Loading...
HomeMy WebLinkAbout17727 59th Ave Ne_BLD1639_2026 Hyak Partners LLC Drawing Index IL Sheed Description GN-1 General Notes PL-1 Level 1 Piping Diagram-Level 1 PL-1.1 Chilled Piping Diagram-Level 1 Arlington , WA PL-1.2 Heated Piping Diagram-Level 1 PL-1.3 Condensation Piping Diagram- Level 1 PL-1.4 Corridor South Wall Elevation-Level 1 PL-1.5 Level 1 Piping Diagram- 1 Ton Fan Coil PL-2 Level 2 Piping Diagram-Level 2 PL-2.1 Chilled Piping Diagram-Level 2 PL-2.2 Heated Piping Diagram-Level 2 PL-2.3 Condensation Piping Diagram- Level 2 C-1 Chiller Piping-Layout C-2 Chiller Secondary Piping-Layout C-3 Chiller-Layout Manufacturer / Supplier CP-1 Chiller Pump Station FC-1 2-1/2 Ton Fan Coil Unit-Cooling Only FC-2 2-1/2 Ton Fan Coil Unit- Heat Delta T Solutions FC-3 Condensation Piping-Layout FC-4 1 Ton Fan Coil Unit FC-5 1 Ton Fan Coil Unit EL-1.1 Elevations Grow Room 110 27711 Diaz Rd - Suite B, Temecula, CA 92590 EL-1.2 Elevations Grow Room 109 760-682-0420, Fax 760-682-0428 EL-1.3 Elevations Grow Room 107 EL-1.4 Elevations Grow Room 104 www.deltatsolutions.com EL-1.5 Elevations Grow Room 103 EL-1.6 Elevations Veg Room Delta T Solutions Job No. 160661-50 EL-1.7 Elevations Packaging &Processing 105 EL-2.1 Elevations Grow Room 205 EL-2.2 Elevations Grow Room 204 EL-2.3 Elevations Grow Room 202 EL-2.4 Elevations Clone Room H-1 Boiler Piping-Detail H-2 Boiler to Section Pump BPF-1 By-Pass Feeder FW-1 Feed Water&Expansion Tank-Layout S-1 Section Pump Z-1 2-Way Zone Control-Detail Z-2 2-WayZone Control-Detail Z-3 2-Way Zone Control-Detail Z-4 2-Way Zone Control-Detail Z-5 3-Way Zone Control-Detail Z-6 3-Way Zone Control-Detail Z-D1 2-Way Zone Control-Detail E-1 System Wiring-Schematic E-2 System Wiring-Schematic E-3 System Wiring-Schematic E-4 System Wiring-Schematic E-5 Boiler Wiring-Schematic Revised 8-23-2017 E-6 Chiller wiring-Schematic Installation Notes (Unless Otherwise Specified) E Labor Materials Supplied (Unless Otherwise Specified) o 1. Refer to Delta T Solutions Specification 6.0 Piping Installation,for Information on Piping. 1. Supplied material will be per customer-approved quote and construction drawings provided System Specs o by Delta T Solutions. g Temp Volume Expansion Tank Pot Feeder 2. Refer to Delta T Solutions Specification 4.0 Air and Water Control,for Installation of Air 2. Unistrut,all-thread rod,and related materials provided as full length pieces to be measured, ® 0 190°F 210.4 DEEJAER23607 2-Gallon y Separator,Air Vent,Expansion Tank,Feed Water Regulator,and Pressure Gauge. cut and field fit during installation. Boilers 03 V+ E oa� 3. All equipment will be installed per customer-approved construction drawings provided by a)o 0 Delta T Solutions. Materials Excluded (Unless Otherwise Specified) Item City Brand Series Model Stages Fuel BTUH In BTUH Out VAC 0 FLA Hz S T 4. Installation shall be from the Point of Connection(POC)as shown on the construction 1. All Line Voltage and Low Voltage Wiring,Conduit and Disconnect shall be Supplied and B-1 1 RBI Dominator DB1050 4 NG 1,050,000 882,000 115 1 11.4 60 � O rn Q drawings. Installed By Electrical contractor. ■� _V 5. Notify Delta T Solutions if changes are necessary so the design can be modified as 2. Gas Line and Gas Regulator shall be Supplied and Installed by Others. Chillers U }+ ie required. 3. Water Line and Backflow Preventer shall be Supplied and Installed by Others. Item otv Brand Series Model connection Stages Tons BTUH kVA VAC 0 Amps Hz = O 0 N and c mo 6. Field coordinate/verify all dimensions,utilities,voltages,amp draws and conditions before 4. Power From main load Panel and all fused disconnects. C-1 2 Daikin AGZ-D 110D 3" 12 106 1,282,000 101.66 120 1 5.54 60 d r E installation. n 8 O F 00 5. Breaker to the boiler unit terminal strip,by Electrical Contractor. ° Ol m Heat Source(s) Pumps .3 m o 1. Refer to Drawings H-1,H-2,or H-3 for Heat source Details. .�CD Operational Notes (Unless OthewiseSpecified) Item City Location Brand Pump Model Flange GPM Ft Hd HP VAC 0 Amps Hz rn X 2. Refer to Delta T Solutions Specification 3.0 Heat Source Installation for Boiler Installation BPA 1 Boiler Federal 2CCL-3/4-4 2" 70.4 4.2 3/4 115/230 1 9.6/4.8 60 Z +4)rn t6 and Operating Information(ie Vent,Gas,and Electrical.) 1. Bench-Top and In-Slab hot water heating systems are designed for 130-140°F water.Do N c NOT exceed this temperature or system damage can occur. S-1 1 Heating Coils Grundfos 80-100F 3" 141 52.1 11%43 230/360 3 4.3 60 y 6 00 3. When boiler piping is supplied by Delta T Solutions,remove flow switch and tee from boiler $s 01 Of Ln 2. Under-Bench and Perimeter Fin Tubes stems are designed for u to 230"F water.Refer to CPA 2 Chiller Federal 3CGL-3-4 3" 315 29.3 3 230/360 3 14.5 60 =o c N o header and install in supply piping as shown. Y 9 P -o o m uo 4. All piping to be supported so that heat source does not support piping weight. design for operating Temperature.Do NOT exceed this temperature or system damage can ZC-1 1 Veg Room Grundfos 40-12OF 230V 1-1/2"GF 35.0 24.7 19/32 208/230 1 2.0 60 4)p C'4 p P 9 PP PP P P 9 9 occur. o c-t`cn ZC-2 1 Grow Room 103 Grundfos 65-12OF 230V 2-1/2"GF 84.0 32.1 1 1/32 208/230 1 3.4 60 5. Gas Service Regulator is required if Gas Pressure is above Y2 PSI. °. rn CD ZC-3 1 Grow Room 104 Grundfos 65-12OF 230V 2-1/2"GF 84.0 26.3 1 1/32 208/230 1 3.4 60 '`g Q W N O0D Piping e Q ZC-4 1 Grow Room 107 Grundfos 50-150F 230V 2"GF 56.0 30.2 27/32 208/230 1 2.8 60 1. Refer to PL Drawings for Piping Layout. ZC-5 1 Grow Room 109 Grundfos 50-150F 230V 2"GF 63.0 30.9 27/32 208/230 1 2.8 60 - 2. All PVC Piping to be Schedule 80. All Steel Piping to be Schedule 7,10,or 40.See -d installation manual for your specific pipe based on design criteria. ZC-6 1 Grow Room 110 Grundfos 50-15OF 230V 2"GF 63.0 30.2 27/32 208/230 1 2.8 60 _ ZC-7 1 Grow Room 202 Grundfos 50-15OF 230V 2"GF 56.0 32.7 27/32 208/230 1 2.8 60 3. Piping runs to be supported as required. 5._- ZC-8 1 Grow Room 204 Grundfos 50-15OF 230V 2"GF 56.0 32.9 27/32 208/230 1 2.8 60 4. Install Pipe Rest,using Unistrut with Brackets. ZC-9 1 Grow Room 205 Grundfos 50-150F 230V 2"GF 63.0 39.9 27/32 208/230 1 2.8 60 = 5. Vent high spots in piping mains to prevent air locks. 6. Installation to follow all state and local codes where applicable. ZC-10 1 Clone Room 206 Grundfos UP 26-64F 1-1/4"G 1 14.0 1 10.3 1 5/64 208/230 1 0.74/0.43 60 E a p 5'o 7. Installer will be required to measure cut and fit some pipe sections per site conditions.Match Construction Drawing set. Zone Valves-Chilled Water Actuator Flow Control = 8. Installer will be required to assemble piping connections using appropriate Teflon tape and m OtY Locationit Type Brand Valve Model Size CV Brand Model VAC Brand Model GPM Sim Detail Sheet t sealant to insure leak free assembly. ZC-1 1 Veg Room 2-Way Mixing Belimo B239 1Y2" 29 Belimo ARB24-3-S 24 Flow Design YRH150-0300 30 1Y2" Z-1 Insulation ZC-2 1 Grow Room 103 2-Way Mixing Belimo B264 2Y" 150 Belimo ARB24-3-S 24 Flow Design YRH250-0840 84 Z/2" Z-2 m 1. Insulation is provided for bare aluminum pipe with-in zones below the 7 ft.(Off Finished ZC-3 1 Grow Room 104 2-Way Mixing Belimo B264 2)z" 150 Belimo ARB24-3-S 24 Flow Design YRH250-0720 72 2Y2' Z-2 Floor)level in each zone. ZC-4 1 Grow Room 107 2-Way Mixing Belimo B252 2" 85 Belimo ARB24-3-S 24 Flow Design YRH2O0-0480 48 2" Z-3a 2. Refer to Installation Manual and provided drawings for insulation installation. ZC-5 1 Grow Room 109 2-Way Mixing Belimo B252 2" 85 Belimo ARB24-3-S 24 Flow Design YRH2O0-0480 48 2" Z-3a =- 3. Installer will be required to measure cut and fit some Insulation and Aluminum clad or PVC ZC-6 1 Grow Room 110 2-Way Mixing Belimo B252 2" 150 Belimo ARB24-3-S 24 Flow Design YRH2O0-0540 54 2" Z-3a - jacket sections per site conditions.Match Construction Drawing set. ZC-7 1 Grow Room 202 2-Way Mixing Belimo B264 2" 85 Belimo ARB24-3-S 24 Flow Design YRH2O0-0540 54 2" Z-3a U Fan Coils ZC-8 1 Grow Room 204 2-Way Mixing Belimo B252 2" 85 Belimo ARB24-3-S 24 Flow Design YRH2O0-0480 48 2" Z-3a E$ J 1. Refer to Drawings sheets FC-1 THRU FC-4 sheets for Fan Coil details. ZC-9 1 Grow Room 205 3-Way Mixing Belimo B351 2" 85 Belimo ARB24-3-S 24 Flow Design YRH2O0-0540 54 2" Z-3b a E J 2. Refer to Drawings sheets PL-1 THRU PL-2.3 sheets for Fan Coil Layouts. ZC-10 1 Clone Room 206 3-Way Mixing Belimo B330 1Y4" 85 Belimo ARB24-3-S 24 Flow Design YRH125-0540 54 11/4" Z-4 0N - L 3. Installer will be required to assemble Fan Coil fittings using appropriate Teflon tape and sealant to insure leak free assembly. Zone Valves-Hot Water Actuator Flow Control = Q Pumps&Zones y ++ Item Oty Location Type Brand Valve Model Sim CV Brand Model VAC Brand Model GPM Sim Detail Sheet p" L n a)1. Refer to S-1 Drawings for Section Pump Detail. 1= M ZH-1 1 Veg Room 3-Way Honeywell DEV3125-09 1Y4" 9 Honeywell VC-2710 24 Flow Design YRH125-0090 9 1Ya' Z-5 a O 2. Refer to Z-1 Drawings for Zone Valve Detail. d T Z ZH-2 1 Grow Room 103 3-Way Honeywell DEV3125-09 1/4 9 Honeywell VC-2710 24 Flow Design YRH125-0150 15 1Y4" Z-5 r a` a 0 3. Installer will be required to assemble zone valve stations per drawing Z-1 using appropriate y r Z ZH-3 1 Grow Room 104 3-Way Honeywell DEV3125-09 1Y4" 9 Honeywell VC-2710 24 Flow Design YRH125-0150 15 1Y4.' Z-5 a)Teflon tape and sealant to insure leak free assembly. L ZH-4 1 Grow Room 107 3-Way Honeywell DEV3125-09 1Y4" 9 Honeywell VC-2710 24 Flow Design YRH125-0120 12 1Y4" Z-5 ZH-5 1 Grow Room 109 3-Way Belimo B341 1Y" 29 Belimo ARB24-3-S 24 Flow Design YRH150-0240 24 11/2" Z-6 a"� y- Testing Notes (unless Otherwise Specified) ZH-6 1 Grow Room 110 3-Way Honeywell DEV3125-09 1Y4" 9 Honeywell VC-2710 24 Flow Design YRH125-0120 12 1Y4' Z-5 1 Fill,Leak Test and Pressure Test system after installation is complete but prior to installation of insulation. ZH-7 1 Grow Room 202 3-Way Honeywell DEV3125-09 1/4 9 Honeywell VC-2710 24 Flow Design YRH125-0090 9 1Ya" Z-5 2 Maintain a water treatment program appropriate for all the materials in the heating system. ZH-8 1 Grow Room 204 3-Way Honeywell DEV3125-09 1Y4" 9 Honeywell VC-2710 24 Flow Design YRH125-0090 9 1Y4' Z-5 In addition,the pH of the system water is to be maintained between 6.8 and 8.5. ZH-9 1 Grow Room 205 3-way Honeywell DEV3125-09 1Y4" 9 Honeywell VC-2710 24 Flow Design YRH125-0090 9 1Y4" Z-5 3 Water testing and Treatment ZH-10 1 Clone Room 206 3-Way Honeywell DEV3125-09 1Y4" 9 Honeywell VC-2710 24 Flow Design YRH125-0060 6 1Y., Z-5 2 Site Conditions Exclusions (unless Othemise Specified) Fan Coil Units 1. Site utilities It.. city Brand Model GPM Ft Hd PHASE FLA/MCA 2. Permits and state or local government approvals FCU-1 43 DELTA T SOLUTIONS 2.5 TON COOLING ONLY 6 7.8 1/2 240 1 5.5/5.8 60 3. Site/Foundation/Soil Preparation,Testing,Demolition,Debris Removal services or FCU-2 40 DELTA T SOLUTIONS 2.5 TON HEATING/COOLING COIL 6 7.8 1/2 240 1 5.5/5.8 60 equipment FCU-3 5 1 TON ENVIRO-TECH 1 TON HEATING/COOLING COIL 2.7 10.4 1/15 240 1 5.5/5.8 60 4. Temporary electrical,water,heating or cooling Revised 5. Craning/Hoisting of equipment No. By Date 6. All high/low voltage control or power wiring,conduit and electrical connections,contactor 1. JDK 2-27-2017 panels,and motor starters for equipment 2. 7. Cutting,core drilling,or patching of walls,floors,doors,ceilings,or roofs 3. a. 8. Access panels&penetrations,Firestop and caulking Reviewed 9. Overtime and/or shiftwork No. By Date 10. Painting of exposed piping and equipment 1. 2. 11. Concrete and/or steel equipment supports and foundations 3. 12. Toilet accessories a. 13. Antifreeze and Antifreeze charging Drawing 14. Concrete pads for equipment Scale lY4"=1'-0" 15. Shut down and drain down of existing systems size Arch D 16. Hot tapping of live piping systems Date 12-10-2016 By JP 17. Roof curbs Project No. 18. Fire protection General Notes Equipment Schedule 160661-50 19. System Balancing GN-1 Scale: None GN-1 Scale: None Sheet GN-1 E ~ U o C O O 0 North Level 1 Boiler on Concrete Pad p (TYP) In d a in yD 00o _I >_ 59'-6" 10'-6" 64'-3" 25'-3" ° r N N 3 3 S_1 ❑ ❑ cQi in O Q 3 ■� �U 5. LEE-Jo -52 ~2 ONV li; ---- ----- m O I..EO ,I III II « O C W a a a 8 II II �� to II to N o I III I i I I J o 00 i5 i CD HOT WATER d CONTROL VALVEi ZH-6 - ---------- ---------- ------------ ----------- Grow Room See SheetZ-1 � a , a a a . o o �W o (TYP) F-------- N o �� S m_L M 110 N 0 N v ;lICIIIsIli Packaging & OZC-6 IIII IIII bp r 1­o W N00Processing o zc-3 zH-3 II 105 Legend 2/TON N _________ '___ FAN COIL UNIT Grow Room w/Hot Water Heating Coils = =- 104 TON FAN COIL UNIT =°-a !�'- Ea B I q `.5 CHILLED WATER MIXING VALVE 1 TON a Grow Room RISERS TO ❑ FAN COIL UNIT 8 2 See Sheet Z-1 M 1 09 (TYP) LEVEL 2 zc-fo w/Hot Water Heating Coils d fr= =^il ZH-10 CHILLED WATER MIXING VALVE h II n li I' ✓6- a =_________ __________ ____________ ,J —Chilled Water Return - ZH-2e CP- ZC-1 ZH-1 —Chilled Water Supply -- I d9 `g __________- - ___ ___________ --Hot Water Supply ---------------------------- - oli i e e a e a------------- ------------ -' ;; I m --Hot Water Return ------ " HOT WATER --------------------- ° _____________ ------------ ------------- -� II d ;i CONTROL VALVE E o 8 J Future Use a E e I I II II II � L II I� II — I I A, I-. IIII III m � (4)MECH.TEES W/CAP M Dry Room FOR FUTURE PIPING Grow Room Veg. Room " 108 Notes (Unless Otherwise Specified) 0 I; IIII `r a` M L 1. All chiller piping to be supported so that Chiller does notsupport piping weight. L2. Maintain a water treatment program appropriate for all theI TO materials in the heating system. In addition,the pH of theL VE 2 system water is to be maintained between 6.8 and 8.5.3. All piping to be supported so that heat source does not support ----------- --------- ------------ --------- --� Piping weight. ZC 4 III; 4. Vent high spots in piping mains to prevent air locks. ______________ 5. Piping runs to be supported as required. ------- -------------------- 6. Installation to follow all state and local codes where applicable. 7. Notify Delta T Solutions if changes are necessary so the Grow Room design 9 can be modified as required. I uired. M 107 8. All line voltage and low voltage wiring,conduit and Irri gation disconnects shall be furnished and installed by others. 9. Field coordinate/verify all dimensions,voltages,amp draws 0 and conditions before installation. 0 10. Installing subcontractor will be required to cut and modify in Revised 5'-0" the field for proper fit per details. No. By Date li N_ 1. JP B-7-17 11. Installing subcontractor shall assemble parts supplied by Delta 000 T per Detail. 2. 12. Attachments to structure shall be supplied by Installing 3. CAP(TYP) o subcontractor as required. 4 OIS-1 13. Installing subcontractor will be required to measure and cut all Reviewed By No. By Date sections of the threaded rod based on Field Conditions. 1 C-1 h 14. The Installing subcontractor will be required to measure and 2 0000 0000 000 Y cut some sections of Unistrut based on Field Conditions. Oo Oo Oo 0000 o Oo Oo Oo D O r g q 3 0 Oo � � 15. The Installing subcontractor will be required to measure,cut, a. and groove some sections of the Pipe and Insulation based on Drawing AGZ110 Field Conditions. scale Y,^=1'-0^ CHILLER(TYP) 5'-0" 16. All hanging hardware shall be stainless steel,Galvanized,or Aluminum as noted on the Detail. sae Arch D 57'-4" 17. Attachments of hangers to structure shall be by others. Date ff-is-zofs By JP 18. This is a corrosive environment and proper materials must be Project No. used. Level 1 System Piping-Layout 19. Insulation is provided for bare aluminum pipe with-in zones 160661-50 Note: Piping Shown Outside the Greenhouse for Clarity Only. Scale: /8" 1'-0" below the 7 ft.(Off Finished Floor)level in each zone. sheer PL-1 = PL-1 E ~ U o C O O 0 North Level N d o yN 0U _I C� 59'-6" 10'-6" 64'-3" 25'-3" r N N 3 m a°' 3 ❑ ❑ OF eO CU � J E0 3"CWS&CWR m c E o 1.e a , PIPING O F 00 m OI 1Y" 11/2'x1Y4" 3/4"(TYP) 00 4 REDUCERS it O �d 1Y2" oo N(� X oo .+ 2112" 1Y4" 12 . Grow Room 2„x1 z" "x3" a a s e e REDUCERS 3" M 110 REDUCERS 2"x1Yz" 1Y2"x1Y4" a`>p N 2" 1Yz" 1Ya" - O ZC-3 STEELxPVC FLANGES REDUCERS REDUCERS Packaging & o Q� 2"x1Y2" a REDUCERS ZC-6 RE2DUCERS Processing _ w`N 00 1Ya" 1Yz'x1/4' 1Y2" Legend REDUCERS 2Y2" 105 TON FAN d IIIII���llppp FAN COIL UNIT 2 Grow Room o b w/Hot Water Heating Coils 5 2" v ° a ° 104 2%TON 1Yz"x1Y4" FAN COIL UNIT = 1Ya REDUCERS 6"x3" b E 1Y2" REDUCERS I I 2"x1Yz" ZC-5 2"x3" t REDUCERS CHILLED WATER REDUCERS 1 TON o RISERS T a Grow Room MIXING VALVE 2 FAN COIL UNIT 8 t M ( ) 2"x1Y2" 1Yz° 1Y2"x1Y4" 1Ya" ��LEVEL w/Hot Water Heating Coils 109 2" CP- See Sheet Z-1 TYP REDUCERS REDUCERS 2"x1Yz° REDUCERS —Chilled Water Return - 1Ya" 1Yi'x1Y4" 1Yz' -1 -REDUCERS —Chilled Water Supply -CHILLED WATER e aMIXING VALVE so2Yi' 2"x1Yz" 1Yz.x1Y4" F- !C E J 2" REDUCERS 1Yz REDUCERS 1Ya 1Yz J A-J 6 e e-J 2%2"x2 a_E m REDUCERS L 2" m J (2)MECH.TEES W/CAP .E Dry Room FOR FUTUREPIPING Grow Room o Veg. Room o i s �? (TYP) 00 N 108 103 "' 1Y4' T a Notes (Unless Otherwise Specified) F< 0 c 1/2° 4-+ - I I 1. All chiller piping to be supported so that Chiller does not Q� 0) 0 support piping weight. L U 3" 2. Maintain a water treatment program appropriate for all the Y=VET2= TO m materials in the heating system. In addition,the pH of the 2" 2"x1%" 1Yz" 1Y2"x1Y4" 1Y4" system water is to be maintained between 6.8 and 8.5. Q REDUCERS REDUCERS %"x1Y4' 3. All piping to be supported so that heat source does not support > y REDUCERS a a a e piping weight. — 1Y4" 1Yz"x1Ya" REDUCERS 4. Vent high spots in piping mains to prevent air locks. U REDUCERS M ZC-4 5. Piping runs to be supported as required. 6"CWS&CWR J 6. Installation to follow all state and local codes where applicable. PIPING 1Ya" 7. Notify Delta T Solutions if changes are necessary so the Grow Room design can be modified as required. M 107 8. All line voltage and low voltage wiring,conduit and 1Yz" Irrigation disconnects shall be furnished and installed by others. 9. Field coordinate/verify all dimensions,voltages,amp draws 0 and conditions before installation. �Y4, 1Y2"x1Y4" 0 10. Installing subcontractor will be required to cut and modify in Revised REDUCERS the field for proper fit per details. No. By Dale ° e n 11. Installing subcontractor shall assemble arts supplied b Delta 1. JP 3-18-17 6"CWS&CWR 9 P PP Y CAPPED CWS&CWR PIPING T per Detail. 2. 12. Attachments to structure shall be supplied by Installing 3. subcontractor as required. 4 5'-0" 6'-0" Reviewed B S-1 13. Installing subcontractor will be required to measure and cut all No. By y Date sections of the threaded rod based on Field Conditions. C-1 Oo O O �0000�0 14. The Installing subcontractor will be required to measure and z co cut some sections of Unistrut based on Field Conditions.g q3. 15. The Installing subcontractor will be required to measure,cut, and groove some sections of the Pipe and Insulation based on AGZ110 Field Conditions Drawing . CHILLER TYP 5'-0" scale Yr"=1'-0" ( ) � � 16. All hanging hardware shall be stainless steel,Galvanized,or Aluminum as noted on the Detail. $ae Arch o 57'-4" 17. Attachments of hangers to structure shall be by others. Date 11.1szols 18. This is a corrosive environment and proper materials must be By JP Project No. used. Chilled Water Cooling System -Layout 19. Insulation is provided for bare aluminum pipe with-in zones 160661-50 Note: Piping Shown Outside the below the 7 ft.(Off Finished Floor)level in each zone. sheet Greenhouse for Clarity Only. L-1.1 Scale: /8"=1'-0" PL-1.1 O n E T__..... is q Y — V1 O � O O 7 North Level 1 Boiler on Concrete Pad o (TYP) L 4 n N -°-_ 59'-6" 10,_6„ 64'-3" 25,_3" m c N _ �Z,x3„ T� O3" o o N Q _ r ■� C U 5'-521 3�.52" �� c -�--- =1—' Ft LUImm H O --- ------- - - 2 753x2 ONO 00 1Y4'' HOT WATER ? { s .0 000 0= cp CONTROL VALVE w See Sheet Z-1 3 24 "x1Ya" r ry Grow Room Isiss- (TYP) (TYP) =o dt� --� ------ o f-- ii 2" N o C N O �� 03 L[) M 110 + - 1Ya" �� — �oN 3"x2Y2' c—�' Packaging o a i�o -- -_; Processing W N 1Ya" t 1Ya° 105 Legend a ZH-3 n 21/=TON - FAN COIL UNIT GrowRoom o w/Hot Water Heating Coils 00 � ------------ 104 TON n f FAN COIL UNIT 2Y2"x2" - 1Ya' =t Grow Room " 1 TON RISERS TO ❑ FAN COIL UNIT 8 t b LEVEL 2 w/Hot Water Heating Coils d M 109 1Ya" �= , ZH-2 LJ Ii ZH-1 2"x1Ya"_j 1 - 1Ya" } -_ (TYP) m`_ ------- -------- ------ ------- ---Hot Water Supply ----------------------------- 2 8 i - -- -- -- - --- --- - - a e e a e ii `! �-q '�'--^�-------------�'--^�------------ --------- __�'--^�-d-'i i i i'i �� ---Hot Water Return ----------------------------- `m o LJ LJ-------------L J------------ -------- LJ " HOT WATER V^ J r- r- r-I CONTROL VALVE =a J 1, - -- h -- Future Use a �' II 1Ya" i > 1Ya" r Q J (4)MECH.TEES W/CAP 4 D Room FOR FUTURE PIPING Grow Room q Dry Veg. Room 108 (TYP) ;; 2"x1Y2" 103 M 1Y;' m T a in cc (V �� 'ii Notes (Unless otherwise Specified) O rn I I 1. All chiller piping to be supported so that Chiller does not support piping weight. .� y 1t/2" 1 ° 2. Maintain a water treatment program appropriate for all the _ TO 2a i 4 materials in the heating system. In addition,the pH of the at L VE 2 1Ya" system water is to be maintained between 6.8 and 8.5.ZH Q �� jf_______ 3. All piping to be supported so that heat source does not support > ______________ e t ��- -- ____________________- __' piping weight. 4. Vent high spots in piping mains to prevent air locks. 1Ya' ---- ------------- 5. Piping runs to be supported as required. 6. Installation to follow all state and local codes where applicable. ---------- 1Ya" 4' 7. Notify Delta T Solutions if changes are necessary so the Grow Room 1Ya" design can be modified as required. M 107 8. All line voltage and low voltage wiring,conduit and Irrigation disconnects shall be furnished and installed by others. 9. Field coordinate/verify all dimensions,voltages,amp draws C � and conditions before installation. 1Ya" O 10. Installing subcontractor will be required to cut and modify in Revised the field for proper fit per details. No. By Date JP 3-18-17 _ _____ _ ___❑� O O O 11. Installing subcontractor shall assemble parts supplied by Delta 1.e � e --- -- a --- --- a --- - ------- T per Detail. 2. 12. Attachments to structure shall be supplied by Installing 3 1Y4.' subcontractor as required. 4 V-0" Reviewed By 13. Installing subcontractor will be required to measure and cut all No. By Date CAP(TYP) sections of the threaded rod based on Field Conditions. 1 0000O Oo Oo0000 14. The Installing subcontractor will be required to measure and 2. cut some sections of Unistrut based on Field Conditions. 3 0000 O Oo Oo0000 15. The Installing subcontractor will be required to measure,cut, a and groove some sections of the Pipe and Insulation based on Drawing AGZ110 — — — Field Conditions. scale CHILLER(TYP) 16. All hanging hardware shall be stainless steel,Galvanized,or -—- — —- -—- Aluminum as noted on the Detail. spa Arch D 17. Attachments of hangers to structure shall be by others. Data 11-16-2016 sy JP 18. This is a corrosive environment and proper materials must be Project No. used. Hot Water System -Layout 19. Insulation is provided for bare aluminum pipe with-in zones 160661-50 Note:Piping Shown Outside the sheet Greenhouse for Clarity Only. L-1. Scale: Ys"=1'-0" below the 7 ft.(Off Finished Floor)level in each zone. PL-1.2 E ~ U o C O O 0 North Level N d o N 0 U _I >_ 59'-6" 63'-6" 25'-3" r w N 3 m a°' 3 ❑ ❑ OF eO CU � E'o > �� m y C E O EJ e a s a II��II OI~ CONDENSATION LINE � � g 00 �.3 m CD o See Sheet FC-3 000 o r x (TYP) ) Grow Room a a a a a a ��L"O' M 110 CONDENSATION LINE d 2 N See SheetFC-3 Packaging & 6 0- Q) _—LE (TYP) 02. 0-o RUN CONDENSATION Processing _ W N ccoo LINE TO DRAIN Legend (By Others) 105 ° TON FA d IIIII���llppp� FAN COIL UNIT Grow Room o w/Hot Water Heating Coils Z_ n p n n a a a a 104 2%TON - b FAN COIL UNIT -20 I I p'o 1 TON Grow Room FAN COIL UNIT 8 9 RUN CONDENSATION RISERS TO ❑ M 1 09 w/Hot Water Heating Coils d LINE TO DRAIN LEVEL 2 (By Others) RUN CONDENSATION Li Li —Condensation Line LINE TO DRAIN _- (By Others) a a a a - e e Ek RUN CONDENSATION ;a J LINE TO DRAIN a E J (By Others) - N _ L m M Dry Room Grow Room o Veg. Room y 103 Co 0_ N108 CL Notes (Unless Otherwise Specified) 0 J r a` �+ c I 1. All chiller piping to be supported so that Chiller does not L o support piping weight. .� N 2. Maintain a water treatment program appropriate for all the f+ s RISERS TO RUN CONDENSATION materials in the heating system. In addition,the pH of the = L LEVEL 2 LINE TO DRAIN system water is to be maintained between 6.8 and 8.5. Q c (By Others) O na a 8 a a 3. All piping to be supported so that heat source does not support > U a a a a piping weight. 4. Vent high spots in piping mains to prevent air locks. 5. Piping runs to be supported as required. 6. Installation to follow all state and local codes where applicable. 7. Notify Delta T Solutions if changes are necessary so the Grow Room design can be modified as required. 107 8. All line voltage and low voltage wiring,conduit and Irrigation disconnects shall be furnished and installed by others. Room 9. Field coordinate/verify all dimensions,voltages,amp draws RUN CONDENSATION and conditions before installation. LINE TO DRAIN 10. Installing subcontractor will be required to cut and modify in Revised (By Others) the field for proper fit per details. Nu. By Data a 11. Installing subcontractor shall assemble parts supplied by Delta 1. T per Detail. 2. 12. Attachments to structure shall be supplied by Installing B. subcontractor as required. 4 5'-0" o Reviewed By 0 13. Installing subcontractor will be required to measure and cut all r,* BY Data sections of the threaded rod based on Field Conditions. OOoOOOOo14. The Installingsubcontractor will be required to measure and Y co cut some sections of Unistrut based on Field Conditions. OO 00 O g q OOOOo � 15. The Installin subcontractor will be re uired to measure,cut, and groove some sections of the Pipe and Insulation based on Drawing Field Conditions. scale Y,^=V-o" 16. All hanging hardware shall be stainless steel,Galvanized,or size Arch D Aluminum as noted on the Detail. 5T-4" 17. Attachments of hangers to structure shall be by others. Date if-fszofs By JP 18. This is a corrosive environment and proper materials must be Project No. used. Condensation Lines- Layout 19. Insulation is provided for bare aluminum pipe with-in zones 160661-50 Note: Piping Shown Outside the L-1.3 Scale: /8"=1'-0" below the 7 ft.(Off Finished Floor)level in each zone. sheet Greenhouse for Clarity Only. PL-1.3 E ~ U o W Supply&Return Lines o Shown on South wall North Level o d a q7 yD r� N N 3 o am 3 ❑ ❑ cQi F e O C U 3 o 700 m y C E O N c OC I—OND 3 m. 00 O d N; C o r IY to �o A-0 ti2L? �a d0N A+90 V/ E-7:L? a IZ O �01 W N O as `o HWS&HWR z 5s LINES w CWS&CWR Y V oa LINES o 5 o E d N a 0 ��W `° 0 — 0 W a— O LL °D 8 t m Ev° J J - N > �N L J A Corridor Lines-South Wall Elevation t c L-1.4 Scale: Y4"=1'-0" L Notes (Unless Otherwise Specified) ° a Q W a` a.+ 1. All chiller piping to be supported so that Chiller does not L support piping weight. .� t 2. Maintain a water treatment program appropriate for all the f+ materials in the heating system. In addition,the pH of the = L n r system water is to be maintained between 6.8 and 8.5. Q 3. All piping to be supported so that heat source does not support > 0a piping weight. 4. Vent high spots in piping mains to prevent air locks. iJ 5. Piping runs to be supported as required. 6. Installation to follow all state and local codes where applicable. 7. Notify Delta T Solutions if changes are necessary so the design can be modified as required. 8. All line voltage and low voltage wiring,conduit and HWS&HWR disconnects shall be furnished and installed by others. LINES z 9. Field coordinate/verify all dimensions,voltages,amp draws CWS&CWR w and conditions before installation. 10. Installing subcontractor will be required to cut and modify in Revised Lu LINES 0 the field for proper fit per details. No. By Data o Z v 11. Installing subcontractor shall assemble parts supplied by Delta a X T per Detail. z. �W 3. w 12. Attachments to structure shall be supplied by Installing o subcontractor as required. 4 LL 4 13. Installing subcontractor will be required to measure and cut all Reviewed By co No. By Date sections of the threaded rod based on Field Conditions. 14. The Installing subcontractor will be required to measure and z cut some sections of Unistrut based on Field Conditions. a 15. The Installing subcontractor will be required to measure,cut, 4. and groove some sections of the Pipe and Insulation based on Drawing Field Conditions. scale Y,^=V-o^ 16. All hanging hardware shall be stainless steel,Galvanized,or Aluminum as noted on the Detail. size Arch D 17. Attachments of hangers to structure shall be by others. Date 11.1s2016 BY JP 18. This is a corrosive environment and proper materials must be Project No. used. Corridor Lines-Section 19. Insulation is provided for bare aluminum pipe with-in zones 160661-50 Note: Piping Shown Outside the Greenhouse for Clarity Only. Scale: 1/8"=1'-0" below the 7 ft.(Off Finished Floor)level in each zone. Sheet L-1.4 PL-1.4 O E T__..... O to O O 7 North Level N t 4 a {U) Ea 66 M o N N CWS&CWR ; >,� LINES o o f .O C U HWS&HWR 8� LINES q E o S O �H� p$ L D n d U)w -000 yo c O d N L? oa Or-0 C r_0 s°= III N00 Legend 2. TON FA o FAN COIL UNIT w/Hot Water Heating CoilsLl `a 8d FA TON a a (4)SADDLE TEE 1.25"X 3/4"FOR FAN COIL UNIT HEATING AND COOLING(TYP) L] (2)SADDLE TEE _ 1.25"X 3/4"FOR COOLING 1 TON N_ (2)SADDLE TEE (TYP) FAN COIL UNIT 8 5 1.25"X 1/2"FOR HEATING w/Hot Water Heating Coils (TYP) 3-WAY HOT WATER —Chilled Water Return 8 t ----- --------� = c Connection to Main Lines-Section CONTROL VALVE —Chilled Water Supply L-1.5 Scale: Ys"=T-0" See Sheet Z-5 --Hot Water Supply =8 (TYP) ❑ ❑ pPy ----------------------------- _ ---Hot Water Return ----------------------------- '" U ------�� 4D, s 1 TON FAN COIL ?a J J (TYP)See Sheet FC-5 - J _ o E N FAN COIL ON LEVEL 2 W/ 2--WAY CHILLED DUCTING DOWN TO LEVEL 1 s WATER MIXING VALVE (Shown for Clarity) Q See Sheet Z-D1 _ 1.25"PIPING OFF MAIN L a SUPPLY AND RETURN(TYP) r_ E Notes (unless otherwise Specified) F a Q Packaging & 1. All chiller piping to be supported so that Chiller does not to support piping weight. L 2. Maintain a water treatment program appropriate for all the '— (2)SADDLE TEE Processing �+ ro materials in the heating system. In addition,the pH of the > 1.25"X 1/2"FOR HEATING 1/2"PIPING OFF MAIN J (TYP) SUPPLY AND RETURN(TYP) system water is to be maintained between 6.8 and 8.5. Q 105 3. All piping to be supported so that heat source does not support > i piping weight. 