Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
3405 172ND ST NE_BLD6362_2026
COMMERCIAL MECHANICAL APPLICATION Community&Economic Development City of Arlington 4, 18204 59th Ave NE •Arlington,WA 98223 • Phone(360)403-3551 This application is for new, addition,altered or replaced mechanical installation and new or altered gas piping and must be accompanied by ELECTRONIC CONSTRUCTION DRAWINGS and CUT SHEETS and/or information outlined in the MECHANICAL SUBMITTAL REQUIREMENTS,if applicable. Type of Permit: ❑ New Installation ❑ Addition © Alteration ❑ Replaced ❑ Gas Piping I Type land Type 11 Hood Systems required submittal of the Commercial Mechanical Addenda 3405 172nd St NE 25 000 Property Address: Project Valuation: Lot#: Parcel ID No.; 310520-004-02$-00 Preferred Contact: O Owner A Contractor Project Description: Tenant Improvement Owner Name: Hansen Rentals LLC Office No.: 360-319-5301 Email Address: Cell No.: Mailing Address: 1251 North Shore Dr city:Bellingham State: wa Zip:98226 Contractor Name: Andgar Mechanical LLC office No.: 360-366-9900 Email Address: Benm@Andgar.com Cell No.: 360-305-1581 Mailing Address: PO BOX 2708 City: Ferndale State: WA zip: 98248 L&I Contractor License Number: ANDGAML796MT Expiration Date: 7/25 i • New gas piping requires a pressure test hooking to any appliance • Sediment traps (drips) are required on all gas lines • Gas lines are required to be supported/secured per IFGS,Section 415 • Proper Combustion air and venting required for all appliances i • A shut-off valve is required within 6 feet of each appliance Gas Piping Specification and complete Schematic PAGE 3 © Not Applicable C! CSST O Brass O Other Proposed Piping Material: 0 Black Steel O Galvanized Steel Proposed Piping Size: C] 1/2" i7 S/a" ❑ 3/41# O 1" O 11/2" ❑ 2" Inlet Pressure: Pressure Drop: Specific Gravity: i I hereby certify that the above information is correct and that the construction on,and the occupancy and the use of the abo escribed property will be in accordance with the laws,rules and regulation of the State of Washington. i Ben Mcglothlin 2/17/25 nature Print Name Date l } i REV03.2022 Page 1 of 3 i MECHANICAL PERMIT FEES (per unit Type of Fixture No.of Units Cost per Unit Subtotal Additional Plan Review fees x $ 75.00 = $ Air Conditioning Unit 15 100 Btu h x $ 15.00 = $ Air Conditioning Unit> 100 Btu h x $ 25.00 = $ Air Conditioning Unit> 500 Btu/hp x $ 50.00 = $ Air Handling Units x $ 15.00 = $ Base Mechanical Fee $ 25.00 $ 25.00 Boiler<100Btu h>3h x $ 15.00 = $ Boiler>1 million Btu/h<50hp x $ 25.00 = $ Boiler>1.5 million Btu/h<50hp x $ 50.00 = $ Boiler>100Btu h 3-15h x $ 15.00 = $ Boiler>500Btu h 15-30hp x $ 25.00 = $ Commercial Hoods-Type I x $ 25.00 = $ Commercial Hoods-Type II x $ 50.00 = $ Diffusers x $ 15.00 = $ Dryer Ducting x $ 15.00 = $ Ductwork(drawings required) x $ 25.00 = $ Evaporative Coolers x $ 15.00 = $ Exhaust Ventilation Fans x $ 15.00 = $ Fireplace/Insert/Stove x $ 15.00 = $ Forced Air Heat<_100 Btu h x $ 15.00 = $ Forced Air Heat>100 Btu h x $ 25.00 = $ Gas Clothes Dryer x $ 15.00 = $ Gas Fired Air Conditioning Unit 15 100 Btu h x $ 15.00 = $ Gas Fired Air Conditioning Unit> 100 Btu h x $ 25.00 = $ Gas Fired Air Conditioning Unit> 500 Btu/hp x $ 50.00 = $ Gas Pi in <_ 5 units x $ 15.00 = $ Gas Piping for each additional unit > 5 x $ 2.00 = $ Heat Exchangers x $ 15.00 = $ Heat Pump-Condensing Unit x $ 25.00 = $ Hot Water Heat Coils x $ 15.00 = $ Miscellaneous Appliance-regulated by x $ 15.00 _ $ mechanical code,not otherwise specified Package Units:5 100 Btu > 100 Btu x $ 25.00 $50.00 = $ Range/Cook top-Gas Fired x $ 15.00 = $ Refrigeration Unit<_100Btu h x $ 15.00 = $ Refrigeration Unit>100Btu h x $ 25.00 = $ Refrigeration Unit>500Btu h x $ 50.00 = $ Re-inspection fee all x $ 75.00 = $ Unit Heaters <_ 100 Btu h x $ 15.00 = $ Unit Heaters>100 Btu h x $ 25.00 = $ Variable Air Volume Boxes (part of Air x $ 10.00 = $ Conditioning System) Wall Heaters-Gas Fired x $ 25.00 = $ Water Heater- Gas Fired x $ 25.00 = $ Permit Fee $ Table 4-8; Plan Review Fee $ Processing/Technology Fee $25.00 Total $ REV2.2024 Page 2 of 3 PRESSURE PIPING SCHEMATIC COMPLETE FOR GAS PIPING ONLY ❑ SCHEMATIC IS TO SCALE ❑ SCHEMATIC NOT TO SCALE Show Pipe Size(s) and Length(s) from meter to all appliances NOTE: Any interior pressure regulators must be indicated REV2.2024 Page 3 of 3 ENERGY CODE NOTES 2021 GENERAL NOTES C103.6 BUILDING DOCUMENTATION AND CLOSEOUT SUBMITTAL REQUIREMENTS C403.4.2.2 AUTOMATIC SETBACK AND SHUTDOWN zz THE CONSTRUCTION DOCUMENTS SHALL SPECIFY THAT DOCUMENTS DESCRIBED IN THE THIS SECTION BE AUTOMATIC TIME CLOCK OR PROGRAMMABLE CONTROLS SHALL BE CAPABLE OF STARTING AND STOPPING I.ALL TRADES TO LEAVE 30"OR 42"CLEARANCE IN FRONT OF MECH EQUIP ACCESS PANELS FOR SERVICING,PER NEC REQUIREMENTS. F PROVIDED TO THE BUILDING OWNER OR OWNER'S AUTHORIZED AGENT WITHIN 90 DAYS OF THE DATE OF THE SYSTEM FOR SEVEN DIFFERENT DAILY SCHEDULES PER WEEK AND RETAINING THEIR PROGRAMMING 2.ALL CRANE LIFTING AND SETTING OF EQUIPMENT AND DUCTWORK TO BE PERFORMED BY MC.SEE SUBMITTALS FOR LIFTING I NSTRUCTIONS. a RECEIPT OF THE CERTIFICATE OF OCCUPANCY,THIS IS TO INCLUDE RECORD DOCUMENTS,O&M MANUALS, AND TIME SETTING DURING A LOSS OF POWER FOR AT LEAST 10 HOURS.ADDITIONALLY,THE CONTROLS. 3.GC IS RESPONSIBLE FORTEMP HEATING DURING CONSTRUCTION. HEATING UNITS SHALL NOT BE USED FOR TEMP HEAT WITHOUT PROTECTION FROM DUST AND APPLICABLE WSEC COMPLIANCE FORMS AND CALCULATIONS. ACCUMULATION,WRITTEN ACCEPTANCE OF DUST RELATED WARRANTY COSTS,AND PRIOR APPROVAL FROM THE MC. p W C403.4.2.3 AUTOMATIC START 4.GC SHALL FURNISH ALL ACCESS PANELS.MOST ACCESS PANELS WILL BE COORDINATED WITH THE ARCHITECT. SOME OR ALL ACCESS PANELS MAY NOT APPEAR U) C403.1.2 CALCULATION OF HEATING AND COOLING LOADS AUTOMATIC START STOP CONTROLS SHALL BE PROVIDED FOR EACH HVAC SYSTEM.THE AUTOMATIC START ON THE ARCHITECTURAL DRAWINGS. ARCHITECTTO DETERMINE WHICHPANELS REQUIRE AFIRE RATING. Lu DESIGN LOADSASSOCIATED WITH HEATING,VENTILATING AND AC OF THE BUILDING SHALL BE DETERMINED CONTROLS SHALL BE CONFIGURED TO AUTOMATICALLY ADJUST THE DAILY STARTTI ME OF THE HVAC 5.UNITWEIGHTS AND LOCATIONS HAVE BEEN COORDINATED WITH ARCHITECTAND STRUCTURAL ENGINEER TO DETERMINE ADEQUACY OF BUI LDI NG STRUCTURE. IN ACCORDANCE WITH THE PROCEDURES DESCRIBED IN ANSI/ASHRAE/ACCA STANDARD 183 OR BYAN SYSTEM IN ORDERTO BRING EACH SPACETO THE DESIRED OCCUPIED TEMPERATURE IMMEDIATELY PRIOR IF IT IS NECESSARY TO RELOCATE A UNIT,NOTIFY ANDGAR'S ENGINEERING DEPARTMENT FOR RE-COORDINATION. APPROVED EQUIVALENT COMPUTATIONAL PROCEDURE,USING THE DESIGN PARAMETERS IN CHAPTER 3. TO SCHEDULED OCCUPANCY. AUTOMATED STOP CONTROLS SHALL BE PROVIDED FOR EACH HVAC SYSTEM SHEET METAL NOTES WITH DI RECT DIGITAL CONTROL OF I NDIVI DUAL ZONES. THE AUTOMATIC STOP CONTROLS SHALL BE C403.1.4 USE OF ELECTRIC RESISTANCE AND FOSSIL FUEL-FIRED HVAC HEATING EQUIPMEN CONFIGURED TO REDUCETHE HVAC SYSTEM'S HEATING TEMPERATURES SET POINTAND INCREASE THE 1.DUCTSIZES INDICATED ON THE DRAWINGS ARE INSIDE DIMENSIONS UNLESS NOTED OTHERWISE. DUCT SIZE SHALL BE INCREASED TO COMPENSATE FOR z N HVAC ENERGY SHALL NOT BE PROVIDED BY ELECTRIC RESISTANCE OR FOSSIL FUEL COMBUSTION COOLING TEMPERATURE SET POINT BYAT LEASE 2°F(1.1°C)BEFORE SCHEDULED UNOCCUPIED PERIODS ACOUSTICAL DUCT LINER THICKNESS. APPLIANCES.EXCEPTIONS:DEFROST;SMALLSYSTEMS;FREEZE PROTECTION;DOAS ERV AUXILIARY HEAT. BASED UPON THETHERMAL LAG AND ACCEPTABLE DRIFT IN SPACE TEMPERATURE THAT IS WITHIN COMFORT 2.DUCT ELBOWS SHALL BE RADIUS TYPE WITH FULL THROUGH RADIUS ON ALL PRIMARY DUCTWORK,UNLESS SHOWN OTHERWISE. TURNING VANE ELBOWS SHALL z LIMITS. HAVE DOUBLE THICKNESS TURNING VANES INSTALLED IN EVERY RAILTAB. C403.2 SYSTEM DESIGN I, 3.EXHAUST DUCTWORK SHALL BE UNLINED GALVANIZED SHEET METAL UNLESS NOTED OTHERWISE. ELBOWS SHALL BE CONSTRUCTED WITH A MINIMUM CL RADIUS Ix MECHANICAL SYSTEMS SHALL BE DESIGNED TO COMPLY WITH SECTIONS C403.2.1 AND C403.2.2. WHERE C403.5 ECONOMIZERS(PRESCRIPTIVE) EQUALTO DUCT DIAMETER.DUCT SHALL BE UNINSULATED UNLESS NOTED OTHERWISE. DRYER EXHAUST DUCT SHALL NOT BE JOINED WITH SCREWS OR OTHER ELEMENTS OF A BUI LDI NG'S MECHANICAL SYSTEMS ARE ADDRESSED IN SECTIONS C403.3 THROUGH C403.13 AIR ECONOMIZERS SHALL BE PROVIDED ON ALL NEW SYSTEMS INCLUDING THOSE SERVING COMPUTER o FASTENERS THAT PROTRUDE MORE THAN 1/8"INTO THE INSIDE OF THE DUCT. FABRICATE AND SEAL EXHAUST DUCTWORK PER SMACNA 1/2"PRESSURE CLASS. AND SHALL COMPLY WITH THE APPLICABLE PROVISIONS IN THESE SECTIONS. ROOMS,ELECTRICAL EQUIPMENT,RADIO EQUIPMENT,AND TELEPHONE SWITCH GEAR. ECONOMIZERS SHALL 4.ALL DUCTWORK SHALL BE SEALED WITH WATER BASED LATEX SEALANT PER WSEC AND SMACNA PRESSURE CLASS: COMPLY WITH SECTIONS C403.5.1 THROUGH C403.5.5. STATIC PRESSURE(WG) SEAL CLASS SEALING REQUIREMENTS C403.2.2 VENTILATION AND EXHAUST EXCEPTIONS:1A,3 AND/OR 11. 1/2"-2" C TRANSVERSE JOINTS ONLY m THE VENTILATION AND EXHAUST SYSTEMS SHALL BE CONFIGURED TO PROVI DE NO GREATERTHAN 150%OF C..)3" B TRANSVERSE JOINTS AND LONGITUDINAL SEAMS J o Z MIN OUTDOOR AIR REQUIRED BY CHAPTERS 4 AND 5 OF THE IMC OR OTHER APPLICABLE CODE OR C403.7.3 VENTILATION AIR HEATING CONTROL 4"-10" A ALLJOINTS,SEAMS AND WALL PENETRATIONS J y w STANDARD,WHICHEVER IS GREATER. FOR VENTILATION AIR UNITS WITH SUPPLEMENTAL HEATING AND CAPACITY IN CONJUNCTION WITH ZONE S.THROUGH PENETRATION AND MEMBRANE PENETRATION FIRE STOP AS REQUIRED IN IBC SHALL BE PROVIDED AND I NSTALLED BY MECHANICAL CONTRACTOR.FIRE v o z Lu HEATING SYSTEM,SUPPLEMENTAL HEATING SHALL NOT WARM VENTILATION SUPPLYAIRTO GREATERTHAN STOP SYSTEM SHALL BE HI LTI CP6015 OR 3M BRAND 1C 15WB+OR APPROVED EQUIVALENT. C403.3.1 EQUIPMENT AND SYSTEM SIZI NG 55°F. 6.ACCESSORIES: pm cc THE OUTPUT CAPACITY OF HEATING EQUIPMENTAND COOLING EQUIPMENTSHALL BE NO GREATER Lavi ACOUSTICAL LINER INDOORS: 1"THICK,FIBERGLASS DUCT LI NER WITH BLACK MAT FACING.JOHNS MANVILLE OR EQUIVALENT.MIN R VALUE TO BE PER WSEC. 9 THAT OF THE SMALLEST AVAILABLE EQUIPMENT SIZE THAT EXCEEDS THE LOADS CALCULATED IN C403.7.8 SHUTOFF DAMPERS ACOUSTICAL LINER OUTDOORS: 2"THICK FI BERGLASS DUCT LINER WITH BLACK MAT FACI NG.JOHNS MANVILLE OR EQUIVALENT. MIN R VALUE TO BE PER WSEC. ACCORDANCE WITH SECTION C403.1.2. OUTDOOR AIR SUPPLY,EXHAUST OPENINGS,AND RELIEF OUTLETS SHALL BE PROVIDED WITH CLASS 1 LOW PRESSURE INSULATED FLEX DUCT:HART&COOLEY F-114,JPL PR-25 OR EQUAL MOTORIZED DAMPERS,INCLUDING MAXIMUM LEAKAGE RATES. DAMPERS SHALL BE INSTALLED WITH UNINSULATED VAPOR PROOF FLEX DUCT:THERMAFLEX S-LP C403.3.2 HVAC EQUIPMENT PERFORMANCE REQUIREMENTS AUTOMATIC CONTROLS CONFIGURED TO CLOSE WHEN THE SYSTEMS OR SPACES SERVED ARE NOT IN USE DUCT INSULATION INDOORS:REFLEXTIX R4.2 DUCT INSULATION EQUIPMENTSHALL MEETTHE MINIMUM EFFICIENCY REQUIREMENTS OF TABLES C403.3.2(1)THROUGH DURING UNOCCUPIED PERIOD WARM-UP AND SETBACK OPERATION,UNLESS THE SYSTEM SERVED REQUIRE DUCT INSULATION OUTDOORS:REFLCTIX R-8.0 DUCT INSULATION CF03.3.2(13)WHEN TESTED AND RATED IN ACCORDANCE WITH THE APPLICABLE TEST PROCEDURE. OUTDOOR OR EXHAUST AIR IN ACCORDANCE WITH THE IMC OR THE DAMPERS ARE OPENED TO PROVIDE INTENTIONAL ECONOMIZER COOLING. REFRIGERANT PIPING NOTES C403.3.2.6 PACKAGED AND SPLIT SYSTEM ELECTRIC HEATING AND COOLING EQU I PM ENT PACKAGED AND SPLIT SYSTEMS ELECTRIC EQUIPMENT PROVIDING BOTH HEATING AND COOLING WITH C403.8.5 FAN Al RFLOW CONTROL 1.REFRIGERANT PIPING SHALL BE ACR TYPE L COPPER TUBING WITH LONG RADIUS WROUGHT IRON FITTI NGS. Li TOTAL COOLING CAPACITY GREATER THAN 6,000 BTU/H SHALL BE HEAT PUMP. EACH DX COOLING SYSTEM>_42,000 BTU/H SHALL BE DESIGNED TO VARY THE INDOOR FAN Al RFLOW AS A 2.PURGE REFRIGERANTTUBING WITH NITROGEN GAS WHILE BRAZING WITH MIN 6%SILVER BRAZING ROD. FUNCTION OF LOAD AND SHALLCOMPLY WITH THE FOLLOWING REQUIREMENTS: 3.PRIOR TO CHARGING SYSTEM WITH REGRIGERANT,SYSTEM SHALL BE PRESSURE TESTED AND EVACUATED TO A VAC OF 500 MICRONS FOR MIN 30 MINUTES. C403.3.5 DEDICATED OUTDOOR AIR SYSTEMS(DOAS) 1.DX COOLING UNITS THAT CONTROL COOLING CAPACITY BASED ON SPACE TEMPERATURE SHALL HAVE 4.INSULATE ALL REFRIGERATION LINES TO MEET WSEC REQUIREMENTS.ALL EXTERIOR INSULATION SHELL BE UV RATED OR COVERED WITH UV PROTECTIVE COVER. FOR BUILDINGS WITH TYPE B OCCUPANCIES,OUTDOORAIR SHALL BE PROVIDED TO EACH OCCUPIED SPACE NOT FEWER THAN TWO STAGES OF FAN CONTROL. ABBREVIATIONS SHEET METAL LEGEND AND SYMBOLS BY A DOAS WHICH DELIVERS 100%OUTDOOR AIR DELIVERED DIRECTLY TO THE OUTDOOR SPACE OR 2.UNITS THAT CONTROLTHE SPACE TEMPERATURE BY MODULATING THE AIRFLOWTO THE SPACE DOWNSTREAM OF THE TERMINAL HEATING AND/OR COOLING COILS WITHOUT REQUIRING OPERATION OF THE SHALL HAVE MODULATING FAN CONTROL. AFF ABOVE FINISHED FLOOR GYP GYPSUM BOARD(SHEETROCK) ® SUPPLY AIR DIFFUSER HEATING AND COOLING SYSTEM FANS FOR VENTILATION AIR DELIVERY. THE DOAS SHALL INCLUDE ENERGY 3.UNITS THAT INCLUDE AN AIR ECONOMIZER SHALL HAVE NOT FEWER THAN TWO SPEEDS OF FAN MANUALVOLUME DAMPER AP ACCESS PANEL HP HORSEPOWER z RETURN AIR GRILLE RECOVERY VENTILATION WITH A 60%ENTHALPY RECOVERY EFFECTIVENESS. EXCEPTIONS:MAKEUP AIR FOR CONTROL DURING ECONOMIZER OPERATION. BDD BACK DRAFT DAMPER HWR HEATING WATER RETURN MOTORIZED DAMPER BOD BOTTOM OF DUCT HWS HEATING WATER SUPPLY COMMERCIAL KITCHEN HOODS. ELBOW WITH TURN VANES C403.10.1 DUCTS CONVEYI NG OUTDOOR AIR BOU BOTTOM OF UNIT ID INSIDE DIMENSION )EOUIPMENTIDENTIFICATION o BACK DRAFT DAMPER C403.3.5.3HEATI NG/COO LING SYSTEM FAN CONTROLS OUTDOOR AIR DUCTS SERVING INDIVIDUAL SUPPLY AIR UNITS WITH LESS THAN 2,800 CFM OF TOTAL Al R BS BIRD SCREEN INS INSULATION EQUIPMENT FANS,CIRCULATION PUMPS,AND TERMINAL UNIT FANS SHALL CYCLE OFF AND TERMINAL UNIT SUPPLY CAPACITY SHALL BE CONTINUOUSLY INSULATED WITH MI N R-7 I INSULATION. BTU BRITISH THERMAL UNIT KW KI LOWATT (D-- )THERMOSTAT No SMOKE DETECTOR PRIMARYCOOLINGAlR SHALL BE SHUT OFF WHEN TH ERE ISNO CALL FOR HEATINGANDCOOLINGTHEZONE. CC CONTROL CONTRACTOR LPG LIQUIFIED PROPANE @ SENSOR C403.10.1.2 OTHER SUPPLY AND RETURN DUCTS CBBDD COUNTER BALANCED BDD MEZZ MEZZANINE FIRE DAMPER C403.4.1 THERMOSTATI0 0ONTROLS ALL OTHER SUPPLY AND RETURN Al R DUCTS AND PLENUMS SHALL BE I NSULATED WITH A MI NI MUM OF R-6 SUPPLY AIR ARROW CFM CUBIC FEET PER MINUTE NC NORMALLY CLOSED �, TH E SUPPLY OF HEATI NG AND COOLI NG ENERGY TO EACH ZONE SHALL BE CONTROLLED BY I NDI VI DUAL INSULATION WHERE LOCATED IN UNCONDITIONED SPACES AND WHERE LOCATED OUTSIDE THE BUILDING CHWR CHI LLED WATER RETURN NIC NOT IN CONTRACT RETURN AIR ARROW COMBINATION FIRE/SMOKE DAMPER THERMOSTATIC CONTROLS CAPABLE OF RESPONDING TO TEMPERATURE WITHIN THE ZONE. CONTROLS WITH A MINIMUM OF R-8 INSULATION IN CLIMATEZONE 4 AND R-12 INSULATION IN CLIMATE ZONE 5.WHERE CHWS CHILLED WATER SUPPLY NO NORMALLYOPEN SHALL NOT BE ALLOW FOR SIMULTANEOUS HEATING AND COOLING,CONTROLS SHALL INCLUDE A DEADBAND. LOCATED WITHIN A BUILDING ENVELOPE ASSEMBLY,THE DUCT OR PLENUM SHALL BE SEPARATED FROM THE CO CARBON MONOXIDE NTS NOT TO SCALE PERMIT SET CONTROLS SHALL PREVENT INTERNAL ELECTRIC RESISTANCE HEATERS FROM SUPPLEMENTAL HEATER BUILDING EXTERIOR OR UNCONDITIONED OR EXEMPT SPACES BY MINIMUM INSULATION VALUE AS REQUIRED 2"xt2'/st INDICATES NER U.O.D.SHEETMETALWITH COP COEFFICI ENT OF PERFORMANCE OBD OPPOSED BLADE DAMPER ---------- 1"SOUNDLINER(U.N.O.),12"x 12"NET ID OPERATION WHEN THE HEATING LOAD CAN BE MET BY HEAT PUMP OPERATION ALONE DURING OUTDOOR FOR EXTERIOR WALLS BYSECTION C402.1.3. DB DRY BULB OSA OUTSIDE AI R COIL DEFROST CYCLES. EXCEPTIONS: 12'xt 2"/2 st INDICATES 16"x 16"O.D.SHEETMETAL WITH DIA DIAMETER PH PHASE 2"SOUNDLINER(U.N.O.),12"x 12"NET ID 1.WHERE LOCATED WITHIN EQUIPMENT. DN DOWN PRIES PRESSURE C403.4.1.2DEADBAND 2.WHERETHE DESIGN TEMPERATURE DIFFERENCE BETWEEN THE INTERIORAN EXTERIOROFTHE E.C. ELECTRI CAL CONTRACTOR PSI POUNDS PER SQUARE INCH 12"xt2" INDICATES UNLINED I2"x12"SMDUCT WHERE USED TO CONTROL BOTH HEATI NG AND COOLI NG,ZONE THERMOSTATIC CONTROLS SHALL BE DUCT OR PLENUM DOES NOT EXCEED 15°F(8°C)AND I NSULATED I N ACCORDANCE WITH TABLE C403.10.2. EC END CAP RA RETURN AIR CONFIGURED TO PROVIDE ATEMPERATURE RANGE OR DEADBAND OF AT LEAST5'F(2.8-C)WITHIN WHICH WHERE LOCATED WITHIN CONDITIONED SPACE,SUPPLY DUCTS WHICH CONVEYSUPPLYAIRATTEMPERATURES INDICATES UNLINEDI2"x12"SMDUCT U EER ENERGY EFFICIENCY RATIO RM ROOM 12'xt2"/w WITH INSULATED WRAP � �J � THE SUPPLY OF HEATING AND COOLING ENERGYTO THE ZONE IS SHUT OFF OR REDUCED TO A MI NIMUM. LESS THAN 55°F OR GREATERTHAN 105°F SHALL BE INSULATED WITH A MINIMUM OF R-3.3INSULATION. EC ELECTRICAL CONTRACTOR RPM REVOLUTIONS PER MINUTE EXCEPTIONS: EX EXHAUSTAIR SA SUPPLYAIR Z 0 Q C403.4.1.6 OPERABLE OPENING SWITCHES FOR HVAC SYSTEMS THERMOSTATIC CONTROL DUCTWORK EXPOSED TO VIEW WITHIN AZONE THATSERVES THATZONE IS NOT REQUIRED TO BE IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII FLEXIBLE DUCT Lu CO � FC FLEX CONNECTOR SF SQUARE FOOT C OPERABLE OPENINGS MEETING THE MINI MUM SIZE CRITERIA OF SECTION C402.5.11 AND THAT OPEN TO THE INSULATED. FD FIRE DAMPER SD SMOKE DETECTOR 24'0 INDICATES ROUND DUCT w C O N OUTDOORS FROM A CONDITIONED SPACE MUST HAVE CONTROLS CONFIGURED TO DO THE FOLLOWING ALL DUCTS,AIR HANDLER,AND FILTER BOXES SHALL BE SEALED.JOINTS AND SEAMS SHALL COMPLY WITH FOB FLAT ON BOTTOM TBD TO BE DETERMINED J } � ONCE DOORS HAVE BEEN OPEN 5 MINUTES: SECTION 603.9 OF THE INTERNATIONAL MECHANICAL CODE. SPIN-IN TAKE-OFF&VOLUME DAMPER WITH l� _ FOT FLAT ON TOP SIR STATIC PRESSURE J W RIGID ROUND SM DUCT 1.DISABLE THE MECHANICAL HEATING TO THE ZONE OR RESET THE SPACE HEATING TEMPERATURE SET FSD FI RE SMOKE DAMPER T-STAY THERMOSTAT Q 0 U Z < POI NTTO 55°F OR LESS WITHIN 5 MI NUTES OF THE DOOR OPEN ENABLE SIGNAL. C403.10.2 DUCT CONSTRUCTION GC GENERAL CONTRACTOR TYP TYPICAL U Z } 1-2.DISABLE THE MECHANICAL COOLI NG TO THE ZONE OR RESET THE SPACE COOU NG TEMPERATURE SET DUCTWORK SHALL BE CONSTRUCTED AND ERECTED I N ACCORDANCE WITH THE I NTERNATIONAL MECHANICAL RISE OR DROP IN DIRECTION OF FLOW Q G NATURAL GAS WIP WORK IN PROGRESS Z Q 3: CD � Z POINTTO 85°F OR MORE WITHIN 5 MINUTES OF THE DOOR OPEN ENABLE SIGNAL. CODE. GPM GALLONS PER MINUTE Q � J z 0 EXCEPTIONS: "" �.w Q 1.HYDRO NIC RADIANT HEATING AND COOLING SYSTEMS. C403.10.2.1 LOW-PRESSURE DUCT SYSTEMS = w - LONGITUDINAL AND TRANSVERSE JOIN DMWING INDEX C) z NITS,SEAMS AND CONNECTIONS OF SUPPLY AND RETURN DUCTS �_ }•- „" LLI to J CD C403.4.2 OFF-HOUR CONTROLS OPERATI NG ATA STATIC PRESSURE:5 2"WG.SHALL BE SECURELY FASTENED AND SEALED WITH WELDS, DV%G DESCRF nON "O°"A°APa°'"e"" a O Q FOR ALL OCCUPANCI ES OTHER THAN GROUP R,EACH ZONE SHALL BE PROVI DED WITH TH ERMOSTATI C GASKETS,ADHESIVES OR TAPES INSTALLEDIN ACCORDANCE WITH MANUFACTURERS INSTALLATION M-001 MECHN01M&ABEIFEMAnONS F Qosxss,„n°9 °a, z INSTRUCTIONS. y w`, ,°I1 Sk„L R,?,,n,I , Last Revision Date: SETBACK CONTROLS THAT ARE CONTROLLED BY EITHER AN AUTOMATIC TIME CLOCK OR PROGRAMMABLE M002 MECHSCHEDULES ©x„kk-m,keyroim CONTROLSYSTEM. M-101 MECH LEVEL 1 1 rt , ® ®""as"",°° m�s,a s 0 211 7/2 02 5 C403.4.2.1 THERMOSTATIC SETBACK C403.10.4 INSULATION OF REFRIGERATION PIPING M-102 MECHFMF �. ' akmbiM,„vsmm® w,y® w,im,ns°p, me, Gi"EE"E""y REFRIGERANT PIPING SHALL HAVE MIN Yn"INSULATION WITHIN CONDITIONED SPACES AND 1"INSULATION '`� "" Best Buy O k �� Va BW THERMOSTATIC SETBACK CONTROLS SHALL BE CONFIGURED TO SETBACK ORTEMPORARILY OPERATE OUTSIDE OF CONDITIONED SPACES,ATA CONDUCTIVE RATION OF 0.21 TO 0.26 BTU x IN(H x FTz x°F)WITH A �. „g O _ _.... 3 MEAN TEMPERATURE RATING OF 75°F. !!)!.I O cake�a a°ss"g SYSTEM TO MAI NTAI N ZONE TEMPERATURES DOWN TO 55°F(13°C)OR UP TO 85°F(29°C). C403.14 MECHANICAL SYSTEM COMMISSIONING SITE MAP VICINITY MAP M-001 MECHANICAL SYSTEMS SHALL BE COMMISSIONED AND COMPLETED IN ACCORDANCE WITH SECTION C408. (S Z 0 I— a 0-1 U U Z co 0 p co w w a 0 0�NM V Z Z N a a 0 Lu Lu co Q U z J � J o Z a W z � o z w C QU cu J Q W V Li EXISTING ROOFTOP UNIT SCHEDULE NOM. I DOWNFLOWI IAHRI EFFICIENCY COOLING CAPACITY HEATING CAPACITY ELECTRICAL WEIGHT TAG MAKE MODEL TONS HORIZONTAL SEER MBh CFM Btuh VOLTS/PH MCA MOP DISCONNEC (LBS.) REMARKS RTU-1 TRANE YSC036E3EMA0047 3 DOWNFLOW 13 37.15 1200 64,000 208-23013 21.4 30 EXISTING 743 RTU-2 TRANE YSC036E3EMA0047 3 DOWNFLOW 13 1 37.15 1200 64,000 208-230/3 21.4 1 30 EXISTING 743 DIFFUSER AND GRILLE SCHEDULE TYPE NECK TAG MAKE MODEL DESCRIPTION MOUNTING TYPE CONNECTION NOMINAL FACE 512E(INCHES) REMARKS CD-1 SHOEMAKER I 700MA MODULAR CORE DIFFUSER T-BAR SQUARE 2424 1,2 CD-2 TECHGRIJLE 4"0 FULLY ADJUSTABLE ROUND GRILLE SURFACE MOUNT ROUND NECK+2" 1,3 PERMIT SET RG-1 SHOEMAKER 600T 1/2"EGG CRATE T-BAR SQUARE 2424 1 RG-2 SHOEMAKER 600T 11T EGG CRATE T-BAR SQUARE 2412 1 NOTES: 1. OBD'S NOT REQUIRED 2. SEE DRAWING FOR NECK SIZE. 3. BALANCE CFM WITH CENTER CONE.NO VOLUME DAMPER PROVIDED IN BRANCH DUCT. U H U eM 04 J = W 00 m QC/) z Q CEILING EXHAUST FAN CU w >Q F- 3: TAG LOCATION SERVICE MAKE MODEL CFM VOLTAGEIHZ MCA NOTES z > Q Z EF-1 NW RESTROOM PANASONIC FV-0511VKS2 0-110 120/60 0.2 1,2,3,4 = Q rZCV` F- F-2 0J E SE RESTROOM PANASONIC FV-0511VKS2 0-110 120/60 0.2 1,2,3,4 `, _ ? Z NOTES: LO 1.WIRING AND POWER SUPPLY BY EC. w U ~ O J 2.SEE FLOOR PLAN FOR DUCT SIZE. (n z � Q 3. INTERLOCK POWER OWOFF WITH LIGHT SWITCH. Last Revision Date: 4. BUILT IN TIME DELAY MODULE 02/17/2025 ENGINEERED BY. DR- BW M-002 Z O a U U Z U O p U w It 0 z 00 00 a0 a c� IY w m O " z J � J o Z LU cu U L Zu u 1 � ;U CO m J aL U g"0 N Sx 8x 8x EXISTING VENT ADA S IBLLED 1 CD 1 Co-1 x UPSIZE TO 6" AD T T C FM AD T 1 0 FM ADJ BTM T 10 FM CD-1 1 125 CF 8"0 8 0 6"0 2 MAS E 1Ox10 CD-1 2x22x14"0 150 CFM RG- 0x10 RG-2 x RRI OR 125 CFM D-1 10x10 12 CFM RTU 1 RG-2 CD-1 10 CFM (E)16x P TO RT -1 0 AD T 1 12" TO RT 1 0 1 16"0 12"0 x 19 p_2 DN TO DRYER Li 12"0 ADJ STME T6 TM NT -1 LOS T 11 CFM 2 OF 09 6"0 Sx8 8 Eli D-1 0 nnRF C -1 11 CFM 11 CFM EXISTING VENT Ill 1 0' "0 TO BE RETROFITTED FOR (E 24 UP 6" 10x 0 DRYER VENT RTU10"0 2 16"0 "0 CD 1 10"0 MAS GE 160 FM ..16 6"0 6"0 x 16"0 14"0 D-1 8 CFM F. 117 10"0 OR V/r1 O" TO RTU UP 22x1 x8"0 AI N' „0 TO RTU-1 1 „ 191 RG 2 22x1 x6"0 4 0 4='0 160 CFM CD-2 O 12x12 12x12 R 2 30 CFM 8 0- CD- CD-1 85 CFM 2x22x1o"0 10'0 1 o CF 6„0 so cF 60 J 1 PERMIT SET �r PD C RRIDO 1 X- 22x2 x120 8"0 R -1 ® 22 x100 15 RG-1 M 4„04"0 0 CF1ox 0D-2 80 CD 18x CFM 240 FM 10 I N CD-1 _ 22x10x8"0 U_ 100 FM xlOx TOILET 1 140 CFM E) M 113 10x10 1 U CD-1 z 140 CFM 6"o Q a0 c) �-H F d coJ = uJ m Q U Z Q _U Q � � z � p Z O = J Q C\J W Lu CD W J Z cam) Q Last Revision Date: 02/17/2025 ENGINEEREDBY BW MECHANICAL PLAN-LEVEL 1 N N M-101 SCALE:1/4"=T-0" M-101 TRUE PLAN NORTH NORTH Z O H IL 0-1 U U Z U O p co w w a 0 O Z Z N a a 0 a Ir Lu Q U � cn J � J o Z a W z � oz w C QU � J Q W V EXISTING 24x14 RA DN TO L1 Li EXISTING 16x16 SA DN TO Li (E)� EXISTING 24x14 RA DN TO Li EXISTING 16x16 SA DN TO L1 (E)� PERMIT SET U H U Z d M O 04 d 04 J = LIJ rn Up Q U) z � 0 0 = J Q ti LLI of r- Z Uw p � LLJ O J � -i z c) Q Last Revision Date: 02/17/2025 BW MECHANICAL PLAN-LEVEL ROOF N N M-102 SCALE:1/4"=1'-0" M-102 TRUE PLAN NORTH NORTH Permit#: 6362 Permit Date: 02/17/25 Permit Type: COMMERCIAL MECHANICAL Project Name: Natural Way Chiropractic Applicant Name: Andgar Mechanical LLC Applicant Address: 6920 Salashan Pkwy A-102 Applicant, City, State, Zip: Ferndale Contact: Ben Mcglothlin Phone: 3603051581 Email: Benm@andgar.com Scope of Work: Commercial HVAC retrofit Valuation: 25000.00 Square Feet: 2200 Number of Stories: 1 Construction Type: VB Occupancy Group: B; Business ID Code: Permit Issued: 09/04/2025 Permit Expires: 03/03/2026 Form Permit Type: COMMERCIAL MECHANICAL Status: COMPLETE Assigned To: Kristin Foster Property Parcel# Address Legal Description Owner Name Owner Phone Zoning 31052000402800 3405 172ND ST NE SMOKEY POINT 599 Other Retail LLC Trade NEC Contractors Contractor Primary Contact Phone Address Contractor Type License License# Andgar Mechanical Dale Vanrooyen 360-366-9900 6920 Salashan MECHANICAL COA 604 255 353 LLC Parkway CONTRACTOR Andgar Mechanical Dale Vanrooyen 360-366-9900 6920 Salashan MECHANICAL Labor&ANDGAML825N3 LLC Parkway CONTRACTOR Industries Plan Reviews Date Review Type Description Assigned To Review Status 02/20/2025 COMMERCIAL BUILDING Approved MECHANICAL Fees Fee Description Notes Amount Enter 1 if permit is for commercial Web Only-Mechanical Commercial Plan mechanical $381.06 Review (Table 4-1) Credit Card Service $11.43 Processing/Technology $25.00 Air Cond.Unit>100 BTU/h Enter#of units $30.00 Diffusers Enter#of units $15.00 ExhaustNentsNent Fans $30.00 Credit Card Service $3.00 Total $495.49 Attached Letters Date Letter Description 09/04/2025 Building Permit 02/17/2025 Web Form-Building Application Payments Date Paid By Description Payment Type Accepted By Amount 02/17/2025 XBP Con£ $381.06 223377671 02/17/2025 Andgar Mechanical 223377671 Hannah Hardwick $11.43 09/04/2025 Andgar Mechancial 242065296 $3.00 09/04/2025 XBP Con£ $100.00 242065296 Outstanding Balance $0.00 Uploaded Files Date File Name 02/26/2025 24697334-20250217 BLD6362 Plans.pdf 02/26/2025 24697333-20250217 BLD6362 Application.pdf