HomeMy WebLinkAbout18611 Ballantrae Dr_BLD982862_2025 INSPECTION REPORT
Permit No.r '� ,_ Lot#
• Address /5Z1.c
Contractorc ''� C =��
Owner
Date
Taken By
PPROVAL ❑ PARTIAL APPROVAL
❑ VIOLATION ❑ CORRECTION REQUESTED
❑ Corrections listed below MUST BE MADE before work can be approved.
❑ Please contact inspector.
❑ Was not able to perform inspection.
❑ CALL 435-0724 FOR RE-INSPECTION - 24 hour notice required.
�\
Inspector i Date ?
TYPE OF INSPECTION REQUESTED
❑ Under-floor ❑ Framing ❑ Gas Piping
❑ Footing ❑ Drywall, Nailing ❑ Consultation
❑ Foundation ❑ Shear Nailing ❑ Groundwork
❑ Mechanical ❑ Grid ❑ Struct. Slab
❑ Wood Stove ❑ Rough-in Plumb. Final ,qa'4-'
O Masonry ❑ Drainage 0 Insulation
❑ Other
L
PO INSPECTION REPORT
Permit No. 7 - Lot # L
• Address 11�L l l ►��,,,.�� � 1�L
Contractor )
Owner _
Date
Taken By V �v
❑ APPROVAL ❑ PARTIAL APPROVAL
❑ VIOLATION ❑ CORRECTION REQUESTED
❑ Corrections listed below MUST BE MADE before work can be approved.
❑ Please contact inspector.
❑ Was not able to perform.inspection.
❑ CALL 435-0724 FOR RE-INSPECTION - 24 hour notice required.
71
Inspector Date >
TYPE OF INSPECTION REQUESTED
❑ Under-floor ❑ Framing ❑ Gas Piping
❑ Footing J14 Drywall, Nailing ❑ Consultation
❑ Foundation ❑ Shear Nailing ❑ Groundwork
❑ Mechanical ❑ Grid ❑ Struct. Slab
❑ Wood Stove ❑ Rough-in Plumb. ❑ Final
❑ Masonry r❑ Drainage ❑ Insulation
❑ Other Re__in�_s L
J INSPECTION REPORT
Permit No. - icAA-ot # 113
h�t0 �• Address /�("-l/ AxL.�/���.___._�
Contractor ,ALE .E PJ> G.Z_/—
Owner
Date I.
Taken By .�
❑ APPROVAL ❑ PARTIAL APPROVAL
❑ VIOLATION ❑ CORRECTION REQUESTED
❑ Corrections listed below MUST BE MADE before work can be approved.
❑ Please contact inspector.
❑ Was not able to perform inspection.
❑ CALL 435-0724 FOR RE-INSPECTION - 24 hour notice required.
Inspector Date
TYPE OF INSPECTION REQUESTED
❑ Under-floor ❑ Framing ❑ Gas Piping
❑ Footing Drywall, Nailing ❑ Consultation
❑ Foundation ❑ Shear Nailing ❑ Groundwork
❑ Mechanical ❑ Grid ❑ Struct. Slab
Cl Wood Stove ❑ Rough-in Plumb. ❑ Final
❑ Masonry ❑ Drainage Cl Insulation
❑ Other L
INSPECTION REPORT
Permit No. 2— of#_�5
Address 11P6 '
Contractor
Owner
Date
Taken By
ROVAL ❑ PARTIAL APPROVAL
Z777; TION ❑ CORRECTION REQUESTED
❑ Corrections isted below MUST BE MADE before work can be approved.
❑ Please contact inspector.
❑ Was not able to perform inspection.
❑ CALL 435-0724 FOR RE-INSPECTION - 24 hour notice required.