4. Vent high spots in piping mains to prevent air locks. - ------------ --------------------------------- ° ❑ 5. Piping runs to be supported as required. Ile FAN COIL 6. Installation to follow all state and local codes where applicable. (2)SADDLE TEE See Sheet FC-4 7. Notify Delta T Solutions if changes are necessary so the 1.25"X 3/4"FOR COOLING ZLILILL-1 for connections (TYP) (TYP) design can be modified as required. 8. All line voltage and low voltage wiring,conduit and disconnects shall be furnished and installed by others. Irrigation 9. Field coordinate/verify all dimensions,voltages,amp draws i and conditions before installation. 10. Installing subcontractor will be required to cut and modify in Revised the field for proper fit per details. No. By Date (2)SADDLE TEE 0 11. Installing subcontractor shall assemble parts supplied by Delta t' JP 6-ts-n 1.25"X 1/2"FOR HEATING T per Detail. 2. (TYP) " 0 a. 12. Attachments to structure shall be supplied by Installing " subcontractor as required. 4 -- ❑ I 13. Installing subcontractor will be required to measure and cut all Reviewed By No. By Date 00 sections of the threaded rod based on Field Conditions. 1. 0 ❑------d 14. The Installing subcontractor will be required to measure and 2. sa H_______.1 cut some sections of Unistrut based on Field Conditions. s (2)SADDLE TEE 15. The Installing subcontractor will be required to measure,cut, 1.25"X 3/4"FOR COOLING 4 (TYP) and groove some sections of the Pipe and Insulation based on Drawing Field Conditions. s<aie a/a =I'•a 16. All hanging hardware shall be stainless steel,Galvanized,or Aluminum as noted on the Detail. siza Arch D 17. Attachments of hangers to structure shall be by others. Data 3-28-2017 By JP 18. This is a corrosive environment and proper materials must be Project No. used. Level 1 Fan Coil Piping- Layout 19. Insulation is provided for bare aluminum pipe with-in zones 160661-50 Note:Piping Shown Outside the sheet Greenhouse for Clarity Only. PL-1.s Scale: 3/s"=1'-0" Level 1 Fan Coil Piping- Layout below the 7 ft.(Off Finished Floor)level in each zone. PL-1.5 Scale: 3/6"=V-0" P L-1.5 C E ~ U o N O O 0 North Level N d i N 000 E o �, "y N N 3 o am 3 0 60'-0" MU�Q 3 do �co O r.. C.)V m y C E O ao 8 8 8 e 3 cc 4)0 « L t� II 0 G1('n X �i FAN COIL ON LEVEL 2 W/ c Grow Room Ii DUCTING DOWN TO LEVEL 1 o r >n�LC'0' � I (Shown for Clarity) F a �� ti � 205 O5 � /��\ 00N V/ —lr) a Q TIC O �I Clone W N ao Legend !' Room 2%TON = r • ___________ ___________ ___________ __- -_=J' r����i b FAN COIL UNIT A- 206 L w/Hot Water Heating Coils 8 --------------- 8 ___----------- • -------------- ZC.9 2'/x TON o b FAN COIL UNIT .a�- I. .il PPP ZH-9 Ili v m �, I� 1 TON w.. Grow Room p FAN COIL UNIT 8 t o ;I II; RISERS FROM LEVEL1 zc-foHeating d � I I I O � w/Hot Water Coils ` ��4 Zone Valves located on ZH-8 zH-fo N C HOT WATER ii -----i level CONTROL VALVE _ f —Chilled Water Return - See Sheet Z-2 —Chilled Water Supply - (TY P) --Hot Water e • a e Supply ------------- - 0, Hot Water Return ------- t." V A Level 2 System - Layout « J Scale: Y8"=V-0" a E J (4)MECH.TEES W/CAP - FOR FUTURE PIPING Q c TYP Dry Room " C E fV 203 II v n N T II� Notes (Unless Otherwise Specified) a r 4 Q 2 N 1. All chiller piping to be supported so that Chiller does not Q� RISERS FROM p p g PP L Cl y LEVEL1 _ a support piping weight. .� N ZH-7 ----- • 2. Maintain a water treatment program appropriate for all the materials in the heating system. In addition,the pH of the = ZC-7 system water is to be maintained between 6.8 and 8.5. Q J r 3. All piping to be supported so that heat source does not support > • • ° • CHILLED WATER piping weight. MIXING VALVE 4. Vent high spots in piping mains to prevent air locks. See Sheet Z-1 5. Piping runs to be supported as required. (TYP) 6. Installation to follow all state and local codes where applicable. 7. Notify Delta T Solutions if changes are necessary so the Grow Room design can be modified as required. 0 2�2 8. All line voltage and low voltage wiring,conduit and M , disconnects shall be furnished and installed by others. 9. Field coordinate/verify all dimensions,voltages,amp draws and conditions before installation. 10. Installing subcontractor will be required to cut and modify in Revised the field for proper fit per details. No. By Data • 11. Installing subcontractor shall assemble parts supplied by Delta 1. _______________ T per Detail. z. 12. Attachments to structure shall be supplied by Installing B. subcontractor as required. 4 54'-0" 5'-0" Reviewed By 13. Installing subcontractor will be required to measure and cut all No. By oate sections of the threaded rod based on Field Conditions. 14. The Installing subcontractor will be required to measure and z cut some sections of Unistrut based on Field Conditions. 8 15. The Installing subcontractor will be required to measure,cut, 4. and groove some sections of the Pipe and Insulation based on brewing Field Conditions. scale Yr^=V-a• 16. All hanging hardware shall be stainless steel,Galvanized,or Aluminum as noted on the Detail. $ae Arch o 17. Attachments of hangers to structure shall be by others. Date 11.1 szois By JP 18. This is a corrosive environment and proper materials must be Project No. used. �� Level 2 System-Layout 19. Insulation is provided for bare aluminum pipe with-in zones 160661-50 Note: Piping Shown Outside the below the 7 ft.(Off Finished Floor)level in each zone. sheet Greenhouse for Clarity Only. PL-2 Scale: Y8"=V-0" P L-2 C E ~ U o W O O 0 North Level N d a N 000 E o �, r� N N 3 o am 3 0 60'-0" MU�Q 3 do �co ~2 ONV Hill m y C E p C e a a s Nc 0 �F ONO ♦♦^^ CO 0 0O �3 v/ imp 1Ya'CWS& Z1Y2"x1Ya" s o00 o r i° CD _ CWR PIPING REDUCERS x o FAN COIL ON LEVEL 2 W/ Grow Room 1Y2"CWS& DUCTING DOWN TO LEVEL 1 o r >n�°D o CWR PIPING (Shown for Clarity) N g° �� N 0 ti 205 d0N - 0 °' 1Y4"CWS& 1Y2"x1Y4" 1Y2" 2"xly2" Clone gY W N°° CWR PIPING REDUCERS REDUCERS Legend a a Room TON d 206 FA IIIII���llppp b FAN COIL UNIT °- w/Hot Water Heating Coils 5 ZC-9 a a a a 2%TON FAN COIL UNIT 1ya"CWS& b CWR PIPING REDUCERS 2 2"CWS& '2 CWR PIPING = 1 TON a Grow Room p FAN COIL UNIT 8 t 0 RISERS FROM LEVEL1 w/Hot Water Heating Coils 204 d 1Y2"CWS& Zone Valves located on CWR PIPING level 1 —Chilled Water Return - 1%"CWS& 1Y2"x1Y4" 1Ya"CWS& —Chilled Water Supply CWRPIPING REDUCERS CWR PIPING ZC-8 3"x2Y2" c° U REDUCERS J L-2. A Chilled Water Cooling System - Layout ;d J N Scale: Y8"=V-0" a - L d (2)MECH.TEES W/ - J CAP FOR FUTURE _ Q E PIPING(TYP) q g Dry Room rn N 203 3"CWS& Notes (Unless Otherwise Specified) r a a Q c CWR PIPING a.+ - 1. All chiller piping to be supported so that Chiller does not Q� RISERS FROM p p g pp L 00 LEVEL1 support piping weight. 2. Maintain a water treatment program appropriate for all the materials in the heating system. In addition,the pH of the = io ZC-7 3„ system water is to be maintained between 6.8 and 8.5. Q 3. All piping to be supported so that heat source does not support > y Tcws&7",,�-�,Y, ZWS& �2.%.' piping weight.CHILLED WATER .1 MIXING VALVE 4. Vent high spots in piping mains to prevent air locks. 10 CWR PIPING REDUCERS CWR PIPING REDUCERS See Sheet Z-1 5. Piping runs to be supported as required. (TYP) 6. Installation to follow all state and local codes where applicable. 7. Notify Delta T Solutions if changes are necessary so the Grow Room design can be modified as required. 0 2"CWS& 8. All line voltage and low voltage wiring,conduit and 202 CWR PIPING disconnects shall be furnished and installed by others. 9. Field coordinate/verify all dimensions,voltages,amp draws and conditions before installation. 1Y4"CWS& 1Y2"x1Y4" 10. Installing subcontractor will be required to cut and modify in Revised CWR PIPING REDUCERS the field for proper fit per details. No. By Data 11. Installing subcontractor shall assemble parts supplied by Delta T per Detail. 2. 12. Attachments to structure shall be supplied by Installing 3. subcontractor as required. 4 5'-0" Reviewed By 13. Installing subcontractor will be required to measure and cut all No. By Dale sections of the threaded rod based on Field Conditions. 14. The Installing subcontractor will be required to measure and 2. cut some sections of Unistrut based on Field Conditions. 3 15. The Installing subcontractor will be required to measure,cut, 4. and groove some sections of the Pipe and Insulation based on Drawing Field Conditions. scale Yr^=V-a• 16. All hanging hardware shall be stainless steel,Galvanized,or Aluminum as noted on the Detail. $ae Arch o 17. Attachments of hangers to structure shall be by others. Dare 11.1 szois aY JP 18. This is a corrosive environment and proper materials must be Project No. used. �� Scale: Ya"=1'-0"Chilled Water Cooling System- Layout 19. Insulation is provided for bare aluminum pipe with-in zones 160661-50 Greenhouse for Clarity Only. Note: Piping Shown Outside the below the 7 ft.(Off Finished Floor)level in each zone. sheet L-2. PL-2.1 C E ~ U o W O O 0 North Level N d a N U V' E o r r� N N 3 o am 3 60'-0" do �oo ~2 ONV m y C?T E O O C �I N c OI~00 g 00 �3 Em0 1Ya" e o00 o s 'I F din x �i FAN COIL ON LEVEL 2 W/ c Grow Room 1 DUCTING DOWN TO LEVEL 1 o r >nW� 205 �4 (Shown for Clarity) F a �� L MN US 46 N a Q r O 00 Clone LY w N Legend r--ry �•--'} �•--'} �•--'� ,, Room 2%TON = _=LJ----------= 206 b FAN COIL UNIT 2"x1Y4"TEE y P w/Hot Water Heating Coils {t�� � _ -------- _ _____________= 2'/:TON • i' T i b FAN COIL UNIT 1 a�- 44 LI PPP Y4" L�- 2„ ZH-9 2"x1Ya" a �, � 1 TON - Grow Room 1Y4.. 2"x1Y4" TEE p FAN COIL UNIT 8 t 20^ RISERS FROM LEVEL1 w/Hot Water Heating Coils d �+ Zone Valves located on m ZH-8 !, • • d a HOT WATER i; ----- level 1 ______ __ _. f-----ii --- o w CONTROL VALVE _ — , See Sheet Z-2 1Y4"HWS&HWR - 1Y4" (TYP) PIPING(TYP) — --Hot Water Supply ----------------------------- - •q •q-------------- • �•�' --Hot Water Return ------- c V LJ LJ--------------- LJ --------------------- J A Hot Water Heating System - Layout J L-2. Scale: Y8"=T-0" a E_ N - N _ L � (2)MECH.TEES W/CAP - d 10 FOR FUTURE PIPINGs. J (TYP) g E Dry Room w In 2„ N Notes (Unless Otherwise Specified) r 4 203 " 2"x1Ya"TEE 1. All chiller piping to be supported so that Chiller does not Q� �+ c RISERS FROM 2„ p p g pp L io LEVEL1 __ __------ support piping weight. .� ZH-7 ----- • 2. Maintain a water treatment program appropriate for all the f+ _ materials in the heating system. In addition,the pH of the = L 0+ system water is to be maintained between 6.8 and 8.5. Q io 3. All piping to be supported so that heat source does not support > piping weight. o 2 4. Vent high spots in piping mains to prevent air locks. 1Ya 5. Piping runs to be supported as required. 6. Installation to follow all state and local codes where applicable. 7. Notify Delta T Solutions if changes are necessary so the Grow Room design can be modified as required. 0 1Ya 8. All line voltage and low voltage wiring,conduit and M 202 disconnects shall be furnished and installed by others. 9. Field coordinate/verify all dimensions,voltages,amp draws and conditions before installation. 1Y4" 10. Installing subcontractor will be required to cut and modify in Revised the field for proper fit per details. No. By Data 1. • 11. Installing subcontractor shall assemble parts supplied by Delta ------- --------____ T per Detail. 2. 12. Attachments to structure shall be supplied by Installing 3. subcontractor as required. 4 5'-0" Reviewed By 13. Installing subcontractor will be required to measure and cut all No. By oate sections of the threaded rod based on Field Conditions. 14. The Installing subcontractor will be required to measure and z cut some sections of Unistrut based on Field Conditions. 3 15. The Installing subcontractor will be required to measure,cut, 4. and groove some sections of the Pipe and Insulation based on g Drawin Field Conditions. spin Yr^_ -o^ 16. All hanging hardware shall be stainless steel,Galvanized,or Aluminum as noted on the Detail. $ae Arch D 17. Attachments of hangers to structure shall be by others. Date 11.1 szois BY JP 18. This is a corrosive environment and proper materials must be Project No. used. Hot Water Heating System- Layout 19. Insulation is provided for bare aluminum pipe with-in zones 160661-50 Note: Piping Shown Outside the Greenhouse for Clarity Only. Scale: Ya"=1'-0" below the 7 ft.(Off Finished Floor)level in each zone. sheet L-2. PL-2.2 C E ~ U o W O O 0 North Level N d a N U V' E o r r� N N 3 RUN CONDENSATION �6 O am 3 �Q 3 60'-0" LINE TO DRAIN �F e� �U (By Others) dE.o 0 700 m y C E O lo C e e a a Nc ♦O^ OI~W CONDENSATION LINE a o � �N� V♦ Cmm See Sheet FC-3 in" -- (TYP) =o :: ca Grow Room _ o C N O ZD 205 a N 0 N 90 A\ c�LO RUN CONDENSATION a LINE TO DRAIN Q c 04 00 o (By others) Clone Legend e� w N Room 2%TON 206 II II FAN COIL UNIT IIII. Il�p w/Hot Water Heating Coils n 2%TON -15 - II II b FAN COIL UNITEl a IIII. ape 5'o RUN CONDENSATION =_ LINE TO DRAIN 1 TON a Grow Room (By Others) FAN COIL UNIT 8 t 204 w/Hot Water Heating Coils d —Condensation Line - o L" V A Chilled Water Cooling System - Layout oE 8 J L-2.3 Scale: Y8"=1'-0" a E J _ L N Q � _ tv Dry Room NCle 203 Notes (Unless Otherwise Specified) r 4 0 iJ C 1. All chiller piping to be supported so that Chiller does not L 0) O support piping weight. .� N 2. Maintain a water treatment program appropriate for all the materials in the heating system. In addition,the pH of the = system water is to be maintained between 6.8 and 8.5. Q c O nn 3. All piping to be supported so that heat source does not support > U a a a a piping weight. 4. Vent high spots in piping mains to prevent air locks. 5. Piping runs to be supported as required. 6. Installation to follow all state and local codes where applicable. 7. Notify Delta T Solutions if changes are necessary so the 'm Grow Room design can be modified as required. 0 202 8. All line voltage and low voltage wiring,conduit and disconnects shall be furnished and installed by others. 9. Field coordinate/verify all dimensions,voltages,amp draws and conditions before installation. 10. Installing subcontractor will be required to cut and modify in Revised the field for proper fit per details. Nu. By Data 11. Installing subcontractor shall assemble parts supplied by Delta T per Detail. 2. 12. Attachments to structure shall be supplied by Installing 3. subcontractor as required. 4 5'-0" Reviewed By 13. Installing subcontractor will be required to measure and cut all Nn. By Dale sections of the threaded rod based on Field Conditions. 14. The Installing subcontractor will be required to measure and z cut some sections of Unistrut based on Field Conditions. 3 15. The Installing subcontractor will be required to measure,cut, 4. and groove some sections of the Pipe and Insulation based on Drawing Field Conditions. scale Y."V-a• 16. All hanging hardware shall be stainless steel,Galvanized,or Aluminum as noted on the Detail. size Arch D 17. Attachments of hangers to structure shall be by others. Dare if-lszois By JP 18. This is a corrosive environment and proper materials must be Project No. used. Condensation Lines-Layout 19. Insulation is provided for bare aluminum pipe with-in zones 160661-50 Note: Piping Shown Outside the Greenhouse for Clarity Only. Scale: ya'=1'-0" below the 7 ft.(Off Finished Floor)level in each zone. sheet L-2.3 PL-2.3 MOD: 1222o Equipment Schedule Piping Schedule g Item Description Part No. Qty Item Description Part No. Qty o In C 1 CHILLER UNIT AGZ130 1 P PIPE STEEL ROLLED SCH 10 3.00"X 21' DSP30010-252R AR 2 IBELIMOACTUATOR PER DESIGN 1 E ELBOW GROOVED 90"3.00" DSE300 5 ® o BV BUTTERFLY VALVE GROOVED 3.00" DSV300 2 Chiller C COUPLING GROOVED RIGID 3.00" DSCR300 13 ? £o FL 3"GRUVLOK FLANGE SET DEFCG30 2 �.rn 3r.3 S1 CHANNEL(GALV.)1.625" DSMU AR O y Q 3 �� ■� =U S2 STRUT CLAMP(PLATED)3.00" DSMC300 AR do v >0tb 1 ~- C (D V ro y C E O N c OC w I—OND �3 _I �mO {0 ems+CO p L x 111— d rn N; C o 2 Ol U-) No �� ti Ntoni 0 m 0 0 N Chiller . AY/1 e_"o to °a W�p BV 2 CWR 0 W C14 00 FL O Y p E to E SEE DRAWING C-2 1 _ FOR SECONDARY LOOP PIPING ♦ C DETAILS. 0-6 E CWS i01 CWRR CWS CWR O O °m tY W 2 OK OC - B Chillers Supply- Piping Detail cam') FL1 =- C-1 Scale: 1"=V-0" -- rN U Ev° J C. a E L ° O O au a Q 3 d R P ra a 0 J Chiller BV L }Ir L 1 / O O BV C p E Revised Ell CWR No. By Dale 1. 2. 3. 4. 0 Reviewed By 31 O O No. By Date V 2. O 3. 4. 0 CWS Drawing w g i Y,"=1'-D" $ize Arch D CWRR CWS CWR Date 12-09-2016 By JP Project No. Chillers Return-Piping Detail Chillers End-End- Layout 160661-50 C-1 Scale: 1"=1'-0" C-1 Scale: Yz"=1'-0" Sheet C-1 MOD: 1222o Equipment Schedule Piping Schedule g Item Description Part No city Item Description Part No city o In 1 AIR SEPARATOR DEAS600 1 P PIPE STEEL 6.00" DSP60010-252R AR o 2 AIR VENT DEAV075M 1 E ELBOW GROOVED 90°6.00" DSE600 4 ° o 3 EXPANSION TANK DEESX110 1 T TEE GROOVED 6.00" DST600 2 Q'a H 4 REGULATOR DEVPR050 1 CP CAP GROOVED 6.00" DSCAP600 2 ? £o 5 PRESSURE GAUGE DEGPO60 1 BV BUTTERFLY VALVE GROOVED 4.00" DSV400 4 to N 333 E 1 p 6 THERMOMETER DET60 2 TO TEE-REDUCING HCX G 6.00"x3.00" DSTR600300 6 7 SENSOR W/WELL DECW 1 Tr2 TEE-REDUCING HCX FTP 6.00"x0.50" DSTR600300 3 M 8 PRESSURE SWITCH DEGPS 1 C1 COUPLING GROOVED RIGID 6.00" DSCR600 15 E o > =N C2 COUPLING GROOVED RIGID 3.00" DSCR300 6 m„ E o CT COUPLING THREADED GALV 0.50" DSCGO50 1 O ot~00 Br BUSHING GALV HEX 1.25"x.05" DSHBG125050 5 3 m o FL 61N 125#GRUVLOCK FLANGE DEFCG60 2 o i°. Boiler Piping -Side Detail N NIPPLE GALV 0.50"x1.50" DSNG050015 1 F d C-2 Scale: 5/8"=V-0" c o t Ol t22 n° }+ ti N L 0 V v 4)0 N aa -I'_O ° W N 00 o o m =`o c F5 55 E a' Connections to Section Pump =_ Station I = SEE DETAIL"B" d Connections From Chiller ? Supply o r Future Boiler C SEE DRAWINGC-3 L�----- CWR y — — - FOR OVERALL 0 LAYOUT DETAILS. CWS Q Q L—�--- a a a J Q CWRR Q Q J � a? o Connections From Chiller -_ L w Supply Connections From Chiller 0) A Connections From Chiller Return 9 4.0 Q 0 Q Return _ p" L 9T a 0 aSEE AWING FW-1 FOR AIR UATOR DETAILS O C2ROTATE ELBOWS TO ALLOW \Connections to FOR UNISTRUT SUPPORT / N Zane and UNISTRUT SUPPORT INSTALLATION Section Pump Tr2 RETURN LOOP P INSTALLATION TYP y y SEE DRAWING FW-1 FOR C2 7 SECTION VIEW C-C EXPANSION TANK DETAILS Connect New System Piping Tr1 cT Connections to C2 to Existing System Pump N Chiller Supply a Tr2 ZONE SUPPLY a a Tr1 C1 3 CP L Revised No. By Dale 1. 2. Connections to SECTION VIEW B-B Connections to 3. Chiller Return C2 Chiller Return C2 4 C1 Tr1 REVERSE RETURN Tr1 Reviewed By CID * LOOP * * E Nn. By Dale 1. z. 3 4. SECTION VIEW A-A Drawing scale %"=1'-0" $ize Arch D Date 12-10.2016 By JP Project No. Secondary Chiller Loop-Detail 160661-50 Sheet C-2 Scale: 5/B"=1'-0" C-2 ,_ r o o N c 0 0 ur 08 66 O yQ �r ■� 00 do >500 r_ ONV ro y C E p C ONo 3 C m m ea)CO p L d U)w N; C 12 O t �No � ti N � L 0 r a � d Q N N 90 E V/ C�L? 0. +A O ° W N Do o o m =`o To Zones - - - - - Building - - - - - it A - PUMP STATION E See Sheet CP-1 Air separator and Feed wale a Sheet FW N C -- - -- -- -- -- -- -- -- -- -- -- -- -- -- - -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -1�.Q 8 water t CWRR + A CWS 4- L CWR o - - . J o a o j E0000 a� Q m 1 0000 0000 I c ++ U �,1 a ( C 0000 0000 0000 1 l r LT-0" 16'-0" 4'-0" 16'-0" 4'-0" 16'-0" / ' 2 -- -- -- -- ----- -- -- -- -- -- -- ----- -- -- ------- Service/Air Intake Clearance --- ----- -- -- -- ----- -- -------- - --J r 61'-11 Revised No. By Dale 1. 2. 3. 4. Reviewed By No. By Date 1. 2. 3. 4. Drawing Scale Y,"=1'-0" $ize Arch D Date 12-09.2016 By JP Project No. Chillers End-End-Layout 160661-50 C-3 Scale: 3/s°=1'-0" Sheet C-3 C2 T Equipment Schedule 0 Item Description Part No. Qty o 0) C E 1 CHILLER PUMP GRUNDFOS-LCSE 2 a o 0 0 cws Piping Schedule <a o IEn g o Item Description Part No. Oly m P1 PIPE STEEL ROLLED SCH 10 4.00"X 21' DSP40010-252R AR m; O > 3 P2 PIPE STEEL ROLLED SCH 10 6.00"X 21' DSP60010-252R AR F 0 01 U 3 P2 E ELBOW GROOVED 90"6.00" DSE600 2 — }I •� C1 COUPLING GROOVED RIGID 4.00" DSCR400 12 d o > aD CV C2 COUPLING GROOVED RIGID 6.00" DSCR600 8 ~c 2 E o R2 me8 � � ')'I*a1- BV1 BUTTERFLY VALVE GROOVED 4.00" DSV400 4 u O �F 000 BV2 BUTTERFLY VALVE GROOVED 6.00" DSV600 1 3 c m o } } C1 CV CHECK VALVE GROOVED 4.00" DSCV400 2 in� %'�� 0) x R1 REDUCER CON GROOVED 4.00X3.00 DSR400300 2 F :+ a BV1 . R2 REDUCER CON GROOVED 6.00X4.00 DSR600400 4 0 c � ao T TEE GROOVED 6.00" DST600 2 `± c m 0 Tr TEE-REDUCING HCxF 6.00"xO.50" DSTR600050 1 d 0 N �o «to � FL1 4"GRUVLOK FLANGE SET DEFCG40 2 0 p1 FL2 3"GRUVLOK FLANGE SET DEFCG30 2 C ° W N OD DV DRAIN VALVE,0.50"W/CAP&CHAIN DSV050HTDC 1 0 `o o c 3 55 R1 FL f P2 FM o j O Flange to top of PumpCWR49 :i -��; %I Discharge Piping- Detail o O j CP-1 Scale: 2"=V-0" From - j Tr Chiller =- Dv o 0 o Source V J cwS _ N - E 2M L C2 To O O O .E Q p 0 o C1 Chilled C1 a Zone � � BV1 �< E O CV j R2 ,� d C O > O O BV1 j FL1 � j Flange to top FL2 of Pump FL1 cP-1 O O j O O O C = Flange to top of Pump CWS R1 I 1 FL2 O O O O O O O O O FL1 Piping From Revised P1 Chiller ( N". By Date CP-1 1. B 2. 3. 4.Reviews By 0 1 No. By Date 1. 2. O O O 3. OO Support as required 4. g II ° Scale %"=1•-0" � 8 Size Arch D O ® O O O Date 12-09.2016 BY JP Project No. Chiller Pump-Elevation Chiller Pump Station- Plan View 160661-50 CP-1 Scale: 2"=V-0" CP-1 Scale: 2"=V-0" Sheet CP-1 O Note:All Chiiled Water Piping shall be wo E insulated. o rn c 0 o 0 0 w �U � GE1�-O m c N .O 1 00q00 E�c do 3 m p 05 O O R a co I-- n' w a t a1 oo 4� N0 N O 3 d�N BG �7� c-No W s°= NDO o O O o EG a s NG1 - TG — HB1 8 HC `6 O -- HB2 BV €a H HC CWR EG CWR g H61 P m HC l 2 a8 CWS J CWS =� \ Uo 0, H HC NG2 A Br1 T2 'a J HB1 a E J HWS OI HWS L rn q' c O HWR O OI, HWR L �Y 0 0'', a a ° o i � U � 0 .� Condensate Condensate LL N N 2 Equipment Schedule Item Description Part No. city 1 2-1/2 TON FAN COIL UNIT CWVFC-2500 1 2 FLOW CONTROL 3/4" DEFRL075-0060 1 3 AIR VENT DEAV012M 1 Revised No. By Date Piping Schedule 1. Item Description Part No. 4ty Z. H 3/4"HOSE DEH075 AR 3. EG ELBOW GALV.FPT 0.75 DSEG075 2 a Reviewed BV BALL VALVE PVC SCH 80 0.75" DPV075 2 No. By Date BG BUSHING GALV.HEX 0.75XO.125" DSHBG075012 1 1 Br1 BUSHING PVC SCH 80 SXS 'PER DESIGN 2 2' 3. A ADAPTER FPT PVC X BRASS PER DESIGN 1 a. TG TEE GALV FPT 0.75 DSTG075 1 Drawing HC HOSE CLAMP DMHC75 4 scale 2Ya"=1•-O" 1-161 BRASS HOSE FITTING 3/4 MPT X 3/4 ID DSHF075XO75 3 she Arch D H62 HOSE BARB PVC SCH 40 S X 0.75" DPNH075 1 Data 12.10.2016 N1 NIPPLE GALV 3.00X.75 DSNG3000075 1 By JDK Project No. N2 NIPPLE GALV.0.75X1.50 DSNG075015 1 REFER TO PL SHEETS FOR PIPE SIZES �2%2 Ton Fan Coil -Cooling Fan Coil -Cooling 160661-50 Sheet FC-1 Scale: 2%a"=V-0" FC-1 O Note:All Chilled Water Piping shall be wo E insulated. o rn c 0 o 0 0 w 4`&U / � � GE1�-O m c N .O 0 0 0 F° C U N 1 00m c E0 N� OC �I"D 3 (j) m p O to 05 h n° � w 3 i t at 0 BG1 �o j m 0 HC EG ~° N HB EG EG BG o o 0 O 0 NG2 m.0W N ago TG a HB HC 8d �6 O -- CWR - \ ICWR O See Drawing FC-1 for CA CWS&CWR Piping = Components. CWS \ \ \ \ i =� H 2 NG1 Tr ;a J 01 NG1 a E J HWS O ® HWS i n 9" c O d HWR O o HWR g L � c �Y 00 8a a U 0 HC BV < L. a.0.r U HB c Condensate O Condensate O ILL 0 0 H N N 2 Equipment Schedule Item Description Part No. city 1 2-1/2 TON FAN COIL UNIT CWVFC-2500 1 2 FLOW CONTROL 3/4" DEFRL075-0060 1 Revised No. By Date 3 AIR VENT DEAV012M 1 1. 2. Piping Schedule 3. 4. Item Description Part No. city Reviewed H 3/4"HOSE DEH075 AR No. By Date EG ELBOW GALV.FPT 0.75 DSEG075 4 1 BV BALL VALVE BRASS FPT 0.75" DSV075 2 2. 3. BG BUSHING GALV.HEX 0.75X0.125" DSHBG075012 1 a. A ADAPTER FPT PVC X BRASS 'PER DESIGN 1 Drawing TG TEE GALV FPT 0.75 DSTG075 2 scale 2Ye'=1•-O" Tr TEE SADDLE-REDUCING i 'PER DESIGN 2 si a Arch D HC HOSE CLAMP DMHC75 8 Data 12-10-2016 HB BRASS HOSE FITTING 3/4 MPT X 3/4 ID DSHF075XO75 8 By JDK Project No. NG1 NIPPLE GALV 3.00X.75 DSNG3000075 2 �2%2 Ton Fan Coil -Cooling& Heat Fan Coil -Cooling& Heat 160661-50 sneer REFER TO PL SHEETS FOR PIPE SIZES FC-2 Scale: 2%4"=V-0" FC-2 O Equipment Schedule o y U Item Description Part No. Qty o m C 1 2.5 TON FAN COIL UNIT CWVFC-2500 1 g Flow of Air See Sheet PL-1.3&PL-2.3 for Condensation Piping Layout o w Piping Schedule for PVC Condensate Piping d Item Description Part No. Qty m O T H1 POLY TUBE 0.5" D1P3050 AR �r �0 c 1 Al PVC SCH 80 ADAPTOR FTP x BARB 0.5" DPNH050F 1 A2 PVC SCH 80 ADAPTOR MTP x BARB 0.5" DPNH050M 1 E o > v N See Sheet PL-1.3&PL-2.3 for Condensation Piping Layout m q E o �� O �1--00 Piping Schedule 1.25" PVC Piping 3 (n ` ) o£ I— Item Description Part No. Qty __ P PIPE PVC SCH 80 1.25 DPP125 AR nr 1`eeeea NCn- Al B1 \ E ELBOW PVC SCH 801.25 DPT125 AR o M o T TEE PVC SCH 80 1.25 DST125 1 �� m 0 61 BUSHING PVC 1.25 X 0.5 S x FTP DP6125050F N 1 d N H1 Intake CP CAP PVC 1.00 DPCP100 1 0 MP-o See Sheet PL-1.3&PL-2.3 for Condensation Piping Layout `g W N C, 2 as A2 T 3 8d �8 €d 8t �8 2-1/2 Ton Fan Coil Condensation Piping-Layout s FC-3 Scale: 1:10 _- U tN J 3 ?9 0 J o°E J i °'c a 0 o 0 o 0 I o W � � L O � U o o ° ° Q U LL o o o C 0 o o o o 1 = N 0 0 0 r 0; 0; 0 — O — — — — O U — — 0 — O — — — — — H1 o ° - - - - ° - - — ° ° - - - - - - - CWS — ° ° Chilled Water 0 0 0 ° o F ° ° y� CWR Source Revised L � 0 - - - - - - - - _ '�'�'UUU����� No. By Date 1. '',o _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ o' HWS 2. ', Heat Source B. — — — — — — — — — — — — — — — — — — — — — ®— — — — — — — — — — — — — — — — HWR a. Oi 01 Reviewed ''0Q No. By Date I,O: s. CP T E P a. T a Drawing RUN CONDENSATION scale PIPING TO DRAIN she Arch D (By Others) Data 77.75.2076 By JP Project No. �� 2-1/2 Ton Fan Coil Condensation Piping-Layout 160661-50 Note:All Chilled Water Piping shall be FC-3 Scale: 1:10 sheet insulated. F -3 O Note:Only Hot Water Piping shown for Note:pipe and fitting configuration for N Equipment Schedule Clarity. stand alone Fan Coil Units. �°, rn It.. Description Part No. Qty p 1 1 TON FAN COIL UNIT ENVIRO-TECH 1 0 0 Y 4`>' y yC N 2 Piping Schedule �'N m c N OItem Description Part No. city ¢o N H POLY TUBE 0.75" D1P3075 AR ail }� c P PIPE PVC SCH 80 0.75 DPP075 AR ENVIRO-TECH FAN COIL UNIT = 3 N HC HOSE CALM DMHC07 2 m; c E o N� O 6F-t" a -� X �3 1/2"COPPER MALE ADAPTOR }l m 0 d N 1/2"FLOW CONTROL o H LO �r O 1/2"COUPLING 1/2"COPPER m= C3 W N 00-0 MALE ADAPTOR 2 1/2"ELBOW (TYp) o ENVIRO-TECH 1 TON FAN COIL UNIT - 1/2" ELBOW - 8d �8 1/2"COPPER MALE ADAPTOR €d 1/2"ACTUATOR - CONNECT TO RETURN PIPING 1/2"COPPER MALE ADAPTOR 8t ATTACH CONDENSATE PIPING TO DRAIN TUBE EXIT SEE DETAIL"B" m CONNECTION TO SUPPLY PIPING 8 Enviro-Tech Fan Coil Heated Water Connections-Top View `s FC-4 Scale: N.T.S. - U J 01 Note:Only Chilled Water Piping shown Note:pipe and fitting configuration for i H CONDENSATION PIPING for Clarity. stand alone Fan Coil Units. 'a i � c YO a T d O HC p L � r O CONDENSATION LINE FROM L U FROM FAN COIL ENVIRO-TECH FAN COIL UNITLL O to r O O 2 3/4"COPPER MALE ADAPTOR 3/4"FLOW CONTROL 3/4"COPPER MALE ADAPTOR Revised 3/4"COUPLING No. By Date �. JP 3-18-17 2. JP 5-15-17 3/4"ELBOW 3. 3/4" 4 ELBOW Reviewed No. By Date 3/4"COPPER MALE ADAPTOR 1 Enviro-Tech Fan Coil-Top View 2. FC-4 Scale: N.T.S. 3/4"ACTUATOR a CONNECT TO RETURN PIPING 4. 3/4"COPPER MALE ADAPTOR Drawing scale ATTACH CONDENSATE PIPING TO DRAIN she Arch D TUBE EXIT SEE DETAIL"B" Data 11.15-2016 CONNECTION TO SUPPLY PIPING By JP Project No. (-A � Enviro-Tech Fan Coil Chilled Water Connections-Top View shee160661-50 Note:All Chilled Water Piping shall be Fc-4 Scale: N.T.S. insulated. FC-4 O Note:Only Hot Water Piping shown for Note:Pipe and fitting configuration for a Equipment Schedule Clarity. Packaging and Processing Room 0 Fan Coil Units. o (d scription Item De Part No. Qty p 1 1 TON FAN COIL UNIT ENVIRO-TECH 1 1 0 5 0 Y 4 f 2& N yC Piping Schedule �'N m c N Item Description Part No. city ¢rn o O N H POLY TUBE 0.75" D1P3075 AR ail }� c P PIPE PVC SCH 80 0.75 DPP075 AR ENVIRO-TECH FAN COIL UNIT ° 0 N HC HOSE CALM DMHC07 2 m; o �P) �3 M at00 �+ _ N L d N L0 Lo ° C�O 1/2"COUPLING =_ u.l N 00 ar as 1/2"ELBOW (TYP) o ENVIRO-TECH 1 TON FAN COIL UNIT 1/2" ELBOW 8d �8 €d CONNECT TO 1.25"RETURN PIPING ATTACH CONDENSATE PIPING TO DRAIN TUBE EXIT SEE DETAIL"B" a s CONNECTION TO 1.25"SUPPLY PIPING 8 c Enviro-Tech Fan Coil Heated Water Connections-Top View FC-5 Scale: N.T.S. — U J a E Note:Only Chilled Water Piping shown Note:Pipe and fitting configuration for H CONDENSATION PIPING O for Clarity. Packaging and Processing Room � 'a Fan Coil Units. - C Q ,. i � c YO a T d O HC P L c O CONDENSATION LINE FROM L U FROM FAN COIL ENVIRO-TECH FAN COIL UNITLL O to r O O 2 a Revised 3/4"COUPLING No. By Date 1. 3/4"ELBOW 2 3. 3/4" 4 ELBOW Reviewed No. By Date 1. Enviro-Tech Fan Coil-Top View 2. FC-5 Scale: N.T.S. a CONNECT TO RETURN PIPING 4. ATTACH CONDENSATE PIPING TO DRAIN Drawing TUBE EXIT SEE DETAIL"B" scale Sae Arch D Data 5-15.2017 CONNECTION TO SUPPLY PIPING By JP Project No. (-A � Enviro-Tech Fan Coil Chilled Water Connections-Top View shee160661-50 Note:All Chilled Water Piping shall be Fc-s Scale: N.T.S. insulated. F C-5 30'-0"Approx. — 30'-0"Approx. — E CEILING HEIGHT CEILING HEIGHT o c 0 0 From Main Lines � V+ £ 0 17 FAN COIL (TYP) a O n- 3 N 33 FAN COIL BOTTOM f,7 of o Loi 0. o x FAN COIL BOTTOM Q r- O V N a o m y C N o o r'n E O ~00 Ql a �.3 ♦A c (Do V co X o 0 0 iiD C'O 12 m io DOOR y o t Ol N t°Dn �o �� M U.) 0 m d 6 N =o CALO 01 L? FINISHED FLOOR FINISHED FLOOR W N 0 Do n� Grow Room 110-South Elevation �D� Grow Room 110-North Elevation L-1.1 Scale: 3/6"=1'_0" L 1. Scale: 3/6"=1,_0. 59'-6"Approx. 16-10" 16'-6" 16-10" — — 4'_9" CEILING HEIGHT d 5'o �c INSULATED CWS &CWR LINES 0 • FAN COIL (TYP) o IJ FAN COIL BOTTOM a _ `. JE.v° CONDENSATION LINE HWS&HWR LINES a E J Run to drain _ N � � O 00 STRUCTURE q� L BUMP OUT tv ,. w �T a o FINISHED FLOOR .� o � L � B Grow Room 110- East Elevation Q c L L-1. Scale: 3/6"=1'_0" > C9 59'-6"Approx. 12'-6" 12'_6, 12'_6„ 12'_6" — — 4'-9" CEILING HEIGHT • FAN COIL WITH HEAT INSULATED CWS FAN COIL (TYP) &CWR LINES (TYP) Revised O No. BY Dale X 2 1. FAN COIL BOTTOM a 2. Q O HWS&HWR LINES CONDENSATION LINE Reviewed Run to drain No. By Date 1. 2. 0 ap 3. 