Loading...
HomeMy WebLinkAbout21210 87th Ave Ne_PJ25-0067_2026 i CONSTRUCTION PERMIT APPLICATION Community&Economic Development City of Arlington • 18204 59th Avenue NE • Arlington,WA 98223 • Phone(360) 403-3551 CIVIL(TYPE I) 71 GRADING/PAVING/DRAINAGE(TYPE II) RIGHT OF WAY(TYPE III) TYPE I&II ONLY NEW DEVELOPMENT REDEVELOPMENT Project Name: COMCAST - JB0002370476 Snohomish County Tax Parcel I.D.#: Project Address/Location: 21210 87TH AVE NE ARLINGTON, WA 98223 Description of Project: 'STARTING WITH POLE 1, UNDERGROUND PROOF AND PULL 143' E TO VAU OWNER Name: Address: City: State: Zip: Phone: Email: APPLICANT Name:COMCAST - CEEJAY D. GUZMAN Address:1701 JOHN F KENNEDY BLVD city: PHILADELPHIA State: PA zip: 19103 Phone: 2536063564 Email: WACONSTRUCTION JOINTUSE@COMCAST.COM ENGINEER Name: Address: City: State: Zip: Phone: Email: License#: Expiration: CONTRACTOR Name: CABLECOM LLC- LEAH IHLENFELDT Address: 1429 AVENUE D #339 city: SNOHOMISH State: WA Zip: 98290 Phone: 360-965-5085 Email: SNOHOMISH.PERM ITTING@CABLEC( License#: CABLEL*971 DP Expiration: 8-21-2025 1, hereby certify that I have read and examined this application, City of Arlington Municipal Code, Standard Plan & Specifications. Performance of the proposed work shall follow all applicable laws and regulations.The owner/applicant shall assume full and complete responsibility for said work and shall be responsible for the acquisition and compliance of all applicable permits and/or authorizations which may include, but not limited to, Right of Way Permit,WSDW Hydraulic Project Approval(HPA),WSDOE Notice of Intent(NOI),National Pollutant Discharge Elimination System(NPDES),Army Corp.of Engineers Permits,the requirements of the Endangered Species Act,and the Forest Practices Application(FPA). Signature C.&6 Print Name: Colin Broenner Date: 11/13/25 Pagel of 2 REV11/2021 Complete package constitutes all items. Only complete submittals will be accepted. Civil-Submittal Requirements,Type I: Electronic files shall be PDF on USB flash-drive,email,or drop-box ❑ Complete Application ❑ Construction Plans including cut/fill quantities ■ 2 full size plan sets 22"x 34" ■ PDF file of the complete plan set ■ 2 full size set of landscape plans 22"x 34" ❑ Marysville Utility plans,if applicable(2 sets) ❑ Drainage Analysis including calculations and downstream analysis(2 sets)and(PDF file); refer to Stormwater Drainage Requirements ❑ Geotechnical Report(2 sets)and(PDF file) ❑ SEPA is required if 500 or more cubic yards of cut/fill is proposed(not required if included with a Land Use Permit);if there is not a Land Use Permit associated with the project,Public Notice Materials will be required ❑ Grading cut/fill quantity: ❑ Design Vehicle-demonstrate turning radius include 45'Fire truck,dual axle,256-inch wheelbase ❑ Drafts of easement(s) dedication(s),and/or CAPE(s)for review ❑ Flood Hazard Permit Application and required documentation if project is within 100-year flood plain;refer to Flood Hazard guidance documents ❑ Construction Calculation Worksheet ❑ NPDES Permit(if required);See Storm Water Drainage Report,New or Redevelopment Flowcharts ❑ Assurance Device will be required prior to Permit Issuance(Bond or Assignment of Funds) ❑ Permit Fee due at time of permit submittal Grading Paving Drainage Submittal Requirements,Type II:Electronic files shall be PDF on USB flash-drive,email,or drop-box ❑ Complete Application ❑ Construction Plans including import/export quantities ■ 2 full size plan sets 22"x 34" ■ PDF file of the complete plan set ❑ Drainage Analysis including calculations and downstream analysis (2 sets)and(PDF file); refer to Stormwater Drainage Requirements ❑ Geotechnical Report(2 sets)and(PDF file) ❑ SEPA is required if 500 or more cubic yards of cut/fill is proposed(not required if included with a Land Use Permit) ❑ SEPA Public Notice Material Requirements: ■ Snohomish County Assessor's Quarter Section Map: ❑ Show Subject Property ❑ Show 500 ft.Boundary ■ Current Owner List(of properties within 50Oft.radius)including the following: ❑ Tax Parcel ID Number(s) ❑ Owner(s)Full Name(s) ❑ Owner(s) Mailing Address(es) ❑ Current Resident&Property Address(if property owner doesn't reside at the property) ■ Mailing Material:Provide❑ white,#10 envelopes with the following affixed to the envelopes: ❑ Postage ❑ Mailing Labels ❑ Return Address labels: 18204 591h Ave NE,Arlington WA 98223 ❑ Grading cut/fill quantity: ❑ Construction Calculation Worksheet ❑ NPDES Permit(if required);See Storm Water Drainage Report,New or Redevelopment Flowcharts ❑ Permit fee due at time of permit submittal Right of Way Submittal Requirements,Type III: Electronic files shall be PDF on USB flash-drive,email,or drop-box ❑ Complete Application. ❑ Construction Plans. ❑ Traffic Control Plan. ❑ Road Closure Request. ❑ Temporary Erosion&Sediment Control(TESC) Plan. ❑ Certificate of Insurance with the City of Arlington named as Additional Insured. ❑ Assurance Device will be required prior to Permit Issuance(Bond or Assignment of Funds). O Engineers Estimated Cost of Construction;$5000.00 ❑ Permit fee due at time of permit issuance. Page 2 of 2 Completed By: O.Villanueva AS B U I LT COVER Completion Date: 10/17/2025 Address: 21210 87TH AVE NE ARLINGTON WA 98223 Job Type: Forced Relocates Site Latitude: 48.188543 Tie-In Latitude: 48.188543 ss Job Subtype: Reimbursable Site Longitude: -122.1157977 Tie-In Longitude: -122.1157977 Survey Scope: Post-Sale Footages Entered On Right of Way,Private Exterior,and Private Interior tabs. Footages are COMCAST Project Manager: summarized on Survey Rollup tab. s P2 ID: JB0002370476 Are Additional Pages Needed: No *IMPORTANT CONSIDERATIONS FOR ROUTE OVERVIEW COMPLETION* CALL OUT IF IT IS COAX OR FIBER. NEED TO KNOW WHAT ADJACENT STRUCTURE IS IMPACTED/REMOVED AND WHERE IT IS LOCATED. NOTATE THE NUMBER AND SIZE OF THE NEW STRUCTURE(IE.;CONDUIT) NOTE ALL FUTURE PEDESTAL/VAULT LOCATIONS ENSURE YOU HAVE VERIFIED THE EXISTING COMCAST FACILITIES(COAX/FIBER/CASE LOCATIONS/SHEATHS PER CASE/SLACK LOCATIONS AND FOOTAGE/STRUCTURE)SHOWN ON THE FACILITY SEARCH MAP WITHIN THE CONSTRUCTION AREA. SHOW OVERALL ROUTE AND WHAT IS BEING RELOCATED FROM AERIAL TO UNDERGROUND OR UNDERGROUND TO AERIAL. Legend Provide Clear Route Overview Construction Details Route STARTING WITH POLE 1, UNDERGROUND PROOF AND PULL 14T E TO VAULT 1.AT VAULT 1,UNDERGROUND OVERPULL 65'S,CONTINUE INTO PRIVATE PROPERTY. FROM VAULT 1,UNDERGROUND PROOF AND PULL,144'E TO VAULT 3. FROM VAULT 3, Underground Route UNDERGROUND PROOF AND PULL 152'E TO VAULT 4.FROM VAULT 4,10-TO POLE 2,RISER UP.FROM VAULT 4,UNDERGROUND OVERPULL 30'ACROSS 212TH ST NE,CONTINUE INTO PRIVATE PROPERTY.WRECKOUT AERIAL ONCE COMPLETE. Aerial Route Underground Overpull Aerial Overlash Footages Aerial UG Footage 150' Aerial Overlash 150'OL Overpull Conduit 150'OP Interior Footage 150'IN Conduit Tic Support f Pedestal Medical <, Vault Fv1 Manhole MH Hand Hole HH Lockbox/Dmark ■ � Telco/Cable Pole O F Highland Dr 212th St NE I Tu ' t r ,. Joint Use Pole Joint Transformer Pole ® ,o 211th L n Power Pole X !c• 0 Pole Tag PT-123 > Riser Power Supply La Addresses Address Number 1234 w R Vacant Lot VL ` Fiber Splice Case Slack Callouts Callout Arrow w 2 00 Completed By: O.Villanueva Route Overview Completion Date: 10/17/2025 Address: 21210 87TH AVE NE ARLINGTON WA 98223 Job Type: Forced Relocates Site Latitude: 48.188543 Tie-In Latitude: 48.188543 ar Job Subtype: Reimbursable Site Longitude: -1z2.1157977 Tie-In Longitude: -122.1157977 ' Survey Scope: Post Sale � COMICAST Y p Footages Entered On Right of Way, Private Exterior,and Private Interior tabs. Footages are Project Manager: summarized on Survey Rollup tab. s P2 ID: JB0002370476 Are Additional Pages Needed: No Legend Provide Clear Route Overview Construction Details Route STARTING WITH POLE 1, UNDERGROUND PROOF AND PULL 143'E TO VAULT 1.AT VAULT 