I
Inspector Date
TYPE OF INSPECTION REQUESTED
❑ Under-floor ❑ Framing ❑ Gas Piping
❑ Footing ❑ Drywall, Nailing ❑ Consultation
❑ Foundation ❑ Shear Nailing ❑ Groundwork
❑ Mechanical ❑ Grid ❑ Struct. Slab
❑ Wood Stove ❑ Rough-in Plumb. 0-Final
❑ Masonry ❑ Drainage Insulation
❑ Other <AZA cLg
�—
L
INSPECTION REPORT
Permit No. Lot # /3
Address loc>& // �,� 6,!�
Contractor
Owner
Date
Taken By '
❑ APPROVAL ❑ PARTIAL APPROVAL
❑ VIOLATION ❑ CORRECTION REQUESTED
❑ Corrections listed below MUST BE MADE before work can be approved.
❑ Please contact inspector.
❑ Was not able to perform inspection.
❑ CALL 435-0724 FOR RE-INSPECTION - 24 hour notice require .
I
Inspector Date _
TYPE OF INSPECTION REQUESTED
❑ Under-floor ❑ Framing ❑ Gas Piping
❑ Footing ❑ Drywall, Nailing ❑ Consultation
❑ Foundation ❑ Shear Nailing ❑ Groundwork
❑ Mechanical ❑ Grid ❑ Struct. Slab
❑ Wood Stove ❑ Rough-in Plumb. ❑ Final
❑ Masonry ❑ Drainage Insulation
❑ Other
INSPECTION REPORT
Permit No. •f Lot# -3—
Address /"Y %// r
Contractor ,mod n
Owner
Date
Taken By f' .1
-if[-'APPROVAL ❑ PARTIAL APPROVAL
❑ VIOLATION ❑ CORRECTION REQUESTED
❑ Corrections listed below MUST BE MADE before work can be approved.
❑ Please contact inspector.
❑ Was not able to perform inspection.
❑ CALL 435-0724 FOR RE-INSPECTION - 24 hour notice required.
Date
TYP OF IN PECTION REQUESTED
❑ Under-floor raming Gas Piping
❑ Footing Drywall, Nailing Consultation
❑ Foundation ❑ Shear Nailing ❑ Groundwork
❑ Mechanical ❑ Grid ❑ Struct. Slab
❑ Wood Stove ❑ Rough-in Plumb. ❑ Final
❑ Masonry ❑ Drainage ❑ Insulation
❑ Other
INSPECTION REPORT
Permit No. Lot #
Address
Al— ContractorG'f
Owner �� �
Date
Taken By
❑ APPROVAL ❑ PARTIAL APPROVAL
❑ VIOLATION ❑ CORRECTION REQUESTED
❑ Corrections listed below MUST BE MADE before work can be approved.
❑ Please contact inspector.
❑ Was not able to perform inspection.
❑ CALL 435-0724 FOR RE-INSPECTION - 24 hour notice required.
Inspector Date —Z -
TYPE OF .NSPECTION REQUESTED
❑ Under-floor Framing =! Gas Piping
❑ Footing ❑ Drywall, Nailing J Consultation
❑ Foundation ❑ Shear Nailing ❑ Groundwork
❑ Mechanical ❑ Grid ❑ Struct. Slab
❑ Wood Stove ❑ Rough-in Plumb. ❑ Final
❑ Masonry ❑ Drainage ❑ Insulation
❑ Other
INSPECTION REPORT
Permit No. &,;L Lot #
Address
Contractor
Owner
Date Li
Taken By
❑ APPROVAL ❑ PARTIAL APPROVAL
❑ VIOLATION ❑ CORRECTION REQUESTED
❑ Corrections listed below MUST BE MADE before work can be approved.
❑ Please contact inspector.
❑ Was not able to perform inspection.
❑ CALL 435-0724 FOR RE-INSPECTION - 24 hour notice required.
