Loading...
HomeMy WebLinkAbout9024 171st Street NE_BLD1441_2026 Lo1— ff9 RESIDENTIAL PERMIT APPLICATION G � Department of Community & Economic Development City of Arlington• 18204 59th Ave NE •Arlington,WA 98223 • Phone(360)403-3551 THIS APPLICATION IS TO BE USED WHEN APPLYING FOR A NEW SINGLE-FAMILY, DUPLEX, TOWNHOUSE, ADDITION, DECK,OR ACCESSORY STRUCTURES. THIS APPLICATION MUST BE ACCOMPANIED BY TWO(2)SETS OF CONSTRUCTION DRAWINGS AND TWO(2)SETS OF STRUCTURAL CALCULATIONS. THE APPLICATION MUST ALSO INCLUDE THE PLUMBING SUBMITTAL AND THE MECHANICAL SUBMITTAL FORMS. THE ZONING VERIFICATION MAY BE SUBMITTED PRIOR. n Project Address: S0)7 �� 5 riGE>✓� /1�� Plat: L� D/21/ '/�-�?�� �r 7P Single-family ❑ Duplex ❑1 Townhouse ❑ Addition ❑ Accessory structure Proposed Area: 1" Floor: 2nd Floor: Garage: Total SF: D scribe Proposal (include cross street): LAL- AJL Valuation: , Owner: ( ( 2W,6,S Address: 114110 fir✓ GY'"J 51 ��o�City: V_A zW A-N z> State: ( A Zip Code: 03 Phone: /x—' -� Emai1: 447U S CA �Lt//{oe�jf,S • God Applicant: Address: ���f(() /�l���y� �� City: l �l State: A_ Zip Code: 9 l)� Phone: q�r _ 7— Email: (A�R . c 5 C�_(�L7��fvN��S• (°Ow( Contractor:L-4 vijt _ Address:_Mo A& 12yrf 5CA(O City: �Id State: Zip Code: Phone: ) — 0 — Email: j6 c�l_ 21 Contact Person: License Number L Expiration: 6/16LP Page 1 of 3 RESIDENTIAL PERMIT APPLICATION Department of Community & Economic Development ��P O City of Arlington• 18204 59th Ave NE • Arlington,WA 98223 • Phone(360)403-3551 II,yG't Plumbing Section (continue filling out if plumbing is involved) (Check all that apply and indicate the number of fixtures proposed) 3—Bath/Shower Combo (4.0) x I �Q Sink (1.5) x I 13—Shower (2.0) x r Lavatory (1.0) x ❑ Clothes Washer (4.0) x C Water Closet(2.5) x Uf Dishwasher (1.5) x I Water Heater x I - Hose Bibb (2.5) x Z Water Heater Model # Other (list) x Plumbing Section Continued Proposed Water Piping Size: �� Proposed DWV Material: S Proposed Piping Material: �F�;L _ Proposed DWV Size: ,1 a • All hose bibs required to be equipped with Atmospheric Vacuum Breakers per ASSE 1019 • All water supplies at 80psi or greater shall have Pressure Reducing Valves (PRV) 6/16LP Page 2 of 3 RESIDENTIAL PERMIT APPLICATION Department of Community & Economic Development City of Arlington• 18204 59th Ave NE •Arlington, WA 98223 • Phone(360)403-3551 Mechanical Section (continue filling out if mechanical equipment is involved) Select proposed appliances: Furnace (80+) Model # qNr �/�C543m4 p�& AFUE 7'5- ❑ Heat Pump Model # SEER HSPE ❑ AC Unit Model # SEER ❑ Type II Hood ❑ Commercial Cooking Appliance ❑ Hydronic Piping ❑ Boiler ❑ Solid-Fuel Appliance PV System Ll Fireplace Insert Outdoor BBQ ❑ Storage Tank — Freestanding Stove Gas Piping (rJ Other Gas Piping Information Not Applicable: ❑ Pipe Material: 1 u-1 Pipe Size: _.� Total BTU's of all Appliances: . 6)06 Distance from Meter to Furthest Appliance: �U • New gas piping requires a pressure test to hooking to any appliance • Sediment traps (drips) are required on all gas lines • Gas lines are required to be supported/secured every 6 to 8 feet • Proper combustion air and venting required for all appliances • A shut-off is required within 6 feet of all appliances Applicant Signature: - Date: 40 9 Print Applicants Name: Akn- "A-PA.S 6/16LP Page 3 of 3 CITY OF ARLINGTON 238 N. OLYMPIC AVE -ARLINGTON, WA. 98223 -� - PHONE; (360)403-3551 BUILDING PERMIT _ Address:9024 171st Street NE Permit#:1441 Parcel#: Valuation: 187422.00 OWNER APPLICANT CONTRACTOR Name:LGI HOMES-WASHINGTON LLC Name:LGI Homes-Washington,LLC Name:LGI Homes-Washington,LLC Address: 1450 LAKE ROBBINS DR STE 430 Address:114 10 NE 124th Street,Ste#103 Address: 11410 NE 124th Street,Ste#103 City,State Zip:THE WOODLANDS,TX 77380 City,State Zip:Kirkland,WA 98034 City,State Zip:Kirkland,WA 98034 Phone: Phone:425-785-0797 Phone:360-353-0588 MECHANICAL CONTRACTOR PLUMBING CONTRACTOR Name: Name: Address: Address: City,State,Zip: City,State,Zip: Phone: Phone: LIC#: EXP: LIC#: EXP: JOB DESCRIPTION PERMIT TYPE: Single Family Residence CODE YEAR: 2015 STORIES: 1 CONST.TYPE: `I-B DWELLING UNITS: 1 OCC GROUP: R-3 BUILDINGS: OCC LOAD: PERMIT APPROVAL I AGREE TO COMPLY WITH CITY AND STATE LAWS REGULATING CONSTRUCTION AND IN DOING THE WORK AUTHORIZED THEREBY;NO PERSON WILL BE EMPLOYED IN VIOLATION OF THE LABOR CODE OF THE STATE OF WASHINGTON RELATING TO WORKMEN'S COMPENSATION INSURANCE AND RCW 18.27. THIS APPLICATION IS NOT A PERMIT UNTIL SIGNED BY THE BUILDING OFFICIAL OR HIS/HER DEPUTY AND ALL FEES ARE PAID. IT IS UNLAWFUL TO USE OR OCCUPY A BUILDING OR STRUCTURE UNTIL A FINAL INSPECTION HAS BEEN MADE AND APPROVAL OR A CERTIFICATE OF OCCUPANCY HAS BEEN GRANTED. IBC 110/IRC110. SALES TAX NOTICE:Sales tax relating to construction and construction materials in the City of-Arltttgt n must be reported on your sales tax return form and c ed ity of i ton#31 I. Sign ure Print Name Date R eased By Date CONDITIONS Adhere to approved plans. Additional requirements: The Quick-Joint fittings(that were included as part of the plat's pressure test)were removed/cut off from tail pieces. These were to be the domestic plumbing point of connection.New ones will need to be supplied and re-installed by plumber/developer at time of service line connection. Call the Public Works Department at 360-403-3526 for connection inspection. THIS PERMIT AUTHORIZS ONLY THE WORK NOTED.THIS PERMIT COVERS WORK TO BE DONE ON PRIVATE PROPERTY ONLY. ANY CONSTRUCTION ON THE PUBLIC DOMAIN(CURBS,SIDEWALKS,DRIVEWAYS,MARQUEES,ETC.)WILL REQUIRE SEPARATE PERMISSION. PERMIT FEES Date Description Fee Amount 5/10/2017 Building Permit Fee $2,109.12 5/10/2017 Building Plan Review Fee $1,370 93 5/10/2017 Furnace $25.00 5/10/2017 Gas Outlets Base Fee 1 to 5 $10.00 5/10/2017 Mechanical Fee(Enter Fixture Fee) $25.00 5/10/2017 Mechanical Permit Base Fee $25.00 5/10/2017 Park-Community MF $1,662.00 5/10/2017 Plumbing Permit Base Fee $25.00 5/10/2017 Plumbing Permit Fee(Enter Fixture Fee) $132.00 5/10/2017 ProcessingfTechnology Fee $25.00 5/10/2017 State Building Code Surcharge Fee $4.50 5/10/2017 Traffic Mitigation $3,355.00 5/10/2017 Water Heater $25.00 Total Due: $8,793.55 Total Payment: $1,370.93 Balance Due: $7,422.62 CALL FOR INSPECTIONS BUILDING(360)403-3417 When calling for an inspection please leave the following information: Permit Number,Type of Inspection being requested,and whether you prefer morning or afternoon SETBACKS NOTES: 1 FRONT 20 .BUILDING DIMENSIGWS ARE 70 SIDE 5' FACE OF FOUNDAAOW 12'WA7ERL REAR 5' •GRADING.S�IONN AS DESIGN ACTUAL LOCA770N MAY VARY 171 o 171ST T. N •SLOPE DRIVEWAY TO PUBLIC ROAD - •SIL T FENCE TO BE INSTALLED PER 8•SENER CY Y OF ARLINGTOV'S STANDARD •SILT FENCE TO BE INSTALLED ON N89 0 49"W GRADIENT SIDE OF BUILDING 125.00 14 PARCEL •CONSINUCTIOW ENTRANCE TO BE s P s f0' INSTALLED PER CITY OF PUBLIC UTILITY ARLINGTOV S STANDARDS • ° ° a m EASEMENT D STORM NOTES: o •TESL INSTALLED PRIOR TO liONSTRUC77ON s ° ns v •BARE SOILS COVFRED WWI MULCH OR ANOTHER APPROVED BMP `o •TOPSOIL PER N5001E BMP 75.13 147 1?0'B o N (EFF 12'DEPTH) v •ALL ONSl7E RUNOFF CONNECTED TO STORM CLEANOUT. PRIVATE STORM STUB CGWNECT ROOF AND 5y6 SF ' — - n .S/7E SHALL BE STABILIZED PR/OR DRAINS J�FOOTING p IVE YyA y TO BUILDING PERMIT BEING 011.00 WN�ON I 19.75 0 o BUILDING FINALIZED I �'`4.25� ° OI/TL/NE SITENOTES.- •AGHTLINE FOOANG DRAINS AND PROOF OVERHANG+ GARAGE 10'� ROOF DRAINS TO PERMANENT ' e STORM DRNNAGr SYSTEM PER I ^ O APPROVED PLAT DRAINAGE PLAN o OW FILE WWI THE COUNTY. I •AREA OF DISTURBANCE INCLUDES I o a o W EN77RE LOT. z ! LOT 48 0 Z414 LEGEND. LEA PROPOSED RESIDENCE COLUM8/A-1487 GARAGE LEFT 1,44 a— BLOW OFF 5'BSBL I f 2,109.iSF = ® WATER METER Poll 770 �, FIR£HYDRANT 2 SF 10.50 ° Q .0- AIR VAC I h 0 CATLYI BASIN I 4 O CLEANOUT 5 24.50 O MANHac£ ---� — J I -5,858L - - - -WATER ° L) SERNC£ I?-T-m?? BLOq( WALL 50.00 a TREE REMOVAL N8920'49"W PROPERTY EAYS77NG COWTOUR CORNER I (P) { SCALE I'm 20' LOT 48 �f1N19'l£D CONTOUR SITE PLAN ,I I GREGOR Y RA RK LG/ HOMES PLAN NO. COL.-1487 LOT AREA = 4,666 SF DATE 411912017 PARCEL # LOT 48 HOUSE= 2,109 SF 4711 NE 191h Plvice;q 101 DRIVEWAY= 516 SF cow Be le Wohn9lvn 98007 DESIGNED CORE ADDRESS 9024 171ST ST. 425 BB5.7B77 FaR 415.BB57963 WALKWAY/PA770 = 12 SF ��DESIGN PROJECT NUMBER TOTAL= 2,637 SF ENGINEERING • PLANNING • SURVEYING DRAWN CAF 13024L-GRG00 rk ` fej.. G� BUILDING INSPECTION REPORT— Residential Final Permit No. 1441 Address: 9024 171st Street NE Contractor: LGI Homes - Washington, LLC Owner: LGI Homes - Washington, LLC 1 Date: 9/26/2017 L APPROVAL ❑ PARTIAL APPROVAL ❑ CORRECTION ❑ OTHER INSPECTION: Final Building ADDRESS NUMBERS: ❑ ACCESS: ❑ PLUMBING: ❑ MECHANICAL: ❑ SMOKE DETECTION: ❑ CO DETECTION: ❑ LIFE SAFETY: ❑ DECKS: ❑ HANDRAILS: ❑ PLANTINGS: ❑ WATER: ❑ SEWER: ❑ LIGHTING: ❑ FINAL ELECTRICAL: ❑ BLOWER DOOR/DUCT CERT: ❑ INSULATION CERT: ❑ Date: 9/26/2017 Inspector: Kevin Olander CITY OF ARLINGTON 238 N. OLYMPIC AVE -ARLINGTON, WA. 98223 PHONE; (360)403-3551 BUILDING PERMIT Address:9024 171 st Street NE Permit#:1441 Parcel#: Valuation: 187422.00 OWNER APPLICANT CONTRACTOR Name:LGI HOMES-WASHINGTON LLC Name:LGI Homes-Washington,LLC Name:LGI Homes-Washington,LLC Address: 1450 LAKE ROBBINS DR STE 430 Address:11410 NE 124th Street,Ste#103 Address: 11410 NE 124th Street,Ste#103 City,State Zip:THE WOODLANDS,TX 77380 City,State Zip:Kirkland,WA 98034 City,State Zip:Kirkland,WA 98034 Phone: Phone:425-785-0797 Phone:360-353-0588 MECHANICAL CONTRACTOR PLUMBING CONTRACTOR Name: Name: Address: Address: City,State,Zip: City,State,Zip: Phone: Phone: LIC#: EXP: LIC#: EXP: JOB DESCRIPTION PERMIT TYPE: Single Family Residence CODE YEAR: 2015 STORIES: I CONST.TYPE: `/-13 DWELLING UNITS: I OCC GROUP: R-3 BUILDINGS: OCC LOAD: PERMIT APPROVAL I AGREE TO COMPLY WITH CITY AND STATE LAWS REGULATING CONSTRUCTION AND IN DOING THE WORK AUTHORIZED THEREBY;NO PERSON WILL BE EMPLOYED IN VIOLATION OF THE LABOR CODE OF THE STATE OF WASHINGTON RELATING TO WORKMEN'S COMPENSATION INSURANCE AND RCW 18.27. THIS APPLICATION IS NOT A PERMIT UNTIL SIGNED BY THE BUILDING OFFICIAL OR HIS/HER DEPUTY AND ALL FEES ARE PAID. IT IS UNLAWFUL TO USE OR OCCUPY A BUILDING OR STRUCTURE UNTIL A FINAL INSPECTION HAS BEEN MADE AND APPROVAL OR A CERTIFICATE OF OCCUPANCY HAS BEEN GRANTED. IBC110/IRC110. SALES TAX NOTICE:Sales tax relating to construction and construction materials in the City f"tn n must be reported on your sales tax return form and Vcd ity of i ton#31 I. VSign ure Print Name Date Men By Date CONDITIONS Adhere to approved plans. Additional requirements: The Quick-Joint fittings (that were included as part of the plat's pressure test) were removed/cut off from tail pieces. These were to be the domestic plumbing point of connection.New ones will need to be supplied and re-installed by plumber/developer at time of service line connection. Call the Public Works Department at 360-403-3526 for connection inspection. THIS PERMIT AUTHORIZS ONLY THE WORK NOTED.THIS PERMIT COVERS WORK TO BE DONE ON PRIVATE PROPERTY ONLY. ANY CONSTRUCTION ON THE PUBLIC DOMAIN(CURBS,SIDEWALKS,DRIVEWAYS,MARQUEES,ETC.)WILL REQUIRE SEPARATE PERMISSION. PERMIT FEES Date Description Fee Amount 5/10/2017 Building Permit Fee $2,109.12 5/10/2017 Building Plan Review Fee $1,370.93 5/10/2017 Furnace $25.00 5/10/2017 Gas Outlets Base Fee 1 to 5 $10.00 5/10/2017 Mechanical Fee(Enter Fixture Fee) $25.00 5/10/2017 Mechanical Permit Base Fee $25.00 5/10/2017 Park-Community MF $1,662.00 5/10/2017 Plumbing Permit Base Fee $25.00 5/10/2017 Plumbing Permit Fee(Enter Fixture Fee) $132.00 5/10/2017 Processing/Technology Fee $25.00 5/10/2017 State Building Code Surcharge Fee $4.50 5/10/2017 Traffic Mitigation $3,355.00 5/1 012 0 1 7 Water Heater $25.00 Total Due: $8,793.5.5 Total 1'avrncnl: $1.370.93 Balance Due: $7,422.62 CALL FOR INSPECTIONS BUILDING(350)403-3417 When calling for an inspection please leave the following information: Permit Number,Type of Inspection being requested,and whether you prefer morning or afternoon \f I ,ram Permit Information Date 4/21/2017 Permit Number 1441 Project Name Gregory Park Applicant Name LGI Homes-Washington,LLC Applicant Address 11410 NE 124th Street,Ste#103 City,State,Zip Kirkland,WA 98034 Contact Matt Adams Phone 425-785-0797 Email matt.adams@lgihomes.com Permit Type Single Family Residence Site Address 9024 171 st Street NE Valuation 187422.00 Status Applied Permit Issued Permit Expires Square Feet 1889 Type of Construction/Occupancy Load V-B Number of Stories 1 Proposed Use New SFR Assigned To Kristin Foster Contractors Contractor Name Primary Phone Email Contractor License License# Contact Type I_GI Homes-Washington,Jake Jabusch 0588 3- ake.jabusch@lgihomes.co CONTRACTOR IIndusLabo and I_GIHOHL857M I_LC )588 Ilndustries Review Date Type Description I Target Date Completed Date J Assigned To Status 4/21/2017 IlResidential Dwellin t/28/2017 lRick Karns lin Review Fees Fee Description I Notes I Amount Building Plan Review Feel 345.83.00.00 1 $1.370.9 Total $1,370.9 Payments Date Paid By Amount I Description I Pa ment T pe I Acce ted B 4/21/2017 JLGI Homes-Washington, LLC $1,370.9 Plan Review ;heck#4460 Kristin Foster Total $1,370.9N Amount Outstanding:$0.Oa Notes Date Note 4/21/2017 Lot 48-Plan 1487 Columbia Uploaded Files Upload File Date File Uploaded B 4/21/2017 3:36:40 PM 1441 Applicationadf Foster, Kristin x 4/21/2017 3:36:40 PM 1441 Site Plan.pdf Foster,Kristin Y RESIDENTIAL PERMIT APPLICATION Department of Community & Economic Development City of Arlington• 18204 59th Ave NE •Arlington,WA 98223 • Phone(360)403-3551 Mechanical Section (continue filling out if mechanical equipment is involved) Select proposed appliances: Furnace (80+) Model # %/-rV,43m4 /� AFUE ❑ Heat Pump Model # SEER HSPE AC Unit Model # SEER LJ Type II Hood ❑ Commercial Cooking Appliance ❑ Hydronic Piping ❑ Boiler ❑ Solid-Fuel Appliance ❑ PV System 01 Fireplace Insert ❑ Outdoor BBQ ❑ Storage Tank �`- Freestanding Stove Gas Piping ❑ Other Gas Piping Information Not Applicable: ❑ Pipe Material: *( Pipe Size: _�Total BTU's of all Appliances: /�O _ �D 6 Distance from Meter to Furthest Appliance: rV • New gas piping requires a pressure test to hooking to any appliance • Sediment traps (drips) are required on all gas lines • Gas lines are required to be supported/secured every 6 to 8 feet • Proper combustion air and venting required for all appliances • A shut-off is required within 6 feet of all appliances Applicant Signature: _ Date: 4VJ 4 Print Applicants Name: /kA-,,— "A-10 6/16LP Page 3 of 3 Low RESIDENTIAL PERMIT APPLICATION Department of Community & Economic Development City of Arlington• 18204 59th Ave NE • Arlington, WA 98223 • Phone(360)403-3551 THIS APPLICATION IS TO BE USED WHEN APPLYING FOR A NEW SINGLE-FAMILY, DUPLEX, TOWNHOUSE, ADDITION, DECK,OR ACCESSORY STRUCTURES. THIS APPLICATION MUST BE ACCOMPANIED BY TWO(2)SETS OF CONSTRUCTION DRAWINGS AND TWO(2)SETS OF STRUCTURAL CALCULATIONS. THE APPLICATION MUST ALSO INCLUDE THE PLUMBING SUBMITTAL AND THE MECHANICAL SUBMITTAL FORMS. THE ZONING VERIFICATION MAY BE SUBMITTED PRIOR. Project Address: �D � f 5 r Cj`rGEE,'i� /�� Plat: 6 Z4_1_6 O/L I/ Single-family ❑ Duplex ❑ Townhouse ❑ Addition ❑ Accessory structure Proposed Area: 1 s` Floor: 2"d Floor: Garage: Total SF: D scribe Proposal (include cross street): ��' N l 7nhl f c�?_ J SLAAJ f Valuation: � I , Owner: GG-,( Address: I1q60 IJL (zj'4 -71- City: V_ ?_W A-N 7> State: I A Zip Code: 03 Phone: 'Q /�// 7-05-- 01-C17- Email: 4A:rT-4,of7u $ (w Applicant: I wLk �— UA&6 A/6 M Address: City: b L�DState: Zip Code: 9 Phone: L Email: {�A'R'. _5 Lt(71f��tF5' . CaOttj Contractor: W,e A- A rJ Address:/-m, City: vta State: Zip Code: ��3 Phone: ) - _ — Email: V11k T. &At'6 Cz— 4k;�.4P' '- Contact Person: 44--w7 License Number:L 04W9 Expiration: 6/16LP Page 1 of 3 A RESIDENTIAL PERMIT APPLICATION • ® Department of Community & Economic Development City of Arlington• 18204 59th Ave NE •Arlington,WA 98223 • Phone(360)403-3551 Plumbing Section (continue filling out if plumbing is involved) (Check all that apply and indicate the number of fixtures proposed) �'—Bath/Shower Combo (4.0) x 6Lli_ Sink (1.5) x r ' --Shower (2.0) x r [4, Lavatory (1.0) x C-1 Clothes Washer (4.0) x ( ! Water Closet (2.5) x [ - Dishwasher (1.5) x I ( Water Heater x r Hose Bibb (2.5) x Water Heater Model# �-- Other (list) x Plumbing Section Continued Proposed Water Piping Size.- Proposed DWV Material: h'(5 S Proposed Piping Material: Ef Proposed DWV Size: a • All hose bibs required to be equipped with Atmospheric Vacuum Breakers per ASSE 1019 • All water supplies at 80psi or greater shall have Pressure Reducing Valves (PRV) 6/16LP Page 2 of 3 SETBACKS NOTES: 1 FRONT 10 *BUILDING DIMENSIONS ARE R7 ow SIDE 5' FACE OF FOUNDAAOW 12' WA ITR REAR 5' -6 RADING WO;W AS DESIGW 1 ACTUAL LOCAAOW MAY VARY 17+ 017.1ST T. N L •SLOPE DRIVEWAY TO PUBLIC ROAD —' •SIL T FENLE TO BE INSTALLED PER B`SEWER CITY OF ARLINGTONS STANDARD N89 0 49'lV •SILT FENCE TO BE INSTALLED ON GRADIENT SIDE OF BUILDING 25.00 � i � PARCEL _ •CONSIRUCAON ENTRANCE TO BE J7 10' INSTALLED PER CITY OF PUBLIC UTILITY ARLINGTCW:S STANDARDS ° 4 EASEMENT o STORM NOTES.- ° ° A o •TESC INSTALLED PRIOR TO CONSIRUCAON •BARE SOILS COVERED W 7H MULCH OR ANOTHER APPROVED BMP •TOPSOIL PER WSDOE BMP a u �7 20'8S8 iv L. v (£fF 12"DEP 7H) STORM CLEANOUT. IL •ALL ONSITE RUNOFF CONNECTED TO CONNECT RDOf"AND 516 Sf'' — ° , PRIVATE STORM STUB FOOANG DRAINS DR31-WA Y •SITE SHALL BE STABILIZED PRIOR I TO BUILDING PERMIT BEING CONNE-ViWR C ON I' 19,75 011.00 BUILDING FINALIZED � 4 OU1L/N£ SITENOTES.• •77GH711N£FOOANG DRAINS AND ROOF OVERHANG GARAOF IO'BSBL ROOF DRAINS TO PERMANENT STORM DRAINAGE SY57EM PER APPROVED PLAT DRAINAGE PLAN p o ON FILE W 7H AIE COUNTY. rpj o •AREA OF DISTURBANCE INCLUDES 44 ENARE LOT. o LOT 48 p ^ 44 h PROPOSED RESIDENCE p p LEGEND. COLUMBIA-1487 GARAGE LEFT ^ o o- BLOW OFF 5'BSBL 2,1091Sr = ® WATER METER FIRE HYDRANT 2 SF 10.50 Q AIR VAC I � \ o ® CATai BASIN 24.50 O CLEANDUT 5 WA7FR O MANHOLE 5'BSBL — RNCE _FTT_I_17 1 BLOa( WALL ` LI 50.00 IRE E REMOVAL 1 N8920'49"W PROPERTY EXISANG CONTOUR Receiveo CORNER I (rxp) A P R 2 %' I (rrp) I SCALE 1"= 20' I • LOT 48 I U� FIN,SHED G'pYTLt'/ � SITE PLAN G GREGOR Y RARK LG/ HOMES PLAN NO. COL.