1,UNDERGROUND OVERPULL 65'S,CONTINUE INTO PRIVATE PROPERTY. FROM VAULT 1,UNDERGROUND PROOF AND PULL,144'E TO VAULT 3. FROM VAULT 3, Underground Route UNDERGROUND PROOF AND PULL 152'E TO VAULT 4.FROM VAULT4,10'TO POLE 2,RISER UP.FROM VAULT4,UNDERGROUND OVERPULL 30'ACROSS 212TH ST NE,CONTINUE INTO PRIVATE PROPERTY.WRECKOUT AERIAL ONCE COMPLETE. Aerial Route Underground Overpull '��' L• r,� ` � Aerial Overlash 1' Q Footages •,� , Aerial UG Footage Aerial Overlash Overpull Conduit Interior Footage Conduit Tic w W I 1 Support Uk Pedestal � ; — _ � �� •. it Vault v❑ � Manhole MH 1 Hand Hole HH _ I � Lockbox/Dmark Telco/Cable Pole W S Joint Use Pole Pole 1 43'O Pole 2 144'O Pole 3 Pole 4 a �0 152'OL Joint Transformer Pole ® _ � ® �iJ • Power Pole X Pole Tag PT-123 r �• Riser 0 65'OP �tl� t N E Power Supply Lai ? 53'OP Addresses Address Number 1234 f �'• . Vacant Lot VL TV Fiber ' t Splice Case ! �` Slack CXD + Callouts .r ` Callout Arrow �-b Completed By: O.Villanueva Route Overview Completion Date: 10/17/2025 Address: 21210 87TH AVE NE ARLINGTON WA 98223 Job Type: Forced Relocates Site Latitude: 48.188543 Tie-In Latitude: 48.188543 ar 40110 Job Subtype: Reimbursable Site Longitude: -122.1157977 Tie-In Longitude: -122.1157977 ' Survey Scope: Post-Sale COMICAST Y p Footages Entered On Right of Way, Private Exterior,and Private Interior tabs. Footages are =• ' Project Manager: summarized on Survey Rollup tab. s P2 ID: JB0002370476 Are Additional Pages Needed: No Legend Provide Clear Route Overview Construction Details Route STARTING WITH POLE 1, UNDERGROUND PROOF AND PULL 143'E TO VAULT 1.AT VAULT 1,UNDERGROUND OVERPULL 65'S,CONTINUE INTO PRIVATE PROPERTY. FROM VAULT 1,UNDERGROUND PROOF AND PULL,144'E TO VAULT 3. FROM VAULT 3, Underground Route UNDERGROUND PROOF AND PULL 152'E TO VAULT 4.FROM VAULT4,10'TO POLE 2,RISER UP.FROM VAULT4,UNDERGROUND OVERPULL 30'ACROSS 212TH ST NE,CONTINUE INTO PRIVATE PROPERTY.WRECKOUT AERIAL ONCE COMPLETE. Aerial Route Underground Overpull Aerial Overlash Footages Aerial UG Footage 150' Aerial Overlash 150'OL r , dW Overpull Conduit 150'OP ' 1 Interior Footage Conduit Tic W Support Pedestal Vault V❑ Manhole MH i Hand Hole HH I Lockbox/Dmark Telco/Cable Pole Joint Use Pole ® Pole 1 143' VAULT 1 144' VAULT 3 15z' VAULT 4 Pole2 Joint Transformer Pole ® "s• A, V❑ V vow Power Pole X 10, Pole Tag PT 123 �i� �■ Riser 65'OP Power Supply Psi' r 30'OP Addresses X vAULT z Address Number 1234 ir Vacant Lot VL " • ' Fiber Oft- Splice Case • , �� ` r Slack �i s s ► �.-- Callouts • Callout Arrow ` '4'> > ` T • � �� Ak f� Right of Way Completed By: O.Villanueva Address: 21210 87TH AVE NE ARLINGTON WA 98223 Completion Date: 10/17/2025 Right of Way Footages: Job Type: Forced Relocates New Aerial Coax: 0 Overlash Coax: 0 New UG Fiber: 0 Job Subtype: Reimbursable New Aerial Fiber: 0 Overlash Fiber: 0 Existing UG Fiber: 0 Survey Scope: Post-Sale Empty Conduit Only: 0 New UG Coax: 499 Existing UG Coax: 0 C O M C A S T Project Manager: P2 ID: IJB0002370476 Are Additional Pages Needed: No *IMPORTANT CONSIDERATIONS FOR RIGHT OF WAY COMPLETION* CALL OUT IF IT IS COAX OR FIBER. NEED TO KNOW WHAT ADJACENT STRUCTURE IS IMPACTED/REMOVED AND WHERE IT IS LOCATED. NOTATE THE NUMBER AND SIZE OF NEW STRUCTURE(IE.;CONDUIT) NOTE ALL FUTURE PEDESTAL/VAULT LOCATIONS ENSURE YOU HAVE VERIFIED THE EXISTING COMCAST FACILITIES(COAX/FIBER/CASE LOCATIONS/SHEATHS PER CASE/SLACK LOCATIONS AND FOOTAGE/STRUCTURE)SHOWN ON THE FACILITY SEARCH MAP WITHIN THE CONSTRUCTION AREA. Legend Provide Clear Right of Way Construction Details Route STARTING WITH POLE 1, UNDERGROUND PROOF AND PULL 143'E TO VAULT 1.AT VAULT 1,UNDERGROUND OVERPULL 65'S,CONTINUE INTO PRIVATE PROPERTY. FROM VAULT 1,UNDERGROUND PROOF AND PULL,144'E TO VAULT 3. FROM VAULT 3,UNDERGROUND PROOF AND PULL 152'E TO VAULT 4.FROM VAULT 4,10'TO POLE 2,RISER UP.FROM VAULT 4,UNDERGROUND OVERPULL 30'ACROSS 212TH ST NE,CONTINUE INTO PRIVATE PROPERTY.WRECKOUT AERIAL ONCE COMPLETE. Underground Route •—— Aerial Route Underground Overpull Aerial Overlash Footages Aerial UG Footage 150' Aerial Overlash 150 oL fi` Oct1 1• • Overpull Conduit 150 oP • • :' • ' • : Interior Footage 150'IN `I 1• Conduit Tic / • JArlington WA 98223 Support United States Pedestal El - Cascade Vault .