Loading...
HomeMy WebLinkAbout217 5th St_PJ25-0124_2026 Right-of-Way Permit Application For submittal checklist, see below. *denotes required fields Project Information *Project Name: 5513939 *Description of Project: ZIPLY FIBER IS TO PULL FIBER THROUGH EXISTING CONDUIT AND OVERLASH EXISTING STRAND. Engineers Estimated Cost of Construction; $ Contact Information Owner Information *Owner Name: IZIPLY FIBER *Office No.: INA *Email Address: PERMIT.ZONEIN@ZIPLY *Cell No.: 469-510-2840 *Mailing Address: 14155 SW CEDAR HILL BI *City: IBEAVERTON *State: OR *Zip: 97005 Engineer Information Engineer Name: Office No.: Email Address: Cell No.: Mailing Address: City: State: Zip: Professional License Number: Expiration Date: Contractor Details Primary Contractor: ISTARTAK FIBER LLC Office No.: Email Address: Cell No.: Mailing Address: City: State: Zip: L&I Contractor ISTARTFL790QE License Number: Expiration Date: 2027-11-05 Acknowledgement I, hereby certify that I have read and examined this application, City of Arlington Municipal Code, Standard Plan & Specifications. Performance of the proposed work shall follow all applicable laws and regulations. The owner/applicant shall assume full and complete responsibility for said work and shall be responsible for the acquisition and compliance of all applicable permits and/or authorizations which may include, but not limited to, Right of Way Permit, WSDW Hydraulic Project Approval(HPA), WSDOE Notice of Intent(NOI), National Pollutant Discharge Elimination System (NPDES), Army Corp. of Engineers Permits, the requirements of the Endangered Species Act, and the Forest Practices Application (FPA). *Print Name: IGUNNER MITCHELL *Date: 2025-12-17 Submittal Checklist Complete package constitutes all items. Only complete submittals will be acce Electronic files shall be PDF and submitted through this portal, email or downloadable link to file server. • Construction Plans; refer to Design Recluirements and Chanter 1 of the City of Arlington's Design and Construction Standards and Specifications Manual for required sheets. • Traffic Control Plan. • Road Closure Request. • Temporary Erosion & Sediment Control (TESC) Plan if new or replaced hard surfacing is being constructed. • Certificate of Insurance with the City of Arlington named as Additional Insured. Permit fee and any assurarnce device (Bond or Assignment of Funds) due at time of permit issuance. An invoice with link for payment will be sent to the applicant email address once permit is reviewed and approved. 0 aJ O SNOHOMISH CITY PERMIT W- Uj w 5513939 ARTNWAXX D 1001 —D 1005 w G1 J 23230 STATE ROUTE 9 NE ARLI NGTON , WA 98223 � a) 0 0 •.'k 4 l'` LLl Ch 0cl) N CD00 xeu llx-; at 7 de �'�" � M p� I-'C7rl� I, y5 -� (2 c) Q - S I T-'�.a V) N � v LLI Z '_7 z0 -_ - VJrsl aS SLfeeL �q 1 ', ri Q LL.I Z R'OV Adini•rii v - -- rr F SF�rncp,+.�,rrlur. Z J 0 Of � Lei Er Q -� - - rY BH m Tea k- y V _�WA9 e=oncary ra L U _- 1�pport z --�- --_�-- " nimimir�.3 F..l ,i1'.r, Last Hallcr Avenue a � O --Y- -_ -- - ' ffiLcl c U W _- - - Vary[e r Z � T. S.�I i m _ RU.I I C.1.919_y M Weisz BurkeAvenue FA i-NUrkeAvrrivax O 1 0 SHEET-8, :P -4�0� VVA 9 Wcst Steil Tian Avenue � �tia5l Gilri ia�i Avrr�ua WA b.JdJ tV7 � r3r� - - -P ''SHEET- y �� L -� LO o Lu co - r }U3 m am �� N SH ET- '.SHEET-5 � '� I �- Lm 4 � LU Z � �� - Wl+rcr ;t i SlryVt Last ;rr,ter. -� N O _ _ LE IF � - - �S C:) LL p= O W� N J� w CD GENERAL NOTES LEGEND �� w mI— D N m i 0 o UG DUCT PLACEMENT WITH FOC ` \ C W UG DUCT PLACEMENT WITH COAX ' 1 Contractor must obtain utilitylocates prior t0 disturbing the round. °�FO° 1 PLACE FIBER IN EXISTING DUCTS m � p g g oA. PLACE COAX IN EXISTING DUCTS 2. Contractor must have a copy of the approved permit from the appropriate agency on the jobsite at all times. PLACE NEW STRAND AND FIBER 3. All sub-surface, cable,and duct facilities will be placed at standard minimum depth 3'(ft). o PLACE NEW STRAND AND COAX OVERLASH FIBER LU 4. Project site will be properly secured prior to the end of each day. a.00Ax o-m� OVERLASH COAX M 5. All work is to be in accordance with all authorities having jurisdiction in the work zone. OH-GUY off-WY PLACE 6.6M OHG LO cli 00 EXISTING U.G. LO N � 6 Contractors are advised to contact Design Firm for any additional information or clarification concerning scope of work or the Ea UG M < requirements necessary for project completion. EXISTING O.H. C1I EDGE OF PAVEMENT(E.O.P.) LLI Z 7. Contractor is responsible to field verify all dimensions, quantities and existing conditions prior to construction. If