Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
4010 172nd Street NE_BLD1179_2026
COMMERCIAL APPLICATION PERMIT SUBMiTT/AL Department of Community & Economic Development City of Arlington • 18204 59th Ave NE -Arlington, WA 98223 • Phone (360)403-3551 The following minimum information is required for your Commercial/Multi-Family Building Permit Application. Mark each box to designate that the information has been provided. Please submit this checklist as part of your submittal documents. Incomplete applications will delay the review. IT One(1) City of Arlington Commercial/Multi-Family Permit Application � (One (1) permit application per building or structure is required) 1 One(1) City of Arlington Commercial/Multi-Family Submittal Requirements Form 13- Two (2)Architectural Drawings Er Two (2) Structural Drawings Two(2) Structural Calculations ❑ One (1) Project Specification Manuals (if applicable) ❑ One(1) NREC Code Compliance Forms tqJ PC One (1) Special Inspection Requirements Forms One(1) Occupant's Statement of Intended Use Form Drawings shall be BOUND SEPARATEL Y BY TYPE, architectural, structural and landscape and then ROLLED TOGETHER IN COMPLETE SETS> , An intake appointment is required for all new Commercial or Multi-Family Building Permit Applications. To schedule an appointment please contact the City of Arlington Permit Center at(360) 403 3551 or by email to ced(c�arlingtonwa.gov. I acknowledge that all items designated above are included as part of this application. REV 2015 Page 1 of 9 y COMMERCIAL APPLICATION PERMIT SUBMITTAL Department of Community & Economic Development City of Arlington • 18204 59th Ave NE •Arlington, WA 98223 • Phone(360) 403-3551 DETAILED SUBMITTAL REQUIREMENTS Mark each box to designate that the information has been provided. Please submit this checklist as part of your submittal documents A. E✓' SITE PLAN —REQUIRED WITH ALL SUBMITTALS (May be included as part of the Architectural Drawing cover Sheet) 1. Drawing shall be prepared at scale not to exceed 1" =20 feet. 2. Show building outline and all exterior improvements. 3. Provide property legal description and show property lines. 4. Provide dimensions from the property lines to a minimum of two building corners (or two identifiable locations for irregular plan shapes) 5. Show building setbacks, easements and street access locations. 6. Indicate North direction. 7. Indicate finish floor elevation for the first level. 8. Provide topographical map of the existing grades and the proposed finished grades with maximum five feet elevation contour lines. 9. Show the location of all existing underground utilities, including water, sewer,gas and electrical. 10. Flood hazard areas, floodways, and design flood elevations as applicable. B. EX ARCHITECTURAL DRAWINGS I ❑ Cover Sheet a) Building Information 1. Specify model code information. 2. Construction Type, 3. Number of stories and total height in feet. 4. Building square footage(per floor and total) 5. IBC Occupancy Type (show all types by floor and total). 6. Mixed-use ratio(if applicable) 7. Occupant load calculation (show by occupancy type and total) S. List work to be performed under this permit b) Design Team Information 1. Design Professional in Responsible Charge 2- Architects 3. Structural Engineers 4. Owner 5. Developer 6. Any other Design Team Members 2. ❑ Floor Plan a) Plan view 1/8"minimum scale. Details a minimum Y.-inch scale. b) Plans must show the entire tenant space. c) Specify the use of each room/area d) Provide an occupant load calculation on the floor plan. (on every floor, in all rooms and spaces) e) Show ALL exits on the plans; include new, existing or eliminated. 0 Show Barrier-Free information on the drawings. g) Show the location of all permanent rooms,walls and shafts. h) Note the uses in the adjacent tenant spaces, if applicable. i) Provide a door and door hardware schedule. REV 2015 Page 3 of 9 f fi COMMERCIAL APPLICATION PERMIT SUBMITTAL Department of Community& Economic Development City of Arlington • 18204 59th Ave NE •Arlington, WA 98223 • Phone(360)403-3551 The building permit does not include any mechanical, electrical, plumbing or fire sprinkler/alarm work. These permits are issued separately. Mechanical, electrical, plumbing, or fire sprinkler/alarm permits require a separate permit application and may also require separate plan review. Please note that any tenant improvement work in a space that involves food handling or preparation requires Snohomish County Health District approval before the permit can be issued. You rnusl provide the Permit Center a copy of the approval letter or the approved plans. Contact the Snohomish County Health District at(425) 339-5250 with any questions or for more information. An intake appointment is required for all large Tenant Improvement Building Permit Applications. To determine if your project requires an intake appointment, to schedule an appointment or to ensure that you have the most current information, please contact the City of Arlington Permit Center at(360)403-3551 or by email to ced@arlingtonwa.gov. Incomplete applications will not be accepted. I acknowledge that all items designated as submittal requirements must accompany my Building Permit Application to be considered a complete submittal. REV 2015 Page 5 of 9 � COMMERCIAL APPLICATION PERMIT SUBMITTAL Department of Community& Economic Development 11City of Arlington • 18204 59th Ave NE•Arlington, WA 98223 • Phone(360)403-3551 hh Project Name/Tenant Ivl ed a LJ-A on V v ai - I -A ar+ Site Address o 10 - 19 - (St_ N E Bldg/Unit/Suite IBC Construction Type \(—B IBC Occupancy Type Description of Use I(!!,:::> l<—�>c M ry) a-ff0TG Building Square Footage w n Number of Stories I Square Footage Per Floor LA mown Will there be any installation, modification or removal of the following? (Check all that apply) ❑ Automatic fire extinguishing systems J o El Compressed gas systems lJ ❑ Fire alarm and detection systems ❑ Fire pumps ❑ Flammable and combustible liquids(tanks, piping etc...) ❑ Hazardous materials ❑ High piled/rack storage ❑ Industrial ovens/furnace ❑ Private fire hydrants ❑ Spraying or dipping operations ❑ Standpipe systems ❑ Temporary membrane structure,tents(>200sq ft) or canopies(>400 sq ft) Provide details on any of the above checked items Installation, changes, modifications or removal of any of the above may require additional submittals, information, or permits during the plan review or construction process. Statement of Special Inspection REV 2015 Page 7 of 9 COMMERCIAL APPLICATION PERMIT SUBMITTAL Department of Community & Economic Developtnent City of Arlington • 18204 59th Ave NE •Arlington, WA 98223 • Phone(360)403-3551 Name of Project: `-d a 6n W� a - -- I --(—�- —- Project Address: 4010 6 L NE — Special Inspection Firm: - _ IF neeHooL Address: Contact Person: _ Phone: Email.- Special Inspection Firm Special Inspectors: 'w The Special inspection Firm of will perform special inspection for the following types of work(separate forms must be submitted if more than one firm is to be employed). ( ) Reinforced Concrete ( ) Bolting in Concrete ( ) Pre-stressed Concrete ( ) Shotcrete ( ) Structural Masonry ( ) Structural Steel and Welding ( ) High-Strength Bolting ( ) Spray-Applied Fireproofing ( ) Smoke-Control Systems ( ) Other Specify: All individual inspectors to be employed on this project will be WABO certified for the type of inspection they are to perform If inspection is for work that is not covered by the WABO categories, a detailed resume of the inspector and firm must be submitted. The resume must show the inspector and firm are qualified to perform the work and testing required by the project design and specifications. The work shall be inspected for conformance with the plans and specifications approved by the City. Revisions and addenda sheets will not be used for inspection unless approved by the City. The special inspector shall report to the City revisions that are not approved A daily record will be maintained on site itemizing the inspections performed, for the review of all parties. Any nonconforming items shall be brought to the immediate attention of the contractor for resolution.A weekly shall be submitted to the City,detailing the inspections and testing performed, listing any nonconforming items and resolution of nonconforming items Unresolved nonconforming items will be detailed on a discrepancy report and presented to the building department A final report shall be submitted to the Building Division prior to the Certificate of Occupancy being issued This report will indicate that inspection and testing was completed in conformance with the approved plans, specifications and approved revisions and addenda. Any unresolved discrepancies must be detailed in the final report. The special inspector and special inspection firm serve in the role as"deputy"City of Arlington inspectors and as such are responsible to the City of Arlington Building Division in the performance of the required work. Contractor: The contractor shall provide the special inspector or agency adequate notification of work requiring inspection. The City approved plans and specifications must be made available, at the job site for the use of the special inspector and the City Inspector.The contractor shall maintain all daily inspections reports, on site, for review. REV 2015 Page 8 of 9 ME D C I — E 11 G in E E R S � Seattle o Portland Lo Spokane •1 San Diego Austin Irvine $ San Francisco September 9, 2016 Anchorage Los Angeles Rick Matteson Acorn Consulting, Inc. 1125 SE Clatsop St Portland, OR 97202 Subject:Walmart Small Cell @ Arlington Address: 4010 172"d Street NE Arlington,WA Mr. Matteson, Verizon will be installing rectangular antennas and supporting equipment mounted to existing CMU walls at four(4) locations on the side of the Walmart Store in Arlington,Washington. In addition, two (2) new RF Equipment Cabinets will be installed on separate concrete pads on the ground adjacent to the building. DCI was asked to design the anchorage of the antenna to the CMU wall and to design a Fiber-Reinforced Plastic (FRP)shroud to hide the antennas. DCI also designed the bases for the new Cabinets to resist sliding and overturning forces from wind and seismic loads.The cabinets weigh 500 lb each. The installation on the CMU wall at each location consists of the following: • (1) Antenna—47 lb. ea • (2) RRU— 65 lb ea • OVP Raycap— 14 lb. • FRP Shroud—480 lb. The CMU wall has the capacity to support the added weight of this new equipment. See the attached sketches SSK-01 &SSK-02 showing attachment requirements for the antenna mount and shroud design. The foundations for the new cabinets mounted on a new footing at grade should be supported as shown in sketch SSK-03. The cabinets are identical and were reviewed for wind and seismic loads from the 2015 IBC. Sincerely, gY JO AAAV 11 1 A r ll Mathew Wies, P.E., S.E. y Associate DCI Engineers % 30090 N Received Attached—Calculations, SSK-01 -SSK-03 S�OV L DCI Project 1 601 1-01 74 (4000) OCT 18 2016 VA V1 818 Stewart Street,Suite 1000 Seattle,Washington,98101 Phone(206)332-1900 S e r v i c e I n n o v a t i o n V a l u e fV O :. l i 10 :. 101-0" FRP ANGLE 4x4x1/4 BOTTOM$TOP 6'-0" O ®h I FRP ANGLE 4x4x1/4 EA I CORNER WITH 314"FRP OVp N17 I BOLT-TYP ® RRUS32 RRUS32 1 I PSU AC 08 PSU AC 08 1 1-518"x 1.5/8"GALV UNISTRUT ANCHORED buno o o 1 TO WALL W/(3)3/8"e THREADED ROD, o - EMBED 2"WITH HILTI HY-70 ADHESIVE (USE SCREEN TUBE IF CELLS NOT 1 GROUTED) 1 1 1 FRP ANGLE 4x4xl/4EA-/Pi - ------L03 CORNER WITH (2)314" FRP BOLTS-TYP ELEVATION AT ANTENNA SHROUD JO F r� � � d 1i ��. 30090 S�Q Sketch# SSK-01 Project Name: Project#: By: Date: Acorn Walmart Arlington 1 601 1-01 74 MHW 9/8/16 N Field Sketch: D I Elevation at Antenna Shroud E n o I n E I_ R s mounted on CMU Wall 818 STEWART STREET, SUITE 1000•SEATTLE,WA 98101 PHONE(206)332-1900 • FAX: (206)332-1600 FRP ANGLE 4x4x1/4 EA CORNER WITH 3/4"FRP T-0" FRP ANGLE 4x4xl/4 EA BOLT-TYP - - CORNER WITH (2)3/4" FRP BOLTS-TYP 1 I -- -1/4"FRP PANEL FRP SHROUD ANCHORED TO WALL W/(6) 3/8"0 THREADED ROD,EMBED 2"WITH HILTI HY-70 ADHESIVE(USE SCREEN TUBE IF CELLS NOT GROUTED-ANCHORS TO BE LOCATED IN CENTER OF CELL:4" FROM TOP,BOTTOM&EDGE OF BLOCK) / R EXISTING CMU WALL I N A M11 1/4"FRP PANEL- b L Z' NA 'r r� 30090 �; •� SSK-02 Acorn Walmart Arlington 1 601 1-01 74 MHW 9/8/16 �DCI Section at Antenna Shroud mounted on CMUWaII 818 STEWART STREET, SUITE 1000" SEATTLE,WA 98101 PHONE(206)332-1900 " FAX: (206)332-1600 500 LB CABINET i� n FOOTING PER PLAN �N 9 x Sri• 30090 `� • ELEVATION AT s.s _V � Gp•€�I�� r 16rW HNs (Hil t i KB-TZ) 1-t fS�'D 4" (1 @ Ea, Corner 4'-0" SQUARE X 6" DEEP CONCRETE FOOTING W/#5 @ 18"OC a o EW, CENTERED. FLAN AT FOOTING Sketch# SSK-03 Project Name: Project M By: Date: Acorn Walmart Arlington 1 601 1-01 74 MHW 9/8/16 Field Sketch: = D C I Cabinet Foundation E n G I n E E R S 818 STEWART STREET, SUITE 1000 - SEATTLE,WA 98101 PHONE(206)332-1900 - FAX: (206)332-1600 Project No. Sheet No. =DCl flEERS Project Date � u t4A.61,T Ar I ingt on o 6 Subject By IZ2v 65 �Z = 130# �a-(c-N0 Up 305# �5 ���� P �Ik0e-L 2.5 J?6f- 10`X51 �- Cz� 3'xio' + z(3',c5�� = L4oFzZ w = ISO* r Q-Q 4 k4�% x gZ' u _4S W I c-s-D L D kl:;> Ito r-' P1—1 - vz &CC A.- 0 -bc z56 L4: . ka Vz. t-o V - Ito 26 �sF MDO (Project No. Sheet No. E n G Project Date L Ar I i ngt on s (4u. Subject By ` r GC, - ->S GC T n-P S K+W Jp TO e'- tet lo�yro' 3` DF / Sr 51,30U-) �5e�ow 2S S 6e C( too IDS C 3� i + Ilq� �L i i yso�oW= G XIb,"IZ Tt_A'O V A&C)L:z (-r�c) = 30 YD�4 7, (3I)�s� I�- TSL Twlu'� Z (�4o ko�b) 00t&—v Tv 553-* V13"4TtAw> ?�-(p G�c� w�E-E1t.T1 V = 3D Tcr '� " g Gr�P � c9�-- =D C I Project No. Sheet No. r= nE 1EER5 Project Date L &-\,1 RT Ar I ingt on C=� /( A Subject B I✓lo A';D� -ro Fo o'C I t—)Gti LJT 7:::Sao lik T-5 Ak ADD x0_�� 2� = 20 40 ��`•�A o �- C-4k C, IS:�5/10.67-= l47- NSF 3 6(4) ••e USA �` Jl7l ('7,' Fil �jL��...��. �l,�T (,J/*ge 1811 oC Project# 16011-0174 Page#: 1 Proj. Name : Acorn Walmart Arlington C IEngineer: MHW Date : 09/07/2016 i - i n E E R S Subject EQUIPMENT SUMMARY Design Criteria: Codes 20151BC ASCE 7-10 Equipment Summary, Loads & Anchorage Equipment Height(ft) Long Length(ft) Short Length(ft) Total Wgt. (kip) Curb Ht. (ft) Uplift Shear w/QO w/Q,, Cabinet 7.50 2.67 2.67 0.50 0.0 -859lb 439lb Wind Load Exp 120 MPH C kz 0.85 kzt 1.0 kd 0.85 qzI 26.6 1 psf F =gzGCfAf G 0.85 Cf 1.55 B/s 0.5 s/h 1.0 F 35.1 psf Provide(4) 1/2" Dia Threaded Rods, Embed 3"w/Hilti HY200 Project#: 1 601 1-0057 Page#: 1 0 C I Proj. Name: Acorn Walmart Arlington Engineer: MHW Date: 09/07/2016 E n G I n E E Fl S Subject: Seismic Coefficients I. Seismic Ground Motion Values: LAT = Site Latitude: = 48.162 LONG = Site Longitude: = -122.176 SS = MCE Spectral Accel @ 0.2 Sec: = 1.085 2002 USGS Mapped Value for Default Site Class B S, = MCE Spectral Accel @ 1.0 Sec: = 0.423 2002 USGS Mapped Value for Default Site Class B SITE = Site Class:(Default is D) = D per Geotech or Table 20.3-1-ASCE 7,pg 205 Fa = Spectral Accel @ 0.2 Sec for Site = Table 114-1-ASCE 7,pg 115 Fv = Spectral Accel @ 1.0 Sec for Site = Table 11.4-2-AscE 7,pg 115 SMS = MCE Spectral Resp(Short Period) = 0.45 =Fa Ss Eqn 11 4-1 5re1 = MCE Spectral Resp(Long Period) = 0.25 =FvS, Eqn 11 4-2 5pg = Design Spectral Accel @ 0.2 Sec = 0.77 =2/3 SMs Eqn 11 4-3 SD1 = Design Spectral Accel @ 1.0 Sec = 0.45 =2/3 SM, Eqn 11 4-4 XUSGS Design Maps Summary Report User—Specified Input Report Title Acorn Walmart Arlington Thu September 8,2016 04:53:07 UTC Building Code Reference Document 2012/2015International Building Code (whi&utilizes USGS hazard data avai6ble In 2008) Site Coordinates 48.1523VN, 122.176216W Site Soil Classification Site Class D -"Stiff Sall" Risk Category I/II/III Stanwood. ,� � ESEPr P OR SUSA BAY I'�l it4l ~� �-� . `wnino � lYIiTONMM01�rran�r lip OTSERVATAON - Marysville USGS-Provided Output S9 as 1.085 g SM= 1.156 g S ,, = 0.771 g Si as 0.4239 SM1= 0.667 g Soi= 0.4459 momm � ' Project# 16011-0174 Page#: 2 � D Proj.Name Acorn Walmart Arlington Engineer MHW Date: 09/07/2016 E f--1 G I I--1 E E F1 S Subject Cabinet Anchorage Seismic Design Requirements for Nonstructural Components-ASCE 7-10 Chapter 13 Equipment: Cabinet Cabinet Geometry: Seismic Coefficients Htoi= 7.5 ft Overall height SDC= D Seismic Design Category h s= 3.8 ft Seis.Centroid=1/2(Unit)+Curb SOS= 0.77 Design spectral acceleration h_w= 3.8 ft Wind Centroid=1/2(H_tot) ap= 1.0 ASCE 7-10-Table 13 6-1 D= 2.67 ft Dist between attachment RP= 2.5 ASCE 7-10-Table 13 6-1 N= 4 Attachments supporting weight Ip= 1.0 Component Importance NOT= 2 Attachments resisting OT OP 2.5 Weight Wp= 0 50 kip z= 1.0 ft h= 1.0 ft Height of building Wind Load Seismic Calculations Wind Pressure= 35.1 psf LRFD Level Wind Width= 2.67 ft Fp caic-0.4*oR*p/I tp Wp(1+2 h) Fp caic= 0.19 kips Wind Load= 0.70 kip Equation 13.3-1 Center of Wind 3 750 Fp.max=1.6*SpS*Ip*Wp Fp max= 0.6 kips WP= 0 5 kip Equation 13.3-2 Fp.min=0.3*SpS*1p*Wp Fp min= 0 12 kips Equation 13 3-3 Wind Load 0.702 kip Controlling Design Shear Force Fp= 0.70 kips FP= 0.70 kips Controlled by Wind Fp,ASD=0.6*Fp= 0.42 kips Reactions h= 3.75 ft N= (4) Attachments supporting weight/resisting shear NOT= (2) Attachments resisting OT Lateral Load in the X-direction (+value equal com ression Point A Point C i 2.67 ft Dead +0.1 kip +0.1 kip Rx=Wp/N R, RO JWind 1 0.5 kip +0.5 kip Rx=FP*h/D Seismic 1 0.1 kip +0.1 kip Max EQ 0.05 kips 1 0.23 kips (1.0+,14SDS)D+0.7EQ Min EQ -0.03 kips 0.15 kips (0.6-14SDS)D+0 7EQ Max Wind -0.17 kips 0.42 kips D+0-6W Min Wind -0.22 kips 1 0.37 kips 0.6D+0.6W Max EQ 0.04 kips 0 30 kips (1.2+,2SDS)D+1 OEQ Min EQ -0.07 kips 0 19 kips (0.6-.2SDS)D+1.OEQ Max Wind -0.34 kips 0.64 kips 1 2D+1 OW Min Wind -0 22 kips 0.37 kips 0.6D+0 6W Tension Compression Shear Max 0.64 kips 0.18 kips LRFD Loads 0.34 kip 0.18 kips Qp Loads -0.86 kip 0.44 kip www.hilti.us Profis Anchor 2.6.5 Company: DCI Engineers Page: 1 Specifier: MHW Project: SLM Walter Address: Sub-Project I Pos.No Cabinet Anchorage Phone I Fax: I Date: 06/02/2016 E-Mail: Specifier's comments: 1 Input data — - Anchor type and diameter: HIT-HY 200+HAS B7 1/2 Effective embedment depth: hef,opti=2.750 in.(h.f,llmit=4.750 in.) Material: ASTM A 193 Grade B7 Evaluation Service Report: ESR-3187 Issued I Valid: 03/01/2016 1 03/01/2018 Proof: Design method ACI 318-08/Chem Stand-off installation: -(Recommended plate thickness:not calculated) Profile: no profile Base material: cracked concrete,2500,fc'=2500 psi;h=6 000 in.,Temp.short/long:32/32°F Installation: hammer drilled hole,Installation condition:Dry Reinforcement: tension:condition B,shear:condition B;no supplemental splitting reinforcement present edge reinforcement:none or<No.4 bar Seismic loads(cat.C,D,E,or F) no Geometry[in.]&Loading[lb,in.lb] Z OP It CF10 OW Input data and results must be checked for agreement with the existing conditions and for plausibility! PROFIS Anchor(c)2003-2009 Hilti AG,FL-9494 Schaan Hilti is a registered Trademark of Hilt!AG,Schaan www.hilti.us Profis Anchor 2.6.5 Company: DCI Engineers Page: 2 Specifier: MHW Project: SLM Walter Address: Sub-Project I Pos.No.: Cabinet Anchorage Phone I Fax: Date: 06/02/2016 E-Mail: 2 Load case/Resulting anchor forces Load case:Design loads Anchor reactions[lb] Tension force:(+Tension,-Compression) Anchor Tension force Shear force Shear force x Shear ford 1 860 440 0 440 max.concrete compressive strain: -[%o] max.concrete compressive stress: -[psi] resulting tension force in(x/y)=(0.000/0.000): 0[lb] resulting compression force in(x/y)=(0 000/0.000):0[lb] 3 Tension load Load N a[lb] Capacity tN„[lb] Utilization ON=Nua/4Nn Status feel Strength' 860 13301 7 OK Bond Strength— 860 1232 70 OK Sustained Tension Load Bond Strength" N/A N/A N/A N/A Concrete Breakout Strength— 860 1726 50 OK "anchor having the highest loading *'anchor group(anchors in tension) 3.1 Steel Strength Nsa =ESR value refer to ICC-ES ESR-3187 �Nsa Nua ACI 318-08 Eq.(D-1) Variables Ase,N[in.2] f [psi] 0.14 125000 Calculations Nsa[lb] 17735 Results Nsa[lb] steel Nsa[lb] Nua[lb] 17735 0.750 13301 860 Input data and results must be checked for agreement with the existing conditions and for plausibility! PROFIS Anchor(c)2003-2009 Hilti AG,FL-9494 Schaan Hilli is a registered Trademark of Hilt!AG,Schaan ELM 11� www.hilti.us Profis Anchor 2.6.5 Company: DO Engineers Page: 3 Specifier: MHW Project: SLM Walter Address: Sub-Project I Pos.No Cabinet Anchorage Phone I Fax: Date: 06/02/2016 E-Mail: 3.2 Bond Strength Na = 1/\AN II Yed,Na ycp,Na Nba ACI 318-11 Eq.(D-18) Na z Nua ACI 318-11 Table D.4.1.1 ANa =see ACI 318-11,Part D.5.5.1,Fig.RD.5.5.1(b) ANao =(2 CNa)` ACI 318-11 Eq.(D-20) CNa =10 da TO—"cr ACI 318-11 Eq.(D-21) 1100 1 ll/ec,Na= �1 + eN 5 1.0 ACI 318-11 Eq.(D-23) \ cNe Wed,Na=0.7+0.3(� 0 1.0 ACI 318-11 Eq.(D-25) Ycp,Na=MAXRLIIie ANa))51.0 ACI 318-11 Eq.(D-27) Cac Cac Nba =Xa'Tk,c'f<'da'hef ACI 318-11 Eq.