• Yr• s' Manhole �- Hand Hole HH Pole 1 Pole 2 Lockbox/Dmark ■ R - Pole 2 Telco/Cable Pole Joint Use Pole Joint Transformer Pole ® -' Power Pole X - — _ - 41 Pole Tag PT-123 Riser Power Supply Ps Addresses Address Number 1234 Vacant Lot VL Fiber Splice Case Slack _ Callouts • Callouts t I f j Right of Way Completed By: O.Villanueva Address: 21210 87TH AVE NE ARLINGTON WA 98223 Completion Date: 10/17/2025 Right of Way Footages: Job Type: Forced Relocates New Aerial Coax: 0 Overlash Coax: 0 New UG Fiber: 0 Job Subtype: Reimbursable New Aerial Fiber: 0 Overlash Fiber: 0 Existing UG Fiber: 0 Survey Scope: Post-Sale Empty Conduit Only: 0 New UG Coax: 499 Existing UG Coax: 0 COMICAST Project Manager: P2 ID: JB0002370476 Are Additional Pages Needed: No Legend Provide Clear Right of Way Construction Details Route STARTING WITH POLE 1, UNDERGROUND PROOF AND PULL 143'E TO VAULT 1.AT VAULT 1,UNDERGROUND OVERPULL 65'S,CONTINUE INTO PRIVATE PROPERTY. FROM VAULT 1,UNDERGROUND PROOF AND PULL,144'E TO VAULT 3. FROM VAULT 3,UNDERGROUND PROOF AND PULL 152'E TO Underground Route VAULT4.FROM VAULT 4,10-TO POLE 2,RISER UP.FROM VAULT4,UNDERGROUND OVERPULL 30'ACROSS 212TH ST NE,CONTINUE INTO PRIVATE PROPERTY.WRECKOUT AERIAL ONCE COMPLETE. Aerial Route Underground Overpull Aerial Overlash Footages Oct Aerial UG Footage 150' `�. Aerial Overlash 150'OL Oct 3, 2025 at • • 2025 • • Overpull Conduit 150'OPN 480 • � • • 480 • W 1220 e a Interior Footage 150'IN • �'�• �� Conduit Tic / ' ' •' 212th St NE ' 'Unit Arlington WA 98223 Arlin Pedestal ❑ -• Stat � Pole 4 J E V_ _e' Vault V _ Hand Hole HH . Lockbox/Dmark `�'� — _ ■ Pole 3 _ ��= C ' — - ,' Pole 1 Pole 2 Joint Transformer Pole ® — — Po l- Pole X - Pole Tag PT-123 • 4 Riser �R Power Supply Ps Addresses ;L Address Number 1234 Vacant Lot VL Fiber Splice Case Slack Callouts � Callouts � II I -- Right of Way Completed By: O.Villanueva Address: 21210 87TH AVE NE ARLINGTON WA 98223 Completion Date: 10/17/2025 Right of Way Footages: Job Type: Forced Relocates New Aerial Coax: 0 Overlash Coax: 0 New UG Fiber: 0 Job Subtype: Reimbursable New Aerial Fiber: 0 Overlash Fiber: 0 Existing UG Fiber: 0 COAACAST Survey Scope: Post-Sale Empty Conduit Only: 0 New UG Coax: 499 Existing UG Coax: 0 IProject Manager: P2 ID: JB0002370476 Are Additional Pages Needed: No Legend Provide Clear Right of Way Construction Details Route STARTING WITH POLE 1, UNDERGROUND PROOF AND PULL 143'E TO VAULT 1.AT VAULT 1,UNDERGROUND OVERPULL 65'S,CONTINUE INTO PRIVATE PROPERTY. FROM VAULT 1,UNDERGROUND PROOF AND PULL,144'E TO VAULT 3. FROM VAULT 3,UNDERGROUND PROOF AND PULL 152'E TO Underground Route VAULT4.FROM VAULT 4,10-TO POLE 2,RISER UP.FROM VAULT4,UNDERGROUND OVERPULL 30'ACROSS 212TH ST NE,CONTINUE INTO PRIVATE PROPERTY.WRECKOUT AERIAL ONCE COMPLETE. Aerial Route Underground Overpull Aerial Overlash Footages Aerial UG Footage LL2j 1so'oL New Pole will be placed here Aerial Overlash 1 1• 6: 1 1• Overpull Conduit 150 OP Interior Footage 150'IN 1• Conduit TicSupport / • • • •' -o Pedestal -`' � � ` .•- • • Vault •' 6 0 Manhole r,H - R Hand Hole RH = Lockbox/Dmark _ - Telco/Cable Pole O 143' __ - V Joint Use Pole - (R 25') Joint Transformer Pole ® _ - 65'OP _ - (143') 144') Power Pole X — -- - — v Pole Tag PT-123 _ Riser Power Supply LLSJ Addresses Place new 4" riser — (es'OP) Address Number 1234FEW Vacant Lot VL Fiber Splice Case Slack Callouts Callouts , d � Right of Way Completed By: O.Villanueva Address: 21210 87TH AVE NE ARLINGTON WA 98223 Completion Date: 10/17/2025 Right of Way Footages: Job Type: Forced Relocates New Aerial Coax: 0 Overlash Coax: 0 New UG Fiber: 0 Job Subtype: Reimbursable New Aerial Fiber: 0 Overlash Fiber: 0 Existing UG Fiber: 0 Survey Scope: Post-Sale Empty Conduit Only: 0 New UG Coax: 499 Existing UG Coax: 0 COMICAST Project Manager: P2 ID: JB0002370476 Are Additional Pages Needed: No Legend Provide Clear Right of Way Construction Details Route STARTING WITH POLE 1, UNDERGROUND PROOF AND PULL 143'E TO VAULT 1.AT VAULT 1,UNDERGROUND OVERPULL 65'S,CONTINUE INTO PRIVATE PROPERTY. FROM VAULT 1,UNDERGROUND PROOF AND PULL,144'E TO VAULT 3. FROM VAULT 3,UNDERGROUND PROOF AND PULL 152'E TO Underground Route VAULT4.FROM VAULT 4,10-TO POLE 2,RISER UP.FROM VAULT4,UNDERGROUND OVERPULL 30'ACROSS 212TH ST NE,CONTINUE INTO PRIVATE PROPERTY.WRECKOUT AERIAL ONCE COMPLETE. Aerial Route Underground Overpull Aerial Overlash Footages Aerial UG Footage 150'�:i . Aerial Overlash 150'OL • • • • Overpull Conduit 150'OP ' : • • • : • e a Interior Footage 150'IN • �'�• �� Conduit Tic / ' ' •' ' ' �1 s'A Support Pedestal • l -d ` Vault V❑ ► ;, Manhole Hand Hole RH r Lockbox/Dmark . i� Telco/Cable Pole O y '� v 10, Joint Use Pole (144') 152 `�' - 211'OP Joint Transformer Pole ® v V _ - — Power Pole X Pole Tag PT-123 152') Riser R� t— Power Supply Ps p Addresses Address Number 1234 Vacant Lot VL Fiber 5 Splice Case �� Slack Callouts —- - Callouts 2-5x5 concrete restoration 2-2x10 curb and gutter restoration 2-6x4 asphalt restoration Possible ADA restoration dependent on locates TC P Completed By: O.Villanueva Address: 21210 87TH AVE NE ARLINGTON WA 98223 Completion Date: 10/17/2025 Right of Way Footages: Job Type: Forced Relocates New Aerial Coax: 0 Overlash Coax: 0 New UG Fiber: 0 Job Subtype: Reimbursable New Aerial Fiber: 0 Overlash Fiber: 0 Existing UG Fiber: 0 Survey Scope: Post-Sale Empty Conduit Only: 0 New UG Coax: 499 Existing UG Coax: 0 COAACAST Project Manager: P2 ID: JB0002370476 Are Additional Pages Needed: No Legend Provide Clear Right of Way Construction Details Route STARTING WITH POLE 1, UNDERGROUND PROOF AND PULL 143'E TO VAULT 1.AT VAULT 1,UNDERGROUND OVERPULL 65'S,CONTINUE INTO PRIVATE PROPERTY. FROM VAULT 1,UNDERGROUND PROOF AND PULL,144'E TO VAULT 3. FROM VAULT 3,UNDERGROUND PROOF AND PULL 152'E TO Underground Route VAULT4.FROM VAULT 4,10-TO POLE 2,RISER UP.FROM VAULT4,UNDERGROUND OVERPULL 30'ACROSS 212TH ST NE,CONTINUE INTO PRIVATE PROPERTY.WRECKOUT AERIAL ONCE COMPLETE. Aerial Route Underground Overpull Aerial Overlash Footages Aerial UG Footage 150' Aerial Overlash 150'OL BUFFER DATA SIGN SPACING =x (1) RURAL HIC+EAMYS !U!65 NFMI N7s 150 OP LONGITUDINAL BUFFER SPACE = B RURAL ROADS 45 155 MPH sw7 WZG-70 (OPTIONAL IF Overpu Conduit RUR/LL ROADS a URBAA ARTERII45 35!tG MPH 357s N MPH OR LESS) 150'IN SPFFD ;MPH: 25 10 35 40 4, 50 SS W !1� 70 RURAL ROADS URBAN ARTERIALS. 25 130 MPH 2W,A 12) Interior Footage RESIDENTIAL A BUSINESS OISTRICTS 451• 46. Conduit Tic / LENGI- ;1ee0 155 200 250 305 3W 425 495 57C 645 730 URBAN STREETS 25 MPH OR LESS IW&rA BE /ROAD i11 ALL SPACING VAY BE ADAA87ED TO ACCOMMODATE Support TRANSPORTABLE ATTENUATOR ROLL AHEAD DISTANCE = R INTFRSEC71ONS AND DRIVEVMYS, PREPARED WORK !21 THIS SPACING MAY BE REDUCED IN URBAN AREAS TO FIT TO S70P AHEAD RUAUwAV CONDITIONS. %-�� ❑ HOST VEHICLE 10 be, HOST VEHICLE WEILHT I,p 16° yl 461 Pedestal 9900 TO 22,000 106. ' 22.000 Ibe. � ONE LANE Vault V❑ N'20.1 < 45 MPH 45-65 MPH SS h11H 45 NPH 45-55 MPH 55 MPH W20-70 ❑ ROAD Manhole MH 100' 123 •?2 74 +ar 150' AHEAD Ie• 4e+ Hand Hole HH PROTECTIVE VEHICLE (WORK VEHICLE)= R % ■ Ois 6 W0.7A W204 No sPcIFIEo olsrAC elRo 6 D DEVICE MI I R s MIN, z II < Telco/Cable Pole Joint Use Pole 0 WORK " ® t DOO AREA C,= O D Joint Transformer Pole Power Pole X Pole Tag PT-123 14 Id Mao I Riser Power Supply Ps x �030DTD START 212TH AVE NE Addresses 4r' 41' Address Number 1234 ONE LANE lV ROAD CHANNELWITION DEVICE Vacant Lot VL AHEAD SPACING tPegn lap \- Idr \•/ MPN TAPER TANGENT Fiber �„ E saros to To a ao 451 W20-4 b+' W20-7A 15.45 10 TO 20 60 Splice Case ROAD / BE 2a.10 1 10 TO 20 1 40 WORK IREPARrD Slack AHEAD TostlP S Callouts 48' 49 CalIOUtS W20.1 WM70 W4.79 (CPTIONAL IF 40 MPH OR LESS NOTES 1,ALL SIGNS ARE BLACK ON ORANGE, LEGEND 2. EXTENDING THE CIHANNEUZING DEVICE TAPER ACROSS SHOULDER IS RECOMMENDED. 