-1487 LOT AREA = 4,666 SF ^ DATE 411912017 PARCEL # LOT 48 HOUSE = 2,109 SF l 14711 NE 1911,Vlv�e,q 701 DRIVEWAY= 516 SF ! Bell--,W-hi gf-9E007 DESIGNED CORE ADDRESS 9024 171ST ST. 425.885.7077 Fax425885.7963 WALKWAY/PAA DESIGN O = 12 SF PROJECT NUMBER TOTAL= 2,637 SF ENGINEERING • PLANNING • SURVEYING DRAWN CAF 13024L-GRGOO NASH&ASSOCIATES ARCHITECTS PLAN 1487 BEAM, LATERAL & SEISMIC CALCULATIONS r C, _ , { c,Ac; 1HOMAS NASH STATE OF VVASHINGT- Received APR 2, n zo�7 2015 IBC JULY 1, 2016 8003 !lath AVE NE Kirkland, WA 98033 (425) 828-4117 WIM NASH—ARCHITECTS.COM I_ '• , . •j � CLIENT: NASHhASSOCIATPS BEAM DESIGN DATA PROJECT: ARC1.1ITECTS DATE: NAME: Roof Loads: LL 25 /sf DL 15 /ef Total 40#/of Unless Noted Otherwise Floor Loads: LL 40#/sf DL 10 #/ef Total 50#/sf Deck Loads: LL 60#/sf DL 10 /sf Total 70 /sf Soil• 1500 PSF Min. Concrete: Per IBC 15 Masonry: Per IBC 15 Steel: Per IBC 15 Wood: Per IBC 15 Nailing: Per IBC 15 4" Beam: Douglas Fir #2 fv = 180 fb = 900 PSI E = 1,600,000 6" Beam: Douglas Fir #2 fv = 170 fb = 875 PSI E = 1.300,000 Joists & Hem Fir #2 Rafters: fv = 150 fb = 650 PSI E = 1,300,000 Glu—Lam Beams: fv = 240 PSI fb = 2,400 PSI (reduced by size factor, CF*K1) E = 1,600,000 8003 118th AVE NE Kirkland, WA 96033 (425) 828-4117 WYf W.NASH—ARCFIITECTS.COM PLAN 1487 BeamChek v201 6 licensed to.Nash Jones Anderson Architects Reg#6464-622 V 8 t Date: 10/24116 Selection 3-1/8x 12 GLB 24F-V4 DFIDF Lu=0.0 Ft Conditions NDS 2015 Min Bearing Area R1=2.6 in' R2=2.6 in' (1.5)DL Defl= 0.23 in Recom Camber=0.34 in DAM Beam Span 16.0 ft Reaction 1 LL 1000# Reaction 2 LL 1000# Beam Wt per ft 9.11 # Reaction 1 TL 1673# Reaction 2 TL 1673# Bm Wt Included 146# Maximum V 1673# Max Moment 6692'# Max V(Reduced) 1464# TL Max DO L/240 TL Actual DO L/421 LL Max DO L 1360 LL Actual Deft L/845 Attribute Section(in') Shear(m� TL DO(in) _ LL DO Actual 75.00 37.50 0.46 0.23 Critical 33.46 9.15 0.80 0.53 Status OK OK OK OK Ratio 45% 24% 57% 43% Fb(psi) Fv(psi) E(psi x mil) Fcl(psi) Values Reference Values 2400 240 1.8 650 Adjusted Values 2400 240 1.8 650 Adjustments Cv Volume 1.000 Cd Duration 1.00 1.00 Cr Repetitive 1.00 Ch Shear Stress N/A Cm Wet Use 1.00 1.00 1.00 1.00 Cl Stability 1.0000 Rb=0.00 Le=0.00 Ft Loads Uniform LL: 125 Uniform TL: 200 =A Uniform Load A ] - - - -� R1 = 1673 R2= 1673 SPAN=I6FT Uniform and partial uniform loads are Ibs per lineal ft. CLIENT: -IINASH&ASSOCIATES WIND AND 5E15MIG DE516N DATA PROJECT: A It, r I'l I PER 2015 IBC DATE•- - -- NAME: WIND DESIGN GRITERIA DESIGN PER ASCE 7-10 I.NOMINALNLTIMATE WIND SPEED V/asd /Vult 05/110 mph 2.R15K CATEGORY II 1.00 5. WIND EXPOSURE CATEGORY "B" 4. INTERNAL PRESSURE COEFFIGENT +/-55 5.COMPONENTS AND CLADDING DESIGN PRESSURE +/- 16 psf BUILDINGS, 5TRUCTURE5,AND PARTS THEREOF GNALL BE DESIGNED AND CONSTRUCTED IN ACCORDANCE WITH STRENGTH DESIGN,LOAD,AND RESISTANCE FACTOR DESIGN, ALLOWABLE 5TRE55 DES16N, EMPIRICAL DESIGN OR CONVENTIONAL CONSTRUCTION METHODS,A5 PERMITTED BY THE APPLICABLE MATERIAL CHAPTER, SECTION 1604.1 BUILDING5, 5TRUGTURE5,AND PARTS THEREOF,SHALL BE DESIGNED TO WITHSTAND WIND LOADS AS DEFINED IN SECTION 160q AND ASGE '1-10 IMPLIFIED METHOD TO BE USED FOR WIND DESIGN PER A5CE 7-10,5EGTION 27.5 (BUILDIN& 1-106FIT 15 LE55 THAN 160 FEET) 110 MPH ULTIMATE WIND SPEED USE Iq.6 P5F PER TABLE 27.6.1 "EXPOSURE B" WOOD DESIGN PER SECTIONS 2504-2306.STRUGTURE5 USING WOOD SHEAR WALLS AND DIAPHRAGMS TO R1=515T WIND,SEISMIC,AND ALL OTHER LATERAL LOADS SHALL BE DESIGNED AND C.ON5TRUCTED IN ACCORDANCE WITH AF 4 PA 50PWS AND PROV15IONS OF SECTIONS 2305-2306 5EISMIG DE516N DATA DESIGN PER ASCE 7-10/5EGTION 1613 I. SEISMIC, IMPORTANCE FACTOR Is 1.00 2.SHORT PERIOD ACCELERATION Ss I.66 •see footnote at bottom of page 5, 1 SECOND ACGELERATION 51 o.-748 •see footnote at bottom of page 4. SITE CLASS D(default class per IBW S.SPECTRAL RESPONSE COEFFICIENT So. 0.4-12 •see footnote at bottom of page 6. SPECTRAL RESPONSE CA EFFIGENT 5w 0.748 •see footnote at bottom of page 7. SEISMIC DESIGN CATEGORY D 8.SEISMIC, FORGE RESISTING SYSTEM PLYWOOD SHEAR WALLS q. DESIGN BASE SHEAR (see seismic calculations) 10. SEI5MIC RESPONSE COEFFICIENT CS 0.13 11.RESPONSE MODIFICATION FACTOR R 6.5 12.ANALYSIS PROCEDURE EQUIVALENT LATERAL FORGE 13.RISK CATEGORY II THE ANCHORAGE OF WALLS SUPPORTING CONSTRUCTION SHALL BE BE DESIGNED IN ACCORDANCE WITH ASCE 7-10,SECTION 12.11.2 IN STRUCTURES ASSIGNED TO SEISMIC DESIGN CATEGORY C-F,COLLECTOR ELEMENTS AND THEIR CONNECTIONS TO VERTICAL ELEMENTS SHALL BE DESIGNED TO RESIST MAXIMUM EFFECTS AS SPECIFIED IN ASCE-T-10,SECTION 12.10.2.1 BASE SHEAR V= (P 5.,/W W ANCHOR BOLTSv 5/0" VIA X 10",A307 OR BETTER W/7" MIN. EMBEDMENT.V- 1104#/BOLT • PER U56&5, THE MAXIMUM 51 IN THE STATE OF WASHINGTON 15 0.748. ALL SEISMIC DE516N VALUES USED IN THIS ANALYSIS ARE BASED UPON THI5 NUMBER. 51NGE !E�15 LE55 THAN 0.75,THEN USE 5EI5MIC CATEGORY D IF RISK CATEGORY 15 I, 11,OR III 8003 118th AVE NE Kirkland, WA 98033 (425) 828-4117 WWW NASH—ARCHITECTS.COM i W CL 0 EO Ir 771 EID ❑D ❑U DE y' LJVYR' J�� 1 p W l lu M O � S Q LA TT t�. a ��•N Q-V s Q �N � N 0 r N � LATERAL CALCULATIONS CLIENT: —I NASHa,AS50CIATES PROJECT: WIND WORK3HEET DATE:__ 55 MPWI10 MPH= NOMINALNLTIMATE WIND SPEED WAVE. Iq.b PSF FRONT ELEVATION LEFT ELEVATION REAR ELEVATION RIGHT ELEVATION LOCATION TOTAL SHEAR FORCE (#) SHEAR UNIT SHEAR W z H z (see chart for wind pressure WALL SHEAR WALL 0 specified height) LENGTH (ft) (#/It) TYPE Kct x l of �• ) K r Cr L3 ►5 y3 5 �l � s�a XI �� � z6 � 6 �3oXgxtaj6) L7Cty pj-Ll - 6jT?—M ra 441�zj ZCIFKb Zqo PI• C411 PI-Vt 8003 118th AVE NE Kirkland, WA 98033 (425) 828-4117 WWW.NASH—ARCHITECTS.COM rN• r. 7111 CLIENT: 11 NASHtASSOCIATBS SEISMIC ANALYSIS PROJECT_ _ R C i-T 11'i DATE: NAME- 1 Weight of Building: Roof Assembly: Asphalt Shingles - 2.00#/ft Cedar Shakes - 2.25#/(t Tile - 9.50#/it Felt - 0.15 #/it Felt - 0.15 #/it Felt - 0.15 #/it 1/2" Plywood - 1.50 #/it 1/2" Plywood - 1.50 #J ft 1/2" Plywood - 1.50 #/it TTrrusses ® 24" o,c. - 1.75 #/it Trusses 0 24" o.c. - 1.75 #/it Trusses ® 24" o.c. - 1.75#/it R-30 Insulation - 2.35 /ft R-30 Insulation - 2.25 N/ft R-30 Insulation - 2.25#/it 1/2" G1VB Ceiling - 2.001/ft 1/2" GWB Ceiling - 2.00#/it 1/2" GWB Ceiling - 2.00#/it Total 9.75#/ft Total 9.90#/it Total 17.90#/ft Use 10.00#/it Use 10,00#/it Use 18.00#/it let & 2nd Floor Assembly Caret / Pad - 0,50#/it Hardwood - 2.50#/ft 3/4 r&G Plywood - 2.50#/it 3/4" T&G Plywood - 2.50#/it 2x10 0 16' o.c. 2.30#/ft 2x10 e 16" o.c. - 2.30#/it 1/2" GWB Ceiling - 2.00#/ft 1/2" GW13 Ceiling - 2,00#/it Total 7,30#/it Total 9.30#/it Use 10.00#/it Use 10.00#/ft Interior Wall Assembly. Exterior Wall Assembly: 1/2" GWB - 2.00#/it 3/4" Wood Siding - 2.30 /ft 2X4 ® 16" o.c. - 1.10 #/it 1/2" Plywood - 1.50 /ft 1/2" GWB - 2.00#/it 20 0 16" 0.c. - 1.37 #/ft Total 5.10 #/it 121 Insulation - 2 10 i/it Use 6.00#/ft Total 9.27#/it Use 10.00#/ft 4" Brick Veneer - + 3.20#/it 8003 118th AVE NE Kirkland, WA 98033 (425) 820-4117 I WWW.NASH-ARCHUECTS.COM 1 CUENT: NASH=ASSOCIATES SEISMIC ANALYSIS PROJECT_ ARC IfiTECTS DATE:- -- NAME: 2 - — SEISMIC: V = (C-) (Wdl) (plywood) 2nd Level: Roof: or (Asphalt / Cedar Shake) 10#/ft X sf = (Tile) 18#/ft X sf =_ Exterior Walls: L x 10#/sf x 1/2 (h) (E2) Interior Walls: L x 8#/sf x 1/2 (h) _ (I� TOTAL lot Level; Roof: (1st Floor Roof) 10#/ft X 69-7-of = 6 7 2nd Floor. 10#/ft X —of R_ _ Exterior Walls: (E2) + L x 10#/sf x 1/2 (h) IgOWIO u Lf. 5 �ssp (E1) Interior Walls: (1 0 + L x 8#/sf x 1/2 (h) 2� � 7S6TOTAL ;;I Basement: \ 1st Floor: 10#/ft X of -_ Exterior Walls: (E1) + L x 10#/sf x 1/2 (h) Interior Walls: (I1) + L x 8#/sf x 1/2 (h) TOTAL 8003 118th AVE NE Kirkland, WA 98033 (425) 828-4117 WWW.NASH-ARCHITECTS.C OM �: I CLIENT: _ _I NASH`ASSOCiATM SEISMIC ANALYSIS PROJECT: — DATE: NAME:__ 3 BASE SHEAR: BASE SHEAR V= (F 5DS/R)W LEVEL 2: Wdl # x 0.149 = LEVEL 1: Wdl 7-I (� # x 0.149 = TOTAL: Wdl y l 1 # x 0.149 = 51 / (V) Level Dead Load Heil ht Moment Shear ® Stor (Wdl) (h� (Wdl)(h) rx = [ Wdl)(h)f v Remarks ml)(h) 2 1 ALA l a �H'I �j l �-7 Total 8003 118th AVE NE Kirkland, WA 98033 (425) 628-4117 WWW.NASH—ARCHITECTS.COM NASH-ASSOCIATES _ CL>ENT: 1 SEISMIC ANALYSIS PROJECT: DATE NAME- 4 xAx V� �Z� 0 N x V� N co n w x0 V� N m N �. a 8003 118th AVE NE Kirkland, WA 98033 (425) 828-4117 WWW.Na �4Y— i i, _! NASH`ASSOQ CLIENT:ATES SEISMIC ANALYSIS PROJECT: A R f;I I f"1 L i s DATE: NAME: 6 Redundancy Factor (p�; 1. Maximum allowable wall shear for p<=1 Vumax = (2)(Vaccstory)/Ab 1/2 2. Maximum actual shear Vmax = Largest seismic wall shear 3. p = 2—[2(Vaccstory)/(Vumax)(Ab 1/2) L ` 16 s,--------------- � 06 u/,NO 8003 118th AVE NE Kirkland, WA 98033 (425) 828-4117 WWW NASH—ARCHITECTS.COM . ,��"�.'r.��t��, .�.. x MiTek MiTek USA, Inc. 250 Klug Circle Corona, CA 92880 951-245-9525 Re: B1605533 1487 A The truss drawing(s)referenced below have been prepared by MiTek USA,Inc.under my direct supervision based on the parameters provided by ProBuild West(Arlington,WA). Pages or sheets covered by this seal: K2591577 thru K2591584 My license renewal date for the state of Washington is September 28,2018. Lumber design values are in accordance with ANSI/TPI 1-2007 section 6.3 These truss designs rely on lumber values established by others. �Q.pWNG WASy� O y �0 54074� sy� S,S+� EtyG November 18,2016 Zhao,Xiaoming IMPORTANT NOTE:The seal on these truss component designs is a certification that the engineer named is licensed in the jurisdictions(s)identified and that the designs comply with ANSI/TPI 1.These designs are based upon parameters ' shown e. loads supports,dimensions shapes and design codes which were given to MiTek.An project specific g•� , PP P g ), g� Y p J P information included is for MiTek's customer's file reference purpose only,and was not taken into account in the preparation of these designs. MiTek has not independently verified the applicability of the design parameters or the designs for any particular building.Before use,the building designer should verify applicability of the design parameters and properly incorporate these designs into the overall building design per ANSI/TPI 1,Chapter 2. Job Truss Truss Type Qty Ply 1487 A K2591577 B1605533 A01 GABLE 1 1 ' I I .Job Reference_(optionall ProBuild Arlington, Arlington,WA 98223 7.640 s Sep 29 2015 MiTek Industries,Inc Thu Nov 17 14:15:54 2016 Page 1 ID:1 pumakLzVH3AMQul2ZVvP 1 yJMj9-2XpxFpANAompNYDeSJLLhf_892GOcuyJ7bpm LylEjp 10t1 8-5 8 5-9-10 5-3-0 o 16-11-8 T40 Scale=1:61.3 3x4= 5.00 12 7 8 9 6 4x8 10 3x8% 5 11 33 34 5x8 4 12 13 14 3 27 30 15 16 �I1 2 17 18 d I 3x6_ 26 25 24 3x4-- 3x4= 3x4 = 3x4= 3x6= 23 22 21 20 19 948-12 153- 35;tI O 8-&12 7-ag —a212 Plate Offsets(X.Y)— 18:0-2-O.Edoel 112:O-4-0.0.1-81 LOADING(psf) SPACING- 2-0-0 CS[ DEFL. in (loc) I/dell Ud PLATES GRIP TOLL 25.0 Plate Grip DOL 1.15 TC 0.55 Vert(LL) -0.15 2-26 >999 240 MT20 1851148 (Roof Snow=25.0) Lumber DOL 1 15 BC 069 Vert(CT) -0 32 2-26 >915 180 TCDL 10.0 BCLL 0.0 Rep Stress Incr YES WB 0-69 Horz(CT) 008 17 n/a n/a ' BCDL 8.0 Code IBC2015/TPI2014 (Matrix) Weight:162 lb FT=20% LUMBER- BRACING- TOP CHORD 2x4 HF No.2 TOP CHORD Structural wood sheathing directly applied or 2-11-6 oc purlins. BOT CHORD 2x4 HF No.2'Except" BOT CHORD Rigid ceiling directly applied or 10-0-0 oc bracing. 17-24:2x4 OF 180OF 1.6E JOINTS 1 Brace at Jt(s):27,28,31 WEBS 2x4 HF Stud/Std"Except' MiTek recommends that Stabilizers and required cross bracing 5-23:2x4 HF No.2 be installed during truss erection,in accordance with Stabilizer OTHERS 2x4 HF Stud/Std Installation Duide REACTIONS. All bearings 10-11-8 except Qt=length)2=0-5-8. (lb)- Max Horz 2=92(LC 10) Max Uplift All uplift 100 lb or less at joint(s)2,20,19 except 22=-563(LC 5) Max Grav All reactions 250 lb or less atjoint(s)22,21,20 except 2=1249(LC 17), 23=1278(LC 5),19=325(LC 1),17=325(LC 1) FORCES. (lb)-Max Comp./Max.Ten -All forces 250(lb)or less except when shown TOP CHORD 2-3=-2369/118,3-4=-2072/94,4-33=-1967/98,5-33=-1923/107,5-6=-465/37, 6-7=-384/52,7-8=-305/55,8-9=-356/65,9-10=-368/55,10-11=-381/43,11-34=-389/33, 12-34=-402/25,12-13=-405/24,13-14=-356/12,14-15=-384/0,15-16=-386/0, 16-17=-394/0 BOT CHORD 2-26=-140/2101,25-26=-51/1537,24-25=-26/1752,23-24=-26/1752,22-23=0/338, 21-22=0/338,20-21=01338,19-20=0/338,17-19=0/338 WEBS 5-28=-1428/68,28-29=-1469/75,27-29=-1466/75,27-30=-1515/82,30-31=-1566/84, 31-32=-1589/87,23-32=-1603/89,3-26=-410/119,25-27=-390/66,5-26=-19/547, 5-25=0/487,13-22=-486/98 NOTES- 1)Wind:ASCE 7-10;Vult=110mph(3-second gust)Vasd=87mph;TCDL=6.Opsf;BCDL=4 8psf;h=25ft;Cat.Il;Exp B;enclosed;MWFRS PORNGZA� (envelope)gable end zone;cantilever left and right exposed;end vertical left and right exposed;Lumber DOL=1 60 plate grip DOL=1.60 'WAS 0 2)Truss designed for wind loads in the plane of the truss only. For studs exposed to wind(normal to the face),see Standard Industry Gable End Details as applicable,or consult qualified building designer as per ANSI/TPI 1. Q�� C�� 3)TCLL:ASCE 7-10;Pf=25 0 psf(flat roof snow);Category 11;Exp B;Fully Exp.;Ct=1 0 4)Unbalanced snow loads have been considered for this design. 5)This truss has been designed for greater of min roof live load of 19.0 psf or 2.00 times flat roof load of 25 0 psf on overhangs non-concurrent with other live loads 6)All plates are 2x4 MT20 unless otherwise indicated A� 54074 41� 7)Gable studs spaced at 2-0-0 oc. t7� ��otsTeR� 8)This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads t151 G 9)•This truss has been designed for a live load of 20.Opsf on the bottom chord in all areas where a rectangle 3-6-0 tall by 2-0-0 wide will SIpNpLEN fit between the bottom chord and any other members. Continued on page 2 November 18,2016 A WARNING-VarHy design parameters and READ NOTES ON THIS AND INCLUDED MITEK REFERENCE PAGE MII.7473 rev.10/03/2015 BEFORE USE. Design valid for use only with MiTek®connectors.This design is based only upon parameters shown,and is for an individual building component.not a truss system Before use,the budding designer must verity the applicability of design parametors and property Incorporate this design into the overall building design Bracing indicated is to prevent buckling or Individual truss web andtor chord members only, Additional temporary and permanent bracing MiTek is akvays required for stability and to prevent collapse with poss:bie personal injury and property damage. For general guidance regarding the fabrication,storage,delivery,erection and bracing of trusses and truss systems.see ANSUTPII Quality Criteria,DSB-89 and BCSI Building Component 250 Klug Circle Safety Information available from Truss Plate Institute,218 N Lee Street,Suite 312,Alexandria.VA 22314. Corona,CA 92880 I Job Truss Truss Type City Ply 1467 A K2591577 81605533 A01 GABLE 1 1 _ job Reference lion ProBuild Arlington, Arlington,WA 98223 7 640 s Sep 29 2015 MiTek Industries,Inc, Thu Nov 17 14:15:54 2016 Page 2 NOTES- IDApumakLzVH3AMQul2ZVvP1yJMj9-2XpxFpANAompNYDeSJLLhf 892GOcuyJ?bpmL_rlEjp 10)Provide mechanical connection(by others)of truss to bearing plate capable of withstanding 100 lb uplift at joint(s)2,20,19 except Qt=lb)22=563. 11)"Semi-rigid pitchbreaks with fixed heels"Member end fixity model was used in the analysis and design of this truss r A WARNING-Verify design paramefers and READ NOTES ON THIS AND INCLUDED MITEK REFERENCE PAGE M11.7473 rev.1010312015 BEFORE USE. Design valid for use only with M1TekO connectors,This design Is based only upon Parameters shown,and is for an individual budding componam,not a truss system.Before use,the building designer must verify the appiicabikly,of design parameters and property incorporate this design into the overall building dosign Bracing indicated is 10 prevent buckl n of individual truss web and/or chord members only.Additional temporary and permanent bracing Mire k is always required for stability and to prevent collapse with possible personal injury and property damage. For general guidance regarding the fabilcateon,storage,delivery,erection and bracing of trusses and truss systems,see ANSUTPII quality Criteria,DSB49 and SCSI Building Component 250 Klug Circle Safety information available from Truss Plate Inshlao.218 N Lee Street,Suite 312.Alexandria.VA 22314 Corona,CA 92880 }7 Job JTruss Truss Type Qly Ply 1487 A K2591578 �1605533 A02 Common 17 1 ` b Reference Ljiona ProBUIId Arlington, Arlington,WA 98223 7.640 s Sep 29 2015 MiTek Industries,Inc Thu Nov 17 14:15:55 2016 Page 1 ID:1 pumakLzVH3AMQul2ZVvP1 yJMj9-XkNJT8B?x6ug?iog00taDtXHjSaVLGOTDFZKuQylEjo s1.0•n n.8.0 0971D 9a.R 1� a5-aD ]B.D.O . 1.00 fi-3-3 6-1-3 5-1-10 5-1-10 6-1-3 T 6-3-3 1t-0�0 Scale=1:60.8 4x4= 500 12 8 3x4% 3x4 3x6% 5 18 17 3x6 4 8 2x4\1 2x4 3 9 2 10 yiiLai 11 I� d 3x8= 15 18 19 14 13 20 21 12 3x8= o 3x4= 3x8— 3x8= 3x4= r R.10.15 17-a 0 { _2c" { 35 1 0 8.110.15 5-7-1 Plate offse►s(x.Y)- 12:0,4-2 a-1-BL 110:0-4-2.0-1-81 LOADING(psf) SPACING- 2-0-0 CSI. DEFL. in (loc) I/deft L/d PLATES GRIP TOLL 25.0 Plate Grip DOL 1 15 TC 063 Vert(LL) -0.26 12-13 >999 240 MT20 185/148 (Roof Snow=25.0) Lumber DOL 1.15 BC 083 Vert(CT) -0.48 12-13 >657 180 TCDL 10.0 BCLL 0.0 Rep Stress Incr YES WB 0.96 Horz(CT) 0.16 10 n/a n/a B u D 1- —8 Code IBC2015/TPI2014 (Matrix) Weight:135 lb FT=20% LUMBER- BRACING- TOP CHORD 2x4 HF No.2 TOP CHORD Structural wood sheathing directly applied or 2-5-4 oc purlins. BOT CHORD 2x4 HF No.2 BOT CHORD Rigid ceiling directly applied or 10-0-0 oc bracing WEBS 2x4 HF Stud/Std"Except' MiTek recommends that Stabilizers and required cross bracing 6-13:2x4 HF No.2 be installed during truss erection,in accordance with Stabilizer REACTIONS. (lb/size) 2=1571I0-5-8,10=1571/0-5-8 Installation guide. Max Horz 2=92(LC 10) Max Uplift 2=-59(LC 10).10=-59(LC 11) FORCES. (lb)-Max Comp./Max.Ten.-All forces 250(lb)or less except when shown TOP CHORD 2-3=-3182/109,3-4=-2856/74,4-16=-2746/78,5-16=-2705/88,5-6=-1992/75, 6-7=-1992/75,7-17=-2705/88,8-17=-2746/79,8-9=-2856/74,9-10=-3182/109 BOT CHORD 2-15=-13412848,15-18=-44/2274,18-19=-44/2274,14-19=-44/2274,13-14=-44/2274, 13-20=0/2274,20-21=0/2274,12-21=0/2274,10-12=-42/2848 WEBS 6-13=-4/1159,7-13=-875/126,5-13=-875/126,7-12=-0/511,9-12=-398/123, 5-15=-0/511,3-15=-398/123 NOTES- 1)Wind:ASCE 7-10;Vult=110mph(3-second gust)Vasd=87mph;TCDL=6.Opsf;BCDL=4.8psf;h=25ft;Cat ll;Exp B;enclosed;MWFRS (envelope)gable end zone;cantilever left and right exposed;end vertical left and right exposed;Lumber DOL=1 60 plate grip DOL=1.60 2)TCLL:ASCE 7-10;Pf=25.0 psf(flat roof snow);Category ll;Exp B;Fully Exp.;Ct=1 3)Unbalanced snow loads have been considered forthis design. 