Loading...
HomeMy WebLinkAbout7530 204th St Ne_PWD3732- Issued Permit_2026 CITY OF ARLINGTON 18204 59th Avenue NE,Arlington,WA 98223 INSPECTIONS: 360-403-3417-Permit Center: 360-403-3551 CIVIL PERMIT 7530 204TH ST NE Permit#:3732 Project Name:Wet Rabbit Express Car Wash Parcel#: 31051400100600 Project#:0 Expires: 02/19/2026 OWNER APPLICANT CONTRACTOR CHAFFEE CHARLES T&ELLEN Wet Rabbit/Chris McClure Saybr Contractors,Inc. 7530 204TH ST NE 3213 W.Wheeler St.#750 3852 S 66th St ARLINGTON,WA 98223-8912 Seattle Tacoma,WA 98409 206-284-8200 253 533 2382 LIC#: 601 795 367 EXP: 08/31/2025 LIC#: SAYBRCI033L7 EXP: 06/30/2026 JOB DESCRIPTION Construction of an automated conveyor type car wash(+/-5,000 sf tunnel)with supporting utility infrastructure,landscaping, parking,etc. CONDITIONS It is the responsibility of the Owner,Developer and Contractor to adhere to the approved plans,verify compliance with the City of Arlington Municipal Code,Public Works Design and Construction Standards,International Code Council(ICC),applicable local, state and federal requirements or any order,proclamation,guidance or decision of the Governor. INSPECTIONS INSPECTIONS (360-403-3417) MUST BE CALLED IN BEFORE 3:30 PM TO BE ON THE NEXT BUSINESS DAY INSPECTION SCHEDULE. Inspections are Monday-Friday with the exception of Local, State or Federal Holidays. Building, Storm and Civil Inspections - 8 am to 4:30 pm; Water or Sewer inspections - 8:00 am to 3:30 pm. To cancel or modify an inspection - Building, Storm or Civil call 360-403- 3433; Water or Sewer call 360-403-3526. It is the responsibility of the Owner, Developer and Contractor to call and arrange for appropriate inspections. Onsite tailgate meetings are advised with each individual inspector prior to installation of their related facilities with those who are performing the work. Failure to call for inspection may result in work being left exposed and/or removed and reconstructed. Re-inspections may be charged at $127.00 per hour, '/2 hour minimum for failure to call for inspection. PERMIT APPROVAL Work to be performed as described and/or shown in the approved plans and/or application for the above named project is approved for construction by the City of Arlington Public Works Department. All work is subject to field inspection. Al_ix� 1 09/09/2024 Develop ent Services Manager or Designee Date of Issuance The issuance or granting of this permit shall not be construed to be a permit for,or approval of,any violation of this Code or any other ordinance or order of the City,of any state or federal law,or of any order,proclamation,guidance advice or decision of the Governor of this State.To the extent the issuance or granting of this permit is interpreted to allow construction activity during any period of time when such construction is prohibited or restricted by any state or federal law,or order,proclamation,guidance advice or decision of the Governor of this State,this permit shall not authorize such work and shall not be valid.The building official is authorized to prevent occupancy or use of a structure where in violation of this Code,any other City ordinances of this jurisdiction or any other ordinance or executive order of the City,or of any state or federal law,or of any order,proclamation, guidance advice or decision of the Governor.The building official is authorized to suspend or revoke this permit if it is determined to be issued in error or on the basis of incorrect,inaccurate or incomplete information,or in violation of any City ordinance, regulation or order, state or federal law,or any order,proclamation,guidance or decision of the Governor. I hereby certify that I have read and examined this permit,the City of Arlington Land Use Code,the most current edition of the City of Arlington Standards and Specifications know the same to be true and correct all provision or laws and ordinances governing this type of work will be compiled with,which may include but are not limited to: Other City of Arlington development permits,WSDW Hydraulic Project Approval(HPA),WSDOE Notice of Intent(NOI),National Pollution Discharge Elimination Systems(NPDES),and Corp of Forest Practices Application(FPA).I also understande that all insurance,approved submittals for all materials and contractor's license. The contractor shall hold the City of Arlington harmless from any loss or damage to any person or property in the performance of said work. SALES TAX NOTICE: Sales tax relating to construction and construction materials in the City of Arlington must be reported on your sales tax return form and coded City of Arlington#3101. NA Nth, chrt< mcc (UYE q-%t-zt=j— Applicant Signature Print Name Date PERMIT FEES Date Name Description Fee Amount 09/09/2024 Processing/Technology $25.00 09/09/2024 Civil Permit $23,817.14 Total Due: $23,842.14 Total Payment: $23,842.14 Balance Due: $0.00 CALL FOR INSPECTIONS Call by 3:30 pm for next day inspection,allow 48 hours for Fire Inspections When calling for an inspection please leave the following information: Permit Number,Type of Inspection being requested,and whether you prefer morning or afternoon