HomeMy WebLinkAbout21125 SMOKEY POINT BLVD_BLD2025_2026 CITY OF ARLINGTON
238 N. OLYMPIC AVE - ARLINGTON, WA. 98223
PHONE; (360) 403-3551
BUILDING PERMIT
Address:21125 Smokey Point Blvd Permit#:2025
Parcel#:31050800300100 Valuation:0.00
OWNER APPLICANT CONTRACTOR
Name:STILLAGUAMISH TRIBE OF INDIANS Name:Stillaguamish Tribe of Indians Name:Faber Construction,Corporation
Address: PO BOX 277 Address:21 l25 Smokey Point Blvd Address: 131 E GROVER ST
City,State Zip:ARLINGTON,WA 98223 City,State Zip:Arlington,WA 98223 City,State Zip:LYNDEN,WA 98264
Phone: Phone:360-722-4350 Phone:360-354-3500
MECHANICAL CONTRACTOR PLUMBING CONTRACTOR
Name: Name:
Address: Address:
City,State,Zip: City,State,Zip:
Phone: Phone:
LIC#: EXP: LIC#: EXP:
JOB DESCRIPTION
PERMIT TYPE: Demolition CODE YEAR: 2015
STORIES: 2 CONST.TYPE:
DWELLING UNITS: 0 OCC GROUP:
BUILDINGS: 1 OCC LOAD:
PERMIT APPROVAL
I AGREE TO COMPLY WITH CITY AND STATE LAWS REGULATING CONSTRUCTION AND IN DOING THE WORK AUTHORIZED THEREBY;
NO PERSON WILL BE EMPLOYED IN VIOLATION OF THE LABOR CODE OF THE STATE OF WASHINGTON RELATING TO WORKMEN'S
COMPENSATION INSURANCE AND RCW 18.27.
THIS APPLICATION IS NOT A PERMIT UNTIL SIGNED BY THE BUILDING OFFICIAL OR HIS/HER DEPUTY AND ALL FEES ARE PAID,
IT IS UNLAWFUL TO USE OR OCCUPY A BUILDING OR STRUCTURE UNTIL A FINAL INSPECTION HAS BEEN MADE AND APPROVAL OR
A CERTIFICATE OF OCCUPANCY HAS BEEN GRANTED. IBC110/IRCl l0.
SALES TAX NOTICE:Sales tax relating to construction and construction materials in the City of Arlington must be reported on your sales tax return form
and 6&Lfs ngton#3101.
d
Signature Print Name Date Released By DatJ
CONDITIONS
Water Meter will need to be removed prior to demolition. Contact COA Utilities to schedule 360-403-3526.
Also the RPBA inside the building will need to have a remove report done and submitted to the Water dept,
please contact Gus 360-403-3542. Per standard 5-3.20 cut, cap and protect the side sewer prior to
demolition, call the sewer inspection line at 360-403-3508 to schedule an inspector to be on-site for any
sewer work.
THIS PERMIT AUTHORIZS ONLY THE WORK NOTED.THIS PERMIT COVERS WORK TO BE DONE ON PRIVATE PROPERTY ONLY. ANY CONSTRUCTION
ON THE PUBLIC DOMAIN(CURBS,SIDEWALKS,DRIVEWAYS,MARQUEES,ETC.)WILL REQUIRE SEPARATE PERMISSION.
PERMIT FEES
Date Description Fee Amount
7/10/2018 Demolition Fee $100.00
7/10/2018 Processing/Technology Fee $25.00
7/10/2018 State Building Code Surcharge Fee $4.50
Total Due: $129.50
Total Payment: $129.50
Balance Due: $0.00
CALL FOR INSPECTIONS
BUILDING(360)403-3417
When calling for an inspection please leave the following information:
CITY OF ARLINGTON
238 N. OLYMPIC AVE - ARLINGTON, WA. 98223
PHONE; (360) 403-3551
BUILDING PERMIT
Address:21125 Smokey Point Blvd Permit#:2025
Parcel#:31050800300100 Valuation:0.00
OWNER APPLICANT CONTRACTOR
Name:STILLAGUAMISH TRIBE OF INDIANS Name:Stillaguamish Tribe of Indians Name:Faber Construction,Corporation
Address: PO BOX 277 Address:21 l25 Smokey Point Blvd Address: 131 E GROVER ST
City,State Zip:ARLINGTON,WA 98223 City,State Zip:Arlington,WA 98223 City,State Zip:LYNDEN,WA 98264
Phone: Phone:360-722-4350 Phone:360-354-3500
MECHANICAL CONTRACTOR PLUMBING CONTRACTOR
Name: Name:
Address: Address:
City,State,Zip: City,State,Zip:
Phone: Phone:
LIC#: EXP: LIC#: EXP:
JOB DESCRIPTION
PERMIT TYPE: Demolition CODE YEAR: 2015
STORIES: 2 CONST.TYPE:
DWELLING UNITS: 0 OCC GROUP:
BUILDINGS: 1 OCC LOAD:
PERMIT APPROVAL
I AGREE TO COMPLY WITH CITY AND STATE LAWS REGULATING CONSTRUCTION AND IN DOING THE WORK AUTHORIZED THEREBY;
NO PERSON WILL BE EMPLOYED IN VIOLATION OF THE LABOR CODE OF THE STATE OF WASHINGTON RELATING TO WORKMEN'S
COMPENSATION INSURANCE AND RCW 18.27.
THIS APPLICATION IS NOT A PERMIT UNTIL SIGNED BY THE BUILDING OFFICIAL OR HIS/HER DEPUTY AND ALL FEES ARE PAID,
IT IS UNLAWFUL TO USE OR OCCUPY A BUILDING OR STRUCTURE UNTIL A FINAL INSPECTION HAS BEEN MADE AND APPROVAL OR
A CERTIFICATE OF OCCUPANCY HAS BEEN GRANTED. IBC110/IRCl l0.
SALES TAX NOTICE:Sales tax relating to construction and construction materials in the City of Arlington must be reported on your sales tax return form
and coded City of Arlington#3101.
Cl
Signature Print Name Date Released By Datct
CONDITIONS
Water Meter will need to be removed prior to demolition. Contact COA Utilities to schedule 360-403-3526.