4)This truss has been designed for greater of min roof live load of 19.0 psf or 2.00 times flat roof load of 25.0 psf on overhangs non-concurrent with other live loads. 5)This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads �0M1NG Z, 6)"This truss has been designed for a live lead of 20 Opsf on the bottom chord in all areas where a rectangle 3-6-0 tall by 2-0-0 wide will fit between the bottom chord and any other members,with BCDL=8.Opsf. WA O 7)Provide mechanical connection(by others)of truss to bearing plate capable of withstanding 100 lb uplift at joint(s)2,10 C� 8)"Semi-rigid pitchbreaks with fixed heels"Member end fixity model was used in the analysis and design of this truss 0 54074 is- AL �G November 18,2016 AWARNING.Verify design parameters and READ NOTES ON THIS AND INCLUDED MITEK REFERENCE PAGE MII.7473 rev.1010312015 BEFORE USE. Design valid for use only with MiTehA connectors.This design is based only upon parameters shown,and Is for an individual building component,not a truss system.Before use,the building designer must verity the applicability of design parameters and property incorporate this design into the overall bustling design. Bracing Indicated is to prevent buckling of indMdual truss web andfor chord members only Additional temporary and permanent bracing MiTek is always required rot stability and to prevent collapse with possible personal injury and property damago. For general gwdanco regarding the fabrication,storage,delivery,erection and bracing of trusses and truss systems,see ANSIITPl1 Quality Criteria,DSB-89 and BCSI Building Component 250 Klug Circle Safety Information availabte from Truss Plate Institute,218 N Lee Street.Suite 312,Alexandria,VA 22314. Corona,CA 92880 Job Truss Truss Type ply Ply 1487 A K2591579 B1605533 A03D Common 2 1 Job Reference o lional ProBuild Arlington, Arlinglon,WA 98223 7.640 s Sep 29 2015 MiTek Industries,Inc Thu Nov 17 14:15:56 2016 Page 1 ID:1 pumakLzVH3AMQul2ZVvP 1 yJMj9-?wxhgUCdiQOXcsNOakOpm43PgruO4klcSvltQsylEjn d-tla 12.4.E 17.8.0 22 7.10 2e-B•�a aS.n.n 411, 0 1:00 8-3-3 6-1-3 5-1-10 5-1-10 8-1-3 8-3-3 1.0.0 Scale=1:61.1 4x4= 5 00 12 6 3x4% 3x4 WO% 5 7 3x10 16 17 4 8 2x4�� 2x414 s s 2 10 91 11 Id 6x18 MT18H= 15 16 19 14 13 20 21 12 d BAB MT18H= 3x4= 4x4= 3x6= 3x4= i7.6-Q 35.0.0 a-10-15 A_7-1_ 8-7-1 a-10-15 f _ Plate Offsets XY)— 12:0-4.11_Edual [10s0.4-11.Edaej, LOADING(ps25 0 SPACING- 2-0-0 CSI. DEFL. in (loc) I/dell Ud PLATES GRIP CLL(Roof Snow=25 0) Plate Grip DOL 1.15 TC 081 Vert(LL) -0 32 13-15 >999 240 MT20 185/148 TCDL 10-0 Lumber DOL 1.15 BC 085 Vert(CT) -0 50 13-15 >832 180 MT18H 2201195 BCLL 0.0 ' Rep Stress Incr YES WB 0.96 Horz(CT) 013 10 n/a n/a 3GU1 Code IBC2015/TPI2014 (Matrix) Weight:151 lb FT=20% LUMBER- BRACING- TOP CHORD 2x4 HF No.2'Except" TOP CHORD Structural wood sheathing directly applied or 2-1-4 oc purlins 1-4,8-11:2x4 DF 180OF 1.6E BOT CHORD Rigid ceiling directly applied or 2-2-0 oc bracing. BOT CHORD 2x4 DF 180OF 1 6E MiTek recommends that Stabilizers and required cross bracing WEBS 2x4 HF Stud/Std"Except' be installed during truss erection,in accordance with Stabilizer WEDGE 6-13:2x4 HF No.2 Installation Guide. Left:2x6 SP No.2,Right:2x6 SP No.2 REACTIONS. (lb/size) 2=1571/0-5-8,10=1571/0-5-8 Max Horz 2=-92(LC 41) Max Uplift2=-2644(LC 38),10=-2644(LC 41) Max Grav 2=3339(LC 25).10=3339(LC 24) FORCES. (lb)-Max Comp./Max.Ten -All forces 250(lb)or less except when shown TOP CHORD 2-3=-7677/6492,3-4=-5752/4027,4-16=-4504/2734,5-16=-4041/2168,5-6=-3278/1993, 6-7=-3278/1993,7-17=-4041/2168,8-17=-4504/2734,8-9=-5752/4027,9-10=-7677/6493 BOT CHORD 2-15=-6002/7046,15-18=-3009/4292,18-19=-1384/3285,14-19=-136013073, 13-14=-312/2273,13-20=-220/3073,20-21=-1 292/3285,12-21=-2917/4292, 10-12=-5910/7046 WEBS 6-13=-4/1157,7-13=-874/170,7-12=-94/558,9-12=-401/229,5-13=-874/170, 5-15=-93/558,3-15=-401/229 NOTES- 1)Wind:ASCE 7-10;Vult=110mph(3-second gust)Vasd=87mph;TCDL=6.Opsf;BCDL=4.8psf;h=25ft;Cat 11;Exp B;enclosed;MWFRS (envelope)gable end zone;cantilever left and right exposed;end vertical left and right exposed;Lumber DOL=1.60 plate grip DOL=1.60 C 2)TCLL:ASCE 7-10;Pf=25 0 psf(flat roof snow);Category 11;Exp B;Fully Exp;Ct=1 �0M 3 Unbalanced snow loads have been considered for this design. Y 4)This truss has been designed for greater of min roof live load of 19.0 psf or 2 00 times flat roof load of 25 0 psf on overhangs Q�jFASA� non-concurrent with other live loads S 5)All plates are MT20 plates unless otherwise indicated. CEO.yr 6)This truss has been designed for a 10 0 psf bottom chord live load nonconcurrent with any other live loads. 7)'This truss has been designed for a live load of 20.Opsf on the bottom chord in all areas where a rectangle 3-6-0 tall by 2-0-0 wide will fit between the bottom chord and any other members,with BCDL=8 Opsf. 8)Provide mechanical connection(by others)of truss to bearing plate capable of withstanding 100 lb uplift at joint(s)except Qt=lb)2=26441, A.t1 54074 QIr 10=2644. 0 GISTE�� ~ 9)his truss along bottom Nord f designed for a total t drag 0 0 fodr of 0 pf.If.Lumber DOL=(1.33)Plate grip DOL=(1 33) Connect truss to resist drag �`sS Gtsn 10)"Semi-rigid pitchbreaks with fixed heels"Member end fixity model was used in the analysis and design of this truss. November 18,2016 AWARNING-Verily design parameters and READ NOTES ON THIS AND INCLUDED MITEK REFERENCE PAGE MII.7473 rev.1010312015 BEFORE USE. Design valid for use only with MITekde connectors This design is based only upon paramolors shown,and is for an individual building component,not a truss system.Before use,the building designer must verify the applicability of design parameters and properly incorporate this design into the overall pal budding design. Bracing indicated Is to prevent buckling of Individual truss web and/or chord members only Additional temporary and permanent bracing MiTek is always required for stabrldy and to prevent collapse with possible personal injury and property damage. For general guidance regarding the fabrication,storage,delivery,erection and bracing of frusses and truss systems,Sao ANSVTPII Quality Criteria,DS8,99 and BCSI Building Component 250 Klug Circle Safety Information available from Truss Plate Institute,218 N.Lee Street-Suite 312,Alexandna,vA 22314. Corona,CA 92880 Job Truss Truss Type Qty Ply 1487 A K2591580 B1605533 A04 Common 2 1 ' Job Reference(optional) ProBuild Arlington, Arlington,WA 98223 7.640 s Sep 29 2015 MiTek Industries,Inc. Thu Nov 17 14:15:58 2016 Page 1 I D:1 pumakLzVH3AMQul2ZVvP 1 yJMj9-xl3R5AD1E1 GFs9WPh9QHrV9mzfdlYcKvwDn_UlylEjl 40 8-3 3 6-1-3 5-1-10 5-1-10 4-4-6 8-0-0 1 Scale=1:60.8 5x8= 5.00 12 6 5 7 17 16 4 6 2x4 2x4 9 3 d1 2 10 11 an c Id 16 19 20 15 14 13 12 3x6= I &10.15 17•B•0 I 19.9.4 I 24.2.12i z&" 8.10.15 �Q1-T_ 2-3.4 4•b8 10-Q-4 Plate Offsets(X.Yl— 12:0-1-2.Edgel LOADING(psf) SPACING- 2-0-0 CSI. DEFL. in (loc) I/dell L/d PLATES GRIP TOLL Plate Grip DOL 1.15 TC 0.75 Vert(LL) -0 30 10-12 >420 240 MT20 185/148 (Roof Snow=25 0) Lumber DOL 1.15 BC 0.69 Vert(CT) -0 59 10-12 >214 180 TCDL 10.0 BCLL 0.0 Rep Stress Incr YES WB 099 Horz(CT) 002 13 n/a n/a ' AF CDL 8.0 Code IBC2015/TPI2014 (Matrix) Weight:141 lb FT=20% LUMBER- BRACING- TOP CHORD 2x4 HF No.2 TOP CHORD Structural wood sheathing directly applied or 4-5-11 oc purlins. BOT CHORD 2x4 HF No.2 BOT CHORD Rigid ceiling directly applied or 6-0-0 oc bracing. WEBS 2x4 HF Stud/Std*Except* WEBS 1 Row at midpt 6-13 6-14,6-13:2x4 HF No 2 MiTek recommends that Stabilizers and required cross bracing [be installed during truss erection,in accordance with Stabilizer Installation guide REACTIONS. All bearings 0-5-8. (lb)- Max Horz 2=92(LC 10) Max Uplift All uplift 100 lb or less at joint(s)2,12,10 except 13=-107(LC 10) Max Grav All reactions 250 lb or less at joint(s)except 2=794(LC 17).13=1739(LC 17),12=675(LC 18),10=406(LC 18) FORCES. (lb)-Max.Comp./Max.Ten -All forces 250(lb)or less except when shown. TOP CHORD 2-3=-1255/68,3-4=-915/32,4-17=-805/37,5-17=-757/47,5-6=0/278,6-7=-5/701, 7-18=0/435,8-18=0/377,8-9=-0/327 BOT CHORD 2-16=-96/1084,16-19=-6/463,19-20=-6/463,15-20=-6/463,14-15=-6/463, 12-13=-421/71 WEBS 6-14=-10/743,7-13=-385/52,5-14=-901/125,7-12=-128/346,5-16=0/562, 3-16=-447/124,6-13=-1475/47,9-12=-490/123 NOTES- 1)Wind:ASCE 7-10;Vult=11Omph(3-second gust)Vasd=87mph;TCDL=6 Opsf;BCDL=4.8psf;h=25ft;Cat 11;Exp B;enclosed;MWFRS (envelope)gable end zone;cantilever left and right exposed;end vertical left and right exposed;Lumber DOL=1 60 plate grip DOL=1 60 2)TCLL:ASCE 7-10;Pf=25.0 psf(flat roof snow);Category 11;Exp B;Fully Exp;Ct=1 3)Unbalanced snow loads have been considered for this design. �OMMG 4)This truss has been designed for greater of min roof live load of 19.0 psf or 2.00 times flat roof load of 25.0 psf on overhangsASItj O non-concurrent with other live loads. 5)All plates are 3x4 MT20 unless otherwise indicated. Gi 6)This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads 0 7)'This truss has been designed for a live load of 20.Opsf on the bottom chord in all areas where a rectangle 3-6-0 tall by 2-0-0 wide will Cli fit between the bottom chord and any other members,with BCDL=8 Opsf. 8)Provide mechanical connection(by others)of truss to bearing plate capable of withstanding 100 lb uplift at joint(s)2,12,10 except (jt=lb)13=107 9)"Semi-rigid pitchbreaks with fixed heels"Member end fixity model was used in the analysis and design of this truss *Pox, ,p 54074Q/ 'SGISTBR� �s`rIONAL EEO November 18,2016 AWARNING-Verily,design parameters and READ NOTES ON TNIS AND INCLUDED MITEK REFERENCE PAGE MII-7473 rev.10/03/2015 BEFORE USE. Design valid for use only with MiTek®connectors This design is based only upon parameters shown,and is for an Individual building component,not a truss system.Beforo use.the building designar must verify the applicability of design parameters and propedy Incorporate this design into the overall building design. Bracing Indicated Is to prevent buckling of individual truss web and/or chord members only Add'dlonal Temporary and permanent bracing M iTe k is akvays required for stability and to prevant co8epse with possible personal Injury and property damage For general guidance regarding the fabrication,storage,detrvery,erection and bracing of trusses and truss systems,see ANSYTPIt Quality Criteria,DSB-89 and BCSI Building Component 250 Klug Circle Safety Information available from Truss Plate Institute,218 N.Lee Street.Suite 312,Alexandria,VA 22314. Corona,CA 92880 Job Truss Truss Type Qty Ply 1487 A K2591581 B1605533 A05 GABLE 1 1 Job Reference footionah ProBuild Arlington, Arlington,WA 98223 7.640 s Sep 29 2015 MiTek Industries,Inc. Thu Nov 17 14:15:58 2016 Page 1 ID:1pumakLzVH3AMQul2ZVvP1yJMj9-xl3R5AD1E1GFs9WPh9QHrV9j9fdKYiRvwDn UlylEjl ti�hll r7-e-D ��.e.e ian.n a�nn 17-6-0 9-6-0 8-G-0 -61 0 Scale=1:80.8 3x4= 5.00 112 11 12 13 10 14 3x4 9 8 15 S4 4x4 7 18 6 17 3x6 18 5 33 4 32 3 31 hI1 2lly 19 20I¢ d d 3x4 = 3x10= 21 3x6= 30 29 26 27 26 25 24 23 22 5x6= I 2a�t2 l �7.0.o I 35-0-0 4-9-12_ &d 8-o-o Plate offsets(X.Y)— [12'0-2-0.EdagJ 12470-3-0 0-3-01 T (ps2 CLL 25.0 SPACING- 2-0-0 CSI DEFL. in (loc) Ildefl Ud PLATES GRIP (Roof Snow=25 0) Plate Grip DOL 1.15 TC 0.93 Vert(LL) -0 32 19-21 >401 240 MT20 185/148 TCDL 10.0 Lumber DOL 1.15 BC 0.69 Vert(CT) -0.62 19-21 >207 180 BCLL 0.0 ' Rep Stress Incr YES WB 0.60 Horz(CT) -0 01 21 n/a n/a UCL11 $0 Code IBC2015/TPI2014 (Matrix) Weight:159 Ib FT=20% LUMBER- BRACING- TOP CHORD 2x4 HF No 2 TOP CHORD Structural wood sheathing directly applied or 2-2-0 oc purlins BOT CHORD 2x4 HF No.2 BOT CHORD Rigid ceiling directly applied or 6-0-0 oc bracing, Except: WEBS 2x4 HF No.2"Except' 10-0-0 oc bracing:19-21. 18-21:2x4 HF Stud/Std JOINTS 1 Brace at A(a),31,32,33 OTHERS 2x4 HF Slud/Std MiTek recommends that Stabilizers and required cross bracing be installed during truss erection,in accordance with Stabilizer Installation uide- _ REACTIONS. All bearings 20-0-0 except Qt=length)21=0-5-8,19=0-5-8 (lb)- Max Horz 19=92(LC 10) Max Uplift All uplift 100 lb or less at joint(s)21,19,30,29,28,27,26,25,24 except 22=-126(LC 11) Max Grav All reactions 250 lb or less at joint(s)2,30,29,28,27,26.25,23 except 22=697(LC 18),21=668(LC 18),19=504(LC 18),24=257(LC 17) FORCES. (lb)-Max.Comp./Max Ten -All forces 250(lb)or less except when shown TOP CHORD 13-14=-5/275,16-19=-419/88 BOT CHORD 19-21=-49/304 WEBS 18-21=-634/131,13-22=-651/119 NOTES- 1)Wind:ASCE 7-10;VuIt=11Omph(3-second gust)Vasd=87mph;TCDL=6.Opsf;BCDL=4 8psf;h=25ft;Cat 11;Exp B;enclosed;MWFRS (envelope)gable end zone;cantilever left and right exposed;end vertical left and right exposed;Lumber DOL=1.60 plate grip DOL=1.60 2)Truss designed for wind loads in the plane of the truss only. For studs exposed to wind(normal to the face),see Standard Industry Gable End Details as applicable,or consult qualified building designer as per ANSI/TPI 1. 3)TCLL:ASCE 7-10;Pf=25.0 psf(flat roof snow);Category 11;Exp B;Fully Exp,;Ct=1 OMMG 2A 4)Unbalanced snow loads have been considered for this design. 5)This truss has been designed for greater of min roof live load of 19.0 psf or 2,00 times flat roof load of 25.0 psf on overhangs W 0 non-concurrent with other live loads �G,r 6)All plates are 2x4 MT20 unless otherwise indicated 7)Gable studs spaced at 2-0-0 oc. 8)This truss has been designed for a 10 0 psf bottom chord live load nonconcurrent with any other live loads 9)"This truss has been designed for a live load of 20.Opsf on the bottom chord in all areas where a rectangle 3-6-0 tall by 2-0-0 wide will fit between the bottom chord and any other members 10)Provide mechanical connection(by others)of truss to bearing plate capable of withstanding 100 lb uplift at joint(s)21,19,30,29,28, A+f� 54074 Qr 27,26,25,24 except(jt=lb)22=126. 0�� FO/S 11)"Semi-rigid pitchbreaks with fixed heels"Member end fixity model was used in the analysis and design of this truss. s' G SIDNAL�� November 18,2016 A WARNING-Verify design parameters and READ NOTES ON THIS AND INCLUDED MITEK REFERENCE PAGE 11111.7473 rev.10/03/2015 BEFORE USE. Design valid for use orgy with MiTek®connectors.This design is based only upon parameters shown,and Is for an individual budding component,not a truss system Before use,the building designer must verity the applicability of design parameters and properly incorporate this design Into the overall budding design.Bracing indicated U to prevent buckling of indvidual truss web andlor chord members only Additional temporary and permanent bracing MiTek' is always required for stability and to prevent collapse with possible personal Injury and property damage.For general guidance regonfktg this fabrication,storage,delivery.erection and bracing of trusses and truss systems.see ANSUTPII Quality Criteria.DSB49 and SCSI Building Component 250 Klug Circle Safety Information availoblo from Truss Plate Institute,218 N Lee Street,Suite 312.Alexandria,VA 22314- Corona,CA 92880 Job Truss FGA Type Qty Ply 1487 A K2591582 81605533 B01 E 1 1 Job Reference Lion ProBuild Arlington, Arlington,WA 98223 7.640 s Sep 29 2015 MiTek Industries,Inc. Thu Nov 17 14:15:59 2016 Page 1 ID:1 pumakLzVH3AMQul2ZVvP 1 yJMj9-PVdgl WEV7LO6TJ5bFsxWOjh5i36KH Hg38txx1 BylEjk r-1 0.G r 1 -M 2441.0 �5.11.n 1-0-0 12-3-0 12-3-0 1 0-0 Scale=1:43.6 3x4= 8 9 7 5-00 12 10 6 11 5 12 4 13 3 2 14 $fit 15 I� d 3x4= 26 25 24 23 22 21 20 19 18 17 16 3x4= 3x4= j 24iw0 1 24�" _ _Plate Offsets fX.Y)— (8 0 2-0.Edggj LOADING(psf) �f TCLL 25.0 SPACING- 2-0-0 CSI. DEFL. in (loc) I/dell Ud PLATES GRIP (Roof Snow=25.0) Plate Grip DOL 1 15 TC 0.12 Vert(LL) 0.00 14 n/r 180 MT20 185/148 TCDL 10.0 Lumber DOL 1 15 BC 0.06 Vert(CT) 0.00 15 n/r 120 BCLL 0.0 Rep Stress Incr YES WB 0.09 Horz(CT) 0.00 14 n/a n/a U09 $Q Code IBC2015/TPI2014 (Matrix) Weight:95 lb FT=20% LUMBER- BRACING- TOP CHORD 2x4 HF No.2 TOP CHORD Structural wood sheathing directly applied or 6-0-0 oc purlins. BOT CHORD 2x4 HF No.2 BOT CHORD Rigid ceiling directly applied or 10-0-0 oc bracing OTHERS 2x4 HF Stud/Std f MiTek recommends that Stabilizers and required cross bracing be installed during truss erection,in accordance with Stabilizer Installation ouide REACTIONS. All bearings 24-6-0. (lb)- Max Horz 2=66(LC 10) Max Uplift All uplift 100 lb or less at joint(s)2,26,25,24,23,19.18,14,17, 16 Max Grav All reactions 250 lb or less at joint(s)2,26,25,24,23,22,20,19,18, 14,17 except 16=287(LC 18) FORCES. (lb)-Max.Comp./Max.Ten -All forces 250(lb)or less except when shown NOTES. 1)Wind:ASCE 7-10;Vult=11Omph(3-second gust)Vasd=87mph;TCDL=6.Opsf;BCDL=4.Bpsf;h=25ft;Cat.II;Exp B;enclosed;MWFRS (envelope)gable end zone;cantilever left and right exposed;end vertical left and right exposed;Lumber DOL=1 60 plate grip DOL=1.60 2)Truss designed for wind loads in the plane of the truss only. For studs exposed to wind(normal to the face),see Standard Industry Gable End Details as applicable,or consult qualified building designer as per ANSI/TPI 1 3)TCLL:ASCE 7-10;Pf=25 0 psf(flat roof snow);Category 11;Exp B;Fully Exp.;Ct=1 4)Unbalanced snow loads have been considered for this design. 5)This truss has been designed for greater of min roof live load of 19 0 psf or 2.00 times flat roof load of 25 0 psf on overhangs non-concurrent with other live loads. 6)All plates are 2x4 MT20 unless otherwise indicated. 7)Gable requires continuous bottom chord bearing. �>,N1IdG 8)Gable studs spaced at 2-0-0 oc. 'Lq 9)This truss has been designed for a 10 0 psf bottom chord live load nonconcurrent with any other live loads WAS O 10)'This truss has been designed for a live load of 20 Opsf on the bottom chord in all areas where a rectangle 3-6-0 tall by 2-0-0 wide will fit between the bottom chord and any other members. 11)Provide mechanical connection(by others)of truss to bearing plate capable of withstanding 100 lb uplift at joint(s)2,26,25,24,23,19, 18,14,17,16. 