HomeMy WebLinkAbout18505 Ballantrae Dr_BLD972721_2025 INSPECTION REPORT
Permit No. Lot# _
Address 105r).s -T
Contractor,
Owner
Date '—
Taken By
PPROVAL ❑ PARTIAL APPROVAL
❑ VIOLATION ❑ CORRECTION REQUESTED
❑ Corrections listed below MUST BE MADE before work can be approved.
❑ Please contact inspector.
❑ Was not able to perform inspection.
❑ CALL 435-0724 FOR RE-INSPECTION - 24 hour notice required.
G
Date
TYPE INSPECTION REQUESTED
❑ Under-floor ❑ Framing ❑ Gas Piping
❑ Footing ❑ Drywall, Nailing ❑ Consultation
❑ Foundation ❑ Shear Nailing ❑ Groundwork
❑ Mechanical ❑ Grid ❑ uct. Slab-�
❑ Wood Stove ❑ Rough-in Plumb. Final �(
❑ Masonry ❑ Drainage ❑ sulation
❑ Other
INSPECTION REPORT
Permit No �7. f Lot# _
Address
Contractor
Owner
Date 7— .'
Taken By
APPROVAL ❑ PARTIAL APPROVAL
VIOLATION ❑ CORRECTION REQUESTED
❑ Corrections listed below MUST BE MADE before work can be approved.
❑ Please contact inspector.
❑ Was not able to perform inspection.
❑,CALL 435-0724 FOR RE-INSPECTION - 24 hour notice required.
1
rje
Inspector Date
TYPE OF INSPECTION REQUESTED
❑ Under-floor ❑ F aming ❑ Gas Piping
❑ Footing rywall, Nailing ❑ Consultation
❑ Foundation ❑ hear Nailing ❑ Groundwork
❑ Mechanical ❑ Grid ❑ Struct. Slab
❑ Wood Stove ❑ Rough-in Plumb. ❑ Final
❑ Masonry ❑ Drainage ❑ Insulation
❑ Other
INSPECTION REPORT
Permit No. , _ _7a Lot# _
• Address
Contractor
Owner
Date
Taken By
APPROVAL ❑ PARTIAL APPROVAL
❑ VIOLATION (3 CORRECTION REQUESTED
❑ Corrections listed below MUST BE MADE before work can be approved.
❑ Please contact inspector.
❑ Was not able to perform inspection.
❑ CALL 435-0724 FOR RE-INSPECTX)N.- 24 hour otic quired.
�L ;S
1
Inspector Date �—
TYPE OF INSPECTION REQUESTED
❑ Under-floor ❑ Framing ❑ Gas Piping
❑ Footing ❑ Drywall, Nailing ❑ Consultation
❑ Foundation ❑ Shear Nailing ❑ Groundwork
❑ Mechanical ❑ Grid ❑ Struct. Slab
❑ Wood Stove ❑ Rough-in Plumb. 0 mal
❑ Masonry ❑ Drainage Insulation
❑ Other
INSPECTION REPORT
0Permit No. Lot #__�42 _
Address
Contractor
Owner
Date
Taken
ROYAL J PARTIAL APPROVAL
❑ VIOLATION ❑ CORRECTION REQUESTED
❑ Corrections listed below MUST BE MADE before work can be approved.
❑ Please contact inspector.
❑ Was not able to perform inspection.
❑ CALL 435-0724 FOR RE-INSPECTION - 24 hour notice required.
Inspector
Date
TYPE OF INSPECTION REQUESTED
❑ Under-floor '/�raming ❑ Gas Piping
❑ Footing J Drywall, Nailing ❑ Consultation
❑ Foundation ❑ Shear Nailing ❑ Groundwork
❑ Mechanical ❑ Grid ❑ Struct. Slab
❑ Wood Stove ❑ Rough-in Plumb. ❑ Final
❑ Masonry ❑ Drainage ❑ Insulation
❑ Other
INSPECTION REPORT
Permit No. Lot# ZO
Address
Contractor, ellz
Owner 2621z7�_')
Date Taken By
PROVAL ❑ PARTIAL APPROVAL
❑ VIOLATION ❑ CORRECTION REQUESTED
❑ Corrections listed below MUST BE MADE before work can be approved.
❑ Please contact inspector.
❑ Was not able to perform inspection.
❑ CALL 435-0724 FOR RE-INSPECTION - 24 hour notice required.
nspector Date
TYPE OF INSPECTION REQUESTED
❑ Under-floor ❑ Framing A Gas Piping
❑ Footing ❑ Drywall, Nailing O Consultation
❑ Foundation ❑ Shear Nailing ❑ Groundwork
Mechanical ❑ Grid ❑ Struct. Slab
❑ Wood Stove ❑ Rough-in Plumb. ❑ Final
❑ Masonry ❑ Drainage ❑ Insulation
❑ Other
INSPECTION REPORT
Permit NoCL?l, � s _� Lot #
Address O�
Contractor
Owner
Date / —_-'Ai
Taken By
APPROVAL ❑ PARTIAL APPROVAL
❑ VIOLATION ❑ CORRECTION REQUESTED
❑ Corrections listed below MUST BE MADE before work can be approved.
