Loading...
HomeMy WebLinkAbout17020 Smokey Point Blvd_BLD2902_2019 Permit Packet Coversheet Community and Economic Development City of Arlington • 18204 59th Avenue NE • Arlington, WA 98223 • Phone (360) 403-3551 Page 1 of 1 Permit Number: Permit Type: Address/Parcel: Completed (Month/Year): Land Use ˆ Notice of Decision ˆ Staff Report ˆ Application ˆ Narrative ˆ Legal Description ˆ Vicinity Map ˆ Site Plan ˆ Landscape Plan ˆ Complete Streets Checklist ˆ Traffic Impact Analysis ˆ Snohomish County Traffic Mitigation Offer ˆ WSDOT Traffic Offer Form ˆ Tree Survey ˆ Stormwater Drainage Report ˆ Geotech Report ˆ Critical Area Evaluation Form ˆ SEPA Checklist ˆ Public Notice Material ˆ Noticing and Related Documents ˆ Water / Sewer Availability Certificate ˆ Unanticipated Discovery Plan Form ˆ Aerial Photo of Site ˆ Proposed Building Materials ˆ Lighting Plans and Lighting Cut Sheets ˆ Color Elevations ˆ Design Matrix ˆ Plat Map ˆ Title Report ˆ Lot Closures ˆ Preliminary Civil Plans ˆ Archaeological Survey o Confidential Documents. Contact the City to obtain. ˆ Topography (Existing Conditions) ˆ CC&R’s ˆ Deeds / Easements / Conveyances /Dedications ˆ Developer’s Agreement ˆ Recorded Copies ˆ Bonding or Assignment of Funds o Confidential Documents. Contact the City to obtain. ˆ Letters and Project Documents ˆ Other: Civil ˆ Issued Permit ˆ Application ˆ Other Applications ˆ Construction Calculation Worksheet ˆ Approved Plans ˆ Review Comment Form ˆ Letters and Project Documents ˆ Other Agency Permits ˆ Reports: o Drainage Report Pg: o Stormwater Pg: o Geotech Pg: o All Other Reports ˆ SEPA and Noticing Materials ˆ Inspections ˆ As-Builts ˆ Other: Building ˆ Issued Permit ˆ Application ˆ Additional Applications ˆ Approved Plans ˆ Site Plan ˆ Letters and Project Documents ˆ Calculations ˆ Project Specification Manuals ˆ Reports ˆ Certificate of Occupancy ˆ Inspections ˆ Other: BLD2902 Fire Sprinkler 17202 Smokey Point Blvd December 2019 ✔ ✔ ✔ ✔ ✔ December 5, 2019 Permit Number: BLD 2902 Project Address: 17020 Smokey Point Boulevard, Arlington Project Description: Fire Sprinkler Plans for AutoZone Contractor: Burns Fire Protection P.O. Box 1110 Granite Falls, WA 98252 Re: Fire Suppression Shop Drawing Review Comments/Approval The Arlington Fire Department has completed a review of the Fire Suppression shop drawing submittal and approved the issuance of the permit with the following conditions: 1. Permit and set of approved plans to remain on site during installation. 2. Significant deviations from approved plans made during installation shall be required to be resubmitted for review prior to inspections: may include hangers, earthquake bracing, sprinkler locations and pipe re- routing that could impact hydraulic calculations. Failure to submit revisions could result in cancellation of an inspection while a review of an as-built resubmittal is conducted. 3. Hangers and earthquake bracing shall be installed in accordance with NFPA 13. 4. Yellow highlighted sprinklers are less than 6 feet apart per the drawing. NFPA 13 Section 8.6.3.4.1 requires that sprinklers be spaced at least 6 feet apart unless certain other conditions are met. 5. Hydrostatic test required: Minimum of 200 psi for 2 hours minimum. 6. Sprinkler system Contractor’s Material and Test Certificate shall be submitted prior to close out of permit. 7. Final as-built drawings shall be submitted prior to close out of permit. 8. Owner shall be provided with a set of approved plans and associated documents for their files. 9. Call at least 48 hours in advance to schedule inspections. Items noted above are conditions on the issued permit and shall be verified as part of the final inspection of the system at project completion. Final approval will not be provided until all conditions are verified. If there are any questions please do not hesitate to call. Sincerely, Mike Makela Mike Makela Assistant Fire Chief Arlington Fire Department City of Arlington Fire Department 6231 188th Street - Arlington, WA 98223 – 360-403-3600 – Fax: 360-403-9267 www.arlingtonwa.gov EMS FIRE