12)"Semi-rigid pitchbreaks with fixed heels"Member end fixity model was used in the analysis and design of this truss. 06� 54074 4 SS��NAL G November 18,2016 A WARNING-Verily design parameters and READ NOTES ON THIS AND INCLUDED MITEK REFERENCE PAGE MII.7473 rev.10/03/2015 BEFORE USE. Design valid for use only with MITek®connectors This design is based only upon parameters shown,and is for an individual building component,not a truss system.Before use,the building designer must verity the applicability of design parameters and properly incorporate this design into the overall budding design. Bracing Indicated is to prevent buckling of individual truss web ardlor chord members only.Additional temporary and permaneht bracing MiTek Is always required for stabddy and to prevent collapse with possible personal injury and property damage For general guidance regarding the fabrication,storage,delivery.erection and bracing of trusses and truss systems,see ANSIITPII Quality Criteria,DSB-89 and SCSI Building Component 250 Klug Circle Safety information available from Truss Plate Ingdute,218 N Lee Street,Suite 312,Alexandria,VA 22314. Corona,CA 92880 Job rBO2ss Truss Type Sly Ply 1487 A K2591563 B1605533 Common IS 1 Job Reference o Co a ProBuild Arlington, Arlington,WA 98223 7.640 s Sep 29 2015 MiTek Industries,Inc. Thu Nov 17 14:16:00 2016 Page 1 ID:1 pumakLzVH3AM0ul2ZVvP1yJMj9-thACW5FBmeXz5TgopZSlwwE8gSKkOhHCNXG5ZdyIEjj 6-5- 12-3.D t8.0.10 a-8.0 2s.a.n 1-0.0 -56 5-9-10 5-9-10 6-5-6 1-0.0 Scale=1:43.5 44= 4 5.00 F12 2x4 \\ 11 12 2x4 3 5 2 e $r 7 jd _ 10 9 8 3x5 3x4= 3x4= 3x4= 3x6 ���--- — 7 G-6— 8.612 i LOADING(psi TCLL 25.0 SPACING- 2-0-0 CSI. DEFL. in (loc) I/deft L/d PLATES GRIP (Roof Snow=25.0) Plate Grip DOL 1.15 TC 0.61 Vert(LL) -0 16 2-10 >999 240 MT20 1851148 TCDL 1010 Lumber DOL 1.15 BC 0.63 Vert(CT) -0 33 2-10 >884 180 BCLL 0.0 " Rep Stress Incr YES WB 0.32 Horz(CT) 0.07 6 n/a n/a BCDL 8,0 Code IBC2015/TPI2014 (Matrix) Weight:84 lb FT=20% LUMBER- BRACING- TOP CHORD 2x4 HF No 2 TOP CHORD Structural wood sheathing directly applied or 3-4-1 oc purlins. BOT CHORD 2x4 HF No.2 BOT CHORD Rigid ceiling directly applied or 10-0-0 oc bracing. WEBS 2x4 HF Stud/Std MiTek recommends that Stabilizers and required cross bracing be installed during truss erection,in accordance with Stabilizer J REACTIONS. (lb/size) 2=1120/0-5-8,6=1120/0-5-8 Installationuide. Max Horz 2=-66(LC 15) Max Uplift2=-45(LC 10),6=-45(LC 11) FORCES. (lb)-Max.Comp./Max.Ten -All forces 250(lb)or less except when shown. TOP CHORD 2-3=-2055/77,3-11=-1 747/39,4-11=-1 657/64,4-12=-1657/64,5-12=-1747/40, 5-6=-2055/78 BOT CHORD 2-10=-77/1815,9-10=0/1217,8-9=0/1217,6-8=-12/1815 WEBS 4-8=-27/625,5-8=-510/128,4-10=-27/625,3-10=-510/128 NOTES- 1)Wind:ASCE 7-10;VUK=11Omph(3-second gust)Vasd=87mph;TCDL=6.Opsf;BCDL=4.8psf;h=25ft;Cat.11;Exp B;enclosed;MWFRS (envelope)gable end zone;cantilever left and right exposed;end vertical left and right exposed;Lumber DOL=1.60 plate grip D0L=1 60 2)TCLL:ASCE 7-10;Pf=25.0 psf(flat roof snow);Category Il;Exp B;Fully Exp.;Ct=1 3)Unbalanced snow loads have been considered for this design. 4)This truss has been designed for greater of min roof live load of 19.0 psf or 2.00 times flat roof load of 25 0 psf on overhangs non-concurrent with other live loads 5)This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 6)"This truss has been designed for a live load of 20.Opsf on the bottom chord in all areas where a rectangle 3-6-0 tall by 2-0-0 wide will fit between the bottom chord and any other members 7)Provide mechanical connection(by others)of truss to bearing plate capable of withstanding 100 lb uplift at joint(s)2,6. OWNG Z 8)"Semi-rigid pitchbreaks with fixed heels"Member end fixity model was used in the analysis and design of this truss. O F � (ice ox w0wpo RF 54074� q,4 SSI�NAL��� November 18,2016 A WARNING-Verify design parameters and READ NOTES ON THIS AND INCLUDED MITEK REFERENCE PAGE 114II-7473 rev.1010312015 BEFORE USE. Design valid for use only with MiTek®connectors.This design is based only upon parameters shown,and is for an individual building component,not a truss system.Before use,the building designer must vitrify the appbcab8tty of design pammelers and property Incorporate this design into the overiel building design Bracing Indicated Is to prevent buckling of Individual truss web anmor chord members only.Additional temporary and permanent bracing MiTek is always required for stability and to prevent collapse with possible personal Injury and proporty damage.For general guidance regarding the fabrication,storage,delivery,erection and bracing of trusses and truss systems,see ANSIITPII quality Criteria,DSB-89 and BCSI Building Component 250 Klug Circle Safety Information available from Truss Plate tnslauto,218 N.Lee Street.Sutte 312,Alexandria,VA 22314. Corona,CA 92880 Job Truss Truss Type Qty Ply 1487 A K2591584 B1605533 C01 GABLE 1 1 J Reference(optional) ProBuild Arlington, Arlington,WA 98223 7.640 s Sep 29 2015 MiTek Industries,Inc. Thu Nov 17 14:16:01 2016 Page 1 to:1 pumakLzVH3AMQul2ZVvP 1 yJMj9-LtkajC Fm WyfpjdF_MHz_T8nQJsoFICdLcBOe54ylEji 1-aD r a n n 1-a0 B-a0 6-a0 1-0-0 Scale=1:29.6 4x4= 5 5.00 F12 4 6 3 15 16 7 2 6 e I0 3x4= 14 13 12 11 10 3x4= r 16.0.0 t&0-0 LOADING(psf) SPACING- 2-0-0 CSI. DEFL. in (loc) I/dell L/d PLATES GRIP TOLL Plate Grip DOL 1.15 TC 017 Vert(LL) -0 00 9 n/r 180 MT20 185/148 (Roof Snow=25 0 0)) Lumber DOL 1.15 BC 010 Vert(CT) 000 9 n/r 120 TCDL 10 0 Rep Stress Incr YES W 0 06 Horz(CT) 0.00 8 n/a n/a BCLL 0 0 B Matra o BCJL 80 Code IBC2015/TPI2014 ( ) � Weight:54 lb FT=20% LUMBER- BRACING- TOP CHORD 2x4 HF No.2 TOP CHORD Structural wood sheathing directly applied or 6-0-0 oc purlins. BOT CHORD 2x4 HF No.2 BOT CHORD Rigid ceiling directly applied or 10-0-0 oc bracing OTHERS 2x4 HF Stud/Std MiTek recommends that Stabilizers and required cross bracing be installed during truss erection,in accordance with Stabilizer Installation ulde. REACTIONS. All bearings 16-0-0. (lb)- Max Horz 2=45(LC 10) Max Uplift All uplift 100 lb or less at joint(s)2,8,14,13,11,10 Max Grav All reactions 250 lb or less at joint(s)2,8,13,12,11 except 14=339(LC 17),10=339(LC 18) FORCES. (lb)-Max.Comp./Max.Ten.-All forces 250(lb)or less except when shown WEBS 3-14=-273/79,7-111 NOTES- 1)Wind:ASCE 7-10;Vul1=110mph(3-second gust)Vasd=87mph;TCDL=6 Opsf;BCDL=4 8psf;h=25ft;Cat.Il;Exp B;enclosed;MWFRS (envelope)gable end zone;cantilever left and right exposed;end vertical left and right exposed;Lumber DOL=1.60 plate grip DOL=1.60 2)Truss designed for wind loads in the plane of the truss only. For studs exposed to wind(normal to the face),see Standard Industry Gable End Details as applicable,or consult qualified building designer as per ANSI/TPI 1. 3)TCLL:ASCE 7-10;Pf=25 0 psf(flat roof snow);Category Il;Exp B;Fully Exp;Ct=1 4)Unbalanced snow loads have been considered for this design. 5)This truss has been designed for greater of min roof live load of 19.0 psf or 2.00 times flat roof load of 25 0 psf on overhangs non-concurrent with other live loads. 6)All plates are 2x4 MT20 unless otherwise indicated. 7)Gable requires continuous bottom chord bearing. 8)Gable studs spaced at 2-0-0 Do. 9)This truss has been designed for a 10 0 psf bottom chord live load nonconcurrent with any other live loads. pt,A1NG ZA- 10)'This truss has been designed for a live load of 20 Opsf on the bottom chord in all areas where a rectangle 3-6-0 tall by 2-0-0 wide will fit between the bottom chord and any other members. p4 WASN 0 11)Provide mechanical connection(by others)of truss to bearing plate capable of withstanding 100 lb uplift at joint(s)2,8,14,13,11.10 12)"Semi-rigid pitchbreaks with fixed heels"Member end fixity model was used in the analysis and design of this truss �e 0 • r 54074 A, G+�, 8f37STV SSfONAL��G November 18,2016 A WARNING-Verily design parameters and READ NOTES ON THIS AND INCLUDED MITEK REFERENCE PAGE MII-7473 rev.1010312015 BEFORE USE. Design valid for use only with MrTeka connectors This design is based only upon parameters shown,and is for an individual building component,not I truss system.Before use,the building designer must vent'the applicability of design parameters and property incorporate thistle sign Into the overall building design Bracing indicated is to prevent buckling of individual truss wob andlor chord members only Add4ional temporary and permanent bracing M iTe k is always required for stability and to prevent collapse with possible personal Injury and property damage. For general guidance regarding the fabrication,storage,delivery,erection and bracing of trusses and truss systems.see ANSIITPII Quality Criteria,DSB-89 and SCSI Building Component 250 Klug Circle Safety Information available from Truss Plate Institute.218 N-Lee Street,Suite 312,Alexandria,VA 22314. Corona,CA 92880 MI n Cl) Z 0. W " Cn Co (n y D q C Cl) N Z mX m m m O r `� m I I s O W c�SG�o�p�zo N o _ a oc c o v m a m c o n C rn ��a�o0 a - a 0�o� = omen n � � OCA oQDG�o�� � nmic a �c 5 Z Er Er 'm oCD a�� -� m- 0DpoC0 Z �Wo 3 a� N N Q^g,- d a� m oni � m N_nm c W c v, a m D O CI a� m (p�• N CAD O O CD < = c•N N a C`G CD �p z CL CDDand N Nvy mC = a O 'o y' 3 °� oCL �n0 �� m•mv _ �v Sim n f) m m=. o ° a m CD�� D s m m a a -0 a o 2 4 0 m N m v O cn O�.(n W a N O n R: O'.co 0 o C N O R CO�1 = y ' CD• Q N•an d 00 m °�' m o = Q= o' 'm 3 °' = rn = m 0'0 0 = ao m = Fn N CD O(D n �m V�'m �'l = - (�.Q Z n 0-N N = C� R: 0_ v Z m �y o o m a M. (� v� o n(D 3 o m 3 0 0 3 o -4 1]N M N CD m N N 0 3 N ID N fA C fD J a,_+ D m d 0 O O C N �p N �• p O > j S 7C p S m O ?Q N gag cn �� .v CD o in 0•am o N m m o ti �' ti z .mo CD j'C O.� m = m = C- N = O O (p N 7 N ICI ._..Q j• O a N•m .�.. �:j X O .� N CDO0 CD N N `G M CDm m n v z n a TOP CHORD cx xxo � v 'C N N � m O W r c-zi 00 CI-8 — : CD cm my mzu, 20 M (SD �C- fD N o f .1 n yy 1-4� VW.2-7 n m awm a) CD m- � z xm rnj v -Ica N U)mo n mom�v, < CD om �� NO I * �mp a�_ 0 w < CD7 w- m �W cm(D C 2 N D (n yy -I = (n Cl) N CD a m m � r O N o. �■ $ �) m U) o X Cl) X m a p 3 Cl) �� CL =� ;u O o =1 cz: n m Cl) m - a -400 r G)m 0 co f y N �/\ (D al3 N 0 o m m J W p ` m C//) A m fD O Q W xp (n" No v F `Z U1 W -< m m o= fD ® 7 N 2 O O x rh m N . CD < C CD v -1 m W34 w � N o � Z aW V CD `) X < D m moo N = CD o m c� ° y y CD S _ CJ1 CG-5 A CD 7 m O m TOP CHORD N -' O N v 01 (n A W N O N W -I 0I N A W N O DC vi�A jC a �O n o W v� �� �� mn NC �C >:C o`_o-1 C> mn� �y„Z Q3 f1 o.y N Z N J W y .yr. O O O a- y 01 J J N (D O. fn^ o a r M 0•o J J (/N�Naa 0-1 M d 3 °�' 3 v 3 fD m °� NmN o y cmi ;'Se.< cyi m a a �n� f0 V Nri' M - O N N 3 J�• 3i m V (D O'O y J N 7 '7 N 3 m� G F IG m y j �y icy_ 010 � � �•° n� � av � 'J° �m °o m Ham 3 � � mx many ;- CD '-. -� � �onv �.>_j Ra �o N oo n� om Ww n m m� x7m 3� m3N m ��D� �•m °c@m � y p CC .J..Q._7 2�O n J DI J 41 C y y N N R O .�D..y f�D 2 ID 3 O y f�(ya,N N a d Sr E to x Q -1 /A Dl y O J Q N J N O N G'� L CD D) J y O. J DI•� O.� .Jn N CD O.� O �O O O J Q Q.03 m V O \I/ C)� m� o�dp ? �Jp2 o y.5. �m m o cR. n$n2 ?(gyp �(op my (°p m �c � 9 m o��^ �'o 0 `/��u N O 3 O.N Q - `8 01 m O N `8 T.N 2 y (O G y0. ut' O `_ oil �a •`�'m3 c l3 m mo �� v� �� mom m� 33 n* �5t myy co m6.Cy m(o � 0 m SO oa. N c ac n x no o o. o^' Cr Z m ma aim ! o0 4F 0) C iY J fD J y i C O N M m O. J . y 0)N C fD �n O.2 m .0 y .< DI y ` Q. 01 Ji. J� O. O y J n 7N CnO /s�(D �J Qm ZC �� y .Jyn � 7 O'y N ID O' m y /'� a M.O N 7 N y J N (D O ID D..Z, m N f1 J Q fD A cn ID O N O i Q 7 C.4 N C O' x y Od W y 9t a W J m 7 6.2 J N�C �`G 1 n 3 O fD a -s N d M d me mo 'o Rty Ja vd �S J �v .J• Cr 2 d �'� 3 W �h m a o v S �' �• Yn a y m CD F m" O O M O o• G J ._�,_. V C M fD d fD J m-fD fD �o yt� a �� n o y �y 3 m �� 3`n CO D N C�. C9 N 7 n O. 7 NN NO' �p a O. f� 9-n 0FD O y cr <D N f0 y p J Wm < (� '•� co 3 m CD 3 m O 1"F m N Prescriptive Energy Code Compliance for All Climate Zones in Washington Project Information Contact Information Plan 1487 This project will use the requirements of the Prescriptive Path below and incorporate the the minimum values listed.In addition,based on the size of the structure,the appropriate number of additional credits are checked as chosen by the permit applicant. Authorized Representative Date All Climate cones R-Value' U-Factor' Fenestration U-Factor" n/a 0.30 Skylight U-Factor n/a 0.50 Glazed Fenestration SHGC" n/a n/a Ceiling" 491 0.026 Wood Frame Walle''°'" 21 int 0.056 Mass Wall R-Value' 21/21" 0.056 Floor 3011 0.029 Below Grade Wall°'' 10/15/21 int+TB 0.042 Slab"R-Value&Depth 10,2 ft n/a *Table R402.1.1 and Table R402.1.3 Footnotes included on Page 2 Each dwelling unit in a residential building shall comply with sufficient options from Table R406.2 so as to achieve the following minimum number of credits: 1.Small Dwelling Unit: 1.5 credits 0 Dwelling units less than 1500 square feet in conditioned floor area with less than 300 square feet of fenestration area. Additions to existing building that are greater than 500 square feet of heated floor area but less than 1500 square feet. [12. Medium Dwelling Unit: 3.5 credits All dwelling units that are not included in#1 or#3. Exception:Dwelling units serving R-2 occupancies shall require 2.5 credits. ❑3.Large Dwelling Unit: 4.5 credits Dwelling units exceeding 5000 square feet of conditioned floor area. ❑4. Additions less than 500 square feet. .5 credits Table R406.2 Summary -Option Description Credit(s) 1a Efficient Building Envelope la 0.5 ❑ lb Efficient Building Envelope lb 1.0 ❑ �� 1c Efficient Building Envelope 1c 2.0 El ����� �® 1d Efficient Building Envelope 1d 0.5 O 2a Air Leakage Control and Efficient Ventilation 2a 0.5 ❑ 2b Air Leakage Control and Efficient Ventilation 2b 1.0 ❑ 2c Air Leakage Control and Efficient Ventilation 2c 1.5 ❑ 3a High Efficiency HVAC 3a 1.0 (] 1.0 3b High Efficiency HVAC 3b 1.0 ❑ 3c High Efficiency HVAC 3c 1.5 ❑ 3d High Efficiency HVAC 3d 1.0 ❑ 4 High Efficiency HVAC Distribution System 1.0 ❑ 5a Efficient Water Heating 5a 0.5 1] 0.5 5b Efficient Water Heating 5b 1.0 ❑ 5c Efficient Water Heating 5c 1.5 ❑ 5d Efficient Water Heating 5d 0.5 ❑ 6 Renewable Electric Energy 0.5 *1200 kwh 0.0 Total Credits 1.50 *Please refer to Table R406.2 for complete option descriptions Received APR 20 2017 1An 1441 . r Table R402.1.1 Footnotes For SI: 1 foot.=304.8 mm,ci.=continuous insulation,int.=intermediate framing. i R-values are minimums. U-factors and SHGC are maximums.When insulation is installed in a cavity which is less than the label or design thickness of the insulation,the compressed R-value of the insulation from Appendix Table A101.4 shall not be less than the R-value specified in the table. b The fenestration U-factor column excludes skylights.The SHGC column applies to all glazed fenestration. "10/15/21.+TB" means R-10 continuous insulation on the exterior of the wall,or R-15 on the continuous insulation on the interior of the wall,or R-21 cavity insulation plus a thermal break between the slab and the basement wall at the interior of the basement wall."10/15/21.+TB"shall be permitted to be met with R-13 cavity insulation on the interior of the basement wall plus R-5 continuous insulation on the interior or exterior of the wall. "10/13" means R-10 continuous insulation on the interior or exterior of the home or R-13 cavity insulation at the interior of the basement wall."TB" means thermal break between floor slab and basement wall. d R-10 continuous insulation is required under heated slab on grade floors.See R402.2.9.1. e There are no SHGC requirements in the Marine Zone. f Reserved. g Reserved. h Reserved. The second R-value applies when more than half the insulation is on the interior of the mass wall. J Reserved. k For single rafter-or joist-vaulted ceilings,the insulation may be reduced to R-38. i Reserved. m Int.(intermediate framing)denotes standard framing 16 inches on center with headers insulated with a minimum of R-10 insulation. Table R402.1.3 Footnote a Nonfenestration U-factors shall be obtained from measurement, calculation or an approved source or as specified in Section R402.1.3. Window, Skylight and Door Schedule P(oject Information Contact Information Plan 1487 Width Height Ref. U-factor Qt. Feet inch Feet inch Area UA Exempt Swinging Door(24 sq. ft. max.) 0.0 0.00 Exempt Glazed Fenestration(15 sq.ft. max.) 0.0 0.00 Vertical Fenestration(Windows and doors) Component Width Height Description Ref. U-factor Qt. Feet inch Feet inch Area UA Foyer 0.30 1 3 6 20.0 6.00 0.30 1 2 6 17.8 5.33 Dining 0.30 1 5 5 25.0 7.50 Great Room 0.30 1 3 5 15.0 4.50 0.30 1 6 16 '° 41.01 12.30 Master Bedroom 10.30 1 5 5 1 25.0 7.50 Bedroom 2 0.30 1 3 5 15.0 4.50 Bedroom 3 0.30 1 3 5 15.0 4.50 0.30 0.0 0.00 0.30 0.0 0.00 0.30 0.0 0.00 0.30 0.0 0.00 0.30 0.0 0.00 0.30 0.0 0.00 0.30 0.01 0.00 0.30 0.0 0.00 0.30 0.0 0.00 0.30 0.0 0.00 0.30 0.0 0.00 0.30 0.0 0.00 0.30 0.0 0.00 0.30 0.0 0.00 0.30 0.0 0.00 0.30 0.0 0.00 0.30 0.0 0.00 0.30 0.0 0.00 0.30 0.0 0.00 0.30 0.0 0.00 0.0 0.00 0.0 0.00 0.0 0.00 0.0 0.00 0.0 0.00 LJ 0.0 0.00 11 F 0.0 0.00 0.01 0.00 0.01 0.00 0.01 0.00 0.0 0.00 0.0 0.00 0.0 0.00 0.0 0.00 Sum of Vertical Fenestration Area and UA 1 173.81 52.13 Vertical Fenestration Area Weighted U=UA/Area 0.30 Overhead Glazing(Skylights) Component Width Height Description Ref. U-factor Qt. Feet inch Feet inch Area UA 0.01 0.00 0.0 0.00 0.0 0.00 0.0 0.00 0.0 0.00 0.01 0.00 Sum of Overhead Glazing Area and UA 0.01 0.00 Overhead Glazing Area Weighted U=UA/Area 1 0.00 Total Sum of Fenestration Area and UA (for heating system sizing calculations) 1 173.81 52.13 Simple Heating System Size:Washington State This heating system sizing calculator is based on the Prescriptive Reguiremenls of the 2015 Washington State Energy Code(WSEC)and ACCA Manuals J and S.This calculator will calculate heating loads only.ACCA procedures for sizing cooling systems should be used to determine cooling loads The glazing(window)and door portion of this calculator assumes the installed glazing and door products have an area weighted average U-factor of 0.30. The incorporated insulation requirements are the minimum prescriptive amounts specified by the 2015 WSEC. Please fill out all of the green drop-downs and boxes that are applicable to your project.As you make selections in the drop-downs for each section,some values will be calculated for you. If you do not see the selection you need in the drop-down options,please call the WSU Energy Extension Program at (360)956.2042 for assistance. Pro vct Information Contact Information Plan 1487 Heating System Type: O All ether Systems O Heat Pump To see detailed Instructions for each section,place your cursor on the word"Instructions". Design Temperature Design Temperature Difference(AT) 47 L r �.. ♦ ! AT=Indoor(70 degrees)-Outdoor Design Temp Area of Buildinq Conditioned Floor Area Instructions Conditioned Floor Area(sq ft) F 1.487 Average Ceiling Height Conditioned Volume Instructions Average Ceiling Height(ft) 9.0 13,383 Glazina and Doors U-Factor X Area = UA Instructions 0.30 159 47,70 Skylights U-Factor X Area UA Instructions 0.50 .» Insulation Attic U-Factor X Area = UA Instructions 1R-49 .