HomeMy WebLinkAbout18515 Ballantrae Dr_BLD982860_2025 INSPECTION REPORT
q
Permit No.C2 to L) Lot# _
Address . z6gz A ,�--
Contractor -oh
Owner
Date 9
Taken By
94,APPROVAL ❑ PARTIAL APPROVAL
❑ VIOLATION ❑ CORRECTION REQUESTED
❑ Corrections listed below MUST BE MADE before work can be approved.
❑ Please contact inspector.
❑ Was not able to perform inspection.
❑ CALL 435-0724 FOR RE-INSPECTION - 24 hour notice required.
Inspector Date
TYPE OF INSPECTION REQUESTED
❑ Under-floor ❑ Framing ❑ Gas Piping
❑ Footing ❑ Drywall, Nailing ❑ Consultation
❑ Foundation ❑ Shear Nailing ❑ Groundwork
❑ Mechanical ❑ Grid ❑ Struct. Slab
❑ Wood Stove ❑ Rough-in Plumb. )w Final JqcQ.
❑ Masonry ❑ Drainage ❑ Insulation
❑ Other !
INSPECTION REPORT
Permit No.9�- d of#
Address
Contractor
Owner
Date j Jr
Taken By
PROVAL ❑ PARTIAL APPROVAL
❑ VIOLATION ❑ CORRECTION REQUESTED
❑ Corrections listed below MUST BE MADE before work can be approved.
❑ Please contact inspector.
❑ Was not able to perform inspection.
❑ CALL 435-0724 FOR RE-INSPECTION - 24 hour notice required.
In ector Date
TY F INSPECTION REQUESTED
❑ Under-floor ❑ F aming ❑ Gas Piping
❑ Footing rywall, Nailing ❑ Consultation
❑ Foundation ❑ Shear Nailing ❑ Groundwork
❑ Mechanical ❑ Grid ❑ Struct. Slab
❑ Wood Stove ❑ Rough-in Plumb. ❑ Final
❑ Masonry ❑ Drainage ❑ Insulation
❑ Other
l.�
INSPECTION REPORT
Permit No.Q7-,_-2:?!P 6 Lot# _
• Address I
Contractor " �—
Owner
•
Date
Taken By S
❑ APPROVAL ❑ PARTIAL APPROVAL
❑ VIOLATION ❑ CORRECTION REQUESTED
❑ Corrections listed below MUST BE MADE before work can be approved.
❑ Please contact inspector.
❑ Was not able to perform inspection.
❑ CALL 435-0724 FOR RE-INSPECTION - 24 hour notice required.
Date
Inspector
TYPE OF INSPECTION REQUESTED
❑ Under-floor ❑ Framing ❑ Gas Piping
❑ Footing ,)<Drywall, Nailing ❑ Consultation
❑ Foundation ❑ Shear Nailing ❑ Groundwork
❑ Mechanical ❑ Grid ❑ Struct. Slab
❑ Wood Stove ❑ Rough-in Plumb. ❑ Final
❑ Masonry ❑ Drainage ❑ Insulation
❑ Other L
M1 INSPECTION REPORT
Permit No. � Lot#
• Address
Contractor
Ownerv%/
Date y 2
Taken By
❑ APPROVAL ❑ PARTIAL APPROVAL
❑ VIOLATION ❑ CORRECTION REQUESTED
❑ Corrections listed below MUST BE MADE before work can be approved.
❑ Please contact inspector.
❑ Was not able to perform inspection.
❑ CALL 435-0724 FOR RE-INSPECTION - 24 hour notice required.
Date
TYP IF INSPECTION REQUESTED
❑ Under-floor ❑ Framing ❑ Gas Piping
❑ Footing rywall, Nailing ❑ Consultation
❑ Foundation O Shear Nailing ❑ Groundwork
❑ Mechanical ❑ Grid ❑ Struct. Slab
❑ Wood Stove ❑ Rough-in Plumb. ❑ Final
❑ Masonry ❑ Drainage ❑ Insulation
❑ Other
INSPECTION REPORT __,;
n` Permit Nor --,;Z8%U Lot# 53
Address
Contractor
Owner LcZ ��-�-�—
� Date 3'�
Taken By -�
PPROVAL ❑ PARTIAL APPROVAL
❑ LATION ❑ CORRECTION REQUESTED
❑ Corrections listed below MUST BE MADE before work can be approved.
❑ Please contact inspector.
❑ Was not able to perform inspection.
❑ CALL 435-0724 FOR RE-INSPECTION - 24 hour notice required.