Q L� CJZ�
Inspector Date
TYPE OF INSPECTION REQUESTED
❑ Under-floor Framing Gas Piping
❑ Footing ❑ Drywall, Nailing ❑ Consultation
❑ Foundation ❑ Shear Nailing ❑ Groundwork
Z Mechanical ❑ Grid ❑ Struct. Slab
❑ Wood Stove ❑ Rough-in Plumb. ❑ Final
❑ Masonry ❑ Drainage ❑ Insulation
❑ Other '
L
INSPECTION REPORT
Permit No. If- Lot# /5
Address /!k-'j0 1 I .SPA__4Le� (��.
Contractor 0-
Owner
Date zV- 7 - 9
Taken By q
❑ APPROVAL ❑ PARTIAL APPROVAL
❑ VIOLATION ❑ CORRECTION REQUESTED
❑ Corrections listed below MUST BE MADE before work can be approved.
❑ Please contact inspector.
❑ Was not able to perform inspection.
Cl/CALL 435-0724 FOR R PECTION - 24 hour notice required.
r-
Inspector Date -
TYPE F INSPECTION REQUESTED
❑ Under-floor ❑ Framing N(Gas Piping
❑ Footing ❑ Drywall, Nailing ❑ Consultation
❑ Foundation ❑ Shear Nailing ❑ Groundwork
-4 Mechanical ❑ Grid ❑ Struct. Slab
❑ Wood Stove ❑ Rough-in Plumb. ❑ Final
❑ Masonry ❑ Drainage ❑ Insulation
❑ Other
L
INSPECTION REPORT
Permit No. _ Lot#J 3
Address k
Contractor
Owner v
Date s3 — —
Taken By
❑ APPROVAL ❑ PARTIAL APPROVAL
❑ VIOLATION ❑ CORRECTION REQUESTED
❑ Corrections listed below MUST BE MADE before work can be approved.
❑ Please contact inspector.
❑ Was not able to perform inspection.
❑ CALL 435-0724 FOR RE-INSPECTION - 24 hour notice required.
1
Inspector Date
TYPE OF INSPECTION REQUESTED
❑ Under-floor ❑ Framing ❑ Gas Piping
❑ Footing ❑ Drywall, Nailing ❑ Consultation
❑ Foundation ❑ Shear Nailing ❑ Groundwork
❑ Mechanical ❑ Grid ❑ Struct. Slab
❑ Wood Stove Rough-in Plumb. ❑ Final
❑ Masonry ❑ Drainage ❑ Insulation
❑ Other '�-
i 2—
INSPECTION REPORT
Permit No. qJ—c;!R2A Lot# 13
` Address /
Contractor f � �
Owner
Date �3--/7-9ff
Taken By
❑ APPROVAL ❑ PARTIAL APPROVAL
❑ VIOLATION CORRECTION REQUESTED
rrections listed below MUST BE MADE before work can be approved.
❑ Please contact inspector.
❑ Was not able to perform inspection.
❑ CALL 435-0724 FOR RE-INSPECTION - 24 hour notice required.
Inspector Date
TYPE OF INSPECTION REQUESTED
❑ Under-floor ❑ Framing ❑ Gas Piping
Cl Footing ❑ Drywall, Nailing ❑ Consultation
❑ Foundation ❑ Shear Nailing ❑ Groundwork
❑ Mechanical ❑ rid ❑ Struct. Slab
❑ Wood Stove Rough-in Plumb. ElFinal
❑ Masonry ❑ rainage ❑ Insulation
❑ Other
INSPECTION REPORT
Permit No) q,7—Cot#
• Address
Contractor
Owner
Date
Taken By ✓
APPROVAL ❑ PARTIAL APPROVAL
❑ VIOLATION ❑ CORRECTION REQUESTED
❑ Corrections listed below MUST BE MADE before work can be approved.
❑ Please contact inspector.
❑ Was not able to perform inspection.
❑ CALL 435-0724 FOR RE-INSPECTION - 24 hour notice required.