�I 0.026 1.487 38.66 Single Rafter or Joist Vaulted Ceilings U-Factor X Area UA Instructions Select R-Value No selection --- Above Grade Walls toes Figure 1) U-Factor X Area UA Instruct ens 61 R-21 Intermediate 0.056 F 1,600 89.60 Floors U-Factor X Area UA Instructions OR-30 -- —� 0.029 1.487 43.12 Below Grade Walls law Figure 1) U-Factor X Area UA Instructions j No Below Grade Walls in this proem ♦ - Slab Below Grade fees Finuren F-Factor X Length UA Instructions Selectcomitloning ♦ I No selection -- Slab on Grade(see FVure ii F-Factor X Length UA Instructions (--� No Slab on Grade In tMs;­oirc: ♦ Location of Ducts J Instructions Duct Leakage Coefficient J UncartOltltxcell Space ♦ 1.10 Sum of UA 219.09 Envelope Heat Load 10,297 Btu/Hour Fwaure 1. Sum ofUAXAT Air Leakage Heat Load 6,793 Btu/Hour VolumeX O.BXATX.010 ntava Graeo Bullding Design Heat Load 17,090 Btu/Hour Air Leakage+Envelope Heat Loss Building and Duct Heat Load 18,799 Btu/Hour Ducts in unconditioned space:Sum of BuidMg Heat Loss X 1,10 Ducts In conditioned space:Sum of Building Heat Loss X 1 Maximum Heat Equipment Output 26,319 Btu/Hour Budding and Duct Heal Loss X 1.40 for Forced Air Furnace Budding and Duct Hoot Loss X 1.25 for Heal Pump (07/OV-13) i -I 1VASH• I I T L C ASSOCIATES CI.>ENT: I SEISMIC ANALYSIS PROJECT _ t rr c'r DATE: NAME: 6 Redundancy Factor (p� 1. Maximum allowable wall shear for p<=1 Vumax = (2)(Vaccstory)/Ab 1/2 2. Maximum actual shear Vmax = Largest seismic wall shear 231:, IK(A 3, p = 2-[2(Vaccstory)/(Vumax)(Ab 1/2) L ` ZCs, Tn ) 06 WINO 8003 118th AVE NE Kirkland, WA 98033 (425) 828-4117 WWW NASH-ARCHITECTS.COD[ a rk ` fej.. G� BUILDING INSPECTION REPORT— Residential Final Permit No. 1441 Address: 9024 171st Street NE Contractor: LGI Homes - Washington, LLC Owner: LGI Homes - Washington, LLC 1 Date: 9/26/2017 L APPROVAL ❑ PARTIAL APPROVAL ❑ CORRECTION ❑ OTHER INSPECTION: Final Building ADDRESS NUMBERS: ❑ ACCESS: ❑ PLUMBING: ❑ MECHANICAL: ❑ SMOKE DETECTION: ❑ CO DETECTION: ❑ LIFE SAFETY: ❑ DECKS: ❑ HANDRAILS: ❑ PLANTINGS: ❑ WATER: ❑ SEWER: ❑ LIGHTING: ❑ FINAL ELECTRICAL: ❑ BLOWER DOOR/DUCT CERT: ❑ INSULATION CERT: ❑ Date: 9/26/2017 Inspector: Kevin Olander CITY OF ARLINGTON 238 N. OLYMPIC AVE -ARLINGTON, WA. 98223 PHONE; (360)403-3551 BUILDING PERMIT Address:9024 171 st Street NE Permit#:1441 Parcel#: Valuation: 187422.00 OWNER APPLICANT CONTRACTOR Name:LGI HOMES-WASHINGTON LLC Name:LGI Homes-Washington,LLC Name:LGI Homes-Washington,LLC Address: 1450 LAKE ROBBINS DR STE 430 Address:11410 NE 124th Street,Ste#103 Address: 11410 NE 124th Street,Ste#103 City,State Zip:THE WOODLANDS,TX 77380 City,State Zip:Kirkland,WA 98034 City,State Zip:Kirkland,WA 98034 Phone: Phone:425-785-0797 Phone:360-353-0588 MECHANICAL CONTRACTOR PLUMBING CONTRACTOR Name: Name: Address: Address: City,State,Zip: City,State,Zip: Phone: Phone: LIC#: EXP: LIC#: EXP: JOB DESCRIPTION PERMIT TYPE: Single Family Residence CODE YEAR: 2015 STORIES: I CONST.TYPE: `/-13 DWELLING UNITS: I OCC GROUP: R-3 BUILDINGS: OCC LOAD: PERMIT APPROVAL I AGREE TO COMPLY WITH CITY AND STATE LAWS REGULATING CONSTRUCTION AND IN DOING THE WORK AUTHORIZED THEREBY;NO PERSON WILL BE EMPLOYED IN VIOLATION OF THE LABOR CODE OF THE STATE OF WASHINGTON RELATING TO WORKMEN'S COMPENSATION INSURANCE AND RCW 18.27. THIS APPLICATION IS NOT A PERMIT UNTIL SIGNED BY THE BUILDING OFFICIAL OR HIS/HER DEPUTY AND ALL FEES ARE PAID. IT IS UNLAWFUL TO USE OR OCCUPY A BUILDING OR STRUCTURE UNTIL A FINAL INSPECTION HAS BEEN MADE AND APPROVAL OR A CERTIFICATE OF OCCUPANCY HAS BEEN GRANTED. IBC110/IRC110. SALES TAX NOTICE:Sales tax relating to construction and construction materials in the City f"tn n must be reported on your sales tax return form and Vcd ity of i ton#31 I. VSign ure Print Name Date Men By Date CONDITIONS Adhere to approved plans. Additional requirements: The Quick-Joint fittings (that were included as part of the plat's pressure test) were removed/cut off from tail pieces. These were to be the domestic plumbing point of connection.New ones will need to be supplied and re-installed by plumber/developer at time of service line connection. Call the Public Works Department at 360-403-3526 for connection inspection. THIS PERMIT AUTHORIZS ONLY THE WORK NOTED.THIS PERMIT COVERS WORK TO BE DONE ON PRIVATE PROPERTY ONLY. ANY CONSTRUCTION ON THE PUBLIC DOMAIN(CURBS,SIDEWALKS,DRIVEWAYS,MARQUEES,ETC.)WILL REQUIRE SEPARATE PERMISSION. PERMIT FEES Date Description Fee Amount 5/10/2017 Building Permit Fee $2,109.12 5/10/2017 Building Plan Review Fee $1,370.93 5/10/2017 Furnace $25.00 5/10/2017 Gas Outlets Base Fee 1 to 5 $10.00 5/10/2017 Mechanical Fee(Enter Fixture Fee) $25.00 5/10/2017 Mechanical Permit Base Fee $25.00 5/10/2017 Park-Community MF $1,662.00 5/10/2017 Plumbing Permit Base Fee $25.00 5/10/2017 Plumbing Permit Fee(Enter Fixture Fee) $132.00 5/10/2017 Processing/Technology Fee $25.00 5/10/2017 State Building Code Surcharge Fee $4.50 5/10/2017 Traffic Mitigation $3,355.00 5/1 012 0 1 7 Water Heater $25.00 Total Due: $8,793.5.5 Total 1'avrncnl: $1.370.93 Balance Due: $7,422.62 CALL FOR INSPECTIONS BUILDING(350)403-3417 When calling for an inspection please leave the following information: Permit Number,Type of Inspection being requested,and whether you prefer morning or afternoon \f I ,ram Permit Information Date 4/21/2017 Permit Number 1441 Project Name Gregory Park Applicant Name LGI Homes-Washington,LLC Applicant Address 11410 NE 124th Street,Ste#103 City,State,Zip Kirkland,WA 98034 Contact Matt Adams Phone 425-785-0797 Email matt.adams@lgihomes.com Permit Type Single Family Residence Site Address 9024 171 st Street NE Valuation 187422.00 Status Applied Permit Issued Permit Expires Square Feet 1889 Type of Construction/Occupancy Load V-B Number of Stories 1 Proposed Use New SFR Assigned To Kristin Foster Contractors Contractor Name Primary Phone Email Contractor License License# Contact Type I_GI Homes-Washington,Jake Jabusch 0588 3- ake.jabusch@lgihomes.co CONTRACTOR IIndusLabo and I_GIHOHL857M I_LC )588 Ilndustries Review Date Type Description I Target Date Completed Date J Assigned To Status 4/21/2017 IlResidential Dwellin t/28/2017 lRick Karns lin Review Fees Fee Description I Notes I Amount Building Plan Review Feel 345.83.00.00 1 $1.370.9 Total $1,370.9 Payments Date Paid By Amount I Description I Pa ment T pe I Acce ted B 4/21/2017 JLGI Homes-Washington, LLC $1,370.9 Plan Review ;heck#4460 Kristin Foster Total $1,370.9N Amount Outstanding:$0.Oa Notes Date Note 4/21/2017 Lot 48-Plan 1487 Columbia Uploaded Files Upload File Date File Uploaded B 4/21/2017 3:36:40 PM 1441 Applicationadf Foster, Kristin x 4/21/2017 3:36:40 PM 1441 Site Plan.pdf Foster,Kristin Y RESIDENTIAL PERMIT APPLICATION Department of Community & Economic Development City of Arlington• 18204 59th Ave NE •Arlington,WA 98223 • Phone(360)403-3551 Mechanical Section (continue filling out if mechanical equipment is involved) Select proposed appliances: Furnace (80+) Model # %/-rV,43m4 /� AFUE ❑ Heat Pump Model # SEER HSPE AC Unit Model # SEER LJ Type II Hood ❑ Commercial Cooking Appliance ❑ Hydronic Piping ❑ Boiler ❑ Solid-Fuel Appliance ❑ PV System 01 Fireplace Insert ❑ Outdoor BBQ ❑ Storage Tank �`- Freestanding Stove Gas Piping ❑ Other Gas Piping Information Not Applicable: ❑ Pipe Material: *( Pipe Size: _�Total BTU's of all Appliances: /�O _ �D 6 Distance from Meter to Furthest Appliance: rV • New gas piping requires a pressure test to hooking to any appliance • Sediment traps (drips) are required on all gas lines • Gas lines are required to be supported/secured every 6 to 8 feet • Proper combustion air and venting required for all appliances • A shut-off is required within 6 feet of all appliances Applicant Signature: _ Date: 4VJ 4 Print Applicants Name: /kA-,,— "A-10 6/16LP Page 3 of 3 Low RESIDENTIAL PERMIT APPLICATION Department of Community & Economic Development City of Arlington• 18204 59th Ave NE • Arlington, WA 98223 • Phone(360)403-3551 THIS APPLICATION IS TO BE USED WHEN APPLYING FOR A NEW SINGLE-FAMILY, DUPLEX, TOWNHOUSE, ADDITION, DECK,OR ACCESSORY STRUCTURES. THIS APPLICATION MUST BE ACCOMPANIED BY TWO(2)SETS OF CONSTRUCTION DRAWINGS AND TWO(2)SETS OF STRUCTURAL CALCULATIONS. THE APPLICATION MUST ALSO INCLUDE THE PLUMBING SUBMITTAL AND THE MECHANICAL SUBMITTAL FORMS. THE ZONING VERIFICATION MAY BE SUBMITTED PRIOR. Project Address: �D � f 5 r Cj`rGEE,'i� /�� Plat: 6 Z4_1_6 O/L I/ Single-family ❑ Duplex ❑ Townhouse ❑ Addition ❑ Accessory structure Proposed Area: 1 s` Floor: 2"d Floor: Garage: Total SF: D scribe Proposal (include cross street): ��' N l 7nhl f c�?_ J SLAAJ f Valuation: � I , Owner: GG-,( Address: I1q60 IJL (zj'4 -71- City: V_ ?_W A-N 7> State: I A Zip Code: 03 Phone: 'Q /�// 7-05-- 01-C17- Email: 4A:rT-4,of7u $ (w Applicant: I wLk �— UA&6 A/6 M Address: City: b L�DState: Zip Code: 9 Phone: L Email: {�A'R'. _5 Lt(71f��tF5' . CaOttj Contractor: W,e A- A rJ Address:/-m, City: vta State: Zip Code: ��3 Phone: ) - _ — Email: V11k T. &At'6 Cz— 4k;�.4P' '- Contact Person: 44--w7 License Number:L 04W9 Expiration: 6/16LP Page 1 of 3 A RESIDENTIAL PERMIT APPLICATION • ® Department of Community & Economic Development City of Arlington• 18204 59th Ave NE •Arlington,WA 98223 • Phone(360)403-3551 Plumbing Section (continue filling out if plumbing is involved) (Check all that apply and indicate the number of fixtures proposed) �'—Bath/Shower Combo (4.0) x 6Lli_ Sink (1.5) x r ' --Shower (2.0) x r [4, Lavatory (1.0) x C-1 Clothes Washer (4.0) x ( ! Water Closet (2.5) x [ - Dishwasher (1.5) x I ( Water Heater x r Hose Bibb (2.5) x Water Heater Model# �-- Other (list) x Plumbing Section Continued Proposed Water Piping Size.- Proposed DWV Material: h'(5 S Proposed Piping Material: Ef Proposed DWV Size: a • All hose bibs required to be equipped with Atmospheric Vacuum Breakers per ASSE 1019 • All water supplies at 80psi or greater shall have Pressure Reducing Valves (PRV) 6/16LP Page 2 of 3 SETBACKS NOTES: 1 FRONT 10 *BUILDING DIMENSIONS ARE R7 ow SIDE 5' FACE OF FOUNDAAOW 12' WA ITR REAR 5' -6 RADING WO;W AS DESIGW 1 ACTUAL LOCAAOW MAY VARY 17+ 017.1ST T. N L •SLOPE DRIVEWAY TO PUBLIC ROAD —' •SIL T FENLE TO BE INSTALLED PER B`SEWER CITY OF ARLINGTONS STANDARD N89 0 49'lV •SILT FENCE TO BE INSTALLED ON GRADIENT SIDE OF BUILDING 25.00 � i � PARCEL _ •CONSIRUCAON ENTRANCE TO BE J7 10' INSTALLED PER CITY OF PUBLIC UTILITY ARLINGTCW:S STANDARDS ° 4 EASEMENT o STORM NOTES.- ° ° A o •TESC INSTALLED PRIOR TO CONSIRUCAON •BARE SOILS COVERED W 7H MULCH OR ANOTHER APPROVED BMP •TOPSOIL PER WSDOE BMP a u �7 20'8S8 iv L. v (£fF 12"DEP 7H) STORM CLEANOUT. IL •ALL ONSITE RUNOFF CONNECTED TO CONNECT RDOf"AND 516 Sf'' — ° , PRIVATE STORM STUB FOOANG DRAINS DR31-WA Y •SITE SHALL BE STABILIZED PRIOR I TO BUILDING PERMIT BEING CONNE-ViWR C ON I' 19,75 011.00 BUILDING FINALIZED � 4 OU1L/N£ SITENOTES.• •77GH711N£FOOANG DRAINS AND ROOF OVERHANG GARAOF IO'BSBL ROOF DRAINS TO PERMANENT STORM DRAINAGE SY57EM PER APPROVED PLAT DRAINAGE PLAN p o ON FILE W 7H AIE COUNTY. rpj o •AREA OF DISTURBANCE INCLUDES 44 ENARE LOT. o LOT 48 p ^ 44 h PROPOSED RESIDENCE p p LEGEND. COLUMBIA-1487 GARAGE LEFT ^ o o- BLOW OFF 5'BSBL 2,1091Sr = ® WATER METER FIRE HYDRANT 2 SF 10.50 Q AIR VAC I � \ o ® CATai BASIN 24.50 O CLEANDUT 5 WA7FR O MANHOLE 5'BSBL — RNCE _FTT_I_17 1 BLOa( WALL ` LI 50.00 IRE E REMOVAL 1 N8920'49"W PROPERTY EXISANG CONTOUR Receiveo CORNER I (rxp) A P R 2 %' I (rrp) I SCALE 1"= 20' I • LOT 48 I U� FIN,SHED G'pYTLt'/ � SITE PLAN G GREGOR Y RARK LG/ HOMES PLAN NO. COL.-1487 LOT AREA = 4,666 SF ^ DATE 411912017 PARCEL # LOT 48 HOUSE = 2,109 SF l 14711 NE 1911,Vlv�e,q 701 DRIVEWAY= 516 SF ! Bell--,W-hi gf-9E007 DESIGNED CORE ADDRESS 9024 171ST ST. 425.885.7077 Fax425885.7963 WALKWAY/PAA DESIGN O = 12 SF PROJECT NUMBER TOTAL= 2,637 SF ENGINEERING • PLANNING • SURVEYING DRAWN CAF 13024L-GRGOO NASH&ASSOCIATES ARCHITECTS PLAN 1487 BEAM, LATERAL & SEISMIC CALCULATIONS r C, _ , { c,Ac; 1HOMAS NASH STATE OF VVASHINGT- Received APR 2, n zo�7 2015 IBC JULY 1, 2016 8003 !lath AVE NE Kirkland, WA 98033 (425) 828-4117 WIM NASH—ARCHITECTS.COM I_ '• , . •j � CLIENT: NASHhASSOCIATPS BEAM DESIGN DATA PROJECT: ARC1.1ITECTS DATE: NAME: Roof Loads: LL 25 /sf DL 15 /ef Total 40#/of Unless Noted Otherwise Floor Loads: LL 40#/sf DL 10 #/ef Total 50#/sf Deck Loads: LL 60#/sf DL 10 /sf Total 70 /sf Soil• 1500 PSF Min. Concrete: Per IBC 15 Masonry: Per IBC 15 Steel: Per IBC 15 Wood: Per IBC 15 Nailing: Per IBC 15 4" Beam: Douglas Fir #2 fv = 180 fb = 900 PSI E = 1,600,000 6" Beam: Douglas Fir #2 fv = 170 fb = 875 PSI E = 1.300,000 Joists & Hem Fir #2 Rafters: fv = 150 fb = 650 PSI E = 1,300,000 Glu—Lam Beams: fv = 240 PSI fb = 2,400 PSI (reduced by size factor, CF*K1) E = 1,600,000 8003 118th AVE NE Kirkland, WA 96033 (425) 828-4117 WYf W.NASH—ARCFIITECTS.COM PLAN 1487 BeamChek v201 6 licensed to.Nash Jones Anderson Architects Reg#6464-622 V 8 t Date: 10/24116 Selection 3-1/8x 12 GLB 24F-V4 DFIDF Lu=0.0 Ft Conditions NDS 2015 Min Bearing Area R1=2.6 in' R2=2.6 in' (1.5)DL Defl= 0.23 in Recom Camber=0.34 in DAM Beam Span 16.0 ft Reaction 1 LL 1000# Reaction 2 LL 1000# Beam Wt per ft 9.11 # Reaction 1 TL 1673# Reaction 2 TL 1673# Bm Wt Included 146# Maximum V 1673# Max Moment 6692'# Max V(Reduced) 1464# TL Max DO L/240 TL Actual DO L/421 LL Max DO L 1360 LL Actual Deft L/845 Attribute Section(in') Shear(m� TL DO(in) _ LL DO Actual 75.00 37.50 0.46 0.23 Critical 33.46 9.15 0.80 0.53 Status OK OK OK OK Ratio 45% 24% 57% 43% Fb(psi) Fv(psi) E(psi x mil) Fcl(psi) Values Reference Values 2400 240 1.8 650 Adjusted Values 2400 240 1.8 650 Adjustments Cv Volume 1.000 Cd Duration 1.00 1.00 Cr Repetitive 1.00 Ch Shear Stress N/A Cm Wet Use 1.00 1.00 1.00 1.00 Cl Stability 1.0000 Rb=0.00 Le=0.00 Ft Loads Uniform LL: 125 Uniform TL: 200 =A Uniform Load A ] - - - -� R1 = 1673 R2= 1673 SPAN=I6FT Uniform and partial uniform loads are Ibs per lineal ft. CLIENT: -IINASH&ASSOCIATES WIND AND 5E15MIG DE516N DATA PROJECT: A It, r I'l I PER 2015 IBC DATE•- - -- NAME: WIND DESIGN GRITERIA DESIGN PER ASCE 7-10 I.NOMINALNLTIMATE WIND SPEED V/asd /Vult 05/110 mph 2.R15K CATEGORY II 1.00 5. WIND EXPOSURE CATEGORY "B" 4. INTERNAL PRESSURE COEFFIGENT +/-55 5.COMPONENTS AND CLADDING DESIGN PRESSURE +/- 16 psf BUILDINGS, 5TRUCTURE5,AND PARTS THEREOF GNALL BE DESIGNED AND CONSTRUCTED IN ACCORDANCE WITH STRENGTH DESIGN,LOAD,AND RESISTANCE FACTOR DESIGN, ALLOWABLE 5TRE55 DES16N, EMPIRICAL DESIGN OR CONVENTIONAL CONSTRUCTION METHODS,A5 PERMITTED BY THE APPLICABLE MATERIAL CHAPTER, SECTION 1604.1 BUILDING5, 5TRUGTURE5,AND PARTS THEREOF,SHALL BE DESIGNED TO WITHSTAND WIND LOADS AS DEFINED IN SECTION 160q AND ASGE '1-10 IMPLIFIED METHOD TO BE USED FOR WIND DESIGN PER A5CE 7-10,5EGTION 27.5 (BUILDIN& 1-106FIT 15 LE55 THAN 160 FEET) 110 MPH ULTIMATE WIND SPEED USE Iq.6 P5F PER TABLE 27.6.1 "EXPOSURE B" WOOD DESIGN PER SECTIONS 2504-2306.STRUGTURE5 USING WOOD SHEAR WALLS AND DIAPHRAGMS TO R1=515T WIND,SEISMIC,AND ALL OTHER LATERAL LOADS SHALL BE DESIGNED AND C.ON5TRUCTED IN ACCORDANCE WITH AF 4 PA 50PWS AND PROV15IONS OF SECTIONS 2305-2306 5EISMIG DE516N DATA DESIGN PER ASCE 7-10/5EGTION 1613 I. SEISMIC, IMPORTANCE FACTOR Is 1.00 2.SHORT PERIOD ACCELERATION Ss I.66 •see footnote at bottom of page 5, 1 SECOND ACGELERATION 51 o.-748 •see footnote at bottom of page 4. SITE CLASS D(default class per IBW S.SPECTRAL RESPONSE COEFFICIENT So. 0.4-12 •see footnote at bottom of page 6. SPECTRAL RESPONSE CA EFFIGENT 5w 0.748 •see footnote at bottom of page 7. SEISMIC DESIGN CATEGORY D 8.SEISMIC, FORGE RESISTING SYSTEM PLYWOOD SHEAR WALLS q. DESIGN BASE SHEAR (see seismic calculations) 10. SEI5MIC RESPONSE COEFFICIENT CS 0.13 11.RESPONSE MODIFICATION FACTOR R 6.5 12.ANALYSIS PROCEDURE EQUIVALENT LATERAL FORGE 13.RISK CATEGORY II THE ANCHORAGE OF WALLS SUPPORTING CONSTRUCTION SHALL BE BE DESIGNED IN ACCORDANCE WITH ASCE 7-10,SECTION 12.11.2 IN STRUCTURES ASSIGNED TO SEISMIC DESIGN CATEGORY C-F,COLLECTOR ELEMENTS AND THEIR CONNECTIONS TO VERTICAL ELEMENTS SHALL BE DESIGNED TO RESIST MAXIMUM EFFECTS AS SPECIFIED IN ASCE-T-10,SECTION 12.10.2.1 BASE SHEAR V= (P 5.,/W W ANCHOR BOLTSv 5/0" VIA X 10",A307 OR BETTER W/7" MIN. EMBEDMENT.V- 1104#/BOLT • PER U56&5, THE MAXIMUM 51 IN THE STATE OF WASHINGTON 15 0.748. ALL SEISMIC DE516N VALUES USED IN THIS ANALYSIS ARE BASED UPON THI5 NUMBER. 51NGE !E�15 LE55 THAN 0.75,THEN USE 5EI5MIC CATEGORY D IF RISK CATEGORY 15 I, 11,OR III 8003 118th AVE NE Kirkland, WA 98033 (425) 828-4117 WWW NASH—ARCHITECTS.COM i W CL 0 EO Ir 771 EID ❑D ❑U DE y' LJVYR' J�� 1 p W l lu M O � S Q LA TT t�. a ��•N Q-V s Q �N � N 0 r N � LATERAL CALCULATIONS CLIENT: —I NASHa,AS50CIATES PROJECT: WIND WORK3HEET DATE:__ 55 MPWI10 MPH= NOMINALNLTIMATE WIND SPEED WAVE. Iq.b PSF FRONT ELEVATION LEFT ELEVATION REAR ELEVATION RIGHT ELEVATION LOCATION TOTAL SHEAR FORCE (#) SHEAR UNIT SHEAR W z H z (see chart for wind pressure WALL SHEAR WALL 0 specified height) LENGTH (ft) (#/It) TYPE Kct x l of �• ) K r Cr L3 ►5 y3 5 �l � s�a XI �� � z6 � 6 �3oXgxtaj6) L7Cty pj-Ll - 6jT?