Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
110 3rd St_PJ25-0085_2026
CONSTRUCTION PERMIT APPLICATION Community&Economic Development City of Arlington • 18204 591h Avenue NE Arlington,WA 98223 • Phone (360) 403-3551 CIVIL (TYPE I) ❑ GRADING/PAVING/DRAINAGE (TYPE II) ❑ RIGHT OF WAY(TYPE III) TYPE I&II ONLY NEW DEVELOPMENT ❑ REDEVELOPMENT ❑ Project Name: ZIPLY FIBER - 6021814 Snohomish County Tax Parcel I.D. #: 31051100100600 ,Project Address/Location: 110 E THIRD ST. ARLINGTON WA Description of Project:Access existing terminal pole & riser down, then pull new fiber through existing conduit to customer at 110 E 3rd st. OWNER Name: Address: City: State: Zip: Phone: Email: APPLICANT Name: Ziply Fiber Northwest, L L C Address: 426 E Casino Rd. City: Everett State: WA Zip: 98208 Phone: 402-670-8384 Email: grpatcopermits(@ziply.com ENGINEER _ Name: Address: City: State: Zip: Phone: Email: License#: Expiration: CONTRACTOR Name: Pacific Cable Construction, Inc. Address:P.O. Box 573 Citv: Woodinville State: WA Zi :98072 Phone: 425-348-7735 Email: Luke-@-.oaccab.com License#: P A C I F C C 9 5 4 P Expiration: I hereby certify that I have read and examined this application, City of Arlington Municipal Code, Standard Plan & Specifications. Performance of the proposed work shall follow all applicable laws and regulations.The owner/applicant shall assume full and complete responsibility for said work and shall be responsible for the acquisition and compliance of all applicable pemlits and/or authorizations which may include, but not limited to, Right of Why Penuit,WSOW Hydraulic Project Approval (HPA),WSDOE Notice of Intent(NOi),National Pollutant Discharge Elimination System (NPDES),Anny Corp. of Engineers Permits,the requirements �oftlle Endangered Species Act;and the Forest Practices Application(FPA). Signature---w4&= w�-� ------------------------------------ - Print Name:William Watts Date: 11/27/2025 Page 1 of2 REVII/2018 .Complete package constitutes all items. Only complete submittals will be accepted._ Civil -Submittal Requirements,Type I: D Complete Application; D Construction Plans including cut/fill quantities; . 2 full size plan sets 22"x 34" • PDF file of the complete plan set . 2 full size set of landscape plans 22"x 34" D Marysville Utility plans, ifapplicable (2 sets); D Drainage Analysis including calculations and downstream analysis (2 sets) and (PDF file); refer to Stormwater Drainage Requirements; D Geotechnical Report (2 sets) and (PDF file); D SEPA is required if 500 or more cubic yards of cut/ fill is proposed (not required if included with a Land Use Permit); D Grading cut/ fill quantity: -------- D Design Vehicle - demonstrate turning radius include 45' Fire truck, dual axle, 256 inch wheel base; D Complete Streets Checklist D Drafts of easement(s) dedication(s), and/or CAPE(s) for review; D Flood Hazard Permit Application and required documentation if project is within 100 year flood plain; refer to Flood Hazard guidance documents; D Construction Calculation Worksheet; D NPDES Permit (if required); See Storm Water Drainage Report, New or Redevelopment Flowcharts, D Assurance Device will be required prior to Permitlssuance (Bond or Assignment of Funds); D Permit Fee due at time of permit submittal. Grading/Paving/Drainage Submittal Requirements,Type I1: D Complete Application; D Construction Plans including import/export quantities; . 