Loading...
HomeMy WebLinkAbout3818 176th Pl Ne_PJ25-0103_2026 i CONSTRUCTION PERMIT APPLICATION Community&Economic Development City of Arlington • 18204 59th Avenue NE • Arlington,WA 98223 • Phone(360) 403-3551 CIVIL(TYPE I) 71 GRADING/PAVING/DRAINAGE(TYPE II) RIGHT OF WAY(TYPE III) TYPE I&II ONLY NEW DEVELOPMENT REDEVELOPMENT Project Name: 100 158477 REPLACE BO POLE Snohomish County Tax Parcel I.D.#: 00598900001200 NEAREST ADDRESS WORK IS IN ROW Project Address/Location: 3818 176TH PL NE ARL Description of Project: REPLACE ONE BO POLE. SAME SIZE SAME MATERIAL OWNER Name: RIGHT OF WAY Address: City: State: Zip: Phone: Email: APPLICANT Name:SNOHOMISH COUNTY PUD Address:PO BOX 1107 city: EVERETT State: WA zip: 98206 Phone:4257838209 Email: PERMITS@SNOPUD.COM ENGINEER Name: BLAIR ANDERSON Address: PO BOX 1107 City: EVERETT State: WA zip: 98206 Phone: 4257838209 Email: BCANDERSON@SNOPUD.COM License#: NONE Expiration: NONE CONTRACTOR Name: SELF Address: City: State: Zip: Phone: Email: License#: Expiration: 1, hereby certify that I have read and examined this application, City of Arlington Municipal Code, Standard Plan & Specifications. Performance of the proposed work shall follow all applicable laws and regulations.The owner/applicant shall assume full and complete responsibility for said work and shall be responsible for the acquisition and compliance of all applicable permits and/or authorizations which may include, but not limited to, Right of Way Permit,WSDW Hydraulic Project Approval(HPA),WSDOE Notice of Intent(NOI),National Pollutant Discharge Elimination System(NPDES),Army Corp.of Engineers Permits,the requirements of the Endangered Species Act,and the Forest Practices Application(FPA). Signature Print Name: BLAIR ANDERSON Date: 12/6/25 Pagel of 2 REV11/2021 Complete package constitutes all items. Only complete submittals will be accepted. Civil-Submittal Requirements,Type I: Electronic files shall be PDF on USB flash-drive,email,or drop-box ❑ Complete Application ❑ Construction Plans including cut/fill quantities ■ 2 full size plan sets 22"x 34" ■ PDF file of the complete plan set ■ 2 full size set of landscape plans 22"x 34" ❑ Marysville Utility plans,if applicable(2 sets) ❑ Drainage Analysis including calculations and downstream analysis(2 sets)and(PDF file); refer to Stormwater Drainage Requirements ❑ Geotechnical Report(2 sets)and(PDF file) ❑ SEPA is required if 500 or more cubic yards of cut/fill is proposed(not required if included with a Land Use Permit);if there is not a Land Use Permit associated with the project,Public Notice Materials will be required ❑ Grading cut/fill quantity: ❑ Design Vehicle-demonstrate turning radius include 45'Fire truck,dual axle,256-inch wheelbase ❑ Drafts of easement(s) dedication(s),and/or CAPE(s)for review ❑ Flood Hazard Permit Application and required documentation if project is within 100-year flood plain;refer to Flood Hazard guidance documents ❑ Construction Calculation Worksheet ❑ NPDES Permit(if required);See Storm Water Drainage Report,New or Redevelopment Flowcharts ❑ Assurance Device will be required prior to Permit Issuance(Bond or Assignment of Funds) ❑ Permit Fee due at time of permit submittal Grading Paving Drainage Submittal Requirements,Type II:Electronic files shall be PDF on USB flash-drive,email,or drop-box ❑ Complete Application ❑ Construction Plans including import/export quantities ■ 2 full size plan sets 22"x 34" ■ PDF file of the complete plan set ❑ Drainage Analysis including calculations and downstream analysis (2 sets)and(PDF file); refer to Stormwater Drainage Requirements ❑ Geotechnical Report(2 sets)and(PDF file) ❑ SEPA is required if 500 or more cubic yards of cut/fill is proposed(not required if included with a Land Use Permit) ❑ SEPA Public Notice Material Requirements: ■ Snohomish County Assessor's Quarter Section Map: ❑ Show Subject Property ❑ Show 500 ft.Boundary ■ Current Owner List(of properties within 50Oft.radius)including the following: ❑ Tax Parcel ID Number(s) ❑ Owner(s)Full Name(s) ❑ Owner(s) Mailing Address(es) ❑ Current Resident&Property Address(if property owner doesn't reside at the property) ■ Mailing Material:Provide❑ white,#10 envelopes with the following affixed to the envelopes: ❑ Postage ❑ Mailing Labels ❑ Return Address labels: 18204 591h Ave NE,Arlington WA 98223 ❑ Grading cut/fill quantity: ❑ Construction Calculation Worksheet ❑ NPDES Permit(if required);See Storm Water Drainage Report,New or Redevelopment Flowcharts ❑ Permit fee due at time of permit submittal Right of Way Submittal Requirements,Type III: Electronic files shall be PDF on USB flash-drive,email,or drop-box ❑ Complete Application. ❑ Construction Plans. ❑ Traffic Control Plan. ❑ Road Closure Request. ❑ Temporary Erosion&Sediment Control(TESC) Plan. ❑ Certificate of Insurance with the City of Arlington named as Additional Insured. ❑ Assurance Device will be required prior to Permit Issuance(Bond or Assignment of Funds). ❑ Engineers Estimated Cost of Construction;$ ❑ Permit fee due at time of permit issuance. Page 2 of 2 ROAD CLOSURE REQUEST Community & Economic Development City of Arlington • 18204 59t"Avenue NE • Arlington, WA 98223 • Phone (360)403-3551 Name/Company: SNOHOMISH COUNTY PUD Street: 3818 176TH PL NE Date: TBD Time: TBD Purpose: REPLACE ONE BAD ORDER POLE FOR PUD O Complete Closure O Partial Closure 0 Diversion Closure (i.e. no access) (i.e.one lane of traffic) (i.e. to turn lane) Describe what section of the road will be closed using cross streets or a street address with the total linear footage of closure. EB LANE OF TRAFFIC ON 176TH PL NE CLOSED FOR APPROX 200 FT ACROSS 3818 AND 3810 176TH PL NE. Please briefly explain your traffic control plan and/or detour route, including safety precautions that will be taken in the evenings for multiple day closures. Attach a traffic control plan in necessary. ALL TRAFFIC AND PEDESTRIANS WILL BE REROUTED TO THE NORTH/WESTBOUND LANE OF TRAFFIC AT PROJECT ADDRESS. THERE IS ALSO A "T". WE WILL HAVE A UTILITY WORKER SIGN TO STOP TRAFFIC AT 38TH DR NE. PUD FLAGGERS WILL SAFELY USHER CARS FROM 38TH AND 176TH TO THE WESTBOUND LANE OF TRAVEL. THIS IS A VERY LOW VOLUME ROAD AND WE EXPECT MINIMAL INTERRUPTION OR ENCOUNTERING OF PEDS AND VEHICLES. EXPECTED TOTAL DURATION OF PROJECT IS 1 DAY (8 HOURS) DURING NORMAL DAYLIGHT WORKING HOURS TO MAXIMIZE CUSTOMER AND CREW SAFETY. NORMAL WEEKDAYS M-F TO BE AT THE DISCRETION OF CREW FOREMAN. Revised 10/2013 R yaht-of-Way P crmit A n2lication For submittal checklist, see below. *denotes required fields P Ioject Information *Project Name: 1100158477 *Description of Project: PUD to replace a BO pole, like for like. Engineers Estimated C cst of C instruction; $ 110,000.00 C mtact Information Owmr Information *Owner Name: Sno Co PUD *Office No.: 425-783-1000 *Email Address: permits@snopud.com *C dl No.: 425-783-8209 *Mailing Address: IPO Box 1107 *C ty: Everett *State: WA *Zip: 98206 E igineer Information Engineer Name: IBlair Anderson Office No.: 425-783-8209 Email Address: bcanderson@snopud.co Cd1No.: Mailing Address: IPO Box 1107 C ty: Everett State: IWA Zip: 198206 Professional License Number: Expiration D zte: C cntractor Details Primary C mtractor: ISno Co PUD Office No.: 425-783-1000 Email Address: permits@snopud.com Cd1No.: Mailing Address: IPO Box 1107 C ty: Everett State: IWA Zip: 198206 L&I C mtractor License Number: Expiration D Ete: A cknowledgement I, hereby certify that I have read and examined this application, Cty of Arlington Municipal C ale, Standard Plan & Specifications. Performance of the proposed work shall follow all applicable laws and regulations. The owner/applicant shall assume full and complete responsibility for said work and shall be responsible for the acquisition and compliance of all applicable permits and/or authorizations which may include,but not limited to, R#ht of Way Permit, WSDW Hydraulic Project Approval(HPA), WSD OENotice of Intent(NOS National Pollutant Dscharge Elimination System (NPDES),Army Corp. of Engineers Permits, the requirements of the Endangered Species Act, and the Forest Practices Application (FPA). *Print Name: lKirsten McCarthy *Date: 2025-12-08 Submittal C becklist Canplete package constitutes all items. Only complete submittals wf71 be accepted. Electronic files shall be PD Fand submitted through this portal, email or downloadable link to file server. • C instruction Plans; refer to D esign R Muirements and C lapter 1 of the C ty of Arlington's D esign and C instruction Standards and Specifications Manual for required sheets. • Traffic C introl Plan. • R cad Closure R equest. • Temporary Erosion & Sediment C introl (TESC)Plan if new or replaced hard surfacing is being constructed. • C ertificate of Insurance with the C ty of Arlington named as Additional Insured. P ermit fee and any assurarnce device (B and or Assignment of Funds) due at time of permit issuance. An invoice with link for payment will be sent to the applicant email address once permit is reviewed and approved. SNOHOMISH COUNTY CONSTRUCTION NOTES Fplo= PUBLIC UTILITY DISTRICT NO 1 TRANSFER OF UTILITIES, REMOVAL OF POLE AND FINAL RESTORATION TO BE CONSISTENT LOCATION 3818 176TH PL NE ARL AREA N CTY WITH APPLICABLE POLE ATTACHMENT AGREEMENT(S) AND JOINT OWNERSHIP POLE AGREEMENT. POLE No. CE20-7 SE1/4S 21 T 31 R 5 DATE 12/6/25 ORDER 100158477 REASON FOR WORK REEL BO POLE ENGINEER ANDERSON OPERATION 0030 DRAFTER UGND No. N/A SCALE NTS q POLE PLI #97349, STENCIL #CE2G-7 APPROVED SET 45FT' CL2 WOOD POLE TIGHT EAST (PW2045/N0110) & DATE PRINTED SET DEPTH = 6.5FT FOREMAN RECORDS NESC VIOLATIONS DATE FOREMAN ■ No ❑ YES (SEE NOTES) USE 5/8 GRVL BCKFLL, CMPCT IN 6 LFTS SUBSTATION SPT FRAME 2 PHASE TANGENT (AS12F201) DATE WORK COMPLETED PERMITS FRAME SINGLE PHASE 120/240 OH XFMR (AS12F601/ZO101) El RESTORATION REQUIRED ■ CITY ARLINGTON clRculT No. 12-1510 PHASE 23 TRANSFER 50 KVA OH XFMR 50-356761 ❑ ADDITIONAL WORK REQUIRED ❑ SNO COUNTY (TOP) NOTES (i.e. REDLINE INFO) ❑ SNo COUNTY (BLANKET) UTG # ❑ SNo COUNTY (MAJOR) SER# ❑ OTHER ❑ No PERMIT REQUIRED N XER OH SVGS ❑ RESTORATION REQUIRED �J INSTL NEW 8' SL BRKT FACING N (10503) ❑ MULTIPLE JOB PHASES (i.e. OH, UG) INSTL NEW 10OW EQ LED TYPE A SL (L0210) FEES REQ'D ❑ YES ■ No EASEMENTS ❑ REQUIRED STET # PRIMARY OVERHEAD F# ■ NOT REQUIRED ❑ RESIDENTIAL STRIP AND TOP 45FT WOOD POLE FOR COMMUNICATIONS ❑ COMMERCIAL REQUEST No. STENCIL POLE CE2G-7 LEO# DATE APPROVED $ � -$ FOREIGN CONTACTS PRIMARY UNDERGROUND ■ JPN# 100158477 ❑ RESIDENTIAL ❑ JOINT TRENCH ZIPLY & CATV ❑ COMMERCIAL El JOINT BORE ZIPLY & CATV BASIC FEE ❑ LEU# 0 POLE STENCILING w FROM To SCHEMATIC MISCELLANEOUS FEES TAKE OFF POLE � VAULT PRE—CONST. REQUIRMENTS PERMIT $ ❑ BACKHOE ■ FLAGGING 4 ■ ONE CALL DATE CE2G��-401695 $ N 725 801 809 SL-107532-A CE2GA-2 CE2GA-7 $ FIBER 13 37 50 37 