—M ra 441�zj ZCIFKb Zqo PI• C411 PI-Vt 8003 118th AVE NE Kirkland, WA 98033 (425) 828-4117 WWW.NASH—ARCHITECTS.COM rN• r. 7111 CLIENT: 11 NASHtASSOCIATBS SEISMIC ANALYSIS PROJECT_ _ R C i-T 11'i DATE: NAME- 1 Weight of Building: Roof Assembly: Asphalt Shingles - 2.00#/ft Cedar Shakes - 2.25#/(t Tile - 9.50#/it Felt - 0.15 #/it Felt - 0.15 #/it Felt - 0.15 #/it 1/2" Plywood - 1.50 #/it 1/2" Plywood - 1.50 #J ft 1/2" Plywood - 1.50 #/it TTrrusses ® 24" o,c. - 1.75 #/it Trusses 0 24" o.c. - 1.75 #/it Trusses ® 24" o.c. - 1.75#/it R-30 Insulation - 2.35 /ft R-30 Insulation - 2.25 N/ft R-30 Insulation - 2.25#/it 1/2" G1VB Ceiling - 2.001/ft 1/2" GWB Ceiling - 2.00#/it 1/2" GWB Ceiling - 2.00#/it Total 9.75#/ft Total 9.90#/it Total 17.90#/ft Use 10.00#/it Use 10,00#/it Use 18.00#/it let & 2nd Floor Assembly Caret / Pad - 0,50#/it Hardwood - 2.50#/ft 3/4 r&G Plywood - 2.50#/it 3/4" T&G Plywood - 2.50#/it 2x10 0 16' o.c. 2.30#/ft 2x10 e 16" o.c. - 2.30#/it 1/2" GWB Ceiling - 2.00#/ft 1/2" GW13 Ceiling - 2,00#/it Total 7,30#/it Total 9.30#/it Use 10.00#/it Use 10.00#/ft Interior Wall Assembly. Exterior Wall Assembly: 1/2" GWB - 2.00#/it 3/4" Wood Siding - 2.30 /ft 2X4 ® 16" o.c. - 1.10 #/it 1/2" Plywood - 1.50 /ft 1/2" GWB - 2.00#/it 20 0 16" 0.c. - 1.37 #/ft Total 5.10 #/it 121 Insulation - 2 10 i/it Use 6.00#/ft Total 9.27#/it Use 10.00#/ft 4" Brick Veneer - + 3.20#/it 8003 118th AVE NE Kirkland, WA 98033 (425) 820-4117 I WWW.NASH-ARCHUECTS.COM 1 CUENT: NASH=ASSOCIATES SEISMIC ANALYSIS PROJECT_ ARC IfiTECTS DATE:- -- NAME: 2 - — SEISMIC: V = (C-) (Wdl) (plywood) 2nd Level: Roof: or (Asphalt / Cedar Shake) 10#/ft X sf = (Tile) 18#/ft X sf =_ Exterior Walls: L x 10#/sf x 1/2 (h) (E2) Interior Walls: L x 8#/sf x 1/2 (h) _ (I� TOTAL lot Level; Roof: (1st Floor Roof) 10#/ft X 69-7-of = 6 7 2nd Floor. 10#/ft X —of R_ _ Exterior Walls: (E2) + L x 10#/sf x 1/2 (h) IgOWIO u Lf. 5 �ssp (E1) Interior Walls: (1 0 + L x 8#/sf x 1/2 (h) 2� � 7S6TOTAL ;;I Basement: \ 1st Floor: 10#/ft X of -_ Exterior Walls: (E1) + L x 10#/sf x 1/2 (h) Interior Walls: (I1) + L x 8#/sf x 1/2 (h) TOTAL 8003 118th AVE NE Kirkland, WA 98033 (425) 828-4117 WWW.NASH-ARCHITECTS.C OM �: I CLIENT: _ _I NASH`ASSOCiATM SEISMIC ANALYSIS PROJECT: — DATE: NAME:__ 3 BASE SHEAR: BASE SHEAR V= (F 5DS/R)W LEVEL 2: Wdl # x 0.149 = LEVEL 1: Wdl 7-I (� # x 0.149 = TOTAL: Wdl y l 1 # x 0.149 = 51 / (V) Level Dead Load Heil ht Moment Shear ® Stor (Wdl) (h� (Wdl)(h) rx = [ Wdl)(h)f v Remarks ml)(h) 2 1 ALA l a �H'I �j l �-7 Total 8003 118th AVE NE Kirkland, WA 98033 (425) 628-4117 WWW.NASH—ARCHITECTS.COM NASH-ASSOCIATES _ CL>ENT: 1 SEISMIC ANALYSIS PROJECT: DATE NAME- 4 xAx V� �Z� 0 N x V� N co n w x0 V� N m N �. a 8003 118th AVE NE Kirkland, WA 98033 (425) 828-4117 WWW.Na �4Y— i i, _! NASH`ASSOQ CLIENT:ATES SEISMIC ANALYSIS PROJECT: A R f;I I f"1 L i s DATE: NAME: 6 Redundancy Factor (p�; 1. Maximum allowable wall shear for p<=1 Vumax = (2)(Vaccstory)/Ab 1/2 2. Maximum actual shear Vmax = Largest seismic wall shear 3. p = 2—[2(Vaccstory)/(Vumax)(Ab 1/2) L ` 16 s,--------------- � 06 u/,NO 8003 118th AVE NE Kirkland, WA 98033 (425) 828-4117 WWW NASH—ARCHITECTS.COM . ,��"�.'r.��t��, .�.. x MiTek MiTek USA, Inc. 250 Klug Circle Corona, CA 92880 951-245-9525 Re: B1605533 1487 A The truss drawing(s)referenced below have been prepared by MiTek USA,Inc.under my direct supervision based on the parameters provided by ProBuild West(Arlington,WA). Pages or sheets covered by this seal: K2591577 thru K2591584 My license renewal date for the state of Washington is September 28,2018. Lumber design values are in accordance with ANSI/TPI 1-2007 section 6.3 These truss designs rely on lumber values established by others. �Q.pWNG WASy� O y �0 54074� sy� S,S+� EtyG November 18,2016 Zhao,Xiaoming IMPORTANT NOTE:The seal on these truss component designs is a certification that the engineer named is licensed in the jurisdictions(s)identified and that the designs comply with ANSI/TPI 1.These designs are based upon parameters ' shown e. loads supports,dimensions shapes and design codes which were given to MiTek.An project specific g•� , PP P g ), g� Y p J P information included is for MiTek's customer's file reference purpose only,and was not taken into account in the preparation of these designs. MiTek has not independently verified the applicability of the design parameters or the designs for any particular building.Before use,the building designer should verify applicability of the design parameters and properly incorporate these designs into the overall building design per ANSI/TPI 1,Chapter 2. Job Truss Truss Type Qty Ply 1487 A K2591577 B1605533 A01 GABLE 1 1 ' I I .Job Reference_(optionall ProBuild Arlington, Arlington,WA 98223 7.640 s Sep 29 2015 MiTek Industries,Inc Thu Nov 17 14:15:54 2016 Page 1 ID:1 pumakLzVH3AMQul2ZVvP 1 yJMj9-2XpxFpANAompNYDeSJLLhf_892GOcuyJ7bpm LylEjp 10t1 8-5 8 5-9-10 5-3-0 o 16-11-8 T40 Scale=1:61.3 3x4= 5.00 12 7 8 9 6 4x8 10 3x8% 5 11 33 34 5x8 4 12 13 14 3 27 30 15 16 �I1 2 17 18 d I 3x6_ 26 25 24 3x4-- 3x4= 3x4 = 3x4= 3x6= 23 22 21 20 19 948-12 153- 35;tI O 8-&12 7-ag —a212 Plate Offsets(X.Y)— 18:0-2-O.Edoel 112:O-4-0.0.1-81 LOADING(psf) SPACING- 2-0-0 CS[ DEFL. in (loc) I/dell Ud PLATES GRIP TOLL 25.0 Plate Grip DOL 1.15 TC 0.55 Vert(LL) -0.15 2-26 >999 240 MT20 1851148 (Roof Snow=25.0) Lumber DOL 1 15 BC 069 Vert(CT) -0 32 2-26 >915 180 TCDL 10.0 BCLL 0.0 Rep Stress Incr YES WB 0-69 Horz(CT) 008 17 n/a n/a ' BCDL 8.0 Code IBC2015/TPI2014 (Matrix) Weight:162 lb FT=20% LUMBER- BRACING- TOP CHORD 2x4 HF No.2 TOP CHORD Structural wood sheathing directly applied or 2-11-6 oc purlins. BOT CHORD 2x4 HF No.2'Except" BOT CHORD Rigid ceiling directly applied or 10-0-0 oc bracing. 17-24:2x4 OF 180OF 1.6E JOINTS 1 Brace at Jt(s):27,28,31 WEBS 2x4 HF Stud/Std"Except' MiTek recommends that Stabilizers and required cross bracing 5-23:2x4 HF No.2 be installed during truss erection,in accordance with Stabilizer OTHERS 2x4 HF Stud/Std Installation Duide REACTIONS. All bearings 10-11-8 except Qt=length)2=0-5-8. (lb)- Max Horz 2=92(LC 10) Max Uplift All uplift 100 lb or less at joint(s)2,20,19 except 22=-563(LC 5) Max Grav All reactions 250 lb or less atjoint(s)22,21,20 except 2=1249(LC 17), 23=1278(LC 5),19=325(LC 1),17=325(LC 1) FORCES. (lb)-Max Comp./Max.Ten -All forces 250(lb)or less except when shown TOP CHORD 2-3=-2369/118,3-4=-2072/94,4-33=-1967/98,5-33=-1923/107,5-6=-465/37, 6-7=-384/52,7-8=-305/55,8-9=-356/65,9-10=-368/55,10-11=-381/43,11-34=-389/33, 12-34=-402/25,12-13=-405/24,13-14=-356/12,14-15=-384/0,15-16=-386/0, 16-17=-394/0 BOT CHORD 2-26=-140/2101,25-26=-51/1537,24-25=-26/1752,23-24=-26/1752,22-23=0/338, 21-22=0/338,20-21=01338,19-20=0/338,17-19=0/338 WEBS 5-28=-1428/68,28-29=-1469/75,27-29=-1466/75,27-30=-1515/82,30-31=-1566/84, 31-32=-1589/87,23-32=-1603/89,3-26=-410/119,25-27=-390/66,5-26=-19/547, 5-25=0/487,13-22=-486/98 NOTES- 1)Wind:ASCE 7-10;Vult=110mph(3-second gust)Vasd=87mph;TCDL=6.Opsf;BCDL=4 8psf;h=25ft;Cat.Il;Exp B;enclosed;MWFRS PORNGZA� (envelope)gable end zone;cantilever left and right exposed;end vertical left and right exposed;Lumber DOL=1 60 plate grip DOL=1.60 'WAS 0 2)Truss designed for wind loads in the plane of the truss only. For studs exposed to wind(normal to the face),see Standard Industry Gable End Details as applicable,or consult qualified building designer as per ANSI/TPI 1. Q�� C�� 3)TCLL:ASCE 7-10;Pf=25 0 psf(flat roof snow);Category 11;Exp B;Fully Exp.;Ct=1 0 4)Unbalanced snow loads have been considered for this design. 5)This truss has been designed for greater of min roof live load of 19.0 psf or 2.00 times flat roof load of 25 0 psf on overhangs non-concurrent with other live loads 6)All plates are 2x4 MT20 unless otherwise indicated A� 54074 41� 7)Gable studs spaced at 2-0-0 oc. t7� ��otsTeR� 8)This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads t151 G 9)•This truss has been designed for a live load of 20.Opsf on the bottom chord in all areas where a rectangle 3-6-0 tall by 2-0-0 wide will SIpNpLEN fit between the bottom chord and any other members. Continued on page 2 November 18,2016 A WARNING-VarHy design parameters and READ NOTES ON THIS AND INCLUDED MITEK REFERENCE PAGE MII.7473 rev.10/03/2015 BEFORE USE. Design valid for use only with MiTek®connectors.This design is based only upon parameters shown,and is for an individual building component.not a truss system Before use,the budding designer must verity the applicability of design parametors and property Incorporate this design into the overall building design Bracing indicated is to prevent buckling or Individual truss web andtor chord members only, Additional temporary and permanent bracing MiTek is akvays required for stability and to prevent collapse with poss:bie personal injury and property damage. For general guidance regarding the fabrication,storage,delivery,erection and bracing of trusses and truss systems.see ANSUTPII Quality Criteria,DSB-89 and BCSI Building Component 250 Klug Circle Safety Information available from Truss Plate Institute,218 N Lee Street,Suite 312,Alexandria.VA 22314. Corona,CA 92880 I Job Truss Truss Type City Ply 1467 A K2591577 81605533 A01 GABLE 1 1 _ job Reference lion ProBuild Arlington, Arlington,WA 98223 7 640 s Sep 29 2015 MiTek Industries,Inc, Thu Nov 17 14:15:54 2016 Page 2 NOTES- IDApumakLzVH3AMQul2ZVvP1yJMj9-2XpxFpANAompNYDeSJLLhf 892GOcuyJ?bpmL_rlEjp 10)Provide mechanical connection(by others)of truss to bearing plate capable of withstanding 100 lb uplift at joint(s)2,20,19 except Qt=lb)22=563. 11)"Semi-rigid pitchbreaks with fixed heels"Member end fixity model was used in the analysis and design of this truss r A WARNING-Verify design paramefers and READ NOTES ON THIS AND INCLUDED MITEK REFERENCE PAGE M11.7473 rev.1010312015 BEFORE USE. Design valid for use only with M1TekO connectors,This design Is based only upon Parameters shown,and is for an individual budding componam,not a truss system.Before use,the building designer must verify the appiicabikly,of design parameters and property incorporate this design into the overall building dosign Bracing indicated is 10 prevent buckl n of individual truss web and/or chord members only.Additional temporary and permanent bracing Mire k is always required for stability and to prevent collapse with possible personal injury and property damage. For general guidance regarding the fabilcateon,storage,delivery,erection and bracing of trusses and truss systems,see ANSUTPII quality Criteria,DSB49 and SCSI Building Component 250 Klug Circle Safety information available from Truss Plate Inshlao.218 N Lee Street,Suite 312.Alexandria.VA 22314 Corona,CA 92880 }7 Job JTruss Truss Type Qly Ply 1487 A K2591578 �1605533 A02 Common 17 1 ` b Reference Ljiona ProBUIId Arlington, Arlington,WA 98223 7.640 s Sep 29 2015 MiTek Industries,Inc Thu Nov 17 14:15:55 2016 Page 1 ID:1 pumakLzVH3AMQul2ZVvP1 yJMj9-XkNJT8B?x6ug?iog00taDtXHjSaVLGOTDFZKuQylEjo s1.0•n n.8.0 0971D 9a.R 1� a5-aD ]B.D.O . 1.00 fi-3-3 6-1-3 5-1-10 5-1-10 6-1-3 T 6-3-3 1t-0�0 Scale=1:60.8 4x4= 500 12 8 3x4% 3x4 3x6% 5 18 17 3x6 4 8 2x4\1 2x4 3 9 2 10 yiiLai 11 I� d 3x8= 15 18 19 14 13 20 21 12 3x8= o 3x4= 3x8— 3x8= 3x4= r R.10.15 17-a 0 { _2c" { 35 1 0 8.110.15 5-7-1 Plate offse►s(x.Y)- 12:0,4-2 a-1-BL 110:0-4-2.0-1-81 LOADING(psf) SPACING- 2-0-0 CSI. DEFL. in (loc) I/deft L/d PLATES GRIP TOLL 25.0 Plate Grip DOL 1 15 TC 063 Vert(LL) -0.26 12-13 >999 240 MT20 185/148 (Roof Snow=25.0) Lumber DOL 1.15 BC 083 Vert(CT) -0.48 12-13 >657 180 TCDL 10.0 BCLL 0.0 Rep Stress Incr YES WB 0.96 Horz(CT) 0.16 10 n/a n/a B u D 1- —8 Code IBC2015/TPI2014 (Matrix) Weight:135 lb FT=20% LUMBER- BRACING- TOP CHORD 2x4 HF No.2 TOP CHORD Structural wood sheathing directly applied or 2-5-4 oc purlins. BOT CHORD 2x4 HF No.2 BOT CHORD Rigid ceiling directly applied or 10-0-0 oc bracing WEBS 2x4 HF Stud/Std"Except' MiTek recommends that Stabilizers and required cross bracing 6-13:2x4 HF No.2 be installed during truss erection,in accordance with Stabilizer REACTIONS. (lb/size) 2=1571I0-5-8,10=1571/0-5-8 Installation guide. Max Horz 2=92(LC 10) Max Uplift 2=-59(LC 10).10=-59(LC 11) FORCES. (lb)-Max Comp./Max.Ten.-All forces 250(lb)or less except when shown TOP CHORD 2-3=-3182/109,3-4=-2856/74,4-16=-2746/78,5-16=-2705/88,5-6=-1992/75, 6-7=-1992/75,7-17=-2705/88,8-17=-2746/79,8-9=-2856/74,9-10=-3182/109 BOT CHORD 2-15=-13412848,15-18=-44/2274,18-19=-44/2274,14-19=-44/2274,13-14=-44/2274, 13-20=0/2274,20-21=0/2274,12-21=0/2274,10-12=-42/2848 WEBS 6-13=-4/1159,7-13=-875/126,5-13=-875/126,7-12=-0/511,9-12=-398/123, 5-15=-0/511,3-15=-398/123 NOTES- 1)Wind:ASCE 7-10;Vult=110mph(3-second gust)Vasd=87mph;TCDL=6.Opsf;BCDL=4.8psf;h=25ft;Cat ll;Exp B;enclosed;MWFRS (envelope)gable end zone;cantilever left and right exposed;end vertical left and right exposed;Lumber DOL=1 60 plate grip DOL=1.60 2)TCLL:ASCE 7-10;Pf=25.0 psf(flat roof snow);Category ll;Exp B;Fully Exp.;Ct=1 3)Unbalanced snow loads have been considered forthis design. 4)This truss has been designed for greater of min roof live load of 19.0 psf or 2.00 times flat roof load of 25.0 psf on overhangs non-concurrent with other live loads. 5)This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads �0M1NG Z, 6)"This truss has been designed for a live lead of 20 Opsf on the bottom chord in all areas where a rectangle 3-6-0 tall by 2-0-0 wide will fit between the bottom chord and any other members,with BCDL=8.Opsf. WA O 7)Provide mechanical connection(by others)of truss to bearing plate capable of withstanding 100 lb uplift at joint(s)2,10 C� 8)"Semi-rigid pitchbreaks with fixed heels"Member end fixity model was used in the analysis and design of this truss 0 54074 is- AL �G November 18,2016 AWARNING.Verify design parameters and READ NOTES ON THIS AND INCLUDED MITEK REFERENCE PAGE MII.7473 rev.1010312015 BEFORE USE. Design valid for use only with MiTehA connectors.This design is based only upon parameters shown,and Is for an individual building component,not a truss system.Before use,the building designer must verity the applicability of design parameters and property incorporate this design into the overall bustling design. Bracing Indicated is to prevent buckling of indMdual truss web andfor chord members only Additional temporary and permanent bracing MiTek is always required rot stability and to prevent collapse with possible personal injury and property damago. For general gwdanco regarding the fabrication,storage,delivery,erection and bracing of trusses and truss systems,see ANSIITPl1 Quality Criteria,DSB-89 and BCSI Building Component 250 Klug Circle Safety Information availabte from Truss Plate Institute,218 N Lee Street.Suite 312,Alexandria,VA 22314. Corona,CA 92880 Job Truss Truss Type ply Ply 1487 A K2591579 B1605533 A03D Common 2 1 Job Reference o lional ProBuild Arlington, Arlinglon,WA 98223 7.640 s Sep 29 2015 MiTek Industries,Inc Thu Nov 17 14:15:56 2016 Page 1 ID:1 pumakLzVH3AMQul2ZVvP 1 yJMj9-?wxhgUCdiQOXcsNOakOpm43PgruO4klcSvltQsylEjn d-tla 12.4.E 17.8.0 22 7.10 2e-B•�a aS.n.n 411, 0 1:00 8-3-3 6-1-3 5-1-10 5-1-10 8-1-3 8-3-3 1.0.0 Scale=1:61.1 4x4= 5 00 12 6 3x4% 3x4 WO% 5 7 3x10 16 17 4 8 2x4�� 2x414 s s 2 10 91 11 Id 6x18 MT18H= 15 16 19 14 13 20 21 12 d BAB MT18H= 3x4= 4x4= 3x6= 3x4= i7.6-Q 35.0.0 a-10-15 A_7-1_ 8-7-1 a-10-15 f _ Plate Offsets XY)— 12:0-4.11_Edual [10s0.4-11.Edaej, LOADING(ps25 0 SPACING- 2-0-0 CSI. DEFL. in (loc) I/dell Ud PLATES GRIP CLL(Roof Snow=25 0) Plate Grip DOL 1.15 TC 081 Vert(LL) -0 32 13-15 >999 240 MT20 185/148 TCDL 10-0 Lumber DOL 1.15 BC 085 Vert(CT) -0 50 13-15 >832 180 MT18H 2201195 BCLL 0.0 ' Rep Stress Incr YES WB 0.96 Horz(CT) 013 10 n/a n/a 3GU1 Code IBC2015/TPI2014 (Matrix) Weight:151 lb FT=20% LUMBER- BRACING- TOP CHORD 2x4 HF No.2'Except" TOP CHORD Structural wood sheathing directly applied or 2-1-4 oc purlins 1-4,8-11:2x4 DF 180OF 1.6E BOT CHORD Rigid ceiling directly applied or 2-2-0 oc bracing. BOT CHORD 2x4 DF 180OF 1 6E MiTek recommends that Stabilizers and required cross bracing WEBS 2x4 HF Stud/Std"Except' be installed during truss erection,in accordance with Stabilizer WEDGE 6-13:2x4 HF No.2 Installation Guide. Left:2x6 SP No.2,Right:2x6 SP No.2 REACTIONS. (lb/size) 2=1571/0-5-8,10=1571/0-5-8 Max Horz 2=-92(LC 41) Max Uplift2=-2644(LC 38),10=-2644(LC 41) Max Grav 2=3339(LC 25).10=3339(LC 24) FORCES. (lb)-Max Comp./Max.Ten -All forces 250(lb)or less except when shown TOP CHORD 2-3=-7677/6492,3-4=-5752/4027,4-16=-4504/2734,5-16=-4041/2168,5-6=-3278/1993, 6-7=-3278/1993,7-17=-4041/2168,8-17=-4504/2734,8-9=-5752/4027,9-10=-7677/6493 BOT CHORD 2-15=-6002/7046,15-18=-3009/4292,18-19=-1384/3285,14-19=-136013073, 13-14=-312/2273,13-20=-220/3073,20-21=-1 292/3285,12-21=-2917/4292, 10-12=-5910/7046 WEBS 6-13=-4/1157,7-13=-874/170,7-12=-94/558,9-12=-401/229,5-13=-874/170, 5-15=-93/558,3-15=-401/229 NOTES- 1)Wind:ASCE 7-10;Vult=110mph(3-second gust)Vasd=87mph;TCDL=6.Opsf;BCDL=4.8psf;h=25ft;Cat 11;Exp B;enclosed;MWFRS (envelope)gable end zone;cantilever left and right exposed;end vertical left and right exposed;Lumber DOL=1.60 plate grip DOL=1.60 C 2)TCLL:ASCE 7-10;Pf=25 0 psf(flat roof snow);Category 11;Exp B;Fully Exp;Ct=1 �0M 3 Unbalanced snow loads have been considered for this design. Y 4)This truss has been designed for greater of min roof live load of 19.0 psf or 2 00 times flat roof load of 25 0 psf on overhangs Q�jFASA� non-concurrent with other live loads S 5)All plates are MT20 plates unless otherwise indicated. CEO.yr 6)This truss has been designed for a 10 0 psf bottom chord live load nonconcurrent with any other live loads. 7)'This truss has been designed for a live load of 20.Opsf on the bottom chord in all areas where a rectangle 3-6-0 tall by 2-0-0 wide will fit between the bottom chord and any other members,with BCDL=8 Opsf. 8)Provide mechanical connection(by others)of truss to bearing plate capable of withstanding 100 lb uplift at joint(s)except Qt=lb)2=26441, A.t1 54074 QIr 10=2644. 0 GISTE�� ~ 9)his truss along bottom Nord f designed for a total t drag 0 0 fodr of 0 pf.If.Lumber DOL=(1.33)Plate grip DOL=(1 33) Connect truss to resist drag �`sS Gtsn 10)"Semi-rigid pitchbreaks with fixed heels"Member end fixity model was used in the analysis and design of this truss. November 18,2016 AWARNING-Verily design parameters and READ NOTES ON THIS AND INCLUDED MITEK REFERENCE PAGE MII.7473 rev.1010312015 BEFORE USE. Design valid for use only with MITekde connectors This design is based only upon paramolors shown,and is for an individual building component,not a truss system.Before use,the building designer must verify the applicability of design parameters and properly incorporate this design into the overall pal budding design. Bracing indicated Is to prevent buckling of Individual truss web and/or chord members only Additional temporary and permanent bracing MiTek is always required for stabrldy and to prevent collapse with possible personal injury and property damage. For general guidance regarding the fabrication,storage,delivery,erection and bracing of frusses and truss systems,Sao ANSVTPII Quality Criteria,DS8,99 and BCSI Building Component 250 Klug Circle Safety Information available from Truss Plate Institute,218 N.Lee Street-Suite 312,Alexandna,vA 22314. Corona,CA 92880 Job Truss Truss Type Qty Ply 1487 A K2591580 B1605533 A04 Common 2 1 ' Job Reference(optional) ProBuild Arlington, Arlington,WA 98223 7.640 s Sep 29 2015 MiTek Industries,Inc. Thu Nov 17 14:15:58 2016 Page 1 I D:1 pumakLzVH3AMQul2ZVvP 1 yJMj9-xl3R5AD1E1 GFs9WPh9QHrV9mzfdlYcKvwDn_UlylEjl 40 8-3 3 6-1-3 5-1-10 5-1-10 4-4-6 8-0-0 1 Scale=1:60.8 5x8= 5.00 12 6 5 7 17 16 4 6 2x4 2x4 9 3 d1 2 10 11 an c Id 16 19 20 15 14 13 12 3x6= I &10.15 17•B•0 I 19.9.4 I 24.2.12i z&" 8.10.15 �Q1-T_ 2-3.4 4•b8 10-Q-4 Plate Offsets(X.Yl— 12:0-1-2.Edgel LOADING(psf) SPACING- 2-0-0 CSI. DEFL. in (loc) I/dell L/d PLATES GRIP TOLL Plate Grip DOL 1.15 TC 0.75 Vert(LL) -0 30 10-12 >420 240 MT20 185/148 (Roof Snow=25 0) Lumber DOL 1.15 BC 0.69 Vert(CT) -0 59 10-12 >214 180 TCDL 10.0 BCLL 0.0 Rep Stress Incr YES WB 099 Horz(CT) 002 13 n/a n/a ' AF CDL 8.0 Code IBC2015/TPI2014 (Matrix) Weight:141 lb FT=20% LUMBER- BRACING- TOP CHORD 2x4 HF No.2 TOP CHORD Structural wood sheathing directly applied or 4-5-11 oc purlins. BOT CHORD 2x4 HF No.2 BOT CHORD Rigid ceiling directly applied or 6-0-0 oc bracing. WEBS 2x4 HF Stud/Std*Except* WEBS 1 Row at midpt 6-13 6-14,6-13:2x4 HF No 2 MiTek recommends that Stabilizers and required cross bracing [be installed during truss erection,in accordance with Stabilizer Installation guide REACTIONS. All bearings 0-5-8. (lb)- Max Horz 2=92(LC 10) Max Uplift All uplift 100 lb or less at joint(s)2,12,10 except 13=-107(LC 10) Max Grav All reactions 250 lb or less at joint(s)except 2=794(LC 17).13=1739(LC 17),12=675(LC 18),10=406(LC 18) FORCES. (lb)-Max.Comp./Max.Ten -All forces 250(lb)or less except when shown. TOP CHORD 2-3=-1255/68,3-4=-915/32,4-17=-805/37,5-17=-757/47,5-6=0/278,6-7=-5/701, 7-18=0/435,8-18=0/377,8-9=-0/327 BOT CHORD 2-16=-96/1084,16-19=-6/463,19-20=-6/463,15-20=-6/463,14-15=-6/463, 12-13=-421/71 WEBS 6-14=-10/743,7-13=-385/52,5-14=-901/125,7-12=-128/346,5-16=0/562, 3-16=-447/124,6-13=-1475/47,9-12=-490/123 NOTES- 1)Wind:ASCE 7-10;Vult=11Omph(3-second gust)Vasd=87mph;TCDL=6 Opsf;BCDL=4.8psf;h=25ft;Cat 11;Exp B;enclosed;MWFRS (envelope)gable end zone;cantilever left and right exposed;end vertical left and right exposed;Lumber DOL=1 60 plate grip DOL=1 60 2)TCLL:ASCE 7-10;Pf=25.0 psf(flat roof snow);Category 11;Exp B;Fully Exp;Ct=1 3)Unbalanced snow loads have been considered for this design. �OMMG 4)This truss has been designed for greater of min roof live load of 19.0 psf or 2.00 times flat roof load of 25.0 psf on overhangsASItj O non-concurrent with other live loads. 5)All plates are 3x4 MT20 unless otherwise indicated. Gi 6)This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads 0 7)'This truss has been designed for a live load of 20.Opsf on the bottom chord in all areas where a rectangle 3-6-0 tall by 2-0-0 wide will Cli fit between the bottom chord and any other members,with BCDL=8 Opsf. 8)Provide mechanical connection(by others)of truss to bearing plate capable of withstanding 100 lb uplift at joint(s)2,12,10 except (jt=lb)13=107 9)"Semi-rigid pitchbreaks with fixed heels"Member end fixity model was used in the analysis and design of this truss *Pox, ,p 54074Q/ 'SGISTBR� �s`rIONAL EEO November 18,2016 AWARNING-Verily,design parameters and READ NOTES ON TNIS AND INCLUDED MITEK REFERENCE PAGE MII-7473 rev.10/03/2015 BEFORE USE. Design valid for use only with MiTek®connectors This design is based only upon parameters shown,and is for an Individual building component,not a truss system.Beforo use.the building designar must verify the applicability of design parameters and propedy Incorporate this design into the overall building design. Bracing Indicated Is to prevent buckling of individual truss web and/or chord members only Add'dlonal Temporary and permanent bracing M iTe k is akvays required for stability and to prevant co8epse with possible personal Injury and property damage For general guidance regarding the fabrication,storage,detrvery,erection and bracing of trusses and truss systems,see ANSYTPIt Quality Criteria,DSB-89 and BCSI Building Component 250 Klug Circle Safety Information available from Truss Plate Institute,218 N.Lee Street.Suite 312,Alexandria,VA 22314. Corona,CA 92880 Job Truss Truss Type Qty Ply 1487 A K2591581 B1605533 A05 GABLE 1 1 Job Reference footionah ProBuild Arlington, Arlington,WA 98223 7.640 s Sep 29 2015 MiTek Industries,Inc. Thu Nov 17 14:15:58 2016 Page 1 ID:1pumakLzVH3AMQul2ZVvP1yJMj9-xl3R5AD1E1GFs9WPh9QHrV9j9fdKYiRvwDn UlylEjl ti�hll r7-e-D ��.e.e ian.n a�nn 17-6-0 9-6-0 8-G-0 -61 0 Scale=1:80.8 3x4= 5.00 112 11 12 13 10 14 3x4 9 8 15 S4 4x4 7 18 6 17 3x6 18 5 33 4 32 3 31 hI1 2lly 19 20I¢ d d 3x4 = 3x10= 21 3x6= 30 29 26 27 26 25 24 23 22 5x6= I 2a�t2 l �7.0.o I 35-0-0 4-9-12_ &d 8-o-o Plate offsets(X.Y)— [12'0-2-0.EdagJ 12470-3-0 0-3-01 T (ps2 CLL 25.0 SPACING- 2-0-0 CSI DEFL. in (loc) Ildefl Ud PLATES GRIP (Roof Snow=25 0) Plate Grip DOL 1.15 TC 0.93 Vert(LL) -0 32 19-21 >401 240 MT20 185/148 TCDL 10.0 Lumber DOL 1.15 BC 0.69 Vert(CT) -0.62 19-21 >207 180 BCLL 0.0 ' Rep Stress Incr YES WB 0.60 Horz(CT) -0 01 21 n/a n/a UCL11 $0 Code IBC2015/TPI2014 (Matrix) Weight:159 Ib FT=20% LUMBER- BRACING- TOP CHORD 2x4 HF No 2 TOP CHORD Structural wood sheathing directly applied or 2-2-0 oc purlins BOT CHORD 2x4 HF No.2 BOT CHORD Rigid ceiling directly applied or 6-0-0 oc bracing, Except: WEBS 2x4 HF No.2"Except' 10-0-0 oc bracing:19-21. 18-21:2x4 HF Stud/Std JOINTS 1 Brace at A(a),31,32,33 OTHERS 2x4 HF Slud/Std MiTek recommends that Stabilizers and required cross bracing be installed during truss erection,in accordance with Stabilizer Installation uide- _ REACTIONS. All bearings 20-0-0 except Qt=length)21=0-5-8,19=0-5-8 (lb)- Max Horz 19=92(LC 10) Max Uplift All uplift 100 lb or less at joint(s)21,19,30,29,28,27,26,25,24 except 22=-126(LC 11) Max Grav All reactions 250 lb or less at joint(s)2,30,29,28,27,26.25,23 except 22=697(LC 18),21=668(LC 18),19=504(LC 18),24=257(LC 17) FORCES. (lb)-Max.Comp./Max Ten -All forces 250(lb)or less except when shown TOP CHORD 13-14=-5/275,16-19=-419/88 BOT CHORD 19-21=-49/304 WEBS 18-21=-634/131,13-22=-651/119 NOTES- 1)Wind:ASCE 7-10;VuIt=11Omph(3-second gust)Vasd=87mph;TCDL=6.Opsf;BCDL=4 8psf;h=25ft;Cat 11;Exp B;enclosed;MWFRS (envelope)gable end zone;cantilever left and right exposed;end vertical left and right exposed;Lumber DOL=1.60 plate grip DOL=1.60 2)Truss designed for wind loads in the plane of the truss only. For studs exposed to wind(normal to the face),see Standard Industry Gable End Details as applicable,or consult qualified building designer as per ANSI/TPI 1. 3)TCLL:ASCE 7-10;Pf=25.0 psf(flat roof snow);Category 11;Exp B;Fully Exp,;Ct=1 OMMG 2A 4)Unbalanced snow loads have been considered for this design. 5)This truss has been designed for greater of min roof live load of 19.0 psf or 2,00 times flat roof load of 25.0 psf on overhangs W 0 non-concurrent with other live loads �G,r 6)All plates are 2x4 MT20 unless otherwise indicated 7)Gable studs spaced at 2-0-0 oc. 8)This truss has been designed for a 10 0 psf bottom chord live load nonconcurrent with any other live loads 9)"This truss has been designed for a live load of 20.Opsf on the bottom chord in all areas where a rectangle 3-6-0 tall by 2-0-0 wide will fit between the bottom chord and any other members 10)Provide mechanical connection(by others)of truss to bearing plate capable of withstanding 100 lb uplift at joint(s)21,19,30,29,28, A+f� 54074 Qr 27,26,25,24 except(jt=lb)22=126. 0�� FO/S 11)"Semi-rigid pitchbreaks with fixed heels"Member end fixity model was used in the analysis and design of this truss. s' G SIDNAL�� November 18,2016 A WARNING-Verify design parameters and READ NOTES ON THIS AND INCLUDED MITEK REFERENCE PAGE 11111.7473 rev.10/03/2015 BEFORE USE. Design valid for use orgy with MiTek®connectors.This design is based only upon parameters shown,and Is for an individual budding component,not a truss system Before use,the building designer must verity the applicability of design parameters and properly incorporate this design Into the overall budding design.Bracing indicated U to prevent buckling of indvidual truss web andlor chord members only Additional temporary and permanent bracing MiTek' is always required for stability and to prevent collapse with possible personal Injury and property damage.For general guidance regonfktg this fabrication,storage,delivery.erection and bracing of trusses and truss systems.see ANSUTPII Quality Criteria.DSB49 and SCSI Building Component 250 Klug Circle Safety Information availoblo from Truss Plate Institute,218 N Lee Street,Suite 312.Alexandria,VA 22314- Corona,CA 92880 Job Truss FGA Type Qty Ply 1487 A K2591582 81605533 B01 E 1 1 Job Reference Lion ProBuild Arlington, Arlington,WA 98223 7.640 s Sep 29 2015 MiTek Industries,Inc. Thu Nov 17 14:15:59 2016 Page 1 ID:1 pumakLzVH3AMQul2ZVvP 1 yJMj9-PVdgl WEV7LO6TJ5bFsxWOjh5i36KH Hg38txx1 BylEjk r-1 0.G r 1 -M 2441.0 �5.11.n 1-0-0 12-3-0 12-3-0 1 0-0 Scale=1:43.6 3x4= 8 9 7 5-00 12 10 6 11 5 12 4 13 3 2 14 $fit 15 I� d 3x4= 26 25 24 23 22 21 20 19 18 17 16 3x4= 3x4= j 24iw0 1 24�" _ _Plate Offsets fX.Y)— (8 0 2-0.Edggj LOADING(psf) �f TCLL 25.0 SPACING- 2-0-0 CSI. DEFL. in (loc) I/dell Ud PLATES GRIP (Roof Snow=25.0) Plate Grip DOL 1 15 TC 0.12 Vert(LL) 0.00 14 n/r 180 MT20 185/148 TCDL 10.0 Lumber DOL 1 15 BC 0.06 Vert(CT) 0.00 15 n/r 120 BCLL 0.0 Rep Stress Incr YES WB 0.09 Horz(CT) 0.00 14 n/a n/a U09 $Q Code IBC2015/TPI2014 (Matrix) Weight:95 lb FT=20% LUMBER- BRACING- TOP CHORD 2x4 HF No.2 TOP CHORD Structural wood sheathing directly applied or 6-0-0 oc purlins. BOT CHORD 2x4 HF No.2 BOT CHORD Rigid ceiling directly applied or 10-0-0 oc bracing OTHERS 2x4 HF Stud/Std f MiTek recommends that Stabilizers and required cross bracing be installed during truss erection,in accordance with Stabilizer Installation ouide REACTIONS. All bearings 24-6-0. (lb)- Max Horz 2=66(LC 10) Max Uplift All uplift 100 lb or less at joint(s)2,26,25,24,23,19.18,14,17, 16 Max Grav All reactions 250 lb or less at joint(s)2,26,25,24,23,22,20,19,18, 14,17 except 16=287(LC 18) FORCES. (lb)-Max.Comp./Max.Ten -All forces 250(lb)or less except when shown NOTES. 1)Wind:ASCE 7-10;Vult=11Omph(3-second gust)Vasd=87mph;TCDL=6.Opsf;BCDL=4.Bpsf;h=25ft;Cat.II;Exp B;enclosed;MWFRS (envelope)gable end zone;cantilever left and right exposed;end vertical left and right exposed;Lumber DOL=1 60 plate grip DOL=1.60 2)Truss designed for wind loads in the plane of the truss only. For studs exposed to wind(normal to the face),see Standard Industry Gable End Details as applicable,or consult qualified building designer as per ANSI/TPI 1 3)TCLL:ASCE 7-10;Pf=25 0 psf(flat roof snow);Category 11;Exp B;Fully Exp.;Ct=1 4)Unbalanced snow loads have been considered for this design. 5)This truss has been designed for greater of min roof live load of 19 0 psf or 2.00 times flat roof load of 25 0 psf on overhangs non-concurrent with other live loads. 6)All plates are 2x4 MT20 unless otherwise indicated. 7)Gable requires continuous bottom chord bearing. �>,N1IdG 8)Gable studs spaced at 2-0-0 oc. 'Lq 9)This truss has been designed for a 10 0 psf bottom chord live load nonconcurrent with any other live loads WAS O 10)'This truss has been designed for a live load of 20 Opsf on the bottom chord in all areas where a rectangle 3-6-0 tall by 2-0-0 wide will fit between the bottom chord and any other members. 11)Provide mechanical connection(by others)of truss to bearing plate capable of withstanding 100 lb uplift at joint(s)2,26,25,24,23,19, 18,14,17,16. 12)"Semi-rigid pitchbreaks with fixed heels"Member end fixity model was used in the analysis and design of this truss. 06� 54074 4 SS��NAL G November 18,2016 A WARNING-Verily design parameters and READ NOTES ON THIS AND INCLUDED MITEK REFERENCE PAGE MII.7473 rev.10/03/2015 BEFORE USE. Design valid for use only with MITek®connectors This design is based only upon parameters shown,and is for an individual building component,not a truss system.Before use,the building designer must verity the applicability of design parameters and properly incorporate this design into the overall budding design. Bracing Indicated is to prevent buckling of individual truss web ardlor chord members only.Additional temporary and permaneht bracing MiTek Is always required for stabddy and to prevent collapse with possible personal injury and property damage For general guidance regarding the fabrication,storage,delivery.erection and bracing of trusses and truss systems,see ANSIITPII Quality Criteria,DSB-89 and SCSI Building Component 250 Klug Circle Safety information available from Truss Plate Ingdute,218 N Lee Street,Suite 312,Alexandria,VA 22314. Corona,CA 92880 Job rBO2ss Truss Type Sly Ply 1487 A K2591563 B1605533 Common IS 1 Job Reference o Co a ProBuild Arlington, Arlington,WA 98223 7.640 s Sep 29 2015 MiTek Industries,Inc. Thu Nov 17 14:16:00 2016 Page 1 ID:1 pumakLzVH3AM0ul2ZVvP1yJMj9-thACW5FBmeXz5TgopZSlwwE8gSKkOhHCNXG5ZdyIEjj 6-5- 12-3.D t8.0.10 a-8.0 2s.a.n 1-0.0 -56 5-9-10 5-9-10 6-5-6 1-0.0 Scale=1:43.5 44= 4 5.00 F12 2x4 \\ 11 12 2x4 3 5 2 e $r 7 jd _ 10 9 8 3x5 3x4= 3x4= 3x4= 3x6 ���--- — 7 G-6— 8.612 i LOADING(psi TCLL 25.0 SPACING- 2-0-0 CSI. DEFL. in (loc) I/deft L/d PLATES GRIP (Roof Snow=25.0) Plate Grip DOL 1.15 TC 0.61 Vert(LL) -0 16 2-10 >999 240 MT20 1851148 TCDL 1010 Lumber DOL 1.15 BC 0.63 Vert(CT) -0 33 2-10 >884 180 BCLL 0.0 " Rep Stress Incr YES WB 0.32 Horz(CT) 0.07 6 n/a n/a BCDL 8,0 Code IBC2015/TPI2014 (Matrix) Weight:84 lb FT=20% LUMBER- BRACING- TOP CHORD 2x4 HF No 2 TOP CHORD Structural wood sheathing directly applied or 3-4-1 oc purlins. BOT CHORD 2x4 HF No.2 BOT CHORD Rigid ceiling directly applied or 10-0-0 oc bracing. WEBS 2x4 HF Stud/Std MiTek recommends that Stabilizers and required cross bracing be installed during truss erection,in accordance with Stabilizer J REACTIONS. (lb/size) 2=1120/0-5-8,6=1120/0-5-8 Installationuide. Max Horz 2=-66(LC 15) Max Uplift2=-45(LC 10),6=-45(LC 11) FORCES. (lb)-Max.Comp./Max.Ten -All forces 250(lb)or less except when shown. TOP CHORD 2-3=-2055/77,3-11=-1 747/39,4-11=-1 657/64,4-12=-1657/64,5-12=-1747/40, 5-6=-2055/78 BOT CHORD 2-10=-77/1815,9-10=0/1217,8-9=0/1217,6-8=-12/1815 WEBS 4-8=-27/625,5-8=-510/128,4-10=-27/625,3-10=-510/128 NOTES- 1)Wind:ASCE 7-10;VUK=11Omph(3-second gust)Vasd=87mph;TCDL=6.Opsf;BCDL=4.8psf;h=25ft;Cat.11;Exp B;enclosed;MWFRS (envelope)gable end zone;cantilever left and right exposed;end vertical left and right exposed;Lumber DOL=1.60 plate grip D0L=1 60 2)TCLL:ASCE 7-10;Pf=25.0 psf(flat roof snow);Category Il;Exp B;Fully Exp.;Ct=1 3)Unbalanced snow loads have been considered for this design. 4)This truss has been designed for greater of min roof live load of 19.0 psf or 2.00 times flat roof load of 25 0 psf on overhangs non-concurrent with other live loads 5)This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 6)"This truss has been designed for a live load of 20.Opsf on the bottom chord in all areas where a rectangle 3-6-0 tall by 2-0-0 wide will fit between the bottom chord and any other members 7)Provide mechanical connection(by others)of truss to bearing plate capable of withstanding 100 lb uplift at joint(s)2,6. OWNG Z 8)"Semi-rigid pitchbreaks with fixed heels"Member end fixity model was used in the analysis and design of this truss. O F � (ice ox w0wpo RF 54074� q,4 SSI�NAL��� November 18,2016 A WARNING-Verify design parameters and READ NOTES ON THIS AND INCLUDED MITEK REFERENCE PAGE 114II-7473 rev.1010312015 BEFORE USE. Design valid for use only with MiTek®connectors.This design is based only upon parameters shown,and is for an individual building component,not a truss system.Before use,the building designer must vitrify the appbcab8tty of design pammelers and property Incorporate this design into the overiel building design Bracing Indicated Is to prevent buckling of Individual truss web anmor chord members only.Additional temporary and permanent bracing MiTek is always required for stability and to prevent collapse with possible personal Injury and proporty damage.For general guidance regarding the fabrication,storage,delivery,erection and bracing of trusses and truss systems,see ANSIITPII quality Criteria,DSB-89 and BCSI Building Component 250 Klug Circle Safety Information available from Truss Plate tnslauto,218 N.Lee Street.Sutte 312,Alexandria,VA 22314. Corona,CA 92880 Job Truss Truss Type Qty Ply 1487 A K2591584 B1605533 C01 GABLE 1 1 J Reference(optional) ProBuild Arlington, Arlington,WA 98223 7.640 s Sep 29 2015 MiTek Industries,Inc. Thu Nov 17 14:16:01 2016 Page 1 to:1 pumakLzVH3AMQul2ZVvP 1 yJMj9-LtkajC Fm WyfpjdF_MHz_T8nQJsoFICdLcBOe54ylEji 1-aD r a n n 1-a0 B-a0 6-a0 1-0-0 Scale=1:29.6 4x4= 5 5.00 F12 4 6 3 15 16 7 2 6 e I0 3x4= 14 13 12 11 10 3x4= r 16.0.0 t&0-0 LOADING(psf) SPACING- 2-0-0 CSI. DEFL. in (loc) I/dell L/d PLATES GRIP TOLL Plate Grip DOL 1.15 TC 017 Vert(LL) -0 00 9 n/r 180 MT20 185/148 (Roof Snow=25 0 0)) Lumber DOL 1.15 BC 010 Vert(CT) 000 9 n/r 120 TCDL 10 0 Rep Stress Incr YES W 0 06 Horz(CT) 0.00 8 n/a n/a BCLL 0 0 B Matra o BCJL 80 Code IBC2015/TPI2014 ( ) � Weight:54 lb FT=20% LUMBER- BRACING- TOP CHORD 2x4 HF No.2 TOP CHORD Structural wood sheathing directly applied or 6-0-0 oc purlins. BOT CHORD 2x4 HF No.2 BOT CHORD Rigid ceiling directly applied or 10-0-0 oc bracing OTHERS 2x4 HF Stud/Std MiTek recommends that Stabilizers and required cross bracing be installed during truss erection,in accordance with Stabilizer Installation ulde. REACTIONS. All bearings 16-0-0. (lb)- Max Horz 2=45(LC 10) Max Uplift All uplift 100 lb or less at joint(s)2,8,14,13,11,10 Max Grav All reactions 250 lb or less at joint(s)2,8,13,12,11 except 14=339(LC 17),10=339(LC 18) FORCES. (lb)-Max.Comp./Max.Ten.-All forces 250(lb)or less except when shown WEBS 3-14=-273/79,7-111 NOTES- 1)Wind:ASCE 7-10;Vul1=110mph(3-second gust)Vasd=87mph;TCDL=6 Opsf;BCDL=4 8psf;h=25ft;Cat.Il;Exp B;enclosed;MWFRS (envelope)gable end zone;cantilever left and right exposed;end vertical left and right exposed;Lumber DOL=1.60 plate grip DOL=1.60 2)Truss designed for wind loads in the plane of the truss only. For studs exposed to wind(normal to the face),see Standard Industry Gable End Details as applicable,or consult qualified building designer as per ANSI/TPI 1. 3)TCLL:ASCE 7-10;Pf=25 0 psf(flat roof snow);Category Il;Exp B;Fully Exp;Ct=1 4)Unbalanced snow loads have been considered for this design. 5)This truss has been designed for greater of min roof live load of 19.0 psf or 2.00 times flat roof load of 25 0 psf on overhangs non-concurrent with other live loads. 6)All plates are 2x4 MT20 unless otherwise indicated. 7)Gable requires continuous bottom chord bearing. 8)Gable studs spaced at 2-0-0 Do. 9)This truss has been designed for a 10 0 psf bottom chord live load nonconcurrent with any other live loads. pt,A1NG ZA- 10)'This truss has been designed for a live load of 20 Opsf on the bottom chord in all areas where a rectangle 3-6-0 tall by 2-0-0 wide will fit between the bottom chord and any other members. p4 WASN 0 11)Provide mechanical connection(by others)of truss to bearing plate capable of withstanding 100 lb uplift at joint(s)2,8,14,13,11.10 12)"Semi-rigid pitchbreaks with fixed heels"Member end fixity model was used in the analysis and design of this truss �e 0 • r 54074 A, G+�, 8f37STV SSfONAL��G November 18,2016 A WARNING-Verily design parameters and READ NOTES ON THIS AND INCLUDED MITEK REFERENCE PAGE MII-7473 rev.1010312015 BEFORE USE. Design valid for use only with MrTeka connectors This design is based only upon parameters shown,and is for an individual building component,not I truss system.Before use,the building designer must vent'the applicability of design parameters and property incorporate thistle sign Into the overall building design Bracing indicated is to prevent buckling of individual truss wob andlor chord members only Add4ional temporary and permanent bracing M iTe k is always required for stability and to prevent collapse with possible personal Injury and property damage. For general guidance regarding the fabrication,storage,delivery,erection and bracing of trusses and truss systems.see ANSIITPII Quality Criteria,DSB-89 and SCSI Building Component 250 Klug Circle Safety Information available from Truss Plate Institute.218 N-Lee Street,Suite 312,Alexandria,VA 22314. Corona,CA 92880 MI n Cl) Z 0. W " Cn Co (n y D q C Cl) N Z mX m m m O r `� m I I s O W c�SG�o�p�zo N o _ a oc c o v m a m c o n C rn ��a�o0 a - a 0�o� = omen n � � OCA oQDG�o�� � nmic a �c 5 Z Er Er 'm oCD a�� -� m- 0DpoC0 Z �Wo 3 a� N N Q^g,- d a� m oni � m N_nm c W c v, a m D O CI a� m (p�• N CAD O O CD < = c•N N a C`G CD �p z CL CDDand N Nvy mC = a O 'o y' 3 °� oCL �n0 �� m•mv _ �v Sim n f) m m=. o ° a m CD�� D s m m a a -0 a o 2 4 0 m N m v O cn O�.(n W a N O n R: O'.co 0 o C N O R CO�1 = y ' CD• Q N•an d 00 m °�' m o = Q= o' 'm 3 °' = rn = m 0'0 0 = ao m = Fn N CD O(D n �m V�'m �'l = - (�.Q Z n 0-N N = C� R: 0_ v Z m �y o o m a M. (� v� o n(D 3 o m 3 0 0 3 o -4 1]N M N CD m N N 0 3 N ID N fA C fD J a,_+ D m d 0 O O C N �p N �• p O > j S 7C p S m O ?Q N gag cn �� .v CD o in 0•am o N m m o ti �' ti z .mo CD j'C O.� m = m = C- N = O O (p N 7 N ICI ._..Q j• O a N•m .�.. �:j X O .� N CDO0 CD N N `G M CDm m n v z n a TOP CHORD cx xxo � v 'C N N � m O W r c-zi 00 CI-8 — : CD cm my mzu, 20 M (SD �C- fD N o f .1 n yy 1-4� VW.2-7 n m awm a) CD m- � z xm rnj v -Ica N U)mo n mom�v, < CD om �� NO I * �mp a�_ 0 w < CD7 w- m �W cm(D C 2 N D (n yy -I = (n Cl) N CD a m m � r O N o. �■ $ �) m U) o X Cl) X m a p 3 Cl) �� CL =� ;u O o =1 cz: n m Cl) m - a -400 r G)m 0 co f y N �/\ (D al3 N 0 o m m J W p ` m C//) A m fD O Q W xp (n" No v F `Z U1 W -< m m o= fD ® 7 N 2 O O x rh m N . CD < C CD v -1 m W34 w � N o � Z aW V CD `) X < D m moo N = CD o m c� ° y y CD S _ CJ1 CG-5 A CD 7 m O m TOP CHORD N -' O N v 01 (n A W N O N W -I 0I N A W N O DC vi�A jC a �O n o W v� �� �� mn NC �C >:C o`_o-1 C> mn� �y„Z Q3 f1 o.y N Z N J W y .yr. O O O a- y 01 J J N (D O. fn^ o a r M 0•o J J (/N�Naa 0-1 M d 3 °�' 3 v 3 fD m °� NmN o y cmi ;'Se.< cyi m a a �n� f0 V Nri' M - O N N 3 J�• 3i m V (D O'O y J N 7 '7 N 3 m� G F IG m y j �y icy_ 010 � � �•° n� � av � 'J° �m °o m Ham 3 � � mx many ;- CD '-. -� � �onv �.>_j Ra �o N oo n� om Ww n m m� x7m 3� m3N m ��D� �•m °c@m � y p CC .J..Q._7 2�O n J DI J 41 C y y N N R O .�D..y f�D 2 ID 3 O y f�(ya,N N a d Sr E to x Q -1 /A Dl y O J Q N J N O N G'� L CD D) J y O. J DI•� O.� .Jn N CD O.� O �O O O J Q Q.03 m V O \I/ C)� m� o�dp ? �Jp2 o y.5. �m m o cR. n$n2 ?(gyp �(op my (°p m �c � 9 m o��^ �'o 0 `/��u N O 3 O.N Q - `8 01 m O N `8 T.N 2 y (O G y0. ut' O `_ oil �a •`�'m3 c l3 m mo �� v� �� mom m� 33 n* �5t myy co m6.Cy m(o � 0 m SO oa. N c ac n x no o o. o^' Cr Z m ma aim ! o0 4F 0) C iY J fD J y i C O N M m O. J . y 0)N C fD �n O.2 m .0 y .< DI y ` Q. 01 Ji. J� O. O y J n 7N CnO /s�(D �J Qm ZC �� y .Jyn � 7 O'y N ID O' m y /'� a M.O N 7 N y J N (D O ID D..Z, m N f1 J Q fD A cn ID O N O i Q 7 C.4 N C O' x y Od W y 9t a W J m 7 6.2 J N�C �`G 1 n 3 O fD a -s N d M d me mo 'o Rty Ja vd �S J �v .J• Cr 2 d �'� 3 W �h m a o v S �' �• Yn a y m CD F m" O O M O o• G J ._�,_. V C M fD d fD J m-fD fD �o yt� a �� n o y �y 3 m �� 3`n CO D N C�. C9 N 7 n O. 7 NN NO' �p a O. f� 9-n 0FD O y cr <D N f0 y p J Wm < (� '•� co 3 m CD 3 m O 1"F m N Prescriptive Energy Code Compliance for All Climate Zones in Washington Project Information Contact Information Plan 1487 This project will use the requirements of the Prescriptive Path below and incorporate the the minimum values listed.In addition,based on the size of the structure,the appropriate number of additional credits are checked as chosen by the permit applicant. Authorized Representative Date All Climate cones R-Value' U-Factor' Fenestration U-Factor" n/a 0.30 Skylight U-Factor n/a 0.50 Glazed Fenestration SHGC" n/a n/a Ceiling" 491 0.026 Wood Frame Walle''°'" 21 int 0.056 Mass Wall R-Value' 21/21" 0.056 Floor 3011 0.029 Below Grade Wall°'' 10/15/21 int+TB 0.042 Slab"R-Value&Depth 10,2 ft n/a *Table R402.1.1 and Table R402.1.3 Footnotes included on Page 2 Each dwelling unit in a residential building shall comply with sufficient options from Table R406.2 so as to achieve the following minimum number of credits: 1.Small Dwelling Unit: 1.5 credits 0 Dwelling units less than 1500 square feet in conditioned floor area with less than 300 square feet of fenestration area. Additions to existing building that are greater than 500 square feet of heated floor area but less than 1500 square feet. [12. Medium Dwelling Unit: 3.5 credits All dwelling units that are not included in#1 or#3. Exception:Dwelling units serving R-2 occupancies shall require 2.5 credits. ❑3.Large Dwelling Unit: 4.5 credits Dwelling units exceeding 5000 square feet of conditioned floor area. ❑4. Additions less than 500 square feet. .5 credits Table R406.2 Summary -Option Description Credit(s) 1a Efficient Building Envelope la 0.5 ❑ lb Efficient Building Envelope lb 1.0 ❑ �� 1c Efficient Building Envelope 1c 2.0 El ����� �® 1d Efficient Building Envelope 1d 0.5 O 2a Air Leakage Control and Efficient Ventilation 2a 0.5 ❑ 2b Air Leakage Control and Efficient Ventilation 2b 1.0 ❑ 2c Air Leakage Control and Efficient Ventilation 2c 1.5 ❑ 3a High Efficiency HVAC 3a 1.0 (] 1.0 3b High Efficiency HVAC 3b 1.0 ❑ 3c High Efficiency HVAC 3c 1.5 ❑ 3d High Efficiency HVAC 3d 1.0 ❑ 4 High Efficiency HVAC Distribution System 1.0 ❑ 5a Efficient Water Heating 5a 0.5 1] 0.5 5b Efficient Water Heating 5b 1.0 ❑ 5c Efficient Water Heating 5c 1.5 ❑ 5d Efficient Water Heating 5d 0.5 ❑ 6 Renewable Electric Energy 0.5 *1200 kwh 0.0 Total Credits 1.50 *Please refer to Table R406.2 for complete option descriptions Received APR 20 2017 1An 1441 . r Table R402.1.1 Footnotes For SI: 1 foot.=304.8 mm,ci.=continuous insulation,int.=intermediate framing. i R-values are minimums. U-factors and SHGC are maximums.When insulation is installed in a cavity which is less than the label or design thickness of the insulation,the compressed R-value of the insulation from Appendix Table A101.4 shall not be less than the R-value specified in the table. b The fenestration U-factor column excludes skylights.The SHGC column applies to all glazed fenestration. "10/15/21.+TB" means R-10 continuous insulation on the exterior of the wall,or R-15 on the continuous insulation on the interior of the wall,or R-21 cavity insulation plus a thermal break between the slab and the basement wall at the interior of the basement wall."10/15/21.+TB"shall be permitted to be met with R-13 cavity insulation on the interior of the basement wall plus R-5 continuous insulation on the interior or exterior of the wall. "10/13" means R-10 continuous insulation on the interior or exterior of the home or R-13 cavity insulation at the interior of the basement wall."TB" means thermal break between floor slab and basement wall. d R-10 continuous insulation is required under heated slab on grade floors.See R402.2.9.1. e There are no SHGC requirements in the Marine Zone. f Reserved. g Reserved. h Reserved. The second R-value applies when more than half the insulation is on the interior of the mass wall. J Reserved. k For single rafter-or joist-vaulted ceilings,the insulation may be reduced to R-38. i Reserved. m Int.(intermediate framing)denotes standard framing 16 inches on center with headers insulated with a minimum of R-10 insulation. Table R402.1.3 Footnote a Nonfenestration U-factors shall be obtained from measurement, calculation or an approved source or as specified in Section R402.1.3. Window, Skylight and Door Schedule P(oject Information Contact Information Plan 1487 Width Height Ref. U-factor Qt. Feet inch Feet inch Area UA Exempt Swinging Door(24 sq. ft. max.) 0.0 0.00 Exempt Glazed Fenestration(15 sq.ft. max.) 0.0 0.00 Vertical Fenestration(Windows and doors) Component Width Height Description Ref. U-factor Qt. Feet inch Feet inch Area UA Foyer 0.30 1 3 6 20.0 6.00 0.30 1 2 6 17.8 5.33 Dining 0.30 1 5 5 25.0 7.50 Great Room 0.30 1 3 5 15.0 4.50 0.30 1 6 16 '° 41.01 12.30 Master Bedroom 10.30 1 5 5 1 25.0 7.50 Bedroom 2 0.30 1 3 5 15.0 4.50 Bedroom 3 0.30 1 3 5 15.0 4.50 0.30 0.0 0.00 0.30 0.0 0.00 0.30 0.0 0.00 0.30 0.0 0.00 0.30 0.0 0.00 0.30 0.0 0.00 0.30 0.01 0.00 0.30 0.0 0.00 0.30 0.0 0.00 0.30 0.0 0.00 0.30 0.0 0.00 0.30 0.0 0.00 0.30 0.0 0.00 0.30 0.0 0.00 0.30 0.0 0.00 0.30 0.0 0.00 0.30 0.0 0.00 0.30 0.0 0.00 0.30 0.0 0.00 0.30 0.0 0.00 0.0 0.00 0.0 0.00 0.0 0.00 0.0 0.00 0.0 0.00 LJ 0.0 0.00 11 F 0.0 0.00 0.01 0.00 0.01 0.00 0.01 0.00 0.0 0.00 0.0 0.00 0.0 0.00 0.0 0.00 Sum of Vertical Fenestration Area and UA 1 173.81 52.13 Vertical Fenestration Area Weighted U=UA/Area 0.30 Overhead Glazing(Skylights) Component Width Height Description Ref. U-factor Qt. Feet inch Feet inch Area UA 0.01 0.00 0.0 0.00 0.0 0.00 0.0 0.00 0.0 0.00 0.01 0.00 Sum of Overhead Glazing Area and UA 0.01 0.00 Overhead Glazing Area Weighted U=UA/Area 1 0.00 Total Sum of Fenestration Area and UA (for heating system sizing calculations) 1 173.81 52.13 Simple Heating System Size:Washington State This heating system sizing calculator is based on the Prescriptive Reguiremenls of the 2015 Washington State Energy Code(WSEC)and ACCA Manuals J and S.This calculator will calculate heating loads only.ACCA procedures for sizing cooling systems should be used to determine cooling loads The glazing(window)and door portion of this calculator assumes the installed glazing and door products have an area weighted average U-factor of 0.30. The incorporated insulation requirements are the minimum prescriptive amounts specified by the 2015 WSEC. Please fill out all of the green drop-downs and boxes that are applicable to your project.As you make selections in the drop-downs for each section,some values will be calculated for you. If you do not see the selection you need in the drop-down options,please call the WSU Energy Extension Program at (360)956.2042 for assistance. Pro vct Information Contact Information Plan 1487 Heating System Type: O All ether Systems O Heat Pump To see detailed Instructions for each section,place your cursor on the word"Instructions". Design Temperature Design Temperature Difference(AT) 47 L r �.. ♦ ! AT=Indoor(70 degrees)-Outdoor Design Temp Area of Buildinq Conditioned Floor Area Instructions Conditioned Floor Area(sq ft) F 1.487 Average Ceiling Height Conditioned Volume Instructions Average Ceiling Height(ft) 9.0 13,383 Glazina and Doors U-Factor X Area = UA Instructions 0.30 159 47,70 Skylights U-Factor X Area UA Instructions 0.50 .» Insulation Attic U-Factor X Area = UA Instructions 1R-49 .�I 0.026 1.487 38.66 Single Rafter or Joist Vaulted Ceilings U-Factor X Area UA Instructions Select R-Value No selection --- Above Grade Walls toes Figure 1) U-Factor X Area UA Instruct ens 61 R-21 Intermediate 0.056 F 1,600 89.60 Floors U-Factor X Area UA Instructions OR-30 -- —� 0.029 1.487 43.12 Below Grade Walls law Figure 1) U-Factor X Area UA Instructions j No Below Grade Walls in this proem ♦ - Slab Below Grade fees Finuren F-Factor X Length UA Instructions Selectcomitloning ♦ I No selection -- Slab on Grade(see FVure ii F-Factor X Length UA Instructions (--� No Slab on Grade In tMs;­oirc: ♦ Location of Ducts J Instructions Duct Leakage Coefficient J UncartOltltxcell Space ♦ 1.10 Sum of UA 219.09 Envelope Heat Load 10,297 Btu/Hour Fwaure 1. Sum ofUAXAT Air Leakage Heat Load 6,793 Btu/Hour VolumeX O.BXATX.010 ntava Graeo Bullding Design Heat Load 17,090 Btu/Hour Air Leakage+Envelope Heat Loss Building and Duct Heat Load 18,799 Btu/Hour Ducts in unconditioned space:Sum of BuidMg Heat Loss X 1,10 Ducts In conditioned space:Sum of Building Heat Loss X 1 Maximum Heat Equipment Output 26,319 Btu/Hour Budding and Duct Heal Loss X 1.40 for Forced Air Furnace Budding and Duct Hoot Loss X 1.25 for Heal Pump (07/OV-13) i -I 1VASH• I I T L C ASSOCIATES CI.>ENT: I SEISMIC ANALYSIS PROJECT _ t rr c'r DATE: NAME: 6 Redundancy Factor (p� 1. Maximum allowable wall shear for p<=1 Vumax = (2)(Vaccstory)/Ab 1/2 2. Maximum actual shear Vmax = Largest seismic wall shear 231:, IK(A 3, p = 2-[2(Vaccstory)/(Vumax)(Ab 1/2) L ` ZCs, Tn ) 06 WINO 8003 118th AVE NE Kirkland, WA 98033 (425) 828-4117 WWW NASH-ARCHITECTS.COD[ a BUILDING INSPECTION REPORT — Residential Final Permit No. 1441 Address: 9024 171st Street NE Contractor: LGI Homes - Washington, LLC Owner: LGI Homes - Washington, LLC Date: 9/27/2017 ® APPROVAL ❑ PARTIAL APPROVAL ❑ CORRECTION ❑ OTHER INSPECTION: Final Building ADDRESS NUMBERS: N ACCESS: N PLUMBING: N MECHANICAL: N SMOKE DETECTION: N CO DETECTION: N LIFE SAFETY: N DECKS: N HANDRAILS: N PLANTINGS: N WATER: N SEWER: N LIGHTING: N FINAL ELECTRICAL: N BLOWER DOOR/DUCT CERT: N INSULATION CERT: N Date: 9/26/2017 Inspector: Kevin Olander _ rs Permit#1441 Address Payment lntb Address Receipt# 1206566 City Date 4/21/2017 State Paid By LGI Homes-Washington,LLC Zip Description Plan Review Payment Type Check#4460 Accepted By Kristin Foster Fees Paid Fee Fee Description Factor Total Fee Amount Amount Paid Building Plan Review Fee 345.83.00.00 0 1,370.93 1,370.93 Total Payment:1,370.93 Permit#: 1441 Permit Date: 04/21/17 Permit Type: RESIDENTIAL SINGLE FAMILY Project Nam e Gregory Park Applicant Nam a LGI Horn cs -Washington, LLC Applicant Address: 11410 NE 124th Street, Ste #103 Applicant, City, State, Zip: Kirkland,WA98034 Contact: Matt Adam s Phone: 425-785-0797 Em al: m at.adam s@lgihom cs.com Scope of Work: New SFR Valuation: 187422.00 Square Feet: 1889 Num ber of Stories: 1 Construction Type: O xupancy G ioup: ID Code: Permit Issued: 05/10/2017 Permit Expires: Form Permit Type: Status: LASERFICHE Assigned To: Kristin Foster Property Parcel# Address L egal Description O wrier Nam e Ovner Phone Zoning LGI HOMES- 9024 171 st Street NE WASHINGTON Residence Single Dam iy -Detached LLC Contractors Contractor P rim ay Contact P hone A ddress C ontractor Type L icense License# LGI HOMES- 12951 BELRED CONSTRUCTION Labor and LGIHOHL857MB WASHINGTON LLC RD#150 CONTRACTOR Industries Inspections Date I nspection Type D escription S cheduled Date C om Ileted Date I nspector S tatus 06/20/2017 R20.SFR/DUPLEX Com Iieted FINAL Plan Reviews Date R eview Type D escription A ssigned To R eview Status 04/21/2017 RESIDENTIAL SINGLE z.Rick Karns FAMILY Fees Fee D escription N otes A in cunt Building Plan Review T able 4-2 $1,370.93 Building Perm i T able 4-1 $2,109.12 Forced Air Heat f ee per Btu $25.00 Gas Piping/Units E nter#of units $10.00 Mechanical Fee(Enter Fixture Fee) $25.00 Mechanical Base P erm i Fee $25.00 Park-Com in nity MF Muti-fam iy $1,662.00 Plum ling Base Perm i Fee $25.00 Mechanical Com in ecial Perm i T able 4-7;Per Unit 1 1 @$12 $132.00 Processing/Technology $25.00 State Surcharge- 1st DU R esidential- 1st Unit $4.50 Traffic Mitigation-C/MF Cbm m mial/Multi-fam iy $3,355.00 Water Heater(Tank) $25.00 Total $8,793.55 Attached Letters Date Letter D escription 05/10/2017 Building Perm i Paym sits Date Paid By D escription P aym art Type A ccepted By A in amt 04/21/2017 LGI Hom cs-Washington,, Plan Review C heck#4460 K ristin Foster $1,370.93 LLC 05/10/2017 LGI Hom cs-Washington,, Building Perm i C heck#4461 K ristin Foster $7,422.62 LLC O itstanding Balance $0.00 Notes Date Note C reated By: 04/21/2017 Lot 48-Plan 1487 Colum lia K ristin Foster Uploaded Files Date File Nam e 10/17/2017 2704838-9024 171 st Street NE.docx 05/10/2017 2277501-1441 Issued Perm i.pdf 04/21/2017 2235108-1441 Site Plan.pdf 04/21/2017 2235109-1441 Application.pdf