a significant STREET CENTER LINE a) Z O change to the route is needed, please contact Design Firm or a project coordinator representative before proceeding. RIGHT OF WAY(APPARENT R.O.W.) E Q Lu z 8. Before construction begins, contractor shall take appropriate precautions to avoid any potential obstructions prior to RIGHT OF WAY(ASSUMED R.O.W.) E � O Qf proceeding with work. LA-aw LF-Ww LIMITED ACCESS-RIGHT OF WAY(LA-R.O.W.) LL W Q 9. The contractor shall verify the road right-of-ways and easements prior to beginning work. PROPERTY LINE _ EASEMENT LINE U z 10. No construction on private property will commence until written approval is given by a Design Firm employee. x x x FENCE LINE W O 11. Contractor shall not proceed with work until they have received approval by a Design Firm employee and have been directed SANITARY SEWER LINES (D LU to do so by an authorized project coordinator representative. �s�s� s�s� STORM SEWER DRAIN LINES 0 z J � E E E _ E E ELECTRIC LINES 0 W O 12. Contractor shall not exceed the original scope of work without written authorization by a Design Firm employee and have p Q W been directed to do so by an authorized project coordinator representative. CABLE TV L —wwwww WATER LINES p 13. Contractors to provide ducts,vaults, cable,and all other hardware necessary to complete installation, unless otherwise GAS LINES N arranged with the project coordinator. r TELEPHONE LINES U 14. All ducts to extend no more than 6"(in)in length inside vaults, hand hole,or man hole walls unless otherwise specified. UNKNOWN UTILITY LINES 15. Contractor to proof all spare ducts. RAIL ROAD LINE U) 16. Contractor to cap and/or plug all ducts. O VAULT I HAND HOLE-EXISTING 17 VAULT I HAND HOLE-INSTALL UTILITY POLE-EXISTING UTILITY POLE-INSTALL 17. Contractor to place grounding rods in all vaults, hand holes,and man holes. RISER-EXISTING RISER-PROPOSED POLE ANCHORIDOWN GUY-EXISTING POLE ANCHORIDOWN GUY-PROPOSED M 18. Contractor shall double lash all aerial cable; bond and ground strand at the beginning and end of each strand,transformer LO CEO AERIAL STORAGE LOOP-EXISTING C>0 AERIAL STORAGE LOOP-PROPOSED 6) poles, poles with other types of power equipment that draw a load current under normal conditions,and at a maximum linear LO pole spacing between grounds of 1,320'(ft). BURIED STORAGE LOOP-EXISTING BURIED STORAGE LOOP-PROPOSED W CC) ►� SPLICE CASE-EXISTING SPLICE CASE-INSTALL J 6) 19. Contractor will complete all work herein unless otherwise specified, and performed to project coordinators'construction PEDESTAL-EXISTING LP PEDESTAL-INSTALL ~ specifications. Z) 00+00 STATION(S) LP LOCATE POST-INSTALL in 20. As-Builts will be required for each project including GPS location and cable footage(sequentials)at every access point, X REMOVAL MARKER POST-INSTALL slack loop,splice location, riser pole and termination point. POLE LABELING ■ BOREPIT-INSTALL E 21. Contractor will also provide notes of all changes in depths, running lines, mh/hh locations, and any other applicable notes to AS-BUILT LOCATION REFERENCE C Z depict the work that took place. w LAT: XX°XX'XX.XIc LONG: XX°XX'XX.XX" � U *NOTE:All major changes must be pre-approved by an authorized Design Firm employee and project coordinator prior to starting the work.* .0 O *****MAKE READY****** AS-BUILT CABLE SEQUENCING cx L xxxxXXXXXx VAULT/LOOP/SPLICE - IN: xxxxxx N- OUT xxxxxx CD Q� LL O WQ w Figure 6E-3. Use of Hand-Signaling Devices by Flaggers Figure 6H-17. Mobile Operations on aTwo-Lane Road (TA-17) _ N PREFERRED METHOD EMERGENCY SITUATIONS ONLY STOPISLOW Paddle Red Flag L N a� 18 ilndms Note:Sea TatAes 6H-2 and 6H-3 N MIN For:he meaning of the rn `II 9ym6d s and+or letter p p codes Used in this figure. H1-1 • 3fic inches _ 6, w lM � Cy') CNv0 N O24 Inches L0 Cy') wz p� Lr) 00 TO STOP TRAFFIC InCh@8 Work YChICIC Q � Z QZ � T+ur_*•muurrleu dl111JT1Ud1 r LL_ IY Q (optional) / [� FL U z W LO Q � a U' w z F r 'p O J 0 � � O � Q � 51"adow vet ide p C v N o U use sign snaps J a, TO LET and ayur,e .2 TRAFFIC PROCEED oao approprial+� in � Fo ltl6 h� _ (op Tonal) of work 4 M W20-$ LO M Lf) O w 00 J 6� "r� Truck-mounted atterPAW co r {optional} L 1 � � .S� E c TO ALERT AND w a) SLOW TRAFFIC Typical Application 17 Q N O rn� Ql� s A t� CD Q� LL O WQ TYPICAL DETAIL TYPICAL DETAIL TYPICAL DETAIL w QUAZITE 30X48X36 ASSEMBLY OR TRENCH IN SOIL(NON TRAFFIC AREAS) HAND HOLE INSTALLATION QUAZITE 24X18X24 ASSEMBLY fy_ U) LIJ G1 J LONG S.S.HEX HEAD AUGER 6"MIN. I- INS EXISTING GROUND SURFACE CONCRETE OR GRASS HAND HOLE FLUSH WITH EXISTING