Loading...
HomeMy WebLinkAbout7224 204TH ST NE, SUITE 104_BLD6640_2026 CITY OF ARLINGTON 18204 59th Avenue NE,Arlington,WA 98223 INSPECTIONS:360-403-3417-Permit Center:360-403-3551 BUILDING PERMIT 7224 204TH ST NE,SUITE 104 Permit#:6640 Parcel#:00769800000600 PERMIT EXPIRES 180 DAYS AFTER DATE OF ISSUANCE. Scope of Work:Add ductwork to existing air handler Valuation:8500.00 OWNER APPLICANT CONTRACTOR WEST EDGE DEVELOPMENT-TWO Cozy Heating COZY HEATING LL PO BOX 430 20223 67th Ave Ne 20221 67TH AVE NE ARLINGTON,WA 98223 Arlington,Wa,98223 ARLINGTON,WA 98223 3604354904 360-435-4904 UC:601088 561 EXP:063Q2026 U0 COZYM•122MM EXP:01/032026 MECHANICAL CONTRACTOR PLUMBING CONTRACTOR LIC#: EXP: LIC#: EXP: JOB DESCRIPTION PERMIT TYPE: COMMERCIAL MECHANICAL CODE YEAR: 2021 STORIES: 0 CONST.TYPE: VB DWELLING UNITS: OCC GROUP: B;Business BUILDINGS: OCC LOAD: PERMIT APPROVAL The issuance or granting of this permit shall not be construed to be a permit for,or approval of,any violation of this Code or any other ordinance or order of the City,of any state or federal law,or of any order,proclamation,guidance advice or decision of the Governor of this State.To the extent the issuance or granting of this permit is interpreted to allow construction activity during any period of time when such construction is prohibited or restricted by any state or federal law,or order,proclamation,guidance advice or decision of the Governor of this State,this permit shall not authorize such work and shall not be valid The building official is authorized to prevent occupancy or use of a structure where in violation of this Code,any other City ordinances of this jurisdiction or any other ordinance or executive order of the City,or of any state or federal law,or of any order,proclamation,guidance advice or decision of the Governor.The building official is authorized to suspend or revoke this permit if it is determined to be issued in error or on the basis of incorrect,inaccurate or incomplete information,or in violation of any City ordinance,regulation or order,state or federal law,or any order,proclamation,guidance or decision of the Governor. I AGREE TO COMPLY WITH CITY AND STATE LAWS REGULATING CONSTRUCTION AND IN DOING THE WORK AUTHORIZED THEREBY;NO PERSON WILL BE EMPLOYED IN VIOLATION OF THE LABOR CODE OF THE STATE OF WASHINGTON RELATING TO WORKMEN'S COMPENSATION INSURANCE AND RCW 18.27. THIS APPLICATION IS NOT A PERMIT UNTIL SIGNED BY THE BUILDING OFFICIAL OR HIS/HER DEPUTY AND ALL FEES ARE PAID. IT IS UNLAWFUL TO USE OR OCCUPY A BUILDING OR STRUCTURE UNTIL A FINAL INSPECTION HAS BEEN MADE AND APPROVAL OR A CERTIFICATE OF OCCUPANCY HAS BEEN GRANTED.IBC110/IRC110. SALES TAX NOTICE: Sales tax relating to construction and construction materials in the City of Arlington must be reported on your sales tax return forma coded City of Arlington#3101. 4/ �- -��'/ 09/04/2025 Applicant S' a ate Building Official Date CONDITIONS Adhere to approved plans. Permit shall be onsite for inspections. Call for inspections. The property owner shall ensure that the construction project complies with all applicable zoning codes and regulations. The property owner shall also ensure that the construction project does not cause any adverse impact on the surrounding environment or community. The property owner shall be responsible for obtaining all necessary permits and approvals from the relevant authorities before conunencing construction. The property owner shall ensure that the construction project complies with all applicable design review requirements. THIS PERMIT AUTHORIZES ONLY THE WORK NOTED. THIS PERMIT COVERS WORK TO BE DONE ON PRIVATE PROPERTY ONLY.ANY CONSTRUCTION ON THE PUBLIC DOMAIN(CURBS,SIDEWALKS,DRIVEWAYS, MARQUEES,ETC.)WILL REQUIRE SEPARATE PERMISSION. PERMIT FEES Date Description Fee Amount 09/04/2025 Wchanical Commercial Plan Reuew $155.51 09/042025 Credit Card SeNce $4 87 09/042025 Processing/Technology $25.00 09/042025 Diffusers $90.00 09/042025 Ductwork/Dryer Dud $1.00 09/042025 E-xhaust/VentsA/ent Fans $15.00 09/042025 Nbchanical Base $25.00 Total Due: $316.18 Total Payment: S316.15 Balance Due: $0.00 CALL FOR INSPECTIONS Call by 3:30 pm for next day inspection,allow 48 hours for Fire Inspections When calling for an inspection please leave the folloNring information: Permit Number, Type of Inspection being requested, and whether you prefer morning or afternoon INSPECTION INFORMATION Pass/Fail COMMERCIAL TENANT IMPROVEMENT INSTALLATION,MODIFICATION OR REMOVAL MAY REQUIRE A SEPARATE PERMIT SUBMITAL *CHECKALL THAT APPLY ❑ Automatic fire extinguishing systems ❑ Compressed gas systems ❑ Fire pumps ❑ Flammable and combustible liquids(tanks,piping etc.) ❑ Standpipe systems ❑ Hazardous materials ❑ Private fire hydrants ❑ Industrial ovens/furnace ❑ Fire alarm and detection systems ❑ Spraying or dipping operations ❑ High piled/rack storage ❑ Temporary membrane structure,tents(>200 sq.ft)or canopies(>400 sq.j ) ❑ Provide details on any of the above checked items: Type of Permit: New Space ❑■ Addition ✓ Alteration Property Address: 7224 204th St NE suite #4 Project valuation: 8500.00 Lot#: 4 Parcel ID No.: 00769800000600 Subdivision: Project Scope of Work: Add on ductwork to existing air handler Description of New Tenant Business O erations: State Farm Insurance office IBC Construction Type: IBC Occupancy Type: Building/Space Square Footage: Number of Stories: Square Footage Per Floor: 1st 2nd 3rd 4th Sth 6th Primary Contact: ❑ Owner ❑ Architect ❑ Engineer ❑■ Contractor Owner Name: West Edge Develoment Office No.: Email Address: Cell No.: Mailin Address: PO Bx 430 City;Arlington State:Wa Zip: 98223 Architect Name: Red Oak Architechure Office No.: Email Address: Cell No.: Mailing Address: 324 Olympic Ave city. Arlington State: Wa Zip: 98223 Professional License Number: Expiration Date: Engineer Name: Office No.: Email Address: Cell No.: Mailing Address: City: State: Zip: Professional License Number: Expiration Date: Primary Contractor: Coast Construction Group office No.: 360 474 0600 Email Address: Cell No.: Mailing Address: 328 Olympic Ave city: Arlington State: Wa Zip: 98223 L&I Contractor License Number: COASTCG865CG Expiration Date: 02/18/2026 REV03.2022 Page 2 of 7 COMMERCIAL TENANT IMPROVEMENT MECHANICAL SYSTEM INFORMATION Type of Permit: O New Installation S Addition A Alteration O Replaced O Gas Piping Mechanical Contractor: Cozy Heating Office No.: 360 435 4904 Email Address: Joeatcozy@aol.com Cell No.: 425 754 2055 Mailing Address. 20223 67Th Ave NE City: Arliongton State: Wa Zip: 98223 L&I Contractor License Number: COZYHI*122MM Expiration Date: 1/3/2026 • New gas piping requires a pressure test hooking to any appliance • Sediment traps (drips)are required on all gas lines • Gas lines are required to be supported/secured per IFGS,Section 415 • Proper Combustion air and venting required for all appliances • A shut-off valve is required within 6 feet of each appliance Gas Piping Specification and complete Schematic PAGE 4 O Not Applicable Proposed Piping Material: 0 CSST 0 Brass 0 Black Steel 0 Galvanized Steel 0 Other Proposed Piping Size: O Y2" O 5/s" ❑ 3/4" 0 1" 0 1Y2" 0 2" Inlet Pressure: Pressure Drop: Specific Gravity: MECHANICAL PERMIT FEES (per unit) Type of Fixture No.of Units Cost per Unit Subtotal Additional Plan Review fees x $75.00 = $ Air Cond.Unit<_100Btu h x $ 15.00 = $ Air Cond.Unit>100Btu x $25.00 = $ Air Cond.Unit>500Btu x $50.00 = $ Air Handling Units x $ 15.00 = $ Base Mechanical Fee $25.00 $25.00 Boiler<100Btu h>3h x $ 15.00 = $ Boiler>1 million Btu/h<50hp x $25.00 = $ Boiler>1.5 million Btu/h<50hp x $50.00 = $ Boiler>100Btu 3-15hp x 115.00 = $ Boiler>500Btu h 15-30hp x $25.00 = $ Commercial Hoods-Type I x $25.00 = $ Commercial Hoods-Type II x $50.00 = $ Diffusers 6 x $15.00 = $ Dryer Ducting x $ 15.00 = $ Ductwork(drawings required) 1 x $25.00 = $ Evaporative Coolers x $15.00 = $ Exhaust Ventilation Fans 1 x $ 15.00 = $ Fireplace/Insert/Stove x $15.00 = $ Forced Air Heat<_100 Btu h x $ 15.00 = $ Forced Air Heat>100 Btu h x $25.00 = $ Gas Clothes Dryer x $15.00 = $ Gas Fired AC :5100 Btu h x $15.00 = $ REV03.2022 Page 3 of 7 COMMERCIAL TENANT IMPROVEMENT MECHANICAL PERMIT FEES (per unit) Gas Fired AC>100 B h I x $25.00 = $ tu Gas Fired AC>500 Btu h x $50.00 = $ Gas Pi in <—5 units x $ 15.00 = $ Gas Piping> 5 units (plus<5 units x $2.00 = $ Heat Exchangers x $ 15.00 = $ Heat Pump-Condensing Unit x $25.00 = $ Hot Water Heat Coils x $ 15.00 = $ Miscellaneous Appliance-regulated by x $15.00 = $ mechanical code,not otherwise specified Pkg.Units<_100btu x $25.00 = $ Pkg.Units>100btu x $50.00 = $ Range/Cook top-Gas Fired x $ 15.00 = $ Refrigeration Unit 5100Btu h x $15.00 = $ Refrigeration Unit>100Btu h x $ 25.00 = $ Refrigeration Unit>500Btu h x $50.00 = $ Re-inspection fee all x $75.00 = $ Unit Heaters:5 100 Btu/b. x $ 15.00 = $ Unit Heaters>100 Btu x $25.00 = $ VAV Boxes (Variable Air Volume,part of air x $ 10.00 = $ conditioning system) Wall Heaters-Gas Fired x $25.00 = $ Water Heater-Gas Fired x $25.00 = $ Permit Fee $ Table 4-8;Plan Review Fee $ Processing/Technology Fee $25.00 Total $ PRESSURE PIPING SCHEMATIC COMPLETE FOR GAS PIPING ONLY-USE A SEPARATE SHEET, IF NECESSARY ❑ SCHEMATIC IS TO SCALE ❑ SCHEMATIC NOT TO SCALE Show Pipe Size(s) and Length(s)from meter to all appliances NOTE:Any interior pressure regulators must be indicated REV03.2022 Page 4 of 7 COMMERCIAL TENANT IMPROVEMENT PLUMBING SYSTEM INFORMATION Type of Permit: 0 New Installation O Addition 0 Alteration 0 Replaced 0 Industrial Plumbing Contractor: Office No.: Email Address: Cell No.: Mailing Address: City: State: Zip: L&I Contractor License Number: Expiration Date: The following items need to be specified on the plans: 0 Fixture specifications and equipment with locations. 0 Location and type of all backflow assemblies for each fixture. 0 Calculations for Grease Interceptor. 0 Pipe size and location of sanitary and potable water systems. 0 Riser diagram of waste,vent,and rain water systems,including sizes. 0 Medical gas piping riser diagram,type of gas,storage room and size of piping. PLUMBING PERMIT FEES (per fixture) Commercial plumbing permits are required to submit line drawings.A plan review fee of 65%per Table 4-6 for plumbing permits will be assessed at time of submittal.Includes two 2 ins ections with permit Type of Fixture No.of Fixtures Cost per Fixture Subtotal Additional Plan Review fees x $75.00 = Alteration/repair piping x $ 15.00 = Backflow Assembly x $25.00 = Base Plumbing Fee $25.00 $25.00 Bath Shower Combo x $ 15.00 = Building Main Waste x $25.00 = Clothes Washer x $ 15.00 = Dishwasher x $ 15.00 = Drinking Fountain x $15.00 = Floor Drains x $ 15.00 = REV03.2022 Page 5 of 7 COMMERCIAL TENANT IMPROVEMENT PLUMBING PERMIT FEES (per fixture) Grease Interceptor x $ 75.00 = Grease Trap x $25.00 = Hose Bibb x $ 15.00 = Icemaker Refri erator x $ 15.00 = Irrigation-per meter x $ 25.00 = Kitchen Sink&Disposal x $ 15.00 = Laundry Tray x $ 15.00 = Lavatory x $ 15.00 = Med Gas Pi in <- 5 inlets outlets x $60.00 = Med Gas Piping>5 inlets/outlets (plus<- 5 x $ 5.00 = inlets outlets Miscellaneous-regulated by plumbing x $ 15.00 = code,not otherwise specified Pretreatment Interceptor x $ 15.00 = Re-inspection Fee all x $75.00 = Roof Drains x $ 15.00 = Shower(only) x $ 15.00 = Sink bar,service,etc. x $ 15.00 = Toilets x $ 15.00 = Urinal x $ 15.00 = Vacuum Breakers x $ 25.00 = Water Heater x $25.00 = Water Heater-Tankless x $ 25.00 = Permit Fee Table 4-6; Plan Review Fee Processing/Technology Fee $25.00 Total PROPOSED BUILDING USE ❑ New ❑ Addition/Alteration ❑ Medical ❑ Automotive Based ❑ Industrial ❑ Office ❑ Restaurant ❑ Machine Shop ❑ Other: CROSS CONNECTION Please check all appliances that are proposed or permanently connected to the water supply. ❑ Ice Machine ❑ Dialysis Equip. ❑ Air washers ❑ Coffee Urn/Espresso ❑ Hydrotherapy Equip. ❑ Steam Generators ❑ Carbonated Bev. ❑ Dental Equip. ❑ Dye Vats ❑ Fume Hoods ❑ Laboratory Equip. ❑ Pressure Washers ❑ Degreasers ❑ Autoclave/Sterilizers ❑ Cooling Towers ❑ Hot Tub/Spa ❑ Decorative Fountain ❑ Fire Sprinkler ❑ Aquarium ❑ Swimming Pools ❑ Sprinkler w/chemicals ❑ Lawn Irrigation ❑ Well on property ❑ Other: WASTEWATER DISCHARGE Does the plumbing system currently have a grease interceptor? ❑ Yes ❑ No ❑ Don't Know Does the plumbing system currently have an oil/water ❑ Yes ❑ No ❑ Don't Know separator? REV03.2022 Page 6 of 7 COMMERCIAL TENANT IMPROVEMENT Is water used in the business process (washing,rinsing, ❑ Yes ❑ No ❑ Don't Know cooling)? Does your business require a NPDES permit? ❑ Yes ❑ No ❑ Don't Know I hereby certify that the above information is correct and that the construction on,and the occupancy and the use of the above-described prope will be in accordance with the laws,rules and regulation of the State of Washington. Joe L i b b ey 07/22/2025 Signature,; `` Print Name Date REV03.2022 Page 7 of 7 IT3 System must include - DOAS system or equal fresh air intake /1—T4-F a� Al!L H!FN46Z rr..x IS!'l S P r 2 0 'tJo c:-ri►�w ig K `P \ • iO-FAV-ENHANCED AND iO-FAVR-ENHANCED FRESH AIR VENTILATION SYSTEMS HVAC Controls ineianapOb].IN s6237 INSTALLATION INSTRUCTIONS 62]7 The iO-FAV-ENHANCED and iO-FAVR-ENHANCED fresh air ventilation systems are designed to improve residential indoor air quality. This is accomplished by introducing fresh, outside air through an intake damper controlled by a logic panel. The panel controls the amount of fresh air required each hour based on the ASHRAE 62.2 - 2013 Ventilation and Indoor Air Quality Standard. t- LN 0 MAUL n iO-FAV-ENHANCED iO-FAVR-ENHANCED The iO-FAV-Enhanced incorporates a built-in The iO-FAVR-Enhanced incorporates a built-in transformer to power the outside air damper that transformer to power the outside air damper is powered open when the panel calls for fresh plus a relay that can energize a whole house air ventilation. exhaust fan whenever the panel calls for fresh air ventilation. INSTALLATION OF INTAKE HOOD, FRESH AIR INTAKE DUCT AND MOTORIZED DAMPER It is recommended that the intake hood be an open metal type with a screen. The fresh air intake should be located away from dryer or furnace vents, driveways, trash containers, swimming pools and at a level above any expected snow accumulation. Check all local codes that might apply. Depending on the CFM requirement, an insulated 6" or 8" diameter, rigid fresh air intake ducts is recommended with a 6" or 8" diameter, 2-wire, motorized fresh air damper. The damper actuator should be power open / spring return closed. PANEL INSTALLATION Remove the panel cover and mount the base to a flat surface in a location that allows easy access and wiring. A WARNING! Improper wiring to the HVAC unit can cause "` " damage to equipment and/or the panel. Disconnect electrical power before wiring the panel to the equipment. PANEL OVERVIEW The panel receives its power from the HVAC equipment transformer. The factory mounted 24VAC, 20VA transformer is wired to the 24V terminals and provides power for the fresh air damper. Exhaust Fan Relay Energized Outside Air Damper Open HVAC System Fan ON 24V from Damper Transformer 24V from HVAC Transformer LEDt LED2 LEDJ0 LEDI 0 LEDS PANEL DAMPER FAN DAMPER EXHAUST POWER TRANS. ON OPEN FAN 20 30 40 Ventilation Timer 10 50 0 an MIN �— DAMPER OPEN MINUTES PER HOUR o w --1 N 0 �a o Outside Air Damper DAMPER Override Switch Heating Call Input Signal tG2 Wo Fan Input from ThermostatG10EF Fan Output to HVAC System E O HVAC System Hot RE o EF HVAC System Common C O 0 a �— O 0 Factoryf 24VAC In 24V0 F210 JP1 Wired ! 24VAC In 24Vo E L 24VAC to Damper — DE e EL 24VAC to Damper — DE Jumper Auxiliary Terminals SEQUENCE OF OPERATION The ventilation control cycle is divided into two cycles per hour. If the ventilation timer is set for 30 minutes, the panel will cycle the fresh air damper open for 15 minutes during each 30 minute period. In the heating mode, if there are not calls from the thermostat during the first 30 minute period, the panel will cycle the fresh air damper open and start the fan during the last fifteen minute period. The same cycle rate pertains to the last 30 minute period which would provide a total ventilation time of 30 minutes out of each 1 hour period. If during the first 30 minute period the thermostat calls for heating, the panel will open the fresh air damper for a maximum time of 15 minutes or until the call is satisfied. If the fresh air damper is open for less than 15 