2 full size plan sets 22"x 34" . PDF file of the complete plan set D Drainage Analysis including calculations and downstream analysis (2 sets) and (PDF file); refer to Stormwater Drainage Requirements; D Geotechnical Report (2 sets) and (PDF file); D SEPA is required if 500 or more cubic yards of cut/fill is proposed (not required if included with a Land Use Permit); D Grading cut/ fill quantity: --------- D Construction Calculation Worksheet; D NPDES Permit (ifrequired); See Storm Water Drainage Report, New or Redevelopment Flowcharts, D Permit fee due at time of permit submittal. Right of Way Submittal Requirements,Type III: Complete Application; 5Q Construction Plans; Traffic Control Plan; ❑ Road dosure Request; ❑ Temporary Erosion &Sediment Control (TESC) Plan; ❑ Certificate oflnsurance with the City ofArlington named as Additional Insured; ❑ Assurance Device will be required prior to Permit Issuance (Bond or Assignment of Funds); Engineers Estimated Cost of Construction; $1,942.60 .... QI Permit fee due at time of permit issuance. Page 2 of2 P-095423 - 6021813 110 E 3RD ST, ARLINGTON WA CITY OF ARLINGTON POLICE Customer:CITY OF ARLINGTON POLICE Order: SCOPE: Issued: Due: PLAN SUMMARY: Proj# 6013935 Sheet-1 Places a 6-Port Aerial MST at the front of the Customer Location. ddress:110E3RDST ARLINGTON WA From the MST, Riser-Down with a Multi-Fiber Drop and follow Existing UG to the MPOE. Terminate Drop, Test & Service Type:DARK FIBER Tag for Customer. Assign me"t:ARTNWAXXDF",6-7 Special Notes: Q ziply GENERAL CONSTRUCTION NOTES: ON fiber MANY FACILITIES WILL BE OMITTED FOR CLARITY.ALWAYS UTILIZE ALL PERSONAL PPE. PROVIDE APPROVED TRAFFIC CONTROL PLAN. City of Arlington Police ALWAYS GET LOCATES BEFORE ANY AND ALL DIGGING.ANY CHANGES OR ADDITIONS NEED TO BE APPROVED BY THE LOCAL ENGINEER. FOLLOW ALL LOCAL AND FEDERAL SAFETY LAWS.UTILIZE ALL TESTING AND SAFETY EQUIPMENT.CLEAN UP ANY WORK AREAS BEFORE LEAVING TO THE NEXT LOCATION.ENSURE GRADE AND GROUND IS REPAIRED. ENSURE THAT ALL REQUIRED PERMITS ARE ACQUIRED AND PROJECT P-095423 C.O.AREA: ARTN ON HAND. UTILIZE ALL MANHOLE PROCEDURES AND PPE. NUMBER EXCH.CODE: DRAWN 11/21 eNGR:DAVIDTOLBERT cNrr SNOHOMISH DATE: COUNTY SCALE: TAX DISTRICT: DWG: TWNSHP: RNG: SEC: MATERIALS: Fr+w 4F = 300' \ NID=1 CONTACTS: ' CONSTRUCTION MANAGER: ° ° ° Q JOHN DALY 360-403-5181 Else �• p ..�: m ENGINEERING COORDINATOR: DAVID TOLBERT 702-721-2329 .P �� - ` OSP PROJECT MANAGER: CRAIG COLWELL 681-283-5414 LOCATES: ! WASHINGTON 811 LCON: T �...'0 LCON: N/A ?F LCON PHONE#: N/A LCON EMAIL: N/A -� Map data©2025 IQGeo Customer:CITY OF ARLINGTON POLICE Order: Issued: Due: ddress:110 E 3RD STARLINGTON WA ServEQUIPMENT LEGEND Assignmence e:DARKFIBER Assignment:ARTNWAXX DF11,6-7 Special Notes: Q ziply- GN fiber NEW AERIAL FIBER POLE-JOINT OWNED City of Arlington Police NEW UNDERGROUND s____ __ POLE-FOREIGN OWNED FIBER PROJECT P-095423 C.O.AREA: ARTN POLE-ZIPLY OWNED ® NUMBER EXCH.CODE: NEW CONDUIT ONLY NEW RISER ® DRAWN 11/21 CNTY:SNOHOMISH ENGR:DAVIDTOLBERT NEW FIBER TERMINAL ® DATE: COUNTY