GROUND N PULL SLOT W CENTER PIN(2 PLACES) BOLT 2 PLACES EXISTING GRADE m I� FLAT WASHER 2 PLACES 12" CA BILE THRU HOLE Ile -0. SLOOPG C • QUAZITE LOGO PUT LID IIT} WARNING TAPE (OPTIONAL) 36"MIN.DEPTH \ SKID RESISTANT SURFACE - - - - - - - BACKFILL- 3p 8"LAYERS CABLE E A GRAVEL �/ CONDUIT(S) 2N 'a W BACKFILL COMPACTED @ 90 /��/ / /j�/ /� c ~ M 4" M U) CV LAG THREAD SELF N LIFTING BOLT PLACES ALIGNING,REPLACEABLE HDPE DUCT Lo O 00 S.S.EZ-NUT 2 PLACES In N 0) 36 24 O CLEAN BACK FILL N j BACKFILL COMPACTED @90 a) W Z � Z O '4o s'a E a W U' � a � z u- of < TYPICAL DETAIL TYPICAL DETAIL TYPICAL DETAIL TYPICAL DETAIL �j LINK SEAL INSTALLATION ISP BUILDING INSTALLATION LOCATE TEST STATION MARKER POST �L Z � O I ORANGE PLASTIC a U' W I f"WARNING BURIED "WARNING BURIED CABLE" _ Z CABLE"LOCKING ORANGE PLASTIC PLAQUE Q J j I COVER MARKER POST, Q CONCAVED,38" O jIIIIIi EXTERIOR WALL THICKNESS. 0 Q WHITE PLASTIC BASE L "LB"CONNECTO TUBING ENCASED TEST POSTS yam+ EXISTING GROU CORE BORE - C CONCRETE OR GRASS BUILDING 45"MIN HEIGHT (� BURIAL LINE U U 1� SUBSURFACE WALL J VARIES �+ >� ROGALV IANIZED. E (PER FLOOR) 1 II TESTWIRES 67"HIGH (n PE \\ I I II�II�I EXTERIOR WALL NEOPRENE SEALING RIUC,_AND COUPLNG SYSTEM EXISTING GROU I li.lillillillillilli 1 1 K CONCRETE OR GRASS (SEE BELOW) EXCEED 45" Ji ABOVEGROUND BURIAL f CORE BORE CABL PLAQUE M CABL BUILDING �' f EXISTING GRO U7 C7 UG CONDUIT(S) � I 1 �� Lf) CABLE A�1r1 ` L.1- W 00 J 0) 1 UG CONDUIT TYPICAL DETAIL 5 OPEN ROAD CUT 00 �t L L TOP OF PAVEMENT SUBSURFACE WALL j CORE DRILL E COUPLING NEOPRENE SEALING RING C Z /CONDUIT -USE STEEL CONDUIT TO / 6"ASPHALT W ENTER BUILDING 48"MIN DEPTH\ / OZGENDEY CAT L� � �F\L GROUT CORE " OOP"WALL SEAL / N O (OR EQUAL) DRILL FLUSH (OR EQUAL) � WINTERIOR WALL TYPICAL DETAIL INSTALLED DUCTS - - I! CONDUIT SEAL 8" QJ i� 0 0 U 0� O CITY:ARLINGTON o W� m J IN U � I w w SEC: 2 I A � CD o A Lu TWP: 31 N ~ N m I mq m i RNG: 5E 3 J o c I Ov I m W LLJ � Q J � W U I o , l cw O co � I 0 a A W U J M U) N O , C 00 co Q L`(j N I z z N 00 cn z 00 I W mZ0 (� 6.0 °► 0 60' E aw0 m 2 Q � Z 501 40'JLR/W 36' � 0Qry 0 n Z O O O O w O < CD 503/W— R/W— R/W— R/W — R W— ) J o / R/W— R/W R/W— — R/W— R/W J U 0 Q O08 O08 BOC BOC BOC R/W— R/W— R/W— R/W— R/W - - - ------- MH-MH=515' ° mmmmm� — BOC BOC BOC m a� E 5TH ST L -,bg o I U ' cfl E 5TH ST E 5TH ST J — BOC BOC 1 - CL CL v� � BOC— 40C J KI W— /W— R/ r' M/21 �I BOC M/2I ' BOC BOC 515' 2" EXISTING DUCT 240'2" CN / R/W— R/W 0 EXISTING DUCT 'Iii 217 R/W— R W co LO L9 r w aoo o v co42'cc m 432 �---60'— � U N L L I 40' m I w �, Z 0 Q w f I o a) Lu m - I o ° N_ N o co I a 1 3 U J in � 0 O z s� 0 m ; IPRT- -71 CC o o I I 525 wLu C) � w �LLImLLI ~ N Q I I J WQ m i >w I \ L N P-NT 41 OU SNOHOMISH 0) z pp PUD fn .-. N N I 0 0 J 509 rn w U U H ch O e— co U) N 64 cli Lo co 04 PINT F-RDETAIL If-38'yl N N N 10 J \ 107 czo m U I 20'RISER AT POLE:P-NT '^ LLu ~ m U I PLACE 2"RISER Y J E Q Z m AND STANDOFF O E 5TH STSEo BRACKETS LL W Of G — � P-NT P-C454 m SNOHOMISH SNOHOMISH Cfl I J PUD 133' PUD EXISTING Li Z z U R ANCHOR&GUY Q 0 fn � a- z CITY:ARLINGTON o SEC: 2 MH-MH=515' O E 5TH ST TWP: 31 N o L) J L RN G: 5 E EXISTING U) MANHOLE O C° 515' 2" EXISTING DUCT c co Lo L9 i 38' o Lu o I m l rn -� in Q L L r V a) w O m m w N iL z Z >, U Q IV O U O p J m � m U cc R 0 P RT- 8 m LL / o O U W� o ^ 0 o w m m° w 04 O N Oo� U U 0 m 009 008 008 \� m rznr, :A c � � I — 008 ' llI�I■1 c:o BCC BOC —008 008 0 U O EXISTING ANCHOR&GUY — [OC BOC SNOHOMISH CITY:ARLINGTON w o o SEC: 2 M m m U co U) N _ UD 00 o m TWP: 31 N L0 o —MAJ —M/21 n N Q RNG: 5E cwz poi 9/m— R/W R/ R n -0 � O Lu p �/ R/W R/W � O Of 0&1 R/W— U- w < CL � W DIVISON ST - CL CL oOe ooa o O c Boc E DIVISON ST eo — �Boc - CL CL CL o z J ooa — M BOC _ CL o Q CL CL BOC_ BO( CL Doe 008 C g a) E DIVISON ST Cw l c CL CL 008 J )CL CL coa CL CL vp 0p� p I� /M/a M M/21 � / � M a � �523 P-NT —M/N �AA/8 00� � PUDSNOHOMISH AA/8 EXISTING �y MIS Lo ANCHOR&GUY 0) L9 O W W 00 00 0 00 ~ LU w D m � —IV— co ' m o 38 - o � 0 60'— : z LLI 541 SNOHOMISH W > U_ PUD } 0 W �- cr � J Q I N O 0 o w aQ1 U p 0 s z 0 I I W J I I m 3 0 O �tia--- � � z FP RT 6 o a ~N 0 P RT- 9 o 860 W °° CITY:ARLINGTON J4 w 0� CD SEC: 2 �' TWP: 31 N mq m O N �G P-NT EXISTING � ° R N G: 5 E .c SNOHOMISH ANCHOR&GUY N PUD 0 0 R/W— R/W - R/W 008 - 0 - K/W' R/W— R/W 008 � ep Q / R/W— R/W— O � - BOC BOC BOC m w CL E BURK AVE b (n N CL CL CL CL b E BURK AVE Lo N CL L 00 rn BOC BOC bUU - M � - BOC BOC 04 R/W— R/W R/W R/W BOC BOC BJ BOC c Z ZO R/ R/W W— R/W— R/\i 1W R/W R/W R/W— R/W R/W— w P Q Z LLJ CD 