Loading...
HomeMy WebLinkAbout501 2nd St_PJ25-0065_2026 i , CONSTRUCTION PERMIT APPLICATION Community and Economic Development City of Arlington • 18204 591h Avenue NE • Arlington,WA 98223 • Phone(360) 403-3551 CIVIL(TYPE I) 71 GRADING/PAVING/DRAINAGE (TYPE II) 71 RIGHT OF WAY(TYPE III) a TYPE I&II ONLY NEW DEVELOPMENT 71 REDEVELOPMENT 71 Project Name: W0965231 Project Address/Location: 501 E 2nd St Tax Parcel I.D.#:00455400100900 Description of Project: Ziply to make permanent transfer of existing aerial facilities from old pole to new pole and remove old pole. Project Size in Acres. •05 DOE General Construction Stormwater Permit#: OWNER Name:Gary and Barbara Peterson Address: 12015 234th ST NE City: Arlington State: WA Zip:98223 Phone: Email: APPLICANT Name:Northwest Fiber LLC DBA Ziply/Amy Yoder Address:135 Lake ST S Ste 155 city: Kirkland State: WA Zip: 98033 Phone: 503-984-3158 Email: ENGINEER Name: Address: City: State: Zip: Phone: Email: License#: Expiration: CONTRACTOR Name:Beon Connect Address: 11716 SE 229th PI City: Kent State: Wa Zip: 98031 Phone: 253-355-3741 Emai1: alex@beonconnect.com License#: BEON1799LT Expiration: 06/25/2026 I, hereby certify that I have read and examined this application, City of Arlington Municipal Code, Standard Plan & Specifications. Performance of the proposed work shall follow all applicable laws and regulations.The owner/applicant shall assume full and complete responsibility for said work and shall be responsible for the acquisition and compliance of all applicable permits and/or authorizations which may include, but not limited to, Right of Way Permit,WSDW Hydraulic Project Approval(HPA),WSDOE Notice of Intent(NOI),National Pollutant Discharge Elimination System (NPDES),Army Corp.of Engineers Permits,the requirements of the Endangered Species Act,and the Forest Practices Application(FPA). Signature �yL � Print Name: Amy Yoder Date: 11/12/2025 Page 1 of 2 REV2/2024 Complete package constitutes all items. Only complete submittals will be accepted. i it- mi 1 Requirements,Type I: Electronic files shall be PDF on USB flash-drive,email,or drop-box Complete Application Construction Plans including cut/fill quantities ■ 2 full size plan sets 22"x 34" ■ PDF file of the complete plan set ■ 2 full size set of landscape plans 22"x 34" Marysville Utility plans,if applicable(2 sets) Department of Ecology General Construction Stormwater Permit(if applicable) Drainage Analysis including calculations and downstream analysis(2 sets) and(PDF file); refer to Stormwater Drainage Requirements eGeotechnical Report(2 sets)and(PDF file) SEPA is required if 250 or more cubic yards of cut/fill is proposed (not required if included with a Land Use Permit);if there is not a Land Use Permit associated with the project,Public Notice Materials will be required Grading cut/fill quantity: _ Design Vehicle-demonstrate turning radius include 45'Fire truck,dual axle,256-inch wheelbase Drafts of easement(s)dedication(s),and/or CAPE(s)for review Flood Hazard Permit Application and required documentation if project is within 100-year flood plain;refer to Flood Hazard guidance documents eConstruction Calculation Worksheet NPDES Permit(if required);See Storm Water Drainage Report,New or Redevelopment Flowcharts eAssurance Device will be required prior to Permit Issuance (Bond or Assignment of Funds) Permit Fee due at time of permit submittal Grading I Paving Drainage Submittal Requirements,Type II:Electronic files shall be PDF on USB flash-drive,email, or drop-box eComplete Application Construction Plans including import/export quantities ■ 2 full size plan sets 22"x 34" ■ PDF file of the complete plan set Drainage Analysis including calculations and downstream analysis(2 sets)and(PDF file);refer to Stormwater Drainage Requirements Department of Ecology General Construction Stormwater Permit(if applicable) Geotechnical Report(2 sets)and(PDF file) SEPA is required if 250 or more cubic yards of cut/fill is proposed(not required if included with a Land Use Permit) SEPA Public Notice Material Requirements: ■ Snohomish County Assessor's Quarter Section Map: O Show Subject Property O Show 500 ft.Boundary ■ Current Owner List(of properties within 500ft.radius) including the following: O Tax Parcel ID Number(s) O Owner(s) Full Names) O Owner(s)Mailing Address(es) 13 Current Resident&Property Address(if property owner doesn't reside at the property) ■ Mailing Material: Provide O white,#10 envelopes with the following affixed to the envelopes: O Postage O Mailing Labels O Return Address labels: 18204 591h Ave NE,Arlington WA 98223 Grading cut/fill quantity: _ Construction Calculation Worksheet NPDES Permit(if required);See Storm Water Drainage Report,New or Redevelopment Flowcharts Permit fee due at time of permit submittal Right of Way Submittal Requirements,Type III: Electronic files shall be PDF on USB flash-drive,email, or drop-box Complete Application. Construction Plans. Traffic Control Plan. Road Closure Request. Temporary Erosion&Sediment Control(TESC) Plan. Certificate of Insurance with the City of Arlington named as Additional Insured. Assurance Device will be required prior to Permit Issuance (Bond or Assignment of Funds). Engineers Estimated Cost of Construction;$350 ✓ Permit fee due at time of permit issuance. Page 2 of 2 R yaht-of-Way P crmit A n2lication For submittal checklist, see below. *denotes required fields P Ioject Information *Project Name: 1W0965231 *Description of Project: Ziply to make permanent transfer of facilities from old pole to new pole and remove old pole. Engineers Estimated C cst of C mstruction; $ 1350 C mtact Information Owmr Information *Owner Name: Gary Peterson *Office No.: 123 *Email Address: amy.yoder@ziply.com *C dl No.: 503-984-3158 *Mailing Address: 112015 234th st ne *C ty: Arlington *State: w a *Zip: 8223 E igineer Information Engineer Name: 0 ffice No.: Email Address: Cd1No.: Mailing Address: C ty: State: Zip: Professional License Number: Expiration D ate: C mtractor Details Primary C mtractor: lAlex Vasilsenco 0 ffice No.: Email Address: lalex@vasilsenco C dl No.: 12533553741 Mailing Address: 11716 SE 229th PI C ty: Kent State: lWa Zip: 198031 L&I C mtractor IBEO NCC1799LT License Number: Expiration D cle: 2026-06-25 A cknowledgement I, hereby certify that I have read and examined this application, Cty of Arlington Municipal C ale, Standard Plan & Specifications. Performance of the proposed work shall follow all applicable laws and regulations. The owner/applicant shall assume full and complete responsibility for said work and shall be responsible for the acquisition and compliance of all applicable permits and/or authorizations which may include,but not limited to, R#ht of Way Permit, WSDW Hydraulic Project Approval(HPA), WSD OENotice of Intent(NOS National Pollutant Dscharge Elimination System (NPDES),Army Corp. of Engineers Permits, the requirements of the Endangered Species Act, and the Forest Practices Application (FPA). *Print Name: JAmyYoder *Date: 2025-11-12 Submittal C becklist Canplete package constitutes all items. Only complete submittals wf71 be accepted. Electronic files shall be PD Fand submitted through this portal, email or downloadable link to file server. • C instruction Plans; refer to D esign R Muirements and C lapter 1 of the C ty of Arlington's D esign and C instruction Standards and Specifications Manual for required sheets. • Traffic C introl Plan. • R cad Closure R equest. • Temporary Erosion & Sediment C introl (TESC)Plan if new or replaced hard surfacing is being constructed. • C ertificate of Insurance with the C ty of Arlington named as Additional Insured. P ermit fee and any assurarnce device (B and or Assignment of Funds) due at time of permit issuance. An invoice with link for payment will be sent to the applicant email address once permit is reviewed and approved. CONTACTS PERMIT LEAD: W 0965 231 PHONE BRANDON RUNYON ONE NUMBER:503-924-9042 EMAIL:BRANDON.RUNYON@ZIPLY.COM PROGRAM MANAGER: Address: 501 E 2nd St NAME:AMY YODER EMAIL:AMY.YODER@ZIPLY.COM ZIPLY VICINITY SCOPE OF WORK NAME: NAME:BRANDON RUNYON _ AERIAL CONSTRUCTION UNDERGROUND CONSTRUCTION ZIPLY to transfer existing aerial equipment from old pole PAGE INDEX to newly replaced pole and remove old pole. �I �^ PAGE ID DESCRIPTION all _- C COVER icf'� 6- �e�r•:c�- j•" BUILDING CONSTRUCTION SITE CONSTRUCTION .•t p PLAN CS CONSTRUCTION STANDARD PERMITS EASEMENTS CITY MONROE t y. JURISDICTION STAMP HERE OVERVIEW GENERAL INFO C COVER -- —" REVISIONS REV DATE: REVISION: #NAME? INITIAL SUBMITTAL j _wow I . R2 R3 Prepared for: Permit Tech : AMY YODER W0965231 py Address: 501 E 2nd St riber Legend Cone rl I '7 FLAG-0ER -' NO PARKS i-I •f i POSITION&DIRECTION FACING ^ ✓ f, 1 �` A . route of moving Work -� L-411"- ! <*SIGN TO BE PLACED = /- ,( •xr� -'-- or � — � � 4 Work Area a"-WORKTRUCK/TMA NOTES: Rerommend--ding 6—elizing devicetaperacross shoulder. Pmtective hi,lere--dee-mav ��� a-w" •'• . O -- — z.beawork-hid, Hagger to be available at all time drivewaysare blocked When used,the downstream taper r dev l spat ng should be 20 O C N TCP1 ,R.rRx<orpxo.Rux ,(� mil... , I v� ■ Rr. r Px,a. Ra�xPx. CHANNEE-nra6 DEVICE SPACING IrEET) Rr MINIMUM TAPER LENGTH(L)IN FEET srRnox.RnMxsraprsunTrexunroxxou.xuoolsnxa.R H LANE POSTED SPEED(MPH) a'aNro""aa`� R zz'oowus. MPH TAPER TANGENT WIDTH .s.,sN.R aa.x,Rx ssasx.x m..aRx W0965231 50n0 40 86 Address:501 E 2nd St 10 105 250 205 265 450 500 550 "1 35/45 11 115 165 225 295 495 550 605 660 1Ro<r1nxE-1-Rorr.RR.PN-1-R 30 60 av,,,.PamPx�PRR rReNroPRP.rRwPRR rw P"Y 12 25 180 245 320 540 600 660 720 780 840 Z1 zs/3o zo ao f'ber Stationary Work Zone Chapter 2 TCP 9 Typical Shoulder Closure - LOW Speed O MPH or Less) @ » r � $ k ) \ � m / \ \ e o CO 8 \ z m - \ \ Q ■ � c U 2 0 { 2 / (/ \\( uj 0 \ _j ¥§ �/� §§ . § /\ ) er ;E -E, 3 j2 0 � 2 ( b .g % om d ~ §2 ^0, *2 \ \ ° ) o E uj - > _ &k / = o 0 (L 2/, = 0 8 \ W2 \§R !'0 \ ® ® / % k- 0 ) } - 0 \ ^ ` k § \ } / \ E5 # = "NIVY.N12 2 ƒ $a / I w w O CL ® 2 ? S G ; k § 2 2 . z o o ® U 2 WR72 \ k3 \ 2 & ` D LU q§ / c E m [ 7 $ \ _ $ §2 � e w ` J2y = 2 0 \ § @ ? $ z L) 0 , \ § £ LU co §% o ! \ 5± = gQ r D � \ » )° a. a / § a § \ , 2 0 0 ( § § & E ` 7 � I � ® m \ \ ( } \ L'j E _ = m \/ & z / § § Lu m 20 = f mz z 22 2 § x / / § /§ § §\ 2 2 / \ = o: z ` z 2 § `/ o �o \ / }) G /3 M \[ / _ :( \7 ) . y ® ( z \ \: �( B �G e � zz, : n § ± ! !g =e § $g [ 2 Of z �( [ � §B )\ 2 @ ■ 2 / e \ [ CID /\ ) ;¥ -8 2 $ \ \ \ ( § ) }( % m= En « e n Q z y +3 n■ 5 Lu g 8 #! ± 2� -° = r \� 2 ( )( § / \ } w 0 -j 2 n ° , WSDOI Work Zone Traffic Control Guidelines for Maintenance Operations M 54-4 08 Page 2-11 January 2021 18204 59th Avenue NE • op ' • 14 Arlington, Washington 98223 to tt Phone: 360-403-3551 jNG� WASHINGTON C Civil Use - Right of Way Permit Parcel:00455400100900 Permit#:25-0065 Permit Address:501 2ND ST Permit Expiration: April 16, 2026 Description of Work:Ziply to make permanent transfer of facilities from old pole to new pole and remove old pole. OWNER APPLICANT CONTRACTOR Permitting Team Alex Vasilsenco Gary Peterson 135 11716 SE 229th Pl,Kent,WA 98031 12015 234TH ST NE ARLINGTON,WA,98223-3935 5039843158 2533553741 Jointusepermits@ziply.com alex@vasilsenco registration_number:BEONCCI799LT PERMIT APPROVAL The issuance or granting of this permit shall not be construed to be a permit for, or approval of, any violation of this Code or any other ordinance or order of the City, of any state or federal law, or of any order, proclamation, guidance advice or decision of the Governor of this State. To the extent the issuance or granting of this permit is interpreted to allow construction activity during any period of time when such construction is prohibited or restricted by any state or federal law, or order, proclamation, guidance advice or decision of the Governor of this State, this permit shall not authorize such work and shall not be valid. The building official is authorized to prevent occupancy or use of a structure where in violation of this Code, any other City ordinances of this jurisdiction or any other ordinance or executive order of the City, or of any state or federal law, or of any order, proclamation, guidance advice or decision of the Governor. The building official is authorized to suspend or revoke this permit if it is determined to be issued in error or on the basis of incorrect, inaccurate or incomplete information, or in violation of any City ordinance, regulation or order, state or federal law, or any order, proclamation, guidance or decision of the Governor. It is unlawful to use or occupy a building or structure until a final inspection has been made and approval or a Certificate of Occupancy has been granted. This permit authorizes only the work noted and covers work to be done on private property only. Any construction on public domain (curbs, sidewalks, driveways, marquees, etc.) will require a separate permit. The property owner shall ensure that the construction project complies with all applicable zoning codes and regulations. The property owner shall also ensure that the construction project does not cause any adverse impact on the surrounding environment or community. The property owner shall be responsible for obtaining all necessary permits and approvals from the relevant authorities before commencing construction. The property owner shall ensure that the construction project complies with all applicable design review requirements. CONDITIONS Traffic Control must comply with the current version of MUTCD. Work Hours are 7 am to 7 pm Monday- Saturday (no work on Sundays or City Recognized Holidays). Inspections are not available on Saturday or 1.) Sunday. Non-motorized traffic control must be provided if any part of the work impacts existing non-motorized facilities. Non-motorized traffic control measures shall provide a level of accessibility that are, at minimum, equal to the existing conditions of the site. Two days before starting work, the applicant must have all utilities located. One Call, is a public utility locating 2.) service (#811 or 1-800-424-5555). Privately installed facilities must also be located using a private utility locating service. Private property owners which may be affected by the proposed work must be notified in advance of potential 3') disruptions in access or utility services. Restoration of any infrastructure affected by the installation shall be per City of Arlington Standards & 4.) Specifications within a period not to exceed 7 days from completion of the