Loading...
HomeMy WebLinkAbout20230801_PWD3507_IssuedPermitCITY OF ARLINGTON 18204 59thAvenue NE, Arlington, WA 98223 INSPECTIONS: 360-403-3417 - Permit Center: 360403-3551 CIVIL PERMIT 1216 F 5TH ST Permit ft: 3507 Project Name: Eagle Creek Elementary - Portables Project ft. ARLINGTON SCI TOOL DISTRICT 16 McGranahanArchuccts 315 N FRENCH AVE 2111 PacificAve ARLINGTON, WA 98223 Tacoma, WA 98402 253-383-3084 JOB DESCRIVIJON Adding two portable classroom buildings and connecting to utilities Parcel #- 31051200200300 Expires: 08/31/2023 CONTRACTOR PACIFIC MOBILE STRUCTURES PO Box 1404 Chehalis, WA 98532 T,TC#: 600498022 EXP: 0513112024 LIC#': PACIEMS0331)(1- EXP: 11/08.LI024 Sheet C3,0 - Water/Sewer crossings shall have a minimum of 18" vertical separation. For example, the crossing near the connection to the existing manhole. It is the responsibility of the Owner., Developer and Contractor to adhere to the approved plans, verify compliance with the City of Arlington Municipal Code, Public Works Design and Construction Standards, International Code Council (ICC), applicable local, state and federal requirements or any order, proclamation, guidance or decision Of the (jOVCMOL In addition, construction sites shall adhere to current , COVID- 19 Jobsite Safety Requirements as per local, state and federal regulations, Waiguffrow - INSPECTIONS (360-403-3417) MUST BE CALLED N BEFORE 3:30 PM TO BE ON THE NEXT BUSINESS DAY INSPECTION SCHEDULE - Inspections are Monday -Friday with exception of Local, State or Federal Holidays. Building, Storm and Civil Inspections - 8 am to 4:30 pm; eater or Sewer inspections - 8:00 am to 3:30 pm - To cancel or modify an inspection - Building, Storm or Civil call 360- 403-34' )3; Water or Sewer call 360-403-3526 - It is the responsibility of the Owner, Developer and Contractor to call and arrange for appropriate inspections. nsite tailgate meetings are advised with each individual inspector prior to installation of their related facilities with those persons who are actually perl'orming the work. - Failure to call for inspection may result in work being left exposed and/or removed mm and reconstructed - Re -inspections may be charged at S I" TOO per hour, V2 hour inimufor failure to call for inspection. PERNII'FAPPROYAL Work to be pertonned as described and,"or shown in the approved plans and/or application for the above named project is approved for construction by the City of Arlington Public Work., Department, All work is subject to field inspection. 07/226/2023 DcvctopnienQScrvices Manager or Designee Date of Issuance The issuance or granting of this permit shall not he construed to be a permit for, or approval of, any violation of this Code or any other ordinance or order of the City, of any state or federal law, or of any order, proclamation, guidance advice or decision of the Governor of this State. To the extent the issuance or granting of this permit is interpreted to allow construction activity during any period of time when such construction is prohibited or restricted by any state or federal law, or order, proclamation, guidance advice or decision of the Governor of this State, this permit shall not authorize such work and shall not be valid. The building official is authorized to prevent occupancy or use of a structure where in violation of this Code, any other City ordinances of this jurisdiction or any other ordinance or executive order of the City, or of any state or federal law, or of any order, proclamation, guidance advice or decision of the Governor. The building official is authorized to suspend or revoke this permit if it is determined to be issued in error or on the basis of incorrect, inaccurate or incomplete information, or in violation of any City ordinance, regulation or order, state or federal law, or any order, proclamation, guidance or decision of the Governor. I hereby certify that I have read and examined this permit, the City of Arlington Land Use Code, the most current edition of the City of Arlington Standards and Specifications know the same to be true and correct all provision or laws and ordinances governing this type of work will be compiled with, which may include but are not limited to: Other City of Arlington development permits, WSDW Hydraulic Project Approval (HPA), WSDOE Notice of Intent (NOI), National Pollution Discharge Elimination Systems (NPDLS), and Corp of Forest Practices Application (FPA). I also understande that all insurance, approved submittals for all materials and contractor's license. The contractor shall hold the City of Arlington harmless from any loss or damage to any person or property in the performance of said work. SALES'fAX NOTICE: Sales tax relating to construction and construction materials in the City of Arlington must be reported on your sales tax rcnform and coed City of Arlington #3 10 1. X, Applicant Ygnaturc Print Name Date PERMIT FEES Date Name Description Fee Amount 07/26/2023 Processing/Technology $25.00 07/26/2023 Civil Permit S6,156.44 07/26/2023 Credit Card Service $185,44 Total Due: $6,366.88 Total Payment-, $6,366.88 Balance Due: $0.00 CALL FOR INSPECTION Call by 3:30 pm for next day inspection, allow 48 hours for Fire Inspections When calling for an inspection please leave the following information: Permit Number, Type Of inspection being requested, and whether you prefer morning or afternoon