4. Drawing Scale %,1'-0'• Sae Arch D FINISHED FLOOR If Data 11-16-2016 By JP Project No. Grow Room 110-West Elevation 160661-50 Note:All Chilled Water Piping shall be L-1.1 Scale: 3/e'=1'-0" Sheet insulated. E L-1.1 o O 30'-0"Approx. — 30'-0"Approx. — p CEILING HEIGHT CEILING HEIGHT W L� o rn c 0 S 0 y �U E0 N w L001 K O ° ° \ O X U r .O C U o FAN COIL (TYP) o c FAN COIL BOTTOM o 0 0. ° FAN COIL BOTTOM a a is c 0 0 °°E Of~ a =� O = NC4i A eo m c C a3i ja) 0 o n° Nfn W zo C CID a t 00 'O `; c mS d 0 N �o a�� FINISHED FLOOR FINISHED FLOOR B o Q W N 0 co a� Grow Room 109-South Elevation �� Grow Room 109-North Elevation _ Scale: V=1'-0" L-1. Scale: V=1'-0" =3 59'-6"Approx. $ CEILING HEIGHT a o n INSULATED CWS &CWR LINES FAN COIL (TYP) FAN COIL WITH HEAT m (TYP) L H HX 'a ° EL rl FAN COIL BOTTOM a ¢ sg a �A CONDENSATION LINE It HWS&HWR LINES a E J Run to drain o Q) O So - to Yl a FINISHED FLOOR 11i O it B Grow Room 109- East Elevation Q o Scale: V=1'-0" ` (� 59'-6" Approx. f 4,_9„ 12'_6" 12'_6" 12,_6" 12,_6" _ _ 4'_9" �1 CEILING HEIGHT INSULATED CWS . FAN COIL WITH HEAT &CWR LINES FAN COIL (TYP) (TYP) Revised ii No. By Date X ° FAN COIL BOTTOM a 2. 3. O � 4. Reviewed HWS&HWR LINES CONDENSATION LINE No. By Date Run to drain 1. 2. 0 pp 3. 4. Drawing Scale Si.. Arch D FINISHED FLOOR if 11 Date 11.15.2016 By JP Project No. Grow Room 109-West Elevation 160661-50 Note:All Chilled Water Piping shall be L-1• Scale: 3/B"=1'-0" Sheet insulated. E L-1.2 30'-0"Approx. — 30'-0"Approx. — 0 CEILING HEIGHT CEILING HEIGHT o c O 2 o QT w m r U N c) 5 o T� 3 .o O (0 Q 3 K OH O X =~ ■� U O a FAN COIL BOTTOM o FAN COIL (TYP) o }i •- @ FAN COIL BOTTOM ¢ 'o O 5 N o o ma c a)� Eo 7 C C~00 00 N N R m CD ❑« L I.- X O O 01 z m m 3 C O c01) 2.o l27 NO tn rd 0)0N 5"0 S U-) FINISHED FLOOR FINISHED FLOOR W N Do n n Grow Room 107-South Elevation �D� Grow Room 107- North Elevation L-1.3 Scale: 3/B"=1'-0" L-1.3 Scale: V=1'-0" 3 59'-6"Approx. 13'-4" I_ 13'_4" I_ 13'-4" 14'_9, _ 11 CEILING HEIGHT 02 INSULATED CWS ° &CWR LINES FAN COIL (TYP) ° oa FAN COIL BOTTOM a _ J a -E CONDENSATION LINE J Run to drain HWS&HWR LINES DOOR a o O co zo y$ to io m L d 3 r lL a 0 0 FINISHED FLOOR .� o � L � B Grow Room 107- East Elevation Q o L-1.3 Scale: V=1'-0" \ 0 54'-0"Approx. 9'-3" 13'-4" 13'-4" ► 13'-4" — — 4'-9" CEILING HEIGHT INSULATED CWS FAN COIL WITH HEAT &CWR LINES ° 0 . (TYP) FAN COIL (TYP) Revised No. BY Data X O FAN COIL BOTTOM a 2. Q 3. O � 4. HWS&HWR LINES CONDENSATION LINE Reviewe Data Run to drain 1. 2. 0 bo 3. 4. Drawing Scale 3/g'•=1•-U•• Sae Arch D FINISHED FLOOR Date 11-15-2016 BY JP Project No. Grow Room 107-West Elevation 160661-50 Note:All Chilled Water Piping shall be 1E L-1.3 scale: V=1'-0" Sheet insulated. EL-1.3 ► 43'-6"Approx. — ~ coi CEILING HEIGHT -" o y c 0 2 o QT w m o T(,j 3 Sj 0 < ■� O U 2 FAN COIL BOTTOM n m o ao o °°" tttttttttt� c E Q N C Oc C6 00 C 0 N N m CD ❑« �.�i.- DOOR o F « N ro �; C o c io m o A-0 S NO 2 l rd O0N 5"0 C�UU.) a CI t-p' FINISHED FLOOR W N 00 n n Grow Room 104- North Elevation m 3 L-1.4 Scale: 3/a°=1''0° �c 63'-9"Approx. IN 4'-4" 4'-0" f CEILING HEIGHT INSULATED CWS ' FAN COIL (TYP) &CWR LINESI So 0 x Tv (o FAN COIL BOTTOM c J a -E CONDENSATION LINE J HWS&HWR LINES Run to drain a= N o a G 3 r W a o 0 FINISHED FLOOR .� o � L � B Grow Room 104- East Elevation Q o L-1.4 Scale: 1/s"=1'-0" \ 0 63'-9"Approx. — 11'-1" �'� 11'-1" �'� 11'-1" �'► 11'-1" �'� 11'-1" 4'-9" CEILING HEIGHT INSULATED CWS . &CWR LINES FAN COIL FAN COIL WITH HEAT(TYP) (TYP) Revised O No. BY Data �A L] O ° FAN COIL BOTTOM o O 2. Q 3. � 4. HWS&HWR LINES CONDENSATION LINE Review Data Run to drain 1. ed 2. -dj' 3. 4. Drawing Scale 3/g'•=1•_U•• Sae Arch D FINISHED FLOOR 11 Date 11-15-2016 BY JP Project No. Grow Room 104-West Elevation 160661-50 Note:All Chilled Water Piping shall be L-1.4 scale: 3/s°=1'-0" Sheet insulated. E L-1.4 38'-0"Approx. — 0 CEILING HEIGHT -" o y c 0 2 o Qs w m Sj 75 T� 3 0 0 _ FAN COIL BOTTOM n m o > 5 ao Q r O N V o tttttttttt� c E Q 7 C Oc a 0,0 C N N R 0 CD ❑« L 'iX � X O 1=od is .; C'O cC aDo DOOR w o ':+ c 2 o rd O0N 5"0 C�UU.) FINISHED FLOOR W N Do do Grow Room 103- North Elevation 22 m 3 L-1.5 Scale: 3/8'=1'-0" 63'-9"Approx. IN 4'-9" 11'-1" �'� 11'-1" 3'_7" f CEILING HEIGHT INSULATED CWS &CWR LINES FAN COIL (TYP) .5 o �a FAN COIL BOTTOM a _ J a -E HWS&HWR LINES CONDENSATION LINE a E J Run to drain _ N .0 O 3 r W a o 0 FINISHED FLOOR .� o � L � B Grow Room 103- East Elevation Q o L-1.5 Scale: 3/6"=1'-0" \ 0 63'-9"Approx. 3'-7" 4'-9" CEILING HEIGHT INSULATED CWS FAN COIL . FAN COIL WITH HEAT &CWR LINES (TYP) 0 ° (TYP) Revised ° No. BY Data O ° FAN COIL BOTTOM n 2. 3. 4. HWS&HWR LINES CONDENSATION LINE ReV1ewe Run to drain 1. 0 2. 4. Data Drawing Scale 3/g'•=1•_U•• Sae Arch D FINISHED FLOOR 11 Date 11-15-2016 BY JP Project No. Grow Room 103-West Elevation 160661-50 Note:All Chilled Water Piping shall be 1,E L-1.5 scale: 3/6"=1'-0" Sheet insulated. E L-1.5 _ 24'-3"Approx. 1.— p 24'-3"Approx. CEILING HEIGHT CEILING HEIGHT - o y c 0 2 o QT w m °S'' 3 cai. O (n Q 3 o ° FAN COIL (TYP) ° i =l- - c U 75 FAN COIL BOTTOM a o ° FAN COIL BOTTOM a m o o0 O r)N 0 o a g C E p N C Ow C~00 CD O O d X bo DOOR TO PACKAGING DOOR 12 c °Do &PROCESS - W NO W0.2 c m In 41 rd 6)pN 5"0 r-—L? FINISHED FLOOR FINISHED FLOOR W N 00 Y n n Cc Veg. Room - East Elevation �D� Veg Room-West Elevation L-1.6 Scale: V=1'-0" L-1.6 Scale: V=1'-0" 3 40'-3"Approx. 110 2'-9" 14'_6" 14'_6" 8.6" — a CEILING HEIGHT ,2; o INSULATED CWS ° FAN COIL (TYP) &CWR LINES oa FAN COIL BOTTOM VJ CONDENSATION LINE HWS&HWR LINES a E J Run to drain - i o - � 00 o 3 > aT a C W FINISHED FLOOR L O .r 0 B Veg. Room- North Elevation Q L-1.6 Scale: V=1'-0" \ 40'-3"Approx. 10'-1" 20'-1" 10'-1" CEILING HEIGHT INSULATED CWS FAN COIL WITH HEAT &CWR LINES FAN COIL 0 (TYP) 0 (TYP) Revised 11 No. BY Data X O FAN COIL BOTTOM a p. Q 3. 4. HWS&HWR LINES CONDENSATION LINE Reviewed Run to drain No. BY Date 1. 2. 0 bo 3. 4. Drawing Scale 3/g'•=1•-U•• Sae Arch D FINISHED FLOOR Date 11-15-2016 BY JP Project No. Veg. Room-South Elevation 160661-50 Note:All Chilled Water Piping shall be 1E L-1.6 scale: V=1'-0" Sheet insulated. E L-1.6 E o y U o N C O C O rn 1`' J U — E 5 r "r umi o T� 3 24'-3"Approx. — 24'-3"Approx. — O Q 3 ,it- ■� �U CEILING HEIGHT CEILING HEIGHT _ " mo > �2 ao y C E9 10 O FAN COIL BOTTOM v' �F Do FAN COIL (TYP) 3 0 X d O ` 3 C c /!� >D o FAN COIL BOTTOM a a $ \H E NO Q Q m o 2L? �0N �a � Lo 1-O ° WNOD n Y 2 n O E DOOR TO VEG ROOM 3i c 3 S5 FINISHED FLOOR FINISHED FLOOR €d �g B Packaging and Processing 105 -West Elevation c Packaging and Processing 105- East Elevation02 -_ L-1.7 Scale: 3/8'=1'-0" L-1.7 Scale: 3/6"=1'-0" a E9 J N J LO 3� 51'-9"Approx. a 0 O In V) 8'-8" 15'_2" �'� 12'_2" �I� 15'_9" — � a1 0) CEILING HEIGHT L o PIPE RISERS TO LEVEL TWO FAN COIL (TYP) FAN COIL BOTTOM > � ------- ------- U � a o n a ir> Q 0 HWS&HWR LINES INSULATED CWS CONDENSATION LINE &CWR LINES Run to drain Revised No. BY Date 1. DOOR TO CORRIDOR 2' 3. 4. FINISHED FLOOR Reviewed No. BY Date 1. 2. Packaging and Processing 105-North Elevation I 3. L-1.7 Scale: 3/8'=1'-0" 4. Drawing Scala Sae Arch D Date 11-15-2016 By JP Project No. 160661-50 Note:All Chilled Water Piping shall be Sheet insulated. L- .7 30'-0"Approx. — 30'-0"Approx. — E CEILING HEIGHT CEILING HEIGHT � c 0 2 o QT w m Nc) 5 Sj X O _O ICI O\ X U to O Q o _ ■ U a FAN COIL BOTTOM ° o o FAN COIL (TYP) ° �� m °) FAN COIL BOTTOM a m o oD Q Q r.. 0 V0 N my C 0)V � ®� aC O cFDo 0 N N R m W ❑« L r.- X O O d z a0 bo .; C O c /!� \V off uDo �2 � o �� fN6 t r d p N 5"o 41 FINISHED FLOOR FINISHED FLOOR W N DAD n n Grow Room 205-South Elevation �D� Grow Room 205- North Elevation EL-2. Scale: 3/B°=1'-0" 1�L-2y Scale: V=1,_0„ 3 59'-6"Approx22 17'-3" 17'-3" 17'-3" — — 4'-9" a CEILING HEIGHT o INSULATED CWS &CWR LINES FAN COIL (TYP) & o �a FAN COIL BOTTOM a _ o L" J a HWS&HWR LINES CONDENSATION LINE a E J Run to drain o N 0o O STRUCTURE y� L j BUMP OUT �C r w a o 0 A-11' N FINISHED FLOOR .� o � L � B Grow Room 205- East Elevation Q o L-2. Scale: V=1'-0" \ 59'-6"Approx. 8'-9" �'� 11'-6" �'� 11'-6" �'� 11'4" �I� 11'-6" — — 4'-9" CEILING HEIGHT INSULATED CWS FAN COIL WITH HEAT &CWR LINES FAN COIL 0 (TYP) (TYP) Revised No. BY Data X LJ 2 FAN COIL BOTTOM a 2. H MEE -Q 3. 7 4. HWS&HWR LINES CONDENSATION LINE Nowew ed Run to drain BY Data 1. 2. o Q oD pD 3. DOOR a. Drawing Scale 3/g'•=1•-U•• Sae Arch D FINISHED FLOOR If Date 11-15-2016 BY JP Project No. Grow Room 205-West Elevation 160661-50 Note:All Chilled Water Piping shall be L-2�1 scale: V=1'-0" Sheet insulated. E L-2.1 30'-0"Approx. — E 30'-0"Approx. — a U CEILING HEIGHT CEILING HEIGHT � c 0 c o d.T w r� JU r N,2 Sj T� 3 X o EAo FAN COIL o X 2,27 ai i- O Q 3 a FAN COIL BOTTOM o o (TYP) _ 075 FAN COIL BOTTOM a m o 5 oD Q Q r.. z C UN roy CNV N N R m(10 co O O 4411 g a0 zo �'.3 C O DOOR 0 e01) Allcc m U? 41 r d 41 p N FINISHED FLOOR FINISHED FLOOR W N ago nY 2 n Grow Room 204-South Elevation �D� Grow Room 204- North Elevation L-2. Scale: 3/a"=1,_0„ L-2. Scale: V=1,_0„ 3 50'-6"Approx. 4'-9" 13'-10" 13'-10" 13'-10" — 4'-3" f CEILING HEIGHT INSULATED CWS ° FAN COIL WITH &CWR LINES ° HEAT(TYP) 7 _ o a FAN COIL BOTTOM ¢ _ `� J'E CONDENSATION LINE � J HWS&HWR LINES Run to drain a= N o a 00 EL 3 W a o 0 A-1 N FINISHED FLOOR .� o � L � B Grow Room 204- East Elevation Q L-2. o Scale: V=1'-0" \ 2 50'-6"Approx. /� 4'_9" 13'-8" '� 13'-8" 13,_8e — — 4'_9" CEILING HEIGHT INSULATED CWS FAN COIL FAN COIL WITH &CWR LINES (TYP) HEAT(TYP) Revised No. BY Date 2 O FAN COIL BOTTOM a a 2. Q O 3. 4. HWS&HWR LINES CONDENSATION LINE Reviewed Run to drain No. BY Date 1. 2. 0 50 3. 4. Drawing Scale Sae Arch D FINISHED FLOOR Date 11-15-2016 BY JP Project No. Grow Room 204-West Elevation 160661-50 Note:All Chilled Water Piping shall be L-2 Scale: V=1'-0" Sheet insulated. E L-2.2 30'-0"Approx. — E 30'-0"Approx. — U CEILING HEIGHT CEILING HEIGHT a vi � c 0 c o d.T w m Jo N a l� '> 6.0 OT� > �Q O X O O, O N~ ■� 2 FAN COIL (TYP) ip\' X U a FAN COIL BOTTOM o o`; o °) FAN COIL BOTTOM a o 2Q 0 N V o o� o m g tttttttttt� c E Q t7 C C~00 00 N N R m CD ❑« L r I- X O O 411 g a0 zo .3 C O C .012 \V al tcn° c NO M t r d 0)0 N 5"0 C�L? FINISHED FLOOR FINISHED FLOOR W N 0 Do nY 2 n Grow Room 202-South Elevation �D� Grow Room 202- North Elevation L-2.3 Scale: 3/a"=1'-0" L-2.3 Scale: 3/B"=1'-0" 3 54'-0"Approx. 4-4- 14'_2e I� 14'-2" �' 14,_2„ 6'-9" — g CEILING HEIGHT o INSULATED CWS • • &CWR LINES FAN COIL & (TYP) a 15 FAN COIL BOTTOM ¢ _ `� J'E CONDENSATION LINE J HWS&HWR LINES Run to drain a=_ N o a E DOOR i > 3 am r W a o 0 A-0 N FINISHED FLOOR .� o � L � B Grow Room 202- East Elevation Q o L-2. Scale: 3/s"=1'-0" \ 0 54'-0"Approx. 4'_9" 14'-2" 14'-2„ 14'_2" CEILING HEIGHT INSULATED CWS e ° FAN COIL WITH HEAT &CWR LINES FAN COIL(TYP) (TYP) _ Revised No. BY Date X O FAN COIL BOTTOM a p. Q 3. 4. HWS&HWR LINES CONDENSATION LINE Reviewed Run to drain No. BY Date 1. 0 2. 60 3. 4. Drawing Scale Sae Arch D FINISHED FLOOR Date 11-15-2016 BY JP Project No. Grow Room 202-West Elevation 160661-50 Note:All Chilled Water Piping shall be L-2.3 scale: 3/s°=1'-0" Sheet insulated. E L-2.3 E o y U o N C O C O rn 1`' J U — E 5 r 2,27 7 T 3 41'_9" _ 6.0 O fit- ■— OU CEILING HEIGHT 5 FAN COIL (TYP) ~2 C v m„.5 0 . c Eo 7 C O C~00 N R m CD ❑« �.�iX X FAN COIL BOTTOM F :: a 2 c a .0 ��� p C NO O rm 0)0N o C ° WNOD n Y 2 n RISERS FROM LEVEL 1 Zone Valves located on level 1 c 3 S5 FINISHED FLOOR Clone Room 206- North Elevation L-2.4 Scale: V=T-0" a Eo J J a°E A, O iV/ Q o > 3 w 24'-3"Approx. r a` a 0 N L �1 E CEILING HEIGHT L d FAN COIL (TYP) Q O > fU X 2 FAN COIL BOTTOM n a Q 0 v 0 Revised ao No. BY Data 1. 2. 3. 4. Reviewed No. BY Date FINISHED FLOOR 1. FINISHED FLOOR 2. 3. 4. rawing A Clone Room 206-West Elevation DBca�e 3�a•=,�-8•• L-2.4 Scale: V=V-0" sale Arch D Date 11-15-2016 BY JP Project No. 160661-50 Note:All Chilled Water Piping shall be Sheet insulated. L- . O MOD: 1105 Equipment Schedule F o Item Description Part No Qty U o rn 1 RBI BOILER DB1050 1 0 2 AIR SEPARATOR DEAS250 1 0 15 SEE V-1 VENT DETAIL r O 3 AIR VENT DEAV075M 1 SEE S-1 PARTS PROVIDED IF APPLICABLE d a y m SECTION DETAIL IN SYSTEM PIPING A3 4 THERMOMETER 2.50"STEM DET25 2 D o Bra 5 BOILER PUMP PER BOILER MODEL 1 m 6 GAS REGULATOR BY OTHERS r 1 V o O N Q 0 0 0 0 0 0 0 .r �� 00 7 THERMOSTATIC MIXING VALVE,2.00" DEVTC200120 1 HWS I� R Sao 0 0 0 0 ®® o 0 oPiping Schedule DSBPBP25 mq O a Eo S1 Item Description Part No Qty We F 0000 P1 ° ° 32 P1 PIPE STEEL ROLLED SCH.10 2.50"x7.50" DSP25010-075R 2 3 JW m o 0 0 0 0 0ak\ o P2 PIPE STEEL ROLLED SCH.10 2.50"x6.625" DSP25010-068R 1 0 R.�% HWR ♦ x P3 PIPE STEEL ROLLED SCH.10 2.50"x6.25" DSP25010-0625R 1 w 0 0 0 0 o o P4 ELBOW GROOVED 90 DEG.2.50" DSE250 222 T TEE GROOVED 2.50" DST250 3 s o + c m 0 Tr TEE-REDUCING HCxF 2.50"x0.50" DSTR250050 3 /�/���� p N Alul ADAPTER GROOVEDxMPT 2.00" DSA200 1 S�L? oa l0 A2 ADAPTER GROOVEDxMPT 2.50" DSA250 3 Q W N C' A3 ADAPTER GROOVEDxMPT 2.00"x5.75" DSA200-00575 1 a C1 COUPLING GROOVED RIGID 2.00" DSCR200 2 o, C2 COUPLING GROOVED RIGID 2.50" DSCR250 15o — FL 2"125#GRUVLOCK FLANGE DEFCG20 2 `a B1 BUSHING GALV HEX 0.75"x0.125" DSHBG075012 1 8 d B2 BUSHING GALV HEX 2.50"x2.00" DSHBG250200 1 `s Br1 BELL REDUCER 1.25"x0.75"(DB900-1050ONLY) DSRG125075 1 €d Br2 BELL REDUCER 1.25"xl.00"(DB1350-15000NLY) DSRG125100 1 = 5 Br3 BELL REDUCER GROOVED 2.50"x2.00" DSRG250200 4 a y 4 ES Br1 or Br2 N1 NIPPLE 0.25"4.75" DSNG025075 1 `g 5 Tr N4 N2 N3 N2 NIPPLE GALV 0.75"x2.00"(DB900-1050 ONLY) DSNG075020 1 N3 NIPPLE GALV 1.00"x2.00"(DB1350-15000NLY) DSNG100020 1 m" C T P3 FL 71® P1 _ N4 NIPPLE GALV 1.25"x12" DSNG125120 1 a Bra ®I A2 N5 NIPPLE GALV 2.00"x3.00" DSNG200030 1 ts E ES STREET ELBOW GALV 1.25" DSESG125 1 8 Si CHANNEL(GALV.)1.65x20" DSMU-020 3 oU S2 STRUT CLAMP(PLATED)2.00" DSMC200 2 `d S3 STRUT CLAMP F (6) �/ F WELL 0.50 COPPER CLDP 2.50" DDECW 0 1 E1. S3 I — — L HWSI ♦ S1 / Flange gaskets,Bolts,Nuts,&Washers not shown a' Level of Finished Floor zi 6 r L °� Piping Included m T a 0 E w/Optional ~a as Piping Package L •� 00 o I I ® I (a I I I I GAS INLET 1 I I �— — I I / 2 I I 0°0 3 4 Revised N5 B2 B1 Tr ® ® No. By Date C T Bra A3 7 1 Piping Included i z w/Optional E I 3 Piping Package Notes (unless otherwise specified) 4. is, �� ___—____ 1 Refer to Delta T Solutions Specification 1.0 Heat Source Installation for Boiler Installation Reviewed and Operating Information(ie Vent,Gas,and Electrical) No. By Date 1. j ) 2 Refer to Delta T Solutions Specification 2.0 Air and Water Control,for Installation of Air Separator,Air Vent,Expansion Tank,Feed Water Regulator,and Pressure Gauge. 2' 3. ® To Expansion Tank Al P2 A2 3 Refer to Delta T Solutions Specification 6.0 Piping Installation,for Information on Piping. H W R l ♦ &Feed Water 4 All piping to be supported so that boiler does not support piping weight. 4 (See Drawing FW-1) P P 9 PP PP P P 9 9 Drawing -- -- - -- -- -- - Level of Finished Floor— 5 Install Pressure Relief Valve to-drain or within six inches of floor. style 1Y:"=1•-0" Till Pipe Rest,using Unistrut with Brackets. size Arch D 7 Gas Service Regulator is required if Gas Pressure is above Y2 PSI. Data 12-08-201e By JP 8 All Line Voltage and Low Voltage Wiring,Conduit and Disconnect shall be Supplied and Project No. Installed By Others. Boiler Loop- Detail lsossl-so 9 Gas Line,Gas Regulator shall be Supplied and Installed by Others. sneer H-1 Scale: 1Y4'=V-0" 10 Water Line and Backflow Preventer shall be Supplied and Installed by Others. H-1 O MOD: 110 5 Table 1 should be used to ensure that the gas supply piping is sized properly.If more than one appliance wo E is supplied by the same supply pipe,the piping must be sized based on the maximum possible demand. 0 Do not neglect the pressure drop due to pipe fittings.Table 1 should be used in conjunction with Table 2 o c to ensure that the gas supply piping has the capacity to meet the demand. o Table 1. Maximum pipe capacity in Ft/Hr based on 0.60 specific gravity gas at a pressure of o 0 0.5 psig or less and a 0.3"WC pressure drop. Table 2. Equivalent Pipe Length Chart w Maximum i capacity in Ft'/Hr based on 0.60 specific gravity as at a pressure of 5 0.5 si and a 0.3"WC pressure drop. Type of Pipe Fitting ¢'' '^ N pipe P tY P 9 h9 P P 9 P P• ul o. _I Pipe Length(Ft) Nominal 80°Elbow Tee+ Gate Valve" Gas Cocle U w1� Iron Pipe o N Nominal 10 20 30 40 50 1 60 80 100 150 Size in Equivalent Pipe Length(Ft) m o O T ronPlpe Size 1 2.6 5.2 0.6 1.5 ¢N N Slze(In) Maximum Gas Volume of Pipe(FVHr) V 1Y4 3.5 6.9 0.8 1.9 Notice r tt- �V O 1 520 350 285 245 215 195 170 150 120 t A minimum gas supply pressure of 6 in,152 mm °o }� 1/z 4.0 8.0 0.9 2.3 E i6 5 oo 1Y4 1,050 730 590 500 440 400 350 302 250 WC natural or 11 in,279 mm WC propane and `o > U N 2 5.2 10.3 1.2 3.0 oi O 1Yz 1,600 1,100 890 760 670 610 530 460 380 maximum 14 in,356 mm WC natural or propane, m o 2Yz 6.2 12.3 1.4 3.7 must be available at the safety shutoff valve inlet = O E N 2 3,050 2,100 1,650 1,450 1,270 11150 990 870 710 3 7.7 15.3 1.8 4.5 with the unit(s)operating. `�= LT~00 2t/ 4,800 3,300 2,700 2,300 2,000 1,850 1,600 1,400 1,130 + _ Notes: 'For through branch. tr 3 fn 3 8,500 5,900 4,700 4,100 3,600 3,250 2,800 2,500 2,000 �Forflowatfullopen. "m 10 w(9 p$ L.-I Note: Multiply the gas volume by 0 0)(n.62 for propane flow capacity in Ft�/Hr.Multiply the propane flow capacity by 2,500 BTUIFP X mi to �'0 w deterne the propane BTU/Hr capacity for a given pipe size and length. ry.3 i of Old� �o �+ r_ N0 d a)0N � t17 L? oa Or-0 C I,_O s= W Ncc Its 2 c 3 yc Section Boiler `s Piping Piping J 8t �m - Boiler Service Clearance --- S= �o U °E J Concrete Pad (By Others) L 0 0 0 0 6" - c Q ° ° ° O Y O O O O O ®® O O I � Q 0 0 m d 0 'a �a Heated Ile.Zones �') o o ° ° = .� m° 0 0 0 0 0 ° ° ° ° ° ♦ Q 0 0 0 0 ° O ° ° ° ° > 2,-0„ A I = By Pass Feeder � ) (V Revised No. By Date _ __ __ __� 1. 2. 3. 4. Reviewed No. By Date Expansion 1. 2. Tank 3. 4. Drawing scale 1Ya"=V-0" Sae Arch D Data 12.08.2015 By JP Project No. A Boiler Loop- Detail 160661-50 H-2 Scale: 1ya"=1'-0" Sheet H-2 O Equipment Schedule wo o Item Description Part No. oty 9 U o rn HS HF BV 1 BY-PASS FEEDER,2 GAL DMPF2P 1 0 o 0 0 Piping Schedule - rn n U) yC Item Description Part No. Qty r,j E O G7 d) T TEE GALV.FPT 0.75" DSTG075 1 N 0 H N BV BALL VALVE FPT 0.75" DSV075 3 600 O (115'Q HF T HC HS RUBBER HOSE 0.75"DIA,FT 7DEH075 10 }, c U 1 HC HOSE CLAMP 0.75" DMHC07 4 E R 33 ao 1 N HF BRASS HOSE FITTING 0.75"MPTx0.75"ID DSHF075X075 4 o q o N NIPPLE BRASS FPT 0.75"CL DSNB075013 4 `g O a)N O 'nc -00 cob tr >v �/w' 3 _/ %m m f6 wN,(D o ® o p1 7 n0 a)CAw o al N 0 N No �� mL9 �d �0N HF BV o� olio u) cr,-o s= W Nco fir Top View By � By-Pass Feeder ® 8 d Drain €d N - 8t �8 �8 9 J 1 HC J a°E 1 HS i r L a> Y a ILL }~a Oi to Cn L f0 HF a.. � � m Notes (Unless otherwise specified) Installation Instructions 1 The By-Pass Feeder should be installed in a convenient location where it may be easily filled.The inlet may be either on the pressure side of a main-line valve or on the BV pressure side of a circulating pump. Revised 2 As shown in the following diagrams,the%"hose should be used to connect the J'IBI] DatHF By-Pass Feeder to a by-pass on the water line of the system being treated.The direction of flow should be Up through the By-Pass Feeder.HF 3 A 3/4"ball valve should be placed on each side of the By-Pass Feeder.. BV 4 A drain is desirable and should be installed near the bottom inlet to the feeder with a Reviewed Oo valve in the outlet. Nr,. ay Date Add Chemical Instructions 1 Side View 5 The in-line valve should be open.Close the By-Pass Feeder valve,open the drain valve 3 -___-_----_------------ and make certain it is operating properly and the pressure in the By-Pass Feeder is relieved.Removed the cap of the By-Pass Feeder and allow water to flow out of the N T By-Pass Feeder's drain. Drawing Scale V=1'-0" 6 Close the drain valve,add the proper amount of chemical to the By-Pass Feeder,and She Arch D crack the inlet valve of the By-Pass Feeder to fill the By-Pass Feeder with water,replace the By-Pass Feeder cap. Data 10-5-2016 N 9y JP 7 Open the By-Pass Feeder valves and partially close the main line valve to force the Project No. water through the By-Pass Feeder.After about 3 to 4 minutes,open the main-line valve By-Pass Feeder- Detail and close the By-Pass Feeder valves.Drain the By-Pass Feeder. lsossl-so BPF-1 Scale: 6"=T-0" 8 Repeat Step 5-7 as required. Sheet BPF-1 O Piping Schedule - Feed Water Piping MOD. /�W2�3 Equipment Schedule wo o Item Description Part No. Qty Item Description Part No. oty 9 U o rn E ELBOW,SCR,STL,0.5" DSEG050 2 1 REGULATOR,WATER DEVPRO50 1 0 BV BALL VALVE,SCR,BR,0.5" DSVB050 1 3 2 PRESSURE GAUGE DEGPO60 1 0 T1 TEE,SCR,STL,0.5" DSTG050 3 B1 3 PRESSURE SWITCH DEGPS 1 ,,AA N T2 TEE,SCR,STL,1" DSTG100 1 Feed Water N1 1 4 AIR SEPARATOR 6" DEAS600 1 va„S V r/ E o a) o U UNION,SCR,STL,0.5" DSUG050 2 2 5 EXPANSION TANK PER DESIGN 1 m_ Use Coupling and SS Screen B1 BUSHING,SCR,STL,0.5"x0.25" DSHBG050025 1 Piping 6 AUTOMATICAIR VENTS/a" DEAV075M 1 O VTj Provided with Feed Water Regulator ¢ Q 62 BUSHING,SCR,STL,1"x0.50" DSHBG100050 1 B2 00 N1 NIPPLE,SCR,STL,0.25"x1.5" DSNG025015 1 N2 N3 �';`� T1 Piping Schedule - Expansion Tank E� R; T2 � N2 NIPPLE,SCR,STL,0.50'x2" DSNG050020 8 Item Description Part No. Qty ao 5 0 N o N3 NIPPLE,SCR,STL,0.50"x3.50" DSNG050035 1 _ BV BALL VALVE,SCR,BR 1" DSV100 1 8 o Feed Water n c O 6F-00 / snot-o I- N1 NIPPLE,SCR,STL,1"X 3" DSNG100030 1 3 m o Valve N2 N2 NIPPLE,SCR,STL,1"X 12" DSNG100012 1 = �'D �r I U T1 ® U UNION,SCR at�-M ,STL,1" DSUG100 1 �.3 c PIPING BY E 61�' OTHERS s o r- m0 N2 d N N BV1 U =_ c U, oa �rO cr,-o s°c W N00 I mr 2 I c 3 I yc 8 d I c8 E €d 6 BV1 NB I 8 5 Br1 N1 PIPING BY OTHERS BV2 I 5 0 8 0 Expansion '- ® Tank N2 I a J = J y N 4 U N2 I r o I 0 Br2 a d p c) ES Ring Base 4 Air Separator I _ (Elevation of Top) Q Q d I Ring Base Air Separator (Top View) Revised No. By Date Piping Schedule - Air Separator 2. Item Description Part No. Qty 3 E ELBOW,SCR,STL,1.0" DSEG100 1 _ 4. ES ELBOW,STREET,SCR,STL,1.0" DSESG100 1 Reviewed No. ay Date BV1 BALL VALVE,SCR,BR 0.75" DSV075 1 1' 2. BV2 BALL VALVE,SCR,BR 1.00" DSV100 1 3. Br1 BUSHING,GALV,HEX,1.50"x0.75" DBHG150075 1 4 Drawing Br2 BUSHING,GALV,HEX,2"x1" DBHG200100 1 Scale 3"=1'-e" NB NIPPLE BRASS,.75"x1.375" DSNB075013 1 BV N1 U N2 she Arch D N1 NIPPLE,SCR,STL,1.0"x3" DSNG100030 2 Data 12-0e-201e gy JP N2 NIPPLE,SCR,STL,1.0"x6" DSNG100060 2 Project No. U UNION,SCR,STL,1.0" DSUG100 1 �n� Air&Water Controls- Details 160661-050 FW-1 Scale: 3"=1'-0" sheet FWA O MOD: 1405.1 Equipment Schedule F o Item Description Part No. Qty W q 1 PUMP,CIRCULATION 3.00"FLANGE 80-10OF 1 ' Q o .2 of 0 Piping Schedule (Provided w/Optional Piping Package) UY Item Description Part No. city 20 N P PIPE STL GROOVED 3.00" AR o H TO TEE REDUCING HCxFPT 3.00"x 0.50" DSTR300050 1 M w O N F LO Tr2 TEE REDUCING HCxFPT 3.00"x 0.75" DSTR300075 2 = }, _ C COUPLER GROOVED RIGID 3.00" DSCR300 6 io 2 oo BV BUTTERFLY VALVE GROOVED 3.00" DSV300 3 o o 0 FL 3.00"IN 125#GRUVLOCK FLANGE DEFCG30 2 >g O c ago S1 CHANNEL GALVANIZED 1.6250 x 40" DSMU-040 2 0.. ♦/\ > V a)o S2 STRUT CLAMP PLATED 3.00" DSMC300 4 r t R CoH WS H W$ HB HOSE BIB MPTX HOSE 0.50" DSHB050 1 z=, a6i N Co B O O O O B Flange gaskets,Bolts,Nuts,&Washers not shown O to Heated 0 0 Heat Q� =z LO 50 Zones 0 0 Source •U � w : _� 00000 o 0 HWR HWR 3 A o 0 0M0 A at �m TO BV 8 HB S1 E a J S2 TR2 J P 9= N L e O O e �_ E a a0. �, o C +�+ to Section View A - A a ca 2 BV S1 1 4 S2 Revised No. By Date 2. 3. 4. Reviewed By No. By Date 1. C P s. 3. FL Section View B - B Notes (Unless Othe wise Specified) a. Drawing 1 Refer to Delta T Solutions Specification 6.0 Piping Installation,for Information on scale Piping. Sae Arch D 2 Provide Stand or Base Support for Equipment. Date 12-8-2016 3 Install Pipe Rest,using Unistrut with Brackets. By jP 4 Install Pump as Per Manufactures Requirements,Level and Grout,Elevation Project No. Opt. 160661-50 �A� Section Pump- Detail 5 All Line Voltage and Low Voltage Wiring,Conduit and Disconnect shall be sheet S-1 Scale: 2112"=V-0" Supplied and Installed By Others. S-1 O MOD : 1509.2 GF Veg. Room Equipment Schedule F o Item Description Part No. Qty 9 U o rn 1 VALVE,2-WAY,24V,1.50"BELIMO DEVS2150 1 0 0 2 FLOW REGULATOR 1.50" DEFRH150-0300 1 0 5 0 3 PRIMARY PUMP 1.50 DEPGM3184012OF 1 U) 4 THERMOMETER DET25 2 to o E M C) 0 2-Way Valve Actuator 5 HIGH LIMIT 1 V N O N Q 6 SENSOR By Othe Others 2 Manna = cc Piping Schedule (Provided w/Optional Piping Package) F—, > N o Item Description Part No. Qty m m E 0 AB A AB A P PIPE GROOVED STL 1.50" AR y O DEPRESS BUTTON 00 TO OPERATE VALVE MANUALLY T TEE GROOVED 1.50" DST150 2 .3 C d19 0 Tr TEE-REDUCING HCxF 1.50"x0.50" DSTR150050 5 o s i+co x —al A ADAPTER GROOVEDXMPT 1.50" DSA150 9 't �; w 24 V COMMON o— -Black— m 24 V COMMON � -Black— H I N C COUPLING GROOVED RIGID 1.50" DSCR150 10 OPEN Red I OPEN Red c d 00 CLOSE White CLOSE White BV BALL VALVE FPT 1.50" DSV150 4 5 0 }+ c m 0 N NIPPLE GALV 1.50"x3.00" DSNG150030 2 p N o. y o. a- y ® ® w ® ® FL1 GRUNDFOS 150#NPT FLANGE SET 1.50" DEFCI5G 1 0 p1r LO 0 FL2 1-1/4"125#CAST IRON FLANGE DEFC12 2 -r`o so W NOD po� pol FL3 1-1/4"VAN STONE FLANGE DEFP12 2 2 Valve in Open Valve in Closed DV DRAIN VALVE,0.50"W/CAP&CHAIN DSV050HTDC 1 - Position Position �3 `8% 6"SUPPLY AND RETURN LINE MOUNTED ON WALL AND SUPPORTED AS REQUIRED o d Control Valve-Actuator Detail =__ Z-1 Scale:8"=V-0" Z-V - 6.00"x 1.50"GROOVED a MECHANINCAL TEE OI 0 "g CWS CWR O O - i cws o U Steel to PCV Transition O O =a J - - - - - - - - to J .. N o FL3 L ae+ ° 9a O O �r c o Tr Tr FL2 CWR a` a a�.r d O O L > OTr 4 •� a� DV Tr T P C BV x O O *Distance to be g O O O O O O field determined m CWR WALL STRUCTURE N O O O O O O Fan Coil ° ° ( Chilled = 62 Water �� 2-Way Mixing Valve-Connection Detail Zones � Z-1 Scale:2 Y2"=V-0" of o of o Source o 0 0 0 o O ® - - f ® cws O O O a O O O Revised No. By Date J 1. FL1 a 1 N 2. j 2 — 3. See Detail B for 4. Actuator Operation Reviewed No. By Date 1. 2. 3. 4. 3 Drawing Scale 2-112"=1'-0" Sae Arch D Data 12.08.2016 Notes (Unless Otherwise Specified) By jp Note:THIS LAYOUT IS USED FOR 1 Refer to Delta T Solutions Specification 6.0 Piping Installation,for Information Project No. on Piping. 160661-050 CHILLED ZONE ZC-1 2-Way Mixing Valve-Piping Detail 2 Refer to Delta T Solutions Specification 4.0 Zones Installation for information sheet Z-1 Scale:2 Y2"=V-0" on control valve installation and operation. Z-1 MODE 1511 .2 GF Grow Room 103, Equipment Schedule F o 104, $e 202 Item Description Part No. Qty U) 1 VALVE,2-WAY,2.50"BELIMO DEVS2250 1 0 0 2 FLOW CONTROL 2.50 Per Design 1 © 02 0 3 PRIMARY PUMP 2.50" DEPGM1185015OF 1 4 THERMOMETER DET25 2 N a H 2 Way Valve Actuator y rn 5 SENSOR By Others 2 o N N Trn See Sheet GN-1 for Specific Flow Control DEPRESS BUTTON TO OPERATE VALVE = _ MANUALLY u= (6 Piping Schedule (Provided w/Optional Piping Package) E o � U 0o AB A AB-A Item Description Part No. oty ~m m C CD-t P PIPE GROOVED STL 2.50" DST250 2 N g O c F 00 T TEE GROOVED 2.50" DST250 2 �.3 Em0 sm am Tr TEE-REDUCING HCxF2.50"x0.50" DSTR250050 5 !0�;CD 24 V COMMON � -BIaCk— 24 V COMMON o- -Black— U p£ L.� OPEN Red N n OPEN � Red N BV BUTTERFLY VALVE GROOVED 2.50" DSV250 4 F d CLOSE white w close white N NIPPLE STEEL 2.50"x3.00" DSNG250030 1 .; e a R . ❑0 FL1 2"GRUNDFOS GF 50 FLANGE SET DEFC20GF 115 16c FL2 2-1/2"GRUVLOK FLANGE DEFCG25 2 F a`)T N�� " �� ®'° s�. FL3 2-1/2"VAN STONE FLANGE DEFP25 2 =o c LO A ADAPTER GROOVEDxMPT 2.50" DSA250 4 -6 a 0 Valve in Open Valve in Closed C COUPLING GROOVED 2.50" DSCR250 16 L 0 ` W 00 N Position Position DV DRAIN VALVE 0.50"W/CAP AND CHAIN DSV050HTDC 1 `o c F5 55 E y Control Valve-Actuator Detail 6 "SUPPLY AND RETURN LINE _ Z-2 Scale:8"=T-0" MOUNTED ON WALL AND SUPPORTED AS REQUIRED `= 8t 6.00"x 2.50"GROOVED d MECHANINCAL TEE CWS CWR i Ev° J Steel to PCV Transition O O O O aE J FL3 CWS o O O O 5 5 o Ig(t))l o FL2 O O ra a 0 N Tr Tr CWR � .� > o � o o o pV 4 C Tr .X O O *Distance to be O O O O O O field determined CWR N O O O O O 0 WALL STRUCTURE Chille Fan Coil _ 1 11 0 0 2 N Water 2-Way Mixing Valve-Connection Detail Z-2 Scale:2"=V-0" O 0 0 0 Zones ��� Source j O 0 o 1 O 0 0 0 CWS O O O O O -- - O O Revised No. BY Dale 2. FL1 A 1 2 J 3. See Detail B for J 4. Actuator Operation Reviewed No. By Date 1. 2. 3. 4. Drawing Scale 2"=1'-0" Sae Arch D Date 12-08-2016 Notes (unless Otherwise Specified) By jp Note:THIS LAYOUT IS USED FOR 1 Refer to Delta T Solutions Specification 6.0 Piping Installation,for Information Project No. 2-Way Mixing Valve-Piping Detail on Piping. 160661-050 COOLING ZONES ZC-3,ZC-4,& / H 1 y g P g 2 Refer to Delta T Solutions Specification 4.0 Zones Installation for information Sheet ZC-6 Z-2 Scale:2"=1'-0" on control valve installation and operation. Z-2 MOD: 1510.2 GF Grow Room 204 & 205 Equipment Schedule F Item Description Part No. oty U o rn 1 VALVE,2-WAY,2.00"BELIMO DEVS2200 1 0 0 2 FLOW CONTROL 2.00 Per Design 1 10 3 PRIMARY PUMP 2.00" DEPGlUP50150 1 y 4 THERMOMETER DET25 2 �� V+ E o a) 2-Way Valve Actuator w w-o 5 SENSOR By Others 2 6 o N N See Sheet GN-1 for Specific Flow Control O yQ DEPRESS BUTTON ■� =0 TO OPERATE VALVE 5= .� MANUALLY Piping Schedule (Provided w/Optional Piping Package) E o � C)N 5 co 00 AB a A AB—A Item Description Part No. oty m E o P PIPE GROOVED STL 2.00" DST200 2 N g O c ) T TEE GROOVED 2.00" DST200 3 Ql c Tr TEE-REDUCING HCxF 2.00"x0.50" DSTR200050 5 �_3 m co m 24 V COMMON o- -Black— & 5 W 24 V COMMON 0 -Black— c m X P BV BALL VALVE FPT 2.00" DSV200 4 OPEN (3 Red w n OPEN Red N n F :; CLOSE White W CLOSE white w N NIPPLE STEEL 2.00"x3.00" DSNG20030 1 N c ' FL1 2"GRUNDFOS GF 50 FLANGE SET DEFC20GF 2 =°s co N o U, ❑O n, FL2 2"GRUVLOK FLANGE DEFCG2 2 F d N Lai y ®w FL3 2"VAN STONE FLANGE DEFP2 2 ="o CLo A ADAPTER GROOVEDxMPT 2.00" DSA200 1 6 a r_o Valve in Open Valve in Closed C COUPLING GROOVED 2.00" DSCR200 18 gY W c1 coA Position Position DV DRAIN VALVE 0.50"W/CAP AND CHAIN DSV050HTDC 1 a a Control Valve-Actuator Detail Z-3a Scale:6"=V-0" E 5'o 6"SUPPLY AND RETURN LINE MOUNTED ON WALL AND SUPPORTED AS REQUIRED `= Fan Coil Zones 6.00"x 2.00"GROOVED d MECHANINCAL TEE o - t� CWS CWR =9 E J 0 0 O O a E J t0 cWS L Steel to PCV Transition q +�+ c0 FL3 iA`° L U A� ^(0 = T li 0 O m > — — — — — — CWR m o lt('))l o FL2 O O _ •L Q X_ DV > 2 o O o o O o Tr *Distance to be M 4 1 field determined 5 IM A 5 Tr T BV Tr WALL STRUCTURE Tr O O O O O O O O CWR ' �-s� Scale:ay_Mixing Valve-Connection Detail O O O O See Detail B for O O O O Actuator Operation I Chilled C Revised A A 1 N1 Water Nu. By Date O O O O Source 1. JP 3-13-17 O O O O O ---- -- O O 2. .4. CWS 3. 