(D-22) Variables Tk,c,uncr[psi] da[In.] haf[In.] Capin[in.] Tk,c[psi] 1670 0.500 2.750 3.000 935 ec1.N[in.] ec2,N[in.] cac[in.] ka 0.000 0.000 4.480 1.000 Calculations CNa[in.] AN.[in.2] ANao[in.2] gfed,Na 6.133 83.41 150.45 0.847 Wecl,Na llec2,Na Ycp,Na Nba[lb] 1.000 1.000 1.000 4039 Results Na[lb] bond Na[lb] Nua[lb] 1896 0.650 1232 860 Input data and results must be checked for agreement with the existing conditions and for plausibility! PROFIS Anchor(c)2003-2009 Hilti AG,FL-9494 Schaan Hilti is a registered Trademark of Hilt!AG,Schaan www.hilti.us Profis Anchor 2.6.5 Company: DCI Engineers Page: 4 Specifier: MHW Project: SLM Walter Address: Sub-Project I Pos.No.: Cabinet Anchorage Phone I Fax: Date: 06/02/2016 E-Mail: 3.3 Concrete Breakout Strength Ncb = (p N,)Wed,N Yc,N ycp,N Nb ACI 318-08 Eq.(D-4) Ncb a N a ACI 318-08 Eq.(D-1) ANC see ACI 318-08,Part D.5.2.1,Fig.RD.5.2.1(b) ANco =9 hef ACI 318-08 Eq.(D-6) 1 wec,N = 2 e�;l<_1.0 ACI 318-08 Eq.(D-9) \1 +3 h�,// wed N =0.7+0.3(�`,n,,)51.0 ACI 318-08 Eq.(D-11) WC0.N _MAX(eo_mm 1.5h�, 5 1.0 ACI 318-08 Eq.(D-13) — Cac � Co.0 No =kc N�f hef5 ACI 318-08 Eq.(D-7) Variables hef[in.] ec,.N[in.] ec2.N[in.] C.rn,,2[in.] %11'r N 2.750 0.000 0.000 3.000 1.000 c,c[in.] kc 7 fC[psi] 4.480 17 1 2500 Calculations AN,(in•2] AN.0[in•2] ac t{fec2 N f tod.N w ,N Nb[lb] 50.77 68.06 1. i N 1.000 0.918 1. 00 3876 Results Ncb[lb] �concreto Ncb[lb] Nua[Ib] 2655 0.650 1726 860 Input data and results must be checked for agreement with the existing conditions and for plausibility! PROFIS Anchor(c)2003-2009 Hilti AG,FL-9494 Schaan Hilti is a registered Trademark of Hilti AG,Schaan www.hilti.us Profis Anchor 2.6.5 Company: DO Engineers Page: 5 Specifier: MHW Project: SLM Walter Address: Sub-Project I Pos.No.: Cabinet Anchorage Phone I Fax: Date: 06/02/2016 E-Mail: 4 Shear load Load Vua[lb] Capacity�V„[lb] Utilization pv=V„10V„ Status Steel Strength' 440 6916 7 OK Steel failure(with lever arm)* N/A N/A N/A N/A Pryout Strength(Bond Strength controls)** 440 2654 17 OK Concrete edge failure in direction y+** 440 949 47 OK *anchor having the highest loading **anchor group(relevant anchors) 4.1 Steel Strength VSe =(0.6 Ase,v fuze) refer to ICC-ES ESR-3187 �Vsteel z Vua ACI 318-08 Eq.(D-2) Variables Ase,y[in•2] fut.[psi] (0.6 Ase,v fut.)[lb] 0.14 125000 10640 Calculations Vsa[lb] _ 10640 Results Vsa[lb] steel Vs.[lb] Vue[lb] 10640 0. 5 6916 440 Input data and results must be checked for agreement with the existing conditions and for plausibility! PROPS Anchor(c)2003-2009 Hilti AG,FL-9494 Schaan Hilti is a registered Trademark of Hilti AG,Schaan 1 � 11= www.hilti.us Profis Anchor 2.6.5 Company: DCI Engineers Page: 6 Specifier: MHW Project: SLIM Walter Address: Sub-Project I Pos.No.: Cabinet Anchorage Phone I Fax: Date: 06/02/2016 E-Mail: 4.2 Pryout Strength(Bond Strength controls) Vcp cp=k [(A%,)wed,Na 4Jcp,Na ba N ] ACI 318-11 Eq.(D-40) �- VcP a Vua ACI 318-11 Table(D.4.1.1) A% see ACI 318-11,Part D.5.5.1,Fig.RD.5 5.1(b) AN.0 =(2 CNa)- ACI 318-11 Eq.(D-20) cNa =10 da ;— ACI 318-11 Eq (D-21) 1100 1 llfec,Ne= \1 + era 5 1.0 ACI 318-11 Eq.(D-23) �Na =0.7+0.3(c �)5 1.0 ACI 318-11 Eq.(D-25) �� llfeQNa _MAX SL!nl cNa 51.0 ACI 318-11 Eq.(D-27) 41cP Na— ( cac cac Nba =ka'Tk,c'R'da'her ACI 318-11 Eq.(D-22) Variables kcP Tk,cuncr[Psi] da[in.] het[n] ca,mrn[in.] 2 1670 0.500 _Y750 3.00 W,[Psi] eo7,N[in.] eczN(in.] cac[in.] l a 935 0.000 0.000 4.480 1.000 Calculations cNa[in.] Ara.(in•21 ANao[in.2] tVs4Na 6,133 83.41 150.45 0.847 41ec2,14a Nba[lb] 010 1.000 00 4039 Results Vcp Pb] VcP[lb] Vua[lb] 3792 0.700 2654 440 Input data and results must be checked for agreement with the existing conditions and for plausibility! PROFIS Anchor(c)2003-2009 Hilti AG,FL•9494 Schaan Hilli is a registered Trademark of Hilti AG,Schaan www.hllti.us Profis Anchor 2.6.5 Company: DCI Engineers Page: 7 Specifier: MHW Project: SLM Walter Address: Sub-Project I Pos.No.: Cabinet Anchorage Phone I Fax: Date: 06/02/2016 E-Mail: 4.3 Conc((rete edge failure in direction y+ Vcb = \Avco)Wed,V Wc,V Wh,V Wparallel,V Vb ACI 318-08 Eq.(D-21) Vcb 2 Vua ACI 318-08 Eq.(D-2) Avc see ACI 318-08,Part D.6.2.1,Fig.RD.6.2.1(b) Avco =4.5 Ca, ACI 318-08 Eq.(D-23) 1 Wec,V- 2e <-1.0 ACI 318-08 Eq.(D-26) 1 +3ca, Wed,V=0.7+0.3( Caz )5 1.0 ACI 318-08 Eq.(D-28) 1.5c„ Ir Wn V = hc: Z 1-0 ACI 318-08 Eq.(D-29) , oz Vb = (7 \da) �) 1�cal ACI 318 08 Eq.(D-24) Variables caf[in.] Caz[in.] ecv[in.] Wc,v ha[in.] 3.000 3.000 0.000 1.000 6.000 la[in.] da[in.] fc[psi] Wparallel,V 2.750 1.000 0 500 2500 1.000 Calculations Av.[in•2] Avco[in•2] Wec,V Wed,v Wh,V Vb[lb] 33.75 40.50 1.000 0.900 1.000 1808 Results Vcb[lb] concrete Vcb[lb] Vua[lb] 1356 0.700 949 440 5 Combined tension and shear loads ON Ov C Utilization pN,v N Status 0.698 0.463 5/3 83 OK RNv=P�+O'V<=1 6 Warnings • Load re-distributions on the anchors due to elastic deformations of the anchor plate are not considered.The anchor plate is assumed to be sufficiently stiff,in order not to be deformed when subjected to the loading! Input data and results must be checked for agreement with the existing conditions and for plausibility! • Condition A applies when supplementary reinforcement is used.The(P factor is increased for non-steel Design Strengths except Pullout Strength and Pryout strength. Condition B applies when supplementary reinforcement is not used and for Pullout Strength and Pryout Strength.Refer to your local standard. • Design Strengths of adhesive anchor systems are influenced by the cleaning method.Refer to the INSTRUCTIONS FOR USE given in the Evaluation Service Report for cleaning and installation instructions • The ACI 318-08 version of the software does not account for adhesive anchor special design provisions corresponding to overhead applications. • Checking the transfer of loads into the base material and the shear resistance are required in accordance with ACI 318 or the relevant standard! Fastening meets the design criteria! Input data and results must be checked for agreement with the existing conditions and for plausibility! PROFIS Anchor(c)2003-2009 Hilti AG,FL-9494 Schaan Hilti is a registered Trademark of Hilti AG,Schaan www.hilti.us Profis Anchor 2.6.5 Company: DCI Engineers Page: 8 Specifier: MHW Project: SLM Walter Address: Sub-Project I Pos.No.: Cabinet Anchorage Phone I Fax: Date: 06/02/2016 E-Mail: 7 Installation data Anchor plate,steel:- Anchor type and diameter:HIT-HY 200+HAS B7 1/2 Profile:- Installation torque:360.001 in.lb Hole diameter in the fixture:- Hole diameter in the base material:0.563 in. Plate thickness(input):- Hole depth in the base material:2.750 in. Recommended plate thickness:- Minimum thickness of the base material:4.000 in Drilling method:Hammer drilled Cleaning:Compressed air cleaning of the drilled hole according to instructions for use is required 7.1 Recommended accessories Drilling Cleaning Setting • Suitable Rotary Hammer Compressed air with required accessories Dispenser including cassette and mixer • Properly sized drill bit to blow from the bottom of the hole Torque wrench • Proper diameter wire brush Coordinates Anchor in. Anchor x y c.x c♦x c-y c.y 1 0.000 0 000 - 3 000 3.000 8 Remarks; Your Cooperation Duties • Any and all information and data contained in the Software concern solely the use of Hilti products and are based on the principles,formulas and security regulations in accordance with Hilli's technical directions and operating,mounting and assembly instructions,etc.,that must be strictly complied with by the user. All figures contained therein are average figures,and therefore use-specific tests are to be conducted prior to using the relevant Hilti product. The results of the calculations carried out by means of the Software are based essentially on the data you put in. Therefore,you bear the sole responsibility for the absence of errors,the completeness and the relevance of the data to be put in by you. Moreover,you bear sole responsibility for having the results of the calculation checked and cleared by an expert,particularly with regard to compliance with applicable norms and permits,prior to using them for your specific facility. The Software serves only as an aid to interpret norms and permits without any guarantee as to the absence of errors,the correctness and the relevance of the results or suitability for a specific application. • You must take all necessary and reasonable steps to prevent or limit damage caused by the Software. In particular,you must arrange for the regular backup of programs and data and,if applicable,carry out the updates of the Software offered by Hilti on a regular basis.If you do not use the AutoUpdate function of the Software,you must ensure that you are using the current and thus up-to-date version of the Software in each case by carrying out manual updates via the Hilti Website. Hilti will not be liable for consequences,such as the recovery of lost or damaged data or programs,arising from a culpable breach of duty by you. Input data and results must be checked for agreement with the existing conditions and for plausibility! PROFIS Anchor,(c)2003.2009 Hdti AG.FL-9494 Schaan Hilu is a registered Trademark of Hilti AG,Schaan ' CITY OF ARLINGTON 238 N. OLYMPIC AVE -ARLINGTON, WA. 98223 _ PHONE; (360)403-3551 BUILDING PERMIT Address:4010 172nd St NE Permit#:1179 Parcel#:00930300000301 Valuation:30000.00 OWNER APPLICANT CONTRACTOR Name:WAL-MART STORES INC Name:Black Rock Consulting Name:Ridgetop Wireless Solutions,Inc Address:PO BOX 8050 M/S 0555 Address:PO Box 1744 Address:35232 Ede Rd City,State Zip:BENTONVILLE,AR 72712-8050 City,State Zip:Tualatin,OR 97062 City,State Zip:Lebanon,OR 97355 Phone: Phone:503-380-1564 Phone: MECHANICAL CONTRACTOR PLUMBING CONTRACTOR Name: Name: Address: Address: City,State,Zip: City,State,Zip: Phone: Phone: LIC#: EXP: LIC#: EXP: JOB DESCRIPTION PERMIT TYPE: Commercial Alteration CODE YEAR: 2015 STORIES: I CONST.TYPE: DWELLING UNITS: 0 OCC GROUP: BUILDINGS: I OCC LOAD: PERMIT APPROVAL I AGREE TO COMPLY WITH CITY AND STATE LAWS REGULATING CONSTRUCTION AND IN DOING THE WORK AUTHORIZED THEREBY;NO PERSON WILL BE EMPLOYED IN VIOLATION OF THE LABOR CODE OF THE STATE OF WASHINGTON RELATING TO WORKMEN'S COMPENSATION INSURANCE AND RCW 18.27. THIS APPLICATION IS NOT A PERMIT UNTIL SIGNED BY THE BUILDING OFFICIAL OR HIS/HER DEPUTY AND ALL FEES ARE PAID. IT IS UNLAWFUL TO USE OR OCCUPY A BUILDING OR STRUCTURE UNTIL A FINAL INSPECTION HAS BEEN MADE AND APPROVAL OR A CERTIFICATE OF OCCUPANCY HAS BEEN GRANTED. IBC 110/IRC 110. SALES TAX NOTICE:Sales tax relating to cons niction and construction materials in the City of Arlington must be reported on your sales tax return form and coded Ci rlin to A3101. ,�i�c�e� 2- Signature Print Name Date Released By to CONDITIONS Adhere to approved plans. THIS PERMIT AUTHORIZS ONLY THE WORK NOTED.THIS PERMIT COVERS WORK TO BE DONE ON PRIVATE PROPERTY ONLY. ANY CONSTRUCTION ON THE PUBLIC DOMAIN(CURBS,SIDEWALKS,DRIVEWAYS,MARQUEES,ETC.)WILL REQUIRE SEPARATE PERMISSION. PERMIT FEES Date Description Fee Amount 2/28/2018 Building Permit Fee $612.59 2/28/2018 Building Plan Review Fee $398.18 2/28/2018 State Building Code Surcharge Fee $4.50 Total Due: $1,015.27 Total Payment: $0.00 Balance Due: $1,015.27 CALL FOR INSPECTIONS BUILDING(360)403-3417 When calling for an inspection please leave the following information: Permit Number,Type of Inspection being requested,and whether you prefer morning or afternoon 00 NOT SCALE DRAWINGS CONTRACTOR MUST VERIFY ALL DIMENSIONS AND ADVISE CONSULTANTS OF ANY ERRORS OR OMISSIONS NO VARIATIONS OR MODIFICATIONS TO WORK SHOWN SHALL BE IMPLEMENTED WITHOUT PRIOR WRITTEN A-AM I Alt MEHOW155VE60ETNLSORAWINOME SUPERSEDED BYTHE LATEST REVISION ALL DRAWINGS AND SPECIFICATIONS REMAIN THE PROPERTY OF ACOM CORPORATION WALMART SMALL CELL = Received OCT 18 201E verizon MEDALLION wtD «-,a 4010 172ND ST NE ARLINGTON, WA 98223 No Dale Revision A 03/25116 90%CD REVIEW SET B 04/07/16 100%CD REVIEW SET 0 05/12/16 REVISIONS 1 05/19/16 REVISIONS 2 05/23/16 100%FINAL CD SET 3 VICINITY MAP PROJECT INFORMATION SCOPE OF WORK VERIZON WIRELESS PROPOSES TO INSTALL NEW EXTERIOR WALL MOUNTED SMALL CELL PANEL ANTENNAS AND GPS UNIT WITH COAX ROUTING FROM THE VZW EQUIPMENT TO THE ANTENNAS VIA SLEEPERS ON ROOF ALL JURISDICTION: CITY OF ARLINGTON PROPOSED RF EQUIPMENT WILL BE INSTALLED IN THE(2)PROPOSED PAD MOUNTED EQUIPMENT CABINETS v e r i z o n✓ ZONING CLASS: HC(HIGHWAY COMMERCIAL) OCCUPANCY GROUP: M(RETAIL) jl PROPOSED USE TELECOM TAX PARCEL ID: 00930300000301 NODE 1(NAD83): LONGITUDE:48°09'3.80" LATITUDE:122"10'29,20" LIST OF DRAWINGS Implementation Team: NODE 2(NAD83): LONGITUDE:48°09'3,80" LATITUDE:122°10.29.20" SHEET DESCRIPTION NODE 3(NAD 83): LONGITUDE:48°09'%38" LATITUDE 122°10'33.64" S I T F_ NODE 4(NAD 83): LONGITUDE:48°09'59.38" LATITUDE:122°10'33 64" _ T-1 COVER SHEET GROUND ELEVATION(NAVD88): 122.0'* STRUCTURE HEIGHT: 20'-0"t(TOP OF BUILDING ROOF) T-2 GENERAL NOTES AND SYMBOLS 26'-8"!(TOP OF BUILDING PARAPET) A-1 PROPOSED SITE PLAN BLACK ROCK A-2 PROPOSED ROOF&EQUIPMENT PLANS A-3 ENLARGED PLANS&ELEVATIONS r CODE COMPLIANCE A-4 FRP SHROUD DETAILS :.<.r Tam A-5 BUILDING ELEVATIONS RF-1 PROPOSED ANTENNA CONFIGURATION ��`•,� ALL WORK AND MATERIALS SHALL BE PERFORMED AND INSTALLED IN ACCORDANCE WITH THE CURRENT E-0 GENERAL ELECTRICAL NOTES CONDITIONS OF THE FOLLOWING CODES AS ADOPTED BY THE LOCAL GOVERNING AUTHORITIES.NOTHING IN THESE PLANS IS TO BE CONSTRUED TO PERMIT WORK NOT CONFORMING TO THESE CODES: E-1 ELECTRICAL BUILDING PLAN CONSULTING INC WASHINGTON STATE AND LOCAL BUILDING CODES NTH THE FOLLOWING REFERENCE CODE: E-2 GROUNDING DETAILS 2012 IBC,STANDARDS AND AMENDMENTS WAC 51-50 20121MC,STANDARDS AND AMENDMENTS WAC 51-52 2012 IFC,STANDARDS AND AMENDMENTS WAC 51-54 2012 WASHINGTON STATE ENERGY CODE WAC51-11C Project Info: 2012 UPC, AND AMENDMENTS 2014 WASHINGTONRDS CIITIES ELECTRICAL CO EAC 51-56 WALMART SMALL CELL MEDALLION 4010 172nd ST NE ARLINGTON,WA 98223 DRIVING DIRECTIONS CONTACTS APPROVALS Drawing Tille: (FROM SEATTLE TACOMA INTERNATIONAL AIRPORT-SEATAC,WA): TITLE SIGNATURE DATE COVER SHEET TAKE WA-518 E FROM AIRPORT EXPRESSWAY.FOLLOW WA-5 1 811-4 0 5N TO 1-5 N.FOLLOW 1-5 N TO EXIT 206(WA-531 WALMART OWNER CONTACT: APPLIWOCLIENT CONTACT A&E CONTACT: REPRESENTATIVE TOWARD LAKEWOOD/SMOKEY POINT)IN SNOHOMISH COUNTY.USE THE RIGHT 2 LANES TO EXIT ONTO WA-531, DAVID HESS SOPHIA METESON KKERS RICK MAT KEEP RIGHT ON WA-531 E/172ND ST NE/EDGECOMB RD.SITE WILL BE ON THE RIGHT WALMART WIRELESS FIELD OPERATIONS BLACK ROCK ACOM CONSULTING,INC PHONE:(479)204-7140 PHONE:(503)380-1564 1125 SE CLATSOP ST RE ENGINEER david w hess@wal-mart corn sophia@blk-rock.com PORTLAND,OR 97202 PHONE:(425)209-6723 Poject Number: Date: rick matteson(HUacomconsullinginccom SITE OWNER 0523/16 Drafter: Designer: RM RM WALMART STORE CONTACT: APPLICANT: Project Manager: Professional of Record: JEFFERY FITTINGER VERIZON WIRELESS AM RJ STORE MANAGER MICHAEL CUNNINGHAM PHONE:(360)386-4608 michael.cunningham2@verizonwireless.Com Revision No: Sheet No: _ 2 T-1 GENERAL NOTES LINE/ANTENNA NOTES DWNQ I EN110 SAND AWILECoNNTnACT01 MUST VERIFYALL DIMENSIONS AND A[WNG CCrr•eRUiZT01 OF ANY ERRORS OR OMISSIONS NOVARIATIONS OR MODIFICATIONS TO WORK SHOWN SHALL BE IMPLEMENTED WITHOUT PRIOR WRITTEN 1. WORK SHALL COMPLY WITH ALL APPLICABLE CODES,ORDINANCES,AND REGULATIONS.ALL 16, VERIFY ALL EXISTING DIMENSIONS PRIOR TO PERFORMING WORK 1 ALL THREADED STRUCTURAL FASTENERS FOR ANTENNA SUPPORT ASSEMBLES SHALL APPROVAL ALL PREVIOUS ISSUES OF THIS DRAW NG ARE SUPERSEDED BY THE OUS IS REVISION ALL DRAWINGS AND NECESSARY LICENSES,CERTIFICATES,ETC-,REQUIRED BY AUTHORITY HAVING CONFORM TO ASTM A307 OR ASTM A36.ALL STRUCTURAL FASTENERS FOR STRUCTURAL STEEL SPE'I ACATIONS R EMAIN TH E PROPERTY OF ACOM FRAMING SHALL CONFORM TO ASTM A325.FASTENERS SHALL BE 51W MIN.DIA.BEARING TYPE CORPORATION JURISDICTION SHALL BE PROCURED AND PAID FOR BY THE CONTRACTOR, 17. VERIFY LOCATION OF ALL BURIED UTILITIES PRIOR TO ANY EXCAVATION. CONNECTIONS WITH THREADS EXCLUDED FROM THE PLANE.ALL EXPOSED FASTENERS.NUTS, 2. ACOM HAS NOT CONDUCTED,NOR DOES IT INTEND TO CONDUCT ANY INVESTIGATION AS TO 16, IN RAWLANO CONDITIONS,TOWER FOUNDATION STRUCTURAL STEEL TO BE GROUNDED AND WASHERS SHALL BE GALVANIZED OTHERWISE NOTED.CONCRETE EXPANSION ANCHORS THE PRESENCE OF HAZARDOUS MATERIAL,INCLUDING,BUT NOT LIMITED TO,ASBESTOS PRIOR TO CONCRETE POUR.TOWER FOUNDATION STRUCTURAL STEEL TO BE CONNECTED SHALL BE HILTI KWIK BOLTS UNLESS OTHERWISE NOTED.ALL ANCHORS INTO CONCRETE SHALL WITHIN THE CONFINES OF THIS PROJECT.ACOM DOES NOT ACCEPT RESPONSIBILITY FOR TO PERMANENT GROUND ROD PRIOR TO TOWER ERECTION,TOWER GROUND MUST BE BE STAINLESS STEEL. THE INDEMNIFICATION,THE REMOVAL,OR ANY EFFECTS FROM THE PRESENCE OF THESE MAINTAINED AT ALL TIMES. 2. NORTH ARROW SHOWN ON PLANS REFERS TO TRUE NORTH.CONTRACTOR SHALL VERIFY MATERIALS.IF EVIDENCE OF HAZARDOUS MATERIALS IS FOUND,WORK IS TO BE SUSPENDED AND THE OWNER NOTIFIED.THE CONTRACTOR IS NOT TO PROCEED WITH 19. THE GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR APPLYING FOR COMMERCIAL MAGNETIC NORTH AND NOTIFY CONSULTANT OF ANY DISCREPANCY BEFORE STARTING FURTHER WORK UNTIL INSTRUCTED BY THE OWNER IN WRITING. POWER IMMEDIATELY UPON AWARD OF CONTRACT.THE GENERAL CONTRACTOR IS CONSTRUCTION. REQUIRED TO KEEP ALL DOCUMENTATION RECEIVED FROM THE POWER COMPANY, 3. ALL MATERIAL FURNISHED UNDER THIS CONTRACT SHALL BE NEW,UNLESS OTHERWISE ACKNOWLEDGING APPLICATION FOR POWER,WRITTEN AND VERBAL DISCUSSIONS WITH THE 3. PROVIDE LOCK WASHERS FOR ALL MECHANICAL CONNECTIONS FOR GROUND CONDUCTORS. NOTED.ALL WORK SHALL BE GUARANTEED AGAINST DEFECTS IN MATERIALS AND POWER COMPANY,ETC. USE STAINLESS STEEL HARDWARE THROUGHOUT. WORKMANSHIP.THE CONTRACTOR SHALL REPAIR OR REPLACE AT HIS EXPENSE ALL WORK THAT MAY DEVELOP DEFECTS IN MATERIALS OR WORKMANSHIP WITHIN SAID PERIOD OF 20. THE GENERAL CONTRACTOR SHALL OBTAIN WRITTEN CONFIRMATION OF THE EXPECTED 4. THOROUGHLY REMOVE ALL PAINT AND CLEAN ALL DIRT FROM SURFACES REQUIRING GROUND TIME OR FOR ONE YEAR AFTER THE FINAL ACCEPTANCE OF THE ENTIRE PROJECT, DATE OF COMPLETION OF THE POWER CONNECTION FROM THE POWER COMPANY. CONNECTIONS. WHICHEVER IS GREATER. 