0 Of Q CITY:ARLINGTON ` " w Q co U Tc SEC: 2 w o Q z TWP: 31N 0 z O J P-NT O O 0 Q SNOHOMISH m m RNG: 5E C PUD O 009 008 - .0 � o U 008 008 O O - 008 008 08 008 - m m -)C BOC BOC BOC U) BOC W \ O U m 103 `9 0 I 0 0 I co Lo � p m m m Lf) A I D o U I P-C459 " 00 117 rn m SNOHOMISH s PUD U m /I I EXISTING m 101 L L ANCHOR&GUY N � E A —MAJ M/b —M/N a —M/' -M/H —MAI —M/b W Z 008 008 008 008 u v In P-a59 008 008 Q E GILMAN AVE CD d SNOHOMISH �o N O CY) PUD w �C 10 E GILMAN AVE b —�o— BOC — � Q EXISTING R/W R W— �- ANCHOR&GUY I — / R/W— R/W R/W— RAP W cl) cam- P-458 BOC BOC BOC j` BOC BOC — SNOHOMISH O -M/ PUD m —M/ —M/2f —M/21 - P RT- 7 Z -M/d MA —M/N 0 P-274269 m P RT- 10 �oI o SNOHOMISH PUD W 01 BOJ 0 H J4 w W HALLER AVE � U) N mLU � m i P-274270 L N SNOHOMISH CO C PUD i� 154 Z 03 CITY:ARLINGTON 105 � 0 W M co SEC: 2 coLo M L N 00 TWP: 31 N o m N j RNG: 5E � Z z # a rn � co (D P-271356 0 �_ a Q . Z SNOHOMISH n � O zj PUD r :� Of U- w Q C - U W z O 7 c CL z O J 20' o Q 105 115 123 0 c U N 0 U P-NT J N SNOHOMISH PUD 00 � M E HALLER AVE Lo rn �t Lo o Jl -i CY' P-NT SNOHOMISH m PUD L L N N N � C W N !, U Q N O P-NT SNOHOMISH \ PUD e P RT- 8 �� 0� CD LL CC QJ O WQ w IJ U LLJ G1 J N .L \ P-NT SNOHOMISH N N PUD 0 a O UJ co CITY:ARLINGTON coco N N O SEC: 2 N � wz TWP: 31N `' Zo Q �E_ Z EXISTING Q J ANCHOR&GUY o o R N G: 5 E LL w Q 1100 m P-271363 SNOHOMISH V PUD U z 0 Qp CL (D O Z O J O � 0 Q O N ) o U J � f^� L VJ U � N� Lo �G L9 m O UO J 6> P-271362 CD O) SNOHOMISH ,0 m 127 PUD v L L 16� (3) (D E O — — a� =5 m c z w > !, a) �c9 IV O U m U 03 105 U PRT- 9 1 ~N LEGEND o _ — 3RTCALP�IltEtA {' _ LL a 6R C WORK LOCATION =WORK AREA — =FLASHING ARROW BOARD Q O FL+l5F1ERa Xr Fc = PORTABLE SIGN =FLAG MAN W QOi I-_ °A"�Ma =CHANNELIZJNG DEVICES =EXISTING STRIPING �� W 30• C-C @ 2 �1 =DIRECTION OF TRAFFIC FLOW U W U) =BARRICADE County Park P P WLo T'PMAL C RerNDan•Wlve SENERAL NOTES PHASE _ MUM PL.14C9tEPF[ t_ N PHASE 13 a 1.CONTRACTOR SHALL BE RESPONSIBLE TO MAINTAIN TRAFFIC CONTROL _ AS SET FORTH IN THE STATE MANUAL ON UNIFORM TRAFFIC CONTROL a) I dog Park PH _ a DEV CES FOR STREETS AND HIGHWAYS. Q PHASE 04 Q Q ,� I _ E Hall Ave I 2.LAN ES MAY BE CLOSET]TO TRAFFIC DURING 9 AM-4 PM ONLY AFTER PHASE 12 Grocery Outlet© PRIOR APPROVAL_ C) nRl�vrTn oleysvrTri DeurawrH DRLy ffTH N Falcon st LET If!! T MO1T AMORM IR L VAi CHASE 09 Cascade DistrictCourt Q erlcv1m11 Son �RT�tiIMxL 1B�"T L[1T li13H5r DP*EW1AMy f_nev1117N 5NM xltrrl-rL FWML &ACCESSIBLE PEDESTRIAN ROUTES SHALL BE MAINTAINED AT ALL TIMES. _ all creatures - veterinary Services — E Burke Ave Y/1UO��hIG LOMTM ARE OPr1aL41 mn MUST R LEED U111f1117 DAM F13I1115 OArlington dv M�stChuch 4.CONTRACTOR SHALL CONTACT THE TRAFFIC MANAGEMENT CENTER LLj PHASE 08 m i SPACING FOR CHANNELLIZING DEVICES AT LEAST ONE WEEKPRIOR TO LANE CLOSING IF LEFT TURNS FROM Z rl PHASE EGilmanAve EDilmanAve E Gilman Ave OPPOSITE DIRECTIONS CANNOT GO TOGETHER ANYTIME DUE TO ROAD 0) 0-, a PHAs A- PLAST C DRUMS ON MERGING TAPER AT 30'C-C NRTH CHEVRON SIGNS OR UTILITY WORK AT SIGNALIZED INTERSECTION 00 Q Mirknooa Public House AT 60'C-C AND TYPE'u' WARNING LIGHT(FOR OVERNIGHT CLOSURE). O Q B'Ivitiiun_St PHASE 06 Fo;,;. &CONTRACTOR SHALL NOTIFY HOME OWNERS WITH,ALLEY ACCESS ONE � in W � E Division st Q F Division sv ston st l r a) W La"a�',i_ "t°n - 13- PLASTIC DRUMS ON DOWN STREAM TAPER AT 35' C-C WEEK PRIOR TO ALLEY CLOSING_ in � z Bailey,Duskin, a O Pe lflte B Martin,PS C .:: a E a TRAFFIC NOTES -0 PHASE 02 2E' P d C- PLASTIC DRUMS ON RADII AT 5'C-C Q o z ���� Terrace 1_CaNTRACTaR SHALL PROVIDE AND INSTALL TRAFFIC CONTROL DEVICES IN Q N U) N Q D-PLASTIC DRUMS ON TANGENT 0 35'C-C WITH VERTICAL PANEL CONFORMANCE WITH PART V1 OF THE FEDERAL HIGHWAY ADMINSITRATION � Olympic 0 ES LStkst AT70'C-C AND TYPE'C'WARNING LIGHT(FOR OVERNIGHT CLOSURE) MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES i FED ERAL HIGHWAY ADMINISTRATION M.4.I.T_C_D.,MOST RECENT EDITION VVITH REVISIONS) P E-PLASTIC DRUMS IN FRONT OF CONSTRUCTION ZONE AT 2TP C-C DURING CONSTRUCTION_ WITH VERTICAL PANEL AT 40'C-C AND TYPE"A"WARNING LIGHT (FOR OVERNIGHT CLOSURE) 2.CONTRACTOR SHALL COVER OPEN EXCAVATIONS WrrH STEEL PLATES o ANCHORED PROPERLY DURING NON-WORKING HOUR AND OPEN F-CONCRETE TRAFFIC BARRIER(C.T.B)OR LOW PROFILE CONCRETE LANES FOR NORMAL TRAFFIC FLOW_ 0 z TRAFFIC BARRIER(L.P_C.T.B)WrrH REFLECTORS AT 10'C-C O0 IF PAVEMENT DROP IS MORE THAN TWELVE INCHES{121 OR MORE_ &ALL TRAFFIC CONTROL DEVICES USED AT NIGHT SHALL BE o z � TRAFFIC CONTROL PLANS FOR PLASTIC OR ILLUMINATE[]. p � G-PLASTIC DRUMS WITH GUARD RAIL MOUNTED. Q O 4.CONTRACTOR SHALL MAINTAIN LOCAL DRIVEWAY ACCESS TO RESIDENTIAL H-28'TUBLAR MARKETS AND COMMERCIAL PROPERTIES ADJACENT TO WORK AREA AT ALL TIMES. 