Inspector Date
TYPE OF INSPECTION REQUESTED
❑ Under-floor ❑ Framing ❑ Gas Piping
❑ Footing ❑ Drywall, Nailing ❑ Consultation
❑ Foundation Shear Nailing ❑ Groundwork
❑ Mechanical ❑ Grid ❑ Struct. Slab
❑ Wood Stove ❑ Rough-in Plumb. ❑ Final
❑ Masonry ❑ Drainage ❑ Insulation
❑ Other
INSPECTION REPORT
Permit No.�0 j Lot #�_
• Address
Contractor
Owner � -
Date
Taken By
PPROVAL ❑ PARTIAL APPROVAL
❑ VIOLATION ❑ CORRECTION REQUESTED
❑ Corrections listed below MUST BE MADE before work can be approved.
❑ Please contact inspector.
❑ Was not able to perform inspection.
❑ CALL 435-0724 FOR RE-INSPECTION - 24 hour notice required.
In
Date o�—�'
TYPE OF INSPECTION REQUESTED
❑ Under-floor ❑ Framing ❑ Gas Piping
❑ Footing ❑ Drywall, Nailing ❑ Consultation
❑ Foundation ❑ Shear Nailing ❑ Groundwork
❑ Mechanical ❑ Grid ❑ Struct. Slab
❑ Wood Stove ❑ Rough-in Plumb. ❑ Final
❑ Masonry ❑ Drainage ❑ Insulation ,✓,�
❑ Other �e!/
INSPECTION REPORT
Permit No. F7- Lot
• Address IFd//
Contractor 0'�P_
Owner
• Date
Taken By
,Q-0PROVAL ❑ PARTIAL APPROVAL
❑ VIOLATION ❑ CORRECTION REQUESTED
❑ Corrections listed below MUST BE MADE before work can be approved.
❑ Please contact inspector.
❑ Was not able to perform inspection.
❑ CALL 435-0724 FOR RE-INSPECTION - 24 hour notice required.
I ecto Date
TYPE O INSPECTION REQUESTED
❑ Under-floor ❑ Framing ❑ Gas Piping
J Footing ❑ Drywall, Nailing ❑ Consultation
Foundation ❑ Shear Nailing ❑ Groundwork
Mechanical ❑ Grid ❑ Struct. Slab
❑ Wood Stove ❑ Rough-in Plumb. ❑ Final
❑ Masonry ❑ Drainage ❑ Insulation
❑ Other
INSPECTION REPORT
Permit No. - Lot# l�
Address Zk� All L
Contractor
Owner
Date �A _a
Taken By
PROVAL ❑ PARTIAL APPROVAL
❑ VIOLATION ❑ CORRECTION REQUESTED
❑ Corrections listed below MUST BE MADE before work can be approved.
❑ Please contact inspector.
❑ Was not able to perform inspection.
❑ CALL 435-0724 FOR RE-INSPECTION - 24 hour notice required.
c or Date 3
TYPE OF INSPECTION REQUESTED
❑ Under-floor ❑ Framing ❑ Gas Piping
4 Footing ❑ Drywall, Nailing ❑ Consultation
Foundation ❑ Shear Nailing ❑ Groundwork
❑ Mechanical ❑ Grid ❑ Struct. Slab
❑ Wood Stove ❑ Rough-in Plumb. ❑ Final
❑ Masonry ❑ Drainage ❑ Insulation
❑ Other
INSPECTION REPORT
Permit No. — Lot #
?
• Address
Contractorttir'
Owner
Date
Taken By
❑ APPROVAL ❑ PARTIAL APPROVAL
❑ VIOLATION _CORRECTION REQUESTED
❑ Corrections listed below MU T BE MADE before work can be approved.
❑ Please contact inspector.
❑ Was not able to perform inspection.
❑ CALL 435-0724 FOR RE-INSPECTION - 24 hour notice required.