Also the RPBA inside the building will need to have a remove report done and submitted to the Water dept,
please contact Gus 360-403-3542. Per standard 5-3.20 cut, cap and protect the side sewer prior to
demolition, call the sewer inspection line at 360-403-3508 to schedule an inspector to be on-site for any
sewer work.
THIS PERMIT AUTHORIZS ONLY THE WORK NOTED.THIS PERMIT COVERS WORK TO BE DONE ON PRIVATE PROPERTY ONLY. ANY CONSTRUCTION
ON THE PUBLIC DOMAIN(CURBS,SIDEWALKS,DRIVEWAYS,MARQUEES,ETC.)WILL REQUIRE SEPARATE PERMISSION.
PERMIT FEES
Date Description Fee Amount
7/10/2018 Demolition Fee $100.00
7/10/2018 Processing/Technology Fee $25.00
7/10/2018 State Building Code Surcharge Fee $4.50
Total Due: $129.50
Total Payment: $129.50
Balance Due: $0.00
CALL FOR INSPECTIONS
BUILDING(360)403-3417
When calling for an inspection please leave the following information:
Ci TY OF ARLINGTON
I
238 N. OLYMPIC AVE - ARLINGTON, WA. 98223
PHONE; (360) 403-3551
BUILDING PERMIT
Address:21125 Smokey Point Blvd Permit#:2025
Parcel#:31050800300100 Valuation:0.00
OWNER APPLICANT CONTRACTOR _
Name:STILLAGUAMISH TRIBE OF INDIANS Name:Stillaguamish Tribe of Indians Name:Faber Construction,Corporation
Address:PO BOX 277 Address:21 125 Smokey Point Blvd Address: 131 E GROVER ST
City,State Zip:ARLINGTON,WA 98223 City,State Zip:Arlington,WA 98223 City,State Zip:LYNDEN,WA 98264
Phone: Phone:360-722-4350 Phone:360-354-3500
MECHANICAL CONTRACTOR PLUMBING CONTRACTOR
Name: Name:
Address: Address:
City,State,Zip: City,State,Zip:
Phone: Phone:
LIC#: EXP: LIC#: EXP:
JOB DESCRIPTION
PERMIT TYPE: Demolition CODE YEAR: 2015
STORIES: 2 CONST.TYPE:
DWELLING UNITS: 0 OCC GROUP:
BUILDINGS: I OCC LOAD:
PERMIT APPROVAL
I AGREE TO COMPLY WITH CITY AND STATE LAWS REGULATING CONSTRUCTION AND IN DOING THE WORK AUTHORIZED THEREBY,
NO PERSON WILL BE EMPLOYED IN VIOLATION OF THE LABOR CODE OF THE STATE OF WASHINGTON RELATING TO WORKMEN'S
COMPENSATION INSURANCE AND RCW 18.27.
THIS APPLICATION IS NOT A PERMIT UNTIL SIGNED BY THE BUILDING OFFICIAL OR HIS/HER DEPUTY AND ALL FEES ARE PAID.
IT IS UNLAWFUL TO USE OR OCCUPY A BUILDING OR STRUCTURE UNTIL A FINAL INSPECTION HAS BEEN MADE AND APPROVAL OR
A CERTIFICATE OF OCCUPANCY HAS BEEN GRANTED. IBC110/IRCl10.
SALES TAX NOTICE:Sales tax relating to construction and construction materials in the City of Arlington must be reported on your sales tax return form
and coded City of Arlington#3101.
Signature Print Name Date Released By Date(
CONDITIONS
Water Meter will need to be removed prior to demolition. Contact COA Utilities to schedule 360-403-3526.
Also the RPBA inside the building will need to have a remove report done and submitted to the Water dept,
please contact Gus 360-403-3542. Per standard 5-3.20 cut, cap and protect the side sewer prior to
demolition, call the sewer inspection line at 360-403-3508 to schedule an inspector to be on-site for any
sewer work.
THIS PERMIT AUTHORIZS ONLY THE WORK NOTED.THIS PERMIT COVERS WORK TO BE DONE ON PRIVATE PROPERTY ONLY. ANY CONSTRUCTION
ON THE PUBLIC DOMAIN(CURBS,SIDEWALKS,DRIVEWAYS,MARQUEES,ETC.)WILL REQUIRE SEPARATE PERMISSION.
PERMIT FEES
Date Description Fee Amount
7/10/2018 Demolition Fee $100.00
7/10/2018 Processing/Technology Fee $25.00
7/10/2018 State Building Code Surcharge Fee $4.50
Total Due: $129.50
Total Payment: $129.50
Balance Due: $0.00
CALL FOR INSPECTIONS
BUILDING(360)403-3417
When calling for an inspection please leave the following information:
Permit Number ')e of Inspection being requested,and whether you p morning or afternoon
s
Permit Information
Date 6/29/2018
Permit Number 2025
Project Name Stillaguamish Tribe Clinic
Applicant Name Stillaguamish Tribe of Indians
Applicant Address 21125 Smokey Point Blvd
City,State,Zip Arlington,WA 98223
Contact Josh Wells
Phone 360-722-4350
Email (wells@stillaguamish.com
Permit Type Demolition
Site Address 21125 Smokey Point Blvd
Valuation 0.00
Status Applied
Permit Issued
Permit Expires
Square Feet 0
Type of Construction/Occupancy Load
Number of Stories 2
Proposed Use demo existing clinic building
Assigned To Launa Peterson
Property
Parcel Address Subdivision Lot Owner
31050800300100 121125 SMOKEY POINT BLVD STILLAGUAMISH TRIBE OF INDIANS
Contractors
Contractor Name Primary Contact Phone Email Contractor Type License License#
Faber Construction Cor oration 1Ben Faber 360-354-3500 en faberconstruction.com Labor&Industries JFABERCC887138
Review
Date T e Descri tion Tar et Date Completed Date Assigned To Status
13/29/2018 Demolition 7/6/2018 Building In Review
6/29/2018 -Demolition 7/6/2018 PW Ad min Rev In Review
(3/29/2018 Demolition 7/6/2018 W-Sew-Rev In Review
6/29/2018 'Demolition 7/6/2018 PW-Wat-Rev In Review
Fees
Fee Description Notes Amount
Demolition Fee 322.10.00.0 $100.0
Processincirrechnology Fe 341.43.00.0 $25.0
State Building Code Surchar a Fe 386.00.01.0 $4.50
Total '129.50
—UP loaded Files Upload File
Date File Uploaded
B
6/29/2018 Peterson, h
9:31:22 Smokey Poinl DEMO PrOject.docx P Patna
AM
6/29/2018
9:31:22 Demolition Permit Application IJEMeeQd9LKSCZ.pdf Peterson,
AM
6/29/2018
9:31:22 attachments C015031000017652928 BTKWDuILRAOL90nwif2u PAT2180525+STILLAGUAMISH+CUNIC+&+GARAGE+21123+SMOKEY+PT+BLVDp_tll Peterson,
AM Launa
DEMOLITION
PERMIT APPLICATION
Department of Community& Economic Development
City of Arlington•.18204 59th Ave NE • Arlington, WA 98223 • Phone(360) 403-3551
THIS APPLICATION MUST BE ACCOMPANIED WITH A COPY OF THE ASBESTOS/DEMOLITION NOTIFICATION FROM PUGET
SOUND CLEAN AIR AGENCY, TWO(2)COPIES OF AN ASBESTOS SURVEY REPORT AND ABATEMENT REPORT
(if applicable)COMPLETED BY AN APPROVED AGENCY.
Type of Permit:(check one) ❑ Residential ✓❑ Commercial ❑ Industrial
Project Address: 21123 Smokev Point BLVD Parcel ID#: 31050800300100
Lot#: Subdivision: Valuation: .000
Building Area (Sq Ft) 12,000 No. of floors: 2 Number of Buildings:)
Owner: Stillaguamish Tribe of Indians ____ Phone Number: 3607224350
21123 Smokey Point BLVD Arlington 98223
Address: City State: WA Zip Code:
Contact Person)oshua Wells Phone Number: 3607224350
Cell Phone: 3607224350 E-mail:jwells@stillaguamish.com
Address: 3322 236th St NE C; Arlington 9ton
State: WA Zip Code: 98223
Contractor: Faber Construction Phone Number: 3603056206
Address: 1511, 131 E Grover St City: Lynden State: WA Zip Code: 98264
Contractor's License Number:FABERCC887138 Expiration:02/07/2020
Scope of Work:
Demo of Existing building
I hereby certify that the above information is correct and that the construction on, and the occupancy and the use of the above-
described property will be in accordance with the laws, rules and regulations of the Stat of Washington.
06/26/2018
Applicants Signature Date
Joshua D. Wells
Print Applicants Name
Received
FOR STAFF USE ONLY
Permit# Accepted Amount Received Receipt# Date Received
0
.. i
. i
i
q7
1 •�,'
f �
1 /
� I S
Ln
Lu
1 _
1oi Received
Tot
_ � � a ► ::
.. � �.
A-T
Asbesto-Test,
Inc.
-)
1429Ave D NI87,Snohomish,WA 98290
425-489-4040
o•u•o••ushr.uoiv i..ungig[rditkrdwsrotaocnm
ASBESTOS SURVEY
Clinic& Garaze Structures 0a 21123 Smokev Point Blvd-Arlinelon, WA 98223
Page 1 of 10
May 30,2018
PAT2180525
Stillaguamish Tribe
POB 277
Arlington,WA 98223
360-722-4350 ; 425-359-5404
Attn.: Josh Wells
jwells(&stillaguamish.com
On May 21,2018,Asbesto-Test personnel conducted an Asbestos survey(per
U.S.E.P.A./A.H.E.R.A.guidelines(as designated and specified by Puget Sound Clean Air
Agency and Washington State)of the clinic&naraQe n 21123 Smokev Point Blvd.,Arlington,
Snohomish County, Washington 98223. This survey purpose is to identify Asbestos
Containing Materials that are present and will require professional removal prior to
demolition.
Note: Samples of suspect Asbestos Containing Materials were taken and analyzed for the presence of asbestos.
THERE WAS NO ASBESTOS DETECTED IN ANY OF THE SAMPLES TAKEN.If there is any additional suspect ACM
located prior to or during demolition(such as,but not limited to,those materials listed on the last page of this
report),that was not discovered in this survey,the material(s)must be Presumed Asbestos Containing Material
unless tested otherwise by laboratory analysis.
NARRATIVE OF FINDINGS
BASIC CONSTRUCTION: The wood frame clinic structure is two stories on a slab
foundation.The siding is hardi-board materials with a stone and mortar accent.The hardi-board
materials were sampled. The siding vapor barrier materials were sampled.The mortar holding the
decorative exterior stone was sampled. The roofing is metal with Tyvek underneath.
INTERIOR CONSTRUCTION, FINISHES, AN FLOORINGS: The interior
construction is wood and drywall. The drywall and taping materials were sampled.The tile and
vinyl flooring materials with the associated mastic and backing materials were sampled. The
misc. mastic materials were also sampled.
Received
INSULATION: The insulation was sampled.
JUN 2 7 2018
LTD 2�2�
continue to page 2
1 ate.
B
Page 2 of 10 May 30,2018
PAT2180525 Asbesto-Test,Inc. 425-489-4040
Clinic& Gurtr,e Structures(,21123 Sinoket' Point Blvtl.,Arlington, if A 98223
ELECTRICAL SYSTEM: The electrical wiring insulation is not of the kind to be ACM.Any
suspect electrical wiring insulation or any suspect TSI(Thermal System Insulation)found in,
around, or behind any located fuse or breaker boxes should be considered to be ACM(Asbestos
Containing Material), unless determined otherwise by laboratory analysis.
HEATING AND VENTILATION SYSTEM:There is a gas forced air furnace in the
structure. There was no relating suspect ACM located. Note:It was not possible to dismantle the
furnace and ducting to locate and/or evaluate any additional suspect ACM that may be
concealed, inside the unit, or associated in hidden areas. It is our opinion any further handling
of the furnace system should be coordinated by the project manager and/or abatement contractor.
If any additional relating suspect materials are located prior to and/or during any demolition or
renovation, any and all additional related suspect materials should be considered to be ACM
(Asbestos Containing Material), unless determined to be otherwise by laboratory analysis. Any
TSI that may be present inside or outside the furnace and/or ducting system including but not
limited to all gaskets,joint compounds, sealants,and/or insulations,are PACM unless tested
otherwise by laboratory analysis.
MISC.: None.
ADDITIONAL STRUCTURES ON SITE INCLUDED IN SURVEY: The garage is a
wood framed structure with composition roofing. The composition roofing materials were
sampled.The interior was finished with drywall. The drywall and taping materials were sampled.
#of structures included in survey:one methadone clinic,one garage
Requested by:Josh Wells
1930 W lli4�aae,Ste 315
5-M.wA9elty n
This certifies that •• n
Christopher L.Patterson
has satisfaclodty completed
4 hours of refresher training as an
AHERA Building Inspector
to comply with the training requirements of
, TSC.A Title II,40 CFR 763(AHERA)
,y
EPA Provider#1085
h41GiiY Date May%2018 Eapree in1 year
Can Phan:167264
Christopher Patterson
VP Operations/Analyst-Asbesto-Test, Inc.
Inspector, Certified A.H.E.R.A.
Accred #167284 EXP.May 9,2019
continue to page 3
40
BBB
A-T
1429Ave.D. r1/87,Snohomish, WA 98290
425-489-4040;f775-665-0420
iriru_r[sbrslnlesl,.cnul;bfy(�irblcslolesl C,_t1N�
i
Page 3 of 10 May 30,2018
PAT2180525 Asbesto-Test,Inc. 425-489-4040
Clinic& Garage Structures A,21123 Smokey Point Blvd.,Arlington, WA 98223
ANALYSIS ID ASBESTOS//TYPE//OUANTITY OTHER MATERIAL
THERE WAS NO ASBESTOS DETECTED IN ANY OF THE SAMPLES LISTED
CLINIC
1.0 mastic NAD adhesive,cellulose
holding counter tops throughout-white
2.0 floor tile NAD non-fibrous materials
throughout office and clinic areas-color:tan
3.0 mastic NAD adhesive
beneath previous sample listed
4.0 mastic NAD adhesive,cellulose
holding brown laminate on countertops throughout
5.0 white mastic NAD adhesive,cellulose
holding base cove-homogenous throughout
6.0 insulation NAD fiberglass,cellulose
color:cream foil
around ducting-foil faced
7.0 mastic NAD adhesive,cellulose
holding wainscot panels throughout
8.0 sheet vinyl flooring NAD non-fibrous materials
clinic areas,restrooms,maintenance areas-gray pebble cellulose,fiberglass
9.0 mastic NAD adhesive
beneath previous sample listed
10.0 mastic NAD adhesive
holding carpet tile throughout
11.0 acoustic ceiling tile NAD cellulose,paint
main floor-gray fiberglass
12.0 drywall/taping compound NAD non-fibrous materials
office 1 cellulose,gypsum
13.0 drywall/taping compound NAD non-fibrous materials
office 2 cellulose,gypsum
14.0 drywall/taping compound NAD non-fibrous materials
office 3 cellulose,gypsum
15.0 drywall/taping compound NAD non-fibrous materials
hall 1 cellulose,gypsum
continue to page 4
BBB
ENRON
�r
/429Ave.D.9187,Snohomish,WA 98290
425-489-4040;f775-665-0420
i
I
Page 4 of 10 May 30,2018
PAT2180525 Asbesto-Test,Inc. 425-489-4040
Clittic& Came Structures(a?21123 Smokev Point Blvd,Arli►reton, WA 98223
ANALYSIS ID ASBESTOS//TYPE//OUANTITY OTHER MATERIAL
CLINIC cont:
16.0 drywall/taping compound NAD non-fibrous materials
hall 2 cellulose,gypsum
17.0 drywall/taping compound NAD non-fibrous materials
hall 3 cellulose,gypsum
18.0 drywall/taping compound NAD non-fibrous materials
stairwell sample cellulose,gypsum
19.0 insulation NAD fiberglass,cellulose
above acoustic ceiling tile on main floor
COMMON AREAS:
20.0 exterior siding NAD non-fibrous materials,
newer vintage"hardy"board cellulose
21.0 siding mortar NAD non-fibrous materials,
holding exterior stone sample 1 cellulose
21.1 siding mortar NAD non-fibrous materials,
holding exterior stone sample 2 cellulose
21.2 siding mortar NAD non-fibrous materials,
holding exterior stone sample 3 cellulose
22.0 vapor barrier NAD cellulose,tar
beneath previous sample
GARAGE
23.0 drywall/taping compound NAD non-fibrous materials
sample 1 composite cellulose,gypsum
24.0 drywall/taping compound NAD non-fibrous materials
sample 2 composite cellulose,gypsum
25.0 drywall/taping compound NAD non-fibrous materials
sample 3 composite cellulose,gypsum
26.0 insulation NAD fiberglass,cellulose
color:cream&beige-attic
27.0 composition roofing NAD cellulose,tar,
non-fibrous materials
28.0 vapor barrier NAD cellulose,tar
beneath previous sample
29.0 mastic NAD cellulose,adhesive
holding composition roofing
continue to page 5
40
BBB
® a_r
1429Ave.D.u187,Snohomish,WA 98290
425-489-4040;f775-665-0420
11_ll'1_ M.jf,Y(lL,y'//J/L'.1'Iy4Y7 /injo 7(lf�!(klll7/CSl.ffl�M
:;
I
I
I
I
Page 5 of 10 May 30,2018
PAT2180525 Asbesto-Test,Inc. 425-489-4040
Clinic& GaraQe Structures 64 21123 Smokey Point Blvd,Arlinvon, WA 98223
I,
vow
s
' r
1
;Y
� S
C
continue to page 6
BBB
CD
/429Ave.D.9187,Snohomish, WA 98290
425-489-4040:f 775-665-0420
iru�ii�ol8�s19�afISYt{1�:in i�(�Qarb(uyolmi.rugr
i
I
Page 6 of 10 May 30,2018
PAT2180525 Asbesto-Test,Inc. 425-489-4040
Clinic& Gang,e Structures(a),21123 Smokej, Point Blv(L,.4rlin,,tun, JVA 98 223
y
1
. r
l
,c.
continue to page 7
8BB "
i
1429Ave.D.u187,Snohomish, WA 98290
425-489-4040;f775-665-0420
ivru._mhesimeQcom;n0dWyb—(q,Y_we.4w
Page 7 of 10 May 30,2018
PAT2180525 Asbesto-Test,Inc. 425-489-4040
Clinic do Garare Structures na,21123 Smokev Point Blvd.,Arlington. WA 98223
A
i
CJ
1
•, I
,i
A
continue to page S
deft
Zr P1t38
1429Ave.D. 4/87,Snohomish,WA 98290
425-489-4040;J'775-665-0420
,ru,v.ns'Aax7f�Hcr-i.cog;f lsbles[�IC�.CfM!
i
i
i
I
Page 8 of 10 May 30,2018
PAT2180525 Asbesto-Test,Inc. 425-489-4040
Clinic Gura-e Structures a,21123 Smokev Point Blvd.,Arlinuton, WA 98223
S
V � {
1�
f�h
continue to page 9
BBB 'ierrt"
1429 Ave.D.9187,Snohomish,WA 98290
425-489-4040;f 775-665-0420
Page 9 of 10 May 30,2018
PAT2180525 Asbesto-Test,Inc. 425-489-4040
Clinic& Gara Structiires no 21123 Smoke Point Blvd. Arlin tun WA 98223
.rk
i'
continue to page 10
BBB
CZ)
1429 Ave.A 9187,Snohomish, WA 98290
425-489-4040;f775-665-0420
u{�i�.�;rhq,�_IgfN�'t,cnm;in b (xpf(oie.r!_com
Page 10 of 10 May 30,2018
PAT2180525 Asbesto-Test,Inc. 425-489-4040
Clinic& Carare Structures(a)21123 Smokey Point R/rtl..Arlingf(III, Ui A 98223
Samples taken are listed with their corresponding analyses.If asbestos is detected,those samples containing asbestos are listed first
and noted with the initials'ACM".
Some sample analyses listed may be a representative analysis of individual and separate samplings and analysis of homogenous
materials,as prescribed by A.H.E.R.A.guideline.
If,during demolition or renovation,any additional suspect asbestos containing materials are located[may include but not limited to:
sheet vinyl flooring,the flooring,wall or ceiling texturings or paints,concrete siding or skirting,cement pipes,cement wallboard,
electrical cloth,electrical wiring insulation,thermal paper,wallboard,joint compounds,vinyl wall coverings,spackling compounds,or
any other suspect TSI(Thermal System Insulation)],those materials are presumed Asbestos Containing Materials unless determined
to be non-asbestos by laboratory analysis.
Asbesto-Test,Inc.does not guarantee approximations of quantities of ACM,which may be listed with the analyses.It is therefore
recommended professional abatement price and/or disposal quotes be obtained by inquiring as to fees per area of specific ACM
material(i.e.square or linear ft etc.),or by on site assessment.
Any and all materials identified as ACM and/or PACM in this report must be abated prior to disturbance in renovation or demolition.
PLM(polarized light microscopy)has been known to miss asbestos in small percentages of some samples,which contain asbestos,
thus negative PLM results cannot be guaranteed. Floor tiles and wipes should be tested with SEM(scanning electron microscope)or
TEM(transmitting electron microscope),to insure analytical accuracy when asbestos is reported in small percentages
Analytical test method.,USEPA 600/R93/116"(PLM);WAC 296-62-07753 App.J
**One percent is the USEPA regulatory limit for asbestos in bulk samples.
Key: "FRIABLE"signifies"Easily Airborne"
ACM signifies Asbestos Containing Material"
PACM signifies"Presumed Asbestos Containing Material"
CAB signifies"Concrete Asbestos Board"
c signifies"less than"
TSI signifies'Thermal System insulation"
HVAC signifies"Heating Ventilating Air-Conditioning"
NAD signifies"No Asbestos Detected"
END OF REPORT
ArLynn Hammond, Pres., BSc.
Analytical Chemist,AIHA proficient
Inspector, certified A.H.E.R.A.
accred.#1628675(Expires July 26,2018)
��
BBB AvaR
1429 Ave.D.r 187,Snohomish,WA 98290
425-489-4040;f775-665-od20
11-11'6VAKh&Wote.1'1,e091;IIII!) QAhlel'II)IONLO H)
:,
I
I
A-T
C
sbesto-Test,
Inc.
1429 Ave.D.#187,Snohomish, WA 98290
425-489-4040
www.asbestotest.com into Ldasbestotest.com
ASBESTOS SURVEY
Clinic& Garage Structures(a)21123 Smokev Point Blvd.,Arlington, WA 98223
Page I of 10
May 30,2018
PAT2180525
Stillaguamish Tribe
POB 277
Arlington, WA 98223
360-722-4350 ; 425-359-5404
Attn.: Josh Wells
jwells(&stillaguamish.com
On May 21, 2018,Asbesto-Test personnel conducted an Asbestos survey(per
U.S.E.P.A./A.H.E.R.A. guidelines (as designated and specified by Puget Sound Clean Air
Agency and Washington State) of the clinic&garage (a,21123 Smokev Point Blvd.,Arlington,
Snohomish County, Washington 98223. This survey purpose is to identify Asbestos
Containing Materials that are present and will require professional removal prior to
demolition.
Note: Samples of suspect Asbestos Containing Materials were taken and analyzed for the presence of asbestos.
THERE WAS NO ASBESTOS DETECTED IN ANY OF THE SAMPLES TAKEN.If there is any additional suspect ACM
located prior to or during demolition(such as,but not limited to,those materials listed on the last page of this
report),that was not discovered in this survey,the material(s)must be Presumed Asbestos Containing Material
unless tested otherwise by laboratory analysis.
NARRATIVE OF FINDINGS
BASIC CONSTRUCTION: The wood frame clinic structure is two stories on a slab
foundation. The siding is hardi-board materials with a stone and mortar accent. The hardi-board
materials were sampled. The siding vapor barrier materials were sampled. The mortar holding the
decorative exterior stone was sampled. The roofing is metal with Tyvek underneath.
INTERIOR CONSTRUCTION, FINISHES, AN FLOORINGS: The interior
construction is wood and drywall. The drywall and taping materials were sampled. The tile and
vinyl flooring materials with the associated mastic and backing materials were sampled. The
misc. mastic materials were also sampled.
INSULATION: The insulation was sampled.
continue to page 2
1
BBB c
Page 2 of 10 May 30, 2018
PAT2180525 Asbesto-Test,Inc. 425-489-4040
Clinic& Garage Structures A 21123 Smokey Point Blvd.,Arlin,-ton, WA 98223
ELECTRICAL SYSTEM: The electrical wiring insulation is not of the kind to be ACM. Any
suspect electrical wiring insulation or any suspect TSI(Thermal System Insulation)found in,
around, or behind any located fuse or breaker boxes should be considered to be ACM(Asbestos
Containing Material), unless determined otherwise by laboratory analysis.
HEATING AND VENTILATION SYSTEM: There is a gas forced air furnace in the
structure. There was no relating suspect ACM located. Note:It was not possible to dismantle the
furnace and ducting to locate and/or evaluate any additional suspect ACM that may be
concealed, inside the unit, or associated in hidden areas. It is our opinion any further handling
of the furnace system should be coordinated by the project manager and/or abatement contractor.
If any additional relating suspect materials are located prior to and/or during any demolition or
renovation, any and all additional related suspect materials should be considered to be ACM
(Asbestos Containing Material), unless determined to be otherwise by laboratory analysis. Any
TSI that may be present inside or outside the furnace and/or ducting system including but not
limited to all gaskets,joint compounds, sealants,and/or insulations, are PACM unless tested
otherwise by laboratory analysis.
MISC.: None.
ADDITIONAL STRUCTURES ON SITE INCLUDED IN SURVEY: The garage is a
wood framed structure with composition roofing. The composition roofing materials were
sampled. The interior was finished with drywall. The drywall and taping materials were sampled.
#of structures included in survey: one methadone clinic, one garage
Requested by:Josh Wells
1900 W.Nickerson,Ste 315
Seeme,WA 98119 (Dl
(206)285-3373 T
This certifies that �• -Nn
Christopher L.Patterson
has satisfactorily completed
4 hours of refresher training as an
AHERA Building Inspector
to comply with the training requirements of
TSCA Title II,40 CFR 763(AHERA)
EPA Provider#1085
Offie'May 9,2018 EV,res r 1 year.
Cerl Num:167284
Christopher Patterson
VP Operations/Analyst-Asbesto-Test,Inc.
Inspector, Certified A.H.E.R.A.
Accred. #167284 EXP. May 9, 2019
continue to page 3
1AWOL
BBB
CD
1429 Ave.D.#187,Snohomish,WA 98290
425-489-4040;f 775-665-0420
www.asbestotest.com;info(dasbtestotest.com
Page 3 of 10 May 30, 2018
PAT2180525 Asbesto-Test,Inc. 425-489-4040
Clinic& Garaze Structures A 21123 Smokey Point Blvd.,Arlington, WA 98223
ANALYSIS ID ASBESTOS//TYPE//QUANTITY OTHER MATERIAL
THERE WAS NO ASBESTOS DETECTED IN ANY OF THE SAMPLES LISTED
CLINIC
1.0 mastic NAD adhesive,cellulose
holding counter tops throughout-white
2.0 floor tile NAD non-fibrous materials
throughout office and clinic areas-color:tan
3.0 mastic NAD adhesive
beneath previous sample listed
4.0 mastic NAD adhesive,cellulose
holding brown laminate on countertops throughout
5.0 white mastic NAD adhesive,cellulose
holding base cove-homogenous throughout
6.0 insulation NAD fiberglass,cellulose
color: cream foil
around ducting-foil faced
7.0 mastic NAD adhesive,cellulose
holding wainscot panels throughout
8.0 sheet vinyl flooring NAD non-fibrous materials
clinic areas,restrooms,maintenance areas-gray pebble cellulose,fiberglass
9.0 mastic NAD adhesive
beneath previous sample listed
10.0 mastic NAD adhesive
holding carpet tile throughout
11.0 acoustic ceiling tile NAD cellulose,paint
main floor-gray fiberglass
12.0 drywall/taping compound NAD non-fibrous materials
office 1 cellulose,gypsum
13.0 drywall/taping compound NAD non-fibrous materials
office 2 cellulose,gypsum
14.0 drywall/taping compound NAD non-fibrous materials
office 3 cellulose,gypsum
15.0 drywall/taping compound NAD non-fibrous materials
hall 1 cellulose,gypsum
continue to page 4
1 a9aa
BBB
1429 Ave.D.#187,Snohomish,WA 98290
425-489-4040;f 775-665-0420
www.asbestotest.com;info(dasbtestotest.com
Page 4 of 10 May 30, 2018
PAT2180525 Asbesto-Test,Inc. 425-489-4040
Clinic& Garage Structures A 21123 Smokey Point Blvd.,Arlington, WA 98223
ANALYSIS ID ASBESTOS//TYPE//QUANTITY OTHER MATERIAL
CLINIC cont:
16.0 drywall/taping compound NAD non-fibrous materials
hall 2 cellulose,gypsum
17.0 drywall/taping compound NAD non-fibrous materials
hall 3 cellulose,gypsum
18.0 drywall/taping compound NAD non-fibrous materials
stairwell sample cellulose,gypsum
19.0 insulation NAD fiberglass,cellulose
above acoustic ceiling tile on main floor
COMMON AREAS:
20.0 exterior siding NAD non-fibrous materials,
newer vintage"hardy"board cellulose
21.0 siding mortar NAD non-fibrous materials,
holding exterior stone sample 1 cellulose
21.1 siding mortar NAD non-fibrous materials,
holding exterior stone sample 2 cellulose
21.2 siding mortar NAD non-fibrous materials,
holding exterior stone sample 3 cellulose
22.0 vapor barrier NAD cellulose,tar
beneath previous sample
GARAGE
23.0 drywall/taping compound NAD non-fibrous materials
sample 1 composite cellulose,gypsum
24.0 drywall/taping compound NAD non-fibrous materials
sample 2 composite cellulose,gypsum
25.0 drywall/taping compound NAD non-fibrous materials
sample 3 composite cellulose,gypsum
26.0 insulation NAD fiberglass,cellulose
color: cream&beige-attic
27.0 composition roofing NAD cellulose,tar,
non-fibrous materials
28.0 vapor barrier NAD cellulose,tar
beneath previous sample
29.0 mastic NAD ccllulose, adhesive
holding composition roofing
continue to page 5
1 a9aa
BBB
1429 Ave.D.#187,Snohomish,WA 98290
425-489-4040;f 775-665-0420
www.asbestotest.com;infoAasbtestotest.com
Page 5 of 10 May 30, 2018
PAT2180525 Asbesto-Test,Inc. 425-489-4040
Clinic& Garage Structures A 21123 Smokey Point Blvd.,Arlin ton, WA 98223
xae
continue to page 6
1 aaaa
BBB
1429 Ave.D.#187,Snohomish,WA 98290
425-489-4040;f 775-665-0420
www.asbestotest.com;info(dasbtestotest.com
Page 6 of 10 May 30, 2018
PAT2180525 Asbesto-Test,Inc. 425-489-4040
Clinic& Garaze Structures A 21123 Smokey Point Blvd.,Arlin ton, WA 98223
_ r
•
continue to page 7
1 a9aa
BBB
1429 Ave.D.#187,Snohomish,WA 98290
425-489-4040;f 775-665-0420
www.asbestotest.com;info(dasbtestotest.com
Page 7 of 10 May 30, 2018
PAT2180525 Asbesto-Test,Inc. 425-489-4040
Clinic& Garage Structures A 21123 Smokey Point Blvd.,Arlin ton, WA 98223
C-1
i
1
ti
i
I
Q
1
ram"
continue to page 8
1 aaaa
BBB
1429 Ave.D.#187,Snohomish,WA 98290
425-489-4040;f 775-665-0420
www.asbestotest.com;info(dasbtestotest.com
Page 8 of 10 May 30, 2018
PAT2180525 Asbesto-Test,Inc. 425-489-4040
Clinic& Garaze Structures A 21123 Smokey Point Blvd.,Arlin ton, WA 98223
iff
`Y
I
r
i
III
/l
Y �
I
1
1
continue to page 9
1 a9aa
BBB
1429 Ave.D.#187,Snohomish,WA 98290
425-489-4040;f 775-665-0420
www.asbestotest.com;info(dasbtestotest.com
Page 9 of 10 May 30, 2018
PAT2180525 Asbesto-Test,Inc. 425-489-4040
Clinic& Gara a Structures 21123 Smoke Point Blvd. Arlin ton WA 98223
21123
O
continue to page 10
1 aaaa
BBB
1429 Ave.D.#187,Snohomish,WA 98290
425-489-4040;f 775-665-0420
www.asbestotest.com;info(dasbtestotest.com
Page 10 of 10 May 30, 2018
PAT2180525 Asbesto-Test,Inc. 425-489-4040
Clinic& Garage Structures A 21123 Smokey Point Blvd.,Arlin,-ton, WA 98223
Samples taken are listed with their corresponding analyses.If asbestos is detected,those samples containing asbestos are listed first
and noted with the initials'ACM".
Some sample analyses listed may be a representative analysis of individual and separate samplings and analysis of homogenous
materials,as prescribed by A.H.E.R.A.guideline.
If,during demolition or renovation,any additional suspect asbestos containing materials are located[may include but not limited to:
sheet vinyl flooring,the flooring,wall or ceiling texturings or paints,concrete siding or skirting,cement pipes,cement wallboard,
electrical cloth,electrical wiring insulation,thermal paper,wallboard,joint compounds,vinyl wall coverings,spackling compounds,or
any other suspect TSI(Thermal System Insulation)],those materials are presumed Asbestos Containing Materials unless determined
to be non-asbestos by laboratory analysis.
Asbesto-Test,Inc.does not guarantee approximations of quantities of ACM,which may be listed with the analyses.It is therefore
recommended professional abatement price and/or disposal quotes be obtained by inquiring as to fees per area of specific ACM
material(i.e.square or linear ft,etc.),or by on site assessment.
Any and all materials identified as ACM and/or PACM in this report must be abated prior to disturbance in renovation or demolition.
PLM(polarized light microscopy)has been known to miss asbestos in small percentages of some samples,which contain asbestos,
thus negative PLM results cannot be guaranteed. Floor tiles and wipes should be tested with SEM(scanning electron microscope)or
TEM(transmitting electron microscope),to insure analytical accuracy when asbestos is reported in small percentages
Analytical test method:USEPA 600/R93/116**(PLM);WAC 296-62-07753 App.l
**One percent is the USEPA regulatory limit for asbestos in bulk samples.
Kev: "FRIABLE"signifies"Easily Airborne'
ACM signifies"Asbestos Containing Material"
PACM signifies"Presumed Asbestos Containing Material"
CAB signifies"Concrete Asbestos Board"
< signifies"less than"
TSI signifies'Thermal System Insulation"
HVAC signifies"Heating Ventilating Air-Conditioning"
NAD signifies"No Asbestos Detected"
END OF REPORT
ArLynn Hammond, Pres., BSc.
Analytical Chemist, AIHA proficient
Inspector, certified A.H.E.R.A.
accred.#1628675(Expires July 26, 2018)
1 a9aa
BBB
1429 Ave.D.#187,Snohomish,WA 98290
425-489-4040;f 775-665-0420
www.asbestotest.com;info(dasbtestotest.com
- DEMOLITION
PERMIT APPLICATION
Department of Community& Economic Development
City of Arlington•.18204 59th Ave NE• Arlington, WA 98223• Phone(360) 403-3551
THIS APPLICATION MUST BE ACCOMPANIED WITH A COPY OF THE ASBESTOS/DEMOLITION NOTIFICATION FROM PUGET
SOUND CLEAN AIR AGENCY, TWO(2)COPIES OF AN ASBESTOS SURVEY REPORT AND ABATEMENT REPORT
(if applicable)COMPLETED BYANAPPROVED AGENCY.
Type of Permit:(check one) ❑ Residential ❑✓ Commercial ❑ Industrial
Project Address: 21123 Smokey Point BLVD Parcel ID#: 31050800300100
Lot#: Subdivision: Valuation: '000
Building Area(Sq Ft) 12,000 No. of floors: 2 Number of Buildings:1
Owner: Stillaguamish Tribe of Indians Phone Number: 3607224350
21123 Smokey Point BLVD Arlington WA 98223
Address: C ty: State: Z p Code:
Contact Person)oshua Wells Phone Number: 3607224350
Cell Phone: 3607224350 E-mail:jwells@stillaguamish.com
Address: 3322 236th St NE City:Arlington� State:�LllA Zip Code: 98223
Contractor: Faber Construction Phone Number: 3603056206
Address: 1511, 131 E Grover St City: Lynden State: WA Zip Code: 98264
Contractor's License Number:FABERCC887138 Expiration:02/07/2020
Scope of Work:
Demo of Existing building
I hereby certify that the above information is correct and that the construction on, and the occupancy and the use of the above-
described property will be in accordance with the laws, rules and regulations of the Stat of Washington.
a366,ede,eza sas,ezo,=,3as 06/26/2018
Applicants Signature Date
Joshua D. Wells
Print Applicants Name
FOR STAFF USE ONLY
Permit# Accepted By Amount Received Receipt# Date Received
Date: 03/23/2026
Permit#: 2025
Permit Date: 06/29/2018
Review Date: 06/29/2018
Permit Type: DEMOLITION
Review Type: DEMOLITION
Target Date: 07/06/2018
Scheduled 00:00
Time:
Completed 06/29/2018
Date:
Description: Water Meter will need to be removed prior to demolition. Contact COA Utilities to schedule.GS
Also the RPBA inside the building will need to have a remove report done and submitted to the
Water dept,please contact Gus 360-403-3542 Thamk you
Review
Status:
Assigned To: PW-WAT-REV
Time In: 00:00
Time Out: 00:00
Hours: 0.0
Property Information
Parcel#: 31050800300100 STILLAGUAMISH TRIBE OF INDIANS
STILLAGUAMISH TRIBE OF INDIANS PO BOX 277
21125 SMOKEY POINT BLVD ARLINGTON, WA 98223
Zoning: 699 Other Miscellaneous Services
NECLot: Block:
Permit#: 2025
Permit Date: 06/29/18
Permit Type: DEMOLITION
Project Name: Stillaguamish Tribe Clinic
Applicant Name: Stillaguamish Tribe of Indians
Applicant Address: 21125 Smokey Point Blvd
Applicant,City,State,Zip:Arlington,WA 98223
Contact: Josh Wells
Phone: 360-722-4350
Email:jwells@stillaguamish.com
Scope of Work: demo existing clinic building
Valuation: 0.00
Square Feet: 0
Number of Stories: 2
Construction Type:
Occupancy Group:
ID Code:
Permit Issued: 07/10/2018
Permit Expires:
Form Permit Type:
Status: LASERFICHE
Assigned To: Launa Black
Property
Parcel# Address Legal Description Owner Name Owner Phone Zoning
31050800300100 21125 SMOKEY POINT BLVD Not Trust Land STILLAGUAMISH 699 Other Miscellaneous
TRIBE OF INDIANS Services NEC
Contractors
Contractor Primary Contact Phone Address Contractor Type License License#
Faber Construction, Ben Faber 360-354-3500 6951 Hannegan Rd CONSTRUCTION UBI 601 268 821
Corporation CONTRACTOR
Faber Construction, CONSTRUCTION
Corporation Ben Faber 360-354-3500 6951 Hannegan Rd CONTRACTOR Labor&Industries FABERCC887138
Plan Reviews
Date Review Type Description Assigned To Review Status
06/29/2018 DEMOLITION BUILDING
06/29/2018 DEMOLITION No comments,LT PW-ADMIN-GIS
Per standard 5-3.20 cut,cap and
protect the side sewer prior to
06/29/2018 DEMOLITION demolition,call the sewer inspection PW-SEW-REV
line at 360-403-3508 to schedule an
inspector to be on-site for any sewer
work.JL
06/29/2018 DEMOLITION Water Meter will need to be removed prior to demolition. PW-WAT-REV
Contact COA Utilities to schedule.GS
Also the RPBA inside the building will need to have a remove report
done and submitted to the Water dept,please contact Gus 360-403-
3542 Thamk you
Fees
Fee Description Notes Amount
Demolition $100.00
Processing/Technology $25.00
State Surcharge-1 st DU Residential-1 st Unit $4.50
Total $129.50
Attached Letters
Date Letter Description
07/10/2018 Building Permit
Payments
Date Paid By Description Payment Type Accepted By Amount
07/10/2018 Stillaguamish Tribe check#116148 Launa Black $129.50
Outstanding Balance $0.00
Notes
Date Note Created By:
08/20/2019 Never Finaled Launa Black
07/10/2018 Emailed permit for signature. Kristin Foster
Uploaded Files
Date File Name
07/16/2018 3718176-2025 Issued Permit.pddf
06/29/2018 3666822-
attachments CO15031000017652928 BTKWDgILRAOL9Onwlf2u PAT2180525+STILLAGUAMISH+CLINIC+&+GARAGE+21123+SMOKEY+PT+BLUD.pdf
06/29/2018 3666823-Demolition Permit Application 1JEMeeOd9LKSCZ.12
06/29/2018 3666824-Smokey Point DEMO Pro'ect.docx
Date: 03/23/2026
Permit#: 2025
Permit Date: 06/29/2018
Review Date: 06/29/2018
Permit Type: DEMOLITION
Review Type: DEMOLITION
Target Date: 07/06/2018
Scheduled 00:00
Time:
Completed 07/05/2018
Date:
Description: Per standard 5-3.20 cut, cap and protect the side sewer prior to demolition, call the sewer
inspection line at 360-403-3508 to schedule an inspector to be on-site for any sewer work. JL
Review
Status:
Assigned To: PW-SEW-REV
Time In: 00:00
Time Out: 00:00
Hours: 0.0
Property Information
Parcel#: 31050800300100 STILLAGUAMISH TRIBE OF INDIANS
STILLAGUAMISH TRIBE OF INDIANS PO BOX 277
21125 SMOKEY POINT BLVD ARLINGTON, WA 98223
Zoning: 699 Other Miscellaneous Services
NECLot: Block: