Permit Number: Permit Type:
Address/Parcel: Completed (Month/Year):
Land Use
Notice of Decision
Staff Report
Application
Narrative
Legal Description
Vicinity Map
Site Plan
Landscape Plan
Complete Streets Checklist
Traffic Impact Analysis
Snohomish County Traffic Mitigation Offer
WSDOT Traffic Offer Form
Tree Survey
Stormwater Drainage Report
Geotech Report
Critical Area Evaluation Form
SEPA Checklist
Public Notice Material
Noticing and Related Documents
Water / Sewer Availability Certificate
Unanticipated Discovery Plan Form
Aerial Photo of Site
Proposed Building Materials
Lighting Plans and Lighting Cut Sheets
Color Elevations
Design Matrix
Plat Map
Title Report
Lot Closures
Preliminary Civil Plans
Archaeological Survey
o Confidential Documents. Contact the
City to obtain.
Topography (Existing Conditions)
CC&R’s
Deeds / Easements / Conveyances
/Dedications
Developer’s Agreement
Recorded Copies
Bonding or Assignment of Funds
o Confidential Documents. Contact the
City to obtain.
Letters and Project Documents
Other:
Civil
Issued Permit
Application
Other Applications
Construction Calculation Worksheet
Approved Plans
Review Comment Form
Letters and Project Documents
Other Agency Permits
Reports:
o Drainage Report Pg:
o Stormwater Pg:
o Geotech Pg:
o All Other Reports
SEPA and Noticing Materials
Inspections
As-Builts
Other:
Building
Issued Permit
Application
Additional Applications
Approved Plans
Site Plan
Letters and Project Documents
Calculations
Project Specification Manuals
Reports
Certificate of Occupancy
Inspections
Other:
BLD6178 Commercial Alteration
17216 51st Ave Ne Ste 114 January 2025
✔
✔
✔
✔
COMMERCIAL TENANT IMPROVEMENT
PERMIT APPLICATION
Community and Economic Development
City of Arlington • ͳͺʹͲͶͷͻȈǡͻͺʹʹ͵Ȉȋ͵ͲȌͶͲ͵Ǧ͵ͷͷͳ
ǡǦ ǡǦ Ǥ
Ǥ
ǤSee ASSISTANCE BULLETIN #30 for detailed design requirements.
EACH BUILDING OR STRUCTURE REQUIRES A SEPARATE SUBMITTAL.
ǢIncomplete applications will not be accepted.
ͳǤ Ǥ
ʹǤ Ǥ ǤǤ
͵ͲǦͶͳǦ͵ͲͲͲǤ
A. DEFERRED SUBMITTALS
ǡ Ǥ
ǡǤ
ͳǤ ȋ Ȍ
ʹǤ ȋ Ȍ
͵Ǥ
ͶǤ
ͷǤ
B. SPECIAL INSPECTION AND TESTING AGREEMENT
Ǥ
ȗ Ǥ
Ǧ
Ǧ Ǧ
Ǧ
Ǧ ǣ̴̴̴̴̴̴̴̴̴̴̴̴̴̴̴̴̴̴̴̴̴̴̴̴̴̴̴̴̴̴̴̴̴̴̴̴̴̴
I acknowledge that all items designated as submittal requirements must accompany my Tenant
Improvement Permit Application to be considered a complete submittal.
REQUIRED DOCUMENTS
ǡ(if applicable)
ǡ(if applicable)
ǡ(if applicable)
ǡ(if applicableȌǣȀȀ Ǥ Ȁ
ȋ Ȍ
✔
✔
✔
✔
✔
✔
COMMERCIAL TENANT IMPROVEMENT
Ͳ͵ǤʹͲʹʹʹ
INSTALLATION, MODIFICATION OR REMOVAL MAY REQUIRE A SEPARATE PERMIT SUBMITAL
*CHECK ALL THAT APPLY
ȋǡ ǤȌ
Ȁ
Ȁ ǡtents (>200 sq. ft.) or canopies (>400 sq. ft.)
ǣ ̴̴̴̴̴̴̴̴̴̴̴̴̴̴̴̴̴̴
BBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBB
Type of Permit:
ǣ ǣ
͓ǣ Ǥǣ ǣ
ǣ
ǣ
ǣ ǣ
Ȁ ǣ ǣ
ǣ ͳ ʹ ͵ Ͷ ͷ
ǣ
ǣ Ǥǣ
ǣ Ǥǣ
ǣ ǣ ǣ ǣ
ǣ Ǥǣ
ǣ Ǥǣ
ǣ ǣ ǣ ǣ
ǣ ǣ
ǣ Ǥǣ
ǣ Ǥǣ
ǣ ǣ ǣ
ǣ ǣ
ǣ Ǥǣ
ǣ Ǥǣ
ǣ ǣ ǣ ǣ
Ƭ ǣ ǣ
✔
VW $YH 1(
&RQVWUXFWGRFNOHYHOHUSLWVIRUGRFNOHYHOHUVDWORDGLQJGRFN
1&6 1DWLRQDO &DUZDVK 6ROXWLRQV
,,,%% 6 +
6PDUWFDS $UOLQJWRQ $LUSRUW ,QGXVWULDO 3DUN 42=% //&
FKULV#WKHVPDUWFDSJURXSFRP
WK $YH 1( 6XLWH 5HGPRQG :$
/DQFH 0XHOOHU $VVRFLDWHV
KDUROGF#OPXHOOHUFRP
/DNHVLGH 6XLWH 6HDWWOH :$
3
(QJLQHHUV 1RUWKZHVW ,QF 36
MRDQQHE#HQJLQHHUVQZFRP
UG $YH : 6XLWH /\QQZRRG
ǣ
'DYLV 6FKXHOOHU ,QF
FVWRFNEXUJHU#GDYLVVFKXHOOHUFRP
&KHQQDXOW %HDFK 5G 6XLWH 0XNLOWHR :$
'$9,66,31
COMMERCIAL TENANT IMPROVEMENT
Ͳ͵ǤʹͲʹʹ͵
MECHANICAL SYSTEM INFORMATION
x
xȋȌ
x
Ȁ
ǡ Ͷͳͷ
x
xǦ
MECHANICAL PERMIT FEES (per unit)
Type of Fixture No. of Units Cost per Unit Subtotal
̈́ͷǤͲͲ α ̈́
ǤζͳͲͲȀ ̈́ͳͷǤͲͲ α̈́
ǤεͳͲͲȀ ̈́ʹͷǤͲͲ α̈́
ǤεͷͲͲȀ ̈́ͷͲǤͲͲ α̈́
̈́ͳͷǤͲͲ α̈́
̈́ʹͷǤͲͲ ̈́ʹͷǤͲͲ
δͳͲͲȀε͵ ̈́ͳͷǤͲͲ α̈́
εͳȀδͷͲ ̈́ʹͷǤͲͲ α̈́
εͳǤͷȀδͷͲ ̈́ͷͲǤͲͲ α̈́
εͳͲͲȀ͵Ǧͳͷ ̈́ͳͷǤͲͲ α̈́
εͷͲͲȀͳͷǦ͵Ͳ ̈́ʹͷǤͲͲ α̈́
Ǧ ̈́ʹͷǤͲͲ α̈́
Ǧ ̈́ͷͲǤͲͲ α ̈́
̈́ͳͷǤͲͲ α̈́
̈́ͳͷǤͲͲ α̈́
ȋȌ ̈́ʹͷǤͲͲ α̈́
̈́ͳͷǤͲͲ α̈́
Ȁ ̈́ͳͷǤͲͲ α̈́
ȀȀ ̈́ͳͷǤͲͲ α̈́
ζͳͲͲȀ ̈́ͳͷǤͲͲ α̈́
εͳͲͲȀ ̈́ʹͷǤͲͲ α̈́
̈́ͳͷǤͲͲ α̈́
ζͳͲͲȀ ̈́ͳͷǤͲͲ α̈́
Type of Permit:
ǣ Ǥǣ
ǣ Ǥǣ
ǣ ǣ ǣ ǣ
Ƭ ǣ ǣ
Gas Piping Specification and complete Schematic PAGE 4
ǣ
ǣΦdz᪨dzΧdzͳdzͳΦdzʹdz
ǣ ǣ
ǣ
COMMERCIAL TENANT IMPROVEMENT
Ͳ͵ǤʹͲʹʹͶ
MECHANICAL PERMIT FEES (per unit)
εͳͲͲȀ ̈́ʹͷǤͲͲ α̈́
εͷͲͲȀ ̈́ͷͲǤͲͲ α̈́
ζͷ ̈́ͳͷǤͲͲ α̈́
εͷȋδͷȌ ̈́ʹǤͲͲ α̈́
̈́ͳͷǤͲͲ α̈́
Ǧ ̈́ʹͷǤͲͲ α̈́
̈́ͳͷǤͲͲ α̈́
Ǧ
ǡ ̈́ͳͷǤͲͲα̈́
ǤζͳͲͲ ̈́ʹͷǤͲͲ α̈́
ǤεͳͲͲ ̈́ͷͲǤͲͲ α̈́
ȀǦ
̈́ͳͷǤͲͲ α̈́
ζͳͲͲȀ ̈́ͳͷǤͲͲ α̈́
εͳͲͲȀ ̈́ʹͷǤͲͲ α̈́
εͷͲͲȀ ̈́ͷͲǤͲͲ α̈́
Ǧ ȋȌ ̈́ͷǤͲͲ α̈́
ζͳͲͲȀ ̈́ͳͷǤͲͲ α̈́
εͳͲͲȀ ̈́ʹͷǤͲͲ α̈́
ȋǡ
Ȍ̈́ͳͲǤͲͲα̈́
Ǧ
̈́ʹͷǤͲͲ α̈́
Ǧ
̈́ʹͷǤͲͲ α̈́
̈́
ͶǦͺǢ ̈́
Ȁ ̈́ʹͷǤͲͲ
̈́
PRESSURE PIPING SCHEMATIC
Ȃǡ
SCHEMATIC IS TO SCALE SCHEMATIC NOT TO SCALE
ȋȌȋȌ
NOTE:
COMMERCIAL TENANT IMPROVEMENT
Ͳ͵ǤʹͲʹʹͷ
PLUMBING SYSTEM INFORMATION
The following items need to be specified on the plans:
Ǥ
Ǥ
Ǥ
Ǥ
ǡǡǡ Ǥ
ǡǡǤ
PLUMBING PERMIT FEES (per fixture)
ǤͷΨͶǦ
Ǥ ȋʹȌ Ǥ
Type of Fixture No. of Fixtures Cost per Fixture Subtotal
̈́ͷǤͲͲ α
Ȁ ̈́ͳͷǤͲͲ α
̈́ʹͷǤͲͲ α
̈́ʹͷǤͲͲ ̈́ʹͷǤͲͲ
Ȁ ̈́ͳͷǤͲͲ α
̈́ʹͷǤͲͲ α
̈́ͳͷǤͲͲ α
̈́ͳͷǤͲͲ α
̈́ͳͷǤͲͲ α
̈́ͳͷǤͲͲ α
Type of Permit:
ǣ Ǥǣ
ǣ Ǥǣ
ǣ ǣ ǣ ǣ
Ƭ ǣ ǣ
COMMERCIAL TENANT IMPROVEMENT
Ͳ͵ǤʹͲʹʹ
PLUMBING PERMIT FEES (per fixture)
̈́ͷǤͲͲ α
̈́ʹͷǤͲͲ α
̈́ͳͷǤͲͲ α
Ȁ ̈́ͳͷǤͲͲ α
Ȃ ̈́ʹͷǤͲͲ α
Ƭ ̈́ͳͷǤͲͲ α
̈́ͳͷǤͲͲ α
̈́ͳͷǤͲͲ α
ζͷȀ ̈́ͲǤͲͲ α
εͷȀȋζͷ
ȀȌ
̈́ͷǤͲͲ α
Ȃ
ǡ
̈́ͳͷǤͲͲ α
̈́ͳͷǤͲͲ α
Ǧ ȋȌ ̈́ͷǤͲͲ α
̈́ͳͷǤͲͲ α
ȋȌ ̈́ͳͷǤͲͲ α
ȋǡ ǡ ǤȌ ̈́ͳͷǤͲͲ α
̈́ͳͷǤͲͲ α
̈́ͳͷǤͲͲ α
̈́ʹͷǤͲͲ α
̈́ʹͷǤͲͲ α
Ǧ ̈́ʹͷǤͲͲ α
ͶǦǢ
Ȁ ̈́ʹͷǤͲͲ
PROPOSED BUILDING USE
Ȁ
ǣ̴̴̴̴̴̴̴̴̴̴̴̴̴̴̴̴̴̴̴̴̴̴̴̴̴̴̴̴̴̴̴̴̴̴̴̴
CROSS CONNECTION
Ǥ
Ǥ
ȀǤ
Ǥ Ǥ
Ǥ
Ȁ
Ȁ
Ȁ
ǣ̴̴̴̴̴̴̴̴̴̴̴̴̴̴̴̴̴̴̴̴̴̴̴̴
WASTEWATER DISCHARGE
ǫǯ
Ȁ
ǫǯ
COMMERCIAL TENANT IMPROVEMENT
Ͳ͵ǤʹͲʹʹ
ȋǡǡ
Ȍǫǯ
ǫǯ
ǡ
Ǧ ǡ
+DUROG&KULVWHQVHQ
SPECIAL INSPECTION AND TESTING AGREEMENT
Community and Economic Development
City of Arlington • 18204 59th Ave NE • Arlington, WA 98223 • Phone (360) 403-3551
Page 1 of 4 - REV03.2022
In accordance with International Building Code Chapter 17, where application is made for construction as described in this section, the Owner or the License Design Professional responsible for, and acting as the owner’s agent shall employ one or more Special Inspectors to provide inspections during construction.
Before a permit can be issued: The owner, Architect or Engineer of record acting as the owner's agent, shall complete this agreement, including the required acknowledgements, and attach structural tests and inspections schedules. A pre-construction conference with the parties involved may be required to review the special inspection requirements and procedures.
Property Address: Lot #: Parcel ID No.: Subdivision: Project Description: Primary Contact: Owner Architect Engineer Contractor Owner Name: Office No.: Email Address: Cell No.: Mailing Address: City: State: Zip: Architect Name: Office No.: Email Address: Cell No.: Mailing Address: City: State: Zip: Professional License Number: Expiration Date: Engineer Name: Office No.: Email Address: Cell No.: Mailing Address: City: State: Zip: Professional License Number: Expiration Date: Contractor Name: Office No.: Email Address: Cell No.: Mailing Address: City: State: Zip: L&I Contractor License Number: Expiration Date:
Page 2 of 4 - REV03.2022
SPECIAL INSPECTION AND TESTING SHALL MEET THE MINIMUM REQUIREMENTS OF 2018 IBC. THE
FOLLOWING CONDITIONS ARE ALSO APPLICABLE.
1. Duties and Responsibilities of Special Inspector a. Observe Work: The Special Inspector shall observe the work for conformance with City of Arlington approved (stamped) design drawings and specifications and applicable workmanship provisions of the IBC The Architect/ Engineer-reviewed shop drawings and/ or project drawings may be used only as an aid to inspection. b. Report Non-Conforming Items: The Special Inspector shall bring non-conforming items to the attention of the Contractor and note all such items in the daily report. If any item is not resolved in a timely manner or is about to be incorporated in the work, the Special Inspector shall immediately notify the City of Arlington by telephone or in person, and notify the project Architect or Engineer. c. Furnish Daily Reports: Each Special Inspector shall complete and sign an inspection report for each day's inspections to remain at
the job site with the contractor for review by the City of Arlington. d. Furnish Weekly Reports: The Special Inspector or agency shall furnish weekly reports of tests and inspections directly to the City of Arlington, project Architect/ Engineer, and others as designated. These reports must include the following: i. Description of daily inspections and test made, with applicable locations. ii. Listing of all non-conforming items. iii. Report on how non-conforming items were resolved or unresolved, as applicable. iv. Itemize all changes authorized by the Architect/ Engineer of Record and City of Arlington if not included in non-conformance items. e. Furnish Final Report: The Special Inspector or inspection agency shall submit a final signed report to the City of Arlington stating that all items requiring special inspection and testing were fulfilled and reported, and to the best of his/ her knowledge, in conformance with the approved design drawings, specifications, approved change orders and the applicable workmanship provisions of the IBC. Items not in conformance, unresolved items or any discrepancies in inspection coverage (i.e., missed inspections, periodic inspections when inspection was required, etc.) shall be specifically itemized in this report.
2. Contractor Responsibilities a. Notify the Special Inspector: The Contractor is responsible for notifying the Special Inspector or agency regarding individual inspection items on the summary schedule and as noted on the City of Arlington approved plan as specified by the Architect and or Engineer of record. b. Provide Access to Approved Plans: The Contractor is responsible for providing the Special Inspector access to approved plans at the job site. c. Retain Special Inspection Records: The Contractor is also responsible for retaining at the job site all Special Inspection records submitted by the Special Inspector and providing these records for review by City of Arlington, upon request.
3. City of Arlington a. Approve Special Inspector: The City of Arlington shall approve all Special Inspectors prior to performing any inspection. b. Monitor Special Inspection: Work requiring special inspection and the performance of Special Inspectors shall be monitored by the City of Arlington. His/ Her approval must be obtained prior to placement of concrete or similar activities in addition to that of the Special Inspector.
Page 3 of 4 - REV03.2022
4. Owner Responsibilities a. Funding: The project owner or the Architect or Engineer of record acting as the owner's agent shall fund the Special Inspection Services.
5. Architect or Engineer of Record Responsibilities a. Drawings: The Architect or Engineer of record shall include special inspection requirements on the design drawings and specifications. b. Schedule Inspections: Provide a summary schedule of required inspections which would outline frequency of inspections for items which may require multiple inspections which may include but are not limited to concrete and grout testing, compaction, testing of backfill and or road beds as recommended by the geo-tech engineer, and structural welding as work progresses.
6. Indicate items requiring special inspection, structural testing, or structural observations by checking the
appropriate box.
☐ STRUCTURAL STEEL ………………………………………………………………. (IBC 1705.2.1 & 1705.12.1)
☐ STEEL CONSTRUCTION OTHER THAN STRUCTURAL STEEL ……. (IBC 1705.2.2)
☐ CONCRETE CONSTRUCTION ……………………………………………………. (IBC 1705.3)
☐ MASONRY CONSTRUCTION ……………………………………………………... (IBC 1705.4)
☐ WOOD CONSTRUCTION …………………………………………………………… (IBC 1705.5, 1705.11.1 & 1705.12.2)
☐ SOILS CONSTRUCTION …………………………………………………………….. (IBC 1705.6)
☐ DRIVEN DEEP FOUNDATIONS …………………………………………………. (IBC 1705.7)
☐ CAST-IN-PLACE DEEP FOUNDATIONS ……………………………………… (IBC 1705.8)
☐ HELICAL PILE FOUNDATIONS …………………………………………………. (IBC 1705.9)
☐ SPRAYED FIRE-RESISTANT MATERIALS ………………………………….. (IBC 1705.14)
☐ MASTIC AND INTUMESCENT FIRE-RESISTANT COATINGS ……….. (IBC 1705.15)
☐ EXTERIOR INSULATION AND FINISH SYSTEMS (EIFS) ……………… (IBC 1705.16)
☐ FIRE-RESISTANT PENETRATIONS AND JOINTS ……………………….. (IBC 1705.17)
Only required for high-rise buildings or those assigned to Risk Category III or IV per IBC Table 1604.5.
☐ SMOKE CONTROL ……………………………………………………………………. (IBC 1705.18)
☐ ARCHITECTURAL COMPONENTS …………………………………………….. (IBC 1705.12.5)
Only required for buildings located within Seismic Design Category D, E, or F
☐ PLUMBING, MECHANICAL & ELECTRICAL COMPONENTS …………. (IBC 1705.12.6)
Only required for buildings located within Seismic Design Category C, D, E, or F
☐ SEISMICALLY ISOLATED SYSTEMS …………………………………………... (IBC 1705.12.8)
Material alternatives or unusual design applications
☐ SPECIAL CASES ………………………………………………………………………... (IBC 1705.1.1)
☐ MISCELLANEOUS AREA
These inspections may be recommended by the Architect/Engineer and are to be approved by the Building
department.
Page 4 of 4 - REV03.2022
Acknowledgements
I HAVE READ AND AGREE TO COMPLY WITH THE TERMS AND CONDITIONS OF THIS AGREEMENT.
(Attach more sheets for signatures if necessary)
Owner Name: Date:
Signature:
☐ Submit written statement of responsibility in accordance with IBC Section 1704.4.
Special Inspector Name: Date:
Signature:
☐ Submit WABO certification for special inspection agency and inspectors, (or)
☐ Submit Special Inspection agency documentation for Building Official approval. Names of Special Inspectors Scope of Work. Submit copies of inspector certifications provided for each discipline.
Architect/Engineer of Record Date:
Signature:
☐ Statement of Special Inspections completed and submitted in accordance with IBC Section 1704.3.
☐ Structural Observations required in accordance with IBC Section 1704.5.
●
●●● ● ● ● ● ● ● ● ● ● ●● ● ●
●
●19020 33rd Ave W #530 Lynnwood, WA 98036
●206.525.7560 fax 206.522.6698
www.engineersnw.com
September 26, 2024
LMA
140 Lakeside Avenue, Suite 310
Seattle, WA 98122
ATTN: Harold Christensen
RE:Arlington Airport Industrial Park Bldg B –NCS T.I.-Leveler Pit Additions
Structural review and drawings
ENW Project No. 22022010
Harold,
Please find the attached set of structural permit drawings for the above-mentioned
project. Note, there are no structural calculations accompanying these drawings as
there is no structural change to the building.
The leveler pits will be added at existing exterior shear wall openings only. There are
no new wall openings required for this project. Therefore, there is no change in impact
to the existing building’s lateral system. The existing building is structurally adequate
for this project.
Please included this letter as part of your permit submittal to the city.
Should you require any additional information regarding this project, please contact us
call.
Sincerely,
ENGINEERS NORTHWEST, INC., P.S.
Joanne Bayuga, P.E.
Senior Project Engineer
JB:ag