4r4 FLAGGING STATION 3, NIGHT WORK REOUIRES ADDI-IONAL ROADWAY LIGHTING AT q TEMPORARY SIGN LOCATION ONE-LANE, TWO-WAY TRAFFIC CONTROL FOR ADDITONAL DFTAI FLAGNG Etg• PROTECTIVE THE STANDARD SPECIFICATIONS CHANNELIVF VEHICLE Devices WITH FLAGGERS tAI 4, SEE SPECIAL PROVISIONS t•OH GHK HOUR HtSIHIC 110NS, ® NOT TO SCALE F'r NA-r s•.y.. N ra suse.na.m.ar n snore i 4,-r.n .•e rsu c WorA 1.11 11.044.C. I—w• 1-14.cmnro.n,rl•m•nn eM,tyr, +1 I IVr 1;as;,4-M •-�• ^•� FED,AID PRO.I,NO, Y _ RATL ,maws —'� PLOTTF] SY Iltt•1/ A9 Mir TC1 DESIGNED BY •"'<•'-• ENTERED S� ...131i�,y t:''i St [.: •�••• C'"KED BY ••-•- 1.1 , Ue^..e r1•Ile't o• Ira aDo rta11OR .. P"G'•r"`'"• TRAFFIC CONTRO. PLAN RCGI04AL ADM, -EVIFAIN -Alt - TC P Completed By: O.Villanueva Address: 21210 87TH AVE NE ARLINGTON WA 98223 Completion Date: 10/17/2025 Right of Way Footages: Job Type: Forced Relocates New Aerial Coax: 0 Overlash Coax: 0 New UG Fiber: 0 Job Subtype: Reimbursable New Aerial Fiber: 0 Overlash Fiber: 0 Existing UG Fiber: 0 Survey Scope: Post-Sale Empty Conduit Only: 0 New UG Coax: 499 Existing UG Coax: 0 COAACAST Project Manager: P2 ID: JB0002370476 Are Additional Pages Needed: No Legend Provide Clear Right of Way Construction Details Route STARTING WITH POLE 1, UNDERGROUND PROOF AND PULL 143'E TO VAULT 1.AT VAULT 1,UNDERGROUND OVERPULL 65'S,CONTINUE INTO PRIVATE PROPERTY. FROM VAULT 1,UNDERGROUND PROOF AND PULL,144'E TO VAULT 3. FROM VAULT 3,UNDERGROUND PROOF AND PULL 152'E TO Underground Route VAULT4.FROM VAULT 4,10-TO POLE 2,RISER UP.FROM VAULT4,UNDERGROUND OVERPULL 30'ACROSS 212TH ST NE,CONTINUE INTO PRIVATE PROPERTY.WRECKOUT AERIAL ONCE COMPLETE. Aerial Route Underground Overpull Aerial Overlash Footages Aerial UG Footage 150' Aerial Overlash 150'OL BUFFER DATA SIGN SPACING =x (1) RURAL HIGMAMYS 60!aS MPH SD7s RURAL ROADS 45!55 MPH sw0 Wao-e {GarIONAL IF 150 OP LONGITUDINAL BUFFER SPACE = B 4c NPn oR LESSI Overpull Conduit RJRAL ROADS a URSN4 ARTERIALS 15 040 MPH 75ds _ Interior Footage 150'IN SPEED (MPH; 25 i( 3) 40 41 50 55 60 4S lD RURAL ROADS.U BUSINESS ARTERIALS, 25!30 MPH Soo.ta; / , aLIRAL OMTIAL . RISINESS d ARTERIALS, s sd" 48 Conduit TIC / LENGTH 11eet, 155 20D 250 305 36Z 425 495 570 1 645 1 730 URBAN STREETS 25 MPH OR LESS 137s.I2: BE ROAD {t)ALL SPACING MAC BE ADJUSTED TO ACCOMMCOATE PREPARED I WORK Support TRANSPORTABI F ATTFNLJATOR ROLL AHEAD DISTANCE = R 121 ITH�RSPACINGS MAG�aREIXfCED M UPIL4� nREAs TC F1T TO STOP AHEAD Pedestal ❑ HOST VEHICLE 22. O II& HOST VEHICLE WEIGHT ROI.DNMV CGND111OA15. 4V 4d" ie. 48. 9.900 TO zz,000 Ix• > zz-000 lbs. ONE LANE Vault V❑ IM2a1 < 45 MPI• 4-,•65 MPH •,I'I = 45 MPH 4$.55 MPH > 55 MPH W204H NH ROAD Manhole 1 OD' +_3 ?4 +oG 150' AHEAD q 4B• Hand Hole HH PROTECTIVE VEHICLE (WORK VEHICLE)= R So TO Too Lockbox/Dmark ■ NO SPECIFIED DISTANCE REQUIRED MFda7A W2o.t r.I I R • 6 NINE X ■ k Telco/Cable Pole O Joint Use Pole o WORK D Joint Transformer Pole Power Pole X Pole Tag PT-123 G Riser �R Power Supply Ps " x A xr7n Addresses 4r' 4r "' FFINISH 212TH AVE NE::] � DME LANE Address Number 1234 RDAD S' AHEAD C14ANNELIZATION DEVICE Vacant Lot VL �� _'"^+� SPACING PE TAP -ANGENT �— 4yl — ad, MPII Nl Sans CR fo TG ae So W2a4 W20.TA 75N5 Fiber 48 , TO TO ?0 s0 Splice Case ROAD BE as to Io To ao b Slack WORK PREPARED ' AHEAD To sToP K Callouts 48' 4'J' Ca l l O uts WZat W2aTB W:C�Ta JCPTIONAL IF 40 MPH UR LESSI NOTES 1•ALL SIGNS ARE BLACK ON ORANGE. LEGEND 2.EXTENDING THE CHANNEDZING DEVICE TAPER ACROSS SHOULDER IS RECOMMENDED. FLAGGING STATION 3•NIGHT WORK REOUIRES ADDITIONAL ROADWAY LIGHTING AT q TEMPORARY SIGN LOCATION FLAGGING ONE-LANE, TWO-WAY TRAFFIC CONTROL FOR A E ADDITIONAL DETAIIS THE STANDARD SPECIFIC4710N3 , 0 CHANNF112ING DEVICES ■ TH FLAGGERS A.SEE: sPEGAL PROVISIONS FON WORK rICJH HrS KICIIUNS• -ROTFCTIVF VEHICIF NOT TO SCALE r Lt NArt s•.