21. IF THE POWER COMPANY IS UNABLE TO PROVIDE THE POWER CONNECTION BY OWNER'S 5. MAKE ALL GROUND CONNECTIONS AS SHORT AND DIRECT AS POSSIBLE,AVOID SHARP BE NDS 4. THE GENERAL CONTRACTOR AND EACH SUBCONTRACTOR SHALL BE RESPONSIBLE FOR REQUIRED DATE,THE GENERAL CONTRACTOR SHALL PROVIDE AND MAINTAIN A TEMPORARY ALL BENDS TO BE A MIN.OF W RADIUS. VERIFYING ALL EXISTING CONDITIONS AND UTILITIES AT THE JOB SITE BEFORE WORK IS GENERATOR UNTIL THE POWER COMPANY CONNECTION IS COMPLETED.COSTS ASSOCIATED 6. FOR GROUNDING TO BUILDING FRAME AND HATCH PLATE GROUND BARS.USE A TWO-BOLT No Date Revision STARTED.NO CLAIMS FOR EXTRA COMPENSATION FOR WORK WHICH COULD HAVE BEEN WITH THE TEMPORARY GENERATOR TO BE APPROVED BY THE OWNER. HOLE NEMA DRILLED CONNECTOR SUCH AS T86 32007 OR APPROVED EQUAL. FORESEEN BY AN INSPECTION,WHETHER SHOWN ON THE CONTRACT DOCUMENTS OR NOT, A 03/25/16 90%CD REVIEW SET WILL BE ACCEPTED OR PAID. 22. IF THE GENERAL CONTRACTOR FAILS TO TAKE NECESSARY MEASURES AS DESCRIBED IN NOTES 19,20 AND 21 ABOVE,THE GENERAL CONTRACTOR SHALL PROVIDE A TEMPORARY 7 FOR ALL EXTERNAL GROUND CONNECTIONS,CLAMPS AND CADWELDS,APPLY A LIBERAL B 04/07/16 100%CD REVIEW SET 5. THE GENERAL CONTRACTOR AND EACH SUBCONTRACTOR SHALL BE RESPONSIBLE FOR GENERATOR AT NO COST TO THE OWNER. PROTECTIVE COATING OR AN ANTI-OXIDE COMPOUND SUCH AS"NO-OXIDE K BY DEARBORN VERIFYING DIMENSIONS AND CONDITIONS AT THE JOB SITE WHICH COULD AFFECT THE CHEMICAL COMPANY. o os/tv15 REVISIONS WORK UNDER THIS CONTRACT.ALL MANUFACTURERS RECOMMENDED SPECIFICATIONS, 23. PLANS PART OF THIS SET ARE COMPLEMENTARY.INFORMATION IS NOT LIMITED TO ONE EXCEPT THOSE SPECIFICATIONS HEREIN,WHERE MOST STRINGENT SHALL BE COMPLIED PLAN.DRAWINGS AND SPECIFICATIONS ARE INSTRUMENTS OF SERVICE AND SHALL REMAIN 8 REPAIR ALL GALVANIZED SURFACES THAT HAVE BEEN DAMAGED BY THERMO-WELDING.USE 1 05/19/15 REVISIONS WITH. THE PROPERTY OF THE ARCHITECT,WHETHER THE PROJECT FOR WHICH THEY ARE MADE IS ERICO T-319 GALVANIZING BAR/COLD GALVANIZING PAINT, 2 05/23/18 100%FINAL CD SET EXECUTED OR NOT.THEY ARE NOT TO BE USED BY THE OWNER ON OTHER PROJECTS OR 6, THE CONTRACTOR SHALL VERIFY AND COORDINATE SIZE AND LOCATION OF ALL OPENINGS EXTENSION TO THIS PROJECT EXCEPT BY AGREEMENT IN WRITING AND WITH APPROPRIATE 9 SEAL ALL CONDUIT PENETRATIONS INTO MODULAR BUILDING WITH A SILICONE SEALANT AND 3 FOR STRUCTURAL,MECHANICAL,ELECTRICAL,PLUMBING,CIVIL,OR ARCHITECTURAL WORK. COMPENSATION TO THE ARCHITECT.THESE PLANS WERE PREPARED TO BE SUBMITTED TO ALL CONDUIT OPENINGS. GOVERNMENTAL BUILDING AUTHORITIES FOR REVIEW FOR COMPLIANCE WITH APPLICABLE Client: 7. THE CONTRACTOR SHALL VERIFY THAT NO CONFLICTS EXIST BETWEEN THE LOCATIONS OF CODES AND IT IS THE SOLE RESPONSIBILITY OF THE OWNER AND/OR CONTRACTOR TO BUILD 10 ANTENNAS AND COAX TO BE PROVIDED BY VERIZON WIRELESS,CONTRACTOR TO COORDINATE ANY AND ALL MECHANICAL,ELECTRICAL,PLUMBING,OR STRUCTURAL ELEMENTS,AND THAT ACCORDING TO APPLICABLE BUILDING CODES. DELIVERY. ALL REQUIRED CLEARANCES FOR INSTALLATION AND MAINTENANCE ARE MET.NOTIFY THE CONSULTANT OF ANY CONFLICTS.THE CONSULTANT HAS THE RIGHT TO MAKE MINOR 24. IF CONTRACTOR OR SUBCONTRACTOR FIND IT NECESSARY TO DEVIATE FROM ORIGINAL MODIFICATIONS IN THE DESIGN OF THE CONTRACT WITHOUT THE CONTRACTOR GETTING APPROVED PLANS,THEN IT IS THE CONTRACTOR'S AND THE SUBCONTRACTOR'S verizont/ ADDITIONAL COMPENSATION. RESPONSIBILITY TO PROVIDE THE ARCHITECT WITH 4 COPIES OF THE PROPOSED CHANGES FOR HIS APPROVAL BEFORE PROCEEDING WITH THE WORK.IN ADDITION THE CONTRACTOR 6. DO NOT SCALE THE DRAWINGS.DIMENSIONS ARE EITHER TO THE FACE OF FINISHED AND SUB-CONTRACTORS SHALL BE RESPONSIBLE FOR PROCURING ALL NECESSARY ELEMENTS OR TO THE CENTER LINE OF ELEMENTS,UNLESS NOTED OTHERWISE.CRITICAL APPROVALS FROM THE BUILDING AUTHORITIES FOR THE PROPOSED CHANGES BEFORE DIMENSIONS SHALL BE VERIFIED AND NOTIFY THE CONSULTANT OF ANY DISCREPANCIES, PROCEEDING WITH THE WORK-THE CONTRACTOR AND SUB-CONTRACTORS SHALL BE PROJECT INFORMATION RESPONSIBLE FOR PROCURING ALL NECESSARY INSPECTIONS AND APPROVALS FROM Implementation Team: 9. THE CONTRACTOR SHALL BE RESPONSIBLE FOR DAILY CLEAN UP OF ALL TRADES AND BUILDING AUTHORITIES DURING THE EXECUTION OF THE WORK. REMOVE ALL DEBRIS FROM THE CONSTRUCTION SITE.AT THE COMPLETION OF THE 1. THIS IS AN MANNED FACILITY WITH RESTRICTED ACCESS EQUIPMENT AND WILL BE USED FOR THE PROJECT,THE CONTRACTOR SHALL THOROUGHLY CLEAN THE BUILDING,SITE,AND ANY 25. IN EVERY EVENT,THESE CONSTRUCTION DOCUMENTS AND SPECIFICATIONS SHALL BE TRANSMISSION OF RADIO SIGNALS FOR THE PURPOSE OF PROVIDING PUBLIC CELLULAR SERVICE. OTHER SURROUNDING AREAS TO A BETTER THAN EXISTING CONDITION. INTERPRETED TO BE A MINIMUM ACCEPTABLE MEANS OF CONSTRUCTION BUT THIS SHALL NOT RELIEVE THE CONTRACTOR,SUB-CONTRACTOR,AND/OR SUPPLIERIMANUFACTURER 10. THE CONTRACTOR IS RESPONSIBLE FOR ADEQUATELY BRACING AND PROTECTING ALL FROM PROVIDING A COMPLETE AND CORRECT JOB WHEN ADDITIONAL ITEMS ARE REQUIRED 2 VERIZON WIRELESS CERTIFIES THAT THIS TELEPHONE EQUIPMENT FACILITY WILL BE SERVICED ONLY WORK DURING CONSTRUCTION AGAINST DAMAGE,BREAKAGE,COLLAPSE,ETC.ACCORDING TO THE MINIMUM SPECIFICATION.IF ANY ITEMS NEED TO EXCEED THESE MINIMUM BY VERIZON WIRELESS EMPLOYEE SERVICE PERSONNEL FOR REPAIR PURPOSES ONLY.THIS FACILITY TO APPLICABLE CODES,STANDARDS,AND GOOD CONSTRUCTION PRACTICES. SPECIFICATIONS TO PROVIDE A COMPLETE,ADEQUATE AND SAFE WORKING CONDITION, IS OCCUPIED AND IS DESIGNED FOR HUMAN OCCUPANCY. BLACK ROCK THEN IT SHALL BE THE DEEMED AND UNDERSTOOD TO BE INCLUDED IN THE DRAWINGS.FOR 11. THE CONTRACTOR SHALL MEET ALL OSHA REQUIREMENTS FOR ALL INSTALLATIONS. EXAMPLE,IF AN ITEM AND/OR PIECE OF EQUIPMENT REQUIRES A LARGER WIRE SIZE(I.E. ELECTRICAL WIRE),STRONGER OR LARGER PIPING,INCREASED QUANTITY(I.E.STRUCTURAL 12. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL DAMAGES TO THE EXISTING ELEMENTS).REDUCED SPACING,AND/OR INCREASED LENGTH(I.E.BOLT LENGTHS,BAR A8E Team CONSTRUCTION AND REPAIR ALL DAMAGES TO BETTER THAN NEW CONSTRUCTION.THE LENGTHS)THEN IT SHALL BE DEEMED AND UNDERSTOOD TO BE INCLUDED IN THE CONTRACTOR SHALL NOTIFY THE ARCHITECT OF ANY DAMAGE TO THE BUILDING SITE OR BID/PROPOSAL THESE DOCUMENTS ARE MEANT AS A GUIDE AND ALL ITEMS REASONABLY X&wn7 ANY ADJACENT STRUCTURES AROUND THE PROJECT.THE CONSULTANT SHALL BE SOLE INFERRED SHALL BE DEEMED TO BE INCLUDED. AND FINAL JUDGE AS TO THE QUALITY OF THE REPAIRED CONSTRUCTION.ANY ADDITIONAL MODIFICATIONS WHICH MUST BE MADE SHALL BE MADE AT THE CONTRACTOR'S EXPENSE, 26. THESE CONTRACT DOCUMENTS AND SPECIFICATIONS SHALL NOT BE CONSTRUED TO CREATE A CONTRACTUAL RELATIONSHIP OF ANY KIND BETWEEN THE ARCHITECT AND THE 13. WHERE ONE DETAIL IS SHOWN FOR ONE CONDITION,IT SHALL APPLY FOR ALL LIKE OR CONTRACTOR. CONSULTING I N C SIMILAR CONDITIONS,EVEN THOUGH NOT SPECIFICALLY MARKED ON THE DRAWINGS OR REFERRED TO IN THE SPECIFICATIONS,UNLESS NOTED OTHERWISE. 14. WHERE NEW PAVING,CONCRETE SIDEWALKS OR PATHS MEET EXISTING CONSTRUCTION, Project Info: THE CONTRACTOR SHALL MATCH THE EXISTING PITCH,GRADE,AND ELEVATION SO THE WALMART SMALL CEL ENTIRE STRUCTURE SHALL HAVE A SMOOTH TRANSITION. MEDALLION 15. THE CONTRACTOR SHALL MODIFY THE EXISTING FLOORS,WALL,CEILING,OR OTHER 4010172nd ST NE CONSTRUCTION AS REQUIRED TO GAIN ACCESS TO AREAS FOR ALL MECHANICAL, ARLINGTON,WA 98223 PLUMBING,ELECTRICAL,OR STRUCTURAL MODIFICATIONS.WHERE THE EXISTING CONSTRUCTION DOORS,PARTITIONS,CEILING,ETC..ARE TO BE REMOVED,MODIFIED,OR REARRANGED OR WHERE THE EXPOSED OR HIDDEN MECHANICAL,ELECTRICAL,SYSTEMS Drawing Title: ARE ADDED OR MODIFIED,THE GENERAL CONTRACTOR SHALL REPAIR,PATCH AND MATCH LEGEND IMPORTANT NOTICE ALL EXISTING CONSTRUCTION AND FINISHES OF ALL FLOORS WALLS AND CEILINGS.WHERE CONCRETE MASONRY CONSTRUCTION IS MODIFIED,THE CONTRACTOR SHALL TOOTH IN ALL THE EXISTING CONDITIONS REPRESENTED HEREIN ARE BASED ON VISUAL OBSERVATIONS AND GENERAL NOTES NEW CONSTRUCTION TO MATCH THE EXISTING BOND.WHERE CONCRETE CONSTRUCTION IS MODIFIED,THE CONTRACTOR SHALL VERIFY THE EXACT DETAILS TO BE USED FOR BUILDINGNVALUDETAIL SECTION LARGE SCALE DETAIL INFORMATION PROVIDED BY OTHERS.ACOM CONSULTING CANNOT GUARANTEE THE CORRECTNESS NOR AND SYMBOLS CONSTRUCTION.ALL WORK SHALL BE COVERED UNDER THE GENERAL CONTRACT. COMPLETENESS OF THE EXISTING CONDITIONS SHOWN AND ASSUMES NO RESPONSIBILITY THEREOF. Detail Number ;......••: CONTRACTOR AND HIS SUB-CONTRACTORS SHALL VISIT THE SITE AND VERIFY ALL EXISTING CONDITIONS A Detail Number AS REQUIRED FOR PROPER EXECUTION OF PROJECT.REPORT ANY CONFLICTS OR DISCREPANCIES TO THE q•1 • CONSULTANT PRIOR TO CONSTRUCTION. Propel Number Data- Sheet Number .....•. A l 05/23/16 Where Detailed Sheet Number IXNtec DesgnU, Where Detailed RM RM REFERENCE Project Manager: Protessienel of Ree-I AM RJ c Rorsbn No: Sheet No: Referenced Drawing _ — — DO NOT SCALE DRAWNGS.CONTRAC I OR MUST VERIEM ALL DIMENSID415 MID ADVISE CONSULTANID OF ANV ERRORS OR W OLBSShM15 NOVMLM11O05 ORYmncI ,IONS TOVIORN SN(MN SHALL BE 1MP1tMEh TEDVA1N0U1 PRIORNMITTEN APPROVAL.ALL PREVIOUD ISSUES OF THIS DNAYANO ARE SUPERSEDED BY THE LATEST REVISION.ALL ON AVM1 GS AND SPECIFICATIONS REMAIN THE PROPERTY OF ACOM - CORPORATION 1 - EDGECOMB ROAD (STATE RT 531) M � EXISTING RETAIL = AREA No Dale Revision EXISTING A 03/25/16 90%CD REVIEW SET RETAIL AREA B 04/07/16 100%CD REVIEW SET EXISTING RETAIL o 05/12116 REVISIONS AREA 1 05/23/16 REVISIONS Ir1 2 OS/231i6 100%FINAL CD SET Lo LLLLJ J 3 Client: oHoo-boo-4-I--ol-o-NooO . verizon✓ OtCEXISTING WALMART— PARKING o AREA I Implementation Team: Ho EXISTING [F�T; OPEN FIELD \ BLACK ROCK of-�-I H--HooH-O� N000 FXISTIF}I;, � " Team A&Offt7 - - LA;kLM6+l2"f 000l-Hot-N-N000 o No CONSULTING INC EXISTING 4440-WWALIVIART PARKING Project Info: AREA —I j j WALMART SMALL CELL IIIMEDALLION 4010 172nd ST NE Il If I ARLINGTON,WA 96223 IJOI� Drawing Title: �000PROPOSED 1 SITE PLAN Project Number rat"05l23l16 Drafter: Designer: RM RM PrG)eCt Manage'. Professional of Record: AM RJ NORTH Rovrsion No- Sheet No 2 A-1 PROPOSED SITE PLAN 1 22"x34"SCALE:1"=20'-0" 1 T'07"SCALE:1"=40'-0" 21r T DO NOT SCALE DRAWINGS CONTRACTOR MUST VERIFY ALL DIMENSIONS AND ADVISE CONSULTANTS OF ANY ERRORS OR PAINT THE EQUIPMENT CABINETS, OMISSIONS NO VARIATIONS OR MODIFICATIONS TO WORK CONDUIT AND ALL HARDWARE TO SHOWN SHALL BE IMPLEMENTED WITHOUT PRIOR WRITTEN APPROVAL ALL PREVIOUS ISSUES OF THIS DRAWING ARE MATCH EXISTING BUILDING COLOR SUPERSEDED BYTHE LATEST REVISION ALL DRAWINGSAN. SPECIFICATIONS REMAIN THE PROPERTY OF ACOM CORPORATION VERIZON WIRELESS WALL • MOUNTED ANTENNAS(TYP) 1 Rr---! A-a EXISTING ASPHALT AREA ' VERIZON WIRELESS EQUIPMENT I— — — �. EXISTING UTILITY 1 CABINET(PAD MOUNTED) TRANSFORMER A-3 —LOAD CENTER(ON CABINET) NODE#1 —4.0'x4-0' 3 N I CONCRETE PAD q-3 LL � z a e No Date Revision ro[•� © L i��n © ❑ A 03/25/16 90%CD REVIEW SET 15t7" �rv.N'• ry B 04/07/18 100%CD REVIEW SET r 0 05/12/16 REVISIONS 1 05119116 REVISIONS © © LL O 2 05/23116 100%FINAL CD SET O 0 0 © © LL / VERIZON WIRELESS WALL 3 O EXISTING ROOF— _ ❑ LU MOUNTED CONDUITS: o • (4)2"EMT FOR FIBER CABLE c!.c If w TO ANTENNAS VERIZON WIRELESS PAD o = ENLARGED EQUIPMENT PLAN 2 ve rizo n✓ MOUNTED EQUIP.CAB. © 22"x34"SCALE:1/8"=1'-0" _ _ 11'k17"SCALE:1/e"=1'40" A' T T 1' 0' �' 0 © l © �i NOTE: CONTRACTOR SHALL NOT DISTURB OR DAMAGE THE implementation Team. EXISTING ROOFING SYSTEM IN ANY WAY,SHAPE OR FORM.IF A NY DAMAGES DO OCCUR, E CONTRACTOR SHALL REPORT TO THE VZW CONSTRUCTION �, 0 MANAGER IMMEDIATELY!IT IS VERIZON WIRELESS CONDUITS THE CONTRACTOR'S ---� ---- 2 1 © a © ON SLEEPERS(TYP): RESPONSIBILITY TO MAINTAIN BLACK ROCK A-2 A-3 ■ (1)2"EMT FOR FIBER& THE ROOFING SYSTEM IN ITS Cry` POWER TO ANTENNAS EXISTING CONDITION DURING %rl CONSTRUCTION. C. VERIZON WIRELESS CONDUITS X&OM7 ON SLEEPERS(TYP): • (1)2"EMT FOR FIBER& CONSULTING INC c POWER TO ANTENNAS vy Ly I �v c'i Info: �! WALMART SMALL CELL MEDALLION 4010 172nd ST NE O'CY ARLINGTON,WA 98223 Drawing TiOe: VERIZON WIRELESS WALL , w _ PROPOSED MOUNTED ANTENNA 1' O — moo,, (TYP) '.z I - ROOF PLAN INODE N3 I Project Number Dale: 05/23/16 Drafter. DeSWer RM RM Project Manager. Professional of Rewrd AM RJ t 1 Revision No, Sheaf No: RF-1 ,A•4 . NORTH � /�A_� PROPOSED ROOF PLAN 1 22"x34"SCALE:1/32"=1'-0" 11"x17"SCALE:1164"=1'-0" 32' 24' 16' 8' 0" 32' DO NOT SCALE DRAWINGS CONTRACTOR MUST VERIFY ALL DIMENSIONS AND ADVISE CONSULTANTS OF ANY ERRORS OR OMISSIONS NO VARIATIONS OR MODIFICATIONS TO WORK SHOWN SHALL BE IMPLEMENTED WITHOUT PRIOR WRITTEN APPROVAL ALL PREVIOUS ISSUES OF THIS DRAWING ARE SUPERSEDED BY THE LATEST REVISION ALL DRAWINGS AND SPECIFICATIONS REMAIN THE PROPERTY OF ACOM nCORPORATION O RF-. A VERIZON WIRELESS WALL MOUNTED ANTENNAS(TYP) o I NODE#1 v 6"THK CONCRETE PAD I I W/#5@8"OC AT MID ` SPAN NODE#7. I o I�, r � _� ram•_ �, _, 4 K I ••I' 1'CHAMFER EDGE-TYP No Date Revision r ,•Y ••s ` I I -�'148� ^r' `I A 03125/16 90%CD REVIEW SET i I I ( I• \ � '•1•� B 04/07/16 100%CD REVIEW SET X — I r 0 05/12/16 REVISIONS �,,-�.;.v.-�`, `r, .,• ` �•f w ( n 3"W/HL TI HY200DED 0D EMBED osnsns REvisloNs "f'-' } • (MIN 4 PER CABINET) z 05/23/1s ooio FINAL CD SET • - a - COORDINATE W/CABINET Y+ r BJ(ISTING MANUFACTURER 3 .•-/ s� Client: --VERIZON WIRELESS CONDUITS " •• r 3"MIN-TYP ON SLEEPERS(TYP): ° '- '' * • (2)2"EMT FOR FIBER& POWER TO ANTENNAS ■ verizonv / NORTH 22N34"SCALE:1/4"=1'-1' ENLARGED ROOF PLAN NODES 2 & 3 11'k1T'SCALE:1/2'=1'-0' 1 CONCRETE PAD DETAIL 3 Implementation Team. 11"x17"SCALE:1/8"=l'-0' 4' 3' T 1- 0 4' VERIZON WIRELESS CONDUITS .,�ON SLEEPERS(TYP): BLACK ROCK • (2)2"EMT FOR FIBER& POWER TO ANTENNAS VERIZON WIRELESS WALL MOUNTED CONDUITS: • (4)2"EMT FOR FIBER&POWER TO ANTENNAS A&E Team: ..Y.' r.. •-• • - • (1)2"EMT FOR POWER AA . (1)2"EMT FOR FIBER \` / /7EXIST�ISi ROOF PAINT CONDUITS AND ALL HARDWARE Pj&OM7 •71 TO MATCH EXISTING BUILDING COLOR VERIZON WIRELESS WALL - MOUNTED ANTENNAS(TYP) 2'-0" " , " _ ! - - - CONSUL TING INC _ , '�• •+. Project Info, • . ; '' r' �—EXISTING BUILDING — -_ _ _- — WALMART SMALL CELL MEDALLION IZON EQUIPMENT aolo n2nd sT NE o I 1 •.,••••t .• - ARLINGTON,WA 98223 o NODE tt4 VIER WIRELESS I s _ ; - CABINET(PAD MOUNTED& - _—PAINTED TO MATCH EXISTING-- LOAD CENTER(ON CABINET) _ _BUILDING COLOR) Drawing Tiue, na - - i,� . i..:• /; rf,� / - — - - - - — ENLARGED PLANS o NODE#3 = - & ELEVATIONS 10.0" % Project'd., +tl Uo,c 05/23/16 Despner. RM RM v RF 1 A4 Proleel MBnopor Profossfonnt of Recortl: AM RJ Revision No: FShootNORTH 2A-3 22"x34"SCALE:111"=T-0" ENLARGED ROOF PLAN @NODES 1 & 4 2 22 x3q"SCALE.3/16'=1'-0" ® ENLARGED EQUIPMENT AREA ELEVATION 1 11"x17"SCALE:1/8-1'-0" 4' 7 2 1 a 4' 11.17"SCALE:3/32••=1•-0" 4' 2' 0" 4' DO NOT SCALE DRAWINGS.CONTRACTOR MUST VERIFY ALL 2'-0" DIMENSIONS AND ADVISE CONSULTANTS OF ANY ERRORS OR OMISSIONS NO VARIATIONS OR MODIFICATIONS TO WORK FRP ANGLE 4x4x1/4 EA SHOWN SHALL BE IMPLEMENTED W THOUT PRIOR WRITTEN CORNER WITH3/4"FRP FRP ANGLE 4x4x1/4 APPROVAL ALL PREVIOUS ISSUESOFTHISDRAWINGARE SUPERSEDED BY THE LATEST REVISION ALL DRAWINGS AND BOLT-TYP TOP&BOTTOM W/1/4" SPECIFICATIONS REMAIN THE PROPERTY OF ACOM FRP PANEL CORPORATION 10'-0" 1/4"FRP PANEL FRP ANGLE 4x4xt/4 FRP SHROUD ANCHORED TO WALL W/(6) BOTTOM&TOP 6-0" T-0" 1/4"G THREADED ROD,EMBED 2"WITH HILTI HY-70 ADHESIVE(USE SCREEN TUBE IF CELLS NOT GROUTED-ANCHORS TO BE LOCATED IN CENTER OF CELL:4" ————_ ® FROM TOP,BOTTOM&EDGE OF BLOCK) Pn FRP ANGLE 4x4x1/4EA ANTENNA No Dale Revision CORNER WITH 3/4"FRP OVP — — BOLT-TYP I ® D RRU/RRUA2 RRU/RRUA2 I co A 03/25/18 90%CD REVIEW SET I I B 04/07/16 100%CD REVIEW SET 1-5/8"x 1-5/8"GALV UNISTRUT ANCHORED tnE n C — — — TO WALL W/(3) "4J THREADED ROD, 0 _ g 05/12/18 REVISIONS -- ------------ —— ---- — EMBED 2"WITH HILTI HY-70 ADHESIVE Q I (USE SCREEN TUBE IF CELLS NOT I 1 osn s/1s REVISIONS GROUTED) 9'-0" —� 2 05/23/16 100%FINAL CD SET FRP ANGLE 4x4x1/4 EA 3 CORNER WITH (2)3/4" EXISTING�M U— FRP BOLTS-TYP 1/4"FRP PANEL Client FRP ANGLE 4x4x114 EA CORNER WITH (2)3/4" FRP BOLTS-TYP • verizon✓ FRP FINISH AND COLOR TO MATCH EXISTING BUILDING 22"x-"SCALE:3/4"=1' ANTENNA SHROUD — ELEV WITHOUT FRP PANEL 4 22"x34"S°ALE,-,/2'=" ANTENNA SHROUD — SECTION 3 Implementation Team: 11"x17"SCALE:3/8"=1"o, 1®, 11"x17"SCALE 3/4"=T4T 1' 6' 7 1. BLACK ROCK A&E Team: FRP SHROUD ANCHORED TO WALL W/(6)*'0 THREADED ROD,EMBED 2"WITH HILTI HY-70 ADHESIVE (USE SCREEN TUBE IF CELLS NOT GROUTED- —EXISTING CMU ANCHORS TO BE LOCATED IN CENTER OF CELL:4" CONSULTING I N C. WALL FROM TOP,BOTTOM&EDGE OF BLOCK) 3 A,4 Project Info: WALMART SMALL CELL MEDALLION 4010 d ST NE ---_ —--—_------—. ARLINGTON,WA 98223 FRP ANGLE 4 FRP ANGLE 4x4x1/4 EA- ' —L— OP W1 I BOTTOM&TOP W/3/4" iv CORNER WITH 3/4"FRP - — —J_ ,� FRP ANGLE 4x4x1/4 EA FRP BOLT Drawing Title: BOLT-TYP I CORNER WITH 3/4"FRP — — — _L BOLT-TYP FRP SHROUD 1/4"FRP PANEL 5'0" DETAILS —1-- 1/4' FRP PANEL ` r /�— _ I LS FRP ANGLE 4x4x1/4EA FRP ANGLE 4x4x1/4 CORNER WITH (2)3/4" BOTTOM&TOP W/1/4" Project Nombor Date. FRP BOLTS-TYP FRP PANEL 05/23/16 FRP ANGLE 4x4x1/4 EA FRP FINISH AND COLOR TO MATCH 10'-0' Dialler: Designer CORNER WITH (2)3/4" EXISTING BUILDING RM RM FRP BOLTS-TYP Proles Manager: Plotessional of Record: FRP FINISH AND COLOR TO MATCH AM RJ EXISTING BUILDING Revision No Sheet No: 2 A-4 22"x34"SCALE:3/4"=1'-0" ® ANTENNA SHROUD — ELEVATION 2 ;;;x""S.�E 3;a-;_a: ®,, ANTENNA SHROUD — PLAN VIEW 1 11"x17"SCALE:3/8"=1'-a" 1 6 0- 1 DO NOT SCALE DRAWN GS CONTRACTOR MUST VERIFY ALL DIMENSIONS AND ADVISE CONSULTANTS OF ANY ERRORS OR OMISSIONS NO VARIATIONS OR MODIFICATIONS TO WORK SHOWN SHALL BE IMPLEMENTED WITHOUT PRIOR WRITTEN APPROVAL ALL PREVIOUS ISSUES FTHIS DRAWING ARE SUPERSEDED BY THE LATEST REVISION ALL DRAWINGS AND SPECIFICATIONS REMAIN THE PROPERTY OF ACOM CORPORATION 2 2 RF-1 n a 1 PROPOSEDVERIZO ANTENNA TIP HEIGHT e WIRELESS ANTENNA,RRU& — � � — — 28'•0't AGI Y SHROUD" OVP BEHIND FRP SHRO I- TOP OF PARAPET 28'-0't AGL TOP OF PAR.8'APET ,J7� f .• 1 s �,.. �.j,., :y yr l Y ;�. .� 'l - 28i AGL r�C"/,`t-j;c;•,� {ti72�St'f `•�it.,{t l kl,V •S{ .1 ;.• Y.=•i�.1'�y t�i•R;��-�� �"C�rf`r — TOP OF ROOF 1 t _ !ZI 1•i�a.!: !-.T. tj'_ - -- - - - --- - - --- 20'•0't GL a. c U.: fr3Ar5; ac sy�s{3� � t ftr�•�t�r.�+ �as.: No Dale Revision A 03/25/16 90%CD REVIEW SET B 04/07116 100%CDREVIEWSET 0 05/12115 REVISIONS 1 05/19/16 REVISIONS PARTIAL- ENLARGED FRONT ELEVATION (RIGHT SIDE) 2 05123/16 100%FINAL CD SET 3 NOTE PROPOSED VERIZON WIRELESS ANTENNA SHROUD PAINTED TO MATCH BUILDING verizon✓ 2 2 n4 RF-1 Implementation Team: PROPOSED VERIZON 4 ANTENNA TIP HEIGHT _ _ WIRELESS ANTENNA,RRU& qd 20`6'i AGL OVP BEHIND FRP SHROUD • TOP OF PARAPET - T L:•+'•.,. •N/ !�, ''.: .,I i e. tS;T L� o i'•• }• ..i-.y7�y'�t I —11 . 28'-8't AGL �3aUlflC:,x tr l�t� �fZ AOFROOF fit- 1 `-P•' } .0 — - ———— -_ K RR OCK LAC ---_-------_ B OP —_— __—_— •0'tAGI -- �... .r .S�•• .•j.t.a t^ `Ids �S�A!-. i�'.. X&OM7 INS -- CONSULTING INC, Project Info: PARTIAL - ENLARGED FRONT ELEVATION (LEFT SIDE) WALMARTL98223 L MED 4010 1 ARLINGT Drawing Title: PROPOSED PROPOSED VERIZON WIRELESS ANTE NA,RRU& naa WIRELESS ANTENNA,RRU& OVP BEHIND FRP SHROUD n a PROPOSED OVP BEHIND FRP SHROUD ELEVATIONS -" -- - - •v ` ---_ - - ProjrclNumtkr, Dltia - -= 05/23/16 ---- Duller. Designer RM RM OVERALL FRONT ELEVATION Project Manager: Professional of Reco(O AM RJ 2 A-5 22"x34"SCALE:3/32'=1'-0" ® FRONT ELEVATION 1 11N17"SCALE:3164"=T-0" 8' 4' 0" 8' DO NOT SCALE DRAWINGS,CONTRACTOR MUST VERIFY ALL DIMENSIONS AND ADVISE CONSULTANTS OF ANY ERRORS OR OMISSIONS NO VARIATIONS OR MODIFICATIONS TO WORK SHOWN SHALL BE IMPLEMENTED WITHOUT PRIOR WRITTEN APPROVAL ALL PREVIOUS ISSUES OF THIS DRAWING ARE 2-1/2"0 GALVANIZED SCHEDULE as PROPOSED ANTENNA AND COAX SCHEDULE SUPERSEDED BY THE LATEST REVISION.ALL DRAWINGS AND PIPE x 95" NUMBER OF DIMENSIONS ELEC MECH NUMBER OF FEEDER FEEDER ADDITIONAL SPECIFICATIONS REMAIN THE PROPERTY OF ACO P1000 UNISTRUT ANCHORED ANTENNA AZIMUTH TIP HEIGHT ANTENNAS VENDOR MODEL DIM 1 OHM 2 DIM TILT TILT FEEDERS TYPE LENGTH EOUIPMEI4i CORPORATION TO WALL(TYP) NODE1 0° 26'-8" 1 AMPMTiNOL HTXCWW4513F000 241" 162" 73" 0' 1 HYBRID 650't MECHANICAL DOWN TILT KIT BY ANTENNA MANUFACTURER�- NODE 2 90° 26'-8" 1 AMPMENOL HTXCYNN4513F000 24 S' 16 T 7 3" 0• NODE3 180° 26'•8° 1 AMPHENOL HTXCWW4513F000 241" 167' 73" 0• 0• 1 HYBRID 325't ' NODE4 270' 26'-6' 1 A...... DL HTXCWW4513F000 241" 16.T 73" 0° 0' FEEDER LENGTHS ARE APPROX ANTENNA MOUNT BRACKETS '\ BY ANTENNA MANUFACTURER DIM 2 DIM 3 PANEL ANTENNA� - 2-1-"O GALVANIZED SCHEDULE 40 PIPE 96" - No Date Revision p A 03125/16 90%CD REVIEW SET ANTENNA MOUNT BRACKETS TOP VIEW BY ANTENNA MANUFACTURER B 04/07/16 100%CD REVIEW SET FRONT SIDE 0 05/12/16 REVISIONS PANELANTENNA 1 OS/19/16 REVISIONS 22"x34"SCALE:NOT TO SCALE PROPOSED ANTENNA MOUNTING DETAILS 3 11"x17"SCALE:NOT TO SCALE 2 OS/23/16 100%FINAL CD SET TOP MANUFACTURER:RAYCAP p MODEL:RHSDC-1064-PF-48 CNent 1• 0.5" - p HEIGHT 85" 7I�I OX - I WIDTH:10.5" CO ODDEPTH: DEPPTH::8J5",15" rtj x/ m WEIGHT:1 BB(WITH MOUNT) C ■ aimOLOR: GRAY v e r i z o n 1 8.15 e Implrtmenlation Team: NODE 2 AZ> 22N34"SCALE NOT TO SCALE 11N1"SCALE:NOTTOSCALE OVP (RAYCAP) SPECIFICATIONS 4 •• : F5 °' 9 '•}7 a :a"' q 90 MANUFACTURER:ERICSSON MODEL:RRUS 12 ® S ® G 'S V-�e 6" HEIGHT:V-B" �- PROPOSED VERIZON WIRELESS PANEL > WIDTH:V-7" _ z % '�' K ANTENNA(FYP OF 4-1 PER NODE) B LACK ROCK DEPTH:6" IS g WEIGHT:58 LBS ® K g ® }3 1{� COLOR:OFF-WHITE tr aD � �vk ® z x zi M e 8 EK Dow, EK' CONSULTING INC- }7 ED e 21 IR E' ® e �' 22x34"SCALE:NOT TO SCALE IK ® ® z Q m 9 11N17"SCALE:NOT TO SCALE RRU SPECIFICATIONS 3 �.. e �' 'D N Project lnl°: WALMART SMALL CELL 1 IK L: m N z E5 MEDALLION MANUFACTURER:CHARLES _ [K —® 19 z E Ei 4010 172nd ST NE MODEL:PM63922RF �,M! ®ICJ�'i� ®g�, ARLINGTON,WA 98223 HEIGHT:T-5" L �i WIDTH:2'-8" zI -_III K I DEPTH: Drawing Title: WEIGHT:500 LBS � COLOR:OFF-WHITE F-WHITE & � �b� � ® ® � � L� PROPOSED VERI© 'PRIOR TO ORDERING ANTENNA FYPROPER VOLTAGE ® F F CONFIGURATION . . . 2'-5" NODE 4°AL opz7o in B- PROPOSED VERIZON WIRELESS A N E L P10JOC1Number: DOW ANTENNA(TYP OF4-1 PER NODE) 05/2123116 N Drafter: Designer: RM RM • Projecl Managoc Professional of Record: AM RJ ROHsIon No Sheet No: PLAN VIEW ra ID,ONl PtV, SEVIEW NORTH 2 RF-1 22"x34"SCALE:NOT TO SCALE CHARLES CABINET SPECIFICATIONS 234SCALE NOT TO SC SCALE-NOT TO SCALE PROPOSED ANTENNA CONFIGURATION 1 11'x17'SCALE:NOT TO SCALE GENERAL ELECTRICAL NOTES LEGEND DO NOT SCALE DRAWINGS CONTRACTOR MODIFICATIONS TO ALL DIMENSIONS AND ADVISE CONSULTANTS OF ANY ERRORS OR OMISSIONS NO VARIATIONS OR MODIFICATIONS TO WORK SHOWN SHALL BE IMPLEMENTED WITHOUT PRIOR WRITTEN APPROVAL ALL PREVIOUS ST RE3 OF TN IS DRAWING ARE SYMBOL DESCRIPTION SPECIFCATIONSREMAIN HE REVISION ALL DRAWINGS AND SPECIFICTIONS REMAIN THE PROPERTY OF ACOM 1.GENERAL 4.RACEWAYS AND BOXES CIRCUIT BREAKER CORPORATION EXAMINE THE SITE CONDITIONS VERY CAREFULLY AND THE SCOPE OF PROPOSED WORK TOGETHER ❑ NON-FUSIBLE DISCONNECT SWITCH WITH THE WORK OF ALL OTHER TRADES AND INCLUDE IN THE BID PRICE ALL COSTS FOR WORK 1. ALL CONDUIT SHALL BE UL LABELED. FUSIBLE DISCONNECT SWITCH SUCH AS EQUIPMENT AND WIRING MADE NECESSARY TO ACCOMMODATE THE ELECTRICAL SYSTEMS 2. ALL EMPTY CONDUITS INSTALLED FOR FUTURE USE SHALL HAVE A PULL CORD. m SURFACE MOUNTED PANEL BOARD SHOWN AND SYSTEMS OF OTHER TRADES. 3. SHEET METAL BOXES SHALL CONFORM TO NEMA OS1;CAST-METAL BOXES SHALL CONFORM TO TR TRANSFORMER SUBMITTAL OF BID INDICATES CONTRACTOR IS COGNIZANT OF ALL JOB SITE CONDITIONS AND WORK NEMA 81 AND SHALL BE SIZED IN ACCORDANCE WITH NEC UNLESS NOTED OTHERWISE ® KILOWATT HOUR METER TO BE PERFORMED UNDER THIS CONTRACT. DENOTES CABLE OR CONDUIT PERFORM DETAILED VERIFICATION OF WORK PRIOR TO ORDERING THE ELECTRICAL EQUIPMENT AND TURNING UP IN PLAN VIEW COMMENCING CONSTRUCTION.ISSUE A WRITTEN NOTICE TO THE CONSULTANT OF ANY DISCREPANCIES. 