Loading...
HomeMy WebLinkAbout19516 Arlington Valley Rd Ne_PJ25-0147_2026 18204 59th Avenue NE • op ' • 14 Arlington, Washington 98223 to tt Phone: 360-403-3551 jNG� WASHINGTON C Civil Use - Right of Way Permit Parcel:31051400304400 Permit#: 25-0147 Permit Address:19516 ARLINGTON VALLEY RD Permit Expiration: May 18, 2026 NE Description of Work:Starting at Existing Doghouse vault,ped 1,bore 3,563's to Ped 1 OWNER APPLICANT CONTRACTOR Comcast-Ceejay Guzman Cablecom LLC AVR BUSINESS PARK LLC 1701 John F Kennedy Blvd,Philadelphia,PA,19103 701 PIKE ST SUITE 1025 SEATTLE,WA,98101 360-965-5085 253-606-3564 SNOHOMISH.PERMITTING@CABLECOMLLC.NET WAConstructionlointUse@comcast.com registration_number:602-265-572 PERMIT APPROVAL The issuance or granting of this permit shall not be construed to be a permit for, or approval of, any violation of this Code or any other ordinance or order of the City, of any state or federal law, or of any order, proclamation, guidance advice or decision of the Governor of this State. To the extent the issuance or granting of this permit is interpreted to allow construction activity during any period of time when such construction is prohibited or restricted by any state or federal law, or order, proclamation, guidance advice or decision of the Governor of this State, this permit shall not authorize such work and shall not be valid. The building official is authorized to prevent occupancy or use of a structure where in violation of this Code, any other City ordinances of this jurisdiction or any other ordinance or executive order of the City, or of any state or federal law, or of any order, proclamation, guidance advice or decision of the Governor. The building official is authorized to suspend or revoke this permit if it is determined to be issued in error or on the basis of incorrect, inaccurate or incomplete information, or in violation of any City ordinance, regulation or order, state or federal law, or any order, proclamation, guidance or decision of the Governor. It is unlawful to use or occupy a building or structure until a final inspection has been made and approval or a Certificate of Occupancy has been granted. This permit authorizes only the work noted and covers work to be done on private property only. Any construction on public domain (curbs, sidewalks, driveways, marquees, etc.) will require a separate permit. The property owner shall ensure that the construction project complies with all applicable zoning codes and regulations. The property owner shall also ensure that the construction project does not cause any adverse impact on the surrounding environment or community. The property owner shall be responsible for obtaining all necessary permits and approvals from the relevant authorities before commencing construction. The property owner shall ensure that the construction project complies with all applicable design review requirements. CONDITIONS Traffic Control must comply with the current version of MUTCD. Work Hours are 7 am to 7 pm Monday- Saturday (no work on Sundays or City Recognized Holidays). Inspections are not available on Saturday or 1.) Sunday. Non-motorized traffic control must be provided if any part of the work impacts existing non-motorized facilities. Non-motorized traffic control measures shall provide a level of accessibility that are, at minimum, equal to the existing conditions of the site. Two days before starting work, the applicant must have all utilities located. One Call, is a public utility locating 2.) service (#811 or 1-800-424-5555). Privately installed facilities must also be located using a private utility locating service. Private property owners which may be affected by the proposed work must be notified in advance of potential 3') disruptions in access or utility services. Restoration of any infrastructure affected by the installation shall be per City of Arlington Standards & 4.) Specifications within a period not to exceed 7 days from completion of the installation. Trench Restoration shall be per Standard Detail R-140; Contact the City Engineer for Roadway Restoration requirements, 360-403-3512. INSPECTIONS Inspection Line: 360-403-3417 Call for inspections by 3:30 pm for next day inspection. Please allow 48 hours for Fire Inspections. Please provide the following information when leaving a message: Permit Number, Type of Inspection, and provide preference of morning or afternoon inspection. Inspection Portal: Please login to customer portal and submit for the desired inspection type for the permit. APPROVED BY Admin - Thad Newport Development Services Engineering Manager ASSOCIATED FEES Date Description Paid Date Amount Paid Balance December 31, Processing/Technology Fee(320.341.43.00.02) $25.00 2025 December 31, Right of Way(006.322.40.00.02) $300.00 2025 TOTAL: Project Fees $325.00 $325.00 Credit/Debit Card 182 Payment Successful February 16, 2026 $325.00 $0.00 i CONSTRUCTION PERMIT APPLICATION Community&Economic Development City of Arlington • 18204 59th Avenue NE • Arlington,WA 98223 • Phone(360) 403-3551 CIVIL(TYPE I) 71 GRADING/PAVING/DRAINAGE(TYPE II) RIGHT OF WAY(TYPE III) TYPE I&II ONLY NEW DEVELOPMENT REDEVELOPMENT Project Name: COMCAST - JB0002388976 Snohomish County Tax Parcel I.D.#: 31051400304400 Project Address/Location: 19516 ARLINGTON VALLEY RD ARLINGTON, WA 98223 Description of Project: 'STARTING AT EXISTING DOGHOUSE VAULT, PED 1, BORE 3,563' S TO PED 1 OWNER Name: Address: City: State: Zip: Phone: Email: APPLICANT Name:COMCAST - CEEJAY D. GUZMAN Address:1701 JOHN F KENNEDY BLVD city: PHILADELPHIA State: PA zip: 19103 Phone: 2536063564 Email: WACONSTRUCTION JOINTUSE@COMCAST.COM ENGINEER Name: Address: City: State: Zip: Phone: Email: License#: Expiration: CONTRACTOR Name: CABLECOM LLC- LEAH IHLENFELDT Address: 1429 AVENUE D #339 city: SNOHOMISH State: WA Zip: 98290 Phone: 360-965-5085 Email: SNOHOMISH.PERM ITTING@CABLEC( License#: CABLEL*971 DP Expiration: 8-21-2025 1, hereby certify that I have read and examined this application, City of Arlington Municipal Code, Standard Plan & Specifications. Performance of the proposed work shall follow all applicable laws and regulations.The owner/applicant shall assume full and complete responsibility for said work and shall be responsible for the acquisition and compliance of all applicable permits and/or authorizations which may include, but not limited to, Right of Way Permit,WSDW Hydraulic Project Approval(HPA),WSDOE Notice of Intent(NOI),National Pollutant Discharge Elimination System(NPDES),Army Corp.of Engineers Permits,the rAuirements of the Endangered Species Act,and the Forest Practices Application(FPA). Signature C/�!_.�L 11 Print Name: Ceejay Guzman Date: 12/31/25 Pagel of 2 REV11/2021 Complete package constitutes all items. Only complete submittals will be accepted. Civil-Submittal Requirements,Type I: Electronic files shall be PDF on USB flash-drive,email,or drop-box ❑ Complete Application ❑ Construction Plans including cut/fill quantities ■ 2 full size plan sets 22"x 34" ■ PDF file of the complete plan set ■ 2 full size set of landscape plans 22"x 34" ❑ Marysville Utility plans,if applicable(2 sets) ❑ Drainage Analysis including calculations and downstream analysis(2 sets)and(PDF file); refer to Stormwater Drainage Requirements ❑ Geotechnical Report(2 sets)and(PDF file) ❑ SEPA is required if 500 or more cubic yards of cut/fill is proposed(not required if included with a Land Use Permit);if there is not a Land Use Permit associated with the project,Public Notice Materials will be required ❑ Grading cut/fill quantity: ❑ Design Vehicle-demonstrate turning radius include 45'Fire truck,dual axle,256-inch wheelbase ❑ Drafts of easement(s) dedication(s),and/or CAPE(s)for review ❑ Flood Hazard Permit Application and required documentation if project is within 100-year flood plain;refer to Flood Hazard guidance documents ❑ Construction Calculation Worksheet ❑ NPDES Permit(if required);See Storm Water Drainage Report,New or Redevelopment Flowcharts ❑ Assurance Device will be required prior to Permit Issuance(Bond or Assignment of Funds) ❑ Permit Fee due at time of permit submittal Grading Paving Drainage Submittal Requirements,Type II:Electronic files shall be PDF on USB flash-drive,email,or drop-box ❑ Complete Application ❑ Construction Plans including import/export quantities ■ 2 full size plan sets 22"x 34" ■ PDF file of the complete plan set ❑ Drainage Analysis including calculations and downstream analysis (2 sets)and(PDF file); refer to Stormwater Drainage Requirements ❑ Geotechnical Report(2 sets)and(PDF file) ❑ SEPA is required if 500 or more cubic yards of cut/fill is proposed(not required if included with a Land Use Permit) ❑ SEPA Public Notice Material Requirements: ■ Snohomish County Assessor's Quarter Section Map: ❑ Show Subject Property ❑ Show 500 ft.Boundary ■ Current Owner List(of properties within 50Oft.radius)including the following: ❑ Tax Parcel ID Number(s) ❑ Owner(s)Full Name(s) ❑ Owner(s) Mailing Address(es) ❑ Current Resident&Property Address(if property owner doesn't reside at the property) ■ Mailing Material:Provide❑ white,#10 envelopes with the following affixed to the envelopes: ❑ Postage ❑ Mailing Labels ❑ Return Address labels: 18204 591h Ave NE,Arlington WA 98223 ❑ Grading cut/fill quantity: ❑ Construction Calculation Worksheet ❑ NPDES Permit(if required);See Storm Water Drainage Report,New or Redevelopment Flowcharts ❑ Permit fee due at time of permit submittal Right of Way Submittal Requirements,Type III: Electronic files shall be PDF on USB flash-drive,email,or drop-box ❑ Complete Application. ❑ Construction Plans. ❑ Traffic Control Plan. ❑ Road Closure Request. ❑ Temporary Erosion&Sediment Control(TESC) Plan. ❑ Certificate of Insurance with the City of Arlington named as Additional Insured. ❑ Assurance Device will be required prior to Permit Issuance(Bond or Assignment of Funds). O Engineers Estimated Cost of Construction;$5000.00 ❑ Permit fee due at time of permit issuance. Page 2 of 2 AS 6 U I LT COVER Completed By: COLIN BROENNER Completion Date: 10/17/2025 Address: 19516 Arlington Valley Rd,Arlington,WA 98223 Job Type: Hyperbuild Row Site Latitude: Tie-In Latitude: Irk Job Subtype: Fiber Site Longitude: Tie-In Longitude: Survey Scope: Post-Sale Footages Entered On Right of Way,Private Exterior,and Private Interior tabs. Footages are / r COMICAST Project Manager: - summarized on Survey Rollup tab. ti P2 ID: JB0002388976 Are Additional Pages Needed: No Legend Provide Clear Route Overview Construction Details Route STARTING AT EXISTING DOGHOUSE VAULT,PED 1,BORE 3,563'S TO PIED 11.POTHOLE LOCATIONS IN ORANGE.SPLICE PER DESIGN. Underground Route Aerial Route Underground Overpull Aerial Overlash Footages Aerial UG Footage 150' Aerial Overlash 150'OL Overpull Conduit 150'OP Interior Footage 150'IN Conduit Tic Support Pedestal ❑ Vault v❑ Manhole MH Hand Hole HH Lockbox/Dmark Telco/Cable Pole O Joint Use Pole Joint Transformer Pole Power Pole X Pole Tag PT-123 Riser ® >.rlington 1. Power Supply LLS Addresses Address Number 1234 Vacant Lot VL Fiber Splice Case Slack Callouts � � - Callout Arrow J y J n � y Completed By: COLIN BROENNER Route Overview Completion Date: 10/17/2025 Address: 19516 Arlington Valley Rd,Arlington,WA 98223 Job Type: Hyperbuild Row Site Latitude: Tie-In Latitude: �r Job Subtype: Fiber Site Longitude: Tie-In Longitude: Survey Scope: Post-Sale W "' E COMICAST Y p Footages Entered On Right of Way,Private Exterior,and Private Interior tabs. Footages are Project Manager: summarized on Survey Rollup tab. s P2 ID: JB0002388976 Are Additional Pages Needed: No Legend Provide Clear Route Overview Construction Details Route STARTING AT EXISTING DOGHOUSE VAULT,PED 1,BORE 3,563'S TO PED 11.POTHOLE LOCATIONS IN ORANGE.SPLICE PER DESIGN. Underground Route Aerial Route Underground Overpull - - •- + 2 0 4 t F-I S t V.4 Aerial Overlash Footages J Aerial UG Footage FP E7 1-1 Aerial Overlash 150'OL v ! _ __ _ r Overpull Conduit 423' Interior Footage 150'IN Conduit Tic MP PED 2 � � Support • - �-.=��J "�: �•� - Pedestal - - - - ' _�• ' - -- -- Per Vault v❑ _ - _ � - „��__ - .. �s — 7� Manhole --- Hand Hole HH -. _, - = �! i 219' 4tr Lockbox/Dmark _ ; - 304' PEDS :� 372' _ PED 4 R _ 279' ( - Telco/Cable Pole _ o% —•-- - - - - - - - PED 7 �}- Joint Use Pole 207 Joint Transformer Pole Power Pole X - - - PED 8 _ Pole Tag PT-123 s. - r a Riser ® t -_ - - - - - a _ � - Wo Power Supplywd rs _ ' s.✓. 444' �- Addresses - t Address Number 1234 ia` _ � �•� _ PED 9 - - r i % Vacant Lot VL Fiber Splice Case Slack ( Callouts Callout Arrow 1 ` - _ 636' ��� _ = Completed By: COLIN BROENNER Address: 19516 Arlington Valley Rd,Arlington,WA 98223 Right of Way Completion Date: 10/17/2025 Right of Way Footages: Job Type: Hyperbuild Row New Aerial Coax: 0 Overlash Coax: 0 New UG Fiber: 0 Job Subtype: Fiber New Aerial Fiber: 0 Overlash Fiber: 0 Existing UG Fiber: 0 C O����� Survey Scope: Post-Sale Empty Conduit Only: 0 New UG Coax: 0 Existing UG Coax: 0 Project Manager: P2 ID: IJB0002388976 Are Additional Pages Needed: No *IMPORTANT CONSIDERATIONS FOR RIGHT OF WAY COMPLETION* NOTE ALL FUTURE PEDESTAL/VAULT LOCATIONS ENSURE YOU HAVE VERIFIED THE EXISTING COMCAST FACILITIES(FIBER/CASE LOCATIONS/SHEATHS PER CASE/SLACK LOCATIONS/FOOTAGE/STRUCTURE)SHOWN ON THE FACILITY SEARCH MAP WITHIN THE CONSTRUCTION AREA. SHOW ENTIRE ROUTE FROM TIE IN TO END POINT LAST ROW FIBER SPLICE CASE NEEDS TO BE WITHIN 800'OF EVERY TARGET BUILDINGS CENTER Legend Provide Clear Right of Way Construction Details Route STARTING AT EXISTING DOGHOUSE VAULT,PED 1,BORE 3,563'S TO PED 11.POTHOLE LOCATIONS IN ORANGE.SPLICE PER DESIGN. Underground Route Aerial Route Underground Overpull Aerial Overlash Footages Aerial UG Footage 150' . • 1 • 1 s e `r; Aerial Overlash 150'OIL Overpull Conduit 150 OP 1 1 t ti 150 IN a" r` a • 'off • • ! Interior Footage 20200 F h _ :, Arlington • 8223 Conduit Tic / — - United States Support Pedestal Vault QAj Manhole --- a -- Hand Hole RH Lockbox/Dmark >,► - *N7 Telco/Cable Pole 423FT Joint Use Pole Joint Transformer Pole 352FT i.. ,. Power Pole x Pole Tag PT-123 Riser U ` Power Supply LLS s Addresses Y y- PLACE NEVV Address Number 1234 �F - Vacant Lot VL / Fiber Splice Case v � (423FT) Slack ^� Callouts Callouts Right of Way Completed By: COLIN BROENNER Address: 19516 Arlington Valley Rd,Arlington,WA 98223 Completion Date: 10/17/2025 Right of Way Footages: Job Type: Hyperbuild Row New Aerial Coax: 0 Overlash Coax: 0 New UG Fiber: 0 Job Subtype: Fiber New Aerial Fiber: 0 Overlash Fiber: 0 Existing UG Fiber: 0 Survey Scope: Post-Sale Empty Conduit Only: 0 New UG Coax: 0 Existing UG Coax: 0 COMICAST Project Manager: P2 ID: JB0002388976 Are Additional Pages Needed: No Legend Provide Clear Right of Way Construction Details Route STARTING AT EXISTING DOGHOUSE VAULT,PED 1,BORE 3,563'S TO PED 11.POTHOLE LOCATIONS IN ORANGE.SPLICE PER DESIGN. Underground Route Aerial Route Underground Overpull Aerial Overlash Footages Aerial UG Footage ,2l -91 ..tee a Aerial Overlash 150'OL t �" _ -{ t Overpull Conduit �1I � l l' �; • ( Interior Footage 150 IN ,, United States, Conduit Tic / Support • Pedestal Vault V❑ �'�_�� - Manhole It - Hand Hole HH 304FT �- 372FT Lockbox/Dmark Telco/Cable Pole (� Joint Use Pole R y` Joint Transformer Pole Power Pole X Pole Tag PT-123 Riser (219FT) (304 FT �� Power Supply Ps Addresses Address Number 1234 • , ;, Vacant Lot VIL • • : • Fiber • • • Splice Case Slack � Callouts Callouts 279FT (372FT) Right of Way Completed By: COLIN BROENNER Address: 19516 Arlington Valley Rd,Arlington,WA 98223 Completion Date: 10/17/2025 Right of Way Footages: Job Type: Hyperbuild Row New Aerial Coax: 0 Overlash Coax: 0 New UG Fiber: 0 Job Subtype: Fiber New Aerial Fiber: 0 Overlash Fiber: 0 Existing UG Fiber: 0 COMICAST Survey Scope: Post-Sale Empty Conduit Only: 0 New UG Coax: 0 Existing UG Coax: 0 IProject Manager: P2 ID: JB0002388976 Are Additional Pages Needed: No Legend Provide Clear Right of Way Construction Details Route STARTING AT EXISTING DOGHOUSE VAULT,PED 1,BORE 3,563'S TO PED 11.POTHOLE LOCATIONS IN ORANGE.SPLICE PER DESIGN. Underground Route Aerial Route Underground Overpull Aerial Overlash Footages Aerial UG Footage Aerial Overlash 150 OL • 6 �0 5 �` ' : ° 1 } c.P' 'C , • e e Overpull Conduit 150'OP 1` Interior Footage 150'IN • •n WA •223 �;. •• United State -• Conduit Tic / Support Pedestal Vault o - Manhole wH - Hand Hole - Lockbox/Dmark ■ Telco/Cable Pole O 2 X 2 POTHOLE _ Joint Use Pole - JointTransformerPole Power Pole X Pole Tag PT-123 Riser Power Supply Ps Addresses Address Number 1234 Vacant Lot VL �F Fiber •:� - Splice Case . • • . • Slack -• Callouts Callouts Wp 327FT V 2 X 2 POTHOLE Right of Way Completed By: COLIN BROENNER Address: 19516 Arlington Valley Rd,Arlington,WA 98223 Completion Date: 10/17/2025 Right of Way Footages: Job Type: Hyperbuild Row New Aerial Coax: 0 Overlash Coax: 0 New UG Fiber: 0 Job Subtype: Fiber New Aerial Fiber: 0 Overlash Fiber: 0 Existing UG Fiber: 0 O����T Survey Scope: Post-Sale Empty Conduit Only: 0 New UG Coax: 0 Existing UG Coax: 0 CI Project Manager: P2 ID: JB0002388976 Are Additional Pages Needed: No Legend Provide Clear Right of Way Construction Details Route STARTING AT EXISTING DOGHOUSE VAULT,PED 1,BORE 3,563'S TO PED 11.POTHOLE LOCATIONS IN ORANGE.SPLICE PER DESIGN. Underground Route Aerial Route Underground Overpull Aerial Overlash Footages Aerial UG Footage 150' • , ' _ \ Aerial Overlash 150'OL Overpull Conduit 150 OP 13 T 1; ";' • • •••: � � l �� Interior Footage 150'IN •,l 11 •' _ • • Conduit Tic / Support Pedestal Vault V❑ Manhole Hand Hole HH Lockbox/Dmark Telco/Cable Pole 636FT O Joint Use Pole 636FT V (636FT) -+ ® (327FT) Joint Transformer Pole Power Pole X Pole Tag PT-123 Riser Power Supply Ps Addresses Address Number 1234 Vacant Lot VL Fiber Oct Splice Case � jJ o • •' ••• • 1st PI NE Slack xP,x.' �.: Arlington W• 98223 States Callouts - I • �y Callouts 636FT i r- Completed By: COLIN BROENNER Completion Date: 10/17/2025 Address: 19516 Arlington Valley Rd,Arlington,WA 98223 Job Type: Hyperbuild Row Site Latitude: Tie-In Latitude: N\ Job Subtype: Fiber Site Longitude: Tie-In Longitude: MICAST Survey Scope: Post-Sale Footages Entered On Right of Way,Private Exterior,and Private Interior tabs. Footages are Project Manager: summarized on Survey Rollup tab. '� s` s P2 ID: JB0002388976 Are Additional Pages Needed: No Legend Provide Clear Route Overview Construction Details Route STARTING AT EXISTING DOGHOUSE VAULT,PIED 1,BORE 3,563'S TO PIED 11.POTHOLE LOCATIONS IN ORANGE.SPLICE PER DESIGN. Underground Route Aerial Route Underground Overpull SIGN SPACING =x (1) Aerial Overlash BUFFER DATA RURAL HIGMANYS GD!63 MPH eDDs LONGITUDINAL BUFFER SPACE = B RURAL ROADS 45)55 MPII SODA. W2F79 (GPTIOMAL IF Footages Rl1RA1 ROAM a URBAN ARTERIALS 35/40 MPH 33Os AO MPH OR LESS) SPEED (MPH) 25 30 35 40 45 50 55 60 65 70 RURAL ROAOs.URBAN ARTERIALS, 25 1 30 MPH 200? .12) Aerial UG Footage 150' RESIDENTVL a DUBINESS DISTRICTS 48" 44• LENGTH (tee0 15S 20D 250 305 3EA 425 495 S70 G45 730 LRBAN StREIETS 25 MPH OR LESS IOD:(zl 9E ROAD 150'OL ;II ALL SPACING W1 N BE ADSTED TO ACCOMMODATE PREPARED WORK Aerial Overlash INTFRSFC'1ONS AND DRIVFVIAYS. TRANSPORTABLE ATTENUATOR ROLL AHEAD DISTANCE = R !.,I HIS S-ACING LW BE 4ECLCED IN UREA% AREAS TO FIT TO STOP AHEAD Over pull Conduit 150 OP HOST VEHICLE WEIGHT HOST VEHICLE WEIGHT HCALIVAAV CONUlilrw5. 48. 4° �. 481 p y 900 TO 22,000 loe. > 22.000 lee. Interior Footage 150'IN 45 MPH 45d5 MPH > 55 MPH 45 MPH 45-SS MPH > 55 MPH • W20.78 ONE 1: ROAOLANE N70.1 Conduit Tic 1W 123' ?7 7C 1013' 150 AHEAD 4e• ae• PROTECTIVE VEHICLE (WORK VEHICLE)= R Support .a,D uo Sr TO wzDaA wzo-a ❑ NO sPCI1-ICE DISTANCE 4CC-IRCO 6 DEVCE 6 DEVICE Pedestal MIN. J " e NIN' X X X X Vault V❑ Ir II p woRK e Manhole Hand Hole HH Lockbox/Dmark a Telco/Cable Pole Q X X f X -f.TO S Joint Use Pole (9 3>�4r' 71ST AVE NE aa• Joint Transformer Pole ® ONE LAME Power Pole X ROAD CHANNELIZATION DEVICE AHEAD N SPACING FEET Pole Tag PT-123 \ `� 201ST ST NE ^\ xis Ivy TANS NT <g4l- W?0.6 0�' W20-TA 35Ns ,J 60Riser QR BE -n 20 PREPREDPower Supply Ps TG"'PAddresses `� W 20.78 ARLINGTON VALLEY RD "\ MI20.1 \m/ Address Number 1234 WIG.19 fGPIIOVAL IF 10 MPH OR LESSI Vacant Lot VL NOTES Fiber I•ALL SIGNS ARE BLACK ON ORANGE. LEGEND 2. EXTENDING THE CHANNELIZING DEVICE TAPER ACROSS Splice Case SHOULDER IS RECOMMENCEO. FLAGGING STATION 3,NIG+IT WORK REQUIRES ADDITIONAL ROADWAY LIG+ITING AT CXDSlack p FLAGGING STATIONS,SEE THE STANDARD SPECIFICATIONS Callouts TEMPORARY SIGN CIES LOCATION ONE-LANE, TWO-WAY TRAFFIC CONTROL FOR ADDITIONAL DETAILS, AND O CHANNELIZING DEVICES 'AA l� Callout Arrow ® PROTHCTIVF VEHICLE WITH FLAGGERS 4, SEE SPECIAL PROVISIONS FOR WORK HOUR RESTRICTIONS, NOT TO SCALE r_ "Ut! S• K .a S', Sftrd. J+111 Sh.t 41.Plblllhed PSO is W. Z... In .c..I.. Ic: 0— . 1—w. I-11I�c..I.. w rlwa.n•ICM,apn �, IIMr I;as;+� .M `^- ^•^ FEQAID PROJ,NO, -• DATIL ,!TAtL � PLOTTF, BY IIsw11 WA9 _A TC1 _ DESIGNED BY •"'••••• ENTERED 0� Waehlnown S°tle '•�• c�rlarD e. .•• --, », Depertmem of TFBne"nordon .. RLr.IDw.L ADM. Rcvlalr.N 7AtE er "" '�• TRAFFIC CONTROL PLAN -•••- 4rtk( tot( WASHINGTON Project Information - ' 'nformat;^ Project # 25-0147 Parcel # 31051400304400 Building ID Location 19516 ARLINGTON VALLEY RD NE Project Type Civil Use Project Use Right of Way Parent Project# Subdivision Applicant Name Comcast-Ceejay Guzman Address 1701 John F Kennedy Blvd, Philadelphia, PA, 19103 Applicant Email WAConstructionjointUse Phone 253-606-3564 Cell @comcast.com Owner Name AVR BUSINESS PARK LLC Address 701 PIKE ST SUITE 1025 SEATTLE, WA, 98101 Owner Email Phone Cell Contractor Cablecom LLC Address Contractor Email SNOHOMISH.PERMITTING Phone 360-965-5085 Cell @CAB LECOM LLC.N ET Property Informat— Type/Improveme Accessory/Struct nt ure Current Use Proposed Use Current Zoning Proposed Zoning Project Cost 5000 Project Value 5000 Current Use And Starting at Existing Doghouse vault, ped 1 , bore 3, 563's to Ped 1 Proposed Changes Lot Width Lot Depth Map Number Total Area of Building &Accessory Total Area of All Man-made Improvements Structures (Sq Ft) (Sq Ft) General Notes Restrictions/ Variances @ Community Development Online Portal Page 1 of 6 April 1, 2026 09:01AM WASHINGTON Structure Information Structure Type # of Stories Usable Floor Area (Sq Ft) Structure Height null # of Units 0 Load per Floor (Lbs) Sign Dimensions # of Bedrooms null # of Bathrooms null Occupancy With Chairs Tables & Chairs Empty Room Foundation Foundation Type Footing Depth null Material Foundation Information Setbacks Front& 0 0 Setbacks Right & 0 0 Rear Left Sides Setbacks Information Water Utility Public Sewage Utility Public Gas Utility Public Electric Utility Public Driveway Width null # of Off Street null # of Off Street null Parking Loading Miscellaneous Information ©Community Development Online Portal Page 2 of 6 April 1, 2026 09:01AM WASHINGTON Contractors License # Business Name Type Contact 602-265-572 Cablecom LLC General Contractor Colin Broenner ©Community Development Online Portal Page 3 of 6 April 1,2026 09:01AM WASHINGTON Inspections Inspection # Inspection Type Status Date Inspector 26-0145 Civil- Right of Way Open March 10, 2026 Inspections ©Community Development Online Portal Page 4 of 6 April 1,2026 09:01AM 4rtk( tot( WASHINGTON Contacts Contact Name Type Project Address Phone Comcast-Ceejay Guzman Applicant 1701 John F Kennedy 253-606-3564 Blvd, Philadelphia, PA, 19103 AVR BUSINESS PARK LLC Owner 701 PIKE ST SUITE 1025 SEATTLE, WA, 98101 Comcast-Ceejay Guzman Applicant 1701 John F Kennedy 253-606-3564 Blvd, Philadelphia, PA, 19103 Cablecom LLC Others 360-965-5085 Cablecom LLC Contractor 360-965-5085 ©Community Development Online Portal Page 5 of 6 April 1, 2026 09:01AM 4rtk( tot( WASHINGTON Fees Fee Type Date Debit Credit Balance Project Fees December 31, 2025 $325.00 $325.00 $325.00 $0.00 T O T A L $325.00 $325.00 $0.00 ©Community Development Online Portal Page 6 of 6 April 1, 2026 09:01AM