installation. Trench Restoration shall be per Standard Detail R-140; Contact the City Engineer for Roadway Restoration requirements, 360-403-3512. INSPECTIONS Inspection Line: 360-403-3417 Call for inspections by 3:30 pm for next day inspection. Please allow 48 hours for Fire Inspections. Please provide the following information when leaving a message: Permit Number, Type of Inspection, and provide preference of morning or afternoon inspection. Inspection Portal: Please login to customer portal and submit for the desired inspection type for the permit. APPROVED BY Admin - Thad Newport Development Services Engineering Manager ASSOCIATED FEES Date Description Paid Date Amount Paid Balance November 17, Processing/Technology Fee(320.341.43.00.02) $25.00 2025 November 17, Right of Way(006.322.40.00.02) $125.00 2025 TOTAL: Project Fees $150.00 $150.00 Credit/Debit Card 50 Payment Successful December 17, 2025 $150.00 $0.00 4rtk( tot( WASHINGTON Project Information - ' 'nformat;^ Project # 25-0065 Parcel # 00455400100900 Building ID Location 501 2ND ST Project Type Civil Use Project Use Right of Way Parent Project# Subdivision Applicant Name Permitting Team Address 135 Applicant Email Jointusepermits@ziply.co Phone 5039843158 Cell m Owner Name Gary Peterson Address 12015 234TH ST NE ARLINGTON, WA, 98223-3935 Owner Email Phone Cell Contractor Alex Vasilsenco Address 11716 SE 229th PI, Kent, WA 98031 Contractor Email alex@vasilsenco Phone 2533553741 Cell Type/Improveme Accessory/Struct nt ure Current Use Proposed Use Current Zoning Proposed Zoning Project Cost 350 Project Value 350 Current Use And Ziply to make permanent transfer of facilities from old pole to new pole and remove old pole. Proposed Changes Lot Width Lot Depth Map Number Total Area of Building &Accessory Total Area of All Man-made Improvements Structures (Sq Ft) (Sq Ft) General Notes Restrictions/ Variances @ Community Development Online Portal Page 1 of 6 April 1, 2026 03:09PM WASHINGTON Structure Information Structure Type # of Stories Usable Floor Area (Sq Ft) Structure Height # of Units Load per Floor (Lbs) Sign Dimensions # of Bedrooms # of Bathrooms Occupancy With Chairs Tables & Chairs Empty Room Foundation Foundation Type Footing Depth Material Foundation Information Setbacks Front& 0 0 Setbacks Right & 0 0 Rear Left Sides Setbacks Information Water Utility Sewage Utility Gas Utility Electric Utility Driveway Width # of Off Street # of Off Street Parking Loading Miscellaneous Information ©Community Development Online Portal Page 2 of 6 April 1, 2026 03:09PM WASHINGTON Contractors License # Business Name Type Contact BEONCC1799LT Alex Vasilsenco General Contractor Alex Vasilsenco ©Community Development Online Portal Page 3 of 6 April 1,2026 03:09PM WASHINGTON Inspections Inspection # Inspection Type Status Date Inspector 26-0123 Civil- Right of Way Incomplete February 25, 2026 Brian Grieve Inspections ©Community Development Online Portal Page 4 of 6 April 1,2026 03:09PM 4rtk( tot( WASHINGTON Contacts Contact Name Type Project Address ' Phone Permitting Team Applicant 135 503-984-3158 Gary Peterson Owner 12015 234TH ST NE ARLINGTON,WA, 98223-3935 Permitting Team Others 135 503-984-3158 Alex Vasilsenco Contractor 11716 SE 229th PI, Kent, 253-355-3741 WA 98031 Alex Vasilsenco Others 11716 SE 229th PI, Kent, 253-355-3741 WA 98031 ©Community Development Online Portal Page 5 of 6 April 1,2026 03:09PM 4rtk( tot( WASHINGTON Fees Fee Type Date Debit Credit Balance Project Fees November 17, 2025 $150.00 $150.00 $150.00 $0.00 T O T A L $150.00 $150.00 $0.00 ©Community Development Online Portal Page 6 of 6 April 1, 2026 03:09PM