5.GROUNDING D DENOTES CABLE OR CONDUIT OBTAIN ALL PERMITS,PAY ASSOCIATED FEES AND SCHEDULE INSPECTION. TURNING DOWN IN PLAN VIEW 1. ALL LIGHTNING PROTECTION AND SAFTEY GROUNDING OF THE ELECTRICAL EQUIPMENT PROVIDE ALL LABOR,MATERIAL,EQUIPMENT,INSURANCE,AND SERVICES TO COMPLETE THIS PROJECT IN SHALL BE CARRIED OUT IN ACCORDANCE WITH THE CURRENT NFPA STANDARDS AND JB JUNCTION BOX ACCORDANCE WITH THE CONTRACT DOCUMENTS AND PRESENT IT AS FULLY OPERATIONAL TO THE SATISFACTION VERIZON WIRELESS STANDARDS PB PULL BOX TO NEC/TELCO STANDARDS OF THE OWNER. CARRY OUT WORK IN ACCORDANCE WITH ALL GOVERNING STATE,COUNTY AND LOCAL CODES AND O.S.H.A. 2. GROUND LUGS ARE SPECIFIED UNDER SECTION 3"CONDUCTORS AND CONNECTORS". _ OVERHEAD UTILITIES 3. ALL GROUND LUG AND COMPRESSION CONNECTIONS SHALL BE COATED WITH ANTI-OXIDANT AGENT, _—R--wr— UNDERGROUND TELCO PRIOR TO BEGINNING WORK COORDINATE ALL POWER AND TELCO WORK WITH THE LOCAL UTILITY COMPANY AS IT SUCH AS NO-OX,NOALOX,PENETROX OR KOPRSHIELD. No Date Revision MAY APPLY TO THIS SITE.ALL WORK TO COMPLY WITH THE RULES AND REGULATIONS OF THE UTILITIES INVOLVED. UNDERGROUND POWER 4. GROUND ALL EXPOSED METALLIC OBJECTS ON EQUIPMENT ROOM EXTERIOR. /''� DENOTES REFERENCE NOTE A 03/25/16 90%CD REVIEW SET FABRICATION AND INSTALLATION OF THE COMPLETE ELECTRICAL SYSTEM SHALL BE DONE IN A FIRST CLASS B 04107/16 100%CD REVIEW SET WORKMANSHIP PER NECA STANDARD 1-2000 BY QUALIFIED PERSONNEL EXPERIENCED IN SUCH WORK AND SHALL • EXOTHERMIC WELD CONNECTION SCHEDULE THE WORK IN AN ORDERLY MANNER SO AS NOT TO IMPEDE PROGRESS OF THE PROJECT. 5. PROVIDE LOCK WASHERS FOR ALL MECHANICAL CONNECTIONS FOR GROUND CONDUCTORS. USE STAINLESS STEEL HARDWARE THROUGHOUT. ■ MECHANICAL CONNECTION(eg LUG,C-TAP) o osn 2fle REVISIONS DURING PROGRESS OF THE WORK,MAINTAIN AN ACCURATE RECORD OF THE INSTALLATION OF THE ELECTRICAL 6. DO NOT INSTALL GROUND RING OUTSIDE OF LEASE AREA GROUND ROD 1 05/19/16 REVISIONS SYSTEMS,LOCATING EACH CIRCUIT PRECISELY AND DIMENSIONING EQUIPMENT,CONDUIT AND CABLE LOCATIONS. lF Q GROUND ROD WITH INSPECTION SLEEVES 2 0siz3ns 100%FINAL CD SET UPON COMPLETION OF THE INSTALLATION,TRANSFER ALL RECORD DATA TO BLACK LINE PRINTS OF THE ORIGINAL 7. REMOVE ALL PAINT AND CLEAN ALL DIRT FROM SURFACES REQUIRING GROUND CONNECTIONS, DRAWINGS AND SUBMIT THESE DRAWINGS AS RECORD DRAWINGS TO THE CONSULTANT. REPAINT TO MATCH AFTER CONNECTION IS MADE TO MAINTAIN CORROSION RESISTANCE. TF GROUND BAR g $( PIN AND SLEEVE RECEPTACLE COMPLETE JOB SHALL BE GUARANTEED FOR A PERIOD OF ONE(1)YEAR AFTER THE DATE OF JOB ACCEPTANCE B. ALL EXTERIOR GROUNDING CONDUCTORS INCLUDING EXTERIOR GROUND RING SHALL BE#2 AWG GROUND CONDUCTOR Client: BY OWNER.ANY WORK,MATERIAL,OR EQUIPMENT FOUND TO BE FAULTY DURING THAT PERIOD SHALL BE SOLID BARE TINNED COPPER UNLESS NOTED OTHERWISE.MAKE ALL GROUND CONNECTIONS AS CORRECTED AT ONCE UPON WRITTEN NOTIFICATION,AT THE EXPENSE OF THE CONTRACTOR, SHORT AND DIRECT AS POSSIBLE.AVOID SHARP BENDS.THE RADIUS OF ANY BEND SHALL NOT BE HP MOTOZ W/HORSEPOWER RATING LESS THAN 8"AND THE ANGLE OF ANY BEND SHALL NOT EXCEED 90".GROUNDING CONDUCTORS e n zo n� GENERAL CONTRACTOR IS RESPONSIBLE FOR REQUESTING CONNECTION OF COMMERCIAL POWER FROM THE `, SHALL BE ROUTED DOWNWARD TOWARD THE BURIED GROUND RING. Y POWER COMPANY.ELECTRICAL CONTRACTOR SHALL COORDINATE THIS WORK WITH THE GENERAL CONTRACTOR 9, BOND ALL EXTERIOR CONDUITS,PIPES AND CYLINDRICAL METALLIC OBJECTS WITH A PENN-UNION GT SERIES CLAMP,BLACKBURN GUV SERIES CLAMP OR A BURNDY GAR 3900BU SERIES CLAMP ONLY,NO COORDINATE EXACT TELEPHONE REQUIREMENTS AND SERVICE ROUTING WITH LOCAL TELEPHONE COMPANY. SUBSTITUTES ACCEPTED. APPLY FOR TELEPHONE SERVICE IMMEDIATELY UPON AWARD OF CONTRACT. 10. ALL GROUND CONNECTIONS SHALL BE APPROVED FOR THE METALS BEING CONNECTED. Implementation Team: 2.BASIC MATERIALS AND METHODS EXTERNAL GROUND CONNECTIONS 11. ALL TO EXTERIORGRODUNDRINGSHALLABETHE ARAL EALTYPE,EXC EXOTHERMIC RODS ABBREVIATIONS ALL ELECTRICAL WORK SHALL CONFORM TO THE EDITION OF THE NEC ACCEPTED BY THE LOCAL JURISDICTION WHICH ARE TEE EXOTHERMIC WELDS,REPAIR ALL GALVANIZED SURFACES THAT HAVE BEEN AND TO THE APPLICABLE LOCAL CODES AND REGULATIONS. • DAMAGED BY EXOTHERMIC WELDING.USE SPRAY GALVANIZER SUCH AS HOLUB LECTROSOL#15-501. AFG ABOVE FINISHED GRADE ALL MATERIALS AND EQUIPMENT SHALL BE NEW.MATERIALS AND EQUIPMENT SHALL BE THE STANDARD AIC AMPERE INTERRUPTING CAPACITY PRODUCTS OF MANUFACTURER'S CURRENT DESIGN.ANY FIRST-CLASS PRODUCT MADE BY A REPUTABLE 12. CONTRACTOR SHALL NOTIFY THE CONSTRUCTION MANAGER WHEN THE BURIED GROUND RING IS BFG BELOW FINISHED GRADE BLACK ROCK MANUFACTURER MAY BE USED PROVIDING IT CONFORMS TO THE CONTRACT REQUIREMENTS AND MEETS THE INSTALLED SO THE REPRESENTATIVE CAN INSPECT THE GROUND RING BEFORE IT IS BACKFILLED C CONDUIT APPROVAL OF THE CONSULTANT AND THE OWNER. WITH SOIL. CRGB CELL REFERENCE GROUND BAR ARRANGE CONDUIT,WIRING,EQUIPMENT,AND OTHER WORK GENERALLY AS SHOWN,PROVIDING PROPER 13. FOR METAL FENCE POST GROUNDING,USE A HEAVY DUTY TYPE GROUNDING CLAMP OR CU COPPER CLEARANCES AND ACCESS.CAREFULLY EXAMINE ALL CONTRACT DRAWINGS AND FIT THE WORK IN EACH EXOTHERMIC WELD CONNECTION TO POST.GROUND ALL FENCE POSTS WITHIN 6'OF EQUIPMENT. A&ETeam: LOCATION WITHOUT SUBSTANTIAL ALTERATION.WHERE DEPARTURES ARE PROPOSED BECAUSE OF FIELD C/W COMPLETE WITH CONDITIONS OR OTHER CAUSES,PREPARE AND SUBMIT DETAILED DRAWINGS FOR ACCEPTANCE. D.T.T. DRY TYPE TRANSFORMER (�(•)� THE CONTRACT DRAWINGS ARE GENERALLY DIAGRAMMATIC AND ALL OFFSETS,BENDS,FITTINGS AND 14. WHERE MECHANICAL CONNECTORS(TWO-HOLE OR CLAMP)ARE USED,APPLY A LIBERAL EC EMPTY CONDUIT PROTECTIVE COATING OF AN ANTI-OXIDE COMPOUND SUCH AS NO-OX,NOALOX,PENETROX OR ACCESSORIES ARE NOT NECESSARILY SHOWN.PROVIDE ALL SUCH ITEMS AS MAY BE REQUIRED TO FIT THE WORK KOPRSHIELD ON ALL CONNECTORS. G GROUND TO THE CONDITIONS. GE GROUNDING ELECTRODE CONSULTING INC. MAINTAIN ALL CLEARANCES AS REQUIRED BY NEC. GEC GROUNDING ELECTRODE CONDUCTOR SEAL AROUND CONDUITS AND AROUND CONDUCTORS WITHIN CONDUITS ENTERING THE BUILDING WHERE 6.OVERCURRENT&SHORT-CIRCUIT/GND FAULT PROTECTION(IF APPLICABLE) GRC GALVANIZED RIGID CONDUIT PENETRATION OCCURS WITH A SILICONE SEALANT TO PREVENT MOISTURE PENETRATION INTO 1. CONTRACTOR SHALL RECORD LOAD READINGS WHEN SITE POWER ORIGINATES FROM A 30 SERVICE MTS MANUAL TRANSFER SWITCH Project Info: BUILDING/SHELTER. TO MONITOR&ASSURE A BALANCED LOAD AT THE PRIMARY SUPPLY.RECORDS SHALL BE PROVIDED NEC NATIONAL ELECTRICAL CODE SILICONE SEAL AROUND ALL BOLTS AND SCREWS USED TO SECURE EQUIPMENT TO EXTERIOR OF BUILDING. TO THE SITE/FACILITY OWNER.CONTRACTOR SHALL CONSULT MANUFACTURER'S PLANS,SHOP O/H OVERHEAD WALMART SMALL CELL DRAWINGS AND SPECS FOR INDOOR/OUTDOOR EQUIPMENT LOCATION&INSTALLATION.ELECTRIC MEDALLION SERVICE SHALL BE IN COMPLIANCE WITH ALL RULES®ULATIONS OF THE UTILITY CO.ELECT, RNC RIGID NON-METALLIC CONDUIT(SCHEDULE 80 PVC) 4010172nd ST NE CONTRACTOR SHALL PROVIDE EQUIPMENT WITH HIGHER SHORT-CIRCUIT FAULT CURRENT RATINGS SD SERVICE DISCONNECT SWITCH ARLINGTON,WA 98223 3.CONDUCTORS AND CONNECTORS (IIA.I.C.)AS REQUIRED TO MATCH&EXCEED UTILITY CO.AVAILABLE SYMMETRICAL&ASYMMETRICAL SE SERVICE ENTRANCE FAULT CURRENT LEVELS.FUSES IN SERVICE SWITCHES SHALL BE CLASS"RK1",CURRENT LIMITING UNLESS NOTED OTHERWISE,ALL CONDUCTORS SHALL BE COPPER,MINIMUM SIZE#12 AWG,WITH TYPE,200 kA.I.C„NON-TIME DELAY,DISCONNECT SWITCHES TO HAVE REJECTION CLIPS,UNLESS SN SOLID NEUTRAL Drawing Title: THERMOPLASTIC INSULATION CONFORMING TO NEMA WC5 OR CROSS-LINKED POLYETHYLENE INSULATION INDICATED OTHERWISE.ELECTRICAL EQUIPMENTS&PROTECTIONS SHALL BE STANDARD kAIC TGB TELCO GROUND BAR GENERAL CONFORMING TO NEMA WC7.(TYPES THHN OR THNM-2).INSULATION SHALL BE RATED FOR 90°C CONDUCTORS RATED HIGHER THAN INCOMING EQUIPMENT AND/OR UTILITY CO.kAIC RATE AND CONSIDERING SHALL BE COLOR CODED IN ACCORDANCE WITH NEC. ELECTRIC MOTORS FAULT CONTRIBUTION.CONTRACTOR SHALL NOT BEGIN CONSTRUCTION UNTIL TEGB TOWER EXIT GROUND BAR ELECTRICAL ALL CONDUCTORS USED FOR GROUNDING SHALL BE COPPER AND SHALL HAVE GREEN INSULATION EXCEPT THIS MANDATORY REQUIREMENT IS MET-IF NEW LOAD IS ADDED CONTRACTOR SHALL VERIFY& TR TRANSFORMER WHERE NOTED. CONFIRM BEFORE CONSTRUCTION THAT TOTAL UTILITY SERVICE LOAD SHALL KEEP EQUALTO(125%MAX.DEMAND+NEW LOAD)<80%SERVICE ENTRANCE CONDUCTORS/MAIN OVER CURRENT TVSS TRANSIENT VOLTAGE SURGE SUPPRESSOR NOTES FOR COPPER CONDUCTORS#6 AWG AND SMALLER USE 3M SCOTCH-LOK OR T&B STA-KON COMPRESSION TYPE PROTECTION CAPACITY,WHICHEVER RATING IS LOWER.LIGHTING SHALL MEET NEC,IESNA AND/OR TYP TYPICAL CONNECTORS WITH INTEGRAL OR SEPARATE INSULATION CAPS.FOR COPPER CONDUCTORS LARGER THAN#6 FAA STANDARDS IF APPLICABLE.PHOTOMETRIC LEVELS SHALL COMPLY WITH LOCAL,STATE& Wp WEATHERPROOF-NEMA 3R AWG USE SOLDERLESS,IDENT HEX SCREW OR BOLT TYPE PRESSURE CONNECTORS OR DOUBLE COMPRESSION FEDERAL RULES.ALL ELECTRICAL EQUIPMENT SHALL BE INSTALLED IN ACCESSIBLE AREAS ONLY. Project Number Data. C-CLAMP CONNECTORS,UNLESS SPECIFIED OTHERWISE ON DRAWINGS. THE ELECTRICAL INSTALLATION SHALL MEET ALL STANDARD REQUIREMENTS OF POWER AND TELE- PHONE UTILITY COMPANIES. PPC POWER PROTECTION SHELTER Draper. Designer: UNLESS NOTED OTHERWISE ALL LUGS SHALL BE TIN PLATED COPPER,TWO-HOLE,LONG BARREL, RM RM r COMPRESSION TYPE. Projea Manager. Professional of Record: RJ CONDUCTOR LENGTHS SHALL BE CONTINUOUS FROM TERMINATION TO TERMINATION WITHOUT SPLICES. SPLICES AM Sheet ARE NOT ACCEPTABLE.IF SPLICES ARE UNAVOIDABLE PRIOR APPROVAL FROM THE ENGINEER MUST BE Revision No: Sheet No: OBTAINED. 2 E-0 DO NOT SCALE DRAWINGS CONTRACTOR MUST VERIFY ALL DIMENSIONS AND ADVISE CONSULTANTS OF ANY ERRORS OR OMISSIONS NO VARIATIONS OR MODIFICATIONS TO WORK SHOWN SHALL BE IMPLEMENTED WITHOUT PRIOR WRITTEN APPNOVAl ALL PREVIOUS ISSUES OF THIS DRAWING ARE SUPERSEDED BY THE LATEST REVISION.ALL DRAWINGS AND SPECIFICATIONS REMAIN THE PROPERTY OF ACOM CORPORATION ' 1 1 Rt-t A I I © � J No. Dale Revision VERIZON WIRELESS CONDUITS A 03/25/16 90%CD REVIEW SET U n —P5 MOUNTED ON SLEEPERS: P" (2)2"EMT CONDUIT FOR ANTENNAS E oaronls 100%CD REVIEW SET 0 05/12/16 REVISIONS 1 OS/19/16 REVISIONS 2 OS/23/16 100%FINAL CD SET 3 �p I o L ooj PROPOSED VERIZON WIRELESS — e L EQUIPMENT CABINET AND LOAD ve ri zo n CENTER MOUNTED ON PAD ro L._J Implementation Team: I EXISTING ELECTRICAL ROOM AND MPOP I BLACK ROCK I J -\nr� AdE Team: A-2 X&&n7 VERIZON WIRELESS CONDUITS r MOUNTED ON SLEEPERS: CONSULTING I N C (2)2"EMT CONDUIT FOR ANTENNAS ICI _ P-p,el Info; WALMART SMALL CELL MEDALLION 4010 172nd ST NE ARLINGTON,WA 96223 © DI f 1 Drawing Title: PROPOSED ELECTRICAL I SITE PLAN IPro1Dd Nuns- Date: 05/23/16 Drafter: Designer RM RM Project Manager PrOosslonal of Record; 1 AM RJ RFI A4 Recision No; Sheet No: r 2 E-1 22"x34"SCALE 1/32"=1'-0" PROPOSED ELECTRICAL SITE PLAN 1 11"x17"SCALE:1/64"=T-0" 32' 24' 16. 6' 0" 32' 00 NOT SCALE ORAYMG.$CONINAC/WI MUST VERNV OWERAWO AND A&ME CONSVi TANTS Of ANY EMOAL OMISSIONS.NO YAIWTIONS OR M001MATIOII{TONORAT SHOWN SHALL SE IMPLEMENTED WITHODT PRIOR WRITTEN APPSOVAL,ALL PMV W/S N,SYE{OFTHIS DRAWINGARE {OP[RSED[D OY 7ME tATUi IIEVISpN ME OSAINNOS"Jo SPECIFICATIONS REMAIN THE PROPERTY OF ACOM CORPORATION ERICSSON ERICSSON CABINET MOUNTED RADIOS ' RRU RRU 0.2273 DIA MAX- DC POWER CORD QTY(2) 12"TO 24" RF DISCONNECT SWITCH — — #10 2 SCOW,00.453"-0.606" WITH SAFETY LOCKOUT ANTENNA CABLE MOUNTED TO SIDE OF LOAD _ CENTER + I�PAD MOUNTED CHARLES CABINET WEATHERPROOFING KIT(SEE NOTE 3 CABLE GROUND KIT- 3W DUPLEX RECEPTACLE 15A,RESI125V.STANT 2P, 3W NEMA 5-15R WEATHER RESISTANT TYPE WITH WEATHERPROOF WHILE-IN #6 AWG STRANDED CU WIRE WITH 6WV. USE COVER THWN INSULATION(GROUNDED TO 7 GROUND BAR-SEE NOTE 1&2) 3/4"LIQUID TIGHT FLEXIBLE METAL CONDUIT 5#10&2#10 GIRD CU THHWTHWN 1'.CONDUIT SCH 40 3#6 CU THHN/THWN TO WALMART CABINET MOUNTED SERVICE DUTY LOAD CENTER 100A,FIXED No Date Revision PROVIDED SERVICE MAINS,2P,1201240V CIRCUIT BREAKERS WITH NEUTRAL& DISCONNECT —GROUND BUS NEMA 3R ENCLOSURE A 03/25/16 90%CD REVIEW SET a B 04/07/16 100%CD REVIEW SET NOTES: 1 DO NOT INSTALL CABLE GROUND KIT AT A BEND AND ALWAYS 0 05/12/16 REVISIONS DIRECT GROUND WIRE DOWN TO GROUND BAR 2.GROUNDING KIT TO BE TYPE AND PART NUMBER AS SUPPLIED OR 1 05/19/16 REVISIONS RECOMMENDED BY CABLE MANUFACTURER 3,WEATHER PROOFING SHALL BE(TYPE AND PART NUMBER AS 3/4"LIQUID TIGHT FLEXIBLE METAL CONDUIT 3#4 CU 2 05/23/16 100%FINAL CD SET SUPPLIED OR RECOMMENDED BY CABLE MANUFACTURER THHN/THQN 3 - 02 AWG CU GROUND WIRE CGun! IN GRADE BRONZE GROUNDCLAMP v e r i z o n v/ 5/8"DIA.X 8FT COPPER CLAD - STEEL GROUND ROD 22"04"SCALE:NOT TO SCALE CONN OF GIRD KIT TO ANTENNA CABLE 4 22x34"SCALE:NOT TO SCALE ONE-LINE POWER DIAGRAM 3 Implementation Team: 1 INIT'SCALE:NOT TO SCALE 11"xl7"SCALE:NOT TO SCALE i ANTENNA(S) 1 _ L --TAP#4 GROUND DIRECTLY TO ANTENNA BLACK ROCK COAXIAL GROUND KITS NOTE:CONTRACTOR TO USE KOPR-SHIELD,PENETROX TYPE 6"LONG GROUND BAR MAY BE INSTALLED IF 2 •E"AT THESE CONNECTIONS u OR MORE ANTENNAS ARE UTILIZED ''.F Team: RADIOS IN MAIN CABINET ;A AWG STR TO#2 AWG STIR COMPRESSION Aftn,_7 r � CONNECTOR L ; HEAT SHRINK ALL OUTSIDE- -NEWCOAXIAL GROUND KITS W/LONG l 3 82 AWG CU.MAIN GROUND LEAD MOUNTED LUG CONNECTIONS BARREL COMPRESSION LUGS(DOUBLE e i DIRECTLY TO POLE W/C CLIPS EVERY 2'-0" LUGS)TO BE INSTALLED BY ANTENNA CONSULTING INC. L — CONTRACTOR WITH HEAT SHRINK ; NEW 4"x 24"x 1/4"lhk COPPER GROUND VERIFY EXACT LOCAR ATION ONAND MANAGER TO oa Into: TO GROUND KIT NSTALLATIONINFIELD PrOWALMART SMALL CELL III O o MEDALLION 4010172nd ST NE LOAD CENTER""�\� IIIL iR I 00 O 0 00to. 0 0 0 o 000 00 AI INGTON,WA 98223 n O O O O O O 00 O 000 O o j O O O . 0 0 O 00 0 0000 O O O O 0 00 O 0 0 0 0 0 0 0 o Drawing Tille: ELECTRICAL & #4/0 CUU LEAD T TOO A TYPE D GROUNDING #4 AWG CU.GROUND LEADS e a I GROUND LOOP DIRECTLY TO MAIN GROUND BAR \ e\ c 24„ DETAILS c\ cc\ I VERIFY IN FIELD r. ProjectNwnW Data; CONNECTTO SCL VERTICAL GROUND,IF NOTES: O5M2 me GROUND IS NOT PRESENT PLACE NEW 1 ALL HARDWARE 8-88 STAINLESS STEEL INCLUDING BELLVILLES Drafter: Designer: 02 AWG CU.GROUND WIRE COAT MATING SURFACES WITH KOPR-SHIELD BEFORE ATTACHMENT 2,FOR GROUND BOND TO STEEL ONLY:INSERT A TOOTH WASHER RIM RM BETWEEN LUG AND STEEL,COAT ALL SURFACES WITH KOPR-SHIELD Project Manager: Professional of Record: 5/8"X 8'LONG COPPER CLAD STEEL 3.ALL HOLES ARE COUNTERSUNK 1116" AM RJ GROUND ROD 4,ALL LUGS ARE DOUBLE HOLED 5.HEAT SHRINK ALL OUTSIDE LUG CONNECTIONS Revision No: Sheet No: 2 E-2 ,34"SCALE:NOT TO SC ALE GROUNDING SCHEMATIC 2 22k34"SCALE:NOT TO SCALE MASTER GROUND BAR DETAIL 1 11'k17"SCALE:NOT TO SCALE 'x17"SCALE:NOT TO SCALE CITY OF ARLINGTON 238 N. OLYMPIC AVE -ARLINGTON, WA. 98223 PHONE; (360)403-3551 BUILDING PERMIT Address:4010 172nd St NE Permit#:1179 Parcel#:00930300000301 Valuation:30000.00 OWNER APPLICANT CONTRACTOR Name:WAL-MART STORES INC Name:Black Rock Consulting Name:Ridgetop Wireless Solutions,Inc Address:PO BOX 8050 M/S 0555 Address:PO Box 1744 Address:35232 Ede Rd City,State Zip:BENTONVILLE,AR 72712-8050 City,State Zip:Tualatin,OR 97062 City,State Zip:Lebanon,OR 97355 Phone: Phone:503-380-1564 Phone: MECHANICAL CONTRACTOR PLUMBING CONTRACTOR Name: Name: Address: Address: City,State,Zip: City,State,Zip: Phone: Phone: LIC#: EXP: LIC#: EXP: JOB DESCRIPTION PERMIT TYPE: Commercial Alteration CODE YEAR: 2015 STORIES: I CONST.TYPE: DWELLING UNITS: 0 OCC GROUP: BUILDINGS: I OCC LOAD: PERMIT APPROVAL I AGREE TO COMPLY WITH CITY AND STATE LAWS REGULATING CONSTRUCTION AND IN DOING THE WORK AUTHORIZED THEREBY;NO PERSON WILL BE EMPLOYED IN VIOLATION OF THE LABOR CODE OF THE STATE OF WASHINGTON RELATING TO WORKMEN'S COMPENSATION INSURANCE AND RCW 18.27. THIS APPLICATION IS NOT A PERMIT UNTIL SIGNED BY THE BUILDING OFFICIAL OR HIS/HER DEPUTY AND ALL FEES ARE PAID. IT IS UNLAWFUL TO USE OR OCCUPY A BUILDING OR STRUCTURE UNTIL A FINAL INSPECTION HAS BEEN MADE AND APPROVAL OR A CERTIFICATE OF OCCUPANCY HAS BEEN GRANTED. IBC 110/IRC 110. SALES TAX NOTICE:Sales tax relating to construction and construction materials in the City of Arlington must be reported on your sales tax return form and coded Ci rain to 13101. Signature Print Name Date Released By to CONDITIONS Adhere to approved plans. THIS PERMIT AUTHORIZS ONLY THE WORK NOTED.THIS PERMIT COVERS WORK TO BE DONE ON PRIVATE PROPERTY ONLY. ANY CONSTRUCTION ON THE PUBLIC DOMAIN(CURBS,SIDEWALKS,DRIVEWAYS,MARQUEES,ETC.)WILL REQUIRE SEPARATE PERMISSION. PERMIT FEES Date Description Fee Amount 2/28/2018 Building Permit Fee $612.59 2/28/2018 Building Plan Review Fee $398.18 2/28/2018 State Building Code Surcharge Fee $4.50 Total Due: $1,015.27 Total Payment: $0.00 Balance Due: $1,015.27 CALL FOR INSPECTIONS BUILDING(360)403-3417 When calling for an inspection please leave the following information: Permit Number,Type of Inspection being requested,and whether you prefer morning or afternoon . � i 2/28/2018 RIDGETOP WIRELESS SOLUTINS INC �uir;e� >pxrin� ori. Barch L&I \-Z lrrlc:; U°I�i Ah Lkil SaPPty�&Health Clarrris,x Workplace Rights Trade&LiceinSMn ANk Washington State Department of " Labor & Industries RIDGETOP WIRELESS SOLUTINS INC Owner or tradesperson 35232 EDE RD WHALEY,BRADEN TYRONE LEBANON,OR 97355 Principals 541-981-2855 WHALEY,BRADEN TYRONE,PRESIDENT THORP,JOSIAH JAMES,SECRETARY WASHINGTON REGISTERED AGNT LLC,AGENT Doing business as RIDGETOP WIRELESS SOLUTINS INC WA UBI No. Business type 603 368 172 Corporation Governing persons JOSIAH THORP License Verify the contractor's active registration/license/certification(depending on trade)and any past violations. Construction Contractor Active. Meets current requirements. License specialties GENERAL License no. RIDGEWS864CL Effective—expiration 02/13/2014—02/13/2020 Bond Wesco Insurance Co $12,000.00 Bond account no. 46WBO40837 Received by L&I Effective date 02/13/2014 01/17/2014 Expiration date Until Canceled Insurance MESA UNDERWRITERS SPECIALTY IN $1,000.000.00 Policy no. MP0046003006897 Received by L&I Effective date 06/14/2017 06/08/2017 Expiration date 06/08/2018 Help »s, ij V1P'r)V4;, hftps://secure.ini.wa.gov/verify/Detail.aspx?UBI=603368172&LIC=RIDGEWS864CL&SAW= 1/2 2/28/2018 RIDGETOP WIRELESS SOLUTINS INC Insurance history Savings- No' �savings accounts during the previous 6 year period. Lawsuits against the bond or savings No lawsuits against the bond or savings accounts during the previous 6 year period. L&I Tax debts No L&I tax debts are recorded for this contractor license during the previous 6 year period,but some debts may be recorded by other agencies. License Violations No license violations during the previous 6 year period. Workers' comp No active workers'comp accounts during the previous 6 year period. Public Works Strikes and Debarments Verify the contractor is eligible to perform work on public works projects. Contractor Strikes No strikes have been issued against this contractor. Contractors not allowed to bid _...... ......_............1...1 No debarments have been issued against this contractor. Workplace safety and health No inspections during the previous 6 year period. ©Washington Slate Dept.of Labor&Industries.Use of this site is subject to the laws of the state of Washington. Help us improve https:Hsecure.Ini.wa.gov/verify/Detail.aspx?UBI=603368172&LIC=RIDGEWS864CL&SAW= 2/2 rcz- -1Gq�pz. s`? 2-7 Permit Information Date 10/18/2016 Permit Number 1179 Project Name Wal-mart/Verizon Applicant Name Black Rock Consulting Applicant Address PO Box 1744 City, State,Zip Tualatin,OR 97062 Contact Sophia Mekkers Phone 503-380-1564 Email sophia@blk-rock.com Permit Type Commercial Alteration Site Address 4010 172nd St NE Valuation 30000.00 Status Applied Permit Issued Permit Expires Square Feet 0 Type of Construction/Occupancy Load Number of Stories 0 Proposed Use Install cell antennas on sides of building and equipment cabinets on west side of store Assigned To Kristin Foster Property Information Owner Information Parcel#:00930300000301 WAL-MART STORES INC WAL-MART STORES INC PO BOX 8050 M/S 0555 4010 172nd Street NE BENTONVILLE,AR 72712-8050 Review Date Type Description I Target Date Completed Date I Assigned To T Status 10/18/2016 1commercial Other 10/25/2016 JlKevin Olander Illn Review Notes Date Note 10/18/2016 Contractor TBD. KF Uploaded Files Upload File Date File Uploaded B 10/18/2016 2:44:29 PM 1179 Plans.odf Foster,Kristin 10/18/2016 2:44:29 PM 1179 Calcs.pdf Foster,Kristin 1 0/1 81201 6 2:30:23 PM 179 Application.pdf Foster,Kristin �( COMMERCIAL APPLICATION PERMIT SUBMITTAL Department of Community & Economic Development City of Arlington • 18204 59th Ave NE •Arlington, WA 98223 • Phone(360)403-3551 The following minimum information is required for your Comn7ercial/Multi-Family Building Permit Application. Mark each box to designate that the information has been provided. Please submit this checklist as part of your submittal documents. Incomplete applications will delay the review. One(1) City of Arlington Commercial/Multi-Family Permit Application r� (One(1) permit application per building or structure is required) u One(1) City of Arlington Commercial/Multi-Family Submittal Requirements Form Two (2) Architectural Drawings Two (2) Structural Drawings Two(2) Structural Calculations ❑ One(1) Project Specification Manuals (if applicable) ❑ One(1) NREC Code Compliance Forms K`R One(1) Special Inspection Requirements Forms One (1) Occupant's Statement of Intended Use Form Drawings shall be BOUND SEPARATELY BY TYPE, architectural, structural and landscape, and then ROLLED TOGETHER IN COMPLETE SETS> An intake appointment is required for all new Commercial or Multi-Family Building Permit Applications. To schedule an appointment please contact the City of Arlington Permit Center at(360)403 3551 or by email to ced cr.arlingtonwa cloy. I acknowledge that all items designated above are included as part of this application. REV 2015 Page 1 of 9 COMMERCIAL APPLICATION � s PERMIT SUBMITTAL Department of Community& Economic Development City of Arlington • 18204 59th Ave NE •Arlington, WA 98223 • Phone(360)403-3551 A. FEES DUE AT TIME OF PERMIT ISSUANCE B. CODES The City of Arlington currently enforces the following: International Codes 1. 