/l
r
�~ r f
Inspector
Date
TYPE OF INSPECTION REQUESTED
❑ Under-floor ❑ Framing ❑ Gas Piping
>�Footing ❑ Drywall, Nailing ❑ Consultation
0 Foundation ❑ Shear Nailing ❑ Groundwork
❑ Mechanical ❑ Grid ❑ Struct. Slab
❑ Wood Stove ❑ Rough-in Plumb. ❑ Final
❑ Masonry ❑ Drainage ❑ Insulation
❑ Other
w
�4
1 N
a L
�s O ;
y
• '1 n
M �
c
:_ 5 t � FEE
!p 1
• CITY OF ARLINGTON �j
C I -rY OF ARL I N0-r0M
OOIVST RUOT I ON RERM I T
RERM I T NO. SS-2a&a
Owner: LAKECREST CONST 4641 SILVERTIP LANE EVERETT 981=0:
Value of Work: $80,240.00 Tax TD. GE 111A 13 "hone: 360 652-6511
9 Describe Work: NEW CONSTRUCTION
Proposed Use: SFR
Legal Description:
Job Address: 18611 BALLANTRAE DR.
Contractor's dame Type Address License#
LAKECREST CONSTRUCTION G 4644J. SILVERTIP LANE LAKECC11707
PUGET HEATING CO INC. M PO BOX 336 PUGETH*2648D
SOUNDVIEW PLUMBING P 2824 W. CASINO RD. SOUNDVP033NF
P E R M I T F E E S
Equipment and Fixtures Nu ber Fee Total Charge
PLUMBING FIXTURES 2 $7.00 $84.00
FURNACE/UNIT HEATER 1 $13.2 5 $13.25
RANGE 1 $9.50 $9.50
VENTILATION FANS 4 $6.50 $26.00
DRYER 1 $9.50 $9.50
METAL FIREPLACE & CHIMNEY 1 $9.50 $9.50
WATER HEATER 1 $9.50 $9.50
GAS PIPING 1-5 OUTLETS 1 $5.00 $5.00
S U B T O T A L...... $166.25
TOTALS Fee
Equipment $82.25
Fixture $84.00
Mech Permit $22.00
Permit Fee $693.50
Plan Fee $450.78
Plumb Permit $15.00
State tee $4.50
School Mitigation $941.00
SIGNATURE:x
TOTAL FEE.. . .. . . . . . ..... . $2,293.03 1 HEREBY CERTOS,Acp
AT I READ
AND EXAMINED PL ION AND
PAYMENTS..... . . .. .. .. .. . .. $417. 14 KNOW THE - AND COR-
RECT ALL PROVISIONS OF LAWS AND
TOTAL DUE.. . . . . . . .. ... ... . $1,875.89 ORDINANCES GOVERNING THIS TYPE OF
WORK WILL BE COMPLIE WITH
BUILDING OFFICIhL,..,
CITY OF ARLINGTON
CONSTRUCTION
PERMIT `
❑ COMBINATION BUILDING ❑ MECHANICAL ❑ PLUMBING ❑ SIGN PERMIT NO. �ll
OWNER MAIL ADDRESS CITY ZIP PHONE
45� r- 3
ARC( ITECT R DESIGNER M A DRESS CITY ZIP PHONE
GENERAL ON RAC TOR MAIL ADDRESS CITY ZIP PHONE LICIENSE I
MLCII NICA CONT AC OR VAdj.ADDRESS CITY ZIP PIIONE LICENSE f
'7I0 -07� Z
PLUMBING CONTRAC70R MAIL ADDRESS CITY ZIP PIIONE LICENSE I
1 CLASS OF WORK
[04I_W ❑AUDITION ❑ALTERATION ❑REPAIR ❑DEMOLI I ION ❑BUILDING RELOCATION
VALUAI ION OF WORK
J OLSCRI��—
PRUPOSI O USE OF BUILDING
I HEREBY CERTIFY THAT I HAVE READ AND EXAMINED THIS APPLICA-
TION AND KNOW THE SAME TO BE TRUE AND CORRECT ALL PROVI-
LLGAL uiit%(*RIPl loll oI PR HoyVN B EL Oq,A; a c�s� SIONS OF LAWS AND ORDINANCES GOVERNING THIS TYPE OF WORK
j LOI FILUCKK OF GI Cw b/ WILL BE COMPLIED WITH WHETHER SPECIFIED HERIN OR NOT.THE
C GRANTING OF A PERMIT DOES NOT PRESUME TO GIVE AUTHORITY TO
i VIOLATE OR CANCEL THE PROVISIONS OF ANY OTHER STATE OR
61
TAX ID NUMBER FROM PROPERTY TAX STATEMENT LOCAL LAW REGULATING CONSTRUCTION OF THE PERFORMANCE OF
L CONSTRUCTION. PERMIT EXPIRES 1 YEAR FROM DATE OF ISSUANCE.
E SIGNATURE O NTRA THORIZEO AGENT;::;71E l}
108 AUURISS
li x
(OPPICIT USE ONLY) (CAL
PLUMBING
NO. TYPE OP PIXTURB PBB z's PIXTURBS O. TYPE OP 13OUIPMENT PBS :'s FIXTURES
AT13R CLOSBf TOIL %IRCOND.UNITS-H.P. EA. ui •Ilt•'
IATIITUD 0PRIOERATION UNITS-II.P.BA ul .Ild••
VATORY ASII BASIN OILERS-II.P.P.A. W .IIA-
IIOWER AS MIRED A.C.UNITS-TONNAGSBA. d .Ilt•"
IIEN SINK&DISPOSAL ORCED AIR SYSTEMS-D.T.U. MEA
ISHWASHER. ALL IIBATERS-B.T.U. M
UNDRY TRAY NIT I(EATERS-B.T.U. M
LO•f1I6 WASIIER VAPORATIVECOOLERS
WATER IWATER LO111RS DRYERS
RINAL ENTILATION PAN
KINKING POUNTAIN ANOB HOOD COMMERCIAL
LOOR DRAIN IR HANDLING UNIT- CPM
ACUUM BREAKERS OVB
OOP DRAINS-RAINLEADERS STAL FIREPLACE&CHIMNEY
INK SURVICE-BAR,MC. ATBR IWATER
AS PIPING •u to S SS•DO �ddnl. 5.75
ul meat Bat mint I r AA.A
SUB TOTAL SUB TOTAL
PERMIT PERMIT
TOTAL Full TOTAL FBB
CK FEE
SIULY%Ry LIBACK SFRLLISLIBACK REAR YARC SE[7 PLAN EEIPTNO
5 � V �' 14
FEE% RECEIPT NO.
ust/ LOT AREA VACANT SII
VALUATION ' FEE
AR
l� J ? / lay4f—11 NO
1YP f ^CO/NS1. UPPANCYGROUP NO.OF DWELLING UNITS PLAN CHECKING VG `
v '`'' ' " I BU'LDING S 3 Ja
SIZL OI BLDG., NO.OF STORIIA MAX.OCC.LOAD
Cp PLUMBING
F IRE SPRINkLERS REQUIRED
❑YES �»lo� MECHANICAL
STATE BLDG.CODE
COMMENTS ENERGY CODE SUROAARGE
RECEIVES#,,!fff�eZPENALTY U.B.C,
SEC.303(+)
JM 14 WATER/SEWER FEES
TOTAL
l (•�� CITY OF ARLINGTON PERMIT VALIDATION
WHEN PROPERLY VALIDATED (IN THIS SPACE)THIS IS YOUR PERMIT&RECEIPT
PAID CRII BY
✓ BUILDING OFFICIAL DATE
Cc:ASSESSOR,APPLICANT,TREASURER, BLDG DEPT. RECORDS COPY