HomeMy WebLinkAbout4701 AIRPORT BLVD_PWD4077 - Issued Permit_2026 CITY OF ARLINGTON
18204 59th Avenue NE,Arlington,WA 98223
INSPECTIONS:360-403-3417-Permit Center:360-403-3551
CIVIL PERMIT
4701 AIRPORT BLVD
Project Name:West Side Condo Association Permit#:4077
Project#: Parcel#: 31052100400108
Expires:07/29/2027
OWNER APPLICANT CONTRACTOR
COA/NW CUSTOM AIRCRAFT Welch Brothers Construction,Inc Welch Brothers Construction
HANGARS,LLC
18204 59th Avenue NE PO Box 818
PO Box 818
Arlington,WA 98223 Anacortes,WA 98221 Anacortes,WA 98221
360-293-9848/360-630-6387 360-293-9848
LIC#:601 109 879
EXP:01/31/2026
LIC#:WELCHBC995RC
EXP: 12/13/2027
JOB DESCRIPTION
Tap the water main and install 6"underground restrained fire main to riser room with flange riser.Test flush and UL Cert.
CONDITIONS
Material submittal approvals and a preconstruction meeting are required prior to the start of construction.It is the responsibility of
the Owner,Developer and Contractor to adhere to the approved plans,verify compliance with the City of Arlington Municipal
Code,Public Works Design and Construction Standards,International Code Council(ICC),applicable local,state and federal
requirements or any order,proclamation,guidance or decision of the Governor.
INSPECTIONS
INSPECTIONS (360-403-3417)MUST BE CALLED IN BEFORE 3:30 PM TO BE ON THE NEXT
BUSINESS DAY INSPECTION SCHEDULE. Inspections are Monday-Friday with the exception of Local,
State or Federal Holidays. Building, Storm and Civil Inspections - 8 am to 4:30 pm; Water or Sewer
inspections- 8:00 am to 3:30 pm. To cancel or modify an inspection - Building, Storm or Civil call 360-403-
3433; Water or Sewer call 360-403-3526. It is the responsibility of the Owner, Developer and Contractor to
call and arrange for appropriate inspections. Onsite tailgate meetings are advised with each individual
inspector prior to installation of their related facilities with those who are performing the work. Failure to
call for inspection may result in work being left exposed and/or removed and reconstructed. Re-inspections
may be charged at$127.00 per hour, %2 hour minimum for failure to call for inspection.
PERMIT APPROVAL
Work to be performed as described and/or shown in the approved plans and/or application for the above named project is approved
for construction by the City of Arlington Public Works Department. All work is subject to field inspection.
0 I/29/2026
Development Services Manager or Designee Date of Issuance
The issuance or granting of this permit shall not be construed to be a permit for,or approval of,any violation of this Code or any
other ordinance or order of the City,of any state or federal law,or of any order,proclamation,guidance advice or decision of the
Governor of this State.To the extent the issuance or granting of this permit is interpreted to allow construction activity during any
period of time when such construction is prohibited or restricted by any state or federal law,or order,proclamation,guidance
advice or decision of the Governor of this State,this permit shall not authorize such work and shall not be valid.The building
official is authorized to prevent occupancy or use of a structure where in violation of this Code,any other City ordinances of this
jurisdiction or any other ordinance or executive order of the City,or of any state or federal law,or of any order,proclamation,
guidance advice or decision of the Governor.The building official is authorized to suspend or revoke this permit if it is determined
to be issued in error or on the basis of incorrect,inaccurate or incomplete information,or in violation of any City ordinance,
regulation or order,state or federal law,or any order,proclamation,guidance or decision of the Governor.
i hereby certify that I have read and examined this permit,the City of Arlington Land Use Code,the most current edition of the
City of Arlington Standards and Specifications know the same to be true and correct all provision or laws and ordinances
governing this type of work will be compiled with,which may include but are not limited to: Other City of Arlington development
permits,WSDW Hydraulic Project Approval(HPA),WSDOE Notice of Intent(NOI),National Pollution Discharge Elimination
Systems(NPDES),and Corp of Forest Practices Application(FPA).I also understande that all insurance,approved submittals for
all materials and contractor's license.
The contractor shall hold the City of Arlington harmless from any loss or damage to any person or property in the performance of
said work.
SALES TAX NOTICE: Sales tax relating to construction and construction materials in the City of Arlington must be reported on
your sales tax return form and coded City of Arlington#3101.
Sarn��nG �J i Se I �O to
Applicant Signature Print Name Date
PERMIT FEES
Date Name Description Fee Amount
01/29/2026 Processing/Technology $25.00
01/29/2026 Civil Permit $1,600.00
Total Due: $1,625.00
Total Payment: S1,625.00
Balance Due: $0.00
CALL FOR INSPECTIONS
Call by 3:30 pm for next day inspection,allow 48 hours for Fire Inspections
When calling for an inspection please leave the following information:
Permit Number,Type of Inspection being requested,and whether you prefer morning or afternoon