5513939 ART N WAXX D 1001 a) 4-LANE TO 2-LANE UNDIVIDED ROADWAY SECTIONS AT 20F C-C IF PAVEMENT DROP IS MORE THAN TWELVE INCHES (12"}OR MORE.RE. � s= b) 4-LANE DIVIDED ROADWAY TO ONE SIDE TWO-WAY ROAD AT 20' C-C Vp c) LEFT LANE.RIGHT LANE STORAGE BAYS AT 20' C-C 5.ALL SIDEWALK CLOSURES SHALL HAVE CLOSURE SIGNS.BARRICADES AND S N O H O M I S H COUNTY "CLOSED AHEAD CROSS HERE"ADVANCE WARNING SSIGNS. PERSONNEL "= SHOULD BE MADE AVAILABLE TO ASSIST DISABLE PEDESTRIANS PER STATE LO J I T U G E E IJ F F E F .`''r E LO AND AdA RE4UIREMENTS. co MERGING TAPER LENGTH AND SPACING OF DEVICES SPEED (MIPH.1 LENGHTH ;F E- . 00 L a rl a $hoLddow CP 10 Fee1 11 Feel 12 Feat vVidth Tapers POSTED SIGN 20 50 MiERG1P4G SHIFTING MERGING SHIFTING MERGING SHIFTINGSHOULDER SPEED SPACINGS C/) 25 75 MPH L Cones L!2 Cones L Cones L12 C WMS L Cones L2 Cones LJ3 COMS (MPH) (FEET) w sa BELOW 100' 30 100 20 TO 5 35 3 75 5 40 3 S+0 i 40 3 25 3 -� � Q 35 125 25 105 6 55 3 115 6 60 4 125 6 65 4 35 3 35 350, w w � L) 40 40 30 150 6 75 4 165 7 85 4 180 7 90 4 50 3 40 35a' ''� IF- 35 205 7 105 4 225 8 115 5 245 8 125 5 70 4 r Iv m OL O 45 180 40 270 8 135 5 295 9 150 5 320 9 160 5 90 4 45 350 50 210 45 450 11 225 6 495 12 250 7 540 13 270 7 150 6 1 50 500, E 55 250 50 500 11 250 5 550 12 275 7 60D 13 300 7 170 6 55 500' � 60 285 56 550 11 275 6 606 12 305 7 660 13 3310 7 186 6 60 -%0- S2 65 325 so 600 11 300 6 660 12 330 7 720 13 360 7 200 s 65 16501 11 13251 B 17151 12 13701 7 780 13 IMI 7 12201 7 • 70 17001 11 13501 8 IT701 12 38 7 540 13 14201 T 12351 7 0 O PHASE -01 WQ C) (HALF ROAD) J� w Qua A� w MC =) N END • � ROAD WORK T WROAD ORK RAILROAD ST ? ' `` W Q m \ r I �WESTAVE r AHEA 25 MPH _ P. f F� 25 MPH ROAD ` ROAD WORK END . �\t F •( WORK AHEAD .r ROADWORK A;• 0 a AHEA I vp P� � o END 'moo w � o * t .r.w � !�, ROAD WORK ILL 11L Q LO BE f• N OLYMPICAVE r_ r ti BE r+ PREPARED . 25 MPH !? PREPARED BE �.. TO STOP ROAD PREPARED l TO STOP r , .� W _ TO STOP • - Jt,1 �,,I I WORK ` - _ v v W N �- O or- AHEA 1f_ • END `�. ! Haney Park 0 N o o ` o r . ROAD WORK 5,,, \ 00 ' . i s y + r + BE ALLEY , RwersideMobile �/ LA O W PREPARED Home Park'® EGz p,e h L Z TO STOP — - RoaD _ 15 MPH END ' dog Park p -0 O WORK ROAD WORK Q cn 0 + AHEA O 1.-. — �_j 'IGrocery OWet® E N ♦Q)!1J ' N Falcon St CI) O �D BE CCD '� �� Cascade District coup 0 yLL N Q PREPARED o ROAD - O Creatures Ali eerrke rive — FIBER CABLE TO STOP WORK l� veter nary Se ces N Arlington seventh dk AHEAD �• O Allen ist Church x WORK ARE 50' 50' _ m BUFFER APER • 100 100, GllmanAve EGilloAve EOil-Ave O) Iy . 100' 100' � EGilman cvc M rkwood Public House r u —L Z5 NTH ST =niw�r s, — eaN;,; O �? 25' '� ��ll EDrvision st y st on St r 1� N - L Hacienda Ark flan • EDivision 0 _ ��_ 25 MPH Bailey,Duskin,0 a E m O (� W i • �Rr �• r. PedfleB Martin,PS y < Z •F E =) .+ 111111 �ONE LAN 0 ROAD Tarr— .. Q z END I o _ CD , ! 0 1 HEAD o — ROADWORK ° Mae'Sanolyrnple 0 E`® rams, o l _ ICU C: 16. BE ROAD C J EPARED r PR WORK N _ •_' TO STOP AHEA ?� T ALLEY ''&AL F _ END 15 MPH co o o ROAD WORK END PHASE-5 0) L? BE ` ,�, BE ROAD WORK ROAD _ ^} o TO STOP TO STOP PREPARED PREPARED i '" WORK dift �- SIMILAR TO THIS TC P SCENARIO. 9) • =5�1�.f �- lip _ N OLYMPIC AVE ¢ '�'71� � ' oe._ .v, r - 25 MPHCD o = 't n END END j ' ' f %-- c_ E LLJ ROAD ~ ROADWORK 'f WORK ROAD WORK ROAD t * 1 i t y`• Q AHEAD WORK ` W z U w w IIWEST AVE ALLEY AHEAD f A� V 25 MPH` --A r�1 r 15 MPH 0-� O 2 t' r• `t F00 N 0 O PHASE -02 W Q C) (ROAD CLOSED) N �@ U Ui U) # J In r y+ { m N � ALLEY .F. 27, * 15 MPH fatco s • F ROAD 0 0 F"1 WORK AHEA END �- ROAD WORK - p lip County Park, P P I `CD � >� 2�'3 x3 �m�at` Haller Park Ld ■1L + • 5��\100V Z ROAD _ . l - M '.I •� I 1 O rn CLOSED ' , I Q ¢ AHEAD r Riverside Mobile n QY© 5�,� L Hone Parb.. ICox Ave Foy O W Z I _ i dog Park Q 4S�iie *k -a Q O CD I Ilaller Ave ,p. O Z i' p ROAD y S �—�� Grocery Outlet® M 4 CLOSED U IN Falcon S[ © �. 