❑ Please contact inspector.
❑ Was not able to perform inspection.
❑ CALL 435-0724 FOR RE-INSPECTION - 24 hour notice required.
nspec Date '
TY OF INSPECTION REQUESTED
❑ Under-floor ❑ Framing ❑ Gas Piping
❑ Footing ❑ Drywall, Nailing ❑ Consultation
❑ Foundation ❑ Shear Nailing ❑ Groundwork
❑ Mechanical ❑ Grid ❑ Struct. Slab
❑ Wood Stove L)!Rough-in Plumb. ❑ Final
❑ Masonry ❑ Drainage ❑ Insulation
❑ Other
Cce
INSPECTION REPORT
Permit No. — Lot #
Address 0-6- ,
Contractor
Owner -0
Date
Taken By
❑ APPROVAL ❑ PARTIAL APPROVAL
❑ VIOLATION CORRECTION REQUESTED
❑ Corrections listed below MUST BE MADE before work can be approved.
❑ Please contact inspector.
❑ Was not able to perform inspection.
Cl CALL 435-0724 FOR RE-INSPECTION - 24 our notice required.
Inspector Date :
TYPE OF INSPECTION REQUESTED
❑ Under-floor ❑ Framing ❑ Gas Piping
❑ Footing ❑ Drywall, Nailing ❑ Consultation
❑ Foundation ❑ Shear Nailing ❑ Groundwork
❑ Mechanical U Grid ❑ Struct. Slab
❑ Wood Stove `.'6 Rough-in Plumb. ❑ Final
❑ Masonry Drainage ❑ Insulation
❑ Other
�`N\' INSPECTION REPORT
Permit No. 1�1-:�7�� Lot#
• Address 1 - --
Contractor
Owner
Date
Taken By r'C It
APPROVAL ❑ PARTIAL APPROVAL
❑ VIOLATION ❑ CORRECTION REQUESTED
❑ Corrections listed below MUST BE MADE before work can be approved.
❑ Please contact inspector.
❑ Was not able to perform inspection.
❑ CALL 435-0724 FOR RE-INSPECTION - 24 hour notice required.
inspector Date
TYP OF INSPECTION REQUESTED
❑ Under-floor ❑ Framing ❑ Gas Piping
❑ Footing J Drywall, Nailing ❑ Consultation
❑ Foundation /Shear Nailing ❑ Groundwork
❑ Mechanical ❑ Grid ❑ Struct. Slab
❑ Wood Stove ❑ Rough-in Plumb. ❑ Final
❑ Masonry ❑ Drainage ❑ Insulation
❑ Other
INSPECTION REPORT
Permit No.C= '� Lot#
• Address I > �
Contractor �/L���'�5
Owner
Date /Q�_ L
Taken By
PPROVAL ❑ PARTIAL APPROVAL
❑ VIOLATION ❑ CORRECTION REQUESTED
❑ Corrections listed below MUST BE MADE before work can be approved.
❑ Please contact inspector.
❑ Was not able to perform inspection.
❑ CALL 435-0724 FOR RE-INSPECTION - 24 hour notice required.
Inspe Date
TYPE O INSPECTION REQUESTED
❑ Under-floor ❑ Framing ❑ Gas Piping
❑ Footing ❑ Drywall, Nailing ❑ Consultation
❑ Foundation �<Shear Nailing ❑ Groundwork
❑ Mechanical Orid ❑ Struct. Slab
❑ Wood Stove ❑ Rough-in Plumb. ❑ Final
❑ Masonry ❑ Drainage ❑ Insulation
❑ Other
INSPECTION REPORT
Permit No. c; Lot #K_
Address
Contractor /GLyrvnc�
® Owner ��'o��-e.�'
Date 7
PROVAL ❑ PARTIAL APPROVAL
❑ VIOLATION ❑ CORRECTION REQUESTED
❑ Corrections listed below MUST BE MADE before work can be approved.
❑ Please contact inspector.
❑ Was not able to perform inspection.
❑ CALL 435-0724 FOR RE-INSPECTION - 24 hour notice required.
Inspector-
Date L?
TYPE OF INSPECTION REQUESTED
❑ Under-floor ❑ Framing ❑ Gas Piping
❑ Footing ❑ Drywall, Nailing ❑ Consultation
❑ Foundation ❑ Shear Nailing Groundwork
❑ Mechanical ❑ Grid ❑ Struct. Slab
❑ Wood Stove ❑ Rough-in ❑ Final
❑ Masonry ❑ Drainage ❑ Insulation
❑ Other
INSPECTION REPORT
Permit No. Lot #6_
Address DR,
Contractor lt4 '_ _1'd.�
♦ Owner
Date l EaS A 7
APPROVAL ❑ PARTIAL APPROVAL
❑ VIOLATION ❑ CORRECTION REQUESTED
❑ Corrections listed below MUST BE MADE before work can be approved.
❑ Please contact inspector.
❑ Was not able to perform inspection.
❑ CALL 435-0724 FOR RE-INSPECTION - 24 hour notice required.
Inspec — Date 7
TYPE OF INSPECTION REQUESTED
❑ Under-floor ❑ Framing ❑ Gas Piping
❑ Footing ❑ Drywall, Nailing ❑ Consultation
Foundation ❑ Shear Nailing ❑ Groundwork
tl ❑ Mechanical ❑ Grid ❑ Struct. Slab
❑ Wood Stove ❑ Rough-in ❑ Final
❑ Masonry ❑ Drainage ❑ Insulation
❑ Other
INSPECTION REPORT
v
Permit No. Z_ / Lot#�2-
Address W .15-
Contractor ���'
Owner Date H6P9
_L7
—U"APPROVAL ❑ PARTIAL APPROVAL
❑ VIOLATION ❑ CORRECTION REQUESTED
❑ Corrections listed below MUST BE MADE before work can be approved.
❑ Please contact inspector.
❑ Was not able to perform inspection.
❑ CALL 435-0724 FOR RE-INSPECTION - 24 hour notice required.
l -
-r-
Insp r r Date
TYPE OF INSPECTION REQUESTED
❑ Under-floor ❑ Framing ❑ Gas Piping
noting ❑ Drywall, Nailing ❑ Consultation
❑ Foundation ❑ Shear Nailing ❑ Groundwork
❑ Mechanical ❑ Grid ❑ Struct. Slab
❑ Wood Stove ❑ Rough-in ❑ Final
❑ Masonry ❑ Drainage ❑ Insulation
❑ Other
z
oz
L1 �
O
w
s } ■ o
i
r •
2
Y
. I Z
1 y
I�
I
y.Z
` � r
. C
r
3
CITY OF
C I TY OF ARL.I NSYON
CONST RUCT I Ohl RE RM I T
RERM I T NO-: Sy-2y21
Owner: LAKECREST CONST 4641 SILVERTIP LANE EVERETT 98203
Value of Work: $79,083.00 Tax iDa Phone: 259-6005
Describe Work: NEW CONSTRUCTION
Proposed Use: SFR
Legal Description: GE 3A LOT 6
Job Address: 18505 BALLANTRAE DR
Contractor's Name Type Address License#
LAKECREST CONSTRUCTION G 4641 SILVERTIP LANE LAKECC11707
PUGET HEATING CO INC. M PO BOX 336 PUGETH*2648D
SOUNDVIEW PLUMBING P 2824 W. CASINO RD. SOUNDVP033NF
P E R M I T F E E S
[Equipment and Fixtures Number -Fee Total Charge
PLUMBING FIXTURES ----- --- - 12 $7.00 $84.00
FURNACE/UNIT HEATER 1 $13.25 $13.25
RANGE 1 $9.50 $9.50
VENTILATION FANS 4 $6.50 $26.00
DRYER 1 $9.50 $9.50
METAL FIREPLACE & CHIMNEY 1 $9.50 $9.50
WATER HEATER 1 $9.50 $9.50
GAS PIPING 1-5 OUTLETS 1 $5.00 $5.00
S U B T O T A L...... $166.25
TOTALS Fee
Equipment $82.25
Fixture $84.00
Mech Permit $22.00
Permit Fee $687.75
Plan Fee $447.04
Plumb Permit $15.00
State fee $4.50
School Mitigation $941.00
SIGNATURE-
TOTAL FEE.... ............. $2,283.54 I HEREBY IFY TH HAV READ
AND EXAMI THIS !_ICATION AND
PAYMENTS................ ..$O.0 KNOW THE SAME TO E TRUE AND COR-
RECT LL ROVISIONS OF LAWS AND
TOTAL DUE... .. ............ $2,283.54 ORDIN NC GOVERNING THIS TYPE OF
WOR IL BE MPLI WITH WHETHER
SPE, F I HE N OT
I E CEIPT #
CITY OF ARLINGTON
CONSTRUCTION
PERMIT
U COM113INAT10N BUILOINO ❑ VIECIIANICAL ❑ PLUMPING SION PERMIT NO.477
I OwNkrt y MAIL ADURESS Cf)Y 2V Ofi
�'®P�-/ Y v� �"�1.Q f ice✓
ARCIIIIIIIECC/T OR OE :NER /y MAIL n URESS CIIY Llr r11Uf+E
I;[+ 1 v ff III XVT UIF =1nll nuuRi'ss ci i v it 1 vi`Fi TEL -
V4 cii NI nL ' IRM MAILAUVRESS cloy I'm riiumE uCEiisE�
I'LUMBINU CON IRAC,OR M ILAT)URE City III, rI10NE LICENSE
`cinTs u'nK
cc _ L%Y [JAUDIIION CJALIE RAT ION [_jrtUAIR []uEMUL1IION �]UVILUINIfRELUCAl1UN
v LUAt1UNOr wortK
kSt: IOk RK,
rp `ri(UrOii Ij VSk Of nUii7mmu
I HEREBY CERTIFY THAT I I IAVE READ AND EXAMINED TI IIS APPLIG
TION AND KNOW THE SAME TO BE TRUE AND CORRECT ALL PROV
a ii_v^ ) .c: it ION O 'rtv�-TY'!$ +nEyw OR AI IAL;II I OUR Fit SIONS OF LAWS AND ORDINANCES GOVERNING THIS TYPE OF WOO
j 1.01 RLcx K ur WILL BE COMPLIED WITH WHETHER SPECIFIED HERIN OR NOT. Ti-
lt GRANTING OF A PERMIT DOES NOT PRESUME TO GIVE AUTHORITY T,
VIOLATE OR CANCEL THE PROVISIONS OF ANY OTHER STATE O
�) TAX 10NUMBEFT MOM rnOrEtITY TAX 91ATEMENT LOCAL LAW REGULATING CONSTRUCTION OFTI-IEPERFORMANCEC
a CONSTRUCTION. PERMIT EXPi AR FROM DATE OF ISSUANCI
/� / /� /� S�CNAIVREO COWRACIORORAVII10 EOAOEIIf OAIE
ioeAuc?RF'sDS ,� ALL gAJrR1 E
II a�
tor,I. a oOi O..v)
rLUM1.1910 tit: Imo"
flu. TYCIl Or rIXCUnn run ti.rimunus TTtD Or nquIrMDNT raft lea riRlvnus_
mint CLOSUr( IR COtim umis-mr. DA. 9dp.list"
IA(II'IUU llli'RIUURATION UNI11I-Mr.U& Lido.not"' _
_,AVA'IURY(WASII UASIN) )OILURS-II.r.IL1. gip.list'"
T .11OW 3% AS rinuu n.C,Utilr9-TONNACDDA. 9d .Ip Ist•• _
I yiuN sINIt R UISrusAL 'ORCUU AIR SYSIUMS-D T.U. MUA _
j_ )ISIIWASIIUR NALL IIDATURS-;D.T.U. M _ —
11UNURY'1RAY NIT IIUATIIRS-D.T.U. M
/ II11!3 wnslI= "' IynrORKr1YIScuOLLRIS _
YAlllR II(MMAt Lo'ITIr�URTIMS _
ttINAL 1241I1-A'1•ION TAN _
)RINRINU rOUNTAM tANOU 1100D COMMURCIAL _
'LOOtt DRAIN Ilt IIANULINO UNIT- CrM _
qVACUUM UIIDAKU11.9 �- royit _
tour DRAINS-RADILUADanS MUM,1`IRDPLACaR CIIIMNUY
INK(SURYICD-BAR.ACC.) ATDR IIDArm- -i—J _
A9 rirma ' vp to S.!).QQ,mddnl.-=.7s
"Dgvlpme"t 111twost beprorided
SUD TOTAL SUU 101"AL _
r,!t(MIT rmmi,r _
_ 70TAL ran _ TOTAL ran
SItiT-Y,\IU-)Sl 1 7 gACK S I rot 1 im IttARYARUSE I OACK rLAN Cl IECK NtIMOE itI'LA►I CHECK r
^ / FEE RECEIri NO.
V31to-f/wNi L�OI Alekn VACANI S+IE.
�c2 /000YEs [jtlo TEES VALUATION FEE
IYrL Ol CUNSI, mcurANCY utiour No.Or DWELLING U141I5 PLAN CI IE001,10 v0
I.//!-Al" / 7
SI/.L OI OtUt.. NO.61 SI LS MAX.00C.LOAD hU'LUINC I 6 6 —
Q�� _ rIUMDINO —
[-� -- rIRE SPRINKI-knsR O VIREU
OYES grip MECI IANICAL
STATE COMMENTS S��/Qpr yy, vo ENERC CODE
r ENERGY CGDE SURCI IARGE _
CITY OF 1�1q�111/ -
WAMUSEWER FEES
_ D _ n D TOTAL
MMIT VALIDATION smo
AI�UNGTON w
WI IEN rROPERLY Y)111OA1[C) IIM 11115 Sr/10E1 11115 IS YOUR rEI1Mlt N gECEIrI
9 7- ;Lrj R C rAIU Cliff by