4. O O O O O -------- O O Reviewed No. By Date 1. FL z. 3. 2 4. Drawing Scale 2"=1'-0" 3 sae Arch D Date 12-08-2016 Notes (unless Otherwise Specified) By ip 1 Refer to Delta T Solutions Specification 6.0 Piping Installation,for Information Project No. on Piping. 160661-050 Way Mixing Valve-Piping Detail 2 Refer to Delta T Solutions Specification 4.0 Zones Installation for information Sheet Z-3a Scale:2"=1'-0" on control valve installation and operation. Z-3a MOD: 1510.2 GF Grow Room 204 & 205 Equipment Schedule F Item Description Part No. Qty CJ o rn 1 VALVE,3-WAY,2.00"BELIMO DEVS3200 1 0 0 2 FLOW CONTROL 2.00 Per Design 1 10 3 PRIMARY PUMP 2.00" DEPGlUP50150 1 y 4 THERMOMETER DET25 2 �� V+ E o a) 5 SENSOR By Others 2 $o y L0 See Sheet GN-1 for Specific Flow Control � ■� c U 33 DEPR a 3-Way Valve Actuator Piping Schedule (Provided w/Optional Piping Package) rdEo TOO ATE B B B }+ i>s a Noo AUALLY J �J Item Description Part No. lty m m � C CD E O � AB A AB A AB A P PIPE GROOVED STL 2.00" DST200 2 N g O c F 00 T TEE GROOVED 2.00" DST200 3 .3 �/\ a m o slack ke — Black 5 a,,, /� Me& 5 Tr TEE-REDUCING HCxF 2.00"xO.50.1 DSTR200050 5 !0 �� 2CV ON k� ON n @'m^ ory\T FU 8�N OPEN Red OPEN(D-- RedSoLoa �Loea wnae �Loea wnlle iN BV BALL VALVE FPT 2.00" DSV200 4 4) N NIPPLE STEEL 2.00"x3.00" DSNG20030 2 V c w �s �" k z �w � Ne mL „" ®-, FL1 2"GRUNDFOS GF 0 n 50 FLANGE SET DEFC20GF 2 s Old 0 '� FL2 2"GRUVLOK FLANGE DEFCG2 2 F N FL3 2"VAN STONE FLANGE DEFP2 2 =o c LO Zz o. rn�6 Valve in Open Position Valve in Mixing Position Valve in By-Pass Position Al ADAPTER GROOVEDxMPT 2.00" DSA200 9 c r_o A2 ADAPTER GROOVEDxMPT 2.00"x6.50" --- 2 L m ` W N°D o C COUPLING GROOVED 2.00" DSCR200 18 _ DV DRAIN VALVE 0.50"W/CAP AND CHAIN DSV050HTDC 1 .G Control Valve-Actuator Detail Z-3b Scale:6"=V-0" E 5'o 6"SUPPLY AND RETURN LINE MOUNTED ON WALL AND SUPPORTED AS REQUIRED `= Fan Coil Zones 6.00"x 2.00"GROOVED d05 MECHANINCAL TEE � I U CWS CWR r S J 0 0 O O o- J R t i CWS = L Q Steel to PCV Transition g 4.0 � O plo L U 3 — — ------------— — — — — FL3 a M O O < y0+ m CWR f° .r > FL2 Q 'K DV See Detail B for Tr Actuator Operation 1 *Distance to be 4 field determined M A 5 Tr T A2 1 BV Al 5 Tr WALL STRUCTURE Tr O O O O O 0 - -- O O � ♦ �� Scale: Mixing Valve-Connection Detail ® ® CWR I O O O O o 0 0 o A2 ( Chilled 1116 C N1 Water Revised No. By Dale 0 0 0 0 0 0 Source 1. JP 8-13-17 0 0 0 0 0 0 0 0 2. ® ® ♦ CWS 3. 4. O O O O O O O O Reviewed No. By t. FL Al 2 2 3. 4. Date Drawing Scale 2"=1'-0" Sae Arch D 3 Date 12-08-2016 Notes (Unless otherwise Specified) By ip 1 Refer to Delta T Solutions Specification 6.0 Piping Installation,for Information Project No. 3-Way Mixing Valve-Piping Detail on Piping. 160661-0502 Refer to Delta T Solutions Specification 4.0 Zones Installation for information Sheet Z-3b Scale:2"=V-0" on control valve installation and operation. Z-3b MOD: 1507.3 Clone Room 206 Equipment Schedule F Item Description Part No. Qty U o rn 1 VALVE,2-WAY,24V,1.25"BELIMO DEVS2125 1 c 0 2 FLOW REGULATOR 1.25" DEFRH125-0060 1 ® 1:5 3 PRIMARY PUMP 1.25" DEPGlUP26-64F 1 y 4 THERMOMETER DET25 2 n o o 5 SENSOR By Others 2 n 0)N o 2-Way Valve Actuator See Sheet GN-1 for Specific Flow Control U F ■O )V DEPRESS BUTTON U 0 TO OPERATEMANUALLY Piping Schedule (Provided w/Optional Piping Package) E_ U co") Item Description Part No. Qty m y C E 9p AB a A AB—A P PIPE GROOVED STL 1.25" AR O F 00 T TEE GROOVED 1.25" DST125 2 .3 m o Tr TEE-REDUCING HCxF 1.25"x0.50" DSTR125050 5 o s ;°.�m x A ADAPTER GROOVEDxMPT 1.25" DSA125 10 F „ J 24 V COMMON o- -Black— & 5 m 24 V COMMON o- -Black— 1D c m n E� C COUPLING GROOVED 1.25" DSCR125 16 ; c o OPEN Red ro n OPEN Red N n "oo :5 o 01) u7 CLOSE White ( W CLOSE �White � w BV BALL VALVE FPT 1.25" DSV125 4 -o o }iV e m 0 N NIPPLE GALV 1.25"x3.00" DSNG125030 2 p FL1 GRUNDFOS 125#NPT FLANGE SET 1.25" DEFC125G 1 -° c U 0 FL2 1-1/4"125#CAST IRON FLANGE DEFC12 2 °a�,ol Q W N 08D FL3 1-1/4"VAN STONE FLANGE DEFP12 2 e a Valve in Open Valve in Closed DV DRAIN VALVE,0.50"FPT,W/CAP AND CHAIN DSV050HTDC 1 - Position Position - 2 Ed Control Valve-Actuator Detail 6 SUPPLY Z 4 Scale:8"=T-0" MOUNTED ON WALL AND SUPPORTED AS REQUIRED t L 6.00"x 1.25"GROOVED _ MECHANINCAL TEE Fan Coil =- Zones o o -So U o oE J1. CWS a E J to d CWS CWR � � O O o t � ♦ ♦ ♦ o Steel to PCV Transition plo L U -__ r a- - - - - - - - O IV FL3 ii O O L � > O O L_ r to CWR FL2 O O \ x 25 DV Tr *Distance to be IM N 5 4 field determined 5 Tr Tr C Tr T P WALL STRUCTURE OI 0 O O O O O O I ® - - - ® CWR O O O O O O I O O Chilled Revised Water �c� 2-Way Mixing Valve-Connection Detail 1. By Date 1 Z-4 Scale:2 Y2"=T-0" 2. oI o �� oI o Source 3 o O O o o 0 4. ® ® CWS Reviewed No. By Date O O O O O 2. N S. A FL1 1 BV a. See Detail B for 2 — Drawing Actuator Operation S.I. 2-1/2"=1•-6" 3 size Arch D Date 12-09-2016 Notes (unless Otherwise Specified) By ip Note:THIS LAYOUT IS USED FOR 1 Refer to Delta T Solutions Specification 6.0 Piping Installation,for Information Project No. on Piping. 160661-050 CHILLED ZONE ZC-10 2-Way Mixing Valve-Piping Detail 2 Refer to Delta T Solutions Specification 4.0 Zones Installation for information Sheet Z-4 Scale:2 Y2"=T-0" on control valve installation and operation. Z-4 O MOD: 1500.1 EQUIPMENT SCHEDULE wo o Heated Zones V e g Room, Item Description Part No. Qly 2 CU 1 VALVE,3-WAY,24V,1-1/4"HONEYWELL VC SERIES 1 g Grow Rooms 103, 104, 107, 110, 2 FLOW REGULATOR,1-1/4"AUTOFLOW YRSERIES 1 0 5 202, 204, 205, & Clone Room 3 SENSOR BY OTHERS 2 aT Cy j U U) E O PIPING SCHEDULE (Provided w/Optional Piping Package) „o y N OItem Description Part No. Qty a P PIPE STEEL GROOVED 1.25" AR 5 a }, U E ELBOW GROOVED 90°1.25" DSE125 2 E o T TEE GROOVED 1.25" DST125 1 m q c a)o Tr TEE-REDUCING HCxF 1.25"x0.50" DSTR125050 3 N g O �a,-DO A ADAPTER GROOVEDxMPT 1.25" DSA125-UYST 9 am-, c C COUPLING GROOVED 1.25" DSCR125 12 o t R a; BV BALL VALVE FPT 1.25" DSV125 4 c x N NIPPLE GALV.1.25"x2.00" DSNG125020 2 �.3 C 22 HB HOSE BIB 0.50" DSHB050 1 -_ c 0f o yo - ML9 �d �0N 117 LO oa op-0 Tr C r-C:)s= W N00 ntf N1 Tr 2 f DV DV BV A P I j o `sd H♦ Qo �a j €n o 0 I Heated Zones T a� j I 1 I �8 j JM Op n e ♦ H W R U 1 a F{ J Ba J �O N C Leel ` 1 Heat �= Q DV Source ' Tr r C a a ♦ oQ ♦ HWS L U E 2 N Revised No. By Date 1. 2. 3. 4. Reviewed No. ay Date 1. 2. 3. 4. Drawing Scale Sae Arch D Date 12.09.2016 Notes runless Otherwise Specified) By ip Note:THIS LAYOUT IS USED FOR 1 Refer to Delta T Solutions Specification 6.0 Piping Installation,for Information Project No.on Piping. 160661-050 HEATED ZONES ZH-1 THRU ZH-4, �A� Zone valve- Piping Detail 2 Refer to Delta T Solutions Specification 4.0 Zones Installation for information sheet &ZH-6 THRU ZH-10 Z 5 Scale: 33/4"=1'-0" for information on control valve installation and operation. Z-5 MOD : 1502 B Grow Room 109 EQUIPMENT SCHEDULE o Item Description Part No. 011Y Cl to 1 VALVE,3-WAY,24V,1.50"BELIMO 1 0 0 2 FLOW REGULATOR,1.50"AUTOFLOW `Per Design 1 5 3 SENSOR By Others 2 N 3-Way Valve Actuator rn a) See Sheet GN-1 for Specific Flow Control � E o a) Lo PIPING SCHEDULE (Provided w/Optional Piping Package) O uTi Q rn Item Description Part No. 4ty }, C V P PIPE STEEL GROOVED 1.50" AR io 5 oo Valve in Open Valve in By-Pass T TEE GROOVED 1.50" DST150 1 m o Position Position Tr TEE REDUCING HCXF 1.50"x0.50" DSTR150050 3 O S allo p A ADAPTOR GROOVEDxMPT 1.50" DSA150 7 =m ao C COUPLING GROOVED RIGID 1.50" DSCR150 7 is a? t—.—� ® BV BALL VALVE FPT 1.50" DSV150 4 m to w N1 NIPPLE BRASS 0.50"x1.25" DSNB050012 1 p white---o CLOSE white---o CLOSE N2 NIPPLE GALV 1.50"x3.00" DSN150030 2 �of- Red ----19 OPEN l� S I " Red OPEN r- N 0 LJ u DV DRAIN VALVE W/CAP AND CHAIN 0.50" DSV050HTDC 1 Black- 24 V COMMON - O -Black- 24 V COMMON p N to Q rr O Cl h O W N00 A T AB A T AB B DEPRESSBUTTON B TO OPERATE VALVE MANUALLY (�� Control Valve-Acturator Detail Z-6 Scale: 8"=V-0" J J DV 3 See Detail B for 1 C P i Tr Tr BV Actuator Operation I i � ca > O 4.0 o HWR 0 A AS ; HWR ° ° O ------ � Q M d I > Heated Heat Zones � � Source I O O I = HWS ♦ 00 HWS No Revised Date Tr BV T 2 N2 2 3 3. 4. Reviewed No. By Date 1. 2. 3. 4. Drawing Scale Sae Arch D Data 1.17.2017 Notes (Unless Otherwise Specified) By jp 1 Refer to Delta T Solutions Specification 6.0 Piping Installation,for Information Project No. Note:THIS LAYOUT IS USED FOR (-_A'� 3-Way Zone Control Valve-Piping Detail on Piping. 160661-050 CHILLED ZONE ZH-5 2 Refer to Delta T Solutions Specification 4.0 Zones Installation for information Sheet Z-6 Scale: 4"=1'-0" on control valve installation and operation. Z-6 EQUIPMENT SCHEDULE - E � o Item Description Part No. city o y 1 VALVE,2-WAY,24V,1.25"BELIMO DEVS2125 1 r_ 0 2 FLOW REGULATOR,1.25"AUTOFLOW DEFRL125-0090 1 0 C rn no PIPING SCHEDULE (Provided w/Optional Piping Package) °o r w y N 3 2-Way Valve Actuator Item Description Part No. city U O N Q P PIPE GROOVED STEEL 1.25" AR = •� =V DEPRESS BUTTON Tr TEE-REDUCING HCxF 1.25"x0.50" DSTR125050 1 o l E' 6 7 ao TO OPERATE V A ADAPTER GROOVEDxMPT 1.25" DSA125 4 ~_ C (1)1)o MANU MANUALLY m m C C COUPLING GROOVED 1.25" DSCR125 4 5` O a)N N� Fa0 AB a A AB-A BV BALL VALVE FPT 1.25" DSV125 3 �.3 rmd N NIPPLE GALV.1.25"x2.00" DSVG125020 3CD HB HOSE BIB 0.50" DSHB050 1 d 24 V COMMON -Black— S[e 24 V COMMON -Black— S mpp � C-p OPEN Red N € OPEN Red w "30�i £ u7 CLOSE White CLOSE �White O N o •L _�� C N 0 m N 0 N o O y or„ .__�� -° W Na00 o m Valve in Open Valve in Closed Position Position - .__ E y Control Valve-Actuator Detail Z-D Scale: 8"=V-0" 8t o o t=�' Ev8 J a°E J L Tr E Y/ HB BV A P � j A co > E o �T a a) ra` O c CWR ♦ o O A ♦ CWR i T C (a 0 0 = Q N Chilled Chiller Zones � � � � Source 2 ��-)--- CWS ♦ A ♦ DO ♦ CWS Revised ` C 1 2 N _ J No. By Date 1. 2. 3. 4. Reviewed No. By Date 1. 2. 3. 4. Drawing Scale 4"=1'•0" Sae Arch D Date 5-15-2017 Notes (unless otherwise Specified) By ip 1 Refer to Delta T Solutions Specification 6.0 Piping Installation,for Information Project No. 2-Way Control Valve- Detail on Piping. 160661-50 2 Refer to Delta T Solutions Specification 4.0 Zones Installation for information sheet Z 131 Scale: 4"=V-0" on control valve installation and operation. Z-D 1 ;_ o o N c 0 0 CC rn 00 (1) C O 8 w+N O NQ Eo >�� 0 . v Environmental Control Environmental Control Environmental Control Environmental Control m y C O System System System System °' (By others) (By others) (By others) (By others) O F W ofCD 3 m 0 Grow Room 240V Grow Room j 240V Grow Room 240V I Grow Room 240V o X 110 10 Field 109 10 Field 107 1 fr7 Field I 104 10 Field �.3 c'0 Wiring Wiring Wiring Wiring o d ��°D L1 L2 G L1 L2 G L1 L2 G L1 L2 G 5° �0 c m 0 r d 4 p N 1 "o �/11/\ Cato to 24V Speed 1 24V Speed 1 24V speed 1 24V Speed 1 II, v C O 24V Speed 2 1 24V Sp."2 24V Sp."2 24V Sp."2 d Y W NOD Common li Common Common li Common n m I I I I I I I I �0 I I I I I I I I I I I I N y o f o f o f o f m o 240V 240V 240V 240V m 3 Heat Coil& 1 Heat Coil& Heat Coil& Heat Coil& 2 2 1 2 Cooling Coil 1 1 M2-a o 1 Cooling Coil M�-a All Cooling Coil 1 M�-a o 1 Cooling Coil 1M�-a o (4)Units (4)Units (4)Units (5)Units F_________________i F_________________i F_________________i F_________________i 1 E-O o _- 24V Speed t M 24V Speed t M 24V Speed t 24V Speed t I I I l 24V Speed 2 24V Speed 2 24V Speed 2 24V Speed 2 — I Common I I I I Common I ' i Common I I I I Common I I I I I I I A N I I I I I I I N q 240V 240V 240V 240V Cooling Coil Cooling Coil 2 Cooling Coil 2 Cooling Coil 1 - 1 I I p4 d° p I 1i g'dpo �OnlyOnly Only Only (5)Units 5 Units 4 Units 7 Units �----------------- ----- ----- ----- I z=m „- VI I I I I I I I J -----------------i ----------------- -----------------i -----------------i I E J Control Valve Actuator a Control Valve Actuator Control Valve Actuator Control Valve Actuator ' N _ L 1 Heating 1 M j Heating 1 M 1 Heating 1 M 1 Heating 1 M - Zone Valve Zone Valve Zone Valve Zone Valve _ = Q ZH-6 a { ZH-5 E ac ry I ac ry I ac ry I ac a �� 24 V Common 24V Common 24V Common I 24V Common m a a (� O Open Open Open Open Cloae Cloae Cl... Cloae L I I r •VL t5 I _ Q W 1 Pump Pump Pump Pump Y/ (1 Pump Valve (1 Pump Valve (1 Pump Valve (1 Pump Valve I I I I I 1 Valve Station per room) Valve Station per room) Valve Station per room) Valve Station per room) Station Station Station Station 1 1 1 1 S/S S/S 5/S 5/S 208Vi i 208V 208V 208V Mohr Molar Molar Molar Mixing Valve 10 Field Mixing Valve : 10 Field Mixing Valve I 10 Field Mixing Valve L 10 Field Wiring Wiring Wiring Wiring �ZC-6 I , ZC-5 I I ZC-4 I I ZC-3 I I I I I I I I m I I I I I I I I I 24 VAC Common o—1 - 24 VAC Common - 24 VAC Common - 24 VAC Common Open Open Open Open close close close close Revised w J — 1 — No. By Date w `-----------------' m w w `_________________' m ontrol Valve Actuator ontrol Valve Actuator ontrol Valve Actuator ontrol Valve Actuator 2. 3. L1 L2 G L1 L2 G L1 L2 G L1 L2 G 4. Reviewed No. By Date 1. 2. 3. 4. Scale N.T.S. Size Arch D Date 11-15-2016 By JP Project No. Grow Room 110-Wiring Diagram Grow Room 109-Wiring Diagram Grow Room 107-Wiring Diagram Grow Room 104-Wiring Diagram 160661-50 E-1 Scale: N.T.S. E-1 Scale: N.T.S. E-1 Scale: N.T.S. E-1 Scale: N.T.S. sheet E-1 E r O o N c 0 0 rn 00 (1) C O 8 +.+N Eo >�� r C N V Environmental Control Environmental Control Environmental Control Environmental Control m„ CE p System System System System C N (By Others) (By Others) (By Others) (By Others) N c O F 00 CD 0 3 m 0 Grow Room 240V ----, 240V 240V o 'X Veg Room Packaging j 1 Ton d cn 103 10 Field 10 Field 10 Field .3 c and Individual o I I Wiring I WiringI I I I o d L1 L2 G L1 L2 G Processing L11L2 G Units o AMA L m to Room oME doto �o 4) to 24V Speed 1 24V Speed 1 li li Fen Enable Open 24V Speed 2 24V Speed 2 Fen Enable Close C W NOD Common Common j o m Fan Enable Open Fan Enable Close t O o Heat Coil& 1 240V Heat Coil& 240V h 3 Cooling Coil aim ° Cooling Coil Mp�d ° B G124V O9 (5)Units (3)Units B cizav Heat Coil& JP3 TERMINAL STRIP o I I I I I I 1 TON I I I I I I I I �� Iq F----------------- F-----------------i Cooling Coll s a `----------------------J `----------------------J Heat Coll& JP3 TERMINAL STRIP p 2 Cooling Coil Unit(TYP) lo (2)Units I 24V Speed 1 24V Speed 1 _ I I I � — 24V Speed 2 j 24V Speed 2 j li li F li Common Common l F i Control Valve Actuator Im II Heating I �A 240V ° ;SP2.d ° Zone Valve M Cooling Coil 2 Cooling CoilI - Only a � Only (TYP) �� _ NC N 25 ( ) ( ) '�----------------------� 24V SPeed2 ,li 24 V C..—pen r o 7 Units 2--Units Common r close E o J ,e ------ - J oII' a Control Valve Actuator Control Valve Actuator 1 Heat Coil& - N Heating M Heating M g 240V - L Coolin Coil Zone Valve Zone Valve (1)Units M° ° 1 _ Q c, O L O L III Chilled Water Control valve Actuator i ?, I I I I ZH-2 N { ZH-1 x { Nc x Nc N F °"' `----------------------J (TYP) A M a s= L 24 V Common 24V Common m T open open Control Valve Actuator F a` y�+ W CI°se 01°ae Heating (1) I� Zone Valve �� close C �� 24 V c C1 ZH-10 ria� fi oommon ven •L 0) I I I I i I _ I NC N Q W F-----------------a F----------------- p P i I I 'I Pump Pump 24 V Common > (1 Pump Valve (1 Pump Valve o, Valve Station per room) Valve Station per room) I Station Station sis SiS ----------------- 1 I I I I 208V j 208V Chilled Water MixingValve III �° Mixing Valve ; 10J Field g 10 Field ZC-2 " Wiring ZC-1 " Wiring Valve Station I I I I O Ii 24 VAC Common - 24 VAC Common - 24 VAC Common E Open OPen Open oae Revised Close — _ No. By Date 0 I Cl 0 cmee � w w m JP 5-22-17 A B oximl valve ActNator A B patrol valve Actuator A B coxtrol verve AaNeror 2. 3. L1 L2 G L1 L2 G 6 L2 4. Reviewed No. By Date 1. 2. 3. 4. Scale N.T.S. Size Arch D Date 11-15-2016 By JP Project No. Grow Room 103 Wiring Diagram Veg Room Wiring Diagram �C� Packaging A Processing Room Wiring Diagram 1 Ton Unit Wiring Diagram 160661-50 E-2 Scale: N.T.S. E-2 Scale: N.T.S. E-2 Scale: N.T.S. E-2 Scale: N.T.S. Sheet E-2 ;_ o o N c 0 o 0 0 rn 00 (1) 1=O 8 w+N O NQ Eo > � v Environmental Control Environmental Control Environmental Control m y C O System System System °' C (By Others) (By Others) (By Others) O F W CO 3 C m O Grow Room 240V 1 Grow Room 240V Grow Room 240V o m 205 10 Field I 204 10 Field 202 10 Field �.3 c,D Wiring Wiring Wiring =d diOf°D L1 L2 G L1 L2 G L1 L2 G �� c m Lo r d dN to 24V Speed 1 24V Speed 1 24V Speed 1 1 1 C n O 24V SPaed 2 li 24V SPaed 2 24V Speed 2 ' C W NOD O N Common Co.on Common I I I I I I °240 240V ° 24 ° 1 Heat Coil& Heat Coil& Heat Coil 3 I I I I I I I I 2 2 Cooling Coil M�-a ° Cooling Coil M�-a ° Cooling Coil MP2-a ° (3)Units (3)Units (4)Units o I I I „, I I E y F_________________i I Iq F_________________i F_________________ o o —_ I i i r , ,I 24V Speed t M 24V Speed t 24V Speed t 1 _ I I I 24V Speed 2 24V Speed 2 24V Speed 2 1 8 c Common 1 Common 1 1i Common 1i1. 240V ° 1 240V ° I 240V ° Cooling Coil Cooling Coil Cooling Coil - Only MPS' Only MPS' Only - (4) Units III III II 4O Units II II (4)Units II � r ------ ------- r ----------------- ----------------- ----------------- Eom VJ E J Control Valve Actuator Control Valve Actuator Control Valve Actuator - N L Heating M Heating M Heating M - Zone Valve Zone Valve Zone Valve _ = Q 2 ZH-9 c HJo� ec a ec a ac a I I I m � L 24 V Common 24V Common 24 V Common o-na. Open Open Open F< O (/) Clone 0 Close Cloee L I I I I I I I I I I I � •L �"� •L 5 I I I I I I I I I I I I W I _ I I I I I I Q Pump (1 Pump Valve 1 Pump (1 Pump Valve Pump1 (1 Pump Valve/ Valve Station per room) I Valve 1 Station per room) I Valve Station per room) Station Station Station 1 01 1 1 1 Va 0 VS Va 1 208V 208V 208V Mixing Valve "°"' 10 Field Mixing Valve "°" L 10 Field I Mixing Valve I "°" 10 Field " Wiring " Wiring zc_� " Wiring ZC-9 ZC-8 I I I I I I +Aualor 24 VAC Common - 24 VAC Common�� - 24 VAC Common o-OpenOpen Open Close Close Close Revised IwNo. By Date w m m `-----------------' `-----------------'ontrol Valve A B onUoI valve Actuator A B ontrol valve Actuator 2. 3. L1 L2 G L1 L2 G L1 L2 G 4. Reviewed No. By Date 1. 2. 3. 4. Scale N.T.S. Size Arch D Date 11-16-2016 By JP Project No. Grow Room 205-Wiring Diagram Grow Room 204-Wiring Diagram �C� Grow Room 202-Wiring Diagram 160661-50 E-3 Scale: N.T.S. E-3 Scale: N.T.S. E-3 Scale: N.T.S. Sheet E-3 ;_ r O o N c 0 o 0 0 00 (1CC rn ) C O N w+N O NQ Eo >�� r 0 . V m y C E O �� O �00 O {0 ems+CO X d .3 C-O 12 !R L Environmental Control Environmental Control r d d System System `>3 s AV/1 C a—Lf) (By Others) (By Others) v° G WNao dti Clone 240V Room 206 10 Field Chiller 1 t o Wiring L1 L2 G ---------------------- 24V Speetl 1 E 2 24V Sp.d 2 I open SEE SHEETCommon Close — I I I I I Ll I E-6 -- li li o li li 8 2 Heat Coil& 240V Cooling Coil ap a ° MMof p (2)Units o I I I I = Control Valve Actuator _ II I Chiller 2 r o V Heating IM IIIJ Zone Valve Jo E- 1 24 V Common III III W open SEE = Q u clo Open U se Cl...v SHEET E-6 �m a 0�a �T y0,, w p Pum L (1 Pump Valve C L Valve Station per room) Chiller 3 .i Station o 1 = y v P-1 I', C ' s,S I 208V Mixing Valve i L 10 Field SEE Open " Wiring Cl... SHEET zc-�o E-6 24 VAC Common Open Close — li Boiler A B Control Valve ACWa10r B"1 L1 L2 G gp_1 Revised No. By Date S-1 1. JP 8-17-17 2. open v SEE B. Cl°se SHEET 4 E-5 Reviewed No. By Date II II 1. z A B 3. 4. Scale N.T.S. Size Arch D Date 11-16-2016 By JP Project No. Clone Room 206-Wiring Diagram Boiler/Chiller-Wiring Diagram 160661-50 E 4 Scale: N.T.S. E-4 Scale: N.T.S. sheet E-4 ,_ 0 Control Panel n 0 (By Others) 0 0 ----------------------------------------- ur CIRCUIT BREAKER DISCONNECT SWITCH ?6 d (By Others) OR POWER BLOCK N o U.N 3 I L1 T1 =~ _ 3 PHASE Lz rz TO COMPRESSOR(S) o C N POWER AND FAN MOTOR m° c m o SOURCE L3 T3 O C N N �F 00 N C EARTH FU4 FU5; 3 m m GROUND - — in S i°"r T1 N Cn i I N.3 C i 35 120 VAC =o }+V c N UO CHWRi r°n 2 301 120 2991 r d d 6 N PUMP N0.1 RELAY FU6 0) (BY OTHERS) CONTROL CIRUIT VAC `s4 g C 120VAC @1.0 AMP MAX FUSE a O TallSEE NOTE 2 TBi 22 W N 00 33 N Y 301A o 10 TB1 TB1 1A t.o P2+ 120 VAC - naa CHWR1 �_3 PUMP NO.1 RELAY 5 (BYOTHERS) 24 VAC 120VAC @1.0 AMP MAX TB1 =— O 31 120 VAC E y I I PUMP 2 �I i - Control Valve Actuator 3 TB1 a- I I 34 120 VAC -6 II I I To Environmental TB1 _ Controls 32A I (By Others) GIRDo _ See Sheet E-4 —(317) _ TB2 r o 52 IF REMOTE STOP REMOTE STOP USED REMOVE v J SWITCH 585 LEAD 585 FROM v°E- (BY OTHERS) TERM TB2-52 TO N TB2 TB2-72(BY L U 72 OTHERS) - �° +0 a 0) i I I L s I TB2 54 �° ^M to TB1 li R 24 VAC 43 ~a y-r c1 L u TB2 d 111 Li T61 N 83 Q� s **NOR.OPEN PUMP > t, AUX.CONTACTS (OPTIONAL) TB2 CHW FLOW �;I 44 SWITCH �I -MANDATORY- TB2 TB2 (BY OTHERS) 0 45 IF EXTERNAL ALARM/EVENT IS USED 555A REMOVELEAD 555A FROM TERM TB2 TB2-45 TO TB2-67 67 Revised i No. By Date 1 JP 6/1/2017 TB2 2. 68 3. TB2 4' 69 Reviewed No. By Date TB2 1. 70 2. TB2 3. 71 4. i I Scale N.T.S. Size Arch D Date 11-15-2016 By JP Project No. Chiller-Wiring Diagram 160661-50 E-6 Scale: N.T.S. sheet E-6 Hyak Partners LLC Drawing Index IL Sheed Description GN-1 General Notes PL-1 Level 1 Piping Diagram-Level 1 PL-1.1 Chilled Piping Diagram-Level 1 Arlington , WA PL-1.2 Heated Piping Diagram-Level 1 PL-1.3 Condensation Piping Diagram- Level 1 PL-1.4 Corridor South Wall Elevation-Level 1 PL-1.5 Level 1 Piping Diagram- 1 Ton Fan Coil PL-2 Level 2 Piping Diagram-Level 2 PL-2.1 Chilled Piping Diagram-Level 2 PL-2.2 Heated Piping Diagram-Level 2 PL-2.3 Condensation Piping Diagram- Level 2 C-1 Chiller Piping-Layout C-2 Chiller Secondary Piping-Layout C-3 Chiller-Layout Manufacturer / Supplier CP-1 Chiller Pump Station FC-1 2-1/2 Ton Fan Coil Unit-Cooling Only FC-2 2-1/2 Ton Fan Coil Unit- Heat Delta T Solutions FC-3 Condensation Piping-Layout FC-4 1 Ton Fan Coil Unit FC-5 1 Ton Fan Coil Unit EL-1.1 Elevations Grow Room 110 27711 Diaz Rd - Suite B, Temecula, CA 92590 EL-1.2 Elevations Grow Room 109 760-682-0420, Fax 760-682-0428 EL-1.3 Elevations Grow Room 107 EL-1.4 Elevations Grow Room 104 www.deltatsolutions.com EL-1.5 Elevations Grow Room 103 EL-1.6 Elevations Veg Room Delta T Solutions Job No. 160661-50 EL-1.7 Elevations Packaging &Processing 105 EL-2.1 Elevations Grow Room 205 EL-2.2 Elevations Grow Room 204 EL-2.3 Elevations Grow Room 202 EL-2.4 Elevations Clone Room H-1 Boiler Piping-Detail H-2 Boiler to Section Pump BPF-1 By-Pass Feeder FW-1 Feed Water&Expansion Tank-Layout S-1 Section Pump Z-1 2-Way Zone Control-Detail Z-2 2-WayZone Control-Detail Z-3 2-Way Zone Control-Detail Z-4 2-Way Zone Control-Detail Z-5 3-Way Zone Control-Detail Z-6 3-Way Zone Control-Detail Z-D1 2-Way Zone Control-Detail E-1 System Wiring-Schematic E-2 System Wiring-Schematic E-3 System Wiring-Schematic E-4 System Wiring-Schematic E-5 Boiler Wiring-Schematic Revised 8-23-2017 E-6 Chiller wiring-Schematic Installation Notes (Unless Otherwise Specified) E Labor Materials Supplied (Unless Otherwise Specified) o 1. Refer to Delta T Solutions Specification 6.0 Piping Installation,for Information on Piping. 1. Supplied material will be per customer-approved quote and construction drawings provided System Specs o by Delta T Solutions. g Temp Volume Expansion Tank Pot Feeder 2. Refer to Delta T Solutions Specification 4.0 Air and Water Control,for Installation of Air 2. Unistrut,all-thread rod,and related materials provided as full length pieces to be measured, ® 0 190°F 210.4 DEEJAER23607 2-Gallon y Separator,Air Vent,Expansion Tank,Feed Water Regulator,and Pressure Gauge. cut and field fit during installation. Boilers 03 V+ E oa� 3. All equipment will be installed per customer-approved construction drawings provided by a)o 0 Delta T Solutions. Materials Excluded (Unless Otherwise Specified) Item City Brand Series Model Stages Fuel BTUH In BTUH Out VAC 0 FLA Hz S T 4. Installation shall be from the Point of Connection(POC)as shown on the construction 1. All Line Voltage and Low Voltage Wiring,Conduit and Disconnect shall be Supplied and B-1 1 RBI Dominator DB1050 4 NG 1,050,000 882,000 115 1 11.4 60 � O rn Q drawings. Installed By Electrical contractor. ■� _V 5. Notify Delta T Solutions if changes are necessary so the design can be modified as 2. Gas Line and Gas Regulator shall be Supplied and Installed by Others. Chillers U }+ ie required. 3. Water Line and Backflow Preventer shall be Supplied and Installed by Others. Item otv Brand Series Model connection Stages Tons BTUH kVA VAC 0 Amps Hz = O 0 N and c mo 6. Field coordinate/verify all dimensions,utilities,voltages,amp draws and conditions before 4. Power From main load Panel and all fused disconnects. C-1 2 Daikin AGZ-D 110D 3" 12 106 1,282,000 101.66 120 1 5.54 60 d r E installation. n 8 O F 00 5. Breaker to the boiler unit terminal strip,by Electrical Contractor. ° Ol m Heat Source(s) Pumps .3 m o 1. Refer to Drawings H-1,H-2,or H-3 for Heat source Details. .�CD Operational Notes (Unless OthewiseSpecified) Item City Location Brand Pump Model Flange GPM Ft Hd HP VAC 0 Amps Hz rn X 2. Refer to Delta T Solutions Specification 3.0 Heat Source Installation for Boiler Installation BPA 1 Boiler Federal 2CCL-3/4-4 2" 70.4 4.2 3/4 115/230 1 9.6/4.8 60 Z +4)rn t6 and Operating Information(ie Vent,Gas,and Electrical.) 1. Bench-Top and In-Slab hot water heating systems are designed for 130-140°F water.Do N c NOT exceed this temperature or system damage can occur. S-1 1 Heating Coils Grundfos 80-100F 3" 141 52.1 11%43 230/360 3 4.3 60 y 6 00 3. When boiler piping is supplied by Delta T Solutions,remove flow switch and tee from boiler $s 01 Of Ln 2. Under-Bench and Perimeter Fin Tubes stems are designed for u to 230"F water.Refer to CPA 2 Chiller Federal 3CGL-3-4 3" 315 29.3 3 230/360 3 14.5 60 =o c N o header and install in supply piping as shown. Y 9 P -o o m uo 4. All piping to be supported so that heat source does not support piping weight. design for operating Temperature.Do NOT exceed this temperature or system damage can ZC-1 1 Veg Room Grundfos 40-12OF 230V 1-1/2"GF 35.0 24.7 19/32 208/230 1 2.0 60 4)p C'4 p P 9 PP PP P P 9 9 occur. o c-t`cn ZC-2 1 Grow Room 103 Grundfos 65-12OF 230V 2-1/2"GF 84.0 32.1 1 1/32 208/230 1 3.4 60 5. Gas Service Regulator is required if Gas Pressure is above Y2 PSI. °. rn CD ZC-3 1 Grow Room 104 Grundfos 65-12OF 230V 2-1/2"GF 84.0 26.3 1 1/32 208/230 1 3.4 60 '`g Q W N O0D Piping e Q ZC-4 1 Grow Room 107 Grundfos 50-150F 230V 2"GF 56.0 30.2 27/32 208/230 1 2.8 60 1. Refer to PL Drawings for Piping Layout. ZC-5 1 Grow Room 109 Grundfos 50-150F 230V 2"GF 63.0 30.9 27/32 208/230 1 2.8 60 - 2. All PVC Piping to be Schedule 80. All Steel Piping to be Schedule 7,10,or 40.See -d installation manual for your specific pipe based on design criteria. ZC-6 1 Grow Room 110 Grundfos 50-15OF 230V 2"GF 63.0 30.2 27/32 208/230 1 2.8 60 _ ZC-7 1 Grow Room 202 Grundfos 50-15OF 230V 2"GF 56.0 32.7 27/32 208/230 1 2.8 60 3. Piping runs to be supported as required. 5._- ZC-8 1 Grow Room 204 Grundfos 50-15OF 230V 2"GF 56.0 32.9 27/32 208/230 1 2.8 60 4. Install Pipe Rest,using Unistrut with Brackets. ZC-9 1 Grow Room 205 Grundfos 50-150F 230V 2"GF 63.0 39.9 27/32 208/230 1 2.8 60 = 5. Vent high spots in piping mains to prevent air locks. 6. Installation to follow all state and local codes where applicable. ZC-10 1 Clone Room 206 Grundfos UP 26-64F 1-1/4"G 1 14.0 1 10.3 1 5/64 208/230 1 0.74/0.43 60 E a p 5'o 7. Installer will be required to measure cut and fit some pipe sections per site conditions.Match Construction Drawing set. Zone Valves-Chilled Water Actuator Flow Control = 8. Installer will be required to assemble piping connections using appropriate Teflon tape and m OtY Locationit Type Brand Valve Model Size CV Brand Model VAC Brand Model GPM Sim Detail Sheet t sealant to insure leak free assembly. ZC-1 1 Veg Room 2-Way Mixing Belimo B239 1Y2" 29 Belimo ARB24-3-S 24 Flow Design YRH150-0300 30 1Y2" Z-1 Insulation ZC-2 1 Grow Room 103 2-Way Mixing Belimo B264 2Y" 150 Belimo ARB24-3-S 24 Flow Design YRH250-0840 84 Z/2" Z-2 m 1. Insulation is provided for bare aluminum pipe with-in zones below the 7 ft.(Off Finished ZC-3 1 Grow Room 104 2-Way Mixing Belimo B264 2)z" 150 Belimo ARB24-3-S 24 Flow Design YRH250-0720 72 2Y2' Z-2 Floor)level in each zone. ZC-4 1 Grow Room 107 2-Way Mixing Belimo B252 2" 85 Belimo ARB24-3-S 24 Flow Design YRH2O0-0480 48 2" Z-3a 2. Refer to Installation Manual and provided drawings for insulation installation. ZC-5 1 Grow Room 109 2-Way Mixing Belimo B252 2" 85 Belimo ARB24-3-S 24 Flow Design YRH2O0-0480 48 2" Z-3a =- 3. Installer will be required to measure cut and fit some Insulation and Aluminum clad or PVC ZC-6 1 Grow Room 110 2-Way Mixing Belimo B252 2" 150 Belimo ARB24-3-S 24 Flow Design YRH2O0-0540 54 2" Z-3a - jacket sections per site conditions.Match Construction Drawing set. ZC-7 1 Grow Room 202 2-Way Mixing Belimo B264 2" 85 Belimo ARB24-3-S 24 Flow Design YRH2O0-0540 54 2" Z-3a U Fan Coils ZC-8 1 Grow Room 204 2-Way Mixing Belimo B252 2" 85 Belimo ARB24-3-S 24 Flow Design YRH2O0-0480 48 2" Z-3a E$ J 1. Refer to Drawings sheets FC-1 THRU FC-4 sheets for Fan Coil details. ZC-9 1 Grow Room 205 3-Way Mixing Belimo B351 2" 85 Belimo ARB24-3-S 24 Flow Design YRH2O0-0540 54 2" Z-3b a E J 2. Refer to Drawings sheets PL-1 THRU PL-2.3 sheets for Fan Coil Layouts. ZC-10 1 Clone Room 206 3-Way Mixing Belimo B330 1Y4" 85 Belimo ARB24-3-S 24 Flow Design YRH125-0540 54 11/4" Z-4 0N - L 3. Installer will be required to assemble Fan Coil fittings using appropriate Teflon tape and sealant to insure leak free assembly. Zone Valves-Hot Water Actuator Flow Control = Q Pumps&Zones y ++ Item Oty Location Type Brand Valve Model Sim CV Brand Model VAC Brand Model GPM Sim Detail Sheet p" L n a)1. Refer to S-1 Drawings for Section Pump Detail. 1= M ZH-1 1 Veg Room 3-Way Honeywell DEV3125-09 1Y4" 9 Honeywell VC-2710 24 Flow Design YRH125-0090 9 1Ya' Z-5 a O 2. Refer to Z-1 Drawings for Zone Valve Detail. d T Z ZH-2 1 Grow Room 103 3-Way Honeywell DEV3125-09 1/4 9 Honeywell VC-2710 24 Flow Design YRH125-0150 15 1Y4" Z-5 r a` a 0 3. Installer will be required to assemble zone valve stations per drawing Z-1 using appropriate y r Z ZH-3 1 Grow Room 104 3-Way Honeywell DEV3125-09 1Y4" 9 Honeywell VC-2710 24 Flow Design YRH125-0150 15 1Y4.' Z-5 a)Teflon tape and sealant to insure leak free assembly. L ZH-4 1 Grow Room 107 3-Way Honeywell DEV3125-09 1Y4" 9 Honeywell VC-2710 24 Flow Design YRH125-0120 12 1Y4" Z-5 ZH-5 1 Grow Room 109 3-Way Belimo B341 1Y" 29 Belimo ARB24-3-S 24 Flow Design YRH150-0240 24 11/2" Z-6 a"� y- Testing Notes (unless Otherwise Specified) ZH-6 1 Grow Room 110 3-Way Honeywell DEV3125-09 1Y4" 9 Honeywell VC-2710 24 Flow Design YRH125-0120 12 1Y4' Z-5 1 Fill,Leak Test and Pressure Test system after installation is complete but prior to installation of insulation. ZH-7 1 Grow Room 202 3-Way Honeywell DEV3125-09 1/4 9 Honeywell VC-2710 24 Flow Design YRH125-0090 9 1Ya" Z-5 2 Maintain a water treatment program appropriate for all the materials in the heating system. ZH-8 1 Grow Room 204 3-Way Honeywell DEV3125-09 1Y4" 9 Honeywell VC-2710 24 Flow Design YRH125-0090 9 1Y4' Z-5 In addition,the pH of the system water is to be maintained between 6.8 and 8.5. ZH-9 1 Grow Room 205 3-way Honeywell DEV3125-09 1Y4" 9 Honeywell VC-2710 24 Flow Design YRH125-0090 9 1Y4" Z-5 3 Water testing and Treatment ZH-10 1 Clone Room 206 3-Way Honeywell DEV3125-09 1Y4" 9 Honeywell VC-2710 24 Flow Design YRH125-0060 6 1Y., Z-5 2 Site Conditions Exclusions (unless Othemise Specified) Fan Coil Units 1. Site utilities It.. city Brand Model GPM Ft Hd PHASE FLA/MCA 2. Permits and state or local government approvals FCU-1 43 DELTA T SOLUTIONS 2.5 TON COOLING ONLY 6 7.8 1/2 240 1 5.5/5.8 60 3. Site/Foundation/Soil Preparation,Testing,Demolition,Debris Removal services or FCU-2 40 DELTA T SOLUTIONS 2.5 TON HEATING/COOLING COIL 6 7.8 1/2 240 1 5.5/5.8 60 equipment FCU-3 5 1 TON ENVIRO-TECH 1 TON HEATING/COOLING COIL 2.7 10.4 1/15 240 1 5.5/5.8 60 4. Temporary electrical,water,heating or cooling Revised 5. Craning/Hoisting of equipment No. By Date 6. All high/low voltage control or power wiring,conduit and electrical connections,contactor 1. JDK 2-27-2017 panels,and motor starters for equipment 2. 7. Cutting,core drilling,or patching of walls,floors,doors,ceilings,or roofs 3. a. 8. Access panels&penetrations,Firestop and caulking Reviewed 9. Overtime and/or shiftwork No. By Date 10. Painting of exposed piping and equipment 1. 2. 11. Concrete and/or steel equipment supports and foundations 3. 12. Toilet accessories a. 13. Antifreeze and Antifreeze charging Drawing 14. Concrete pads for equipment Scale lY4"=1'-0" 15. Shut down and drain down of existing systems size Arch D 16. Hot tapping of live piping systems Date 12-10-2016 By JP 17. Roof curbs Project No. 18. Fire protection General Notes Equipment Schedule 160661-50 19. System Balancing GN-1 Scale: None GN-1 Scale: None Sheet GN-1 E ~ U o C O O 0 North Level 1 Boiler on Concrete Pad p (TYP) In d a in yD 00o _I >_ 59'-6" 10'-6" 64'-3" 25'-3" ° r N N 3 3 S_1 ❑ ❑ cQi in O Q 3 ■� �U 5. LEE-Jo -52 ~2 ONV li; ---- ----- m O I..EO ,I III II « O C W a a a 8 II II �� to II to N o I III I i I I J o 00 i5 i CD HOT WATER d CONTROL VALVEi ZH-6 - ---------- ---------- ------------ ----------- Grow Room See SheetZ-1 � a , a a a . o o �W o (TYP) F-------- N o �� S m_L M 110 N 0 N v ;lICIIIsIli Packaging & OZC-6 IIII IIII bp r 1­o W N00Processing o zc-3 zH-3 II 105 Legend 2/TON N _________ '___ FAN COIL UNIT Grow Room w/Hot Water Heating Coils = =- 104 TON FAN COIL UNIT =°-a !�'- Ea B I q `.5 CHILLED WATER MIXING VALVE 1 TON a Grow Room RISERS TO ❑ FAN COIL UNIT 8 2 See Sheet Z-1 M 1 09 (TYP) LEVEL 2 zc-fo w/Hot Water Heating Coils d fr= =^il ZH-10 CHILLED WATER MIXING VALVE h II n li I' ✓6- a =_________ __________ ____________ ,J —Chilled Water Return - ZH-2e CP- ZC-1 ZH-1 —Chilled Water Supply -- I d9 `g __________- - ___ ___________ --Hot Water Supply ---------------------------- - oli i e e a e a------------- ------------ -' ;; I m --Hot Water Return ------ " HOT WATER --------------------- ° _____________ ------------ ------------- -� II d ;i CONTROL VALVE E o 8 J Future Use a E e I I II II II � L II I� II — I I A, I-. IIII III m � (4)MECH.TEES W/CAP M Dry Room FOR FUTURE PIPING Grow Room Veg. Room " 108 Notes (Unless Otherwise Specified) 0 I; IIII `r a` M L 1. All chiller piping to be supported so that Chiller does notsupport piping weight. L2. Maintain a water treatment program appropriate for all theI TO materials in the heating system. In addition,the pH of theL VE 2 system water is to be maintained between 6.8 and 8.5.3. All piping to be supported so that heat source does not support ----------- --------- ------------ --------- --� Piping weight. ZC 4 III; 4. Vent high spots in piping mains to prevent air locks. ______________ 5. Piping runs to be supported as required. ------- -------------------- 6. Installation to follow all state and local codes where applicable. 7. Notify Delta T Solutions if changes are necessary so the Grow Room design 9 can be modified as required. I uired. M 107 8. All line voltage and low voltage wiring,conduit and Irri gation disconnects shall be furnished and installed by others. 9. Field coordinate/verify all dimensions,voltages,amp draws 0 and conditions before installation. 0 10. Installing subcontractor will be required to cut and modify in Revised 5'-0" the field for proper fit per details. No. By Date li N_ 1. JP B-7-17 11. Installing subcontractor shall assemble parts supplied by Delta 000 T per Detail. 2. 12. Attachments to structure shall be supplied by Installing 3. CAP(TYP) o subcontractor as required. 4 OIS-1 13. Installing subcontractor will be required to measure and cut all Reviewed By No. By Date sections of the threaded rod based on Field Conditions. 1 C-1 h 14. The Installing subcontractor will be required to measure and 2 0000 0000 000 Y cut some sections of Unistrut based on Field Conditions. Oo Oo Oo 0000 o Oo Oo Oo D O r g q 3 0 Oo � � 15. The Installing subcontractor will be required to measure,cut, a. and groove some sections of the Pipe and Insulation based on Drawing AGZ110 Field Conditions. scale Y,^=1'-0^ CHILLER(TYP) 5'-0" 16. All hanging hardware shall be stainless steel,Galvanized,or Aluminum as noted on the Detail. sae Arch D 57'-4" 17. Attachments of hangers to structure shall be by others. Date ff-is-zofs By JP 18. This is a corrosive environment and proper materials must be Project No. used. Level 1 System Piping-Layout 19. Insulation is provided for bare aluminum pipe with-in zones 160661-50 Note: Piping Shown Outside the Greenhouse for Clarity Only. Scale: /8" 1'-0" below the 7 ft.(Off Finished Floor)level in each zone. sheer PL-1 = PL-1 E ~ U o C O O 0 North Level N d o yN 0U _I C� 59'-6" 10'-6" 64'-3" 25'-3" r N N 3 m a°' 3 ❑ ❑ OF eO CU � J E0 3"CWS&CWR m c E o 1.e a , PIPING O F 00 m OI 1Y" 11/2'x1Y4" 3/4"(TYP) 00 4 REDUCERS it O �d 1Y2" oo N(� X oo .+ 2112" 1Y4" 12 . Grow Room 2„x1 z" "x3" a a s e e REDUCERS 3" M 110 REDUCERS 2"x1Yz" 1Y2"x1Y4" a`>p N 2" 1Yz" 1Ya" - O ZC-3 STEELxPVC FLANGES REDUCERS REDUCERS Packaging & o Q� 2"x1Y2" a REDUCERS ZC-6 RE2DUCERS Processing _ w`N 00 1Ya" 1Yz'x1/4' 1Y2" Legend REDUCERS 2Y2" 105 TON FAN d IIIII���llppp FAN COIL UNIT 2 Grow Room o b w/Hot Water Heating Coils 5 2" v ° a ° 104 2%TON 1Yz"x1Y4" FAN COIL UNIT = 1Ya REDUCERS 6"x3" b E 1Y2" REDUCERS I I 2"x1Yz" ZC-5 2"x3" t REDUCERS CHILLED WATER REDUCERS 1 TON o RISERS T a Grow Room MIXING VALVE 2 FAN COIL UNIT 8 t M ( ) 2"x1Y2" 1Yz° 1Y2"x1Y4" 1Ya" ��LEVEL w/Hot Water Heating Coils 109 2" CP- See Sheet Z-1 TYP REDUCERS REDUCERS 2"x1Yz° REDUCERS —Chilled Water Return - 1Ya" 1Yi'x1Y4" 1Yz' -1 -REDUCERS —Chilled Water Supply -CHILLED WATER e aMIXING VALVE so2Yi' 2"x1Yz" 1Yz.x1Y4" F- !C E J 2" REDUCERS 1Yz REDUCERS 1Ya 1Yz J A-J 6 e e-J 2%2"x2 a_E m REDUCERS L 2" m J (2)MECH.TEES W/CAP .E Dry Room FOR FUTUREPIPING Grow Room o Veg. Room o i s �? (TYP) 00 N 108 103 "' 1Y4' T a Notes (Unless Otherwise Specified) F< 0 c 1/2° 4-+ - I I 1. All chiller piping to be supported so that Chiller does not Q� 0) 0 support piping weight. L U 3" 2. Maintain a water treatment program appropriate for all the Y=VET2= TO m materials in the heating system. In addition,the pH of the 2" 2"x1%" 1Yz" 1Y2"x1Y4" 1Y4" system water is to be maintained between 6.8 and 8.5. Q REDUCERS REDUCERS %"x1Y4' 3. All piping to be supported so that heat source does not support > y REDUCERS a a a e piping weight. — 1Y4" 1Yz"x1Ya" REDUCERS 4. Vent high spots in piping mains to prevent air locks. U REDUCERS M ZC-4 5. Piping runs to be supported as required. 6"CWS&CWR J 6. Installation to follow all state and local codes where applicable. PIPING 1Ya" 7. Notify Delta T Solutions if changes are necessary so the Grow Room design can be modified as required. M 107 8. All line voltage and low voltage wiring,conduit and 1Yz" Irrigation disconnects shall be furnished and installed by others. 9. Field coordinate/verify all dimensions,voltages,amp draws 0 and conditions before installation. �Y4, 1Y2"x1Y4" 0 10. Installing subcontractor will be required to cut and modify in Revised REDUCERS the field for proper fit per details. No. By Dale ° e n 11. Installing subcontractor shall assemble arts supplied b Delta 1. JP 3-18-17 6"CWS&CWR 9 P PP Y CAPPED CWS&CWR PIPING T per Detail. 2. 12. Attachments to structure shall be supplied by Installing 3. subcontractor as required. 4 5'-0" 6'-0" Reviewed B S-1 13. Installing subcontractor will be required to measure and cut all No. By y Date sections of the threaded rod based on Field Conditions. C-1 Oo O O �0000�0 14. The Installing subcontractor will be required to measure and z co cut some sections of Unistrut based on Field Conditions.g q3. 15. The Installing subcontractor will be required to measure,cut, and groove some sections of the Pipe and Insulation based on AGZ110 Field Conditions Drawing . CHILLER TYP 5'-0" scale Yr"=1'-0" ( ) � � 16. All hanging hardware shall be stainless steel,Galvanized,or Aluminum as noted on the Detail. $ae Arch o 57'-4" 17. Attachments of hangers to structure shall be by others. Date 11.1szols 18. This is a corrosive environment and proper materials must be By JP Project No. used. Chilled Water Cooling System -Layout 19. Insulation is provided for bare aluminum pipe with-in zones 160661-50 Note: Piping Shown Outside the below the 7 ft.(Off Finished Floor)level in each zone. sheet Greenhouse for Clarity Only. L-1.1 Scale: /8"=1'-0" PL-1.1 O n E T__..... is q Y — V1 O � O O 7 North Level 1 Boiler on Concrete Pad o (TYP) L 4 n N -°-_ 59'-6" 10,_6„ 64'-3" 25,_3" m c N _ �Z,x3„ T� O3" o o N Q _ r ■� C U 5'-521 3�.52" �� c -�--- =1—' Ft LUImm H O --- ------- - - 2 753x2 ONO 00 1Y4'' HOT WATER ? { s .0 000 0= cp CONTROL VALVE w See Sheet Z-1 3 24 "x1Ya" r ry Grow Room Isiss- (TYP) (TYP) =o dt� --� ------ o f-- ii 2" N o C N O �� 03 L[) M 110 + - 1Ya" �� — �oN 3"x2Y2' c—�' Packaging o a i�o -- -_; Processing W N 1Ya" t 1Ya° 105 Legend a ZH-3 n 21/=TON - FAN COIL UNIT GrowRoom o w/Hot Water Heating Coils 00 � ------------ 104 TON n f FAN COIL UNIT 2Y2"x2" - 1Ya' =t Grow Room " 1 TON RISERS TO ❑ FAN COIL UNIT 8 t b LEVEL 2 w/Hot Water Heating Coils d M 109 1Ya" �= , ZH-2 LJ Ii ZH-1 2"x1Ya"_j 1 - 1Ya" } -_ (TYP) m`_ ------- -------- ------ ------- ---Hot Water Supply ----------------------------- 2 8 i - -- -- -- - --- --- - - a e e a e ii `! �-q '�'--^�-------------�'--^�------------ --------- __�'--^�-d-'i i i i'i �� ---Hot Water Return ----------------------------- `m o LJ LJ-------------L J------------ -------- LJ " HOT WATER V^ J r- r- r-I CONTROL VALVE =a J 1, - -- h -- Future Use a �' II 1Ya" i > 1Ya" r Q J (4)MECH.TEES W/CAP 4 D Room FOR FUTURE PIPING Grow Room q Dry Veg. Room 108 (TYP) ;; 2"x1Y2" 103 M 1Y;' m T a in cc (V �� 'ii Notes (Unless otherwise Specified) O rn I I 1. All chiller piping to be supported so that Chiller does not support piping weight. .� y 1t/2" 1 ° 2. Maintain a water treatment program appropriate for all the _ TO 2a i 4 materials in the heating system. In addition,the pH of the at L VE 2 1Ya" system water is to be maintained between 6.8 and 8.5.ZH Q �� jf_______ 3. All piping to be supported so that heat source does not support > ______________ e t ��- -- ____________________- __' piping weight. 4. Vent high spots in piping mains to prevent air locks. 1Ya' ---- ------------- 5. Piping runs to be supported as required. 6. Installation to follow all state and local codes where applicable. ---------- 1Ya" 4' 7. Notify Delta T Solutions if changes are necessary so the Grow Room 1Ya" design can be modified as required. M 107 8. All line voltage and low voltage wiring,conduit and Irrigation disconnects shall be furnished and installed by others. 9. Field coordinate/verify all dimensions,voltages,amp draws C � and conditions before installation. 1Ya" O 10. Installing subcontractor will be required to cut and modify in Revised the field for proper fit per details. No. By Date JP 3-18-17 _ _____ _ ___❑� O O O 11. Installing subcontractor shall assemble parts supplied by Delta 1.e � e --- -- a --- --- a --- - ------- T per Detail. 2. 12. Attachments to structure shall be supplied by Installing 3 1Y4.' subcontractor as required. 4 V-0" Reviewed By 13. Installing subcontractor will be required to measure and cut all No. By Date CAP(TYP) sections of the threaded rod based on Field Conditions. 1 0000O Oo Oo0000 14. The Installing subcontractor will be required to measure and 2. cut some sections of Unistrut based on Field Conditions. 3 0000 O Oo Oo0000 15. The Installing subcontractor will be required to measure,cut, a and groove some sections of the Pipe and Insulation based on Drawing AGZ110 — — — Field Conditions. scale CHILLER(TYP) 16. All hanging hardware shall be stainless steel,Galvanized,or -—- — —- -—- Aluminum as noted on the Detail. spa Arch D 17. Attachments of hangers to structure shall be by others. Data 11-16-2016 sy JP 18. This is a corrosive environment and proper materials must be Project No. used. Hot Water System -Layout 19. Insulation is provided for bare aluminum pipe with-in zones 160661-50 Note:Piping Shown Outside the sheet Greenhouse for Clarity Only. L-1. Scale: Ys"=1'-0" below the 7 ft.(Off Finished Floor)level in each zone. PL-1.2 E ~ U o C O O 0 North Level N d o N 0 U _I >_ 59'-6" 63'-6" 25'-3" r w N 3 m a°' 3 ❑ ❑ OF eO CU � E'o > �� m y C E O EJ e a s a II��II OI~ CONDENSATION LINE � � g 00 �.3 m CD o See Sheet FC-3 000 o r x (TYP) ) Grow Room a a a a a a ��L"O' M 110 CONDENSATION LINE d 2 N See SheetFC-3 Packaging & 6 0- Q) _—LE (TYP) 02. 0-o RUN CONDENSATION Processing _ W N ccoo LINE TO DRAIN Legend (By Others) 105 ° TON FA d IIIII���llppp� FAN COIL UNIT Grow Room o w/Hot Water Heating Coils Z_ n p n n a a a a 104 2%TON - b FAN COIL UNIT -20 I I p'o 1 TON Grow Room FAN COIL UNIT 8 9 RUN CONDENSATION RISERS TO ❑ M 1 09 w/Hot Water Heating Coils d LINE TO DRAIN LEVEL 2 (By Others) RUN CONDENSATION Li Li —Condensation Line LINE TO DRAIN _- (By Others) a a a a - e e Ek RUN CONDENSATION ;a J LINE TO DRAIN a E J (By Others) - N _ L m M Dry Room Grow Room o Veg. Room y 103 Co 0_ N108 CL Notes (Unless Otherwise Specified) 0 J r a` �+ c I 1. All chiller piping to be supported so that Chiller does not L o support piping weight. .� N 2. Maintain a water treatment program appropriate for all the f+ s RISERS TO RUN CONDENSATION materials in the heating system. In addition,the pH of the = L LEVEL 2 LINE TO DRAIN system water is to be maintained between 6.8 and 8.5. Q c (By Others) O na a 8 a a 3. All piping to be supported so that heat source does not support > U a a a a piping weight. 4. Vent high spots in piping mains to prevent air locks. 5. Piping runs to be supported as required. 6. Installation to follow all state and local codes where applicable. 7. Notify Delta T Solutions if changes are necessary so the Grow Room design can be modified as required. 107 8. All line voltage and low voltage wiring,conduit and Irrigation disconnects shall be furnished and installed by others. Room 9. Field coordinate/verify all dimensions,voltages,amp draws RUN CONDENSATION and conditions before installation. LINE TO DRAIN 10. Installing subcontractor will be required to cut and modify in Revised (By Others) the field for proper fit per details. Nu. By Data a 11. Installing subcontractor shall assemble parts supplied by Delta 1. T per Detail. 2. 12. Attachments to structure shall be supplied by Installing B. subcontractor as required. 4 5'-0" o Reviewed By 0 13. Installing subcontractor will be required to measure and cut all r,* BY Data sections of the threaded rod based on Field Conditions. OOoOOOOo14. The Installingsubcontractor will be required to measure and Y co cut some sections of Unistrut based on Field Conditions. OO 00 O g q OOOOo � 15. The Installin subcontractor will be re uired to measure,cut, and groove some sections of the Pipe and Insulation based on Drawing Field Conditions. scale Y,^=V-o" 16. All hanging hardware shall be stainless steel,Galvanized,or size Arch D Aluminum as noted on the Detail. 5T-4" 17. Attachments of hangers to structure shall be by others. Date if-fszofs By JP 18. This is a corrosive environment and proper materials must be Project No. used. Condensation Lines- Layout 19. Insulation is provided for bare aluminum pipe with-in zones 160661-50 Note: Piping Shown Outside the L-1.3 Scale: /8"=1'-0" below the 7 ft.(Off Finished Floor)level in each zone. sheet Greenhouse for Clarity Only. PL-1.3 E ~ U o W Supply&Return Lines o Shown on South wall North Level o d a q7 yD r� N N 3 o am 3 ❑ ❑ cQi F e O C U 3 o 700 m y C E O N c OC I—OND 3 m. 00 O d N; C o r IY to �o A-0 ti2L? �a d0N A+90 V/ E-7:L? a IZ O �01 W N O as `o HWS&HWR z 5s LINES w CWS&CWR Y V oa LINES o 5 o E d N a 0 ��W `° 0 — 0 W a— O LL °D 8 t m Ev° J J - N > �N L J A Corridor Lines-South Wall Elevation t c L-1.4 Scale: Y4"=1'-0" L Notes (Unless Otherwise Specified) ° a Q W a` a.+ 1. All chiller piping to be supported so that Chiller does not L support piping weight. .� t 2. Maintain a water treatment program appropriate for all the f+ materials in the heating system. In addition,the pH of the = L n r system water is to be maintained between 6.8 and 8.5. Q 3. All piping to be supported so that heat source does not support > 0a piping weight. 4. Vent high spots in piping mains to prevent air locks. iJ 5. Piping runs to be supported as required. 6. Installation to follow all state and local codes where applicable. 7. Notify Delta T Solutions if changes are necessary so the design can be modified as required. 8. All line voltage and low voltage wiring,conduit and HWS&HWR disconnects shall be furnished and installed by others. LINES z 9. Field coordinate/verify all dimensions,voltages,amp draws CWS&CWR w and conditions before installation. 10. Installing subcontractor will be required to cut and modify in Revised Lu LINES 0 the field for proper fit per details. No. By Data o Z v 11. Installing subcontractor shall assemble parts supplied by Delta a X T per Detail. z. �W 3. w 12. Attachments to structure shall be supplied by Installing o subcontractor as required. 4 LL 4 13. Installing subcontractor will be required to measure and cut all Reviewed By co No. By Date sections of the threaded rod based on Field Conditions. 14. The Installing subcontractor will be required to measure and z cut some sections of Unistrut based on Field Conditions. a 15. The Installing subcontractor will be required to measure,cut, 4. and groove some sections of the Pipe and Insulation based on Drawing Field Conditions. scale Y,^=V-o^ 16. All hanging hardware shall be stainless steel,Galvanized,or Aluminum as noted on the Detail. size Arch D 17. Attachments of hangers to structure shall be by others. Date 11.1s2016 BY JP 18. This is a corrosive environment and proper materials must be Project No. used. Corridor Lines-Section 19. Insulation is provided for bare aluminum pipe with-in zones 160661-50 Note: Piping Shown Outside the Greenhouse for Clarity Only. Scale: 1/8"=1'-0" below the 7 ft.(Off Finished Floor)level in each zone. Sheet L-1.4 PL-1.4 O E T__..... O to O O 7 North Level N t 4 a {U) Ea 66 M o N N CWS&CWR ; >,� LINES o o f .O C U HWS&HWR 8� LINES q E o S O �H� p$ L D n d U)w -000 yo c O d N L? oa Or-0 C r_0 s°= III N00 Legend 2. TON FA o FAN COIL UNIT w/Hot Water Heating CoilsLl `a 8d FA TON a a (4)SADDLE TEE 1.25"X 3/4"FOR FAN COIL UNIT HEATING AND COOLING(TYP) L] (2)SADDLE TEE _ 1.25"X 3/4"FOR COOLING 1 TON N_ (2)SADDLE TEE (TYP) FAN COIL UNIT 8 5 1.25"X 1/2"FOR HEATING w/Hot Water Heating Coils (TYP) 3-WAY HOT WATER —Chilled Water Return 8 t ----- --------� = c Connection to Main Lines-Section CONTROL VALVE —Chilled Water Supply L-1.5 Scale: Ys"=T-0" See Sheet Z-5 --Hot Water Supply =8 (TYP) ❑ ❑ pPy ----------------------------- _ ---Hot Water Return ----------------------------- '" U ------�� 4D, s 1 TON FAN COIL ?a J J (TYP)See Sheet FC-5 - J _ o E N FAN COIL ON LEVEL 2 W/ 2--WAY CHILLED DUCTING DOWN TO LEVEL 1 s WATER MIXING VALVE (Shown for Clarity) Q See Sheet Z-D1 _ 1.25"PIPING OFF MAIN L a SUPPLY AND RETURN(TYP) r_ E Notes (unless otherwise Specified) F a Q Packaging & 1. All chiller piping to be supported so that Chiller does not to support piping weight. L 2. Maintain a water treatment program appropriate for all the '— (2)SADDLE TEE Processing �+ ro materials in the heating system. In addition,the pH of the > 1.25"X 1/2"FOR HEATING 1/2"PIPING OFF MAIN J (TYP) SUPPLY AND RETURN(TYP) system water is to be maintained between 6.8 and 8.5. Q 105 3. All piping to be supported so that heat source does not support > i piping weight. 4. Vent high spots in piping mains to prevent air locks. - ------------ --------------------------------- ° ❑ 5. Piping runs to be supported as required. Ile FAN COIL 6. Installation to follow all state and local codes where applicable. (2)SADDLE TEE See Sheet FC-4 7. Notify Delta T Solutions if changes are necessary so the 1.25"X 3/4"FOR COOLING ZLILILL-1 for connections (TYP) (TYP) design can be modified as required. 8. All line voltage and low voltage wiring,conduit and disconnects shall be furnished and installed by others. Irrigation 9. Field coordinate/verify all dimensions,voltages,amp draws i and conditions before installation. 10. Installing subcontractor will be required to cut and modify in Revised the field for proper fit per details. No. By Date (2)SADDLE TEE 0 11. Installing subcontractor shall assemble parts supplied by Delta t' JP 6-ts-n 1.25"X 1/2"FOR HEATING T per Detail. 2. (TYP) " 0 a. 12. Attachments to structure shall be supplied by Installing " subcontractor as required. 4 -- ❑ I 13. Installing subcontractor will be required to measure and cut all Reviewed By No. By Date 00 sections of the threaded rod based on Field Conditions. 1. 0 ❑------d 14. The Installing subcontractor will be required to measure and 2. sa H_______.1 cut some sections of Unistrut based on Field Conditions. s (2)SADDLE TEE 15. The Installing subcontractor will be required to measure,cut, 1.25"X 3/4"FOR COOLING 4 (TYP) and groove some sections of the Pipe and Insulation based on Drawing Field Conditions. s<aie a/a =I'•a 16. All hanging hardware shall be stainless steel,Galvanized,or Aluminum as noted on the Detail. siza Arch D 17. Attachments of hangers to structure shall be by others. Data 3-28-2017 By JP 18. This is a corrosive environment and proper materials must be Project No. used. Level 1 Fan Coil Piping- Layout 19. Insulation is provided for bare aluminum pipe with-in zones 160661-50 Note:Piping Shown Outside the sheet Greenhouse for Clarity Only. PL-1.s Scale: 3/s"=1'-0" Level 1 Fan Coil Piping- Layout below the 7 ft.(Off Finished Floor)level in each zone. PL-1.5 Scale: 3/6"=V-0" P L-1.5 C E ~ U o N O O 0 North Level N d i N 000 E o �, "y N N 3 o am 3 0 60'-0" MU�Q 3 do �co O r.. C.)V m y C E O ao 8 8 8 e 3 cc 4)0 « L t� II 0 G1('n X �i FAN COIL ON LEVEL 2 W/ c Grow Room Ii DUCTING DOWN TO LEVEL 1 o r >n�LC'0' � I (Shown for Clarity) F a �� ti � 205 O5 � /��\ 00N V/ —lr) a Q TIC O �I Clone W N ao Legend !' Room 2%TON = r • ___________ ___________ ___________ __- -_=J' r����i b FAN COIL UNIT A- 206 L w/Hot Water Heating Coils 8 --------------- 8 ___----------- • -------------- ZC.9 2'/x TON o b FAN COIL UNIT .a�- I. .il PPP ZH-9 Ili v m �, I� 1 TON w.. Grow Room p FAN COIL UNIT 8 t o ;I II; RISERS FROM LEVEL1 zc-foHeating d � I I I O � w/Hot Water Coils ` ��4 Zone Valves located on ZH-8 zH-fo N C HOT WATER ii -----i level CONTROL VALVE _ f —Chilled Water Return - See Sheet Z-2 —Chilled Water Supply - (TY P) --Hot Water e • a e Supply ------------- - 0, Hot Water Return ------- t." V A Level 2 System - Layout « J Scale: Y8"=V-0" a E J (4)MECH.TEES W/CAP - FOR FUTURE PIPING Q c TYP Dry Room " C E fV 203 II v n N T II� Notes (Unless Otherwise Specified) a r 4 Q 2 N 1. All chiller piping to be supported so that Chiller does not Q� RISERS FROM p p g PP L Cl y LEVEL1 _ a support piping weight. .� N ZH-7 ----- • 2. Maintain a water treatment program appropriate for all the materials in the heating system. In addition,the pH of the = ZC-7 system water is to be maintained between 6.8 and 8.5. Q J r 3. All piping to be supported so that heat source does not support > • • ° • CHILLED WATER piping weight. MIXING VALVE 4. Vent high spots in piping mains to prevent air locks. See Sheet Z-1 5. Piping runs to be supported as required. (TYP) 6. Installation to follow all state and local codes where applicable. 7. Notify Delta T Solutions if changes are necessary so the Grow Room design can be modified as required. 0 2�2 8. All line voltage and low voltage wiring,conduit and M , disconnects shall be furnished and installed by others. 9. Field coordinate/verify all dimensions,voltages,amp draws and conditions before installation. 10. Installing subcontractor will be required to cut and modify in Revised the field for proper fit per details. No. By Data • 11. Installing subcontractor shall assemble parts supplied by Delta 1. _______________ T per Detail. z. 12. Attachments to structure shall be supplied by Installing B. subcontractor as required. 4 54'-0" 5'-0" Reviewed By 13. Installing subcontractor will be required to measure and cut all No. By oate sections of the threaded rod based on Field Conditions. 14. The Installing subcontractor will be required to measure and z cut some sections of Unistrut based on Field Conditions. 8 15. The Installing subcontractor will be required to measure,cut, 4. and groove some sections of the Pipe and Insulation based on brewing Field Conditions. scale Yr^=V-a• 16. All hanging hardware shall be stainless steel,Galvanized,or Aluminum as noted on the Detail. $ae Arch o 17. Attachments of hangers to structure shall be by others. Date 11.1 szois By JP 18. This is a corrosive environment and proper materials must be Project No. used. �� Level 2 System-Layout 19. Insulation is provided for bare aluminum pipe with-in zones 160661-50 Note: Piping Shown Outside the below the 7 ft.(Off Finished Floor)level in each zone. sheet Greenhouse for Clarity Only. PL-2 Scale: Y8"=V-0" P L-2 C E ~ U o W O O 0 North Level N d a N 000 E o �, r� N N 3 o am 3 0 60'-0" MU�Q 3 do �co ~2 ONV Hill m y C E p C e a a s Nc 0 �F ONO ♦♦^^ CO 0 0O �3 v/ imp 1Ya'CWS& Z1Y2"x1Ya" s o00 o r i° CD _ CWR PIPING REDUCERS x o FAN COIL ON LEVEL 2 W/ Grow Room 1Y2"CWS& DUCTING DOWN TO LEVEL 1 o r >n�°D o CWR PIPING (Shown for Clarity) N g° �� N 0 ti 205 d0N - 0 °' 1Y4"CWS& 1Y2"x1Y4" 1Y2" 2"xly2" Clone gY W N°° CWR PIPING REDUCERS REDUCERS Legend a a Room TON d 206 FA IIIII���llppp b FAN COIL UNIT °- w/Hot Water Heating Coils 5 ZC-9 a a a a 2%TON FAN COIL UNIT 1ya"CWS& b CWR PIPING REDUCERS 2 2"CWS& '2 CWR PIPING = 1 TON a Grow Room p FAN COIL UNIT 8 t 0 RISERS FROM LEVEL1 w/Hot Water Heating Coils 204 d 1Y2"CWS& Zone Valves located on CWR PIPING level 1 —Chilled Water Return - 1%"CWS& 1Y2"x1Y4" 1Ya"CWS& —Chilled Water Supply CWRPIPING REDUCERS CWR PIPING ZC-8 3"x2Y2" c° U REDUCERS J L-2. A Chilled Water Cooling System - Layout ;d J N Scale: Y8"=V-0" a - L d (2)MECH.TEES W/ - J CAP FOR FUTURE _ Q E PIPING(TYP) q g Dry Room rn N 203 3"CWS& Notes (Unless Otherwise Specified) r a a Q c CWR PIPING a.+ - 1. All chiller piping to be supported so that Chiller does not Q� RISERS FROM p p g pp L 00 LEVEL1 support piping weight. 2. Maintain a water treatment program appropriate for all the materials in the heating system. In addition,the pH of the = io ZC-7 3„ system water is to be maintained between 6.8 and 8.5. Q 3. All piping to be supported so that heat source does not support > y Tcws&7",,�-�,Y, ZWS& �2.%.' piping weight.CHILLED WATER .1 MIXING VALVE 4. Vent high spots in piping mains to prevent air locks. 10 CWR PIPING REDUCERS CWR PIPING REDUCERS See Sheet Z-1 5. Piping runs to be supported as required. (TYP) 6. Installation to follow all state and local codes where applicable. 7. Notify Delta T Solutions if changes are necessary so the Grow Room design can be modified as required. 0 2"CWS& 8. All line voltage and low voltage wiring,conduit and 202 CWR PIPING disconnects shall be furnished and installed by others. 9. Field coordinate/verify all dimensions,voltages,amp draws and conditions before installation. 1Y4"CWS& 1Y2"x1Y4" 10. Installing subcontractor will be required to cut and modify in Revised CWR PIPING REDUCERS the field for proper fit per details. No. By Data 11. Installing subcontractor shall assemble parts supplied by Delta T per Detail. 2. 12. Attachments to structure shall be supplied by Installing 3. subcontractor as required. 4 5'-0" Reviewed By 13. Installing subcontractor will be required to measure and cut all No. By Dale sections of the threaded rod based on Field Conditions. 14. The Installing subcontractor will be required to measure and 2. cut some sections of Unistrut based on Field Conditions. 3 15. The Installing subcontractor will be required to measure,cut, 4. and groove some sections of the Pipe and Insulation based on Drawing Field Conditions. scale Yr^=V-a• 16. All hanging hardware shall be stainless steel,Galvanized,or Aluminum as noted on the Detail. $ae Arch o 17. Attachments of hangers to structure shall be by others. Dare 11.1 szois aY JP 18. This is a corrosive environment and proper materials must be Project No. used. �� Scale: Ya"=1'-0"Chilled Water Cooling System- Layout 19. Insulation is provided for bare aluminum pipe with-in zones 160661-50 Greenhouse for Clarity Only. Note: Piping Shown Outside the below the 7 ft.