2015 International Building Code(IBC) 2. 2015 International Residential Code(IRC) 3. 20,15 International Mechanical Code(IMC) 4. 2015 International Fuel Gas Code(IFGC) 5. 2015 International Fire Code(IFC) 6. 2015 International Plumbing Code(IPC) 7. 2015 International Property Maintenance Code (IPMC) S. 2015 International Existing Property Code(IEBC) 9. 2015 Washington State Energy Code(WESC) 10. 2009 Accessible&Usable Buildings and Facilities(ICC/ANSI 1417-1) Washington State Amendments 1. WAC 51-50 Washington State Building Code 2. WAC 51-51 Washington State Residential Code 3. WAC 51-52 Washington State Mechanical Code 4. WAC 51-54 Washington State Fire Code 5. WAC 51-56&51-57 Washington State Plumbing Code and Standards 6. WAC 51-11 Washington State Energy Code 7. WAC 296-46B Electrical Safety Standards,Administration, and Installation C. CITY OF ARLINGTON DESIGN REQUIREMENTS Design Wind Speed: 85 miles per hour(Exposure C) Ground Snow Load: 25 pounds per square foot Seismic Zone: D2 Rainfall: 2 inches per hour for roof drainage design- Frost Line Depth: 12 inches Soil Bearing Capacity: 1,500 psf unless a Geo-Technical Report is provided. (IBC Table 1804.2& IRC R401.4.1) D. PLANS AND DRAWINGS Submit two(2)complete sets of drawings and plans. Drawings and plans must be submitted on minimum 18"X 24", or maximum 30"X 42"paper.All sheets are to be the same size and sequentially labeled. Plans are required to be clearly legible,with scaled dimensions, in indelible ink, blue line, or other professional media. Plans will not be accepted that are marked preliminary or not for construction,that have red lines, cut and paste details or those that have been altered after the design professional has signed the plans- Please Note:A separate submittal of plans is required for each building or structure. REV 2015 Page 2 of 9 COMMERCIAL APPLICATION PERMIT SUBMITTAL Department of Community& Economic Development City of Arlington • 18204 59th Ave NE •Arlington, WA 98223 • Phone (360)403-3551 DETAILED SUBMITTAL REQUIREMENTS Mark each box to designate that the information has been provided. Please submit this checklist as part of your submittal documents A. E� SITE PLAN —,REQUIRED WITH ALL SUBMITTALS (May be included as part of the Architectural Drawing cover Sheet) 1 Drawing shall be prepared at scale not to exceed 1" =20 feet. 2. Show building outline and all exterior improvements. 3 Provide property legal description and show property lines. 4. Provide dimensions from the property lines to a minimum of two building corners (or two identifiable locations for irregular plan shapes). 5. Show building setbacks, easements and street access locations. 6. Indicate North direction. 7. Indicate finish floor elevation for the first level. 8. Provide topographical map of the existing grades and the proposed finished grades with maximum five feet elevation contour lines. 9. Show the location of all existing underground utilities, including water, sewer,gas and electrical. 10. Flood hazard areas,floodways, and design flood elevations as applicable. B. ARCHITECTURAL DRAWINGS 1 ❑ Cover Sheet a) Building Information 1. Specify model code information 2. Construction Type. 3. Number of stories and total height in feet 4. Building square footage(per floor and total) 5. IBC Occupancy Type(show all types by floor and total) 6. Mixed-use ratio(if applicable) 7. Occupant load calculation (show by occupancy type and total) 8. List work to be performed under this permit b) Design Team Information 1. Design Professional in Responsible Charge 2. Architects 3. Structural Engineers 4. Owner 5. Developer 6_ Any other Design Team Members 2- ❑ Floor Plan a) Plan view 1/8"minimum scale. Details a minimum %-inch scale. b) Plans must show the entire tenant space. c) Specify the use of each room/area. d) Provide an occupant toad calculation on the floor plan. (on every floor, in all rooms and spaces) e) Show ALL exits on the plans; include new, existing or eliminated. f) Show Barrier-Free information on the drawings. g) Show the location of all permanent rooms,walls and shafts. h) Note the uses in the adjacent tenant spaces, if applicable. i) Provide a door and door hardware schedule. REV 2015 Page 3 of 9 I: e COMMERCIAL APPLICATION PERMIT SUBMITTAL Department of Community& Economic Development City of Arlington • 18204 59th Ave NE •Arlington, WA 98223 • Phone(360) 403-3551 j) Show the location of all new walls, doors,windows, etc. k) Provide details and assembly numbers for any fire resistive assemblies. 1) Indicate on the plans all rated walls, doors,windows and penetrations. m) Provide a legend that distinguishes existing walls,walls to be removed and new walls. 3. ❑ Reflected Ceiling Plan a) Plan view 1/8"minimum scale. Details a minimum %-inch scale. b) Provide ceiling construction details. c) Provide suspended ceiling details complying with IBC 803.9.1.1. Show seismic bracing details. d) Show the location of all emergency lighting and exit signage. e) Detail the seismic bracing of the fixtures. f) Include a lighting fixture schedule. 4. ❑ Framing Plan a) Specify the size, spacing, span and wood species or metal gage for all stud walls. b) Indicate all wall, beam and floor connections. c) Detail the seismic bracing for all walls. d) Include a stair section showing rise, run, landings, Ireddrourn, handrail and guardrail dimensions. 5. ❑ Storage Racks(if applicable) a) Structural calculations are required for seismic bracing of storage racks eight feet or greater in height. b) Eight feet or less,show a positive connection to floor or walls. NOTE: High pile storage shall meet the requirements of current International Building and Fire Codes. C. ❑ SPECIAL INSPECTION 1. Where special inspection is required by IBC 1704,the registered design professional in responsible charge shall prepare a special inspection program that will be submitted to the City of Arlington and approved prior to issuance of the building permit to comply with IBC 106.1. D. ❑ WASHINGTON STATE ENERGY CODE N I R 1. One(1)completed Washington State Non-Residential Energy Code Envelope Summary forms. E. OCCUPANT'S STATEMENT OF INTENDED USE 1. The Occupant's Statement of Intended Use form shall be completely filled out and may require the submittal of a Hazardous Materials inventory Statement(HMIS). Contact the Arlington REV 2015 Page 4 of 9 } COMMERCIAL APPLICATION PERMIT SUBMITTAL Department of Community & Economic Development City of Arlington • 18204 59th Ave NE •Arlington, WA 98223 • Phone (360)403-3551 The building permit does not include any mechanical, electrical, plumbing or fire sprinkler/alarm work. These permits are issued separately. Mechanical, electrical, plumbing, or fire sprinkler/alarm permits require a separate permit application and may also require separate plan review. Please note that any tenant improvement work in a space that involves food handling or preparation requires Snohomish County Health District approval before the permit can be issued. You must provide the Permit Center a copy of the approval letter or the approved plans. Contact the Snohomish County Health District at(425) 339-5250 with any questions or for more information. An intake appointment is required for all large Tenant Improvement Building Permit Applications. To determine if your project requires an intake appointment, to schedule an appointment or to ensure that you have the most current information, please contact the City of Arlington Permit Center at(360) 403-3551 or by email to ced@arlingtonwa.gov. Incomplete applications will not be accepted. I acknowledge that all items designated as submittal requirements must accompany my Building Permit Application to be considered a complete submittal. REV 2015 Page 5 of 9 6 vy- '� COMMERCIAL APPLICATION PERMIT SUBMITTAL Department of Community& Economic Development City of Arlington • 18204 59th Ave NE •Arlington, WA 98223 • Phone(360)403-3551 THIS APPLICATION TO BE USED FOR NEW COMMERCIAL STRUCTURES AND RESIDENTIAL DWELLINGS NOT REGULATED UNDER THE IRC. THIS APPLICATION MUST BE ACCOMPANIED BY A COMMERCIAL APPLICATION SUBMITTAL CHECKLIST AND AN OCCUPANT'S STATEMENT OF INTENDED/USSE. f I /� ��( j Name of Project:i m.cut � ` ` I y n_ ' _` �(f Valuation.- Project 1"' Address: 4010 1 - � t. N E � Fn .W A q g 22 Parcel ID#: �� �4 A AMA I Legal Description y t I a h fcA e Owner: a I +csto r`(-5 , ny - Phone Number: Address: l ( City((�njon\(I 115 State: �i _, Zip Code: Tf4-I LP -5525 Engineer:ta u I 1 `o nd Jacob60r) Phone Number: 4-Z- 20q - U--23 Cell Phone: r— l E-mai `-� �„ /� �^ Address: �,1� E ,�1�U� City:_ OrRl r State: _� Zip Code: "t�LV2 General Contractor:--f-BD b w bick-) Phone Number: Cell Phone: E-mail: Address: _ _ City: State: Zip Code- Contractor's License Number: Expiration: Contact Person: h i a m eaffrs Phone Number: 603 -3 to - t6o+ Cell Phone:6 SO- 1 E-mail:(�,, L) I a @ b l IL- 60011L. COM Address: P• 1-+ City]LA l n State: OP-1 Zip Code: a-4OlP Proposed Scope of Work: I"`o LA `t (5m aI L c( i l an-r n I a5 +a o Lj-5�� t)U_i tc�i f aaad(5. Rd p�cL m o ter)� e%�l.pr nEn f C29.bIn cY a_�- 8ra,�in - REV 2015 Page 6 of 9 4 w COMMERCIAL, APPLICATION PERMIT SUBMITTAL Department of Community & Economic Development City of Arlington • 18204 59th Ave CIE •Arlington, WA 98223 • Phone (360)403-3551 Project Name/Tenant " V V Cd a L)-A on �( — �{ � �- Site Address 0 10 G -- (St- N E Bldg/Unit/Suite IBC Construction Type V—B IBC Occupancy Type Description of Use i e Iccom ran l-An i ca-fal)5 Building Square Footage «n K-now n Number of Stories_ Square Footage Per Floor can � nOVVYI Will there be any installation, modification or removal of the following? (Check all that apply) ❑ Automatic fire extinguishing systems I\ 0 ❑ compressed gas systems lJ V ❑ Fire alarm and detection systems ❑ Fire pumps ❑ Flammable and combustible liquids(tanks, piping etc...) ❑ Hazardous materials ❑ High piled/rack storage ❑ Industrial ovens/furnace ❑ Private fire hydrants ❑ Spraying or dipping operations ❑ Standpipe systems ❑ Temporary membrane structure, tents(>200sq ft)or canopies(>400 sq ft) Provide details on any of the above checked items Installation, changes, modifications or removal of any of the above may require additional submittals, information, or permits during the plan review or construction process. Statement of Special Inspection REV 2015 Page 7 of 9 i COMMERCIAL APPLICATION PERMIT SUBMITTAL Department of Community & Economic Development City of Arlington • 18204 59th.Ave NF •Arlington, WA 98223 • Phone (360) 403-3551 Name of Project: `-(�a ��► I �� a Project Address: 40 1 O `L ( N — -- - — Special Inspection Firm: _ '� (r neeGf en, Address: — Contact Person: _- _ _ _ Phone: �+ Email: Special Inspection Firm Special Inspectors: The Special inspection Firm of will perform special inspection for the following types of work(separate forms must be submitted if more than one firm is to be employed). ( ) Reinforced Concrete ( ) Bolting in Concrete ( ) Pre-stressed Concrete ( ) Shotcrete ( ) Structural Masonry ( ) Structural Steel and Welding ( ) High-Strength Bolting ( ) Spray-Applied Fireproofing ( ) Smoke-Control Systems ( ) Other Specify: All individual inspectors to be employed on this project will be WABO certified for the type of inspection they are to perform. If inspection is for work that is not covered by the WABO categories, a detailed resume of the inspector and firm must be submitted. The resume must show the inspector and firm are qualified to perform the work and testing required by the project design and specifications. The work shall be inspected for conformance with the plans and specifications approved by the City. Revisions and addenda sheets will not be used for inspection unless approved by the City. The special inspector shall report to the City revisions that are not approved. A daily record will be maintained on site itemizing the inspections performed, for the review of all parties. Any nonconforming items shall be brought to the immediate attention of the contractor for resolution.A weekly shall be submitted to the City: detailing the inspections and testing performed, listing any nonconforming items and resolution of nonconforming items. Unresolved nonconforming items will be detailed on a discrepancy report and presented to the building department A final report shall be submitted to the Building Division prior to the Certificate of Occupancy being issued This report will indicate that inspection and testing was completed in conformance with the approved plans, specifications and approved revisions and addenda. Any unresolved discrepancies must be detailed in the final report. The special inspector and special inspection firm serve in the role as"deputy"City of Arlington inspectors and as such are responsible to the City of Arlington Building Division in the performance of the required work. Contractor: The contractor shall provide the special inspector or agency adequate notification of work requiring inspection. The City approved plans and specifications must be made available, at the job site for the use of the special inspector and the City Inspector. The contractor shall maintain all daily inspections reports, on site,for review. REV 2015 Page 8 of 9 o COMMERCIAL APPLICATION PERMIT SUBMITTAL Department of Community & Economic Development City of Arlington• 18204 591h Ave NE• Arlington.WA 98223• Phone(360)403-3551 The special Inspection functions are considered to be in addition to the normal inspections performed by the City and the contractor is rasoonsible for contacting the City to schedule regular inspections.No concrete shall be poured or other work covered until approved oy the City Inspector, Building Division: The Building Division shall review any revisions and addenda. Approved copies will be given to the contractor to maintain as part of the approved plan set. The City Inspector will monitor the special�nspection functions for compliance with the agreement and the approved plans. he Cily Inspector shall be responsible for approving various stages of construction to be covered and work to proceed. Design Professionals: The architect and engineer will clearly indicate on the plans and specifications for the specific types of special inspection required, anc shall include a schedule for inspection and testing The architect and engineer will coordinate their revisions and addenda process in such a way as to insure aif required Ctty approva:_ are obtained. prior to work shown on the revisions being performer Owner: The project owner,or the architect or engineer acting as the owners agent,shall employ the special inspector or agency_ ENFORCEMENT: A failure of the special inspector or firm to perform in keeping the requirements of the IBC.the approved plans and this document may rotd this agreement and the Building Officials approval of the special inspector.In such case a new special inspector andror firm would ^eeo to be proposed for approval.A failure of the design an&or construction parties to perform in accordance with this agreement may :esurt in a STOP WORK notice being posted on the project, until nonconforming items have been resolved. ACKNOW LEDGEM,ENTS I have read and agree to comply with the terms and conditions of this agreement, Owner: - -1 Li p-����� -- --- Date: I hereby certify that the above information is correct and that (lie construction on, and the occupancy and the use of the above-described property will be in accordance with the laws.rules and regulation of the State of Washington. 4-1 Applicants Signat re Vedzon Wireless by Black Rock Print Applicants Name Dale Ibr FOR STAFF USE ONLY Received Permit# JAR m Aount Received Receipt REV 2015 Page 0 of 9 BLACK ROCK Pi-vrroping Tomwww's Infrostrwhim for Wne♦ess,RenemWe Energy&C4s October 5, 2016 City of Arlington Building Division 18204 59t"Avenue NE Arlington,WA 98223 RE: Verizon Wireless Retail Store at 4010 172"d Street NE, Arlington,WA Greetings: My client, Verizon Wireless, intends to place small cell antennas on the exterior fagade of the Wal-Mart, located at 4010 172"d Street NE, in Arlington, to improve coverage for customers visiting the store. Equipment cabinets will be located at grade, outside of the store building. In support of the required building permit, please find the following: • Commercial Building Permit Application and attachments • Two (2) complete sets of construction drawings • Two (2) structural reports (plans + talcs) Upon calculation of the fees, please contact the owner of my firm, Jim Jaggers, at 916-213-8407. Jim will pay for the permit fees with our corporate credit card. Please let me know if there is any further information that I can provide at this time. Best regards, Sophia Mekkers Sophia Mekkers 174 Link Court Newberg, OR 97132 (503) 380-1564 Mobile sophia@blk-rock.com Black Rock Consulting for Verizon Wireless ,y CITY OF ARLINGTON RUILDINO DEPARTMENT DCI APPROVED e n G in e e R 5 Fa Seattle � '"""�"'1"- q Portland NO CHANGES AL"ORrM Spokane UNLOSS APPROVED BY THIS San Diego BUILDING INSPECTOR Austin Irvine San Francisco September 9, 2016 Anchorage Los Angeles Rick Matteson Acorn Consulting, Inc. COPY 1125 SE Clatso PStOFFICE Portland, OR 97202 Subject:Walmart Small Cell @ Arlington Address: 4010 172"d Street NE Arlington,WA Mr. Matteson, Verizon will be installing rectangular antennas and supporting equipment mounted to existing CMU walls at four(4) locations on the side of the Walmart Store in Arlington,Washington. In addition,two (2) new RF Equipment Cabinets will be installed on separate concrete pads on the ground adjacent to the building. DCI was asked to design the anchorage of the antenna to the CMU wall and to design a Fiber-Reinforced Plastic (FRP) shroud to hide the antennas. DCl also designed the bases for the new Cabinets to resist sliding and overturning forces from wind and seismic loads. The cabinets weigh 500 lb each. The installation on the CMU wall at each location consists of the following: Y (1) Antenna—47 lb. ea • (2) RRU— 65 lb ea • OVP Raycap— 14 lb. FRP Shroud—480 lb. The CMU wall has the capacity to support the added weight of this new equipment. See the attached sketches SSK-01 &SSK-02 showing attachment requirements for the antenna mount and shroud design. The foundations for the new cabinets mounted on a new footing at grade should be supported as shown in sketch SSK-03. The cabinets are identical and were reviewed for wind and seismic loads from the 2015 IBC. Sincerely, gY J O r Mathew Wies, P.E., S.E. Associate DCl Engineers 30090 Received Attached—Calculations, SSK-01 -SSK-03 OCT DCI Project 1 601 1-01 74 (4000) 8 2016 WO 411 818 Stewart Street,Suite 1000 Seattle,Washington,98101 Phone(206)332-1900 S e r v i c e I n n o v a t i o n V a I u e CJVOASqA FRP�M4x„-(,-r. ,rne TOP 8 0• 3-0, TF � I FRP ANGLE 4x4x114 EA ANTENNA I CORNER WITH 314.FRP OVp iv BOLT-TYP ® - RRUS32 RRUS32 j I f-1 PSU AC 08 PSU AC OB 1-518"x 1-518"GALV UNISTRUT ANCHORED-� o o --- - '_'- TO WALL W1(3)318"e THREADED ROD, EMBED 2"WITH HILTI HY-70 ADHESIVE (USE SCREEN TUBE IF CELLS NOT GROUTED) i i FRP ANGLE 4x4xlA EA CORNER WITH (2)3/4" FRP BOLTS-TYP ELEVATION AT ANTENNA SHROUD JO r r-- 30090 Sketch# SSK-01 Project Name: Project#: By: Date: Acorn Walmart Arlington 1 601 1-01 74 MHW 9/8/16 Field Sketch: m=m D C I Elevation at Antenna Shroud mounted on CMU Wall E In G I n E E R S 818 STEWART STREET, SUITE 1000 • SEATTLE,WA 98101 PHONE (206) 332-1900 • FAX: (206)332-1600 FRP ANGLE 4x4x1/4 EA CORNER WITH 3/4"FRP 3,-0' FRP ANGLE 4x4x1/4 EA BOLT-TYP CORNER WITH (2)3/4" FRP BOLTS-TYP I I 1/4"FRP PANEL FRP SHROUD ANCHORED TO WALL W/(S) 3/8"0 THREADED ROD,EMBED 2"WITH HILTI HY-70 ADHESIVE(USE SCREEN TUBE IF CELLS NOT GROUTED-ANCHORS TO BE LOCATED IN CENTER OF CELL:4"FROM TOP,BOTTOM&EDGE OF BLOCK) 4 EXISTING CMU 1 1 zt WALL 1/4"FRP PANEL ` z Z' r�r. SSK-02 -Acorn Walmart Arlington 1 601 1-01 74 MHW 9/8/16 = D C I Section at Antenna Shroud mounted Enc3InE: ERS on CMU Wall 818 STEWART STREET, SUITE 1000• SEATTLE,WA 98101 PHONE(206)332-1900 • FAX: (206)332-1600 500 LB 21-811 CABINET FOOTING PER 3011 PLANell. w :� a yf Y x y V �G / � 1 Sri 30090 �� ^ ELEVATION AT p. Hoa�, (HiI t i KB-TZ) ----- — - to 5eV 4" @ Ea_ Cor ner r 1F1_OH SQUARE X 6" DEEP CONCRETE FOOTING W/#5 @ 18°oC e EW, CENTERED. PLAN AT FOOTING r Sketch# -- SSK-03 Project Name: Project#: By: Date: Acorn Walmart Arlington 1 601 1-01 74 MHW 9/8/16 �` -DC1 - Field Sketch: = Cabinet Foundation E n G I n E E R S 818 STEWART STREET, SUITE 1000- SEATTLE,WA 98101 PHONE(206)332-1900 - FAX: (206)332-1600 =DCI Project No. Sheet No. egnE. LEERS Project Date /� . WU �� Ar I ingt on o 6 Subject g ' Y�` IZR.v 65 U¢ YZ = 130# 3 �, = 305# YA,, 'P62, P 10`x�' I�t I e�s� L o v Il o MPS F Y_P G z G �b-QS psIF =D C I tProject No. Sheet No. EIIGIflEERS Project Date LI!off( W Ar I ingt on (� Subject BY K-Wv`p To C, � u ►o Yam° /Se too IT i ys��` s �clb•fl�Z Fe4M� = 3�5 L�� V/&oL�( ITS V= 30 Tcr ' � " gSc7 p 1�/s 5 Sly Vc�v = a_g�clZ4c� _ `�Z ( -?