 AM Air Content,%(C231) NT Time Sampled 8:40 AM Unit Weight,pcf(C138) NT Air Temperature,°F 32 Water Added on Job,gals 15 Mix Temp.°F(C1064) 64 Water Requested by Contractor Laboratory Data: Lab Test Age Test Total Load Avg.D Area Compressive LNo. (Days) Date (lbs) ML (in) (in 2) Strength (psi) Remarks SEEM- 92263 7 02-28 55340 4.01 12.63 4380 TYPE 2:Set 2 92264 12 03-05 53230 4.01 12.63 4210 TYPE 2:Set 2,Field Cure 92265 12 03-05 53670 4.01 12.63 4250 TYPE 2:Set 2,Field Cure 92266 28 03-21 0 0.00 0.00 0 Set 2 92267 28 03-21 0 0.00 0.00 0 Set 2 92268 28 03-21 0 0.00 0.00 0 Set 2 92269 Hold 00-00 0 0.00 0.00 0 Set 2 Comments: Sample Location: 29th Truck,Mid-Pour,Shoveled From Pump Truck Chute,Center of Western Perimeter of Site Field Data: Truck/Ticket# 84/157124 Slump,in.(C143) 7.00 Time Batched 8:48 AM Air Content,%(C231) NT Time Sampled 10:24 AM Unit Weight,pcf(C138) NT Air Temperature,°F 39 Water Added on Job,gals 10 Mix Temp.°F(C1064) 64 Water Requested by Contractor Laboratory Data: Lab Test Age Test Total Load Avg.D Area Compressive No. (Days) Date (lbs) (in) (in 2) Strength (psi) Remarks 92270 7 02-28 59350 4.01 12.63 4700 TYPE 2:Set 3 92271 12 03-05 56400 4.01 12.63 4470 TYPE 2:Set 3,Field Cure 92272 12 03-05 57400 4.01 12.63 4540 TYPE 2:Set 3,Field Cure 92273 28 03-21 0 0.00 0.00 0 Set 3 92274 28 03-21 0 0.00 0.00 0 Set 3 92275 28 03-21 0 0.00 0.00 0 Set 3 92276 Hold 00-00 0 0.00 0.00 0 Set 3 GEOTEST SERVICES, INC. 741 Marine Drive,Bellingham, WA 98225 2061167th Ave.NE, Unit A,Arlington, WA 98223 www.geotest-inc.com phone: (360)733-7318 fax: (360) 733-7418 Concrete Compressive Strength Test Report * Continuation PROJECT: Smartcap JOB#: 18-0734 CLIENT: Coast Construction Group REPORT#: CB007 CONTRACTOR: Coast Construction Group PAGE #: 3 of 4 Sample Location: 38th Truck, Mid-Pour,Shoveled From Pump Truck Chute,Near Southwest Site Entrance Field Data: Truck/Ticket# 81 /157150 Slump,in.(C143) 6.00 Time Batched 12:16 Air Content,%(C231) NT Time Sampled 12:52 Unit Weight,pcf(C138) NT Air Temperature,°F 50 Water Added on Job,gals 15 Mix Temp.°F(C1064) 64 Water Requested by Contractor Laboratory Data: Lab Test Age Test Total Load Avg.D Area Compressive No. (Days) Date (lbs) (in) (in 2) Strength (psi) Remarks 92331 7 02-28 68070 4.01 12.63 5390 TYPE 2:Set 4 92332 12 03-05 60260 4.01 12.63 4770 TYPE 2:Set 4,Field Cure 92333 12 03-05 62420 4.01 12.63 4940 TYPE 2:Set 4,Field Cure 92334 28 03-21 0 0.00 0.00 0 Set 4 92335 28 03-21 0 0.00 0.00 0 Set 4 92336 28 03-21 0 0.00 0.00 0 Set 4 92337 Hold 00-00 0 0.00 0.00 0 Set 4 Comments: Sample Location: Field Data: Truck/Ticket# / Slump,in.(C143) Time Batched Air Content,%(C231) Time Sampled Unit Weight,pcf(C138) Air Temperature,°F Water Added on Job,gals Mix Temp.