HomeMy WebLinkAbout18516 Ballantrae Dr_BLD972604_2025 �.� sccivi
INSPECTION REPORT q
Permit No. 64 Lot #9_
• Address
Contractor
Owner 10Lez
Date •�—
Taken By
'.1-A-PPROVAL ❑ PARTIAL APPROVAL
CI VIOLATION ❑ CORRECTION REQUESTED
❑ Corrections listed below MUST BE MADE before work can be approved.
❑ Please contact inspector.
❑ Was not able to perform inspection.
❑ CALL 435-0724 FOR RE-INSPECTION - 24 hour notice required.
U�
nspector Date
TY OF INSPECTION REQUESTED
❑ Under-floor ❑ Framing ❑ Gas Piping
❑ Footing ❑ Drywall, Nailing ❑ Consultation
❑ Foundation ❑ Shear Nailing ❑ Groundwork
❑ Mechanical ❑ Grid ❑ Struct. Slab
❑ Wood Stove ❑ Rough-in Plumb inal
❑ Masonry ❑ Drainage ❑ Insulation
❑ Other
INSPECTION REPORT
Permit No. — �%�� Lot#
• Address
Contractor
Owner
Date /' -7— 9,3
Taken By
APPROVAL ❑ PARTIAL APPROVAL
❑ VIOLATION ❑ CORRECTION REQUESTED
❑ Corrections listed below MUST BE MADE before work can be approved.
❑ Please contact inspector.
❑ Was not able to perform inspection.
❑ CALL 435-0724 FOR RE-INSPECTION - 24 hour notice required.
Ins or Date '
TYPE OF INSPECTION REQUESTED
❑ Under-floor ❑ Framing ❑ Gas Piping
❑ Footing Drywall, Nailing ❑ Consultation
El Foundation ❑ hear Nailing ❑ Groundwork
❑ Mechanical ❑ Grid ❑ Struct. Slab
❑ Wood Stove ❑ Rough-in Plumb. ❑ Final
❑ Masonry ❑ Drainage ❑ Insulation
❑ Other
(� INSPECTION REPORT
Permit No. ^ — I Lot #
Address ( � H,
Contractor
Owner '
Date
Taken By
❑ APPROVAL ❑ �100RRELCTION
�ALPPROVAL❑ VIOLATION REQUESTED
❑ Corrections listed below MUST BE MADE before work can be approved.
❑ Please contact inspector.
❑ Was not able to perform inspection.
❑ CALL 435-0724 FOR RE-INSPECTION - 24 hour notice equired.
yi26
707 � a�
Q 4Ae-m' -
17 � .
C 92
Insp Date '—
TYPE OF INSPECTION REQUESTED
❑ Under-floor ❑ Framing ❑ Gas Piping
❑ Footing Drywall, Nailing ❑ Consultation
❑ Foundation ❑ hear Nailing ❑ Groundwork
❑ Mechanical ❑ Grid ❑ Struct. Slab
❑ Wood Stove ❑ Rough-in Plumb. ❑ Final
❑ Masonry ❑ Drainage ❑ Insulation
❑ Other
INSPECTION REPORT
Permit No. - ) Lot #
Address 1,7 1:2v�
Contractor �-
Owner
Date --
Taken By
---a APPROVAL ❑ PARTIAL APPROVAL
❑ VIOLATION Cl CORRECTION REQUESTED
❑ Corrections listed below MUST BE MADE before work can be approved.
❑ Please contact inspector.
❑ Was not able to perform inspection.
❑ CALL 435-0724 FOR RE-INSPECTION - 24 hour notice required.
Inspec Date
TYPE OF INSPECTION REQUESTED
❑ Under-floor ❑ Framing ❑ Gas Piping
❑ Footing ❑ Drywall, Nailing ❑ Consultation
❑ Foundation ❑ Shear Nailing ❑ Groundwork
❑ Mechanical ❑ Grid ❑ Struct. Slab
❑ Wood Stove ❑ Rough-in Plumb. ❑ Final
❑ Masonry ❑ Drainage >Q'nsulation
❑ Other
/►o /
INSPECTION REPORT
Permit No. Lot# 22,
• Address l 51 jel 0AIjLl�
Contractor �--
Owner
Date _C
Taken Bys
❑ AP VAL ❑ PARTIAL APPROVAL
IOLATION ❑ CORRECTION REQUESTED
❑ Corrections listed below MUST BE MADE before work can be approved.