(Off Finished Floor)level in each zone. sheet L-2. PL-2.1 C E ~ U o W O O 0 North Level N d a N U V' E o r r� N N 3 o am 3 60'-0" do �oo ~2 ONV m y C?T E O O C �I N c OI~00 g 00 �3 Em0 1Ya" e o00 o s 'I F din x �i FAN COIL ON LEVEL 2 W/ c Grow Room 1 DUCTING DOWN TO LEVEL 1 o r >nW� 205 �4 (Shown for Clarity) F a �� L MN US 46 N a Q r O 00 Clone LY w N Legend r--ry �•--'} �•--'} �•--'� ,, Room 2%TON = _=LJ----------= 206 b FAN COIL UNIT 2"x1Y4"TEE y P w/Hot Water Heating Coils {t�� � _ -------- _ _____________= 2'/:TON • i' T i b FAN COIL UNIT 1 a�- 44 LI PPP Y4" L�- 2„ ZH-9 2"x1Ya" a �, � 1 TON - Grow Room 1Y4.. 2"x1Y4" TEE p FAN COIL UNIT 8 t 20^ RISERS FROM LEVEL1 w/Hot Water Heating Coils d �+ Zone Valves located on m ZH-8 !, • • d a HOT WATER i; ----- level 1 ______ __ _. f-----ii --- o w CONTROL VALVE _ — , See Sheet Z-2 1Y4"HWS&HWR - 1Y4" (TYP) PIPING(TYP) — --Hot Water Supply ----------------------------- - •q •q-------------- • �•�' --Hot Water Return ------- c V LJ LJ--------------- LJ --------------------- J A Hot Water Heating System - Layout J L-2. Scale: Y8"=T-0" a E_ N - N _ L � (2)MECH.TEES W/CAP - d 10 FOR FUTURE PIPINGs. J (TYP) g E Dry Room w In 2„ N Notes (Unless Otherwise Specified) r 4 203 " 2"x1Ya"TEE 1. All chiller piping to be supported so that Chiller does not Q� �+ c RISERS FROM 2„ p p g pp L io LEVEL1 __ __------ support piping weight. .� ZH-7 ----- • 2. Maintain a water treatment program appropriate for all the f+ _ materials in the heating system. In addition,the pH of the = L 0+ system water is to be maintained between 6.8 and 8.5. Q io 3. All piping to be supported so that heat source does not support > piping weight. o 2 4. Vent high spots in piping mains to prevent air locks. 1Ya 5. Piping runs to be supported as required. 6. Installation to follow all state and local codes where applicable. 7. Notify Delta T Solutions if changes are necessary so the Grow Room design can be modified as required. 0 1Ya 8. All line voltage and low voltage wiring,conduit and M 202 disconnects shall be furnished and installed by others. 9. Field coordinate/verify all dimensions,voltages,amp draws and conditions before installation. 1Y4" 10. Installing subcontractor will be required to cut and modify in Revised the field for proper fit per details. No. By Data 1. • 11. Installing subcontractor shall assemble parts supplied by Delta ------- --------____ T per Detail. 2. 12. Attachments to structure shall be supplied by Installing 3. subcontractor as required. 4 5'-0" Reviewed By 13. Installing subcontractor will be required to measure and cut all No. By oate sections of the threaded rod based on Field Conditions. 14. The Installing subcontractor will be required to measure and z cut some sections of Unistrut based on Field Conditions. 3 15. The Installing subcontractor will be required to measure,cut, 4. and groove some sections of the Pipe and Insulation based on g Drawin Field Conditions. spin Yr^_ -o^ 16. All hanging hardware shall be stainless steel,Galvanized,or Aluminum as noted on the Detail. $ae Arch D 17. Attachments of hangers to structure shall be by others. Date 11.1 szois BY JP 18. This is a corrosive environment and proper materials must be Project No. used. Hot Water Heating System- Layout 19. Insulation is provided for bare aluminum pipe with-in zones 160661-50 Note: Piping Shown Outside the Greenhouse for Clarity Only. Scale: Ya"=1'-0" below the 7 ft.(Off Finished Floor)level in each zone. sheet L-2. PL-2.2 C E ~ U o W O O 0 North Level N d a N U V' E o r r� N N 3 RUN CONDENSATION �6 O am 3 �Q 3 60'-0" LINE TO DRAIN �F e� �U (By Others) dE.o 0 700 m y C E O lo C e e a a Nc ♦O^ OI~W CONDENSATION LINE a o � �N� V♦ Cmm See Sheet FC-3 in" -- (TYP) =o :: ca Grow Room _ o C N O ZD 205 a N 0 N 90 A\ c�LO RUN CONDENSATION a LINE TO DRAIN Q c 04 00 o (By others) Clone Legend e� w N Room 2%TON 206 II II FAN COIL UNIT IIII. Il�p w/Hot Water Heating Coils n 2%TON -15 - II II b FAN COIL UNITEl a IIII. ape 5'o RUN CONDENSATION =_ LINE TO DRAIN 1 TON a Grow Room (By Others) FAN COIL UNIT 8 t 204 w/Hot Water Heating Coils d —Condensation Line - o L" V A Chilled Water Cooling System - Layout oE 8 J L-2.3 Scale: Y8"=1'-0" a E J _ L N Q � _ tv Dry Room NCle 203 Notes (Unless Otherwise Specified) r 4 0 iJ C 1. All chiller piping to be supported so that Chiller does not L 0) O support piping weight. .� N 2. Maintain a water treatment program appropriate for all the materials in the heating system. In addition,the pH of the = system water is to be maintained between 6.8 and 8.5. Q c O nn 3. All piping to be supported so that heat source does not support > U a a a a piping weight. 4. Vent high spots in piping mains to prevent air locks. 5. Piping runs to be supported as required. 6. Installation to follow all state and local codes where applicable. 7. Notify Delta T Solutions if changes are necessary so the 'm Grow Room design can be modified as required. 0 202 8. All line voltage and low voltage wiring,conduit and disconnects shall be furnished and installed by others. 9. Field coordinate/verify all dimensions,voltages,amp draws and conditions before installation. 10. Installing subcontractor will be required to cut and modify in Revised the field for proper fit per details. Nu. By Data 11. Installing subcontractor shall assemble parts supplied by Delta T per Detail. 2. 12. Attachments to structure shall be supplied by Installing 3. subcontractor as required. 4 5'-0" Reviewed By 13. Installing subcontractor will be required to measure and cut all Nn. By Dale sections of the threaded rod based on Field Conditions. 14. The Installing subcontractor will be required to measure and z cut some sections of Unistrut based on Field Conditions. 3 15. The Installing subcontractor will be required to measure,cut, 4. and groove some sections of the Pipe and Insulation based on Drawing Field Conditions. scale Y."V-a• 16. All hanging hardware shall be stainless steel,Galvanized,or Aluminum as noted on the Detail. size Arch D 17. Attachments of hangers to structure shall be by others. Dare if-lszois By JP 18. This is a corrosive environment and proper materials must be Project No. used. Condensation Lines-Layout 19. Insulation is provided for bare aluminum pipe with-in zones 160661-50 Note: Piping Shown Outside the Greenhouse for Clarity Only. Scale: ya'=1'-0" below the 7 ft.(Off Finished Floor)level in each zone. sheet L-2.3 PL-2.3 MOD: 1222o Equipment Schedule Piping Schedule g Item Description Part No. Qty Item Description Part No. Qty o In C 1 CHILLER UNIT AGZ130 1 P PIPE STEEL ROLLED SCH 10 3.00"X 21' DSP30010-252R AR 2 IBELIMOACTUATOR PER DESIGN 1 E ELBOW GROOVED 90"3.00" DSE300 5 ® o BV BUTTERFLY VALVE GROOVED 3.00" DSV300 2 Chiller C COUPLING GROOVED RIGID 3.00" DSCR300 13 ? £o FL 3"GRUVLOK FLANGE SET DEFCG30 2 �.rn 3r.3 S1 CHANNEL(GALV.)1.625" DSMU AR O y Q 3 �� ■� =U S2 STRUT CLAMP(PLATED)3.00" DSMC300 AR do v >0tb 1 ~- C (D V ro y C E O N c OC w I—OND �3 _I �mO {0 ems+CO p L x 111— d rn N; C o 2 Ol U-) No �� ti Ntoni 0 m 0 0 N Chiller . AY/1 e_"o to °a W�p BV 2 CWR 0 W C14 00 FL O Y p E to E SEE DRAWING C-2 1 _ FOR SECONDARY LOOP PIPING ♦ C DETAILS. 0-6 E CWS i01 CWRR CWS CWR O O °m tY W 2 OK OC - B Chillers Supply- Piping Detail cam') FL1 =- C-1 Scale: 1"=V-0" -- rN U Ev° J C. a E L ° O O au a Q 3 d R P ra a 0 J Chiller BV L }Ir L 1 / O O BV C p E Revised Ell CWR No. By Dale 1. 2. 3. 4. 0 Reviewed By 31 O O No. By Date V 2. O 3. 4. 0 CWS Drawing w g i Y,"=1'-D" $ize Arch D CWRR CWS CWR Date 12-09-2016 By JP Project No. Chillers Return-Piping Detail Chillers End-End- Layout 160661-50 C-1 Scale: 1"=1'-0" C-1 Scale: Yz"=1'-0" Sheet C-1 MOD: 1222o Equipment Schedule Piping Schedule g Item Description Part No city Item Description Part No city o In 1 AIR SEPARATOR DEAS600 1 P PIPE STEEL 6.00" DSP60010-252R AR o 2 AIR VENT DEAV075M 1 E ELBOW GROOVED 90°6.00" DSE600 4 ° o 3 EXPANSION TANK DEESX110 1 T TEE GROOVED 6.00" DST600 2 Q'a H 4 REGULATOR DEVPR050 1 CP CAP GROOVED 6.00" DSCAP600 2 ? £o 5 PRESSURE GAUGE DEGPO60 1 BV BUTTERFLY VALVE GROOVED 4.00" DSV400 4 to N 333 E 1 p 6 THERMOMETER DET60 2 TO TEE-REDUCING HCX G 6.00"x3.00" DSTR600300 6 7 SENSOR W/WELL DECW 1 Tr2 TEE-REDUCING HCX FTP 6.00"x0.50" DSTR600300 3 M 8 PRESSURE SWITCH DEGPS 1 C1 COUPLING GROOVED RIGID 6.00" DSCR600 15 E o > =N C2 COUPLING GROOVED RIGID 3.00" DSCR300 6 m„ E o CT COUPLING THREADED GALV 0.50" DSCGO50 1 O ot~00 Br BUSHING GALV HEX 1.25"x.05" DSHBG125050 5 3 m o FL 61N 125#GRUVLOCK FLANGE DEFCG60 2 o i°. Boiler Piping -Side Detail N NIPPLE GALV 0.50"x1.50" DSNG050015 1 F d C-2 Scale: 5/8"=V-0" c o t Ol t22 n° }+ ti N L 0 V v 4)0 N aa -I'_O ° W N 00 o o m =`o c F5 55 E a' Connections to Section Pump =_ Station I = SEE DETAIL"B" d Connections From Chiller ? Supply o r Future Boiler C SEE DRAWINGC-3 L�----- CWR y — — - FOR OVERALL 0 LAYOUT DETAILS. CWS Q Q L—�--- a a a J Q CWRR Q Q J � a? o Connections From Chiller -_ L w Supply Connections From Chiller 0) A Connections From Chiller Return 9 4.0 Q 0 Q Return _ p" L 9T a 0 aSEE AWING FW-1 FOR AIR UATOR DETAILS O C2ROTATE ELBOWS TO ALLOW \Connections to FOR UNISTRUT SUPPORT / N Zane and UNISTRUT SUPPORT INSTALLATION Section Pump Tr2 RETURN LOOP P INSTALLATION TYP y y SEE DRAWING FW-1 FOR C2 7 SECTION VIEW C-C EXPANSION TANK DETAILS Connect New System Piping Tr1 cT Connections to C2 to Existing System Pump N Chiller Supply a Tr2 ZONE SUPPLY a a Tr1 C1 3 CP L Revised No. By Dale 1. 2. Connections to SECTION VIEW B-B Connections to 3. Chiller Return C2 Chiller Return C2 4 C1 Tr1 REVERSE RETURN Tr1 Reviewed By CID * LOOP * * E Nn. By Dale 1. z. 3 4. SECTION VIEW A-A Drawing scale %"=1'-0" $ize Arch D Date 12-10.2016 By JP Project No. Secondary Chiller Loop-Detail 160661-50 Sheet C-2 Scale: 5/B"=1'-0" C-2 ,_ r o o N c 0 0 ur 08 66 O yQ �r ■� 00 do >500 r_ ONV ro y C E p C ONo 3 C m m ea)CO p L d U)w N; C 12 O t �No � ti N � L 0 r a � d Q N N 90 E V/ C�L? 0. +A O ° W N Do o o m =`o To Zones - - - - - Building - - - - - it A - PUMP STATION E See Sheet CP-1 Air separator and Feed wale a Sheet FW N C -- - -- -- -- -- -- -- -- -- -- -- -- -- -- - -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -1�.Q 8 water t CWRR + A CWS 4- L CWR o - - . J o a o j E0000 a� Q m 1 0000 0000 I c ++ U �,1 a ( C 0000 0000 0000 1 l r LT-0" 16'-0" 4'-0" 16'-0" 4'-0" 16'-0" / ' 2 -- -- -- -- ----- -- -- -- -- -- -- ----- -- -- ------- Service/Air Intake Clearance --- ----- -- -- -- ----- -- -------- - --J r 61'-11 Revised No. By Dale 1. 2. 3. 4. Reviewed By No. By Date 1. 2. 3. 4. Drawing Scale Y,"=1'-0" $ize Arch D Date 12-09.2016 By JP Project No. Chillers End-End-Layout 160661-50 C-3 Scale: 3/s°=1'-0" Sheet C-3 C2 T Equipment Schedule 0 Item Description Part No. Qty o 0) C E 1 CHILLER PUMP GRUNDFOS-LCSE 2 a o 0 0 cws Piping Schedule <a o IEn g o Item Description Part No. Oly m P1 PIPE STEEL ROLLED SCH 10 4.00"X 21' DSP40010-252R AR m; O > 3 P2 PIPE STEEL ROLLED SCH 10 6.00"X 21' DSP60010-252R AR F 0 01 U 3 P2 E ELBOW GROOVED 90"6.00" DSE600 2 — }I •� C1 COUPLING GROOVED RIGID 4.00" DSCR400 12 d o > aD CV C2 COUPLING GROOVED RIGID 6.00" DSCR600 8 ~c 2 E o R2 me8 � � ')'I*a1- BV1 BUTTERFLY VALVE GROOVED 4.00" DSV400 4 u O �F 000 BV2 BUTTERFLY VALVE GROOVED 6.00" DSV600 1 3 c m o } } C1 CV CHECK VALVE GROOVED 4.00" DSCV400 2 in� %'�� 0) x R1 REDUCER CON GROOVED 4.00X3.00 DSR400300 2 F :+ a BV1 . R2 REDUCER CON GROOVED 6.00X4.00 DSR600400 4 0 c � ao T TEE GROOVED 6.00" DST600 2 `± c m 0 Tr TEE-REDUCING HCxF 6.00"xO.50" DSTR600050 1 d 0 N �o «to � FL1 4"GRUVLOK FLANGE SET DEFCG40 2 0 p1 FL2 3"GRUVLOK FLANGE SET DEFCG30 2 C ° W N OD DV DRAIN VALVE,0.50"W/CAP&CHAIN DSV050HTDC 1 0 `o o c 3 55 R1 FL f P2 FM o j O Flange to top of PumpCWR49 :i -��; %I Discharge Piping- Detail o O j CP-1 Scale: 2"=V-0" From - j Tr Chiller =- Dv o 0 o Source V J cwS _ N - E 2M L C2 To O O O .E Q p 0 o C1 Chilled C1 a Zone � � BV1 �< E O CV j R2 ,� d C O > O O BV1 j FL1 � j Flange to top FL2 of Pump FL1 cP-1 O O j O O O C = Flange to top of Pump CWS R1 I 1 FL2 O O O O O O O O O FL1 Piping From Revised P1 Chiller ( N". By Date CP-1 1. B 2. 3. 4.Reviews By 0 1 No. By Date 1. 2. O O O 3. OO Support as required 4. g II ° Scale %"=1•-0" � 8 Size Arch D O ® O O O Date 12-09.2016 BY JP Project No. Chiller Pump-Elevation Chiller Pump Station- Plan View 160661-50 CP-1 Scale: 2"=V-0" CP-1 Scale: 2"=V-0" Sheet CP-1 O Note:All Chiiled Water Piping shall be wo E insulated. o rn c 0 o 0 0 w �U � GE1�-O m c N .O 1 00q00 E�c do 3 m p 05 O O R a co I-- n' w a t a1 oo 4� N0 N O 3 d�N BG �7� c-No W s°= NDO o O O o EG a s NG1 - TG — HB1 8 HC `6 O -- HB2 BV €a H HC CWR EG CWR g H61 P m HC l 2 a8 CWS J CWS =� \ Uo 0, H HC NG2 A Br1 T2 'a J HB1 a E J HWS OI HWS L rn q' c O HWR O OI, HWR L �Y 0 0'', a a ° o i � U � 0 .� Condensate Condensate LL N N 2 Equipment Schedule Item Description Part No. city 1 2-1/2 TON FAN COIL UNIT CWVFC-2500 1 2 FLOW CONTROL 3/4" DEFRL075-0060 1 3 AIR VENT DEAV012M 1 Revised No. By Date Piping Schedule 1. Item Description Part No. 4ty Z. H 3/4"HOSE DEH075 AR 3. EG ELBOW GALV.FPT 0.75 DSEG075 2 a Reviewed BV BALL VALVE PVC SCH 80 0.75" DPV075 2 No. By Date BG BUSHING GALV.HEX 0.75XO.125" DSHBG075012 1 1 Br1 BUSHING PVC SCH 80 SXS 'PER DESIGN 2 2' 3. A ADAPTER FPT PVC X BRASS PER DESIGN 1 a. TG TEE GALV FPT 0.75 DSTG075 1 Drawing HC HOSE CLAMP DMHC75 4 scale 2Ya"=1•-O" 1-161 BRASS HOSE FITTING 3/4 MPT X 3/4 ID DSHF075XO75 3 she Arch D H62 HOSE BARB PVC SCH 40 S X 0.75" DPNH075 1 Data 12.10.2016 N1 NIPPLE GALV 3.00X.75 DSNG3000075 1 By JDK Project No. N2 NIPPLE GALV.0.75X1.50 DSNG075015 1 REFER TO PL SHEETS FOR PIPE SIZES �2%2 Ton Fan Coil -Cooling Fan Coil -Cooling 160661-50 Sheet FC-1 Scale: 2%a"=V-0" FC-1 O Note:All Chilled Water Piping shall be wo E insulated. o rn c 0 o 0 0 w 4`&U / � � GE1�-O m c N .O 0 0 0 F° C U N 1 00m c E0 N� OC �I"D 3 (j) m p O to 05 h n° � w 3 i t at 0 BG1 �o j m 0 HC EG ~° N HB EG EG BG o o 0 O 0 NG2 m.0W N ago TG a HB HC 8d �6 O -- CWR - \ ICWR O See Drawing FC-1 for CA CWS&CWR Piping = Components. CWS \ \ \ \ i =� H 2 NG1 Tr ;a J 01 NG1 a E J HWS O ® HWS i n 9" c O d HWR O o HWR g L � c �Y 00 8a a U 0 HC BV < L. a.0.r U HB c Condensate O Condensate O ILL 0 0 H N N 2 Equipment Schedule Item Description Part No. city 1 2-1/2 TON FAN COIL UNIT CWVFC-2500 1 2 FLOW CONTROL 3/4" DEFRL075-0060 1 Revised No. By Date 3 AIR VENT DEAV012M 1 1. 2. Piping Schedule 3. 4. Item Description Part No. city Reviewed H 3/4"HOSE DEH075 AR No. By Date EG ELBOW GALV.FPT 0.75 DSEG075 4 1 BV BALL VALVE BRASS FPT 0.75" DSV075 2 2. 3. BG BUSHING GALV.HEX 0.75X0.125" DSHBG075012 1 a. A ADAPTER FPT PVC X BRASS 'PER DESIGN 1 Drawing TG TEE GALV FPT 0.75 DSTG075 2 scale 2Ye'=1•-O" Tr TEE SADDLE-REDUCING i 'PER DESIGN 2 si a Arch D HC HOSE CLAMP DMHC75 8 Data 12-10-2016 HB BRASS HOSE FITTING 3/4 MPT X 3/4 ID DSHF075XO75 8 By JDK Project No. NG1 NIPPLE GALV 3.00X.75 DSNG3000075 2 �2%2 Ton Fan Coil -Cooling& Heat Fan Coil -Cooling& Heat 160661-50 sneer REFER TO PL SHEETS FOR PIPE SIZES FC-2 Scale: 2%4"=V-0" FC-2 O Equipment Schedule o y U Item Description Part No. Qty o m C 1 2.5 TON FAN COIL UNIT CWVFC-2500 1 g Flow of Air See Sheet PL-1.3&PL-2.3 for Condensation Piping Layout o w Piping Schedule for PVC Condensate Piping d Item Description Part No. Qty m O T H1 POLY TUBE 0.5" D1P3050 AR �r �0 c 1 Al PVC SCH 80 ADAPTOR FTP x BARB 0.5" DPNH050F 1 A2 PVC SCH 80 ADAPTOR MTP x BARB 0.5" DPNH050M 1 E o > v N See Sheet PL-1.3&PL-2.3 for Condensation Piping Layout m q E o �� O �1--00 Piping Schedule 1.25" PVC Piping 3 (n ` ) o£ I— Item Description Part No. Qty __ P PIPE PVC SCH 80 1.25 DPP125 AR nr 1`eeeea NCn- Al B1 \ E ELBOW PVC SCH 801.25 DPT125 AR o M o T TEE PVC SCH 80 1.25 DST125 1 �� m 0 61 BUSHING PVC 1.25 X 0.5 S x FTP DP6125050F N 1 d N H1 Intake CP CAP PVC 1.00 DPCP100 1 0 MP-o See Sheet PL-1.3&PL-2.3 for Condensation Piping Layout `g W N C, 2 as A2 T 3 8d �8 €d 8t �8 2-1/2 Ton Fan Coil Condensation Piping-Layout s FC-3 Scale: 1:10 _- U tN J 3 ?9 0 J o°E J i °'c a 0 o 0 o 0 I o W � � L O � U o o ° ° Q U LL o o o C 0 o o o o 1 = N 0 0 0 r 0; 0; 0 — O — — — — O U — — 0 — O — — — — — H1 o ° - - - - ° - - — ° ° - - - - - - - CWS — ° ° Chilled Water 0 0 0 ° o F ° ° y� CWR Source Revised L � 0 - - - - - - - - _ '�'�'UUU����� No. By Date 1. '',o _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ o' HWS 2. ', Heat Source B. — — — — — — — — — — — — — — — — — — — — — ®— — — — — — — — — — — — — — — — HWR a. Oi 01 Reviewed ''0Q No. By Date I,O: s. CP T E P a. T a Drawing RUN CONDENSATION scale PIPING TO DRAIN she Arch D (By Others) Data 77.75.2076 By JP Project No. �� 2-1/2 Ton Fan Coil Condensation Piping-Layout 160661-50 Note:All Chilled Water Piping shall be FC-3 Scale: 1:10 sheet insulated. F -3 O Note:Only Hot Water Piping shown for Note:pipe and fitting configuration for N Equipment Schedule Clarity. stand alone Fan Coil Units. �°, rn It.. Description Part No. Qty p 1 1 TON FAN COIL UNIT ENVIRO-TECH 1 0 0 Y 4`>' y yC N 2 Piping Schedule �'N m c N OItem Description Part No. city ¢o N H POLY TUBE 0.75" D1P3075 AR ail }� c P PIPE PVC SCH 80 0.75 DPP075 AR ENVIRO-TECH FAN COIL UNIT = 3 N HC HOSE CALM DMHC07 2 m; c E o N� O 6F-t" a -� X �3 1/2"COPPER MALE ADAPTOR }l m 0 d N 1/2"FLOW CONTROL o H LO �r O 1/2"COUPLING 1/2"COPPER m= C3 W N 00-0 MALE ADAPTOR 2 1/2"ELBOW (TYp) o ENVIRO-TECH 1 TON FAN COIL UNIT - 1/2" ELBOW - 8d �8 1/2"COPPER MALE ADAPTOR €d 1/2"ACTUATOR - CONNECT TO RETURN PIPING 1/2"COPPER MALE ADAPTOR 8t ATTACH CONDENSATE PIPING TO DRAIN TUBE EXIT SEE DETAIL"B" m CONNECTION TO SUPPLY PIPING 8 Enviro-Tech Fan Coil Heated Water Connections-Top View `s FC-4 Scale: N.T.S. - U J 01 Note:Only Chilled Water Piping shown Note:pipe and fitting configuration for i H CONDENSATION PIPING for Clarity. stand alone Fan Coil Units. 'a i � c YO a T d O HC p L � r O CONDENSATION LINE FROM L U FROM FAN COIL ENVIRO-TECH FAN COIL UNITLL O to r O O 2 3/4"COPPER MALE ADAPTOR 3/4"FLOW CONTROL 3/4"COPPER MALE ADAPTOR Revised 3/4"COUPLING No. By Date �. JP 3-18-17 2. JP 5-15-17 3/4"ELBOW 3. 3/4" 4 ELBOW Reviewed No. By Date 3/4"COPPER MALE ADAPTOR 1 Enviro-Tech Fan Coil-Top View 2. FC-4 Scale: N.T.S. 3/4"ACTUATOR a CONNECT TO RETURN PIPING 4. 3/4"COPPER MALE ADAPTOR Drawing scale ATTACH CONDENSATE PIPING TO DRAIN she Arch D TUBE EXIT SEE DETAIL"B" Data 11.15-2016 CONNECTION TO SUPPLY PIPING By JP Project No. (-A � Enviro-Tech Fan Coil Chilled Water Connections-Top View shee160661-50 Note:All Chilled Water Piping shall be Fc-4 Scale: N.T.S. insulated. FC-4 O Note:Only Hot Water Piping shown for Note:Pipe and fitting configuration for a Equipment Schedule Clarity. Packaging and Processing Room 0 Fan Coil Units. o (d scription Item De Part No. Qty p 1 1 TON FAN COIL UNIT ENVIRO-TECH 1 1 0 5 0 Y 4 f 2& N yC Piping Schedule �'N m c N Item Description Part No. city ¢rn o O N H POLY TUBE 0.75" D1P3075 AR ail }� c P PIPE PVC SCH 80 0.75 DPP075 AR ENVIRO-TECH FAN COIL UNIT ° 0 N HC HOSE CALM DMHC07 2 m; o �P) �3 M at00 �+ _ N L d N L0 Lo ° C�O 1/2"COUPLING =_ u.l N 00 ar as 1/2"ELBOW (TYP) o ENVIRO-TECH 1 TON FAN COIL UNIT 1/2" ELBOW 8d �8 €d CONNECT TO 1.25"RETURN PIPING ATTACH CONDENSATE PIPING TO DRAIN TUBE EXIT SEE DETAIL"B" a s CONNECTION TO 1.25"SUPPLY PIPING 8 c Enviro-Tech Fan Coil Heated Water Connections-Top View FC-5 Scale: N.T.S. — U J a E Note:Only Chilled Water Piping shown Note:Pipe and fitting configuration for H CONDENSATION PIPING O for Clarity. Packaging and Processing Room � 'a Fan Coil Units. - C Q ,. i � c YO a T d O HC P L c O CONDENSATION LINE FROM L U FROM FAN COIL ENVIRO-TECH FAN COIL UNITLL O to r O O 2 a Revised 3/4"COUPLING No. By Date 1. 3/4"ELBOW 2 3. 3/4" 4 ELBOW Reviewed No. By Date 1. Enviro-Tech Fan Coil-Top View 2. FC-5 Scale: N.T.S. a CONNECT TO RETURN PIPING 4. ATTACH CONDENSATE PIPING TO DRAIN Drawing TUBE EXIT SEE DETAIL"B" scale Sae Arch D Data 5-15.2017 CONNECTION TO SUPPLY PIPING By JP Project No. (-A � Enviro-Tech Fan Coil Chilled Water Connections-Top View shee160661-50 Note:All Chilled Water Piping shall be Fc-s Scale: N.T.S. insulated. F C-5 30'-0"Approx. — 30'-0"Approx. — E CEILING HEIGHT CEILING HEIGHT o c 0 0 From Main Lines � V+ £ 0 17 FAN COIL (TYP) a O n- 3 N 33 FAN COIL BOTTOM f,7 of o Loi 0. o x FAN COIL BOTTOM Q r- O V N a o m y C N o o r'n E O ~00 Ql a �.3 ♦A c (Do V co X o 0 0 iiD C'O 12 m io DOOR y o t Ol N t°Dn �o �� M U.) 0 m d 6 N =o CALO 01 L? FINISHED FLOOR FINISHED FLOOR W N 0 Do n� Grow Room 110-South Elevation �D� Grow Room 110-North Elevation L-1.1 Scale: 3/6"=1'_0" L 1. Scale: 3/6"=1,_0. 59'-6"Approx. 16-10" 16'-6" 16-10" — — 4'_9" CEILING HEIGHT d 5'o �c INSULATED CWS &CWR LINES 0 • FAN COIL (TYP) o IJ FAN COIL BOTTOM a _ `. JE.v° CONDENSATION LINE HWS&HWR LINES a E J Run to drain _ N � � O 00 STRUCTURE q� L BUMP OUT tv ,. w �T a o FINISHED FLOOR .� o � L � B Grow Room 110- East Elevation Q c L L-1. Scale: 3/6"=1'_0" > C9 59'-6"Approx. 12'-6" 12'_6, 12'_6„ 12'_6" — — 4'-9" CEILING HEIGHT • FAN COIL WITH HEAT INSULATED CWS FAN COIL (TYP) &CWR LINES (TYP) Revised O No. BY Dale X 2 1. FAN COIL BOTTOM a 2. Q O HWS&HWR LINES CONDENSATION LINE Reviewed Run to drain No. By Date 1. 2. 0 ap 3. 4. Drawing Scale %,1'-0'• Sae Arch D FINISHED FLOOR If Data 11-16-2016 By JP Project No. Grow Room 110-West Elevation 160661-50 Note:All Chilled Water Piping shall be L-1.1 Scale: 3/e'=1'-0" Sheet insulated. E L-1.1 o O 30'-0"Approx. — 30'-0"Approx. — p CEILING HEIGHT CEILING HEIGHT W L� o rn c 0 S 0 y �U E0 N w L001 K O ° ° \ O X U r .O C U o FAN COIL (TYP) o c FAN COIL BOTTOM o 0 0. ° FAN COIL BOTTOM a a is c 0 0 °°E Of~ a =� O = NC4i A eo m c C a3i ja) 0 o n° Nfn W zo C CID a t 00 'O `; c mS d 0 N �o a�� FINISHED FLOOR FINISHED FLOOR B o Q W N 0 co a� Grow Room 109-South Elevation �� Grow Room 109-North Elevation _ Scale: V=1'-0" L-1. Scale: V=1'-0" =3 59'-6"Approx. $ CEILING HEIGHT a o n INSULATED CWS &CWR LINES FAN COIL (TYP) FAN COIL WITH HEAT m (TYP) L H HX 'a ° EL rl FAN COIL BOTTOM a ¢ sg a �A CONDENSATION LINE It HWS&HWR LINES a E J Run to drain o Q) O So - to Yl a FINISHED FLOOR 11i O it B Grow Room 109- East Elevation Q o Scale: V=1'-0" ` (� 59'-6" Approx. f 4,_9„ 12'_6" 12'_6" 12,_6" 12,_6" _ _ 4'_9" �1 CEILING HEIGHT INSULATED CWS . FAN COIL WITH HEAT &CWR LINES FAN COIL (TYP) (TYP) Revised ii No. By Date X ° FAN COIL BOTTOM a 2. 3. O � 4. Reviewed HWS&HWR LINES CONDENSATION LINE No. By Date Run to drain 1. 2. 0 pp 3. 4. Drawing Scale Si.. Arch D FINISHED FLOOR if 11 Date 11.15.2016 By JP Project No. Grow Room 109-West Elevation 160661-50 Note:All Chilled Water Piping shall be L-1• Scale: 3/B"=1'-0" Sheet insulated. E L-1.2 30'-0"Approx. — 30'-0"Approx. — 0 CEILING HEIGHT CEILING HEIGHT o c O 2 o QT w m r U N c) 5 o T� 3 .o O (0 Q 3 K OH O X =~ ■� U O a FAN COIL BOTTOM o FAN COIL (TYP) o }i •- @ FAN COIL BOTTOM ¢ 'o O 5 N o o ma c a)� Eo 7 C C~00 00 N N R m CD ❑« L I.- X O O 01 z m m 3 C O c01) 2.o l27 NO tn rd 0)0N 5"0 S U-) FINISHED FLOOR FINISHED FLOOR W N Do n n Grow Room 107-South Elevation �D� Grow Room 107- North Elevation L-1.3 Scale: 3/B"=1'-0" L-1.3 Scale: V=1'-0" 3 59'-6"Approx. 13'-4" I_ 13'_4" I_ 13'-4" 14'_9, _ 11 CEILING HEIGHT 02 INSULATED CWS ° &CWR LINES FAN COIL (TYP) ° oa FAN COIL BOTTOM a _ J a -E CONDENSATION LINE J Run to drain HWS&HWR LINES DOOR a o O co zo y$ to io m L d 3 r lL a 0 0 FINISHED FLOOR .� o � L � B Grow Room 107- East Elevation Q o L-1.3 Scale: V=1'-0" \ 0 54'-0"Approx. 9'-3" 13'-4" 13'-4" ► 13'-4" — — 4'-9" CEILING HEIGHT INSULATED CWS FAN COIL WITH HEAT &CWR LINES ° 0 . (TYP) FAN COIL (TYP) Revised No. BY Data X O FAN COIL BOTTOM a 2. Q 3. O � 4. HWS&HWR LINES CONDENSATION LINE Reviewe Data Run to drain 1. 2. 0 bo 3. 4. Drawing Scale 3/g'•=1•-U•• Sae Arch D FINISHED FLOOR Date 11-15-2016 BY JP Project No. Grow Room 107-West Elevation 160661-50 Note:All Chilled Water Piping shall be 1E L-1.3 scale: V=1'-0" Sheet insulated. EL-1.3 ► 43'-6"Approx. — ~ coi CEILING HEIGHT -" o y c 0 2 o QT w m o T(,j 3 Sj 0 < ■� O U 2 FAN COIL BOTTOM n m o ao o °°" tttttttttt� c E Q N C Oc C6 00 C 0 N N m CD ❑« �.�i.- DOOR o F « N ro �; C o c io m o A-0 S NO 2 l rd O0N 5"0 C�UU.) a CI t-p' FINISHED FLOOR W N 00 n n Grow Room 104- North Elevation m 3 L-1.4 Scale: 3/a°=1''0° �c 63'-9"Approx. IN 4'-4" 4'-0" f CEILING HEIGHT INSULATED CWS ' FAN COIL (TYP) &CWR LINESI So 0 x Tv (o FAN COIL BOTTOM c J a -E CONDENSATION LINE J HWS&HWR LINES Run to drain a= N o a G 3 r W a o 0 FINISHED FLOOR .� o � L � B Grow Room 104- East Elevation Q o L-1.4 Scale: 1/s"=1'-0" \ 0 63'-9"Approx. — 11'-1" �'� 11'-1" �'� 11'-1" �'► 11'-1" �'� 11'-1" 4'-9" CEILING HEIGHT INSULATED CWS . &CWR LINES FAN COIL FAN COIL WITH HEAT(TYP) (TYP) Revised O No. BY Data �A L] O ° FAN COIL BOTTOM o O 2. Q 3. � 4. HWS&HWR LINES CONDENSATION LINE Review Data Run to drain 1. ed 2. -dj' 3. 4. Drawing Scale 3/g'•=1•_U•• Sae Arch D FINISHED FLOOR 11 Date 11-15-2016 BY JP Project No. Grow Room 104-West Elevation 160661-50 Note:All Chilled Water Piping shall be L-1.4 scale: 3/s°=1'-0" Sheet insulated. E L-1.4 38'-0"Approx. — 0 CEILING HEIGHT -" o y c 0 2 o Qs w m Sj 75 T� 3 0 0 _ FAN COIL BOTTOM n m o > 5 ao Q r O N V o tttttttttt� c E Q 7 C Oc a 0,0 C N N R 0 CD ❑« L 'iX � X O 1=od is .; C'O cC aDo DOOR w o ':+ c 2 o rd O0N 5"0 C�UU.) FINISHED FLOOR W N Do do Grow Room 103- North Elevation 22 m 3 L-1.5 Scale: 3/8'=1'-0" 63'-9"Approx. IN 4'-9" 11'-1" �'� 11'-1" 3'_7" f CEILING HEIGHT INSULATED CWS &CWR LINES FAN COIL (TYP) .5 o �a FAN COIL BOTTOM a _ J a -E HWS&HWR LINES CONDENSATION LINE a E J Run to drain _ N .0 O 3 r W a o 0 FINISHED FLOOR .� o � L � B Grow Room 103- East Elevation Q o L-1.5 Scale: 3/6"=1'-0" \ 0 63'-9"Approx. 3'-7" 4'-9" CEILING HEIGHT INSULATED CWS FAN COIL . FAN COIL WITH HEAT &CWR LINES (TYP) 0 ° (TYP) Revised ° No. BY Data O ° FAN COIL BOTTOM n 2. 3. 4. HWS&HWR LINES CONDENSATION LINE ReV1ewe Run to drain 1. 0 2. 4. Data Drawing Scale 3/g'•=1•_U•• Sae Arch D FINISHED FLOOR 11 Date 11-15-2016 BY JP Project No. Grow Room 103-West Elevation 160661-50 Note:All Chilled Water Piping shall be 1,E L-1.5 scale: 3/6"=1'-0" Sheet insulated. E L-1.5 _ 24'-3"Approx. 1.— p 24'-3"Approx. CEILING HEIGHT CEILING HEIGHT - o y c 0 2 o QT w m °S'' 3 cai. O (n Q 3 o ° FAN COIL (TYP) ° i =l- - c U 75 FAN COIL BOTTOM a o ° FAN COIL BOTTOM a m o o0 O r)N 0 o a g C E p N C Ow C~00 CD O O d X bo DOOR TO PACKAGING DOOR 12 c °Do &PROCESS - W NO W0.2 c m In 41 rd 6)pN 5"0 r-—L? FINISHED FLOOR FINISHED FLOOR W N 00 Y n n Cc Veg. Room - East Elevation �D� Veg Room-West Elevation L-1.6 Scale: V=1'-0" L-1.6 Scale: V=1'-0" 3 40'-3"Approx. 110 2'-9" 14'_6" 14'_6" 8.6" — a CEILING HEIGHT ,2; o INSULATED CWS ° FAN COIL (TYP) &CWR LINES oa FAN COIL BOTTOM VJ CONDENSATION LINE HWS&HWR LINES a E J Run to drain - i o - � 00 o 3 > aT a C W FINISHED FLOOR L O .r 0 B Veg. Room- North Elevation Q L-1.6 Scale: V=1'-0" \ 40'-3"Approx. 10'-1" 20'-1" 10'-1" CEILING HEIGHT INSULATED CWS FAN COIL WITH HEAT &CWR LINES FAN COIL 0 (TYP) 0 (TYP) Revised 11 No. BY Data X O FAN COIL BOTTOM a p. Q 3. 4. HWS&HWR LINES CONDENSATION LINE Reviewed Run to drain No. BY Date 1. 2. 0 bo 3. 4. Drawing Scale 3/g'•=1•-U•• Sae Arch D FINISHED FLOOR Date 11-15-2016 BY JP Project No. Veg. Room-South Elevation 160661-50 Note:All Chilled Water Piping shall be 1E L-1.6 scale: V=1'-0" Sheet insulated. E L-1.6 E o y U o N C O C O rn 1`' J U — E 5 r "r umi o T� 3 24'-3"Approx. — 24'-3"Approx. — O Q 3 ,it- ■� �U CEILING HEIGHT CEILING HEIGHT _ " mo > �2 ao y C E9 10 O FAN COIL BOTTOM v' �F Do FAN COIL (TYP) 3 0 X d O ` 3 C c /!� >D o FAN COIL BOTTOM a a $ \H E NO Q Q m o 2L? �0N �a � Lo 1-O ° WNOD n Y 2 n O E DOOR TO VEG ROOM 3i c 3 S5 FINISHED FLOOR FINISHED FLOOR €d �g B Packaging and Processing 105 -West Elevation c Packaging and Processing 105- East Elevation02 -_ L-1.7 Scale: 3/8'=1'-0" L-1.7 Scale: 3/6"=1'-0" a E9 J N J LO 3� 51'-9"Approx. a 0 O In V) 8'-8" 15'_2" �'� 12'_2" �I� 15'_9" — � a1 0) CEILING HEIGHT L o PIPE RISERS TO LEVEL TWO FAN COIL (TYP) FAN COIL BOTTOM > � ------- ------- U � a o n a ir> Q 0 HWS&HWR LINES INSULATED CWS CONDENSATION LINE &CWR LINES Run to drain Revised No. BY Date 1. DOOR TO CORRIDOR 2' 3. 4. FINISHED FLOOR Reviewed No. BY Date 1. 2. Packaging and Processing 105-North Elevation I 3. L-1.7 Scale: 3/8'=1'-0" 4. Drawing Scala Sae Arch D Date 11-15-2016 By JP Project No. 160661-50 Note:All Chilled Water Piping shall be Sheet insulated. L- .7 30'-0"Approx. — 30'-0"Approx. — E CEILING HEIGHT CEILING HEIGHT � c 0 2 o QT w m Nc) 5 Sj X O _O ICI O\ X U to O Q o _ ■ U a FAN COIL BOTTOM ° o o FAN COIL (TYP) ° �� m °) FAN COIL BOTTOM a m o oD Q Q r.. 0 V0 N my C 0)V � ®� aC O cFDo 0 N N R m W ❑« L r.- X O O d z a0 bo .; C O c /!� \V off uDo �2 � o �� fN6 t r d p N 5"o 41 FINISHED FLOOR FINISHED FLOOR W N DAD n n Grow Room 205-South Elevation �D� Grow Room 205- North Elevation EL-2. Scale: 3/B°=1'-0" 1�L-2y Scale: V=1,_0„ 3 59'-6"Approx22 17'-3" 17'-3" 17'-3" — — 4'-9" a CEILING HEIGHT o INSULATED CWS &CWR LINES FAN COIL (TYP) & o �a FAN COIL BOTTOM a _ o L" J a HWS&HWR LINES CONDENSATION LINE a E J Run to drain o N 0o O STRUCTURE y� L j BUMP OUT �C r w a o 0 A-11' N FINISHED FLOOR .� o � L � B Grow Room 205- East Elevation Q o L-2. Scale: V=1'-0" \ 59'-6"Approx. 8'-9" �'� 11'-6" �'� 11'-6" �'� 11'4" �I� 11'-6" — — 4'-9" CEILING HEIGHT INSULATED CWS FAN COIL WITH HEAT &CWR LINES FAN COIL 0 (TYP) (TYP) Revised No. BY Data X LJ 2 FAN COIL BOTTOM a 2. H MEE -Q 3. 7 4. HWS&HWR LINES CONDENSATION LINE Nowew ed Run to drain BY Data 1. 2. o Q oD pD 3. DOOR a. Drawing Scale 3/g'•=1•-U•• Sae Arch D FINISHED FLOOR If Date 11-15-2016 BY JP Project No. Grow Room 205-West Elevation 160661-50 Note:All Chilled Water Piping shall be L-2�1 scale: V=1'-0" Sheet insulated. E L-2.1 30'-0"Approx. — E 30'-0"Approx. — a U CEILING HEIGHT CEILING HEIGHT � c 0 c o d.T w r� JU r N,2 Sj T� 3 X o EAo FAN COIL o X 2,27 ai i- O Q 3 a FAN COIL BOTTOM o o (TYP) _ 075 FAN COIL BOTTOM a m o 5 oD Q Q r.. z C UN roy CNV N N R m(10 co O O 4411 g a0 zo �'.3 C O DOOR 0 e01) Allcc m U? 41 r d 41 p N FINISHED FLOOR FINISHED FLOOR W N ago nY 2 n Grow Room 204-South Elevation �D� Grow Room 204- North Elevation L-2. Scale: 3/a"=1,_0„ L-2. Scale: V=1,_0„ 3 50'-6"Approx. 4'-9" 13'-10" 13'-10" 13'-10" — 4'-3" f CEILING HEIGHT INSULATED CWS ° FAN COIL WITH &CWR LINES ° HEAT(TYP) 7 _ o a FAN COIL BOTTOM ¢ _ `� J'E CONDENSATION LINE � J HWS&HWR LINES Run to drain a= N o a 00 EL 3 W a o 0 A-1 N FINISHED FLOOR .� o � L � B Grow Room 204- East Elevation Q L-2. o Scale: V=1'-0" \ 2 50'-6"Approx. /� 4'_9" 13'-8" '� 13'-8" 13,_8e — — 4'_9" CEILING HEIGHT INSULATED CWS FAN COIL FAN COIL WITH &CWR LINES (TYP) HEAT(TYP) Revised No. BY Date 2 O FAN COIL BOTTOM a a 2. Q O 3. 4. HWS&HWR LINES CONDENSATION LINE Reviewed Run to drain No. BY Date 1. 2. 0 50 3. 4. Drawing Scale Sae Arch D FINISHED FLOOR Date 11-15-2016 BY JP Project No. Grow Room 204-West Elevation 160661-50 Note:All Chilled Water Piping shall be L-2 Scale: V=1'-0" Sheet insulated. E L-2.2 30'-0"Approx. — E 30'-0"Approx. — U CEILING HEIGHT CEILING HEIGHT a vi � c 0 c o d.T w m Jo N a l� '> 6.0 OT� > �Q O X O O, O N~ ■� 2 FAN COIL (TYP) ip\' X U a FAN COIL BOTTOM o o`; o °) FAN COIL BOTTOM a o 2Q 0 N V o o� o m g tttttttttt� c E Q t7 C C~00 00 N N R m CD ❑« L r I- X O O 411 g a0 zo .3 C O C .012 \V al tcn° c NO M t r d 0)0 N 5"0 C�L? FINISHED FLOOR FINISHED FLOOR W N 0 Do nY 2 n Grow Room 202-South Elevation �D� Grow Room 202- North Elevation L-2.3 Scale: 3/a"=1'-0" L-2.3 Scale: 3/B"=1'-0" 3 54'-0"Approx. 4-4- 14'_2e I� 14'-2" �' 14,_2„ 6'-9" — g CEILING HEIGHT o INSULATED CWS • • &CWR LINES FAN COIL & (TYP) a 15 FAN COIL BOTTOM ¢ _ `� J'E CONDENSATION LINE J HWS&HWR LINES Run to drain a=_ N o a E DOOR i > 3 am r W a o 0 A-0 N FINISHED FLOOR .� o � L � B Grow Room 202- East Elevation Q o L-2. Scale: 3/s"=1'-0" \ 0 54'-0"Approx. 4'_9" 14'-2" 14'-2„ 14'_2" CEILING HEIGHT INSULATED CWS e ° FAN COIL WITH HEAT &CWR LINES FAN COIL(TYP) (TYP) _ Revised No. BY Date X O FAN COIL BOTTOM a p. Q 3. 4. HWS&HWR LINES CONDENSATION LINE Reviewed Run to drain No. BY Date 1. 0 2. 60 3. 4. Drawing Scale Sae Arch D FINISHED FLOOR Date 11-15-2016 BY JP Project No. Grow Room 202-West Elevation 160661-50 Note:All Chilled Water Piping shall be L-2.3 scale: 3/s°=1'-0" Sheet insulated. E L-2.3 E o y U o N C O C O rn 1`' J U — E 5 r 2,27 7 T 3 41'_9" _ 6.0 O fit- ■— OU CEILING HEIGHT 5 FAN COIL (TYP) ~2 C v m„.5 0 . c Eo 7 C O C~00 N R m CD ❑« �.�iX X FAN COIL BOTTOM F :: a 2 c a .0 ��� p C NO O rm 0)0N o C ° WNOD n Y 2 n RISERS FROM LEVEL 1 Zone Valves located on level 1 c 3 S5 FINISHED FLOOR Clone Room 206- North Elevation L-2.4 Scale: V=T-0" a Eo J J a°E A, O iV/ Q o > 3 w 24'-3"Approx. r a` a 0 N L �1 E CEILING HEIGHT L d FAN COIL (TYP) Q O > fU X 2 FAN COIL BOTTOM n a Q 0 v 0 Revised ao No. BY Data 1. 2. 3. 4. Reviewed No. BY Date FINISHED FLOOR 1. FINISHED FLOOR 2. 3. 4. rawing A Clone Room 206-West Elevation DBca�e 3�a•=,�-8•• L-2.4 Scale: V=V-0" sale Arch D Date 11-15-2016 BY JP Project No. 160661-50 Note:All Chilled Water Piping shall be Sheet insulated. L- . O MOD: 1105 Equipment Schedule F o Item Description Part No Qty U o rn 1 RBI BOILER DB1050 1 0 2 AIR SEPARATOR DEAS250 1 0 15 SEE V-1 VENT DETAIL r O 3 AIR VENT DEAV075M 1 SEE S-1 PARTS PROVIDED IF APPLICABLE d a y m SECTION DETAIL IN SYSTEM PIPING A3 4 THERMOMETER 2.50"STEM DET25 2 D o Bra 5 BOILER PUMP PER BOILER MODEL 1 m 6 GAS REGULATOR BY OTHERS r 1 V o O N Q 0 0 0 0 0 0 0 .r �� 00 7 THERMOSTATIC MIXING VALVE,2.00" DEVTC200120 1 HWS I� R Sao 0 0 0 0 ®® o 0 oPiping Schedule DSBPBP25 mq O a Eo S1 Item Description Part No Qty We F 0000 P1 ° ° 32 P1 PIPE STEEL ROLLED SCH.10 2.50"x7.50" DSP25010-075R 2 3 JW m o 0 0 0 0 0ak\ o P2 PIPE STEEL ROLLED SCH.10 2.50"x6.625" DSP25010-068R 1 0 R.�% HWR ♦ x P3 PIPE STEEL ROLLED SCH.10 2.50"x6.25" DSP25010-0625R 1 w 0 0 0 0 o o P4 ELBOW GROOVED 90 DEG.2.50" DSE250 222 T TEE GROOVED 2.50" DST250 3 s o + c m 0 Tr TEE-REDUCING HCxF 2.50"x0.50" DSTR250050 3 /�/���� p N Alul ADAPTER GROOVEDxMPT 2.00" DSA200 1 S�L? oa l0 A2 ADAPTER GROOVEDxMPT 2.50" DSA250 3 Q W N C' A3 ADAPTER GROOVEDxMPT 2.00"x5.75" DSA200-00575 1 a C1 COUPLING GROOVED RIGID 2.00" DSCR200 2 o, C2 COUPLING GROOVED RIGID 2.50" DSCR250 15o — FL 2"125#GRUVLOCK FLANGE DEFCG20 2 `a B1 BUSHING GALV HEX 0.75"x0.125" DSHBG075012 1 8 d B2 BUSHING GALV HEX 2.50"x2.00" DSHBG250200 1 `s Br1 BELL REDUCER 1.25"x0.75"(DB900-1050ONLY) DSRG125075 1 €d Br2 BELL REDUCER 1.25"xl.00"(DB1350-15000NLY) DSRG125100 1 = 5 Br3 BELL REDUCER GROOVED 2.50"x2.00" DSRG250200 4 a y 4 ES Br1 or Br2 N1 NIPPLE 0.25"4.75" DSNG025075 1 `g 5 Tr N4 N2 N3 N2 NIPPLE GALV 0.75"x2.00"(DB900-1050 ONLY) DSNG075020 1 N3 NIPPLE GALV 1.00"x2.00"(DB1350-15000NLY) DSNG100020 1 m" C T P3 FL 71® P1 _ N4 NIPPLE GALV 1.25"x12" DSNG125120 1 a Bra ®I A2 N5 NIPPLE GALV 2.00"x3.00" DSNG200030 1 ts E ES STREET ELBOW GALV 1.25" DSESG125 1 8 Si CHANNEL(GALV.)1.65x20" DSMU-020 3 oU S2 STRUT CLAMP(PLATED)2.00" DSMC200 2 `d S3 STRUT CLAMP F (6) �/ F WELL 0.50 COPPER CLDP 2.50" DDECW 0 1 E1. S3 I — — L HWSI ♦ S1 / Flange gaskets,Bolts,Nuts,&Washers not shown a' Level of Finished Floor zi 6 r L °� Piping Included m T a 0 E w/Optional ~a as Piping Package L •� 00 o I I ® I (a I I I I GAS INLET 1 I I �— — I I / 2 I I 0°0 3 4 Revised N5 B2 B1 Tr ® ® No. By Date C T Bra A3 7 1 Piping Included i z w/Optional E I 3 Piping Package Notes (unless otherwise specified) 4. is, �� ___—____ 1 Refer to Delta T Solutions Specification 1.0 Heat Source Installation for Boiler Installation Reviewed and Operating Information(ie Vent,Gas,and Electrical) No. By Date 1. j ) 2 Refer to Delta T Solutions Specification 2.0 Air and Water Control,for Installation of Air Separator,Air Vent,Expansion Tank,Feed Water Regulator,and Pressure Gauge. 2' 3. ® To Expansion Tank Al P2 A2 3 Refer to Delta T Solutions Specification 6.0 Piping Installation,for Information on Piping. H W R l ♦ &Feed Water 4 All piping to be supported so that boiler does not support piping weight. 4 (See Drawing FW-1) P P 9 PP PP P P 9 9 Drawing -- -- - -- -- -- - Level of Finished Floor— 5 Install Pressure Relief Valve to-drain or within six inches of floor. style 1Y:"=1•-0" Till Pipe Rest,using Unistrut with Brackets. size Arch D 7 Gas Service Regulator is required if Gas Pressure is above Y2 PSI. Data 12-08-201e By JP 8 All Line Voltage and Low Voltage Wiring,Conduit and Disconnect shall be Supplied and Project No. Installed By Others. Boiler Loop- Detail lsossl-so 9 Gas Line,Gas Regulator shall be Supplied and Installed by Others. sneer H-1 Scale: 1Y4'=V-0" 10 Water Line and Backflow Preventer shall be Supplied and Installed by Others. H-1 O MOD: 110 5 Table 1 should be used to ensure that the gas supply piping is sized properly.If more than one appliance wo E is supplied by the same supply pipe,the piping must be sized based on the maximum possible demand. 0 Do not neglect the pressure drop due to pipe fittings.Table 1 should be used in conjunction with Table 2 o c to ensure that the gas supply piping has the capacity to meet the demand. o Table 1. Maximum pipe capacity in Ft/Hr based on 0.60 specific gravity gas at a pressure of o 0 0.5 psig or less and a 0.3"WC pressure drop. Table 2. Equivalent Pipe Length Chart w Maximum i capacity in Ft'/Hr based on 0.60 specific gravity as at a pressure of 5 0.5 si and a 0.3"WC pressure drop. Type of Pipe Fitting ¢'' '^ N pipe P tY P 9 h9 P P 9 P P• ul o. _I Pipe Length(Ft) Nominal 80°Elbow Tee+ Gate Valve" Gas Cocle U w1� Iron Pipe o N Nominal 10 20 30 40 50 1 60 80 100 150 Size in Equivalent Pipe Length(Ft) m o O T ronPlpe Size 1 2.6 5.2 0.6 1.5 ¢N N Slze(In) Maximum Gas Volume of Pipe(FVHr) V 1Y4 3.5 6.9 0.8 1.9 Notice r tt- �V O 1 520 350 285 245 215 195 170 150 120 t A minimum gas supply pressure of 6 in,152 mm °o }� 1/z 4.0 8.0 0.9 2.3 E i6 5 oo 1Y4 1,050 730 590 500 440 400 350 302 250 WC natural or 11 in,279 mm WC propane and `o > U N 2 5.2 10.3 1.2 3.0 oi O 1Yz 1,600 1,100 890 760 670 610 530 460 380 maximum 14 in,356 mm WC natural or propane, m o 2Yz 6.2 12.3 1.4 3.7 must be available at the safety shutoff valve inlet = O E N 2 3,050 2,100 1,650 1,450 1,270 11150 990 870 710 3 7.7 15.3 1.8 4.5 with the unit(s)operating. `�= LT~00 2t/ 4,800 3,300 2,700 2,300 2,000 1,850 1,600 1,400 1,130 + _ Notes: 'For through branch. tr 3 fn 3 8,500 5,900 4,700 4,100 3,600 3,250 2,800 2,500 2,000 �Forflowatfullopen. "m 10 w(9 p$ L.-I Note: Multiply the gas volume by 0 0)(n.62 for propane flow capacity in Ft�/Hr.Multiply the propane flow capacity by 2,500 BTUIFP X mi to �'0 w deterne the propane BTU/Hr capacity for a given pipe size and length. ry.3 i of Old� �o �+ r_ N0 d a)0N � t17 L? oa Or-0 C I,_O s= W Ncc Its 2 c 3 yc Section Boiler `s Piping Piping J 8t �m - Boiler Service Clearance --- S= �o U °E J Concrete Pad (By Others) L 0 0 0 0 6" - c Q ° ° ° O Y O O O O O ®® O O I � Q 0 0 m d 0 'a �a Heated Ile.Zones �') o o ° ° = .� m° 0 0 0 0 0 ° ° ° ° ° ♦ Q 0 0 0 0 ° O ° ° ° ° > 2,-0„ A I = By Pass Feeder � ) (V Revised No. By Date _ __ __ __� 1. 2. 3. 4. Reviewed No. By Date Expansion 1. 2. Tank 3. 4. Drawing scale 1Ya"=V-0" Sae Arch D Data 12.08.2015 By JP Project No. A Boiler Loop- Detail 160661-50 H-2 Scale: 1ya"=1'-0" Sheet H-2 O Equipment Schedule wo o Item Description Part No. oty 9 U o rn HS HF BV 1 BY-PASS FEEDER,2 GAL DMPF2P 1 0 o 0 0 Piping Schedule - rn n U) yC Item Description Part No. Qty r,j E O G7 d) T TEE GALV.FPT 0.75" DSTG075 1 N 0 H N BV BALL VALVE FPT 0.75" DSV075 3 600 O (115'Q HF T HC HS RUBBER HOSE 0.75"DIA,FT 7DEH075 10 }, c U 1 HC HOSE CLAMP 0.75" DMHC07 4 E R 33 ao 1 N HF BRASS HOSE FITTING 0.75"MPTx0.75"ID DSHF075X075 4 o q o N NIPPLE BRASS FPT 0.75"CL DSNB075013 4 `g O a)N O 'nc -00 cob tr >v �/w' 3 _/ %m m f6 wN,(D o ® o p1 7 n0 a)CAw o al N 0 N No �� mL9 �d �0N HF BV o� olio u) cr,-o s= W Nco fir Top View By � By-Pass Feeder ® 8 d Drain €d N - 8t �8 �8 9 J 1 HC J a°E 1 HS i r L a> Y a ILL }~a Oi to Cn L f0 HF a.. � � m Notes (Unless otherwise specified) Installation Instructions 1 The By-Pass Feeder should be installed in a convenient location where it may be easily filled.The inlet may be either on the pressure side of a main-line valve or on the BV pressure side of a circulating pump. Revised 2 As shown in the following diagrams,the%"hose should be used to connect the J'IBI] DatHF By-Pass Feeder to a by-pass on the water line of the system being treated.The direction of flow should be Up through the By-Pass Feeder.HF 3 A 3/4"ball valve should be placed on each side of the By-Pass Feeder.. BV 4 A drain is desirable and should be installed near the bottom inlet to the feeder with a Reviewed Oo valve in the outlet. Nr,. ay Date Add Chemical Instructions 1 Side View 5 The in-line valve should be open.Close the By-Pass Feeder valve,open the drain valve 3 -___-_----_------------ and make certain it is operating properly and the pressure in the By-Pass Feeder is relieved.Removed the cap of the By-Pass Feeder and allow water to flow out of the N T By-Pass Feeder's drain. Drawing Scale V=1'-0" 6 Close the drain valve,add the proper amount of chemical to the By-Pass Feeder,and She Arch D crack the inlet valve of the By-Pass Feeder to fill the By-Pass Feeder with water,replace the By-Pass Feeder cap. Data 10-5-2016 N 9y JP 7 Open the By-Pass Feeder valves and partially close the main line valve to force the Project No. water through the By-Pass Feeder.After about 3 to 4 minutes,open the main-line valve By-Pass Feeder- Detail and close the By-Pass Feeder valves.Drain the By-Pass Feeder. lsossl-so BPF-1 Scale: 6"=T-0" 8 Repeat Step 5-7 as required. Sheet BPF-1 O Piping Schedule - Feed Water Piping MOD. /�W2�3 Equipment Schedule wo o Item Description Part No. Qty Item Description Part No. oty 9 U o rn E ELBOW,SCR,STL,0.5" DSEG050 2 1 REGULATOR,WATER DEVPRO50 1 0 BV BALL VALVE,SCR,BR,0.5" DSVB050 1 3 2 PRESSURE GAUGE DEGPO60 1 0 T1 TEE,SCR,STL,0.5" DSTG050 3 B1 3 PRESSURE SWITCH DEGPS 1 ,,AA N T2 TEE,SCR,STL,1" DSTG100 1 Feed Water N1 1 4 AIR SEPARATOR 6" DEAS600 1 va„S V r/ E o a) o U UNION,SCR,STL,0.5" DSUG050 2 2 5 EXPANSION TANK PER DESIGN 1 m_ Use Coupling and SS Screen B1 BUSHING,SCR,STL,0.5"x0.25" DSHBG050025 1 Piping 6 AUTOMATICAIR VENTS/a" DEAV075M 1 O VTj Provided with Feed Water Regulator ¢ Q 62 BUSHING,SCR,STL,1"x0.50" DSHBG100050 1 B2 00 N1 NIPPLE,SCR,STL,0.25"x1.5" DSNG025015 1 N2 N3 �';`� T1 Piping Schedule - Expansion Tank E� R; T2 � N2 NIPPLE,SCR,STL,0.50'x2" DSNG050020 8 Item Description Part No. Qty ao 5 0 N o N3 NIPPLE,SCR,STL,0.50"x3.50" DSNG050035 1 _ BV BALL VALVE,SCR,BR 1" DSV100 1 8 o Feed Water n c O 6F-00 / snot-o I- N1 NIPPLE,SCR,STL,1"X 3" DSNG100030 1 3 m o Valve N2 N2 NIPPLE,SCR,STL,1"X 12" DSNG100012 1 = �'D �r I U T1 ® U UNION,SCR at�-M ,STL,1" DSUG100 1 �.3 c PIPING BY E 61�' OTHERS s o r- m0 N2 d N N BV1 U =_ c U, oa �rO cr,-o s°c W N00 I mr 2 I c 3 I yc 8 d I c8 E €d 6 BV1 NB I 8 5 Br1 N1 PIPING BY OTHERS BV2 I 5 0 8 0 Expansion '- ® Tank N2 I a J = J y N 4 U N2 I r o I 0 Br2 a d p c) ES Ring Base 4 Air Separator I _ (Elevation of Top) Q Q d I Ring Base Air Separator (Top View) Revised No. By Date Piping Schedule - Air Separator 2. Item Description Part No. Qty 3 E ELBOW,SCR,STL,1.0" DSEG100 1 _ 4. ES ELBOW,STREET,SCR,STL,1.0" DSESG100 1 Reviewed No. ay Date BV1 BALL VALVE,SCR,BR 0.75" DSV075 1 1' 2. BV2 BALL VALVE,SCR,BR 1.00" DSV100 1 3. Br1 BUSHING,GALV,HEX,1.50"x0.75" DBHG150075 1 4 Drawing Br2 BUSHING,GALV,HEX,2"x1" DBHG200100 1 Scale 3"=1'-e" NB NIPPLE BRASS,.75"x1.375" DSNB075013 1 BV N1 U N2 she Arch D N1 NIPPLE,SCR,STL,1.0"x3" DSNG100030 2 Data 12-0e-201e gy JP N2 NIPPLE,SCR,STL,1.0"x6" DSNG100060 2 Project No. U UNION,SCR,STL,1.0" DSUG100 1 �n� Air&Water Controls- Details 160661-050 FW-1 Scale: 3"=1'-0" sheet FWA O MOD: 1405.1 Equipment Schedule F o Item Description Part No. Qty W q 1 PUMP,CIRCULATION 3.00"FLANGE 80-10OF 1 ' Q o .2 of 0 Piping Schedule (Provided w/Optional Piping Package) UY Item Description Part No. city 20 N P PIPE STL GROOVED 3.00" AR o H TO TEE REDUCING HCxFPT 3.00"x 0.50" DSTR300050 1 M w O N F LO Tr2 TEE REDUCING HCxFPT 3.00"x 0.75" DSTR300075 2 = }, _ C COUPLER GROOVED RIGID 3.00" DSCR300 6 io 2 oo BV BUTTERFLY VALVE GROOVED 3.00" DSV300 3 o o 0 FL 3.00"IN 125#GRUVLOCK FLANGE DEFCG30 2 >g O c ago S1 CHANNEL GALVANIZED 1.6250 x 40" DSMU-040 2 0.. ♦/\ > V a)o S2 STRUT CLAMP PLATED 3.00" DSMC300 4 r t R CoH WS H W$ HB HOSE BIB MPTX HOSE 0.50" DSHB050 1 z=, a6i N Co B O O O O B Flange gaskets,Bolts,Nuts,&Washers not shown O to Heated 0 0 Heat Q� =z LO 50 Zones 0 0 Source •U � w : _� 00000 o 0 HWR HWR 3 A o 0 0M0 A at �m TO BV 8 HB S1 E a J S2 TR2 J P 9= N L e O O e �_ E a a0. �, o C +�+ to Section View A - A a ca 2 BV S1 1 4 S2 Revised No. By Date 2. 3. 4. Reviewed By No. By Date 1. C P s. 3. FL Section View B - B Notes (Unless Othe wise Specified) a. Drawing 1 Refer to Delta T Solutions Specification 6.0 Piping Installation,for Information on scale Piping. Sae Arch D 2 Provide Stand or Base Support for Equipment. Date 12-8-2016 3 Install Pipe Rest,using Unistrut with Brackets. By jP 4 Install Pump as Per Manufactures Requirements,Level and Grout,Elevation Project No. Opt. 160661-50 �A� Section Pump- Detail 5 All Line Voltage and Low Voltage Wiring,Conduit and Disconnect shall be sheet S-1 Scale: 2112"=V-0" Supplied and Installed By Others. S-1 O MOD : 1509.2 GF Veg. Room Equipment Schedule F o Item Description Part No. Qty 9 U o rn 1 VALVE,2-WAY,24V,1.50"BELIMO DEVS2150 1 0 0 2 FLOW REGULATOR 1.50" DEFRH150-0300 1 0 5 0 3 PRIMARY PUMP 1.50 DEPGM3184012OF 1 U) 4 THERMOMETER DET25 2 to o E M C) 0 2-Way Valve Actuator 5 HIGH LIMIT 1 V N O N Q 6 SENSOR By Othe Others 2 Manna = cc Piping Schedule (Provided w/Optional Piping Package) F—, > N o Item Description Part No. Qty m m E 0 AB A AB A P PIPE GROOVED STL 1.50" AR y O DEPRESS BUTTON 00 TO OPERATE VALVE MANUALLY T TEE GROOVED 1.50" DST150 2 .3 C d19 0 Tr TEE-REDUCING HCxF 1.50"x0.50" DSTR150050 5 o s i+co x —al A ADAPTER GROOVEDXMPT 1.50" DSA150 9 't �; w 24 V COMMON o— -Black— m 24 V COMMON � -Black— H I N C COUPLING GROOVED RIGID 1.50" DSCR150 10 OPEN Red I OPEN Red c d 00 CLOSE White CLOSE White BV BALL VALVE FPT 1.50" DSV150 4 5 0 }+ c m 0 N NIPPLE GALV 1.50"x3.00" DSNG150030 2 p N o. y o. a- y ® ® w ® ® FL1 GRUNDFOS 150#NPT FLANGE SET 1.50" DEFCI5G 1 0 p1r LO 0 FL2 1-1/4"125#CAST IRON FLANGE DEFC12 2 -r`o so W NOD po� pol FL3 1-1/4"VAN STONE FLANGE DEFP12 2 2 Valve in Open Valve in Closed DV DRAIN VALVE,0.50"W/CAP&CHAIN DSV050HTDC 1 - Position Position �3 `8% 6"SUPPLY AND RETURN LINE MOUNTED ON WALL AND SUPPORTED AS REQUIRED o d Control Valve-Actuator Detail =__ Z-1 Scale:8"=V-0" Z-V - 6.00"x 1.50"GROOVED a MECHANINCAL TEE OI 0 "g CWS CWR O O - i cws o U Steel to PCV Transition O O =a J - - - - - - - - to J .. N o FL3 L ae+ ° 9a O O �r c o Tr Tr FL2 CWR a` a a�.r d O O L > OTr 4 •� a� DV Tr T P C BV x O O *Distance to be g O O O O O O field determined m CWR WALL STRUCTURE N O O O O O O Fan Coil ° ° ( Chilled = 62 Water �� 2-Way Mixing Valve-Connection Detail Zones � Z-1 Scale:2 Y2"=V-0" of o of o Source o 0 0 0 o O ® - - f ® cws O O O a O O O Revised No. By Date J 1. FL1 a 1 N 2. j 2 — 3. See Detail B for 4. Actuator Operation Reviewed No. By Date 1. 2. 3. 4. 3 Drawing Scale 2-112"=1'-0" Sae Arch D Data 12.08.2016 Notes (Unless Otherwise Specified) By jp Note:THIS LAYOUT IS USED FOR 1 Refer to Delta T Solutions Specification 6.0 Piping Installation,for Information Project No. on Piping. 160661-050 CHILLED ZONE ZC-1 2-Way Mixing Valve-Piping Detail 2 Refer to Delta T Solutions Specification 4.0 Zones Installation for information sheet Z-1 Scale:2 Y2"=V-0" on control valve installation and operation. Z-1 MODE 1511 .2 GF Grow Room 103, Equipment Schedule F o 104, $e 202 Item Description Part No. Qty U) 1 VALVE,2-WAY,2.50"BELIMO DEVS2250 1 0 0 2 FLOW CONTROL 2.50 Per Design 1 © 02 0 3 PRIMARY PUMP 2.50" DEPGM1185015OF 1 4 THERMOMETER DET25 2 N a H 2 Way Valve Actuator y rn 5 SENSOR By Others 2 o N N Trn See Sheet GN-1 for Specific Flow Control DEPRESS BUTTON TO OPERATE VALVE = _ MANUALLY u= (6 Piping Schedule (Provided w/Optional Piping Package) E o � U 0o AB A AB-A Item Description Part No. oty ~m m C CD-t P PIPE GROOVED STL 2.50" DST250 2 N g O c F 00 T TEE GROOVED 2.50" DST250 2 �.3 Em0 sm am Tr TEE-REDUCING HCxF2.50"x0.50" DSTR250050 5 !0�;CD 24 V COMMON � -BIaCk— 24 V COMMON o- -Black— U p£ L.� OPEN Red N n OPEN � Red N BV BUTTERFLY VALVE GROOVED 2.50" DSV250 4 F d CLOSE white w close white N NIPPLE STEEL 2.50"x3.00" DSNG250030 1 .; e a R . ❑0 FL1 2"GRUNDFOS GF 50 FLANGE SET DEFC20GF 115 16c FL2 2-1/2"GRUVLOK FLANGE DEFCG25 2 F a`)T N�� " �� ®'° s�. FL3 2-1/2"VAN STONE FLANGE DEFP25 2 =o c LO A ADAPTER GROOVEDxMPT 2.50" DSA250 4 -6 a 0 Valve in Open Valve in Closed C COUPLING GROOVED 2.50" DSCR250 16 L 0 ` W 00 N Position Position DV DRAIN VALVE 0.50"W/CAP AND CHAIN DSV050HTDC 1 `o c F5 55 E y Control Valve-Actuator Detail 6 "SUPPLY AND RETURN LINE _ Z-2 Scale:8"=T-0" MOUNTED ON WALL AND SUPPORTED AS REQUIRED `= 8t 6.00"x 2.50"GROOVED d MECHANINCAL TEE CWS CWR i Ev° J Steel to PCV Transition O O O O aE J FL3 CWS o O O O 5 5 o Ig(t))l o FL2 O O ra a 0 N Tr Tr CWR � .� > o � o o o pV 4 C Tr .X O O *Distance to be O O O O O O field determined CWR N O O O O O 0 WALL STRUCTURE Chille Fan Coil _ 1 11 0 0 2 N Water 2-Way Mixing Valve-Connection Detail Z-2 Scale:2"=V-0" O 0 0 0 Zones ��� Source j O 0 o 1 O 0 0 0 CWS O O O O O -- - O O Revised No. BY Dale 2. FL1 A 1 2 J 3. See Detail B for J 4. Actuator Operation Reviewed No. By Date 1. 2. 3. 4. Drawing Scale 2"=1'-0" Sae Arch D Date 12-08-2016 Notes (unless Otherwise Specified) By jp Note:THIS LAYOUT IS USED FOR 1 Refer to Delta T Solutions Specification 6.0 Piping Installation,for Information Project No. 2-Way Mixing Valve-Piping Detail on Piping. 160661-050 COOLING ZONES ZC-3,ZC-4,& / H 1 y g P g 2 Refer to Delta T Solutions Specification 4.0 Zones Installation for information Sheet ZC-6 Z-2 Scale:2"=1'-0" on control valve installation and operation. Z-2 MOD: 1510.2 GF Grow Room 204 & 205 Equipment Schedule F Item Description Part No. oty U o rn 1 VALVE,2-WAY,2.00"BELIMO DEVS2200 1 0 0 2 FLOW CONTROL 2.00 Per Design 1 10 3 PRIMARY PUMP 2.00" DEPGlUP50150 1 y 4 THERMOMETER DET25 2 �� V+ E o a) 2-Way Valve Actuator w w-o 5 SENSOR By Others 2 6 o N N See Sheet GN-1 for Specific Flow Control O yQ DEPRESS BUTTON ■� =0 TO OPERATE VALVE 5= .� MANUALLY Piping Schedule (Provided w/Optional Piping Package) E o � C)N 5 co 00 AB a A AB—A Item Description Part No. oty m E o P PIPE GROOVED STL 2.00" DST200 2 N g O c ) T TEE GROOVED 2.00" DST200 3 Ql c Tr TEE-REDUCING HCxF 2.00"x0.50" DSTR200050 5 �_3 m co m 24 V COMMON o- -Black— & 5 W 24 V COMMON 0 -Black— c m X P BV BALL VALVE FPT 2.00" DSV200 4 OPEN (3 Red w n OPEN Red N n F :; CLOSE White W CLOSE white w N NIPPLE STEEL 2.00"x3.00" DSNG20030 1 N c ' FL1 2"GRUNDFOS GF 50 FLANGE SET DEFC20GF 2 =°s co N o U, ❑O n, FL2 2"GRUVLOK FLANGE DEFCG2 2 F d N Lai y ®w FL3 2"VAN STONE FLANGE DEFP2 2 ="o CLo A ADAPTER GROOVEDxMPT 2.00" DSA200 1 6 a r_o Valve in Open Valve in Closed C COUPLING GROOVED 2.00" DSCR200 18 gY W c1 coA Position Position DV DRAIN VALVE 0.50"W/CAP AND CHAIN DSV050HTDC 1 a a Control Valve-Actuator Detail Z-3a Scale:6"=V-0" E 5'o 6"SUPPLY AND RETURN LINE MOUNTED ON WALL AND SUPPORTED AS REQUIRED `= Fan Coil Zones 6.00"x 2.00"GROOVED d MECHANINCAL TEE o - t� CWS CWR =9 E J 0 0 O O a E J t0 cWS L Steel to PCV Transition q +�+ c0 FL3 iA`° L U A� ^(0 = T li 0 O m > — — — — — — CWR m o lt('))l o FL2 O O _ •L Q X_ DV > 2 o O o o O o Tr *Distance to be M 4 1 field determined 5 IM A 5 Tr T BV Tr WALL STRUCTURE Tr O O O O O O O O CWR ' �-s� Scale:ay_Mixing Valve-Connection Detail O O O O See Detail B for O O O O Actuator Operation I Chilled C Revised A A 1 N1 Water Nu. By Date O O O O Source 1. JP 3-13-17 O O O O O ---- -- O O 2. .4. CWS 3. 4. O O O O O -------- O O Reviewed No. By Date 1. FL z. 3. 2 4. Drawing Scale 2"=1'-0" 3 sae Arch D Date 12-08-2016 Notes (unless Otherwise Specified) By ip 1 Refer to Delta T Solutions Specification 6.0 Piping Installation,for Information Project No. on Piping. 160661-050 Way Mixing Valve-Piping Detail 2 Refer to Delta T Solutions Specification 4.0 Zones Installation for information Sheet Z-3a Scale:2"=1'-0" on control valve installation and operation. Z-3a MOD: 1510.2 GF Grow Room 204 & 205 Equipment Schedule F Item Description Part No. Qty CJ o rn 1 VALVE,3-WAY,2.00"BELIMO DEVS3200 1 0 0 2 FLOW CONTROL 2.00 Per Design 1 10 3 PRIMARY PUMP 2.00" DEPGlUP50150 1 y 4 THERMOMETER DET25 2 �� V+ E o a) 5 SENSOR By Others 2 $o y L0 See Sheet GN-1 for Specific Flow Control � ■� c U 33 DEPR a 3-Way Valve Actuator Piping Schedule (Provided w/Optional Piping Package) rdEo TOO ATE B B B }+ i>s a Noo AUALLY J �J Item Description Part No. lty m m � C CD E O � AB A AB A AB A P PIPE GROOVED STL 2.00" DST200 2 N g O c F 00 T TEE GROOVED 2.00" DST200 3 .3 �/\ a m o slack ke — Black 5 a,,, /� Me& 5 Tr TEE-REDUCING HCxF 2.00"xO.50.1 DSTR200050 5 !0 �� 2CV ON k� ON n @'m^ ory\T FU 8�N OPEN Red OPEN(D-- RedSoLoa �Loea wnae �Loea wnlle iN BV BALL VALVE FPT 2.00" DSV200 4 4) N NIPPLE STEEL 2.00"x3.00" DSNG20030 2 V c w �s �" k z �w � Ne mL „" ®-, FL1 2"GRUNDFOS GF 0 n 50 FLANGE SET DEFC20GF 2 s Old 0 '� FL2 2"GRUVLOK FLANGE DEFCG2 2 F N FL3 2"VAN STONE FLANGE DEFP2 2 =o c LO Zz o. rn�6 Valve in Open Position Valve in Mixing Position Valve in By-Pass Position Al ADAPTER GROOVEDxMPT 2.00" DSA200 9 c r_o A2 ADAPTER GROOVEDxMPT 2.00"x6.50" --- 2 L m ` W N°D o C COUPLING GROOVED 2.00" DSCR200 18 _ DV DRAIN VALVE 0.50"W/CAP AND CHAIN DSV050HTDC 1 .G Control Valve-Actuator Detail Z-3b Scale:6"=V-0" E 5'o 6"SUPPLY AND RETURN LINE MOUNTED ON WALL AND SUPPORTED AS REQUIRED `= Fan Coil Zones 6.00"x 2.00"GROOVED d05 MECHANINCAL TEE � I U CWS CWR r S J 0 0 O O o- J R t i CWS = L Q Steel to PCV Transition g 4.0 � O plo L U 3 — — ------------— — — — — FL3 a M O O < y0+ m CWR f° .r > FL2 Q 'K DV See Detail B for Tr Actuator Operation 1 *Distance to be 4 field determined M A 5 Tr T A2 1 BV Al 5 Tr WALL STRUCTURE Tr O O O O O 0 - -- O O � ♦ �� Scale: Mixing Valve-Connection Detail ® ® CWR I O O O O o 0 0 o A2 ( Chilled 1116 C N1 Water Revised No. By Dale 0 0 0 0 0 0 Source 1. JP 8-13-17 0 0 0 0 0 0 0 0 2. ® ® ♦ CWS 3. 4. O O O O O O O O Reviewed No. By t. FL Al 2 2 3. 4. Date Drawing Scale 2"=1'-0" Sae Arch D 3 Date 12-08-2016 Notes (Unless otherwise Specified) By ip 1 Refer to Delta T Solutions Specification 6.0 Piping Installation,for Information Project No. 3-Way Mixing Valve-Piping Detail on Piping. 160661-0502 Refer to Delta T Solutions Specification 4.0 Zones Installation for information Sheet Z-3b Scale:2"=V-0" on control valve installation and operation. Z-3b MOD: 1507.3 Clone Room 206 Equipment Schedule F Item Description Part No. Qty U o rn 1 VALVE,2-WAY,24V,1.25"BELIMO DEVS2125 1 c 0 2 FLOW REGULATOR 1.25" DEFRH125-0060 1 ® 1:5 3 PRIMARY PUMP 1.25" DEPGlUP26-64F 1 y 4 THERMOMETER DET25 2 n o o 5 SENSOR By Others 2 n 0)N o 2-Way Valve Actuator See Sheet GN-1 for Specific Flow Control U F ■O )V DEPRESS BUTTON U 0 TO OPERATEMANUALLY Piping Schedule (Provided w/Optional Piping Package) E_ U co") Item Description Part No. Qty m y C E 9p AB a A AB—A P PIPE GROOVED STL 1.25" AR O F 00 T TEE GROOVED 1.25" DST125 2 .3 m o Tr TEE-REDUCING HCxF 1.25"x0.50" DSTR125050 5 o s ;°.�m x A ADAPTER GROOVEDxMPT 1.25" DSA125 10 F „ J 24 V COMMON o- -Black— & 5 m 24 V COMMON o- -Black— 1D c m n E� C COUPLING GROOVED 1.25" DSCR125 16 ; c o OPEN Red ro n OPEN Red N n "oo :5 o 01) u7 CLOSE White ( W CLOSE �White � w BV BALL VALVE FPT 1.25" DSV125 4 -o o }iV e m 0 N NIPPLE GALV 1.25"x3.00" DSNG125030 2 p FL1 GRUNDFOS 125#NPT FLANGE SET 1.25" DEFC125G 1 -° c U 0 FL2 1-1/4"125#CAST IRON FLANGE DEFC12 2 °a�,ol Q W N 08D FL3 1-1/4"VAN STONE FLANGE DEFP12 2 e a Valve in Open Valve in Closed DV DRAIN VALVE,0.50"FPT,W/CAP AND CHAIN DSV050HTDC 1 - Position Position - 2 Ed Control Valve-Actuator Detail 6 SUPPLY Z 4 Scale:8"=T-0" MOUNTED ON WALL AND SUPPORTED AS REQUIRED t L 6.00"x 1.25"GROOVED _ MECHANINCAL TEE Fan Coil =- Zones o o -So U o oE J1. CWS a E J to d CWS CWR � � O O o t � ♦ ♦ ♦ o Steel to PCV Transition plo L U -__ r a- - - - - - - - O IV FL3 ii O O L � > O O L_ r to CWR FL2 O O \ x 25 DV Tr *Distance to be IM N 5 4 field determined 5 Tr Tr C Tr T P WALL STRUCTURE OI 0 O O O O O O I ® - - - ® CWR O O O O O O I O O Chilled Revised Water �c� 2-Way Mixing Valve-Connection Detail 1. By Date 1 Z-4 Scale:2 Y2"=T-0" 2. oI o �� oI o Source 3 o O O o o 0 4. ® ® CWS Reviewed No. By Date O O O O O 2. N S. A FL1 1 BV a. See Detail B for 2 — Drawing Actuator Operation S.I. 2-1/2"=1•-6" 3 size Arch D Date 12-09-2016 Notes (unless Otherwise Specified) By ip Note:THIS LAYOUT IS USED FOR 1 Refer to Delta T Solutions Specification 6.0 Piping Installation,for Information Project No. on Piping. 160661-050 CHILLED ZONE ZC-10 2-Way Mixing Valve-Piping Detail 2 Refer to Delta T Solutions Specification 4.0 Zones Installation for information Sheet Z-4 Scale:2 Y2"=T-0" on control valve installation and operation. Z-4 O MOD: 1500.1 EQUIPMENT SCHEDULE wo o Heated Zones V e g Room, Item Description Part No. Qly 2 CU 1 VALVE,3-WAY,24V,1-1/4"HONEYWELL VC SERIES 1 g Grow Rooms 103, 104, 107, 110, 2 FLOW REGULATOR,1-1/4"AUTOFLOW YRSERIES 1 0 5 202, 204, 205, & Clone Room 3 SENSOR BY OTHERS 2 aT Cy j U U) E O PIPING SCHEDULE (Provided w/Optional Piping Package) „o y N OItem Description Part No. Qty a P PIPE STEEL GROOVED 1.25" AR 5 a }, U E ELBOW GROOVED 90°1.25" DSE125 2 E o T TEE GROOVED 1.25" DST125 1 m q c a)o Tr TEE-REDUCING HCxF 1.25"x0.50" DSTR125050 3 N g O �a,-DO A ADAPTER GROOVEDxMPT 1.25" DSA125-UYST 9 am-, c C COUPLING GROOVED 1.25" DSCR125 12 o t R a; BV BALL VALVE FPT 1.25" DSV125 4 c x N NIPPLE GALV.1.25"x2.00" DSNG125020 2 �.3 C 22 HB HOSE BIB 0.50" DSHB050 1 -_ c 0f o yo - ML9 �d �0N 117 LO oa op-0 Tr C r-C:)s= W N00 ntf N1 Tr 2 f DV DV BV A P I j o `sd H♦ Qo �a j €n o 0 I Heated Zones T a� j I 1 I �8 j JM Op n e ♦ H W R U 1 a F{ J Ba J �O N C Leel ` 1 Heat �= Q DV Source ' Tr r C a a ♦ oQ ♦ HWS L U E 2 N Revised No. By Date 1. 2. 3. 4. Reviewed No. ay Date 1. 2. 3. 4. Drawing Scale Sae Arch D Date 12.09.2016 Notes runless Otherwise Specified) By ip Note:THIS LAYOUT IS USED FOR 1 Refer to Delta T Solutions Specification 6.0 Piping Installation,for Information Project No.on Piping. 160661-050 HEATED ZONES ZH-1 THRU ZH-4, �A� Zone valve- Piping Detail 2 Refer to Delta T Solutions Specification 4.0 Zones Installation for information sheet &ZH-6 THRU ZH-10 Z 5 Scale: 33/4"=1'-0" for information on control valve installation and operation. Z-5 MOD : 1502 B Grow Room 109 EQUIPMENT SCHEDULE o Item Description Part No. 011Y Cl to 1 VALVE,3-WAY,24V,1.50"BELIMO 1 0 0 2 FLOW REGULATOR,1.50"AUTOFLOW `Per Design 1 5 3 SENSOR By Others 2 N 3-Way Valve Actuator rn a) See Sheet GN-1 for Specific Flow Control � E o a) Lo PIPING SCHEDULE (Provided w/Optional Piping Package) O uTi Q rn Item Description Part No. 4ty }, C V P PIPE STEEL GROOVED 1.50" AR io 5 oo Valve in Open Valve in By-Pass T TEE GROOVED 1.50" DST150 1 m o Position Position Tr TEE REDUCING HCXF 1.50"x0.50" DSTR150050 3 O S allo p A ADAPTOR GROOVEDxMPT 1.50" DSA150 7 =m ao C COUPLING GROOVED RIGID 1.50" DSCR150 7 is a? t—.—� ® BV BALL VALVE FPT 1.50" DSV150 4 m to w N1 NIPPLE BRASS 0.50"x1.25" DSNB050012 1 p white---o CLOSE white---o CLOSE N2 NIPPLE GALV 1.50"x3.00" DSN150030 2 �of- Red ----19 OPEN l� S I " Red OPEN r- N 0 LJ u DV DRAIN VALVE W/CAP AND CHAIN 0.50" DSV050HTDC 1 Black- 24 V COMMON - O -Black- 24 V COMMON p N to Q rr O Cl h O W N00 A T AB A T AB B DEPRESSBUTTON B TO OPERATE VALVE MANUALLY (�� Control Valve-Acturator Detail Z-6 Scale: 8"=V-0" J J DV 3 See Detail B for 1 C P i Tr Tr BV Actuator Operation I i � ca > O 4.0 o HWR 0 A AS ; HWR ° ° O ------ � Q M d I > Heated Heat Zones � � Source I O O I = HWS ♦ 00 HWS No Revised Date Tr BV T 2 N2 2 3 3. 4. Reviewed No. By Date 1. 2. 3. 4. Drawing Scale Sae Arch D Data 1.17.2017 Notes (Unless Otherwise Specified) By jp 1 Refer to Delta T Solutions Specification 6.0 Piping Installation,for Information Project No. Note:THIS LAYOUT IS USED FOR (-_A'� 3-Way Zone Control Valve-Piping Detail on Piping. 160661-050 CHILLED ZONE ZH-5 2 Refer to Delta T Solutions Specification 4.0 Zones Installation for information Sheet Z-6 Scale: 4"=1'-0" on control valve installation and operation. Z-6 EQUIPMENT SCHEDULE - E � o Item Description Part No. city o y 1 VALVE,2-WAY,24V,1.25"BELIMO DEVS2125 1 r_ 0 2 FLOW REGULATOR,1.25"AUTOFLOW DEFRL125-0090 1 0 C rn no PIPING SCHEDULE (Provided w/Optional Piping Package) °o r w y N 3 2-Way Valve Actuator Item Description Part No. city U O N Q P PIPE GROOVED STEEL 1.25" AR = •� =V DEPRESS BUTTON Tr TEE-REDUCING HCxF 1.25"x0.50" DSTR125050 1 o l E' 6 7 ao TO OPERATE V A ADAPTER GROOVEDxMPT 1.25" DSA125 4 ~_ C (1)1)o MANU MANUALLY m m C C COUPLING GROOVED 1.25" DSCR125 4 5` O a)N N� Fa0 AB a A AB-A BV BALL VALVE FPT 1.25" DSV125 3 �.3 rmd N NIPPLE GALV.1.25"x2.00" DSVG125020 3CD HB HOSE BIB 0.50" DSHB050 1 d 24 V COMMON -Black— S[e 24 V COMMON -Black— S mpp � C-p OPEN Red N € OPEN Red w "30�i £ u7 CLOSE White CLOSE �White O N o •L _�� C N 0 m N 0 N o O y or„ .