AERIAL EXISTING RISER SCALE: TAX DISTRICT: DWG: NEW FIBER TERMINAL rRP:1 EXT GUY WITH FOREIGN ANCHOR UG TWNSHP: RING: SEC: NEW FIBER HUB EXT GUY WITH ANCHOR -4-< AERIAL EXT GUY WITH SIDEWALK ANCHOR NEW FIBER HUB UG EXISTING MH �H NEW GUY WITH ANCHOR --►< NEW HH HH NEW GUY WITH SIDEWALK ANCHOR -11 EXISTING HH "" SPLICE ARROW c_—_ NEW PED SNOWSHOE C><j EXISTING FED LOOP (7) NEW SAI iXi FLOWERPOT (� > Map data©20, iQGeo 1, Q Shrl Action port_V I* v Q ziply kw it! a fiber �K�NP gton Liquor Mark „ E3 City of Arlington Police I I MH 9- r I19 ti- 11 � PROJECT P-095423 c.o.AREA: ARTN 11 1 NUMBER EXCH.CODE: t' Coast Construction Group O t Nail Salon Q 11 I I EXISTING TERM DATE:N 11/21 ENGR;DAVID TOLBERT GNn'SNOHOMISH couNTv DOFTP FT-1-13003018 II SCALE: TAX DISTRICT: DWG: 11 11 288F:DF11,6-7(287-288) O 11� MST: DF11,6-7(1-2) U TWNSHP: RNG: SEC: 11 The Shop of O O Arlington Health Foods Arlington TirePros\j (PULL DROP FROM TERM THROUGH 11 I ® J EXISTING RISER+CONDUIT) ,s o 11 U 11 Mountain Sol Q 11 11 i® c Bird Cafe© 0a is t� =''leers 11 Anx+n:nn U I- II 11 Arlington School 0 Nar Offic 11 Q 1 e Orchilbfiee of Massage it �� 11 � OArlington Gla�q 11din-' n Lakes O Q�7 Sassafras i a Gifts 110, and Gallery Ir„ 11 = n, n 11 I1 z r1 Police 1 ent Stafne Law Advocacv ii 110 E 3RD ST to NEW 4P FIBER DROP-300' u X aon City Hall,O AU10 Parts O n p W to Parts\/ 1► N 2 ARTNWAXX DF1 1,6-7 ii (D XD,3-4 n O :a (PULL DROP FROM TERM THROUGH r;r EXISTING RISER+CONDUIT) (PLACE NID,TEST+TAG) I� NID 0 ,1 rt ,r E3 Ir Q The Stilly L 1� rt 1r rl rI I Ir ,I I I • v0 yle -__ Map data©2025 Google iQGeo r. Customer:CITY OF ARLINGTON POLICE Order: Issued: Due: 1 - ddress:110 E 3RD STARLINGTON WA Service Type:DARK FIBER Assignment:ARTNWAXX DF11,6-7 Special Notes: Q ziply 0 fiber «_. T City of Arlington Police PROJECT P-095423 C.O.AREA: ARTN NUMBER EXCH.CODE: 4"PVC APPROX 200' DRAWN WITHMULETAPE \ 11/21 ENGR:DAVIDTOLBERT cN1Y:COUNTY COUNTY SH DATE: i I 4 SCALE: TAX DISTRICT: DWG: PSE POLE PATH FIBER TERM - - + --- TWNSHP: RING: SEC: AND RISER TOMPOE `.r . yt _--,'�"••.Yi FIBER TERM 1' -- -�_ T H3003:205-216 i! MPO FROM POLE T \ 'a TO MPOE W/PULLSTRING r iQGeo Customer:CITY OF ARLINGTON POLICE Order: Issued: Due: MPc" ddress:110 E 3RD STARLINGTON WA `t Service Type:DARK FIBER ssignment:ARTNWAXX DF11,6-7 y � Special Notes: 8 8�� slr�t;xEzpLr --- FIBER DROP PON Q ziply� 0 fiber City of Arlington Police w PROJECT P-095423 C.O.AREA: ARTN 7 NUMBER EXCH.CODE: III f DRAWN ENGR: SNOHOMISH DATE: 11/21 DAVID TOLBERT cNrv.COUNTY SCALE: TAX DISTRICT: DWG: W ' TWNSHP: RING: SEC: N:zjy POWER ON THE , RACK O A r m A� O•s p THERE IS A SINGLE FIBER DROP EXISTING THAT HAS BEEN PLACED FROM THE POLE AN AND FEEDS AZIPLY PON 06 09 4'FROM POLE Go gl Map data©2025 iQGeo ATCO COMMUNICATIONS SERVICES,LLC AS THE DESIGNER OF THIS TRAFFIC CONTROL PLAN, MAKES NO REPRESENTATION AS TO ITS GENERAL ADEQUACY OR BEING APPROVED FOR IMPLEMENTATION. APPROVAL MUST RESULT FROM THE TRAFFIC ENGINEER OR OTHER PUBLIC OFFICIAL HAVING STATUTORY ENFORCEMENT AUTHORITY IN THE JURISDICTION.UTILIZATION AND IMPLEMENTATION OF THIS PLAN SHALL BE A RESULT OF THE APPROVAL.REF.MUTCD 2009 6A-01(10) IAI" O CITY OF A R L I N G T O N ATCO COMMUNICATIONS SERVICES,llC www.atcotelecom.com 