HomeMy WebLinkAbout18215 59th Ave Ne_BLD2967_2026 r
NOTICE
TO PERMITEE AND/OR OWNER
Cl PARTIAL APPROVAL ❑ CORRECTIONS REQUIRED
❑ DO NOT OCCUPY XAPPROVED
PERMIT#: � AM PM DATE: 7
JOB ADDRESS LOT#
PROJECT:
TYPE OF INSPECTION: T i• , }�G t `� �'���
OTHER:
❑ NO PERMIT-STOP WORK-OBTAIN PERMIT
❑ CONSTRUCTION IS NOT IN ACCORDANCE WITH APPROVED PLANS AND
PERMIT -STOP WORK
❑ STOP WORK UNTIL AUTHORIZED TO CONTINUE BY INSPECTOR.
❑ CORRECTIONS LISTED BELOW MUST BE MADE BEFORE WORK CAN BE
APPROVED.
❑ WORK NOT READY FOR INSPECTION: $50 REINSPECTION FEE (PER IBC)
MUST BE PAID PRIOR TO NEXT INSPECTION.
Cl CONTACT INSPECTOR 360-403-3551 ❑ CALL FOR REINSPECTION
�= r I SKI- (1( 1%C,
THE ACTIONS OR CORRECTIONS INDICATED ABOVE ARE REQUIRED WITHIN DAYS OR
PENALTIES IMPOSED BYLAW MAYAPPLY.
FOR INSPECTION CALL: 360-403-3417
INSPECTOR DAT9
0 PLANNING Cl CIVIL /BUILDING CITY OF ARLINGTON •
r
NOTICE
TO PERMITEE AND/OR OWNER
❑ PARTIAL APPROVAL ❑ CORRECTIONS REQUIRED
❑ DO NOT OCCUPY XAPPROVED
PERMIT#: AM PM DATE:
JOB ADDRESS:
PROJECT: A,
TYPE OF INSPECTION:
OTHER: '
❑ NO PERMIT-STOP WORK-OBTAIN PERMIT
❑ CONSTRUCTION IS NOT IN ACCORDANCE WITH APPROVED PLANS AND
PERMIT -STOP WORK
❑ STOP WORK UNTIL AUTHORIZED TO CONTINUE BY INSPECTOR.
❑ CORRECTIONS LISTED BELOW MUST BE MADE BEFORE WORK CAN BE
APPROVED.
❑ WORK NOT READY FOR INSPECTION: $50 REINSPECTION FEE(PER IBC) j
MUST BE PAID PRIOR TO NEXT INSPECTION.
❑ CONTACT INSPECTOR 360-403-3551 Cl CALL FOR REINSPECTION
1 V12,DI>r r7
THEACTIONS OR CORRECTIONS INDICATED ABOVEARE REQUIRED WITHIN DAYS OR
PENALTIES IMPOSED BY LAW MAYAPPLY.
FOR INSPECTION CALL: 360-403-3417
21G1lo
INSPECTOR DATE <
S 1' p�
0 PLANNING Cl CIVIL /BUILDING CITY OF ARLINGTON ��„�•t
,-NOTICE -/- ev
TO PERMITEE AND/OR OWNER
❑ PARTIAL APPROVAL ❑ CORRECTIONS REQUIRED
❑ DO NOT OCCUPY ❑ APPROVED
PERMIT#: �� PM DATE: 2111W tO
OBADDRESS: -e_ LOT#:
PROJECT: g, _-
TYPE OF INSPECTION: aoG 41
OTHER:
❑ NO PERMIT-STOP WORK-OBTAIN PERMIT
❑ CONSTRUCTION IS NOT IN ACCORDANCE WITH APPROVED PLANS AND
PERMIT -STOP WORK
❑ STOP WORK UNTIL AUTHORIZED TO CONTINUE BY INSPECTOR.
❑ CORRECTIONS LISTED BELOW MUST BE MADE BEFORE WORK CAN BE
APPROVED.
❑ WORK NOT READY FOR INSPECTION:$50 REINSPECTION FEE (PER IBC)
MUST BE PAID PRIOR TO NEXT INSPECTION.
❑ CONTACT INSPECTOR 360-403-3551 ❑ CALL FOR REINSPECTION
THE ACTIONS OR CORRECTIONS INDICATED ABOVE ARE REQUIRED WITHIN DAYS OR
PENALTIES IMPOSED BYLAW MAYAPPLY.
FOR INSPECTION CALL: 360-403-3417
INSPECTOR DATE
O PLANNING 0 CIVIL /BUILDING CITY OF ARLINGTON ��, •
NOTICE f�
TO PERMITEE AND/OR OWNER
Cl PARTIAL APPROVAL ❑ CORRECTIONS REQUIRED
❑ DO NOT OCCUPY ❑APPROVED
,PERMIT#: 11 � DATE
i
,AM PM :
JOB ADDRESS: 1 e LOT#:
PROJECT:
TYPE OF INSPECTION:
OTHER:
❑ NO PERMIT-STOP WORK-OBTAIN PERMIT
❑ CONSTRUCTION IS NOT IN ACCORDANCE WITH APPROVED PLANS AND
PERMIT -STOP WORK
❑ STOP WORK UNTIL AUTHORIZED TO CONTINUE BY INSPECTOR.
❑ CORRECTIONS LISTED BELOW MUST BE MADE BEFORE WORK CAN BE
APPROVED.
❑ WORK NOT READY FOR INSPECTION: $50 REINSPECTION FEE(PER IBC)
MUST BE PAID PRIOR TO NEXT INSPECTION.
Cl CONTACT INSPECTOR 360-403-3551 ❑ CALL FOR REINSPECTION
THEACTIONS OR CORRECTIONS INDICATED ABOVEARE REQUIRED WITHIN DAYS OR
PENALTIES IMPOSED BYLAW MAYAPPLY.
FOR INSPECTION CALL: 360-403-3417
INSPECTOR DATE
Cl PLANNING Cl CIVIL BUILDING CITY OF ARLINGTON
CITY OF ARLINGTON
238 N. OLYMPIC AVE - ARLINGTON, WA. 98223
PHONE; (360) 403-3551
BUILDING PERMIT
Address:18215 59th Avenue NE Permit#:2967
Parcel#:31052200101200 Valuation:475000.00
OWNER APPLICANT CONTRACTOR
Name:SWIRE PACIFIC HOLDINGS Name:[Company Name] Name:Wize Solutions Inc
Address: 12634 S 265 WEST Address:[Company Address] Address:2500 Decker Lake Blvd
City,State Zip:DRAPER,UT 84020 City,State Zip:West Valley City,UT 84119 City,State Zip:West Valley City,UT 84119
Phone: Phone:385-549-6200 Phone:385-549-6200
LIC:WIZESS1900M3 EXP:07/23/2020
MECHANICAL CONTRACTOR PLUMBING CONTRACTOR
Name: Name:
Address: Address:
City,State,Zip: City,State,Zip:
Phone: Phone:
LIC#: EXP: LIC#: EXP:
JOB DESCRIPTION
PERMIT TYPE: Commercial Alteration CODE YEAR: 2015
STORIES: CONST.TYPE:
DWELLING UNITS: OCC GROUP:
BUILDINGS: OCC LOAD:
PERMIT APPROVAL
I AGREE TO COMPLY WITH CITY AND STATE LAWS REGULATING CONSTRUCTION AND IN DOING THE WORK AUTHORIZED THEREBY;
NO PERSON WILL BE EMPLOYED IN VIOLATION OF THE LABOR CODE OF THE STATE OF WASHINGTON RELATING TO WORKMEN'S
COMPENSATION INSURANCE AND RCW 18,27.
THIS APPLICATION IS NOT A PERMIT UNTIL SIGNED BY THE BUILDING OFFICIAL OR HIS/HER DEPUTY AND ALL FEES ARE PAID.
IT IS UNLAWFUL TO USE OR OCCUPY A BUILDING OR STRUCTURE UNTIL A FINAL INSPECTION HAS BEEN MADE AND APPROVAL OR
A CERTIFICATE OF OCCUPANCY HAS BEEN GRANTED. IBC 110/IRCI10.
SALES TAX NOTICE:Sales tax relating to construction and construction materials in the City of Arlingt must be reported on your sales tax return l'onn
a=,d it of lin #3101. �
Signature Print Name Date Released By Date
CONDITIONS
Special Inspection paperwork required for anchors. Adhere to approved plans. Call for inspections.
THIS PERMIT AUTHORIZES ONLY THE WORK NOTED.THIS PERMIT COVERS WORK TO BE DONE ON PRIVATE PROPERTY ONLY. ANY
CONSTRUCTION ON THE PUBLIC DOMAIN(CURBS,SIDEWALKS,DRIVEWAYS,MARQUEES,ETC.)WILL REQUIRE SEPARATE PERMISSION,
PERMIT FEES
Date Description Fee Amount
01/15/2020 Building Permit Fee $3,023.47
01/15/2020 Processing/Technology Fee $25.00
01/15/2020 Building Plan Review Fee $4,651.49
Total Due: $7,699.96
Total Payment: $0.00
Balance Due: $7,699.96
CALL FOR INSPECTIONS
BUILDING(360)403-3417
When calling for an inspection please leave the following information:
Permit Number,Type of Inspection being requested,and whether you prefer morning or afternoon
r
i
Permit#: 2967
Permit Date: 01/09/20
Project Name: Swire Coca-Cola ICI I L L- 1aL Q LJ k e-&7_
Site Address: 18215 59th Avenue NE
Company/Applicant Name: Wize Solutions IncL�
Company/Applicant Address: 2500 Decker Lake Blvd.
City, State, Zip: West Valley City, UT 84119
Contact: Travis Jenkins
Phone: 385-549-6200
Email: tjenkins@wizesolutions.com
Permit Type: Commercial Alteration
Valuation: 475000.00
Square Feet: 0
Number of Stories: 0
Type of Construction: 11113
Occupancy Type: S-1
Proposed Use: Racking for warehouse
MIC/Opportunity Zone: Opportunity Zone
Permit Issued:
Permit Expires:
DNU:
Status: M PROCESS
Property
Parcel# Address Legal Description Owner Name Owner Phone Zoning
SEC 22 TWP 31 RGE 05RT- SWIRE PACIFIC
31052200101200 18215 59TH AVENUE NE 6A)Sl/2 Nl/2 SW1/4 HOLDINGS
NE 1/4 EXC RDS
Plan Reviews
Date Review Type Description Assigned To Review Status
01/09/2020 Commercial Other Building In Review
Notes
Date Note Created By:
01/09/2020 Received the complete application on 1-8-2020 Kristin Foster
01/09/2020 Received submittal on 12-23-19 without a complete application.Emailed applicant to complete Kristin Foster
the application to process.
Uploaded Files
Date File Name
01/09/2020 6074174-2967 Application.pdf
Kristin Foster
From: Kristin Foster
Sent: Thursday, December 26, 2019 8:20 AM
To: tjenkins@wizesolutions.com
Subject: City of Arlington Applications
Attachments: 2015_Commercial Application Packet.pdf, Business License 1.2019.pdf
Good morning,
We received a business license application and commercial application for Wize Solutions however,the last page of the
business license application and page six of the commercial application were not in the packet. Attached is the business
license application and commercial application. Please complete the last page of the business license application and
page six of the commercial application and return for processing.
Let me know should you have any questions.
Thank you,
Kristin Foster
Permit Technician
City of Arlington
18204 59th Ave NE
360-403-3549
kfoster@arlingtonwa.gov
i
;�
I
COMMERCIAL APPLICATION
PERMIT SUBMITTAL
Deparhnent of Community&Economic Development
City of Arlington•18204 n"T Ave NE-Ar.rq(on,WA 938223•Phone 313-C)403-3551
THM APPLLGATION Yo DE US[D FOR/V W CONMERCL4L STRt1C FURFS AND RFSIDENTIAL DrYlELU1M"AIOTRE64XATM LNYOW TW
ARC- rN5APPLICATOON MUST BEACCOMPANALDRYACOMMFRCIALAJ•MWAnONSumWrml.CHFCKL/STAND AN OCCUPANTS
5TATff NNY'TOFWTtEMMVUSE.
Name of Project: —.A.'v C L `lit;tc � v°�a�, ValUa00n:
P1Cje0 AW,,.,; 1?l 1 C )�(.G �11�€- Ar'i,-t T z , �-
Pa(00 IQ#; Legal Detmpbon
Owner r?w i i e. r t't 4 (.14 Phone Number: (G • '
Acidness: i � L 1 � S 1 rl Abut kc City. ' nc,kj stage: Zip Code: qb"L�
F PhoneNum1w. If CA �jti�l)ti
Call!Phwe. , E JG S �j 6 4,
Address hr- City:Lf ut,+Wa.. State Zip Cody:
Gleam Contractor: 'Lz' '>b}uh to f -!A.t(. Phone Nuntbat: S4 E `1 0 z I Q
Cell Phone:
Addream:'- L:,; L*i,,p Blum City:Wu Stat.: %.,-q ! Zip Code: P1tis
Contnc toe's Liceme Number v ?iC45 f1-1 C u M I Expiration: - Z i 2 c7 2 0
CwHat!Per9on_ 1:n,l.r C+�iC c S Phone Number: 4 S b� 'z
Call Phone: E-mail; ? ..tc t c CP %-/'24 y i.h+•• L o.vti
Addmw:->;N 0rckvr LA;ce City. Z statu: ifr Zip Code. 19-t �
Proposed Scom of Work: �4t_1
KFV 1!rX11!) Raga 6 or 9
Received
JAN 0 S 2020
V,4r2?Aiio
r
Ctt Y
COMMERCIAL APPLICATION
PERMIT SUBMITTAL
Department of Community& Economic Development
City of Arlington• 18204 59th Ave NE •Arlington,WA 98223 • Phone(360)403-3551
Project Name/Tenant .(%Ad/'e (L)rZ,--(r>k
Site Address IgZIS �4- A, Avc, Wir Arlin ,&Q .A -Tg17�,BIdg/Unit/Suite
IBC Construction Type IBC Occupancy Type
Description of Use P411ct (&k1 w, ►i"0-11 T&I)
Building Square Footage Number of Stories _
Square Footage Per Floor
Will there be any installation, modification or removal of the following? (Check all that apply)
❑ Automatic fire extinguishing systems
❑ Compressed gas systems
❑ Fire alarm and detection systems
❑ Fire pumps
❑ Flammable and combustible liquids(tanks, piping etc...)
❑ Hazardous materials
❑ High piled/rack storage
❑ Industrial ovens/furnace
❑ Private fire hydrants
❑ Spraying or dipping operations
❑ Standpipe systems
❑ Temporary membrane structure,tents(>200sq ft)or canopies(>400 sq ft)
Provide details on any of the above checked items:
Installation,changes, modifications or removal of any of the above may require additional submittals,
information, or permits during the plan review or construction process.
Statement of Special Inspection
REV 2015 Page 7 of 9 Received
DEC 2 3 2019
'AW-1
r
c 7v Y
COMMERCIAL APPLICATION
PERMIT SUBMITTAL
Department of Community& Economic Development
City of Arlington• 18204 59th Ave NE •Arlington,WA 98223 • Phone (360)403-3551
Name of Project: QA21 IC 6(4- Cp'�A
Project Address: I�LI S PIJC IJP ���1 �'J 2Z3
Special Inspection Firm:
Address: -71 2-L, ' AUr NE it Qb (f 9-eJMb/%A WA "(15 Z
Contact Person: Phone: ZS-- plf� _ �Sd Z.