53 C N ¢ * 14 f. Cascade District Court ` ' - _ ,i , _ - T M ) Okll creatures RAILRO eiermSery AD ST R+ varyices EBurke.Ave O Arlington seventh-, 25 MPH ` Adventist Church O • '� � 'Jl Gilman Ave ¢ � � O PIHP4� �8 m z } END _ EGilman Ave EGilman Ave Q Z w ROAD WORK PHasE 07 FE irkwood Public House O ~ W � O ( FIBER CABLE Q ,. Divisionst PHasE os FGrvrsion5i Z _ _ s! a 51 3La Hacienda Ai li I Division IY O + "� ¢ '_ ROAD Bailey,Duskin,O WORK -� Peiffle R Martin,PS o t a' O i *♦ o �' w •� ;,F- ; AHEAy z zco s 't ROAD �� z Terrace r'arb. _ U END r� - (1) >� ++ ROADWORK CLOSED . . * ,; — Moe'son'Olympic A ESrhStIke 100 45ih,i fn lip 5 IKI '• c E 5TH ST _ r l r E 5TH ST o 25 MPH � 25 MPH , l r oo' END P HAS E-6,P HAS E-7 & PHASE-8 L z ROAD b ROADWORK SIMILAR TO THIS TCP SCENARIO. _ J WORK ( p 1 C Qf Z U AHEAD W W to } END ROAD ► _ 1 U ROAD WORK WORK 0-~ 0 AHEAD N m ALLEY - - 15 MPH N 0 O PHASE -03 WQ CD (FLAGGER) N �@ ? cLO O m WEST AVE L N - 25 MPH END c ` ROAD END ROADWORK 0 a) ROAD I X .I END WORK ROADWORK �r. - - AHEAD — 1t ��} an.rX.` y WORK AR EA LU J Q r �� 1P • Iti..E 100' 100, 100' rFIBER CABLE f Ld z N ROAD BE ROAD 0)• j V WORK M W W WORK PREPARED BE O - P 0) H 70 STOP i� PREPARED Q _ AHEAD - i,,, p coIlk 0 O) AHEA END �• T11. -'`` TO STOP orF — W Haller Par,. N Q LLJROAD WORK —— 1a —100' Q L H Z Z O Q END �,*��! PV PHASE 11 Q ROAD WORKLf) Riverside M soo �_ c) Z J N _ _ r� C CV Home ,rP*V �o�a,c C Q N J W i dog Park© PHASE �S iJ C 07 N Q 100' 100' LL- ' 00' -r � • � ROAD EHall•rAw hti` ROAD BE • F+ O `T• ' WORK END .., Grocery Outlet® ' v* WORK PREPARED A ' . AHEA ROADWORK �L<• --' NFalmn st AHEA TO STOP RAILROAD STO PHASE 09 Cdscade District Court 0 L0 •' Creatures END 25 MPH j il O E Burlce Ara ROADWORK _ # � eiermaryServices _ OgdingtonSeventh, �a" _ ' Z • ; €' Adventist Church 0 Z l S .� J A 1* \• �••� r — Gilman vr N - EGilman Ave O ~ UJ J EGilman Ave E Gilman Ave W Q 100, 100 a� �', _ ,Rrr �A 3 Z_ H ' •' ' ' - �! -+ '1 z 0 Mirkwood Public House 0 J ' — Of O ROAD BE f' BE ROAD I �Drv(apt y3= f Q 0 WORK _ + aion st C PREPARED PREPARED WORK .�: • I EDivi:ion se s+• END AHEA ) ^ r La Hacienda Arlin ton EDivision ��� TO STOP TO STOP AHEAD 1 �g ® p a O i ROAD WORK �. •• . ' ■ Bailey,Duskin,O Peiffle B Martin,PS Iy o a ICU J O -- \ }� t Terrace Park _ Z �;o U) ,. �►' '\ O d - Moe's on Olympic A E 5th St I Sth St En 500' s t • W N F G s 0) O ROAD-- ` • _ p O WORK • AHEA - t END r i a e ROAD WORK CD PHASE-9, PHASE—10 & PHASE— 11 L z NE LAN 0- SIMILAR TO THIS TCP SCENARIO. ' � f ROAD Q �• - '� HEAD .v�• - C: 0� Z L) W W 07 CD FA m END WORK ROAD �� ROADWORK AHEA t ► "tea �~ t ■ E WEST AVE E ' 25 MPH � JbL" S -1 Ilk - N 0 O ��SMPN PHASE -04 C, WU o ROP�Er10 eNDs;� (HALF ROAD) Jti w ROADWORK N U Uj (n RDA +f/ W ^T!f WORK , • J J g ' AHEA - In PREPaREo j/ T•, � TO STOP co � 0 0 011111: l �• .c^* r''�.d . :err ,., -' END �• `Jt ' County Park P P ROADWORK 1 �' I Haller Park LLI N 0) W N oNo' -� \ -• !^"' �r } 1 PHASE 15 y O Q 140' 100 16 100'-� ! q ECOX Are- In N W Z ROAD BE �{ e 1 4a�_ E Haller Ave WORK I PREPARED •TA + 9� CO AH TO STOP q. PHASE 12 Grocery Outlet® Q`e' . M E Q J .. . A .. p ( V� 1, • 1 N Falcon St Ch as ■1 Cascade District Court Q C LL N Q ;;,� - II Creatures �. > `�.• - I Veterinary Services _ 'w O Arlington Seventh, p,y� FIBER CABLE - T PREPARED ROAD • Adventist Church AHEA Gil 3 �' �•^, ..1 { _ Q manvc A < m E Gilman Ave END E Gilman Ave o O ROADWORK100' w r E Gilman Ave O 00` I 3 Mirkwood Public House 0 O 2f 0- EDwfs.o OLij W _ rn 1 EDivision St u 5t -on St (7 s -- 1 Fell Q a La Hacienda Arlington® - E Division O :EBailey,Duskin,0 } a a E . 0 Z = 100' i "It,. se • w .1el&Martin,PS .Y a O r r END o V z LL C .. a a ROAD WORK z :- BE ■ r Z Terrace Park O L PREPARED —�■n./ •'S STOP CO TO '1 00 •,. 1 }>• - _ R U ��•. - Moe'S on Olympic A E sth 51 E sth St w e J U �yr ROAD^ © vJ "at BE :EWO K z - w O, PREPARED r - All - l TO STOP END Lf) ROAD WORK O PHASE 1 HASE 13 °° - .- 500 1 ROAD END ROAD AD SIMILAR TO THIS TCP SCENARIO. ` L Z e �'• L � AHEAWOR AHEA K t ROADWORK WORK w r� C � J ROAD N Q WORK 0L z U 'Y END I 1' AHEA �1 }_ • W W U) ROADWORK _u 2i - _J U_ • WESTAVErf`4 s J¢ ' - 25 M EN PH D �"' 'I END 0 ROADWORK ROAD ROADWORK IN m O WORK . fiz ILROAD ST AHEA25MPH - - s �- is N City of Arlington 18204 59th Avenue NE, Arlington, • • Washington 98223 Phone: 360-403-3551 jNG� WASHINGTON C Invoice Number: 25-0139 INVOICE Invoice Date: December 22, 2025 Account Number: 3979840443 Bill To: Invoice Questions? GUNNER MITCHELL Phone: 360-403-3551 4155 SW CEDAR HILL BLVD Email: ced@arlingtonwa.gov Invoice Due Date: December 22, 2025 Record Number: Project A25-0124 Parcel Number: 00529900700100 Location: 217 5TH ST Date Description Paid Date Amount Paid Balance December 22, 2025 Processing/Technology Fee (320.341.43.00.02) $25.00 December 22, Right of Way(006.322.40.00.02) $1,100.00 2025 TOTAL: Project Fees $1,125.00 $1,125.00 ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------- ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------- --------------------------------------------------------- REMITTANCE INFORMATION If you are paying by check, please include this portion with your payment and remit to the address listed on this invoice. Remittance Information Invoice Account Total Due Your payment is due by December 22, 2025 Number Number This Invoice 25-0139 13979840443 1$1,125.00 GUNNER MITCHELL 4155 SW CEDAR HILL BLVD 18204 59th Avenue NE • ' • 14 op Arlington, Washington 98223 to tt Phone: 360-403-3551 jNG� WASHINGTON C Civil Use - Right of Way Permit Parcel:00529900700100 Permit#:25-0124 Permit Address:217 5TH ST Permit Expiration: March 26, 2026 Description of Work:ZIPLY FIBER IS TO PULL FIBER THROUGH EXISTING CONDUIT AND OVERLASH EXISTING STRAND. OWNER APPLICANT CONTRACTOR GUNNER MITCHELL StarTak Fiber LLC ZIPLY FIBER 4155 SW CEDAR HILL BLVD 4401 S Technology Dr,Sioux Falls,SD 57106 PO BOX 152206 IRVING,TX,75015 4695102840 4847478711 permit.zoneln@ziply.com rcorrell@teamstarlink.com registration_number:STARTFL790QE PERMIT APPROVAL The issuance or granting of this permit shall not be construed to be a permit for, or approval of, any violation of this Code or any other ordinance or order of the City, of any state or federal law, or of any order, proclamation, guidance advice or decision of the Governor of this State. To the extent the issuance or granting of this permit is interpreted to allow construction activity during any period of time when such construction is prohibited or restricted by any state or federal law, or order, proclamation, guidance advice or decision of the Governor of this State, this permit shall not authorize such work and shall not be valid. The building official is authorized to prevent occupancy or use of a structure where in violation of this Code, any other City ordinances of this jurisdiction or any other ordinance or executive order of the City, or of any state or federal law, or of any order, proclamation, guidance advice or decision of the Governor. The building official is authorized to suspend or revoke this permit if it is determined to be issued in error or on the basis of incorrect, inaccurate or incomplete information, or in violation of any City ordinance, regulation or order, state or federal law, or any order, proclamation, guidance or decision of the Governor. It is unlawful to use or occupy a building or structure until a final inspection has been made and approval or a Certificate of Occupancy has been granted. This permit authorizes only the work noted and covers work to be done on private property only. Any construction on public domain (curbs, sidewalks, driveways, marquees, etc.) will require a separate permit. The property owner shall ensure that the construction project complies with all applicable zoning codes and regulations. The property owner shall also ensure that the construction project does not cause any adverse impact on the surrounding environment or community. The property owner shall be responsible for obtaining all necessary permits and approvals from the relevant authorities before commencing construction. The property owner shall ensure that the construction project complies with all applicable design review requirements. CONDITIONS 1.) Permit holder to notify City communications group prior to trail closures. The applicant is required to notify the City for inspections. Failure to give notice will result in violation of AMC 2 ) Chapter 12.40.240 and may result in additional inspection fees. To request an inspection call 360-403-3417 by 3:30 for next day inspection. Applicant must comply with all applicable City of Arlington, state and federal laws, ordinances, code and regulation in performing the work authorized by this permit. Traffic Control must comply with the current version of MUTCD. Work Hours are 7 am to 7 pm Monday- Saturday (no work on Sundays or City Recognized Holidays). Inspections are not available on Saturday or 3.) Sunday. Non-motorized traffic control must be provided if any part of the work impacts existing non-motorized facilities. Non-motorized traffic control measures shall provide a level of accessibility that are, at minimum, equal to the existing conditions of the site. Two days before starting work, the applicant must have all utilities located. One Call, is a public utility locating 4.) service (#811 or 1-800-424-5555). Privately installed facilities must also be located using a private utility locating service. 