360.563.9000 708 First Street Snohomish,WA 98290 ziP Iy fiber The Shop of Everett,WA 98206 Arlington Tire Pros Tire shop Q a a o p O a Z Z � Blue Bird Cafe it American Q Q Q c~n > W v i Of a o LU T co o � 1 z v O o6 � N (A ! Q I I I ■ � W ring lice Department PAPA Auto Parts WOR AREA O Stilly Auto Parts U wto parts storeLU L M uJ m � � o z Q z ui U U p Q Q Z � � 0O J A d d J LL V The Stilly Diner DATE: 11.25.2025 1 REVIEWED BY: M. LUNA WTCS#013184 DESIGNED BY: W.WATTS ATCO CONTACT: 740.744.8292 william.watts@atcotelecom.com SCALE: SHEET: VICINITY MAP NOT TO SCALE NO: 1 OF 2 LEGEND: ATCO COMMUNICATIONS SERVICES,LLC AS THE DESIGNER OF THIS TRAFFIC CONTROL PLAN, MAKES NO REPRESENTATION AS TO ITS GENERAL ADEQUACY OR BEING APPROVED FOR IMPLEMENTATION. ^ ^ APPROVAL MUST RESULT FROM THE TRAFFIC ENGINEER OR OTHER PUBLIC OFFICIAL HAVING STATUTORY PHASE 'I O ENFORCEMENT AUTHORITY IN THE JURISDICTION.UTILIZATION AND IMPLEMENTATION OF THIS PLAN CONE(CANDLESTICK) SHALL BE A RESULT OF THE APPROVAL.REF.MUTCD 2009 6A-01(10) O mm WORK TRUCK ATCO COMMUNICATIONS SERVICES,UC www.alcotelecom.com 9000 WORK ZONE LIMITS WORK DETAILS: 08 First Street SIGN LEGEND: 7o8Firststreet MUM PORTABLE SIGN ACCESS EXISTING TERMINAL POLE&RISER Snohomish,WA 98290 DOWN,THEN PULL NEW FIBER THROUGH EXISTING CONDUIT TO CUSTOMER AT 110 E 4 EXISTING SIGN ROAD 3RD ST. ZI I f i b P r SHOULDER SIDEWALK N OF TRAFFIC ® DRIVEWAY WORK WORK CLOSED p y AHEAD SPOTTER NEEDED FOR PEDESTRIAN TRAFFIC it Everett,WA 98206 (NOT PADIRECTIVEMENT MARKINGS) I z CONTRACTOR TO PLACE NO PARKING SIGNS W20-1 W21-5 R8-3a R9-9 I Q R8-3A 72 HOURS PRIOR TO START WORK IN N r CONED WORK AREA. Q —EP EDGE OF PAVEMENT w I (}� 3 n III = n zO nz' o Q v W20-1 � ~z z 0 D EXISTING G Q TERMINAL Lxp l > U POLE � w o a C, D I U 40' 40' A I `� E O C) E 3RD ST SHOULDER SHOULDER X o (25 MPH) TAPER TAPER I X O n/ w t ZR9-9 R9-9 W21-5 W20-1 �s _� w z EP EP IDEWAgLK •SIDF�i i • PARKWAY p O EP E PARKW"E�-• O EP EP EP � SIDEWALK —d3 d3 U 0 0 • • 0 0 0 0 d3 d3 d3 ..� ---------------� -------- U '♦ �_ -► --► _� _� ------------- - EP EP EP-FA >-EP ESIDEWALK EP EPSIDEWALK EP—EP— E EP E m w Y PARKWAY PARKWAY �mIII"""III�� PARKWAAY EF _EP— Q M� �I=�� z Q L.V LLj Q ARLINGTON I M� E 3RD ST " " Q _ m w W20-1 Z I NOTE: z POLICE D 1 t D MON.-FRI.=7:00am TO 4:00pm O O U J X DEPARTMENT N (25 MPH) a o U- m m m �/20_1 CHANNELIZATION DEVICE w20-1 (110 E 3RD �" E I m SPACING(feet) a I x MPH TAPER TANGENT ST) I 50/70 40 80 DATE: 11.25.2025 2 35/45 30 60 < I 25/30 20 40 REVIEWED BY: M.LUNA m rn I WTCS#013184 SIGN SPACING=X(1) FREEWAY&EXPRESSWAYS 55/70 MPH 1500'± DESIGNED BY: W.WATTS RURAL HIGHWAYS 60/65 MPH 8001± ATCO CONTACT: 740.744.8292 MINIMUM SHOULDER TAPER LENGTH=L/3(feet) RURAL ROADS 45/55 MPH 500'± william.watts@atcotelecom.com RURAL ROADS&URBAN ARTERIALS 35/40 MPH 350'± SHOULDER POSTED SPEED(MPH) RURAL ROADS&URBAN ARTERIALS 25/30 MPH 200'± (2) SCALE: SHEET: WIDTH RESIDENTIAL&BUSINESS DISTRICTS (feet) 25 30 35 40 45 50 55 60 65 70 URBAN STREETS 25 MPH OR LESS 100'± (z) " 0 8 40 40 60 90 120 130 150 160 170 190 (1)ALL SPACING MAY BE ADJUSTED TO ACCOMMODATE INTERCHANGE RAMPS, 1 =40' L 10 40 60 90 90 150 170 190 220 220 240 AT-GRADE INTERSECTIONS AND DRIVEWAYS USE A MINIMUM 3 DEVICES