°F(C1064) Water Requested by Laboratory Data: Lab Test Age Test Total Load Avg.D Area Compressive No. (Days) Date (lbs) (in) (in 2) Strength (psi) Remarks 741 Marine Drive,Bellingham, WA 98225 www.geotest-inc.com 00Y GG OTG ST 20611 67th Ave. NE. Unit A.Arlington, WA 98223 phone:(360) 733.7318 toll free:(888)251.5276 fax:(360) 733.7418 Concrete Compressive Strength Test Report * Continuation PROJECT: Smartcap JOB M 18-0734 CLIENT: Coast Construction Group REPORT M CB007 CONTRACTOR: Coast Construction Group PAGE#: 4 of 4 Figure 1. Concrete placement, consolidation, and finishing process for tilt-up panels (looking northeast). 741 Marine Drive, Bellingham, WA 98225 www.geotest-inc.com 0�jp Gy OTG ST 20611 67th Ave.NE. Unit A.Arlington, WA 98223 phone:(360) 733.7318 toll free:(888)251.5276 fax:(360) 733.7418 Concrete Inspection & Compressive Strength Test Report PROJECT: Smartcap JOB#: 18-0734 ADDRESS: 6321 180th Street NE,Arlington, WA REPORT#: CB008 PERMIT M BLD-2016 DATE: 3/1/2019 CLIENT: Coast Construction Group PAGE#: 1 of 2 CONTRACTOR: Coast Construction Group INSPECTOR: Joel Morder Placement Location: Footings at Grids F/11.4-12 and F/1.3-2 Sample Location: F/11.7 Field Data: Eq. No. Supplier Stanwood Redi-Mix Slump, in.(C143) 5.00 15 Mix# 50420C Air Content, %(C231) NT Mix Description 5 Sack,3/4"Aggregate Unit Weight,pcf(C138) NT Truck/Ticket# 85/157461 Air/Mix Temp.,°F(C1064) 45/62 JM6 Strength Required 3000 psi at 28 days Field Cure Temperature,°F Quantity Placed,cy 22 Cure Method-Initial/Final Container/Water Tank Time Batched 11:36 AM Water Added on Job,gals 0 Time Sampled 12:40 PM Water Requested by Laboratory Data: Lab Test Age Test Total Load Avg.D Area Compressive No. (Days) Date (Ibs) (in) (in 2) Strength (psi) Remarks 92674 7 03-08 34130 4.01 12.63 2700 TYPE 2: 92675 28 03-29 0 0.00 0.00 0 92676 28 03-29 0 0.00 0.00 0 92677 28 03-29 0 0.00 0.00 0 92678 Hold 00-00 0 0.00 0.00 0 Reinforcement Inspection Yes n/a: not applicable Specimen Size 4"X 8" Reinforcement Conforms Yes n/t: not tested Test Reference ASTM C31/C39/C1231 Comments: GeoTest on site for inspection of the footings in the above-referenced locations. Reviewed reinforcing steel in accordance with D/S3.1 and C/S2.2 and found to be in conformance. COPIES:chumphrey@safebuilt.com,dspencer@safebuilt.com,ericflones@stanwoodredi-mix.com,jake.l@coast-group.com, Reviewed by kfoster@arlingtonwa.gov,kolander@arlingtonwa.gov,Ipeterson@arlingtonwa.gov,rjones@arlingtonwa.gov, stever@coast-group.com This report shall not be reproduced except in full,without the written approval of GeoTest Services,Inc. The above test results relate to the sample(or location)tested. 741 Marine Drive,Bellingham, WA 98225 www.geotest-inc.com 00Y GG OTG ST 20611 67th Ave. NE. Unit A.Arlington, WA 98223 phone:(360) 733.7318 toll free:(888)251.5276 fax:(360) 733.7418 Concrete Inspection & Compressive Strength Test Report PROJECT: Smartcap JOB M 18-0734 CLIENT: Coast Construction Group REPORT M CB008 CONTRACTOR: Coast Construction Group PAGE#: 2 of 2 Rebar in Place for the Footing at Grids F/11.4-12 ?