5 ) Private property owners which may be affected by the proposed work must be notified in advance of potential disruptions in access or utility services. The applicant is required to notify the Communications Department Manager; 360-403-3441 or 6.) slopez@arlingtonwa.gov; mkruger@arlingtonwa.gov and Community and Economic Development 360-403-3551 or ced@arlingtonwa.gov three days prior to any traffic deviation. Please be advised Ziply is responsible for ensuring the placement of new and updated structures. Do not restrict 7.) existing use of right of way. Please take special note of secondary accesses that are used for RVa€T"s, boats, or other special uses. 8 ) Restoration of any infrastructure affected by the installation shall be per City of Arlington Standards & Specifications within a period not to exceed 7 days from completion of the installation. Trench Restoration shall be per Standard Detail R-140; Contact the City Engineer for Roadway Restoration requirements, 360-403-3512. INSPECTIONS Inspection Line: 360-403-3417 Call for inspections by 3:30 pm for next day inspection. Please allow 48 hours for Fire Inspections. Please provide the following information when leaving a message: Permit Number, Type of Inspection, and provide preference of morning or afternoon inspection. Inspection Portal: Please login to customer portal and submit for the desired inspection type for the permit. APPROVED BY Admin - Thad Newport Development Services Engineering Manager ASSOCIATED FEES Date Description Paid Date Amount Paid Balance December 22, ProcessingfIechnology Fee(320.341.43.00.02) $25.00 2025 December 22, Right of Way(006.322.40.00.02) $1,100.00 2025 TOTAL: Project Fees $1,125.00 $1,125.00 Credit/Debit Card 139 Payment Successful December 22, 2025 $1,125.00 $0.00 4rtk( tot( WASHINGTON Project Information - ' 'nformat;^- Project # 25-0124 Parcel # 00529900700100 Building ID Location 217 5TH ST Project Type Civil Use Project Use Right of Way Parent Project# Subdivision Applicant Name GUNNER MITCHELL Address 4155 SW CEDAR HILL BLVD Applicant Email permit.zoneln@ziply.com Phone 4695102840 Cell Owner Name ZIPLY FIBER Address PO BOX 152206 IRVING,TX, 75015 Owner Email Phone Cell Contractor StarTak Fiber LLC Address 4401 S Technology Dr, Sioux Falls, SD 57106 Contractor Email rcorrell@teamstarlink.co Phone 4847478711 Cell m Type/Improveme Accessory/Struct nt ure Current Use Proposed Use Current Zoning Proposed Zoning Project Cost 55,000.00 Project Value 55,000.00 Current Use And ZIPLY FIBER IS TO PULL FIBER THROUGH EXISTING CONDUIT AND OVERLASH EXISTING STRAND. Proposed Changes Lot Width Lot Depth Map Number Total Area of Building &Accessory Total Area of All Man-made Improvements Structures (Sq Ft) (Sq Ft) General Notes Restrictions/ Variances ©Community Development Online Portal Page 1 of 6 April 15, 2026 10:08AM WASHINGTON Structure Information Structure Type # of Stories Usable Floor Area (Sq Ft) Structure Height # of Units Load per Floor (Lbs) Sign Dimensions # of Bedrooms # of Bathrooms Occupancy With Chairs Tables & Chairs Empty Room Foundation Foundation Type Footing Depth Material Foundation Information Setbacks Front& 0 0 Setbacks Right & 0 0 Rear Left Sides Setbacks Information Water Utility Sewage Utility Gas Utility Electric Utility Driveway Width # of Off Street # of Off Street Parking Loading Miscellaneous Information ©Community Development Online Portal Page 2 of 6 April 15, 2026 10:08AM WASHINGTON Contractors License # Business Name Type Contact STARTFL790QE StarTak Fiber LLC General Contractor NA NA ©Community Development Online Portal Page 3 of 6 April 15,2026 10:08AM WASHINGTON Inspections Inspection # Inspection Type Status Date Inspector 26-0011 Civil- Right of Way Pass January 9, 2026 Brian Grieve Inspections 26-0229 Civil- Right of Way Final Pass April 14, 2026 Brian Grieve ©Community Development Online Portal Page 4 of 6 April 15,2026 10:08AM 4rtk( tot( WASHINGTON Contacts Contact Name Type Project Address Phone GUNNER MITCHELL Applicant 4155 SW CEDAR HILL 469-510-2840 BLVD ZIPLY FIBER Owner PO BOX 152206 IRVING, TX, 75015 GUNNER MITCHELL Others 4155 SW CEDAR HILL 469-510-2840 BLVD StarTak Fiber LLC Others 4401 S Technology Dr, 484-747-8711 Sioux Falls, SD 57106 StarTak Fiber LLC Contractor 4401 S Technology Dr, 484-747-8711 Sioux Falls, SD 57106 ©Community Development Online Portal Page 5 of 6 April 15, 2026 10:08AM 4rtk( tot( WASHINGTON Fees Fee Type Date Debit Credit Balance Project Fees December 22, 2025 $1,125.00 $1,125.00 $1,125.00 $0.00 T O T A L $1,125.00 $1,125.00 $0.00 ©Community Development Online Portal Page 6 of 6 April 15, 2026 10:08AM