—t � d� 0S-C-, 5/g; 70vp lid- beD 3�� W DC I Project No. Sheet No. Enc. IfIEERS Project Date L tx\ &�-M 6zT Ar I ingt on � �( 4(. Subject TE3 U N kT o T t`7'( I-o AZ7 To F o o WT =Sao Ti 071`-� _ 42,0 S�Act T- 2= �I�--0 D x 0_�� 2� = 20 40 ��• U% o �- �1-t r--C lam- Sd l l` t C, 6 _- 0.46 ' ar = 2 ITO Po F- o lL 3 6(4� - — u 6" ,pP 6o pJL_ F-rc, vj/*s e 1811 OC - Project#: 16011-0174 Page#: 1 I Proj. Name : Acorn Walmart Arlington E ngineer MHW Date : 09/07/2016 D C E rl G I rl E E Fi S Subject EQUIPMENT SUMMARY Design Criteria: Codes 20151BC ASCE 7-10 Equipment Summary, Loads & Anchorage Equipment Height(ft) Long Length('ft) Short Length(ft)l Total Wgt. (kip) Curb Ht. (ft) Uplift Shear w/90 w/QO Cabinet 7.50 2.67 2.67 0.50 0.0 -859lb 439lb Wind Load Exp 120 MPH C k, 0.85 k,t 1.0 kd 0.85 qzJ 26.6 1 psf F =gZGCfAf G 0.85 Cf 1.55 B/s 0.5 s/h 1.0 F 35.1 psf Provide(4) 1/2"Dia Threaded Rods, Embed 3"w/Hilti HY200 Project#- 1 601 1-0057 Page#: 1 Proj. Name: Acorn Walmart Arlington Engineer: MHW Date: 09/07/2016 E n G 1 11-1 E E Ft S Subject: Seismic Coefficients I. Seismic Ground Motion Values: LAT = Site Latitude: = 48.162 LONG = Site Longitude: = -122.176 SS = MCE Spectral Accel @ 0.2 Sec: = 1.086 2002 USGS Mapped Value for Default Site Class B S, = MCE Spectral Accel @ 1.0 Sec: = 0.423 2002 USGS Mapped Value for Default Site Class B SITE = Site Class: ( Default is D) = D per Geotech or Table 20.3-1-ASCE 7,pg 205 Fa = Spectral Accel @ 0.2 Sec for Site = Table 11.4-1-ASCE 7,pg 115 FV = Spectral Accel @ 1.0 Sec for Site = Table 11.4-2-ASCE 7,pg 115 SMS = MCE Spectral Resp(Short Period) = 0.45 =Fe SS Eqn 11.4-1 SM, = MCE Spectral Resp(Long Period) = 0.25 =Fv S1 Eqn 11 4-2 SDs = Design Spectral Accel @ 0.2 Sec = 0.77 =2/3 SMs Eqn 11 4-3 SDI = Design Spectral Accel @ 1.0 Sec = 0.46 =2/3 SM, Eqn 11 4-4 MUM Design Maps Summary Report User-Specified Input Report Title Acorn Walmart Arlington Thu September a,2016 04:53:07 UTC Building Code Reference Document 2012, 2015 International Building Code (which utilizes USGS hazard data avaftble In 2008) Site Coordinates 48.1523211N, 122.17621°W Site Soil Classification Slte Class D -"Stiff Soil" Risk Category I/II/III Stanwood i EBE)F i POR ` r 5U SA • t BAY Arlington i Marto 3 'k 1 �4lNGTON RlUH('ArRIORT T1�AL 1 � 9 SESfERIINTIDN r1 Marysville r ; USGS-Provided Output S9 : 1.085 g S,0= 1.156 g S 5 = 0.7719 Si = 0.423 9 S,,i= 0.667 g Soi = 0.4459 C ' Project : 16011-0174 Page : 2 � D Proj.Name:_ Acom Walmart Arlington Engineer: MHW Date: 0 9107/2 01 6 E 171 G I M E E Ft S Subject: Cabinet Anchorage Seismic Design Requirements for Nonstructural Components-ASCE 7-10 Chapter 13 Equipment: Cabinet Cabinet Geometry: Seismic Coefficients H,.t= 7.5 ft Overall height SDC= D Seismic Design Category h s= 3.8 ft Seis Centroid=1/2(Unit)+Curb SDs= 0.77 Design spectral acceleration h_w= 3.8 ft Wind Centroid=1/2(H_tot) ap= 1.0 ASCE 7-10-Table 13.6-1 D= 2.67 ft Dist between attachment RP= 2.5 ASCE 7-10-Table 13.6-1 N= 4 Attachments supporting weight Ip= 1.0 Component Importance NOT= 2 Attachments resisting OT QP 2.5 Weight Wp= 0 50 kip z= 1.0 ft h= 1.0 ft Height of building Wind Load Seismic Calculations Wind Pressure= 35.1 psf LRFD Level Wind Width= 2.67 ft Fp,cQic =0.4*up ns*Wp(1+21) Fp caic= 0.19 kips Wind Load= 0 70 kip p /p ` Equation 13.3-1 Center of Wind 3.750 Fp,,,l.x=1.6*Spg*/p*Wp FP-M..= 0.6 kips Wp= 0.5 kip Equation 13.3-2 \Y F,.in=0.3*Spg*Ip*Wp Fp.min= 0.12 kips Equation 13.3-3 Wind Load 0.702 kip Controlling Design Shear Force Fp= 0.70 kips FP= 0.70 kips Controlled by Wind Fp,ASD=0.6*Fp= 0.42 kips Reactions h= 3 75 ft N= (4) Attachments supporting weight/resisting shear NOT= (2) Attachments resisting OT Lateral Load in the X-direction (+value equal compression Point A Point C 2 67 ft Dead I +0.1 kip +0-1 kip Rz=Wp/N Rp, RO Wind 1 0.5 kip +0.5 kip Rz=Fp"h/D Seismic 1 0.1 kip +0.1 kip Max EQ 0.05 kips 1 0.23 kips (1.0+.14SDS)D+0.7EQ Min EQ -0.03 kips 1 0.15 kips (0.6-.14SDS)D+0.7EQ Max Wind -0.17 kips 0.42 kips D+0.6W Min Wind -0.22 kips 0.37 kips 0.6D+0.6W Max EQ 0 04 kips 0.30 kips (1.2+.2SDS)D+1.OEQ Min EQ -0 07 kips 0.19 kips (0.6-.2SDS)D+1.OEQ Max Wind -0.34 kips 0,64 kips 1 2D+1.0W Min Wind -0.22 kips 0.37 kips O.GD i O.GW Tension Compression Shear Max 0.64 kips 0.18 kips LRFD Loads 0.34 kip 0.18 kips Op Loads -0.86 kip 0.44 kip _1 www.hilti.us Profis Anchor 2.6.5 Company: DCI Engineers Page: 1 Specifier: MHW Project: SLM Walter Address: Sub-Project I Pos.No Cabinet Anchorage Phone I Fax: Date: 06/02/2016 E-Mail: Specifier's comments: 1 Input data Anchor type and diameter: HIT-HY 200+HAS 137 1/2 Effective embedment depth: hef,opt!=2 750 in.(heuimit=4.750 in.) Material: ASTM A 193 Grade B7 Evaluation Service Report: ESR-3187 Issued I Valid: 03/01/2016 1 03/01/2018 Proof: Design method ACI 318-08/Chem Stand-off installation: -(Recommended plate thickness:not calculated) Profile: no profile Base material: cracked concrete,2500,fc'=2500 psi;h=6 000 in.,Temp.short/long:32/32°F Installation: hammer drilled hole,Installation condition:Dry Reinforcement: tension:condition B,shear:condition B;no supplemental splitting reinforcement present edge reinforcement:none or<No.4 bar Seismic loads(cat.C,D,E,or F) no Geometry[in.]&Loading[lb,in.lb] Z W st �0 3 co AAo x Input data and results must be checked for agreement with the existing conditions and for plausibility! PROPS Anchor(c)2003-2009 Hilt!AG,FL-9494 Schaan Hilti is a registered Trademark of Hilti AG,Schaan r_MI www.hilti.us Profis Anchor 2.6.5 Company: DCI Engineers Page: 2 Spccificr: MHW Project: SLM Walter Address: Sub-Project I Pos.No.. Cabinet Anchorage Phone I Fax: Date: 06/02/2016 E-Mail: 2 Load case/Resulting anchor forces Load case:Design loads Anchor reactions[lb] Tension force:(+Tension,-Compression) Anchor Tension force Shear force Shear force x Shear force y 1 360 440 0 440 max.concrete compressive strain: r6l max concrete compressive stress: -[psi] resulting tension force in(x/y)=(0.000/0.000): 0[lb] resulting compression force in(x/y)=(0.000/0.000):0[lb] 3 Tension load Load N..pbJ Capacity AWa[lb] Utilization pN in N,K/#Nn Status Steel Strength' 860 13301 7OK Bond Strength** 860 1232 70 OK Sustained Tension Load Bond Strength* N/A N/A N/A N/A Concrete Breakout Strength** 860 1726 50 OK *anchor having the highest loading **anchor group(anchors in tension) 3.1 Steel Strength Nsa =ESR value refer to ICC-ES ESR-3187 �Nsa 2 Nua ACI 318-08 Eq.(D-1) Variables A..N[in.2] fma[psi] 0.14 125000 Calculations Nsa[lb] 17735 Results Nse lib] �Meel qi,Nsa[lb) Nua[Ib] 17735 0.750 13301 860 Input data and results must be checked for agreement with the existing conditions and for plausibility! PROPS Anchor(c)2003-2009 Hdll AG,FL-9494 Schaan Hilti is a registered Trademark of Hilli AG,Schaan MLE NJ www.hilti.us Profis Anchor 2.6.5 Company: DCI Engineers Page: 3 Specifier: MHW Project: SLM Walter Address: Sub-Project I Pos.No: Cabinet Anchorage Phone I Fax: Date: 06/02/2016 E-Mail: 3.2 Bond Strength Na _(AND)wed,Na Tcp,Na Nba ACI 318-11 Eq.(D-18) Na z N a ACI 318-11 Table DA.1.1 ANa =see ACI 318-11,Part D.5.5.1,Fig RD.5.5.1(b) AN.0 =(2 CNa)2 ACI 318-11 Eq.(D-20) cNa =10 da Tura ACI 318-11 Eq.(D-21) 1100 1 Yec,Na= 1 1 +eN 5 1.0 ACI 318-11 Eq.(D-23) CNa tlled,Na=0.7+0.3(Si=)5 1.0 ACI 318-11 Eq.(D-25) Tcp,Na=MAX(Ca=rmn CNa)51.0 ACI 318-11 Eq.(D-27) Cac Cac Nba =ka'Tk,c'Ir'da'her ACI 318-11 Eq.(D-22) Variables rk,c,.[psi] da[in.J h,,,(in I _ c..m.[in.] ,k�[psi] 1670 0.500 2 160 3.000 935 ecl,N[in.] ec2.N[in.] cac[in.] ka 0.000 0.000 4.480 1.000 Calculations CNa[in.] ANa[in.2] AN.0[in.2] U/etl Na 6.133 83.41 150.45 0.847 tifecl,Na Wec2,Na Wcp Na Nba[lb] 1.000 1.000 1.000 4039 Results Na[Ib] bond Na[lb] Nua[lb] 1896 0.650 1232 860 Input data and results must be checked for agreement with the existing conditions and for plausibility! PROFIS Anchor(c)2003-2009 Hilti AG,FL-9494 Schaan Hilt!is a registered Trademark of Hill!AG,Schaan www.hilti.us Profis Anchor 2.6.5 Company: DCI Engineers Page: 4 Specifier: MHW Project: SLM Walter Address: Sub-Project I Pos.No.: Cabinet Anchorage Phone I Fax: Date: 06/02/2016 E-Mail: 3.3 Concrete Breakout Strength Ncb = (p Nco)Wed,N Wc,N Wep,N Nb ACI 318-08 Eq.(D-4) Ncb z N„a ACI 318-08 Eq.(D-1) ANc see ACI 318-08,Part D.5.2.1,Fig.RD.5.2.1(b) A Nco of 1 Wec'N = (1 +2 eN 5 1.0 ACI 318-08 Eq.(D-9) \ 3 her Wed,N =0.7+0.3(Ca,min\5 1.0 ACI 318-08 Eq.(D-11) 1.5hpr J lllcp,N _ _MAX(-min 1.5hef)5 1.0 ACI 318-08 Eq.(D-13) Cao ' Cac Nb =kc x;f:hef5 ACI 318-08 Eq.(D-7) Variables het M•) ec1,N[in.] ec9.N[init ce.rwe[in.] t rC.N 2.750 0.000 0.000 3. 00 1.000 cac[in.] kc fc[psi] 4.480 17 1 2500 Calculations AN.[in•2] ANco[in.21 ect.N f fed,N 1c,N Nb(lb] %77 68.06 i.000 1.ec2,N 0.918 1.000 3876 Results Ncb[lb] Vkonueto Ncb llbl Nw Ub) 2665 0.650 1726 86iF Input data and results must be checked for agreement with the existing conditions and for plausibility! PROFIS Anchor(c)2003.2009 Hilti AG.FL-9494 Schaan Hilti is a registered Trademark of Hilti AG,Schaan www.hilti.us Profis Anchor 2.6.5 Company: DO Engineers Page: 5 Specifier: MHW Project: SLM Walter Address: Sub-Project I Pos.No Cabinet Anchorage Phone I Fax: Date: 06/02/2016 E-Mail: 4 Shear load Load Vua[lb] Capacity#Va[lb] Utilization pv=V_1# Status SteelStrength* 440 6916 7 OK Steel failure(with lever arm)* N/A N/A N/A N/A Pryout Strength(Bond Strength controls)** 440 2654 17 OK Concrete edge failure in direction y+** 440 949 47 OK *anchor having the highest loading **anchor group(relevant anchors) 4.1 Steel Strength Vsa =(0.6 Ase,v futa) refer to]CC-ES ESR-3187 Vsteel Z Vua ACI 318-08 Eq.(D-2) Variables Ase,y[in•2] futa[psi] (0.6 Ase,y fuia)[lb] 0.14 125000 10640 Calculations Vsa[lb] 10640 Results Vsa[lb] Vsa[lb] Vua[lb] 10640 0.650 6916 440 Input data and results must be checked for agreement with the existing conditions and for plausibility! PROMS Anchor(c)2003-2009 Hilt!AG,FL-9494 Schaan HIM is a registered Trademark of Hilti AG,Schaan I 2ZO www.hilti.us Profis Anchor 2.6.5 Company: DCI Engineers Page: 6 Specifier: MHW Project: SLM Walter Address: Sub-Project I Pos.No.: Cabinet Anchorage Phone I Fax: Date: 06/02/2016 E-Mail: 4.2 Pryout Strength(Bond Strength controls) Vcp =kcpIGA'o)yred,Na ycp,Na Nba] ACI 318-11 Eq.(D-40) 0 Vcp z V a ACI 318-11 Table(D.4.1.1) ANa see ACI 318-11,Part D.5.5.1,Fig.RD.5.5.1(b) ANa0 ( Na)= 2 c 2 ACI 318-11 Eq.(D-20) CNa =10 da Tuncr ACI 318-11 Eq.(D-21) 1100 1 lifec,Na= �1 e/ 51.0 ACI 318-11 Eq.(D-23) \ CNa/ ed,Na-0.7+0.3(C� )5 1.0 ACI 318-11 Eq.(D-25) — AC -MAX(C""a,N.)51.0 ACI 318-11 Eq.(D-27) WcP.Na— ac Nba =a.a'Tk,c'7r'da' her ACI 318-11 Eq.(D-22) Variables kc Tk.o.unor[Psi) da[in.] haf)in-) Capin[in.] 1670 0.500 2.760 3.000 Tk.c[Psi] eat.N[in.] ea2.N[in.] cae[in.] Xa 935 0.0 0.000 4.480 1.000 Calculations CNa[in.] AN.[fn 2] ANa0[in•2] tVed,Na 6.133 83AI 150.45 0.847 graci.Na 'rec2.Na 41co.Na Nba[lb] 1.000 1.000 1.UUu 4039 Results Vcp[lb] �concrole m Vcp[lb] Vua[Ib) 3792 0.700 2654 440 Input data and results must be checked for agreement with the existing conditions and for plausibility! PROFIS Anchor(c)2003.2009 Hdli AG.FL-9494 Schaan Hilti is a registered Trademark of Hilti AG,Schaan www.hilti.us Profis Anchor 2.6.5 Company: DCI Engineers Page: 7 Specifier: MHW Project: SLM Walter Address: Sub-Project I Pos.No. Cabinet Anchorage Phone I Fax: Date: 06/02/2016 E-Mail: 4.3 Concrete edge failure in direction y+ Vcb = \Avco/Yed,V Wc,V Wh,V llfparallel,V Vb ACI 318-08 Eq.(D-21) �Vcb z Vus ACI 318-08 Eq (D-2) Avc see ACI 318-08,Part D.6.2.1,Fig.RD.6.2.1(b) Avco =4.5 Ca, ACI 318-08 Eq.(D-23) 1 Wec,V= (1 +�2e,/ 51.0 ACI 318-08 Eq.(D-26) 3ca, tped,V=0 7+0.3 )5 1.0 ACI 318-08 Eq.(D-28) 1,5c,, Wh,v = 1.5ca'a 1.0 ACI 318-08 Eq.(D-29) ha oz Vb = (7(tla) �) ca; ACI 318-08 Eq.(D-24) Variables ca,[u i l caz[in.] ecv[in.] 4/C.V ha[in.] _ 3.000 3,000 . 00 1.000 6.000 le[in.] X da[in.] fc Ipsq y/psrs! 2.750 1.000 0.500 5 00 1.000 Calculations Avc[in.2] Avco(i�s] �ec,v v t n,v Vb[lb] 33.75 4 .50 1. 00 0.900 1.000 1808 Results Vcb[Ib] +concrete Vcb[lb] Vua[lb] 1356 0.700 949 440 5 Combined tension and shear loads PN,_ [iv _ _ Utilization DN.v[%]_ Status 0.698 0.463 5r3 83 OK [3NV=P�+[iv<=1 6 Warnings • Load re-distributions on the anchors due to elastic deformations of the anchor plate are not considered.The anchor plate is assumed to be sufficiently stiff,in order not to be deformed when subjected to the loading! Input data and results must be checked for agreement with the existing conditions and for plausibility! • Condition A applies when supplementary reinforcement is used.The(P factor is increased for non-steel Design Strengths except Pullout Strength and Pryout strength. Condition B applies when supplementary reinforcement is not used and for Pullout Strength and Pryout Strength.Refer to your local standard. • Design Strengths of adhesive anchor systems are influenced by the cleaning method.Refer to the INSTRUCTIONS FOR USE given in the Evaluation Service Report for cleaning and installation instructions • The ACI 318-08 version of the software does not account for adhesive anchor special design provisions corresponding to overhead applications. • Checking the transfer of loads into the base material and the shear resistance are required in accordance with ACI 318 or the relevant standard! Fastening meets the design criteria! Input data and results must be checked for agreement with the existing conditions and for plausibility! PROFIS Anchor(c)2003-2009 HIM AG,FL-9494 Schaan Hilti is a registered Trademark of Hilti AG,Schaan www.hilti.us Profis Anchor 2.6.5 Company: DCI Engineers Page: 8 Specifier: MHW Project: SLM Walter Address: Sub-Project I Pos.No.: Cabinet Anchorage Phone I Fax: Date: 06/02/2016 E-Mail: 7 Installation data Anchor plate,steel:- Anchor type and diameter:HIT-HY 200+HAS 67 1/2 Profile:- Installation torque:360.001 in.lb Hole diameter in the fixture:- Hole diameter in the base material:0.563 in. Plate thickness(input):- Hole depth in the base material:2.750 in. Recommended plate thickness:- Minimum thickness of the base material:4.000 in. Drilling method:Hammer drilled Cleaning:Compressed air cleaning of the drilled hole according to instructions for use is required 7.1 Recommended accessories Drilling Cleaning Setting • Suitable Rotary Hammer Compressed air with required accessories Dispenser including cassette and mixer • Properly sized drill bit to blow from the bottom of the hole Torque wrench • Proper diameter wire brush Coordinates Anchor in. Anchor x y c-, c+x c r _c_ 1- - n OOO 0000 3 0 0 n 3,000 8 Remarks; Your Cooperation Duties • Any and all information and data contained in the Software concern solely the use of Hilti products and are based on the principles,formulas and security regulations in accordance with Hilti's technical directions and operating,mounting and assembly instructions,etc.,that must be strictly complied with by the user. All figures contained therein are average figures.and therefore use-specific tests are to be conducted prior to using the relevant Hilti product The results of the calculations carried out by means of the Software are based essentially on the data you put in. Therefore,you bear the sole responsibility for the absence of errors,the completeness and the relevance of the data to be put in by you. Moreover,you bear sole responsibility for having the results of the calculation checked and cleared by an expert,particularly with regard to compliance with applicable norms and permits,prior to using them for your specific facility. The Software serves only as an aid to interpret norms and permits without any guarantee as to the absence of errors,the correctness and the relevance of the results or suitability for a specific application. • You must take all necessary and reasonable steps to prevent or limit damage caused by the Software. In particular,you must arrange for the regular backup of programs and data and,if applicable,carry out the updates of the Software offered by Hilti on a regular basis.If you do not use the AUtoUpdate function of the Software,you must ensure that you are using the current and thus up-to-date version of the Software in each case by carrying out manual updates via the Hilti Website. Hilti will not be liable for consequences,such as the recovery of lost or damaged data or programs,arising from a culpable breach of duty by you. Input data and results must be checked for agreement with the existing conditions and for plausibility! PROFIS Ancl»wr(c)2003.2009 Hitt!AG,FL-9494 Schaan Hilti is a registered Trademark of Hilti AG,Schaan L-1 Z woo ssalanmuozuanoZwegBuluun laegolw 9094-99E(099)3NOHd :ON laagS :ON uolslnaa WVHONINNnO 13VHOIW S30VNVIN 3HO1S ra Wb sS3-a8W N021a3A _�30Muld Aa�3 d3f iNvonddv 3Yl�r d3 gaols IM :Pj0006joleuolssQJOJdl ia6eueW lOalwd Wa Wa :lauBlsaO :jalle,0 9 L/£Z/SO a3NM0 311S woo oul6u0lnsuoowoae5uosallew 43P :8180 lagwnry POlOrd EZL9-60Z(SZO:3NOHd LOW)loa-)Ilq&elgd- woo Pew-IeMOSsag M PIMP ZOZL6 a0'ONVIlaOd a33NION3 3a 1S dOS1V10 38 SZL L 499L-09£(COS)3NOHd 9ro LL-4OZ(6L9)3NOHd 1HOIa 31-11 NO 39111M 311S'Oa 8114003003/314 1S ONWIS LES-tlM NO IHOW d33X ONI'ONIl1nSN00 WOOV XOON XOVl9 SNOI1Va3dO O13Id SS3131JM latlWIVM NOSBlltlW NOIa Sa3NX3W V111dOS SS3H OIAVO LES-tlM OINM lIX3 Ol S3NVI Z 1H01a 3H13Sn h1NnOO HSIWOHONS M(1NIOd A3XOWS7OQOM3HVl OaVM01 3A11tl1N3S3ad3a aOV1N00 olu -LOV 01N I1311NV Ild N :10V1N00 1 VW1V LES-VM)90Z lIX6 Ol N S-I MOIIOd N S-I Ol N90ro-1/9 LS-VM MOTOd kVMSS3UdX31kiOdaIV Woad 3 9LS-VM 3XVl :(VM'0V1V3S-laOdalV 1VNOIIVNa31Nl VWOOV13111V3S WOad) 13AHs �33noo 31VO 3an1VNOIS 31111 :81111 Oulmeio SIVAO�Iddb S10b'1N00 SN0110�?JId JNI/�I�I EZZ96 VM'N010NIlaV 9N 1S PuZLL 0LOV ^ NO�/TI�V+ IC13W Adui UO 113J 11 V WJ ��vW�vAn 3000 Itl01a1O313 Sall NOlONIHSVM 4LOZ 1 0 1 V V V/V` 99-1,9 OVM S1N311YON3Wtl oNV SOaVONV1S'Odn ZLOZ O L L-LSOVM 3000 AOa3N3 31V1S N010NIHSVM ZLOZ I :olul paladL 45-L9 OVM S1N3WON3WV ONV SONVONV1S'0d1 ZLOZ ZS-LS OtlM S1N3WON3WV ONV SOaVONV1S bWl ZLOZ OZ U010USNI ONIC31Ins OSHI OVM 00E)Ni N3wV ONVSOa V91VS'O91Z)NI $IIVl ONIONnOaO Z-3 3000 3ONBa3d3a ONIMOIIOd 3H1 H1WL 53000 ONIOIInS 1VO01 ONV 31V15 N010NIHSVM O N I J N 117 fl S N O O 8H1 J18 a3/1O2lddd SS3lN S3000 3S914J 01 VNIWaOdNOO lON NLOM 1LWa3d Ol O3n81SNOO Be 01 SI SNVid 3S3Hl [N0,d ON1011n IVOIalO3l3 L-3 NI ONIHION S3t_UHOHlnV ONINa3A001VO013H1 A9 O31d00V SV S3003`ONWOI-1033H1 l0 SNOWONOO _•- 1N3aan0 3H1 HIM 30NYOa000V N103IIV1SNl O ia NV O3WNO3d 39 TVHS SIVIU31VVA ONV MaOM 11V S310N WMLL 131Va3N30 0-3 �`•'�� d 03SOdOad L-da o — /�/��� SNOIIV 13 ONIollne S-V weol 34v C13 A,O)IdV - 30NVIldIN00 3000 s•9v noaH9 �da ro-tl ,,�.�,y�.313 9 S 0301dIN3 £-V 1,N VUWd3Q ONIC]tfl4 03SOdoad Z-V _ NO0I Nodie i 0LT,1D 1 rmv JC3 a3sodoad L-tl (13dtlatld ONI011n9 d0 d01)T..9-,9Z S.10N IVa3N30 Z-1 000a ONI011n9 d0 dOD{.0-AZ :1H013H 3anlOnalS - 133HS 83AOO L-1 s.O ZZI, :(990AVN)NOI-LVAB121 ONnoHo 3 1 '^ .WVIE,OL.ZZL:3On1Iltl1 .9E 6S,60.94:3On110NO1 :(E9 OVN)ro 30ON 1 `a „48'E£.OL.ZZL:aan111V1 „9C'69.60.W3WILLION01 :(S9 OVN)E BOON NOIldINOS3O 133HS .OZ 6Z.W ZZV BOI11LLVl „O9'£.6O.9V:3On110NO1 :(£9OVN)Z WON zu :weal uolleluawaldwl S J N IM`d�l a d O 1S I .OZ6Z,OL.ZZL:3OnLIIV1 Avc,00.gv:BOn110NO1 :(E9OVN)L 3OON L09000009OC600 :GI 130aVd XVl J LI003131 3sn O3SOdOad II "�- (11V13a)W :dnoa0 hONvdnOOO I UO`IL/S�/ \ (IVIOa3WWOOhtlMH01H)OH SSVIOONINOZ � . SIBNISVO 1N3WdInO3 031NnOW OVd O3SOdOad(Z)3Hl NI 03I1tl1SNl 30 11IM 1N3WdInoa da o3SOdOad NOIONIIatl dO UI0 :NO1131asIanr 11V d008 NO Sa3d331S VIA SVNN31NV 3Hl 011N3WdIno3 MZA 3Hl WOad ONIlnON XVOO HIM IINn Sd0 ONV SVNN31NV 13NVd ll3O 11tlWS 031NnOW 1IVM aOla31X3 M3N 11V1SNI Ol S9SOdOad SS313'd M NOM13A LNalIO Mom d0 Dd00S N01iVMJ0dN1 103f M:]d dVW AlIN101A . E 13S 00 IVNId%OOL 9L/EZ/90 Z SNOISIA3a 91,/61,/90 l SNOISIA3a 9"V90 0 13SM31A3a 0O k00L 9L/LO/ro0 9 19SM3IA38 CIO k06 9L/SZ/£0 V uolslnaa oleo ON £ZZ86 VM `N019N11MV 3N 1S 4NZL� 00V NOIIIVC13W 0 IJ 9A 910Z 9.1 130�0 - ■ 1 P8AI000N 1,133 YlvWs Luvwmlvm N011Vtl.