minutes and there are no further calls during the first 30 minutes, the panel will open the fresh air damper and start the fan to complete the ventilation time remaining. The same cycle rate would pertain to the last 30 minute period which would provide a total ventilation time of 30 minutes out of each 1 hour period. In the cooling mode, the panel acts independently of cooling calls (with the exception of heat pumps) but can be wired to prioritize cooling in place of heating. TEST, CHECK & STARTUP To test the FAV functions, power up the panel. Turn the ventilation timer dial clockwise to 60 minutes. All LEDs will light and initiate the system fan, open the fresh air damper and energize the exhaust fan relay through the EF terminals. After testing, reset the ventilation timer using the Quick Reference Chart or Ventilation Formula. VENTILATION TIMER QUICK REFERENCE CHART The reference chart below is designed to provide FAV ventilation timer settings based on using 8" rigid straight duct with friction loss of 0.1" w.g. per 100 ft. This chart can be used for most applications. VENTILATION TIMER SETTING (MINUTES PER HOUR) NUMBER OF BEDROOMS ONE TWO THREE FOUR FIVE <500 8 10 12 15 16 501-1000 12 15 16 19 21 1001-1500 16 19 21 23 25 1501-2000 21 23 25 27 29 N 2001-2500 25 27 29 31 33 uj 2501-3000 29 31 33 35 37 O 3001-3500 33 35 37 39 41 3501-4000 37 39 41 43 45 4001-4500 41 43 1 45 47 49 4501-5000 4i 47 49 51 53 FORMULA FOR SETTING THE VENTILATION TIMER The iO-FAV-ENHANCED and i0-FAVR-ENHANCED are designed to simplify selecting the minimum ventilation cycle rate to meet ASHRAE 62.2 - 2013 Standard by using a single dial to set the desired number of minutes per hour that ventilation will take place. The timer cycle rate is calculated as follows: (Home Area in Sq. Ft. x 0.03) + ((Number of Bedrooms + 1) x 7.5) = Required Airflow in CFM (Required Airflow in CFM x 60 +Total Airflow of Fresh Air Duct) x 60 =Ventilation Minutes Per Hour Example: Home Area = 2,500 Sq. Ft. with 4 bedrooms. (2,500 x 0.03 = 75) + ((4 + 1)x 7.5 = 37.50) = 112.50 CFM Total airflow of 8" rigid fresh air duct @ 0.1" w.c. = 220 CFM x 60 = 13,200 Cubic Feet Per Hour (112.50 CFM x 60 Minutes = 6,750) 6,600 = 13,200 x 60 = 30.68 Ventilation Minutes Per Hour • The ventilation timer would be set for 31 Minutes www.iohvaccontrols.com HVAC Controls For Technical Support Call Toll Free: 866-225-5032 Ind, apoW IN48237 PP iO-06-1305-111318 r v Jc-� U Iv?'ciz CONaC_ Tr+vtC ��2 ktr- M�-to rtrl Z il�P4,2 St+Are- g r System must include DOAS system or equal fresh air intake L-T Q Cbr►1 o� )S r!N(.-AYIL H4N4&2 IL ` iO-FAV-ENHANCED AND iO-FAVR-ENHANCED FRESH AIR VENTILATION SYSTEMS HVAC Controls Indianapol e,IN d6237 INSTALLATION INSTRUCTIONS 277 The iO-FAV-ENHANCED and iO-FAVR-ENHANCED fresh air ventilation systems are designed to improve residential indoor air quality. This is accomplished by introducing fresh, outside air through an intake damper controlled by a logic panel. The panel controls the amount of fresh air required each hour based on the ASHRAE 62.2 - 2013 Ventilation and Indoor Air Quality Standard. 01 d - � � e i� ► iO-FAV-ENHANCED iO-FAVR-ENHANCED The iO-FAV-Enhanced incorporates a built-in The iO-FAVR-Enhanced incorporates a built-in transformer to power the outside air damper that transformer to power the outside air damper is powered open when the panel calls for fresh plus a relay that can energize a whole house air ventilation. exhaust fan whenever the panel calls for fresh air ventilation. INSTALLATION OF INTAKE HOOD, FRESH AIR INTAKE DUCT AND MOTORIZED DAMPER It is recommended that the intake hood be an open metal type with a screen. The fresh air intake should be located away from dryer or furnace vents, driveways, trash containers, swimming pools and at a level above any expected snow accumulation. Check all local codes that might apply. Depending on the CFM requirement, an insulated 6" or 8" diameter, rigid fresh air intake ducts is recommended with a 6" or 8" diameter, 2-wire, motorized fresh air damper. The damper actuator should be power open / spring return closed. PANEL INSTALLATION fl Remove the panel cover and mount the base to a flat surface in a location that allows easy access and wiring. WARNING! -� Improper wiring to the HVAC unit can cause damage to equipment and/or the panel. Disconnect electrical power before wiring the panel to the equipment. PANEL OVERVIEW The panel receives its power from the HVAC equipment transformer. The factory mounted 24VAC, 20VA transformer is wired to the 24V terminals and provides power for the fresh air damper. Exhaust Fan Relay Energized Outside Air Damper Open HVAC System Fan ON 24V from Damper Transformer ----, 24V from HVAC Transformer LE01 O 1ED26 LEDs LED1 LEDS 0 PANEL DAMPER FAN DAMPER EXHAUST POWER TRANS. ON OPEN FAN 000 0 0 2E�� 30 40 Ventilation Timer 1050 O0 601AIN -� DAMPER OPEN MINUTES PER HOUR O N Q OLO _j L) Outside Air Damper DAMPER Override Switch Heating Call Input Signal Wo Fan Input from Thermostat tG1 0 Fan Output to HVAC System G2� EF HVAC System Hot Ro oEF HVAC System Common C 0 a Fol 0 Factory r 24VAC In 24VE 00 Wired L 24VAC In 24Vp J� 0 L 24VAC to Damper p 0 e a L 24VAC to Damper p 0 Jumper Auxiliary Terminals SEQUENCE OF OPERATION The ventilation control cycle is divided into two cycles per hour. If the ventilation timer is set for 30 minutes, the panel will cycle the fresh air damper open for 15 minutes during each 30 minute period. In the heating mode, if