Inspector .Date
TYPE OF INSPECTION REQUESTED
❑ Under-floor ❑ Framing ❑ Gas Piping
❑ Footing ❑ Drywall, Nailing ❑ Consultation
❑ Foundation ❑ Shear Nailing ❑ Groundwork
❑ Mechanical ❑ Grid ❑ Struct. Slab
❑ Wood Stove ❑ Rough-in Plumb. ❑ Final
❑ Masonry ❑ Drainage insulation
❑ Other L
INSPECTION REPORT
Permit No. F 4P 0 Lot#
Address
Contractor
Owner
Date aV - �
Taken By
APPROVAL ❑ PARTIAL APPROVAL
❑ VIOLATION ❑ CORRECTION REQUESTED
❑ Corrections listed below MUST BE MADE before work can be approved.
❑ Please contact inspector.
❑ Was not able to perform inspection.
❑ CALL 435-0724 FOR RE-INSPECTION - 24 hour notice required.
Inspector Date
. ,J
TYPE OF INSPECTION REQUESTED
❑ Under-floor .�( Framing ❑ Gas Piping
❑ Footing ❑ Drywall, Nailing ❑ Consultation
❑ Foundation ❑ Shear Nailing ❑ Groundwork
❑ Mechanical ❑ Grid ❑ Struct. Slab
❑ Wood Stove ❑ Rough-in Plumb. ❑ Final
❑ Masonry ❑ Drainage ❑ Insulation
❑ Other ��_
INSPECTION REPORT
• • Lot#fl
Permit No. '
Address
Contractor � L3rr�C'i3 pt MnE'
Owner
Date _ G�
Taken By
❑ APPROVAL ❑ PARTIAL APPROVAL
❑ VIOLATION ❑ CORRECTION REQUESTED
❑ Corrections listed below MUST BE MADE before work can be approved.
❑ Please contact inspector.
❑ Was not able to perform inspection.
❑ CALL 435-0724 FOR RE-INSPECTION - 24 hour notice required.
J
Inspector Date -
YPE OF INSPECTION REQUESTED
❑ Under-floor raming ❑ Gas Piping
❑ Footing Drywall, Nailing j Consultation
❑ Foundation ::I Shear Nailing ❑ Groundwork
❑ Mechanical ❑ Grid ❑ Struct. Slab
❑ Wood Stove ❑ Rough-in Plumb. ❑ Final
❑ Masonry ❑ Drainage ❑ Insulation
❑ Other L
INSPECTION REPORT
Permit N og ,; &t 6 Loi #-
• Address
Contractor
Owner
Date 73
Taken By �-
APPROVAL ❑ PARTIAL APPROVAL
❑ VIOLATION ❑ CORRECTION REQUESTED
❑ Corrections listed below MUST BE MADE before work can be approved.
❑ Please contact inspector.
❑ Was not able to perform inspection.
❑ CALL 435-0724 FOR RE-INSPECTION - 24 hour notice required.
(_
l ZI
Inspector ,y �'�-' Date
TYPE OF INSPECTION REQUESTED
❑ Under-floor ❑ Framing Gas Piping
❑ Footing ❑ Drywall, Nailing Consultation
❑ Foundation ❑ Shear Nailing ❑ Groundwork
"IMechanical ❑ Grid ElStruct. Slab
"I
Wood Stove ❑ Rough-in Plumb. ❑ Final
❑ Masonry ❑ Drainage ❑ Insulation
❑ Other L
INSPECTION REPORT
Permit No. ) Lot# _
• Address 1'3 5 1
Contractor
Owner
Date _5"5--
Taken By
79PPROVAL
❑ PARTIAL APPROVAL
❑ V OLATION ❑ CORRECTION REQUESTED
❑ Corrections listed below MUST BE MADE before work can be approved.
❑ Please contact inspector.
❑ Was not able to perform inspection.
❑ CALL 435-0724 FOR RE-INSPECTION - 24 hour notice required.
Inspector Date
6
TYPE OF INSPECTION REQUESTED
❑ Under-floor ❑ Framing ❑ Gas Piping
❑ Footing ❑ Drywall, Nailing ❑ Consultation
❑ Foundation ❑ Shear Nailing ❑ Groundwork
❑ Mechanical �_❑ rid ❑ Struct. Slab
❑ Wood Stove ough-in Plumb. ❑ Final
❑ Masonry ❑ Drainage ❑ Insulation
❑ Other
INSPECTION REPORT
Permit No. — Lot # _
Address
Contractor
Owner`Y ��'_ �
•
Date �a
Taken By
ROYAL ❑ PARTIAL APPROVAL
�),
VIOLA ❑ CORRECTION REQUESTED
❑ Corrections listed below MUST BE MADE before work can be approved.
❑ Please contact inspector.
❑ Was not able to perform ins ction.
❑ CALL 435-0724 FOR RE-1 PECTION - 24 hour notice required.
Inspector Date
TYPE OF INSPECTION REQUESTED
❑ Under-floor ❑ Framing ❑ Gas Piping
❑ Footing Al=eaarllailing
ll Nailing ❑ Consultation
❑ Foundation ❑ Groundwork
❑ Mechanical ❑ Grid ❑ Struct. Slab
❑ Wood Stove ❑ Rough-in Plumb. ❑ Final
❑ Masonry ❑ Drainage ❑ Insulation
❑ Other , A-ti,� -
INSPECTION REPORT
d
Permit No. ��% Lot # oa
Address —
Contractor ,c.
Owner
Date
Taken By
❑ APPROVAL 0 ARTIAL APPROVAL
❑ VIOLATION CORRECTION REQUESTED
❑ Corrections listed below MUST BE MADE before work can be approved.
❑ Please contact inspector.
❑ Was not able to perform inspection.
❑ CALL 435-0724 FOR RE-INSPECTION - 24 hour notice required.
Inspector Date
TYPE OF INSPECTION REQUESTED
❑ Under-floor ❑ Framing ❑ Gas Piping
❑ Footing ❑ Drywall, Nailing ❑ Consultation
❑ Foundation )<Shear Nailing ❑ Groundwork
❑ Mechanical ❑ Grid ❑ Struct. Slab
❑ Wood Stove ❑ Rough-in Plumb. ❑ Final
❑ Masonry ❑ Drainage ❑ Insulation
❑ Other
INSPECTION REPORT
Permit No. Lot#
• Address
Contractor
i
Owner
� Date —
-9 �
Taken By
❑ APPROVAL ❑ PARTIAL APPROVAL
❑ VIOLATION ❑ CORRECTION REQUESTED
❑ Corrections listed below MUST BE MADE before work can be approved.
❑ Please contact inspector.
❑ Was not able to perform inspection.
❑ CALL 435-0724 FOR RE-INSPECTION - 24 hour notice required.
Inspector Date �"
TYPE OF SSPECTION REQUESTED
❑ Under-floor ❑ Framing ❑ Gas Piping
❑ Footing ❑ Drywall, Nailing ❑ Consultation
❑ Foundation ❑ Shear Nailing /ik Groundwork
❑ Mechanical ❑ Grid L1.Struct. Slab
❑ Wood Stove ❑ Rough-in Plumb. ❑ Final
❑ Masonry ❑ Drainage ❑ Insulation
❑ Other
INSPECTION REPORT
Permit No.v' Lot# IF
Address
Contractor
Owner
Date O~�
Taken By
PPROVAL ❑ PARTIAL APPROVAL
❑ VIOLATION ❑ CORRECTION REQUESTED
❑ Corrections listed below MUST BE MADE before work can be approved.
❑ Please contact inspector.
❑ Was not able to perform inspection.
❑ CALL 435-0724 FOR RE-INSPECTION - 24 hour notice required.
ns e Date
7 LLzr_
TY E OF INSPECTION REQUESTED
❑ Under-floor ❑ Framing ❑ Gas Piping
J Footing ❑ Drywall, Nailing ❑ Consultation
foundation ❑ Shear Nailing ❑ Groundwork
❑ Mechanical ❑ Grid ❑ Struct. Slab
❑ Wood Stove ❑ Rough-in Plumb. ❑ Final
❑ Masonry ❑ Drainage ❑ Insulation
❑ Other
INSPECTION REPORT
CIO
e r'� Lot# _
Permit No.
• Address
Contractor ��-
Owner
• Date —•�
Taken By
❑ P_PROVAL ❑ ARTIAL APPROVAL
❑ VIOLATION ❑ CORRECTION REQUESTED
❑ Corrections listed below MUST BE MADE before work can be approved.
❑ Please contact inspector.
❑ Was not able to perform inspection.
❑ CALL 435-0724 FOR RE-IN ECTION - 24 hour notice required.
' 1
Inspector Date
TYPE OF INSPECTION REQUESTED
❑ Under-floor ❑ Framing ❑ Gas Piping
Footing 0 Drywall, Nailing ❑ Consultation
Foundation 0 Shear Nailing ❑ Groundwork
❑ Mechanical ❑ Grid ❑ Struct. Slab
❑ Wood Stove ❑ Rough-in Plumb. ❑ Final
❑ Masonry ❑ Drainage ❑ Insulation
❑ Other
v �
` . zo
O t
V
�V
s
' j b
I
� ! c
all 1 «
L„
N
J
RECEIVED
JAN 14 1998
CITY OF ARUNGTON
CITY OF ARLINGTON
CONSTRUCTION
PERMIT 1 ` r
❑ COMBINATION BUILDING ❑ MECHANICAL ❑ PLUMBING ❑ SIGN �1
PERMIT NO. ,,
OWNER MAIL ADDRESS CITY ZIP PHONE
3
ARCI IT'CT R DE SIGNER M _ADDRESS CITY ZIP PHONE
GENERALON AC OR MAIL ADDRESS CITY ZIP PHONE LICENSE/—
e 3 - //
MLCII NICA CONT ACTO AI ADDRESS CITY ZIP PHONE LICENSE/
7/0
PLUMBING CON TRACTOR MAIL ADDRESS CITY ZIP PIIONE LICENSE/
CLASS WORK
l.W ❑AUDITION ❑ALTERATION ❑REPAIR ❑I)EMOLI I ION ❑BUILDING RELOCATION
VALUAI ION OF WORK
ULSCRIBE WOROK
PRUPOSI U USE 01 BUILDING
I HEREBY CERTIFY THAT I HAVE READ AND EXAMINED THIS APPLICA-
TION AND KNOW THE SAME TO BE TRUE AND CORRECT ALL PROVI-
LL4AL SCaIPI IU/N PROPLRIY SHOWN BELOW OR 1ACII F R COP! SIONS OF LAWS AND ORDINANCES GOVERNING THIS TYPE OF WORK
�`"`` � WILL BE COMPLIED WITH WHETHER SPECIFIED HERIN OR NOT.THE
LUI ALUCK-1 OT
GRANTING OF A PERMIT DOES NOT PRESUME TO GIVE AUTHORITY TO
VIOLATE OR CANCEL THE PROVISIONS OF ANY OTHER STATE OR
TAX ID NUMBER FROM PROPERTY TAX STATEMENT LOCAL LAW REGULATING CONSTRUCTION OF THE PERFORMANCE OF
CONSTRUCTION.PERMIT EXPIRES 1 YE FROM DATE OF ISSUANCE.
SIGNATURE Of RIZEO A DATE
TOOAUURISS -
(&FR%USE ONLY)
PLUM13INO IlEatw1cwx
NO. TYPE OF PIXTURD PHU FIXTURES NO TYPO OF 13OUIPMUNT PEB x's FIXTURES
ATER CLOSOr T'OILEI IR COND.UNITS-II.P. P.A. d .llst'"
Z IATIITUD UPRIOIRATION UNITS-II.P.R& d .Ilst'"
3 VATORY ASH BASIN OILERS-II.P.EA. d .Ilst••
110WER ASPIRED A.C.UN1FS-TONNAGBEA. d .Iirt"
arCIIEN SINS&DISPOSAL aORCBD AIR SYSTEMS-D.T.U. MDA
f ISIIWASIIBR ALL IIBATRRS-B.T.U. M
UNDRY TRAY )NIT HEATERS-D.T.U. M
LOTIIES WASHER IVAPORATIVE COOLERS
AT'IIR IIBATER 'LO.11113 URYDt9
RINAL QTTILATION PAN
RINKINO FOUNTAIN v ANG13 HOOD COMMERCIAL
LOOR DRAIN IR IIANDLING UNIT- CPM
VACUUM BREAKERS OVE
LOOP DRAINS-RAINLPADERS J ISfAL PIREPLACB A CIIIMNEY
INK SBRVICB-DAR.inc.) v ATER ABATER
AS PIPING '(up to 3-$3.00 addol.-$.TS4;� '
—..Equipment lid must be provided
SLID TOTAL: SUB TOTAL
PERMIT PERMIT
TOTAL PHIS TOTAL PDD
SIU.V.\RU LIIIACik SIRLLISLIBACK REAR YARD SEI PLA CIICKNUM PLAN C11ECKFEE
RECEIPT NO.
SF / N) lUl ARLA VACANT SIZE �`��'
YES ❑ VALUATION
' FEE
l YPL OI CO S1. CX CUP�WNGY 4 P NO,OF UWELLlNG UNITS C KINC ��O •-J a i�
�A (/C 2c� Il BU'LDING f J J
SUL Of BI.11t.. NO.Of STORILS MAX.OCC.LOAD
I g5o PLUMBING
f IRE SPRINKLERS REQUIRED
❑YES t� MECHANICAL
€ T r7 STATE BLDG.CODE
COMMENTS A I, �Q
R �1V ENERGY CODE SURCHARGE "C
t f U.B.C.
°] PENALTY SEC.303(aI) _
C— WATER/SEWER FEES
P11-IL.UNU I L✓N TOTAL
PERMIT VALIDATION
Zer WHEN PROPERLY VALIDATED IIN THIS SPACE)THIS IS YOUR PERMIT b RECEIPT
a fib PAID CRII BY_
BUII DING OFFICIAL DATE
cc:ASSESSOR,APPLICANT,TREASURER.BLDG.DEPT. RECORDS COPY