— No Vd0A N3—d 3H1 NIVW3e SNOI1VOIi103dS ONV SONIMVaU 11V NOISIA3N 1S31V13H1A90303Sa3dns 3SV ONNAVHO SIHI d0 83nSSI Sn01A3ad 11V 1VAOeddV N3LLjW HOlad 1nOH1IM 031N3W31d W13a 11VHS NMOHS MOM OI SN011VO1110011 e0 SNOIIVIHVn ON SNOISSIWO c NO SHONN3 ANV d0 S1NV11nSN0o 3S1AGV ONV SNOISN3WI0 A 11V IH3AISMW e01OVUINOO SON1MVNo 31VOS ION 00 F Z 6ulMelO PODUDJOI98 L•v 4S ON(10WI-11 ra wv md ABOUON130fmd 30N3a3d3a a Wa Papela0 alayM OO :�aye1O jagwnN laa4S Pap pa a�ayM 9L/£Z/SO v • ,,,,,,� jagwnNlaa4S� ales JOgwnN POWs N0113na1SN03 Ol a01ad 1NtllInSN03 © • • v 3Hi 01 S31ONvd3a0S10 NO S1011AN03 MV 180d38-133rOad j0 NOfin33X3 2f3dOad NOj 03afn03a Sv lagwnN pe1aO v SNOI11ONOO OONIISIX311V AdIa3A ONV 311S 3HI IISIA 1IVHS SN0IOV81NOO.8nS SIH ONV 801OV81NOD :,,,,,,.. I3VlagwnN I!e1aQ FSEUON AS QNV j03a3H1 AI11181SNOdS3a ON S3WnSSv ONV NMOHS SNOI110NOO DMISIX3 3H1 j0 MN3131dW03 uoi o3 03 a of s OJ 3 a I3 X3 03N3A03 381 11VHS U .LO lNOD-3H OnaiSN03 Y V NON SS3N103HU00 3H1331NVWnE)IONNV3 ONI11nSNOO WOOV'S83H10 A8 0301AO8d NOLMMOMI 1Itl130 31VOS 3JaV1 N01103 1M130/l IW�JNIQII 8 iS 03Sn 38 Ol SO 383 A'ON 8 O USI 3A 11VHS IVIN0 1NOU 3H1'Q3 O M3N �`d2� N J ONV SNO1IVAN3S801vnslA NO 03SVB 3NV N1383H 031N3S3ad3a SNOIIIONO3 DMISIX3 3H1 SI V N13na1SN00 313a3NO3 3a3HUL 'am OJNIISIX3 3HI H01VW Ol N0110nYY 313H NOO ITd NI H100111vHS N013Va1NO3 3H1'Q31dI00W SI N0113na1SN00 ANNOSVW 313a3NO3 I10 N 1 Nb'l�l O d W I a N 3 03� 3 DIVV4 ONV QNv S11VM sa001j 11V j0 S3HSINIj OM/N0110naiSN03 O 030GVNIISIX3 8V H31VW QNV HOlvd'Nrod3a 11VHS a013va1N001Va3N3OJ 3H1'031jIOOW 80 0300V 3aV :a0il6uIMe�O SW3ISAS'1V01M1D313'1V01NVH33W N300IH NO 03SOdX3 3HI 3a3HM NO 039NV88v3N NO'031JIOOW'03AOW3N 38 013NV"Ol3'VN11130'SNOIIIlaVd'SHOOQ N0110nNISNOO DMISIX3 3H1363HM'SNOIIV01J1OOW IvanionalS a0'1v31810313'OJN18Wnld 'NOl�JNIIaV '1VOINVH03W Intl a0j SV3NV Ol SS300V NIVOO Ol03NIn03a SV NOIlOnaISN03 EZZ96 tlM 3N 15 'NOUZL )N1T a3H10 80'VN11133'11VM'S8001j`DMISIX3 3HI AA1QOW 11VHS 801OV81NOD 3HI '9L NOFIIVG3 W NOWSNVal Hi00WS V 3AVH IIVHS 3an13na1S 3aI1N3 1130 1]VVYS 12jvvylvm 3HI OS NOI1VA313 ONv'30VaJ'H311d OJNIlSIX3 3HI H31VW IIVHS 8013Va1N :OJU110@fad 'N0113nN1SNOO DMISIX3 i331N SHIVd 80 SAIVM3OIS 313H0NO0'9N1AVd M3N 3a3HM 'K '3S1MN3HIO a310N SS31Nn'SNOIIV01d103dS 3HI NI 01038U3j31i NO SOONMVNO 3HI NO Q3AHVW AIIVOU133dS ION HOJnOHI N3A3'SNOIl10NO3 HVIIWIS -O N 1 J N 111 n S N O O a013Va1NO0 80 3NII IIV'dOj A1ddV 11VHS 11'NOI110NOO 3NO NOj NMOHS SI 11V130 3NO 3N3HM E L 3Hi ONV 1031lHDUV 3HI N33M138 QNIN ANV j0 dIHSNOf1V13a 1vn13va1NOO V 31V3a3 oVV4 38 Ol Q3nHiSNOO 38 ION 11VHS SNOUVOId133dS ONV S1N3Wn30Q 13VNINO0 3S3H1 9Z NOO 3HI IV 3 1VNOIII X3 NV1N01 OnalSN00 O3Nrod3a 31H d0 al V O 3HI Ol SVw3`JO O 1VNIdI ONV ��•)�\ 030nIONl 38 0103W330 38 11VHS O3aa3-AN1 310S 38 11VHS INv11nSN03 3Hi-103rOad 3HI ONnOav Mni3nalS 1N33VCGV ANV J AIBVNOSV3a SW 1V 3111 ONV Minv St/1NV3W 38V S1N3Wn300 3S3H1'1VSOdO8d/018 NO 311S OONIQlins 3HI 013OJVWVQ ANV AO I03IIH08V 3HI AJ1iON 1IVHS 801DV81NOD 3HI NI 03Qn1ONl 38 Ol QOO1S830Nn 0Nv 03W330 38 11VHS 11 N3Hl(SHIOJN3-1 3H1'N0113n81SNO3 M3N NVHI H31138 01 S39MVQ 11V 8IVd38 ONV NO113n8ISN00 :weal 3yy NVB'SHIOON311108 3'1)HIOJN3103SV380NI NO/ONV'OJN13VdS 033na3N'(S1N3W313 OONIISIX3 3HI Ol S3evywa 11V NOj 3181SNOdS38 381WHS 8010".LNOO 3HI 'Z L 1V8n10nals ao A111Ntln0 03SV3d0N1'0N1d1d N3`J8VI 80 839NONIS'(381AA Iv3I813313 '31)3ZIS 38MA a3OJ8V1 V S3HinO3a 1N3WdInO3 j0 3031d a0/ONV W311 NV dl'31dWVX3 SNOIlv11v1SNl IIV a0j S1N3W3aln03a VHSO IIV 133W-1IVHS aOI3VaIN03 3HI L L NO 8Oj'SOJNMv8a 3HI NI 03QnIONI 38 Ol OOOISa30Nn ONV 03W330 3HI 38 11VHS 11 N3Hl N JMI N.7d18 A3NVdn300 NVWnH a0j 03NOJIS30 SI ONV Q3ldn330 SI 'NO1110NO3 9NINa0M 3-NS QNV 31vnO30V'313ldWOO V 30IAONd 01 SNOIIV31j133dS S30 Sd`V1I N0113na1SN03 OOOOJ oNv'S0avNoilon ISNO ON18 1ddV Ol AlIl10Vj SIHl'A1NO S3SOd8nd Nrod3a 80313NNOS83d 33IAa3S 33AOIdIN3 SS3138M NOZIa3A AB WnWINIW 3S3H10330X301033N SIN311 ANV j1'NOI1V01J1D3dS WnWINIW 3HI Ol OJNIOa033V'313'3Sd ONV E) 13VNe3N8'3OJVWVO lSNIVOJV NOII3na1SN03`OV81 O D 3HI AINO(301Aa3S 3811M Aj1110Vj iNgINWO3 3NOHd3131 SIHI IVHI S31JU1333 SS9138M NOZIa3A 'Z 03a1nO3N 3aV SW311 IVNOIIIOOV N3HN 80r 133HUO3 ONV 3131dWOO V VNIOAOad WOMA 11V JNI13310ad ONV OJNI3vN8 A131tln030V a0j 3181SNOdS3a SI N013balNOO 3HI OL 838n13tljnNvw/N3nddns 8O/0NV'bOIDVN1NO3-8nS'a013VaiNOO 3H13A31138 ION •N01110NOO OONIISIX3 NVHI 831138 v Ol SV38V OONIONnONNn3 a3H10 '331A83S av1m130 3118nd SNIMAOad j0 3SOd8nd 3HI NOj SIVNOJIS OIOVN j0 NOISSIWSNVal 11VHS SIHI In8 NOLLOn8ISNO330 SNV3W 318VId330V WnWINIW v 38 010313ada3lNl 71 'r3Hi aO-A 03Sn 38 IIIM QNV iN3WdInO3 SS300v 03131a1S3a HIM A11110VA 03NNVIN NV SI SIHl 'l 38 1TdHS SNOIlV01d133dS ONV S1N3Wn000 N0113na1SN03 3S3H1'1N3A3 Aa3A3 NI '4Z ANV 3HI 0 0113 MOO 3HI 1V 1 S NOI On8ISNOO 3HI WOaj SIaB30 11V 3AOW38 'NHOM 3HI j0 N0Iin33X3 3Hi ONIanO S31116OHlnv ON1011n8 ONV S30vai llv j0 do Nv313 AIIva aOj 31819NOdS3a 38 11VHS a013V81NO3 3HI '6 :weal u01muawaldwl N O I l`dW�I O N 11� ('O ey d WOad SWAONddV ONV SNO133dSNl ANVSS303N 11V OJNIan30ad NOA 3181SNOdS38 38 11VHS SN013va1NO3 8nS ONV a013vaIN00 3H1'NaOM 3HI HIM E)N1033308d S313Nvd3N0S10 ANV d01Nv11nS03 3HI AJ1ION ONV 031JI83A 38 11VHS SNOISN3WI0 3aOj38 S3OJNVO 03SOdOad 3HI NOj 10VUlNOO 3 I')18ONi lnB 3HI WOaj S1VAOaddv 1V3111N3'3S1MN3H10 0310N SS31Nn'S1N3W313 j0 3N11 a31N30 3HI 01 NO SIN3W313 ANVSS333N IIV 0NI8n00Nd 804 3181SNOdS3a 38 IIVHS SNOIOVa1NO3-8nS ONV 03HSINIj j0 33Vj 3Hi 01 a3H113 3aV SNOISN3WI0'SOJNMvaO 3HI.31 d0S ION OO '8 NOIDVNINO3 3Hi NOLLI00V NI')18 M 3HI HIM OONI033008d 3801381VAONddV SIH NOA 'NOIIVSN3d1M03 IVNOIIIOOV ��O IJ;BA S39NVHO 03SOdONd 3HI j0 S31dO3 V HIM 1031IH08V 3H1301A08d 01 A111IBISNOdS3a S,N013VN1NQ3.8ns 3Hi QNV S,a010VNINQ3 3HI Sl II NBHI'SNVId 03AOaddV OJNI113OJ NOl3va1N00 18 3HI VH 113Va1NO3 3Hi j0 NOJIS30 3HI NI SNOIItlinS 0W 1VNIE)180 WONA 31VIA30 OI AUVSS303N 11 ONU 8=VNINOO'8nS NO 801OV81NOD jl 'YZ NONIW 3NVW Ol 1HOJIN 3HI SVH 1NVNOIIVI 3 3H1'SI3113NO3 ANv j0 iN in638 00 3HI AjIlON 13W 3Nv 3ONVN3INIVW ONV NOIiV11V1SNl NOj S30Nvav313 03aInO3a llt/ Aa3A1130 S3000 ONIOIrB 318VOIIddV Ol OONIQa03OV 1VHI QNV'S1N31N313 1van13na1S 80'OONIBWnId'1V31813313'IVOINVH33W 11v ONV ANV :1ua93 31VNIOa000 01 NOi0VHiN00'SS313a1M NOZ183A A8 0301AOad 38 Ol XVOO QNV SVNN3INV 'O L mine Ol UMOVNIN03 80/0NV a3NM0 3HI j0 A111181SNOdS3a 310S 3HI SI 11 ONV S3000 j0 SNOI1VOO1 3HI N33M138 ISIX3 S13113NO3 ON IVHI Aj1a3A 11VHS a013VNINOO 3HI 'L 318v311ddV HIM 30NVIIdY403 NOj M3IA3a aw S3w8oHlnv OONIQIIne Iv1N3WN83AOOJ e 'SJNIN3dO-unON00 lIV 010311IW8nS 38 01038Vd3ad 383M SNV1d 3S3H1'13311H0NV 3HI.01 NOIIVSN3dW03 -XaOM 1van13311HOaV NO'IIAI3'ON18Wnld'1V31a13313'1v31NtlH33W'IVan13na1S Hoi ONV 1NVIV3S 3NO0Il1S V HIM JNI011ne av1naon O1N1 SNOI-LVai3N3d iinONOO IIV IV3S '6 3lVI8dO8ddV HIM ONV OJNIIIaM NI iN3W3389V A8 1d30X3133rOad SIHI Ol NOISN31X3 SOONIN3d011V A0 NOIIVOOI ONV 3ZIS 31VNIOa000 ONV AAR13A 11VHS HOI0VaiNO3 3HI '9 80 S103rOad 83HIO NO a3NMO 3HI A8 03Sn 38 Ol ION 3NV A3HI'ION NO Q31n33X3 HlIM 13S 00 lHNld%OOL 9L/EZ/90 Z '1NIvd JNIZINVAIVOJ OI03/ave JNIZINVAIVOJ 6L£-1031a3 SI 30VW 38v A3H1 H31HhA aOj 103rONd 3HI 2I3H13HM'10311H3Ntl 3HI j0 u83dO8d 3HI. SNOISIA3a 9L/6L/90 L 3Sn'OJNIQI3M-OWa3H1 A8 Q30VINVO N33 S33 8 3AVH iVHI VjanS 03ZINVAIVJ IIV a IH lVd3a '8 NW3a 11VHS ONV 301Aa3S j0 S1N3Wna1SN1 3NV SNOI1VOIj133dS ONV SOJNMVNO-NVId Q311dW03 3811VHS 1N31NWODS is83SOW j n.Lpv NV1N 1 I'I3V8NO0 SIHI b30Nn 3SOHI1 Nbom 3NO 0103imn ION SI NOIIVWNOdN1'A8V1N3W31dW03 3HV 13S SIHI j018Vd SNV1d '£L S3Hl ioluv O1nO3 H3 HM 31 S 80r 3Hi 1VSNOLL10 03 ONV SNOISN3W G`VNIAdla3n SNOISIA3a 9L/ZL/90 0 'ANVd1N001V011M3H3 Na08aV3Q A8��v 301X0-ON..SV H3nS ONnOdW03 3QIX0-IlNV NV a0 ONI1V03 3A113310ad 'a j3NM0 3Hi O11S03 ON 1V aO1Va3N3J NO 3181SNOdS3a 38 IIVHS N0I3VN1N038nS H3v3 ONV N013Va1NO3lva3N3 3 HI 9 13S M31/\38 CIO%OOL 91/L0/40 ra IVN3811 V A1ddV'SQI3MOV3 ONV SdWV10'SNO1103NNO3 ONmrio IVNa31X3 IIV HOj •L AN"OdYM V 3OIAOad IIVHS a013Va1NO0 IV83N30 3H1'3A08V LZ OM/OZ'6L S310N NI 0381NOS30 SV S3anSV3W AaVSS303N 3NV101 S11Vd a013VN1N031va3N3J 3HI SI ZZ OIVd a0 031d333V 38 IIIM I 136M31A3N 00%06 909Z/90 v '-lvnOa 03AOaddV NO LOOZ£811 SV H3nS 80103NNOO Q3111a0 VW3N 310H 'ION a0 SAVH ai 00 13va1NO3 3Hi NO NMOHS a3H13HM iX3 8 4 SN1 NV O Naawls uoislnaa ale ON 1108-OMl V 3Sn'SatlB ONf10aOJ 31v1d HO1VH QNv 3Wtlaj OJNI011nB Ol JNIONnOaOJ a0d '9 'N3NM0 3HI A8 03AOaddv 38 Ol aOlva3N3OJ AatlaOdW313H1 HIM N338 3AVH OIn03 H01HM NNOM aOj NOIlvSN3dW03 valX3 aOj SWIVIO ON NIAJ181S Q31v130Ssv S1SOO'Q3131dW03 SI N01133NN03 ANbdW03 83MOd 3HI 111Nn aOlVN3N3OJ SI 480M 380j38 311S 80r 3HI IV S3111111n ONV SNOLLIONO3 OONIISIX3 IlV OJNIAj1a3A Sf11OVa 8 j0 WIN V 38 01 SON38 IIV ANVaOdW31 V NrolNIVW ONV 301A08d IIVHS a010VN1NO31VN3N3OJ 3H.L'31VO 03MO38 NOd 3181SNOdS3a 381WHS N013va1N038nS HOV3 ONtl a013va1N031tla3N3OJ 3HI 'b 'SON38 daVHS QIOAV'3181SSOd SV 103a10 ONV INOHS SV SNO1103NNOO ONnodo Ilv 3NVW '9 S,83NM0 A8 NO1103NNOO N3MOd 3H1301AONd 01318vNn SI ANVdW03 N3MOd 3HI Al 'LZ 'a31V3HO SI a3A3H31HM t SN01133NN03 'ANVdW03 a3MOd 3HI WOaj NOI103NNOO a3MOd 3Hi j0 NO1131dW03 j0 31VO '103mbd 3NI1N3 3HI AO 30NV1d303V lVN1d 3Hi 831AV 8V3A 3NO 80j 80 3WI1 ONnOHJ OJNIa1n03a S33vjws WOaj IaIO IIV NV310 ONV INIVd IIV 3AOW3a A1HOJnOaOHl 1, O3IO3dX3 3HI d0 NOIIVWNIjNO3 N31118M NIV180 IIVHS a013va1N00lvN3N3J 3HI OZ j0 OOIa3d OVS NIH1M dIHSNVWHNOM a0 S1v1VHS N NI S133j3Q HI'd1HQ AVW dOM f NaOM 11V 3SN3dX3 SIH IV 3OV1d3N NO alvd3a 11VHS a013vNIN00 3H1'dIHSNtlWHaOM 1nOHOJnOaHl 3aVMOatlH 1331S SS3INItl1S 3Sn '013'ANV`dW03 a3MOd ONV SIVIN3IVW N1 S133j3Q 1SNIVOJV Q331NVavno 38 I1vH3 HaOM 11v'0310N L Sa013n0N00 ONnOaO 60j SN01133NN031V31NVH33W lItl a0j Sa3HSVM N301 301AOad 'E 3HI HIM SNOISSn3SIQ 1vBN3A QNv N3111aM'a3MOd NOj NOIIV311ddV OONeaMMONNOV 3SMa3H10 SS31Nn'M3N 38 11VHS I0Va1NO3 SIHI a30Nn 03HSINNnj IvwBivW llv '6 ANVdW00 N3MOd 3HI NONA 03A13038 NOI1vIN3Wn000 11V d33H Ol O3a1nO3a �JNI11aM NI a3NM0 3Hl A8 0313nN1SNl lI1Nn HNOM a3H1Nnj ' 'N0113naiSN03 SI a013tlN1NOO 1Va3N3OJ 3Hl'13va1NO3 j0 ONVMv NOdn A131vIQ3WWl 83MOd JNIlav1S 3aOj38 A3NVd3a3S10 ANd j0 1NV11nSN03 AjIlON ONV H1a0N 31I3NOVW IVI3N3WW03 aOj OJNIAIddV a0j 3181SNOdS38 38 ITMS a01OV81NOO 1Va3N30 3Hi '6L HIM 0333ONd OI ION SI 8013Va1NO3 3Hl'031dIlON a3NM0 3HI ONV 03ON3dSfIS AjIa3A 11tlHS a013V81NO3'HibON 3nm Ol Sa3j3a SNVId NO NMOHS MOaaV H1a0N 'Z 38 Ol SI 8d 3HI OMA 1 3:133 1VW 0*IVAOZVH 30 33NO1 IA3 J1Nw3 IN31v i S3WI1lly 1V O3NItl1NIVW 3S3H1 j0 30N3S3ad 3HI WOaj Sl33jj3 ANv a0'IVAOW3a 3Hl'N011v31jINW30N1 3HI 1331S SS3lNIV1S 38 381SnW ONnONOJ a3MOl'N0113383 a3M0101 NOW OON ONnOaO IN3NVWa3d Ol NOj AII1181SNOdS3a 1d333V ION S300 WOOV'103rOad S1HI j0 S3NIAN00 3HI NIHIM 1nVHS 31383NO3 O1NI S80HONV 11V'0310N 3SMa3H10 SS31Nn S1108 XMX I111H 38 INNS 03103NN03 38 Ol 1331S Ivanl3nalS NO1IVQNnOj N3M01 anOd 313N0NO3 Ol aO1Nd SOlS38SV'OI Q311W11 3n NO0 01 ON31Nl'1S300 W N*ano ON j0 3ONSVH V4 3HI I SNOHONV NOISNVdX3 31380NOD'03iON 3SMa3H10 03ZINVAlVO 38 IIVHS SN3HSVM ONV 030NnONOJ 38 Ol 1331s 1Van13nN1S NOlVQNnOj HWOI'SNOIIIONOO ONV1MVa NI '8L 01 SV NOIIVOJIIS3ANI ANv 13nONO3 Ol ON31NI 11 S300 LION'0313nON00 ION SVH W03v 'Z 'S1nN'S83N31SVj 03SOdX3 IW'3NVld 3HI WONj 03QnI0X3 SQV38H1 HIM SNO1103NNOO NOIlVAV3X3 ANV Ol aOlad S311111in 031ane-IIV d0 NOIIVO01 AzlIa3A 'LL 'HO1OVa1NOO 3HI AS a04 01Vd ONv 03NnOONd 38 11VHS NOIIOIQSlanr i Nainonuoo 3dA1 OJN18V38'VIQ'NIW.9/S 38 11VHS Sa3N31SVj'9Z£V WISV Ol WNO-4NO3 IIVHS OJNIWVHA JNIAVH A11NOHlnv A8 03ain03a"013'S31VOIjIlN30'S3SN3011 AHVSS333N WOOV d0A183dO8d 3H1 NIVW38 SNOII 13103dg 1331E lvani3n8ls aOd Sa3N31Svj Ivani3nals IIV 9£tl WISV NO LOW WISV Ol W80ANO3 aNV SONIM"'"'11111A381111V13HI 1113a3s83dns NaOM OJNIWHOdb3d 0l aOlad SNOISN3WI0 JNIlSIX3 11V AdIa3A '9L 11V'SN011vinJ3N ONtl'S33NtlNi0a0'53003318v311ddv lltl HlM AldW03llvHS Na L 3W ONMVtla SIHI AO s3nssi snO_Ud 11V 1-OUddV 1WHS S318W3SSV INOddns VNN3INV aOj Sa3N31SVj 1van13na1S 030V38H111V 'L N3_Um 80I8d—H1IM 031N3 W31M 38 IIVHS NMOHS 880M 018 Nouvowiao W 805NOf1Vn1VA ON SNOISSI NO ' 80S80883nNViOSINvllnsNO03SIAOVONVSNOISN3WIa S310N VNN31NV/3NI� S310N ��13N3 F 11V. IN-15nW 8010V81N0050NIMV803IVaS ION 00 F f NV-ld 31lS 43SOdMJd — N „L:3,dZ)S,.LLx,.LL I H 7 �� ��0-AZ=.�L 3lV�S,.6fK.ZZ :ON wogS :ON U()!wby H1aON rd wM pmaa 10(UwjSzoJold aa0euepy m wd wa wa aauOle.o uopmo 9 L/EZ/SO :plop logwnN 108!Ojd S0do d Nd :9I1116uIMelO EMS VM'NOlONITdV 3N 1S PNZLL Mot, l NlVNS i 3W H J 1 1 1 1 1 1 1�30 T�dWS b`dWI`dM M3NM :Olul loalwd \ E)N1>Iavd i.d I IMISIXI ONI JNI11nSNOO umal 3VV Noon Noe,e 0131d N3d0 �\ JNIlSIX3 oftillillill � H 1 im iiiiiii :weal uolleluawaldwl N*ff H321M H JN1Jl JVd —lavwlMnn F1 �+4] JNIlSIX3 pUOziaan yl h h-I IhI I I b 0d+H4fl—H*H+ HdAg luall0 13S OO IVNI3%00L 9L/EZ/90 Z t \\ SNOISIA321 9L/BL/SO L SNOISIAM2I 9L2 ,L/SO 0 V13H j 13S AAMA3IU CIO%00L 9L/LO/60 9 EJNIISIX3 \ _ - M3aM CIO 9L/SZ/EO V llM1321 JNIISIX3 f� uOlSlAay ale❑ ON 13SM31A3i1 1 — C� JNIISIX3 �\ -Q O - 18-91VIS) GVO& 8W003003 NOI1VNOdNOa m WO3V d0 A1N3d ONd 3H1 NItlW3N SN011V013103dsSN3 ONVSONIMVNOIIV NOISIA--i3 3H1 A00303d05 �l 3NV 0"'"'SIHI d0 S30SSI Sn--d IIV IVAONddV N31 l—NOINd 1nOHIM031N3W3IdWl30IIVHS NMOHS L� NNOMOLSNOI1tl01310aWNOSNOI1—VAON SNOISSIWO 11' YO SNOML3_10 C111Y11n4N0a 15V19v ow CNo Nina IIV A31N3A 1SOW NOIDVN1N00 SON—O 1IY01 lON 00 .9 19L OZ ,ZE ,.0-.1..094:31VOS..LLK 7 NV-Id - 0OMJ 43SOdMJd .A-.L=„ZE/L:31VOS..VCX. z ,ZZ Z—v H1aON -ON1•04S :ONuolSlnaa VIV L JJ ra AV :pXX"JO leuolssaloJd J•Mu■W pY1Wd Wa MI UKISI-o ayeiO 9UEZ/SO :aleO JagwON;WIOJd NV-1d =1002J a3S0dMJd o l ❑ �do I m111-11W VNN31NV031NnoA 7t SS3I3HtAA NOZR13A EZZ96 VM'NO-LON1121V f 3N 1S POZLL 0LOP N0II-1`d43W 1-13011VINS INcIV AVM :O;ul IOOfOJd 1 ONI �N11 1nsNoo SVNN31NV SVNN3INV 01213MOd� T N381d N031W3.,Z W •' :(dA-L)S213d331S NO / S11naNOO SS31 M 3H NOZIHM—/ _ :weal •rb '� I�I u 'NOIl'onUiSNOJ E)NIw(]NOIIIONOO 0NIISIX3 SVNN31NV 01 H3MOd \ v Sll NI W31SAS JNUOM:1 3H1 '8 M381j 210d 1W3„Z(L) • £-V Z-V ,^ nJ0a Nov-18 NIVINIVWOlAl11191SNOcIS321 $dAl)S213d33ISN0 0 [] © L Z z, S1801OV'diN00 31-11 S11nONOO SS313MVANOZRI3A— SI lI iAl31VIO3WW1 N3DVNVW © Q FA © — — Noiiond1SNOO MZA 3H1 01 12JOd3a IIVHS UOlOVHINOO © © Q ©I J 3H1'Hn000 OO S30VWV0 ANV I dl'WNOd 803dVHS'AVMANV NI W31SAS 0NIzIOOU`JNIISIX3 Q 0 :weal uolleluawaldwl 31-113SVWV0 a0 8an1S10 lON I1VHS UOlOVHINOO I :31ON Q u ozia an Z Nb'�d 1N3Wd1f103 a3J2J`d�N3 .0 .L x A L 1V05„LLX.LL SnA VOS„bEX.ZZ '8VO'dlfl03 O31Nnm ■ —OVd SS31321IM NOM:13A SVNN31NV Ol r..Ila 318VO HEIBIJ HOd IW3 2(b) • o t :S11n0NOO 031Nf10W m E IIVM SS313U M NOZRl3A i0MA ONIISIX-, 0 13S OO lVNld%OOL 91,/EZ/So Z _ O 0 SNOISIA38 9L/6L/90 L SNOISIA3a 9V L/so 0 0 '� 13S M31M3 1 00%OO L 9L/Lo/YO 9 0 »01.5RA .L15 L c 135 M31A32i OO/006 9L/SZ/Eo V ID •� (�I © © N o 0 uols!nab ale(] ON I r 1� £'V 0Vd 313UONOO ' I 0 � ��o e 0 '[] 1 I F £ „0-.b X X-.4- (13NIEIV0 NO)b31N30 0VO-1— £_V I 6#300N ii3Wb0dSNV211 I �J (031Nnon OVd)131\1I0VO A1nun ONIISIX3 1N3WdInO3 SS31MI M NOZlbl3A- V3aV IIVHdSV SNIISIX3 f l (dAl)SVNN3INV 031NnOW 1 IIVM SS313HIM NOZIa3A N01"UOd HOO WOOV d0AJN3dONd 3HJ NIVW3H SNOIJVOIdl03d5 ON SONMVVG IIV NOO I5305 93N 3HId d G03003SU3ns NOIOO ON10 3 V IIn8�JNIISIX3 HO1VW +, N311NM NOW JOOHJIMO3JN3W3ld I3ellVHS NMOHS 0132iVM02lVH IIV 0NV Iln0N00 ILIQIj,; NaOM OJ SNOIJVOIJIOON NO SNOIJVrovn ON SNOISSIWO 'S13NIGV01N3WdinO33H11NIVd NO SHONN3 ANV d0 S1NVJ10SN00 3SIAQV ONV SNOISN3WIO llV"IN3n JSOW HOJOVN1N00 SONIMVNO 31VOS JON 00 N011t/A313 `d32Jb' 1N3Wdlfl03 a3J2J`d1N3 ''® 9L/E3ltl0S.,b£x„ZZ H1aON CIE 31VOS.1M.L� Z -V v � S3c] N`dld 30MJ 43EMVIN3 ` ,Z ,E A- ,.9/L:31VOS„Kx„ZZ,A-,L=„b/L:31V05„bEx„ZZ E_V z ON IMIS :ON UOISIAaa ra wd :plooay)o leuolsse/md aaBeuey�loafwd wa wa 7c# 9AZ/90w:ale(] :lagwnN loafwd .A-.Ot SNO1-LVA313 '8SNVId 4302Jb'1N3oN o :a011 6uIMe/ (a0100`JNI011r18- — - .. �', <• ,, .OLL (] (13N19V0 NO)a31N30 OVOI FN-1i IX3 H01VW 01031NIVd ;„ :•• - ZY Y300N V O31Nr10W OVd)13NISVO EZZ96 VM'No1ONnaV 1N3WdIr103 SS313aIM NOZIa3A 3N 1S POZU OLOb -- — - — — — ___ "�' '�• - I 4#300N= 1130 TWNS D:1VVYTdM - 1 ��JNI011f18�JNIISIX3 :olul loafwd � - -.. ;K, 'ONI JN111f1SN00 — - �•' ' .O'.Z (dAl)SVNN3INV 031Nf10W a NI 0100 J011r19 9NUSIX3 HO1VW Ol 11VM SS313aIM NOZIa3n 38VMOaVH 11V 0NV S1UlONO01NIVd a391d aOd 1W3„Z(L) dOOZI`SNUSM3 > 1613MOd a0d 1W3„Z(t) :wea138tl SVNN31NV •.�, M1r. •i - •-.c Ol a3MOd S a391d a0d 1W3,,Z(b) • ''e :S1U10N00 031Nr10W IIVM SS313aIM NOZIM A WH3N81zlaO O w3 2(Z) :(dAl)S83d331S NO S11rtON00 S6313HIAA NOZIa3A— :weal uolleluawaldwl .L 0 -9 t ,A-,L=„Z/L 3ltl0S„LLx,.LL ? £ 18 Z S340N @ Ndld 30MJ 43ENJYM3 •► -0 .l L £ 11`dl3a d`dd 313230N0O Q� „0-,L=.d 31tl0S.,bEx„ZZ „0-,L=„b/L31tl0S„bEx„ZZ H18ON /� -U OZIJ cIA SVNN3INV Ol b3MOd .. '8 H38ld a0d 1W3 ,Z(Z) dAl MINX � rl :(dAl)S?J3d331S NO � > s..•>•• ue S1U10NO0 SS313aIM NOZIa3A E a3af110Vdf1NVW J ONIiS ' dl Z AOOa' 1D`C--/ 13NISV0/M3IVNIOa000 , 4' 135 OO lVNId%OOL sL/ez/so z (13NI13V0 aid 4 NIW) OOZAH I111H/M,.£ SNOISIA3N sL/sL/so L O39W3OOa03OV3aHJ-0 �1S' � - ':, ,•t• - <<-••d-=-��- SNOISIA31d 912L/90 0xz 13S M31A3210O%OOL 9L/L0/60 9 'I �1 n 'i - I I �.1 +'� .♦� /� �\ 13SM31A38 00%06 9L/SZ/£0 V uolslAail ale(] ON 'dAl-3003 a3d1NVH0..t y I '" I I. - „':•, `•• \ aIW 1V'0'0„8 @7 9#/M OVd 313aON00 NH1.9 L#300N 0 .0•OL Jr (dill)SVNN31NV 031Nnon Z 11VM SS313aIM NOZIa3A 0 0 4-V L-da o m YO.1WOdYDJ WOJV f0 Alb3dOtld 3b1 MVW3Y SYOI1VJ11C13d0 0f1Y 90MNAV vvo%.l jo 63Y l.,%A&A LL AO 03039Y3da9 7YVONVNVY0 OY110Y03M] Ild"I s1V it W.d V b Vcm01IIAA tm*LOlW nONLM03 Q?MMlVWI 3Y11V11Y 1"no UYONOL9Np*11lMOWb0%/O AM110Y.0 N3Y10 YO 9YOYtl7 AMI.p YiNY1N91Y)J 39MOV OYV 9NO19N3WI0 11V AfIY3A 1CIIW t101JYY1MOJ{ONYAWO TVJ9 tOM 00 ,A'.L=..O/E:3lVO5..Llx,.Ll .l A 9 M31n Md1d - cinM HS `�NN31N`d ® E:3,tl09..bEX.ZZ Z N011V �313 - cinMAHS VNN31N`d ® Ad= /E 3lVOS..bEX.ZZ �-`d Z :ON IaayS :oN uolslnaa ONIalIna 9NIISIX3 Ma INV HOIVIN 01 a0100 aNV HSINId dad :pmooll Jo IeuOlssOlad :Ja0euelnl 108[Old dA1-shoe dad "Id wa :Jaublsaa :laye�a 'i ONIaIIna ONIISIX3 „4/E(Z) d 9L/SZ/90 .O AL HO1VW Ol HO100 aNV HSINId dad V3 4/Lx4XV xb 3l0NNV d dad :ale( :IagwnN ioafwd 13NVd dad dAI-SIlOB dad „b/L/M dO1'9 IN01108 WC(Z) H11M a3N2100 II/Lx4x► 310NV dad V3 IF/Lx4x4 31ONV dad �I S11V134 s �` os -�- --- -- --- ------ —� ami H S J V� 13NVd dad„4/L _ —T 13NVd dad„b/L I 1 a Ua dAl-11O8 —j- - :allll6ulmela N 1108 dad dad,.4/E HIMa3N210O I— _ _ _ _ _ dAl-1108 0 4/E/M d01 8 W01108 V3 4/Mrx4 31ONV dad I _ I 1 x x I - — �- V3 b/Lx4 431E)NV dad 4/L 4 4 31ONV dad EZZ96 VM'NOl911Il8V - — _T 3N.LS PuZLL Mil, —7-— — N0111V03W g -- -- - - - - -- - - - — -- :Olul 108101d Y�V E �11VM / 040018-AO 3009 V W011o8'd01 Woad .A•Al 'O N I J N 111 n S N O O nno ONIISIX3 J „4:1130 d0 H31N30 NI(131VOOl 38 Ol SHOHONV ILJ -a3lnoHo ION S1130 dI 38n1 N33HOS 3Sn) 3AIS3HaV OL-AH I1-11H HIM.,Z 038W3'OOH a30V3aH1 0,*(9)/M-11VM Ol 03WHONV amiHS dad :weal 3BV T17 11JOa !IJ V 18 weal ugleluOUlgduq £ N01103S - onMJHS VNN31Nb' �` 4 d .A-.L=�.b/E:3lVDS�.LLx,dl � 13NVd &13 -Ln0H11M n313 - onMAHS `dNN31NV '`® ..0-d=..b/E 3lVOS..bEXZZ �.0-.L=.Z/L-L'dIV0S..bEx,.ZZ EM(nne EMISIX3 HO1VIN 01 a0100 ONV HSINId dad /M0ziaan dAl-S1108 dad b/£(Z) H11M a3Na00 V3 4/Lx4x4 31ONV dad u nna 13NVd dad„4/L I 11yM dAl-S1108 dad E ! nW0 EMUSIX3 .4/£(Z) HIM a3Na00 V3 4/Lx4x4 310NV dad 13S OO ltlNld%OOL 9L/EZ/SO Z rh o (a3lnoaE) SNOISIABil 9 L/6 L/SO l I / i ION S1130 dl 38n1 N33aOS 3Sn sNolslnaa sLaL/so o ® __ 3NS3HOV OL-AH I1l1H H11M„Z 038W3 O O� 'OOa 03aV3aH1 0.,f(£)/M IIVM Ol 3?J W%OOL 9L/GO/40 B - _-__--- --— _ O o 0380HONV lnalswn AIVO,.9/9-L x,,9/4-L 13S M31n I I 13SAAMAMI a3%06 9l/SZ/EO IN zvnaamaa zvm&m!au0lslnay ale( I I dAl'1108 I dA0 1 dad,.4/£HIM a3Na00 VNN31N V3 WM7x4 31ONV dad l+ I v` (NOOl8d030039W01108'dOlWOad ----- - --' -------------- -- ------- „b:1130 d0 a31N30 NI allVOOl 38 01 SHOHONV-031no8o ION S1130 dl 38n1 N331:10S 3Sn)3AIS3HOV OL-AH I111H H1IM„Z a381N3'OOa O30V3HHl0„4/L ,0's .0-,9 d01'8 IN01108 -49)/M 11VM Ol GAHOHONV anONHS dad 4i 310NV dad 13NVd dad„4/L - i I NOIVNOdNOO 13NVd dad FN ��l V 30 Attl3JWL/M W01108'8 dOl d)U-1109 O IIV NOISIA3N IS31V13HI AS 0303SY3dns Y0 SIH1 dO"nSSI sn—Nd 11V IVAONddV b/Lxbxb 3lONV dad dad„4/E HIM a3Na00 INd 1nOH1IM 031N31NMM 3511VHS NMOHS OI1VOIJ10OW NO SNOIIVIHVA ON SNOISSIWO V9 WMx4 31ONV dad V d0 S1NVlloSN00 351A0tl ONV SNOISN3WI0snW NO13VN1N00 SONAAVN031VOS ION 00 NOIJ-VAEI-3 1NOb3 ® „b9,E 31VOS.,LLx.,LL CH 7 .A-�L=..ZE/E 3lVOS„bEx„ZZ J_ V V :ON 1404S ON uaSI%0J ra W" NOl VA11131N0:1711WtJ3A0 pmuea to louolssatad :la6eueW r'olad Wa Wa :,coolsoa aoge,a 9 uszi90 — :Blea mCjwnNP-fad = Fu I -_ SNOUVAT13 43 SOdMJd �.� OnOaHS dad ONIH38 dn0 OnOaHS dad ONIH38 dn0 8 naa'VNN3INV SS3l3aIM naa'VNN3INV SS3l3aIM ti NOZIa3A O3SOdOad NOZIa3n O3SOd0ad :011!1 Bu1lne,O EZZ96 VM'NOlONI18V 3N 1S PNZLL OLOb RIM NOI11` (13W 1130 IIVNS -L JJVNIVAA :oyul laalo,d (aUIS 1331) NOUVA313 1NOb3 a3EMVIN3 -IVLLb] 'd ONI JN111r1SNOO Alin f) t= went 37V ". ^ V \J^ ————————— ——————————————————————— n(� �3 s ' . ---- vso 3:4Si�V7Af �C.^; �,? ' ,• j'yy f( --- — I jOOM j0 dM rl ,.rr~ Sc'• } �., t f � 'i:: S,v '- •x:a t: cr.r k+ }� ' �w:?� fE _ s.9Az d0 i; ?' 13dVMVd dt OnOaHS dad ONIH38 dAO v naa'VNN3INV SS3l36IM 1HJ13H dil vNN31M! NOZIa3A 03SOdONd :weal uo0eluawaldwl t-d21 V-V Z z uoziaan ONImIna HOIVW 01031NIVd On0HHS VNN3INV luallo SS3d3aIM NOZIa3A O3SOdOad :310N - S 13S OO-1VNId%001 9L/EZ/90 z 3aIS 1H9Ib) NOLLVA313 1NME 43EM1 N3 - IVLLl ]Vd SNOISIA3'd 9L/6L/90 L SNOISIA38 9L/ZL/90 0 13SM31A3a 00%OOL 9L/LO/40 8 138MAIAB'd OO%06 91/9Z/EO V - uolslnaa alea 'ON 13dViiVd do dol - - - - _ }r Li �:d 2 ..t .:,.2• r:"�"rc+' •,y. -•t'. 113dV!!Vd d'JV i3O•,9Z 0 dal ' OnOaHS dad ONIH38 dn0 y.V lovs,o.az v naa'VNN3iNV SSTD3 JIM H'JL3H dll VNN3INV -NOZI MA 03SOd0ad 4 by i-da I z NO11VNOd NOa d0 A1N3d`Nd 3H1 NIVW3N SNOI1VO11103dS FHO�8�ANV7309INV�flSNO03SIAOVUNVSNOIVN3AlO IIV NOISIA3tl1S31V13H1AB03a3Su-s o GMl/O 4)nSMCnOIAIWllyWAOV dV1nOH11M 031N3W3ldWI 3B lltlHS NMOHS OI1V01d10OW NO SNOIIVINVA ON SNOISSIWO d0 S1NVIlnSNO03SIAOVONVSNOISN3WIO nW eOlaVN1NOa SON-0 31VOS ION 00 3lVOS O110N 31V 0S„LXLL M31�1NOtld 31V OS110N 31V oS-7SNOUN013103dS 13MOV0 S31'dVH0 31VOS 0110N31VOS„KX,,ZZNOld2� 1J13N00 bNN31Nb a3SOdObd 31VOSO110N31V0S„K..ZZ V—J j G HIHON 31E ON MOMS :oN uo1s1A0a ra Wv HIM OwOaalolUL"%%O101d :J.beueW loafmd _ n Wa Wa :Jau61600 '/avail -lJ A 9 L/EZ/90 LL1uuu -alga JQQWnN n01ad (SOON aid L-b d0 dA11 VN O 13Nvd SS3l38WA NOZIaBA 03SOdO'dddOad g I a W ZV►3 / NO11d !DJN 00 dNN31NV 43SOdOd 567 K_ J®l G:i1{ :av!16u1Mail 33Ov11S1mlHO9MMAl-03didodno50x ga=1�♦aHwdOlJaa31sI3n+0.M 9-,Z:HLd3 00.9-.Z=HLam /Q�+7 F-1M0lWVYS 'NO1ONIlaV ¢ � '� ® L,®h'',® td 11 Y- .S-.L:1H�JI3H •B��Z POZLL OLOb daZZ601Md-na0W ��1 ® �, S3lavH0:a3anLovdnNVW 1WAIN m E m vl w w x 1< 12i`dWI`dM :o/ul loaloid 'I�1 Q, z A w ® s ® '�aJ I1`d013103dS flbb 311 0 VOS 110N W m it 9 £ SNO 31VOS 110N 31VOS„bEX,ZZ ® � id 2 E e 6 � A IR 0N1 JNI1lf1SN00 d> ,/ uro01 39V m ❑ � 5: ® LS � 51 � 311W=1=10:uoloo ^ g S7 0 m 71 Cv ED S8l 9S : LH013M 9 �J (BOON aid L-b d0 dKD VNN3INV :HGM 4 l3NVd SSAIM M NOZIa3A O3SOdOad .9LL`1H013H .9 'g' ® 6: z 0 ® ZL Snaa:130oW .4j �� m w NOSS018A:N3urL0vdnNVW 0: 9 '` g N m SNOUVOI3103dS (dVDA`d J) dAO 3WlV 31OS 0110N:31V0SI �L OS Ol lON 31VO5..V6)U„bEX.Z2 9: :weal.011eluawaldwl O C: 0 qm Fi 5 L'8 UO Z l J 9/\ Avao xa o aoloo QNnOW H1W0S8 1�1H013M w -I .91 B Hid 30 aNa �_ .5 OL:: LOIM .99 EL:.LH013H „5 0 L :luall0 9►Jd-►90L-0OSHa:1300W dV3,k":83an10v=inNVW - E d01 13S 00 lVNld%o0L 9L/EZ190 Z E Sll`d13G 0NI1Nnoim VNN31Md a3SOdMId 31VOS 01 l0N31V0S..L SNOISIA38 9L/6L/SO L 3lVOS O110N:3lVOS,.VEX,ZZ SNOISIA3a WZL/SO 0 VNN3LNV13NVd 341S 1NO2Jd 13S M31A3a 00%OOL 9L/LO/bo 9 a3an10VdnNVW VNNBINV AB M31A dOl S13N0VaB 1NnOW VNN31NV 13S M31A3a 00%06 9L/SZ/EO V 0 uOISlAaa ale❑ ON .96X Bdld o►31n03H0S 03ZINVAlY0 0„Z/L-Z VNN3INV 19NVd ZWIO ol E WIO \ aB8n10V3nNVW VNN3INV AS S13XOVUS 1NnOW VNN3INV XOaddV 3HV SH10N31 83033d .0 .0 -E L .Z 9L bZ 000=lU9VNM3X1H ,OM3ild-Mv L -9-.9Z .OLZ b 300N _ {,SZE OINBAH L _ E BOON .0 .0 „E L ��Z 9L AbZ 0003E LSbMM0X1H lON3HdWV L ��B-,9Z .OBI --_ .0 .0 ..E L „Z 9L A bZ 0003E LSbMM0X1H lON3HdWV L „B-.9Z .06 Z 3OON ` a3anlovdnNVW VNN3INV A9 T.099 01aBAH L ` lIN 1111 NMOO lV0lNVHO3W .0 .0 ��E L „Z 9L ..L bZ 000=1USPA M0X1H lON3HdWV L $'.9Z .0 L 300N (dAJ)IIVM Ol _ NOlvaodaoo 1NMNdIn03 H1ON31 3dA-L Sa30333 llll 1111 E VIIO Z WI0 L W10 13OOW a00N3A SVNN31NV 1H013H dll H1nWIZV HNN3INH 03a OHONV 1na1SINn 000Ld 7:.UANV Vdo ua3dOtld3H1NIVW3a sNOI1VOId1O3dS 1VN01110OV a3033d a30333 3o a3ewnN HO3W 0313 SNOISN3W10 30 a39WnN _ ..96 X 3dld -lltl'NOISIA3a1S31V13H1 Ae 0303Stl3dHS 31n03HOS X`d00 ONV dNN31NH 03SOdOLId - ob 3lnOBHos a3z Nvnlv�o„z/L-z tlO SIHl d0 53aS51 SHOIA3tld lltl'ltlAOtlddVltld 1nOH1Wl031N3W3ldWl3a lltlHS NMOHS NO-V01d IOOW tl0SNOI1VItlVAON SNOISSIWO V i0 S1NV1laSNOO 351AOV ONtl SNOISN3WI0 sm U013-1NOO SONMVa031VOS ION 00 0-3 Z '03NIV180 ON laa4S :oN UOMUGM 381snW N33NION3 3HI WOHd 1VAOHddV HOINd 318V010AVNn 3HV S3OI1dS d1'318V1d3OOV ION 3NV fa WV S3311dS 'S3011dS InOHIM NOIIVNIW83101 NOIIVNIWH31 WOHd SnonNIINOO 38 IIVHS SH1ON31 HOlOnONOO :w00aa to MuOISSO Wd 1a0m1on po('d '3dA1 N01SS3NdW00 INN WN 'I3HNV8 9NO1'3IOH-OMl'H3ddO0 03IVId Nil AG IIVHS S9nl IIV 3SIMN31110 0310N SS31Nn J..N a ,aye,0 H3113HS NOIlO3iOHd N3MOd Odd 'S31NVdWO3 A11111n 3NOHd 9L/£Z/90 ONnON9H30Nn 9/n -31310NV H3Mod d0 S1N3W II 3NIn03N MWONVIS 11V 133W VHS NO11V11VISN1 IVOIN10313 3HI SONWAVHO NO 3SIN1H3HIO 031dIO3dS SS3INn'SNOlO3NN00 dWVlO O N£VW3N-d00NdN3H1V3M dM 'AINO SV3HV 3I81SS300V NI 03I1VISNI 38 IIVHS 1N3WdIn031VO1NIO313 IIV"S3lnH 1VH303d NOISS3MMOO 3I8n00 NO SH0103NNOO 3HnSS38d 3dAl 1108 NO M3HOS X3H 1N301'SS31H301OS 3Sn 9MV 9 31VIS'IVOOI H11M AIdWOO IIVHS SI3A31 O1H13WOIOHd'3I8VO11ddV d1 SONVONVIS VVd 9#NVHl 839NVl SNOIonONO0 N3ddOO HOd'SdVO NOIlV1nSNl 3IVHVd3S NO 1VNO31N1 H11M SHOlOEINNOO IVOIdAl dAl HO/0NV VNS31'03N 133W 11VHS ONI1H01-1*U3MOl SI 9N1IV8 H3A3HOIHM'AIIOVdV0 N0110310Nd 3dA1 NOISSMIMOO NON-VIS GVINO NOTHOlOOS WE 3Sn H3IIV114S 0NV OMV 9#SNOlonONOO N3ddOO HOd S310N NOSS3HddnS 39NfIS 3OVIl0A1N31SNVNl SSAl �9ZL)Ol1Vn03 d33N'l'lVHS OVOIo3O1AN3SOAInIlnlVIOLIVHIN011onNI N D 3HOd38 WmdN00 oionc] OO HM IIV /^ v ^ -7 N3WNOdSNVNl HI V AdIN3A IIVHS HOIOVNINOO 0300V SI OVOI M3N d1'13W SI 1N3W3NIn03H AH01V0NVW SIHI 1d3OX3 NOIlVInSNI N33HO 3AVH IIVHS 0NV H3ddO3 38lIVHS ONI0Nf10NO NOd 03Sn SHolOnON00 IIV WO R :UO3 I3 NV8(]NnoHO IIX3 a3MO1 8031 I11 NN NouonNiSNOO SNOO ONV 31�LIMN T1 HS UOn a0/ONV IN3Wdln03 ONIW00NIVNVH10N3HOIH 031VN '03N H11M 30NVOU000V NI 03000 b0100 38 IIVHS I : N 3 0 NV8 aNnoHe 00131 801 OIVM ONVONVIS 38 11VHS SNOUO310Nd V S1N3Wd1n03 lVO1NIO313'3SIMN3H10 03-LVOIONI SN NOuvInS 13N _1A 031VN 38 IIVHS NONO NO S 'A VW3 l 1. NHHl S3dAl)'LOM VW3N Ol E)NINUSV_1dO0dN00 NOI1VlnSNI 3N31AH13AlOd 03�1NI1-SSONO NO 90M VW3N Ol ONIWNOdNOO NOIlVinSNI OIlSVidOWN3Hl :allll 6ulme,0 1VNln3N O110S NS SS31Nn'Shc]O NOI1031 3H 3AVH 01 S3HOIIMS 103NNOOSl0'AV130 3WI1-NON"O'1'VH 00Z'3dAl H11M'9MV ZL#3ZIS WnWINIW'H3dd0038l1VHS SN010f10NO011V'3SIMN3H10 0310N SS3INn 30NVNiN3 3OIAH36 3S ONWINII 1N3HNno L�IH..SSV10 38 IIVHS S3HOIMS 33MBS NI S3snd'S13A3I IN3HHno I1nVd 1VOIH131N1NASV'81VOIN13WWAS 3I8VIIVAV'O0 A111111n0390X3'8 HOIVW 01(3HIn03H SV 0TVM) SHOI33NNOO ONV SNoionON00'£ EZZ96 VM'NOi0N1TdV HOIMS lO3NNOOSl0 301AH3S Os SONIIVN 1NMIdn0 linVi lInON1O-1NOHS N3H0IH HIIM 1N3WdInO3 301AOHd IIVHS HOlOVHINOO 3N 1S PuM Mt' (0Ad 09 3In03HOS)lInONOO OIIIVI3W-NON 0191H ONN '1o3-13,00 kinun 3HI do SNO1IVIn93H'8 S31nH lIV Him 3ONVIIdWOO Ni 38 IIVHS 301AN3S NO11 VQ3 W O12110313'NOIlV11V1SN1'8 NOIIVOOI IN3WdIn03 NOOO1f10R1000N1 NOd SOMS 0NV SONIMVNO 1��0 I_JVVq 12J`dW�b'M OV3HN3AO H/0 dOHS'SNVId S N3NnlOVdnNVW 11nSNOO IIVHS NOIOVN1NO0'N3NM0 u111OVd/311S 3HI 01 '9N101In8 d0 a01H31X9 011N3Wd1n03 3un03S 0103Sn SM3HOS ONV S1108IIV ONnONV 1V3S 3NO0111S :OluI palo,d MOO IVOIH1O3I31VNOIIVN 03N 0301AONd 38 11VHS SON003N'AIddns ANVWIHd 3HI IV OVOI 030NVIV0 V 3HnSSV 9 NOIINOW Ol "N3113HS/0NI0IIn8 HOi MS H3dSNVNl iVnNVW S1W 30IM71S OJ£V WONd S31VN1018O N3MOd 311S N31AM S9NIOV3N 0V01 011003H IIVHS NOIOVNINOO 'L O1NI NOI1VH13N3d 3HnIS10W 1N3AMd 01 INV IV36 3NO0111S V HIM SNnoOO NOI1VN13N3d lIn0NOO 0191N 03ZINVAIVO oNO (3I8VOI1ddV A N01103IONd 11nVd 0NOf11noN1O'1NOHS V_LN3HHnoN3AO'9 3H3HM ONI0iln8 3HI ONIH3IN3 SIInONOO NIHIIM SHOIonONOO ONnOHV ONV SIInONOO ONf10NV IV3S NolonONOO 300a10313 ON10NnOHO 030 'OAN A8 03HIn03d SV S30NVNV'TO 11V NIVINIVW O N I J N 111 fl S N O O 300N1O313 ONIONnoNO 39 'SNOIlIONOO 3Hl Ol ONno8o 9 'SH0103NNOO I-IV NO 0131HSHdON XHOM 3HI lId 0103HIn03M 38 AVW SV SIN311 HonS IIV 301AOHd'NMOHS AIINVSS3O3N ION 3NV S3INOSS300V lInON00 AldW3 O3 NO XON13N3d'XOIVON'XO-ON SV HonS ONnOdW00 301XO-I1NV NV d0 9NI1VOo 3AI103108d 0NV SONlllld'S0N38'SI3SddO IIV ONV 011VWWVN9VI0 AllVH3N3O 3NV SONIMVHO lOVN1N00 3HI IVN3811 V AIddV'03Sn 3NV(dINV1O NO 31OH-OMI)SHOI33NN00IVOINVH03W 3N3HM 4L H31M8OdSWt113dA1 ANO 1'1'O '30NVId3OOV NOd SONIMVNO 03IIV13011W8nS ONV 3HVd3ad's3snVo N3H10 NO SNOIl10NOO H11M 3131d1N0O M/0 O131d d0 3SnVo38 03SOdOHd 3NV S3NnINVd30 3H3HM'NOIIVH311V IVIINVISBnS InOH11M NOIIVOOI :wea134V '1N3Wd1n03 d0�9 NIHlIM S1SOd 30N3d IIV ONf10N9'1SOd Ol N01103NN00 013M OIWH3H10X3 HOV3 Ni NHOM 3HI ILA 0NV SONIMVHO IOVNINOO lIV 3NIWVX3 A11nd3HV0'SS300V 0NV S30NVUV3_1O N3ddOO no 60 dINVIO ONIONf10NO 3dA1 A1n0 AAV3H V 3Sn'9NIONnON91SOd 30N3d 1V13W NOd 'EL 1:13dONd 9NI01AOHd'NMOHS SV AllVH3N39 NHOM N3H10 0NV'IN3Wdln03'9NINIM'lInONOO 39NVNNV NV8 ONnodo 3ON3N3d3N 1130 89H0 'IIOS HIM "113NM0 3HI ONV 1NV11nSN00 3HI d0 IVAONddV lInONOO 0 03IIIJAOVe SI ll 38Od30 ONIH ONnoNO 3HI 103dSN1 NVO 3A11VIN3S31Jd31:1 3HI OS 03IIV1SNI 11.J0a JI.J V 18 30VN9 03HSINId M0198 938 SI ON IN ONnoN9 03INn8 3Hl N3HM N3OVNVW NOIIonH1SNOO 3HI AdIlON IIVHS HOlOVH1N00 71, 3Hl S133W ONV S1AGW3HIn0on IONd SSV13HI Il SW *N91S3 11 NMunOHd 03Sn 38 AVW N3Nn1OVd M:ld 3l8VInd3N V A8 3OVW 10n00Hd SSVlO-ISNId ANV'NOIS301N3HNn0 SN3Nn10VdnNVW d0 S10n00Nd AI1OVdVO 9NIldnHN31N1 3N3MV o1V ONVONVIS 3HI 38IIVHS INAWdIn03 ONV S1VI831VW'M3N 38 IIVHS IN31NdlnO3 0NV SIVIN3IVW IIV 30VN9 03HSINId 3A08V 9dV L09-9 L#IOsauo31 8nI0H SV HOnS N3ZINVAIVO AVNdS 3Sn'9N10I3M OIWH3HIOX3 A8 039VWV0 'SNOI1Vln93H 0NV S3000 IVOO1 318VOIIddV 3Hl Ol ONV N338 3AVH 1VHl S3OVd NS 03ZINVAIVO IV HIVd3N'SO13M OIWH3H10X3 3313HV HOIHM NOIIo10SIHnf IVO013H1 A8 031d3OOV 03N 3HI d0 N011103 3Hl 01 WHOdNO0 IVHS>INOM 1VON103I31V S00 0wa0H3_1� 33Mll HO339 38 IIVHS 9NIM O 1VT SNOUVIA V88V I3IOX i aaAVO1WH3XIIVHS SNORDANNO 0NnONO 1VNN31X3 L L SOOHI3W ONV SlVIN31VW OISVB'Z :wea1 uolleluawaldwl '(13103NNOO 01\1I38 SIV13W 3HI HOd 03AOHddV 38 IIVHS SNO1103NNOO ONnON911V 'OL IOVNINOO d0 OHVMV NOdn AI31VI03WW1301AU3S 3NOHd3I31210d A1ddV *03Id3OOV S31n11IS8ns ANVdWOO 3NOHd3I311VO01 H11M ONIlnOH 33IAH3S 0NV S1N3W3NIn03N 3N0Hd3l3l lOVX3 31VNIOH000 ON'A1NO dWVIO S3IN3S n8006£NV9 A0NNn8 V NO MVIO S31H3S AM NNnBNOVlB'dWV10 S31N3S 19 NOINn-NN3d V HIIM S1O3f80 01-1IV131N IVOINONIIAO ONV S3dId'S11nON00 HOIN31X311V ON08 '6 'N010VN1N00lVH3N39 3HI HlIM XHOM SIHI 31VNI0N000 IIVHS N010VH1NO3 1V0161O313'ANVdWOO N3MOd ,AU O Z I J;B A 3H1 WOHd H3MOd IV1OH3WWOO d0 N01103NNOO ONI1S3n03N HOd 3I81SNOdS3N SI NOIOVN1NOO IVH3N3O '9NIN ONf10N9 031Hn8 3Hl ONVMOlOHVMNM00 031f1OH AG IIVHS sNolonONOO 9N10NnON9'006 033OX3 1ON IIVHS 0N38 ANV d0 319NV 3HI ONV.18 NVHI SS3I ONIIVN N3MOd3SNOH/M ZOIOW dH 38 ION IIVHS 0N38 ANV d0 SnIOVH 3Hl'SON38 dNVHS OIOAV'3181SSOd SV 103HIO 0NV 1HOHS 'HOIOVNINOO 3HI d0 3SN3dX3 3HI IV'NOI1VOULLON N3111NM NOdn 30NO 1V(13103NNOO SV SNOIlO3NNOO ONnoN911V 3AVW"3SIMH3H10 0310N SS31Nn H3ddOO 03NNI131:1V8 0110S 38 IIVHS 001H3d IVHl 9NIHn0 A11nVd 38 01 ONnOd 1N3WdIn03 HO'IVIH3IVW'NNOM ANV'H3NMo A8 qusllO NolonONOO ONnoHO ------"'- OMV Z#3811VHS ONIN ONnON9 NOIN31X3 9N10n1ONl SHOIonONOO ONI0Nf10H9 NOIN31X3I1V '9 30NVId3OOV 80f d0 31V0 3Hl H311V HV3A W 3NO d0 OOIN3d V HOd 0331NVNVnO 38 IIVHS 80f 313IdW00 3IOV1d303N 3A331S ONV NId E HV8 ONnOHO 1 '30NV1SIS3H NOISOHHOO NIVINIVW 0130VW SI NOI103NNOO H31dV HOIVW OI INIVd3N -LNV1InSNOO 3HI Ol SONIMVHO OH00311 SV SONWIVHO 3S3H111W8nS ONV SONIMVNO 13S CIO IVNld%00L 9VEZ/90 z S3A33IS N01103dSNl HIIM OON ONnoN9 'SNO1103NNOO ONfIOHO 9NINIn03H S3oVdHnS WOHd 1H101IV NV310 0NV 1NIVd 1IV 3AOW3H 'L IVNI91HO 3HI d0 SlNIHd 3NII MOVlB 01 VIVO 08003H IIV N3dSNVN1'NOIlV11V1SN13H1 d0 N0113IdW00 NOdn 'SNOI1VO013I8V0 ONV lInONOO'1N3WdIn03 ONINOISN31NI0 ONV A13SIO3Nd llnoNlO HOV3 ONIIVOOI'SW3ISAS SNOISIAA8 9UW90 t OOH ONnoNO 'V3NV 3SV31 d0 301S1n0 ONIN ONnOH9IIVISNI ION 00 '9 IVOIN13313 3HI d0 NOIIVIIVISNI 3HI d0 0NOo3H 31VHnOOV NV NIVINIVW'NHOM 3Hl d0 SS3HOONd ONINnO SNOISIA38 Wzl/so 0 (dVl-O'Onl 6s)N01103NNOO IVOINVH03W • 'InOH9nONH13HVM0NVH 1331S SS31NIVIS N01103NNOO 013M OIWH3HIOX3 • 3Sn SNOlonONOO ONnON9 NOd SNO1103NNOO 1VOINVH03W IIV HOd SN3HSVM N001301AOHd 'S UQM HHd 3H110 N31 NUX3 3NNOW1 3d 031 SV OSA3NNVW AlN30N0 NV NI NNOM dIH 31n03H0S 13S M31A32100%OOL 9L/LO/40 a IIVHS ONV NNOM HOnS NI 03ON31H3dX3 l3NNOSH3d 031dIlVnD A9 OOOZ-L 0HV0NVIS VO3N N3d dIHSNVWNNOM 310N 30N3H3d3N S310N3(1 SSVl0 ISHId V N13N00 38 IIVHS W31SAS IV01H10313 313IdWOO 3HI d0 NOIlVilVlSNI ONV NOUVOIN8Vd 13S M91AD8 00%06 9usz/Ea v 'NOIN31X3 WOON 1N3WdIn03 NO S1O3f80 o1I1V13W 03SOdX311V ONnON9 'b 83MOd 0Nf10HON30Nn -�'--iO"-- '03AlOANI S3111111n 3HI d0 SNOIlVln938 0NV S3ln8 3Hl HIM AldW00 01NHOM lIV'311S SIHI Ol AlddV AVW uoISIAay al-0 -ON '0I311ASHdOX NO XON13N3d'XOIVON'XO-ON SV HOf1S 11 SV ANVdW00 Allllln IVOOI 3HI HIIM AHOM 00131(INV H3MOd IIV 31VNI0H000),1NOM 9NINNI938 Ol N I 001310Nf10N9N30Nn —�-- o-- 1N39V 1NVOIXO-I1NV HIIM 031VOO 38 IIVHS SNO1103NNOO NOISS3HdWOO ONV 9n1 ONnON911V E S3111II1n 0V3H83A0 —'w—' — V H'S'O 0NV S30001VOOI ONV AlNnoo'31VIS 9NINN3A0O 11V Him30NVOH000V NI HNOM InO ANHVO SNOlO3NNOO ONV SN010nON00 E N01103S N30Nn 031d103dS 3HV SOnI ONfIOHO 'Z N3 SONVONVIS 00131/03N of X08-rind ed SONVONVIS SS3l3NW\NOZIH3A NOIIOVdSIlVS 3HI Ol IVNOIlVH3d0 Allnd SV lI 1N3638d 0NV S1N3Wn00010VN1N00 3Hl Him30NV 3HI do ONVOH000V XO8 NO1IONnf a ONV SONVONVIS VddN IN3NHn0 3HI H11M 3ONVON000V NI I110 031HHV3 3811VHS Ni lo3fONd SIHI 3191MOO 01 S30MBS ONV'3ONVHnSNI'1N3WdIn03'lVRf31VW'N08VI IIV 3OIAONd 1N3WdIn031VO1H10313 3Hl d0 9NIONnOH9 A31dVS ONV NO110310Hd ONIN1H9111IV I M31A NVId NI NMOO ONINNnl "NOIIO3dSN1 31n03H0S ONV S33d 031VIOOSSV AVd'S11WN3d IIV NIVl80 lInONOO NO 3I8VO S310N30 c— ONIONnOH9'S 'S310NVd3HOSl0 ANV dO lNV1lf1SNOO 31Hl 013OIlON N3ILINM V 3nSSl'NOIlOnN1SN00 9NION3WWOO M91A NVId NI do ONINNnl 0— 0NV 1N3WdIn031VOIN13313 3HI 9NIH30N0 01 HOINd AMOM d0 NOI-LVOIJI83A 0311V130 WNOdN3d lInONOO HO 318V0 S310N30 N313W HnOH JIVMOIIN ® 3SIMN3H10 0310N SS3INn OAN HIM 30NV0H000V NI 03ZIS 38 IIVHS 0NV L9 VW3N IOVHINOO SIHI 1VOIG 03WN18 Ivi 38 Ol �IHOM ONV SN01110NOO 311S eOf llV dOINVZIN90O SI N010VH1N00 S31V010NI 018 d0 iV111W8nS N31NHOdSNVN1 a1 01 WNOdNOO IIVHS S3Xo8 IVI3W-1SVO'LSO VW3N Ol WHOdNOO 11VHS S3X08IV13W 133HS £ 'S30VHI N3H10 d0 SW31SAS ONV NMOHS OHVOG I3NVd 031NnOIN 3OVdNnS M 'ONOo ilnd V 3AVH IIVHS 3Sn 3Hfllnd HOd 0311VISNI SIInONOO AldW3 IIV 'Z SW3ISAS IVOIN10313 3H131VOOWW000V Ol AUVSSE103N 30V1R1 9NIHW1 ONV 11\13Wdln03 SV HonS HOIIMS 103NNOOSIO 3I81Snd rfl '03I38V1 In 38 IIVHS lInONOO IIV L MNOM NOd SISOO IIV 301Hd 018 3HI NI 30n1oN1 ONV S3OVN1 N3H10 IIV d0 Ai JOM 3HI H11M NOUNS lOEINNOOSIO 3181Snd-NON fl H3H13901 XHOM 03SOdOHd d0 3dOOS 3H10NV AIInd3HVO AN3A SN01110NOO 311S 3H13NIWVX3 N011vtladtloo N3NV3N811nON10 MOB 0NV SAVM30VH'4 IVN3N39'L WOOVd0A1N3dONd3H1NIVW d SNOI1VOIilO3dS pNV SOWMVWQ"V#"V 3Y 1e311/13Nl As o3o9"'" NOIldlbJOS30 ioewns Sad ONn" SIHI d0 S3nssl SnOM-d 1 lV IVAONddV N3111NM t101tld 1nOH1IM 031N3 Wald WI 3811VH5 NMOHS NI OI T11tl AMOWNOSNOI1tl1—O'SNOISSIWo dN3J31 S310N W011:110313 IVU3N30 NO SNONtl3 ANV d0 S1NV1lnSNOO 3SIAOV ONtl SNOISN3WI0 IIVA N3A 1SnWtl 3181NO0 SONIMVNO 31vos IoN OO Mdld 31lS IVOI2:10313 03SOdObd Ze .9 .9L .vZ.ZE .L=..b9,L 31VOS..LLx..LL I7 ..0-.L=..ZE/L:31V OS..Kx..ZZ I 3 V :ON IaayS :ON uoISIAaa rN WV :P)WQW Lo IOuolssalad isOvuun pofold l l Wa Wa aauBIS-0 :fayef0 9 L/EZ/90 -aged 1ogwON P-101d NV Id 311S I -IVOI2:110313 � �, Ell a3S0d0?Jd © © © o I :all!1 Bw1ne,O EZZ96 VM'NOlONIIaV 3N 1S PuZLL Mt' :Olul 1DO-ld O N I J N 111 n S N O © © h © © I, ©I © II L 0 SVNN31NV HOd lInONO01W3 .Z(Z) I � :Sa3d33IS NO O31Nnon -_ S1IncNOO SS3I3U[AA NOM13A � <<•)�) L E a m :weal.3gy ZV o © o oI j >1002J Movie 0 T7dOdW ONV n o o i ' NMI IVORI103I3 ONIISIX3 :weal uo0eluawaldwl U '� G'f �� i� Q I 4p uoziaan o OVd NO O31NnOW a31N30 © Q © OVOI ONV 13NISVO 1N3WdIn03 SS3I3HIAA NOZ1H3A 03SOdOad 7eallO o� • E 13S OO 1VNId%OOL auerso z © © © L1 F SNOISIA3a 9L/6L/90 L © �� SNOISIA3a MUM 0 13SM31A3a OO%OOL 9L,LOPo0 a SVNN31NV HOd 11nONO01W3 2(Z) :Sa3d33IS NO 031Nnovi 13SAA31A38 GO%06 9u9Z/E0 v S11nONO0 SS3I3aIM NOZIMA -�- uoISlAaa 01e0 ON t l ■o�lvroduo� 11VUO 11 V-1—H IS 3HI 9a303SU3dng ON 3MV ON MVWO SI NOISIA3a 1S31tl1 A3Hd 1 0303S93ddV 3atl MNOIUO inoim031N W31dN1391V HS NMOHS MNW 0 SNO VOIJ10N 0 O SNO ldIN 3a lltlHS NMOHS NaOHW3ANOAO91 V11n9N SN011Aa VQNV SNOISSIWO 90 V9 N9 i.s d0 S1NV H1NO30 ON—ONV SNOT N OO lltl AdIa3A 15fIW aOlOMH1NOO SONNAVLO 31tlO510N 00 -llVi3a bJVB aNnmie 2:131S` VY 31VOS 0110N:31VOS..V6x..ZZ Z �I1`dW3H0S JNI4Nnm:jp 31VOS 01 iON:31VOS..LLx,.LL Z_D 7 3lVOS 0N:3lVOS..bEx„ZZ ON 10049 :ON UOISNaa SNO1103NNOO ra Wtl onl 3aIS1n011V XNWHS 1V3H'S 0310H 31anOO 3Nv Sonl llV'4 OOa ONnmo .9W XNnSa31NnoD 3'V S3-1OH lIV-£ 1331S OV-10 83ddO3 ON01.9 X.9/9 PMOU10 IYUMSalold :1a6eueW loafold I 0131HS-6 dOX HIM 83OVdanS lltl 1VOO'1331S(3NV Onl N33M139 Wa Wa a3HSVM HIOOI V la3SNl:A1NO 1331S Ol aN09 ONnOaO aOd'Z 1N3WHOVllV 3aOd39 Ol31HS-adOX H1IM S3OVdanS ONIIVW 1VOO 1aug9oa :1a9ej0 S3111A1139 oNIanIONI I331S SS3INIVIS 99-9 38VMOaVH 11V-L 9U M ONnouwno omv 9 L/cZG0 M3N 30V1d 1N3S3ad ION SI(IN I. OIeO �opwnN laafad L S310N dI'aNflOa91V011a3A 13S Ol IO31 00 - a-131a Ni A3ia3A " SlIb13a .4z � ° J N 14 N f l 02�J dOO-1 ONnoao ° \ atl9 aNnoao Nlvw of Auo3ala ^ �J of av3l no 9/4# Sava'I aNnoao•no oMtl 4# �`•,/�./NiO313 - Ol3MaVO SH 3dAl V �J " :a1p16mrAula 0 p 0 0 0 0 0 0 0 0 0 0 0 0 00 O 0000 �0 00Lol O O O O 0 0l e O 000 O 00 O O O O 0 £ZZ96 tlM'NOl•JNIIaV 00 000 0 00 0 0 0 0 0 00 " 0 I`^ \ 3N 1S PuZLI OL04 I I I `a3LN3D at101 NOI� WIDN ° ° TIDO �llvns i2jvvylvm 1iM ONnOao of :o)ul pafad OI3Il NI NOliV-nVlSNI ,• �I VI ONV NOlIVOOl IOVX3 AdIa3A OI a30VNVW Noliona1SNOO'aV9 - ONnOHo 83ddOO N41.4/L x..4Zx.4M3N- 0 N I EJ N 111 n S N O J XNWHS 1V3H HIM aOlOVa1NOO I VNN3INV A9 0211VISNI 39 Ol(SOnI �f 3lanoa)S°Jnl NOISS3adWOO l3aaVS SNOIIO3NNOO onl .0-•ZAa3A3 Sd1100/M 310d OI A113AU10� O :. E)NOI/M SAN ONnodo 1dIXV09M3N 301Sln0IIV XNIHHS IV'3H a31NnoW OVM ONnOaO NIVW'no SIMV zo 80103NNOO I 13NIGY0 NItlW NI SOIOVa NOISS3adWOO HIS JMV Z#Ol alS�JMV Yi L J 3S SNOli33NNO0 3S3H1 IV A., 03zlllln 3NV SVNN31NV 3110W a0 3dA1 X0813N3d'Ol31HS-adOX Z dl a3llVISNI 3a AtlW ava aNnouo ONOI.9 3Sn Ol 801OVa1NOO:310N tlNN31NV N^J O� N O`Jv a 1^ SIIX aNnomo ItlIXVOO Ol AllO3ala aNnoa`J 4#dVl - j/ � —�8)YNN3INV E nv' :PD` IG 'd3MOd 3NIl-3NO 31VOS 0110N 3TLOS..LLx..LL VNN31NV 0111>I a2JJ 30 NNOO 31VOS O110N 3lVOS..LLx..LL :weal uolleluawaldwl 31tlOS Ol lON:3NOS..4EXZZ 3lVOS O110N:31V05..bEx,.ZZ 0011 ONnOao 1331S OY10 a3ddO3 ld9 X'tl10.9/S /%U O z i a a n dWV13 aNnoaO 3zNoaa 3aV-dD- 1ua90 3aIM ONf10aO-nO OMV ZM • E NOH1/NHH1 13S OO 1VNId%OOL 9L/SZ/SO Z no 4#E lIna NOO ltl13W 31aIX31d 1H911 aln011.4/E a3anlOtljnNVW 319YO A9 G30N3WWO03H Ho(3anddnS SW a39WnN latld 0NV 3dA1)3911VHS ONUOOad a3H1VW S SNOISIA3a 9L/SL/SO L a3an10V3nNtlW 3l9VOA903GN3WWO038 80 031IddnS SV a39W0N INVd ONV 3dAl 39 Ol IN oNIONnoao'Z SNOISIA3a 9LML/SO 0 atl90NnoNE)OI WOO 38IM ONnOao 133810 SAVMIV ONV ON39 V IV l0l ONnOao 319VO llV1SNl ION Oa L 13S M31A38 a0%00L 91/LO/40 9 S310N 13S M31A3a OO%06 9L/SZ/EO V 3anSOlON3 aE VW3N Sn9 ONmio OO B lValn3N H1IM Sa3)IV3a911noalO A04Z/0ZL'dZ'SNIVW lO3NNSIa a 103NNS SIOG3GlA0ad uoiSlAaa -W 'UN 03XId'VOOL a31N30 aVOI AlnO 3OIAa3S❑31NnOW 13NIaVO laVW1VM Ol NMHI/NHH.L no 9#S 04 HOS 1InON0O.l NMHl/NHH.L no Oao OL#Z 9 OL#S lInONOO IV13W 3191X31d 1HOIl a1non..4/S (Z S L 310N 33S-8V9 aNnoHE) a3AO0 3Sn 01 G30Nno8E))NOI1VlnSNI NMHl NI-31IHM dO0ada3H1V3M HIM 3dA1 — 'A009 HIM 3WA no a30NValS OMV 9# 1NV1SIS3a a3H1V3M'd9 V9 VW3NMS 'dZ'ASZ L'VS L 31OV1d3O3a X3ldna lOjo enr�r• IIN ONno8s 3lavo C 31ON 33S)11A 9NIdO08d83H1V3M IANIOVO 83IUVHO a31NnoW OVd�� I nN a31N3O atlol d0 3019 01 031NnoninoA3 IM 318V9 VNN31Ntl .909'0-.£94'00'MOOS Z-OW HOIlAA01AINNOD IUA (Z)'Al0 OaOO 83MOd OO HOlIMS 103NNOOSIO da �,.4Z Ol„Z L + XVW VIO£LZZ 0SOIaVa 031Nf10W 13Ni9V0 N011VHOdaOa WOOV d0 A1H3dOHd 3H1 NIVW3H SNOIIVOI3IO3d5 ONV SONIMVHO IIV NOISIA38 IN31V13H1 AG a3O3SH3dnS 3NV ONIMVH0 SIHI 30 S3 nSSI SnOIA38d 11V IVAOHddV N3111W HOIHd 1nouim M UW3ldWl 3e llVHS NMOHS xNW 01 SNOI1V0I3IOOW NO SNOIIVIHVA ON SNOISSIWO HO SNOHH3 ANV 30 S1NV1lnSN00 3SIAUV ONV SNOISN31NIO llV A3I83A ISM U013VNIN03 SONIMVH031V39 ION OO Perm #: 1179 Perm t Date: 10/18/16 Perm IType: COMM hRCIALALTERATION Project Nam a Wd-Mart/Verizon Applicant Nam a Black Rock Consulting Applicant Address: PO Box 1744 Applicant, City, State, Tualatin, OR 97062 Zip: Contact: Sophia M ekkers Phone: 503-380-1564 Em al: sophia@blk-rock.com Scope of Work: Install cell antennas on sides of building and equipm aft cabinets on west side of store Valuation: 30000.00 Square Feet: 0 Num ber of Stories: 0 Construction Type: O wupancy G ioup: ID Code: Permit Issued: 02/28/2018 Perm Expires: Form Perm t Type: Status: LASERFICHE Assigned To: Kristin Foster Property Parcel# Address L egal Description O wner Nam e Omer Phone Zoning WAL-MART 569 Other Retail 00930300000301 4 010 172nd Street NE STORES INC Trade-Apparel& Accessories NEC Contractors Contractor P rim ay Contact P hone A ddress C ontractor Type L icense License Ridgetop Wireless Braden Whaley 3 5232 Ede Rd C ONSULTANT Solutions,Inc Plan Reviews Date R eview Type D escription A ssigned To R eview Status 10/18/2016 C om m ecial Other B UILDING Fees Fee D escription N otes A m cant Building Perm i T able 4-1 $612.59 Building Plan Review T able 4-2 $398.18 State Surcharge- 1st DU R esidential- 1st Unit $4.50 Total $1,015.27 Attached Letters Date Letter D escription 02/28/2018 Building Perm i Paym acts Date Paid By D escription P aym art Type A ccepted By A m(out 02/28/2018 Trevor Kruse 6 8740082 c c $1,015.27 O astanding Balance $0.00 Notes Date Note C reated By: 10/18/2016 Contractor TBD.KF K ristin Foster Uploaded Files Date File Nam e 03/05/2018 3127317-1179 Issued Perm i.pdf 10/18/2016 1899377-1179 Calcs.pdf 10/18/2016 1899378-1179 Plans.pdf 10/18/2016 1899350-1179 Application.pdf