�. •.N ra s•.�se.ne.m.ar , sn.,e L af_r.n nee rsu Ic Wa.R t..r. Ir. �Cmltro.Ic= u.L.n. r.. Nr rn �ce.rr:..lr rl•ao..+•r.�,np.. _ I for f;as:.e+r •-�'•r `^^ FED.AID PROJ,h7, �..r OATL � PLOTrri " I1441. a WA9 A TC1 DESIGNED 6Y PN1tRea s� Washington Stato ,..r crr_KrD a, W -n•-v+•n Department of Transportation .. vROJ,rvr.R• .. TRAFFIC CONTRO. PL AN «.•. REGIONAL ADM. REV13ICN 3ATr RY 18204 59th Avenue NE • op ' • 14 Arlington, Washington 98223 to tt Phone: 360-403-3551 jNG� WASHINGTON C Civil Use - Right of Way Permit Parcel:31051200200500 Permit#:23-0067 Permit Address:21210 87TH AVE NE Permit Expiration: April 14, 2026 Description of Work:Right of way work for Comcast OWNER APPLICANT CONTRACTOR Comcast/Ceejay D.Guzman Cablecom LLC PUBLIC UTILITY DIST 1 SNO CO 1701 John F Kennedy BLVD 2320 CALIFORNIA EVERETT,WA,98201 360-965-5085 WACONSTRUCTIONJOINTUSE@COMCAST.COM SNOHOMISH.PERMITTING@CABLECOMLLC.NET registration_number:602-265-572 PERMIT APPROVAL The issuance or granting of this permit shall not be construed to be a permit for, or approval of, any violation of this Code or any other ordinance or order of the City, of any state or federal law, or of any order, proclamation, guidance advice or decision of the Governor of this State. To the extent the issuance or granting of this permit is interpreted to allow construction activity during any period of time when such construction is prohibited or restricted by any state or federal law, or order, proclamation, guidance advice or decision of the Governor of this State, this permit shall not authorize such work and shall not be valid. The building official is authorized to prevent occupancy or use of a structure where in violation of this Code, any other City ordinances of this jurisdiction or any other ordinance or executive order of the City, or of any state or federal law, or of any order, proclamation, guidance advice or decision of the Governor. The building official is authorized to suspend or revoke this permit if it is determined to be issued in error or on the basis of incorrect, inaccurate or incomplete information, or in violation of any City ordinance, regulation or order, state or federal law, or any order, proclamation, guidance or decision of the Governor. It is unlawful to use or occupy a building or structure until a final inspection has been made and approval or a Certificate of Occupancy has been granted. This permit authorizes only the work noted and covers work to be done on private property only. Any construction on public domain (curbs, sidewalks, driveways, marquees, etc.) will require a separate permit. The property owner shall ensure that the construction project complies with all applicable zoning codes and regulations. The property owner shall also ensure that the construction project does not cause any adverse impact on the surrounding environment or community. The property owner shall be responsible for obtaining all necessary permits and approvals from the relevant authorities before commencing construction. The property owner shall ensure that the construction project complies with all applicable design review requirements. CONDITIONS Traffic Control must comply with the current version of MUTCD. Work Hours are 7 am to 7 pm Monday- Saturday (no work on Sundays or City Recognized Holidays). Inspections are not available on Saturday or 1.) Sunday. Non-motorized traffic control must be provided if any part of the work impacts existing non-motorized facilities. Non-motorized traffic control measures shall provide a level of accessibility that are, at minimum, equal to the existing conditions of the site. Two days before starting work, the applicant must have all utilities located. One Call, is a public utility locating 2.) service (#811 or 1-800-424-5555). Privately installed facilities must also be located using a private utility locating service. Private property owners which may be affected by the proposed work must be notified in advance of potential 3') disruptions in access or utility services. The applicant is required to notify the City for inspections. Failure to give notice will result in violation of AMC 4 ) Chapter 12.40.240 and may result in additional inspection fees. To request an inspection call 360-403-3417 by 3:30 for next day inspection. Applicant must comply with all applicable City of Arlington, state and federal laws, ordinances, code and regulation in performing the work authorized by this permit. INSPECTIONS Inspection Line: 360-403-3417 Call for inspections by 3:30 pm for next day inspection. Please allow 48 hours for Fire Inspections. Please provide the following information when leaving a message: Permit Number, Type of Inspection, and provide preference of morning or afternoon inspection. Inspection Portal: Please login to customer portal and submit for the desired inspection type for the permit. APPROVED BY Admin - Thad Newport Development Services Engineering Manager ASSOCIATED FEES Date Description Paid Date Amount Paid Balance December 26, Processing/Technology Fee(320.341.43.00.02) $25.00 2025 December 26, Right of Way(006.322.40.00.02) $300.00 2025 TOTAL: Project Fees $325.00 $325.00 Credit/Debit Card 149 Payment Successful December 30, 2025 $325.00 $0.00 4rtk( tot( WASHINGTON Project Information - ' 'nformat;^ Project # 25-0067 Parcel # 31051200200500 Building ID Location 21210 87TH AVE NE Project Type Civil Use Project Use Right of Way Parent Project# Subdivision Applicant Name Comcast/Ceejay D. Guzman Address 1701 John F Kennedy BLVD Applicant Email WACONSTRUCTIONJOINT Phone Cell 2536063564 USE@COMCAST.COM Owner Name PUBLIC UTILITY DIST 1 SNO CO Address 2320 CALIFORNIA EVERETT, WA, 98201 Owner Email Phone Cell Contractor Cablecom LLC Address Contractor Email SNOHOMISH.PERMITTING Phone 360-965-5085 Cell @CABLECOMLLC.NET Type/Improveme Accessory/Struct nt ure Current Use Proposed Use Current Zoning Proposed Zoning Project Cost 5,000.00 Project Value 5,000.00 Current Use And Right of way work for Comcast Proposed Changes Lot Width Lot Depth Map Number Total Area of Building &Accessory Total Area of All Man-made Improvements Structures (Sq Ft) (Sq Ft) General Notes Restrictions/ Variances @ Community Development Online Portal Page 1 of 5 April 1, 2026 08:58AM WASHINGTON Structure Information Structure Type # of Stories Usable Floor Area (Sq Ft) Structure Height null # of Units 0 Load per Floor (Lbs) Sign Dimensions # of Bedrooms null # of Bathrooms null Occupancy With Chairs Tables & Chairs Empty Room Foundation Foundation Type Footing Depth null Material Foundation Information Setbacks Front& 0 0 Setbacks Right & 0 0 Rear Left Sides Setbacks Information Water Utility Public Sewage Utility Public Gas Utility Public Electric Utility Public Driveway Width null # of Off Street null # of Off Street null Parking Loading Miscellaneous Information ©Community Development Online Portal Page 2 of 5 April 1, 2026 08:58AM WASHINGTON Contractors License # Business Name Type Contact 602-265-572 Cablecom LLC General Contractor Colin Broenner ©Community Development Online Portal Page 3 of 5 April 1,2026 08:58AM 4rtk( tot( WASHINGTON Contacts Contact Name Type Project Address Phone Comcast Applicant 1701 John F Kennedy 360-403-3551 BLVD Cablecom LLC Contractor 360-965-5085 Comcast/Ceejay D. Applicant 1701 John F Kennedy Guzman BLVD PUBLIC UTILITY DIST 1 Owner 2320 CALIFORNIA SNO CO EVERETT, WA, 98201 Cablecom LLC Others 360-965-5085 ©Community Development Online Portal Page 4 of 5 April 1, 2026 08:58AM 4rtk( tot( WASHINGTON Fees Fee Type Date Debit Credit Balance Project Fees December 26, 2025 $325.00 $325.00 $325.00 $0.00 T O T A L $325.00 $325.00 $0.00 ©Community Development Online Portal Page 5 of 5 April 1, 2026 08:58AM