TAPER FOR SHOULDER LESS THAN 8' (2)THIS SPACE MAY BE REDUCED IN URBAN AREAS TO FIT ROADWAY CONDITIONS. NO:20F2 City of Arlington 18204 59th Avenue NE, Arlington, • • Washington 98223 Phone: 360-403-3551 jNG� WASHINGTON C Invoice Number: 25-0109 INVOICE Invoice Date: December 12, 2025 Account Number: 979145006 Bill To: Invoice Questions? Ziply Fiber Northwest, LLC Phone: 360-403-3551 426 E Casino Rd Email: ced@arlingtonwa.gov Invoice Due Date: December 12, 2025 Record Number: Project A25-0085 Parcel Number: 31051100100600 Location: 110 3RD ST Date Description Paid Date Amount Paid Balance December 1, Processing/Technology Fee (320.341.43.00.02) $25.00 2025 December 12, Right of Way(006.322.40.00.02) $125.00 2025 TOTAL: Project Fees $150.00 $150.00 ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------- ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------- --------------------------------------------------------- REMITTANCE INFORMATION If you are paying by check, please include this portion with your payment and remit to the address listed on this invoice. Remittance Information Invoice Account Total Due Your payment is due by December 12, 2025 Number Number This Invoice 25-0109 979145006 J$150.00 Ziply Fiber Northwest, LLC 426 E Casino Rd 18204 59th Avenue NE • op ' • 14 Arlington, Washington 98223 to tt Phone: 360-403-3551 jNG� WASHINGTON C Civil Use - Right of Way Permit Parcel:31051100100600 Permit#:25-0083 Permit Address:110 3RD ST Permit Expiration: June 8, 2026 Description of Work:ACCESS EXISTING TERMINAL POLE&RISER DOWN,THEN PULL NEW FIBER THROUGH EXISTING CONDUIT TO CUSTOMER AT 110 E 3RD ST. OWNER APPLICANT CONTRACTOR Ziply Fiber Northwest,LLC Pacific Cable Construction CITY OF ARLINGTON 426 E Casino Rd PO Box 573,Woodinville,WA 98072 238 N OLYMPIC AVE ARLINGTON,WA,98223 402-670-8384 luke@paccab.compermits@ziply.com registration number:PACI FCC954PJ PERMIT APPROVAL The issuance or granting of this permit shall not be construed to be a permit for, or approval of, any violation of this Code or any other ordinance or order of the City, of any state or federal law, or of any order, proclamation, guidance advice or decision of the Governor of this State. To the extent the issuance or granting of this permit is interpreted to allow construction activity during any period of time when such construction is prohibited or restricted by any state or federal law, or order, proclamation, guidance advice or decision of the Governor of this State, this permit shall not authorize such work and shall not be valid. The building official is authorized to prevent occupancy or use of a structure where in violation of this Code, any other City ordinances of this jurisdiction or any other ordinance or executive order of the City, or of any state or federal law, or of any order, proclamation, guidance advice or decision of the Governor. The building official is authorized to suspend or revoke this permit if it is determined to be issued in error or on the basis of incorrect, inaccurate or incomplete information, or in violation of any City ordinance, regulation or order, state or federal law, or any order, proclamation, guidance or decision of the Governor. It is unlawful to use or occupy a building or structure until a final inspection has been made and approval or a Certificate of Occupancy has been granted. This permit authorizes only the work noted and covers work to be done on private property only. Any construction on public domain (curbs, sidewalks, driveways, marquees, etc.) will require a separate permit. The property owner shall ensure that the construction project complies with all applicable zoning codes and regulations. The property owner shall also ensure that the construction project does not cause any adverse impact on the surrounding environment or community. The property owner shall be responsible for obtaining all necessary permits and approvals from the relevant authorities before commencing construction. The property owner shall ensure that the construction project complies with all applicable design review requirements. CONDITIONS The applicant is required to notify the City for inspections. Failure to give notice will result in violation of AMC 1.) Chapter 12.40.240 and may result in additional inspection fees. To request an inspection call 360-403-3417 by 3:30 for next day inspection. Applicant must comply with all applicable City of Arlington, state and federal laws, ordinances, code and regulation in performing the work authorized by this permit. Traffic Control must comply with the current version of MUTCD. Work Hours are 7 am to 7 pm Monday- Saturday (no work on Sundays or City Recognized Holidays). Inspections are not available on Saturday or 2.) Sunday. Non-motorized traffic control must be provided if any part of the work impacts existing non-motorized facilities. Non-motorized traffic control measures shall provide a level of accessibility that are, at minimum, equal to the existing conditions of the site. Two days before starting work, the applicant must have all utilities located. One Call, is a public utility locating 3.) service (#811 or 1-800-424-5555). Privately installed facilities must also be located using a private utility locating service. Please be advised Ziply is responsible for ensuring the placement of new and updated structures. Do not restrict 4.) existing use of right of way. Please take special note of secondary accesses that are used for RVA€"s, boats, or other special uses. Restoration of any infrastructure affected by the installation shall be per City of Arlington Standards & 5.) Specifications within a period not to exceed 7 days from completion of the installation. Trench Restoration shall be per Standard Detail R-140; Contact the City Engineer for Roadway Restoration requirements, 360-403-3512. The applicant is required to notify the City for inspections. Failure to give notice will result in violation of AMC 6 ) Chapter 12.40.240 and may result in additional inspection fees. To request an inspection call 360-403-3417 by 3:30 for next day inspection. Applicant must comply with all applicable City of Arlington, state and federal laws, ordinances, code and regulation in performing the work authorized by this permit. INSPECTIONS Inspection Line: 360-403-3417 Call for inspections by 3:30 pm for next day inspection. Please allow 48 hours for Fire Inspections. Please provide the following information when