CE2GA-5 TOTAL DUE El YES ■ NO 43 42 41 F100 CE2G5o1 CE2GA 8 17625 37 s0 cE2is w DATE PAID STREET LIGHTING - 37 50 3050 cE2c s RECEIPT No. ■ YES ❑ NO 14 1 628 j CE2G t O 37 z ENGINEER ANDERSON M&R IN AS-BUILT �� m 37 283 CE2G 3 G-5 0 PHONE 4257838209 is M&R OUT 1 H PL NE 6 CELLULAR 4253435803 GIs QC JOINT USE - - - TO SPT U 97348 CKT 12-1510 50-3855 2 3 37-2950 97349 9 350 50-35671 3 SL-101734-A E2G-6 CE2G-7 EJ-8 LEGEND : 10 11 SL-107536-A 13 826 L--27533-A 728 3802 BEFORE AND AFTER O EXISTING POLE 810 3818 3 T EXISTING POLE-TO BE REMOVED °I 0 NEW POLE r NEW POLE TO REPLACE EXISTING POLE SHEET OF �o w c 2N m uS a U Z Z Ilr A O g U) 3dAl > �o w Wc9 z V U r, WNIK m r� y ¢F? J W IL Wa0 3 s a F w¢ LL Nwo Z Z r U °Q O >m a U F Q rp o Z yQ z- p �241 2 m �r� 0 aaw U w0 z 6z o oQ w z U O >U X Jo am ° a��y LL W ai ] LL zmw O Ow< H Z w F O = N S a¢ay z N W 0 > O� OLLOO W 3� z �wwm rc p cai W Q w � z z as a ¢oom S a z J U F o X 20 Di* w�p $ z J a r zOrfG rc O ¢ y ¢w ©o ° o z a Wyy° ¢ a 3 O /Ny J = z °a ~ w W Z z z w x -m z z rwWm ¢ °o y z :9 Qr '�' • $a am m7 0 o��x rcw�oQ w w Q UO � a i ■■• - FLL aW U 2ww. 1W..m j N ° 3m " o.5s p 3 rc r Nc S301A30+9 •■ �m a° qa c80B— p¢zpoJ p z w _.� iJ3dV1,001-A9 •■ °z a0 r NywJ ¢�zrN W > W— Imo` mo ° k LL°¢zo m o 5 ® Z B 6 S31ON 33S I °_ fp J llz 1 mm�m c� z a r c (ltlN011dO) °1 g z �m cyi w W a S 0 E ci o z Q W 3 £ U y zUw °z (9° _�' m�mLL °�g�az 'at U w J J C A } + lo¢g �? LL >¢ 3 zazwp o WrN w m w o >a LL a y�M�_ a m 00 OO W �¢ W ° Woo U wLL oz J aC U e H ■ G N w Q O w 0~ H ■ O z z Q Z Ois G ■ zwa Na a ° `3 ■ LV = ui O w jr Z ,,^^ UU mW y0 V mo U> ° �N J2 �a w a a3 Y Q r > > z w0 00' m ui J zK �Q 0^ = Ou (' Q m a- wok z H z_wwQa L m Z W ° w r Z z F Z i w Z 3W N w rc ggQ ¢ ~ ° w = Q a 8 o 0 O wCo ° O N — F< N W � U ~ Z Ids n¢ O M -ZF o LV ~ WOW m F mw a Ozw _ ° a m c0 k W J W ° H z z w 3 O w a C 3 m SS301A30+9 ■• O r w W. 2J3dVl,00L-,O9 ■• z p m a zz zGU W N N ■• o N r$ ° Uy Q o o ■• n x go N n XW m o '� o o z� 6 N® v L ;3 m N O b z_ z_ ao X m g O^ y C z +I N N a = wLL ■ 3 � M O O K O z 2 N n E C ° r X f wW w X ¢z < nei — O a ° a a w Oa ¢ n mz0 W w N 8 C7 rL rL J� mz Z N° W U w z N o w �� m o 0 3� w w 0 a , O aw v^' v z oz a0 z o Z O $ x rG L O O_ ZO z w d A z Q � � U S w Z J Jm pZ O N M N ^' O U ya ¢UNrw � who = O u= 2 o °� w W N 3 z z = w a ao ¢S^ a m z ¢z O z w g z m a m J N « x N > 2 > y f ¢ �z ya ap 05 V5 HMO 2%2 Q I w m�oW z =� � �dIW �s`� 3 w P 0 ID ¢ ¢a � aa ay OJM �E r N O a w J s a awz z ❑ ¢ w o i R m a m r x¢ O w GWOWi W Hjazrz Swam _ ■ ■ /y z Wk w 4 w Om =Maom i ircm -M.G 1 G W U 6 C k IL ! § Q m u ! LULL LL ) ' . 0 § ! I § a } � � $ )/ x } . � w � � 2 � R 2 O _ 9 � r Le �) « , & | > ci ! LLF 2 ( ( a o � 2 ! � � ! kLU zUJ � ( * )\ } o / }\ « Of LU E 0\ __. m103S89w g D0 - �LU f 00 §~ LU a ) jo z! O 2 ■ j|�/\z1.}j City of Arlington 18204 59th Avenue NE, Arlington, • • Washington 98223 Phone: 360-403-3551 jNG� WASHINGTON C Invoice Number: 25-0093 INVOICE Invoice Date: December 11, 2025 Account Number: 2206904045 Bill To: Invoice Questions? Snohomish County PUD Joint Use & Permits Dept Phone: 360-403-3551 PO Box 1107 Email: ced@arlingtonwa.gov Invoice Due Date: December 11, 2025 Record Number: Project 25-0103 Parcel Number: 00598900001200 Location: 3818 176TH PL NE Date Description Paid Date Amount Paid Balance December 8, Processing/Technology Fee (320.341.43.00.02) $25.00 2025 December 9, Right of Way(006.322.40.00.02) $125.00 2025 TOTAL: Project Fees $150.00 $150.00 ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------- ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------- --------------------------------------------------------- REMITTANCE