Email:
Special Inspection Firm Special Inspectors:
The Special inspection Firm of AA62 t`"}t will perform special inspection for
the following types of work(separate forms must be-submitted J more than one firm is to he employed).
( ) Reinforced Concrete
(7Q Bolting in Concrete
( ) Pre-stressed Concrete
( ) Shotcrete
( ) Structural Masonry
( ) Structural Steel and Welding
{ ) High-Strength Bolting
( ) Spray-Applied Fireproofing
( ) Smoke-Control Systems
( ) Other Specify:
All individual inspectors to be employed on this project will be WABO certified for the type of inspection they are to perform. If inspection
is for work that is not covered by the WABO categories,a detailed resume of the inspector and firm must be submitted.The resume
must show the inspector and firm are qualified to perform the work and testing required by the project design and specifications.
The work shall be inspected for conformance with the plans and specifications approved by the City. Revisions and addenda sheets will
not be used for inspection unless approved by the City.The special inspector shall report to the City revisions that are not approved.
A daily record will be maintained on site itemizing the inspections performed,for the review of all parties.Any nonconforming items shall
be brought to the immediate attention of the contractor for resolution.A weekly shall be submitted to the City;detailing the inspections
and testing performed, listing any nonconforming items and resolution of nonconforming items. Unresolved nonconforming items will be
detailed on a discrepancy report and presented to the building department.
A final report shall be submitted to the Building Division prior to the Certificate of Occupancy being issued.This report will indicate that
inspection and testing was completed in conformance with the approved plans,specifications and approved revisions and addenda.
Any unresolved discrepancies must be detailed in the final report.
The special inspector and special inspection firm serve in the role as"deputy"City of Arlington inspectors and as such are responsible
to the City of Arlington Building Division in the performance of the required work.
Contractor:
The contractor shall provide the special inspector or agency adequate notification of work requiring inspection
The City approved plans and specifications must be made available,at the job site for the use of the special inspector and the City
Inspector.The contractor shall maintain all daily inspections reports,on site,for review.
REV 2015 Page 8 of 9
r
0A r\
COMMERCIAL APPLICATION
'•����1',�� PERMIT SUBMITTAL
Department of Community&Economic Development
City of Arlington • 18204 59th Ave NE •Arlington, WA 98223 • Phone(360)403-3551
The special inspection functions are considered to be in addition to the normal inspections performed by the City and the contractor is
responsible for contacting the City to schedule regular inspections. No concrete shall be poured or other work covered until approved
by the City Inspector.
Building Division:
The Building Division shall review any revisions and addenda.Approved copies will be given to the contractor to maintain as part of the
approved plan set.
The City Inspector will monitor the special inspection functions for compliance with the agreement and the approved plans.
The City Inspector shall be responsible for approving various stages of construction to be covered and work to proceed.
Design Professionals:
The architect and engineer will clearly indicate on the plans and specifications for the specific types of special inspection required, and
shall include a schedule for inspection and testing.
The architect and engineer will coordinate their revisions and addenda process in such a way as to insure all required City approvals
are obtained, prior to work shown on the revisions being performed.
Owner:
The project owner,or the architect or engineer acting as the owners agent,shall employ the special inspector or agency.
ENFORCEMENT:
A failure of the special inspector or firm to perform in keeping the requirements of the IBC,the approved plans and this document may
void this agreement and the Building Officials approval of the special inspector. In such case a new special inspector and/or firm would
need to be proposed for approval.A failure of the design and/or construction parties to perform in accordance with this agreement may
result in a STOP WORK notice being posted on the project, until nonconforming items have been resolved.
ACKNOWLEDGEMENTS
I have read and agree to comp) with the terms and conditions of this agreement.
Owner: Date:
I hereby certify that the above information is correct and that the construction on,and the occupancy and the use of the above-described
property will be in accord nce with the laws,rules and regulation of the State of Washington.
ppli Signature
/ram IL4s _-Fen l�iy It-
Print Applicants Name Date
FOR STAFF USE ONLY
DEC 2 3 2019
Permit# Accepted By Amount Received Receipt# Date Received
REV 2015 Page 9 of 9
rosmio�m�.nd
Labor&Industries(h�Sos'//Ini.wa.gov),
Contractors
Wize Solutions Inc
Owner or tradesperson 2500 S Decker Lake Blvd#20
Principals WEST VALLEY,UT 84119
PECK,RYAN,PRESIDENT 801-966-0210
■ BIGELOW,TYSON WILLIS,VICE PRESIDENT
Doing business as
Wize Solutions Inc
WA UBI No. Business type
602 961 419 Corporation
Governing persons
TYSON
BIGELOW
RYAN BOUCHER;
JOSH TRAYNER;
License
Verify the contractor's active registration I license/certification(depending on trade)and any past violations.
Construction Contractor Active
Meets current requirements.
License specialties
GENERAL
License no.
WIZESS1900M3
Effective—expiration
07/23/2010—07/23/2020
Bond
WESTERN SURETY CO $12,000.00
Bond account no.
70969130
Received by L&I Effective date
07/23/2010 07/23/2010
Expiration date
Until Canceled
Insurance
Continental Cas Co $10,000,000.00
Policy no.
6014333759
Received by L&I Effective date
09/16/2019 09/27/2019
Expiration date
09/27/2020
Valley Forge Ins Co $1,000,000.00
Policy no
5093295801
Received by L&I Effective date
09/16/2019 09/27/2018
Expiration date
09/27/2020
Insurance history
Say... ings
... ...............
No savings accounts during the previous 6 year period.
Lawsuits against the bond or savings
No lawsuits against the bond or savings accounts during the previous 6 year period.
L&I Tax debts
No L&I tax debts are recorded for this contractor license during the previous 6 year period,but some debts
may be recorded by other agencies.
License Violations
No license violations during the previous 6 year period.
Certifications & Endorsements
OMWBE Certifications
No active certifications exist for this business.
Apprentice Training Agent
No active Washington registered apprentices exist for this business.Washington allows the use of apprentices
registered with Oregon or Montana.Contact the Oregon Bureau of Labor&Industries or Montana Department of Labor
&Industry to verify if this business has apprentices.
Workers' Comp
Do you know if the business has employees?If so,verify the business is up-to-date on workers'comp premiums.
L&I Account ID Recently opened account,no premiums are
699,947-00 due or owed at this time.
Doing business as
WIZE SOLUTIONS INC
Estimated workers reported
N/A
L&I account contact
T5/LINDSAY BARLOW(360)902-4735-Email:BLIN235@lni.wa.gov
Public Works Requirements
Verify the contractor is eligible to perform work on public works projects.
Required Training—Effective July 1,2019
Needs to complete training.
Contractor Strikes
No strikes have been issued against this contractor.
Contractors not allowed to bid
............................................._............................._...........
No debarments have been issued against this contractor.
Workplace Safety& Health
Check for any past safety and health violations found on jobsites this business was responsible for.
No inspections during the previous 6 year period.
f '
I
I
t
Structural
Engineering
1:) e9i1qn
CITY Or ARLINGTON
' BUILDING DEPARTMENT
APPROVED
DATE * BY
NO CHANGES AUTHORIZED
UNLESS APPRovED 13Y THE
BUILDING INSPECTOR
weceived
OFFICE
COPY
Project Name : SWIRE COCA COLA `�,GQInOZ�
of WAS,,,,,., G
Project Number : LV-101519-1
o
' � z
Date : 11/15/19
n R 36354 O
Street Address: 18215 59TH AVE NE
BONA L � j
City/State : ARLINGTON, WA 98223 I
11/21/2019
Scope of Work : STORAGE RACK T&Z Consulting Services,LLC
TEL:909.596.1351 FAX:90.9.596.7186
WA COA Lic. No. 4010
r
,-� ..-..��.�...�►-•"�"., .,.� �.S alai
W j �
�__' _ ., -
,.�.....�.�.,»���.�..... ,. ___,.,.�o,....,_y� .,.
. . . r- �
�, - .�
i
_ .... .... _ s
Structural
Engineering & Design I nc.
1815 Wriaht Ave La Verne. CA 91750 Tel: 909.596.1351 Fax: 909.596.7186
By: N.VEng:Mgz. Project: SWIRE COCA COLA Project#: LV-101519-1
TABLE OF CONTENTS
TitlePage.............................................................................................................. 1
Tableof Contents................................................................................................... 2
Design Data and Definition of Components.......................................................... 3
Critical Configuration......................................... ................................................ 4
SeismicLoads....................................................................................................... 5 to 6
Column.................................................. .. .................................................... 7
Beam and Connector............................................................................................ 8 to 9
Bracing.................................................................................................................. 10
Anchors................................................................................................................. 11
BasePlate............................................................................................................. 12
Slabon Grade....................................................................................................... 13
OtherConfigurations............................................................................................. 14
TYPE CP CARTON FLOW 1 750 EXTERIOR Page ? of I 1 1/1 5/2019
r
Structural
Engineering & Design Inc.
1815 Wright Ave La Verne CA 91750 Tel:909 596 1351 Fax:909 596 7186
By: N.VEng:Mgz. Project: SWIRE COCA COLA Project#: LV-101519-1
Design Data
1)The analyses herein conforms to the requirements of the:
2018I8C Section 2209
2016 CSC Section 2209A
ANSI MH 16.1-2012 SperrfiCations for the Design oflndustrial Steel Storage Racks'2012 RMI Rack Design Manual"
ASCE 7-16,section 15.5.3
2)Transverse braced frame steel conforms to ASTM A570, Gr.50,with minimum strength, Fy=50 ksi
Longitudinal frame beam and connector steel conforms to ASTM A570,Gr.50,with minimum yield,Fy=50 ksi
All other steel conforms to ASTM A36,Gr. 36 with minimum yield, Fy=36 ksi
3)Anchor bolts shall be provided by installer per ICC reference on plans and calculations herein.
4)All welds shall conform to AWS procedures, utilizing E70xx electrodes or similar.All such welds shall be performed
in shop, with no field welding allowed other than those supervised by a licensed deputy inspector.
5)The existing slab on grade is 6"thick with minimum 4000 psi compressive strength.Allowable Soil bearing capacity is 750 psf.
The design of the existing slab is by others.
6)Load combinations for rack components correspond to 2012 RMI Section 2.1 for ASD level load criteria
Definition of Components
A >
Beam
BraceBa3m w;)L-,
Cnnrectvr Daronal
qq Brace
Raane
Fier-h: Beam
so-Ins 82 se Plate and
Anchors T
Beam
LeNth
Fame
Fermi View:Dor.-n AhtE Section As CYoss Aisle
fLongeudina0 rranw_
- ITransers4 1 Frame
TYPE CF CARTON FLOW 1 750 EXTERIOR Page of 1 1/1 5/2019
r
Structural
Engineering & Design Inc.
1815 Wright Ave La Verne CA 91750 Tel* 909 596 1351 Fax&909 596 7186
By: N.VEng:Mgz, Project: SWIRE COCA COLA Project#: LV-101519-1
Configuration&Summary:TYPE CF CARTON FLOW(EXT COL ANALYSIS)
"*RACK COLUMN REACTIONS
64" 12" ASD LOADS
AXIAL DL= 225lb
80" 44" AXIAL LL= 9,8251b
SEISMICAXIAL Ps=t/- 12,301 lb
26" 44" 1 BASEMOMENT= 8,0001n-lb
240" 240"
24" 44"
4
24" 4„
16„ 44"
96" 42" k— 42"
12"
Seismic Criteria #Bm Lvls Frame Depth I Frame Heightl #Diagonals I Beam Length Frame Type
Ss=1.072, Fa=1.071 6 42 in 240.0 in 1 6 96 in
Component Description STRESS
Column Fy=50 ksi Struc C3x3.5 P=2438 lb, M=9258 in-lb 0.83-OK
Column&Backer To Level 5 C3x3.5/C3x3.5 p= 4875 lb, M= 19980 in-lb 0.24-OK
Beam Fy=50 ksi Struc C4x4.5 unbraced Length=48" Capacity: 8043 Ib/pr 0.6-OK
Beam Connector Fy=50 ksi Lvl 5: 2 bolt OK Mconn=13171 in-lb Mcap=27480 in-lb 0.48-OK
Brace-Horizontal F =36 ksi Struc L2 x L2 x 1/8 0.31-OK
Brace-Diagonal Fy=36 ksi Struc L2 x L2 x 1/8 0.68-OK
Base Plate Fy=36 ksi 8x8x0.5 Fixity=4002 in-lb 0.69-OK
Anchor 4 per Base 0.5"x 3.25"Embed HILTI KWIKBOLT TZ ESR 1917 Inspection Reqd(Net Seismic Uplift=7217 Ib) 0.875-OK
Slab&Soil 6"thk x 4000 psi slab on grade.750 psf Soil Bearing Pressure 0.99-OK
Level Load" Story Force Story Force Column Column Conn. Beam
Per Level Beam Spcg Brace Transv Longit. Axial Moment Moment Connector
1 1,750 lb 16.0 in 44.0 in 29 lb 15 lb 10,050 lb 4,002 "# 5,410 "# 2 bolt OK
2 1,750 lb 24.0 in 44.0 in 73 lb 38 lb 9,138 lb 7,914 "# 6,700 "# 2 bolt OK
3 1,750 lb 24.0 in 44.0 in 117 lb 60 lb 8,225 lb 7,689 "# 6,709 "# 2 bolt OK
4 4,800 lb 26.0 in 44.0 in 435 lb 223 lb 7,313 lb 7,940 "# 13,171 "# 2 bolt OK
5 4,800 lb 80.0 in 44.0 in 821 lb 420 lb 4,875 lb 19,980 "# 13,632 "# 2 bolt OK
6 4,800 lb 64.0 in 12.0 in 1,130 lb 579 lb 2,438 lb 9,258 "# 6,639 "# 2 bolt OK
**Load defined as product weight per pair of beams Total: 2,606 lb 1,334 lb
Notes
BACKER UP TO 184 INCHES
2 STD ROW SPACERS
TYPE CF CARTON FLOW 1750 EXTERIOR Page �] of 1 1/15/2019
r
Structural
Engineering & Design i nc.