leaving a message: Permit Number, Type of Inspection, and provide preference of morning or afternoon inspection. Inspection Portal: Please login to customer portal and submit for the desired inspection type for the permit. APPROVED BY Admin - Thad Newport Development Services Engineering Manager ASSOCIATED FEES Date Description Paid Date Amount Paid Balance December 1, Processing/Technology Fee(320.341.43.00.02) $25.00 2025 December 12, Right of Way(006.322.40.00.02) $125.00 2025 TOTAL: Project Fees $150.00 $150.00 Credit/Debit Card 109 Payment Successful March 2, 2026 $150.00 $0.00 4rtk( tot( WASHINGTON Project Information - ' 'nformat;^ Project # 25-0085 Parcel # 31051100100600 Building ID Location 110 3RD ST Project Type Civil Use Project Use Right of Way Parent Project# Subdivision Applicant Name Ziply Fiber Northwest, LLC Address 426 E Casino Rd Applicant Email permits@ziply.com Phone 402-670-8384 Cell Owner Name CITY OF ARLINGTON Address 238 N OLYMPIC AVE ARLINGTON, WA, 98223 Owner Email Phone Cell Contractor Pacific Cable Construction Address PO Box 573, Woodinville, WA 98072 Contractor Email luke@paccab.com Phone Cell Type/Improveme Accessory/Struct nt ure Current Use Proposed Use Current Zoning Proposed Zoning Project Cost 1942.60 Project Value 1942.60 Current Use And ACCESS EXISTING TERMINAL POLE & RISER DOWN,THEN PULL NEW FIBER THROUGH EXISTING CONDUIT TO Proposed CUSTOMER AT 110 E 3RD ST. Changes Lot Width Lot Depth Map Number Total Area of Building &Accessory Total Area of All Man-made Improvements Structures (Sq Ft) (Sq Ft) General Notes Restrictions/ Variances ©Community Development Online Portal Page 1 of 5 April 7, 2026 04:06PM WASHINGTON Structure Information Structure Type # of Stories Usable Floor Area (Sq Ft) Structure Height null # of Units 0 Load per Floor (Lbs) Sign Dimensions # of Bedrooms null # of Bathrooms null Occupancy With Chairs Tables & Chairs Empty Room Foundation Foundation Type Footing Depth null Material Foundation Information Setbacks Front& 0 0 Setbacks Right & 0 0 Rear Left Sides Setbacks Information Water Utility Public Sewage Utility Public Gas Utility Public Electric Utility Public Driveway Width null # of Off Street null # of Off Street null Parking Loading Miscellaneous Information ©Community Development Online Portal Page 2 of 5 April 7, 2026 04:06PM 4rtk( tot( WASHINGTON Contractors License# Business Name Type Contact PACIFCC954PJ Pacific Cable Construction Out of City Timothy Jones ©Community Development Online Portal Page 3 of 5 April 7, 2026 04:06PM 4rtk( tot( WASHINGTON Contacts Contact Name Type Project Address Phone CITY OF ARLINGTON Applicant 238 N OLYMPIC AVE ARLINGTON, WA, 98223 Ziply Fiber Northwest, LLC Applicant 426 E Casino Rd 402-670-8384 CITY OF ARLINGTON Owner 238 N OLYMPIC AVE ARLINGTON, WA, 98223 Ziply Fiber Northwest, LLC Others 426 E Casino Rd 402-670-8384 Pacific Cable Construction Contractor PO Box 573, Woodinville, WA 98072 ©Community Development Online Portal Page 4 of 5 April 7, 2026 04:06PM 4rtk( tot( WASHINGTON Fees Fee Type Date Debit Credit Balance Project Fees December 1, 2025 $150.00 $150.00 $150.00 $0.00 T O T A L $150.00 $150.00 $0.00 ©Community Development Online Portal Page 5 of 5 April 7, 2026 04:06PM