�� y 3 4 741 Marine Drive, Bellingham, WA 98225 www.geotest-inc.com 0�jp Gy OTG ST 20611 67th Ave.NE. Unit A.Arlington, WA 98223 phone:(360) 733.7318 toll free:(888)251.5276 fax:(360) 733.7418 Concrete Inspection & Compressive Strength Test Report PROJECT: Smartcap JOB#: 18-0734 ADDRESS: 6321 180th Street NE,Arlington, WA REPORT#: CB009 PERMIT M BLD-2016 DATE: 3/4/2019 CLIENT: Coast Construction Group PAGE#: 1 of 2 CONTRACTOR: Coast Construction Group INSPECTOR: Joel Morder Placement Location: Electrical Room Slab on Grade and Plinth Bases at Grids E/2 and Ell Sample Location: Electrical Room Slab on Grade, East Half Field Data: Eq. No. Supplier Stanwood Redi-Mix Slump, in.(C143) 6.00 15 Mix# 65120 Air Content, %(C231) NT Mix Description 6.5 Sack,3/4"Aggregate Unit Weight,pcf(C138) NT Truck/Ticket# 85/157500 Air/Mix Temp.,°F(C1064) 40/64 JM6 Strength Required 3000 psi at 28 days Field Cure Temperature,°F JM6 Quantity Placed,cy 15 Cure Method-Initial/Final Container/Water Tank Time Batched 9:21 AM Water Added on Job,gals 5 Time Sampled 10:30 AM Water Requested by Pump operator Laboratory Data: Lab Test Age Test Total Load Avg.D Area Compressive No. (Days) Date (Ibs) (in) (in') Strength (psi) Remarks 92745 7 03-11 0 0.00 0.00 0 92746 28 04-01 0 0.00 0.00 0 92747 28 04-01 0 0.00 0.00 0 92748 28 04-01 0 0.00 0.00 0 92749 Hold 00-00 0 0.00 0.00 0 Reinforcement Inspection Yes n/a: not applicable Specimen Size 4"X 8" Reinforcement Conforms Yes n/t: not tested Test Reference ASTM C31/C39/C1231 Comments: GeoTest on site for inspection of the electrical room slab on grade and plinth bases at grids E/2 and E/11. Reviewed reinforcing steel of the slab on grade in accordance with the call-out on S1.1 S and the plinths per J/S3.1 and found all to be in conformance. COPIES:chumphrey@safebuilt.com,dspencer@safebuilt.com,ericflones@stanwoodredi-mix.com,jake.l@coast-group.com, Reviewed by kfoster@arlingtonwa.gov,kolander@arlingtonwa.gov,Ipeterson@arlingtonwa.gov,rjones@arlingtonwa.gov, stever@coast-group.com This report shall not be reproduced except in full,without the written approval of GeoTest Services,Inc. The above test results relate to the sample(or location)tested. 741 Marine Drive,Bellingham, WA 98225 www.geotest-inc.com 00Y GG OTG ST 20611 67th Ave. NE. Unit A.Arlington, WA 98223 phone:(360) 733.7318 toll free:(888)251.5276 fax:(360) 733.7418 Concrete Inspection & Compressive Strength Test Report PROJECT: Smartcap JOB M 18-0734 CLIENT: Coast Construction Group REPORT M CB009 CONTRACTOR: Coast Construction Group PAGE M 2 of 2 r., Plinth Base Form and Reinforcing Steel at Grid E/2 i