1815 Wright Ave La Verne. CA 91750 Tel: 909.596.1351 Fax:909,596,7186
By: N.VEng:Mgz. Project: SWIRE COCA COLA Project M LV-101519-1
Seismic Forces Configuration:TYPE CF CARTON FLOW(EXT COL ANALYSIS)
Lateral analysis is performed with regard to the requirements of the 2012 RMI ANSI MH 16.1-2012 Sec 2.6&ASCE 7-10 sec 15.5.3 Ss= 1.072
Transverse(Cross Aisle)Seismic Load S1= 0.418
V= Cs*Ip*Ws=Cs*Ip*(0.67*P*Prf+D) Vt Fa= 1.071
Cs1= Sds/R Fv= 1.582
= 0.1914 Cs-max*Ip= 0.1914 Sds=2/3*Ss*Fa= 0.765
Cs2= 0.044*Sds Vmin= 0.015 Sd1=2/3*SI*Fv= 0.441
= 0.0337 Eff Base Shear=Cs= 0.1914 rransysr�Lcwattm Ca=0.4*2/3*Ss*Fa= 0.3062
Cs3= 0.5*S1/R Ws= (0.67*PLRFI* PL)+DL(RMI 2.6.2) (Transverse,Braced Frame Dir.)R=4,0
= 0.0523 = 13,616lb Ip= 1.0
Cs-max= 0.1914 Vtransv=Vt= 0.1914*(450 lb+ 13165.5 Ib) PRF1= 1.0
ease shear coeff=cs= 0.1914 Etransverse= 2,606 lb Pallet Height=hp= 48.0 in
[imit States Level rransverse seismic shear per upright DL per Beam Lvl= 75 lb
Level PRODUCT LOAD P P*0.67*PpF; DL hi wi*hi Fi Fl* hi+hp/2
1 1,750 lb 1,173 lb 75 lb 16 in 19,960 29.3 lb 1,172-#
2 1,750 lb 1,173 lb 75 lb 40 in 49,900 73.2 lb 4,685-#
3 1,750 lb 1,173 lb 75 lb 64 in 79,840 117.2 lb 10,3144
4 4,800 lb 3,216 lb 75 lb 90 in 296,190 434.7 lb 49,556-#
5 4,800 lb 3,216 lb 75 lb 170 in 559,470 821.2 lb 159,313-#
6 4,800 lb 3,216 lb 75 lb 234 in 770,094 1,130.3 lb 291,617-#
sum: P=19650lb 13,166lb 450 lb W=13615.5lb 1,775,454 2,606lb 1=516,656
Longitudinal(Downaisle)Seismic Load
Similarly for longitudinal seismic loads,using R=6.0 Ws= (0.67*PLRF2*P)+DL PRF2= 1.0 Q •'•
Cs1=Sd1/(T*R)= 0.0980 = 13,616 lb (Longitudinal,Unbraced Dir.)R= 6.0
Cs2= 0.0337 Cs=Cs-max*Ip= 0.0980 T= 0.75 sec
Cs3= 0.0348 Vlong= 0.098*(450 lb+ 13165.5 0
Cs-max= 0.0980 [Elongitudinal= 1,334 lb LimitStatmLeve/Longit mismicshearperupright
Level PRODUC LOAD P P*0.67*PRF2 DL hi wl*hl FI Front View
1 1,750 lb 1,173 lb 75 lb 16 in 19,960 15.0 lb
2 1,750 lb 1,173 lb 75 lb 40 in 49,900 37.5 lb
3 1,750 lb 1,173 lb 75 lb 64 in 79,840 60.0 lb
4 4,800 lb 3,216 lb 75 lb 90 in 296,190 222.5 lb
5 4,800 lb 3,216 lb 75 lb 170 in 559,470 420.4 lb
6 4,800 lb 3,216 lb 75 lb 234 in 770,094 578.6 lb
I
sum: 13,166lb 450 lb W=13615.5lb 1,775,454 1,334lb
TYPE CP CARTON FLOW 1750 EXTERIOR Page 6 of 1 1/15/2019
r
Structural
Engineering & Design Inc.
1815 Wright Ave La Verne CA 91750 Tel:909,596,1351 Fax: 909.596.7186
By: N.VEng:Mgz. Project: SWIRE COCA COLA Project#: LV-101519-1
Downaisle Seismic Loads Configuration:TYPE CIF CARTON FLOW(EXT COL ANALYSIS)
Determine the story moments by applying portal analysis.The base plate is assumed to provide partial fixity.
Seismic Story Forces
Typical frame made
Vlong= 1,334lb Tributaryarea o(two columm
Vcol=Vlong/2= 667 lb of rack frame'N*'
F1= 15 lb r Fr♦ KI � K E yp ca amc made
F2= 38lb !� dt-C.lumns
F3= 601b i F�], 0;
E.- El t.,,,l,r
Top View
I�-- 96„ -�I `-------'i
I f Front View SisL�CtCiv
Seismic Story Moments Comeptual System
Mbase-max= 8,000 in-lb <__=Defaultcapacay hl-eff= hl-beam clip height/2
Mbase-v= (Vcol*hleff)/2 = 12 in Vcol
= 4,002 in-lb <===Moment going to base 17
Mbase-eff= Minimum of Mbase-max and Mbase-v h2
= 4,002 in-lb
M 1-1= [Vcol *hleff]-Mbase-eff M 2-2= [Vcol-(Fl)/2] *h2
= (667 lb* 12 in)-4002 in-lb = [667 lb- 18.8 Ib]*24 in/2
= 4,002 in-lb = 7,914 in-lb hl hleff
Mseis= (Mupper+Mlower)/2
Beam to Column
Mseis(1-1)= (4002 in-lb+7914 in-lb)/2 Mseis(2-2)= (7914 in-lb+ 7689 in-lb)/2 Elevation
5,958 in-lb = 7,802 in-lb rho= 1.0000
Summary of Forces
LEVEL hi Axial Load Column Moment** Mseismic** Mend-fixity Mconn** Beam Connector
1 16 in 10,050 lb 4,002 in-lb 5,958 in-lb 1,770 in-lb 5,410 in-lb 2 bolt OK
2 24 in 9,138 lb 7,914 in-lb 7,802 in-lb 1,770 in-lb 6,700 in-lb 2 bolt OK
3 24 in 8,225 lb 7,689 in-lb 7,814 in-lb 1,770 in-lb 6,709 in-lb 2 bolt OK
4 26 in 7,313 lb 7,940 in-lb 13,960 in-lb 4,856 in-lb 13,171 in-lb 2 bolt OK
5 80 in 4,875 lb 19,980 in-lb 14,619 in-lb 4,856 in-lb 13,632 in-lb 2 bolt OK
6 64 in 2,438 lb 9,258 in-lb 4,629 in-lb 4,856 in-lb 6,639 in-lb 2 bolt OK
I
Mconn= (Mseismic+ Mend-fixity)*0.70*rho
Mconn-allow(2 Bolt)= 27,480 in-lb
**all moments based on limit states level loading
TYPE CF CARTON FLOW 1750 EXTERIOR Page 6, of U 1 1/15/201 9
r
Structural
Cngineering & Design Inc.
1815 Wright Ave La Verne CA 91750 Tel- 909 596 1351 Fax:909.596 7186
By: N.VEng:Mgz. Project: SWIRE COCA COLA Project#: LV-101519-1
Backered Column(Longitudinal) Configuration:TYPE CF CARTON FLOW(EXT COL ANALYSIS)
Section Properties
Column Member= C3x3.5/C3x3.5 3.00 in
Aeff= 1.762 inA2 Fy= 50,000 psi
Ix= 2.828 inA4 Kx= 1.7 Wr 1.38 in
Sx= 1.886 inA3 Lx= 22.0 in
rx= 1.267 in Ky= 1.0
Iy= 1.637 inA4 Ly= 44.0 in
Sy= 1.191 inA3 Cm= 0.85
ry= 0.964in
Loads Considering loads at level 2
COLUMN DL=D= 188 lb Crltic.:al load cases are:RMI Sec 2.1
COLUMN LIVE LOAD=P= 8,950 lb Load Case 5.-:(1+0.105*5ds)D+0.75*(1.4+0.145ds)*B*P+0.75*(0.7*rho*E)<=1.0,ASD Methoc
Mcol= 7,914 in-lb axial load coeff.- 0.7912569*P seismic moment coeff.• 0.5625*Mcol
Sds= 0.7654 Load Case 6.:(1+0.104*5ds)D+(0.85+0.145ds)*S*P+(0.7*rho*E)<=1.0,ASD Method
1+0.105*Sds= 1.0804
1.4+0.14Sds= 1.5072 By analysis, Load case 5 governs utilizing loads as such
1+0.14Sds= 1.1072
0.85+0.14*Sds= 0.9572 Axial=Pa= 1.080367*187.5 Ib+ 0.75* 1.507156*0.7*8950 lb
B= 0.7000 = 7,284lb
rho= 1.0000 Moment=Mx= 0.75*0.7*rho*Mcol
= 0.525*7914 in-lb _
= 4,155 in-lb
Axial Analysis
(kl/r)x= (1.7*22 in/1.267 in) (kl/r)y = (1*44 in/0.964 in)
= 29.52 = 45.64
(kl/r)max= 45.64 Cc= (2nA2E/Fy)^0.5
= 107.0
SINCE(KL/r)max <Cc, USE EQTN E2-1
Fa = [1-((kl/r)^2/2CC^2)fy
5/3 +3(kl/r)/BCc-(kl/r)^3/8Cc^3
= 25,015 psi
fa= Pa/AREA fa/Fa= 0.17 >0.15
= 4,134 psi
Bending Analysis
fbx= Mx/Sx Fbx= 0.6*Fy
= 2,203 psi = 30,000 psi
F'ex= (12*nA2*E)/(23*(K fb/Fb= 0.07
= 171,380 psi
(1-fa/F'e)= 1.00
Combined Stresses
fa/Fa +fbx/[Fbx*(1-fa/F'ex)] = 0.24 5 1.0 OK
fa/(0.6*Fy)+fb/Fb= 0.21 <_ 1.0 OK
TYPE CF CARTON FLOW 1750 EXTERIOR Page of 1 1/1 5/2019
Structural
Engineering & Design Inc.
1815 Wright Ave La Verne,CA 91750 Tel: 909.596,1351 Fax: 909.596.7186
By: N.VEng:Mgz. Project: SWIRE COCA COLA Project#: LV-101519-1
Column(Longitudinal) Configuration:TYPE CF CARTON FLOW(EXT COL ANALYSIS)
Section Properties I
Column Member= Struc C3x3.5 i� 3.00 in
Aeff= 0.881 inA2 Fy= 50,000 psi I _�
Ix= 1.414 inA4 Kx= 1.7
1.38 in
Sx= 0.943 inA3 Lx= 22.0 in
rx= 1.267 in Ky= 1.0
Iy= 0.138 in^4 Ly= 44.0 in
Sy= 0.157 inA3 Cm= 0.85
ry= 0.396 in
Loads Considering loads at level 2
COLUMN DL= 187 lb Critical load cases are:RMI Sec 2.1
COLUMN PL= 8,950 lb Load Case 5.•:(1+0.105*5ds)D+0.75*(1.4+0.14Sds)*8*P+0.75*(0.7*rho*E)<=1.0,ASD Method
Mcol= 7,914 in-lb
Sds= 0.7654 Load Case 6::(1+0.104*5ds)D+(0.85+0.145ds)*8*P+(0.7*rho*E)<=1.0,ASD Method
1+0.105*Sds= 1.0804
1.4+0.14Sds= 1.5072 By analysis, Load case 5 governs utilizing loads as such
1+0.14Sds= 1.1072
0.85+0.14*Sds= 0.9572 Axial Load=Pa= 1.080367*187 lb+0.75* 1.507156*0.7*8950 lb
B= 0.7000 = 7,284lb
rho= 1.0000 Moment=Mx= 0.75*0.7*rho*Mcol
= 0.525*7914 in-lb
= 4,155 in-lb
Axial Analysis
(kl/r)x= (1.7*22 in/1.267 in) (kl/r)y= (1*44 in/0.396 in)
= 29.52 = 111.11
(kl/r)max= 111.11 Cc= (2nA2E/Fy)^0.5
= 107.0
SINCE(KL/r)max > Cc, USE EQTN E2-2
Fa = 12n^2E 23 kl r ^2
23(kl/r)^2
= 12,096 psi
fa= Pa/AREA
= 8,268 psi fa/Fa= 0.68 > 0.15
Bending Analysis
fbx= Mx/Sx Fbx= 0.6*Fy
= 4,406 psi = 30,000 psi
F'ex= (12*n^2*E)/(23*(KL fb/Fb= 0.15
= 171,380 psi
(1-fa/F'e)= 1.00
Combined Stresses
fa/Fa+fbx/[Fbx* (1-fa/F'ex)] = 0.83 _< 1.0 OK
fa/(0.6*Fy)+fb/Fb= 0.42 <_ 1.0 OK
L
TYPE CF CARTON FLOW 1750 EXTERIOR Page of 1 1/15/2019
r
Structural
Engineering & Design Inc.
1815 Wright Ave La Verne.CA 91750 Tel:909.596,1351 Fax 909,596.7186
By: N.VEng:Mgz. Project: SWIRE COCA COLA Project* LV-101519-1
Beam Configuration:TYPE CF CARTON FLOW(EXT COL ANALYSIS)
The beam to column connection is assumed to provide partial end fixity for the beam frame.The end moment calculated herein is added
to the lateral force force portal moment when analyzing the connection capacity.
The impact load on the beam is addressed by including the Impact Factor"a"in the determination of the beam center bending stress.
Section Properties
Beam Member= Struc C4x4.5
ffnTnumnTuffnTrwrrm
Beam at Level= 5 Beam Weight= 4.0 Ib/ft ----------------
Beam
Type= Structural Thickness= 0.137 in 4.000 in LL
Ix= 3.469 inA4 Beam Shape= Channel
Sx= 1.735 inA3 _
L]
Beam Length=L= 96.0 in d/Af= 9.4 Beam
Unbraced Length, Lu= 48.0 in LengthImpact Factor(a)=[1-(25%/2)]= 0.875
L vihr V a
Loads
Load Case.D t 0.88P t Impact RMl Section 1.1,Load case 10
% End Fixity= 25% Coeff 13= 0.104/0.125
0 = 0.25 = 0.832
Mcenter= 6*(wLA2/8) Mcenter= Mcenter(simple ends)-0*Mcenter(fixed ends)
= 0.832*(wLA2/8) = wLA2/8-(0.25*wLA2/12)
Mends= O*Mmax(fixed ends) = wLA2/8 - wLA2/48
= (wLA2/12)*0.25 = 0.104*wLA2
= 0.0208*wLA2
Fy= 50,000 psi
Fb= 0.6* Fy
= 30,000 psi Fb' = 12,000/(lu*d/A.f)
= 12,000/(48*9.4)
Fb-eff= 26,596 psi = 26,596 psi
Live Load/Pair= 4,800 lb Dead Load/Pair= (4 Ib/ft)*2*96 in/12 Dist Load=w= 25.3 lb/in
= 641b
Mcenter= 0.104*wLA2 Mends= 0.0208*wLA2
= 24,281 in-lb = 4,856 in-lb
Bending
M= 24,281 in-lb
fb= (M/Sx)/a 4 includes impact factor(a)reduction coef,, conservatively 1.0P is used in lieu of 0.88P
= 15,994 psi
fb/Fb= 15994 psi/26596 psi
= 0.60 <= 1.0, OK
Bending Capcity= 8,043 lb/pair <__=Critical
Deflection
De.fl-allow=L/ 180 Defl= 6*[5wL^4/(384*E*Ix)j
= 0.534 in = [5*25.3 Ib/in*(96 in)^4/(384*29.5x10^6 psi*3.469 inA4)]*0.832
0.227 in <= 0.534 in,OK
Deflection Capacity= 11,378 lb/Pair
Allowable load per beam pair= 8,043 lb
K Z ,
TYPE CF CARTON FLOW 1 750 EXTERIOR Page of 1 1/15/2019
Structural
Engineering & Design i nc.
1815 Wright Ave La Verne_ CA 91750 Tel:909 596.1351 Fax-909 596 7186
By: N.VEng:Mgz. Project: SWIRE COCA COLA Project* LV-101619-1
2 Bolt Beam to Column Connection Configuration: TYPE CF CARTON FLOW(EXT COL ANALY515)
1"
P1
Mconn max= (Mseismic+ Mend-fixity)*0.70*Rho
= 13,171 in-Ib t 2"
8„ 6"
P2
C
Connector Type= 2 Bolt
Standard Bolt Pattern
Shear Capacity of Bolt
Bolt Dam= 0.50 in fy= 50,000 psi
Fv-bolt= 2 1 ,000 psi
Ashear= (0.5 in)^2 ' PV4
= 0.1 963 in^2
Pshear= Ashear ' Fv
= 2 1 ,000 psi " 0. 1 963 in^2 0
= 4,122 Ib rvv ane �_
Bearing Capacity of Bolt 0 811
�i
tcol= 0. 137 in Fu= 65,000 psi
Bolt Diam= 0.500 in
0
3"
Pbearing= 1 .2 ' Bearing Area " Fu
1 .2 ' 0.5 in dram ' O.137 in ' 65000 psi (2). GRi
= 5,343 Ib > 4 122 Ib BOLT
Moment Capacity of Bracket
Edge Distance=E= 1 .00 in Bolt Spacing= 4.0 in Fy= 50,000 psi
C= P 1 +P2 tclip= 0. 13 in Sclip= 0. 140 in^3
= P I+P 1 '(270)
1.1 1 " PI
Mcap= 5clip ' Fbending C'd= Mcap = I . I I d= E
= 0. 14in^3 " O.66 " Fy = I .00in
= 4,620 in-lb
Pclip= Mcap/(I . I I " d)
= 4620 in-lb/(I . I I " I in) Thus, P I = 4,129 Ib
= 4, 1 62 Ib
Mconn-allow= [P I"6"+P I'(2"/6")"0.5111
= 41 22
= 27,480 in-lb > Mconn max, OK
TYPE CF CARTON FLOW 1 750 EXTERIOR Page q of /1 1 1/1 5/201 9
V
Structural
Engineering & Design I nc.
1815 Wright Ave In Verne_ CA 917.50 Tel- 909 596 1351 Fax- 909 596 7186
By: N.VEng:Mgz Project: SWIRE COCA COLA Project#: LV-101519-1
Transverse Brace TYPE CIF CARTON FLOW(E)(T COL ANALYSIS)
Diagonal Member= Struc L2 x L2 x 1/8 Horizontal Member= Struc L2 x L2 x 1/8 o —�
Area= 0.48 in^2 Area= 0.48 in^2
r min= 0.398 in r min= 0.398 in
K= 1.0 K= 1.0
Fy= 36,000 psi
Ldiag
H
Frame Dimensions
0
Load Case 6.:(i t[(0.85+0.145ds)*B*P+[0.7*rho*EJ<=1.0.A5D Method z"tYp
Bottom Panel Height=H= 44.0 in Clear Depth=D-B*2-4"=d= 35.3 in B
Frame Depth=D= 42.0 in Ldiag= [d^2+ HA2]^0.5 ?Yri«i aan�,
Column Width=B= 1.4 in = 56.4 in csnl!racz,?
Diagonal Brace
Vtransverse= 2,606lb Vdiag= V*(Ldiag/D)
Vb=Vtransv*0.7*rho= 2606 lb*0.7* 1 = 2,450 lb
= 1,824lb
(kl/r)max= 141.71
(kl/r)x= (1*56.4 in/0.398 in) Cc= (2n^2E/Fy)^0.5 fa= P/AREA
= 141.71 = 126.1 = 5,062 psi
(KL/r)max> Cc, Eqtn E2-2 Applies
Check Weld
Fa = 12nA2E/23(ki/r)^2 Weld Tension= 2,450 lb
23(kl/r)^2 tweld= 0.125 in
= 7,436 psi Lweld= 4.0 in
Fweld= 70,000 psi
fa/Fa= 0.68 <= 1.0 OK Weld Capacity= tweld*0.7071*Lweld*0.3*Fweld*1.0
= 7,425 lb 33.0% OK
Horizontal Brace
V=Vtransv= 1,824lb
(kl/r)x= (1*42 in/0.398 in) (kl/r)max= 105.53
= 105.53 Cc= (2n^2E/Fy)^0.5
= 126.1
(KL/r)max< Cc,Eqtn E2-1 Applies
Fa = _L-C(kl/r)^2/2Cc^2)]Fy fa= P/AREA
5/3 + 3(kl/r)/8Cc-(kl/r)^3/8Cc^3 = 3,769 psi
= 12,266 psi
fa/Fa= 0.31 <= 1.0 OK
lea 0 ' (
r
Structural
Engineering & Design Inc.
1815 Wright Ave La Verne CA 91750 Tel: 909.596.1351 Fax:909,596.7186
By: N.VEng:Mgz. Project: SWIRE COCA COLA Project#: LV-101519-1
Single Row Frame Overturning Configuration:TYPE CF CARTON FLOW(EXT COL ANALYSIS)
Loads
Critical Load case(s):
1) RMI Sec 2.2, item 7: (0.9-0.2Sds)D+ (0.9-0.20Sds)*B*Papp-E*rho hp ;
Sds= 0.7654 y
Vtrans=V=E=Qe= 2,606lb (0.9-0.20Sds)= 0.7469
DEAD LOAD PER UPRIGHT=D= 450 lb (0.9-0.2Sds)= 0.7469
PRODUCT LOAD PER UPRIGHT=P= 19,650 lb B= 1.0000 H h
Papp=P*0.67= 13,165lb rho= 1.0000
-1=Wstl=(0.74692*D+0.74692*Papp*l)= 10,169 lb
Frame Depth=Df= 42.0 in T
Product Load Top Level, Ptop= 4,800 lb Htop-IvI=H= 234.0 in
DL/Lvl= 75lb # Levels= 6 ItDf
Seismic Ovt based on E, E(Fi*hi)= 516,656 in-lb #Anchors/Base= 4
hel h 'de th ratio= 5.6 in h = 48.0 in SIDE ELEVATION
A Fully Loaded Rack h=H+h 2= 258.0 in
Load case 1:
Movt= E(Fi*hi)*E*rho Mst= Wstl * Df/2 T= (Movt-Mst)/Df
= 516,656 in-lb = 10169 lb*42 in/2 = (516656 in-lb-213549 in-lb)/42 in
= 213,549 In-lb = 7,217 lb Net Uplift per Column
Net Seismic U lift= 7,217 lb
B Top Level Loaded Only
Load case 1:
0 Vl=Vtop= Cs*Ip*Ptop >= 350 lb for H/D>6.0 Movt= [Vl_*h+V2*H/2]*0.7*rho
= 0.1914*4800 lb = 172,975 in-lb
= 919lb T= (Movt-Mst)/Df
Vleff= 919 lb Critical Level= 6 = (172975 in-lb-82348 in-lb)/42 in
V2=VpL= Cs*Ip*D Cs*Ip= 0.1914 = 2,158lb Net Uplift per Column
= 86 lb
Mst= (0.74692*D+0.74692*Ptop*1)*42 in/2
= 82,318 in-lb
Net Seismic U lift= 2,158 lb
Anchor
Check(4)0.5"x 3.25"Embed HILTI KWIKBOLT TZ anchor(s)per base plate.
Special inspection is required per ESR 1917.
Pullout Capacity=Tcap= 1,961 lb L.A. City Jurisdiction? NO Tcap*Phi= 1,961 lb
Shear Capacity=Vcap= 2,517 lb Phi= 1 Vcap*Phi= 2,517 lb
Fully Loaded: (1804 Ib/1961 Ib)^1 + (325 Ib/2517 Ib)^1 = 1.05 <= 1.2 OK
Top Level Loaded: (539 Ib/1961 Ib)^1 +(114 Ib/2517 Ib)^1 = 0.32 <= 1.2 OK
TYPE CF CARTON FLOW 1 750 EXTERIOR Page I of 1 1/15/2019
r
Structural
Engineering & Design Inc.
1815 Wriaht Ave La Verne, CA 91750 Tel:909 596 1351 Fax• 909 59F 7186
By: N.VEng:Mgz. Project: SWIRE COCA COLA Project#: LV-101519-1
Base Plate Configuration:TYPE CIF CARTON FLOW(EXT COL ANALYSIS)
Section f— a —► P
Baseplate= 8x8x0.5
Eff Width=W= 8.00 in a = 3.00 in Mb
Eff Depth=D= 8.00 in Anchor c.c. =2*a=d = 6.00 in
Column Width=b= 3.00 in N=#Anchor/Base= 4 I I b I.*- E
Column Depth=dc= 2.75 in Fy= 36,000 psi w
L= 2.63 in
Plate Thickness=t= 0.500 in Downaisle Elevation
Down Aisle Loads Load Case 5::(1+0.105*5ds)D+0.75*((1.4+0.145ds)VIP+0.75*/0.7*rho*EI<=1.0 ASD Method
COLUMN DL= 225 lb Axial=P= 1.080367* 225 lb+0.75* (1.507156*0.7*9825 lb)
COLUMN PL= 9,825 lb = 8,017 lb
Base Moment= 8,000 in-lb Mb= Base Moment*0.75*0.7*rho
1+0.105*Sds= 1.0804 = 8000 in-lb*0.75*0.7*rho
1.4+0.14Sds= 1.5072 = 4,200 in-lb Effec.
B= 0.7000 Axial Load P = 8,017 lb Mbase=Mb= 4,200 in-lb Effec.
Axial stress=fa= P/A= P/(D*W) M1= wL^2/2= fa*L^2/2
= 125 psi = 432 in-lb
Moment Stress=fb= M/S = 6*Mb/[(D*B^2] Moment Stress=fb2= 2*fb*L/W
= 49.2 psi = 32.3 psi
Moment Stress=fbl = fb-fb2 M2= fbl*L^2)/2
= 16.9 psi = 58 in-lb
M3= (1/2)*fb2*L*(2/3)*L= (1/3)*fb2*L^2 Mtotal = M1+M2+M3
= 74 in-lb = 564 in-lb/in
S-plate= (1)(t^2)/6 Fb= 0.75*Fy
= 0.042 in^3/in = 27,000 psi
fb/Fb= Mtotal/[(S-pl ate)(Fb)] Pp= 0.7*F'c
= 0.50 OK = 2,800 psi OK
Tanchor= (Mb-(PLapp*0.75*0.46)(a))/[(d)*N/2] Tallow= 1,961 lb OK
_ -2,192 lb No Tension
Cross Aisle Loads CndcaLAwd—RM15ec2.1,Lfem4:(i4aiisd5)DL+(1+0.145D5)PL-0.75+EV0.75-1.0,A5DMethod Check uplift load on Baseolate
Check uplift forces on basepiate with 2 or more anchors per RMI 7.2.2.
Pstatic= 8,017 lb hen the base plate configuration consists of two anchor bolts located on either side
f the column and a net uplift force exists,the minimum base plate thickness
Movt*0.75*0.7*rho= 271,244 In-lb Pseismic= Movt/Frame Depth shall be determined based on a design bending moment in the plate equal
Frame De th= 42.0 in = 6,458 lb to the uplift force on one anchor times 1/2 the distance from
P=Pstatic+Pseismic= 14,475 lb a centerline of the anchor to the nearest edge of the rack column"
b=Column Depth= 2.75 in T
L=Base Plate Depth-Col Depth= 2.63 in Ta M0 a
fa = P/A= P/(D*W) M= wL^2/2= fa*L^2/2 I b I
= 226 psi = 779 in-lb/in F
Uplift per Column= 7,217 lb
Sbase/in= (1)(t^2)/6 Fbase= 0.75*Fy Qty Anchor per BP= 4
= 0.042 in^3/in = 27,000 psi Net Tension per anchor=Ta= 1,804 lb
c= 2.63 in
fb/Fb= M/[(S-plate)(Fb)] Mu=Moment on Baseplate due to uplift= Ta*c/2
0.69 OK = 2,368 in-lb
Splate= 0.333 in^3
fb Fb *0.75= 0.197 OK
TYPE CF CARTON FLOW 1750 EXTERIOR Page Ic of 1 1/15/2019
Structural
Engineering & Design I nc.
1815 Wright Ave La Verne. CA 91750 TeL 909.596,1351 Fax:909-596,7186
By: N.VEng:Mgz. Project: SWIRE COCA COLA Project#: LV-101519-1
Slab on Grade Configuration:TYPE CF CARTON FLOW(EXT COL ANALYSIS)
1 P slab
a ,----------i Concrete
i F a fc= 4,000 psi
slab tD e tslab=t= 6.0 in
Cross teff= 6.0 in
----
c ---- ;Aisle phi=0= 0.6
X �I �� c -►� I Soil
f y g
----I. .:.:.�"'�_:�'� .:, '� fsoil= 750 psf
- i Down Aisle Movt= 361,659 in-lb
SLAB ELEVATION Frame depth= 42.0 in
Baseplate Plan View
Sds= 0.765
Base Plate 0.2*Sds= 0.153
Effec.Baseplate width=B= 8.00 In width=a= 3.00 in midway disc face of column to edge of plate=c= 5.50 In
Effec.Baseplate Depth=D= 8.00 in depth=b= 2.75 in midway dist face of column to edge of plate=e= 5.38 in
Column Loads
DEAD LOAD=D= 225 lb per column Load Case 1) (1.2+0.2Sds)D+(1.2+0.2Sds)*B*P+ rho*E RMI SEC 2.2 EQTN 5
unfactoredAISD load = 1.35308*225 lb+ 1.35308*0.7*9825 lb+ 1*8610 lb
PRODUCT LOAD=P= 91825 lb per column = 18,220 lb
unfactoredA5D load Load Case 2) (0.9-0.2Sds)D+(0.9-0.2Sds)*B*Papp+ rho*E RMI SEC 2.2 EQTN 7
Papp= 6,583 lb per column = 0.74692*225 lb+0.74692*0.7*6582.75 Ib+ 1 *8610 lb
P-seismic=E= (Movt/Frame depth) = 12,220 lb
= 8,610 lb per column Load Case 3) 1.2*D+ 1.4*P RMI SEC 2.2 EQTN 1,2
unfactored[imit5tateload = 1.2*225 lb+ 1.4*9825 lb
B= 0.7000 = 14,025 lb
rho= I.0000 Effective Column Load=Pu= 18,220 lb per column
Sds= 0.7654
1.2+0.2*Sds= 1.3531
0.9-0.20Sds= 0.7469
Puncture
Apunct= [(c+t)+(e+t)]*2*t Fpunct= 2.66*phi*sgrt(fc)
= 274.50 in^2 = 100.9 psi
fv/Fv= Pu/(Apunct*Fpunct)
= 0.658 < 1 OK
Slab Bending
Pse=DL+PL+E= 18,220 lb
Asoil= (Pse*144)/(fsoil) L= (Asoil)^0.5 y= (c*e)^0.5+ 2*t
= 3,498 in^2 = 59.14 in = 17.4 in
x= (L-y)/2 M= w*x^2/2 S-slab= 1*teff^2/6
= 20.9 in = (fsoil*x^2)/(144*2) = 6.0 in^3
Fb= 5*(phi)*(fC)^0.5 = 1,132.5 in-lb fb/Fb= M/(S-slab*Fb)
= 189.74 psi = 0.995 < 1,OK
TYPE CP CARTON FLOW 1750 EXTERIOR Page 1,3 of �� � 1 1/15/2019
r
Structural
Engineering & Design Inc.
1815 Wright Ave La Verne,CA 91750 Tel: 909.596.1351 Fax: 909.596,7186
By: N.VEng:Mgz. Project: SWIRE COCA COLA Project* LV-101519-1
Configuration&Summary:TYPE CF CARTON FLOW(INT COL ANALYSIS)
**RACK COLUMN REACTIONS
12" ASO LOADS
64" 4-- AXIAL DL= 113/b
" 44" AXIAL LL= 7,200/b
SEISMIC AXIAL Ps=+/- 9,438/b
240 44" BASEMOMENT= 8,0001n-/b
80" 240" J
44"
44"
90"
44"
+ 96" 42" 4 4- 42" 4
12"
Seismic Criteria #Bm Lvls Frame Depth Frame Heightl #DiagonalsT Beam Length Frame Type
Ss=1.072, Fa=1.071 3 42 in 240.0 in 6 96 in
Component Description STRESS
Column Fy=50 ksi Struc C3x3.5 P=2438 lb, M=7336 in-lb 0.7-OK
Column&Backer To Level 2 C3x3.5/C3x3.5 p=7313 lb, M= 33624 in-lb 0.68-OK
Beam Fy=50 ksi Struc C4x4.5 I Unbraced Length=48" Capacity:8043 Ib/pr 0.6-OK
Beam Connector Fy=50 ksi Lvl 1: 2 bolt OK Mconn=20709 in-lb Mcap=27480 in-lb 0.75-OK
Brace-Horizontal F =36 ksi Struc L2 x L2 x 1/8 0.22-OK
Brace-Diagonal Fy=36 ksi Struc L2 x L2 x 1/8 0.49-OK
Base Plate Fy=36 ksi 8x8x0.5 Fixity= 8000 in-lb 0.52-OK
Anchor 4 per Base 0.5"x 3.25"Embed HILTI KWIKBOLT TZ ESR 1917 Inspection Reqd(Net Seismic Uplift=5751 lb) 0.692-OK
Slab&Soil 6"thk x 4000 psi slab on grade.750 psf Soil Bearing Pressure 0.65-OK
Level Load** Story Force Story Force Column Column Conn. Beam
Per Level Beam Spcg Brace I Transv Longit. Axial Moment Moment Connector
1 4,800 lb 90.0 in 44.0 in 344 lb 176 lb 7,313 lb 33,624 "# 20,709 "# 2 bolt OK
2 4,800 lb 80.0 in 44.0 in 650 lb 333 lb 4,875 lb 15,832 "# 11,508 "# 2 bolt OK
3 4,800 lb 64.0 in 44.0 in 895 lb 459 lb 2,438 lb 7,336 "# 5,967 "# 2 bolt OK
44.0 in
44.0 in
12.0 in
**Load defined as product weight per pair of beams Total: 1,890 lb 968 lb
Notes
BACKER UP TO 184 INCHES
2 STD ROW SPACERS
TYPE CF CARTON FLOW 1 750 INTERIOR Page ILI o"U 1 1/1 5/2019
r
Structural
Engineering & Design Inc.
1815 Wright Ave La Verne CA 91750 Tel: 909 59R 1351 Fax• 909 59R 7186
By: N.V Eng:Mgz. Project: SWIRE COCA COLA Project#: LV-101519-1
Configuration&Summary:TYPE Rl
- - °'°°RACK COLUMN REACTIONS
2" ASO LOADS
78" -'�- AXIAL DL= 113lb
- 44" AXIAL LL= 7,500lb
SEISMICAXL4L Ps=+/- 9,809lb
44" BASE MOMENT= 8,000 in-lb
240" 80 240"
44"
44"
80"
44"
4 96" 42" 4
Seismic Criteria # Bm Lvls Frame Depthl Frame Heightl #Diagonals I Beam Length Frame Type
Ss=1.072, Fa=1.071 3 42 in 240.0 in 6 96 in Single Row
Component Description STRESS
Column F =50 ksi Struc C3x3.5 P=5075 lb, M=16770 in-Ib 0.74-OK
Column&Backer To Level 1 C3x3.5/C3x3.5 p= 7613 lb,M=30266 in-lb 0.59-OK
Beam F =50 ksi Struc C4x4.5 Unbraced Length=48" Capacity: 7974 Ib/pr 0.63-OK
Beam Connector Fy=50 ksi Lvl 1: 2 bolt OK Mconn=20002 in-lb Mcap=27480 in-lb 0.73-OK
Brace-Horizontal Fy=36 ksi Struc L2 x L2 x 1/8 0.23-OK
Brace-Diagonal Fy=36 ksi Struc L2 x L2 x 1/8 0.51-OK
Base Plate F =36 ksi 8x8x0.5 Fixity=8000 in-lb 0.54-OK
Anchor 4 per Base 0.5"x 3.25"Embed HILTI KWIKBOLT TZ ESR 1917 Inspection Reqd(Net Seismic Uplift=5972 lb) 0.717-OK
Slab&Soil 6"thk x 4000 psi slab on grade. 750 psf Soil Bearing Pressure 0.69-OK
Level Load** Story Force Story Force Column Column Conn. Beam
Per Level Beam Spcg Brace I Transv Longit. Axial Moment Moment Connector
1 5,000 lb 80.0 in 44.0 in 329 Ib 169 Ib 7,613 lb 30,266 "# 20,002 "# 2 bolt OK
2 5,000 lb 80.0 in 44.0 in 658 Ib 337 Ib 5,075 lb 16,770 "# 12,831 "# 2 bolt OK
3 5,000 lb 78.0 in 44.0 in 979 Ib 501 lb 2,538 lb 9,777 "# 6,961 "# 2 bolt OK
44.0 in
44.0 in
12.0 in
**Load defined as product weight per pair of beams Total: 1,967 lb 1,007 lb
Notes
BACKER UP TO 90 INCHES
TYPE R I Page of t 1 /8/201 9
Structural
Engineering & Design I nc.
1815 Wright Ave La Verne CA 91750 Tel: 909,596,1351 Fax•909 596 7186j
By: N.V Eng:Mgz. Project: SWIRE COCA COLA Project#: LV-101519-1
Configuration&Summary:TYPE T1
_ �� **RACK COLUMN REAC77ONS
12° ASD LOADS
78" 4-- AXIAL DL= 113lb
' � 44" AXIAL LL= 8,750/b
�— SEISMICAXIAL Ps=t/- 11,6051b
44" BASE MOMENT= B 000 In-lb
240' 70 240"
44"
4-
44"
80"
44"
144" 42"
Seismic Criteria #Bm Lvls Frame Depth Frame Heightl #Diagonals I Beam Length Frame Type
Ss=1.072,Fa=1.071 3 42 in 240.0 in 6 144 in Single Row
Component Description STRESS
Column Fy=50 ksi Struc C4x4.5 P=8863 lb, M=36498 in-lb 0.84-OK
Column&Backer None None None N/A
Beam Fy=50 ksi Struc C6x8.2 Unbraced Length=72" Capacity: 9282 Ib/pr 0.81-OK
Beam Connector Fy=50 ksi Lvl 2: 2 bolt OK Mconn=19144 in-lb I Mcap=27480 in-lb 0.7-OK
Brace-Horizontal Fy=36 ksi Struc L2 x L2 x 1/8 0.27-OK
Brace-Diagonal Fy=36 ksi Struc L2 x L2 x 1/8 0.59-OK
Base Plate F =36 ksi 8x8x0.5 Fixity=8000 in-lb 0.94-OK
Anchor 4 per Base 0.5"x 3.25"Embed HILTI KWIKBOLT TZ ESR 1917 Inspection Reqd(Net Seismic Uplift=7143 lb) 0.958-OK
Slab&Soil 6"thk x 4000 psi slab on grade. 750 psf Soil Bearing Pressure 0.91-OK
Level Load** Story Force Story Force Colurn Column Conn. Beam
Per Level Beam Spcg Brace I Transv Longit. Axial Moment Moment Connector
2 7,500 lb 70.0 in 44.0 in 846 lb 433 lb 7,575 lb 19,105 "# 19,144 "# 2 bolt OK
3 7,500 lb 78.0 in 44.0 in 1,286 lb 659 lb 3,788 lb 12,841 "# 12,457 "# 2 bolt OK
44.0 in
44.0 in
12.0 in
I
**Load defined as product weight per pair of beams Total: 2,287 lb 1,171 lb
Notes
TYPE T I TUNNEL Page of 1 11512019
r
Structural
Engineering & Design Inc.
1815 Wright Ave.,La Verne,CA 91750 Tel:909.596.1351 Fax:909.593.8561
DRIVE-IN RACK ANALYSIS
r
Structural
Engineering & Design Inc.
1815 Wright Ave..La Verne, CA 91750 Tel: 909.596.1351 Fax: 909.593.8561
By: Bs Eng:Mgz Project: Swire Coca-Cola Project#: LV-101519-1
Design Data 2 Arm x 5 Deep Drive In
1)The analyses conforms to the requirements of the 2018 IBC
2)Steel yields conform to:
Column-Fy= 50,000 psi Rail-Fy= 36,000 psi
Frame Brace-Fy= 50,000 psi Strap-Fy= 36,000 psi
OTB-Fy= 50,000 psi Baseplate-Fy= 36,000 psi
3)Anchor bolts shall be provided by installer per ICC reference on plans and calculations herein.
4)Bolts shall be minimum Grade 5 quality or better installed to snug tight fit(Finger tight plus 2/3 turn by wrench)
5)All welds shall conform to AWS procedures,utilizing E70xx electrodes or similar.All such welds shall be performed
in shop,with no field welding allowed other than those supervised by a licensed deputy inspector.
6)The slab on grade is 6"thick with minimum 4000 psi compressive strength.Soil bearing capacity is 1000 psf.
Definition of Components
10
W34
Pallet 4 7
=Z�= 6
8
Front (Longitudinal) Side(Transverse)
Elevation Elevation
Component Schedule_
Column 6 Diagonal Brace
2 Overhead Tie Beam (OTB) 7 Horizontal Brace
3 Rail Support Beam (RSB) 8 Base Plate
4 Load Rail 9 Rear Vertical X Brace
5 Rail Support Arm 10 Plan X Brace
Page 1 ;-of Zt
Structural
Engineering & Design Inc.
1815 Wright Ave..La Verne.CA 91750 Tel:909.596.1361 Fax:909.593.8561
By: Bs Eng:Mgz Project: Swire Coca-Cola Project M LV-101519-1
Summary of Results 2 Arm x 5 Deep Drive In
5,000 lb
288 in
5,000 lb 74 in
1
Backer to 1st arm level.
138 in
I
f— 89 in ►�
Front Elevation
Load per Pallet= 5,000 lb
Description Component Stress
Column C5x6.7/C5x6.7 52.7%
OTB/R5B OTB:C5x6.7#.,RSB: C4x4.5# 71.8%
RSB/OTB to Col Conn RSB: 2 Bolt,OTB: 3 Bolt 0.0%
Diag Brace L2x2xl/8 44.9%
Horiz Brace L2x2xl/8 21.8%
Brace Weld 3 long x 0.125 in thk E70xx 17.6%
Rear Vertical X Brace 2"X 7 GA STRAP every 1 bay(s)with 0.5 in diam Grade 5 Bolt 98.80/0
Top Plan X Brace 2"x 7 GA STRAP with 0.5 in diam Grade 5 Bolt(See plan x brace schedule) 94.71j/0
Load Rail L5x3xl/4 39.0%
Anchor (1)0.5 in diam x 3.25 in min.embedment Powers SD2(4 per base at rear) 66.4%
Slab&Soil 6 in thick x 4000 psi with 1000 psf soil 87.0%
Base Plate 5 in x 8 in x 3/8,Except at rear post 8x8x3/8 0.0%
Page/r of 2�
r
Structural
Engineering & Design I nc.
1815 Wright Ave., La Verne,CA 91750 Tel:909.596.1351 Fax:909.593.8561
By: Bs Eng:Mgz Project: Swire Coca-Cola Project#: LV-101519-1
Forces 2 Arm x S Deep Drive In
Transverse(Braced Frame)Seismic Load
Lateral analysis is performed with regard to the 2018 IBC.All loads based on tributary area per post.
Ss= 1.0710
V= F*Sps*I*(LL*0.67+DL)/(R*1.4) Fa= 1.072
Vmin= 0.015 (RMI Sec 2.5.1,2) R-transv= 4.0
SoS= 2/3 *Ss*Fa Ip= 1.0
= 0.7654 Eff Base Shear= 0.1367 PLRF= 1.0
R-long= 4.0
n= 1.00
F= 1.00
Vtransv= 0.1367* 6760 Ib Ws= (DL+ LL*0.666)*# Level
= 924 Ib (Per Post) = (50 Ib +5000 Ib*0.666)*2
= 6,760 Ib #Arm Level=N= 2
Live Load/Pallet=LL= 5,000 Ib
Longitudinal Seismic Load Dead Load/Level=DL= 50 Ib
Rlong= 4.0 Vlong= Vtransv* (Rtransv/Rlong)
= 924 Ib (Per Post)
Seismic Force Distribution
Level (LL*0.666) DL hi wi*hi Fi Pcol M
1 3,330 Ib 50 Ib 138 in 459,540 364 Ib 6,660 Ib 46,489 in-lb
2 3,330 Ib 50 Ib 212 in 705,960 560 Ib 3,330 Ib 44,622 in-lb
3 0 Ib 0 Ib 0 in 0 0 Ib 0 Ib 0 in-lb
4 0 Ib 0 Ib 0 in 0 0 Ib 0 Ib 0 in-lb
5 0 Ib 0 Ib 0 in 0 0 Ib 0 Ib 0 in-lb
1,165,500 924 lb
Height of Resultant Force,a= E(Fi*hi)/Vlong -------
= 183 in F3
H ------- T
V M2 i - v- ' F2 1
a b
--- - i h2
Ft
Ground Elev * *Top Tie Elev nt
RI M R2 Front Elevation
Column Load Diagram
H= 288 in
Moment at resultant=M= V*a*b/H Ri=Load to Floor= V*b/H h1= 138 in
= 61,648 in-lb = 337 Ib h2= 74 in
R2=Load To Top Brace= V*a/H h3= 0 in
= 587 Ib h4= 0 in
b= 105 in
Frame Depth= 42 in
Column Loads
Arm Level=N= 2 Pcol-static= + Nselsmlc= (vtransv)-Z-a/ueptn
= 10,100lb = 8,052lb
Live Load/Pallet=LL= 5,000 Ib Mcol= 61,648 in-lb
Dead Load/Level=DL= 50 Ib
Page -of 1
Structural
Engineering & Design I nc.
1815 Wright Ave., La Verne,CA 91750 Tel:909.596.1351 Fax: 909.593.8561
By: Bs Eng:Mgz Project: Swire Coca-Cola Project#: LV-101519-1
Column(Longitudinal Loads) 2 Arm x 5 Deep Drive In
Analysis conforms to Chapter H of the 9th Hition AISI ASD Manual.
Section Properties
Column Member= C5x6.7/C5x6.7
Aeff= 3.422 in^2 Fy= 50,000 psi �a— 5.0 in --a�
Ix= 14.430 inA4 Kx= 1.0
Sx= 5.750 inA3 Lx= 288.0 in
rx= 2.050 in Ky= 1.0
Iy= 5.600 inA4 Ly= 44.0 in
Sy= 3.180 inA3 Cm= 1.00
ry= 1.280 in
Loads
P= 6,660 lb Mcol= 46,489 in-lb <_=Loads at arm level 1
Axial Analysis
(kl/r)x= (1*288 in/2.05 in) (kl/r)y= (1*44 in/1.28 in)
= 140.49 = 34.38
(kl/r)max= 140.49 Cc= (2nA2E/Fy)^0.5
= 107.0
SINCE(KL/r)max> Cc,USE EQTN E2-2
Fa = 12n^2E/23(kl/r)^2
23(kl/r)^2
= 7,566 psi
fa= P/AREA
= 1,946 psi fa/Fa= 0.26 > 0.15
Bending Analysis
fbx= M/Sx Fbx= 0.6*Fy
= 8,085 psi = 30,000 psi
F'ex= (12*nA2*E)/(23*(KL/r)^2) fb/Fb= 0.27
= 7,566 psi
(1-fa/F'e)= 0.7428
Combined Stresses
(H1-1): fa/Fa + Cm*fbx/[Fbx*(1-fa/F'ex)] = 0.62 <_ 1.33 OK
(H1-2): fa/(0.6*Fy) + fb/Fb= 0.33 <_ 1.33 OK
Page?c of 2t
Structural
Engineering & Design I nc.
1815 Wright Ave., La Verne,CA 91750 Tel: 909.596.1351 Fax:909.593.8561
By: Bs Eng:Mgz Project: Swire Coca-Cola Project#: LV-101519-1
Column(Transverse) 2 Arm x 5 Deep Drive In
Analysis conforms to Chapter H of the 9th Edition AISI ASS Manual.
Section Properties
Column Member= C5x6.7/C5x6.7
Aeff= 3.422 inA2 Fy= 50,000 psi do-- 5.0 in
Ix = 14.430 inA4 Kx= 1.0
Sx= 5.750 inA3 Lx= 288.0 in
rx= 2.050 in Ky= 1.0
Iy = 5.600 inA4 Ly= 44.0 in
Sy= 3.180 inA3 Cm= 1.00
ry= 1.280 in
Loads
Pstatic= 10,100 lb Pmax= Pstatic+ Pseismic Mcol= 0 in-lb
Pseismic= 8,052lb = 18,152lb
Axial Analysis
(kl/r)x= (1*288 in/2.05 in) (kl/r)y= (1*44 in/1.28 in)
= 140.49 = 34.38
(kl/r)max= 140.49 Cc= (2nA2E/Fy)A0.5
= 107.0
SINCE(KL/r)max> Cc, USE EQTN E2-2
Fa = 12nA2E/23(kl/r)A2
23(kl/r)A2
= 7,566 psi
fa= P/AREA
= 5,305 psi fa/Fa= 0.70 > 0.15
Bending Analysis
fbx= M/Sx Fbx= 0.6*Fy
= 0 psi = 30,000 psi
F'ex= (12*nA2*E)/(23*(KL/r)A2) fb/Fb= 0.0
= 7,566 psi
(1-fa/F'e)= 0.2989
Combined Stresses
(H1-1): fa/Fa + Cm*fbx/[Fbx* (1-fa/F'ex)] = 0.70 <_ 1.33 OK
(H1-2): fa/(0.6*Fy) +fb/Fb = 0.18 <_ 1.33 OK
Page)I of 2t
r
Structural
Engineering & Design I nc.
1816 Wright Ave. La Verne CA 91750 Tel:909.696.1351 Fax:909 593 8661
By: Bs Eng:Mgz Project: Swire Coca-Cola Project#: LV-101519-1
Overhead Tie Beam(OTB) 2 Arm x 5 Deep Drive In
Analysis conforms to Chapter H of the 9th Edition AISI ASD Manual.
Section Properties
Top Tie(OTB)= C5x6.7
P
...................._..........
Aeff= 1.970 inA2 Fy= 50,000 psi .................
Ix= 7.490 inA4 Kx= 1.0
Sx= 3.000 inA3 Lx= 89.0 in OTB M
rx= 1.950 in Ky= 1.0
ry= 0.493 in Ly= 89.0 in
Cm= 1.00
OTB Elevation
Loads
P=Vlong*N= 4,620 lb MoTB= 0 in-lb N= 5
Axial Analysis
(M/r)x= (1*89 in/1.95 in) (kl/r)y= (1*89 in/0.493 in)
= 45.64 = 180.53
(kl/r)max= 180.53 Cc= (2nA2E/Fy)A0.5
= 107.0
SINCE(KL/r)max>Cc, USE EQTN E2-2
Fa = 12nA2E/23(k1 r)^
23(kl/r)A2
= 4,582 psi
fa= P/AREA
= 2,345 psi fa/Fa= 0.51 > 0.15
Bending Analysis
fbx= M/Sx Fbx= 0.6*Fy
= 0 psi = 30,000 psi
F'ex= (12*nA2*E)/(23*(KL/r)A2) fb/Fb= 0.0
= 71,687 psi
(1-fa/F'e)= 0.9673
Combined Stresses
fa/Fa + Cm*fbx/[Fbx* (1-fa/F'ex)] = 0.51 <_ 1.33 OK
fa/(0.6*Fy) + fb/Fb = 0.08 <_ 1.33 OK
Page 22 of 2b
r
Structural
Engineering & Design i nc.
1815 Wright Ave. La Verne CA 91750 Tel: 909.596.1351 Fax:909 593 8561
By: Bs Eng:Mgz Project: Swire Coca-Cola Project#: LV-101519-1
Transverse Brace 2 Arm Level 4 deep Drive In
Section Properties
Diagonal Member= L2x2x1/8 Horizontal Member= L2x2x1/8
Area= 0.484 in^2 Area= 0.484 in^2
r min= 0.394 in r min= 0.394 in
Fy= 36,000 psi Fy= 36,000 psi
K= 1.00 K= 1.00
4c= 1.92
Frame Dimensions
Panel Height=H= 44.0 in Column Width=B= 3.50 in
Frame Depth=D= 42.0 in Clear Depth=D-B*2-2"=Dc= 33.0 in
Diagonal Member
V=Vtransv*2= 1,8481b D
V _
Ldiag= [(Dc)^2+ (H-2")A2]^1/2 (kl/r)= (k* Ldiag)/r min
= 53.4 in = (1 x 53.4 in/0.394 in /
= 135,5 in H 1
P= V*(Ldiag/D) P
= 2,350 lb
fa= P/Area Fa= (12pi^2*E)/[23*(kl/r)^2]
= 2350 lb/0.484 in = 8,133 psi
= 4,855 psi fa/Fa= 0.60 <= 1.33 OK
Check Brace Weld Side Elevation
L::eki= 3.0 in tweld= 0.125 in
Fu= 70 ksi Weld Capacity= 0.3*Fv*Lweld*tweld*1.33
= 10,474lb OK
Horizontal brace
Pmax=V= 1,848 lb (kl/r)= (k*Lhoriz)/r min
= (1 x 42 in)/0.394 in
= 106.6 in
fa= P/Area Fe= (12pi^2*E)/[23*(kl/r)^2]
= 1848 lb/0.484 in^2 = 13,141 psi
= 3,818 psi
fa/Fa= 0.29 <= 1.33 OK
Anchors
Brand= Powers SD2 #per Baseplate= 1 Column Uplift= 2,510 lb
Diam= 0.500 in Tallow= 1,250 lb Base Shear/Col= 337 lb
Embed= 3.25 in Vallow= 1,840 lb Shear/Bolt= 337 lb
Movt= 2*Vtransv*a DL= 1001b Tension/Bolt= 1,255 Ib
= 388,912 in-lb LL= 6,660 lb Exp= 1.66
Wst= (0.9*DL+LL)*2*D/2
= 283,500 in-lb
(1255 Ib)/(12501b*1.33)^1.66 + (337 Ib)/(1840 Ib*1.33)A1.66= 0.664 <= 1.0 OK
Page of Z.S
r
Structural
Engineering & Design Inc.
1815 Wright Ave. La Verne CA 91750 Tel:909 596 1351 Fax:909 693 8661
By: Bs Eng:Mgz Project: Swire Coca-Cola
Project#: LV-101519-1
Distribution of Seismic Forces 2 Arm x 5 Deep Drive In
5 4 3 2 1
arav a+ra�
Entry
Plan X Brace Schedule
Brace every'Y' bays: 4 4 2 2 1
Eff seismic load to brace (Vp): 2,349 lb 4,697lb 3,523lb 4,697lb 2,936lb
Plan X Brace 2 Arm x 5 Deep Drive In
Agross=Ag= 0.269 in^2
Anet=An= 0.269 in^2 Fy= 36,000 psi
t= 0.188 in Fu= 58,000 psi Vp
Bolt Diam= 0.500 in -�
Fv= 21,000 psi }
Lx=Post c.c.= 89.0 in Lz I
Ly=Frame Depth= 42.0 in
Lz= 98.4 in Ly
Vz
Vp=Max load to brace= 4,697 lb Vz= Vp*Lz/Lx
= 5,193 lb
FLX
Strap Capacityl= 0.6*Fy*Ag* 1.33 Bolt Shear Capacity= (Bolt Area)*Fv* 1.33 Brace Plan
= 7,728lb OK = 5,4841b OK
Strap Capacityl= 0.5*Fu *An* 1.33 Bolt Bearing Capacity= 1.2*Fu*Bolt Area*train*1.33
= 10,375 lb OK = 8,701 lb OK
z ,+ 2-k
r
Structural
Engineering & Design Inc.
1815 Wright Ave.,La Verne CA 91750 Tel:909.596.1351 Fax:909 593 8661
By: Bs Eng:Mgz Project: Swire Coca-Cola Project M LV-101519-1
Rear Vertical X Brace 2 Arm x 5 Deep Drive In
Check loads on the rear transverse vertical X brace in resisting the total of the"R reactions from the top X bracing
Fy= 36,000 psi
Agross=Ag= 0.269 in^2 Fu= 58,000 psi
Anet=An= 0.269 in^2 Fv= 21,000 psi
t= 0.188 in Lx= 89.0 in
Bolt Diam= 0.500 in Ly= 138.0 in Vry
# Frame/Brace=Nb= 1 Lz= 164.2 in
#Bay Deep=Nd= 5 LZ
R2= 5871b Vz= Vrv*Lz/Lx Ly
Vrv=R2*Nd*Nb= 2,936lb = 5,416lb \
Vz
F.F.
Strap Capacityl= 0.6*Fy*Ag* 1.33 Bolt Shear Capacity= (Bolt Area) *Fv* 1.33 �
= 7,7281b OK = 5,484lb OK
LX
Strap Capacity2= 0.5*Fu*An* 1.33 Bolt Bearing Capacity= 1.2*Fu*Bolt Area*tmin*1.33 Brace Elevation
= 10,375 lb OK = 8,701 lb OK
Load Rail 2 Arm x 5 Deep Drive In
Analyze the rail carrying half of one pallet uniform load
Rail= L5x3xl/4 L= 42 in
Ix= 5.390 inA3 Fy-rail= 36,000 psi (1)Pallet
Sx= 1.570 in^3
Pallet Weight=W= 5,000 lb
Bending L
M= (W/2) *L/8
= 13,125 in-lb
Side Elevation
fb= M/Sx Fb= 0.6*Fy
= 8,360 psi = 21,600 psi
fb/Fb= 0.39
Deflection
A= 5*w*LA4/(384*E*I) Dallow= L/180 Defl ratio= 0.09
0.02 = 0.23
Page z S of "
r
r
Structural
Engineering & Design Inc.
1815 Wright Ave., La Verne CA 91750 Tel: 909.596.1351 Fax:909 593 8561
By: Bs Eng:Mgz Project: Swire Coca-Cola Project#: LV-101519-1
Slab on Grade l 2 Arm x 5 Deep Drive In
slab
+ '• Concrete
a fc= 4,000 psi
Eb
tslab=t= 6.0 in
slab t D i e phi=O= 0.65
Cross Soil
�I��� c ---- c -'--' Aisle X fsoil= 1,000 psf
y
SLAB ELEVATION :: Down Aisle
Base Plate
Baseplate Plon View
B= 8.00 in width=a= 3.50 in eff.baseplate width=c= 8.00 in
D= 5.00 in depth=b= 5.00 in eff. baseplate depth=e= 5.00 in
Static Loads
P-DL= 100 Ib P-LL= 10,000lb Ps=DL+L = !0,100 lb
Puncture
Pu= 1.4*PDL+ 1.7*PLL Fpunct= 2.66*phi*sgrt(fc)
= 17,140 lb = 109.4 psi
Apunct= [(c+t)+(e+t)]*2*t fv/Fv= Pu/(Apunct*Fpunct)
= 300 inA2 = 0.52 <= 1.0 OK
Slab Bending
Asoll= (Pc*144)/(fsoll) L= (Asoil)^0.5 y= (c*e)^0.5+t*2
= 1,454 in^2 = 38.14 in = 18.3 in
x= (L-y)/2 M= w*x^2/2 S-slab= 1*t^2/6
= 9.9 in = (fsoil*x^2)/(144*2) = 6.0 inA3
= 340.7 in-Ib
Fb= 5*(phi)*(fc)^0.5/1.7 fb/Fb= M/(S-slab*Fb)
= 120.91 psi (Sec 1922.5.1) = 0.47 <= 1.0 OK
Seismic Loads
P-DL= 100 Ib P-LL= 10,000lb E= 11,273 1b Pse=DL+LL+E/1.4= 21,373 I
Puncture
Pu= 1.1*(DL*1.2+0.5*LL+ 1*E) Fpunct= 2.66*phl*sgrt(fc)
= 18,032 lb = 109.4 psi
Apunct= [(c+t)+(e+t)]*2*t fv/Fv= Pu/(Apunct*Fpunct)
= 300 inA2 = 0.55 <= 1.0 OK
Slab Bending
Moll= (Ps`144)/(fsoil*1.33) L= (Asoll)^0.5 y= (cle)^0.5+t*2
= 2,314 inA2 = 48.10 in = 18.3 in
x= (L-y)/2 M= w*x^2/2 S-slab= 1*t^2/6
= 14.9 in = (fsoil*x^2)/(144*2) = 6.0 in^3
= 769.8 in-lb
Fb= 5*(phi)*(fc)^0.5/1.4 fb/Fb= M/(S-slab*Fb)
= 146.82 psi (Sec 1922.5.1) = 0.87 <= 1.0 OK
Page of
COMMERCIAL APPLICATION
PERMIT SUBMITTAL
Department of Community&Econornk Development
City of Artinighm• 18204 7':11, Ave NE•Arr;nigur•,WA 98223•Phone(360)403.3551
TM APPLACATWX rO W USED FUR AWW C01WVERCfAL SrRVC rVRFS AND RFS10ENrlAL DWLUAMGS NOT ARGULATED t1111DER TIME
NQ rPOS AYNUCATION AW r AE ACCOHPANfLV EY A C04WPRCJAL APPLfCA TMN SUBWrTAL CNECRLASTANO AN OCCUPANT'S
STArLAriffr OFWTEMDEDME.
p b
Name of Proleci: � J 1 - _ L 0(�cb C °��► Valuation: T
PrgeaAdr .%* 1g�I C ��� (�L` Rd`E- �1r', .t om �k 7 `�>
Parch 10# Lrx3a4 DL—simption
Owner_ ' c fl e i 4 rl e�S Phone Number:
Address: , i i S-1 SL t1Lc r C Coy. i .. Scale: Lip Zip Code: 9ld;.L3
EMinaer:'A r.c to:A 1 L A�..���.'.... 0- s.A.'\ Phone NunVW. 'i LA
Ces Phan E-CAML AV S is A'^c i+e•�
Address_ :!W.' :.Jr*k4 tftr- City: 4 uco�y-s. Sta4q• zP Co'k
GeoWW onVoctor: (j 2r_ f 7L.4,,L Phone Number: %► `T b ZIa
Call Phone: L-rrlarL (��'�L��.�� w.i~ y:i«t,:s�. <n�
Address:.-y-S uu a c.WLc L mLc Uw> City:6"L Staw- Vt Tip Code:1'1 111
ComracWs Licansr Number: :,u ?f55.5 S 4-f C.Z M Expiration; 7�Z� 20 Z-fy
]C Ata !6f Z UContmi ftnon: t
Call Phone_ E-mail: t . %c,n C Cow W'2•%y". 4t N-I L c..+ C
Addross: tN 'Dr c k t,t t-e LL City 4E Staia: i.or Zip Code: g t l ct
Properad Scox o(We<k. ',la �l t It c
Rt=V 1^f7CPt r) P age 5 of 9
A rr�
COMMERCIAL APPLICATION
r PERMIT SUBMITTAL
Department of Community& Economic Development
City of Arlington• 18204 59th Ave NE•Arlington,WA 98223• Phone(360)403-3551
Project Name/Tenant Kudre Cbrb-�cJ4
Site Address i, i 4i�1{dll Ave, Wi' Arlin,-kt,) `iL-I. Bldg/Unit/Suite
IBC Construction Type IBC Occupancy Type
Description of Use PAM latly,s fnS�ull�(�q
Building Square Footage Number of Stories
Square Footage Per Floor
Will there be any installation, modification or removal of the following? (Check all that apply)
❑ Automatic fire extinguishing systems
❑ Compressed gas systems
❑ Fire alarm and detection systems
❑ Fire pumps
❑ Flammable and combustible liquids(tanks, piping etc...)
❑ Hazardous materials
❑ High piled/rack storage
❑ Industrial ovens/furnace
❑ Private fire hydrants
❑ Spraying or dipping operations
❑ Standpipe systems
❑ Temporary membrane structure,tents(>200sq ft)or canopies(>400 sq ft)
Provide details on any of the above checked items:
Installation, changes, modifications or removal of any of the above may require additional submittals,
information,or permits during the plan review or construction process.
Statement of Special Inspection
i
REV 2015 Page 7 of 9 Received
DEC 2 3 2019
G.Jl Ur
COMMERCIAL APPLICATION
PERMIT SUBMITTAL
Department of Community&Economic Development
City of Arlington • 18204 59th Ave NE•Arlington,WA 98223• Phone(360)403-3551
Name of Project: �la1j �G &(0- (CAA
Project Address: I;q7& A Vc AJe Ar ii2s�!,? 0 3?4
Special Inspection Firm: /7 __t�5f TL r-do t)cc,
4pny
—7
Address: [ 1 �j^ �UF N E 1 ?e,I M A WA
Contact Person: Phone: q Za— 92( — !�gl Z
Email:
Special Inspection Firm Special Inspectors:
The Special inspection Firm of Pa 12 te4m,l will perform special inspection for
the following types of work(separate forms must b submitted if more than one firm is to be employed).
( ) Reinforced Concrete
Bolting in Concrete
( ) Pre-stressed Concrete
( ) Shotcrete
( ) Structural Masonry
( ) Structural Steel and Welding
( ) High-Strength Bolting
( ) Spray-Applied Fireproofing
{ ) Smoke-Control Systems
( j Other Specify:
All individual inspectors to be employed on this project will be WABO certified for the type of inspection they are to perform. If inspection
is for work that is not covered by the WABO categories,a detailed resume of the inspector and firm must be submitted.The resume
must show the inspector and firm are qualified to perform the work and testing required by the project design and specifications.
The work shall be inspected for conformance with the plans and specifications approved by the City. Revisions and addenda sheets will
not be used for inspection unless approved by the City.The special inspector shall report to the City revisions that are not approved.
A daily record will be maintained on site itemizing the inspections performed,for the review of all parties.Any nonconforming items shall
be brought to the immediate attention of the contractor for resolution.A weekly shall be submitted to the City;detailing the inspections
and testing performed,listing any nonconforming items and resolution of nonconforming items. Unresolved nonconforming items will be
detailed on a discrepancy report and presented to the building department.
A final report shall be submitted to the Building Division prior to the Certificate of Occupancy being issued.This report will indicate that
inspection and testing was completed in conformance with the approved plans,specifications and approved revisions and addenda.
Any unresolved discrepancies must be detailed in the final report.
The special inspector and special inspection firm serve in the role as"deputy"City of Arlington inspectors and as such are responsible
to the City of Arlington Building Division in the performance of the required work.
Contractor:
The contractor shall provide the special inspector or agency adequate notification of work requiring inspection.
The City approved plans and specifications must be made available,at the job site for the use of the special inspector and the City
Inspector.The contractor shall maintain all daily inspections reports,on site,for review.
REV 2015 Page 8 of 9
L%�Y O fi
COMMERCIAL APPLICATION
PERMIT SUBMITTAL
Department of Community& Economic Development
P Y
City of Arlington • 18204 59th Ave NE•Arlington,WA 98223 • Phone(360)403-3551
The special inspection functions are considered to be in addition to the normal inspections performed by the City and the contractor is
responsible for contacting the City to schedule regular inspections. No concrete shall be poured or other work covered until approved
by the City Inspector.
Building Division:
The Building Division shall review any revisions and addenda.Approved copies will be given to the contractor to maintain as part of the
approved plan set.
The City Inspector will monitor the special inspection functions for compliance with the agreement and the approved plans.
The City Inspector shall be responsible for approving various stages of construction to be covered and work to proceed.
Design Professionals:
The architect and engineer will clearly indicate on the plans and specifications for the specific types of special inspection required, and
shall include a schedule for inspection and testing.
The architect and engineer will coordinate their revisions and addenda process in such a way as to insure all required City approvals
are obtained, prior to work shown on the revisions being performed.
Owner:
The project owner,or the architect or engineer acting as the owners agent,shall employ the special inspector or agency
ENFORCEMENT:
A failure of the special inspector or firm to perform in keeping the requirements of the IBC,the approved plans and this document may
void this agreement and the Building Officials approval of the special inspector. In such case a new special inspector and/or firm would
need to be proposed for approval.A failure of the design and/or construction parties to perform in accordance with this agreement may
result in a STOP WORK notice being posted on the project, until nonconforming items have been resolved.
ACKNOWLEDGEMENTS
I have read and agree to comply with the terms and conditions of this agreement.
Owner: / Date:
I hereby certify that the above information is correct and that the construction on,and the occupancy and the use of the above-described
property will be in accord nce with the laws,rules and regulation of the State of Washington.
ppli siiggnature
Print Applicants Name Date
FOR STAFF USE ONLY �Prp l�snr�
pFr. 2 3 ?019
Permit# Accepted By Amount Received Receipt# Date Received
REV 2015 Page 9 of 9
CITY OF ARLINGTON
238 N. OLYMPIC AVE - ARLINGTON, WA. 98223
PHONE; (360) 403-3551
BUILDING PERMIT
Address:18215 59th Avenue NE Permit#:2967
Parcel#:31052200101200 Valuation:475000.00
OWNER APPLICANT CONTRACTOR
Name:SWIRE PACIFIC HOLDINGS Name:[Company Name] Name:Wize Solutions Inc
Address: 12634 S 265 WEST Address:[Company Address] Address:2500 Decker Lake Blvd
City,State Zip:DRAPER,UT 84020 City,State Zip:West Valley City,UT 84119 City,State Zip:West Valley City,UT 84119
Phone: Phone:385-549-6200 Phone:385-549-6200
LIC:WIZESSI900M3 EXP:07/23/2020
MECHANICAL CONTRACTOR PLUMBING CONTRACTOR
Name: Name:
Address: Address:
City,State,Zip: City,State,Zip:
Phone: Phone:
LIC#: EXP: LIC#: EXP:
JOB DESCRIPTION
PERMIT TYPE: Commercial Alteration CODE YEAR: 2015
STORIES: CONST.TYPE:
DWELLING UNITS: OCC GROUP:
BUILDINGS: OCC LOAD:
PERMIT APPROVAL
I AGREE TO COMPLY WITH CITY AND STATE LAWS REGULATING CONSTRUCTION AND IN DOING THE WORK AUTHORIZED THEREBY;
NO PERSON WILL BE EMPLOYED IN VIOLATION OF THE LABOR CODE OF THE STATE OF WASHINGTON RELATING TO WORKMEN'S
COMPENSATION INSURANCE AND RCW 18.27.
THIS APPLICATION IS NOT A PERMIT UNTIL SIGNED BY THE BUILDING OFFICIAL OR HIS/HER DEPUTY AND ALL FEES ARE PAID.
IT IS UNLAWFUL TO USE OR OCCUPY A BUILDING OR STRUCTURE UNTIL A FINAL INSPECTION HAS BEEN MADE AND APPROVAL OR
A CERTIFICATE OF OCCUPANCY HAS BEEN GRANTED. IBC110/IRC110.
SALES TAX NOTICE:Sales tax relating to construction and construction materials in the City of Arlingl n must be reported on your sales tax return fonts
a = illy of A lin t#3101.
Signature Print Name Date Released By Dale
CONDITIONS
Special Inspection paperwork required for anchors. Adhere to approved plans. Call for inspections.
THIS PERMIT AUTHORIZES ONLY THE WORK NOTED.THIS PERMIT COVERS WORK TO BE DONE ON PRIVATE PROPERTY ONLY. ANY
CONSTRUCTION ON THE PUBLIC DOMAIN(CURBS,SIDEWALKS,DRIVEWAYS,MARQUEES,ETC.)WILL REQUIRE SEPARATE PERMISSION.
PERMIT FEES
Date Description Fee Amount
01/15/2020 Building Permit Fee $3,023.47
01/15/2020 Processing/Technology Fee $25.00
01/15/2020 Building Plan Review Fee $4,651.49
Total Due: $7,699.96
Total Payment: $0.00
Balance Due: $7,699.96
CALL FOR INSPECTIONS
BUILDING(360)403-3417
When calling for an inspection please leave the following information:
Permit Number,Type of Inspection being requested,and whether you prefer morning or afternoon
Permit#: 2967
Permit Date: 01/09/20
Permit Type: COMMERCIAL RACKING
Project Name: Swire Coca-Cola
Applicant Name: Wize Solutions Inc
Applicant Address: 2500 Decker Lake Blvd.
Applicant, City, State, Zip: West Valley City, UT 84119
Contact: Travis Jenkins
Phone: 385-549-6200
Email: tjenkins@wizesolutions.com
Scope of Work: Racking for warehouse
Valuation: 125000.00
Square Feet: 0
Number of Stories: 0
Construction Type: 11113
Occupancy Group: S-1; Storage Mod Hazard
ID Code: Opportunity Zone
Permit Issued: 01/27/2020
Permit Expires:
Form Permit Type:
Status: COMPLETE
Assigned To: Kristin Foster
Property
Parcel# Address Legal Description Owner Name Owner Phone Zoning
SEC 22 TWP 31 RGE 05RT- SWIRE PACIFIC
31052200101200 18215 59TH AVENUE NE 6A)Sl/2Nl/2 SWl/4 HOLDINGS
NEl/4 EXC RDS
Contractors
Contractor Primary Contact Phone Address Contractor Type License License#
Wize Solutions Inc Travis Jenkins 385-549-6200 2500 Decker Lake CONSTRUCTION L&I WIZESSI900M3
Blvd CONTRACTOR
Plan Reviews
Date Review Type Description Assigned To Review Status
01/09/2020 Commercial Other BUILDING
Fees
Fee Description Notes Amount
Building Permit Table 4-1 $1,707.99
Processing/Technology $25.00
Building Plan Review Table 4-2 $1,110.19
Credit Card Service $85.30
Total $2,928.48
Attached Letters
Date Letter Description
O1/09/2020 Building Permit
Payments
Date Paid By Description Payment Type Accepted By Amount
O1/16/2020 Josh Trayner 78640697 $2,843.18
O1/16/2020 Josh Trayner CC Surcharge Transaction Kristin Foster $85.30
Outstanding Balance $0.00
Notes
Date Note Created By:
O1/09/2020 Received submittal on 12-23-19 without a complete application.Emailed applicant to complete Kristin Foster
the application to process.
O1/09/2020 Received the complete application on 1-8-2020 Kristin Foster
Uploaded Files
Date File Name
03/06/2020 6327833-1.31.20 IC Final.pdf
03/06/2020 6327820-2.26.20 IC Final.pdf
O1/09/2020 6074174-2967 Application.pdf
13NTOH L898-99Z409) - - 0310N SV O l'L8900-5086
6LL69 HHlfl'A110 3Nb'I 1ltlS a0 3NId Z99
:31MJS '3ZIS`JM° :a38Wf1N80f :tl38Wf1N1°3fOdd EZZ96 VM 'NO1NI-ldV zo do W
- - - ----
A 133H8
�N '3AV H165 56Z8t s'ZorZ' swS31dS aNV °"db00 VOOO 3alAAS
Nd33NN3 tM'NOlJN112H b NGU
31V4 GAHdV AG NOISIA38 :3WVN 103M ld 3WVN HAy4Olsno
a6—M a
z w
M
>
LLJ W
�q4
N+1
1.
ti c
- m la Va Va Va O � w m
I � I A a5F
w zo¢
M Na I � A o u
_ fox
la .a La la la to la la In in La a F
- ...
i u FazUw
�wO
u
I IS Ltl 4tl La Va La la Va la la I _ FV 1
t F 6
4 4tl L la t la la a la a-� la ltl 4tl b
I
-- :.n b
ce^
w
La la la la la La la Ia la Lb La
I I I I I
_.-} - to 4a Vb Ltl ttl lb La La Vn La Va'. la
a a
I I la a a a Va a s�.:_
la la Lb 4tlt ILyI ltlI lb 4tl Ltl7 1 '.a la la ..._
I � a
-� la to La In la la1114
la = .a to a la la a La Ltl
la to Vb Va la la Va to Va r. la La .tl.... e.- n Vn 71 m La1 La
ERE
Va 4tl Va Va lb Va La ttl
la lb La La Ltl la uy lb to77tl
: a
rn
I I -
/'
w
�y La Ltl la ,a ,a I`
a
Z Q
F- I Ill Q cn
I
� 6
y I
I 1
I
X
f
� j I
x I I
x.
�4 f
1
L 1 I
LL w ❑ U ] Q
0310N 1M AI SB310 W9b21a1SNW d0B3SOdaM aOd 1NY3W lON SI ONb03Wa0da3d 3801 NaOM 3H1 d01N31X30Nb a31SVaY.10 Wd ae:BS:Z 6 Wz'S 10gwwp EM#pL'L8800'mBl\°b'J\bM'OO40UIVtl'4'LBB00'SOBI\BIO'J'BOa�NIMy7pL�e4y0Le11°1:j
3H131btl18f1111 01 0 3 0N31Nl AlNO SI ONMbtl03H1 H31bS90NItl33NION3 fOH dO1N36NOO N3111bM tl01tld3H1111OH11M A111N3 aO N09a3d ANV 013lBVllb"b 3pHVN b0 a31bNIW3@SI001,-3S 10N AbW N13a3H103NIl—N011VV1a09.VI ANv
a0N ONIMbnO 61H1 0311SIHOad 613tlf1601OS10 a0'NOI1b011tlf10'3BN03-OH—Nf1ANb Hbl(1 At103Nb111b5'OO 83lbS9ONItl33NI0N3 fOH 3H1 d0 Altl3dOtld a'I1VH1 NOI1bWtlOdNI lbI1N301dN006NItl1N00lbltl3lbW SIHl 1N111-6Aab131nd0ad
iaNrOH 888-99Z(�CW 0310NSH 0 VL8900-GM
%MHHlr: 1HS 603NIjZ99 - _ _ _ :31WJ5 :3ZIS` :tl38WfIN90f :H38WNN1 A3f EZZ86 VM'NO-LNI-kJV Z0 zio ZO
3N 'and H169 9298 :C133HS
STIVS(INd t 6UZO/ZL Sw
JNIH33NIJN3 dM`NOIDNll23ti t/l00 dOOO 3bIMS
T81va Gn v
vyli
v a L 31V0 GANdV A9 NOISIA3H :3WbN 133PONd :3Wb'N HMoisno rea .OeW-.
F-
LU
0)
H
li
d
$ Cl)
M
00
o
o�
..� .a
(fl
M
z
O
O a
i N
co
N
W_
W
i
f
O
it m N N N a
zo
(V -
O
w
Ir
I
tD
O
N
OP
bo
LL
W
$� r? ih
D
in fD (O
M
ummbVhwoKn
i vow aodeois �NI W6I 6 E2;Z86 VM'NOiDNIIdV m �
vtlnioneis �,w LO
3N 3AV H169 SLZBL ZON �.- wr ewxuo *-
�NId��NI�N�
�d�U�l1dl boo-eOoo DHinns <o .m _ > g W
NOISIA3d 'A3d 3.LV4 / JNItl33NIOlJN3 roH ixa o J Cl)
V
2 J m
<� Sp p0 Z W F Q F- m C7 w r/i ¢ �/ \ OV
Uz r6 ¢o a <O F ¢ W O¢w ¢w o z m o LL o�`�\\ Q
W m 2 O¢ W w w CW7 0 w F- U LL 0 U ¢ W Y 3
o J z¢dz 0 r rn zO ¢ z as ¢ m ¢¢ F
y F x U' O z w G w O C7 F o
rnm w -xm ¢ ¢ a ¢ W c�iw¢w omwm O ¢�❑ w r"-.
a � F- ❑
S�W �LLz 0 <->1 WC¢ �wLLj:O�n-
Orww2ou<J.YZO pzZdw¢�pwoj>a¢wiJ
UOwUWpwTw0 %ww Z OO¢ � o w` O ,0 Cc) ¢ ww ~ 0 6) WO 6 0 ipFm QaU°x zz ?vipz W w x 0c-z z Z5m >U¢ ¢O m Wm w m F ~ o LL OW Zo Z ZO w¢ pwC)O U W; w -LP
9' r p 1 O ¢
¢ iw O 6g ZOO O7Uw ' ¢ dC.) Wa w O p
O Z m ry Wo oF Upp¢ z ¢o
w.
L W ti Z w a F W O m - 7¢ Zp > N z O �w� �civ 6 � 2UwaC _ m > zz a 0m ¢ w ¢ m OO ? WYdz O ¢2 O LL W~O Q 7 ?Ww )o LN g Uw a LL w
cq
¢ w-wOFS3n wow , uO J WZ �i ¢C a Jy ap p w w ¢Wwa Z C)u Jw ¢0 C, z N U Y U Z w O
O W O U O ULLolWf 20 0
Ww> O w $ZDZ¢ w Z p w O¢Z Z� ¢
O o zOm w >ZZ zoRUUO5¢`6Z�I.
1
w L, Jp W W O wW w tZ QZ mNyZ W >> a . ZtlZ zUZ
pZza p m O p O Z Q 80a~ 1 OOl¢ P Ua Q O U2w Y w0", Y po w. am ¢ ¢ > Z ¢
¢O U
Q¢Z Z p z Qw O ZaOLLOawQ wZ < < > d aC) a 4a
Z o wQdWwmnw= Qz o O CzVU H. 0z z c
Q ma O0 U N¢U 2 w p w W ZgI O wa ZV LL w 9
m z o Ca O a Ow ¢
a ¢¢waZ oW w ¢ m0O c0 ti U ¢ <>
p
-<-.
w
V a of 6 ;n.m r m of o cv m ff LOm ai N m.o
cr F m U
7 50
Z d d
z �Z cc
O Q �z m< _
o z Q
Q f— J g C'3
CC C) d w Z Z
G W W LL i >
rr cco i m � 0
a L U F-
a.
0 W 4
;
0 Z cn w Z
LLF _
Z o F- 6 z W
zw J
Z U) W W
Z j a O N w m� W
Q O 2 - aQlo p Z
m I) L, a
U z m z'm = (r a
3:Q w
J p W U)w W H
Q m .tIo,v'' _ U� ¢
f- w 0 m �ej l Q O
W " z zW Y
a _ o
J Z LLI�ION'� m
O LOL,
(uiI� J_ Q z
V N w _ ¢ Z O
m0 W Ow.O,� � W 0
1 zm o4a ¢w ad /W^ C)
m WILL¢ U (yk vJI w
0
zU W U) W
d
m a
0
F- g p_
J
N ¢ n U m
L "I m O
lL J
V C11 W _ U.
z LO LO
p E3 2 �ia CE _
x m N " O
O V Q N o0 7 N W
JIr
J
W Cc
~
J I I ��
v tr w W
w < I cv I via < a U �Z
I- J U W V W U=
w :5 I zz z off¢
w zaw
iO =
i a a
a o
W b'I Q O w O
X W N m CO(0 Q LO
111 ~Ili _ .ocr
¢ Ir w m
OJUM, 1 loy � M aQ'
Ir
*k z O ¢!N � a �1 a a twi 3 " �
_W'm' a o a' in a °¢
X J F Q Z Z C/) Z
am O Q O 0 O m
zld ¢ y a_ a y ¢ a ¢ w
�,.g2 m.,¢�I� ¢ ¢ J Cl) NN Q m }
w U Uw J
w U w w ww U W W
O I w O W ¢ w W F W F-W W F
z i Z)L) 0 :E Fi o 2 co S) o � ai
z
�¢Im4 a
O J J p
�kb
U O N p
I N M X o Z U uj�j
r i 'o iy O >
U a U LL.
C', � ^ a w�7 ¢ N a
Z N mz 0
2 co "C ¢Z cam[ a
U U q j 00 n W�p c
i
(7
Z ¢J F
/ z Z
UEd °)O w O m
71 ¢ ¢ X aU � a ¢ >-
New - WUaz U) Uw
Z 7 00 Z Z) m <
cn m ui a
cesa o a ¢ o
fr o ¢ o
o D o
J X w I o U n
> w a m Lu 11 I W u v OJ ¢
w . U) LL I 1 z ti tL
mw
]/� 0 Ln
LL
w w p Z FIt Q ¢ Y I p c v Z m
O O w x
Z O U mIN i -_ O a U m v m
Z O I-O
x o aw o,_! a a (,� N a U. v U a
U w ¢U am 0 J W M CJ O O +/ O J w_ a¢ O J W
cr_ z'o_ Q a OaQ
k—mew—Y H
W Y(Lw Ua � U.W w U W W W�U U W!J
UF l-w-� (0 [ w U) F WF W aW�m@J zl�� o'� o m z'zm o <lw
�BLL'965'606 X'dd�SEL'965'606 3NOHd OSLl6 YO'3NbBn b-I'3/�b'_H917M SL9L T N
�I \I EZZ86tlM�NOl�JNI"IFitl -Ivtlniondis •oew � �
�I VI���NI�I V� 3N3HHA`d^^H16S^^51Z8]1.� ^Ac zow AB'OX3 wrAeXMtlO � N
V1O0_V VOV 38IMS efo <<<<azva
DNId33NIDN3f H iXano J W
NOISIA3k! 'A3k! 31tl4 I!V!/Vll IVIr' /V7VIr�7 �
u
i w w wpw0 i5 ¢ z
cxi os� 9S z°
z uU wa3 x w F a ¢0 w
P. pU Z wOW ug (n
-Sxawxo, ¢ o R o v :s
0ojz iO- Z p J
Z z
p z
a�Qoi
oEl
u~ wu7 g m 5Q� �zZ°¢ _ off=p� 8LL
Sm ¢ a ¢ =0 mcc X
N N U H (D 1 m o °t�x Z U F Z� � F_Y U i W p N �
CC
y = i LL ¢ O d- 5g x °S¢ a N
O t7 O O U z j LL w o p r w O 7 w r w O `n N O z O ¢m C
<�< F �_� m W =J� O z3ow�z°W � z Z�� Nw xw W
U m U p p r w 0 z w z LL¢¢asO ¢¢O TW
¢ °wU w w Ow = Z mm -`UZOOw ¢ W wwvi°<m?� a2 2� 2 Z LV
E UU �z OZZ ¢0.Wm0-m ° oo°zdow ��3 0 oW�¢omw7 °0 s� _
it O O ?am ¢ a Z pb0 O w 0¢ w<o oQ mZ a`z�' LU
mLL � '� ww Fwo ogoz��� W o �Q�WNo� W M OM W o rozS° r W Qca
2x7 LLaLL`3 ¢ 9O �oWLLF oz �E02 IQ� Z � O
�_ a w a~ m m O< W O = z c~i o p r N=r i¢O 0 S w m p o Z
W II v p f LL a p ss z w x r w° o w p z w m 1 m w � w x cxi Q
n of N pU O¢°z 0w al- 0 ¢7d� �v�zw jO =<n���� gz U�O�� f
Qow "'m mm ZZjgwgxg-o�mmNga_w w x8,nam�g F 2a'¢� z� /w'/^� Z W
W r; N 2 p 2 O fL U N C7 a¢g 9 y p w Z vl w¢ x a° O Z> Z a 0 U 0 V J
Z 2< o a i O v� F =ww w w w r u�¢ °w w> w U U m o f o m > `-` ° a�a 0 a w 4¢ a W w
Qw wx W mw 1a-s ZZ ZZ ZZ
Z ¢ 6$Ilj° Q W U W W Z N O N N 2 < W w Z w w¢ O 1 U Z
U p U j n U aa H N w Z_ W a Z O p T LL w 2 U U pp F w H xw 6 U ¢ Z x a {�yyff
Z II W g Z fl 2 J U Z F p W 1 m°° ¢w Z W p 2 0 r 2 6 U F�9°a g p O O LL a O >
C7 I-a O 4° z W 2 O a Z F v1= a t- ¢O �li Z U' r -n g
W W z¢ 25 2 r ?i 0 LL W,-LL ° °LL Z 'W o.w O 2
ow 3wG Zao �¢° ° �°wooF`� ¢p2°Zo0Fzo°j�CW��°vwwoo -aWz¢po� �t4Z4p� C,E�
¢ II U(� ¢o m w g3 N¢7 O 3 y 7 0 Q z g p ¢ _ °m 3 7 r W zi Z O w Q O m i°O¢ m
CL Op v� t.m °a O x c z oVz m F Z Z 0 w¢05 m w m °<z 0 w ? p o m g ¢ ¢ o 0 ¢ a O
a m 4 m 0 w m i W m $m¢ a w o�a U o o Q w 1 w 1 0 v2 E. 0 0 n i°Z °2 0 m w a O U�Y LL z
¢ °¢ ° ga@)b cz �wlgi a at- �¢w m xz N �0 1NwyS>cn a? ¢a .0 Owz¢O O
J ¢w d n m u W D m a m w x m O w ¢ a a a
QII��� aQ v¢¢a0 m¢¢C7(� mua�.N ,ZC7 rU0 m
a¢ V cn Z Z O a 2 --I w Y 2 f� Iw- 1-Z cn 7 m_w w LL g w w W Q w'�j 6 J O w x F- w w
cc wU �. w ¢ �=0�¢yf z�L9W�Iwa 9 w�0 gy m O m no 0 c��m w� 013: mwZ3FF¢ ww6 ~Nzmp U
W 0 2 o w �d z m °w m 3 m m 0 o rn y w w w u o=a o Q Z m 3 o -g O Q¢ m w o Q¢
Z aA�an u U 01QQ wx -I�Zw a� w¢w mzIw0 FydU O�aw//maww0C7 wOw� w
W W 6N C W N O aU7d' °N-N N°m m 2Z twA t7d°J N7 ¢ O$m¢m W 6m v�i rN °
�WR
V N n d vi ro n ro a m '^ a a s d d ai w
Va= I
0 w N I QVQ�53 u�m uj CL
w J
cez o o
m
2 0 U)
OZ u In Oa Z.
H j 6 ce N_U
Y O
J rn
=am LL aw xs
9 3¢ C5w m
�w ]t7,
=¢a wZ N fNV
zJa a Qo z� O�z
zw
zaw
w01 w
a m a ci
w a
o ?p ¢ m x
=rn =O w 11 U
3 z Z z _ y g
n a - 11
- rn
W
T >'o T
Z w O Wrn
NN
i� cc
0
2IN
K O w 0 N JD N
of O r-- FX' U In = r rq cVw ,0. � N
• J ~�1 To + N Z
O N J O O' m r� O J °
Q E J
U W J w MW
z U �k w W
y 1- F Z N N w DC H
LU y Z U w O In w O N
y ¢
o a
o d
o M
a 0 r J
° Z cwli Z
°a n w
a ---- --- w a >
~
— — -- — ---- OL 3
iT L O Z
Er
=a 0 ° oO
aq a W �cai
> a
ir
mg j cc c rw-cc w�
/ z°m _ — -_----= -------- ° 2 U) a z�and
/ N cc
/' cc
II ° oo
,awo o OJ o
cc 0 it 0
(� N 1}Z O ii N a V �y
c•A Z U Z d cv
a
-- ------IL_ --------- N' n u' J on,
a
CD � F�y V QJ_ 2� F X
�' 0 U 6
J W J I W W
oF_
EC cc J w @J V W Vy W
w Q w O(A w N F - W N F
F_ 2 ° rq to
6 S QY y y 2
sw� m coo o a
L
F p o MCD
m 2 xN TUw Z wZZ
n u�i OVwa xm _�� op m C7 J® U U `� ) C a o6
_ zz
o ° o ° mo
� ¢ W �`�_ a ¢ w m _U
s � } m > ao
0 w W w@
III co) 00)
_ ° m to N Z 0 Q
io
® - o
'W O — — --
co
co
ayac uiaw n r LL JULL
it cc w �LU O� gUc`�i I O ° aka _ rvf as _
Lo
m O aoa w n O w x -k Y ox
z n m
a w J w 2 U ¢ v) U a
3 D rn w
cc xz� a ¢ w a 9
((W�� >- a }
U wwY r rr
W w U w w U W w W W
O Q Z7U p ~ Z j w a
Z m N ° fN