INFORMATION If you are paying by check, please include this portion with your payment and remit to the address listed on this invoice. Remittance Information Invoice Account Total Due Your payment is due by December 11, 2025 Number Number This Invoice 25-0093 6690 0045 $150.00 Snohomish County PUD Joint Use & Permits Dept PO Box 1107 18204 59th Avenue NE • ' • 14 op Arlington, Washington 98223 to tt Phone: 360-403-3551 jNG� WASHINGTON C Civil Use - Right of Way Permit Parcel:00598900001200 Permit#:25-0103 Permit Address:3818 176TH PL NE Permit Expiration: March 15, 2026 Description of Work:PUD to replace a BO pole, like for like. OWNER APPLICANT CONTRACTOR Snohomish County PUD Joint Use&Permits Dept Snohomish County PUD Sno Co PUD PO Box 1107 3818 176TH PL NE ARLINGTON,WA,98223 PO Box 560 425-783-5681 permits@snopud.com 35681 com permits@snopud.com registration_number:Snohomish County PUD PERMIT APPROVAL The issuance or granting of this permit shall not be construed to be a permit for, or approval of, any violation of this Code or any other ordinance or order of the City, of any state or federal law, or of any order, proclamation, guidance advice or decision of the Governor of this State. To the extent the issuance or granting of this permit is interpreted to allow construction activity during any period of time when such construction is prohibited or restricted by any state or federal law, or order, proclamation, guidance advice or decision of the Governor of this State, this permit shall not authorize such work and shall not be valid. The building official is authorized to prevent occupancy or use of a structure where in violation of this Code, any other City ordinances of this jurisdiction or any other ordinance or executive order of the City, or of any state or federal law, or of any order, proclamation, guidance advice or decision of the Governor. The building official is authorized to suspend or revoke this permit if it is determined to be issued in error or on the basis of incorrect, inaccurate or incomplete information, or in violation of any City ordinance, regulation or order, state or federal law, or any order, proclamation, guidance or decision of the Governor. It is unlawful to use or occupy a building or structure until a final inspection has been made and approval or a Certificate of Occupancy has been granted. This permit authorizes only the work noted and covers work to be done on private property only. Any construction on public domain (curbs, sidewalks, driveways, marquees, etc.) will require a separate permit. The property owner shall ensure that the construction project complies with all applicable zoning codes and regulations. The property owner shall also ensure that the construction project does not cause any adverse impact on the surrounding environment or community. The property owner shall be responsible for obtaining all necessary permits and approvals from the relevant authorities before commencing construction. The property owner shall ensure that the construction project complies with all applicable design review requirements. CONDITIONS Traffic Control must comply with the current version of MUTCD. Work Hours are 7 am to 7 pm Monday- Saturday (no work on Sundays or City Recognized Holidays). Inspections are not available on Saturday or 1.) Sunday. Non-motorized traffic control must be provided if any part of the work impacts existing non-motorized facilities. Non-motorized traffic control measures shall provide a level of accessibility that are, at minimum, equal to the existing