HomeMy WebLinkAbout6221 180th St Ne_BLD1792 - Review Docs_2026 City of Arlington ��CING�O� Community • • Development February 26, 2018 Port Gardner Architects 1512 Wetmore Avenue Everett,WA 98201 Dear Mr. Hannam, The design documents submitted for this project have been reviewed for compliance with the locally adopted codes and amendments. The following comments must be addressed before a building permit is issued. For processing; • Please submit revised construction documents containing the requested information or plan revisions with all revisions clouded or otherwise identified. • Please respond in writing to each comment by marking the attached list or creating a response letter. Indicate which plan sheet, detail, specification, or calculation shows the requested information. Please send revisions to the attention of the plans examiner with the building permit application number noted. Revised drawings must clearly show code compliance. A RESPONSE LETTER MUST BE INCLUDED WITH THE REVISED PLAN SUBMITTAL. • Please be sure to include on the resubmittal the engineer's or architect's "wet" stamp, signature, registration number and date on the cover page of any structural calculations, all structural details and structural sheets of the plans. In order to keep your permit in an "Active" status, please respond within 60 days. For questions about the required information please contact Kevin Olander at 360-403-3433 or kolander(a).arlingtonwa.gov. Sincerely, Kevin Olander Combination Inspector 60 i DESIGN CRITERIA: 1. The structural design of the building has reduced the roof snow load from the jurisdiction minimum of 25 to 11.90. This reduction appears to be less than allowed by the ASCE Standards 7-10. Please provide further proof of snowload reduction allowance. 2. It appears the square footage of the shop portion of the building (F-1 occupancy) exceeds the allowable area in square feet per IBC Table 506.2. The table outlines a maximum allowable square footage of 34,000 square feet in a Type V-B sprinkled F- 1 occupancy structure. Building s.f. is 39,562; Office s.f. 4607 =total s.f. 34,955 SITE PLAN: 1. It appears the number of parking spaces provided is inadequate for the occupant load of the structure. 2. If the number of parking spots is increased to accommodate the revised occupant load,the number of ADA compliant parking spaces will need to be increased per IBC Table 1106.1. SHEET A3: 1. Occupancy calculations do not comply with IBC Table 1004.1.2, please revise. 2. The plan is missing sufficient cross sections. Please provide full cross sections throughout the plan: North/South and East/West at a minimum. 3. Cross section shall classify interior wall finishes complying with IBC Section 803. 4. Details labeled are missing on sheet Al 1. Many of the details are labeled "X",these need to be assigned a number and included on sheet A11. 5. Connection details and supported structural engineering are missing for connection between the framed wall and the concrete tilt-up panel. Please provide cross section details in addition to supporting structural engineering. 6. It appears the stairs may exceed the 12' max before requiring a landing. Please include a scaled cross section of the stairs to verify. 7. The plans are missing detailed information regarding the rack/hoist system. Please provide. 8. Is the shop area heated? Please provide information on the plans to include mechanical equipment type. SHEET A4: 1. The plans do not outline door hardware and pull requirments. Please provide this information to include compliance with ADA minimums. 2. The plans do not include compliance with ADA requirements. Please provide this information to include elevations of ADA components for clarification. 3. The plans do not include locations of safety glazing. Please provide this information. SHEET A5: 1. Exit access for future second floor shall comply with IBC Section 1023, 1022, 1024, 1028. Doors to the bathroom are unrated in this hall. 2. The steel building plans do not include the rear patio or covered entry. Please provide full structural details for both. SHEET A6: 1. Guard detail not included on plans. Please provide information on cross section. 2. Stair details missing and incomplete. Please provide full cross section meeting the maximum 12'vertical height limitations with landing. 3. There is no bathroom shown on the second floor. Will there be plumbing provided for future use? If so, show rough in. SHEET A7: 1. Provide smoke and flame spread rating of insulation that is exposed throughout complying with IBC Section 603 and IBC Section 720. 2. Many details are labeled with "X"throughout. All details must be assigned a number and have corresponding detail supplied. 3. Plans are missing minimum fire blocking throughout. Please provide fire blocking complying with IBC Section 718. SHEET A8: 1. Many details are labeled with "X"throughout. All details must be assigned a number and have corresponding detail supplied. 2. Parapet connection details are missing. Please provide details in compliance with IBC 705.11. 3. Proper drainage details need to be shown for reverse slope at covered entry. SHEET A9: 1. Please provide in-lay ceiling support and connections complying with IBC Section 808. SHEET A10: 1. Please provide the WP 4135 details on the plans from elevator shaft. SHEET A11: 1. Please verify that all details are properly accounted for throughout the plans. SHEET Al2: 1. Detail 6/Al2 mentions 95% compaction of soil. This will require special inspection. SHEET S1: 1. List ALL specific Special Inspections that will be required for this project to include: • Bolting • Welding • Rebar • Concrete • Soil Compaction SHEET S3: 1. Foundation calculations not provided. Please provide. 2. Provide foundation layout and plan at a minimum 1/8" scale that allows for all details to be identified on the plans and specific throughout. 3. Plans need to include notation "SLAB MUST BE POURED WITH THE FOUNDATION TO PREVENT STRUCTURAL FAILURE" or provide engineering to support otherwise. 4. Shearwall calculations not provided. Please provide calculation and all connection details between shearwall panels and roof, tilt-up panels. 5. STHD hold downs are calledout on the framing plan. How are these to be connected to the tilt-up panels? Please provide supporting structural engineering. 6. Slab insulation not shown on foundation details. Please provide on plan or provide supporting documentation detailing exemption on provided Washington State Energy Code compliance forms. SHEET S4: 1. Shearwall schedule indicates minimum nailing patterns. Cross section however, indicates steel studs? Please revise shearwall schedule or wall framing. 2. Please provide connection details and supporting engineering for hold-down in tilt- up panels called out on framing plan. 3. Please provide slab insulation on plan or provide supporting documentation detailing exemption on provided Washington State Energy Code compliance forms. 4. Schedule for interior framed walls with details not provided on plans. Please provide. This is an initial review of plans submitted. Please be advised additional corrections may be required once complete plans are submitted. Cit �. . of Arlington Community & Economic Development March 3, 2018 Port Gardner Architects 1512 Wetmore Avenue Everett,WA 98201 Dear Mr. Hannam, There were additional comments that were not included in the comment letter sent on February 26, 2018.1 have highlighted the additional comments foryour convenience. The design documents submitted for this project have been reviewed for compliance with the locally adopted codes and amendments. The following comments must be addressed before a building permit is issued. For processing: • Please submit revised construction documents containing the requested information or plan revisions with all revisions clouded or otherwise identified. • Please respond in writing to each comment by marking the attached list or creating a response letter. Indicate which plan sheet, detail, specification,or calculation shows the requested information. Please send revisions to the attention of the plans examiner with the building permit application number noted. Revised drawings must clearly show code compliance. A RESPONSE LETTER MUST BE INCLUDED WITH THE REVISED PLAN SUBMITTAL. • Please be sure to include on the resubmittal the engineer's or architect's "wet"stamp, signature,registration number and date on the cover page of any structural calculations, all structural details and structural sheets of the plans. In order to keep your permit in an"Active"status,please respond within 60 days. For questions about the required information please contact Kevin Olander at 360-403-3433 or kolanderParlingtonwa.gov. Sincerely, Kevin Olander Combination Inspector 61 1 DESIGN CRITERIA: 1. The structural design of the building has reduced the roof snow load from the jurisdiction minimum of 25 to 11.90. This reduction appears to be less than allowed by the ASCE Standards 7-10. Please provide further proof of snowload reduction allowance. 2. The plans make note of a fire sprinkler system installed in the proposed structure. Please note the fire sprinkler permit and review are not part of this review. 3. It appears the square footage of the shop portion of the building (F-1 occupancy) exceeds the allowable area in square feet per IBC Table 506.2. The table outlines a maximum allowable square footage of 34,000 square feet in a Type V-B sprinkled F- 1 occupancy structure. Building s.f. is 39,562; Office s.f. 4607 = total s.f. 34,955 SITE PLAN: 1. It appears the number of parking spaces provided is inadequate for the occupant load of the structure. 2. If the number of parking spots is increased to accommodate the revised occupant load,the number of ADA compliant parking spaces will need to be increased per IBC Table 1106.1. SHEET A3: 1. Please provide full cross section view of storage racks. Include rack height, sprinklers and clearances to ceiling for high pile storage per fire code. 2. Occupancy calculations do not comply with IBC Table 1004.1.2, please revise. 3. The plan is missing sufficient cross sections. Please provide full cross sections throughout the plan: North/South and East/West at a minimum. 4. Cross section shall classify interior wall finishes complying with IBC Section 803. 5. Details labeled are missing on sheet A11. Many of the details are labeled "X",these need to be assigned a number and included on sheet A11. 6. Connection details and supported structural engineering are missing for connection between the framed wall and the concrete tilt-up panel. Please provide cross section details in addition to supporting structural engineering. 7. It appears the stairs may exceed the 12' max before requiring a landing. Please include a scaled cross section of the stairs to verify. 8. The plans are missing detailed information regarding the rack/hoist system. Please provide. 9. Is the shop area heated? Please provide information on the plans to include mechanical equipment type. SHEET A4: 1. The plans do not outline door hardware and pull requirments. Please provide this information to include compliance with ADA minimums. 2. The plans do not include compliance with ADA requirements. Please provide this information to include elevations of ADA components for clarification. 3. The plans do not include full elevator details. Please provide this information to include product listings. 4. The plans do not include locations of safety glazing. Please provide this information. SHEET A5: 1. Mechanical equipment type and fuel source not included on plans. Please provide this information to include sizing documentation. 2. Provide mechanical room separation details complying with IBC 509.4.2. 3. Washington State Energy Code Compliance forms not included. Please include all compliance requirements on plans matching forms submitted. 4. Exit access for future second floor shall comply with IBC Section 1023, 1022, 1024, 1028. Doors to the bathroom are unrated in this hall. 5. The steel building plans do not include the rear patio or covered entry. Please provide full structural details for both. SHEET A6: 1. Guard detail not included on plans. Please provide information on cross section. 2. Stair details missing and incomplete. Please provide full cross section meeting the maximum 12'vertical height limitations with landing. 3. There is no bathroom shown on the second floor. Will there be plumbing provided for future use? If so, show rough in. SHEET A7: 1. Provide smoke and flame spread rating of insulation that is exposed throughout complying with IBC Section 603 and IBC Section 720. 2. Many details are labeled with "X"throughout. All details must be assigned a number and have corresponding detail supplied. 3. Plans are missing minimum fire blocking throughout. Please provide fire blocking complying with IBC Section 718. SHEET AB: 1. Many details are labeled with "X"throughout. All details must be assigned a number and have corresponding detail supplied. 2. Parapet connection details are missing. Please provide details in compliance with IBC 705.11. 3. Proper drainage details need to be shown for reverse slope at covered entry. SHEET A9: 1. Please provide in-lay ceiling support and connections complying with IBC Section 808. 2. Please include fire sprinkler head locations on cross sections for in-lay ceiling. SHEET A10: 1. Please provide the WP 4135 details on the plans from elevator shaft. SHEET A11: 1. Please verify that all details are properly accounted for throughout the plans. SHEET Al2: 1. Detail 6/Al2 mentions 95% compaction of soil. This will require special inspection. SHEET S1: 1. List ALL specific Special Inspections that will be required for this project to include: • Bolting • Welding • Rebar • Concrete • Soil Compaction SHEET S3: 1. Foundation calculations not provided. Please provide. 2. Provide foundation layout and plan at a minimum 1/8" scale that allows for all details to be identified on the plans and specific throughout. 3. Plans need to include notation "SLAB MUST BE POURED WITH THE FOUNDATION TO PREVENT STRUCTURAL FAILURE" or provide engineering to support otherwise. 4. Shearwall calculations not provided. Please provide calculation and all connection details between shearwall panels and roof, tilt-up panels. S. STHD hold downs are calledout on the framing plan. How are these to be connected to the tilt-up panels? Please provide supporting structural engineering. 6. Slab insulation not shown on foundation details. Please provide on plan or provide supporting documentation detailing exemption on provided Washington State Energy Code compliance forms. SHEET S4: 1. Shearwall schedule indicates minimum nailing patterns. Cross section however, indicates steel studs? Please revise shearwall schedule or wall framing. 2. Please provide connection details and supporting engineering for hold-down in tilt- up panels called out on framing plan. 3. Please provide slab insulation on plan or provide supporting documentation detailing exemption on provided Washington State Energy Code compliance forms. 4. Schedule for interior framed walls with details not provided on plans. Please provide. This is an initial review of plans submitted. Please be advised additional corrections may be required once complete plans are submitted. Structural Deli n ssociatcs ill _ �, Engirieeriiig Structure.s to Last O�VVY' M.M `8163 April 11, 2019 co VI Dantrawl Inc. of W^Sy 62XX 180th St. NE, G ti Arlington, WA Subject: Burke Bolt Inserts p �Fei 38 SDA Ref. #8163 SfoN To whom this may concern: AP 5 2019 A q Panel Burke inserts do not align with the steel building column in multiple locations. The Burke inserts prevent the installation of the panel clips specified in detail A/S5, April 29, 2018. Coast Construction and Port Gardner Architects have provided locations of the Burke inserts that do not align with the steel building columns. Structural Design Associates [SDA] has reviewed and observed the following in the documentation provided by both parties: 1) The Burke insert alignment issue is limited to "Type N' connections. No other panel connection conflicts are reported; 2) The identified Burke insert conflicts include missing inserts, inserts covered by the steel frame, and inserts with `extreme' horizontal offsets; 3) The"Type A" connection conflicts are reported to exist at the following locations: a. East Elevation, Gridline: B/11 & B/2; b. West Elevation, Gridline: D/2 & D/3; c. North Elevation, Gridline: B/2, .B.2/2, C/2, C.2/2, & D/2; d. South Elevation, Gridline: C.1/14 & C/14. Each "Type A" connection conflict noted above shall be replaced with a"Panel Connection Type `A' Retrofit", which is detailed in the attached sketch. This letter shall be issued to Port Gardner Architects, Geotest, Coast Construction, and the Building Official. Any discrepancies between the site conditions and the description above shall be reported to the engineer of record. Please contact this office if you have any questions concerning this letter, or for any other assistance. Sincerely, C�f Jasper Baarbe, E.I.T. Chris Covington, P.E. 3006 Rucker \ve. I.ver-ett, AF \ 98201 Ph: 425-339-O293 [=six: 425-252-0916 Nvwxv..sdaeverett.com Mr-C.S TJK)& Bud+-K COLTS MX- 3 NT - TEOClL>fr .t/VSER,T Noa3G (7/8 ALLow>&,io MkIxOK3 = �1,goo 000 A LLOow smcA2 = S, ono i Nlco�ol, S 14C/As • a � 4p g �ANdtaL QM SBXIoo - 2 SPAAJOA4L PER " 17 .01 31 - ol" to/Ig/2o�8' Pic �� I x ' S•�IZ3 l 3/vRll`/ 31 = 118��y F2rc��,a� 12 I'tp�c,�L. Sva.uD2aL L��1 = 2s' E-T s Z /liW IfJ% -- 3,4 2,00D K -IvtZ (SeA jN'VjL- iTxrFAAzs) 74 K a/ Smvy-,Lt 46S g-42 C"T'&C caw fPi9,.a#.L w/ b = SOD?S z E = 403Zrz; Fr s 11149,120 s S PA,10R I, -3 3C S'Tl TF F*-k TAAJ PA.N£L 6Ur MUST e ONSspt.Jt OZ42.9CM-0-1 OF CO&OtQG . SPAWO(ZAL- 1 WTbTS AS PAA_)f - CONY-TV6e .per (ZIEAC-TT V v& : TA = �' E _ D,2q`1 K ')' - Z,o6K � W - p,27s x 1 '= I. 9 3 K T F PAA l Ca r t v*z 4' STA@ OAPL. TbO5 T a-k- .5 rT F"Of'5s Loan ws-L.L ACr- AS Couftk PAnr*4- Top *Lodo'll26 3 _ ['�S]� �= o.ocN3" 9 = fct,4"'.( O-vd�r3 /s)(Tr-//&o) - 0. 000,06 Y-"�.t SP/., 'DaA-L VNT-T P(XT-4TtoZ = IM 0"= O. D33 J. Pi ULL SR'L"#1 » SPubR6L -� ALL_ 6uRK CoN.sa-oLaf,J7„ TOP 4 66a T Cox P - 2.o6/2 = 1.03 K Gc Noa3G T = ti.8 K GVRIC aoL.Ta- Z CAFPesTY - 101,2K - - N/lop, g l63 GDN5T4P,f � F2TLTT aN PLATES Ftv——Ix,5-j ft&FL tP 3/g" FLAA ck ��= V(f" �r = Ay!) P n� P � c, Mf rZ _ zC3�g)Z/ti P1�ATE D. 3 l 6 1►t, f� LMN��s o,316x36A1 0 FtAx4t y P = 6,92 K �a WX. Aug = 2,c6 AM eL M � = Px2Yz -9'4) +H N A = D.291 x �®�,g9 � 6.06k- ,�, tzp P=/2. 42K MA-f . A"WPO = 2 x 2.4 2 =&t.8 S K GOutIW"s PAUtrL R UM-Tam Wl,'> &,W—Tgre j oeO.C=-jC-- Cow-x-of C max. P, 2.06 P,2 2.ac Pt 2 f w ' S' 4► .: COr-Ja .H WOUM OIS /V&ctx&a._,r CANC r T`f 1 F' (t► reo Frr- CoNN NOTE THAT" CoNN 'A' Oss*=6vTt,5 QNE fAjAL Lo&V TO jNt Nf-�l FEE So LT1�ZT SPa.r02 Sr2�tSS CONcf�TR,4 Xot4 PRov3V*- .Tito - WAY C�a�,.10...�G- b� 'ltaiC pAvit,L , Ap(J,S Q�s�puAL CAPS r`r. i SHIM PLATE, FRICTION PLATE, ELEVATION, AND PANEL CONNECTION TO CONFORM WITH A/S5 DATED APRIL 29, 2018 UNLESS NOTED OTHERWISE BELOW. RETROFIT CONNECTION ONLY APPLICABLE AT m h y �w DEMARKATED LOCATIONS (SEE ATTACHED LETTER). IN NEW CONNECTION TYPE �I WF RIGID STEEL o N 'A' RETROFIT (PLACE IN -- L-- FRAME BY MTL `� N PAIRS ONLY) ii II li BLD G MFG. u! � v 3? OFFSET (ABOVE Ij OR BELOW) (TYP.) II w q BURKE BOLT o II -- I�INSERTS OFFSET BURKE BOLT INSERT 1 " OR MORE PLACED BEHIND COLUMN o OR MISSING Ij w = V -� mo III w N Q — PANEL CONNECTION TYPE 'A' RETROFIT ELEVATION VIEW °III Q w CENTER OF BOLT TO EDGE OF GRID SHIM PLATE THICKNESS TO PROVIDE SNUG FIT z 0 FLANGE TO BE MINIMUM " BETWEEN PANEL & z0 AND MAXIMUM OF 1 " (TYP.) FRICTION PLATE (TYP.) w L o .' 74" THK TILT—UP z PANEL EMBEDMENT TO BE 34" t( 1» J MINIMUM AND 44 MAXIMUM FRICTION PLATE (TYP.) (TYP.) WF RIGID STEEL FRAME REPLACE BOLTS & BURKE BY MTL BLD'G MFG. INSERTS w/ (4) J"O F1554, GR36 THREADED ROD EPDXIED ' Drawn By:JIB l PROVIDE SPECIAL Checked By:CCC TO PANEL w/ SET-3G (MIN. Ll Date:04-'5 INSPECTION FOR EMB.=34"); SECURE NUTS, & EPDXY INSTALLATION SDDAI63. F436 WASHERS STRUCTURAL PANEL CONNECTION TYPE 'A' RETROFIT PLAN VIEW DETAILS 4/11/2019 »MX-3 HI-TENSILE INSERT Contact Us i P rR Y MeadowBurke- Call Us (877) 518-7665 HOME PRECAST FORMING REINFORCING ROAD&BRIDGE TILT-UP DISTRIBUTORS ENGINEERING PRODUCTS —` Home/Shop/Precast/NC Threaded Inserts and Accessories/NC Threaded Inserts/MX-3 HI-TENSILE INSERT DISTRIBUTOR FINDER MX-3 HI-TENSILE INSERT ENGINEERING SUPPORT The MX-3 Hi-Tensile Insert is a ductile iron cast in place NC insert available for use in fastening and/or hanging equipment,plumbing,mechanical fixtures,etc.to the concrete.It is also used very effectively as a Burk'Ldl diaphragm insert in prestressed bridge beams.The Hi-Tensile Insert is available in the sizes shown in the Coil Liling table.Attachment to the form can be accomplished by utilizing the nail lugs on the insert,an NC bolt run DngBone through the form wall,or by using FC-18 or MX-28 NC threaded plugs. Erecter Connector Halfen ,nchorinq _- MX-3 HI-TENSILE INSERT NC`hrended Insells lim Bog — � ��° c TlWWoeom 901 ns>� 1 Braeiny Herd Hale NOXI Mr I-W 29M I-W umm ss• I&W r '26w Mob ;2.WA W06L Z7W eooea 27M Rapid Lift NM : are' [-VS' 29mm I-W 41w r- :25mm I. 251W 0"IlalcikN Nor.:Amm mobil 401114 prestress NIM in, MR, 32m 2.11V YFftn I.3W 35MM 341 19 milwoa17,5m 1,600Et&IM;11500ee4710 pr--cas"Ghe'nlCa s N0a3/ 518' I-9/a'135mm 2-914" M.. 1_112'`3M. 15I16- 24mm 2,700104,1120W 2,100ap;9,UN f26e0tW 11-6kN 1 Raipid-Lok 140035 W I.Irr 3&= 3Sa' 691VA-W Umq: I-IM' 261W'4,0251*1IT dr2,664Xu 11&14,3AWFA 162hN Na036 7W 1-5A' 41mm 4' 102mm 1-374' 45r1tl11 1-3116' 31M 50001b6 2226N 3,9Wft 17.6FN 4„8000.21,4M Utility Lifting c}sterns N0036 1' 134' 45mm:9-0?114mm 1-7/11 461ma1 1-IfI' 38om,6,000]bai2&7kN`A,B00 ia•2E4MlIS6,600 iL46.M Welded 1A/4r Girders Sete working bads teased an 3,000 psi ounlxele and a 3:1 safety factor, E3ow_;c) ndusfrl es 1) Safe working bed is based on the insert setback 112"from the concrete surface. t�-7ENsx.e MB View our Product literature Precasl ourHrsloly ^ventor CleariIce F n Local Map RaInIGIClorcutg La.11fonods by Address 111 Road&13nr P Saing olteictory tut-up Blog Distrlbutrlrx Caranrs Enymews -,2U19 ieuco.v 81::1<�P.11 Rtgeas rdeser;ed. 'r=iRN &CCiN, II K)N S ONS O�SALE FRIL'AGY meadowburke.com/shop/precast/nc-threaded-inserts-and-accessories/nc-threaded-inserts/6655-mx-3-hi-tensile-insert/ 1/1 STRUCTURAL DESIGN ASSOCAITES Project Title: Engineer: Project ID: SDA#8163- 190410 Project Descr: Printed:11 APR 2019, 8:17AM Conc11111 rete Slender Wall rslsdapglONEDRI-11NErWOR-11PROJEC-118000-8-118163-D-11190409-118163.190409-Burk Bolt Issueec6 Software copyright ENERCALC,INC.1983-2018,Buil:10.1812.13 I.I I I • Description: TYP WALL Code References Calculations per ACI 318-11 Sec 14.8, IBC 2012, CBC 2013, ASCE 7-10 Load Combinations Used : ASCE 7-16 General Information fc:Concrete 28 day strength = 5.0 ksi Wall Thickness 7.250 in Temp Diff across thickness = deg F Fy:Rebar Yield = 60 0 ksi Rebar at wall center Min Allow Out-of-Plane Defl Ratio= U 00 Ec:Concrete Elastic Modulu: = 4,03221 ksi Rebar"d"distance 3.625 in X :Lt Wt Conc Factor = 1.0 Lower Level Rebar Min allow As/bd = 00020 Fr:Rupture Modulus = 353.553 psi Bar Size # 5 Using Stiff.Reduction Factor per ACI R.10.12.3 Max Allow As/bd = 0.02125 Bar Spacing 12.0 in Max Pu/Ag=fc* = 0.060 Concrete Density = 150 0 pcf Width of Design Strip = 12.0 in One-Story Wall Dimensions A Clear Height = 21.0 ft B Parapet height = ft B Wall Support Condition Top & Bottom Pinned Pmf Ahwhmerd f by Attachment Lateral Loads Wind Loads: Seismic Loads Full area WIND load 26.20 psf Wall Weight Seismic Load Input Method ASCE seismic factors entered SIDS Value per ASCE 1211 1 SIDS *1 = 0.7720 Fp=Wall Wt " 0.3088 = 27 985 psf DESIGN SUMMARY Results reported for"Strip Width" of 12.0 in Governing Load Combination. . . Actual Values... Allowable Values. PASS Moment Capacity Check Maximum Bending Stress Ratio = 0.3097 +0.90D+E+0 90H Max Mu 1 547 k-ft Phi*Mn 4.994 k-ft PASS Service Deflection Check Actual Defl.Ratio U 2,377 Allowable Defl. Ratio 360.0 E Only Max.Deflection 01060 in PASS Axial Load Check Max Pu/Ag 14.0 psi Max.Allow.Defl. 0.70 in +1 20D+L+0.20S+E+1 90H Location 10.150 ft 0.06*fc 300.0 psi PASS Reinforcing Limit Check Actual As/bd 0.007126 Max Allow As/bd 0,02125 Maximum Reactions. for Load Combination.... Top Horizontal E Only 293.843 k Base Horizontal E Only 293.843 k Vertical Reaction +D+O 70E+0.60H 1.903 k STRUCTURAL DESIGN ASSOCAITES Project Title: Engineer: Project ID: SDA#8163- 190410 Project Descr: Printed:11 APR 2019. 8:17AM Concrete Slender Wall rs4sdepglONEDRI-1WETWOR-11PROJEC-118000-8-1181630-I%i9D409-118163.190409.8urk Bol Im e.w6i Sofhvaie oopynght ENERCALC,INC 1983 2018,8utk1:10.18 f213 Description: TYP WALL Design Maximum Combinations-Moments Results reported for"Strip Width"=12 in. Axial Load Moment Values 0.6* Load Combination Pu 0.06*fc*b*t Mcr Mu Phi Phi Mn As As Ratio rho bal k k k-ft k-tt k-it in12 0.000 0.000 0.00 0.00 0.00 0.00 0.000 0.0000 0.0000 0.000 0.000 0.00 0.00 0.00 0.00 0.000 00000 0.0000 0.000 0.000 0.00 0.00 0.00 0.00 0.000 0.0000 0.0000 0.000 0 000 0.00 0.00 0.00 0.00 0.000 0.0000 0.0000 +1.20D+1.60Lr+0.50W+1.60H at 9.80 to 10.5 1.218 26.100 3.10 0.73 0.90 5.08 0.310 0.0071 0.0213 0.000 0 000 0.00 0.00 0.00 0.00 0.000 0.0000 0,0000 +1.20D+1.60S+0.50W+1.60H at 9.80 to 10.50 1.218 26100 3.10 0.73 0.90 508 0.310 0.0071 0,0213 +1.20D+0.50Lr+L+W+1.60H at 9.80 to 10.50 1.218 26.100 3.10 1.45 0.90 5.08 0.310 0.0071 0.0213 +1.20D+L+0.50S+W+1.60H at 9.80 to 10.50 1,218 26.100 3.10 1-45 0.90 5.08 0.310 0.0071 0.0213 +0,90D+W+1.60H at 9.80 to 10.50 0.913 26.100 3.10 145 0.90 5.01 0.310 0.0071 0.0213 +1.20D+L+0.20S+E+1.90H at 9.80 to 10.50 1.218 26.100 3.10 1.55 0.90 5.08 0,310 0.0071 0.0213 +0.90D+E+0.90H at 9.80 to 10.50 0.913 26100 3.10 1.55 0.90 5.01 0-310 0.0071 0,0213 Design Maximum Combinations-Deflections Results reported for"Strip Width"=12 in. Axial Load I Moment Values Stiffness Deflections Load Combination Pu Mcr Mactual I gross I cracked I effective Deflection Defl.Ratio k k-rt k-ft in14 n14 in14 in 0.000 000 0.00 U00 0.00 0 000 0.000 00 0.000 000 0.00 0,00 0.00 0.000 0.000 00 0.000 000 0,00 000 0.00 0.000 0.000 00 0.000 000 0.00 000 0,00 0 000 0.000 00 0.000 0.00 0.00 0.00 0.00 0.000 0.000 00 0.000 0.00 0.00 0.00 0.00 0 000 0 000 0.0 +D+0.60W+H at 9.80 to 10.50 1.015 3.10 0.87 381.08 21.89 285.809 0 060 4,208.6 +D+0.750Lr+0.450W+H at 9.80 to 10.50 1.015 3.10 0,65 381.08 21.89 285.809 0 045 5,611.5 +D+0.750S+0.450W+H at 9.80 to 10.50 1.015 3.10 0.65 381.08 21.89 285.809 0 045 5,611.5 +0.60D+0.60W+0.60H at 9.80 to 10.50 0.609 3.10 0.87 381.08 21.52 285,809 0.060 4,217.7 +D+0.70E+0.60H at 9.80 to 10.50 1.015 3.10 1.08 381.08 21.89 285.809 0.075 3,377.3 +D+0,750L+0.750S+0.5250E+H at 9.80 to 10. 1.015 3.10 0.81 381.08 21.89 285.809 0.056 4,503.1 +0.60D+0.70E+H at 9.80 to 10.50 0.609 3.10 1.08 381.08 21.52 285.809 0.074 3.384.6 0.000 0.00 0.00 0.00 0.00 0.000 0.000 0.0 0.000 0.00 0.00 0.00 0,00 0.000 0.000 0.0 0.000 0.00 0.00 0.00 0.00 0.000 0.000 0.0 0.000 0.00 0.00 0.00 0.00 0.000 0.000 0.0 W Only at 10.50 to 1120 0.000 3.10 1.44 381.08 20.96 285.809 0.099 2,538.8 E Only at 10.50 to 11.20 0.000 3.10 1.54 38108 20.96 285.809 0,106 2.376.8 0.000 0.00 0.00 0.00 000 0.000 0.000 0.0 Reactions-Vertical&Horizontal Load Combination Base Horizontal Top Horizontal Vertical @ Wall Base +D+H 0.0 k 000 k 1.903 k +D+L+H 0.0 k 000 k 1.903 k +D+Lr+H 0.0 k 0.00 k 1.903 k +D+S+H 0.0 k 0.00 It 1,903 k +D+0.750Lr+0.750L+H 0.0 k 0.00 k 1.903 k +D+0.750L+0.750S+H 0.0 k 000 k 1.903 k +D+0.60W+H 0.2 k 017 k 1,903 k STRUCTURAL DESIGN ASSOCAITES Project Title.- Engineer: Project ID: SDA#8163- 190410 Project Descr: Printed:11 APR 2019, 8:17AM Concrete Slender Wall rstsdapglONEDRI-1WETWOR-11PROJEG118000.8-118163•D-11190409-�1%8163190409•&uk8olissue.ec6 Software copyright ENERCALC,INC 1983.2018,Build:10.18.12.13 . r:r DESIGN ASSOCIATES Description: TYP WALL Reactions-Vertical&Horizoiftl Load Combination Base Horizontal Top Horizontal Vertical @ Wall Base +D+O 7501-r+0 450W+H 0.1 k 0.12 k 1.903 k +D+0.750S+0.450W+H 0.1 k 0.12 k 1.903 k +0.60D+0.60W+0.60H 0.2 k 0.17 k 1142 k +D+0.70E+0.60H 0.2 k 0.21 k 1903 k +D+0.750L+0 750S+0 5250E+H 0.2 k 0.15 k 1.903 k +0.60D+0.70E+H 0.2 k 0.21 k 1.142 k D Only 0.0 k 000 k 1903 k Lr Only 0.0 k 0.00 k 0 000 k L Only 0.0 k 000 k 0 000 k S Only 0.0 k 000 k 0 000 k W Only 0.3 k 0.28 k 0 000 k E Only 0.3 k 0.29 k 0.000 k H Only 0.0 k 000 k 0 000 k STRUCTURAL DESIGN ASSOCAITES Project Title: Engineer: Project ID: SDA#8163- 190410 Project Descr: Printed:11 APR 2019, 8:17AM General Section Property Calculator rslsdapglONEDRI-11NETWOR-IIPROJEC-118000-8-118163-D-11190409-118163-190409-Bud(Bodlssue.ec6 . P Software oo ght ENERCALC.INC.1983-2018,Build:10.18.12.13 . Description: W-SECTION Final Section Properties Total Area inA2 Ixx in"4 Sxx: Y in"3 : Calculated final C G.distance from Datum: lyy in"4 Sxx +Y in"3Syy -X in"3 X cg Dist. in Zxx in"3 " Y cg Dist. in Zyy "3 SYY +X n 3 in Edge Distances from CG.: r xx in +X in +Y in r yy in -X in -Y in Minumim Section Properties Rotation of All Components @ Angle: 0.00 deg CCW Rotation Angle(CCW) deg CCW I:Moment of Inertia inA4 r:Radius of Gyration in S:Modulus inA3 Z:Plastic Modulus in"3 CG Y General Shapes _ - 1 :#1 Xcg= 0.000 in Ycg= 0.000 in Rotation= 0 deg CCW Top Flange Width= 5.000in Top Flange Thick= 0.250in Web Thickness= 0.135in Bottom Flange Width 5.000 in Bottom Flange Thic 0.250 in Top Height= 12.000 in STRUCTURAL DESIGN ASSOCAITES Project Title: Engineer: Project ID: SDA#8163- 190410 Project Descr: Printed:11 APR 2019, 8:17AM Steel Beam with Torsional Loads rslsdapglON®RI-1WETWOR-11PROJEC-118000-8-lk8163-D-11190409-1\8163-190409-Burk Bok Issue.ec6 . Software wpo ht ENERCALC,INC.1983-2018,Buik1:10.181213 KW-06011301 Licensee:STRUCTURAL DESIGN ASSOCIATES Description: SPANDRAL CODE REFERENCES Calculations per AISC 360-10, IBC 2012, CBC 2013, ASCE 7-10 Load Combination Set: ASCE 7-16 Analysis Settings Analysis Method:Allowable Strength Design Fy:Steel Yield 50.0 ksi Beam Bracing: Completely Unbraced E:Modulus: 29,000.0 ksi Bending Axis: Major Axis Bending Load Combination ASCE 7-16 Ak, ,4 W12x16 Span=21,0 ft Applied Loads Service loads entered. Load Factors will be applied for calculations. Load(s)for Span Number 0 Moment: D=0 08330 k-ft,Loc=10.50 ft in span, Torsional Load DESIGN SUMMARY • - Max Flange Normal Stress Ratio = 0.592: 1 Maximum Shear Stress Ratio = 0.055: 1 Flange Normal Stress 2 94 ksi Flange Shear Stress 1.10 ksi Phi vn: Flange Normal Stress 4 97 ksi Web Shear Stress 090 ksi (Phi Mn/Sxx) Vn/Omega:Allowable 20.00 ksi Max Mu:Applied 0.00 k-ft Section used for this span W12x16 Section used for this span W12x16 Load Combination +D+H Load Combination +D+H Maximum Rotation = 1.9174 deg at 10.50 ft Maximum Deflection Max Download Transient Load Deflection 0.000 in Max Downward Total Deflection 0.000 in Ratio= 0<360 Ratio= 0<180 Max Upward Transient Load Deflection 0.000 in Max Upward Total Deflection 0.000 in Ratio= 0<360 Ratio= 0<180 Maximum Forces&Stresses for Load Combinations Max Stress Bending Max Flange Normal (ksi) Flange Shear (ksi) Web Shear (ksi) Load Combination Ratio Mu (kft) Vu (k) Total Allow Ratio Total Allow Ratio Total Allow Ratio +D+H 0 592 2.943 4.971 0.592 1.096 20.000 0.055 0.902 20.000 0.045 +D+L+H 0 592 2.943 4.971 0.592 1.096 20.000 0.055 0.902 20.000 0.045 +D+Lr+H 0.592 2.943 4.971 0.592 1096 20.000 0.055 0.902 20.000 0.045 +D+S+H 0.592 2.943 4.971 0.592 1.096 20.000 0.055 0.902 20.000 0.045 +D+0.750Lr+0.750L+H 0.592 2.943 4.971 0.592 1.096 20 000 0,055 0.902 20.000 0.045 +D+0.750L+0.750S+H 0.592 2.943 4.971 0.592 1.096 20.000 0.055 0.902 20.000 0.045 +D+0.60W+H 0.592 2.943 4.971 0.592 1.096 20.000 0.055 0.902 20-000 0.045 +D+0.750Lr+0.450W+H 0,592 2.943 4.971 0.592 1.096 20.000 0.055 0.902 20.000 0,045 +D+0.750S+0.450W+H 0.592 2,943 4.971 0.592 1.096 20.000 0.055 0 902 20 000 0 045 +0.60D+0.60W+0,60H 0.355 1.766 4.971 0.355 0.658 20.000 0.033 0.541 20.000 0.027 +D+0.70E+0.60H 0,592 2,943 4,971 0.592 1,096 20000 0,055 0,902 20000 0.045 +D+0.750L+0.750S+0 5250E+H 0.592 2.943 4.971 0.592 1.096 20.000 0.055 0 902 20 000 0.045 +0.60D+0.70E+H 0 355 1.766 4.971 0.355 0.658 20.000 0,033 0,541 20.000 0.027 Overall Maximum Deflections-Unfactored Loads Load Combination Span Max."-"DO Location in Span Load Combination Max "+"Defl Location in Span 1 00000 0.000 00000 0.000 STRUCTURAL DESIGN ASSOCAITES Project Title: Engineer: Project ID: SDA#8163- 190410 Project Descr: Printed:11 APR 2019, 8:17AM Steel Beam with Torsional Loads rslsdWglONEDRI-1WEIWOR-11PROJEC--118000-8-118163-D-11190409-118163.190409.Burk Boh issueec6 Software;;It ENERCALC,INC 1902018,Budd 10.18 12 13 . r.r r • am Description: SPANDRAL Vertical Reactions •Unfactored Values in KIPS Load Combination Support 1 Support 2 Overall MAXimum +D+H +D+L+H +D+Lr+H +D+S+H +D+0.750Lr+0.750L+H +D+0.750L+0 750S+H +D+O60W+H +D+0.750Lr+0.450W+H +D+0.750S+0.450W+H +0.60D+0.60W+0.60H +D+0.70E+0.60H +D+O 750L+0.750S+0.5250E+H +0.60D+0.70E+H D Only Lr Only L Only S Only W Only E Only H Only STRUCTURAL DESIGN ASSOCAITES Project Title: Engineer: Project ID: SDA#8163- 190410 Project Descr: Printed:11 APR 2019, 8:17AM Concrete Beam _ rslsdapsloNEDRI-1WETWOR-11PROJEC-118000-8-118163-D�-11190409-118163-190409-Burk Bok Issue.ec6 Sothwe copyright ENERCALO.INC.f983-2018.Build:10.18.12.13 KW-06011301 Licensee:STRUCTURAL DESIGN ASSOCIATES Description: ECCENTRICALLY LOAD PANEL CODE REFERENCES Calculations per ACI 318-11, IBC 2012, CBC 2013, ASCE 7-10 Load Combination Set: ASCE 7-16 Material Properties fc 112 = 5.0 ksi Phi Values Flexure: 0.90 fr= f c "7.50 = 530.33 psi Shear: 0 750 T Density = 145.0 pcf R 1 = 0.80 X LtWt Factor = 1 0 Elastic Modulus = 4,030 51 ksi Fy-Stirrups 40.0 ksi fy-Main Rebar = 60.0 ksi E-Stirrups = 29,000.0 ksi • • E-Main Rebar = 29,000.0 ksi Stirrup Bar Size# 3 Number of Resisting Legs Per Stirrup= 2 ul E( tip) L-i, 3 UE) E( 2.06) E(1.76) 4.0 ft 5.0 ft 4.0 ft d w-x-7-2.5-n :•a-w x r�15-h 7 24-- 29--h- _Cross Section & Reinforcing Details Rectangular Section, Width=24.0 in, Height=7.250 in Span#1 Reinforcing.... 244 at 3.0 in from Bottom,from 0.0 to 4.0 ft in this span 244 at 3.0 in from Top,from 0.0 to 4.0 ft in this span Span#2 Reinforcing .. 244 at 3.0 in from Bottom,from 0.0 to 5.0 ft in this span 244 at 3.0 in from Top,from 0.0 to 5.0 ft in this span Span#3 Reinforcing.... 244 at 3.0 in from Bottom,from 0.0 to 4.0 ft in this span 244 at 3.0 in from Top,from 0.0 to 4.0 ft in this span Applied Loads Service loads entered. Load Factors will be applied for calculations. Load for Span Number 1 Point Load: E=-1 760 k @ 0.0 It,(P2) Load for Span Number 2 Point Load: E=-2.060 k @ 0 0 ft,(P1) Point Load: E=-2.060 k @ 5.0 ft,(P1) Load for Span Number 3 Point Load: E=1.760 k @ 4.0 ft,(P2) DESIGN SUMMARY • Maximum Bending Stress Ratio = 0.577 : 1 Maximum Deflection Section used for this span Typical Section Max Downward Transient Deflection 0.034 in Ratio= 2796>=360 Mu:Applied 7.039 k-ft Max Upward Transient Deflection -0.034 in Ratio= 2798>=360. Mn"Phi:Allowable 12 203 k-ft Max Downward Total Deflection 0.034 in Ratio= 2796>=240. Location of maximum on span 0 000 ft Max Upward Total Deflection -0.034 in Ratio= 2798>=240. Span#where maximum occurs Span#2 STRUCTURAL DESIGN ASSOCAITES Project Title: Engineer: Project ID: SDA#8163- 190410 Project Descr: Printed:11 APR 2019, 8:17AM Concrete Beam rslsdapglONEDRI-1WETWOR-11PROJEC-118000-8-118163-D-11190409-118163-190409-Burk Bok Issue ec6 , Software copyright ENERCALC.INC.1983-2018,Build:10 18 12 13 . KW-06011301 Licensee:STRUCTURAL DESIGN ASSOCIATES Description: ECCENTRICALLY LOAD PANEL Cross Section Strength& Inertia Top&Bottom references are for tension side of section Phi'Mn (k-ft) Moment of Inertia (in^4) Cross Section Bar Layout Description Bottom Top I gross Icr-Bottom Icr-Top Section 1 2-#4 @ d=4.25",2-#4 @ d=3", 12.20 12.20 762.16 49.60 4960 Section 2 2-#4 @ d=4.25",2-#4 @ d=T. 12.20 12.20 762.16 49.60 4960 Section 3 2-#4 @ d=4.25",2-#4 @ d=3", 12.20 12.20 76216 4960 4960 Vertical Reactions Support notation:Far left is#1 Load Combination Support 1 Support 2 Support 3 Support 4 Overall MAXimum -6.635 2 515 Overall MINimum -3.484 1 321 +D+H +D+L+H +D+Lr+H +D+S+H +D+0.750Lr+0.750L+H +D+0.750L+0.750S+H +D+0.60W+H +D+0.750Lr+0.450W+H +D+0.750S+0.450W+H +0.60D+0.60W+0.60H +D+0.70E+0.60H -4.645 1.761 +D+0.750L+0 750S+0.5250E+H -3.484 1.321 +0.60D+0.70E+H -4.645 1,761 D Only Lr Only L Only S Only W Only E Only -6.635 2.515 H Only Shear Stirrup Requirements Entire Beam Span Length:Vu<PhiVc/2, Req'd Vs=Not Reqd 11.4.6.1, use#3 stirrups spaced at 0.000 in ' Anchor DesignerT"" Company: SDA Date: 4/10/2019 Engineer: JIB Page: 1/5 Software Project: DANTRAWL Version 2.7.6990.9 Address: Phone: E-mail: 1.Prolect information Customer company: Project description:PANEL CLIP Customer contact name: Location: Customer e-mail: Fastening description: Comment: 2.Input Data&Anchor Parameters General Base Material Design method:ACI 318-14 Concrete: Normal-weight Units: Imperial units Concrete thickness,h(inch):7.25 State:Cracked Anchor Information: Compressive strength,f.(psi):5000 Anchor type: Bonded anchor qjc,v: 1.0 Material:F1554 Grade 36 Reinforcement condition:B tension,B shear Diameter(inch):0.875 Supplemental reinforcement:Not applicable Effective Embedment depth,hef(inch):3 750 Reinforcement provided at corners:Yes Code report: ICC-ES ESR-4057 Ignore concrete breakout in tension: No Anchor category:- Ignore concrete breakout in shear: No Anchor ductility:Yes Hole condition:Water-saturated concrete hmin(inch):5.75 Inspection:Continuous cac(inch):6,63 Temperature range,Short/Long: 150/110°F Cmin(inch):1.75 Ignore 6do requirement:Not applicable Smin(inch):3.00 Build-up grout pad:Yes Base Plate Length x Width x Thickness(inch):6.00 x 10 00 x 0.25 Recommended Anchor Anchor Name: SET-3G-SET-3G w/7/8"fd F1554 Gr.36 Code Report: ICC-ES ESR-4057 i, Input data and results must be checked for agreement with the existing circumstances,the standards and guidelines must be checked for plausibility. Simpson Stiong-Tie Company Inc 5956 W.Las Positas Boulevard Pleasanton,CA 94588 Phone:925.560.9000 Fax:925.847.3871 www.strongtie,com • Anchor Designer TM Company: SDA Date: 4/10/2019 Engineer: JIB Page: 2/5 Software Project: DANTRAWL Version 2.7.6990.9 Address: Phone: E-mail: Load and Geometry Load factor source:ACI 318 Section 5.3 Load combination: not set Seismic design:Yes Anchors subjected to sustained tension:No Ductility section for tension:17.2 3.4.3(a)(iii)-(vi)is satisfied Ductility section for shear:17.2.3.5 3(a)is satisfied .Qo factor:not set Apply entire shear load at front row: No Anchors only resisting wind and/or seismic loads: No Strength level loads: Nua(lb].6800 Wax[lb]:0 Vuay[lb]:0 Mux[ft-lb]:0 Muy[ft-lb]:0 Mu:[ft-lb]:0 <Figure 1> Z 6800 lb ft-lb Ask O lb 0 I b ` 0 ft-lb X o ft-lb Input data and results must be checked for agreement with the existing circumstances,the standards and guidelines must be checked for plausibility. Simpson Stiong-Tie Company Inc 5956 W.Las Positas Boulevard Pleasanton,CA 94588 Phone:925.560.9000 Fax:925.847.3871 www.strongtie.com • Anchor DesignerTM Company: SDA Date: 4/10/2019 Engineer: JIB Page: 3/5 Software Project: DANTRAWL Version 2.7.6990 9 Address: Phone: E-mail <Figure 2> s 10.00 -r s 0 C I , 7.00 Input data and results must be checked for agreement with the existing circumstances,the standards and guidelines must be checked For plausibility. Simpson Shong-Tie Company Inc 5956 W.Las Positas Boulevard Pleasanton,CA 94588 Phone:925.560.9000 Fax:925.847.3871 www.strongtie.com • Anchor DesignerTDA Company: SDA Date: 4/10/2019 Engineer: JIB Page: 4/5 t W : Software Project: DANTRAWL i , Version 2.7.6990 9 Address: Phone: E-mail: 3.Resulting Anchor Forces Anchor Tension load, Shear load x, Shear load y, Shear load combined, Nua(lb) Vuax(lb) V..,(lb) 0uaa)2+(Vuay)2(lb) 1 3400.0 0.0 0.0 00 2 3400.0 0.0 0.0 00 Sum 6800.0 00 0.0 0.0 Maximum concrete compression strain(%a):0.00 <Figure 3> Maximum concrete compression stress(psi):0 Resultant tension force(lb):6800 Resultant compression force(lb):0 Eccentricity of resultant tension forces in x-axis,e'Nx(inch):0.00 Eccentricity of resultant tension forces in y-axis,e'Ny(inch):0.00 Y Dr► 0 2 X 4.Steel Strength of Anchor in Tension (Sec. 17.4.1) Nsa(I b) 0 ON-(lb) 26795 0.75 20096 5.Concrete Breakout Strength of Anchor in Tension(Sec. 17.4.21 Nb=kcA.a�Pchar'S(Eq. 17.4.2.2a) kc A. Pc(psi) her(in) Nb(I b) 17.0 100 5000 3.750 8729 0.75ONcbg=0.750(ANc/ANw)V'egNY'ed,NYgNYlcp,NNb(Sec 17.3.1 & Eq.17.4.2.1 b) ANc(In2) ANc.(In2) ca,min(In) Tec,N Ted,N VqN Tcp,N Nb(lb) 0 0.750Ncb,(lb) 205.31 126.56 - 1.000 1.000 1.00 1.000 8729 0.65 6903 6.Adhesive Strength of Anchor in Tension L$gr.. 17^4.5) rk,cr= rk,crfsb.n4e=Ksm(Pc/2,500)"aNse;S rk,cr(psi) fsb.,N mr Ksat aN wis f c(psi) n rk,ar(psi) 1265 1.00 1.00 1.00 5000 0.24 1494 Nba=A.arcrzdaher(Eq. 17.4.5.2) A.a rcr(psi) da(in) her(in) Nb.(I b) 1.00 1494 0.88 3.750 15400 0.75ONag=0.750(ANa/ANao)T ,Na T ed,Na TcpNaNba(Sec. 17.3.1 &Eq.17.4.5.1 b) ANa(In2) ANao(in2) cNa(In) ca,.m(In) V'egNa Ted,Na Tcp,Na Nba(Ib) 0 0.750Nag(lb) 711.44 547.63 11.70 - 1.000 1 000 1.000 15400 0.55 8253 Input data and results must be checked for agreement with the existing circumstances,the standards and guidelines must be checked for plausibility Simpson Stiong-Tie Company Inc 5956 W.Las Posltas Boulevard Pleasanton,CA 94588 Phone:925.560.9000 Fax:925.847 3871 www.strongtie.com ' Anchor DesignerTM Company: SDA Date 4/10/2019 Engineer: JIB Page: 5/5 C= Software Project DANTRAWL Version 2.7.6990.9 Address: • Phone E-mail: 11. Results 11. Interaction of Tensile and Shear Forces (Sec. D.7)? Tension Factored Load, Nua(lb) Design Strength,oNn(lb) Ratio Status Steel 3400 20096 0.17 Pass Concrete breakout 6800 6903 0.99 Pass(Governs) Adhesive 6800 8253 0.82 Pass SET-3G w17/8"0 F1554 Gr.36 with hef=3.750 inch meets the selected design criteria. ACI 318-14 Section 17.2.3.4.3(a)(i)&(ii)Calculations for Ductility requirement for tension load Steel Factored Lpad, Nua(lb) 1.2 x Nominal Strength, Nn(lb) Ratio Steel 3400 32154 10 6% Concrete Factored Load, %.(lb) Nominal Strength, Nn(lb) Ratio Concrete breakout 6800 14161 48.0% Governs Adhesive 6800 20007 34.0% ACI 318-14 Section 17.2.3.4.3(a)(i)&(ii)is not satisfied since steel ratio does not govern. 12.Warnings -Brittle failure governs for tension.Governing anchor failure mode is brittle failure.Attachment shall be designed to satisfy the requirements of ACI 318-14 Section 17.2.3.4.3 for structures assigned to Seismic Design Category C, D, E,or F when the component of the strength level earthquake force applied to anchors exceeds 20 percent of the total factored anchor force associated with the same load combination. In case when ACI 318-14 Sections 17.2.3 4.3(a)(iii)to(vi),(b),(c)or(d)is satisfied for tension loading,select appropriate checkbox from Inputs tab to disable this message Alternatively,00 factor can be entered to satisfy ACI 318-14 Section 17.2.3.4.3(d)to increase the earthquake portion of the loads as required. Per designer input,ductility requirements for shear have been determined to be satisfied—designer to verify. Designer must exercise own judgement to determine if this design is suitable. -Refer to manufacturer's product literature for hole cleaning and installation instructions. Input data and results must be checked for agreement with the existing circumstances,the standards and guidelines must be checked for plausibility. Sonpson Strong-Tie Company Inc 5956 W.Las Posltas Boulevard Pleasanton,CA 94588 Phone:925.560.9000 Fax:925.847.3871 www.strongtie.00m Y City of Arlington dC44CG OO 14 a��044Q� • Public Works '•plINn�o 238 N. Olympic •Arlington, WA 98223 DATE r"* B NO. ❑Administration ❑Maintenance & Operations ATTENTION I JO ❑Engineering ❑Utilities RE: TO WE ARE SENDING YOU ❑ Attached ❑ Under separate cover via the following items: ❑ Shop drawings ❑ Prints ❑ Plans ❑ Samples ❑ Specifications ❑ Copy of letter ❑ Change order ❑ COPIES DATE NO. DESCRIPTION ��' ��.-'' I�'' 2�•� jy�[-i�4.t! � I�eCt�C-r1Z_`�1 r.n:V�C: � C � i 1 J � Mots, �l A 1--` 6- -- THESE ARE TRANSMITTED as checked below: ❑ For approval ❑ Approved as submitted ❑ Resubmit copies for approval ❑ For your use ❑ Approved as noted ❑ Submit copies for distribution ❑ As requested ❑ Returned for corrections ❑ Return corrected prints ❑ For review and comment ❑ ❑ FORBIDS DUE 20 ❑ PRINTS RETURNED AFTER LOAN TO US REMARKS COPY TO SIGNED: If enclosures are not as noted,kindly notify us at once. AFE il V/ S bu t 1621 114"Ave. SE, Suite 219 Bellevue,WA 98004 425-818-4182 RETURN TRANSMITTAL Date: January 4th, 2019 The following projects have been reviewed and have been deemed complete. Separate document lists are included for each permit for your use in quality control. Invoicing will be done separately and will be pursuant to the services contract. TYPE OF ORIGINAL DATE PERMIT # PERMIT OF RECEIPT COMMENTS 1 BID1792 Building Re-review of issued permit for changes to structure 2 3 4 SAFEbuilt Contact Information: Name: David Spencer Email: dspencer@safebuilt.com Phone: 206-316-0865 RECEIVED: BY "A iL Signature Date Printed Name SAFEbuilt Washington Bellevue Office✓ ���" City of Arlington I[EVURn OCR 4 C��C�i]0441�d • Public Works ��<�NG�° 238 N. Olympic • Arlington, WA 98223 DATE cos No. ❑Administration ❑Maintenance & Operations ATTENTION ❑Engineering ❑Utilities _ T ` } RE O i� WE ARE SENDING YOU ❑ Attached ❑ Under separate cover via the following items: ❑ Shop drawings ❑ Prints ❑ Plans ❑ Samples ❑ Specifications ❑ Copy of letter ❑ Change order ❑ COPIES DATE NO. DESCRIPTION THESE ARE TRANSMITTED as checked below: ❑ For approval ❑ Approved as submitted ❑ Resubmit copies for approval ❑ For your use ❑ Approved as noted ❑ Submit copies for distribution ❑ As requested ❑ Returned for corrections ❑ Return corrected prints ❑ For review and comment ❑ ❑ FORBIDS DUE 20 ❑ PRINTS RETURNED AFTER LOAN TO US REMARKS COPY TO SIGNED: If enclosures are not as noted,kindly notify us at once. *"04': City of Arlington d cffulln O[P Public Works 238 N. Olympic•Arlington, WA 98223 DATE f Boa No. ❑Administration ❑Maintenance & Operations ATTENTION ❑Engineering ❑Utilities RE: t T I WE ARE SENDING YOU ❑ Attached ❑ Under separate cover via the following items: ❑ Shop drawings ❑ Prints ❑ Plans ❑ Samples ❑ Specifications ❑ Copy of letter ❑ Change order ❑ COPIES DATE NO. DESCRIPTION THESE ARE TRANSMITTED as checked below: ❑ For approval ❑ Approved as submitted ❑ Resubmit copies for approval ❑ For your use ❑ Approved as noted ❑ Submit copies for distribution ❑ As requested ❑ Returned for corrections ❑ Return corrected prints ❑ For review and comment ❑ ❑ FORBIDS DUE 20 ❑ PRINTS RETURNED AFTER LOAN TO US REMARKS COPY TO SIGNED: If enclosures are not as noted,kindly notify us at once. " � City of Arlington I[EVUM OO [F 4 MM�WITTID. • Public Works 70 238 N. Olympic•Arlington,WA 98223 DATE I L;i JOB NO. ❑Administration ❑Maintenance & Operations ATTENTION TO ❑Engineering ❑Utilities RE: I WE ARE SENDING YOU ❑ Attached ❑ Under separate cover via the following items: ❑ Shop drawings ❑ Prints ❑ Plans ❑ Samples ❑ Specifications ❑ Copy of letter ❑ Change order ❑ COPIES DATE NO. DESCRIPTION C' THESE ARE TRANSMITTED as checked below: ❑ For approval ❑ Approved as submitted ❑ Resubmit copies for approval ❑ For your use ❑ Approved as noted ❑ Submit copies for distribution ❑ As requested ❑ Returned for corrections ❑ Return corrected prints ❑ For review and comment ❑ FORBIDS DUE 20 ❑ PRINTS RETURNED AFTER LOAN TO US REMARKS COPY TO SIGNED: If enclosures are not as noted,kindly notify us at once. *N'G'� City of Arlington 11277[ n OO [P 4 � 0-5wulfull Public Works 238 N. Olympic • Arlington, WA 98223 DATE J Boa No. ❑Administration ❑Maintenance & Operations ATTENTION ❑Engineering ❑Utilities RE: TO `i-t �_LL.I�•'; ii WE ARE SENDING YOU ❑ Attached ❑ Under separate cover via the following items: ❑ Shop drawings ❑ Prints ❑ Plans ❑ Samples ❑ Specifications ❑ Copy of letter ❑ Change order ❑ COPIES DATE NO. DESCRIPTION ✓,'.11� �i'-= '!t 1 C I- ,1� tilt�ti I I } THESE ARE TRANSMITTED as checked below: ❑ For approval ❑ Approved as submitted ❑ Resubmit copies for approval ❑ For your use ❑ Approved as noted ❑ Submit copies for distribution ❑ As requested ❑ Returned for corrections ❑ Return corrected prints ❑ For review and comment ❑ ❑ FORBIDS DUE 20 ❑ PRINTS RETURNED AFTER LOAN TO US REMARKS COPY TO J,= SIGNED: If enclosures are not as noted,kindly notify us at once. SAFEbuilt Contact Information: Name: Lou Whitford Email: LwhitfordCaD-safebuilt.com Phone: 206-503-5948 RECEIVED BY: atu Date Printed Name SAFEbuilt Washington Bellevue Office✓ ,yYPPveNe., APPLICATION STATUS ❑ Revisions Required — Hold ;NWPPP PYP<�" ❑x Initial Review ❑ 2nd Review ❑ 3rd Review El Approved With Conditions SAFEbuilt ❑ APPROVED APPLICANT: Dantrawl Inc. PHONE # 206-472-4091 EMAIL: dnhannam@frontier.com DATE: 2/12/2018 PHONE # 425-388-5588 PERMIT #: BID1792 FROM: Amber Green PROJECT: Dawntrawl Incl EMAIL: agreen@safebuilt.com ADDRESS: 62XX 180T" ST, NE CODES REVIEWED: OCCUPANCY GROUP: F-1/13 ❑ 2015 IRC 0 2015 IBC Z 2015 IMC TYPE OF CONSTRUCTION: VB 0 2015 UPC 0 2015 IFGC Z 2015 WSEC NUMBER OF STORIES: 2 The design documents submitted for this project have been reviewed for compliance with the locally adopted codes and amendments. The following comments must be addressed before a building permit is issued. For processing: Please submit revised construction documents containing the requested information or plan revisions with all revisions clouded or otherwise identified. Please respond in writing to each comment by marking the attached list or creating a response letter. Indicate which plan sheet, detail, specification, or calculation shows the requested information. Please send revisions to the attention of the plans examiner with the building permit application number noted. Revised drawings must clearly show code compliance. A RESPONSE LETTER MUST BE INCLUDED WITH THE REVISED PLAN SUBMITTAL. Please be sure to include on the resubmittal the engineer's or architect's "wet" stamp, signature, registration number and date on the cover page of any structural calculations, all structural details and structural sheets of the plans. Please submit the requested information via email or hard copy to: 1621 114th Ave SE, Suite 219, Bellevue WA 98004 In order to keep your permit in an "Active" status, please respond within 60 days. For questions about the required information please contact the reviewer listed below at the SAFEbuilt office: 425-786-0001 or by email: Safebuiltbellevue�safebuilt.com Please understand that other review agencies/divisions may have revision comments, which are not contained within this Revision Letter. Please contact the local jurisdiction for a list of these agencies. Sincerely, Awl 6jrU.w Building Plans Examiner SAFEbuilt 1621 114t"Ave SE, Ste 219 Bellevue WA 98004 SAFEbuilt Washington Bellevue Office✓ DESIGN CRITERIA: 1. The structural design of the building has reduced the roof snow load from the jurisdiction minimum of 25 to 11.90. This reduction appears to be less than allowed by the ASCE Standards7-10. Please provide further proof of snowload reduction allowance. 2. The plans make note of a fire sprinkler system installed in the proposed structure. Please note the fire sprinkler permit and review are not part of this review. 3. It appears the square footage of the shop portion of the building (F-1 occupancy) exceeds the allowable area in square feet per IBC Table 506.2. The table outlines a maximum allowable square footage of 34,000 square feet in a Type V-B sprinkled F-1 occupancy structure. SITE PLAN: 1. It appears the number of parking spaces provided is inadequate for the occupant load of the structure. 2. If the number of parking spots is increased to accommodate the revised occupant load, the number of ADA compliant parking spaces will need to be increased per IBC Table 1106.1. SHEET Al 1. Please provide full cross section view of storage racks. Include rack height, sprinklers and clearances to ceiling for high pile storage per fire code. 2. Occupancy calculations do not comply with IBC Table 1004.1.2, please revise. 3. The plan is missing sufficient cross sections. Please provide full cross sections throughout the plan: North/South and East/West at a minimum. 4. Cross section shall classify interior wall finishes complying with IBC Section 803. 5. Details labeled are missing on sheet A11. Many of the details are labeled "X", these need to be assigned a number and included on sheet A11. 6. Connection details and supported structural engineering are missing for connection between the framed wall and the concrete tilt-up panel. Please provide cross section details in addition to supporting structural engineering. 7. It appears the stairs may exceed the 12' max before requiring a landing. Please include a scaled cross section of the stairs to verify. 8. The plans are missing detailed information regarding the rack/hoist system. Please provide. SAFEbuilt Washington Bellevue Office✓ 9. Is the shop area heated? Please provide information on the plans to include mechanical equipment type. SHEET A4: 1. The plans do not outline door hardware and pull requirments. Please provide this information to include compliance with ADA minimums. 2. The plans do not include compliance with ADA requirements. Please provide this information to include elevations of ADA components for clarification. 3. The plans do not include full elevator details. Please provide this information to include product listings. 4. The plans do not include locations of safety glazing. Please provide this information. SHEET A5: 1. Mechanical equipment type and fuel source not included on plans. Please provide this information to include sizing documentation. 2. Provide mechanical room separation details complying with IBC 509.4.2. 3. Washington State Energy Code Compliance forms not included. Please include all compliance requirements on plans matching forms submitted. 4. Exit access for future second floor shall comply with IBC Section 1023, 1022, 1024, 1028. Doors to the bathroom are unrated in this hall. 5. The steel building plans do not include the rear patio or covered entry. Please provide full structural details for both. SHEET A6: 1. Guard detail not included on plans. Please provide information on cross section. 2. Stair details missing and incomplete. Please provide full cross section meeting the maximum 12' vertical height limitations. 3. There is no bathroom shown on the second floor. Will there be plumbing provided for future use? SHEET A7: SAFEbuilt Washington Bellevue Office✓ 1. Provide smoke and flame spread rating of insulation that is exposed throughout complying with IBC Section 603 and IBC Section 720. 2. Many details are labeled with "X" throughout. All details must be assigned a number and have corresponding detail supplied. 3. Plans are missing minimum fire blocking throughout. Please provide fire blocking complying with IBC Section 718. SHEET A8: 1. Many details are labeled with "X" throughout. All details must be assigned a number and have corresponding detail supplied. 2. Parapet connection details are missing. Please provide details in compliance with IBC 705.11. 3. Proper drainage details need to be shown for reverse slope at covered entry. SHEET A9: 1. Please provide in-lay ceiling support and connections complying with IBC Section 808. 2. Please include fire sprinkler head locations on cross sections for in-lay ceiling. SHEET A10: 1. Please provide the WP 4135 details on the plans from elevator shaft. SHEET Al 1 : 1. Please verify that all details are properly accounted for throughout the plans. SHEET Al2: 1. Detail 6/Al2 mentions 95% compaction of soil. This will require special inspection. SHEET S1 : 1. List ALL specific Special Inspections that will be required for this project to include: • Bolting • Welding • Rebar • Concrete • Soil Compaction SAFEbuilt Washington Bellevue Office✓ SHEET S3: 1. Foundation calculations not provided. Please provide. 2. Provide foundation layout and plan at a minimum 1/8" scale that allows for all details to be identified on the plans and specific throughout. 3. Plans need to include notation "SLAB MUST BE POURED WITH THE FOUNDATION TO PREVENT STRUCTURAL FAILURE." 4. Shearwall calculations not provided. Please provide calculation and all connection details between shearwall panels and roof, tilt-up panels. 5. STHD hold downs are calledout on the framing plan. How are these to be connected to the tilt-up panels? Please provide supporting structural engineering. 6. Slab insulation not shown on foundation details. Please provide on plan or provide supporting documentation detailing exemption on provided Washington State Energy Code compliance forms. SHEET S4: 1. Shearwall schedule indicates minimum nailing patterns. Cross section however, indicates steel studs? Please revise shearwall schedule or wall framing. 2. Please provide connection details and supporting engineering for hold-down in tilt-up panels called out on framing plan. 3. Please provide slab insulation on plan or provide supporting documentation detailing exemption on provided Washington State Energy Code compliance forms. 4. Schedule for interior framed walls not provided on plans. Please provide. This is an initial review of plans submitted. Please be advised additional corrections may be required once complete plans are submitted. SAFEbuilt Washington Bellevue Office✓ 741 Marine Drive,Bellingham,WA 98225 www.geotest4nc.com GCOTC ST 20611 67th Ave.NE.Unit A.Arlington,WA 98223 phone:(360)733.7318 toll free:(888)251.5276 fax:(360)733.7418 Concrete Inspection & Compressive Strength Test Report PROJECT: Dantrawl JOB#: 18-0376 ADDRESS: 6221 180th Street NE,Arlington,WA REPORT#: CB007 PERMIT M BLD-1792 DATE: 1/1 412 0 1 9 CLIENT: Coast Construction Group PAGE#: 1 of 3 CONTRACTOR: Coast Construction Group INSPECTOR: Joel Morder Placement Location: Slab-On-Grade Located at Grids B-D/8-11.3 and C-D/11.3-14 Sample Location: Slab-On-Grade Beginning at Approximate Grid C.3/8.2 Field Data: Eq.No. Supplier Stanwood Redi-Mix Slump,in.(C143) 5.00 15 Mix# 65120 Air Content,%(C231) NT Mix Description 1/2 SACK 3/4"Agg.NO AIR Unit Weight,pcf(C138) NT Truck/Ticket# 98/156296 Air/Mix Temp.,•F(C1064) 25/65 Strength Required 3000 psi at 28 days Field Cure Temperature,•F NT Quantity Placed,cy 250 Cure Method-Initial/Final Container/Water Tank Time Batched 4:45 AM Water Added on Job,gals 0 Time Sampled 5:20 AM Water Requested by Laboratory Data: Lab Test Age Test Total Load Avg.D Area Compressive No. (Days) Date (Ibs) (In) (Ina) Strength(psi) Remarks 91241 7 01-21 0 0.00 0.00 0 91242 28 02-11 0 0.00 0.00 0 91243 28 02-11 0 0.00 0.00 0 91244 28 02-11 0 0.00 0.00 0 91245 Hold 00-00 0 0.00 0.00 0 Reinforcement Inspection Yes n/a:not applicable Specimen Size 4"X 8" Reinforcement Conforms Yes I n/t: not tested Test Reference ASTM C31/C39/C1231 Comments: GeoTest on-site for inspection of the slab on grade located at grids B-D/8-11.3 and C-D/11.3-14. Performed final inspection of steel, which was in conformance with structural drawings except that hairpins at AB's did not have adequate coverage at the outer edge of forms. Concrete was placed by pump and consolidated through mechanical vibration, and mechanical screed. *The Stanwood Redi-Mix QC provided the thermometer for mix temperature readings. COPIES chumphrey@safebuitt com,dspenoer@safebui t.com,Ellas@danbawl corn,erk:gones@stanwoodredFmbc.mm, Reviewed by Jake I@coast-group com,kolander@ari�rgtonwa.gov,Ipstemon@adingtonwa gov This report shall not be reproduced except In full,without the written approval of GeoTest Services,Inc. The above test results relate to the sample(or location)tested. CaEOTEST SERVICES, INC. 741 Marine Drive,Bellingham, WA 98225 20611 67th Ave.NE,Unit A,Arlington,WA 98223 www.geotest-inc.com phone: (360)733-7318 fax. (360)733-7416 Concrete Compressive Strength Test Report* Continuation PROJECT: Dantrawl JOB M 18-0376 CLIENT: Coast Construction Group REPORT M CB007 CONTRACTOR:Coast Construction Group PAGE M 2 of 3 Sample Location: Approximate Grid D/11 Field Data: Truckrricket# 98/156309 Slump,in.(C143) 4.50 Time Batched 6:01 AM Air Content,%(C231) NT Time Sampled 7:20 AM Unit Weight,pcf(C138) NT Air Temperature,'F 25 Water Added on Job,gals 10 Mix Temp.°F(C1064) 60 Water Requested by Stanwood Red!-Mi Laboratory Data: Lab Test Age Test IT07bs)lLoad Avg.D Area Compressive No. (Days) Date (in) (Id) Strength(psi)I Remarks 91246 7 01-21 0 0.00 0.00 0 91247 28 02-11 0 0.00 0.00 0 91248 28 02-11 0 0.00 0.00 0 91249 28 02-11 0 0.00 0.00 0 91250 Hold 00-00 0 0.00 0.00 0 Comments: - —� Sample Location: Field Data: Truckrricket# / Slump,in.(C143) Time Batched Air Content,%(C231) Time Sampled Unit Weight,pcf(C138) Air Temperature,"F Water Added on Job,gals Mix Temp.°F(C1064) I Water Requested by Laboratory Data: Lab Test Age Test Total Load Avg. Area Compressive Remarks No. (Days) Date (Ibs) (in) (In') Strength(psi) 741 Marine Drive,Bellingham,WA 98225 www.geotest4nc.com CpG OTG ST 20611 67th Ave.NE.Unit A.Arlington,WA 98223 —ftip" phone:(360)733.7318 toll free:(888)251.5276 fax.(360)733.7418 Concrete Compressive Strength Test Report* Continuation PROJECT: Dantrawl. JOB#: 18-0376 CLIENT: Coast Construction Group REPORT#: CB007 CONTRACTOR: Coast Construction Group PAGE#: 3 of 3 Mechanical screed in action during concrete placement. r.- , x- � 741 Marine Drive,Bellingham,WA 98225 www.gootest4nc.com MVC7 e W ST 20611 67th Ave.NE.Unit A.Arington,WA 98223 phone:(360)733.7318 toll free:(888)251.5276 fax:(360)733.7418 Concrete Inspection $ Compressive Strength Test Report PROJECT: Dantrawl JOB#: 18-0376 ADDRESS: 6221 180th Street NE,Arlington,WA REPORT M CB008 PERMIT#: BLD-1792 DATE: 1/15/2019 CLIENT: Coast Construction Group PAGE M 1 of 4 CONTRACTOR: Coast Construction Group INSPECTOR: Joel Morder Placement Location: Slab-on-Grade Located at Grids B-D/2-8.5 Sample Location: Grid B.5/4 Field Data: Eq.No. Supplier Stanwood Redi-Mix Slump,in.(C143) 5.00 15 Mix# 65120 Air Content,%(C231) NT Mix Description 1/2 Sack 3/4 Agg,No Air Unit Weight,pcf(C138) NT Truck/Ticket# 95/156363 Air/Mix Temp.,•F(C1064) 28/62 Strength Required 3000 psi at 28 days Field Cure Temperature,•F NT Quantity Placed,cy 380 Cure Method-Initial/Final Container/Water Tank Time Batched 5:16 AM Water Added on Job,gals 10 Time Sampled 5:45 AM Water Requested by Stanwood Red!-Mi Laboratory Data: Lab Test Age I Test Total Load Avg.D Area Compressive No. (Days) Date (Ibs) (in) (ire) Strength(psi) Remarks 91284 7 01-22 0 0.00 0.00 0 91285 28 02-12 0 0.00 0.00 0 Set 1 91286 28 02-12 0 0.00 0.00 0 Set 1 91287 28 02-12 0 0.00 0.00 0 Set 1 91288 Hold 00-00 0 0.00 0.00 0 Set 1 Reinforcement Inspection Yes n/a:not applicable Specimen Size 4"X 8" Reinforcement Conforms Yes n/t: not tested Test Reference ASTM C31/C39/C1231 Comments: GeoTest on site for inspection of reinforced concrete for the slab-on-grade located at grids B-D/2-8.5. Reinforcing steel was in conformance with structural drawings. However the hairpins for the columns around the perimeter of the slab did not meet concrete cover requirements. Notified the contractor of the deficiency. Please see figure 2 below for reference to the hairpin coverage. *Used Stanwood Redi-Mix Q/C for mix temperature readings today. COPIES_chumphrey@safebutlt corn dspencer@safebuUt.00m,Ellas@danbawl.eom,erldones@stanwoodredi-mix corn Reviewed by Jake I@coast-group com,kolander@adingtonwa gov,Ipetwwn®arlingtDnwo.gov This report shall not be reproduced except In full,without the written approval of GeoTest Services,Inc The above test results relate to the sample(or location)tested — _ I GEOTEST SERVICES, INC. 741 Marine Drive,Bellingham, WA 98225 2061167th Ave.NE,Unit A,Arlington,WA 98223 www.geotest-inc.com phone: (360)733-7318 fax. (360)733-7418 Concrete Compressive Strength Test Report* Continuation PROJECT: Dantrawl JOB M 18-0376 CLIENT: Coast Construction Group REPORT M CB008 CONTRACTOR:Coast Construction Group PAGE M 2 of 4 Sample Location: Sampled from Grid C/4 Field Data: Truckrricket# 85/156372 Slump,in.(C143) 5.00 Time Batched 6:19 AM Air Content,%(C231) NT Time Sampled 6:55 AM Unit Weight,pcf(C138) NT Air Temperature,°F 28 Water Added on Job,gals 10 Mix Temp.°F(C1064) 60 Water Requested by Stanwood Redi-Mi Laboratory Data: Lab Test Age I Test ITotal Load Avg.D Area Compressive Remarks No. (Days) Date (Ibs) (in) (in') Strength psi 91297 7 01-22 0 0.00 0.00 0 Set 2 91298 28 02-12 0 0.00 0.00 0 Set 2 91299 28 02-12 0 0.00 0.00 0 Set 2 91300 28 02-12 0 0.00 0.00 0 Set 2 91301 Hold 00-00 0 0.00 0.00 0 Set 2 Comments: Sample Location: Sampled from Grid C.5/5.5 Field Data: Truckrricket# 87/156375 Slump,in.(C143) 5.50 Time Batched 6:35 AM Air Content,%(C231) NT Time Sampled 7:15 AM Unit Weight,pcf(C138) NT Air Temperature,°F 28 Water Added on Job,gals 10 Mix Temp.°F(C1064) 61 Water Requested by Stanwood Red!-Mi Laboratory Data: Lab Test Age Test Total Loadl Avg.D Area Compressive No. (Days) Date (Ibs) (in) (In°) Strength(psi) Remarks 91302 7 01-22 0 0.00 0.00 0 Set 3 91303 28 02-12 0 0.00 0.00 0 Set 3 91304 28 02-12 0 0.00 0.00 0 Set 3 91305 28 02-12 0 0.00 0.00 0 Set 3 91306 Hold 00-00 0 0.00 0.00 0 Set 3 GEOTEST SERVICES,INC. 741 Marine Drive,Bellingham,WA 98225 20611 67th Ave.NE,Unit A,Arlington, WA 98223 www.geotest-inc.com phone: (360)733-7318 fax: (360)733-7418 Concrete Compressive Strength Test Report* Continuation PROJECT: Dantrawl JOB M 18-0376 CLIENT: Coast Construction Group REPORT M CB008 CONTRACTOR:Coast Construction Group PAGE M 3 of 4 Sample Location: Grid B.5/7 Field Data: Truckrricket# 97/156384 Slump,in.(C143) 5.00 Time Batched 7:20 AM Air Content,%(C231) NT Time Sampled 7:55 AM Unit Weight,pcf(C138) NT Air Temperature,°F 29 Water Added on Job,gals 10 Mix Temp.°F(C1064) 63 Water Requested by Stanwood Red!-M! Laboratory Data: 1 Lab Test Age Test Total Load Avg.D Area Compressive Remarks No. (Days) Date (Ibs) (in) QW) Strength(psi) 91307 7 01-22 0 0.00 0.00 0 Set 91308 28 02-12 0 0.00 0.00 0 Set 4 91309 28 02-12 0 0.00 0.00 0 Set 4 91310 28 02-12 0 0.00 0.00 0 Set 4 91311 Hold 00-00 0 0.00 0.00 0 Set 4 Comments: Sample Location: Grid C/7.5 Field Data: Truckrricket# 84/156391 Slump,in.(C143) 5.50 Time Batched 7:56 AM Air Content,%(C231) NT Time Sampled 8:30 AM Unit Weight,pcf(C138) NT Air Temperature,'F 29 Water Added on Job,gals 10 Mix Temp.°F(C1064) 60 Water Requested by Stanwood Redi-Mi Laboratory Data: Lab Test Age I Test ITotal Load Avg.D Area Compressive No. (Days) Date (Ibs) (in) (in') Strength(psi)No. 91312 7 01-22 0 0.00 0.00 0 Set 5 91313 28 02-12 0 0.00 0.00 0 Set 5 91314 28 02-12 0 0.00 0.00 0 Set 5 91315 28 02-12 0 0.00 0.00 0 Set 5 91316 Hold 00-00 0 0.00 0.00 0 Set 5 741 Marine Drive,Bellingham,WA 98225 www.geotest-inc.com GeOTG ST 20611 67th Ave.NE.Unit A.Arlington,WA 98223 phone:(360)733.7318 toll free:(888)251.5276 fax.(360)733.7418 Concrete Compressive Strength Test Report* Continuation PROJECT: Dantrawl JOB M 18-0376 CLIENT: Coast Construction Group REPORT M CB008 CONTRACTOR: Coast Construction Group PAGE M 4 of 4 F Figure 1: Concrete Screed Towards the End of the - Placement It tea__ cht iru Figure 2: Example of one of the hairpins that did not meet minimum concrete cover requirements. Contractor was notified, and indicated that the outer edge of the slab would be grouted for the tilt up panels at a later date. r�Ss r 00 +.l