there are not calls from the thermostat during the first 30 minute period, the panel will cycle the fresh air damper open and start the fan during the last fifteen minute period. The same cycle rate pertains to the last 30 minute period which would provide a total ventilation time of 30 minutes out of each 1 hour period. If during the first 30 minute period the thermostat calls for heating, the panel will open the fresh air damper for a maximum time of 15 minutes or until the call is satisfied. If the fresh air damper is open for less than 15 minutes and there are no further calls during the first 30 minutes, the panel will open the fresh air damper and start the fan to complete the ventilation time remaining. The same cycle rate would pertain to the last 30 minute period which would provide a total ventilation time of 30 minutes out of each 1 hour period. In the cooling mode, the panel acts independently of cooling calls (with the exception of heat pumps) but can be wired to prioritize cooling in place of heating. TEST, CHECK & STARTUP To test the FAV functions, power up the panel. Turn the ventilation timer dial clockwise to 60 minutes. All LEDs will light and initiate the system fan, open the fresh air damper and energize the exhaust fan relay through the EF terminals. After testing, reset the ventilation timer using the Quick Reference Chart or Ventilation Formula. VENTILATION TIMER QUICK REFERENCE CHART The reference chart below is designed to provide FAV ventilation timer settings based on using 8" rigid straight duct with friction loss of 0.1" w.g. per 100 ft. This chart can be used for most applications. VENTILATION TIMER SETTING (MINUTES PER HOUR) NUMBER OF BEDROOMS ONE TWO THREE FOUR FIVE <500 8 10 12 15 16 501-1000 12 15 16 19 21 1001-1500 16 19 21 23 25 1501-2000 21 23 25 27 29 w ry 2001-2500 25 27 29 31 33 w 2501-3000 29 31 33 35 37 = 3001-3500 33 35 37 39 41 3501-4000 37 39 41 43 45 4001-4500 11 41 43 45 47 49 4501-5000 45 47 49 51 53 FORMULA FOR SETTING THE VENTILATION TIMER The iO-FAV-ENHANCED and i0-FAVR-ENHANCED are designed to simplify selecting the minimum ventilation cycle rate to meet ASHRAE 62.2 - 2013 Standard by using a single dial to set the desired number of minutes per hour that ventilation will take place. The timer cycle rate is calculated as follows: (Home Area in Sq. Ft. x 0.03) + ((Number of Bedrooms + 1) x 7.5) = Required Airflow in CFM (Required Airflow in CFM x 60_Total Airflow of Fresh Air Duct) x 60 = Ventilation Minutes Per Hour Example: Home Area = 2,500 Sq. Ft. with 4 bedrooms. (2,500 x 0.03 = 75) + ((4 + 1)x 7.5 = 37.50) = 112.50 CFM Total airflow of 8" rigid fresh air duct @ 0.1"w.c. = 220 CFM x 60 = 13,200 Cubic Feet Per Hour (112.50 CFM x 60 Minutes = 6,750) 6,600 + 13,200 x 60 = 30.68 Ventilation Minutes Per Hour • The ventilation timer would be set for 31 Minutes HVAC Controls www.iohvaccontrols.com nden4ds,114 46237 For Technical Support Call Toll Free: 866-225-5032 iO-0&1305-111318 Vv rlct !`�U v�ws�1 VYZ Cb T72o L �(C �-�fL t S'71N //Y%kty- Zvi v o�T Mv-ro rt - il�A-vtiP4-2 rlv`-7 S�4G� FDA1KFNW - absolute comfort ■■■■■■■■■■■■■■■ ■■ M■■■■ ■■■ MEMO■■ ■■ ■■■E ■■ MM ■■ No 0 mom ■M■■ ■ ■� ME OEM ■ - ►� ■ No ON ■EOM ■ ON ■E No MME ■■■■ ■ ■■■■ ■ ■M■ EEM MOON■ ■ ■ ■■ ■ ■MEMO ON 0 No ■■ ■MM ■■■EE■■■E■■ ■ EE ■■■ ■■MM MEME■MEMOMMM ■■ ■■ No ■■■M■■ EME■■ME■EMEM■M ■ME■■ME■■EME■■■ ME■■■EEMEMEMEMEMEM■MEMEM■ ME■M■■ OMENS E■■OME■EMM■ EMMEMMO■ ■ ME ■ ■■ ■■■MEMMM■ ME■E■ MEMM■MMEM■■■ ■■ME■■EMM■■■ ME■■M■ MMEM■M■■Emom MEMENEMOME ON MEMO MMMEMEME■ MM■MM■MMMM■MM■ MMM MEMEMOMMEMEMM ■M ■■■ E■■SEENEEN ME11MMENEEMMM■MMEM■ ME ■■■■ ■ ■■ MM■MEMO No NEMESES ■EMM■■M ■ ■E mom NNE MM►�ME■EMM■ MMMM ONE MENEM ARM NOMINEE ERMEM ENO ■■ PP ME EMOM No ■■EM■MEMEMM MMMMMMMMMM■ ■EME■EM ■■M■EMOMME ■ ■■■■■■■■■■�■MOMME■E lmom �MMM MEMMMEMEMMEN oom MOMMEMENMEEM Daikin AC (Americas), Inc. 1 1645 Wallace Drive, Suite 110 1 Carrollton, TX 75006 USA www.daikinac.com • iO-FAV-ENHANCED AND iO-FAVR-ENHANCED FRESH AIR VENTILATION SYSTEMS HVAC Controls INSTALLATION INSTRUCTIONS .nd—Pol a.IN 46277 The iO-FAV-ENHANCED and iO-FAVR-ENHANCED fresh air ventilation systems are designed to improve residential indoor air quality. This is accomplished by introducing fresh, outside air through an intake damper controlled by a logic panel. The panel controls the amount of fresh air required each hour based on the ASHRAE 62.2 - 2013 Ventilation and Indoor Air Quality Standard. 4AL a 49 ,i iO-FAV-ENHANCED iO-FAVR-ENHANCED The iO-FAV-Enhanced incorporates a built-in The iO-FAVR-Enhanced incorporates a built-in transformer to power the outside air damper that transformer to power the outside air damper is powered open when the panel calls for fresh plus a relay that can energize a whole house air ventilation. exhaust fan whenever the panel calls for fresh air ventilation. INSTALLATION OF INTAKE HOOD, FRESH AIR INTAKE DUCT AND MOTORIZED DAMPER It is recommended that the intake hood be an open metal type with a screen. The fresh air intake should be located away from dryer or furnace vents, driveways, trash containers, swimming pools and at a level above any expected snow accumulation. Check all local codes that might apply. Depending on the CFM requirement, an insulated 6" or 8" diameter, rigid fresh air intake ducts is recommended with a 6" or 8" diameter, 2-wire, motorized fresh air damper. The damper actuator should be power open / spring return closed. PANEL INSTALLATION - Remove the panel cover and mount the base to a flat surface in a location that allows easy \ access and wiring. WARNING! Improper wiring to the HVAC unit can cause damage to equipment and/or the panel. Disconnect electrical power before wiring the panel to the equipment. iO-FAVR-ENHANCED 120 VOLT WIRING DIAGRAM 120V(NEUTRAL) "".......'""" WHOLE HOUSE EXHAUSTFAN 120V(HOT) 120V(HOT) "�" FACTORY WIRING .................... • . ................... FIELD WIRING 120V(NEUTRAL) RIBUIC RELAY 100VC ORANGE •••• =O -O LL O 1-0 1E O • 3 PANEL DAMPER FAN DAMPEN EXHAUST : POWER TRANS. ON OPEN FAN . s 0 � � 20 30 40 0 1D 0 60 r50N DAMPER OPEN F n O MINUTES PER HOUR o W w Y J J ? g iD LED ON WHEN 5 ;� m r = RELAY ACTIVATESO DAMPER VIOLET �- BROWN ; w W m Wo f t G2o a a ^ oEF -� TRANSFORMER CID RE) oEF[DOVIOLET 24V❑O a = 00 Pt EL BROWN 24D❑ o NIL Do WHITENELLOW BLACK The iO-FAVR-ENHANCED has a built-in transformer used to power the outside air damper open when the panel calls for ventilation air and a relay that allows a whole house exhaust fan to be wired directly to the panel. Whenever the FAVR calls for ventilation air, 24 volts is sent to the relay coil which closes the 120V (Hot) contact to the exhaust fan. 1. Remove the cover on the 2 x 4 junction box. 2. Wire the 120 volt neutral from the exhaust fan and 120V primary neutral to the white neutral wire in the junction box. 3. Wire the 120 volt primary hot wire to the black hot and yellow hot wire in the junction box. 4. Wire the 120 volt hot wire from the exhaust fan to the orange hot wire in the junction box. PANEL OVERVIEW The panel receives its power from the HVAC equipment transformer. The factory mounted 24VAC, 20VA transformer is wired to the 24V terminals and provides power for the fresh air damper. Exhaust Fan Relay Energized Outside Air Damper Open HVAC System Fan ON 24V from Damper Transformer 24V from HVAC Transformer LED, LED2 LED3 0 LE01 0 LED5 PANEL DAMPER FAN DAMPER EXHAUST POWER TRANS. ON OPEN FAN 00 0 20 30 40 Ventilation 000 Timer O 10 n L __J 0 60 MIN DAMPER OPEN —� MINUTES PER HOUR o w O Q O U Outside Air Damper DAMPER Override Switch Heating Call Input Signal — WE Fan Input from Thermostat G1 E Fan Output to HVAC System —ME 110 []EF HVAC System Hot RE 0 EF HVAC System Common C 0 m a m °0 Factoryf 24VAC In 24Vo ❑0 Wired L 24VAC In 24Vo ❑L 24VAC to Damper p F21 m oL 24VAC to Damper p 1§1 0] -7 Jumper Auxiliary Terminals SEQUENCE OF OPERATION The ventilation control cycle is divided into two cycles per hour. If the ventilation timer is set for 30 minutes, the panel will cycle the fresh air damper open for 15 minutes during each 30 minute period. In the heating mode, if there are not calls from the thermostat during the first 30 minute period, the panel will cycle the fresh air damper open and start the fan during the last fifteen minute period. The same cycle rate pertains to the last 30 minute period which would provide a total ventilation time of 30 minutes out of each 1 hour period. If during the first 30 minute period the thermostat calls for heating, the panel will open the fresh air damper for a maximum time of 15 minutes or until the call is satisfied. If the fresh air damper is open for less than 15 minutes and there are no further calls during the first 30 minutes, the panel will open the fresh air damper and start the fan to complete the ventilation time remaining. The same cycle rate would pertain to the last 30 minute period which would provide a total ventilation time of 30 minutes out of each 1 hour period. In the cooling mode, the panel acts independently of cooling calls (with the exception of heat pumps) but can be wired to prioritize cooling in place of heating. TEST, CHECK & STARTUP To test the FAV functions, power up the panel. Turn the ventilation timer dial clockwise to 60 minutes. All LEDs will light and initiate the system fan, open the fresh air damper and energize the exhaust fan relay through the EF terminals. After testing, reset the ventilation timer using the Quick Reference Chart or Ventilation Formula. VENTILATION TIMER QUICK REFERENCE CHART The reference chart below is designed to provide FAV ventilation timer settings based on using 8" rigid straight duct with friction loss of 0.1" w.g. per 100 ft. This chart can be used for most applications. VENTILATION TIMER SETTING (MINUTES PER HOUR) NUMBER OF BEDROOMS ONE TWO THREE FOUR FIVE <500 8 10 12 15 16 501-1000 12 15 16 19 21 1001-1500 16 19 21 23 25 N 1501-2000 21 23 25 27 29 N 2001-2500 25 27 29 31 33 U) w 2501-3000 29 31 33 35 37 p 3001-3500 33 35 37 39 41 3501-4000 37 39 41 43 45 4001-4500 41 1 43 45 47 1 49 4501-5000 45 47 49 51 1 53 FORMULA FOR SETTING THE VENTILATION TIMER The iO-FAV-ENHANCED and iO-FAVR-ENHANCED are designed to simplify selecting the minimum ventilation cycle rate to meet ASHRAE 62.2 - 2013 Standard by using a single dial to set the desired number of minutes per hour that ventilation will take place. The timer cycle rate is calculated as follows: (Home Area in Sq. Ft. x 0.03) + ((Number of Bedrooms + 1) x 7.5) = Required Airflow in CFM (Required Airflow in CFM x 60 _Total Airflow of Fresh Air Duct) x 60 =Ventilation Minutes Per Hour Example: Home Area = 2,500 Sq. Ft. with 4 bedrooms. (2,500 x 0.03 = 75) + ((4 + 1)x 7.5 = 37.50) = 112.50 CFM Total airflow of 8" rigid fresh air duct @ 0.1"w.c. = 220 CFM x 60 = 13,200 Cubic Feet Per Hour (112.50 CFM x 60 Minutes = 6,750) 6,600 + 13,200 x 60 = 30.68 Ventilation Minutes Per Hour The ventilation timer would be set for 31 Minutes www.iohvaccontrols.com HVAC Controls For Technical Support Call Toll Free: 866-225-5032 Ind—apolu,IN 46237 iO-06-1305-111318 PpFrDAIFKAFN AC absolute comfort ■■■■■■ ■■■■■■■ iii ONE ■E■EEE MEMM■■■ ■■ ■■ ■■■■■ ■■■■■■■■■■■ ■ ON ■■ ■■■■■ I ■EMEME■EM■ No ■■ MEMO■■ ■■■■MEMO■■ ■E■■■■ ■■MEMO MMMMMM■■■M■ ■ ■■ ■ ■ ■E■EM■ ■MMMMMMMM■MMM ■■ ■ ■ ■EMMME ■■MEEMM■■■MMMM■ ■ ■ ■EE■E■ ■MM■MMMMMMMMMMMM■ IN ■ ■EEEM■1■■■■■■■■■■■■■■■■■■ ■■ ■■ ■MM■M■ ■MEM■■MMMMMMMEMMM■ EE■ OEM MEME■■ ■MM■MMMMMEMMMMEEM ■■EE ■■ EMME■■ MEMEMMEMMEMEM■EME NONE■EE MEN EMOMME■ME■MMEMEM■ MEMO■ ■MME■ ■OMME■■■ME■EMMEM■ MENME ■E■■E■ ■MME■MEMMMMMMMMMM■ MENE■ ■E■■E■ ■MMMMMEMMMEMMMMMMO ■■■E■ ■■MEMO ■MMOMMOM■■■MOMMEMEM■■ME ■ ■■■■■■■■■E■■■ME■■E■■MOOS■O■■■■■■ ■ ■EMOMM■■ ■MMMMMMMEMEM■MMM■MO■ ■EEO■OEM■DOE■■EEEEE■E■■■■EEM■■■ Daikin AC (Americas), Inc. 1 1645 Wallace Drive, Suite 110 1 Carrollton, TX 75006 USA www.daikinac.com From: joeatcozy(aaol.com To: Hannah Hardwick Subject: Re: BLD-6640 3rd Round Review Comment Date: Friday,August 22,2025 7:01:03 AM Attachments: State farm HRV info.Ddf imaae001.Dno imaae004.Dno imaaeWluno imaae002.Dna This message is from an External Sender This message came from outside the City of Arlington Good Morning Sorry for the delay's. Actually the model is a HERO 120. Attached is the Secs sheets Thanks Joe On Thursday, August 21, 2025 at 11:20:01 AM PDT, Hannah Hardwick<hhardwick@arlingtonwa.gov> wrote: Hello, Can you please confirm the model number highlighted below from your plans and please sent in the spec sheet for that model. ftgq aw ' 00 Sincerely, i I I Hannah Hardwick Community&Economic Development, Fire Permit Technician 11 18204 59th Ave NE,Arlington, WA 98223 O: 360.403.3549 hhardwick(o)arlingtonwa.gov I www.arlingtonwa.gov wtv Note: Emails and attachments sent to and from the City of Arlington are public records and may be subject to disclosure pursuant to the Public Records Act. VDA/KIN A C absolute comfort ■ NOON■■ a ■ ■ MENNo in ■ ■ ■EON■■ �ii� ■■ ■ ■ ■■■n■ NOON■■ ■ ■ ■ ■■■ ■■ NONE■■ ■ ■ ■ ■ mom ■■■■ENME■ ■■ ■ ■MME ■■EMMOMM■ ■■ENE■ ME No MMEEMEMEM MM ■■■ ME ■EMMEMMOMM■MM ■ ME NM mom MMMMMNMMMMMMMMMM No ■■■O ■■E■ENMEMME■MMEE■ ■MONO ■■■■■■■■■■■■■■■■■■ IMEM■■ENE■ ■■ ■ JMMMMMMMENMMEMNM■ ■■■EOM ■ ■■ ■ MEMOMM■MEMENEEME ■■■ ■ENE■■ ■MEMEMEMMEM■M■M■ ■■■ IN■ mom IN MEOMNMMMMMEM ON 0 MEEMM ■M■ MMEM■ NONEE ■E■ ■■■ MENE■ IN■E■ ■MOM■ MONO■ ON ■■ ■ ■ENEM EMEMMENEM■EMEMEM■ME No MENNE■ ■MNNMMM■MMMMEMMMM ME MEN MEMNO■ ■MEMEMOMMEMM■MMEM ■NMEN■ MEMEMMNMEMMEMEMMMMEMOMENEMME MMIMME ■MEMEM■MMEMM■MEMEMM■MME ■ MME■M■■NNNM■■NME■■■■MMMMM■MEN ■MMMMMMMM■■■■■OEM■MM■MMMMMMMMMMN ■MEMEMMEMEMEMMMEMEMENMM MEMO ■MMMNMMMMMMMMMMM■ Daikin AC (Americas), Inc. 1 1645 Wallace Drive, Suite 110 1 Carrollton, TX 75006 USA www.daikinac.com Dimensions&Airflow i -- �===✓ fresh air to inside C pTi— fresh air from outside stale air • i � from inside stale air A B _, to outside !HERCI12 231/4 590 111/2 291 225/8 575 241/4 616 crradon is in inches C'eat'an0e of 12'(3G5mmi in front of the unit Is recommended fo-rarrc%, of core All units feeture three foot plug-in power cord with 3-prong plug. Ventilation Performance Airflow I(/s1 ® I 1 ® 1 I I ® I 1 ® 1 I I 1 00 9 19 28 37 47 57 66 77 725 ®®®®®®®® (D Spend �+M Md sp.ad Speed Net supply airflow 131(621 125 159) 1191561 112 153) 1061501 97(46) 891421 81 (38) On ©ttn+.ri Speed 200 3 a Gross supply airflow 138(651 131 (62) 1251591 117 155) 110(52) 102(48) 93(44) 65(40) __ Gross exhaust airflow 144(681 138 1651 131 (621 125(59) 117(55) 108(51) 97(46) 67(41) 06 ISO y d balancing Range:40 cfm 09(/sl to 140 cfm:68 L/sl If a bal8nCC0'tow auts,de the adeva range is reauireo,please a` revs t oar product offerings to ensure a properly sized unt is selected a a.4 loo 3 in o� so 0.00 20 40 60 80 100 120 140 166.0 4knergV performance Airflow(cfml Latent recoverylmoisture Supply temperature transfer 32 0 70 33 69 81 88 0.00 32 0 1C0 47 89 76 64 0.00 32 0 114 54 119 76 83 0.00 -13 -25 66 31 96 65 68 0.15 Requirements and standards • Complies with the UL 1812 requirements regulating the construction and installation of Heat Recovery Ventilators • Complies with the CSA C22.2 no. 113 Standard applicable to ventilators • Complies with the CSA F326 requirements regulating the installation of Heat Recovery Ventilators • Technical data was obtained from published results of test relating to CSA C439 Standards.This data was optained without the use of the MERV8 supply filter. • HVI certified and ENERGY STAR®qualified* AR®by c r:efficiency guidelines set by Natural Resources Canada and the US EPA.It meets ENERGY START requirements only vnen use Contacts Distributed by: Submitted by: Data. Quantity: Model: Pril4: Comments: Location: _ Architect: Engineer: Contractor: United States 10048 Industrial Blvd •Lenexa.KS 66215•1,800 747,1762•www.fantech,net Canada 50)(anelflakt Way•8ouctouche,N8 E4S 3M5•1.800.565.3548•wwv.fantech,ne[ •"•- fantech •��.;. . Systemair reserves tre^Ig-rt�modify,sit any Lime aria w�Lroct notice,any or al,of Its prodacs features,designs,comps- ��; ; nents end saecifications to mainta:r their technolog cal ieadi 1p position, a systemair company Specification ate: „0 5-03 HERO 120H Fresh Air Appliance - HRV Product #: 99400 Fans Two(2)factory-balanced fans with backward curved blades. Motors come with permanently lubricated, sealed ball-bearings to guarantee long life and maintenance-free operation. Heat Recovery Core • • Counterflow heat recovery exchanger built from thermoformed polymer plates covered by a limited lifetime warranty.Core dimensions are 14.4' x 14.4" (366 x 366 mml with a 10" (255 mm) depth. Our heat exchangers are designed and manufactured to withstand extreme temperature variations. F4ER0 WinterguardT"'Defrost The unit incorporates a unique and quiet internal recirculation defrost that does not depressurize the home during the defrost cycle.A preset defrost sequence is activated when the outdoor temperature falls below Fantech's most efficient series yet!The HERO 120H is ideal for high-rise 23' F(-5°C) and automatically adjusts itself based on operating apartment applications, condominiums, single and multi family homes. conditions. The fan speed is also adjusted automatically to provide a With a completely new design the HERO 12OH features a Counterflow smooth and quiet transition between Ventilation 6 Defrost mode, core, round metal collars and a high efficiency rating! Serviceability Features Core,filters, fans and electronic panel can be accesses easily from the • 5" 1125mm) round metal duct connections with rubberized duct access panel. Core conveniently slides out with only 12" (305 ni seals clearance. • Removable screw terminal for easy connection with external access Duct Connections • Top port design fits in tight spaces 5" (125mm)round metal duct connections with rubberrized seal. • Includes wall mounting:peed bracket • Counterflow heat recovery core Case • Multiple speed operation 22 gauge galvanized steel cabinet with a pre-painted steel corrosion • Internal recirculation defrost resistant door. • 41 Ibs (18.75 kg) including core Insulation Optional Controls: Cabinet is fully insulated with 3/4" 120 mm) high density expanded • ECO-TOUCHY — Programmable Touch Screen Wall Control polystyrene. • ECO-Feel — Automatic IAO Control • Filters EDF7 — Electronic multi-function dehumidistat Two(2)washable electrostatic panel type air filters 7.87"(2O0mm) x • EOF1 R — Multi-function dehumidistat 9.84" (25Omm)x 0.125" (3mm). • RTS-W — Wireless 20/40/60 minute timer • RTS2 — 20 minute timer over-ride Balancing and commissioning • RTS5 — 20/40/60 minute timer Balancing must be completed using the Fantech ECO-Touch& • MDEH1 — Dehumidistat Programmable Touch Screen Wall Control Specifications Warranty • Duct size — 5" (125mm) round Limited lifetime on counterflow exchanger, 7 year on motors, and 5 year • Voltage/Phase — 120/1 on parts. • Power rated — 165 W • Amp — 1.2 A • Average airflow — 119 cfm 156 Us) ®0.3'P (75 Pal fantech " a systemair company WOE] 18'61Zl lZ't S9'8 O 1 C ru o w vE ru v cn — 1 L Q1 Y a v Z E N p� - • lJ N 0 C rv`p 61 5 rN m m o N •• '• • •::::S e M r — r l£'0 w • a 0 IZ'9b t] 9L'S IL'LLI M 90'£ v p C 00 N C N �O 0= • N N CV - 00 10 --Q- N v1 N n hp N I IL'Z81 SZ'£ [Z'88l] M tb'L [S'06Z] I— Wtt . o •- N (CbLS] E9'ZZ � �o M I l'9 t9] 9Z'bZ Permit#: 6640 Permit Date: 07/22/25 Permit Type: COMMERCIAL MECHANICAL Project Name: State Farm Insurance Office Applicant Name: Cozy Heating Applicant Address: 20223 67th Ave Ne Applicant, City, State, Zip: Arlington,Wa, 98223 Contact: Joe Libbey Phone: 3604354904 Email:joeatcozy@aol.com Scope of Work: Add ductwork to existing air handler Valuation: 8500.00 Square Feet: 0 Number of Stories: 0 Construction Type: VB Occupancy Group: B; Business ID Code: Permit Issued: 09/05/2025 Permit Expires: 03/04/2026 Form Permit Type: COMMERCIAL MECHANICAL Status: ISSUED Assigned To: Hannah Hardwick Property Parcel# Address Legal Description Owner Name Owner Phone Zoning PILCHUCK VILLAGE- BUILDING A Section 14 Township 31 Range 5 Quarter NW JENSEN BUSINESS PARK,PHASE 7224 204TH ST NE,SUITE 1 BLK 000 D-00 PAR A OF WEST EDGE 00769800000600 104 CITY ARL BLA NO.728 DEVELOPMENT- 140 MIXED-USE REC AFN 202010095004 TWO LL BEING A PTN OF LOT 6 OF EXST SD PLAT&PTN OF LOT 28JENSEN BUSINESS PARK PHASE II Contractors Contractor Primary Contact Phone Address Contractor Type License License# COZY HEATING Vince Willett 360-435-4904 20221 67TH AVE CONSTRUCTION City of Arlington 601 088 561 NE CONTRACTOR COZY HEATING Vince Willett 360-435-4904 20221 67TH AVE CONSTRUCTION LABOR&COZYHI*122MM NE CONTRACTOR INDUSTRIES Plan Reviews Date Review Type Description Assigned To Review Status 08/20/2025 COMMERCIAL BUILDING Approved MECHANICAL Fees Fee Description Notes Amount Mechanical Commercial Plan Review Table 4-1 $155.51 Credit Card Service $4.67 Processing/Technology $25.00 Diffusers Enter#of units $90.00 Ductwork/Dryer Duct $1.00 Exhaust/VentsNent Fans $15.00 Mechanical Base Permit Fee $25.00 Credit Card Service $4.68 Total $320.86 Attached Letters Date Letter Description 09/04/2025 Building Permit Payments Date Paid By Description Payment Type Accepted By Amount 07/23/2025 Steven Maisch 237982330 Hannah Hardwick $4.67 07/23/2025 XBP Conf: $155.51 237982330 09/04/2025 XBP Conf: $156.00 242031551 09/04/2025 Steven Maisch 242031551 $4.68 Outstanding Balance $0.00 Notes Date Note Created By: 03/02/2026 sent expiration notice Hannah Hardwick 02/02/2026 Expiration notice sent LaNay Hendrick 08/21/2025 sent 3rd round review comments. Hannah Hardwick 08/19/2025 emailed applicant the review comment Hannah Hardwick 08/08/2025 emailed corrections to applicant. Hannah Hardwick Uploaded Files Date File Name 09/05/2025 28134749-2025 BLD6640 IssuedPermit.pdf 08/22/2025 27940585-20250822 BLD6640 Additional Spec Sheet.pdf 08/22/2025 27940586-20250820 BLD6640 3rd Round Revision.pdf 08/20/2025 27900334-20250820 BLD6640 2nd Round Revision.pdf 07/22/2025 27446822-20250722 BLD6640 Plans.pdf 07/22/2025 27446823-20250722 BLD6640 Anp.pdf