conditions of the site. Two days before starting work, the applicant must have all utilities located. One Call, is a public utility locating 2.) service (#811 or 1-800-424-5555). Privately installed facilities must also be located using a private utility locating service. Private property owners which may be affected by the proposed work must be notified in advance of potential 3') disruptions in access or utility services. INSPECTIONS Inspection Line: 360-403-3417 Call for inspections by 3:30 pm for next day inspection. Please allow 48 hours for Fire Inspections. Please provide the following information when leaving a message: Permit Number, Type of Inspection, and provide preference of morning or afternoon inspection. Inspection Portal: Please login to customer portal and submit for the desired inspection type for the permit. APPROVED BY Admin - Thad Newport Development Services Engineering Manager ASSOCIATED FEES Date Description Paid Date Amount Paid Balance December 8, Processing/Technology Fee(320.341.43.00.02) $25.00 2025 December 9, Right of Way(006.322.40.00.02) $125.00 2025 TOTAL: Project Fees $150.00 $150.00 Credit/Debit Card 93 Payment Successful December 15, 2025 $150.00 $0.00 4rtk( tot( WASHINGTON Project Information - ' 'nformat;^- Project # 25-0103 Parcel # 00598900001200 Building ID Location 3818 176TH PL NE Project Type Civil Use Project Use Right of Way Parent Project# Subdivision Applicant Name Snohomish County PUD joint Use & Permits Address PO Box 1107 Dept Applicant Email permits@snopud.com Phone 4257835681 Cell Owner Name Sno Co PUD Address 3818 176TH PL NE ARLINGTON, WA, 98223 Owner Email Phone Cell Contractor Snohomish County PUD Address Contractor Email permits@snopud.com Phone 425-783-5681 Cell Type/Improveme Accessory/Struct nt ure Current Use Proposed Use Current Zoning Proposed Zoning Project Cost Project Value Current Use And PUD to replace a BO pole, like for like. Proposed Changes Lot Width Lot Depth Map Number Total Area of Building &Accessory Total Area of All Man-made Improvements Structures (Sq Ft) (Sq Ft) General Notes Restrictions/ Variances ©Community Development Online Portal Page 1 of 5 April 7, 2026 04:13PM WASHINGTON Structure Information Structure Type # of Stories Usable Floor Area (Sq Ft) Structure Height # of Units Load per Floor (Lbs) Sign Dimensions # of Bedrooms # of Bathrooms Occupancy With Chairs Tables & Chairs Empty Room Foundation Foundation Type Footing Depth Material Foundation Information Setbacks Front& 0 0 Setbacks Right & 0 0 Rear Left Sides Setbacks Information Water Utility Sewage Utility Gas Utility Electric Utility Driveway Width # of Off Street # of Off Street Parking Loading Miscellaneous Information ©Community Development Online Portal Page 2 of 5 April 7, 2026 04:13PM 4rtk( tot( WASHINGTON Contractors License# Business Name Type Contact Snohomish County PUD Snohomish County PUD General Kirstin McCarthy ©Community Development Online Portal Page 3 of 5 April 7, 2026 04:13PM 4rtk( tot( WASHINGTON Contacts Contact Name Type Project Address Phone Snohomish County PUD Applicant PO Box 1107 425-783-5681 joint Use& Permits Dept Sno Co PUD Owner 3818 176TH PL NE ARLINGTON, WA, 98223 Snohomish County PUD Others PO Box 1107 425-783-5681 joint Use& Permits Dept Snohomish County PUD Contractor 425-783-5681 ©Community Development Online Portal Page 4 of 5 April 7, 2026 04:13PM 4rtk( tot( WASHINGTON Fees Fee Type Date Debit Credit Balance Project Fees December 8, 2025 $150.00 $150.00 $150.00 $0.00 T O T A L $150.00 $150.00 $0.00 ©Community Development Online Portal Page 5 of 5 April 7, 2026 04:13PM