__�� -° W Na00 o m Valve in Open Valve in Closed Position Position - .__ E y Control Valve-Actuator Detail Z-D Scale: 8"=V-0" 8t o o t=�' Ev8 J a°E J L Tr E Y/ HB BV A P � j A co > E o �T a a) ra` O c CWR ♦ o O A ♦ CWR i T C (a 0 0 = Q N Chilled Chiller Zones � � � � Source 2 ��-)--- CWS ♦ A ♦ DO ♦ CWS Revised ` C 1 2 N _ J No. By Date 1. 2. 3. 4. Reviewed No. By Date 1. 2. 3. 4. Drawing Scale 4"=1'•0" Sae Arch D Date 5-15-2017 Notes (unless otherwise Specified) By ip 1 Refer to Delta T Solutions Specification 6.0 Piping Installation,for Information Project No. 2-Way Control Valve- Detail on Piping. 160661-50 2 Refer to Delta T Solutions Specification 4.0 Zones Installation for information sheet Z 131 Scale: 4"=V-0" on control valve installation and operation. Z-D 1 ;_ o o N c 0 0 CC rn 00 (1) C O 8 w+N O NQ Eo >�� 0 . v Environmental Control Environmental Control Environmental Control Environmental Control m y C O System System System System °' (By others) (By others) (By others) (By others) O F W ofCD 3 m 0 Grow Room 240V Grow Room j 240V Grow Room 240V I Grow Room 240V o X 110 10 Field 109 10 Field 107 1 fr7 Field I 104 10 Field �.3 c'0 Wiring Wiring Wiring Wiring o d ��°D L1 L2 G L1 L2 G L1 L2 G L1 L2 G 5° �0 c m 0 r d 4 p N 1 "o �/11/\ Cato to 24V Speed 1 24V Speed 1 24V speed 1 24V Speed 1 II, v C O 24V Speed 2 1 24V Sp."2 24V Sp."2 24V Sp."2 d Y W NOD Common li Common Common li Common n m I I I I I I I I �0 I I I I I I I I I I I I N y o f o f o f o f m o 240V 240V 240V 240V m 3 Heat Coil& 1 Heat Coil& Heat Coil& Heat Coil& 2 2 1 2 Cooling Coil 1 1 M2-a o 1 Cooling Coil M�-a All Cooling Coil 1 M�-a o 1 Cooling Coil 1M�-a o (4)Units (4)Units (4)Units (5)Units F_________________i F_________________i F_________________i F_________________i 1 E-O o _- 24V Speed t M 24V Speed t M 24V Speed t 24V Speed t I I I l 24V Speed 2 24V Speed 2 24V Speed 2 24V Speed 2 — I Common I I I I Common I ' i Common I I I I Common I I I I I I I A N I I I I I I I N q 240V 240V 240V 240V Cooling Coil Cooling Coil 2 Cooling Coil 2 Cooling Coil 1 - 1 I I p4 d° p I 1i g'dpo �OnlyOnly Only Only (5)Units 5 Units 4 Units 7 Units �----------------- ----- ----- ----- I z=m „- VI I I I I I I I J -----------------i ----------------- -----------------i -----------------i I E J Control Valve Actuator a Control Valve Actuator Control Valve Actuator Control Valve Actuator ' N _ L 1 Heating 1 M j Heating 1 M 1 Heating 1 M 1 Heating 1 M - Zone Valve Zone Valve Zone Valve Zone Valve _ = Q ZH-6 a { ZH-5 E ac ry I ac ry I ac ry I ac a �� 24 V Common 24V Common 24V Common I 24V Common m a a (� O Open Open Open Open Cloae Cloae Cl... Cloae L I I r •VL t5 I _ Q W 1 Pump Pump Pump Pump Y/ (1 Pump Valve (1 Pump Valve (1 Pump Valve (1 Pump Valve I I I I I 1 Valve Station per room) Valve Station per room) Valve Station per room) Valve Station per room) Station Station Station Station 1 1 1 1 S/S S/S 5/S 5/S 208Vi i 208V 208V 208V Mohr Molar Molar Molar Mixing Valve 10 Field Mixing Valve : 10 Field Mixing Valve I 10 Field Mixing Valve L 10 Field Wiring Wiring Wiring Wiring �ZC-6 I , ZC-5 I I ZC-4 I I ZC-3 I I I I I I I I m I I I I I I I I I 24 VAC Common o—1 - 24 VAC Common - 24 VAC Common - 24 VAC Common Open Open Open Open close close close close Revised w J — 1 — No. By Date w `-----------------' m w w `_________________' m ontrol Valve Actuator ontrol Valve Actuator ontrol Valve Actuator ontrol Valve Actuator 2. 3. L1 L2 G L1 L2 G L1 L2 G L1 L2 G 4. Reviewed No. By Date 1. 2. 3. 4. Scale N.T.S. Size Arch D Date 11-15-2016 By JP Project No. Grow Room 110-Wiring Diagram Grow Room 109-Wiring Diagram Grow Room 107-Wiring Diagram Grow Room 104-Wiring Diagram 160661-50 E-1 Scale: N.T.S. E-1 Scale: N.T.S. E-1 Scale: N.T.S. E-1 Scale: N.T.S. sheet E-1 E r O o N c 0 0 rn 00 (1) C O 8 +.+N Eo >�� r C N V Environmental Control Environmental Control Environmental Control Environmental Control m„ CE p System System System System C N (By Others) (By Others) (By Others) (By Others) N c O F 00 CD 0 3 m 0 Grow Room 240V ----, 240V 240V o 'X Veg Room Packaging j 1 Ton d cn 103 10 Field 10 Field 10 Field .3 c and Individual o I I Wiring I WiringI I I I o d L1 L2 G L1 L2 G Processing L11L2 G Units o AMA L m to Room oME doto �o 4) to 24V Speed 1 24V Speed 1 li li Fen Enable Open 24V Speed 2 24V Speed 2 Fen Enable Close C W NOD Common Common j o m Fan Enable Open Fan Enable Close t O o Heat Coil& 1 240V Heat Coil& 240V h 3 Cooling Coil aim ° Cooling Coil Mp�d ° B G124V O9 (5)Units (3)Units B cizav Heat Coil& JP3 TERMINAL STRIP o I I I I I I 1 TON I I I I I I I I �� Iq F----------------- F-----------------i Cooling Coll s a `----------------------J `----------------------J Heat Coll& JP3 TERMINAL STRIP p 2 Cooling Coil Unit(TYP) lo (2)Units I 24V Speed 1 24V Speed 1 _ I I I � — 24V Speed 2 j 24V Speed 2 j li li F li Common Common l F i Control Valve Actuator Im II Heating I �A 240V ° ;SP2.d ° Zone Valve M Cooling Coil 2 Cooling CoilI - Only a � Only (TYP) �� _ NC N 25 ( ) ( ) '�----------------------� 24V SPeed2 ,li 24 V C..—pen r o 7 Units 2--Units Common r close E o J ,e ------ - J oII' a Control Valve Actuator Control Valve Actuator 1 Heat Coil& - N Heating M Heating M g 240V - L Coolin Coil Zone Valve Zone Valve (1)Units M° ° 1 _ Q c, O L O L III Chilled Water Control valve Actuator i ?, I I I I ZH-2 N { ZH-1 x { Nc x Nc N F °"' `----------------------J (TYP) A M a s= L 24 V Common 24V Common m T open open Control Valve Actuator F a` y�+ W CI°se 01°ae Heating (1) I� Zone Valve �� close C �� 24 V c C1 ZH-10 ria� fi oommon ven •L 0) I I I I i I _ I NC N Q W F-----------------a F----------------- p P i I I 'I Pump Pump 24 V Common > (1 Pump Valve (1 Pump Valve o, Valve Station per room) Valve Station per room) I Station Station sis SiS ----------------- 1 I I I I 208V j 208V Chilled Water MixingValve III �° Mixing Valve ; 10J Field g 10 Field ZC-2 " Wiring ZC-1 " Wiring Valve Station I I I I O Ii 24 VAC Common - 24 VAC Common - 24 VAC Common E Open OPen Open oae Revised Close — _ No. By Date 0 I Cl 0 cmee � w w m JP 5-22-17 A B oximl valve ActNator A B patrol valve Actuator A B coxtrol verve AaNeror 2. 3. L1 L2 G L1 L2 G 6 L2 4. Reviewed No. By Date 1. 2. 3. 4. Scale N.T.S. Size Arch D Date 11-15-2016 By JP Project No. Grow Room 103 Wiring Diagram Veg Room Wiring Diagram �C� Packaging A Processing Room Wiring Diagram 1 Ton Unit Wiring Diagram 160661-50 E-2 Scale: N.T.S. E-2 Scale: N.T.S. E-2 Scale: N.T.S. E-2 Scale: N.T.S. Sheet E-2 ;_ o o N c 0 o 0 0 rn 00 (1) 1=O 8 w+N O NQ Eo > � v Environmental Control Environmental Control Environmental Control m y C O System System System °' C (By Others) (By Others) (By Others) O F W CO 3 C m O Grow Room 240V 1 Grow Room 240V Grow Room 240V o m 205 10 Field I 204 10 Field 202 10 Field �.3 c,D Wiring Wiring Wiring =d diOf°D L1 L2 G L1 L2 G L1 L2 G �� c m Lo r d dN to 24V Speed 1 24V Speed 1 24V Speed 1 1 1 C n O 24V SPaed 2 li 24V SPaed 2 24V Speed 2 ' C W NOD O N Common Co.on Common I I I I I I °240 240V ° 24 ° 1 Heat Coil& Heat Coil& Heat Coil 3 I I I I I I I I 2 2 Cooling Coil M�-a ° Cooling Coil M�-a ° Cooling Coil MP2-a ° (3)Units (3)Units (4)Units o I I I „, I I E y F_________________i I Iq F_________________i F_________________ o o —_ I i i r , ,I 24V Speed t M 24V Speed t 24V Speed t 1 _ I I I 24V Speed 2 24V Speed 2 24V Speed 2 1 8 c Common 1 Common 1 1i Common 1i1. 240V ° 1 240V ° I 240V ° Cooling Coil Cooling Coil Cooling Coil - Only MPS' Only MPS' Only - (4) Units III III II 4O Units II II (4)Units II � r ------ ------- r ----------------- ----------------- ----------------- Eom VJ E J Control Valve Actuator Control Valve Actuator Control Valve Actuator - N L Heating M Heating M Heating M - Zone Valve Zone Valve Zone Valve _ = Q 2 ZH-9 c HJo� ec a ec a ac a I I I m � L 24 V Common 24V Common 24 V Common o-na. Open Open Open F< O (/) Clone 0 Close Cloee L I I I I I I I I I I I � •L �"� •L 5 I I I I I I I I I I I I W I _ I I I I I I Q Pump (1 Pump Valve 1 Pump (1 Pump Valve Pump1 (1 Pump Valve/ Valve Station per room) I Valve 1 Station per room) I Valve Station per room) Station Station Station 1 01 1 1 1 Va 0 VS Va 1 208V 208V 208V Mixing Valve "°"' 10 Field Mixing Valve "°" L 10 Field I Mixing Valve I "°" 10 Field " Wiring " Wiring zc_� " Wiring ZC-9 ZC-8 I I I I I I +Aualor 24 VAC Common - 24 VAC Common�� - 24 VAC Common o-OpenOpen Open Close Close Close Revised IwNo. By Date w m m `-----------------' `-----------------'ontrol Valve A B onUoI valve Actuator A B ontrol valve Actuator 2. 3. L1 L2 G L1 L2 G L1 L2 G 4. Reviewed No. By Date 1. 2. 3. 4. Scale N.T.S. Size Arch D Date 11-16-2016 By JP Project No. Grow Room 205-Wiring Diagram Grow Room 204-Wiring Diagram �C� Grow Room 202-Wiring Diagram 160661-50 E-3 Scale: N.T.S. E-3 Scale: N.T.S. E-3 Scale: N.T.S. Sheet E-3 ;_ r O o N c 0 o 0 0 00 (1CC rn ) C O N w+N O NQ Eo >�� r 0 . V m y C E O �� O �00 O {0 ems+CO X d .3 C-O 12 !R L Environmental Control Environmental Control r d d System System `>3 s AV/1 C a—Lf) (By Others) (By Others) v° G WNao dti Clone 240V Room 206 10 Field Chiller 1 t o Wiring L1 L2 G ---------------------- 24V Speetl 1 E 2 24V Sp.d 2 I open SEE SHEETCommon Close — I I I I I Ll I E-6 -- li li o li li 8 2 Heat Coil& 240V Cooling Coil ap a ° MMof p (2)Units o I I I I = Control Valve Actuator _ II I Chiller 2 r o V Heating IM IIIJ Zone Valve Jo E- 1 24 V Common III III W open SEE = Q u clo Open U se Cl...v SHEET E-6 �m a 0�a �T y0,, w p Pum L (1 Pump Valve C L Valve Station per room) Chiller 3 .i Station o 1 = y v P-1 I', C ' s,S I 208V Mixing Valve i L 10 Field SEE Open " Wiring Cl... SHEET zc-�o E-6 24 VAC Common Open Close — li Boiler A B Control Valve ACWa10r B"1 L1 L2 G gp_1 Revised No. By Date S-1 1. JP 8-17-17 2. open v SEE B. Cl°se SHEET 4 E-5 Reviewed No. By Date II II 1. z A B 3. 4. Scale N.T.S. Size Arch D Date 11-16-2016 By JP Project No. Clone Room 206-Wiring Diagram Boiler/Chiller-Wiring Diagram 160661-50 E 4 Scale: N.T.S. E-4 Scale: N.T.S. sheet E-4 ,_ 0 Control Panel n 0 (By Others) 0 0 ----------------------------------------- ur CIRCUIT BREAKER DISCONNECT SWITCH ?6 d (By Others) OR POWER BLOCK N o U.N 3 I L1 T1 =~ _ 3 PHASE Lz rz TO COMPRESSOR(S) o C N POWER AND FAN MOTOR m° c m o SOURCE L3 T3 O C N N �F 00 N C EARTH FU4 FU5; 3 m m GROUND - — in S i°"r T1 N Cn i I N.3 C i 35 120 VAC =o }+V c N UO CHWRi r°n 2 301 120 2991 r d d 6 N PUMP N0.1 RELAY FU6 0) (BY OTHERS) CONTROL CIRUIT VAC `s4 g C 120VAC @1.0 AMP MAX FUSE a O TallSEE NOTE 2 TBi 22 W N 00 33 N Y 301A o 10 TB1 TB1 1A t.o P2+ 120 VAC - naa CHWR1 �_3 PUMP NO.1 RELAY 5 (BYOTHERS) 24 VAC 120VAC @1.0 AMP MAX TB1 =— O 31 120 VAC E y I I PUMP 2 �I i - Control Valve Actuator 3 TB1 a- I I 34 120 VAC -6 II I I To Environmental TB1 _ Controls 32A I (By Others) GIRDo _ See Sheet E-4 —(317) _ TB2 r o 52 IF REMOTE STOP REMOTE STOP USED REMOVE v J SWITCH 585 LEAD 585 FROM v°E- (BY OTHERS) TERM TB2-52 TO N TB2 TB2-72(BY L U 72 OTHERS) - �° +0 a 0) i I I L s I TB2 54 �° ^M to TB1 li R 24 VAC 43 ~a y-r c1 L u TB2 d 111 Li T61 N 83 Q� s **NOR.OPEN PUMP > t, AUX.CONTACTS (OPTIONAL) TB2 CHW FLOW �;I 44 SWITCH �I -MANDATORY- TB2 TB2 (BY OTHERS) 0 45 IF EXTERNAL ALARM/EVENT IS USED 555A REMOVELEAD 555A FROM TERM TB2 TB2-45 TO TB2-67 67 Revised i No. By Date 1 JP 6/1/2017 TB2 2. 68 3. TB2 4' 69 Reviewed No. By Date TB2 1. 70 2. TB2 3. 71 4. i I Scale N.T.S. Size Arch D Date 11-15-2016 By JP Project No. Chiller-Wiring Diagram 160661-50 E-6 Scale: N.T.S. sheet E-6 Y COMMERCIAL PLUMBING PERMIT APPLICATION l jNGC Department of Community&Economic Development City of Arlington • 18204 59th Ave NE •Arlington, WA 98223 • Phone (360)403-3551 THIS APPLICATION MUST BE ACCOMPANIED BY TWO(2) SETS OF CONSTRUCTION DRAWINGS, AND TWO (2) SETS OF FIXTURE SPECIFICATIONS (CUT SHEETS). CALCULATIONS ARE REQUIRED FOR GREASE INTERCEPTOR IF APPLICABLE. Type of Permit: New Installation �t Addition/Alte/r�ation ❑ Industrial Project Address: -7-7�� `J ��fi� .�/� �1��i�P71� Parcel ID#: Lot#: Subdivision: Project Description: a-C✓ 7 riA)k /' �'S 7�'� moo Valuation:4 /ZIX�J, QC/ Owner: Phone Number: Address: > -72-7 City:• P�/�4'*-e- State: lam14- Zip Code: Contact Person: ��/` S �_ � �— Phone Number: Cell Phone:�906 -2--Ye-p) T`7 3? E-mail: (:f'J(Sgy4-e Address: ;,7d - 2d K /7'Z7 City: �'�L-e- State: Zip Code: p�GO Contractor: %� '— (J l /"1, '�1 Phone Number:IJ Cell Phone: ���' ' �' Email: /C�J �G�D��A bt��/P1�014 i-7 Address: '- , Uk' A,- `7 City: ��l c � Stater Zip Code: �JPU/ Contractor License Number: `5WOVA � �-r2/ZK Expiration Date: )�! I Z f l7 Please indicate number of fixtures: Water Closet Floor Sink Sump Hose Bibb Miscellaneous Lavatory Laundry Tub Washer Water Heater Grease Trap Urinal Interceptor Sink Med Gas Drinking Fountain Floor Drain Dishwasher Backflow. Shower Other 6/16LP Page 2 of 3 COMMERCIAL PLUMBING PERMIT APPLICATION l�NG`t Department of Community&Economic Development City of Arlington • 18204 59th Ave NE •Arlington, WA 98223 • Phone (360)403-3551 PROPOSED BUILDING USE ❑ New Commercial ❑ Restaurant ❑ Automotive Based '_F;�Commercial Addition/Alteration ❑ Office ❑ Machine Shop ❑ Industrial ❑ Medical ❑ Other: CROSS CONNECTION Please check all appliances that are proposed or are permanently connected to the water supply. ❑ Ice Machine ❑ Dialysis Equip. ❑ Air washers ❑ Swimming ❑ Fire Sprinkler Pools ❑ Coffee Steam Sprinkler ❑ Hydrotherapy Equip. ❑ ❑ Hot Tub/Spa ❑ Urn/Espresso Generators w/chemicals ❑ Carbonated Bev. ❑ Dental Equip. ❑ Dye Vats ❑ Aquarium ❑ Lawn Irrigation ❑ Fume Hoods ❑ Laboratory Equip. ❑ Pressure ❑ Decorative ❑ Well on Washers Fountain property ❑ Degreasers ❑ Autoclave/Sterilizers Cooling Tewer3 J. _j Other: WASTEWATER DISCHARGE 1. Does the plumbing system currently have a grease interceptor? ❑ Yes allo ❑ Don't Know Date grease trap/interceptor was last cleaned (provide service record): 2. Does the plumbing system currently have an oil/water separator? ❑ Yes L3 No ❑ Don't Know 3. Date oil/water separator was last cleaned (provide service record): �y 4. Is water used in the business process(washing, rinsing, cooling)? ❑ Yes L-'7 No El Don't Know 5. Does your business require a NPDES permit? ❑ Yes LvJ No ❑ Don't Know I hereby certify that the above information is correct and that the construction on,and the occupancy and the use of the above-described property will bZ�ina? the laws, rules and regulation of the State of Washingto . 1)/ � 47 �Applicants Signature Date Print Applicants Name FOR STAFF USE ONLY Permit# Accepted By Amount Received Receipt# Date Received 6/16LP Page 3 of 3 CITY OF ARLINGTON 238 N. OLYMPIC AVE -ARLINGTON, WA. 98223 ` PHONE; (360)403-3551 BUILDING PERMIT Address:17727 59th Ave NE,Suite B Permit#:1639 Parcel#:31052200404100 Valuation: 12000.00 OWNER APPLICANT CONTRACTOR Name:ARLINGTON ADVANCED Name:Sno-Valley Plumbing Name:Sno-Valley Plumbing MANUFACTURING PARK Address:3316 FUHRMAN AVE E STE 200 Address:PO Box 1634 Address:PO Box 1634 City,State Zip:SEATTLE,WA 98102 City,State Zip:Duvall,WA 98019 City,State Zip:Duvall,WA 98019 Phone: Phone:206-792-6346 Phone:206-792-6346 MECHANICAL CONTRACTOR PLUMBING CONTRACTOR Name: Name:Sno-Valley Plumbing Address: Address:PO Box 1634 City,State,Zip: City,State,Zip:Duvall,WA 98019 Phone: Phone:206-792-6346 LIC#: EXP: LIC#: EXP: JOB DESCRIPTION PERMIT TYPE: Commercial Plumbing CODE YEAR: STORIES: CONST.TYPE: DWELLING UNITS: OCC GROUP: BUILDINGS: OCC LOAD: PERMIT APPROVAL I AGREE TO COMPLY WITH CITY AND STATE LAWS REGULATING CONSTRUCTION AND IN DOING THE WORK AUTHORIZED THEREBY;NO PERSON WILL BE EMPLOYED IN VIOLATION OF THE LABOR CODE OF THE STATE OF WASHINGTON RELATING TO WORKMEN'S COMPENSATION INSURANCE AND RCW 18.27, THIS APPLICATION IS NOT A PERMIT UNTIL SIGNED BY THE BUILDING OFFICIAL OR HIS/HER DEPUTY AND ALL FEES ARE PAID. IT IS UNLAWFUL TO USE OR OCCUPY A BUILDING OR STRUCTURE UNTIL A FINAL INSPECTION HAS BEEN MADE AND APPROVAL OR A CERTIFICATE OF OCCUPANCY HAS BEEN GRANTED. IBC110/IRC110. SALES TAX NOTICE:Sales tax relating to construction and construction materials in the City ofAAonpus rted7onour sales tax return form and code�Con#3101. 09 Signature Print Name Date Re 83E y Date CONDITIONS Approved as submitted. Additional requirements: for cross connection, a RPBA must be installed as in- premise isolation to the cold water supply for the boiler. THIS PERMIT AUTHORIZS ONLY THE WORK NOTED.THIS PERMIT COVERS WORK TO BE DONE ON PRIVATE PROPERTY ONLY ANY CONSTRUCTION ON THE PUBLIC DOMAIN(CURBS,SIDEWALKS,DRIVEWAYS,MARQUEES,ETC.)WILL REQUIRE SEPARATE PERMISSION PERMIT FEES Date Description Fee Amount 9/15/2017 Plumbing Permit Base Fee $25.00 9/15/2017 Plumbing Permit Fee(Enter Fixture Fee) $25 00 9/15/2017 Plumbing Plan Review Fees $250.00 9/15/2017 Processing/Technology Fee $25.00 Total Due: $325.00 Total Payment: $0.00 Balance Due: $325.00 CALL FOR INSPECTIONS BUILDING(360)403-3417 When calling for an inspection please leave the following information: Permit Number,Type of Inspection being requested,and whether you prefer morning or afternoon CITY OF ARLINGTON 238 N. OLYMPIC AVE -ARLINGTON, WA. 98223 PHONE; (360) 403-3551 BUILDING PERMIT Address:17727 59th Ave NE,Suite B Permit#:1639 Parcel#:31052200404 100 Valuation:12000.00 OWNER APPLICANT CONTRACTOR Name:ARLINGTON ADVANCED Name:Sno-Valley Plumbing Name:Sno-Valley Plumbing MANUFACTURING PARK Address:3316 FUHRMAN AVE E STE 200 Address:PO Box 1634 Address:PO Box 1634 City,State Zip:SEATTLE,WA 98102 City,State Zip:Duvall,WA 98019 City,State Zip:Duvall,WA 98019 Phone: Phone:206-792-6346 Phone:206-792-6346 MECHANICAL CONTRACTOR PLUMBING CONTRACTOR Name: Name:Sno-Valley Plumbing Address: Address:PO Box 1634 City,State,Zip: City,State,Zip:Duvall,WA 98019 Phone: Phone:206-792-6346 LIC#: EXP: LIC#: EXP: JOB DESCRIPTION PERMIT TYPE: Commercial Plumbing CODE YEAR: STORIES: CONST.TYPE: DWELLING UNITS: OCC GROUP: BUILDINGS: OCC LOAD: PERMIT APPROVAL I AGREE TO COMPLY WITH CITY AND STATE LAWS REGULATING CONSTRUCTION AND IN DOING THE WORK AUTHORIZED THEREBY;NO PERSON WILL BE EMPLOYED IN VIOLATION OF THE LABOR CODE OF THE STATE OF WASHINGTON RELATING TO WORKMEN'S COMPENSATION INSURANCE AND RCW 18.27. THIS APPLICATION IS NOT A PERMIT UNTIL SIGNED BY THE BUILDING OFFICIAL OR HIS/HER DEPUTY AND ALL FEES ARE PAID. IT IS UNLAWFUL TO USE OR OCCUPY A BUILDING OR STRUCTURE UNTIL A FINAL INSPECTION HAS BEEN MADE AND APPROVAL OR A CERTIFICATE OF OCCUPANCY HAS BEEN GRANTED. IBCI10/IRCI10. SALES TAX NOTICE:Sales tax relating to construction and construction materials in the City of ton�11t9 orted on your sales tax return form and codedAt li),t ton#3101, Signature Print Name Date Ri s-WBy Date CONDITIONS - Approved as submitted. Additional requirements- f RPBA must be installed as in- premise isolation t, oiler. THIS PERMIT AUTHORIZS ONLY THE WORK NOTED.T i PRIVATE PROPERTY ONLY. ANY CONSTRUCTION ON THE PUBLIC DOMAIN(CURBS,SIDED L REQUIRE SEPARATE PERMISSION. Date Description Fee Amount 9/15/2017 Plumbing Permit Base Fee $25.00 9/15/2017 Plumbing Permit Fee(Enter Fixture $25.00 9/15/2017 Plumbing Plan Review Fees $250.00 9/15/2017 Processing/Technology Fee $25.00 Total Due: $325.00 Total Payment: $0.00 Balance Due: S325.00 CALL FOR INSPECTIONS BUILDING(360)403-3417 When calling for an inspection please leave the following information: Permit Number,Type of Inspection being requested,and whether you prefer morning or afternoon Permit Information Date 9/7/2017 Permit Number 1639 Project Name Hyak Venture Partners,LLC/Patriot Meds Applicant Name Sno-Valley Plumbing Applicant Address PO Box 1634 City,State,Zip Duvall,WA 98019 Contact Bill Ostiguy Phone 206-792-6346 Email bill@snovalleyplubming com Permit Type Commercial Plumbing Site Address 17727 59th Ave NE,Suite B Valuation 12000.00 Status Ready to Issue Permit Issued Permit Expires Square Feet 0 Type of Construction/Occupancy Load Number of Stories 0 Proposed Use Plumbing for 1 502 Assigned To Kristin Foster Property Information Owner Information Parcelk 31052200404100 ARLINGTON ADVANCED MANUFACTURING PARK ARLINGTON ADVANCED MANUFACTURING PARK 3316 FUHRMAN AVE E STE 200 17727 59TH AVENUE NE SEATTLE,WA 98102 Contractors Contractor Name Primary Contractor Email Contractor License License# Contact Type Sno-Valley (Bill Ostiguy 206-792 bill@snovalleyplubming.comCONTRACTOR (Labor and SNOVAVP950R Plumbing 6346 Industries Review Date Type Description Target Completed Assigned Status Date Date To ,9/7/2017��ommercial 9/14/2017 Rick Karns IIn Review I lumbin 9/7/2017�"ommercial No comments, LT .9/14/2017 '9/8/2017 PW Admin Com lete Plumbin I�ev p 9/7/2017 No comments.-SB /14/2017 9/12/2017 pproved rommercial PW-Sew- lumbing I L Rev For Cross connection an RPBA must be install as in- /7/2017 Commercial premise isolation to the cold make up water for the /14/2017 /11/2017 PW-Wat- �pproved with (Plumbing boiler.Gus Rev onditions Fees Fee Description Notes Amount Plumbing Permit Base Fee 322.10.00.00 $25.00 Plumbing Permit Fee(Enter Fixture Fee) 322.10.00.00 $25.0 Plumbing Plan Review Fees 32210.0000 $250.0 Processing/Technology Fee 341.43.00.02 $25.0 Total $325.001 Payments Date Paid By Amount Description Payment Type Accepted B 9/15/2017 [Sno-Valley Plumbing $325 00 jCheck#3425 jKristin Foster Totag, $325.0 Amount Outstanding:$0.0 Notes Date Note 9/7/2017 The work has already been completed. Uploaded Files Upload File Date File Uploaded B 9/7/2017 3:27:36 PM 160661-50-S-Hvak Venture Partners LLC 8-23-17 Part1.pdf Foster. Kristin X 9/7/2017 3:27:36 PM 160661-50-8-Hvak Venture Partners LLC 8-23-17 Part3.pdf Foster,Kristin x 9/7/2017 3:27:35 PM 160661-50-S-Hyak Venture Partners LLC 8-23-17 Part2.pdf Foster,Kristin k 9/7/2017 3:15:43 PM 1639 Agpllication.pdf Foster, Kristin x COMMERCIAL PLUMBING PERMIT APPLICATION Department of Community&Economic Development City of Arlington • 18204 59th Ave NE •Arlington, WA 98223 • Phone (360)403-3551 THIS APPLICATION MUST BE ACCOMPANIED BY TWO(2) SETS OF CONSTRUCTION DRAWINGS, AND TWO(2) SETS OF FIXTURE SPECIFICATIONS (CUT SHEETS). CALCULATIONS ARE REQUIRED FOR GREASE INTERCEPTOR IF APPLICABLE. Type of Permit: 0 New Installation ,.�y�[Addition/Alternation [� Industrial Project Address: � 7�� `��' AV-647fiE'04 Parcel ID#: Lot#: n Subdivision: Project Description: r-C��1h�� �� �` "`�S �� Coa(wta Valuation: Owner. Phone Number: —1W 1�'739 Address: �Z7 City: P�/��'-� State: ` Zip Code: ��06q Contact Person: ��n�5 C_ �— Phone Number: Cell Phone: J696 -2 YO `"T-7 V E-mail C3��y-t-P c�l� �/mlLio v , C �`n'► Address: v> 72-7 City: t?1C IttL-e- State: t'44 � Zip Code: Contractor: 0 ✓�'1. �� Phone Number: Cell Phone: ���� \ `' Email: /�JSG�(J�� y�� c�� CG�7 Address: �s „ � 1. `I City: r c l Stater Zip Code: ���/ Contractor License Number: `J5WoyA V?y 5V gK Expiration Date: �2l i Z + 17 Please indicate number of fixtures: Water Closet Floor Sink Sump Hose Bibb Miscellaneous Lavatory Laundry Tub Washer Water Heater_ _ Grease Trap Urinal Interceptor Sink Med Gas Drinking Fountain Floor Drain Dishwasher Backflow Shower _ Other 6/16LP Page 2 of 3 T i I l 1 F, _ A I I �Y COMMERCIAL PLUMBING PERMIT APPLICATION lIN Department of Community&Economic Development City of Arlington• 18204 59th Ave NE •Arlington, WA 98223 • Phone (360)403-3551 PROPOSED BUILDING USE ❑ ew Commercial ❑ Restaurant ❑ Automotive Based Commercial Addition/Alteration ❑ Office ❑ Machine Shop ❑ Industrial ❑ Medical ❑ Other: CROSS CONNECTION Please check all appliances that are proposed or are permanently connected to the water supply. ❑ Ice Machine ❑ Dialysis Equip. Air washers Swimming ❑ Fire Sprinkler Pools ❑ Coffee Steam Sprinkler ❑ Hydrotherapy Equip. ❑ Hot Tub/Spa Urn/Espresso Generators w/chemicals ❑ Carbonated Bev. ❑ Dental Equip. ❑ Dye Vats ❑ Aquarium ❑ Lawn Irrigation ❑ Fume Hoods Laboratory Equip. ❑ Pressure ❑ Decorative ❑ Well on Washers Fountain property ❑ Degreasers Autoclave/Sterilizers Cooling Towers r� ❑ Other: WASTEWATER DISCHARGE 1. Does the plumbing system currently have a grease interceptor? ❑ Yes l!f No ❑ Don't Know Date grease trap/interceptor was last cleaned (provide service record): r,y _ 2. Does the plumbing system currently have an oil/water separator? ❑ Yes L3 No ❑ Don't Know 3. Date oil/water separator was last cleaned (provide service record): 4. Is water used in the business process(washing, rinsing, cooling)? ❑ Yes L-'� No ❑ Don't Know 5. Does your business require a NPDES permit? ❑ Yes LvJ No ❑ Don't Know I hereby certify that the above information is correct and that the construction on,and the occupancy and the use of the above-described property will be in a n ith the laws, rules and regulation of the State of Wasshingto . Applicants Signature Date Print Applicants Name FOR STAFF USE ONLY II��GI SEP 0 5 2017 Permit# Ai6cepted ey Amount Received Receipt# Date Received 6/16LP Page 3 of 3 F', �- � ,. � 9/7/2017 SNO VALLEY PLUMBING Search L&I Saft;Ly& i e<fif#h 0�wns& Insuraiic e �Norkplece Rights Trades&L�renswg Washington State Department of " Labor & Industries SNO VALLEY PLUMBING Owner or tradesperson P O BOX 1634 Principals DUVALL,WA 98019 206-792-6346 OSTIGUY,WILLIAM JOSEPH,OWNER KING County Doing business as SNO VALLEY PLUMBING WA UBI No. Business type 602 461 938 Individual License Verify the contractor's active registration/license/certification(depending on trade)and any past violations. Construction Contractor Active. Meets current requirements. License specialties PLUMBING License no. SNOVAVP95ORK Effective—expiration 12112/2005-12/12/2017 Bond RLI INS CO $6,000.00 Bond account no. SRS1003579 Received by L&I Effective date 12/09/2005 12/15/2005 Expiration date Until Canceled Insurance Endurance American Insurance C $1,000,000.00 Policy no. CBC20001794000 Received by L&I Effective date 09/22/2016 09126/2016 Expiration date 09/26/2017 Insurance history Savings No savings accounts during the previous 6 year period. Lawsuits against the bond or savings No lawsuits against the bond or savings accounts during the previous 6 year period. L&I Tax debts No L&I tax debts are recorded for this contractor license during the previous 6 year period,but some debts may be recorded by other agencies. https://secure.ini.wa.gov/verify/Detaii.aspx?UBI=602461938&LIC=SNOVAVP95ORK&SAW= 1/2 i 9/7/2017 SNO VALLEY PLUMBING License Violations , ` No license violations during the previous 6 yea._ A od. Workers' comp Do you know if the business has employees?If so,verify the business is up-to-date on workers'comp premiums. L&I Account ID Account is closed. 330,183-00 Doing business as WILLIAM JOSEPH OSTIGUY Estimated workers reported NIA L&I account contact T3 I KAYLENE MONIER(360)902-6627-Email:BRKB235@lni.wa.gov Public Works Strikes and Debarments Verify the contractor is eligible to perform work on public works projects. Contractor Strikes No strikes have been issued against this contractor. Contractors not allowed to bid No debarments have been issued against this contractor. Workplace safety and health No inspections during the previous 6 year period. L Washington Stale Dept.of Labor&Industries,Use of this site is subject to the laws of[lie state of Washington. I Help os improve hftps://secure.Ini.wa.gov/verify/Detail.aspx?UBI=602461938&LIC=SNOVAVP95ORK&SAW= 2/2 a I I Permit#: 1639 Permit Date: 09/07/17 Permit Type: COMMERCIAL PLUMBING Project Name: Hyak Venture Partners, LLC/Patriot Meds Applicant Name: Sno-Valley Plumbing Applicant Address: PO Box 1634 Applicant, City, State, Zip: Duvall,WA 98019 Contact: Bill Ostiguy Phone: 206-792-6346 Email: bill@snovalleyplubming.com Scope of Work: Plumbing for 1502 Valuation: 12000.00 Square Feet: 0 Number of Stories: 0 Construction Type: Occupancy Group: ID Code: Permit Issued: 09/18/2017 Permit Expires: Form Permit Type: Status: COMPLETE Assigned To: Kristin Foster Property Parcel# Address Legal Description Owner Name Owner Phone Zoning ARLINGTON 31052200404100 17727 59TH AVENUE NE ADVANCED 637 Warehousing& MANUFACTURING Storage Services PARK Contractors Contractor Primary Contact Phone Address Contractor Type License License# Sno-Valley Plumbing Bill Ostiguy 206-792-6346 PO Box 1634 CONSTRUCTION Labor andSNOVAVP950RK CONTRACTOR Industries Plan Reviews Date Review Type Description Assigned To Review Status 09/07/2017 COMMERCIAL z.Rick Karns PLUMBING 09/07/2017 COMMERCIAL No comments,LT PW-ADMIN-GIS PLUMBING 09/07/2017 COMMERCIAL No comments.-SB PW-SEW-REV PLUMBING COMMERCIAL For Cross connection an RPBA must be install as in- 09/07/2017 PLUMBING premise isolation to the cold make up water for the boiler. PW-WAT-REV Gus Fees Fee Description Notes Amount Plumbing Base Permit Fee $25.00 Mechanical Commercial Permit Table 4-7;Per Unit $25.00 Plumbing Plan Review Fees $250.00 Processing/Technology $25.00 Total $325.00 Attached Letters Date Letter Description 09/15/2017 Building Permit Payments Date Paid By Description Payment Type Accepted By Amount 09/15/2017 Sno-Valley Plumbing Check#3425 Kristin Foster $325.00 Outstanding Balance $0.00 Notes Date Note Created By: 02/20/2019 Expired.Filed in address files.No final was done. Raelynn Jones 09/07/2017 The work has already been completed. Kristin Foster Uploaded Files Date File Name 09/18/2017 2610137-1639 Issued Permit.pdf 09/07/2017 2588565-160661-50-S-Hyak Venture Partners LLC 8-23-17 Part3.pdf 09/07/2017 2588566-160661-50-S-Hyak Venture Partners LLC 8-23-17 Partl.pdf 09/07/2017 2588564-160661-50-S-Hyak Venture Partners LLC 8-23-17 Part2.pdf 09/07/2017 2588549-1639 Appllication.pdf Date: 03/23/2026 Permit#: 1639 Permit Date: 09/07/2017 Review Date: 09/07/2017 Permit Type: COMMERCIAL PLUMBING Review Type: COMMERCIAL PLUMBING Target Date: 09/14/2017 Scheduled 00:00 Time: Completed 09/11/2017 Date: Description: For Cross connection an RPBA must be install as in-premise isolation to the cold make up water for the boiler. Gus Review Status: Assigned To: PW-WAT-REV Time In: 00:00 Time Out: 00:00 Hours: 0.0 Property Information Parcel#: 31052200404100 ARLINGTON ADVANCED MANUFACTURING PARK ARLINGTON ADVANCED MANUFACTURING 3316 FUHRMAN AVE E STE 200 PARK 17727 59TH AVENUE NE SEATTLE,WA 98102 Zoning: 637 Warehousing & Storage ServicesLot: 12131ock: