17727 59th Ave Ne_BLD1627_2026
Hyak Partners LLC Drawing Index IL Sheed Description GN-1 General Notes PL-1 Level 1 Piping Diagram-Level 1 PL-1.1 Chilled Piping Diagram-Level 1 Arlington , WA PL-1.2 Heated Piping Diagram-Level 1 PL-1.3 Condensation Piping Diagram- Level 1 PL-1.4 Corridor South Wall Elevation-Level 1 PL-1.5 Level 1 Piping Diagram- 1 Ton Fan Coil PL-2 Level 2 Piping Diagram-Level 2 PL-2.1 Chilled Piping Diagram-Level 2 PL-2.2 Heated Piping Diagram-Level 2 PL-2.3 Condensation Piping Diagram- Level 2 C-1 Chiller Piping-Layout C-2 Chiller Secondary Piping-Layout C-3 Chiller-Layout Manufacturer / Supplier CP-1 Chiller Pump Station FC-1 2-1/2 Ton Fan Coil Unit-Cooling Only FC-2 2-1/2 Ton Fan Coil Unit- Heat Delta T Solutions FC-3 Condensation Piping-Layout FC-4 1 Ton Fan Coil Unit FC-5 1 Ton Fan Coil Unit EL-1.1 Elevations Grow Room 110 27711 Diaz Rd - Suite B, Temecula, CA 92590 EL-1.2 Elevations Grow Room 109 760-682-0420, Fax 760-682-0428 EL-1.3 Elevations Grow Room 107 EL-1.4 Elevations Grow Room 104 www.deltatsolutions.com EL-1.5 Elevations Grow Room 103 EL-1.6 Elevations Veg Room Delta T Solutions Job No. 160661-50 EL-1.7 Elevations Packaging &Processing 105 EL-2.1 Elevations Grow Room 205 EL-2.2 Elevations Grow Room 204 EL-2.3 Elevations Grow Room 202 EL-2.4 Elevations Clone Room H-1 Boiler Piping-Detail H-2 Boiler to Section Pump BPF-1 By-Pass Feeder FW-1 Feed Water&Expansion Tank-Layout S-1 Section Pump Z-1 2-Way Zone Control-Detail Z-2 2-WayZone Control -Detail Z-3 2-Way Zone Control-Detail Z-4 2-Way Zone Control-Detail Z-5 3-Way Zone Control-Detail Z-6 3-Way Zone Control-Detail Z-D1 2-Way Zone Control-Detail E-1 System Wiring-Schematic E-2 System Wiring-Schematic E-3 System Wiring-Schematic E-4 System Wiring-Schematic E-5 Boiler Wiring-Schematic Revised 8-23-2017 E-6 Chiller Wiring-Schematic Installation Notes (Unless Otherwise Specified) E Labor Materials Supplied (Unless Otherwise Specified) o 1. Refer to Delta T Solutions Specification 6.0 Piping Installation,for Information on Piping. 1. Supplied material will be per customer-approved quote and construction drawings provided System Specs o by Delta T Solutions. g Temp Volume Expansion Tank Pot Feeder 2. Refer to Delta T Solutions Specification 4.0 Air and Water Control,for Installation of Air 2. Unistrut,all-thread rod,and related materials provided as full length pieces to be measured, ® 0 190°F 210.4 1 DEEJAER23607 2-Gallon y Separator,Air Vent,Expansion Tank,Feed Water Regulator,and Pressure Gauge. cut and field fit during installation. Boilers V+ E oa� 3. All equipment will be installed per customer-approved construction drawings provided by 4)o-o Delta T Solutions. Materials Excluded (Unless Otherwise Specified) Item Qty Brand Series Model Stages Fuel BTUHin BTUHOut VAC 0 FLA Hz �,`o_ TU-) 4. Installation shall be from the Point of Connection(POC)as shown on the construction 1. All Line Voltage and Low Voltage Wiring,Conduit and Disconnect shall be Supplied and B-1 1 RBI Dominator DB1050 4 NG 1,050,000 882,000 115 1 11.4 60 O N Q drawings. Installed By Electrical contractor. _V 5. Notify Delta T Solutions if changes are necessary so the design can be modified as 2. Gas Line and Gas Regulator shall be Supplied and Installed by Others. Chillers U 2 }+ ie required. 3. Water Line and Backflow Preventer shall be Supplied and Installed by Others. Item Otv Brand Series Model connection Stages Tons BTUH kVA VAC 0 Amps Hz = O N and c m 6. Field coordinate/verify all dimensions,utilities,voltages,amp draws and conditions before 4. Power From main load Panel and all fused disconnects. C-1 2 Daikin AGZ-D 110D 3" 12 106 1,282,000 101.66 120 1 5.54 60 d"_ E o installation. u 1 O F 00 5. Breaker to the boiler unit terminal strip,by Electrical Contractor. Heat Source(s) Pumps .3 m o 1. Refer to Drawings H-1,H-2,or H-3 for Heat source Details. CDItem Qty Location Brand Pump Model Flange GPM Ft Hd HP VAC 0 Amps Hz Operational Notes (Unless Otherwise Specified) um rn X 2. Refer to Delta T Solutions Specification 3.0 Heat Source Installation for Boiler Installation BPA 1 Boiler Federal 2CCL-3/4-4 2" 70.4 4.2 3/4 115/230 1 9.6/4.8 60 Z +4)to t6 and Operating Information(ie Vent,Gas,and Electrical.) 1. Bench-Top and In-Slab hot water heating systems are designed for 130-140°F water.Do N 3: c NOT exceed this temperature or system damage can occur. S-1 1 Heating Coils Grundfos 80-100F 3" 141 52.1 1'%43 230/360 3 4.3 60 y e 00 3. When boiler piping is supplied by Delta T Solutions,remove flow switch and tee from boiler $s di 6!to 2. Under-Bench and Perimeter Fin Tubes stems are designed for u to 230°F water.Refer to CPA 2 Chiller Federal 3CGL-3-4 3" 315 29.3 3 230/360 3 14.5 60 =o c N o header and install in supply piping as shown. Y 9 P m u? 4. All piping to be supported so that heat source does not support piping weight. design for operating Temperature.Do NOT exceed this temperature or system damage can ZC-1 1 Veg Room Grundfos 40-12OF 230V 1-1/2"GF 35.0 24.7 19/32 208/230 1 2.0 60 4)p l:V p P 9 PP PP P P 9 9 occur. o c-t`cn ZC-2 1 Grow Room 103 Grundfos 65-12OF 230V 2-1/2"GF 84.0 32.1 1 1/32 208/230 1 3.4 60 5. Gas Service Regulator is required if Gas Pressure is above Y2 PSI. °a rn 1-o ZC-3 1 Grow Room 104 Grundfos 65-12OF 230V 2-1/2"GF 84.0 26.3 1 1/32 208/230 1 3.4 60 '`g Q W N O0D Piping e Q ZC-4 1 Grow Room 107 Grundfos 50-150F 230V 2"GF 56.0 30.2 27/32 208/230 1 2.8 60 1. Refer to PL Drawings for Piping Layout. ZC-5 1 Grow Room 109 Grundfos 50-15OF 230V 2"GF 63.0 30.9 27/32 208/230 1 2.8 60 - 2. All PVC Piping to be Schedule 80. All Steel Piping to be Schedule 7,10,or 40.See installation manual for your specific pipe based on design criteria. ZC-6 1 Grow Room 110 Grundfos 50-15OF 230V 2"GF 63.0 30.2 27/32 208/230 1 2.8 60 d ZC-7 1 Grow Room 202 Grundfos 50-15OF 230V 2"GF 56.0 32.7 27/32 208/230 1 2.8 60 3. Piping runs to be supported as required. ZC-8 1 Grow Room 204 Grundfos 50-150F 230V 2"GF 56.0 32.9 27/32 208/230 1 2.8 60 4. Install Pipe Rest,using Unistrut with Brackets. ZC-9 1 Grow Room 205 Grundfos 50-15OF 230V 2"GF 63.0 39.9 27/32 208/230 1 2.8 60 =2 5. Vent high spots in piping mains to prevent air locks. _°a ZC-10 1 Clone Room 206 Grundfos UP 26-64F 1-1/4"G 14.0 10.3 5/64 208/230 1 0.74/0.43 60 E a 6. Installation to follow all state and local codes where applicable. p 5 Z 7. Installer will be required to measure cut and fit some pipe sections per site conditions.Match Construction Drawing set. Zone Valves-Chilled Water Actuator Flow Control = 8. Installer will be required to assemble piping connections using appropriate Teflon to a and Item Qty Location Type Brand Valve Model Size CV Brand Model VAC Brand Model GPM Sim Detail Sheet a Q PP 9 9P 82 sealant to insure leak free assembly. ZC-1 1 Veg Room 2-Way Mixing Belimo B239 1Y2" 29 Belimo ARB24-3-S 24 Flow Design YRH150-0300 30 1Y2" Z-1 Insulation ZC-2 1 Grow Room 103 2-Way Mixing Belimo B264 2Y" 150 Belimo ARB24-3-S 24 Flow Design YRH250-0840 84 Z/2" Z-2 m 1. Insulation is provided for bare aluminum pipe with-in zones below the 7 ft.(Off Finished ZC-3 1 Grow Room 104 2-Way Mixing Belimo B264 2y" 150 Belimo ARB24-3-S 24 Flow Design YRH250-0720 72 2Y2' Z-2 Floor)level in each zone. ZC-4 1 Grow Room 107 2-Way Mixing Belimo B252 2" 85 Belimo ARB24-3-S 24 Flow Design YRH2O0-0480 48 2" Z-3a 2. Refer to Installation Manual and provided drawings for insulation installation. ZC-5 1 Grow Room 109 2-Way Mixing Belimo B252 2" 85 Belimo ARB24-3-S 24 Flow Design YRH2O0-0480 48 2" Z-3a =- 3. Installer will be required to measure cut and fit some Insulation and Aluminum clad or PVC ZC-6 1 Grow Room 110 2-Way Mixing Belimo B252 2" 150 Belimo ARB24-3-S 24 Flow Design YRH2O0-0540 54 2" Z-3a - jacket sections per site conditions.Match Construction Drawing set. ZC-7 1 Grow Room 202 2-Way Mixing Belimo B264 2" 85 Belimo ARB24-3-S 24 Flow Design YRH2O0-0540 54 2" Z-3a U Fan Coils ZC-8 1 Grow Room 204 2-Way Mixing Belimo B252 2" 85 Belimo ARB24-3-S 24 Flow Design YRH2O0-o480 48 2" Z-3a E' J 1. Refer to Drawings sheets FC-1 THRU FC-4 sheets for Fan Coil details. ZC-9 1 Grow Room 205 3-Way Mixing Belimo B351 2" 85 Belimo ARB24-3-S 24 Flow Design YRH2O0-0540 54 2" Z-3b a E J 2. Refer to Drawings sheets PL-1 THRU PL-2.3 sheets for Fan Coil Layouts. ZC-10 1 Clone Room 206 3-Way Mixing Belimo B330 1Y4" 85 Belimo ARB24-3-S 24 Flow Design YRH125-0540 54 11/4" Z-4 N - t>_ 3. Installer will be required to assemble Fan Coil fittings using appropriate Teflon tape and sealant to insure leak free assembly. Zone Valves-Hot Water Actuator Flow Control = Q Pumps&Zones y ++ n Item Qty Location ype Brand Valve Model Sim CV Brand Model VAC Brand Model GPM Sim Detail Sheet a" L d 1. Refer to S-1 Drawings for Section Pump Detail. (� ZHA 1 Veg Room 3-Way Honeywell DEV3125-09 1Y4" 9 Honeywell VC-2710 24 Flow Design YRH125-0090 9 1Y4" Z-5 a O 2. Refer to Z-1 Drawings for Zone Valve Detail. T ZH-2 1 Grow Room 103 3-Way Honeywell DEV3125-09 1/4 9 Honeywell VC-2710 24 Flow Design YRH125-0150 15 1Ya" d Z-5 r a` a Z 0 3. Installer will be required to assemble zone valve stations per drawing Z-1 using appropriate y r M ZH-3 1 Grow Room 104 3-Way Honeywell DEV3125-09 1Y4" 9 Honeywell VC-2710 24 Flow Design YRH125-0150 15 1Ya" Z-5 a)Teflon tape and sealant to insure leak free assembly. L ZH-4 1 Grow Room 107 3-Way Honeywell DEV3125-09 1Y4" 9 Honeywell VC-2710 24 Flow Design YRH125-0120 12 1Y4" Z-5 �_ y ZH-5 1 Grow Room 109 3-Way Belimo B341 1Y" 29 Belimo ARB24-3-S 24 Flow Design YRH150-0240 24 1Yz' Z-6 a"� y- Testing Notes (unless Otherwise Specified) ZH-6 1 Grow Room 110 3-Way Honeywell DEV3125-09 1Y4" 9 Honeywell VC-2710 24 Flow Design YRH125-0120 12 1Y4' Z-5 1 Fill,Leak Test and Pressure Test system after installation is complete but prior to installation of insulation. ZH-7 1 Grow Room 202 3-Way Honeywell DEV3125-09 1/4 9 Honeywell VC-2710 24 Flow Design YRH125-0090 9 1Y., Z-5 2 Maintain a water treatment program appropriate for all the materials in the heating system. ZH-8 1 Grow Room 204 3-Way Honeywell DEV3125-09 1Y4" 9 Honeywell VC-2710 24 Flow Design YRH125-0090 9 1Y4' Z-5 In addition,the pH of the system water is to be maintained between 6.8 and 8.5. ZH-9 1 Grow Room 205 3-way Honeywell DEV3125-09 1Y4" 9 Honeywell VC-2710 24 Flow Design YRH125-0090 9 1Y4" Z-5 M 3 Water testing and Treatment ZH-10 1 Clone Room 206 3-Way Honeywell DEV3125-09 1Y4" 9 Honeywell VC-2710 24 Flow Design YRH125-0060 6 1Y., Z-5 2 Site Conditions Exclusions (unless Otherwise Specified) IN Fan Coil Units 1. Site utilities It.. Qty Brand Model GPM Ft Hd PHASE FLA/MCA 2. Permits and state or local government approvals FCU-1 43 DELTA T SOLUTIONS 2.5 TON COOLING ONLY 6 7.8 1/2 240 1 5.5/5.8 60 3. Site/Foundation/Soil Preparation,Testing,Demolition,Debris Removal services or FCU-2 40 DELTA T SOLUTIONS 2.5 TON HEATING/COOLING COIL 6 7.8 1/2 240 1 5.5/5.8 60 equipment FCU-3 5 1 TON ENVIRO-TECH 1 TON HEATING/COOLING COIL 2.7 10.4 1/15 240 1 5.5/5.8 60 4. Temporary electrical,water,heating or cooling Revised 5. Craning/Hoisting of equipment No. By Date 6. All high/low voltage control or power wiring,conduit and electrical connections,contactor 1. JDK 2-27-2017 panels,and motor starters for equipment 2. 7. Cutting,core drilling,or patching of walls,floors,doors,ceilings,or roofs 3. a. 8. Access panels&penetrations,Firestop and caulking Reviewed 9. Overtime and/or shiftwork No. By Date 10. Painting of exposed piping and equipment 1. 2. 11. Concrete and/or steel equipment supports and foundations 3. 12. Toilet accessories a. 13. Antifreeze and Antifreeze charging Drawing 14. Concrete pads for equipment Scale lY4"=1'-0" 15. Shut down and drain down of existing systems size Arch D 16. Hot tapping of live piping systems Date 12-10-2016 By JP 17. Roof curbs Project No. 18. Fire protection General Notes Equipment Schedule 160661-50 19. System Balancing GN-1 Scale: None GN-1 Scale: None Sheet GN-1 E ~ U o C O O 0 North Level 1 Boiler on Concrete Pad p d o N yD 0 U U) >_ 59'-6" 10'-6" 64'-3" 25'-3" ° r N N 3 3 S_1 ❑ ❑ cai rn O Q 3 ■� �U 5. 2 2'-Ot_1 ]�"f'1 ;; .1 o j 7 00 li; ---- ----- m O 'E O rr___ ______. ____ __ � c 11 II; II = O C F Doto a to N o I Ito 4) II ' OOO in« L I-- HOT WATER d U) CONTROL VALVE ZH-6 - ---------- ---------- ------------ ----------- Grow Room See SheetZ-1 �W o (TYP) li I' ------ IIII lil N g �� (N6 U.) M 110 41 0 N 41 Packaging & Q� ZC-6 rr r�o - -� Processing W NDo zc-3 zH-3 IIII 105 Legend 2,a 9 8 9 B B Ili II IIII III III 2'/:TON o FAN COIL UNIT A o Grow Room o w/Hot Water Heating Coils ------------------ ------------------ - ZH-5 v �d =� 104 li p TON FA c c. - ------------------ II } IIII IIII � II I; ili FAN COIL UNIT _°-a i)-- E a B I =5 II; ZC-5 - CHILLED WATER MIXING VALVE 1 TON a Grow Room RISERS TO ❑ FAN COIL UNIT 8 t See Sheet Z-1 M 109 (TYP) LEVEL 2 zc-fo w/Hot Water Heating Coils d 7 fr= =^il ZH-10 CHILLED WATER MIXING VALVE 6- a ---____-- ---------- ------------ J —Chilled Water Return - ZH-2e C- ZC-1 ---Chilled Water Supply Z" ------ -rd- 9a`g __________ ___________ Hot Water SuPPIY ----------------------- Hot Water Return --------------------------- o HOT WATER CONTROL VALVE do o- �J�, r_ Future Use aEP- /II II II � i✓ II I� II - I I A, I-. IIII III m � (4)MECH.TEES W/CAP @ ii ++ a M Dry Room FOR FUTURE Grow Room C Veg. Room i ( ' ! 103 c) ! R ^cc " 108 Notes (Unless Otherwise Specified) m T li 0 I; IIII `r a` M 1. All chiller piping to be supported so that Chiller does not T d. support piping weight. L a ;I1 °II 2. Maintain a water treatment program appropriate for all the +=+ y I TO i Imaterials in the heating system. In addition,the pH of the = L VE 2 system water is to be maintained between 6.8 and 8.5. J a a a a a a a o 3. All piping to be supported so that heat source does not support v-- ----------- --------- ------------ --------------------- -- Piping weight. ZC 4 'Il 4. Vent high spots in piping mains to prevent air locks. ----- f_ ________ _ _______---------____ 5. Piping runs to be supported as required. ------- -------------------- 6. Installation to follow all state and local codes where applicable. 7. Notify Delta T Solutions if changes are necessary so the Grow Room design 9 can be modified as required. I uired. M 107 8. All line voltage and low voltage wiring,conduit and Irri gation disconnects shall be furnished and installed by others. 9. Field coordinate/verify all dimensions,voltages,amp draws 0 and conditions before installation. 0 10. Installing subcontractor will be required to cut and modify in Revised the field for proper fit per details. No. BY Dale li N_ 0 11. Installing subcontractor shall assemble parts supplied by Delta 1. JP B-7-17 00 T per Detail. s. 12. Attachments to structure shall be supplied by Installing B. CAP(TYP) o subcontractor as required. 4 S-1 O O 13. Installing subcontractor will be required to measure and cut all Reviewed By I No. BY Date sections of the threaded rod based on Field Conditions. 1. C-1 Oo Oo 0000 0000 h 14. The Installing subcontractor will be required to measure and 2. Y cut some sections of Unistrut based on Field Conditions. DO0 00 OOO r 9 q 4. � Oo � O Oo � Oo � O Oo � � 15. The Installing subcontractor will be required to measure,cut, a. and groove some sections of the Pipe and Insulation based on Drawing AGZ110Y1 Field Conditions. scale Y,^=f'-o" CHILLER(TYP) 5'-0" 16. All hanging hardware shall be stainless steel,Galvanized,or Aluminum as noted on the Detail. sae Arch o 5T-4" 17. Attachments of hangers to structure shall be by others. Dare if-fszofs BY JP 18. This is a corrosive environment and proper materials must be Project No. used. Level 1 System Piping-Layout 19. Insulation is provided for bare aluminum pipe with-in zones 160661-50 Note: Piping Shown Outside the Greenhouse for Clarity Only. Scale: /8" 1'-0" below the 7 ft.(Off Finished Floor)level in each zone. sheet PL-1 = PL-1 E ~ U o C O O 0 North Level N d o yN 0U _I C� 59'-6" 10'-6" 64'-3" 25'-3" r N N 3 m a°' 3 ❑ ❑ OF eO CU � E o > �� ~ O N V 3"CWS&CWR m c E o PIPING 00 dYix1Y" /"(�P)1 41/4„ co REDUCERS { . 00 0 �d �� 1Yz'. oo N(� X 2112" 1Y4" 12 Do Grow Room 2"x1Y2" 4„x3„ a a a 7-ye REDUCERS 3"110 REDUCERS " " ' I p N 2" 1/z 1Ya" OZC-3 STEELxPVC FLANGES REDUCERS REDUCERS Packaging & c u 2"x1Y2" REDUCERS ZC-6 REDUCERS Processing _ W N aoo 1Y;' %"X1Y4' 1Yi' Legend REDUCERSJ 2Y2" 105 FA TON d IIIII���llppp FAN COIL UNIT 3" 2 Grow Room b b w/Hot Water Heating Coils 5 2" v ' a ' 104 2%TON 1Y2'x1Y4" FAN COIL UNIT a 1Ya REDUCERS 6"x3,, b E 1Yi' REDUCERS I I 2"x1Y2" ZC-5 2"x3" t REDUCERS CHILLED WATER REDUCERS 1 TON 2 o RISERS T a- Grow Room MIXING VALVE LEVEL 2 FAN COIL UNIT 8 2 M ( ) 2"x1Y2" 1Yz" 1Y2"x1Ya" 1Ya" zc-fo w/Hot Water Heating Coils 109 2" CP See Sheet Z-1 TYP REDUCERS REDUCERS 2"x1Y2" REDUCERS —Chilled Water Return - 1Y4" 1Yi'x1Y4" 1Yz" ZC-1 =- REDUCERS —Chilled Water Supply CHILLED WATER d- '+ a a a a a MIXING VALVE 5 1Yx142Yi' 72Y2"x2 x1Y2" 2" Y" E a �J1Yz C 1Ya zREDUCERS REDUCERS J/ _ a E y REDUCERS L 2" E (2)MECH.TEES W/CAP +�+ a Dry Room FOR FUTURE PIPING Grow Room CP o Veg. Room o i s �? (TYP) (� U) N 108 103 "' 1Y4" T a Notes (Unless Otherwise Specified) F< Q c 1/z" 4-+ I I 1. All chiller piping to be supported so that Chiller does not 0) C support piping weight. L U 3" 2. Maintain a water treatment program appropriate for all the I TO m materials in the heating system. In addition,the pH of the L VE 2 2" 2"x1%" 1Yz" 1Y2"x1Y4" 1Ya" system water is to be maintained between 6.8 and 8.5. Q REDUCERS REDUCERS 1Yi'x1Y4' 3. All piping to be supported so that heat source does not support > y REDUCERS a a a a piping weight. — 1Y4" 1Yz"x RS REDUCERS 4. Vent high spots in piping mains to prevent air locks. U REDUCERS (� ZC 4 5. Piping runs to be supported as required. 6"CWS&CWR 6. Installation to follow all state and local codes where applicable. PIPING 1Y4" 7. Notify Delta T Solutions if changes are necessary so the Grow Room design can be modified as required. M 107 8. All line voltage and low voltage wiring,conduit and 1Yz" Irrigation disconnects shall be furnished and installed by others. 9. Field coordinate/verify all dimensions,voltages,amp draws O and conditions before installation. 1Y, 1Y2"x1Y4" 10. Installing subcontractor will be required to cut and modify in Revised A_REDUCI:RS the field for proper fit per details. No. By Dale e n 11. Installing subcontractor shall assemble arts supplied b Delta JP 3-18-17 6"CWS&CWR 9 P PP y CAPPED CWS&CWR PIPING T per Detail. 2. 12. Attachments to structure shall be supplied by Installing 3. subcontractor as required. 4 5'-0" 6'-0" Reviewed B S-1 13. Installing subcontractor will be required to measure and cut all No. By y Date sections of the threaded rod based on Field Conditions. 1. C-1 O O O O O O O 14. The Installing subcontractor will be required to measure and 2. co cut some sections of Unistrut based on Field Conditions. O 0 O O O 0 r 9 q 3. OO � 15. The Installing subcontractor will be required to measure,cut, and groove some sections of the Pipe and Insulation based on Drawing AGZ110 Field Conditions. CHILLER TYP scale Yr^=�'-o" ( ) � � 16. All hanging hardware shall be stainless steel,Galvanized,or Aluminum as noted on the Detail. sae Arch o 5T-4" 17. Attachments of hangers to structure shall be by others. Date ff-1szols 18. This is a corrosive environment and proper materials must be By JP Project No. used. Chilled Water Cooling System -Layout 19. Insulation is provided for bare aluminum pipe with-in zones 160661-50 Note: Piping Shown Outside the below the 7 ft.(Off Finished Floor)level in each zone. sheet Greenhouse for Clarity Only. L-1.1 Scale: /8"=1'-0" PL-1.1 O n E T__..... O � O O 7 North Level 1 Boiler on Concrete Pad o (TYP) L 4 n N -°-_ 59'-6" 10,_6„ 64'-3" 25,_3" a m c N _ 2Y2',x3„ T� IF 3" o o 'o O N Q _ r ■� C U 5'-53�.52" �'—f=� -=1—' F.. LUI m» O r 1-f==-T T=====1�1'-====17-====_" C ---------------- --- ------ ;; 3"x2" 2" I =3 O )OND -- ----- 2"x1Ya° 'w at co 1t/a" HOT WATER ii ii ? { s o00 0= r0 CONTROL VALVE 3 w " See Sheet Z-1 2"x1Ya" Grow Room (TYP) ZH_6 =�__________ ___ (TYP) -000 -- ae e a t to ------ 2" N o C N O M 110 + - 1Ya" — o N 3"x2Lo Y2" Packaging & - Q� .__ oa Mi-0 -- -_; Processing W N 1Ya" t 1Ya" 105 Legend a ZH-3 n 21/=TON - FAN COIL UNIT Growr m Room o ii� w/Hot Water Heating Coils 3 i lug ------------ a 104 TON n f � FAN COIL UNIT 1Ya" 2" „ - 91 L] 2Y2"x2" - 1Ya' =t Grow Room 1 TON o RISERS TO ❑ FAN COIL UNIT 8 t o LEVEL 2 i', w/Hot Water Heating Coils d M 109 1Ya" �= , f r=-411 :i ZHA 2"x1Ya" - � �`==,r=- ------ -------- ------ ------- ---Hot Water Supply ----------------------------- 2 8 - -- -- -- - - --- --- - - a e e a e ii `! �� ---Hot Water Return ----------------------------- m o HOT WATER r- r- r-I CONTROL VALVE =a J 1, - -- ---h ----------------------�. a--------------1 Future Use a E 1Ya" m _ L > s � d 1Ya" a m Q J (4)MECH.TEES W/CAP 4 A Zi D Room FOR FUTURE PIPING Grow Room q Dry Veg. Room C, 108 (TYP) !; 2"x1Y2" 103 M 1Y;' m a rn N 'ii �;� Notes (unless Otherwise Specified) Q pt I I All All chiller piping to be supported so that Chiller does not __ " support piping weight. .� y __________ -------- 1/2"x1/a" _ 1t/2 ° 2. Maintain a water treatment program appropriate for all the _ TO 2a 4 materials in the heating system. In addition,the pH of the at L VE 2 ZH� 1Ya" system water is to be maintained between 6.8 and 8.5. Q _____________ [ i, o ;I 3. All piping to be supported so that heat source does not support > _ 4. Vent high spots in piping mains to prevent air locks. ------ 1Ya' ---- --- 5. Piping runs to be supported as required. 6. Installation to follow all state and local codes where applicable. 1Ya" D 4' 7. Notify Delta T Solutions if changes are necessary so the Grow Room 1Ya" design can be modified as required. M ii 107 l ;; 8. All line voltage and low voltage wiring,conduit and Irrigation disconnects shall be furnished and installed by others. 9. Field coordinate/verify all dimensions,voltages,amp draws C� and conditions before installation. 1Ya" 10. Installing subcontractor will be required to cut and modify in Revised the field for proper fit per details. t1l Date 3-16-17 OOO11. Installing subcontractor shall assemble parts supplied by Delta T per Detail.12. Attachments to structure shall be supplied by Installing1Ya' subcontractor as required. V-0" Reviewed By 13. Installing subcontractor will be required to measure and cut all No. By Date CAP(TYP) sections of the threaded rod based on Field Conditions. 1. Oo 0 0 O Oo Oo0000 14. The Installing subcontractor will be required to measure and 2. cut some sections of Unistrut based on Field Conditions. 3 0 Oo O Oo Oo0000 15. The Installing subcontractor will be required to measure,cut, a and groove some sections of the Pipe and Insulation based on Drawing AGZ110 — — — Field Conditions. s<aie Y; CHILLER(TYP) 16. All hanging hardware shall be stainless steel,Galvanized,or -—- — —- -—- Aluminum as noted on the Detail. siza Arch D 17. Attachments of hangers to structure shall be by others. Data 11-15-2016 By JP 18. This is a corrosive environment and proper materials must be Project No. used. Note:Piping Shown Outside the Hot Water System -Layout 19. Insulation is provided for bare aluminum pipe with-in zones 160661-50 Greenhouse for Clarity Only. L-1. Scale: Y8"=V-0" below the 7 ft.(Off Finished Floor)level in each zone. sneer PL-1.2 E ~ U o C O O 0 North Level N d o N 0 U _I >_ 59'-6" 63'-6" 25'-3" r w N 3 m a°' 3 ❑ ❑ OF eO CU � E'o > .� Lu m y C E O e a s a II��II r'n O OI a)00 CONDENSATION LINE ED g 00 See Sheet FC-3 000 o r x (TYP) ) di(�L"O' Grow Room a a a a a a M 110 CONDENSATION LINE m 6 N See Sheet FC-3 Packaging & o Q� _—LO (TYP) °L .5)1-o RUN CONDENSATION Processing _ W N co LINE TO DRAIN Legend e (By Others) 105 ° TON FA d IIIII���llppp� FAN COIL UNIT Grow Room o w/Hot Water Heating Coils Z_ n p n n a a a a 104 T 2%TON - b FAN COIL UNIT .20 El I T p'o 1 TON Grow ROOM FAN COIL UNIT 8 9 RUN CONDENSATION RISERS TO ❑ M 1 09 w/Hot Water Heating Coils d LINE TO DRAIN LEVEL 2 (By Others) RUN CONDENSATION —Condensation Line LINE TO DRAIN _- (By Others) a a a a - e e Ek RUN CONDENSATION E'a J LINE TO DRAIN a E J (By Others) - N _ L m M Dry Room Grow Room o Veg. Room y 103 00 M N CL r� Notes (Unless Otherwise Specified) (J J r a` �+ c 1 I 1. All chiller piping to be supported so that Chiller does not L o support piping weight. .� N 2. Maintain a water treatment program appropriate for all the f+ s RISERS TO RUN CONDENSATION materials in the heating system. In addition,the pH of the = L LEVEL 2 LINE TO DRAIN system water is to be maintained between 6.8 and 8.5. Q c (By Others) O ne a 8 a a 3. All piping to be supported so that heat source does not support > U a a a a piping weight. 4. Vent high spots in piping mains to prevent air locks. 5. Piping runs to be supported as required. 6. Installation to follow all state and local codes where applicable. 7. Notify Delta T Solutions if changes are necessary so the Grow Room design can be modified as required. 107 8. All line voltage and low voltage wiring,conduit and Irrigation disconnects shall be furnished and installed by others. Room 9. Field coordinate/verify all dimensions,voltages,amp draws RUN CONDENSATION and conditions before installation. LINE TO DRAIN 10. Installing subcontractor will be required to cut and modify in Revised (By Others) the field for proper fit per details. No. By Data a 11. Installing subcontractor shall assemble parts supplied by Delta 1. T per Detail. 2. 12. Attachments to structure shall be supplied by Installing B. subcontractor as required. 4 5'-0" o Reviewed By 0 13. Installing subcontractor will be required to measure and cut all No. By Dale sections of the threaded rod based on Field Conditions. Oo Oo 0000 0000 14. The Installing subcontractor will be required to measure and 2. cut some sections of Unistrut based on Field Conditions. O � OO Oo O Oo 0 r 9 q 4. OO 0000 OO Oo � � 15. The Installing subcontractor will be required to measure,cut, a. and groove some sections of the Pipe and Insulation based on Drawing Field Conditions. scale Y,^=1'-0^ 16. All hanging hardware shall be stainless steel,Galvanized,or $ae Arch D Aluminum as noted on the Detail. 5T-4" 17. Attachments of hangers to structure shall be by others. Date if-fszofs 18. This is a corrosive environment and proper materials must be By JP Project No. used. Condensation Lines- Layout 19. Insulation is provided for bare aluminum pipe with-in zones 160661-50 Note: Piping Shown Outside the Greenhouse for Clarity Only. TL-1.3 Scale: /8"=1'-0" below the 7 ft.(Off Finished Floor)level in each zone. sheet PL-1.3 E ~ U o N Supply&Return Lines o Shown on South wall North Level o d 0 N yD Eo r� N N 3 o am 3 ❑ ❑ CU 3 o 700 m y C E O C Nc O VFW 00 E-[a 0 d N; C o r iY to 00.2 A-0 ti m_ A+90 V/ E- C7 L? a IZ O �° W Nao as `o HWS&HWR z 5s LINES w CWS&CWR Y V oa LINES o 5 o E d - N a 0 ��W 0 — 0 W a— O LL aD 8 2 m Ev0 J J - N > �N L J A Corridor Lines-South Wall Elevation t c L-1.4 Scale: Y4"=1'-0" L Notes (Unless Otherwise Specified) a Q W a` a.+ 1. All chiller piping to be supported so that Chiller does not L support piping weight. .� t 2. Maintain a water treatment program appropriate for all the f+ materials in the heating system. In addition,the pH of the = L N system water is to be maintained between 6.8 and 8.5. Q 3. All piping to be supported so that heat source does not support > piping weight. 4. Vent high spots in piping mains to prevent air locks. U 5. Piping runs to be supported as required. 6. Installation to follow all state and local codes where applicable. 7. Notify Delta T Solutions if changes are necessary so the design can be modified as required. 8. All line voltage and low voltage wiring,conduit and HWS&HWR disconnects shall be furnished and installed by others. LINES z 9. Field coordinate/verify all dimensions,voltages,amp draws CWS&CWR w and conditions before installation. 10. Installing subcontractor will be required to cut and modify in Revised Lu LINES 0 the field for proper fit per details. No. By Data o Z v 11. Installing subcontractor shall assemble parts supplied by Delta a X T per Detail. z. �W 3. w 12. Attachments to structure shall be supplied by Installing o subcontractor as required. 4 LL 4 13. Installing subcontractor will be required to measure and cut all Reviewed By co No. By Date sections of the threaded rod based on Field Conditions. 1. 14. The Installing subcontractor will be required to measure and 2. cut some sections of Unistrut based on Field Conditions. a 15. The Installing subcontractor will be required to measure,cut, 4. and groove some sections of the Pipe and Insulation based on Drawing Field Conditions. scale Y,^=V-o^ 16. All hanging hardware shall be stainless steel,Galvanized,or Aluminum as noted on the Detail. size Arch D 17. Attachments of hangers to structure shall be by others. Date 11.1s2016 By JP 18. This is a corrosive environment and proper materials must be Project No. used. Corridor Lines-Section 19. Insulation is provided for bare aluminum pipe with-in zones 160661-50 Note: Piping Shown Outside the Greenhouse for Clarity Only. Scale: 1/8"=1'-0" below the 7 ft.(Off Finished Floor)level in each zone. sheet L-1.4 PL-1.4 O w E T__..... O N O O 7 North Level N t 4 a {,/wJ N —" E N _ . u° o r N N CWS&CWR ; >,� LINES o o F .O C U HWS&HWR 8� LINES q c E o c N� O aF00 N 3 m p jp N rD 05 "h w r_ NO N O d N E L? oa Or-0 C r_0 s°= III N00 Legend 2. TON FA o FAN COIL UNIT w/Hot Water Heating CoilsLl `a 8d FA TON a a (4)SADDLE TEE 1.25"X 3/4"FOR FAN COIL UNIT HEATING AND COOLING(TYP) L] '0,2 22 (2)SADDLE TEE _ 1.25"X 3/4"FOR COOLING 1 TON N_ (2)SADDLE TEE (TYP) FAN COIL UNIT 8. 1.25"X 1/2"FOR HEATING w/Hot Water Heating Coils (TYP) 3-WAY HOT WATER —Chilled Water Return 8 t ----- --------� = c Connection to Main Lines-Section CONTROL VALVE —Chilled Water Supply L-1.5 Scale: Ys"=T-0" See Sheet Z-5 --Hot Water Supply =8 (TYP) ❑ ❑ PPy ----------------------------- _ ---Hot Water Return ----------------------------- '" U ------� s 1 TON FAN COIL ?a J J (TYP)See Sheet FC-5 J o E FAN COIL ON LEVEL 2 W/ N 2--WAY CHILLED DUCTING DOWN TO LEVEL 1 r WATER MIXING VALVE (Shown for Clarity) _ Q See Sheet Z-D1 1.25"PIPING OFF MAIN F L 'a SUPPLY AND RETURN(TYP) r_ E Notes (Unless Otherwise Specified) � Q v �a N 1. All chiller piping to be supported so that Chiller does not P p 9 pP Packaging & g g support in weight. L piping 9 9 � a ( ) Processing 2 Maintain a water treatment program appropriate for all the �+ > 2 SADDLE TEE L 1.25"X 1/2"FOR HEATING 1/2"PIPING OFF MAIN materials in the heating system. In addition,the the system water is to be maintained between 6.8 andd 8.5.5. (TYP) SUPPLY AND RETURN(TYP) Q a) 3. All piping to be supported so that heat source does not support 105 > piping weight. 4. Vent high spots in piping mains to prevent air locks. I 9 9 � --------------------- ---- -------------------- ° ❑ '„ 5. Piping runs to be supported as required. FAN COIL „ 6. Installation to follow all state and local codes where applicable. (2)SADDLE TEE See Sheet FC-4 1.25"X 3/4"FOR COOLING 7. Notify Delta T Solutions if changes are necessary so the for connections (TYP) (TYP) design can be modified as required. 8. All line voltage and low voltage wiring,conduit and disconnects shall be furnished and installed by others. 9. Irrigation Field coordinate/verify all dimensions,voltages,amp draws < „ and conditions before installation. 10. Installing subcontractor will be required to cut and modify in Revised the field for proper fit per details. t1l Date (2)SADDLE TEE 0 11. Installing subcontractor shall assemble parts supplied by Delta 6-ts-n1.25"X 1/2"FOR HEATINGT per Detail.(TYP) „ 12. Attachments to structure shall be supplied by Installing subcontractor as required. -- ❑ I 13. Installing subcontractor will be required to measure and cut all Reviewed By No. By Date O O0 sections of the threaded rod based on Field Conditions. ❑------d 14. The Installing subcontractor will be required to measure and 2. sa H_______.1 cut some sections of Unistrut based on Field Conditions. s (2)SADDLE TEE 15. The Installing subcontractor will be required to measure,cut, 4. 1.25"X 3/4"FOR COOLING (TYP) Field groove some sections of the Pipe and Insulation based on Drawing Field Conditions. s<aie a/a =I'•a 16. All hanging hardware shall be stainless steel,Galvanized,or Aluminum as noted on the Detail. siza Arch D 17. Attachments of hangers to structure shall be by others. Data 3-28-e017 By JP 18. This is a corrosive environment and proper materials must be Project No. used. Level 1 Fan Coil Piping- Layout 19. Insulation is provided for bare aluminum pipe with-in zones 160661-50 Note:Piping Shown Outside the sheet Greenhouse for Clarity Only. PL-1.s Scale: 3/s"=1'-0" Level 1 Fan Coil Piping- Layout below the 7 ft.(Off Finished Floor)level in each zone. PL-1.5 Scale: 3/6"=V-0" P L-1.5 C E ~ U o W O O 0 North Level N d i N 000 E o �, "y N N 3 o am 3 0 60'-0" MU�Q 3 E Sao r2 ONV m y C E O 0 8 8 8 e N0 « L 0 �=t� II t 11111 GN V) X �i FAN COIL ON LEVEL 2 W/ E..; c Z Grow Room Ii DUCTING DOWN TO LEVEL 1 o r >n�LC'0' � I (Shown for Clarity) F a �� L N 205 � /��\ 0)0N V/ —lr) a Q TIC O CloneW N aD Legend !' Room 2%TON = FAN COIL UNIT A 206 L w/Hot Water Heating Coils g --------------- g -------------- e -------------- ZC-9 2'/z TON o b FAN COIL UNIT .a�- I. .il PPP ZH-9 v m , I� 1 TON w.. Grow Room p FAN COIL UNIT 8 t RISERS FROM LEVEL1 zc-fo g d 204 O � w/Hot Water Heating Coils ` I ZH-8 Zone Valves located on zH-fo HOT WATER iI -----i level 1 d v CONTROL VALVE _ f —Chilled Water Return -a See Sheet Z-2 ;� —Chilled Water Supply _- (TY P) I --- d Hot Water Supply ----------------------------- - = --------------- -------------- '� ZC 8 I; --Hot Water Return ----------------------------- V Level 2 System - Layout OE J J -- PL-2 Scale: %8"=V-0" a (4)MECH.TEES W/CAP - FOR FUTURE PIPING Q c TYP CIL Dry Room " C E N v n Notes (Unless Otherwise Specified) r 4 a Q N 1. All chiller piping to be supported so that Chiller does not Q) RISERS FROM I p p g PP Cl LEVEL1 _ a support piping weight. L y = 14 ZH-7 ----- • 2. Maintain a water treatment program appropriate for all the �„f i y materials in the heating system. In addition,the pH of the = a) ZC-7 system water is to be maintained between 6.8 and 8.5. Q J r 3. All piping to be supported so that heat source does not support > CHILLED WATER piping weight. .V MIXING VALVE 4. Vent high spots in piping mains to prevent air locks. See Sheet Z-1 5. Piping runs to be supported as required. (TYP) 6. Installation to follow all state and local codes where applicable. 7. Notify Delta T Solutions if changes are necessary so the Grow Room design can be modified as required. M 202 8. All line voltage and low voltage wiring,conduit and , disconnects shall be furnished and installed by others. 9. Field coordinate/verify all dimensions,voltages,amp draws and conditions before installation. 10. Installing subcontractor will be required to cut and modify in Revised the field for proper fit per details. Nu. By Data 11. Installing subcontractor shall assemble parts supplied by Delta T per Detail. 2. 12. Attachments to structure shall be supplied by Installing 3. 54'-0" 5'-0" subcontractor as required. 4 71Date 13. Installing subcontractor will be required to measure and cut all sections of the threaded rod based on Field Conditions.14. The Installing subcontractor will be required to measure and cut some sections of Unistrut based on Field Conditions.15. The Installing subcontractor will be required to measure,cut,and groove some sections of the Pipe and Insulation based on Field Conditions. �aer 16. All hanging hardware shall be stainless steel,Galvanized,or Aluminum as noted on the Detail. size Arch D 17. Attachments of hangers to structure shall be by others. Date if-lszois By JP 18. This is a corrosive environment and proper materials must be Project No. used. �� Level 2 System-Layout 19. Insulation is provided for bare aluminum pipe with-in zones 160661-50 Note: Piping Shown Outside the below the 7 ft.(Off Finished Floor)level in each zone. sheet Greenhouse for Clarity Only. PL-2 Scale: ya'=V-0" P L-2 C E ~ U o N O O 0 North Level N d a N 000 E o �, r� N N 3 o am 3 0 60'-0" MU�Q 3 E Sao ~2 ONV Hill m y C E p C e a a s Nc 0 �F ONO ♦♦^^ CO 0 0O �3 v/ imp 1Ya'CWS& Z1Y2"x1Ya" s o00 o r CD CWR PIPING REDUCERS x o FAN COIL ON LEVEL 2 W/ Grow Room 1Y2"CWS& DUCTING DOWN TO LEVEL 1 o r >n�°D o CWR PIPING (Shown for Clarity) N g° �� ti N 0 205 212 0 � 1Y4"CWS& 1Y2"x1Y4" 1Y2" 2"xly2" Clone gY W N OD CWR PIPING REDUCERS REDUCERS Legend a a Room 2'/:TON d d 206 IIIII���llppp b FAN COIL UNIT °- w/Hot Water Heating Coils ZC-9 a a a a 2%TON FAN COIL UNIT 1ya"CWS& b CWR PIPING REDUCERS 2 2"CWS& '2 CWR PIPING = 1 TON a Grow Room p FAN COIL UNIT 8 t 0 RISERS FROM LEVEL1 w/Hot Water Heating Coils 204 d 1Y2"CWS& Zone Valves located on CWR PIPING level 1 —Chilled Water Return - 1%"CWS& 1Y2"x1Y4" 1Ya"CWS& —Chilled Water Supply CWRPIPING REDUCERS CWR PIPING ZC-8 3"x2Y2" c° U REDUCERS J L-2. A Chilled Water Cooling System - Layout ;d J N Scale: Y8"=V-0" a - L d (2)MECH.TEES W/ - J CAP FOR FUTURE _ Q E PIPING(TYP) q g Dry Room rn N 203 3"CWS& Notes (Unless Otherwise Specified) r a a Q c CWR PIPING a.+ - 1. All chiller piping to be supported so that Chiller does not Q� RISERS FROM p p g pp L 00 LEVEL1 support piping weight. 2. Maintain a water treatment program appropriate for all the materials in the heating system. In addition,the pH of the = io ZC-7 3„ system water is to be maintained between 6.8 and 8.5. Q 3. All piping to be supported so that heat source does not support > y Tcws&7",,�x�iy, ZWS& �2'x%" piping weight.CHILLED WATER .1 MIXING VALVE 4. Vent high spots in piping mains to prevent air locks. 10 CWR PIPING REDUCERS CWR PIPING REDUCERS See Sheet Z-1 5. Piping runs to be supported as required. (TYP) 6. Installation to follow all state and local codes where applicable. 7. Notify Delta T Solutions if changes are necessary so the Grow Room design can be modified as required. 0 2"CWS& 8. All line voltage and low voltage wiring,conduit and 202 CWR PIPING disconnects shall be furnished and installed by others. 9. Field coordinate/verify all dimensions,voltages,amp draws and conditions before installation. 1Y4"CWS& 1Y2"x1Y4" 10. Installing subcontractor will be required to cut and modify in Revised CWR PIPING REDUCERS the field for proper fit per details. No. By Data 11. Installing subcontractor shall assemble parts supplied by Delta T per Detail. 2. 12. Attachments to structure shall be supplied by Installing 3. subcontractor as required. 4 5'-0" Reviewed By 13. Installing subcontractor will be required to measure and cut all No. By Dal" sections of the threaded rod based on Field Conditions. 1. 14. The Installing subcontractor will be required to measure and 2. cut some sections of Unistrut based on Field Conditions. 3 15. The Installing subcontractor will be required to measure,cut, 4. and groove some sections of the Pipe and Insulation based on Drawing Field Conditions. scale Yr^=V-a• 16. All hanging hardware shall be stainless steel,Galvanized,or Aluminum as noted on the Detail. size Arch D 17. Attachments of hangers to structure shall be by others. Dare 111-1s2016 By JP 18. This is a corrosive environment and proper materials must be Project No. used. �� Scale: Ya"=1'-0"Chilled Water Cooling System- Layout 19. Insulation is provided for bare aluminum pipe with-in zones 160661-50 Greenhouse for Clarity Only. Note: Piping Shown Outside the below the 7 ft.(Off Finished Floor)level in each zone. sheet L-2. PL-2.1 C E ~ U o N O O 0 North Level N d a N U V' E o r r� N N 3 o am 3 60'-0" do >Sao ~2 ONV m y C E O ?T O C________ _ o OI~00 00 g 1Ya" e o00 in i.2 CD M'I F d U) " �i FAN COIL ON LEVEL 2 W/ c Grow Room 1 DUCTING DOWN TO LEVEL 1 o r >nW� 205 �4 (Shown for Clarity) F a �� L MN US d 6 N 9 0 LO S L? a Q r O Clone LY N00 Legend r--ry �•--'} �•--'} �•--'� �•--'� Room 2%TON = LJ rLJ=====_____=LJ=====__--_=LJ=====_____=LJ==-Tr-===�' 206 b FAN COIL UNIT 2"x1y4'TEE y P w/Hot Water Heating Coils _ _________ ______________�`-- 2%TON • i' T i b FAN COIL UNIT a�- 44 LI PPP 1Ya" 2„ ZH-9 2"xlya" a 1 TON - 1 4" 2"x1y4" TEE p FAN COIL UNIT 8 t Grow Room 204 „ RISERS FROM LEVEL1 w/Hot Water Heating Coils Zone Valves located on m ZH-8 !, • • d a HOT WATER i; ----- level 1 ______ __ _. f-----ii --- o w CONTROL VALVE _ — , See Sheet Z-2 1Y4"HWS&HWR - 1Y4" (TYP) PIPING(TYP) — �, ---Hot Water Supply ----------------------------- - •q •q-------------- • �•�' --Hot Water Return ------- c V LJ LJ--------------- LJ --------------------- J A Hot Water Heating System - Layout J L-2. Scale: %8"=V-0" a E_ N - N _ L � (2)MECH.TEES W/CAP - d 10 FOR FUTURE PIPINGs. J (TYP) ^° ++ E Dry Room In 2„ N v a N Notes (Unless Otherwise Specified) r 4 203 " 2"x1%4'TEE 1. All chiller piping to be supported so that Chiller does not Q� �+ c RISERS FROM 2„ p p g pp L io LEVEL1 __ __------ support piping weight. .� ZH-7 ----- • 2. Maintain a water treatment program appropriate for all the f+ _ materials in the heating system. In addition,the pH of the = L 0+ system water is to be maintained between 6.8 and 8.5. Q io 3. All piping to be supported so that heat source does not support > piping weight. o 2 4. Vent high spots in piping mains to prevent air locks. 1Ya 5. Piping runs to be supported as required. 6. Installation to follow all state and local codes where applicable. 7 Notify Delta T Solutions if changes are necessary so the . Grow Room design can be modified as required. 0 1y4 8. All line voltage and low voltage wiring,conduit and M 202 s s an y disconnects be furnished d installed b others. ii�I, 9. Field coordinate/verify all dimensions,voltages,amp draws and conditions before installation. 1y4" 10. Installing subcontractor will be required to cut and modify in Revised the field for proper fit per details. Nu. By Data • 11. Installing subcontractor shall assemble parts supplied by Delta 1. ------- --------____ T per Detail. 2. 12. Attachments to structure shall be supplied by Installing 3. subcontractor as required. 4 5'-0" Reviewed By 13. Installing subcontractor will be required to measure and cut all N.. By oate sections of the threaded rod based on Field Conditions. 14. The Installing subcontractor will be required to measure and 2. cut some sections of Unistrut based on Field Conditions. 3 15. The Installing subcontractor will be required to measure,cut, 4. and groove some sections of the Pipe and Insulation based on g Drawin Field Conditions. spin Yr^_ -o^ 16. All hanging hardware shall be stainless steel,Galvanized,or Aluminum as noted on the Detail. size Arch D 17. Attachments of hangers to structure shall be by others. Date if-lszofs By JP 18. This is a corrosive environment and proper materials must be Project No. used. Hot Water Heating System- Layout 19. Insulation is provided for bare aluminum pipe with-in zones 160661-50 Note: Piping Shown Outside the Greenhouse for Clarity Only. Scale: ya'=1'-0" below the 7 ft.(Off Finished Floor)level in each zone. sheet L-2. PL-2.2 C E ~ U o N O O 0 North Level N d a N U V' E o r r� N N 3 RUN CONDENSATION aS O am 3 Z Q 3 60'-0" LINE TO DRAIN (By Others) dE.o 0 700 m y C E O lo C e e a a Nc ♦O^ W 0OI~ CONDENSATION LINE a m All � �N, m � V♦ Cm See Sheet FC-3 �� in -- (TYP) =o :: ca Grow Room _ o C N O ZD 205a ��N d 6 90 A\ c�LO RUN CONDENSATION a V/ LINE TO DRAIN Q c 04 o 00 (By Others) Clone Legend Q� w N e e e a e Room 2%TON 2 0 206 FAN COIL UNIT IIII. �p w/Hot Water Heating Coils n 2%TON - II II b FAN COIL UNIT a IIII. ape 5'o RUN CONDENSATION =_ LINE TO DRAIN 1 TON a Grow Room (By Others) FAN COIL UNIT 8 t 204 w/Hot Water Heating Coils d —Condensation Line - o L" V A Chilled Water Cooling System - Layout oE 8 J L-2.3 Scale: Y8"=1'-0" a E J _ ✓ N Q � _ tv Dry Room N v nCle r� _ 203 Notes (Unless Otherwise Specified) r 4 (J iJ C 1. All chiller piping to be supported so that Chiller does not L 0) O support piping weight. .� N 2. Maintain a water treatment program appropriate for all the materials in the heating system. In addition,the pH of the = system water is to be maintained between 6.8 and 8.5. Q c O nn 3. All piping to be supported so that heat source does not support > U a a a a piping weight. 4. Vent high spots in piping mains to prevent air locks. 5. Piping runs to be supported as required. 6. Installation to follow all state and local codes where applicable. 7. Notify Delta T Solutions if changes are necessary so the 'm Grow Room design can be modified as required. 0 202 8. All line voltage and low voltage wiring,conduit and disconnects shall be furnished and installed by others. 9. Field coordinate/verify all dimensions,voltages,amp draws and conditions before installation. 10. Installing subcontractor will be required to cut and modify in Revised the field for proper fit per details. Nu. By Data 11. Installing subcontractor shall assemble parts supplied by Delta T per Detail. 2. 12. Attachments to structure shall be supplied by Installing 3. subcontractor as required. 4 5'-0" Reviewed By 13. Installing subcontractor will be required to measure and cut all Nn. By Dale sections of the threaded rod based on Field Conditions. 14. The Installing subcontractor will be required to measure and 2. cut some sections of Unistrut based on Field Conditions. 3 15. The Installing subcontractor will be required to measure,cut, 4. and groove some sections of the Pipe and Insulation based on Drawing Field Conditions. scale Y."=V-a• 16. All hanging hardware shall be stainless steel,Galvanized,or Aluminum as noted on the Detail. size Arch D 17. Attachments of hangers to structure shall be by others. Dare if-lszois By JP 18. This is a corrosive environment and proper materials must be Project No. used. Condensation Lines-Layout 19. Insulation is provided for bare aluminum pipe with-in zones 160661-50 Note: Piping Shown Outside the Greenhouse for Clarity Only. Scale: ya'=1'-0" below the 7 ft.(Off Finished Floor)level in each zone. sheet L-2.3 PL-2.3 MOD: 1222o Equipment Schedule Piping Schedule g Item Description Part No. city Item Description Part No. city-Jko N C 1 CHILLER UNIT AGZ130 1 P PIPE STEEL ROLLED SCH 10 3.00"X 21' DSP30010-252R AR o 2 IBELIMOACTUATOR PER DESIGN 1 E ELBOW GROOVED 90"3.00" DSE300 5 ® p BV BUTTERFLY VALVE GROOVED 3.00" DSV300 2 £o w Chiller C COUPLING GROOVED RIGID 3.00' DSCR300 13 E o FL 3"GRUVLOK FLANGE SET DEFCG30 2 -o �.rn S1 CHANNEL(GALV.)1.625" DSMU AR 6.2 O y Q d� ■� =U S2 STRUT CLAMP(PLATED)3.00" DSMC300 AR Eo � >moo 1 ~- N V m y C E O C Nc O �hW 3 m O �p N CO in ■ L I.- X d w Ot O �° m N d Chiller = Ar/1 � to BV 2 CWR °6 2a o r-to rn�o FL O e� WcID�D P E E SEE DRAWING C-2 1 _ FOR SECONDARY LOOP PIPING ♦ ♦ C DETAILS. E `" CWS i 8t CWRR CWS CWR O Om tY N 2 OC - B Chillers Supply- Piping Detail cam') FL1 I lo - C-1 Scale: 1"=V-0" -- So U Ev° J C. J Ea° L � �0 Q ° O O .o L 3 2. M d 7 V V >1 P 2. a 0 R J Chiller BV L }Ir L 1 / O O BV C P E Revised Ell UWR No. BY Dale 1. 2. 3. 4. 0 0o SS21 �V'1 Reviewed O O No. 2. 3. O 4. CW$ Drawing Scale Y,"=1'-D" Size Arch D CWRR CWS CWR Date 12-09-2016 BY I JP Project No. Chillers Return-Piping Detail Chillers End-End- Layout 160661-50 C-1 Scale: 1"=1'-0" C-1 Scale: Yi'=1'-0" Sheet C-1 MOD: 1222o Equipment Schedule Piping Schedule g Item Description Part No city Item Description Part No city o N 1 AIR SEPARATOR DEAS600 1 P PIPE STEEL 6.00" DSP60010-252R AR o 2 AIR VENT DEAV075M 1 E ELBOW GROOVED 90°6.00" DSE600 4 ® p w 3 EXPANSION TANK DEESX110 1 T TEE GROOVED 6.00" DST600 2 4 REGULATOR DEVPR050 1 CP CAP GROOVED 6.00" DSCAP600 2 ? £ a1 2 Lo o 5 PRESSURE GAUGE DEGPO60 1 BV BUTTERFLY VALVE GROOVED 4.00" DSV400 4 S o �. E 1 p 6 THERMOMETER DET60 2 TO TEE-REDUCING HCX G 6.00"x3.00" DSTR600300 6 6.- .0 0)� 7 SENSOR W/WELL DECW 1 Tr2 TEE-REDUCING HCX FTP 6.00"x0.50" DSTR600300 3 —5 �A _ t6 M 8 PRESSURE SWITCH DEGPS 1 C1 COUPLING GROOVED RIGID 6.00" DSCR600 15 E, > N C2 COUPLING GROOVED RIGID 3.00" DSCR300 6 m„ o CT COUPLING THREADED GALV 0.50" DSCGO50 1 O �F Do Br BUSHING GALV HEX 1.25"x.05" DSHBG125050 5 B m o FL 61N 125#GRUVLOCK FLANGE DEFCG60 2 o .�CD Boiler Piping -Side Detail N NIPPLE GALV 0.50"x1.50" DSNG050015 1 F d�)w C-2 Scale: 5/8"=V-0" c of � 01) cno .w C O o _ V m 4) N _o Ar/1 C LO �a CD ° W N DD nF� C_3 C E a' Connections to Section Pump Station SEE DETAIL"B" 8 s Connections From Chiller Supply / o C r Future Boiler SEE DRAWING C-3 t CWR�----- y - o FOR OVERALL r -_ LAYOUT DETAILS. 1 B F CWS 4. " QB ° U oE J QJill p CWRR Q 4. a Q J a N _ Connections From Chiller -_ L w Supply Connections From Chiller j A Connections From Chiller Return 9 4 Return p" L a 1 a_ O 9T a o �< 2 __j 1 SEE DRAWING FW-1 FOR AIR L U 1 SEPARATOR DETAILS •S i }ir L R FL Q 0 O C2 ROTATE ELBOWS TO ALLOW \ Connections to E FOR UNISTRUT SUPPORT / N Zane and UNISTRUT SUPPORT INSTALLATION Section Pump Tr2 RETURN LOOP P INSTALLATION TYP N T _ 2 SEE DRAWING FW-1 FOR C2 7 SECTION VIEW C-C EXPANSION TANK DETAILS Connect New System Piping Tr1 CT Connections to C2 to Existing System Pump N Chiller Supply a Tr ZONE SUPPLY a a Tr1 C1 2 3 CID Revised No. By Dale 1. 2. Connections to SECTION VIEW B-B Connections to 3. Chiller Return C2 Chiller Return C2 4 C1 Tr1 REVERSE RETURN Tr1 Reviewed By CID * LOOP * * E No. By Date 1. z. 3 4. SECTION VIEW A-A Drawing Scale %"=1'-0" Size Arch D Date 12-10.2016 By JP Project No. Secondary Chiller Loop-Detail 160661-50 C-2 Scale: 5/6"=1'-0" Sheet C-2 ,_ r o o N c 0 0 d n N w �U d W p o v 0) 2SZ 600 O y Q $ 1`o 7 N r_ 0NV m y C E p N c OC l—00 3 m O �p 0)CO p r ■ L r X N� C-001) w o t O)Of to �° c m U? V m r- N a r-O ° W N DD n° To Zones - - - - - Building - - - - - 0-6 PUMP STATION E See Sheet CP-1 Air separator and Feed J, water(See Sheet FW-1) -- - ----- -- -- ----- --� °y N o) ar Q �s > CWRR A IL CWS ♦ 29CWRzo 10 j --10 SOU °E J L mQ m 1000000000000 - r j60 `0 LOOOO 0000 0000 T-0" 16'-0" 4'-0" 16'-0" 4'-0" 16'-0" / o L-- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- - Service/Air Intake Clearance -- -- -- -- -- -- -- ----- -- -- ---- --J r 61'-11 Revised No. BY Dale 1. 2. 3. r By Date Drawing Scale Y,"=1'-0" $ize Arch D Date 12-09.2016 BY JP Project No. Chillers End-End -Layout 160661-50 C-3 Scale: 3/s°=1'-0" Sheet C-3 C2 T Equipment Schedule 0 Item Description Part No. Qty 01 to C E 1 CHILLER PUMP GRUNDFOS-LCSE 2 o 0 0 cws Piping Schedule <o toE o� o Item Description Part No. Oty r -p P1 PIPE STEEL ROLLED SCH 10 4.00"X 21' DSP40010-252R AR m;o O > 3 P2 PIPE STEEL ROLLED SCH 10 6.00"X 21' DSP60010-252R AR F 0 U 3 P2 E ELBOW GROOVED 90"6.00" DSE600 2 — }I •��— C1 COUPLING GROOVED RIGID 4.00" DSCR400 12 dsal o > 0 00 CV C2 COUPLING GROOVED RIGID 6.00" DSCR600 8 ~c o oic R2 BV1 BUTTERFLY VALVE GROOVED 4.00" DSV400 4 u O �F allo 0 BV2 BUTTERFLY VALVE GROOVED 6.00" DSV600 1 .3 m o } } C1 CV CHECK VALVE GROOVED 4.00" DSCV400 2 0 � x R1 REDUCER CON GROOVED 4.00X3.00 DSR400300 2 F :+ a BV1 R2 REDUCER CON GROOVED 6.00X4.00 DSR600400 4 T TEE GROOVED 6.00" DST600 2 `+ dim 0 Tr TEE-REDUCING HCxF 6.00"x0.50" DSTR600050 1 �v OfON FL1 4"GRUVLOK FLANGE SET DEFCG40 2 0 � p1 FL2 3"GRUVLOK FLANGE SET DEFCG30 2 I`O �° W Nao DV DRAIN VALVE,0.50"W/CAP&CHAIN DSV050HTDC 1 e `o c F5 55 R1 FL C2 P2 = j o O O Flange to top of Pump • CWR j I B Discharge Piping- Detail j o O O j CP-1 Scale: 2"=V-0" From - j Tr Chiller =- DV O O O Source So J cwS _ N - E _ L C2 To O O O ` Q p 0 o C1 Chilled C1 to :z Zone ��� BV1 ra a0+ E O CV j R2 ,� d C O > O O BV1 j FL1 � j Flange to top FL2 of Pump FL1 cP_t O O j O O O C = Flange to top of Pump CWS R1 j 1 FL2 O O O O I,/ O O O O FL1 Piping From Revised P1 Chiller ( N". By Data CP-1 1. B 2. 3. C Reviews By 0 1 No.AN OY Date t. 2. O O 3. °O Support as required a. 6 Drawing ® o ® o II ° b Scale Y" ® ® 8 8 � Size Arch D O O O O Date 72.09.2036 By JP Project No. Chiller Pump-Elevation Chiller Pump Station- Plan View 160661-50 CP-1 Scale: 2"=V-0" CP-1 Scale: 2"=V-0" sheet CP-1 O Note:All Chiiled Water Piping shall be wo E insulated. o rn c 0 o 0 0 w VCC! yC U E O w L VF �O QIV o O O ° 5 91 0 t6 ao 1 00q E� 00 m O O � O o: 017 X n° 2Cnw � ry.3 � i °2 _ 6 00 N N O �+ L9 BG ="� ��Lo O O °N Q cr,-0 s°= W Na0 o O O o EG 2 a NG1 - TG - I � I �3 I 89 HB1 c� O HC HB2 BV €a l H HC i = CWR J EG O CWR `g \A =d O HB1 m HC P 2 a8 CWS CWS \ 08 U H HC NG2 A �� J HB1 Br1 T2 J a? HWS O O! HWS i n q' c O co U N }0 C HWR 0 C HWR m L O �Y 0 o a a +�+ O i � U � 0 Condensate O Condensate O LL of 0 N N 2 Equipment Schedule Item Description Part No. city 1 2-1/2 TON FAN COIL UNIT CWVFC-2500 1 2 FLOW CONTROL 3/4" DEFRL075-0060 1 3 AIR VENT DEAV012M 1 Revised No. By Date Piping Schedule 1. Item Description Part No. 4ty Z. H 3/4"HOSE DEH075 AR 3. EG ELBOW GALV.FPT 0.75 DSEG075 2 a Reviewed BV BALL VALVE PVC SCH 80 0.75" DPV075 2 No. By Date BG BUSHING GALV.HEX 0.75XO.125" DSHBG075012 1 1 Br1 BUSHING PVC SCH 80 SXS 'PER DESIGN 2 2' 3. A ADAPTER FPT PVC X BRASS PER DESIGN 1 a. TG TEE GALV FPT 0.75 DSTG075 1 Drawing HC HOSE CLAMP DMHC75 4 scale 2Ya"=1•-O" HB1 BRASS HOSE FITTING 3/4 MPT X 3/4 ID DSHF075XO75 3 she Arch D HB2 HOSE BARB PVC SCH 40 S X 0.75" DPNH075 1 Data 12-10-2016 N1 NIPPLE GALV 3.00X.75 DSNG3000075 1 By JDK Project No. N2 NIPPLE GALV.0.75X1.50 DSNG075015 1 REFER TO PL SHEETS FOR PIPE SIZES �n� 2%2 Ton Fan Coil -Cooling 160661-50 FC-1 Scale: 2%a"=1'-0" sheet FC-1 O Note:All Chiiled Water Piping shall be wo E insulated. o rn c 0 o 0 0 w VCC! yC U E O w L V F NO M0 o O O o 5 9 10 t6 ao 1 00q E� O �I-t" O O x 0 o 01 7 X n w -000 3 t atOf LO EG NG2 mm dro W� m LoBG1 W -W j5�HC V La?NNO BG o Mi oH EG g o o o TG 2 HB HC c � 8d 77 i4 O -- €d CWRE I I J O CWR O `d See Drawing FC-1 for CWS&CWR Piping = l Components. a.8 CWS \ J O CWS H 2 NG1 Tr J;a NG1 a E J HWS O HWS i n 0 O HB - r— Q u d HWR 0 o HWR L O �Y 00 8R a U O HC BV < 0 HB L 0 Condensate O Condensate ILL O IM Di Q 0 4 N 2 Equipment Schedule Item Description Part No. city 1 2-1/2 TON FAN COIL UNIT CWVFC-2500 1 2 FLOW CONTROL 3/4" DEFRL075-0060 1 Revised No. By Date 3 AIR VENT DEAV012M 1 1. 2. Piping Schedule 3. 4. Item Description Part No. city Reviewed H 3/4"HOSE DEH075 AR No. By Date EG ELBOW GALV.FPT 0.75 DSEG075 4 1 BV BALL VALVE BRASS FPT 0.75" DSV075 2 2. 3. BG BUSHING GALV.HEX 0.75X0.125" DSHBG075012 1 a. A ADAPTER FPT PVC X BRASS 'PER DESIGN 1 Drawing TG TEE GALV FPT 0.75 DSTG075 2 scale 2Ye'=1•-O" Tr TEE SADDLE-REDUCING HCxF 'PER DESIGN 2 she Arch D HC HOSE CLAMP DMHC75 8 Data 12-10-2016 HB BRASS HOSE FITTING 3/4 MPT X 3/4 ID DSHF075XO75 8 By JDK Project No. NG1 NIPPLE GALV 3.00X.75 DSNG3000075 2 �A� 2%2 Ton Fan Coil -Cooling& Heat 160661-50 sneer REFER TO PL SHEETS FOR PIPE SIZES FC-2 Scale: 2%4"=V-0" FC-2 O Equipment Schedule o y U Item Description Part No. Qty o m C 1 2.5 TON FAN COIL UNIT CWVFC-2500 1 g Flow of Air See Sheet PL-1.3&PL-2.3 for Condensation Piping Layout o w Piping Schedule for PVC Condensate Piping d LOO)�2 Item Description Part No. Qty m O T 5 H1 POLY TUBE 0.5" D1 P3050 AR c¢ rn V SZ c 1 Al PVC SCH 80 ADAPTOR FTP x BARB 0.5" DPNH050F 1 A2 PVC SCH 80 ADAPTOR MTP x BARB 0.5" DPNH050M 1 E o > v N See Sheet PL-1.3&PL-2.3 for Condensation Piping Layout m q E o �� O �1--00 Piping Schedule 1.25" PVC Piping 3 (n ` ) o£ I— Item Description Part No. Qty __ P PIPE PVC SCH 80 1.25 DPP125 AR nt 1`eeeea NCn- Al B1 \ E ELBOW PVC SCH 801.25 DPT125 AR o M of o �T TEE PVC SCH 80 1.25 DST125 1 � m 0 61 BUSHING PVC 1.25 X 0.5 S x FTP DP6125050F 1 d N N H1 Intake CP CAP PVC 1.00 DPCP100 1 0 MP-o See Sheet PL-1.3&PL-2.3 for Condensation Piping Layout `g W N C, 2 as A2 T 3 8d �8 €d 8t �8 2-1/2 Ton Fan Coil Condensation Piping-Layout s FC-3 Scale: 1:10 _- U tN J 3 ?9 0 J o°E J i °'c � •c a 0 o 0 o 0 I o W � � L O � U o o ° ° Q U LL o o o C 0 o o o o 1 = N 0 o o o 0 r Q � 0 — O — — — — U U — — 0 — O — — — — — H1 LJ- - a — ° ° - - - - ° ° - - a — ° - - - - - - - _ CWS 0 0 0 0 ° � Chilled Water a a �101", � CWR Source 0 — — — — — — — — y Revised L 'p�'�'I[U�U�U���'I No. By Date �1— — — — — — — — — — — — — — — — HWS 1 2. 2. Heat Source B. — — — — — — — — — — — — — — — — — — — — — ®— — — — — — — — — — — — — — — — HWR a. Reviewed '0 ?� No. By Date 1. a! ! 2. CP T P E a. T a. Drawing RUN CONDENSATION scale PIPING TO DRAIN she Arch D (By Others) Data 77.75.2076 By JP Project No. �2-1/2 Ton Fan Coil Condensation Piping-Layout-1/2 Ton Fan Coil Condensation Piping-Layout 160661-50 Note:All Chilled Water Piping shall be FC-3 Scale: 1:10 sheet insulated. F -3 O Note:Only Hot Water Piping shown for Note:pipe and fitting configuration for N Equipment Schedule Clarity. stand alone Fan Coil Units. �°, rn It.. Description Part No. Qty p 1 1 TON FAN COIL UNIT ENVIRO-TECH 1 0 0 Y 4`> y yC N n Piping Schedule 2N m c NtA O Item Description Part No. city o N ¢ H POLY TUBE 0.75" D1P3075 AR }� c P PIPE PVC SCH 80 0.75 DPP075 AR ENVIRO-TECH FAN COIL UNIT = N HC HOSE CALM DMHC07 2 m; c E o ACO a %.2(0 �3 1/2"COPPER MALE ADAPTOR }l m Lo 0 d N 1/2"FLOW CONTROL o H LO �r O 1/2"COUPLING 1/2"COPPER m= W N 00-0 MALE ADAPTOR a 1/2"ELBOW (TYp) o ENVIRO-TECH 1 TON FAN COIL UNIT 1/2" ELBOW 8d �8 1/2"COPPER MALE ADAPTOR €d 1/2"ACTUATOR - CONNECT TO RETURN PIPING 1/2"COPPER MALE ADAPTOR 8t ATTACH CONDENSATE PIPING TO DRAIN TUBE EXIT SEE DETAIL"B" m CONNECTION TO SUPPLY PIPING 8 Enviro-Tech Fan Coil Heated Water Connections-Top View `s FC-4 Scale: N.T.S. - U J a E Note:Only Chilled Water Piping shown Note:pipe and fitting configuration for i H CONDENSATION PIPING for Clarity. stand alone Fan Coil Units. 'a i � 06 c Y O a T d O HC p L c O CONDENSATION LINE FROM L U FROM FAN COIL ENVIRO-TECH FAN COIL UNITLL O to r O O 2 3/4"COPPER MALE ADAPTOR 3/4"FLOW CONTROL 3/4"COPPER MALE ADAPTOR Revised 3/4"COUPLING No. By Date 1. JP 3-18-17 2. JP 5-15-17 3/4"ELBOW 3. 3/4" 4 ELBOW Reviewed No. By Date 3/4"COPPER MALE ADAPTOR 1 Enviro-Tech Fan Coil-Top View 2. FC-4 Scale: N.T.S. 3/4"ACTUATOR a CONNECT TO RETURN PIPING 4. 3/4"COPPER MALE ADAPTOR Drawing scale ATTACH CONDENSATE PIPING TO DRAIN she Arch D TUBE EXIT SEE DETAIL"B" Data 11.15-2016 CONNECTION TO SUPPLY PIPING By JP Project No. (-A � Enviro-Tech Fan Coil Chilled Water Connections-Top View shee160661-50 Note:All Chilled Water Piping shall be Fc-4 Scale: N.T.S. insulated. FC-4 O Note:Only Hot Water Piping shown for Note:Pipe and fitting configuration for a Equipment Schedule Clarity. Packaging and Processing Room 0 Fan Coil Units. o (d scription Item De Part No. Qty p 1 1 TON FAN COIL UNIT ENVIRO-TECH 1 1 0 5 0 Y N n Piping Schedule 2N m c NtA OItem Description Part No. city ¢0 1A H POLY TUBE 0.75" D1P3075 AR ail }� c P PIPE PVC SCH 80 0.75 DPP075 AR ENVIRO-TECH FAN COIL UNIT = 0 N HC HOSE CALM DMHC07 2 m; o N� O �P� 3 m p a -- x �3 atLoo �+ _ N L d N L0 Lo ° C�O 1/2"COUPLING =_ u.l N 00 ar as 1/2"ELBOW (TYP) o ENVIRO-TECH 1 TON FAN COIL UNIT 1/2" ELBOW 8d �8 €d CONNECT TO 1.25"RETURN PIPING ATTACH CONDENSATE PIPING TO DRAIN TUBE EXIT SEE DETAIL"B" a s CONNECTION TO 1.25"SUPPLY PIPING 8 c Enviro-Tech Fan Coil Heated Water Connections-Top View FC-5 Scale: N.T.S. — U J a E Note:Only Chilled Water Piping shown Note:Pipe and fitting configuration for H CONDENSATION PIPING O for Clarity. Packaging and Processing Room � 'a Fan Coil Units. - C Q ,. i � c YO a T d O ;n a N m _ �a HC P L � c O CONDENSATION LINE FROM L U FROM FAN COIL ENVIRO-TECH FAN COIL UNITLL O to r O O 2 a Revised 3/4"COUPLING No. By Date 1. 3/4"ELBOW 2 3. 3/4" 4 ELBOW Reviewed No. By Date 1. Enviro-Tech Fan Coil-Top View 2. FC-5 Scale: N.T.S. a CONNECT TO RETURN PIPING 4. ATTACH CONDENSATE PIPING TO DRAIN Drawing TUBE EXIT SEE DETAIL"B" scale Sae Arch D Data 5-15.2017 CONNECTION TO SUPPLY PIPING By JP Project No. (-A � Enviro-Tech Fan Coil Chilled Water Connections-Top View shee160661-50 Note:All Chilled Water Piping shall be Fc-s Scale: N.T.S. insulated. F C-5 30'-0"Approx. — 30'-0"Approx. — E CEILING HEIGHT CEILING HEIGHT o c 0 0 From Main Lines W oV+ E 0 FAN COIL (TYP) o r T� 66 O ya q of x �� ■� �U o FAN COIL BOTTOM ° o' ° a d o }+ is o x FAN COIL BOTTOM a � o m y tttttttttt� C h o Do v 3 m o CD p d X O o c0 ; C'p m DOOR y12 io d o t Ol ton �o �� mto 0 n -6 6 d 0 r) 0.Lfv1/1 C � FINISHED FLOOR FINISHED FLOOR W N 0 00 n� Grow Room 110-South Elevation �D� Grow Room 110-North Elevation L-1.1 Scale: 3/6"=V-0" L 1. Scale: 3/6"=V-0. 59'-6"Approx. 0.2 16-10" 16'-6" 16-10" — — 4'-9" 11 CEILING HEIGHT d 5'o �c INSULATED CWS • &CWR LINES FAN COIL (TYP) 0 0 EL o -- n FAN COIL BOTTOM a `S JE.v° CONDENSATION LINE HWS&HWR LINES a E J Run to drain _ N � � O 00 STRUCTURE q� L BUMP OUT � tv �C C W �T a o �< FINISHED FLOOR .� o � L � B Grow Room 110- East Elevation Q c L L-1. Scale: 3/6"=1'_0" > C9 59'-6"Approx. 12'-6" 12'-6" 12'-6„ 12'-6" — — 4'-9. CEILING HEIGHT • FAN COIL WITH HEAT • INSULATED CWS FAN COIL (TYP) EA &CWR LINES (TYP) Revised �I No. BY Dale 1J X 2EU 1. FAN COIL BOTTOM a 2. � Q 3. 7 4. HWS&HWR LINES CONDENSATION LINE Reviewed Run to drain No. By Date 1. 2. 0 ap 3. 4. Drawing Scale %°=1'-0'° Sae Arch D FINISHED FLOOR If Data 11-16-2016 By JP Project No. Grow Room 110-West Elevation 160661-50 r7ELL-1.1 Note:All Chilled Water Piping shall be L-1.1 Scale: 3/e'=1'-0" insulated. o o 30'-0"Approx. — 30'-0"Approx. — p CEILING HEIGHT CEILING HEIGHT W L� o rn o c 0 © S y Fl- go X i0 X U~ �O tmo o FAN COIL (TYP) 5 2 a FAN COIL BOTTOM o o; ° FAN COIL BOTTOM ¢ F a 3 N o o roaO C w f~eo V T = O O N(�i 1 C m p O O O G1 Cn N W Co s� 3 �00 io DOOR a t E 00 'O `; c m� d 0 N FINISHED FLOOR FINISHED FLOOR W N om 2 a� Grow Room 109-South Elevation �� Grow Room 109-North Elevation _ Scale: V=1'-0" L-1. Scale: V=1'-0" =3 59'-6"Approx. $ q'_9" 16'_6, 16'_8" 16'_6, — — 4,_9. _- CEILING HEIGHT a o n INSULATED CWS &CWR LINES FAN COIL (TYP) FAN COIL WITH HEAT m (TYP) o =9 FAN COIL BOTTOM a ¢ sg J "� CONDENSATION LINE HWS&HWR LINES a It J Run to drain o Q) O So - to YLIJ a FINISHED FLOOR 11 .� C }r L it B Grow Room 109- East Elevation Q o Scale: V=1,_0„ > (� 59'-6" Approx. 4'-9" 12'_6" 12'_6" 12,_6" 12,_6" — _ 4'_9" �1 CEILING HEIGHT INSULATED CWS . FAN COIL WITH HEAT &CWR LINES FAN COIL (TYP) 0 (TYP)) Revised -:E] X No. By Date 0 Q FAN COIL BOTTOM a 2. 3. � O 4. Reviewed HWS&HWR LINES CONDENSATION LINE No. By Date Run to drain 1. 2. b pp 3. 4. Drawing Scale Si.. Arch D FINISHED FLOOR if 11 Date 11.15.2016 By JP Project No. Grow Room 109-West Elevation 160661-50 Note:All Chilled Water Piping shall be L-1• Scale: 3/B"=1'-0" Sheet insulated. E L-1.2 30'-0"Approx. — 30'-0"Approx. — 0 CEILING HEIGHT CEILING HEIGHT o � O 2 o QT w m E0 w °� T� 3 6. � �Q 3 o S a FAN COIL BOTTOM - o, FAN COIL (TYP) o }i •- @ FAN COIL BOTTOM ¢ F o O cOi N 0 o as g tttttttttt� c E 9 N I m CD ❑« L r- X O O d m m 3 C O c 2.01 In No to r d p N FINISHED FLOOR FINISHED FLOOR W N 00 n n Grow Room 107-South Elevation �D� Grow Room 107- North Elevation L-1.3 Scale: 3/B"=1'-0" L-1.3 Scale: 3/B"=1'-0" 3 59'-6"Approx. 13'-4" 13'-4" 13'-4" 14'-9" — 11 CEILING HEIGHT 02 INSULATED CWS ° &CWR LINES FAN COIL (TYP) ° o �a FAN COIL BOTTOM a _ J a 'E CONDENSATION LINE J Run to drain HWS&HWR LINES DOOR a o O .0 y$ to io m L d 3 r lL a 0 0 FINISHED FLOOR .� o � L � B Grow Room 107- East Elevation Q o L-1.3 Scale: 3/s"=1'-0" \ 0 54'-0"Approx. 9'-3" 13'-4" ► 13'-4" 13'-4" — — 4'-9" -111— CEILING HEIGHT INSULATED CWS FAN COIL WITH HEAT &CWR LINES (TYP) FAN COIL (TYP) Revised " No. BY Data x o FAN COIL BOTTOM a p. Q O 3. � 4. HWS&HWR LINES CONDENSATION LINE Reviewed Run to drain 1. 0 2. 60 3. 4. Data Drawing Scale 3/g'•=1•-U•• Sae Arch D FINISHED FLOOR Date 11-15-2016 By JP Project No. Grow Room 107-West Elevation 160661-50 Note:All Chilled Water Piping shall be 1E L-1.3 scale: 3/s°=1'-0" Sheet insulated. EL-1.3 ► 43'-6"Approx. — ~ coi CEILING HEIGHT -" o y c 0 2 o QT w m N > 3 3 .o O Q 3 0 H o x d- ■ rU 2 0 0 - _ FAN COIL BOTTOM n m o ao V tttttttttt� c E Q t'n Oc C6 00 C 0 N N m CD ❑« �.�iX DOOR o F « co EO ; C O c io _ t°Dn No w o A-0 M to rd O0N 5"0 CCU? a Clt�p FINISHED FLOOR D W N Do n n Grow Room 104- North Elevation m 3 L-1.4 Scale: 3/a"=1''0" �c 63'-9"Approx. IN 4'-4" 4'-0" f CEILING HEIGHT INSULATED CWS Li L ° FAN COIL (TYP) &CWR LINES 0 ° O:' K T v O - o FAN COIL BOTTOM c `S J a -E CONDENSATION LINE J HWS&HWR LINES Run to drain a= _ N o a G 3 r W a o 0 FINISHED FLOOR .� o � L � B Grow Room 104- East Elevation Q o L-1.4 Scale: 3/s"=1'-0" \ 0 63'-9"Approx. — 11'-1" 11'-1" 11'-1" ► 11'-1" 11'-1" — — 4'-9" CEILING HEIGHT INSULATED CWS &CWR LINES FAN COIL WITH FAN COIL HEAT(TYP) (TYP) Revised No. BY Data O FAN COIL BOTTOM o < 2. 3. 4. HWS&HWR LINES CONDENSATION LINE Review Data Run to drain 1. ed 2. -dj' 3. 4. Drawing Scale 3/g'•=1•-U•• Sae Arch D FINISHED FLOOR 11 Date 11-15-2016 By JP Project No. Grow Room 104-West Elevation 160661-50 Note:All Chilled Water Piping shall be L-1.4 scale: 3/s°=1'-0" Sheet insulated. E L-1.4 38'-0"Approx. — 0 CEILING HEIGHT -" o y c 0 2 o Qs w m N c Sj T� 3 o o x "� ■O U 3 0L o =_ �0 •_ m 0 � _ FAN COIL BOTTOM n m o ao ¢ r O N V o tttttttttt� c E Q N Oc �F OD C � N N R m'CD ❑« L iX � X `R 0 L '10 Do 12 d 60 N 12 C a DOOR w o ':+ c M to rd O0N 5"0 4, AL? FINISHED FLOOR W N a0o do Grow Room 103- North Elevation 22 m 3 L-1.5 Scale: 3/8'=1'-0" 63'-9"Approx. IN 4'-9" 11'-1" �'� 11'-1" 3'_7" f CEILING HEIGHT INSULATED CWS &CWR LINES ° FAN COIL (TYP) oa FAN COIL BOTTOM a _ A. J a �� HWS&HWR LINES CONDENSATION LINE a E J Run to drain _ N .0 O 2 lL a o 0 FINISHED FLOOR .� o � L � B Grow Room 103- East Elevation Q o L-1.5 Scale: 3/6"=1'-0" \ 0 63'-9"Approx. 3'-7" 4'-9" CEILING HEIGHT INSULATED CWS FAN COIL FAN COIL WITH HEAT &CWR LINES (TYP) 0 ° ° (TYP) Revised No. Y B Date O ° FAN COIL BOTTOM n 2, 3. 4. HWS&HWR LINES CONDENSATION LINE Neviewg Date Run to drain 1. 0 2. dj 3. 4. Drawing Scale 3/g'•=1•_U•• Sae Arch D FINISHED FLOOR 11 Date 11-15-2016 BY JP Project No. Grow Room 103-West Elevation 160661-50 Note:All Chilled Water Piping shall be 1,E L-1.5 scale: 3/6"=1'-0" Sheet insulated. E L-1.5 _ 24'-3"Approx. — p 24'-3"Approx. CEILING HEIGHT CEILING HEIGHT - o y c 0 2 o QT w m TM 3 6.0 O �< 3 o FAN COIL (TYP) qo:l c PL FAN COIL BOTTOM a o FAN COIL BOTTOM a m o }i o0 O t)N _ E0 to _I C~oo C N N R m oo ❑« L r I-- X O O I'll— 01 z DOOR TO PACKAGING DOOR c-°co &PROCESS - o In.2 A-0 •i m In r d p N 5 o C LO FINISHED FLOOR FINISHED FLOOR 11 W N 00 n n Cc Veg. Room - East Elevation �D� Veg Room-West Elevation 2.2 L-1.6 Scale: 3/B"=1'-0" L-1.6 Scale: V=1'-0" 3 40'-3"Approx. 110 2'-9" 14'_6" 14'_6" 8'-6" — 14 CEILING HEIGHT �g o go INSULATED CWS ° FAN COIL (TYP) &CWR LINES ° m o oa FAN COIL BOTTOM `S J E CONDENSATION LINE HWS&HWR LINES a E J Run to drain - i o - � oo Q c o 3 > aT a C W FINISHED FLOOR L O .� � B Veg. Room- North Elevation Q L-1.6 Scale: V=1'-0" \ 40'-3"Approx. 10'-1" 20'-1" 10'-1" CEILING HEIGHT INSULATED CWS FAN COIL WITH HEAT &CWR LINES FAN COIL 0 (TYP) 0 (TYP) Revised No. BY Data X O 1. FAN COIL BOTTOM a 2. Q 3. 4. HWS&HWR LINES CONDENSATION LINE Reviewed Run to drain t,, BY Date 0 op Drawing Scale 3/g'•=1•-U•• Sae Arch D FINISHED FLOOR Date 11-15-2016 BY JP Project No. Veg. Room-South Elevation 160661-50 Note:All Chilled Water Piping shall be 1E L-1.6 Vscale: =1'-0" Sheet insulated. E L-1.6 E O U o N C O 2 O rn 7 U >_ r w �o �rn3 24'-3"Approx. — 24'-3"Approx. — O Q 3 ,it- ■� �U CEILING HEIGHT CEILING HEIGHT _ " 7 0D ao y C E9 FAN COIL BOTTOM v' O -F Do FAN COIL (TYP) 3Cn w m o X d o 2 /!! o FAN COIL BOTTOM a ° $ \V ��0� Q Q O i f6 t0 LO �O CAL? a tm1-O O WNOD Y n n O EO L. m o DOOR TO VEG ROOM c 3 S5 FINISHED FLOOR FINISHED FLOOR €d �g B Packaging and Processing 105 -West Elevation c Packaging and Processing 105- East Elevation02 -_ IE L 1.7 Scale: 3/6"_V_0" L-1.7 Scale: 3/6"_V-13" a E� J N J LO 3� 51,_9.Approx. a c �¢ O N 6'_6e 15'_2" �'� 12'-2" CEILING HEIGHT L o PIPE RISERS TO LEVEL TWO FAN COIL (TYP) _ 06 -- -- c FAN COIL BOTTOM >-___ -- ------- ------- U � a o n a u> Q 0 HWS&HWR LINES INSULATED CWS CONDENSATION LINE &CWR LINES Run to drain Revised No. BY Data 1. DOOR TO CORRIDOR 2. 3. 4. FINISHED FLOOR Reviewed No. BY Date 1. Packaging and Processing 105-North Elevation . 3 L-1.7 . Scale: 3/8'=1'-0" 4. Drawing Scala 3/g'•=1•-U•• Sae Arch D Date 11-15-2016 By JP Project No. 160661-50 Note:All Chilled Water Piping shall be Sheet insulated. L- .7 30'-0"Approx. — 30'-0"Approx. — E CEILING HEIGHT CEILING HEIGHT o � O 2 o QT w m U E O 5 o T� 3 X �� ■O C U 3 o =- a FAN COIL BOTTOM ° o, FAN COIL (TYP) o �kO FAN COIL BOTTOM Q F o O Co', o o ao y tttttttttt� c E N I m CD O O 01 X a0 BO c 12 °rNo m to r d 0 p N 5"0 C�L? FINISHED FLOOR FINISHED FLOOR `g W N 0 n n Grow Room 205-South Elevation �D� Grow Room 205- North Elevation EL-2. Scale: 3/B°=1'-0" 1�L-2y Scale: 3/6"=1,_0„ 3 59'-6"Approx22 17,_3" 17'-3" 17'-3" — — 4'-9" CEILING HEIGHT 02 INSULATED CWS ° &CWR LINES FAN COIL (TYP) 0 Eloa FAN COIL BOTTOM a _ L" Ja E HWS&HWR LINES CONDENSATION LINE a E J Run to drain N .0 O STRUCTURE y� L j BUMP OUT �C r w a o 0 -W N FINISHED FLOOR .� o � L � B Grow Room 205- East Elevation Q o L-2. Scale: 3/s"=1'-0" \ 0 59'-6"Approx. 8'-9" 1 T_6" 11'-6" — — 4'-9" CEILING HEIGHT INSULATED CWS FAN COIL WITH HEAT &CWR LINES FAN COIL 0 0 (TYP) (TYP) Revised X No. BY Data O 1. FAN COIL BOTTOM a 2. Q - 3. O 4. HWS&HWR LINES CONDENSATION LINE Reviewed Data Run to drain 1. 2. o Q BO W 3. DOOR a. Drawing Scale 3/g'•=1•_U•• Sae Arch D FINISHED FLOOR If Date 11-15-2016 BY JP Project No. Grow Room 205-West Elevation 160661-50 Note:All Chilled Water Piping shall be L-2�1 scale: 3/s°=1'-0" Sheet insulated. E L-2.1 30'-0"Approx. — E CEILING HEIGHT 30'-0"Approx. — CEILING HEIGHT - U o y c 0 2 o m rn �U V/ Eo 0 Sj �rn 3 cai. Q 3 0 o FAN COIL q — ■� �U t o a FAN COIL BOTTOM o o (TMP) ° FAN COIL BOTTOM a m o Q , Q r.. O t)N o m o m y 0 75C E p N I m CD X O O d t z a0 � .; C'O DOOR oDo No w o A-0 M In r d 0)0 N 5"0 S LO FINISHED FLOOR FINISHED FLOOR W N Do n n Grow Room 204-South Elevation �D� Grow Room 204- North Elevation L-2. Scale: 3/B"=1,_0. L-2. Scale: 3/6„=1,_0. 3 50'-6"Approx. 11 4'-9" 13'-10" �'� 13'-10" �'� 13'-10" — 4'-3" f CEILING HEIGHT - �o 01 o - PLINSULATED CWS ° FAN COIL WITH &CWR LINES ° HEAT(TYP) - X 4 2 = FAN COIL BOTTOM a `- J'E CONDENSATION LINE J 00 HWS&HWR LINES Run to drain a=_ N 00 a E L 3 r W a 0 0 A-0 N FINISHED FLOOR .� o � L � B Grow Room 204- East Elevation Q o L-2. Scale: V=1'-0" \ 2 50'-6"Approx. — /� 4'-9" 13'-8" '� 13'-8" 13,_8" — — 4'-9" CEILING HEIGHT INSULATED CWS FAN COIL FAN COIL WITH &CWR LINES (TYP) .:� HEAT(TYP) Revised �Aa -L� * -171. No. BY Date E� O FAN COIL BOTTOM a a 2. Q O 3. 4. HWS&HWR LINES CONDENSATION LINE Reviewed Run to drain No. BY Date t. 2. 0 op 3. 4. Drawing Scale 3/g'•=1•_U•• Sae Arch D FINISHED FLOOR Date 11-15-2016 By JP Project No. Grow Room 204-West Elevation 160661-50 Note:All Chilled Water Piping shall be L-2 Scale: 3/se=1'-0" Sheet insulated. E L-2.2 30'-0"Approx. — E CEILING HEIGHT 30'-0"Approx. — CEILING HEIGHT — o y c 0 2 o QT w m U E c) 5 Sj T� 3 0 ". ■O �U 3 o FAN COIL (TYP) t0 I o a FAN COIL BOTTOM o —] i 0 o FAN COIL BOTTOM a m o Q Q r O N V o o m y Ittttttttt� c E Q N8, 'v0w, CaDo to N I m CD X O O a,t z a0 BO .; C'O c /!� .0S No 2 \V off u�� In r d 0 N 5"0 C�U-) FINISHED FLOOR FINISHED FLOOR W N Do n n Grow Room 202-South Elevation �D� Grow Room 202- North Elevation L-2.3 Scale: 3/a"=1'-0" IE L-2.3 Scale: 3/e"=1'-0" 3 54'-0"Approx. 4'-9" 14'-2" I� 14'-2" �' 14'-2" 6'-9" — g CEILING HEIGHT �g o INSULATED CWS &CWR LINES FAN COIL 12 (TYP) 1. X �4 2 = FAN COIL BOTTOM a J'E CONDENSATION LINE J HWS&HWR LINES Run to drain a=_ N cc a 2 DOOR i > r W a o 0 A-0 N FINISHED FLOOR .� o � L � B Grow Room 202- East Elevation Q o L-2. Scale: 3/s"=1'-0" \ 0 54'-0"Approx. /� 4'-9" 14'-2" 14'_2" 14'_2" CEILING HEIGHT INSULATED CWS ° FAN COIL WITH HEAT &CWR LINES LFANCOIL(TYP) (TYP) Revised No. BY Data X 2 FAN COIL BOTTOM a 2. Q O 3. 4. HWS&HWR LINES CONDENSATION LINE Reviewed Run to drain No. BY t. 0 2. 60 3. 4. Date Drawing Scale 3/g'•=1•-U•• Sae Arch D FINISHED FLOOR Date 11-15-2016 BY JP Project No. Grow Room 202-West Elevation 160661-50 Note:All Chilled Water Piping shall be 1E L-2.3 scale: 3/s°=1'-0" Sheet insulated. E L-2.3 E r O U o N C O 2 O rn 7 U E r w T(,j 3 41,_9„ _ .o O Q 3 CEILING HEIGHT 75 75 r c U FAN COIL (TYP) ~2 c Bpi v m„ . c Eo t'n O Ol~Do C (0 N N R m ❑« �.�iX X FAN COIL BOTTOM O c `2 a£ ��� a C No Q 1n A .2 0 •i m Un r o d 0)0 N �� 4) LO a Cl 1-p' ° N W 00 Y n n RISERS FROM LEVEL 1 Zone Valves located on level 1 ° .22 c 3 S5 FINISHED FLOOR B Clone Room 206- North Elevation L-2.4 Scale: V=T-0" a E9 J J a°E L n A, C V/ O i > a't 3 w 24'-3"Approx. r a` a 0 A-0 N L 0) E CEILING HEIGHT L d FAN COIL (TYP) Q O > L) lq X FAN COIL BOTTOM 2 a Q 0 v 0 Revised ao No. BY Data 1. 2. 3. 4. Reviewed No. BY FINISHED FLOOR 1. FINISHED FLOOR 2. 3. 4. Date Drawing A Clone Room 206-West Elevation DBca�e 3�a•=,�-8•• L-2.4 Scale: V=V-0e sale Arch D Date 11-15-2016 BY JP Project No. 160661-50 Note:All Chilled Water Piping shall be Sheet insulated. L- . O MOD: 1105 Equipment Schedule F o Item Description Part No Qty 9 U o rn 1 RBI BOILER DB1050 1 0 2 AIR SEPARATOR DEAS250 1 0 15 SEE V-1 VENT DETAIL r O 3 AIR VENT DEAV075M 1 SEE S-1 PARTS PROVIDED IF APPLICABLE m SECTION DETAIL IN SYSTEM PIPING A3 4 THERMOMETER 2.50"STEM DET25 2 w o V/ Bra 5 BOILER PUMP PER BOILER MODEL 1 166 o H N 6 GAS REGULATOR BY OTHERS 1 V N O N Q 0 0 0 0 0 o o .r �� C U 7 THERMOSTATIC MIXING VALVE,2.00" DEVTC200120 1 HWS ♦ ® E� R S 0 0 0 0 ®® o 0 ao oPiping Schedule DSBPBP25 mq O Eo S1 Item Description Part No Qty We� 6 F-W P1 ° ° S2 P1 PIPE STEEL ROLLED SCH.10 2.50"x7.50" DSP25010-075R 2 3 m o 0 0 0 0 0 o P2 PIPE STEEL ROLLED SCH.10 2.50"x6.625" DSP25010-068R 1 0 .�%� HWR ♦ x P3 PIPE STEEL ROLLED SCH.10 2.50"x6.25" DSP25010-0625R 1 0 0 0 0 0 0 P4 ELBOW GROOVED 90 DEG.2.50" DSE250 2 T TEE GROOVED 2.50" DST250 3 s o + c we A- m 0 Tr TEE-REDUCING HCxF 2.50"x0.50" DSTR250050 3 a. /�/���� p Ct Al ADAPTER GROOVEDxMPT 2.00" DSA200 1 W to oa �rO A2 ADAPTER GROOVEDxMPT 2.50" DSA250 3 Q W N� A3 ADAPTER GROOVEDxMPT 2.00"x5.75" DSA200-00575 1 a C1 COUPLING GROOVED RIGID 2.00" DSCR200 2 - C2 COUPLING GROOVED RIGID 2.50" DSCR250 15 - FL 2"125#GRUVLOCK FLANGE DEFCG20 2 `a B1 BUSHING GALV HEX 0.75"x0.125" DSHBG075012 1 8 d B2 BUSHING GALV HEX 2.50"x2.00" DSHBG250200 1 `s Br1 BELL REDUCER 1.25"x0.75"(DB900-1050ONLY) DSRG125075 1 €d Br2 BELL REDUCER 1.25"xl.00"(DB1350-15000NLY) DSRG125100 1 = 5 Br3 BELL REDUCER GROOVED 2.50"x2.00" DSRG250200 4 y 4 ES Br1 or Br2 N1 NIPPLE 0.25"xO.75" DSNG025075 1 `g 5 Tr N4 N2 LN3__j N2 NIPPLE GALV 0.75"x2.00"(DB900-1050 ONLY) DSNG075020 1 N3 NIPPLE GALV 1.00"x2.00"(DB1350-15000NLY) DSNG100020 1 m" T P3 FL ® P1 C Br3 — N4 NIPPLE GALV 1.25"x12" DSNG125120 1 a A2 N5 NIPPLE GALV 2.00"x3.00" DSNG200030 1 E ES STREET ELBOW GALV 1.25" DSESG125 1 8 Si CHANNEL(GALV.)1.65x20" DSMU-020 3 oU S2 STRUT CLAMP(PLATED)2.00" DSMC200 2 `d F (6) �I �/ F WELL 0.50 COPPER CLDP S STRUT CLAMP(PLATE )2.50" DDECW 0 1 E S3 — — L HWS( ♦ S1 / Flange gaskets,Bolts,Nuts,&Washers not shown �' L_ Level of Finished Floor 7 6 r (a � a Piping Included m' a o E w/Optional ~a ++ Piping Package L •� 00 I I I I GAS INLET 1 I I �— — I I / 2 ® �� I I ono 3 4 Revised N5 B2 B1 Tr 1 l o o No. By Data C T Br3 A3 7 Piping Included i O z w/Optional E 3 Piping Package Notes (Unless otherwise specified) a. ____—___ 1 Refer to Delta T Solutions Specification 1.0 Heat Source Installation for Boiler Installation Reviewed and Operating Information(ie Vent,Gas,and Electrical) Ne. By Date j ) 2 Refer to Delta T Solutions Specification 2.0 Air and Water Control,for Installation of Air Separator,Air Vent,Expansion Tank,Feed Water Regulator,and Pressure Gauge. 2' O4 To Expansion Tank 3 Refer to Delta T Solutions Specification 6.0 Piping Installation,for Information on Piping. s. &Feed Water L Al P2 A2 P P 9 a HWR( ♦ J (See Drawing FWA) 4 All piping to be supported so that boiler does not support piping weight. Drawing Level of Finished Floor— 5 Install Pressure Relief Valve to-drain or within six inches of floor. scale 1Ya"=1'-0" 6 Install Pipe Rest,using Unistrut with Brackets. size Arch D 7 Gas Service Regulator is required if Gas Pressure is above Y2 PSI. Data 12-08-201e 8 All Line Voltage and Low Voltage Wiring,Conduit and Disconnect shall be Supplied and BY JPProject No. Installed By Others. Boiler Loop- Detail 160661-50 9 Gas Line,Gas Regulator shall be Supplied and Installed by Others. sneer H-1 Scale: 1Y4'=V-0" 10 Water Line and Backflow Preventer shall be Supplied and Installed by Others. H-1 O MOD: 110 5 Table 1 should be used to ensure that the gas supply piping is sized properly.If more than one appliance wo E is supplied by the same supply pipe,the piping must be sized based on the maximum possible demand. 0 Do not neglect the pressure drop due to pipe fittings.Table 1 should be used in conjunction with Table 2 o c to ensure that the gas supply piping has the capacity to meet the demand. o Table 1. Maximum pipe capacity in Ft/Hr based on 0.60 specific gravity gas at a pressure of o 0 0.5 psig or less and a 0.3"WC pressure drop. Table 2. Equivalent Pipe Length Chart w Maximum i capacity in Ft'/Hr based on 0.60 specific gravity as at a pressure of 5 0.5 si and a 0.3"WC pressure drop. Type of Pipe Fitting ¢'' '^ N pipe P tY P 9 h9 P P 9 P P• ul o _/ Pipe Length(Ft) Nominal 00-Elbow Tee+ Gate Valve" Gas Cocle U w1� Iron Pipe o N Nominal 10 20 30 40 50 60 80 100 150 Size in Equivalent Pipe Length(Ft) m o O >1 ronSize Plpe 1 2.6 5.2 0.6 1.5 ¢N to Slze(In) Maximum Gas Volume of Pipe(FVHr) V r tt- �V 1 520 350 285 245 215 195 170 150 120 1Y4 3.5 6.9 0.8 1.9 Notice U c 1Yz 4.0 8.0 0.9 2.3 A minimum gas supply pressure of 6 in,152 mm o -W 1Y4 1,050 730 590 500 440 400 350 302 250 WC natural or 11 in,279 mm WC propane and o � > U N 2 5.2 10.3 1.2 3.0 oi O 1Yz 1,600 1,100 890 760 670 610 530 460 380 maximum 14 in,356 mm WC natural or propane, m q c E o 2Yz 6.2 12.3 1.4 3.7 must be available at the safety shutoff valve inlet .5 O N 2 3,050 2,100 1,650 1,450 1,270 1,150 990 870 710 3 7.7 15.3 1.8 4.5 with the units)operating. `�= 6F-co 2t/ 4,800 3,300 2,700 2,300 2,000 1,850 1,600 1,400 1,130 + a Notes: For flow through branch. tr 3 _m O 3 8,500 5,900 4,700 4,100 3.600 3.250 2,800 2,500 2,000 2For flow at full open. "m i`,�, X Note: Multiply the gas volume by 0.62 for propane flow capacity in Ft�/Hr.Multiply the propane flow capacity by 2,500 BTUIFP to �'o � N(n w determine the propane BTU/Hr capacity for a given pipe size and length. ry Z- i of Old 20 -o �+ r N� d N C t17 L? oa Or-0 C i,-O s= W Ncc Its 2 o c 3 yc Section Boiler `s Piping Piping J 8t �m - Boiler Service Clearance - -- -- -- -- -- -- -- -- -- -- -- - - U J °E J Concrete Pad (By Others) 0 0 i ®® o o 0 ' ° A+m° ° D o D o mT d 0 'aa �a Heated o o ° o i Zones �'� o 0 0 0 .� m Q � 2'0" By Pass Feeder � ) o i Revised No. By Date I - -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- 2. 3. 4. Reviewed No. By Date Expansion 1. 2. Tank 3. 4. Drawing Scale 1Ya"=V-0" Sae Arch D Data 12.08.2015 By JP Project No. A Boiler Loop- Detail 160661-50 H-2 Scale: 1Ya"=1'-0" Sheet H-2 O Equipment Schedule wo o Item Description Part No. oty 9 U o rn HS HF BV 1 BY-PASS FEEDER,2 GAL DMPF2P 1 0 o 0 0 Piping Schedule o ¢n U) C Nem Description Part No. city W rj 1=O w d) T TEE GALV.FPT 0.75" DSTG075 1 m o y N BV BALL VALVE FPT 0.75" 7DSV075 3 600 O to Q HF T HC HS RUBBER HOSE 0.75"DIA,FT DEH075 10 }, c U 1 HC HOSE CLAMP 0.75" DMHC07 4 E � R 5 lb 1 N HF BRASS HOSE FITTING 0.75"MPTx0.75"ID DSHF075XO75 4 o q o N NIPPLE BRASS FPT 0.75"CL DSNB075013 4 `g O av N 0 n c co ao >v o 3 m O m m fti a)CO o x o NCn i o al Of to N No �� mL d N 0 HF BV o op-o cr,_o s= W Nco nr Top View By � By-Pass Feeder o 8 d Drain €d N - 8t �8 �3 9 J 1 HC E., J a°E 1 HS Lee r L a> Y a ILL }~a Oi to HF a.. � � m Notes (Unless otherwise specified) Installation Instructions 1 The By-Pass Feeder should be installed in a convenient location where it may be easily filled.The inlet may be either on the pressure side of a main-line valve or on the BV pressure side of a circulating pump. Revised 2 As shown in the following diagrams,the%"hose should be used to connect the J'IBI] Date HF By-Pass Feeder to a by-pass on the water line of the system being treated.The direction of flow should be Up through the By-Pass Feeder.HF 3 A 3/4"ball valve should be placed on each side of the By-Pass Feeder.. BV 4 A drain is desirable and should be installed near the bottom inlet to the feeder with a Reviewed Ovalve in the outlet. No. By Date Add Chemical Instructions 2. Side View 5 The in-line valve should be open.Close the By-Pass Feeder valve,open the drain valve 3 -- ----- _ and make certain it is operating properly and the pressure in the By-Pass Feeder is relieved.Removed the cap of the By-Pass Feeder and allow water to flow out of the a. N T By-Pass Feeder's drain. Drawing Scale B"=1'-0" 6 Close the drain valve,add the proper amount of chemical to the By-Pass Feeder,and She Arch D crack the inlet valve of the By-Pass Feeder to fill the By-Pass Feeder with water,replace the By-Pass Feeder cap. Date 10-5-2016 N By JP 7 Open the By-Pass Feeder valves and partially close the main line valve to force the Project No. water through the By-Pass Feeder.After about 3 to 4 minutes,open the main-line valve BY-Pass Feeder- Detail and close the By-Pass Feeder valves.Drain the By-Pass Feeder. lsossl-so BPF-1 Scale: 6"=T-0" 8 Repeat Step 5-7 as required. Sheet BPF-1 O Piping Schedule - Feed Water Piping MOD. /�W2�3 Equipment Schedule wo o Item Description Part No. Qty Item Description Part No. oty 9 U o rn E ELBOW,SCR,STL,0.5" DSEG050 2 1 REGULATOR,WATER DEVPRO50 1 0 BV BALL VALVE,SCR,BR,0.5" DSVB050 1 3 2 PRESSURE GAUGE DEGPO60 1 0 T1 TEE,SCR,STL,0.5" DSTG050 3 B1 3 PRESSURE SWITCH DEGPS 1 ,,AA N T2 TEE,SCR,STL,1" DSTG100 1 N1 1 4 AIR SEPARATOR 6" DEAS600 1 va S V/ E o a) Feed Water o„ w U UNION,SCR,STL,0.5" DSUG050 2 2 5 EXPANSION TANK PER DESIGN 1 = H N Use Coupling and SS Screen B1 BUSHING,SCR,STL,0.5"x0.25" DSHBG050025 1 Piping 6 AUTOMATICAIR VENTS/a" DEAV075M 1 O VTj Provided with Feed Water Regulator ¢ Q 62 BUSHING,SCR,STL,1"x0.50" DSHBG100050 1 c U N1 NIPPLE,SCR,STL,0.25"x1.5" DSNG025015 1 N2 N3 �` T1 Piping Schedule - Expansion Tank E� R; T2 � N2 NIPPLE,SCR,STL,0.50'x2" DSNG050020 8 Item Description Part No. city ao 5 0 N o N3 NIPPLE,SCR,STL,0.50"x3.50" DSNG050035 1 BV BALL VALVE,SCR,BR 1" DSV100 1 8 — o Feed Water n c O d�~do shut-o ► N1 NIPPLE,SCR,STL,1"X 3" DSNG100030 1 3 J CO o Valve i° R.�+CO N2 N2 NIPPLE,SCR,STL,1"X 12" DSNG100012 1 = �'� �r at�-M I U T1 ® U UNION,SCR �,STL,1" DSUG100 1 �.3 c PIPING BY E ' OTHERS s o r- m0 �d a d 0 N N2 BV1 U =_ c Lo d �r CScr,-o s°c W N00 I mr 2 I c 3 I yc 8 d I c8 E €d 6 I = BV1 NB I 8 5 Br1 N1 PIPING BY OTHERS BV2 I 5 0 8 ® Expansion '- ® Tank N2 I a J = J y N 4 U N2 I r o I � U Br2 a d p ES Ring Base 4 Air Separator I _ (Elevation of Top) Q Q d I Ring Base Air Separator (Top View) Revised No. By Date Piping Schedule - Air Separator 2. Item Description Part No. Qty 3 E ELBOW,SCR,STL,1.0" DSEG100 1 _ 4. ES ELBOW,STREET,SCR,STL,1.0" DSESG100 1 Reviewed No. ay Date BV1 BALL VALVE,SCR,BR 0.75" DSV075 1 1' — _ 2. BV2 BALL VALVE,SCR,BR 1.00" DSV100 1 — 3. Br1 BUSHING,GALV,HEX,1.50"x0.75" DBHG150075 1 4 Drawing Br2 BUSHING,GALV,HEX,2"x1" DBHG200100 1 Scale NB NIPPLE BRASS,.75"x1.375" DSNB075013 1 BV N1 U N2 She Arch D N1 NIPPLE,SCR,STL,1.0"x3" DSNG100030 2 Data 12-0e-201e gy JP N2 NIPPLE,SCR,STL,1.0"x6" DSNG100060 2 Project No. U UNION,SCR,STL,1.0" DSUG100 1 A Air&Water Controls- Details 160661-050 FW-1 Scale: 3"=1'-0" sheet FWA O MOD: 1405.1 Equipment Schedule F o Item Description Part No. Qty W q 1 PUMP,CIRCULATION 3.00"FLANGE 80-10OF 1 ' Q o .2 of 0 Piping Schedule (Provided w/Optional Piping Package) UY Item Description Part No. city 20 N P PIPE STL GROOVED 3.00" AR o H TO TEE REDUCING HCxFPT 3.00"x 0.50" DSTR300050 1 M w O N F LO Tr2 TEE REDUCING HCxFPT 3.00"x 0.75" DSTR300075 2 = }, _ C COUPLER GROOVED RIGID 3.00" DSCR300 6 io 2 oo BV BUTTERFLY VALVE GROOVED 3.00" DSV300 3 o o 0 FL 3.00"IN 125#GRUVLOCK FLANGE DEFCG30 2 >g O c ago S1 CHANNEL GALVANIZED 1.6250 x 40" DSMU-040 2 0.. ♦/\ > V a)o S2 STRUT CLAMP PLATED 3.00" DSMC300 4 r t R CoH WS H W$ HB HOSE BIB MPTX HOSE 0.50" DSHB050 1 z=, a6i N Co B O O O O B Flange gaskets,Bolts,Nuts,&Washers not shown O LIn 0 0 �' =3LO L �d � NI—N Heated 0 0 Heat ai o Q� °' to o� =zCD Zones 0 0 Source =� _0 0 LU co o 0 HWR HWR 3 A o 0 018 M0 A at �m TO BV 8 HB '1 S1 E a J S2 TR2 J P 9= N L e O O e �_ E a a0. �, o C +�+ to Section View A - A a ca 2 BV S1 1 4 S2 Revised No. By Date 2. 3. 4. Reviewed By No. By Date 1. C P s. 1 FL Section View B - B Notes (Unless Othe wise Specified) a. Drawing 1 Refer to Delta T Solutions Specification 6.0 Piping Installation,for Information on &ale sia"= Piping. Sae Arch D 2 Provide Stand or Base Support for Equipment. Date 12-8-2016 3 Install Pipe Rest,using Unistrut with Brackets. By jP 4 Install Pump as Per Manufactures Requirements,Level and Grout,Elevation Project No. Opt. 160661-50 r-A� Section Pump- Detail 5 All Line Voltage and Low Voltage Wiring,Conduit and Disconnect shall be sheet S-1 Scale: 2112"=V-0" Supplied and Installed By Others. S-1 O MOD : 1509.2 GF Veg. Room Equipment Schedule F o Item Description Part No. Qty 9 U o rn 1 VALVE,2-WAY,24V,1.50"BELIMO DEVS2150 1 0 0 2 FLOW REGULATOR 1.50" DEFRH150-0300 1 0 5 0 3 PRIMARY PUMP 1.50 DEPGM3184012OF 1 U) 4 THERMOMETER DET25 2 to o E M C) O 2-Way Valve Actuator 5 HIGH LIMIT OtheEAQrs 1 V N O N Q 6 SENSOR By Others 2 -r ■� C U cc Piping Schedule (Provided w/Optional Piping Package) F-, > N o �, Item Description Part No. Qty m» E p AB A AB—A P PIPE GROOVED STL 1.50" AR y O DEPRESS BUTTON F 00 TO OPERATE VALVE MANUALLY T TEE GROOVED 1.50" DST150 2 Tr TEE-REDUCING HCxF 1.50"x0.50" DSTR150050 5 " 2.�to- o t � 5 A ADAPTER GROOVEDXMPT 1.50" DSA150 9 '0 �; w 24 V COMMON o— -Black— m 24 V COMMON � -Black— @ m H I N t 3g C COUPLING GROOVED RIGID 1.50" DSCR150 10 OPEN Red I OPEN Red O c y c0 CLOSE White CLOSE White BV BALL VALVE FPT 1.50" DSV150 4 5 0 }+ c m 0 N NIPPLE GALV 1.50"x3.00" DSNG150030 2 p N �- y ® ® wpo� pol ® ® FL1 GRUNDFOS 150#NPT FLANGE SET 1.50" DEFC15G 1 0 p1 Lo o FL2 1-1/4"125#CAST IRON FLANGE DEFC12 2 I`o s= W N00 FL3 1-1/4"VAN STONE FLANGE DEFP12 2 2 Valve in Open Valve in Closed DV DRAIN VALVE,0.50"W/CAP&CHAIN DSV050HTDC 1 - Position Position �3 `8% 6"SUPPLY AND RETURN LINE MOUNTED ON WALL AND SUPPORTED AS REQUIRED a d B Control Valve-Actuator Detail Z-1 Scale:8"=V-0" - 6.00"x 1.50"GROOVED a MECHANINCAL TEE OI 0 "g CWS CWR O "0- - i cws U Steel to PCV Transition O O =a J - - - - - - - - i to J � o FL3 L i - C Q 9 c 0 C) C)6 6 °r A� � LL 0 O Tr Tr FL2 CWR a` a�.r d O O L > O O Tr 4 �� DV Tr T P C BV - C Q x O O *Distance to be g O O O O O O field determined m ® — CWR ,C WALLSTRUCTURE N O O O O O O Fan Coil of o ( Chilled = 62 Water �� 2-Way Mixing Valve-Connection Detail Zones � Z-1 Scale:2 Y2"=V-0" of o of o Source i o 0 0 0 0 0 ® - - f cws O O O a O O O Revised No. By Date J 1. FL1 a 1 N 2. j 2 — B. See Detail B for 4. Actuator Operation Reviewed No. By Date 1. 2. 3. 4. 3 Drawing Scale 2-112"=1'-0" Sae Arch D Data 12.08.2016 Notes (Unless Otherwise Specified) By Up Note:THIS LAYOUT IS USED FOR 1 Refer to Delta T Solutions Specification 6.0 Piping Installation,for Information Project No. on Piping. 160661-050 CHILLED ZONE ZC-1 2-Way Mixing Valve-Piping Detail 2 Refer to Delta T Solutions Specification 4.0 Zones Installation for information sheet Z-1 Scale:2 Y2"=V-0" on control valve installation and operation. Z-1 MODE 1511 .2 GF Grow Room 103, Equipment Schedule F 104, & 202 Item Description Part No. Qty o N 1 VALVE,2-WAY,2.50"BELIMO DEVS2250 1 0 0 2 FLOW CONTROL 2.50 Per Design 1 ® 2 3 PRIMARY PUMP 2.50" DEPGM1185015OF 1 y �4 THERMOMETER DET25 2 �� V+ o a)5 SENSOR By Others 2 2-Way Valve Actuator �, .� o N N See Sheet GN-1 for Specific Flow Control a O N Q DEPRESS BUTTON 33 TO OPERATE VALVE = _ MANUALLY u= (6 Piping Schedule (Provided w/Optional Piping Package) E o � U 0o AB � A AB-A Item Description Part No. oty ~m m C CD-t P PIPE GROOVED STL 2.50" DST250 2 N g O c F 00 T TEE GROOVED 2.50" DST250 2 �.3 �md sm am Tr TEE-REDUCING HCxF2.50"x0.50" DSTR250050 5 !0�� 24 V COMMON -Black— 24 V COMMON o- -Bieck— n OPEN Red N n OPEN Red H I BV BUTTERFLY VALVE GROOVED 2.50" DSV250 4 y CLOSE White w CLOSE �`Amite (D N NIPPLE STEEL 2.50"x3.00" DSNG250030 1 .; e w ❑0 ❑0 FL1 2"GRUNDFOS GF 50 FLANGE SET DEFC20GF 1 c o `± c m FL2 2-1/2"GRUVLOK FLANGE DEFCG25 2 F N 1 0 16 & s�. FL3 2-1/2"VAN STONE FLANGE DEFP25 2 =o LO A ADAPTER GROOVEDxMPT 2.50" DSA250 4 a r-o Valve in Open Valve in Closed C COUPLING GROOVED 2.50" DSCR250 16 W c1 DAD Position Position e DV DRAIN VALVE 0.50"W/CAP AND CHAIN DSV050HTDC 1 E y Control Valve-Actuator Detail 6 "SUPPLY AND RETURN LINE _ Z-2 Scale:8"=T-0" MOUNTED ON WALL AND SUPPORTED AS REQUIRED `= 82 6.00"x 2.50"GROOVED d MECHANINCAL TEE CWS CWR * _- i E Steel to PCV Transition O O v° J O O aE J FL3 CWS O O O = Q 5 5 0 (g('))) 0 FL2 O O r a a N Tr Tr O O L a)CWR ,� j o 0 0 0 0 pV 4 Tr .X O O *Distance to be � O o o O o O field determined CWR I � N O o o O O O WALLSTRUCTURE Fan Coil o o N Water 2 Zones Source 0 0 Chilled 2-Way Mixing Valve-Connection Detail Z-2 Scale:2"=1'-0" � �0 0 j O O O O O O O CWS Revised O O O O O O O r2- FL1 A 2See Detail B for Actuator Operation Reviewed No. By Date 1. 2. 3. 4. Drawing Scale 2"=1'-0" Sae Arch D Date 12-08-2016 Notes (unless Otherwise Specified) By ip Note:THIS LAYOUT IS USED FOR 1 Refer to Delta T Solutions Specification 6.0 Piping Installation,for Information Project No. 2-Way Mixing Valve-Piping Detail on Piping. 160661-050 COOLING ZONES ZC-3,ZC-4,& / H 1 y g P g 2 Refer to Delta T Solutions Specification 4.0 Zones Installation for information Sheet ZC-6 Z-2 Scale:2"=V-0" on control valve installation and operation. Z-2 MOD: 1510.2 GF Grow Room 204 & 205 Equipment Schedule F Item Description Part No. oty U o rn 1 VALVE,2-WAY,2.00"BELIMO DEVS2200 1 0 0 2 FLOW CONTROL 2.00 Per Design 1 10 3 PRIMARY PUMP 2.00" DEPGlUP50150 1 y 4 THERMOMETER DET25 2 �� V+ E o a) 2-Way Valve Actuator w w-o 5 SENSOR By Others 2 6 o N N See Sheet GN-1 for Specific Flow Control O yQ DEPRESS BUTTON ■� =0 TO OPERATE VALVE MANUALLY Piping Schedule (Provided w/Optional Piping Package) E o � C)N 5 co 00 AB A AB-A Item Description Part No. oty ~m m C CD-t P PIPE GROOVED STL 2.00" DST200 2 N g O c ) T TEE GROOVED 2.00" DST200 3 Ql c Tr TEE-REDUCING HCxF 2.00"x0.50" DSTR200050 5 3 m co m 24 V COMMON (D— -Black— & 5 W 24 V COMMON 0 -Black— c m ♦) X P BV BALL VALVE FPT 2.00" DSV200 4 OPEN Red w n OPEN � Red u ff � t w CLOSE (White W CLOSE White w N NIPPLE STEEL 2.00"x3.00" DSNG20030 1 N c ' FL1 2"GRUNDFOS GF 50 FLANGE SET DEFC20GF 2 =°s c 01) o N o U, ❑0 FL2 2"GRUVLOK FLANGE DEFCG2 2 F d N �y �y ®w s�_ FL3 2"VAN STONE FLANGE DEFP2 2 ="o C LO A ADAPTER GROOVEDxMPT 2.00" DSA200 1 a o Valve in Open Valve in Closed C COUPLING GROOVED 2.00" DSCR200 18 a W N 00 Position Position DV DRAIN VALVE 0.50"W/CAP AND CHAIN DSV050HTDC 1 a a Control Valve-Actuator Detail Z-3a Scale:6"=V-0" E 5'o 6"SUPPLY AND RETURN LINE MOUNTED ON WALL AND SUPPORTED AS REQUIRED `= Fan Coil Zones 6.00"x 2.00"GROOVED d MECHANINCAL TEE o CWS CWR oE J 0 0 =9 O O a E J t0 CWS L Steel to PCV Transition q +r c0 FL3 A° L C) T ^ O li �0.r d — II O O i > — — — — — — — CWR to o (g('))l o FL2 O O = X_ DV > o O o o O o Tr *Distance to be 4 1 field determined 5 A 5 Tr T BV Tr WALL STRUCTURE Tr r O O O O O O O O ' �-s� Scale: Mixing Valve-Connection Detail CWR O O O O See Detail B for O O O O Actuator Operation I Chilled C Revised A A 1 N1 Water Nu. By Date O O O O Source 1. JP 3-13-17 O O O O O ---- -- O O 2. f CWS 3. 4. O O O O O -------- O O Reviewed No. By 1. FL z. 3. 2 4. Date Drawing Scale 2"=1'-0" 3 sae Arch D Date 12-08-2016 Notes (unless Otherwise Specified) By ip 1 Refer to Delta T Solutions Specification 6.0 Piping Installation,for Information Project No. 3-Way Mixing Valve-Piping Detail on Piping. 160661-0502 Refer to Delta T Solutions Specification 4.0 Zones Installation for information Sheet Z-3a Scale:2"=V-0" on control valve installation and operation. Z-3a MOD: 1510.2 GF Grow Room 204 & 205 Equipment Schedule F Item Description Part No. Qty CJ o rn 1 VALVE,3-WAY,2.00"BELIMO DEVS3200 1 0 0 2 FLOW CONTROL 2.00 Per Design 1 10 3 PRIMARY PUMP 2.00" DEPGlUP50150 1 y 4 THERMOMETER DET25 2 �� V+ E o a) 5 SENSOR By Others 2 o y L0 See Sheet GN-1 for Specific Flow Control � ■� c U 33 DEPR a 3-Way Valve Actuator Piping Schedule (Provided w/Optional Piping Package) rdEo TOO ATE B B B }+ i0s a Nco AUALLY J �J Item Description Part No. lty m m � C CD E O � AB A AB A AB A P PIPE GROOVED STL 2.00" DST200 2 N g O c F 00 T TEE GROOVED 2.00" DST200 3 .3 �/\ a m o slack ke — Black 5 a,,, /� Me& 5 Tr TEE-REDUCING HCxF 2.00"x0.50" DSTR200050 5 !0 �� 2CV ON k� ON n @'m^ ory\T FU 8�oLoaN OPEN Red OPEN(D— Red�Loea wnae �Loea wnlle i� BV BALL VALVE FPT 2.00" DSV200 4 y N NIPPLE STEEL 2.00"x3.00" DSNG20030 2 V c w 12 FL1 2"GRUNDFOS GF 50 FLANGE SET DEFC20GF 2 s Old 0 FL2 2"GRUVLOK FLANGE DEFCG2 2 F N FL3 2"VAN STONE FLANGE DEFP2 2 =o c LO o. zo Valve in Open Position Valve in Mixing Position Valve in By-Pass Position Al ADAPTER GROOVEDxMPT 2.00" DSA200 9 c r_o A2 ADAPTER GROOVEDxMPT 2.00"x6.50" --- 2 L m ` W N°D o C COUPLING GROOVED 2.00" DSCR200 18 _ DV DRAIN VALVE 0.50"W/CAP AND CHAIN DSV050HTDC 1 .G Control Valve-Actuator Detail Z-3b Scale:6"=V-0" E 5'o 6"SUPPLY AND RETURN LINE MOUNTED ON WALL AND SUPPORTED AS REQUIRED `= Fan Coil Zones 6.00"x 2.00"GROOVED d05 MECHANINCAL TEE � ) U CWS CWR r S J 0 0 O O o- J R CWS L Q c Steel to PCV Transition - g 4.0 3: O clo L_ U — — — — FL3 9 M c d o O O ~a yOr y — — CWR f° FL2 Q 'K DV See Detail B for Tr Actuator Operation 1 *Distance to be 4 field determined A 5 Tr T A2 1 BV Al 5 Tr WALL STRUCTURE Tr CO, O O 0 O 0 - -- O O ® ® ♦ CWR �� Scale:way Mixing Valve-Connection Detail O O O 0 0 0 0 o A2 ( Chilled 11 3 C N1 Water Revised 16 No. By Dale 0 0 0 0 0 o Source 1. JP 8-13-17 O 0 0 O 0 0 o O 2. �4 0 ♦ CWS 3. 0 4. O O O O O O O O Reviewed No. By Data 1. FL Al 2 2 3. 4. Drawing Scale 2"=1'-0" Sae Arch D 3 Date 12-08-2016 Notes (Unless Otherwise Specified) By ip 1 Refer to Delta T Solutions Specification 6.0 Piping Installation,for Information Project No. 3-Way Mixing Valve-Piping Detail on Piping. 160661-0502 Refer to Delta T Solutions Specification 4.0 Zones Installation for information Sheet Z-3b Scale:2"=V-0" on control valve installation and operation. Z-3b MOD: 1507.3 Clone Room 206 Equipment Schedule F Item Description Part No. Qty U o rn 1 VALVE,2-WAY,24V,1.25"BELIMO DEVS2125 1 c 0 2 FLOW REGULATOR 1.25" DEFRH125-0060 1 ® 1:5 3 PRIMARY PUMP 1.25" DEPGlUP26-64F 1 y 4 THERMOMETER DET25 2 n o o 5 SENSOR By Others 2 n 0)N o 2-Way Valve Actuator See Sheet GN-1 for Specific Flow Control U F ■O )V DEPRESS BUTTON °0 TO OPERATEMANUALLY Piping Schedule (Provided w/Optional Piping Package) E_ U N Item Description Part No. Qty m y C E 9p AB a A AB—A P PIPE GROOVED STL 1.25" AR O F 00 T TEE GROOVED 1.25" DST125 2 .3 m o Tr TEE-REDUCING HCxF 1.25"x0.50" DSTR125050 5 o s ;°.�m x A ADAPTER GROOVEDxMPT 1.25" DSA125 10 F „ J 24 V COMMON o- -Black— & 5 m 24 V COMMON o- -Black— 1D c m n E� C COUPLING GROOVED 1.25" DSCR125 16 ; c o OPEN Red ro n OPEN Red H n "oo :5o 01) u7 CLOSE White ( W CLOSE �white � w BV BALL VALVE FPT 1.25" DSV125 4 -o e m 0 N NIPPLE GALV 1.25"x3.00" DSNG125030 2 p FL1 GRUNDFOS 125#NPT FLANGE SET 1.25" DEFC125G 1 -° c U 0 FL2 1-1/4"125#CAST IRON FLANGE DEFC12 2 °a�,ol Q W N� FL3 1-1/4"VAN STONE FLANGE DEFP12 2 e a Valve in Open Valve in Closed DV DRAIN VALVE,0.50"FPT,W/CAP AND CHAIN DSV050HTDC 1 - Position Position - 2 Ed Control Valve-Actuator Detail 6 SUPPLY Z 4 Scale:8"=T-0" MOUNTED ON WALL AND SUPPORTED AS REQUIRED t L 6.00"x 1.25"GROOVED _ MECHANINCAL TEE Fan Coil =- Zones o o -So U o o oE J cWS a E J to d cWS CWR � � O O o t � ♦ ♦ i o Steel to PCV Transition plo L U (0 c —__ r a- - - - - - - - O IV FL3 ii O O r > CWR FL2 O O \ x 25 DV Tr *Distance to be IM N 5 4 field determined 5 Tr Tr C Tr T P WALL STRUCTURE OI 0 O O O O O O I ® — — — ® — — CWR O O O O O O I O I in Chilled Revised Water c 2-Way Mixing Valve-Connection Detail By Date 1 Z-4 Scale:2 Y2"=V-0" 2. oI o ��"� o o Source 3 o O O O o 0 4. ® ® cWS Reviewed No. By Date O O O O O 2. N 3. A FL1 1 BV a. See Detail B for 2 — Drawing Actuator Operation S.I. 2-1/2"=1•-6" 3 size Arch D Date 12-09-2016 Notes (unless Otherwise Specified) By ip Note:THIS LAYOUT IS USED FOR 1 Refer to Delta T Solutions Specification 6.0 Piping Installation,for Information Project No. on Piping. 160661-050 CHILLED ZONE ZC-10 2-Way Mixing Valve-Piping Detail 2 Refer to Delta T Solutions Specification 4.0 Zones Installation for information Sheet Z-4 Scale:2 Y2"=T-0" on control valve installation and operation. Z-4 O MOD: 1500.1 EQUIPMENT SCHEDULE wo o Heated Zones V e g Room, Item Description Part No. Qly 2 CU 1 VALVE,3-WAY,24V,1-1/4"HONEYWELL VC SERIES 1 g Grow Rooms 103, 104, 107, 110, 2 FLOW REGULATOR,1-1/4"AUTOFLOW YRSERIES 1 0 5 202, 204, 205, & Clone Room 3 SENSOR BY OTHERS 2 aT Cy j U U) E O w PIPING SCHEDULE (Provided w/Optional Piping Package) „o rn N OItem Description Part No. Qty a o (/� P PIPE STEEL GROOVED 1.25" AR 5 a }, U E ELBOW GROOVED 90°1.25" DSE125 2 E o T TEE GROOVED 1.25" DST125 1 m q c a)o Tr TEE-REDUCING HCxF 1.25"x0.50" DSTR125050 3 N g O �a,-DO A ADAPTER GROOVEDxMPT 1.25" DSA125-UYST 9 am-, c C COUPLING GROOVED 1.25" DSCR125 12 o t R a; BV BALL VALVE FPT 1.25" DSV125 4 n c x N NIPPLE GALV.1.25"x2.00" DSNG125020 2 3 C HB HOSE BIB 0.50" DSHB050 1 -_ o yo — ML9 �d �0N 117 LO oa op-0 Tr C r-C:)s= W N00 ntf N1 Tr 2 f DV DV BV A P I H♦ e Oo I Heated Zones T a� U H* A e 0 ♦ HWR J O en J �O N l C I Lee` 1 Heat �= Q DV Source ' Tr r C a a ♦ OO ♦ HWS .� E 2 N Revised No. By Date 1. 2. 3. 4. Reviewed No. ay Date 1. 2. 3. 4. Drawing Scale Sae Arch D Date 12.09.2016 Notes runless Otherwise Specified) By ip Note:THIS LAYOUT IS USED FOR 1 Refer to Delta T Solutions Specification 6.0 Piping Installation,for Information Project No.on Piping. 160661-050 HEATED ZONES ZH-1 THRU ZH-4, �A� Zone valve- Piping Detail 2 Refer to Delta T Solutions Specification 4.0 Zones Installation for information sheet &ZH-6 THRU ZH-10 Z 5 Scale: 33/4"=1'-0" for information on control valve installation and operation. Z-5 MOD : 1502 B Grow Room 109 EQUIPMENT SCHEDULE o Item Description Part No. 011Y Cl to 1 VALVE,3-WAY,24V,1.50"BELIMO 1 0 0 2 FLOW REGULATOR,1.50"AUTOFLOW `Per Design 1 5 3 SENSOR By Others 2 N 3-Way Valve Actuator w a) See Sheet GN-1 for Specific Flow Control � E O a) r "uDa PIPING SCHEDULE (Provided w/Optional Piping Package) O uTi Q rn Item Description Part No. 4ty }, C V P PIPE STEEL GROOVED 1.50" AR io Valve in Open Valve in By-Pass T TEE GROOVED 1.50" DST150 1 ro o Position Position Tr TEE REDUCING HCXF 1.50"x0.50" DSTR150050 3 O at~ago m A ADAPTOR GROOVEDxMPT 1.50" DSA150 7 cn m 19 C COUPLING GROOVED RIGID 1.50" DSCR150 7 R a �'n y O ® y 0 BV BALL VALVE FPT 1.50" DSV150 4 to w N1 NIPPLE BRASS 0.50"x1.25" DSNB050012 1 M-000 p white---o CLOSE 0 white---o CLOSE N2 NIPPLE GALV 1.50"x3.00" DSN150030 2 60f Red ----19 OPEN l� S I " Red OPEN r- N 0 LJ u DV DRAIN VALVE W/CAP AND CHAIN 0.50" DSV050HTDC 1 Black- 24 V COMMON — O —Black- 24 V COMMON a)p N to Q or O C r—O W N00 A T AB A T AB B TO O E RATE VALVE B TO OPERATE VALVE MANUALLY (�� Control Valve-Acturator Detail Z-6 Scale: 8"=V-0" J J DV 3 See Detail B for 1 C P i > Tr Tr BV Actuator Operation I i � ca d O 4.0 o HWR �Q A ne ; O HWR O O O ------ O d Q M I > Heated Heat Zones � � Source I O O I = HWS 0 ♦ 00 HWS No Revised Date Tr BV T 2 N2 2 3 a. 4. Reviewed No. By Date 1. 2. 1 4. Drawing Scale 4"=1'-0" Sae Arch D Data 1.17.2017 Notes (Unless Otherwise Specified) By jp 1 Refer to Delta T Solutions Specification 6.0 Piping Installation,for Information Project No. Note:THIS LAYOUT IS USED FOR (-_A'� 3-Way Zone Control Valve-Piping Detail on Piping. 160661-050 CHILLED ZONE ZH-5 2 Refer to Delta T Solutions Specification 4.0 Zones Installation for information Sheet Z-6 Scale: 4"=1'-0" on control valve installation and operation. Z-6 EQUIPMENT SCHEDULE - E � o Item Description Part No. city o rn 1 VALVE,2-WAY,24V,1.25"BELIMO DEVS2125 1 0 2 FLOW REGULATOR,1.25"AUTOFLOW DEFRL125-0090 1 ® 5 y w o E' w v a) W PIPING SCHEDULE (Provided w/Optional Piping Package) .10 w y N 2-Way Valve Actuator Item Description Part No. city U O N Q P PIPE GROOVED STEEL 1.25" ARce = •� =V DEPRESS BUTTON Tr TEE-REDUCING HCxF 1.25"x0.50" DSTR125050 1 o l E' 6 ao TO OPERATE VALVEA ADAPTER GROOVEDxMPT 1.25" DSA125 4 ~_ C a1)o MANUALLY m m C C COUPLING GROOVED 1.25" DSCR125 4 5` O - a)N N� Fa0 AB a A AB-A BV BALL VALVE FPT 1.25" DSV125 3 �.a �co 6 N NIPPLE GALV.1.25"x2.00" DSVG125020 3 g m�_m HB HOSE BIB 0.50" DSHB050 1 V x y� x 24 V COMMON -Black— S m 24 V COMMON -Black— OPEN Red w € OPEN Red w "30� o r O) lP) C tO CLOSE White CLOSE White F Q N y o O or„ Q� �_�_� ° W N co n� Valve in Open Valve in Closed - Position Position - E y Control Valve-Actuator Detail Z-D Scale: 8"=V-0" '— 82 o o Ev° J a°E J L Tr E Y/ HB BV A P � j j O O j A > �a a i r< o c CWR ♦ O ♦ CWR L C (a N Chilled Chiller Zones � � � � Source II O ��-- � o o O II 2 CWS ♦ A ♦ OO M CWS Revised ` C 1 2 N _ J No. By Date 1. 2. 3. 4. Reviewed No. By Date 1. 2. 3. 4. Drawing Scale 4"=1'•0" Sae Arch D Date 5-15-2017 Notes (unless otherwise Specified) By ip 1 Refer to Delta T Solutions Specification 6.0 Piping Installation,for Information Project No. 2-Way Control Valve- Detail on Piping. 160661-50 2 Refer to Delta T Solutions Specification 4.0 Zones Installation for information sheet Z-D1 Scale: 4"=V-0" on control valve installation and operation. Z-D 1 ;_ r O o rn c O O O O N U 1=O 0) w+� 60, O yQ Eo >.5oo r p ")"* Environmental Control Environmental Control Environmental Control Environmental Control m y � C O System System 2'go (By Others) System System O (By Others) (By Others) (By Others) rn m F W v ♦^ -O v♦ �_ _________________� �-'m CD 0 r---------------- m m 16}0),(-- Grow Room 240V Grow Room 240V Grow Room 240V I Grow Room 240V o 110 10 Field 109 10 Field 107 10 Field I 104 10 Field Wiring Wiring Wiring Wiring o d �� L1 L2 G L1 L2 G L1 L2 G L1 L2 G 5oS° A..0 c m 0 li li li r d 0 N to C�L? 24V Speed 1 z4V Speed 1 'I, 24V Speed 24V Speed 1 v C t,-O 24V Speed 2 24V SPaed 2 24V SPaed 2 24V SPaed 2 I d Y W NOD Common li Commonl. Common li Common n m I I I I I I I I I �0 I I N y I I o f I I o f I o f I I I o f m 240V 240V I 240V 240V Heat Coil& Heat Coil& Heat Coil& Heat Coil& 2 2 2 2 Cooling Coil Mpa.d o Cooling Coil M�-d o Cooling Coil s' o Cooling Coil 1 M�-d o (4)Units (4)Units (4)Units (5)Units = E-O F_________________i F_________________i F_________________i F_________________i m ---------------------- 5'o _— 1 ,I 1 1 1 24V Speed t M1 24V Speed t M1 1 24V Speed t 1 24V Speed t 1 _ I I I v" 24V Speed 2 24V Speed 2 24V Speed 2 24V SPeed 2 8 t 1 Common Common Common Common I I I I I I A N I I I I I I I N ;240V 240V 240V 240VCooling Coil Cooling Coil III 2 Cooling CoilCooling Coil Only Only =,, ° i Only M— OnlyMPS' =- Y (5)Units (5) Units I III (4)Units (7)Units -- m I I I I I I I I I I I I I I O -----------------i -----------------i E J a 1. Control Valve Actuator Control Valve Actuator Control Valve Actuator Control Valve Actuator - N I. I _ L Heating M Heating I. M Heating 1 M Heating M - AA`` W Zone Valve Zone Valve Zone Valve Zone Valve _ = Q u E ac ry I ac ry I ac ry I ac a �� 24 V Common 24V Common 24V Common I 24V Common m T a U Open Open Open Open F Q O (/) Cloae Closa Closa Closa L U y I _ Q W Pump Pump Pump Pump Y/ (1 Pump Valve 1 (1 Pump Valve (1 Pump Valve 1 (1 Pump Valve I I I I I Valve Station per room) I Valve Station per room) I Valve I Station per room) Valve Station per room) Station Station Station Station 1 10 110 11 S/S S/S 5/S 5/S 208V 208V I 208V 208V Mohr Molar Molar Molar Mixing Valve 10 Field Mixing Valve : 10 Field Mixing Valve I 10 Field Mixing Valve L 10 Field IN I IN zC-s Wiring ZC-5 Wiring ZC-4 Wiring ZC-3 Wiring I I I I I I m I I I I I I I I I 1 24 VAC Common o— - 24 VAC Common - 24 VAC Common - 24 VAC Common Open Open Open Open close Close close close Revised w w — No. By Date ontrol Valve Actuator ontrol Valve Actuator ontrol Valve Actuator ontrol Valve Actuator 2. 3. L1 L2 G L1 L2 G L1 1-2 G L1 L2 G 4. Reviewed No. By Data 1. 2. 3. 4. Scale N.T.S. Size Arch D Date 11-15-2016 By JP Project No. Grow Room 110-Wiring Diagram Grow Room 109-Wiring Diagram �C� Grow Room 107-Wiring Diagram Grow Room 104-Wiring Diagram 160661-50 E-1 Scale: N.T.S. E-1 Scale: N.T.S. E-1 Scale: N.T.S. E-1 Scale: N.T.S. Sheet E-1 E r O o rn c O O O O N CJ C O 0) o U, cai� O y Q Eo >.5oo r C N V Environmental Control Environmental Control Environmental Control Environmental Control m„ � � p System System System System =•' C ty (By Others) (By Others) (By Others) (By Others) N c O F 00 oC_ m'3 p' a+eO CD Grow ROOM 240V 240V 240V o X Veg Room 1 Packaging 1 Ton t d u� 1 fD Field 1 fr3 Field 1 P1 Field 103 3 c WiringI Wiring and Individual o L1 L2 L1 L2 G Of Processing L11L2 G Units �o ring c o �--� L m to Room �� 0 0 C,4 9 o C � I I i I I I II II — ,i v 24V Speed 1 24V Speed 1 1 Fen Enable Open w C p 24V Speed 2 24V Speed 2 Fen Enable Close d s W NOD Common Common o Fan Enable Open ° o l R GI26V tOh�€ 90 Fan Enable Cloe Heat Coil& I i240V 240V Heat Cooling Coil ai °Cooling Coil (3)Units 1 Heat Coil& JP3 TERMINAL STRIP a(5)Units � 1 TON F-----------------d `----------------------J F-----------------i `----------------------JI I I, Cooling Coll �d i Heat Coll& JP3 TERMINAL STRIP c I Cooling Coil Unit(TYP) - I d= 24V Speed, 7, 24V Speed, ' (2)Units ' a I , , I — 24V Speed 2 1 24V Speed 2 1 F i 8c Common Common 1 I I F � I I Control Valve Actuator A d I Heating 240V °I 240v ° 11 Zone Valve M Cooling Coil 2 Cooling Coil - Setl Mp d I (TYP) Only OnIY �o� _ (7)Units (2) Units 24VS ed, x° N _- Ve 24 V Common L U 24V SPeed2 OPen d J F- 1 Common Close E v---------------- -----------------1 �= J ° ll aE Control Valve Actuator Control Valve Actuator 1 Heat Coil& - (f' Heating M Heating M g I ;240VP -_ L Cooling Coil I _ Zone Valve 11 Zone Valve (1)Units 1 _ Q U OL O L III Chilled Water ',I Control Valve Actuator �� i ?, .� ZH-2 No� { ZH-1 xa� { xc x Nc ry IF i (TYP) M a 24 V Common 24V Common m T open open Control Valve Actuator F a` y�+ N close 1 close Heating M 1 iio u NC Zone Valve 1 24 V Common oe ZH-10 NaJ n L d = —I I Q W NCcN F-----------------a F-----------------i I I 'I cloo se Pump 1', Pump 'iI 24VCommon (1 Pump Valve (1 Pump Valve own / Valve Station per room) Valve Station per room) c1°ee Station Station I II II I , I I sty s/s ----------------- 1 I I I 208V j 208V 1 Chilled Water Mixing Valve 111 �° Mixin Valve I "�° 1 9 10J Field g 10 Field ZC-2 " Wiring ZC-1 " Wiring Valve Station I I I I O II 24 VAC Common - 24 VAC Common - I, 24 VAC Corr— Open OPen Open 1 o close Close cmae Revised — _ No. By Date 0 1 1 � I w w m JP 5-22-17 -----------------I m ---------------- m - A B onirol valve Actuator A B onUol Valve Actuator A B Control valve Actuator 2. 3. L1 L2 G L1 L2 G 6 L2 4. Reviewed No. By Date 1. 2. 3. 4. Scale N.T.S. Size Arch D Date 11-16-2016 By JP Project No. Grow Room 103 Wiring Diagram Veg Room Wiring Diagram �C� Packaging a&Processing Room Wiring Diagram 1 Ton Unit Wiring Diagram 160661-50 E-2 Scale: N.T.S. E-2 Scale: N.T.S. E-2 Scale: N.T.S. E-2 Scale: N.T.S. Sheet E-2 ;_ r O o rn c O O O O 0) U 1= w+� cai� O y Q do >.5oo r p Environmental Control Environmental Control Environmental Control of y C System System System °' C (By Others) (By Others) (By Others) rn c O F W C a7m0 03 ea)CD Grow Room 240V 1 Grow Room 240V Grow Room 240V o 205 10 Field 204 1 fr3 Field 202 10 Field .3 c Wiring Wiring Wiring O L1 L2 G L1 L2 G L1 L2 G c IN o S }+ .L N to rd 4)—N �o W to C In a,i Ir ,i 24V Speed 1 24V Speed 1 24V Speed 1 C�0O 24V SPaed 2 li 24V SPaed 2 24V Speed 2 ' Y W NOD O m Common Common Common ° Heat Coil& I I I I I I Heat Coil& 240V 240V ° Heat Coil& 240V ° m 2 2 2 Cooling Coil M�-a ° Cooling Coil = ° Cooling Coil M�-a ° (3)Units (3)Units (4)Units a I I I I I m, F_________________i F_________________i F_________________i E y 5'o —_ r , ,I 24V Speed t M 24V Speed t 24V Speed t _ I I I 24V Speed 2 24V Speed 2 24V Speed 2 i3 c Common i I Common I II I Common I I II Lod 240V I 240V ° 240V ° Cooling Coil Cooling Coil Cooling Coil - Only M° ' Only III °mod Only M°^' I (4) Units j (4)Units (4)Units 40 -- r= 0m I I I I I I � _� .- J Control Valve Actuator Control Valve Actuator Control Valve Actuator - N L Heating M Heating M Heating M - Zone Valve Zone Valve Zone Valve _ = Q 2 ZH-9 c HJo� ec a ec a ac a m L 14V Common 24V Common U V Common m T a U Open Open Open F< O Cloae Cloae Cloae L U I I w I _ I I I I I I Q W Pump (1 Pump Valve Pump (1 Pump Valve Pump (1 Pump Valve/ Valve Station per room) Valve Station per room) Valve Station per room) Station Station I Station 1 0 1 1 Va 0 VS Va j 208V 208V Mixing Valve 208V I "°"' 10 Field Mixing Valve "°" 10 Field I Mixing Valve I "°" 10 Field " Wiring " Wiring " Wiring ZC-9 ZC-8 ZC-7 I I I I I I +Au.I.r 24 VAC Common - I 24 VAC Common�� C.l 24 VAC Common o- I,Open Open clove clods Revised wNo. By Date wmm _________________' `_________________' 1. ootroi vawe A B e Actuator A B ootroi varoe Actuator 2. 3. L1 L2 G L1 L2 G L1 L2 G 4. Reviewed No. By Data 1. 2. 3. 4. Scale N.T.S. Size Arch D Date 11-16-2016 By JP Project No. Grow Room 205-Wiring Diagram Grow Room 204-Wiring Diagram �C� Grow Room 202-Wiring Diagram 160661-50 E-3 Scale: N.T.S. E-3 Scale: N.T.S. E-3 Scale: N.T.S. Sheet E-3 ;_ r O o rn c O O O O CC N Uo C w+� cai� O y Q E 2 >.5 oo r C 'D V m y C E O N c OC di~00 r C CO 03 e0O p L X d .3 C-O �e \V 10 o0 50 }+ C �t0 �° i Environmental Control Environmental Control r d d 0 N System System `-s s" C—U (By Others) (By Others) co v ✓T O ° W Nd0 Y Clone 240V 10 Field Chiller 1 t Room 206 A- Wiring L1 L2 G o ---------------------- 24V Sp.e 1 SEE o 24V Sp.d 2 Open U - c°mm°n cl°ee SHEET E-6 -- Heat Coil& 240V Cooling Coil ap a ° MMof p (2)Units I Io I I I I = Control Valve Actuator I _ II I Chiller 2 1r V Heating IM C1 ~o � J Zone Valve J o E- 1 24 V Common III III W open SEE = Q U cl° Open U ee Cl...v SHEET E-6 �m �a �T y0,, rn Pump (1 Pump Valve Chiller 3 I .� U Valve Station per room) i U Station o _ Q' Q W y 0 I', CP-1 s,S 208V Mixing Valve I L 10 Field SEE Open " Wiring Cl— SHEET zc-�o E-6 24 VAC Common Open I, Cbse - I li Boiler A IsControl Valve ACWator L1 L2 G gp_1 Revised No. By Date S-� 1. JP 8-17-17 2. open v SEE B. Cl— SHEET 4. E-5 Reviewed No. By Date II II 1. z A B 3. 4. Scale N.T.S. Size Arch D Date 11-15-2016 By JP Project No. Clone Room 206-Wiring Diagram Boiler/Chiller-Wiring Diagram 160661-50 E-4 Scale: N.T.S. E-4 Scale: N.T.S. sheet E-4 ,_ 0 rn Control Panel 0 (By Others) 0 0 ----------------------------------------- ur CIRCUIT BREAKER DISCONNECT SWITCH ? m (By Others) OR POWER BLOCK N o T 2S2 Urn C y Q 5 -1 T1 _� ■� =U 3 PHASE Lz rz TO COMPRESSOR(S) o N POWER AND FAN MOTOR m d CDo SOURCE L3 T3 O C 0(y �F 00 C (0 EARTH Fua Fus; 3 w m m GROUND — — o s ;°"r` x i I N.3 C i TB1 Of 35 120 VAC =o \}+V C N UO CHWRi in 2 i 301 120 2991 r d d 0 N PUMP N0.1 RELAY FU6 9 0 0) In (BY OTHERS) CONTROL CIRUIT VAC - C—t0 120VAC @1.0 AMP MAX FUSE a iT I-O TB1 SEE NOTE 2 TB1 22 °c W N 00 33 N Y 301A °i0 "TB1TB1 t.o P2+ 120 VAC - I naa CHWR1 c�s PUMP NO.1 RELAY 5 (BYOTHERS) 24 VAC 120VAC @1.0 AMP MAX TB1 - trovC..., 31 120 VAC i I E v Qa ve Actuator MOTOR 3 TB1 a— I I 34 izo VAC _ II To Environmental TB1 _ Controls 32A I (By Others) GIRDo _ See Sheet E-4 —(317) - TB2 r o 52 IF REMOTE STOP CONTROL IS oE oREMOTE STOP USED REMOVE v J SWITCH 585 LEAD 585 FROM v°E- (BY OTHERS) TERM TB2-52 TO N TB2 TB2-72(BY L U 'ii 72 OTHERS) - a Q E 4.0 0) L s I L_____________________ TB2 I 54 T61 a0 to 24 VAC 43 ~< y-+ C L u TB2 d 74 '� W TB1 = d N 83 Q� s **NOR.OPEN PUMP > V AUX.CONTACTS (OPTIONAL) rez CHW FLOW �;I 44 SWITCH �I -MANDATORY- TB2 TB2 (BY OTHERS) 0 45 IF EXTERNAL ALARM/EVENT IS USED 555A REMOVELEAD 555A FROM TERM TB2 TB2-45 TO TB2-67 67 Revised i No. By Date 1 JP 6/1/2017 TB2 2. 68 3. TB2 4' 69 Reviewed No. By Date TB2 1. 70 2. TB2 3. 71 4. i I Scale N.T.S. Size Arch D Date 11-16-2016 By JP Project No. ('A-'� Chiller-Wiring Diagram 160661-50 E-6 Scale: N.T.S. sheet E-6 �,•�'� �,� COMMERCIAL MECHANICAL • PERMIT APPLICATION .y Department of Community& Economic Development City of Arlington• 18204 59th Ave NE• Arlington, WA 98223• Phone(360) 403-3551 THIS APPLICATION MUST BE ACCOMPANIED BY TWO (2) SETS OF CONSTRUCTION DRAWINGS AND ALL OTHER INFORMATION OUTLINED IN THE MECHANICAL PERMIT SUBMITTAL REQUIREMENTS, IF APPLICABLE. Type of Permit: New Installation Replacement Alteration Project Address: 1 7 7 2.4 (),64 13f 5_ Ay IN ' Parcel #: Project Description: .5�01( WG _v i Valuation:�_/41'1 UOD Owner: dWok mvv- p,i?ft'aS L C Phone#:(CZak') Z+0 Address: 7727 8 AltII /E. City: State: Zip: 679 Z23 Email Address: G h ad ' C a, Contact Person: 61 ri j�� _ Phone 4- L12,5 5 t�B q 3 7� Address: N1 ZZ 105)� live NE City: State: zip. - oso3 Email Address: o GSS ✓e Contractor Name: O s 5 4 C.L:i( ca . LPL_ Phone#:(` Z-5 ) $D$7 q 3-75 Contractor Address: lLfl'V— -105 K�f�\� _City: K/� `` �� I � I y � State:W A /Zi Email: C rsrc�55��?�_Ca ,Cl Ir^_ ,�o Contact Person: �� t/r f Contractor License Number: COeADG Mt 3 b Expiration. �D��O f-7f 7 1 Please indicate type of number of appliances: FURNACE CONDENSING UNIT GAS PIPING OUTLET BOILER HEAT PUMP(multi-split) UNIT HEATER CHILLER 3 HEAT PUMP(mini-split) PAINT BOOTH COOLER HEAT PUMP(other) TYPE I HOOD AC(air cooled) ] HEAT REJECTION EQUIP TYPE II HOOD AC(water cooled) VENTILATION SYSTEM AST AC(evaporator) PACKAGED UNIT UST AC(VRF) DRYER OTHER I hereby certify that the above informatioJic recl and that the construction on, and the occupancy and the use of the above- described property will be in accordance ws,rules and regulation of the State of Washington. Applicants Signature Date B Applicants Printed Name: FOR STAFF USE ONLY �(p��j AUG �. 8 ?_01% Permit# AccYpIrd By V Amount Received Receipt# Date Received 6/16LP Page 1 of 1 Kristin Foster From: Greg Griffith <compassgreg@gmail.com> Sent: Tuesday,August 29, 2017 8:36 AM To: Kristin Foster Subject: Fwd: 160661 - Hyak Venture Partners LLC PDF Attachments: 160661-50-S - Hyak Venture Partners LLC 8-23-17.pdf Kristin, here is the second set of plans for the building at 17727 59th Ave NE, Thanks, Greg ---------- Forwarded message ---------- From: Prieto,Jorge<JPrietogdeltatsolutions.com> Date: Wed, Aug 23, 2017 at 2:37 PM Subject: 160661 -Hyak Venture Partners LLC PDF To: "compassgregAgmail.com" <compassgreg( ,gmail.com> Cc: "Miller, David" <DMiller&deltatsolutions.com> Greg, Please see attached PDF for project 160661 - Hyak Venture Partners LLC. Thanks, Jorge Prieto Delta T Solutions 27711 Diaz Rd-Suite B Temecula, California, 92590 (800)552-5058, (760)682-0420 ext. 24 forge@deltaTsolutions.com www.deltaTsolutions.com 1 Greg Griffith/Owner Compass Mechanical, LLC (425)508-9375 Compassqreq@qmail.com 2 ° CITY OF ARLINGTON 238 N. OLYMPIC AVE -ARLINGTON, WA. 98223 PHONE; (360)403-3551 BUILDING PERMIT Address:17727 59th Ave NE Permit#:1627 Parcel#:31052200404100 Valuation: 147000.00 OWNER APPLICANT CONTRACTOR Name.ARLINGTON ADVANCED Name:Compass Mechanical,LLC Name:COMPASS MECHANICAL,LLC MANUFACTURING PARK Address:3316 FUHFN AN AVE E STE 200 Address:14122 105th Ave NE,Ste B Address: 14122 105th Ave NE City,State Zip:SEATTLE,WA 98102 City,State Zip:Kirkland,WA 98034 City,State Zip:Kirkland,WA 98034 Phone: Phone:425-508-9375 Phone:425-508-937 MECHANICAL CONTRACTOR PLUMBING CONTRACTOR Name:COMPASS MECHANICAL,LLC Name: Address: 14122 105th Ave NE Address: City,State,Zip:Kirkland,WA 98034 City,State,Zip: Phone:425-508-937 Phone: LIC#: EXP: LIC#: EXP: JOB DESCRIPTION PERMIT TYPE: Commercial Mechanical CODE YEAR: 2015 STORIES: CONST.TYPE: DWELLING UNITS: 0 OCC GROUP: BUILDINGS: I OCC LOAD: PERMIT APPROVAL I AGREE TO COMPLY WITH CITY AND STATE LAWS REGULATING CONSTRUCTION AND IN DOING THE WORK AUTHORIZED THEREBY;NO PERSON WILL BE EMPLOYED IN VIOLATION OF THE LABOR CODE OF THE STATE OF WASHINGTON RELATING TO WORKMEN'S COMPENSATION INSURANCE AND RC W 18.27. THIS APPLICATION IS NOT A PERMIT UNTIL SIGNED BY THE BUILDING OFFICIAL OR HIS/HER DEPUTY AND ALL FEES ARE PAID. IT IS UNLAWFUL TO USE OR OCCUPY A BUILDING OR STRUCTURE UNTIL A FINAL INSPECTION HAS BEEN MADE AND APPROVAL OR A CERTIFICATE OF OCCUPANCY HAS BEEN GRANTED. IBC110/IRCI I0. SALES TAX NO [ .:Sales tax relating to construction and construction materials in t Ci r m must be ported on your sales tax return form and coded City A gton#3101. gnature Print Name Date Y--RelAscd By Date CONDITIONS See red lined drawings. Adhere to approved plans. THIS PERMIT AUTHORIZS ONLY THE WORK NOTED.THIS PERMIT COVERS WORK TO BE DONE ON PRIVATE PROPERTY ONLY. ANY CONSTRUCTION ON THE PUBLIC DOMAIN(CURBS,SIDEWALKS,DRIVEWAYS,MARQUEES,ETC.)WILL REQUIRE SEPARATE PERMISSION. PERMIT FEES Date Description Fee Amount 8/31/2017 A/C Unit $2,150.00 8/31/2017 Boiler/Compressor $25.00 8/31/2017 Gas Outlets Base Fee 1 to 5 $10.00 8/31/2017 Mechanical Fee(Enter Fixture Fee) $500.00 8/31/2017 Mechanical Plan Review Fee $150.00 8/31/2017 Processing/Technology Fee $25.00 Total Due: $2,860.00 Total Payment: $0.00 Balance Due: $2,860.00 CALL FOR INSPECTIONS BUILDING(360)403-3417 When calling for an inspection please leave the rollowing information: Permit Number,Type of Inspection being requested,and whether you prefer morning or afternoon 10- TN' 2.5-TON DELTACOOL1 i COOLING DEHUMIDIFICATION %"Tapped Hanger 2.SPasd Connection(Typ) Conditioned Fsn Air Electrical a a a HearmQ Connections Discharge Cog -� Cooling Coil 3/a"H W R Q Filler 3/a"CWR -----Filter 0 % CWS - o CWS&CWR c Piping Chilled Air c'-�,HWS a HI Outlet Piping �Cond Filter Condensate a/a Condensate Access Condensation Piping Drain(Below) Drain Specifications Model Size Dimensions Fans(Qty.) Motors filet Weight 2.5-tan j 28"W x 40"H x 22"D 1 Qty.1 (208-23OV/60/1) 125 lbs. 2.5-ton with Heat Coil 28"W x 40"H x 22"D 1 Qty.1 (208-230W60/1) 135 lbs. Ihlet t t t t t t t t Nom. "Fluid Size Air Dry Sensible Press Drop Air Dry Model (ions) ACFM Bulb %RH Total Btuh btuh GPM Ft H20" Bulb Fluid Temp SGHO-030 1586 75 47.70% 30083 30083 6 7.8 57.1 58 Full Speed 2.5 1586 75 50.00% 30629 29186 6 7.8 56.7 58.2 48-F EWT 1586 75 1 60.00% 1 34182 1 25804 6 7.8 1 59.6 59.4 SGHO-030 790 75 42.20% 18533 18533 6 7.8 52.9 54.2 Half Speed 2.5 790 75 50.00% 20780 17372 6 7.8 54.2 54.9 M-F EWT 790 75 60.00% 24749 16327 6 7.8 55.4 56.3 SGHO-030 1586 75 40.00% 36626 36626 6 7.8 53.2 54.2 Full Speed 2.5 1586 75 50.00% 39842 32928 6 7.8 55.4 55.3 42*F EWT 1586 75 60.00% 44392 29798 6 7.8 57.2 56.8 SGHO-OW 790 75 40.00% 24118 21702 6 7.8 49.1 50 i Half Speed 2.5 790 75 50.00% 27974 20472 6 7.8 50.5 51.3 42°F EWT 790 75 60.00% 32670 19652 6 7.8 51.4 52.9 HeatingCap. Entering Water Temerature Size PD Model (Tons) EAT CFM GPM (Ft-H20) 120°F 130°F 140°F 150°F 160°F 170°F 180°F 190-F 200°F SGHO-030 2.5 650F 800 2.2 0.6 8.4 10 11.5 13.2 14.8 16.4 18 19.5 21.1 Half Speed SGHD-030 2.5 65°F 1600 2.2 0.6 11.9 14.1 16.4 18.7 21 23.3 25:6 27.9 30.2 Full Speed i DeltaCoolTM Better Cooling than Traditional HVAC a loft 4 ' !r Compare the DeltaCool"' Advantages The DeltaCool—System provides consistent and precise cooling and humidity controls.Standard air conditioning systems cool the air by pulling moisture out of the air,resulting in inconsistent humidity levels. Maintaining proper humidity levels is critical to the health of a crop. Understanding the differences between cooling systems will ensure a successful crop. Cooling Benefits DeltaCoolTM'System Traditional HVAC Other Systems Efficiency Saves up to 35%energy usage. Requires more energy overall. Varies by system, Dehumidification Regulates water temp as it enters the Continual dehumidification results in Do not modulate incoming water fan coil to provide consistent,precise inconsistent humidity levels. temperatures to fan coil. cooling&humidity control. Chiller Units Heavy duty,industrial-grade system with Use condensers instead of cold water Residential and lightweight commercial- standard steel piping.Generally requires chiller. grade use Sch 40 PVC piping.Requires one or two large tonnage units.Available multiple smaller tonnage units with in up to 250 ton units. more piping. Fan Coils Industrial,galvanized steel construction No fan coils;expensive duct work. Residential and lightweight commercial- with precise published specs.Available grade with questionable outputs. in 2.5-&5-ton units. Horticultural Integrated with DeltaCool-system Typically standard wall thermostats. Standard HVAC control. Environmental Control design. Contact us for more information on how your growing operation can benefit from DeltaCool— Chilled Water Cooling Systems. Delta T Engineering,Integrating,Innovating Systems 27711 Diaz Road,Suite B,Temecula,CA 92590 ■ 800.552.5058 ■ 760.682.0428(fax) ■ www.deltatsolutions.com Fa Submittal Page 2 0 2 PQ �© 2 �§ ! mA x- cu / 2 \ / ¥ �k \ kE k| P ly! _ •m6§2 R K k§ RAW Hoes.. §2 a R K E'.e M Kwt 2 - 2§2 �2■�#B( �m� ��|$(�&■ §E�B�2 §§§§�|B § k-e §§_� �, �! A § §� k�) woo 10 ■0"s NO M B§)§}§f N � k �k |§�}2|, � § ) ��E )§ §§E �§2 ■ � � . ® h#p:www:ennme.om%ago%a Su mmk.a p9Uo An/=46 11lan£a u as=t. 5152017 Fan Submittal Page 1 of 2 Page 1 of 2 aMca aennro r ■otMGt C usp Order#3019628 Direct Order#3019628 Quantity: 1 rrssc� Fan # 1 NCA36FA 550.45 lbs Construction Features Tag:of--1 Housing constructed of heavy gauge aluminum•Centrifugal Belt Drive Centrifugal Upblast Exhaust Fan with 36"wheel backward inclined,non-overloading wheel fabricated from aluminum•Weatherproof safety disconnect switch•Grease Motor spout welded to housing•Vibration isolators•Adjustable pitch Model 00218OT1 BA056Z-S40PK•2 HP•1 Phs•115/208- drive assemblies•Adjustable motor mount•Ball bearing 230 V•18.6/10.3-9.3 FLA•60 Hz•ODP(Open Drip Proof) motors•Forces fresh air through motor to ensure long motor life•Corrosion resistant fasteners•High heat operation(300° Pulley information F)•Rated for restaurant and general ventilation applications Part Type (3yt Browning# Turns Out Grease classification tested•UL705 and UL762 Belt 2 BX53 Blower Pulley 1 2BK160H Bushing 1 H-13/16 Motor Pulley 1 2VP42 x 7/8 2.5 Performance Volume:9500 cfm SP: 0.2"w.g. BHP: 1.248 RPM:389 Tip Speed:3794 ft/min Altitude:0' Installation Information Unit Voltage: 1 phs 115 V Motor/Control Circuit:23.3 Amps MCA,40 Amps MOP, 115 V, 10 AWG Wire Min. https://www.thermotek.com/Catalog/FanSubmittal.asp?nJobfansid=462111&nFanunitid=I... 5/15/2017 i' i _ II II I ' Hyak Partners LLC Drawing Index Sheet Description GN-1 General Notes ;i PL-1 Level 1 Piping Diagram- Level 1 W PL-1.1 Chilled Piping Diagram-Level 1 Arling `On A PL-1.2 Heated Piping Diagram-Level 1 PL-1.3 Condensation Piping Diagram-Level 1 PL-1.4 Corridor South Wall Elevation - Level 1 I PL-1.5 Level 1 Piping Diagram- 1 Ton Fan Coil PL-2 Level 2 Piping Diagram-Level 2 PL-2.1 Chilled Piping Diagram-Level 2 PL-2.2 Heated Piping Diagram- Level 2 PL-2.3 Condensation Piping Diagram-Level 2 C-1 Chiller Piping-Layout C-2 Chiller Secondary Piping-Layout ,i C-3 Chiller-Layout Manufacturer / Supplier CP-1 Chiller Pump Station FC-1 2-1/2 Ton Fan Coil Unit-Cooling Only FC-2 2-1/2 Ton Fan Coil Unit- Heat FC-3 Condensation Piping-Layout FC-4 1 Ton Fan Coil UnitDelta Soiuflows ' FC-5 1 Ton Fan Coil Unit II CITY OF ARLINGTON EL-1.1 Elevations Grow Room 110 27711 Diaz Rd - Suite B, Temecula, CA 92590 OUILDDINGDEPARTMENT EL-1.2 Elevations Grow Room 109 APPROVER 760-682-0420, Fax 760-682-0428 DAB„_ EL-1.3 Elevations Grow Room 107 pOCFIANOESAV1TiDRIZEo EL-1.4 Elevations Grow Room 104 !! UNLESS APPROVED BY 7HH Www.deltatsolutions.com BUILDING INSPECTOR EL-1.5 Elevations Grow Room 103 EL-1.6 Elevations Veg Room Delta T Solutions Job No. 160661-50 EL-1.7 Elevations Packaging & Processing 105 CE)a6i ws' 07 ��� `� ; EL-2.1 Elevations Grow Room 205 EL-2.2 Elevations Grow Room 204 it Mw07M EL-2.3 Elevations Grow Room 202 EL-2.4 Elevations Clone Room cui � � ��� L clApo lad � Inva�� H-1 Boiler Piping-Detail fty-e- ip Aon, H-2 Boiler to Section Pump BPF-1 By-Pass Feeder -a,_ C QIP0 cF-rn FW-1 Feed Water& Expansion Tank- Layout r q S-1 Section Pump Z-1 2-Way Zone Control-Detail fat. tos lr' rlvC phb�-lL.G' 1 cf--�or�) Z-2 2-WayZone Control-Detail i ,I,I,GQ io 3�a, Z-3 2-Way Zone Control- Detail sue- Z-4 2-Way Zone Control- Detail i i Z-5 3-Way Zone Control- Detail � Z-6 3-Way Zone Control- Detail Z-D1 2-Way Zone Control- Detail W OFFICE COPY E-1 System Wiring -Schematic — E-2 System Wiring -Schematic LL- CDP `I E-3 System Wiring -Schematic E-4 System Wiring -Schematic 146ceived E_5 Boiler Wiring-Schematic evised A17 892017 E-6 Chiller Wiring-Schematic ! SAD IV21 �_.... ...... ....... ....--- - - - Installation Notes -_(unless oth-isespaclr,ea) c Labor Materials 3upplhed ,duniesaome.wisespecin Eear o U 1. Refer to Delta T Solutions Specification 6.0 Piping Installation,for Information on Piping. 1. Supplied material will be per customer-approved quote and construction drawings provided System Specs o U) by Delta T Solutions. remp vdlnme Ezp�ns,©n,rank Pot Feeder g 2. Refer to Delta T Solutions Specification 4.0 Air and Water Control,for Installation of Air 2. Unistrut,all-thread rod,and related materials provided as full length pieces to be measured, © 2 Separator,Air Vent,Expansion Tank,Feed Water Regulator,and Pressure Gauge. cut and field fit during installation. 190'E 210.4 DEEJAER23607 2-Gallon _ p co 3. All equipment will be installed per customer-approved construction drawings provided by Boilers V+ E c)N Materials Exci id (unass 0,h-i-Specitedl Delta T Solutions. i uem city .,and sar�as Model slages Fuel BruH in ' BruH ont vac 0 "FLa H� - _ _ 1. All Line Voltage and Low Voltage Wiring, T� 4. Installation shall be from the Point of Connection(POC)as shown on the construction 9 g g,Conduit and Disconnect shall be Supplied and B-1 1 RBI Dominator DB1050 4 NG 1,050.000 882,000 115 1 11.4 60 Q drawings. Installed By Electrical contractor. U 5. Notify Delta T Solutions if changes are necessary so the design can be modified as 2. Gas Line and Gas Regulator shall be Supplied and Installed by Others. Chillers i rma required. 3. Water Line and Backflow Preventer shall be Supplied and Installed by Others. nom ary Brand serer Model J Connac[d sea9as Tons BruH, WA vac`e Amps H� O v my ED 6. Field coordinate/verify all dimensions,utilities,voltages,amp draws and conditions before 4. Power From main load Panel and all fused disconnects. 2 Da in AGZ-D 1101) 3' 12 106 1,282 000 101.66 120 1 L5sa 60 _ N installation.Heat Sourc 5 Breaker to the boiler unit terminal strip,by Electrical Contractor. v e d rn _m O Pumps 1. Refer to Drawings H-1,H-2,or H-3 for Heat source Details. 1cemf5ty h 11on eran, ufip Model Flange GPM Fr ad HP vac o Amps Hx o s 2. Refer to Delta T Solutions Specification 3.0 Heat Source Installation for Boiler Installation Operational Notes (unless omerw se'sPec r eai 3 - and Operating Information(ie Vent,Gas,and Electrical.) 1. Bench-Top and In-Slab hot water heating systems are designed for 130-1407 water.Do BPA 1 Boiler Federal 2CCL-3/4-4 2" 70.4 4.2 /4 115/230 1 9.614.8 60 1, NOT exceed this temperature or system damage can occur. $A 1 Heating Coils Grundfos 80-100F 3" 141 52.1 11%43 230/360 3 4.3 60 �00 3. When boiler piping is supplied by Delta T Solutions,remove flow switch and tee from boiler o M of uT 2. Under-Bench and Perimeter Fin Tubes stems are designed for u to 231 water.Refer to CP-1 2 Chiller Federal 3CGL-3-4 3" 315 29.3 3 230/360 3 14.5 60 =_ ♦� e m ro header and install in supply piping as shown. Y 9 p - design for operating Temperature.Do NOT exceed this temperature or system damage can ZC-1 1 Veg Room Grundfos 40-12OF 230V 1-1/2"GF 35.0 24.7 19132 208/230 1 2.p 60 1 a � 4)4. All piping to be supported so that heat source does not support piping weight. occur. o /1 0 O ZC-2 1 Grow Room 103 Grundfos 65-12OF 230V 2-1/2"GF 84.0 32.1 1 1/32 208/230 1 3.4 60 - W LO 5. Gas Service Regulator is required if Gas Pressure is above Yz PSI. o LO �I�o Piping ZC-3 1 Grow Room 104 Grundfos 65-12OF 230V 2-1/2"GF 84.0 26.3 1 1/32 208/230 1 3.4 60 _ W rr-CNI m ZC-4 1 Grow Room 107 Grundfos 50-15OF 230V 2"GF 56.0 30.2 27/32 208/230 1 2.8 60 1. Refer to PL Drawings for Piping Layout. ZC-5 1 Grow Room 109 Grundfos 50-15OF 230V 2"GF 63.0 30.9 27/32 208/230 1 2.8 60 -_ 2. All PVC Piping to be Schedule 80. All Steel Piping to be Schedule 7,10,or 40.See ZC-6 1 Grow Room 110 Grundfos 50-150F 230V 2"GF 63.0 30.2 27/32 208/230 1 2.8 60 installation manual for your specific pipe based on design criteria. - ZC-7 1 Grow Room 202 Grundfos 50-15OF 230V 2"GF 56.0 32.7 27/32 208/230 1 2.8 60 3. Piping runs to be supported as required. - _ 4. Install Pipe Rest,using Unistrut with Brackets. ZC-8 1 Grow Room 204 Grundfos 50-15OF 230V 2"GF 56.0 32.9 27/32 208/230 1 2.8 60 ZC-9 1 Grow Room 205 Grundfos 50-15OF 230V 2"GF 63.0 39.9 27132 208/230 1 2.8 60 5. Vent high spots in piping mains to prevent air locks. ZC-10 1 Clone Room 206 Grundfos UP 26-64F 1-1/4"G 14.0 10.3 5/64 208/230 1 0.7410.43 60 6. Installation to follow all state and local codes where applicable. o v 7. Installer will be required to measure cut and fit some pipe sections per site conditions. Zone Valves-Chilled Water Actuator Flow Control 75 =- Match Construction Drawing set. a Item ©tY Locanon Ty . Model VAC t x r�M DaPailSheek o 8. Installer will be required to assemble piping connections using appropriate Teflon tape and -- ,E pe Brand Valve Model Sizecv' Brand Brand Model $I-�-_- " d m m"�a sealant to insure leak free assembly. -1 1 Veg Room 2-Way Mixing Belimo B239 1Y2" 29 Belimo ARB24-3-S 24 Flow Design YRH150-0300 30 1 z" Z-1 Insulation ZC12 1 Grow Room 103 2-Way Mixing Belimo B264 2Y2" 150 Belimo ARB24-3-S 24 Flow Design YRH250-0840 84 2Y2' Z-2 N c m 1. Insulation is provided for bare aluminum pipe with-in zones below the 7 ft.(Off Finished zc-3 1 Grow Room 104 2-Way Mixing Belimo B264 2Y2' 150 Belimo ARB24-3-S 24 Flow Design YRH250-0720 72 2Y2' Z-2 Q Floor)level in each zone. ZC-4 1 Grow Room 107 2-Way Mixing Belimo B252 2" 85 Belimo ARB24-3-S 24 Flow Design YRH2O0-0480 48 2" Z4a - 2. Refer to Installation Manual and provided drawings for insulation installation. ZC-5 1 Grow Room 109 2-Way Mixing Belimo B252 2" 85 Belimo ARB24-3-S 24 Flow Design YRH2O0-0480 48 2" Z-3a = 3. Installer will be required to measure cut and fit some Insulation and Aluminum clad or PVC ZC-6 1 Grow Room 110 2-Way Mixing Belimo B252 2' 150 Belimo ARB24-3-S 24 Flow Design YRH2O0-0540 54 2" Z-3a t 'jacket sections per site conditions.Match Construction Drawing seta ZC-7 1 Grow Room 202 2-Way Mixing Belimo B264 2 ._= 85 Belimo ARB24-3-S 24 Flow Design YRH2O0-0540 54 2" Z-3a �+ Fan Coils ZG-8 1 Grow Room 204 2-Way Mixing Belimo B252 -.A2" 85 Belimo ARB24-3-S 24 Flow Design YRH2O0-0480 48 2" Z-3a E1. Refer to Drawings sheets FC-1 THRU FC 4 sheets for Fan Coil details. ZC-9 1 Grow Room 205 3-Way Mixing Belimo85 Belimo ARB24-3-S 24 Flow Design YRH2O0-0540 54 2" Z-3b EJ2. Refer to Drawings sheets PL-1 THRU PL-2.3 sheets for Fan Coil Layouts. ZC-10 1 Clone Room 206 3-Way Mixing Belimo B330 85 Belimo ARB24-3-S 24 Flow Design YRH125-0540 54 1Ya" Z-4 N 3. Installer will be required to assemble Fan Coil fittings using appropriate Teflon tape and -- sealant to insure leak free assembly. a a Zone Valves-Hot Water Actuator Flow Control Pumps&Zones 4-+cr ' rn T 1. Refer to S-1 Drawings for Section Pump Detail ZN 1 dry 1 Veocation Room 3�Wa Honeywell DEV3125-09 1Ya� 9 Hone ype Brand W-Model sn� nel VACwell VC-2710 24- r Flowrand Desi n Y_ _,W 090 GPM Sae Dete� eet N I - a) 2. Refer to Z-1 Drawings for Zone Valve Detail 0 Y y y g T a ru = Z ZH-2 1 Grow Room 103 3-Way Honeywell DEV3125-09 1Y4" 9 Honeywell VC-2710 24 Flow Design YRH125-0150 15 1Y.. Z-5 ¢ O 3. Installer will be required to assemble zone valve stations per drawing Z-1 using appropriate 4 r Teflon tape and sealant to insure leak free assembly. ZH_3 1 Grow Room 104 3-Way Honeywell DEV3125-09 1Y4" 9 Honeywell VC-2710 24 Flow Design YRH125-0150 15 1Y4" Z-5 CD y ZH-4 1 Grow Room 107 3-Way Honeywell DEV3125-09 1Y4" 9 Honeywell VC-2710 24 Flow Design YRH125-0120 12 1%" Z-5 y n = v ZH-5 1 Grow Room 109 3-Way Belimo B341 1Y2" 29 Belimo ARB24-3-S 24 Flow Design YRH150-0240 24 1Y" Z-6 A-0 L Testing Notes (unies$tr,se,w,seS `'Beal Jq Q ZH-6 1 Grow Room 110 3-Way Honeywell DEV3125-09 1Y4" 9 Honeywell VC-2710 24 Flow Design YRH125-0120 12 1Y4' Z-5 1 Fill,Leak Test and Pressure Test system after installation is complete but prior to Q� installation of insulation. ZH•7 1 Grow Room 202 3-Way Honeywell DEV3125-09 1Y4" 9 Honeywell VC-2710 24 Flow Design YRH125-0090 9 1Y4' Z-5 \ Y4 2 Maintain a water treatment program appropriate for all the materials in the heating system. zill 1 Grow Room 204 3-Way Honeywell DEV3125-09 1 ' 9 Honeywell VC-2 710 24 Flow Design YRH125-0090 9 1Y4' Z-5 /� In addition,the pH of the system water is to be maintained between 6.8 and 8.5. ZH-9 1 Grow Room 205 3-Way Honeywell DEV3125-09 1Y4' 9 Honeywell VC-2710 24 Flaw Design YRH125-0090 9 1X" Z-5 3 Water testing and Treatment ZH-10 1 Clone Room 206 3-Way Honeywell DEV3125-09 1%., 9 Honeywell VC-2710 24 Flow Design YRH125-00f 6 1Y4" Z-5 2 bite C �r t tions Exclusions ' fumes.oth._%e spenitme) Fan Coil Units 1. Site utilities em Dry Brand Moa ^ " 4 GPM F#Ha >HP � Y�s PHASE FLA' Hz 2. Permits and state or local government approvals FCU-1 43 DELTA T SOLUTIONS 2.5 TON COOLING ONLY 6 7.8 1/2 240 1 5.515.8 60 3. Site/Foundation/Soil Preparation,Testing,Demolition,Debris Removal services or FCU-2 40 DELTA T SOLUTIONS 2.5 TON HEATING/COOLING COIL 6 7.8 1/2 240 1 5.5/5.8 60 equipment FCU-3 5 1 TON ENVIRO-TECH 1 TON HEATING/COOLING COIL 2.7 10.4 1/15 240 1 5.5/5.8 60 4. Temporary electrical,water,heating or cooling 5. Craning/Hoisting of equipment No. By Dare s 6. All high/low voltage control or power wiring,conduit and electrical connections,contactor 1. 0Dx 2-27-2017 panels,and motor starters for equipment z. 7. Cutting,core drilling,or patching of walls,floors,doors,ceilings,or roofs 3. 8. Access panels&penetrations,Firestop and caulking 4Iy v - 9. Overtime and/or shiftwork No. By Dare 10. Painting of exposed piping and equipment 1. 2. 11. Concrete and/or steel equipment supports and foundations 3. 12. Toilet accessories 4. 13. Antifreeze and Antifreeze charging a _ 14. Concrete pads for equipment scale 1'/4"=1•-, 15. Shut down and drain down of existing systems size Arch D 16. Hot tapping of live piping systems I Data 12.10.2016 By JP 17. Roof curbs 18. Fire protection 19. System Balancing % kN A •, General Notes % 160661-50 e Equipment Schedule GN-1/r Scale None - GN 1 r Scale: None - r GN-1 / E w.._.. .r ...... ..... O N n t O North Level 1 Boiler on Concrete Pad ?� � 0 0 (TYP) Y as _ 8 U 59'-6" 10,_6„ 64,_3„ 25,_3„ r i 1 m d rn E3 1 : (BP-1; _ s T� �51..� - om° �Q Co 2--0 — vo 7 W i Oil COO ------.. .._--_. ___ } ""` :nV.""",ti c m O i to .........._ a ov �� Y �t a ? �,-f - HOT WATER CONTROL VALVE Grow Room (TYP) �f - - � �� a a a s � a 5 0 M c o o q 9�y ;. CQ ( 1 ll } o m n €. ��� �d 6 0 k S c N ao � .3't�. Lecend a,= o) a Y FAN COIL UNIT Grow � Room o w/ Water Heating oils ',,7 (�p}.q�q ( Hot in C 2%TON o- ti 1[ FAN COIL UNIT ............... r ...... ,a 1. a m CHILLED WATER p� MIXING VALVE 1 TON o Grow Room '� _.. FAN COIL UNIT _ See Sheet Z-1 RISERS TO ❑ r�i (TYP) LEVEL 2 J""' "`10l - w/Hot Water Heating Coils o CHILLED WATER a e MIXING VALVE Chilled Wat r Supply ... - 4L ° a j '� �- -.- >� k...� `_ _ � -- ��E,_.t a w i ---Hai Water S�:�piy �a 1-1 ` � --- - w a a e HOT WATER ----------------------------- Hot Water Return c I - ---- --- U L CONTROL VALVE .- - J Future Use j J 6--1 ...-. ...... y—d ...... -. .. E ,w .. o v, L (4)MECH.TEES W/CAP h m art€ FOR FUTURE PIPING Grow Room � I;i� Veo- ,,'nP rri v o,� L Al (TYP) VC'CJ�V IC�$.AII& 3 a N - { � �i.pIt)teS jllnless Otherwise Specified) o li C All chiller piping to be supported so that Chiller does not support piping weight _ L = 2. Maintain a water treatment program appropriate for all the - RISC TO materials in the heating system. In addition,the pH of the d L /E 2 Z[` system water is to be maintained between 6.8 and 8.5. J ___ ____ == _ - � '' • a 3. All piping to be supported so that heat source does not support, s a a a d = = - -- piping weight. ZG-4 zr M• a.. N ........ ........ -- - — 4. Vent high spots in piping mains to prevent air locks. .. _ ...... ............................. ......... *r =- 5. Piping runs to be supported as required. _ - 6. Installation to follow all state and local codes where applicable. 7. Notify Delta T Solutions if changes are necessary so the o Grow Rooms design can be modified as required. �t t 3? 8. All line voltage and low voltage wiring,conduit and 7 t f \ ) .t disconnects shall be furnished and installed by others. ". 9. Field coordinate/verify all dimensions voltages,amp draws �t and conditions before installation. 10. Installing subcontractor will be required to cut and modify in 5'-0' the field for proper fit per details. N By Date -...... — _ ....... _ ......... _._ 1. JP 8-7-17 11. Installing subcontractor shall assemble parts supplied by Delta \�/ ) T per Detail. � ......._ E __ - 12. Attachments to structure shall be supplied by Installing 3. 4. CAP(Typ) o \ subcontractor as required. 13. Installing subcontractor will be required to measure and cut all ❑ _._ Nc tq sections of the threaded rod based on Field Conditions. Cod O ha ..-._.. - be re ----- v Data c ®C 0 Oo C I� Oo Oo Oo Oo nit 14 The Installing subcontractor will be required to measure a z. - - - ``J m cut some sections of Unistrut based on Field Conditions. s j C l 1 n lUi 0 ��J r 9 q a J ` � � � 'J ', (� r>' �' � 15. The Installing subcontractor will be required to measure,cut, - and groove some sections of the Pipe and Insulation based on Drawing AGZ110 Field Conditions. scale CHILLER(TYP) 5'-0" 16. All hanging hardware shall be stainless steel,Galvanized,or Aluminum as noted on the Detail sea Arch o -- --57,_4, � ( ............... ......... ......... ... ........... ... Date 11-05-201fi 17. Attachments of hangers to structure shall be b..others. 18. This is a corrosive environment and proper materials must be used. ENE A Level 1 System Piping Layout 19. Insulation is provided for bare aluminum pipe with-in zones 160661-50 Nflf2:Piping Shown Outside the ...... ......... _._____—... below the 7 ft.(Off Finished Floor)level in each zone. m- PL Scale: Ye" 1'-0" ROW 1@11M Greenhouse for Clarity Only. j = _ PL-1 o ;_ O � ti 0 1n 0 North i 2 o 0 E o 59,-6„ 10,�„ 64,-3„ 25-3„ LO , n 5.»,. .. < 0 Q - - Vl . � I o �N 3"CWS&CWR _I m o 8 g PIPING =71 g co 1Y2"x1Ya ... B 3Y4,(NP) -co 1Ya' REDUCERS _... - � 1 � 3 c m o ,,. ,Y" X 2"X1Y2" a a a e a `°-t L " W CCU REDUCERS x3 3' =a c -rot �{ g^� _ REDUCERS ' y '- E t F 2„ 2"x1Y2" 1Y„ 1Yi'x1Ya' 1Ya" a d 1 N L - STEELxPVC FLANGES REDUCERS REDUCERS ^ oLO d° REDUCERS LO C-6 t .\ 2Yz"x2„ )c _ °a Q C r o n Q l W N m 1Yd' 1Yz'"x1Ya" 1Y2" REDUCERS L. Y9 1 cal REDUCERS �Y2 r s a s a ) � _- ... .... .. 3„ FAN COIL UNIT ° ::::r ::::_ ..... ::: .: j 2„ �°roW �oo ,, b w/Hot Water Heat g oils 3 in 104 01 ........ ....... ..................... __ 2 ... A „ „ v { FAN COIL UNIT TON _ 1Ya" 1Y"x1Ya" ...... REDUCERS 6 x3 e„ 1Y2' REDUCERS I .. n 2„x3„ 2"x1Y2' REDUCERS REDUCERS 1 TON o J CHILLED WATER RISERS TO ° Grow door FAN COIL UNIT MIXING VALVE ❑ o ,g py 1 <-. - 2"x1Y2' 1Y2'x1Ya' LEVEL 2 �j w/Hot Water Heating Coils m 6 Lj _::::::::::a o ��R _;(TYP) 1Yz" 1Ya zc t0; b 2" Cc_i,, �CE R�EDUCLRS� v� 2"x%" n 8 4 8 2 REDUCERS :::: - ',', ..._.._Chilled Water Return--- -------._ ......... .......... 1Y2"x1Ya" —Chilled Water Supply v 1Ya" REDUCERS 1Yz" ZC-11 v c e $ > CHILLED WATER a a s F s p MIXING VALVE ... 2Y 2"x1Y° 1 1Yz''x1Yd' ® �. f _... _,_._ -_ - - _, 2„ 1/21 1Yd 1Y2" I o J r=r--1 -• ---t y REDUCERS REDUCERS .- � REDUCERS 2 (2)MECH.TEES W/CAP > tp; y C a a� a FOR FUTURE PIPING Grow Rooms �! (}, (TYP) / �� [Ld47 �11 � w v 3 Cl) N 0 t3 Y, 1Ya NOtSS {Unless otherwisespecfied) °'= Q. 0 C 1. All chiller piping to be supported ~ _ support piping ng weight. so that Chiller does not L U ....... .....__. - ._ .._..... 3" 2 Maintain a water treatment program appropriate for all the �EES TO materials in the heating system In addition the pH of the Q a L VE 2 2" 2"x1Yz" 1Y2 1Y"x1Ya" 1Ya' system water is to be maintained between 6.8 and 8.5. REDUCERS REDUCERS .... .... ....... .. ...... ........ a 1Yz'"x1Ya" 3 All piping to be supported so that heat source does not support \ y e 6 s a a A a R Rweight. / - REDUCERS 1Yz''x1Ya" 2„x1Y2" — piping ..... . .. t .... .. 1Ya REDUCERS REDUCERS -" _ 4. Vent high spots in piping mains to prevent air locks U ........ ..._ ...._........... c 5 Piping runs to be supported as required r vv CWR ' 17 Notify nto follow all state and local codes where applicable Z 6 . ._ & i design T� PIPING 1Y4, Delta T Solutions if changes are necessary so the b n can be modified as required. �q __� M k� 1 �_., - c - - 8 All line voltage and low voltage wiring,conduit and l! I r i disconnects shall be furnished and installed by others ... 9. Field coordinate/verify all dimensions,voltages,amp draws 1Y;' 1Y2'x1Yd' ... i t }1L / °O i and conditions before installation. �_REDUCERS - • �� -__/ ,1 10. Installing subcontractor will be required to cut and modify in �Revesd 1 the field for proper fit per details. " By- [Date ea ..................................................... ................. .... ........ ....... ... 1. JP 3-18-17 t•• f 6"CWS&CWR 11. Installing subcontractor shall assemble parts supplied by Delta CAPPED CWS&CWR PIPING ( T per Detail z. - - - - --. - ---' -- --- - - - 12. Attachments to structure shall be supplied by Installing 3 subcontractor as required.5. ° S 1 ......I! ... r __ 13 Installing subcontractor will be required to measure and cut all N By Date sections of the threaded rod based on Field Conditions -I O) 0 Oo, © O Oo 14. The Installing subcontractor will be required to measure and 2. J O cut some sections of Unistrut based on Field Conditions. Oo � Oo 3. � O� �-��J � � 15. The Installing subcontractor will be required to measure,cut, 4 and groove some sections of the Pipe and Insulation based on AGZ110 Field Conditions. min -XI ` CHILLER(TYP) Scale — 16. All hanging hardware shall be stainless steel,Galvanized,or Aluminum as noted on the Detail. Si. Arch D 57-4 17 Attachments of hangers to structure shall be by others. Dale 11-1ssols .._._....._.. __....,._„ ...._. By JP 18. This is a corrosive environment and proper materials must be F folect p' used. ,r A Chilled Water Cooling System - Layout 19. Insulation is provided for bare aluminum pipe with-in zones 160661-50 Note:Piping Shawn outside the -_ 5h Greenhouse far Clarity Only, ?L 1 j Scale: Y8"=T-0" below the 7 ft.(Off Finished Floor)level in each zone. ee, PL-1.1 ff n E U O N 0 U North 'iLevel 1 Boiler on Concrete Pad 0 59'-6" 10'-6" 64'-3" 25'_3" ) d rn �o 2/2 x3" m.. T 3 ---- 6 3 ---'_ - ---- ? .._ ------------------ 4 -' - mN °X1Y' Cc o1Y4 �� (TYP) 0�.. ___ HOTWATER __ -- CONTROL VALVE 3�� i � .ww� os �� See Sheet Z-1 �; "x1 4' �ZH-6 C - �.... TYP f a a a a s 1= Grow Room b i, „ (( C N b l W O N 0 i 2 3I ;i 110 �i 1Ya" [ mpN _3'X2Y° ii " (" C ub j1_� a 3 r /� '@ W N 00 1Y4" ; 1Y4� Lecien,.8& 2%TON �s �p row �ooCY1 0 -� FAN COIL IT w/Hot Waterer Heating Coils 4 f 2Y.TON r 104 FAN COIL UNIT I � ii i ii a 7 1Y4 �� 2 , �' f I' 2�� � E a 2Y2"x2" j rC�� Room 1 TON b i; ii �q FAN COIL UNIT RISERS TO ❑ 0 M 10 ;; ' ° 1Ya" LEVEL 2 w/Hot Water Heating Coils v -r ZH-16l r� 4 �- 11 � B ZH 2 L,.El :ZH t L._...,r L-„� � )a � '-�^ - ---- ------- - ----- --- ---- ' ---tief Water Supply Hot Water Return ---- ----- ----- ----- o HOT WATER a ` _......_— E.o �� J CONTROL VALVE F E E J Fur 1 o a a i a1 N (4)MECH.TEES W/CAP i; 1Ya" �, J •�� FOR FUTURE PIPING ( o ;, ,.. y (TYP) I v = L w 00 to i NOf@S (Unless OtherwAse 9 .rfjedT a 1. All chiller piping to be supported so that Chiller does not -- i� ;i support piping weight L cc y--- -- -- -- - -- - ,I 1Y2'X1Y4' li ..... _ 1/2 program appropriate � 2 Maintain a water treatment ro ram a ro Hate for all the 2 �I TO in materials the heating system. In addition,the pH of the at L VE 2 ZH Ya system water is to be maintained between 6.8 and 8.5. acc - - 3. All piping to be supported so that heat source does-not support ' Piping weight. ---------- .�. _ 1Y4' �'__- __ " 4. Vent high spots in piping mains to prevent air locks _ _ _ 5. Piping runs to be supported as required. o 1Y4' (. 6. Installation to follow all state and local codes where applicable. 1 a' 7. Notify Delta T Solutions if changes are necessary so the _i 4 , 1Ya" ... design can be modified as required ... 8 All line voltage and low voltage wiring,conduit and r \ r ' tion j disconnects shall be furnished and installed by others - ... t _ - _ 9 Field coordinate/verify all dimensions,voltages,amp draws h ........... ~i and conditions before installation. \ O ........ .. ................................................... 1Ya" �; — �/ 10. Installing subcontractor will be required to cut and modify inv g i the Ne By Dare. ... % \ for proper fit per details. ...... ......................................................................................... ................. .......... 1. JP 3-18-17 _� -� r �. 1. Installing subcontractor shall assemble parts supplied by Delta 1 LJ L T per Detail z. _ _� ..... .....-..... ........... 1Y4' 12 Attachments is to structure shall be supplied by a -` Installing 3. subc 5'-0" as required. ..._-. ....--...__ .......... ..... ........... 13 Installing subcontractor will be required to measure and cut all No. By Dare' CAP 1sections of the threaded rod based on Field Conditions 1. .......................................................... OO O 00 Oo Oo 14 The Installing subcontractor will be required to measure and 2. n cut some sections of Un.strut based on Field Conditions � CCU 00 © ® � 0 � � required .... 3. J U U�OJ� � � � 15 The Installing subcontractor will be to measure cut, a - and groove some sections of the Pipe and Insulation based on --- , AGZ110 Field Conditions. Wf- CHILLER(TYP) sale Y^=r-o• 16. All hanging hardware shall be stainless steel,Galvanized,or Aluminum as noted on the Detail. size Arch 0 17. Attachments of hangers to structure shall be by others. Data 11-18-2016 tq ..._.. ...................... ........ By JP 18. This is a corrosive environment and proper materials must be No used. A 1 Hot Water System - Layout 19. Insulation is provided for bare aluminum pipe with-in zones 160661-50 Note:Piping Shown Outside the __ L-1. below the 7 ft.(Off Finished Floor)level in each zone. sneer Greenhouse for Clarity Only. ', �.. � Scale: YB"=1'-0" PL-1.2 N E F- m U , North Level 1 o rin O 59.6" 63'-6" 25,_3„ d! d rn--0a y ,.'0 ..:. �° NN 1 1 co L_ J E o .2 ......... U N r—.1 ........ _ ......... �. . .....__ __._.... ............_ 7 n. 5 E N 6�1 4J _. a00 CONDENSATION LINE See Sheet FC-3 (TYP) N s c Grow Room �......... �........--- .... 1-- 1 - 1 = m 11 a 22 CONDENSATION LINE _c ±+ f0 to J N9 See SheetFC-3 Packaging g & o °� LO :7 cLO (TYP) °" RUN CONDENSATION ........ Processing ° W N 00 LINE TO DRAIN g a (By Others) ' 105 Legend a ♦ 4 A x A N` o n FA TON 9 � FAN COIL UNIT h =- - Groff/ Room w/Hot Water Heatin Coils ` - ' 104 2Y2 TON FAN COIL UNIT a - { €v 1 TON o Grow Room "\ RUN CONDENSATION RISERS TO ❑ FAN COIL UNIT 8 - S> w/Hot Water Heatin Coils co• 109 LINE TO DRAIN LEVEL 2 9 g (By Others) f ♦ . . F4� e` RUN CONDENSATION —Condensation Line -------------------- LINE TO DRAIN - (By/// / ( Y Others) ♦ 1�....-... --� _- ......... ---- .....� ..........� a i; g 3 I " RUN CONDENSATION E 9 J LINE TO DRAIN J (By Others) y Dry Room ) Grow Room o Veg. Room J 08 ` 10 M c� N Notes (Unless Otherwise Specified) v O J T I 1. All chiller piping to be supported }' e p'p g pported so that Chiller does not � � O support piping weight = a -_.... ............... — y RISERS TO 2. Maintain a water treatment program appropriate for all the - e RUN CONDENSATION i y LEVEL 2 LINE TO DRAIN [ materials in the heating system. In addition the pH of the -O system water is to be maintained between 6.8 and 8.5. Q e r--� (By Others) ... ................. O i 3 _�_ 3. All piping to be supported so that heat source does not support V _ ---------- pipingx x ♦ ♦ x P P 9 PP PP e « + e weight. 4 Vent high spots in piping mains to prevent air locks 5. Piping runs to be supported as required. 6. Installation to follow all state and local codes where applicable .... 8. All line voltage Solutions rf changes are necessary so the 7. Notify Delta T o Ni 'g modified as required o Grow Room � �, _ M 107 . - . - - 9 and low voltage wiring,conduit and \ Irrigation disconnects shall be furnished and installed by others — 1 ..... 9 Field coordinate/verify all dimensions,voltages,amp draws RUN CONDENSATION Room and conditions before installation LINE TO DRAIN ( _._�.. 10. Installing subcontractor will be required to cut and modify in Revsed the field for proper fit per details. N" ev Dale .ta (By Others) _ 11 Installin sub I assemble I--4 --` --�• g contractor shall asse b e parts supplied by Delta ' 1. u T per Detail. 2. ........... :::::,� .... .. 3. ;. --- - -- - - � 12. Attachments to structure shall be su lied by Installing 1 o subcontractor as required. 4 -� 5'-0" �- Z 13. Installing subcontractor will be required to measure and cut all No. By o.t. sections of the threaded rod based on Field Conditions - - -- 4 14. The Installing subcontractor will be required to measure and 2. doo 0000 Y eo cut some sections of Unistrut based on Field Conditions. _..........._-.. ..........__.. _. 3. I 15. The Installing subcontractor will be required to measure,cut, — a. and groove some sections of the Pipe and Insulation based o.. Drawing Field Conditions. scale Ye"=V.0" 5'-0" 16. All hanging hardware Shall be stainless steel,Galvanized,or -"—" -'--"—'---'--'-----'-'— Aluminum as noted on the Detail. si:e ArchD f 5T-4" 17 Attachments of hangers to structure shall be by others. oats ff-05.201fi 18. This is a corrosive environment and proper materials must be By jp used. -- Note: Piping Shown Outside the Condensation Lines Layout 19. Insulation is provided for bare aluminum pipe with in zones Greenhouse for Clarity Only, 160661.50 below the 7 ft.(Off Finished Floor)level in each zone. '� L 1 3 P Scale. Ye"=1'-0"., PL-1.3 E S u t&Return Lines ' "'"' - p Stiov�tt on South wail '/� r 9 North , o p 3 -1 a n N _ } o O-0 "0 . o f/1 04 � 61 � c x ( E.o > 7 N r— C' rn 1-- OD_ vv o Ci ,5mo �m - ~ x -_ C No 5.c �a T L9 m m N Mir-O C I_O r°c W NOD ' ac n a -- — ....__ _.__ _ — HWS&HWR C7 N z �_ CWS&CWR w w LINES b m o N ❑ U)lL ❑ LU v OLL 00 V E J J > L J A \, Corridor Lines-South Wall Elevation -. Q �PL_L4i Scale: Y4"=1'-i 4Z 0 3T Notes'. (Unless Otherwise Specified) a a 0 W '1. All chiller piping to be supported so that Chiller does not support piping weight. 2. Maintain a water treatment program appropriate for all the materials in the heating system. In addition,the pH of the = z'- !n system water is to be maintained between 6.8 and 8.5. Q ................. ............... ........ ........ ........ . ................._ O 3 All piping to be supported so that heat source does not support _- - piping weight, O 4. Vent .. nt high spots In piping mains to prevent air locks U ..-. _.._.._ ....-. 5. Piping runs to be supported as required. 6. Installation to follow all state and local codes where applicable. o ....... ° 7. Notify Delta T Solutions if changes are necessary so the design can be modified as required. 8. All line voltage and low voltage wiring,conduit and NWS&HWR disconnects shall be furnished and installed by others. f LINES ... .-. ..-...... 1 C7 9 Field coordinate/verify all dimensions,voltages amp draws Z and conditions before installation CWS&CWR w 10. Installing subcontractor will be required to cut and modify in N �_ Y^ LINES U the field for proper fit per details. No. ey Date ZC1 ...... ......... ......... ..... 1. o Z 11. Installing subcontractor shall assemble parts supplied by Delta �w of T per Detail. L 00 12. Attachments to structure shall be supplied by Installing 3 LL ❑ subcontractor as required. 4 "m 13. Installing subcontractor will be required to measure and cut all No.' By Date sections of the threaded rod based on Field Conditions. _... ..._.. _ .. ._-..-.-. 14 The Installing subcontractor will be required to measure and z. cut some sections of Unistrut based on Field Conditions. s 15. The Installing subcontractor will be required to measure,cut, 4 —_...__ and groove some sections of the Pipe and Insulation based on Drawing Field Conditions. scale Y„=r-o„ 16. All hanging hardware shall be stainless steel,Galvanized,or Aluminum as noted on the Detail. size Arch D Date 11-15-2016 17. Attachments of hangers to structure shall be by others. ___ ............. ___._____ ...._....-.... ............____ 91 JP 18. This is a corrosive environment and proper materials must be ProJ.ct No used. '............... ..... Greenhouse for Clarity Only. 1'L-1.4/ Scale: %"=1'-0' below the 7 ft.(Off Finished Floor)level in each zone. Sir PL-1.4 pal g c _o N �•' North Level ' o L N a V/ CWS&CWR U N O y Q LINES HWS&HWR v }J @ LINES e o > >eo ^ce :c... f ( CR �;.: !t c 0 F—ONO x .s_ ccpa d� x o W o LO 2 �� N O N e�� oq otrr;o @c W N00 Legend a a A TON o coF FAN COIL UNIT w/Hot Water Heating Coils 8v 2%TON _ (4)SADDLE TEE 1.25"X 3/4"FOR FAN COIL UNIT HEATING AND COOLING(TYP) 2 (2)SADDLE TEE 1.25"X 3/4"FOR COOLING 1 TON -- (2)SADDLE TEE (TYP) p FAN COIL UNIT 8 s 1.25"X 1/2"FOR HEATING 2J w/Hot Water Heating Coils (TYP) ., ee 3-WAY HOT WATER _ Chilled Water Return q 2 c Connection to Main Lines- Section CONTROLVALVE=- - --- - - —Chilled Water Supply y ' Chill d Wate --- PL-1.5 Scale: _0_ See Sheet Z-5 N/e 1,_��� -- Hot Water Supply ----------------------------- 8 (TYP) --Hot Water Return ----------------------------- E U $ 1 TON FAN COIL J (TYP)See Sheet FC-5 g- J FAN COIL ON LEVEL 2 W/ .6 NL 2--WAY CHILLED DUCTING DOWN TO LEVEL 1 WATER MIXING VALVE (Shown for Clarity) Q rn See SheetZ-D1 s 1.25"PIPING OFF MAIN L SUPPLY AND RETURN(TYP) Notes (unless Otherwise Specified) ! t'�' O Pa c k g i n 1. All chiller piping to be supported so that Chiller does not ~< Q� in support piping weight. (2)SADDLE TEE 2. Maintain a water treatment program appropriate for all the " Processing materials in the heating system. In addition,the H of the > 1.25 X 1/2'FOR HEATING 1/2 PIPING OFF MAIN 9 Y p = (TYP) SUPPLY AND RETURN(TYP) n system water is to be maintained between 6.8 and 8.5. a -- V 5 3. All piping to be supported so that heat source does not support l piping weight }� 4. Vent high spots in piping mains to prevent air lacks. 1CZ — ---- a ° ( 5. Piping runs to be supported as required. FAN COIL 6. Installation to follow all state and local codes where applicable (2)SADDLE TEE Sea Sheet FC-4 --- " 7. Notify Delta T Solutions if changes are necessary so the 1.25"X 3/4"FOR COOLING ( F 7 for connections �y y g y " l J design can be modified as required. TYP (TYP) g .............. 8. All line voltage and low voltage wiring,conduit and __-- disconnects shall be furnished and installed by others ..... .... ...... .... ..... " Irrigation 11 l 9 Field coordinate/verify all dimensions,voltages amp draws �, II and.conditions before installation. .... ....... ........................... ]... 10. Installing subcontractor will be required to cut and modify in Re —`'� -- - the field for proper fit per details No. By Date (2)SADDLE TEE �.J ... ......... .... ......... ........ 1. dP 5-15-17 1.25"X 1/2"FOR HEATING 11 Installing subcontractor shall assemble parts supplied by Delta T per Detail. (TYP) 10 z. ��-- •--`f '-' ._......__— 12. Attachments to structure shall be supplied by Installing 3' _2- 111111, subcontractor as required. 4. - ..-......° 13. Installing subcontractor will be required to measure and cut all No. By Date sections of the threaded rod based on Field Conditions. ..... "- 14. The Installing subcontractor will be required to measure and z, cut some sections of Unistrut based on Field Conditions. 3. (2)SADDLE TEE „ ._.-.. '. .:::::: _._. ., 1.25"X 3/4"FOR COOLING 15. The Installing subcontractor will be required to measure,cut, 4 (TYP) and groove some sections of the Pipe and Insulation based on a Field Conditions. scale �r,„-=r o' - . 16 All hanging hardware shall be stainless steel,Galvanized,or Aluminum as noted on the Detail. Slza Arch D 17. Attachments of hangers to structure shall be by others. Date 3-28.2017 .... ......... .......... ..,,,,, ......... ...................... By JP 18. This is a corrosive environment and proper materials must be used. B Level 1 Fan COII Piping -Layout 19. Insulation is provided for bare aluminum i e with-in zones160661-50 Nate: Piping Shown Outside the . ......... ....................-—..........................................................................................._.................................................................................................. �._._, pipe PL-1.5 ale: %fi'=1'-0" Level 1 Fan Coil Pi in -La OUt below the 7 ft.(Off Finished Floor)level in each zone. Greenhouse for Clarity Only. A } JD .1 e PL-1.5 Scale: N/e"=1'-0" P L-1.J 5 N C CS North t <.T Ea — 60'-0„ TT m c C E �' r "v vti & °mo ,�€ 9 E��� FAN COIL ON LEVEL 2 W/ ye —a o r V'r('�VII ROOM DUCTING DOWN TO LEVEL 1 0 5 � ��. 1 (Shown for Clarity) =o NO 12 205 WON c o I� Clones W N00 Legend Room w a a a a ry ��++ FAN ON d `. =- -= _ J, 2�V -� COIL UNIT € ... ; w/Hot Water Heating Coils !§s ------------ 2Y2 TON FAN COIL UNIT ° 50,-6, �- ZH_9 ii _ Grow Room II I; RISERS FROM LEVEL1 �zc-o� I-� 1 TON € o oom ,' „ D FAN COIL UNIT 3 o �'q w/Hot Water Heating Coils 204 ; (� i i �i 1. Zone Valves located on ZH_jp, g 8 �. HOT WATER it lZH B� level 1 -- ------- as CONTROLVALVE w/ 0 -............- Chilled Water Return 8" See Sheet Z-2 _ I (TYP) " --Chilled Water Supply -Hot Water Supply -- I Hot Water Return ---- --------- - A Level 2 System Layout - ......... ...------ { PL-2 Scale. %s =1'-0" o E J r _ (4)MECH.TEES W/CAP =$ L FOR FUTURE PIPING m Q C 4 Lary R om � (TYP) �A as 203 a � Lo J. piping so RISERS FROM „ 1. All chiller pip � � � �to be supported so that Chiller does not LEVEL1 -.- -: support piping weight = w_-.._ ZH_7 Maintain a water treatment program appropriate for all the - materials in the heating system In addition,the pH of the Q ZC 7 system water is to be maintained between 6.8 and 8.5. _= 3. All piping to be supported so that heat source does not support e a a a piping weight.— CHILLED WATER Y MIXING VALVE 4. Vent high spots in piping mains to prevent air locks h See Sheet Z-1 -...... 5. Piping runs to be supported as required (TYP) 6. Installation to follow all state and local codes where applicable. ....... ...... .-, „_ ........ ....... tJ•.1 j 7. Notify Delta T Solutions if changes are necessary so the Grow Room design can be modified as required. 4 8. All line voltage and low voltage wiring,conduit and 20 disconnects shall be furnished and installed by others ...._.__..__.. ....._.—--.... 9. Field coordinate/verify all dimensions,voltages,amp draws and conditions before installation. _ 10. Installing subcontractor will be required to cut and modify in the field for proper fit per details. Nc. BY Deie ......... L a * * �� 11. Installing subcontractor shall assemble parts supplied by Delta _ T per Detail, 2. _.. .., . ' ) 12 Attachments to structure shall be supplied by Installing '' 54'-0" 5'-0" I- subcontractor as required. - 4 13. Installing subcontractor will be required to measure and cut all No. BY Daee sections of the threaded rod based on Field Conditions. 1. 14 The Installing subcontractor will be required11 to measure and 2. cut some sections of Unistrut based on Field Conditions. s 15. The Installing subcontractor will be required to measure,cut, 4 and groove some sections of the Pipe and Insulation based on Drawl; Field Conditions. scale Y;-r•o 16. All hanging hardware shall be stainless steel,Galvanized,or Aluminum as noted on the Detail. s:e Arch o .- ......... .......... ......... Date 11-16-2016 17. Attachments of hangers to structure shall be by others ........ ............... .. .......... BY JP 18. This is a corrosive environment and proper materials must be project No. used. — A eVe ystem- Layout 19. Insulation is provided for bare aluminum pipe with in zones 160667 50 Nate:Piping Shown Outside the below the 7 ft.(Off Finished Floor)level in each zone. Sheet PL 2 Scale Ye =1'-0" .. (3re�;rthtztase far Clarity Only. ......_.� P L-2 re E U O North Level 2o a C m 'En @ 60'_0" - chi I C6 00 ......:_..---- -. .... _ ...._... ........- _ — o ii a o b (L)c\i P �00 c _rt �ti (� _0 i � �m i6 NCO 1Yd'CWS& 1Y"x1Y4" Cn CWR PIPING REDUCERS ( x m FAN COIL ON LEVEL 2 W/ S Grow 1Y2"CWS& DUCTING DOWN TO LEVEL 1 rn�� CWR PIPING Cl) Shown for Clarity) m 205 to tn 0)r_o 1Y4"CWS& 1%"x1)/4" 1Y2' 2 x1Y2' W N w 2! CWR PIPING REDUCERS REDUCERS �L-nen « e a a M .. - ------ -- - - - -- 6 FAN COIL UNIT _ 2/TON :-- - ' w/Hot Water Heating of 3 ZO-9 a.:: - s a 2%TON ...., 1Y4'CWS& 1Y2'x1Ya' FAN COIL UNIT £ CWR PIPING REDUCERS 2/2"CWS& CWR PIPING _. ..........a j aN �y 1 TON o r�}W �.ot�t`1 p FAN COIL UNIT 3s o � I RISERS FROM LEVEL1 w/Hot Water Heating Coils ' 1Y2'CWS& \ Zone Valves located on e CWR PIPING level 1 a o �t .... ....... i, _...-_..Ci '.;r•1rte,7eturn-- --------- a 1Y4"CWS& 1Y2'x1Ya" CWR PIPING REDUCERS 1Yd"CWS& —Chilled V'ater Supply CWR PIPING s e s eZC-8} 3"x2Y" ♦� REDUCERS A Chilled Water Cooling System-Layout __ _ L )._ — -- - J- --- --- �L-2.1� Scale y _T-0" " w oa aE — y i d (2)MECH.TEES W/ L J CAP FOR FUTURE Q d PIPING(TYP) r ,. o 3"CWS& T ta` CL 0 c N�1��$ fUnless otherwise Specified} 0� CWR PIPING 1 All chiller piping to be supported so that Chiller doe 0 RISERS FROM L U LEVEL1 �` support piping weight. __ --_... .................. 2. Maintain a water treatment program appropriate for all the materials in the heating system. In addition,the pH of the L is system water is to be maintained between 6.8 and 8.5. Q -.. ............... 3. All piping to be supported so that heat source does not support > y a a C. �YF piping weightCHILLED WATER ......... ......1Ya"CWS& 1y"x1Y4" 1Y2"CWS& 2 MIXING VALVE 4. Vent high spots in piping mains to prevent air locks. 0 _ .._.._.. CWR PIPING REDUCERS CWR PIPING REDUCERS -- " 5. Piping runs to be supported as required. (TYP) 6. Installation to follow all state and local codes where applicable. .......... ...... ........ 7. Notify Delta T Solutions if changes are necessary so the (' design can be modified as required. M2"CWS& 1 8. All line voltage and low voltage wiring,conduit and CWR PIPING disconnects shall be furnished and installed by others. .__.._ .... - 9. Field coordinate/verify all dimensions,voltages,amp draws and conditions before installation. 1%L' r'dS& 1Yz''x1Ya" { 10. Installing subcontractor will be required to cut and modify in CWR PIPING REDUCERS the field for proper fit per details. Ne. By Data e e s 11. Installing subcontractor shall assemble parts supplied by Delta I' T per Detail. 2. -... 12. Attachments to structure shall be supplied by Installing s 5'-0" subcontractor as required. 4 �I I� 13. Installing subcontractor will be required to measure and cut all ` OM Ne. By Dare sections of the threaded rod based on Field Conditions. _._........ --._ .... 14 The Installing subcontractor will be required to measure and 2. cut some sections of Unistrut based on Field Conditions. s 15. The Installing subcontractor will be required to measure,cut, a and groove some sections of the Pipe and Insulation based on Drawing Field Conditions. 1 0 olo 16. All hanging hardware shall be stainless steel,Galvanized,or s Aluminum as noted on the Detail. sza Are D ..-.- ................. .. Date 11-15-2016 17. Attachments of hangers to structure shall be by others. --.. __-__-___- _..-...._. _.......-_._..............J By JP 18. This is a corrosive environment and proper materials must be Rr 3 used. Note:Piping Shown Outside theA , Chilled Water Cooling System- Layout 19. Insulation is provided for bare aluminum pipe with-in zones 160661 50 _..... LPL 2 1 Scale. %"=T-0" below the 7 ft,(Off Finished Floor)level in each zone. L - PL-2.1 o yi4vU North Level 2 _ 0 w. a� N 60'-011 <ti O00 77 Q .�tTT ....,I_ ,...�.»�...e.,... s O 75 n m lY4.. CI) �p (0 d 5 H a � d u) m FAN COIL ON LEVEL 2 W/ i Grow Room 1Y4, DUCTING DOWN TO LEVEL 1 � ��ro 0 of o (Shown for Clarity) [ 0 N° _ II vN Q corn r o a atr;o cCNo 0 LLJ Legend ' �-•••�. s — 2%TON c �o rl _- t_J - =_- _� 4=_�' i -- FAN COIL UNIT GIs 3 .;„ w/Hot Water He 2"x1Ya"TEE ... sting Co 2%TON "m FAN COIL UNIT "�g 1Ya" ;' t - z - o E �; ZH•9 I� _° -- "—y ii 2"x1%a" .. 1TON o Grow Room 1Y" �� ; �� 2"x1Ya" TEE U FAN COIL NIT -- o m ) a ;; RISERS FROM LEVEL1 O w/Hot Water Heating Coils Cl 204 � H 8� Zone Valves located on -o g 8 s HOT WATER -_ level 1 - _ - - a° CONTROL VALVE f ` - - a v _ °@ 1Ya" See Sheet Z-2 i; " r. 1Ya"HWS&HWR (TYP) PIPING(TYP) Hot Water SUPPly --- ° ..., --_ Hot Water Return --- ---- ----- -- jU 1 A Hot Water Heating System -Layout -- a Scale: e1-0" e J N (2)MECH.TEES W/CAP -- L > m u FOR FUTURE PIPING Q J r " (TYP) m o a U) `" N4#r#S {Unl@sg iTf ectfied) ii�yll ¢` 0 O1 2"x1Y4'TEE 1. All chiller i � RISERS FROM 2 � piping to be supported so that Chiller does not LEVELI support piping weight..-..-...: ......... ......................... C d ZH 7 Sr = 2. Maintain a water treatment program appropriate for all the _ materials in the heating system. In addition,the pH of the L - - „ system water is to be maintained between 6.8 and 8.5. Q m "-- 3 All piping to be supported so that heat source does not support ___--- --- -- b a a - - piping weight. o ...... ....... ....... Y S 1Y4' 4 Vent high spots in piping mains to prevent air locks 5. Piping runs to be supported as required. fi 6. Installation to follow all state and local codes where applicable. 7. Notify Delta T Solutions if changes are necessary so the t u design can be modified as required. 1Yn" m ice`" 8. All line voltage and low voltage wiring conduit and disconnects shall be furnished and installed by others. € --_._ ....... ..............--- ._----,_ ---__- --------__.."._ .......... i 9. Field coordinate/verify all dimensions,voltages,amp draws and conditions before installation. 14 i; 10. Installing subcontractor will be required to cut and modify in 61 ijp �I OI pl the field for proper fit per details N° By Dace ......... ......... 11. Installing subcontractor"shall assemble parts supplied by Delta ---------- T per Detail. z. 12. Attachments to structure shall be supplied by Installing a subcontractor as required. Reviewed ByI 13. Installing subcontractor will be required to measure and cut all No By Dace sections of the threaded rod based on Field Conditions. .. ........ ......... ......... 14. The Installing subcontractor will be required to measure and cut some sections of Unistrut based on Field Conditions. 15. The Installing subcontractor will be required to measure,cut, and groove some sections of the Pipe and Insulation based on crewing Field Conditions. — 16. All hanging hardware shall be stainless steel,Galvanized,or size Arch D Aluminum as noted on the Detail. .......... Y.. Dace 11.1e-2016 17 "Attachments of hangers to structure shall be bothers. ___.__ __..____. _.____-_ ______________ By JP 18. This is a corrosive environment and proper materials must be Pic€ use Note:Piping Shown Outside the A `,i Hot Water Heating System-Layout 19. Insulation is provided for bare aluminum pipe with-in zones 1 16066 -50 ...... ....... ._....... ........ -................ Greenhouse for Clarity Only. PL 22` Scale. Y6 =1'-0" below the 7 ft.(Off Finished Floor)level in each zone. PL-2.2 c n E j r U North Ello 1 n o TQ 60, 51 CONDENSATION TODRAI d Others) F atU c Do 14 00 CONDENSATION LINE See Sheet FC-3 �! Grow Room �< M �o LO 20 �'m AA++ 4)0N RUN CONDENSATION a°a W 5—Lo LINE TO DRAIN r-o /� s' Q e (By Others) ��or1@ W N c0 Room - Legend a x £ x x R t 0 �.. FA TON 206 FAN COIL UNIT o 3 w!Hot Water Heating Coils 8d �^ 2%TON 3 -- FAN COIL UNIT L n RUN CONDENSATION j LINE TO DRAIN 1 TON t Grow Room (dy Others) FAN COIL UNIT 8 t a� 204 w/Hot Water Heating Coils = _ a I � Condensation Line --------— ---- A -'— _-- U --- _ A `, Chilled Water Cooling System Layout 9 J ---..... .... 1 sE J �L 2 3,i Scale: Ye' - -0' y I =_9 i.......i re d Dry Room L H �£ (D n as a 1 "-"' Notes (unl 11 ess otherwise Specified) t 0- J € 1. All chiller piping to be supported so that Chiller does not0 O support piping weight. .. -..-, ............. ......... ..... ......... ......... N 2. Maintain a water treatment program appropriate for all the =materials in the heating system. In addition,the pH of the m -- system water is to be maintained between 6.8 and 8.5. a C ...... ...... ....... a _ CD3. All piping to be supported so that heat source does not support > L) a a a x piping weight. Y ....... ..... ........................................................... .. . 4 Vent high spots in piping mains to prevent air locks 5. Piping runs to be supported as required. 6 Installation to follow all state and local codes where applicable .... 7. Notify Delta T Solutions if changes are necessary so the i ( Grow Room design can be modified as required. __._.. m 202 8. All line voltage and low voltage wiring,conduct and disconnects shall be furnished and installed by others. ........ ......... 9. Field coordinate/verify all dimensions,voltages,amp draws and conditions before installation. _- - -— - 10. Installing subcontractor will be required to cut and modify in 5 sue, the field for proper fit per details. No.I By Date x x x x 11. Installing subcontractor shall assemble parts supplied by Delta 1. T per Detail. Z' _ — ..... 3. 12. Attachments to structure shall be supplied by Installing subcontractor as required. 4. 13. Installing subcontractor will be required to measure and cut all No. By Date sections of the threaded rod based on Field Conditions. ............... 14. The Installing subcontractor will be required to measure and 2. cut some sections of Unistrut based on Field Conditions. 15. The Installing subcontractor will be required to measure,out, 4 and groove some sections of the Pipe and Insulation based on Drawl g Field Conditions. sale %'-ro 16 All hanging hardware shall be stainless steel,Galvanized,or cNe Arch D Aluminum as noted on the Detail. - ......... ......... ........... ......... ........ Date 11-15-2016 17, Attachments of hangers to structure shall be by others BY JP _— 18. This is a corrosive environment and proper materials must be Protect No. used. Note:Piping Shawls Outside the ! A Condensation Lines-Layout 19. Insulation is provided for bare aluminum pipe with-in zones Sheet 50 LPL 2.3/ Scale: Ye =1'-0" -,.-...-. below the 7 ft.(Off Finished Floor)level in e ach zone. Greenhouse far Clarity Only. ...........; P L-2.3 MOD: 1222 Equipment Schedule Piping Schedule 0 Item Description Part No. Qty Item Description C 1 CHILLER UNIT AGZ130 1 P PIPE STEEL ROLLED SCH 10 3.00"X 21' DSP30010-252R AR o 0 2 BELIMO ACTUATOR PER DESIGN 1 E ELBOW GROOVED 90°3.00" DSE300 5 ® o 49 BV BUTTERFLY VALVE GROOVED 3.00" DSV300 2 <r to Chiller d C COUPLING GROOVED RIGID 3.00" DSCR300 13 FL 3"GRUVLOK FLANGE SET DEFCG30 2 a� S1 CHANNEL(GALV.)1.625" DSMU AR <-6 Q S2 STRUT CLAMP(PLATED)3.00" DSMC300 AR O o m 1 8 > L)cw� o 42 �o HDo �= V,Iw 11)006 S =r n€ � d m � r3 c a00 N O _ N Chiller toMr- BV 2 CWR w N 00 FL O 2 Y P E E SEE DRAWING C-2 1 FOR SECONDARY LOOP PIPING ♦ ♦ C DETAILS, 8 E v S 1 ♦ S2 = �— F M�� CWs I -"Cl-" J� �^ CWRR CWs CWR 0 0 � tt7 2 � ae r B', Chillers Supply- Piping Detail L> U FL1 v $y C 1 i Scale. 1"=1-0" � V ......... J Eo a.... 9d J a E _t o. C. 0 0t!1� 7 P �� a O Chiller BV L' L L Q 1 -1 0 0 BV C P E E1 CWR No. By Date 2. 3, 4. S1 NG. By Date S2 d' 0 0 04 2. ._......._.. O 4. Scale �W 3 .. _ ..... .... _ ..... ............ Site Arch CWRR CWs CWR Date 12.08.2018 By JP c� Chillers Return- Piping C-1 Pi IngDetail `A- Chillers illers End-End- Layout shy 160661-50 Scale: 1 =1-0' . __ ......... ......... ......... Scale: Y2'=1'-0" C-1 MOD: 1222 Equipment Schedule Piping Schedule 0 Item Description ID Mo city Item Description` Park Na ',Dty o C 1 AIR SEPARATOR DEAS600 1 P PIPE STEEL 6.00" DSP60010-252R AR o 15 2 AIR VENT DEAV075M 1 E ELBOW GROOVED 90°6.00" DSE600 4 ° o (n 3 EXPANSION TANK DEESX110 1 T TEE GROOVED 6.00" DST600 2 4 REGULATOR DEVPR050 1 CP CAP GROOVED 6,00" DSCAP600 2 Do - £o Yea 5 PRESSURE GAUGE DEGP060 1 BV BUTTERFLY VALVE GROOVED 4.00" DSV400 4 N T� E ,p' 6 THERMOMETER DET60 2 Tr1 TEE-REDUCING HCX G 6.00"x3.00" DSTR600300 6 �O V 7 SENSOR W/WELL DECW 1 Tr2 TEE-REDUCING HCX FTP 6,00"0.50" DSTR600300 3 ♦.I @ M 8 PRESSURE SWITCH DEGPS 1 C1 COUPLING GROOVED RIGID 6.00" DSCR600 15 a > N C2 COUPLING GROOVED RIGID 3.00" DSCR300 6 v O c p CT COUPLING THREADED GALV 0.50" DSCG050 1 A! ��ib Br BUSHING GALV HEX 1.25"x.05" DSHBG125050 5 &€ c ro O B Boiler Piping -Side Detail FL BIN 125#GRUVLOCK FLANGE DEFCG60 2 0 C-2 Scale: wv=1'-0" N NIPPLE GALV 0.50"x1.50" DSNG050015 1 N; c �..._i o r cm LO C N O $ 0 N /7\ C o o a Y/ `o OI r O o W N OOD ne as $.o �s 8� Connections to € j Section Pump =_ Station w_ SEE DETAIL"B" a Connections From Chiller Supply �\ I a .... Future Bailer ~ W SEE DRAWING C-3 f _ - _. .........- C W R-- ........... --- -- — -- L- - E 8 FOR OVERALLA. LAYOUT DETAILS. 1 t..._. C cws ........ ........ « �"......... C......_ _. - - ..... �� B (,� J E CWRR 1� at J o E I Supply a ns From Chiller L Connections w � Su I Connections Frain RGehkller /� a�, � 4)A Connections From Chiller A Q urn .�_+ CL 0 t Return L 0 fl 2 I..� SEE DRAWING FW-1 FOR AIR L U 1 SEPARATOR DETAILS .� r FL Q C v C2 ROTATE ELBOWS TO ALLOW ` y Connections to E FOR UNISTRUT SUPPORT / N Zone and -- 6 UNIS.TRUT SUPPORT INSTALLATION Y Section Pump � Tr2 RETURN LOOP � �l=1 � INSTALLATION TYP � .... ........... ......... _ ............. ��///---. ......... ......... —.. NN A+ i � � ......... ...... -- ._...... _ --. SEE DRAWING FW-1 FOR 7 EXPANSION TANK DETAILS C2 ^^ SECTION VIEW C-C Connect New System Piping Tri CT Connections to C2 C.7> 5 to Existing System Pump \ N Chiller Supply\ a Tr2 ZONE SUPPLY a ppy i Tr1 C1 3 CP « 'M No. BY Dete 2. Connections to 3. Chiller Return SECTION VIEW B-g Connections to 4. C2 Chiller Return C2 C1 r Tr1 REVERSE RETURN. Reviewed OOP CP * * — *� Tr1 E No By, Date F 2. 4. SECTION VIEW A-A D awing b Scale 6/B'�'I•0 ', Size ArchD Date 72.70-2016 BY JP Project No, A` Secondary Chiller Loop- Detail� 160661-50 / Sheet C 2/ Scale: 8,,.-1,-0,. _...... — C-2 o o cn cm 0 m n N 01 E 0 0) y Sin a Q O �Q . 0 �-+ CIO >_� g �Q) o E0 O 00 19 �.3 U) 0 Yea m1 �� -NC �+ m 1.0 oN to u, ° W N co mz T • c 3 PUMP STATION IE See Sheet CP-1 Air., l t water(See Sheet FWA) qEj r - ._._...--- ---....... - ..............------_.- --- t CWRR - _ ... .... _ CWs . ........ � 41 C39 cc> YY C W R L17 ` D - 1 -- Ea J J o°E 0000 000000 0000 _ WW 3 M 'o OOOO CC ® ® � O � � ao ® a' •— U � L ,_0,_- 16,-0 —......-.4-0 16.0 q_p..—..-.......... 16.Oa lie --- ----- -- -- ----- Service(Air Intake Clearance --- -- -- ---_ 61'-11" �Revised Tv No. By Data 2. 3. Reviewed By No By Dale 1. 2. 3. 4. -._Scale yz•'=1'0•• Blze Arch D Data 12-09-2016 By JP . �.�,..,.::I�. ;. /n A Chillers End End-Layout 160661-50 C 3� Scale: W=T_0' C-3 C2 T Equipment Schedule 0 Item Description Part No:" 'Qty o to E 1 CHILLER PUMP GRUNDFOS-LCSE 2 0 •0 0 GWS z n - Piping Schedule y m ;o -. o Item Description Part No• Qtt� 2") V --" """ - P1 PIPE STEEL ROLLED SCH 10 4.00''X 21' DSP40010-252R AR N O — - P2 PIPE STEEL ROLLED SCH 10 6.00"X 21' DSP60010-252R AR F �0 �U P2 E ELBOW GROOVED 90°6.00" DSE600 2 A-1 c C1 COUPLING GROOVED RIGID 4.00" DSCR400 12 o > 2 N CV C2 COUPLING GROOVED RIGID 6.00" DSCR600 8 v E o R2 BV1 BUTTERFLY VALVE GROOVED 4.00" DSV400 4 n v O j H ib BV2 BUT VALVE GROOVED 6.00" DSV600 1 �'; °-m o 4 ? C1 CV CHECK VALVE GROOVED 4.00" DSCV400 2 o E ` BV1 R1 REDUCER CON GROOVED 4.00X3.00 DSR400300 2 N r Cd R2 REDUCER CON GROOVED 6.00X4.00 DSR600400 4 v 0,,0 I T TEE GROOVED 6.00" DST600 2 '_o �� ` m a "4 LO EF TEE-REDUCING HCxF 6.00"xO.50" DSTR600050 1 'jy 0 N4"GRUVLOK FLANGE SET DEFCG40 2 o a a L9 P1 3"GRUVLOK FLANGE SET DEFCG30 2 a air-o WNWDRAIN VALVE,0.50"W/CAP&CHAIN DSV050HTDC 1 a a m� c 3 R1 FL C2 8'u P2 8 o Flange to tap of Purnp - q I § CWR 49 t I B Discharge Piping-Detail -- CP„1 i Scale: 2"=1'-0" j From 2 8 W= Tr Chiller ra =s DV o 0 o Source V -- a 9 J I E Gws a N E >` Cz _........................................................ I '° Q To O o o W �, 0 o C1 Chilled o — o O o >` c1 = N CL Zone l Bv1 �� 0 E CV R2 L d R2 O� j Q U I O BV1 FL1 j Flange to top FL2 of Pump FL1 CP. I O O O - C _ ..._ ......... - Flange to top of Pump j I � GWS R1 l 1 FL2 J O O j O O O O O 0 0 _ FL1 Piping From d P1� / Chiller No. By Date ,.•t '••....... D ....... C t. B ., ......... ..... ......... ........ ....... ......... .........-.... .. . ■ 2. 3. O _ _ e e ..... __ 4.IN JIM O 1 No. By Date 2. O O b .......... 3. O __... pp tl'�asregtnrer9 a .... ......... Do _ ......... .... 777 ® o o IDrawin9 � stt II o �• scale Yz' O O O Sin Arch D O Data 72.09.2016 ........................_..... By JP c„ Chiller Pump-Elevation A Chiller Pump Station - Plan View 160661-50 ... ........ ............................................ CP-1 l Scale: 2'=1-0" Scale: 2"=V-0" CP-1 Note:All Chiiled Water Piping shall be E insulated. 0 .0 2 75 42 E .............. .................. ................................... -0a) C5 .................... .................... --------------------- ...................................... ...................................................................... .................. 1C9 0 0 C, a)cj 00 dil- r -(0 co 0 0 S2 X --000 2 0 0 3 BG L? -6 Z Mr-0 1- ............. 0 LU N 0 00 O t� EG L 0............... NG1 TG HB1 HC i 'a HB2 BV HC i EG .... ......... ..... C R ................. .................................. ............................... .... \�,' \ _ \\\ HB1 L P ............................. —TH L................ cws D -ws \Nmii RN H HC NG2 A Ea Brl T2 VE —j HB1 E w HWS go ................. ........................................................................................................................................................................................................................................................... ............................................. ......................................................................................... k, O HWR HWR 0 0. 0 4.0 0 Condensate -------------- Condensate 'w — U- ------------------------ 0 Equipment Schedule It— Des—ption R.0 No. Qty 1 2-112 TON FAN COIL UNIT CWVFC-2500 1 FFLOW CONTROL 3/4" DEFRL075-0060 1 l=AIR VENT DEAV012M 1 -Revised I Piping Schedule No, BY Da1 e1L —��t#6ripfi.. z--72":!�`111111�� -—Part N.l h-, 2. H 3/4"HOSE DEH075 AR 3. EG ELBOW GALV.FPT 0.75 DSEG075 2 4. BV BALL VALVE PVC SCH 80 0.75" DPV075 2 N N., By Data BG BUSHING GALV.HEX 0.75X0.125" DSHBG075012 1 1L Brl BUSHING PVC SCH 80 SXS -,-SIGN 2 2. A ADAPTER FPT PVC X BRASS 'PEP ,-,SIGN 1 3, 4, TG TEE GALV FPT 0.75 DSTG075 1 Cheer HC HOSE CLAMP DMHC75 4 Seale 21/� HB1 BRASS HOSE FITTING 3/4 MPT X 3/4 ID DSHF075XO75 3 sa. Arch D HB2 HOSE BARB PVC SCH 40 S X 0.75" DPNH075 1 Data 12-10-2016 N1 NIPPLE GALV 3.00X.75 DSNG3000075 1 By JDK N2 NIPPLE GALV.0.75X1.50 DSNG075015 1 Project No, -, , f 'OR PIPE SIZES A 2..Y9 Ton Fan Coil Cooling 160661-50 ......... .............. --- - -— sneer FC-1j Scale: 2,Y4"=V-0" F C-1 Ante:All Chided Water Piping shall be E ._ .. r O m o M O - © 0 � N y6 ///V ____. E ..... ___ ..... ....... ... ..._ -__ _.� 1 t _ N o ti m= �N --� m O TC< �Q U O O E > >tb 1 " - 0 aa)V � Eo _ F-m �3 E " .�y� O O c= d� 3 _ of BG1 m C HC EG v m N O HB EG BG Q a o oh EG r -- — O NG2 WNW a� TG 0 HB HC i , i CWR CWR O f k CWS "VA-1 �\ c cws ws _ � i' H 2 NG1 Tr J NG1 J HWS I ® S ,-,. .............. ....... __ - ... ......... ..._l ----_.. ... ....... ......... ... L ...... i i _-_ Ok HB - a Q HWR "_` ® HWR a i 1 U HC BV r a 0 _ �+ O HB U � ......_ -A c Condensate ) Condensate ._ ea LL L" C N lie Equipment Schedule Item ;1 Description .part No-`- - 9 2-1/2 TON FAN COIL UNIT CWVFC-2500 1 2 FLOW CONTROL 3/4" DEFRL075-0060 1 `Revised 3 AIR VENT DEAV012M 1 No. By Dare 1. 2, Piping Schedule 3. Item Description - part Na. 4. AWEVia+ H 3/4"HOSE DEH075 AR No. By Date EG ELBOW GALV.FPT 0.75 DSEG075 4 1, BV BALL VALVE BRASS FPT 0.75" DSV075 2 2. BG BUSHING GALV.HEX 0.75X0.125" DSHBG075012 1 3, A ADAPTER FPT PVC X BRASS `F' :SIGN 1 tip/aw ng ; TG TEE GALV FPT 0.75 DSTG075 2 2Y,.-1,a.: Tr TEE SADDLE-REDUCING HCxF ' . C;SIGN 2 Sze Arch D HC HOSE CLAMP DMHC75 8 Date 12-10-2016 HB BRASS HOSE FITTING 3/4 MPTX 3/4 ID DSHF075XO75 8 By ID. tRfGr11  _ NG1 NIPPLE GALV 3.00X.75 DSNG3000075 2 _ NG2 NIPPLE GALV.0.75X1.50 DSNG075015 4 A 2Y2,TOn Fan COII-Cooling & Heat 180661 50 _ b FC-2 ` REFER TO PL SHEETS FOR RIPE SIZES �._ .� Scale: 2Y4"=T-0" FC-2 I i--- -- .: Equipment Schedule 0 Mill III 1 2.5 TON FAN COIL UNIT CWVFC-2500 1 0 FLOW C All' See Sheet F'L-1.3&PL-2.3 for Condensation Piping Layout _ N Piping Schedule for PVC Condensate Piping "� o Item Description Part No f]ty ',) H1 POLY TUBE 0.5" D1P3050 AR <F �O rnV 1 Al PVC SCH 80 ADAPTOR FTP x BARB 0.5" DPNH050F 1 g �� A2 PVC SCH 80 ADAPTOR MTP x BARB 0.5" DPNH050M 1 s 0 N See Sheet PL-1.3&PL-2.3 for Condensation Piping Layout flif O 6F-00 Piping Schedule 1.25" PVC Piping (/) m o � a)0 o is r X P PIPE PVC SCH 80 1.25 � DPP125 AR c Al B1 �C E ELBOW PVC SCH 801.25 DPT125 AR s00 T TEE PVC SCH 80 1.25 DST125 1 81 BUSHING PVC 1.25 X 0.5 S x FTP DPB12505OF 1 A d N H1 W _ - i IC1'�c��(@ CP CAP PVC 1.00 DPCP100 1 %� o See Sheet PL-1,3&PL-2.3 for Condensation Piping Layout £ W N 00 nti �a m A2 T e 8d �9 e`W �8 B 2 1/2 Ton Fan Coil Condensation Piping-Layout FC 3J Scale: 1.10 V 0 J E v T 91 J s o to �� c a _ 'a I 11a li F m o...... ......... o a ° L 0 — i o � o 0 0 0 0 = Q C) cc 0 0 0 0 0 0 c _ ............................. ......................................................_........................................................ � H 1 = N 0 0 0 0 o o f O - - - - O O - - ii — O - - - - - - ii til H1 CWs LJ...... .... ........ 0 o ....... ...... _ ° _. f ........ ........ ° o ° y ,,.... Chilled Wafter 0 4 0 f - - - - - - - - _.. - - — _ - - - - - - - Source E� I J - � WR L — — — — — — — — — — — — — — — — — — — Rev+sed ... ....,. .. .. .__. ... .... ... ... ,. _ .. _—. .... . .. __ .. — .... I I W -� No. BY Date _ ,. ._.__ _. .__ _.. _ _.... _._ __. _ _._. _ ... 2. � Heat Source 3. - - - - - - - - - - - - - - - - - - - - - - - - - - - - - � HWR a.- - - - - - - - - - - - - - - - - - - - - - - - - - I �^ — { J...L_._._..—......---.,.��.- ..—...� -Ll.-__ ..............._....�J . .. ___.._.. � ........___ _._._�.—__ 'o. BY Date CP T P E a, T 4. RUN CONDENSATION Scale 10^0'.0" PIPING TO DRAIN Size Arch D (By Others) Date 11.15-2016 BY JP 6 Ject No ei 1 ill A \ 2-1/2 Ton Fan Coil Condensation Piping- Layout 160661.50 Note:All Chilled Water Piping shall by Fa3 scale: 1:10 y (i insulated. FC-3 Note:Only Hot Water Piping shown for Note:pipe and flitting configuration for 6F Equipment Schedule Clarity. stand alone Fan Coil Units, _ g Item Description Part No. sty _ O 1 1 TON FAN COIL UNIT ENVIRO-TECH 1 a =3 0 E o Piping Schedule y N Item Da—iPtion Wert Na. O (A Q H POLY TUBE 0.75" D1P3075 AR c U P PIPE PVC SCH 80 0.75 DPP075 AR E^ }+ m 3 0 HC HOSE CALM DMHC07 2 ENVIRO-TECH FAN COIL UNIT 0 E v O 0 c> �m0 L_ x , 1/2"COPPER MALE 0 ADAPTOR 5 CV 1/2"FLOW CONTROL AW1 Q 1/2"COUPLING 1/2"COPPER - W N mcN-o MALE ADAPTOR 1/2"ELBOW -- (TYP) ENVIRO-TECH 1 TON FAN COIL UNIT 1/2" "=t o - - ELBOW 1/2"COPPER MALE ADAPTOR - E w 1/2"ACTUATOR CONNECT TO RETURN PIPING 1/2"COPPER MALE ADAPTOR 9 3= ATTACH CONDENSATE PIPING TO DRAIN TUBE EXIT SEE DETAIL"B" CONNECTION TO SUPPLY PIPING - %c\, Enviro-Tech Fan Coil F' : �inns-Top View ,FC-4,/ Scale: N.T.S. U J d - o Note.Cr>- 1, =zier Piping shown Note: ,,. (All cm c H CONDENSATION PIPING for Clarity. Stand alone Fan Coil Unifs. - CU Q � Q a L � C [ (� a a o HC P i c •� O CONDENSATION LINE FROM L U FROM FAN COIL � Q U ENVIRO-TECH FAN COIL UNIT U- 0 O 2 3/4"COPPER MALE ADAPTOR 3/4"FLOW CONTROL 3/4"COPPER MALE ADAPTOR ee,sed 3/4"COUPLING No,I By I Date JP 3-18_17 2. JP 5-15-17 3/4"ELBOW 3 3/4" 4. ELBOW T No, By I Data 3/4"COPPER MALE ADAPTOR Enviro-Tech Fan Coil -Top View_ 2. ....... ......... ......... ............... . ......... FC-4 Scale N.T.S. 3/4"ACTUATOR a. CONNECT TO RETURN PIPING 4. 3/4"COPPER MALE ADAPTOR D awt g seaie 10-1 0" ATTACH CONDENSATE PIPING TO DRAIN sae Arch D TUBE EXIT SEE DETAIL"B Date 11.15-2016 CONNECTION TO SUPPLY PIPING 9j P ', �Prolegt Nc, - 160661.50 A`, Enviro-Tech Fan Coil Gi-iiii66' vVd1Cl Top View Shy Note:Al � p, In Scale: N.T.S. � - - FC-4 Note:Only Hot Water Piping shown for Note: Pipe and fitting configuration for - E Equipment Schedule Clarity. Packaging and Processing Room $ Fan Coil Units. o y Item Description Part No. aty n O 1 1 TON FAN COIL UNIT ENVIRO-TECH 1 _ w E Piping Schedule 7U yLEY) Item Description c P Part No. 4ty U N O w Q H POLY TUBE 0.75" D1 P3075 AR P PIPE PVC SCH 80 0.75 DPP075 AR }+ ie 5 oo HC HOSE CALM DMHC07 2 ENVIRO-TECH FAN COIL UNIT _� p 6 v O 6,H00 r€ =mo e t � a)(0 �$ d�-M R� c'0"2 ao '2 Cm� m°9 �0to rWil to �o CrO 1/2"COUPLING lu N 00 az 1/2"ELBOW "c (TYP) = ENVIRO-TECH 1 TON FAN COIL UNIT 1/2" ."_-3 ELBOW 8$ �3 CONNECT TO 1.25"RETURN PIPING ATTACH CONDENSATE PIPING TO DRAIN TUBE EXIT SEE DETAIL"B" o CONNECTION TO 1.25"SUPPLY PIPING _ c Enviro Tech Fan Coil Heated Water Connections-Top View e ..... ............. ... ............................................................................................................... ......... ......... d- FC-5J Scale. N.T.S. _ U J E a° taaJ E _I o Note:Only Chilled Water Piping shown Note: Pipe and fitting configuration for H CONDENSATION PIPING for Clarity. Packaging and Processing Room w ° Q d Fan Coil Units. 06 mW L c -- HC P a ,= o 3/4"CONDENSATION LINE ++ i V FROM FAN COIL _ ir 4 Q) Q ENVIRO-TECH FAN COIL UNIT LL ra 0 F0— i 3/4"COUPLING Na, By Date 1. 2. 3/4"ELBOW 3. a. 3/4" ELBOW V! No. By I Date i. .. e....�.......Enviro-Tech Fan.....Coil......'...Top...View..............................................................................._..................................... 2 �FC-9 Scale: N.T.S. 3 CONNECT TO RETURN PIPING a, ATTACH CONDENSATE PIPING TO DRAIN Drawing TUBE EXIT SEE DETAIL"B" scale o"=r-o" Sl Arch D Date 5.15.2017 CONNECTION TO SUPPLY PIPING By JP / A~\. Enviro-Tech Fan Coil Chilled Water Connections Top View naQt sossl-so Note:All f;h Oled Water Piping shall be `PC- Scale: N.T.S.insiaiated. ---- ---------- 5�' FC-5 o ► - 30.0 Approx. 30'_0"Approx. o CEILING HEIGHT CEILING HEIGHT - r v H O 0 From Main Lines ��; �¢a //�/ E rr J U y 1 FAN COIL (TYP) N N m� o o -- ._ F C rn -- - — FAN COIL BOTTOM _-- 2 a -' FAN COIL BOTTOM a E o w ....... Q ... ......... ............ ......... ........ m n ¢ ° o N V— - i:l EO o O CV OD Cm0 (( v♦ �p NCO E O c d In @ O a0 DOOR �o �O 04 FINISHED FLOOR ( v 0 - - FINISHED FLOOR C) W N 00 i C ', Grow Room 110-South Elevation %p`\, Grow Room 110- North Elevation - ....- --- o _:.. €L 1. ' % = 3 Scale: 38��=1�_0�, Scale. T-0" 59'-6"Approx. 8 16-10" 16'_6" �i► 16'-10" _ _ 4'-9" 9 r M CEILING HEIGHT e ' 3t INSULATED CWS &CWR LINES 0 1 FAN COIL (TYP) i l I a - a... ---- ......... .. ........................................................E,....................... ........__. G o c a" �1TL,—(�l.�l—, 1= " � ....::__.—. :: - -- - FAN COIL BOTTOM Q a::.... .. ...........----,:r ::: -:--rx�- ..._ ..... -..-_.._ _ • wa .. .................. o J �a CONDENSATION LINE HWS&HWR LINES $E J Run to drain o Q� W t i �m FINISHED FLOOR .-.. .- _-..-.._ O_ O L iY / B�. Grow Room 110-East Elevation Q c EL 1.� Scale: 3/8"=T-O -- 59'-6"Approx. ► 12'-6" 12'-6" - - CEILING HEIGHT FAN COIL WITH HEAT A J � INSULATED CWS FAN COIL L p ( ) &CWR LINES (TYP) .; ...... ............. -- -- ._ ¢ ;I 4 Revised _... .,�.• _.... v 'i� ........ ........ .... — ........ I r-"1 No. By j Dates i _ .-. _._.. a :7 K ..... ...... -�� _. _". .....___................ .. „� -- o - ) FAN COIL BOTTOM a z. V 4. HWS&HWR LINES CONDENSATION LINE Run to drain Ne, gy D to 2. 0 aD 3. 4. Drawing sl.hc__. a.'=1 0�. ai.. Arch D FINISHED FLOOR cage 11-1e-201e _ -... ____. _...- _...... - __-. ----. ......... ... .................. -__-. _. ev JP /A Grow Room 110-West Elevation 160661-50 ._.._....a ........_ ......... __-...... .. ...........Nate f.,a, Piping Shall be EL-1.1- Scale: e„=1,_0 Sheet "till" EL-1.1 y E 30'-0"Approx. 30'-0"Approx. F 0 CEILING HEIGHT CEILING HEIGHT o c a o y o _I GC 0— 6. L0 ........- _.___— bl ... _- ._._... ...__. F—._... .. .......... ..... ...._........... <ti C -,� U FAN COIL (TYP) � ��o a FAN COIL BOTTOM - z...., ti, FAN COIL BOTTOM a E a Co Oa) E OO ;it 0 O �00 v _ _ _ Cco ( mm R (D(0 05 t.�r OI M 50 co DOOR oilcc L? Q - �- ��LO 11 FINISHED FLOOR FINISHED FLOOR N W N 0 — — — — 2- c~, Grow Room 109-South Elevation !D�•, Grow Room 109-North Elevation Scale: V=T-0" 1,EL-13/ Scale: 3/a"_V_0" i 59'-6"Approx. - 4'-9" 16-8„ — 16-8" �'� 16'-8" 4-_9„ °s CEILING HEIGHT E INSULATED CWS &CWR LINES FAN COIL (TYP) FAN COIL WITH HEAT 0 . 0 ' (TYP) _. .. .... ......... __......_.................................................................. 2 _ .._— -.-...... —P` --- - FAN COIL BOTTOM a =8 to — — o U V Ea J CONDENSATION LINE HWS&HWR LINES J Run to drain a — N o C >_ w �+ NV L m a o 0 FINISHED FLOOR if E O 4-1 IX Grow Room 109 East Elevation Q c .............. _.__................................... ........ L EL 1,2 Scale: e -1 0" ` 1 59,_6„ gPProx. /� 12'_6" _'-� 4-_9„ CEILING HEIGHT INSULATED CWS �j FAN COIL WITH HEAT &CWR LINES FAN COIL - i v ;l ) _ �;.. ..---. ......... .... ........ ......-. -- No. By Data X 0 fyY P FAN COIL BOTTOM C 4. HWS&HWR LINES CONDENSATION LINE No. BY Date Run to drain 1. 0 z. pp 3. 4 Scale %"=1 0 Slze Arch D FINISHED FLOOR if Date 11-15-2016 ......... B, JP Protect Vo A\`, Grow Room 109-West Elevation 160661-50 /Va$ C Piping shall be ,EL-1.2 Scale: 3/"=1'_0 meet rv�ul-ated. EL-1.2 30'-0"Approx. 30'-0"Approx. — r o CEILING HEIGHT CEILING HEIGHT ......... . ....... .. ......... _ o c _ O 0 t � a& y E :a o �� O x ....... ........------ - :. ....---.............................................. ....................... .. .. i �', r r ■e>• U 4 FAN COIL BOTTOM ( FAN COIL (TYP) - - - o c «:... _ _ o FAN COIL BOTTOM a E 0 }+ R N 4 ......... ........ ......... ,:..... -- -.............................."— -- ...... ,,.._....., �`m � C �O a o c .a y$ O H�tM M x c S. S1?2 50 � H.� c -_ -a of rnCE00 'o r'm �0N ^+ d u7 W C +n i FINISHED FLOOR FINISHED FLOOR °a Q r-o .................. ...... ............. _... ........ 'c WNW 2 an do C Grow Room 107-South Elevation D.. Grow Room 107- North Elevation 23 EL 1 3' Scale V=1'.0" � Scale: V-1'-0" 59'-6"Approx. 8 v �6 13'-4" 13'-4" 13'-4" 14'.9" _ a CEILING HEIGHT €a 8� INSULATED CWS FAN COIL (TYP) &CWR LINES El o n Ej mm � : _ - - FAN COIL BOTTOM a - - ... --_— - - -- - 4'. .. a Eo CONDENSATION LINE HWS&HWR LINES DOOR TT V E J Run to drain s0 _ L N 50 r a 0 0 FINISHED FLOOR L Eo -.. ._ 0 B Grow Room 107- East Elevation Q c CL_1,3r Scale. '/a::_1,_3:, \ 54'-0"Approx. �- Y-3" 13'-4" ►' 13'-4" 13'-4" 4-9" _11- >4 CEILING HEIGHT INSULATED CWS FAN COIL WITH HEAT &CWR LINES. (TYP) FAN C A id (TYP)O e .. . .,., ..... ° ._.. - - --- - -- -- . X N" ey ar" _� FAN COIL BOTTOM CL a a. m v 4. HWS&HWR LINES CONDENSATION LINE ME Run to drain eY De+e 0 z. co 3. 4. Size Arch D FINISHED FLOOR 11 Date 11.15.2016 'v JP P,,ject No A Grow Room 107-West Elevation 160661-50 Note:All Chilled Water Piping shall be L-1.3 Scale: %"=1'-0" sr,ee+ insulated. EL-1.3 E 43'-6"Approx' CEILING HEIGHT 2 0 I r ... 0 ��76 w_ L LLLL..- .............. ..... -- ...__�... _...... ............ .... ......... ....__.__ ._... ....... ....... ....... ......... ....... ....... a E x y— __. FAN COIL BOTTOM Q ♦� a _ _ —--- • ,i n8 O F 00 DOOR 4 �s X c0 a g C ' W h12 —U 00 LO 92, N o W � FINISHED FLOOR LouN pm "f as C Grow Room 104-North Elevation d �o kL-1.4, Scale: %8'=1'-0" 63'-9"Approx. 8 4'-4" .� 1T-1" �' 1T-1" �► c 11'_1 �'.� 11'_1 �.'� 11'_1, 4'_0" f- -a CEILING HEIGHT a g I $s �d -- INSULATED CWS ' 0 FAN COIL (TYP) I ' &CWR LINES 0 2 _t II n -. -: — — FAN COIL BOTTOM — . a �8 —.'..- ---- — -- --- -- - Q ... ... ... 0 � Ec CONDENSATION LINE E •J HWS&HWR LINES Run to drain s3 N L y C r Q O L y W n- o FINISHED FLOOR if E O •— O B ` Grow Room 104-East Elevation Q c ..... ...... ......... > Scale. 63'-9"Approx. co 4'-9" � CEILING HEIGHT INSULATED CWS - &CWR LINES / ', f I l FAN COIL A J _ d (TYP)FAN EAT(TYP) ... - .... ..... ... No. By Data.. ._— -. ...- ...- vl g... _ _:. A� - _ FAN COIL BOTTOM a 2. I, _ - __ .- ---- - ..... -_ ...............................--- _... _ 0 3. 4 HWS&HWR LINES CONDENSATION LINE Run to drain Nc. By Data 4 z. co 3. 4: Scale a/e'•1'•0" Size Arch D FINISHED FLOOR 11 Date 11.15.2016 .............. ................. _._.- By JP A Grow Room 104 -West Elevation lsoss�-so Note:All Chilled Water Piping shall be EL-1.4 Scale ^=1'-0 insulated. EL-1.4 N 38'_0 E Approx. o CEILING HEIGHT c 0 c o - ..... ...... ...... ..... ......._ ... ...... ........._ ......... ......... .._.. ._. ........ ......... .......___._.. Q YS: ..... ........ ,_ B FAN COIL BOTTOM ° o }+ Acu ........ ...._ ..._ ..... ......._ F........ h, Q E.. 7 00 _. .-...... ¢ U N _ .... .... .....-.. .-...... .................._. - N V __. O as C ... ............ _ ._ 9 =c �: EO n O 6~W 3 m O . g= M o G�i(q 20 DOOR c e a1 uD -� � ccooLO r�L FINISHED FLOOR o Q c N o ac a° '-G Grow Room 103- North Elevation L 1 5 — — Scale: %"=1'-0" �3 63'-9"Approx. 8 4'-9" 1 T-1" T-T' f CEILING HEIGHT o v 8� El ' INSULATED CWS N COIL ( &CWR LINES i ...... ......... FA o� :......._ _...— -.. --= - FAN COIL BOTTOM • o HWS&HWR LINES CONDENSATION LINE J Run to drain a E Q o 20 _ - 2= U = a a o 0 FINISHED FLOOR E _.. _.,_ _ _..... ....._ ,,....... O ._ ....___.__. . O Grow Room 103-East Elevation = Q c ......... c� �L_1,j Scale: % 1 0 \ 63'-9"Approx. /� 4'-9" a CEILING HEIGHT t } INSULATED CWS • ; :, FAN COIL WITH HEAT �r &CWR LINES (YNPCOIL � • p '...._ �... {.._.__ ........ ...................... E {.... ....... ........_ :i .Ikn '¢ ........ ......... ....... __ G ........................................................... _ ........ ......... ....---- ...... �......-..... ,� .......__ ._....... _._ ......... ......... . _ .:: -- ........ ..---.._ ......---.-.._ - ....._ __...... .. .... Na. By Data —�, ] o n .............................. In ' aL 1 FAN COIL BOTTOM d 2. cnv _ ------- --.— ..... . ... ......" --- Q -- .......... 3. 4. µ. HYJS&HWR LINES CONDENSATION LINE Run to drain Nn. By Date t. 0 3. 4. Scale Size Arch D FINISHED FLOOR Date 11-15-2016 ........ ........ ...... .. ...... _..-. ...... BY J P Project No Grow Room 103-West Elevation 160661-50 .... ....... __ ......... ......... Note er Piping shall be �L-1 j scale: V=1-a sheet EL-1.5 24'-Y Approx. 24'-Y Approx. 0 ........... CEILING HEIGHT CEILING HEIGHT ..... r- N g o = rn E o nLo - -- - ...... .... _ X O Q _. . o FAN COIL (TYP) x ■� =U ' - FAN COIL BOTTOM FAN COIL BOTTOM a = >j Q UN O .. :W O r O V - V — N N m F-Co rD O v♦ L (1)(0 ( - X C w j DOOR TO PACKAGING f °D BO 00 &PROCESS DOOR C N O p N tD V/ •- i FINISHED FLOOR if FINISHED FLOOR w-N w - ........... . ........... Veg. Room- East Elevation %D ,. VegRoom-West Elevation — ----- — -- 0 ,EL_1� Scale: 3/B -1'-0" €L 1 6 Scale 3/B =1'-0' 40,-Y Approx. - - 2'-9" 14'-6" 14'-6" 8-6" -- CEILING HEIGHT INSULATED CWS &CWR LINES r FAN COIL (TYP)I ...... FAN COIL BOTTOM a ... __.. _.. . - .._. --. _.---; — Q r o o E. CONDENSATION LINE o J Run to drain HWS&HWR LINES L L � T � _ N IZ 0 w 4-1 FINISHED FLOOR 0 w B\\} Veg. Room North Elevation Q 6% Scale: j^=1,_0-..... ........ - 40'-3"Approx. �— 10'-1.1 20'-1" 10' — CEILING HEIGHT i t INSULATED CWS FAN COIL WITH HEAT &CWR LINES FAN COIL �... (TYP) 0 (TYP) Nevsed By Date o FAN COIL BOTTOM n 2. I a O 3. V 4. HWS&HWR LINES CONDENSATION LINE }_ i Run t(1 drain Ne. By x Date 2. O OD 3. Drawing ,a y1.B. Size Arch D I FINISHED FLOOR Data 11-15-2016 __........... By JP i A\. Veg. Room-South Elevation 160661.50 ...... ....... _-..._..... ............ Sheet Note:All Chilled Water Piping shah be L-1.s Scale: D/a'=V-0" insulated. E L-1.6 E r O fl 0 N C N O 0 O N 24,_3„Approx. 24'-W Approx. CEILING HEIGHT CEILING HEIGHT '6. ■ ImU ED U N j cif C a)O FAN COIL BOTTOM y O a1~00 a :°: I n a.� FAN COIL (TYP) & .5 0]o FAN COIL BOTTOM a ! i - 6)w LO to - m 76 N C tol W Na0 OD sOD DOOR TO VEG ROOM ° 83 i i =3 o c v FINISHED FLOOR If 11 FINISHED FLOOR `•, Packaging and Processing 105-West Elevation e g g g c Packaging and Processing 105- East Elevation eZ EL-1.7 Scale. %a"=1'-0" L-1.7 Scale. %"=1'-D" d da i?A tz a do E� J J aE O La a W m i CD - ---- 51'-9"Approx. m r O N �< 15'-2" — 12,_2" -- — —' 15'-9" CEILING HEIGHT L v PIPE RISERS TO ---- = O a LEVEL TWO FAN COIL (TYP) f m .......ggyypy[� .............,... p .........n FAN COIL BOTTOM ......... ......... - - -... ........ . :. -,. ..... `—t. o =a - - — ..............- = — - - --- -- - o HWS&HWR LINES INSULATED CWS CONDENSATION LINE &CWR LINES Run to drain ! ' I i II No BY Data DOOR TO CORRIDOR Jf/I 2' 3. 4. FINISHED FLOOR No.I By Date 1. A .........., Packaging and Processing 105- North Elevation 2. 3. L 1 71 Scale: 3/"=1'-0" 4. Scale 4%"_i,-0" Size Arch D Data 11.15.2016 BY JP ' amf$at Mp.! it 160661.50 Note:All Chilled Water Piping shall be !� insulated. EL-1.7 30'_0 Approx. 30'-0"gpprox. o CEILING HEIGHT CEILING HEIGHTcn - o 0 0 t W y y � N LO o _ _ . ..... �� O N _ ..__- - g _ ..-_ _ , ._ ' G�: FAN COIL (TYR) 2 3 CU 0. FAN COIL BOTTOM ..... _ a o > Q ---- ........ --..__ s: FAN COIL BOTTOM a d o m i, a Q r-.. U N o _ .... _ aim C E O rn$ ZT~� m O � m O NCO 0 BO o t d(n cD C N O f � N rG 41 a1 AW1 c_ FINISHED FLOOR o �n FINISHED FLOOR r 01 Q W N cc 2 C ., Grow Room 205-South Elevation �D,. . Grow Room 205- North Elevation C. Scale V=1'-01, EL-2.1 Scale e =1'-0" 59'-6"gPProx .0a 17'-3" 17'-3" 17'-3 _ 4,-9„ o a CEILING HEIGHT €a 8t INSULATED CWS `d &CWR LINES FAN COIL (TYR) ' Kg _ . ....... (................................ --- r- ........ ......... ........ ........................................... F ..... ...... - i. +, a 1 �1 — — - — — _ ? FAN COIL BOTTOM ¢ _ � — -- ., Ea HWS&HWR LINES CONDENSATION LINE Run to drain o - C O ro STRUCTURE "� L BUMP OUT LU / a O c 4-0 04 FINISHED FLOOR ~ L O B ` Grow Room 205-East Elevation Q o LL'_ ....... ....... ......... ,EL_2.1 Scale: '/8 1 0" ` 59'-6"Approx. 1'_6" ► 1 T-6-' 11,-6" 1 T_6" - — — 4'_9" CEILING HEIGHT _ 1 FAN COIL WITH 7.) INSULATED CWS l H HEAT . &CWR LINES FAN COIL ) ............................................. ......................................... EE n_ .........- ................................................... ... --. ..... — ... ........... _ No. By. Dam FAN COIL BOTTOM CL __ ........ ... 2--= ,i- Q a. HWS&HWR LINES CONDENSATION LINE eviewed Run to drain e, r o o 2. zo DOOR bo s. a. 5'¢e Arch D j FINISHED FLOOR Date 71-15-2016 t ........___...__..-._..�._ __ .......___. .. _..._,. ------- Rv JP PFojed No rA`\ Grow Room 205-West Elevation 1 60 661-50 ... .. ... ..._. _ ........... ......_._.. L Note:All Chilled Water Piping shall be \EL 2�'' Scale: 3/B -1-0" sr,ee insulated. E L-2.1 CEILING HEIGHT 30'-0"Approx. 30'_0,Approx. o — N U CEILING HEIGHT v y- -E 1. _it it c O O N r .. N r c� N ca N ........ ...... ........ ...... O N ' a -� _ N �U t - _ i FAN COIL BOTTOM - a c n ■ a — ..... .. .... ....__ ... ........__...-- Iw TYP FAN COIL BOTTOM a }+ a 0> �N a V (D N F co Q o N Cn w OD ( Zo _ DOOR I!t ao ') N o No LO Lin FINISHED FLOOR .. l - - - FINISHED FLOOR T W N m /�Grow Room 204-South Elevation ! o�, Grow Room 204-North Elevation ..._... ...__. - ....._._. —...__ -- �•EL-2 2' Scale: V=1-0" EL 2.?� Scale. %'=1'-0" 50'-6"Approx. 13'-10" �'� 13'-10" �' 13'-10" 4'-3" 16 CEILING HEIGHT E INSULATED CWS FAN COIL WITH t F &CWR LINES --:-p ;HEAT(TYP) # ; T 0 y. .---- .. _ _......... ....::._ "a .. ...._ ..�-..... - - ;.- - FAN COIL BOTTOM 0 777g a 0 - - —_ HWS J ____________ P _ U &HWR LINES CONDEN ATIO11,i LINE Run to dram D - L N Q Q� °D O = W O o FINISHED FLOOR if £ O B Grow Room 204- East Elevation Q o ....... .... ........_ ....................... €L_2�;....Scale 3/6 1-0" C7 50'-6"Approx. 4'-Yr 13,_8" 13'-8" 13,_8" 4'_9" � CEILING HEIGHT FAN COIL INSULATED CWS - &CWR LINES (TYP) FAN COIL WITH L ' — HEAT(TYP) - �... .- .. ... ............. ................................................ ..... ........._ -!5_...... ...... ._ ........... .. ..... .. (i N By Date. .. ... _ .. __. _. _._..__._ _.. __ _ _ .._..... ..... n o - 1 FAN COIL BOTTOM a _ CL z _ o V 4 HWS&HWR LINES CONDENSATION LINE Reviewed Rug to drain N By Date t. - z. 0 �' 3. 4. �r3WhiQ'i. Scar, 0 - Size Arch D FINISHED FLOOR Date Arch 76 BY JP Project No. Grow Room 204-West Elevation 160661-50 +.. ............. .. ...... ......_. ...................... _...................__ Sheet Note:All Chilled Water Piping shall be Scale: 3/a -1 0 - insulated. E L-2.2 CEILING HEIGHT _ 30'-0"Approx. 30'-0"Approx. U CEILING HEIGHT .......... d n_ - ❑ � a � 0 Qm 42 N M LO - L N ............. ......... ...... .......- .... , o - - —I. f0_n UFAN COIL (TYP) o ¢ as FAN COIL BOTTOM ... ......... ...... --... - -..-- ..... _.... FAN COIL BOTTOM ❑ d 2 a ¢ .. ... ...... U N p -- ---- '- p m cm N O N OD m m o _O c Rwl(O J ❑L ~ _N(n r wX Bo i ro 0-� N O = C N o /V7/1 C rO LO FINISHED FLOOR o h -r 6 FINISHED FLOOR °a Q c r-o ......... -.. _._... c W N cc 2 c\ Grow Room 202-South Elevation !D `, Grow Room 202- North Elevation d .._......---- ......- ---- - - - o EL_2/ Scale: %" 1_0' €L-2 3' Scale %"=1'-0"� c 3 54'-0"Approx. R s. 14,_2, 14'_2 a►' B'_9 _ o- CEILING HEIGHT o 1-6 INSULATED CWS &CWR LINES FAN COIL El 0 d (NP) ..._ ........ ......... .._..__... r. ... ._ ._......... ......... :.......... ... ........... ...._.__.. .. ........._- .................__.... . 10 ......... ......... _.. ............. — FAN COIL BOTTOM a - "= ....... ........ ........ ........ i 6 ¢ d 6 t V - -- " ---------- c _ o J t— E a CONDENSATION LINE - J HWS&HWR LINES a wain _ r Q o DOOR J L W Q a o 0 FINISHED FLOOR 11i O O / B` Grow Room 202 East Elevation.. Q c ... 1... .......... L 0 \EL_24 Scale: 3/a 1-0" 54'-0"Approx. E 4,_9. 14,_2, 14'_2" 14'_2" �1 CEILING HEIGHT INSULATED CWS -.- &CWR LINES ' L FAN COIL WITH HEAT FAN COIL(TYP) C== I (TYP) ... .........._ ..-.. ... -'� ......... ..... ... ..... ..... No. By Dere --- --- 4 o 1. -- -- g c ---- -- _ FAN COIL BOTTOM Q z. —'__.--- may., ................ ,__. ........ � = 3. 4. HWS&HWR LINES CONDENSATION Run to brain N" By '.. '., 2. 0 W 3. Drawing Size Arch D FINISHED FLOOR Dere rt-a.2016 Project�o A\, Grow Room 202-West Elevation 160661-50 ............. Note ter Piping shall be Scale: '/'-1'-0 sn F slated E L-2.3 E o cn C 0 0 0 N Eo _tea <y ON 2gZ Q 5►� 41'-9" — _ CEILING HEIGHT o~ U do >0ao FAN COIL (TYP) m o .5 0 a) �h� �v R aim FAN COIL BOTTOM r d C w O N 3 'O 0o LO p o C N O o..-r �d �+ �OCV C In v - W Ln o C O r0 W Nao RISERS FROM LEVEL 1 - Zone Valves located on level 1 81. FINISHED FLOOR E tq %s'\ Clone Room 206- North Elevation L-2.4i Scale: 3/e=V-0" ° Ea J J °o E $°o L N 10 L d a o 24'_3"Approx. a � C. W 4� N _8 10'_6" �► 4'_1" �_ L 0) E 9' O CEILING HEIGHT +�+ '— 0 FAN COIL (TYP) Q 0 U . a � o FAN COIL BOTTOM a 0 v 0 ro N"- By� Data i 2. 3. 4. N.. By Date _ FINISHED FLOOR 1. FINISHED FLOOR 2. 3. 4. i A�, Clone Room 206-West Elevation - - \FL 2 4 Scale: V=1 0 Scale =1-0., Size Arch D Date 11-15-2016 BY JP 160661.50 Pete.All Chilled Water Piping shall be insulated, EL-2.4 Equipment Schedule 01 E �. 1 o Item Desanpuon: Part No Oty m O 01 CID1 RBI BOILER DB1050 1 c O 2 AIR SEPARATOR DEAS250 1 SEE V-1 VENT DETAIL 2 N 3 AIR VENT DEAV075M 1 .. SEE S-1 PARTS PROVIDED IF APPLICABLE ,^ @ SECTION DETAIL \ IN SYSTEM PIPING \ A3 4 THERMOMETER 2.50"STEM DET25 2 V+ NE o- ` Br3 5 BOILER PUMP PER BOILER MODEL 1 o = .2N i 6 GAS REGULATOR BY OTHERS 1 m� C N< o 0 o c �� rig cc 7 THERMOSTATIC MIXING VALVE,2.00" DEVTC200120 1 U Piping Schedule DSBPBP25 ~° No m 0 Vu o V =o = S1 tfem DescriP[iar� Part Ro- Qzy m' F 00 Pi o S2 ` , / P1 PIPE STEEL ROLLED SCH.10 2.50"x7.50' DSP25010-075R 2 0 0 0 o L_.....-{ -----` "--------- P2 PIPE STEEL ROLLED SCH.10 2.50"x6.625' DSP25010-068R 1 os HWR P3 PIPE STEEL ROLLED SCH.10 2.50"x6.25" DSP25010-0625R 1 m _ P4 ELBOW GROOVED 90 DEG.2.50" DSE250 2 T TEE GROOVED 2.50" DST250 3 o c m 0 Tr TEE-REDUCING HCxF 2.50"4.50" DSTR250050 3 p N Al ADAPTER GROOVEDxMPT 2.00" DSA200 1 c r a a)r`o A2 ADAPTER GROOVEDxMPT 2.50" DSA250 3 -6 c Q LU N 00 A3 ADAPTER GROOVEDxMPT 2.00"x5.75" DSA200-00575 1 a C1 COUPLING GROOVED RIGID 2.00" DSCR200 2 - C2 COUPLING GROOVED RIGID 2.50" DSCR250 15 - FL 2"125#GRUVLOCK FLANGE DEFCG20 2 B1 BUSHING GALV HEX 0.75"xO.125" DSHBG075012 1 B2 BUSHING GALV HEX 2.50"x2.00" DSHBG250200 1 V 3 Br1 BELL REDUCER 1.25"x0.75"(DB900-1050ONLY) DSRG125075 1 Br2 BELL REDUCER 1.25"x1.00"(DB1350-1500ONLY) DSRG125100 1 = 5 Br3 BELL REDUCER GROOVED 2.50"x2.00" DSRG250200 4 4 N4 N2 or N3 N1 NIPPLE 0.25"x0.75" DSNG025075 1 `g s Tr N2 NIPPLE GALV 0.75"x2.00"(DB900-1050ONLY) DSNG075020 1 N3 NIPPLE GALV 1.00"x2.00"(DB1350-15000NLY) DSNG100020 1 T 3 d FL P1 a P _ N4 NIPPLE GALV 1.25"x12" DSNG125120 1 E C Bra r A2 `1) N5 NIPPLE GALV 2.00"x3.00" DSNG200030 1 ES STREET ELBOW GALV 1.25" DSESG125 1 S1 CHANNEL(GALV.)1.65x20" DSMU-020 3 U -,t \ S2 STRUT CLAMP(PLATED)2.00" DSMC200 2 E I- . J S3 STRUT CLAMP(PLATED)2.50" DSMC250 1 0` J l6'1 F____ i WELL 0.50 COPPER CLIP DECW 1 i S1 H / RW ( r_c d_1ts,&Washers not Shawn J— Y I I I 0 as f/ 6 Piping Included / a Q w!Optional J' i O d I I Piping Package m J9 I I � GAS INLET I I / II ------ ------------' --- — --------------------- --------- - .... 2 y 3 4 NS 82 B1 Tr Q o Revised C T Br3 A3 7 No. By Date Piping Included \ wt Optional -\ 05, Piping Package a _ Notes 40ntsss Oiheewise&P:: ' { 0` J ----------- -- 1 Refer to Delta T Solutions Specification 1.0 Heat Source Installation for Boiler Installation and Operating Information Ile Vent,Gas,and Electrical.) No. BY Data 1. (% 2 Refer to Delta T Solutions Specification 2.0 Air and Water Control,for Installation of Air Separator,Air Vent,Expansion Tank,Feed Water Regulator,and Pressure Gauge. z. 4 To Expan,, Tank it 3 r 3 Refer to Delta T Solutions Specification 6.0 Piping Installation,for Information on Pi in . Al P2 A2 P P g I s -- P 9 4 HW RI ♦ ? j5ea bras^✓i g rw-1) ---- ---- _.-.. --- — -.._ 4 All piping to be supported so that boiler does not support piping weight. Dta r"9 7 :. i _ 5 Install Pressure Relief Valve to-drain or within six inches of"floor. ............. (76�Install Pipe Rest,using Unistrut with Brackets. S Arch D ,7 Gas Service Regulator is required if Gas Pressure is above Y2 PSI. D"m 12-08-2016 8 All Line Voltage and Low Voltage Wiring,Conduit and"Disconnect shall be Supplied and Lrotec'.No. Installed By Others. rA Boiler Loop-Detail 9 Gas Line,Gas Regulator shall be Supplied and Installed by Others. sheet160661-50 ......... H-1 Scale. 1y4'=1'-0" 10 Water Line and Backflow Preventer shall be Supplied and Installed by Others. H-1 Table 1 should be used to ensure that the gas supply piping is sized properly.If more than one appliance to E is supplied by the same supply pipe,the piping must be sized based on the maximum possible demand. c0i Do not neglect the pressure drop due to pipe fittings.Table 1 should be used in conjunction with Table 2 o to to ensure that the gas supply piping has the capacity to meet the demand. p Table 1. Maximum pipe capacity in Fe/Hr based on 0.60 specific gravity gas arts pressure of o 0.5 psig or less and a 0.3"WC pressure drop. Table 2 Equivalent Pipe Length Chart w y Maximum pipe capacity in FBIHr based on 0.66 specific gravity gas at a pressure of 5 b.t psig and a 0.3"WC pressure drop. �.. r Type of Pipe F1Ytting ti N _2 Pi Length Fi Nominal 90°Elbow Tea' Gate Valvez ("3a"s Cock � �U y 0 � _ Pe g t l lron Pipe o„ ,Nominal EqutvalentP Pe Length tFTJ ¢' O, to Iron Pipe 10 20 30 40 50 60 80 100 150 Giza In 1 2.6 5.2 0.6 1.5 Size(In) Ma>tmum C,as Volume of Pipe(FflH11 U m Q Notice • U 1 520 350 285 245 215 195 170 150 120 1Ya 3.5 6.9 0.8 1.9 1Y, 1,050 730 590 500 440 400 350 302 250 1Yx 4.0 8.0 0.9 2.3 A minimum gas supply pressure of 6 in,152 mm o }� at i+ to WC natural or 11 in,279 mm WC propane and o > L)N 00 2 5.2 10.3 1.2 3.0 O N 1Y2 1,600 1,100 890 760 670 610 530 460 380 maximum 14 in,356 mm WC natural or propane, of d C O 2Y2 6.2 12.3 1.4 3.7 d O C must be available at the safety shutoff valve inlet N F 2 3,050 2,100 1,650 1,450 1,270 1,150 990 870 �2,000 10 3 7.7 15.3 1.8 4.5 with the unit(s)operating. vOD 2Y2 4,800 3,300 2,700 2,300 2,000 1,850 1,600 1,400 130 = ♦/� c Notes: 'For Flow through branch. 3 8,500 5,900 4,700 4,100 3,600 3,250 2,800 2,500 2For Flow at full open. m w �p�N,CO oS 0 Note: Multiply the gas volume by 0.62 for propane flow capacity in Ft'/Hr.Multiply the propane flow capacity by 2.500 BTU/Ft3 to lassia I N determine the propane BTU/Hr capacity for a given pipe size and length. t = , OD 4� r _N r�to d0N � o V/ �I-O c@ WNc0O c_3 Boiler 51 Piping =8 €v k ka -- Boiler Service Clearance ---- -- -- -------- 2 U E$ J aE w ,^ i C .... ' j t ......... ........ .` o -- c O a 0 0 m T = Q H� ,. 1 �Q D o 0 J W N A 0 0 � I -- ......._- B I � MOW TI No,I By Date .......... .... ........... .. ........... ........... .......... ......... 2 3. �. 4 No. By Date 2. Drawing ,Size Arch D Date 12-08-2015 JP Project No. Boiler Loop Detail 160661-50 `,�H-2 j Scale: 1Ya"=1 0 � GMce, H-2 Equipment Schedule E r O It.. Descdption Part No. W "{�1y m U HF BV 1 BY-PASS FEEDER,2 GAL w HS DMPF2P 1 p o 0 Piping Schedule ° m _ Item Description ,�; ,. No, j £p �7 il�ii�' � T TEE GALV.FPT 0.75" � DSTG075 1 - y N HC BV BALL VALVE FPT 0.75" DSV075 3 U y O to(11 HS RUBBER HOSE 0,75"DIA,FT }+ c U HF T / DEH075 10 = _ HC HOSE CLAMP 0.75" DMHC07 4 yMu Eo 1 N HF BRASS HOSE FITTING 0.75"MPTX0.75"ID DSHF075XO75 4 v E v �\ N NIPPLE BRASS FPT 0.75"CL DSNB075013 4 = a o N^ 00 cm~ C 5m0 �Po- x to af'Lloo N .2 C m� LO BO W ° to HF BV o o - Mr-o = 00 W N� ae V L �3 By-Pass Feeder — Drain $" N €d 8� U a �./ HC Ea J 1 a J E HS - L a LL a 2 0 m � a HF \\W Q Note55"tLe othinm a spee1f13d "y �L a Installation Instructions 1 The By-Pass Feeder should be installed in a convenient location where it may be easily filled.The inlet may be either on the pressure side of a main-line valve or on the BV pressure side of a circulating pump. Revised 2 As shown in the following diagrams,the 3/4'hose should be used to connect the "10 . ey Date HF By-Pass Feeder to a by-pass on the water line of the system being treated.The direction of flow should be Up through the By-Pass Feeder. 2. HF 3 A Y4'ball valve should be placed on each side of the By-Pass Feeder. 3. BV 4 A drain is desirable and should be installed near the bottom inlet to the feeder with a Remewea � valve in the outlet. No ev 6a1e Add Chemical Instructions Z, 5 The in-line valve should be open.Close the By-Pass Feeder valve,open the drain valve 3 and make certain it is operating properly and the pressure in the By-Pass Feeder is 4. relieved.Removed the cap of the By-Pass Feeder and allow water to flow out of the N T ---- By-Pass Feeder's drain. Scale 6"1'-0" — - - -- - ----- . -- 6 Close the drain valve,add the proper amount of chemical to the By-Pass Feeder,and sue Arch D crack the inlet valve of the By-Pass Feeder to fill the By-Pass Feeder with water,replace r cae 10-s-zo16 N the By-Pass Feeder cap. P 7 Open the By-Pass Feeder valves and partially close the main line valve to force the r,olec'No water through the By-Pass Feeder.After about 3 to 4 minutes,open the main-line valve A \ B Pass Feeder-Detail 6066,50 y and close the By-Pass Feeder valves.Drain the By-Pass Feeder.-....- _. ...... Sheet aPF-t j Scale: 6 -1-0' 8 Repeat Step 5-7 as required - BPF-1 O Piping Schedule - Feed Water Piping Equipment Schedule o Item Description ,.Part No. CJIY 0 Item I Description Pert No. U V7 E ELBOW,SCR,STL,0.5" DSEG050 2 1 REGULATOR,WATER DEVPR050 1 0 BV BALL VALVE,SCR,BR,0.5" DSVB050 1 3 2 PRESSURE GAUGE DEGP060 1 © 5 T1 TEE,SCR,STL,0.5" DSTG050 3 B1 3 PRESSURE SWITCH DEGPS 1 '^ 2 T2 TEE,SCR,STL,1" DSTG100 1 N1 1 4 AIR SEPARATOR 6" DEAS600 1 N' V/ E p Feed Water =� U UNION,SCR,STL,0.5' DSUG050 2 2 5 EXPANSION TANK PER DESIGN 1 $a N N B1 BUSHING,SCR,STL,0.5"x0.25" DSHBG050025 1 Piping Use Coupling and SS Screen N p g ®N��� provided with Feed Water Regulator 6 AUTOMATIC AIR VENT%" DEAV075M 1 N O v)Q B2 BUSHING,SCR,STL,1"x0.50" DSHBG100050 1 B2 �U N1 NIPPLE,SCR,STL,0.25"x1.5" DSNG025015 1 N2 a' 53 T1 _ f� @ N2 NIPPLE,SCR,STL,0.50'x2" DSNG050020 8 T2 / Piping Schedule - Expansion Tank � la Do N3 NIPPLE,SCR,STL,0.50"x3.50" DSNG050035 1 m Description Part No. oty ~m -5N E BV BALL VALVE,SCR,BR 1" DSV100 1 =8 - a - 4- Feed Water € G100 N1 NIPPLE,SCR,STL,1"X 3" DSNG100030 1 'z m snm-olr► o t Y Vulva N2 N2 NIPPLE,SCR,STL,1"X 12" DSNG100012 1 T1 0 Is— d�-M PIPING BY l U E U UNION,SCR,STL,1" DSUG100 1 c 0 OTHERSN o }+ c m 0 N2 BV1 U v N In off V/ u? °c W N N I eg dd l � s E €.@ 1Br N1 PIPING BY °v OTHERS i 2 BV2 ® Expansion ® Tank Ec I 9E J in 4 Br2 2 a ES M Ring Base 4 \ _ Air Separator (Elevation of Top) Q a Y i Ring Base Air Separator (Top View) No By Date Piping Schedule - Air Separator l i,plion i.i�illlllli ll iili l°, IN ':II"" iUid ill„�� . 'ids 3. E ELBOW,SCR STL,1.0 DSEG100 1 _ 4, ES ELBOW,STREET,SCR,STL,1.0" DSESG100 1 4' W HIM '1 No. By Date BV1 BALL VALVE,SCR,BR 0.75" DSV075 1 BV2 BALL VALVE,SCR,BR 1.00" DSV100 1 �' s Br1 BUSHING,GALV,HEX,1.50"4.75" DBHG150075 1 4. Br2 BUSHING,GALV,HEX,2"x1" DBHG200100 1 Scale 3,114" NB NIPPLE BRASS,.75"x1.375" DSNB075013 1 BV N1 U N2 s'i:e Arch D Ni NIPPLE,SCR,STL,1.0"x3" DSNG100030 2 Data 12.08.2016 By JP N2 NIPPLE,SCR,STL,1.0"x6" DSNG100060 2 IP P w, U UNION,SCR,STL,1.0" DSUG100 1 A 1 Air&Water Controls-Details 160661.060 (FW 1 Scale: 3 0 FW-1 0 MO► a a Equipment Schedule N o f r O O Item I Description w , Ed ih W N U 1 PUMP,CIRCULATION 3.00"FLANGE 80-10OF 1 x < y�a Q p N® Ol jjj Piping Schedule (Provided w/Optional Piping Package) 0- m ' On Item lDescr pt on Part No. Q, �a tj �2� P PIPE STL GROOVED 3.00" - AR Tr1 TEE REDUCING HCxFPT 3.00"x 0.50" DSTR300050 1 rn O rn Tr2 TEE REDUCING HCxFPT 3.00"x 0.75" DSTR300075 2 2 y i C COUPLER GROOVED RIGID 3.00" DSCR300 6 a g M(D (� BV BUTTERFLY VALVE GROOVED 3.00" DSV300 3 q e o FL 3.00"IN 125#GRUVLOCK FLANGE DEFCG30 2 3.8 O o N S1 CHANNEL GALVANIZED 1.6250 x 40" DSMU-040 2 0 �/� a tQ ..--- �, V W e a PLATED 3.00 DSMC300 4 F£ HWS S2 STRUTCLAMPP HB HOSE BIB MPTX HOSE 0.50" DSH8050 1 z'o ` x """ -'— ' "' Flange gaskets,Bolts,Nuts,&Washers not shown E 1 " B O O O O B LE ""s o1 u003 g c�;�c Heated (' Cq Heat to I ..... �+ o a 'pt O Zones ( � Source �9 W ao ago T� O O - HWR HWR �4 A 1TI� O O A s 9 As TO HB BV 8 $1 E a S2 TR2 J P .G LN. r'z �$ 4) O o ♦ �� M a Pl f1 O a c i d C a..+ •L W Section view A - A ) Q i A 2 BV S1 1 4 S2 No. By Date 3. .......... ii 4. No. By Date 1. C P 2. 3. FL Section view B — B Ia h eaoth—i..sp- all 4 1 Refer to Delta T Solutions Specification 6.0 Piping Installation,for Information on scale aia,r-0" Piping. Size Arch D 2 Provide Stand or Base Support for Equipment. Data 12.8-2016 3 Install Pipe Rest,using Unistrut with Brackets. By Jp 71 Install Pump as Per Manufactures Requirements,Level and Grout,Elevation Opt. 160661 50 A Section Pump - Detail 5 All Line Voltage and Low Voltage Wiring,Conduit and Disconnect shall be i, r Supplied and Installed By Others. S-1J Scale: 2vz"=1,_0„ .S Equipment Schedule WO E o ':. ItQm Descr pt°n- _ IIR,: A U 1 VALVE 2-WAY 24V.1.50 BELIMO DEVS2150 1 2 FLOW REGULATOR 1.50" DEFRH150-0300 1 © 3 0 3 PRIMARY PUMP 1.50 DEPGM3184012OF 1 A V/ @ 4 THERMOMETER DET25 2 o az Z-Way Valve Actuator 5 HIGH LIMIT DEAO 1 m j aC4 6 SENSOR By Others 2 U 0 O y Q ■�co c O Ei 2 Piping Schedule (Provided w/Optional Piping Package) E o > N i It.. Description Part No tatty m 0)�p C (1)(N DEPRESS BUTTON AB ; A AB-A P PIPE GROOVED STL 1.50" - AR 1--y 8 co TO OPERATE VALVE d O A'1 MANUALLY T TEE GROOVED 1.50" DST150 2 m o Tr TEE-REDUCING HCxF 1.50"x0.50" DSTR150050 5 o s `i.) a m m m A ADAPTER GROOVEDXMPT 1.50" DSA150 9 24 V CCNIMON -Black _ 1 - 7!� j� x 2a v COMMON (�-- Black- ^�, f0•' OPEN Red IN \' ";8 C COUPLING GROOVED RIGID 1.50" DSCR150 10 ; p OPEN Red CLOSE White & CLOSE 0—White \- BV BALL VALVE FPT 1.50" DSV150 4 °6 of N`O ♦--� m L ❑ ❑0 N NIPPLE GALV 1.50"x3.00" DSNG150030 2 FL1 GRUNDFOS 150#NPT FLANGE SET 1.50" DEFC15G 1 W ��n w s }� .6 ®� ®= FL2 1-1/4"125#CAST IRON FLANGE DEFC12 2 1 w Oro FL3 1-1/4"VAN STONE FLANGE DEFP12 2 a Valve in Open Valve in Closed DV DRAIN VALVE,0.50"W/CAP&CHAIN DSV050HTDC 1 - Position Position c 3 �c 6"SUPPLY AND RETURN LINE i SUPPORTED As REQUIREDB`, Control Valve-Actuator Detail _ -- - �Z-1 Scale.8"=1'-0" Ez - 6 o 50" 8 c L \ MiECH>- I W a� CV4S cWR O \ Y'%' o OJ /\ c J Steel to PCV Transition ,� \ J cc / -- — N i °' FL3 I L I c a �t O ... ..... In �.. � ......... o Tr Tr FL2 CWR �a 0 N .......... O O �� �' ! _\ > \ ol, Tr 4 DV Tr C BV O T P _ Q X O O *Distance to be\ \ O O O O O O field determined ` / ® - - - - ® GWRW Lam. I' t�TUCE N O O O O O O Fan i 1 OI 0 ( died 8- 2 ,� c 1 Way Mixing Valve Connection Detail ........ O OO I I J Scale 2/z'-1'-0" O_ O O O O O - ` Revised .t I ..No BY cite _,.. W N FL1 `,� '� 1 , z. ......., 2 3. See Detail B for ^. Actuator Operation IMaw No. By Date 1. 2. 3, 4. 3 Drawing _... Scale 2-112 -1'F Arch D _ f -e 12-08-2016 �r w Piisn --_ )'•OFe S'� (u"tens Om—se Specified) cy UP Note:THIS LAYOUT IS USED FOR 1 Refer to Delta T Solutions Specification 6.0 Piping Installation,for Information Project No. p g. q 2-Way Mixing Valve-Piping Detail 160661.0502 Refer to Delta T Solutions Specification 4.0 Zones Installation for information sneel " Z 1 j Scale.2/z'-1'-0" on control valve installation and operation. Z-1 Equipment Schedule O i r�-r �(�1lescnpuon.... Part No. DtY o N 1 VALVE,2-WAY.2.50"BELIMO DEVS2250 1 0 2 FLOW CONTROL 2.50 sign 1 © 2 3 PRIMARY PUMP 2.50" DEPGM1185015OF 1 N 2-Way Valve Actuator E o�, 4 THERMOMETER DET25 2 �o N � co 5 SENSOR By Others 2 0 w N See Sheet GN-1 for Specific Flow Control DEPRESS BUTTON U 1, O Q TOOPERATE VALVE ■ C U MANUALLY , Piping Schedule (Provided w/Optional Piping Package) E. m cD AB a A AB-A Item Dascnption Part No. Cry > N O m C P PIPE GROOVED STL 2.50" DST250 2 N c O = a)� T TEE GROOVED 2.50" DST250 2 z4vcoMMON Black- 'sm Tr TEE-REDUCING HCxF 2.50"x0.50" DSTR250050 5 v iL O— 24 V COMMON -Black OPEN Red '\� n OPEN Red N n .00 BV BUTTERFLY VALVE GROOVED 2.50" DSV250 4 o y m CLOSE �white W CLOSE d White N NIPPLE STEEL 2.50"x3.00" DSNG250030 1 ; w y — ❑o FL1 2"GRUNDFOS GF 50 FLANGE SET DEFC20GF 1 °_ ��o N FL2 2-1/2"GRUVLOK FLANGE DEFCG25 2 ♦� - t0`n FL3 2-1/2"VAN STONE FLANGE DEFP25 2 c_�-LO Valve in Open Valve in Closed A ADAPTER GROOVEDxMPT2.50" DSA250 4 oz FMii o Position POSItIOn C COUPLING GROOVED 2.50" DSCR250 16 L` W cw coo DV DRAIN VALVE 0.50"W/CAP AND CHAIN DSV050HTDC 1 c 3 I j B \ Control Valve-Actuator Detail 6"SUPPLY AND RETURN LINE Z-2 Scale:8"=1,_0.' FJI0 : Ft;' N`, v SUP€ CWS CWR Steel to PCV Transition E j +� o J — — — — — — FL3 E lr k nry F b Q 5 5 0 (qU)� o FL2 a N Tr Tr O OO \ L4-0 > o © o o O o DV 4 C g �\CW / // 'L c i� Tr T i Q X O O *Distance to be O O O O O O CWR field determined i \. N ! \ t O O O O O O e.` . O O .rm�. aled _ 2-Way Mixing Valve N -Connection Detail I2 .. ----- --- �Z-2; Scale:2"=1 0" O O O O O 0O O O O \^ Q O ..No..:. By Date 1 2. FL1 A 1 2 a. l See Detail Bfor � -' 4 Actuator Operation J Reviewed No BY e I 2. 3. 4. .. 3 grawmg ''.➢P = _1 1._B. Arch D Notes cam 12-os-2o1s Unls&s tll .t (tied? 3v JP Note:THIS LAYOUT IS USED FOR 1 Refer to Delta T Solutions Specification 6.0 Piping Installation,for Information Wrovecr No 4 , / on Piping. 160661-050 COC ' s z A 2-Way Mixing Valve-Piping Detail —-..... 2 Refer to Delta T Solutions Specification 4.0 Zones Installation for information sheet ��_ `Z-2/' Scale:2"=1-0' on control valve installation and operation. Z-2 D: 1 10 2 GF Grow Room 204 & 205 Equipment Schedule � E ...................................................... ......... __ — o Item Description Part No. City y 1 VALVE,2-WAY,2.00"BELIMO DEVS2200 1 O 2 FLOW CONTROL 2,00 'Per Design 1 3 PRIMARY PUMP 2.00" DEPG1 UP50150 1 t ,vA N 2-Way Valve Actuator 4 THERMOMETER DET25 2 / E O 5 SENSOR By Others 2 a,N See Sheet GN-1 for Specific Flow Control °) DEPRESS BUTTON U O ppC) TO OPERATE VALVE 6~ C) MANUALLY Piping Schedule Provided w/Optional Piping Package) i3 0 }i p g � P P 9 9 ) v° � ��w _ - JAB A AB A nPart No. City ! O 00 P PIPE GROOVED STL 2.00" DST200 2 g O NT TEE GROOVED 2.00" DST200 3 Cho- Tr TEE-REDUCING HCxF 2.00"x0. V 24VCOMMON -Black— m 24VCOMMON o- Black— `P OPEN Red OPEN Red BV BALL VALVE FPT 2.00" DSV200 4cFx NCLOSE White CLOSE White N NIPPLE STEEL 2.00"x3.00" DSNG20030 1 ; c w FL1 2"GRUNDFOS GF 50 FLANGE SET DEFC20GF 2 ��o FL2 2"GRUVLOK FLANGE DEFCG2 2 h& ++ m'n ra^,+ m'- 1--. FL3 2"VAN STONE FLANGE DEFP2 2 0- 0 A ADAPTER GROOVEDxMPT 2.00" DSA200 1 `0 9 °1 r--0� Valve in Open _ Valve in Closed C COUPLING GROOVED 2.00" DSCR200 18 a` W N_0000 Position Position DV DRAIN VALVE 0.50"W/CAP AND CHAIN DSV050HTDC 1 ao -`o c e Control Valve-Actuator Detail Z-3a/ Scale:6"=1 0 € 6"SUPPLY AND RETURN LINE MOUNTED ON WALL AND SUPPORTED AS REQUIRED Fait Coil Zones 6.00"x 2.00"GROOVED v MECHANINCAL TEE do CWS CWR 1 E� J _ it CWS Steel to PCV Transition O =5 O FL3 m ' U c a a is o o WILD ILE d L M CWR to 0 (� 0 FL2 p', ��+ -L to DV 25 0 O 0 0 O 0 Tr *Distance to be / is 4 7 l field determined i •V M 5 5 Tr T BV j Tr Tr O p II O O O O O O c 2-Way Mixing Valve-Connection Detail CWR �Z-3a Scale:2"=1'-0" 0 o p o See Detail B for o p i C h i l l e d O O Actuator Operation A 1 N1 C � ;......... Water A No. By Data O O O O Source 1. JP 3-13-17 OO O O O ................. .............. O p 2. ® CWS 3. 4. _.-.......... pO Re v FL p, No By Date t. 2. .............-' 3. 2 4. S.M. 2"=V-0" 3 Size Arch D Date 12.08.2016 Note$ (Dniaae otherwise Speclfietl) I' By JP 1 Refer to Delta T Solutions Specification 6.0 Piping Installation for InformationHE A 3-Way Mixing Valve-Piping Detail on Piping.2 Refer to Delta T Solutions S ific 160661.050 ....................................................................................................__.................................................................... Spa 4.0 Zones Installation for information (Z-3a j Scale:2"=1'-0" �._.. on control valve installation and operation. 73a o 3.. .. .,e ,., a ? Equipment Schedule E �f. t _ o It.. Description U °ty Ui 1 VALVE,3-WAY,2.00"BELIMO DEVS3200 1 U 0 2 FLOW CONTROL 2.00 'Per Design 1 a 3 PRIMARY PUMP 2.00" DEPG1 UP50150 1 N V+ 4 THERMOMETER in DET25 2 E O 5 SENSOR By Others 2 C; = N N See Sheet GN-1 for Specific Flow Control UN O �Q 3-Way Valve Actuator B B B Piping P Piping Package) PI in Schedule Provided w/Optional LLY AB F A AB A AB-4L A item I Deacrrpttonilll O m o P PIPE GROOVED STL 2.00" DST200 2 w O C a)04 °MMo 21VIl."e"O— Black n i� oNMe"�— 6ack Tr TEE REDUU ING HCxF 2.00"x0.50" DST 200050 5 3 is m o_ `" Rea °� sE Reav n loB BV BALL VALVE FPT 2.00" DSV200 4 @ coos `: cwsE�—White „ cLo White o ® ® N NIPPLE STEEL 2.00"x3.00" DSNG20030 2 3 = FL1 2"GRUNDFOS GF 50 FLANGE SET DEFC20GF 2 CIO aim 20 'R FL2 2"GRUVLOK FLANGE DEFCG2 2 ��--� m`n m n 7 N FL3 2"VAN STONE FLANGE DEFP2 2 =_ _ � Valve in Open Position Valve in Mixing Position Valve in By-Pass Position Al ADAPTER GROOVEDxMPT 2.00" DSA200 9 °II coo A2 ADAPTER GROOVEDxMPT 2.00"x6.50" --- 2 _ W N°° nc C COUPLING GROOVED 2.00" DSCR200 18 a DV DRAIN VALVE 0.50"W/CAP AND CHAIN DSV050HTDC 1 a° � 8. 13 ,\ Control Valve-Actuator Detail r" _.... ....__.. ° Z-3t j Scale 6'=1'-0" 6"SUPPLY AND RETURN LINE 'a rE - -QUIRED =7 pll �� � _ , CS „r. t' 1 ED L E.- 'EE \ a� i = (/ I CWS CWR `^ J - aE J CWS oo ; Q o r a - Steel to PCV Transition � � �. .r � p j e6 c FL3 0 N > i CWR .� > ----------I--- ---------------------- FL2 ( Q DV S *Distance to be Tr Ar. c�a#lon 4 .I field determined #I T1 M A 5 5 Tr T A2 (If 1 BV Al j IJ_-,!R C 1UPA-Tr Z Tr O o 0 0 0 0 0 0 -Way Mixing Valve-Connectio n Detail 2 CWR s j sale:z„=1,-0„ o o o: o A2 C "led 3 _ " ` ........ r ter 16 C N1 Na- fir Date o' O (� O: O O O - t. JP 8-13-17 O O A, O t T o O O O z. S CwS 3 � f -Gy 4 O o O O O O O O Reviewed N. 3v Bas t FL Al 2 2. —' 3. 4. NONE Scale 2"=1'1" 3 Size Arch D ..-.._.__._._. Data 12.08.2016 `(Unless one se Specified)'. By JP 1 Refer to Delta T Solutions Specification 6.0 Piping Installation,for Information roject No /A `.I 3-Way Mixing Valve Plping Detail on Piping. 1s0661.050 2 Refer to Delta T Solutions Specification 4.0 Zones Installation for information heet Z-3b Scale.2'=1'-0" on control valve installation and operation. Z-3b 0 1507.3 Clone ROOM 206 Equipment Schedule E .. o It.. Description Part Cry ¢ U '.. O Vl 1 VALVE,2-WAY,24V,1.25"BELIMO DEVS2125 1 p 2 FLOW REGULATOR 1.25" DEFRH125-0060 1 3 PRIMARY PUMP 1.25" DEPGlUP26-64F 1 / N 4 THERMOMETER DET25 2 � V/ o 2 Wa Valve Actuator 5 SENSOR By Others 2 8 N N See Sheet GN-1 for Specific Flow Control Y OF .O a1V ♦r ._ oe=RessE vALve Aronto TO oPeleAre Piping Schedule (Provided w/Optional Piping Package) o > MANUALLY H„ aaaaa� E Oi AB a A AB—A �P PIPE GROOVED STL 1.25" - AR y$ O ��o T TEE GROOVED 1.25" DST125 2 ®o Tr TEE-REDUCING HCxF 1.25"x0.50" DSTR125050 5 0 a.a=m zavcoMMON o- -slack- - m 24VCOMMON o- -Black- n p A ADAPTER GROOVEDxMPT1.25" DSA125 10 �' d x OPEN &— Red n c8 OPEN �— Red c0 C COUPLING GROOVED 1.25" DSCR125 16 ao CLOSE white c osE �}—whits w BV BALL VALVE FPT 1.25" DSV125 4 v a s coo - i�to N NIPPLE GALV 1.25"x3.00" DSNG125030 2 AteA++ p N ® R FL1 GRUNDFOS 125#NPT FLANGE SET 1.25" DEFC125G 1 W 5 ® Lo s®, s y FL2 1-1/4"125#CAST IRON FLANGE DEFC12 2 £_ W N 000 W FL3 1-1/4"VAN STONE FLANGE DEFP12 2 e p, Valve In Open Valve in Closed DV DRAIN VALVE,0.50"FPT,W/CAP AND CHAIN DSV050HTDC 1 Position Position av IT .Is €v o s Control Valve-Actuator Detail 6"SUPPLY AND RETURN LINE 4 Scale:8"=1'-0" MOUNTED ON WALL AND SUPPORTED AS REQUIRED &� 6.00"x 1.25"GROOVED a Fan � �� MECHANINCALTEE "` Zones a 5$ CWS E J CWS CWR , � O C tit c Steel to PCV Transition U e o,� .N O L — — — — — — FL3 a a a = --- d r 0 rV 0) I J i � .� \ I�. CWR FL2 O lo'. Q c TV / � *Distance to be 5 4 1 field determined 5 Tr Tr T C P I- Tr P?L O O — — — — _ CWR I O o 1 Chilled >......... Water c 2 Way Mixing ........ ..... ng Valve-Connection Detail N By Date . ........... .. ................................................................. 1. Z 4/ Source Scale 2 Y2"=1 0 2 3. i a. .. ...... 1 ♦ CWS IEEE a No. By Data .................. 2. 3. A FL1 N BV ! a. 1 See Detail B for 2 .......... Actuator Operation scale 2.1n^=r•0" 3 sire Arch D Date 12.09.2016 I „f BY JP Note:THIS LAYOUT IS USED FOR 1 Refer to Delta T Solutions Specification 6.0 Piping Installation,for Information CHILLED ZONE ZC-10 /A'� 27Way Mixing Valve-Piping Detail on Piping. lsossl•oso Scale:2 Yz =1'-0" ......... 2 Refer to Delta T Solutions Specification 4.0 Zones Installation for information Z 4 on control valve installation and operation. �� Diu Z-4 0 MOD: 15 . EQUIPMENT SCHEDULE we E '�" Room, - — 1 o w.; '� Irem Description Pett Na, city y «q VALVE,3-WAY,24V,1-1/4"HONEYWELL VC SERIES 1Grow Rooms 103, p 1 / ' 2 FLOW REGULATOR,1-1/4"AUTOFLOW YR SERIES 1 1 2 y 3 SENSOR BY OTHERS 2 y Eo 5 s PIPING SCHEDULE (Provided w/Optional Piping Package) Item J�@4rPriptian.. iiii Part No cry U in O rq Q Z P PIPE STEEL GROOVED 1.25" AR ,;1 =U SS E ELBOW GROOVED 90°1.25" DSE125 2 }i T TEE GROOVED 1,25" DST125 1 E o 0 N 7 Tr TEE-REDUCING HCxF 1.25"x0.50" DSTR125050 3 w g DO0)C14 A ADAPTER GROOVEDxMPT 1.25" DSA125-UYST 9 € o C COUPLING GROOVED 1.25" DSCR125 12 9; V♦ y?to r- BV BALL VALVE FPT 1.25" DSV125 4 r;t y w N NIPPLE GALV.1,25"x2.00" DSNG125020 2 �.9 5 0 HB HOSE BIB 0.50" DSHB050 1 s o �N o y_ -1-0 •C m to CN o� W E�tn O l'-o Tr t. o WC400 N1 ETD "r Dv Div as BV A Pfo _- � �c I 8 8E H♦ m _ o �W i vq Heated Zones T 2 V Ea J H _......_..... _OO A 6 H W R .............................................................................._ BA v E C 1 vLI Heat W Q d DV SOUP u i R Tr d 0 .5 e ♦ (8J 4 HWS ) ll .......y •— ra E 2 N Q M .......... Y No,I By I Date 1. 2. 3. 4. No. By Date 1. 2. 3. 4. ' ', JDrpwing iJa - scale 5�/i'•p•0„ Si. Arch D Date 12.09.2016 Notes (Unless Otherwise Spec,t ed) By up Note:THIS LAYOUT IS USED FOR 1 Refer to Delta T Solutions Specification 6.0 Piping Installation,for Information ;-P—MT67 " on Piping. 160661 050 HEATED ZONES ZH-1 THRU ZH-4, e Zone Valve- Piping Detail 2 Refer to Delta T Solutions Specification 4.0 Zones Installation for information %she 11I "i"Iu &ZH-6 THRU ZH-10 < Scale: 3/4"=1'-0^ for information on control valve installation and operation. Z-5 n ��2 B ��WQ � 1 Q� EQUIPMENT SCHEDULE E v Item I tYeserlptlon T,. pert No. 'QtY V Ol .............................................................................................................................................................. 1 VALVE,3-WAY,24V,1.50"BELIMO 1 c 0 2 FLOW REGULATOR,1.50"AUTOFLOW *Per Design 1 5 3-Way Valve Actuator 3 SENSOR By Others 2 (n m See Sheet GN-1 for Specific Flow Control CN PIPING SCHEDULE (Provided w/Optional Piping Package) Ip 0:1)Q P PIPE STEEL GROOVED 1.50" AR > DOD Valve in Open Valve in By-Pass T TEE GROOVED 1.50" DST150 1 aa) Position Position Tr TEE REDUCING HCXF 1.50"x0.50" DSTR150050 3 O w A ADAPTOR GROOVEDxMPT 1.50" DSA150 7 °1 tD � ® RL.................. .+ .® �CO C COUPLING GROOVED RIGID 1.50" DSCR150 7 R a BV BALL VALVE FPT 1.50" DSV150 4 y @ N1 NIPPLE BRASS 0.50"x1.25" DSNBO50012 1 w -7lYtom, CLOSE N2 NIPPLE GALV 1.50"x3.00" DSN150030 2 White� Whit._� CLOSE 6�� 8 ssq ' OPEN ' ` i Red �/ OPEN DV DRAIN VALVE W/CAP AND CHAIN 0.50" DSV050HTDC 1 }+ •E �`n E LJ - —Black- 24 V COMMON LJ —Black- 24 V COMMON t,N Bit, 6 E LT @ ��� W CN 00 A TAB A—FAB IB DEPRESS BUTTON Bff TO OPERATE VALVE MANUALLY �B Control Valve-Acturator Detail Z-6) Scale B"=1-0" V J DV 3 See Detail B for L Tr Tr BV Actuator Operation 1 C P Q f L � � - > O --— - m H W R — _1.. ......... ---- .. - A. j d o 0 i�l I '..� . AB�I — HWIR I i� i, K ,;,. ji l—I i. Heated K! �. Heat Zones i Source ca I O O O 0 O I HW ' O ' li O O Ii I I III O � WWSO .----- . ------ �I 'Naae"see By I Dale Tr BV T 2 N2 z. 3 3. 4. No, By Date 1. 2. 3. 4. Drawing i Scale 4"=1'-0" Size Arch D •1 _ Date 1.17.2017 ICI Notes'. (Unleae Otherwi sPecified) By UP 1 Refer to Delta T Solutions Specification i.0 Piping Installation,for Information on Piping. 160661.050 / A 3-Way Zone Control Valve-Piping Detail CHILLED ZONE ZH-5 2 Refer to Delta T Solutions Specification 4.0 Zones Installation for information Note: i Z-6 Scale: 4 =1'-0" on control valve installation and operation. Z-6 EQUIPMENT SCHEDULE 5 11" r O l� park iN� Q0 o vi 1 VALVE,2-WAY,24V,1.25"BELIMO DEVS2125 1 p 2 FLOW REGULATOR,1.25"AUTOFLOW DEFRL125-0090 1 0 y N "0 j E� 0) au, PIPING SCHEDULE (Provided w/Optional Piping Package) _ �� >a 2-Way Valve Actuator _Item DaacnpClon <s' N W P PIPE GROOVED STEEL 1.25" AR r c U DEPRESS BUTTON Tr TEE-REDUCING HCxF 1.25"x0.50" DSTR125050 1 W ,moo. >j TO OPERATE VALVE MANUALLY A ADAPTER GROOVEDxMPT 1.25" DSA125 4 r= o mq c E C COUPLING GROOVED 1.25" DSCR125 4 �� O H00 AB a A AB-A BV BALL VALVE FPT 1.25" DSV125 3 3 ♦/� m o N NIPPLE GALV.1.25"x2.00" DSVG125020 3 g HB HOSE BIB 0.50" DSHB050 1 n y 24 V COMMON -Black- a 24 V COMMON '� -Black- o- � o-/ � OPEN Q— Red N n OPEN �.T Red Iw n o u pf� 00 }, CLOSE White w CLOSE White w c o C N� Na rev 0 L0 m K iN r ®, I lY - ®. m� C7� ,�—. � �v `o cc n' Valve in Open Valve in Closed $ Position Position o E.S. B ' Control Valve-Actuator Detail o ...... _ (Z D Scale: 8"=T-0" _ 3t I £� w8 do gE 9SE J s3 L 9< � HB BV A P � a > O O yr a d �< o j CWR ♦ ® ♦ CWR j T .................._ O O j N C Chilled ��� ) L, Chiller Zones 1 j Source j O I cws 1■ ::a ♦ ® ;',' ♦ cws . ............................................................................. O O i I C 1 2 N No.I By I Date I t. 2. 3. 4. � No. By Data 2. 3. i 4. Scale 4-11•0" Size Arch D Data 5.15.2017 04$i By Notes,Refer to DeltaT Solutions Specification 6.0 Piping Installation,for Information Projec ;'i ' 1M JP on Piping. Z-D1 S a \ S cale 4 'Way Control Valve-Detal I 2 Refer to Delta T Solutions S Specification 4.0 Zones Installation for information 160861-50 1 � '=1'-0 on control valve installation and operation. Z-D1 E 0 I o w c I o 0 0 ' rn i 'E' y6 �U o O n ■� U E o > _ O N V • ry ronmc fa Goniml mcn al_.,1 rro( 6 r r rfal iutrrzl Environmental Control m C E Of S} n on6Yst m -m - ar_ 6 C System � �N (B thwrsj (By Others; P .hersj (By Others) m 6))—CO 21 -CO r _ --_------____.� _ r___ --� > •—m rya ✓`STY ! a.€*s pA el aaf '^k `s LVV &.. .k ... `tI G'4llVS ' 4V�j O o Q)V) X - d 109 10 Field 10 Field Wiring Wiring ig o 2 I L;% G L1 L2 G L1 L2 G L L2 G = C N o to LO 1 j j 1 I C _________ __, r_______ _______________ t- ________________--___, __ p_ 24V SPeetl 24V SPeetl 1 1 1 1 24V SPeed 1 24V Speed 1 Y o W O 24V SPeetl 2 O l ..... .... 26V Speed 2 O©i i ........ ..... 24V Speed 2 O ..-�. — .... .... 24V SPeetl 2 a E�I ... .... -.-.._..- v= N f Common O ... .._. _...� Common O ..... l Common o ....I _ 1 Lammon O®i - y a FLU `' t Coll t 240V I 240V ° 240V 240V F: Heat Coil& He It Coil Heat Coil& 1 /r2� ....... Q" s^. Ili 2� .. .......a 2�.......... .......7..... I fr2 1 ..�...... {�: ',wal l sp. HOC 9 E4 3'..C311 �Pe�ea eea o ° Cv.`, `,>cJil I emr CC a 1: � � sPeea ° M r M ° (4) hilts (4) Units �_ r,cy -- 1 1 a a ma 2dV ---------------------- SPeedt ....... 24V speed O-u1_._T_....... ........_ 24V SPeetl 2 —I. ......... ................. 24V speed 2 Q I_ I ......... ................. 24V SPeetl 2 O L ................ _. I 24V SPeed 2 0 .. 1 T ...._1._...... ..... Common I Common Common Co n':non O f 1 o m y (� € 1 240V .._ 4... o f d a /40V ........ ....o 1 C" 240V ... ° {..Cbol1 1 - 240V a €.-.....-° 2 A sPeea I ,l, i i I I I I lr^ m. J..IiI 2 \ '.. CC!t�,. ._ ...roil r`ts .^;,~Il r2� .. CCfoling\°.roll / 2 .... sPeea ._...- I h -�..L .. ....... .� - ,'"Y I --`�........ . ...... ......� ((}} sPeea t - J A__...... ..-__........... s a ........ -_ Mom ...-1 € i 1 Momr i t- .. -- j - `Mom Units S 4 >3�itsOnly 7 Units - ...... _ J I 1 L J L ------------------ ______-------------- L--------------------J L----------------------J J F_________________i F-----------------i t._________________i F_________________i V c J Control Valve Actuator Control Valve Actuator Control Valve Actuator Control Valve Actuator a N He .ng ��'' M 4 He ing Heating :') f c 1 s .7.'. "!i`%S(e L 1 J' s' .. c� .. c <6 III III �IIII IIII i E , One 1falVe �����IIII IIII Q Z ° x f _. H 5 I u il.... Ci _ I N N "1 I I NC N v. �y I I 1 I I ......... I t 26 V Common ....--. ......... .... 24 V Common .V. ._.___. 24 V mmon ...... ......... ..—.._.... .. ......... .. y G O O - Co O , 24 V Common O I._.... Ga a 0 V Open ". Open 1 OPen I OPan H¢ O close U close o close �y—'•,— close U—r �y }/ V e� V W______.___i F____________._____� F-----------------j F____. --__-_______i Plump Pump I�u Pump (1 Pump Valve (1 Pump Valve i (1 Pump Valve (1 Pump Valve Valve Station per room Valve Station per room Valve I Valve P ) P ) Station per room) Station per room) Station Station Station Station y 0... -. ale aid 0 alsoT ale % 20SV r 208V 1 Mixing Valve i Mom 1 wAci Mixir�i'valve I Mel„ — ........ �_ 1 field' Mixing Valve M 1�; I Mixing Valve I ( M �_ 1. ...... .. r—� `•.__ ....... ....... _ ....�N :'En —� �.._...G.-. ........... "d .. \:- _..__...__ —_ - N v •�._..._.. _-_ _.m N Field. -_................. �t J (W=6 LC- I Wiring ,Y Wiring I I �rea.41 I I ��a-�I I I I I neaz I I .ee I wev I .:+ 1 24 VAC Common u 24 VAC Common -. >u 24 VAC Common (�'-- _ 24 VAC Cemmon OPen O l f ... OPen O— f ........ _I" OPen O 7 ...J `.n open O 7 T (J^ Close O —) O i o close O i ....... ...d o aoee i o Revised - - No. By Date a m w m m L-- --------------� ontro Va ve Actuator Control Valve Actuator ontro Va ve Actuator ontro Va ve Actuator ' 2. L1 L2 G L1 L2 G 1 L2 G L1 L2 G s. 4. No.... By Date 2. 3. 4. . 'I DrawMn Scale N.T.S. S tee Arch D ^3- 11-16-2016 JP I Pro7erl No A `' Grow Room 110-Wiring Diagram ! s �, Grow Room 109-Wiring Diagram %c`, Grow Room 107 -Wiring Diagram p�} Grow Room 104-Wiring Diagram 160661-50 _............ E 1 - Scale: N.T.S. E-1 l Scale: N.T.S. - `— sh�e1 / � _� � &1 % Scale: N.T.S. `E-1/ Scale: N.T.S. E-1 E o o vi c N o © '2 0 y 4 N !A to <8 .O Q!V C r N E > 7 00 Environmental Control Environmental Control Environmental Control as° N Environmental Control m N �� C System System System System °' _ O (By Others) (By Others) (By Others) (By Others) in$ /Ow�' ocVp _________________i r--_-_____________n 3 _/ r m 1 Z40V 1 r----------------1 r-----------------I m I I I I Griaw Roam 1 240V 240v x Vag Room Packaging 1 Ton 103 10 Field 10 Field 10 Field 8 and individual WiriLL2nG L1WL2nG Processing 00 Wiring Units o M e o L1 L2 G Room I-v �A\+ dON so.1 W c�� r______________________� 1 O g 'E ' zav speeds le i---I 24VSpeed1 y : iI f .. II Fen Enable OP en 0w1 ......................._...-.......... ........................... s£a oo �O W N OD 24V Speed 2 Oo ........................ 2AV Speed _ ........... Fen Enable Closeso Common , -.. ....... ...... .......on _o Fan Enable Open Lj Fan Enable CloseL 240V 240VHeat Coll& 1 eat of 1 I \...............COOling C011 I Iu°sa �';��'' i Ci0011ng�.+011 I i �oII z ....03 UnItS 1 TON JP3 TERMINAL STRIP nits O Heat Coil& Cooling Coll IF----------.._..._..__....{ ----------------------� F-------- --- -----------------------' Heat Coil& JP 3 TERMINAL STRIP i e I I I I ---- I Coaling Coil nit(TYP) --------------- ---- -------------------, v 24V Speed .�_--- --_----- 24V Speedlp .:� ....._.., (2) Units 24VSpeed O o•f 1....... ..- 24V Speed vO..ol.I..1..................................................................................... i'---------'-------' 8 Common Common 1.5 Control Valve Actuator .2 II iII II sMpoebeNdr x _- ��I FF^"-'r- �c•1 AilI 1II II 'I Mot ar L .. .._ .... .—_._. h1-----------------iI L.............-_z......,.,.,.,....,...........,...... Heating 240V 240V Zone Val veCoolingCoi I Cooling Coil 2 I (TYP)Only Only 1 .......... --------------'-------............... — ............... ........... .Nw�C 7 Units /G) Units .r• fCi �-oa rc_24V Speeds L---------------------- -----------------------J 4VCommon 24V Speed Open................................................... Common ------------------ 0o' y Cl... E E`mEControl Valve Actuator Control Valve Actuator � o,. 240v Heating Heating Cooling Coil UJN L Zone Valve Zone Valve (1) Units Mc C ror °1 v Chilled Water 1• I �Y1J I c RfN"+ 11Control Valve ActuatorN0� ........... iH-1 NO--' tj................ V�-allve � r-24VCom n 0.......... N.................................................) 0..........I N N...) I'-------___:___---'l �____ CI R) m.r �Q C Open .......................................... zavcommonaose L................................................................................................. Heating Control Valve Actuator eo— C...................... < 0 clo NO y-.... Zone Valve i I I I JIJII III I I I I p �I 26 V Common 0......1--- }4 ZH-10 Nc x 1 close f.......................................................................................................... L 0Ui ------- (1 Pump Valve -----------------i (1 Pump Valve Open �— .........................N.._.._.... _. ,.f......_...) Open p..........L............................:.................................................................................... Q W ----- 11 Pump Pump 24v�pmman p---r Valve Station per room) Valve I Station per room) Cmae O -- ------ Station I Station L................................ I I ..............._..._._............................................................ slss� 1 --- 1...............................--------� 1 - 1�' F----------- ---i 208V 208V 1 I Metor ...........................--- Metor --........... Chilled Water Mixing Valve p Field Mixing Valve 1 -. ..... .... __..._ >, �N 1 Field 1 Valve Station 1 2C 2� . �.. Wiring I zc•1 I Wiring 1 1 ..., � zc•10 1 w. 24 VAC Common O I _r. 1 Sy 24 VAC Co Open p j r ......... ",; 26 VAC Common V "'. open O 1 .. Close close O i Close�—j I 6V19'fi III �'tijiN BY Date m i w No. JP 5-22-17 A B onro eve Aduetor A B onro eve Actuator � -� A B on ro Valve Actuator 2. L1 L2 G L1 L2 G L1 2 a' 4. No. By Data 1. 2. 4, -Drawing Scale N.T.S. Sae Arch D Dale 11.15.2018 BY JP (i Protect No. B Veg Room Wiring Diagram c`'1 Packaging a& Processing Room Wiring Diagram '.D,' 1 Ton Unit Wiring Diagram 160661.50 A ` Grow Room 103 Wiring Diagraml - g_ g g g g 9 9 .... --...... E 2 Scale N.T.S. CE-2) Scafe. N.T.S. E-2 i Scale: N.T.S. E-2 Scale: N.T.S. E-2 E 0 o c 0 - 0 Go �o r y�� �y O Ma y� �� ■� M E o 7 00 Environmental Control i:vir r fa.Gan' - System Sy:'�,m: ein Co�irol of`m N� O E CN �m w' 6~co (Sy Others) (P7 ^�,rsi v �au -� o Cn C _,6 r_________________� _. _.r___.... __.____� O Il- rOW ROOM � 240V ; <`; yv If ""OM � 240V �� ��� tC1e'a.s ar3tYt 240V s o m m 10 Field 10 Field 1 Field a 205 204 I 202 1 �.3 c 1 Wiring Wiring Wiring =� � �cc) L1 L2 G S 2 d L1 L2 G L1 L2 G -'° �/ c N 0 -2 _ I I mN G0f 0LO ° ------------------------ __________ ------- a rn I - �n O 24V speed 1 ' zav Speed 1 ' NV Speed 1 W N 00 24V apeetl 2 O j - j 24V aPeed 2 O u � 24V Speed 2 j j.._.._ ... .... ... d t L O i Common O { 1 -- - - Common O O{ Common O ' {— .. j o f t i o I o N m (-feat COII& 240V .� 240V Heat oil "3 Neat Coll& e & 2aov (� I `g Coil i i 1 l(�� � " oil i 1 ( d� ...... v o� i Cooling Coil �o (3) Units (4) nits °n E- ----i L-------` ----- __---1 L-- F-----------------i ' €a r----- -- I I l l I ---------------------- r 26V Speed 1 O __.�.. 24V Speed 1 OF.F....�_ .__— ...—,,.., 24V Speed 1 _ 24V SPeetl 2 L ........................................._ 24V Speed 2 O .........l...—_._ ......... i 24V SPeetl 2 Common I Commnn.O- ' Common 1 °m it c N I I I I 240V ( 240V 240V Cooling Coil Coll 1 Cooling Coll ( r _ m g C oil 1 -� Only ! Mm�E ..._ .....� , _ a ..._. of-�ng Coil 1 Only 4"° �.d -_ __. --- _ �� �.._— _ s (4) Units (4) Units - 1 (�{ ` tlrts 1 ' I =° U =N J '_________________i ----------------- Ev I I I I c Control Valve Actuator Control Valve Actuator Control Valve Actuator 9 ,^ y/ t Hey-!ng M Heating M Heating j _- Zane u ;'ve �- ZOr1e Value Zol1.� =;ve n n m. , I N .... ;� E 24 V Common -- 24-1-1- a n t O. t ........ ...... ...... O t Oe O ....'___—.. ..... ......... .... N�. a O (,� 2a vcommon ....... ........___. Open n Open close v—i i close y i i close v i � }r � 1 I I i ; � � I I }+ •L d ______ __________i ______ _________i _________________ Pump Q W (1 Pump Valve (1 Pump Valve Pump (1 Pump Valve Valve Station per room) l...lve Station per room) j Valve Station per room) Station Si.:;--tlon Station I Y l O --- 1 O ; ........_ 1 O eta Sty I I , , 2 r GV / , j 208V —. —- mixing Valve 1 "� �- 10 Field. 1 Mixing Valve I M I Mixing Valve I � �- �. ...... .......�» g J 1 Field. �_� ....._._.-_ ._ ...... ..._. .........�N ._....._.. .. ..........._..... .._-+e N �C 9J Wiring zc s zc tlVlr ng I I +A.t..or 24 VAC Common 24 VAC CommonO26 VAC CommonOpen O 1 ...1Open O1OpenvClose OClose ...O iClose O---- 0 No_________________ ----------------- Control eve A B Contra a c ve Actuator A B onro eve Actuator 1� 2. L1 L2 G L1 L2 G Lt L2 G 3. 4 1__ ', Reviewed_ W. ey Date..:. 2. 3. 4. Scale N.T.S. Size Arch D Date 11-16-2016 'Y JP Project No n` Grow Room 205-Wiring Diagram ems"'\ Grow Room 204-Wiring Diagram �o Grow Room 202-Wiring Diagram 160661-50 ............... ......_._. .. , ........ ._..__.. ..._.._. .___.........._ ; .. ..-...... Sheet E-3 Scale: N.T.S. E3 Scale. N.T.S. E-3 Scale: N.T.S. E-3 0 C F O C 0 O N .. da y 2 to n a L. ` •O �U }� r t6 o > 7 OD O V a) O F-CO c' (/ E-m 0 7 d� 3 C a 00 cL CIN0 75 Environmental Control c }i n Enviromental Control System System C (By Others) -_ ^+ (By Others) V/ -`--- Clone 240V W Nao Room 206 l 10 Field I Chiller 1 i Wiring - I NCI L1 L2 G I I CP•1� � - Z6 �a I I 24V pne 1 Q. zav Speed l o SEE Open P cemmen SHEET = Close Q 6 an E SA Heat Coil& 240v I 1 ; � ill � av Coaling Coil ; I T (2) Units i m _c N I I — �o I Control Valve Actuator I I y o �g Chiller 2 V Heating -• M o -a I Zone Valve E9 I zN-10( I I I I I I 24VC..M.. Q...... ... ...... : h L op Q ... ... ........ .. SEE Cl se 0-- , Op Oi Mee Q SHEET 111 E-6 E �r I I a a m> O-----------------1 a m P(tlnp (1 Pump Valve L 2 !ve St Chiller 3 Station per room) •— k ' 0--: .................. ^, Q W W I sra > I I I � �� 208V ,C lixil -`Ive Noy. �� 10 Field SEE �.. e Wiring Cluse O SHEET �+ �zc-1 D E-6 24 VAC C mo or n cbse Q o i I l I ----------------- I w '.. A Control valve ActuatorIIPP L1 LZ G By Date i S-t JP 8-17-17 2. iopen SEE 3. cbseQ_.._�..............................................................._ SHEET 4 / I E_ Reviewed �No- ny Date ._________________ 2. A B 3. 4 -Dr.w I nE''°' .` lei N.T.S. Arch D Late 11-15-2016 `SY JP ,e1t Nn A , Clone Room 206 Wiring Diagramn 'B�... Boiler/Chiller-Wiring Diagram lsoss,-eo E-4 % Scale: N.T.S. _ __ sneer - - � E� Scale. N.T.S. E-4 N EC V Control Panel o (By Others) - 0 0 --._..._.,.._...._.......--------................................. ,^ CIRCUIT BREAKER DISCONNECT SWITCH ' V/ y M a (By Others) OR POWER BLOCK ,g T01 �N O Na m � 3 PHASE 1 TO COMPRESSORS E° 5 CO POWER ..................._.....1r ..................,..,..........-.,...._......,............................ -................................_._......>L2 T2 ........_................._.... -,. __._,.,..__............. ( ) _ 0 o N AND FAN MOTOR m v SOURCE O — 0 e'_—_ _ )L3 T3 CEARTHd C a C C T ............... GROUND _ Fua T1 FU51 0 LL j n g x TB1 ...................................... C `V — o00 35] 120 VAC v o C N O CHWRIPUMP NO.1 RELAY FUB 301 12 2298 �'a }+ d 0 N 120VAC 01.0 AMP MAX VAC ' o.9 ^+ of�_O BY OTHERS WLO ( ) I CONTROL CIRUIT I TB1 FUSE i C I �O TB1 I SEE NOTE 2 22 W NaD I 301A T81 2° o TB1 .......................1A t P2+ 120 VAC ° neap CHWR1 `�o u.. 10 ...... PUMP NO.1 RELAY _. (BY OTHERS) 4.mm ............................... i . 24 VAC 120VAC @1,0 AMP MAX I' ..... ....." TB1 t.. ( 0 °n —1311 120 VAC €v mPUMP 2 ......................................... _...._._ I I c o ontrol Valve Actuator MOTOR ; ; � 3 TB1 ER x o I 34l 120 VAC I I � ---------------------- To Environmental TB1 I a Controls zA 6 (By Others) l GRD See Sheet E-4 _ (317) g TB2 'a .....__,..._.........................__....._........_.. ..........................7................"52 IF REMOTE STOP S° CONTROL IS c eJ REMOTE STOP USED REMOVE E I I SWITCH 585 LEAD 585 FROM E ^' (BY OTHERS) TERM TB2-52 TO i H TB2 TB2.72( ° S) 5'm L tl j .........i........................................................ a s Q cc I I I 72.............. OTHERS i 5 t C= - f t �____________.-------- TB2 54 a a ^ C to TB, O !p 24 VAC 43 TB2 d W I,I 74� T�BBI _ N `*NOR.OPEN PUMP N "J') — AUX.CONTACTS (OPTIONAL) T132 Y CHW FLOW -- - ............................44 ` SWITCH ' MANDATORY- TB2 TB2 I .... (BY OTHERS) 61� F EXTERNAL 45 - ALARM/EVENT / IS USED 555A REMOVE LEAD 555A FROM TERM TB2 T132.45 TO TB2.87 67 I I I I I I No. By Dete JP 6/1/2017 TB2 66 2. 3. I TB2 4. 69 Reviewed TB2 No, By Dete r70� I I 2. TB2 3. . i 71 4. - � I I 1 3cele N.T.S. Size Arch D Date 11.15.2016 By JP —__ Project No. A � Chiller-Wiring 160661 50ng Diagram C , ,.............,,; - E-6 Scale: N.T.S. shee E-6 CITY OF ARLINGTON 238 N. OLYMPIC AVE -ARLINGTON, WA. 98223 42 PHONE; (360)403-3551 BUILDING PERMIT Address:17727 59th Ave NE Permit#:1627 Parcel#:31052200404100 Valuation: 147000.00 OWNER APPLICANT CONTRACTOR Name:ARLINGPON ADVANCED Name:Compass Mechanical,LLC Name:COMPASS MECHANICAL,LLC MANUFACTURING PARK Address:3316 FUHRMAN AVE E STE 200 Address:14122 105th Ave NE,Ste B Address: 14122 105th Ave NE City,State Zip:SEATTLE,WA 98102 City,State Zip:Kirkland,WA 98034 City,State Zip:Kirkland,WA 98034 Phone: Phone:425-508-9375 Phone:425-508-937 MECHANICAL CONTRACTOR PLUMBING CONTRACTOR Name:COMPASS MECHANICAL,LLC Name: Address: 14122 105th Ave NE Address: City,State,Zip:Kirkland,WA 98034 City,State,Zip: Phone:425-508-937 Phone: LIC#: EXP: LIC#: EXP: JOB DESCRIPTION PERMIT TYPE: Commercial Mechanical CODE YEAR: 2015 STORIES: CONST.TYPE: DWELLING UNITS: 0 OCC GROUP: BUILDINGS: 1 OCC LOAD: PERMIT APPROVAL I AGREE TO COMPLY WITH CITY AND STATE LAWS REGULATING CONSTRUCTION AND IN DOING THE WORK AUTHORIZED THEREBY;NO PERSON WILL BE EMPLOYED IN VIOLATION OF THE LABOR CODE OF THE STATE OF WASHINGTON RELATING TO WORKMEN'S COMPENSATION INSURANCE AND RCW 18.27. THIS APPLICATION IS NOT A PERMIT UNTIL SIGNED BY THE BUILDING OFFICIAL OR HIS/HER DEPUTY AND ALL FEES ARE PAID. IT IS UNLAWFUL TO USE OR OCCUPY A BUILDING OR STRUCTURE UNTIL A FINAL INSPECTION HAS BEEN MADE AND APPROVAL OR A CERTIFICATE OF OCCUPANCY HAS BEEN GRANTED. IBCI10/IRCI10. SALES TAX N 1 :Sales tax relating to construction and construction materials in ti Ci Ar`Im ro must be eported on your sales tax return form and coded City A gton#3101. gnature Print Name Date Released By Date CONDITIONS See red lined drawings. Adhere to approved plans. THIS PERMIT AUTHORIZS ONLY THE WORK NOTED.THIS PERMIT COVERS WORK TO BE DONE ON PRIVATE PROPERTY ONLY. ANY CONSTRUCTION ON THE PUBLIC DOMAIN(CURBS,SIDEWALKS,DRIVEWAYS,MARQUEES,ETC.)WILL REQUIRE SEPARATE PERMISSION. PERMIT FEES Date Description Fee Amount 8/31/2017 A/C Unit $2,150.00 8/31/2017 Boiler/Compressor $25.00 8/31/2017 Gas Outlets Base Fee 1 to 5 $10.00 8/31/2017 Mechanical Fee(Enter Fixture Fee) $500.00 8/31/2017 Mechanical Plan Review Fee $150.00 8/31/2017 Processing/Technology Fee $25.00 Total Due: $2,860.00 Total Payment: $0.00 Balance Due: $2,860.00 CALL FOR INSPECTIONS BUILDING(360)403-3417 When calling for an inspection please leave the following information: Permit Number,Type of Inspection being requested,and whether you prefer morning or afternoon Permit Information Date 8/30/2017 Permit Number 1627 Project Name Hyak Venture Partners,LLC/Patriot Meds Applicant Name Compass Mechanical,LLC Applicant Address 14122 105th Ave NE,Ste B City,State,Zip Kirkland,WA 98034 Contact Greg Griffith Phone 425-508-9375 Email compassgreg@gmail.com Permit Type Commercial Mechanical Site Address 17727 59th Ave NE Valuation 147000.00 Status Applied Permit Issued Permit Expires Square Feet 0 Type of Construction/Occupancy Load Number of Stories 0 Proposed Use New system for 1 502 Producer/Processor Assigned To Kristin Foster Property Information Owner Information Parcel#:31052200404100 ARLINGTON ADVANCED MANUFACTURING PARK ARLINGTON ADVANCED MANUFACTURING PARK 3316 FUHRMAN AVE E STE 200 17727 59TH AVENUE NE SEATTLE,WA 98102 Contractors Contractor Name Primary Contact L�Phone �[Email Contractor Type License License# COMPASS MECHANICAL, LLC 425-508-937 1 1CONTRACTOR IlLabor and Industries COMPAML983NB Review Date Type Description I Target Date Completed Date I Assigned To Status �B/30/2017 1ommercial Mechanical 1 19/6/2017 lRick Karns 111n Review Fees Fee Description Notes Amount Mechanical Plan Review Feel 322.10.00.OQ $700.0 Total $7 00.0 Notes Date Note 8/30/2017 Application received on 8-18-2017.First set of plans received on 8-22-2017. PDF for second set of plans received on 8-29-2017. KF Uploaded Files Upload File Date File Uploaded B 8/30/2017 1:37:08 PM 1627 Email with Second Set of Plans Attached.pdf Foster. Kristin }( 8/30/2017 1:34:57 PM 1627 Application..pdf Foster. Kristin I X COMMERCIAL MECHANICAL • PERMIT APPLICATION y'Pll� GtL Department of Community& Economic Development City of Arlington• 18204 59th Ave NE• Arlington,WA 98223• Phone(360) 403-3551 THIS APPLICATION MUST BE ACCOMPANIED BY TWO (2) SETS OF CONSTRUCTION DRAWINGS AND ALL OTHER INFORMATION OUTLINED IN THE MECHANICAL PERMIT SUBMITTAL REQUIREMENTS, IF APPLICABLE. Type of Permit: New Installation Replacement Alteration 7 Z ;.� �raiectAddress: J7 Uo I r �r,,1�G] II�-- 1 Parcel Project Description: �.r.54A C'�;I�� W oA� g �O�t/t✓ Sy57cw1 Valuation: $ /47, 000 Owner: �� �� O���(�vs L'L C" Phone#:( ZY-0 " g10C1 Address: 17727 8 SR) Ajt L city: I State: I,.)I� zip.- Email Address: �e- ad ' Contact Person: ��leG� ( 7ri�j jG� Phone 4- `BLS �c�� q37� Address: -lqI ZZ IOS' Ave- NE city: Ki-M 4,AJ State: 014 zip: g9C)3 Email Address: o GS5 V_e_ r"G tl ONE Contractor Name: O, ( s5 C au (CO LL-C- Phone#:( ' L5 Contractor Address: I'T 1�72- f 05 -ft%AX JIC City: K:fk.a&J State: W A Zi CIg0.34 Email: Co CD Contact Person: CI,- Tyrt"` Contractor License Number: —Expiration: 1 D C-7 1 Please indicate type of number of appliances: FURNACE CONDENSING UNIT GAS PIPING OUTLET BOILER ; HEAT PUMP(multi-split) UNIT HEATER CHILLER 3 HEAT PUMP(mini-split) PAINT BOOTH COOLER HEAT PUMP(other) TYPE I HOOD AC(air cooled) FT_ HEAT REJECTION EQUIP TYPE II HOOD AC(water cooled) VENTILATION SYSTEM AST AC(evaporator) PACKAGED UNIT UST AC(VRF) DRYER OTHER I hereby certify that the above informatiojic rest and that the construction on, and the occupancy and the use of the above- described property will be in accordance ws.rules and regulation of the State of Washington Applicants Signature: Date a ,1 Applicants Printed Name: r' Receive, FOR STAFF USE ONLY -- Permit# Acc By V Amount Received Receipt# Date Received 6/16L P Page 1 of 1 2-� �t 8/30/2017 COMPASS MECHANICAL LLC 1 Search L&I Sateiy,� Health Claims &Insurarrr_:r- Righ(s •T',,des & fr—,nsing Aft Washington State Department of " Labor & Industries COMPASS MECHANICAL LLC Owner or tradesperson 14122105th Ave NE KIRKLAND,WA 98034 Principals 425-508-9375 GRIFFITH,GREG ALLEN,PARTNER/MEMBER KING County Doing business as COMPASS MECHANICAL LLC WA UBI No. Business type 602 220 489 Limited Liability Company Governing persons GREGORY GRIFFITH GREGORY A GRIFFITH; I License Verify the contractor's active registration/license/certification(depending on trade)and any past violations. Construction Contractor Active. Meets current requirements. License specialties GENERAL License no. COMPAML983NB Effective—expiration 08/02/2002-10/08/2018 Bond State Farm Fire&Cas Co $12,000.00 Bond account no. 98BMS0255 Received by L&I Effective date 05/01/2015 04/06/2015 Expiration date Until Canceled Bond history Insurance State Farm Fire&Cas Co $1,000,000.00 Policy no. 98B8V7605 Received by L&I Effective date 04/07/2017 04/02/2017 Expiration date 04/02/2018 Insurance history Savings ...................... No savings accounts during the previous 6 year period. Lawsuits against the bond or savings Help i-I.s improve https:Hsecure.ini.wa.gov/verify/Detail.aspx?UBI=602220489&LIC=COMPAML983NB&SAW= 1/2 8/30/2017 COMPASS MECHANICAL LLC No lawsuits against the bond or savings accour�—iuring the previous 6 year period. L&I Tax debts No L&I tax debts are recorded for this contractor license during the previous 6 year period,but some debts may be recorded by other agencies. License Violations No license violations during the previous 6 year period. Workers' comp Do you know if the business has employees?If so,verify the business is up-to-date on workers'comp premiums. This company has multiple workers'comp accounts. Active accounts L&I Account ID Call L&I account representative for account 596,616-05 status. Doing business as COMPASS MECHANICAL LLC Estimated workers reported Incomplete premium report received. L&I account contact Collections Dialer Unit,800-301-1826-Email:dialercollections@Lni.wa.gov Public Works Strikes and Debarments Verify the contractor is eligible to perform work on public works projects. Contractor Strikes No strikes have been issued against this contractor. Contractors not allowed to bid No debarments have been issued against this contractor. Workplace safety and health No inspections during the previous 6 year period. Washington State Dept.of Labor&Industries.Use of this site is subject to the laws of the state of Washington. a eip, os improve https://secure.ini.wa.gov/verify/Detail.aspx?UBI=602220489&LIC=COMPAML983NB&SAW= 2/2 .� �, k• ,y, I Kristin Foster From: Greg Griffith <compassgreg@gmail.com> Sent: Tuesday,August 29, 2017 8:36 AM To: Kristin Foster Subject: Fwd: 160661 - Hyak Venture Partners LLC PDF Attachments: 160661-50-S- Hyak Venture Partners LLC 8-23-17.pdf Kristin,here is the second set of plans for the building at 17727 59th Ave NE, Thanks, Greg ----------Forwarded message ---------- From: Prieto,Jorge <JPrieto deltatSOlutiOnS.Com> Date: Wed,Aug 23, 2017 at 2:37 PM Subject: 160661 -Hyak Venture Partners LLC PDF To: "conipas�eg(a�gmail.com" <compassgregCa)gmaiI.com> Cc: "Miller, David" <DMiller(&deltatsolutions.com> Greg, Please see attached PDF for project 160661 -Hyak Venture Partners LLC. Thanks, Jorge Prieto Delta T Solutions 27711 Diaz Rd-Suite B Temecula,California,92590 (800)552-5058, (760)682-0420 ext. 24 iorge(o)deltaTsolutions com www deltaTsolutions.com 1 Greg Griffith/Owner Compass Mechanical, LLC (425)508-9375 Compassqreq@qmail.com 2 Permit#: 1627 Permit Date: 08/30/17 Permit Type: COMMERCIAL MECHANICAL Project Name: Hyak Venture Partners, LLC/Patriot Meds Applicant Name: Compass Mechanical, LLC Applicant Address: 14122 105th Ave NE, Ste B Applicant, City, State, Zip: Kirkland, WA 98034 Contact: Greg Griffith Phone: 425-508-9375 Email: compassgreg@gmail.com Scope of Work: New system for 1502 Producer/Processor Valuation: 147000.00 Square Feet: 0 Number of Stories: 0 Construction Type: Occupancy Group: ID Code: Permit Issued: 09/01/2017 Permit Expires: Form Permit Type: Status: COMPLETE Assigned To: Kristin Foster Property Parcel# Address Legal Description Owner Name Owner Phone Zoning ARLINGTON 31052200404100 17727 59TH AVENUE NE ADVANCED 637 Warehousing& MANUFACTURING Storage Services PARK Contractors Contractor Primary Contact Phone Address Contractor Type License License# COMPASS 425-508-937 14122 105th Ave CONSTRUCTION Laborand COMPAML983NB MECHANICAL,LLC NE CONTRACTOR Industries Inspections Date Inspection Type Description Scheduled Date Completed Date Inspector Status CIO. 04/19/2018 MECHANICAL Approved ROUGH-IN Plan Reviews Date Review Type Description Assigned To Review Status 08/30/2017 COMMERCIAL z.Rick Karns MECHANICAL Fees Fee Description Notes Amount Mechanical Commercial Plan Review Table 4-1 3 hours $150.00 Air Cond.Unit Bm/h<100>; 86 @ 25 $2,150.00 Btu/hp>500 <100>Btu/h>3hp- 15; <500 Btu/h 15-3 Ohp;Boiler/Compressor >1 million Btu/h<50hp; $25.00 >1.5 million Btu/h<50hp; Gas Piping/Units Enter#of units $10.00 Mechanical Fee(Enter Fixture Fee) 12 @ 25;2 @ 100 $500.00 Processing/Technology $25.00 Total $2,860.00 Attached Letters Date Letter Description 08/31/2017 Building Permit Payments Date Paid By Description Payment Type Accepted By Amount 09/01/2017 Compass Mechanical,LLC Check#2057 Kristin Foster $2,860.00 Outstanding Balance $0.00 Notes Date Note Created By: Application received on 8-18-2017.First set of plans received on 8-22-2017.PDF for second set 08/30/2017 Kristin Foster of plans received on 8-29-2017.KF Uploaded Files Date File Name 09/01/2017 2576048-1627 Issued Permit.pdf 08/30/2017 2570500-1627 Email with Second Set of Plans Attached.pdf 08/30/2017 2570487-1627 Application.pdf