Loading...
HomeMy WebLinkAbout103 N DUNHAM UNIT A_2782_2026 Ameresia Lawlis From: Jennifer Pittman Sent: Monday, April 5, 2021 2:35 PM To: secretary@glgpllc.com; sarah@glgpllc.com Subject: Arlington Zoning Application-103 N Dunham Good Afternoon, Please see the below list for the Zoning Permit comments and requirements for 103 N Dunham as requested. • Civil Permit required • ROW Permit required • Updates to utilities • Frontage improvements where necessary(failing sidewalk, etc) • Paving of the alley and driveway • Storm improvements for all new impervious • ADA ramps possibly • Any architectural feature changes will need to meet old town residential standards • Building permit required due to change of use • Fire wall required • Floor separation required • Egress required • Must meet life safety requirements • Architectural plans will be required Please feel free to reach out to our office with any questions you may have. Thank you, Jennifer Pittman Permit Technician City of Arlington Community& Economic Development 18204 59th Ave NE Arlington, WA 98223 Office: 360-403-3550 www.arlingtonwa.gov f Z RESIDENTIAL MECHANICAL APPLICATION Community and Economic Development qW City of Arlington• 18204 59th Ave NE•Arlington,WA 98223•Phone(360)403-3551 This application is for new, addition, altered or replaced mechanical installation and new or altered gas piping. Please fill out all pages of this application and include all information. Type of Permit: ❑ New Installation 0 Addition/Alteration/Repair ❑ Gas Piping Property Address: 103 N Dunham Ave #B Project Valuation: 12326.24 Lot#: Parcel ID No.: _ Preferred Contact: ❑Owner P Contractor Install Hp and 1 indoor wall unit Project Description: Owner Name: Iris Ingram-Forbus Horne No.: 509-304-8091 Email Address: iris-ingram@yahoo.com Cell No.: Mailing Address: 11908 N Lakeshore Dr City: Lake Stevens State: WA Zip: 98258 Contractor Name: Nordstrom Heating and Air Office No.: 360-386-9819 Email Address: office@ no rdstrom heating.com Cell No.: Mailing Address: 1059 State Ave Suite G City: Marysville State: WA Zip: 98270 L&I Contractor License Number: nordsha884jw Expiration Date: 4/16/2024 • New gas piping requires a pressure test hooking to any appliance • Sediment traps(drips)are required on all gas hies • Gas lines are required to be supported/secured every 6 to 8 feet • Proper Combustion air and venting required for all appliances • A shut-off valve is required within 6 feet of all appliances Gas Piping Information Lam' Not Applicable ❑CSST ❑ Brass ❑ Other Proposed Piping Material: ❑ Black Steel ❑ Galvanized Steel Proposed Piping Size: ❑ 'A" ❑ 5/s" ❑ 3/4" ❑ 1" ❑ 11h" ❑ 2" Distance from Meter to furthest Appliance: Total BTU's of all Appliances: I hereby certify that the above information is correct and that the construction on,and the occupancy and the use of the above described property will be in accordance with the laws,rules and regulation of the State of Washington. Signature Print Name Date FOR STAFF USE ONLY AUG 0,4 ZOZZ PERMIT# ACCEPTED BY: DATE STAMP REV03.2022 Pagel of2 Z!°Z abed OZOZ'ZA321 00'0ST lelos 00'SZ$ aad AB0l0ugaa,L/2utssaa0ad 00'53 aad uoilaadsul 00'0S aad llutaad 00'5Z$ x pa."A seg-aaleaHaaleM 00'5Z$ x paald se0-saaleaH lle tuals s uiuoil►puoj 00'0i$ x ate 3o laed'atunloA iiy algelaeA)saxog AHA 00'5Z$ x q nlg 00l<staleaH Ilttfl 00'51$ x q nIg 0015 UaleaH Ilufl 00'51$ x pooH a tred leguapisa-1 00'5L$ x aa3 uotlaa sta-jd 00'05$ x nIg005<ltufl•uogeaa Lyad = 00'5Z$ x q tilgo0i<llufl uogeaa Lya�l = 00'51$ x g nlg00i>llufl uogeaa ujad = 00'5t$ x paatd se0-cool)IooO a uell 00'05$ x nlgoot<sllufl'bId 00'5Z$ x nlg00i5 sllnfl' id pa1jpa s aslAuaglo Iou'apoa leatuegaatu 00'51$ x 6q palepiliai-aattegddd snoauellaastyy 00'51$ x MOD leaH aaleM loH 00'SZ = 00'5Z$ x j Ilufl uisuapuo:)- tundleaH 00 5 L$ x dad uGgaxH juaH o0'Z$ x shun S>snl sltun S < u!did Se0 00'51$ x shun S > u► id seH = 00'05$ x q nIS OOS <DV pages seo 00'5Z$ x q nIg 00I<OV paatd seH 00'51$ x 'I nlg OOi>Odpal)d se!) 00'51$ x as Q saglo10 seg 00'5Z$ x nIg OOi<IeaH MV pamOA 00'5i$ x nIg OOi5 IeaH aIV paaaod 00'51$ x anols laasul aael aqA 00'51$ x sued u0tlelRu9A lsitetpcg 00'51-$ x saaloo0 aAileao eng 00'5Z$ x paatit as s uimuap 31aoAllanQ 00'51$ x uilanQaa Q 00'ST,$ x saasnBtQ 00'0S$ x II a ,L-spooH Ielaaauttuo0 00'5Z$ x I a ,L-spooH letaaatutuOD = 00'5Z$ x g0£-5i q nlgooS<aapog 00'51$ x dqSi-£tI nlg00i<aaltog 00'05$ x dgOS>q nlg tioilpui S j<aaltog 00'SZ$ x qo5>q nlg uoiU!m j<aaltog 00'5I$ x q£=q n4gooj>aaltog 00'5Z$ = 00'5Z$ x i aad leatuegaaW aseg 00'5i$ x slltifl tnlptreH aiy 00-05$ x g nIg00S<IIu❑-puOD aI 00'5Z$ x g nlg00i<Ilufl puoD.ny 00'5I $ x tI/nIg00Z5IIufl'pno0-nd 00'SL$ x saa3 Aeatnag held Ieu0illpp -ON Ppoyll ielolgnS Iiu❑as ;sod SIMIJo-ON aan;xid 3o 3dUL aiun.la Sddi.LIWIIdd'Id:)INVH:)dW S Dun Aye Y w N D u n"h'a m Awe CD f•� r-`T • rrt 17 �j i 00 a �, u 9 19 FAQ o�m r' i/ Z 0 0 m m x f F s g N. I rt c h 0 0i ? i to p rn m � _ O aMOM 0 i S I TOWN ❑F AR LI N GTO N STATE OF WASHIN13TON September 5, 1961 a. s, l+bca. R. 3. Ingr+m Rt. L Box 320 Arlington, Wash. Dear Mrs. Ingram: We enclose receipt for $25.00 fee accompanying your Application for Conditional Use Permit. Please be advised the Planning Commission has set the date of Public Hearing on your application as September 14th, 8:00 P. M. in the Council Chambers of the Town hall. Notice ., of such hearing will be published in the Arlington Times on September 7th and all property owners within a 300 foot radius of your property have been notified in writing of data of said hearing. After such hearing (required by law), the Commission may then grant or deny your permit. We noticed on your application where it asks "Term Desired" you put in - "1 year to complete". We think you have this permit confused with a building permit. "Term Desired" on this permit wants to know how long you wish to use this property as a Du-Plex. Term may be revocable, conditional, or valid for a term period. We think you probably want a term period of so many years and you can let us know and we will change your application. Yours very truly, MLINGMN PLANNING COMMISSION Helen Bergan Secretary lice. R. J. Itgram Rt. 4 kriington, Mesh. Dear Madam s I assumed I would have to refuse your Use and occupancy Permit Application for a tri—plex on lots ll and 12 block 4 To�sidentie�l of Arlington because said property is zoned Single Family but I waited to so advise yku until I could use or sure m with the Planning Commission. They agreed that p ed in the Single Family Residential Zone. The Planning Commission pointed out that if you wished, you could apply for a Conditional Use Permit but even so -- the property will not meet the minimum lot requirement of 111,400 sq. ft. for a tri— plex. In addition, under the Building Code, a tri—plex in Fire Zone 3 (which is the fire zone this property is located in) would have to have exterior walls of one hour fire resistant materials. The property Would accomodate a du—plex and in order to be allowed to do that you Would need to apply for a Conditional Use Permit Vh*reby yawl fill out the enclosed application, file it with me along with plans to show detail of proposed use and a fee of $25.00, The Planning Commission would then have to hold a public hearing before they could grant or refuse the permit. If you have any further questions, please oontaot me and I Will endeavor to answer them. Yours very truly, "%'j &AV-\ Helen Bergan Town Clerk -4c6 6 4j sn9-10 s��t •;Jaf d i bos _ selo, bJ J W 1 1 i RECEIPT Dote pp pp Received From— - - 19`- No. A dress. 1 F Dollors t�rV ACCOUNT MOW ►A!O T,OF - - -!AM*Uw LASH Cmcjt out IKIO2 R.M,.w 0101� B a Ameresia Lawlis From: Iris Ingram <iris_ingram@yahoo.com> Sent: Friday, August 5, 2022 9:00 AM To: Ameresia Lawlis Cc: brad@nordstromheating.com; Nordstrom Heating &Air Subject: Can we proceed on Monday, August 8 This message is from an External Sender This message came from outside the City of Arlington Ms. Lawlis, I located the email printed sent April 5, 2021, out by my attorney, Bruce Galloway last evening. One of the requirements is updated utilties and "life safety requirements". I feel that the installation of this furnace meets one of the requirements requested to meet the zoning. This natural gas furnace needs to be replaced, there is a part needed that can no longer be obtained. This upstairs is hot in the summer and the new heat pump will also allow for cooling. Many players were in place for the installation on Monday, handyman to remove old furnace and plug the walls; electrician installing new wiring and electrical panel, residents on alert, owner entering to receive instruction on new unit. The scheduling of this been in the works since April of 2022. A permit for this installation, with other items pending would be essential. Iris Ingram Forbus i TOWN OF ARLINGTON STATE OF WAS HINGTON J September 5, 1961 , s l+hce. R. 3, Ingram Rt. 4 Box 320 Arlington, clash. Dear Mrs. Ingram: We enclose receipt for $25.00 fee accompanying your Application for Conditional Use Permit. Please be advised the Planning Commission has set the date of Public Hearing on your application as September 1.4th, 8:00 P. M. in the Council Chambers of the Town Hall. Notice of such hearing will be published in the Arlington Times on September 7th and all property owners within a 300 foot radium of your property have been notified in writing of date of said hearing. After such hearing (required by law), the Commission may then grant or deny your permit. We noticed on your application where it asks "Term Desired" you put in - "1 year to complete". We think you have this permit confused with a building permit. "Term Desired" on this permit wants to know how long you wish to use this property as a Du-plex. Term may be revocable, conditional, or valid for a term period. We think you probably want a term period of so many years and you can let us know and we w111 change your application. Yours very truly, ARLINGTON PLANNING GOYMSSION Helen Bergen Se cretsuq Rt. 4 Arlluaton Dear Madams I assumed I Would have to refuse your Use and occupancy Permit Application for a tri-plea on lots 11 and 12 block 4 To�aidentiel Arlington because said PoPe�rty�til zoned couldSingle check�fory sure with the but I waited to so advisey Planning Commission. They agreed that such use is not permitted in the Single Family Residential Zone. The Planning Commission pointed out that if sou wishedv you could l apply for a Conditional Use Permit but even property not meet the minincum lot requirement of 11#400 sq. ft. for a tri. plex. In addition, under the Building Code, a tri-plea in Fire Zone 3 (Which its the fire zone this property is located in) would ha," to.haw exterior walls of one hour fire resistant materials. The property would accomodate a du-plea and in order to be allowed to do that ym would need to apply for a Conditional Use Permit vhorebr you Fill out the enclosed applioation, file it vith me along with plans to show detail of proposed use and a fee of $25.00. The Planning Commission would then have to hold a public hearing before they could grant or refuse the permit. If you have any further questions, please contact me and I will endeavor to answer them. Yours very truly, a Helen Bergan Town Clerk I 016Jliew a,b c86 Jja4a^v� t�SS tiaS�,, ZDor snq�o l8�Stbl j a�3 41. s1-1/ eJ� • oa d \ f � f d1796`1� _ �bJJ�I/ y I, 1 1 RECEIPT Oates -_S 19, to l No. 1 Received From,- 1` A dress F r_ Dollars AlCOUNi AMi Of rAIQ KICVNr i �r�I� Aul PAID 1 MAIAN(@ out v SK402 ItNA� 01Mt 6 �`- -1 UN ur /AML-I1Nu 1 STATE OF WASHIN13TON September 5, 1961320 Arlington, Wash. Dear Mrs. Ingram: We enclose receipt for $25.00 fee accompanying your Application for Conditional Use Permit. Please be advised the Planning Commission has set the date of Public Hn,aring on your application as September 14th, 8:00 P. M. in the Council Chambers of the Town Hall. Notice of such hearing will be published in the Arlington Times on September 7th and all property owners within a 300 foot radius of your property have been notified in writing of date of said hearing. After such hearing (required by law), the Commission may then grant or deny your permit. We noticed on your application where it asks "Term Desired" + you put in - 01 year to complete". We think you have this permit confused with a building permit. "Term Desired" on this permit wants to know how long you wish to use this property as a Du-Plex. Tara may be revocable, conditional, or valid for a terse period. We think you probably want a tans pariod of so many yearn and ycra can let ue know and we M= change your application. Yours very trultiy a IRLINGTON PLANNING OO1+iMISSI011 Helen Bergan Secretary — - - - 1NVD11dd`d 'NVld 101d n 'alp:)s o; 'uoila:)ildda siy4 to apis asaanaa 044 uo MVMa JauMO 6u!pl!nq pun 6uluoz 6u!;01n6aa sennl a;o;S puo sa:)uou!pio d4!3 Ilo y;!m Aldwo:) o; aaa6o puo 1:)0.1.10:) si anogn ay; ;ny; a;a;s puo uo!;a:)!lddn s!y; pow anny I ;oy; a6palnnouI:)o Agaaay I •uo140311ddo s!y; u! paq!a:)sap A;aadoad ay; to a8uM0 Io6aI ay; wn I •aossal .10 •6u!d!d sneJ pun aDun!lddo soE) :;aa}wonbs u1 na.Jo s;!pun asn y:)oa;sil '6u!pl!nq In!Daawwo:)n 11 4uodm3o s! ;un:)!lddo uaym pa;uasaad aq 'dn�looy aa;oM ❑ 'dn loot'aannaS ❑❑ 01 woa4 AJN`ddnDDO d0 3JNVHJ ;snw aaurno 10 uo14nz1Joy;no ua;;uM '6u!noyy E] 'su6!S E] '6u!gwnld E] -- - 1:)o;san!I}o pu!)l 1NVIHOdW1 (1:)a4:)) — sbuipl!nq Aaossa»n Aq p9a9n0:);01}o 96n4ua:)aad :ao}paa!nbaa man s;!w.'ad Inuo!;!ppV - Su!ppnq wow Aq paaano:);01 10 96o1u9:)aad s1lorn 6u!joag - -;ol uo mou s6uipl!nq}o asn 401 uo Mou sbuipl!nq}o'ON saa;}na loom say!wol to'ON swoon 10 'ON snaao puo sao0l}loud!;!ppd spn;s ao!aa;ul oam aoold;s l_ DOM aooJl;uawasng -;gbiay In401 salao;s}o'ON uo!;!ppo ao 6u!pl!nq}o az!s Ho SDO spn;s aoua;x3 " 40110 oaay-- - - auoZ aai� auoZ asn a:)nuan j 6u!I!a:';slot as;nay aa;nM .10011 puZ'4slor a4 L A A a4 L Al Al 17 £ Z L NOISIAIG uay:);!)l aooll is 1 ';slot 1H III A L III III 11 I (' I H 0 :1 3 d J 9 `d amuan4aoo13 saapa10 (apip) 6uippq uigw pasodoad 6uippnq wow pasodoad a:)oldaa!y (II!s)a}old 'M'm ao}uasaid 10 NOI1Jnb1SNOJ 10 3dAl ao }uasaid 10 AJN`ddnJJO :10 3dAl s3n13 undS 6u!:)odS az!s 3Wda3 N011VW210dN1 JNINOZ punoa6 ui y;dad c� 4 110-17 z7 - �� � T�� f uo!;d!aosap pa;;nldun ao uo!s!nipgns 6u!loo.aaa ao loom w04oq;o y;p!M s110nn soya;ul do;;)y;p!M Cj Q• 7 Q ON T)0IS . / oN 4-1 :AA-1d6bd 30 NOIldINDS30 W011 sllnM.jo1aa4x3 lblaa;ow 90 _ ssaapp`d ZI ao;:)oa;uoa E)NI83AODI scald a01184x3 NOIl`ddNn03 ssaaPPd 199u!6u3 SNOIld:)1d1:)3dS ssajppy p94!4:)AV ssaappy aa;;!waad 'palgnop aq y U J i �4 as};!waad y , ssaappb' O Iloys aa} ;!waad ay; `,� I" / aaua pau!n;qo s! ;!waad aao}aq L ���~v �r1 wl:)043 unld pa;an;s s! Acorn aaa4M ,, (� rj�< 0�6� C) a�un! o7 6u!uoz}o a;no 3 7 I 1 O N oar o;uo pasoq uo!;onlon -!l!;aa� 0 col panoiddo puo opow uaaq sny uo!;oDilddo uo I!;un penss! aq 11oys 6uipl!nq Aun to A:)UDdr»:)o ao aiodaa '6UTAOW 'uo!;naa;Io 'uo!;:)aaa col ;!waad ON '3:)110N a;nd A:)UDdn»O}o a}oniplia' uo!;oaa;ld aqu:)sad �M I!wJad 6ulppq C/ ;uaw;jodaa 6u!plln8 HS110W34 " N011100V NOIlb'm311b' ❑ M3N (1:)a4:)) MOM 10 SS`d1J NOIDNIIHV}o AiD 01 ❑ a:)uoildwo' 6u1u0Z 10 91p:)1PP9:) :d03 NOP `^!W210M NOIl )nuSNC`� NOliV:)Ilddd PLOT PLAN FOR DEPARTMENT. USE FOR DEPARTMENTAL USE Application for Certificate of Zoning om ❑ Draw below,to scale, a plot plan showing: pP� g Compliance p Checked Initials 1. Dimension and shape of the lot. 1. 2. Front street name. 2. Building Permit d, Ceptificate of Occupancy ❑ checked and approved. T 3. Side street name if corner lot. 3. 4. Sizes and location on the lot of buildings already existing. 4. 5. Location and dimensions of proposed building or alterations. 5. Building Inspector '21-6ate 6. Front yard,side yard,rear yard setbacks. 6. '7�� 7. Locate and describe any fences,walls,hedges,signs, 7. Issued Building Permit No. �� Date front yard trees and shrubs,green belt. 8. Location and size of required off-street parking and lolading. 8. INSPECTION RECORD Inspection Date Signature Set Back Excavation Concrete Reinforced Steel Grout Blocks Bond Beam Frame Roofing Room Ventilation Kitchen Vent Bathroom Vent Fnundntinn Vent Access Hole Garage Fireproofing Fireplace Spark Arrester Water Closet Water Heater Sewage Disposal Lathing Plastering Correction Order Left Stop Work Order Issued Stop Work Order Released Give brief report of special or unusual conditions Job completed &={ Date Building Inspector Certificate of Zoning Compliance No. Issued Date Certificate of Occupancy No. Issued Date MOORE BUSINESS FORMS INC,LA