❑ Please contact inspector.
❑ Was not able to perform inspection.
❑ CALL 435-0724 FOR RE-INSPECTION - 24 hour notice required.
its �
In ector Date
TY E OF INSPECTION REQUESTED
❑ Under-floor ❑ Framing ❑ Gas Piping
❑ Footing ❑ Drywall, Nailing ❑ Consultation
❑ Foundation ❑ Shear Nailing ❑ Groundwork
❑ Mechanical ❑ Grid ❑ Struct. Slab
❑ Wood Stove ❑ Rough-in Plumb. ❑ final
❑ Masonry n❑ Drainage Insulation
❑ Other
a
Zqlh INSPECTION
�� /REPORT
Permit No. 7 �; � Lot#
Address 1 k.L&
4;21
Contractor L&fir.- ('--A5/-
Owner tt1 '.z
Date Z
Taken By r �—
❑ APPROVAL ❑ PARTIAL APPROVAL
❑ VIOLATION ❑ CORRECTION REQUESTED
❑ Corrections listed below MUST BE MADE before work can be approved.
❑ Please contact inspector.
❑ Was not able to perform inspection.
❑ CALL 435-0724 FOR RE-INSPECTI N - 24 hour notice required.
c
Ins or Date'
TYP OF INSPECTION REQUESTED
❑ Under-floor ❑ Framing ❑ Gas Piping
❑ Footing ❑ Drywall, Nailing ❑ Consultation
❑ Foundation ❑ Shear Nailing ❑ Groundwork
❑ Mechanical ❑ Grid ❑ Struct. Slab
❑ Wood Stove ❑ Rough-in Plumb. ❑ Final
❑ Masonry ❑ Drainage Xlnsulation
❑ Other
INSPECTION REPORT
Permit No. Lot # spa
• • Address
Contractor _Ga;,Ap k.LU,4CL
Owner
Date Q— O-4?7
Taken By
❑ APPROVAL 4TARTIAL APPROVAL
❑ VIOLATION ION REQUESTED
❑ Corrections listed below MUST BE MADE before work can be approved.
❑ Please contact inspector.
❑ Was not able to perform inspection.
❑ CALL 435-0724 FOR RE-INSPECTION - 24 hour notice required.
ns ector Date
TY F INSPECTION REQUESTED
❑ Under-floor ❑ Framing ❑ Gas Piping
❑ Footing ❑ Drywall, Nailing ❑ Consultation
❑ Foundation ❑ Shear Nailing ❑ Groundwork
❑ Mechanical ❑ Grid ❑ Struct. Slab
❑ Wood Stove ❑ Rough-in Plumb. ❑ Final
❑ Masonry ❑ Drainage insulation
❑ Other
INSPECTION REPORT
Permit No. "oZ 0 Lot # _
Address 5-1 (o 6 Zt,-k- " 0
Contractor � uQ,C`�ip.e
Owner
Date 17
-
Taken By
PPROVAL ❑ PARTIAL APPROVAL
❑ VIOLATION ❑ CORRECTION REQUESTED
❑ Corrections listed below MUST BE MADE before work can be approved.
❑ Please contact inspector.
❑ Was not able to perform inspection.
❑ CALL 435-0724 FOR RE-INSPECTION - 24 hour notice required.
Inspe Date
NIJ
TYPE OF INSPECTION REQUESTED
❑ Under-floor X_raming ❑ Gas Piping
❑ Footing ❑ Drywall, Nailing ❑ Consultation
❑ Foundation ❑ Shear Nailing ❑ Groundwork
❑ Mechanical ❑ Grid ❑ Struct. Slab
❑ Wood Stove ❑ Rough-in Plumb. ❑ Final
❑ Masonry ❑ Drainage ❑ Insulation
❑ Other 1, _�� 142ja �
INSPECTION REPORT
Permit No. &2 Lot#
Address
Contractor �
Date
Taken By
PPROVAL ❑ PARTIAL APPROVAL
❑ VIOLATION ❑ CORRECTION REQUESTED
❑ Corrections listed below MUST BE MADE before work can be approved.
❑ Please contact inspector.
❑ Was not able to perform inspection.
❑ CALL 435-0724 FOR RE-INSPECTION - 24 hour notice required.
Inspe Date - -7
TYPE INSPECTION REQUESTED
❑ Under-floor ❑ Framing ❑ Gas Piping
❑ Footing ❑ Drywall, Nailing ❑ Consultation
❑ Foundation ❑ Shear Nailing ❑ Groundwork
❑ Mechanical ❑ Grid ❑ Struct. Slab
❑ Wood Stove ❑ Rough-in Plumb. ❑ Final
❑ Masonry ❑ Drainage ❑ Insulation
❑ Other ��G�f'Y�l '
C/
INSPECTION REPORT
Permit No.?-9 Lot#�a
Address
Contractor
Owner
Date �— l
Taken By
❑ APPROVAL ❑ PARTIAL APPROVAL
❑ VIOLATION ❑ CORRECTION REQUESTED
❑ Corrections listed below MUST BE MADE before work can be approved.
❑ Please contact inspector.
❑ Was not able to perform inspection.
❑ CALL 435-0724 FOR RE-INSPECTION - 24 hour notice required.
of
Inspect
Date /Z' �_; 7
TYPE OF INSPECTION REQUESTED
❑ Under-floor raming ❑ Gas Piping
❑ Footing ❑ Drywall, Nailing ❑ Consultation
❑ Foundation ❑ Shear Nailing ❑ Groundwork
Mechanical ❑ Grid ❑ Struct. Slab
Li Wood Stove Qough-in Plumb. Final
❑ Masonry D Drainage ❑ Insulation
❑ Other
INSPECTION REPORT
Permit No. W-2 6 A, Lot # ff
Address f-YS/6� llar'2
Contractor
• Owner
Date /Z - O-Z-17
❑ APPROVAL ❑ PARTIAL APPROVAL
❑ VIOLATION ❑ CORRECTION REQUESTED
❑ Corrections listed below MUST BE MADE before work can be approved.
❑ Please contact inspector.
❑ Was not able to perform inspection.
❑ CALL 435-0724 FOR RE-INSPECTION - 24 hour notice required.
(D e A 5; A-1
Inspec Date /2
TYPE OF INSPECTION REQUESTED
❑ Under-floor ❑ Framing ❑ Gas Piping
❑ Footing ❑ Drywall, Nailing ❑ Consultation
❑ Foundation ❑ Shear Nailing ❑ Groundwork
❑ Mechanical ❑ Grid ❑ Struct. Slab
❑ Wood Stove Rough-in ❑ Final
❑ Masonry ❑ Drainage ❑ Insulation
❑ Other
INSPECTION REPORT
Permit No. Lot#
Address 12511, PY1044nz
Contractor LILII�Owner
Date
Date 12 -.S -ct7
❑ APPROVAL ❑ PARTIAL APPROVAL
❑ VIOLATION ❑ CORRECTION REQUESTED
❑ Corrections listed below MUST BE MADE before work can be approved.
❑ Please contact inspector.
❑ Was not able to perform inspection.
❑ CALL 435-0724 F4R RE-INSPECTION - 24 hour notice required.
Insp Date
—
TYPE INSPECTION REQUESTED
❑ Under-floor ❑ Framing �as Piping
❑ Footing ❑ Drywall, Nailing ❑ Consultation
❑ roundation ❑ Shear Nailing ❑ Groundwork
echanical ❑ Grid ❑ Struct. Slab
❑ Wood Stove ❑ Rough-in ❑ Final
❑ Masonry ❑ Drainage ❑ Insulation
❑ Other
INSPECTION REPORT
Permit No.C+�_� Lot# ��
Address U. i I CIC GJ DK
Contractors;
• Owner ^�
Date
❑ APPROVAL ❑ PA -APPROVAL
❑ VIOLATION 21C ORRECTION REQUESTED
❑ Corrections listed below MUST BE MADE before work can be approved.
❑ Please contact inspector.
❑ Was not able to perform inspection.
❑ CALL 435-0724 FOR RE-INSPECTION - 24 hour notice required.
I n Date '
TYPE OF INSPECTION REQUESTED
❑ Under-floor ❑ Framing ❑ Gas Piping
❑ Footing ❑ Drywall, Nailing ❑ Consultation
❑ Foundation ❑ Shear Nailing ❑ Groundwork
❑ Mechanical ❑ Grid ❑ Struct. Slab
❑ Wood Stove Rough-in
❑ Masonry / ❑ Drainage Insulation
❑ Other
P� INSPECTION REPORT
Permit No. T7-Z60�Lot # f�7_
Address / ? S-1 �a //,-4/7 4r,Q
Contractor
Owner
Date
APPROVAL ❑ PARTIAL APPROVAL
❑ VIOLATION ❑ CORRECTION REQUESTED
❑ Corrections listed below MUST BE MADE before work can be approved.
❑ Please contact inspector.
❑ Was not able to perform inspection.
❑ CALL 435-0724 FOR RE-INSPECTION - 24 hour notice required.
J�
Inspector Date
TYPE OF INSPECTION REQUESTED
❑ Under-floor ❑ Framing ❑ Gas Piping
❑ Footing ❑ Drywall, Nailing ❑ Consultation
❑ Foundation q Shear Nailing ❑ Groundwork
❑ Mechanical ❑ Grid ❑ Struct. Slab
❑ Wood Stove ❑ Rough-in ❑ Final
❑ Masonry ❑ Drainage ❑ Insulation
❑ Other
INSPECTION REPORT
Permit No. Lot # 9Zr
Address _/$5110 &t(&An ra o, a,
Contractor (_A at'..gg C=
Owner
Date
PPROVAL ❑ PARTIAL APPROVAL
❑ VIOLATION ❑ CORRECTION REQUESTED
❑ Corrections listed below MUST BE MADE before work can be approved.
❑ Please contact inspector.
❑ Was not able to perform inspection.
❑ CALL 435-0724 FOR RE-INSPECTION - 24 hour notice required.
In e ~ Date /c_ �!S'�
TYPE OF INSPECTION REQUESTED
❑ Under-floor ❑ Framing ❑ Gas Piping
❑ Footing ❑ Drywall, Nailing ❑ Consultation
❑ Foundation ❑ Shear Nailing 16L Groundwork
❑ Mechanical ❑ Grid ❑ Struct. Slab
❑ Wood Stove ❑ Rough-in ❑ Final
❑ Masonry ❑ Drainage ❑ Insulation
❑ Other
INSPECTION REPORT
Permit No. Lot #
• Address
Contractor
Owner _6l- ,
Date '
APPROVAL ❑ PARTIAL APPROVAL
❑ VIOLATION ❑ CORRECTION REQUESTED
❑ Corrections listed below MUST BE MADE before work can be approved.
❑ Please contact inspector.
❑ Was not able to perform inspection.
❑ CALL 435-0724 FOR RE-INSPECTION - 24 hour notice required.
�—
Inspector Date
TYPE OF INSPECTION REQUESTED
❑ Under-floor ❑ Framing ❑ Gas Piping
❑ Footing Cl Drywall, Nailing ❑ Consultation
foundation ❑ Shear Nailing ❑ Groundwork
❑ Mechanical ❑ Grid ❑ Struct. Slab
❑ Wood Stove ❑ Rough-in ❑ Final
❑ Masonry ❑ Drainage ❑ Insulation
❑ Other
City of Arlington
NOTICE and Inspection Report
Phone#
Permit No. Lot#
Date Called ' 7 Address
TimeCalled—Al 5n Contractor/Owner
By '1 Requested by CDt,,a.0
TYPE OF • REQUESTED
❑ Setback ❑ Roof Diaphragm ❑ Insulation
❑ Plumb GW ❑ Framing ❑ Gas Piping
__Footing ❑ Drywall Nailing ❑ Final
j =oundation ❑ Rough-in Plumbing ❑ Reinspection
❑ Shear Wall ❑ Mechanical ❑ Other
APPROVAL ❑ CORRECTION REQUIRED
�/Wwk
rrectionslisted below MUST BE MADE before work can be approved.
listed below has been inspected and approved.
CALL a35-0 4 FOR REINSPECTION—24 hour notice required.
Inspector bate /�—��
•
F t�
� 02
o
i o IL
460
04
• I- � O ■1
• l Z
� � O
1 � �
i
MTV of
o
x
q7 - Z�b
C I-ry OF ARL I NOTOM
COIVST RUCT I ON PE RM I T
PERM I T NO_ 97-2G0-+
Owner: LAKECREST CONST 4641 SILVERTIP LANE EVERETT 98203
Value of Work: $80,240.00 Tax ID: Phone: 259-6005
Describe Work: NEW CONSTRUCTION
Proposed Use: SFR
Legal Description: GE 3A LOT 82
Job Address: 18516 BALLANTRAE DR
Contractor' s Name Type Address License#
LAKECREST CONSTRUCTION G 4641 SILVERTIP LANE LAKECC11707
PUGET HEATING CO INC. M PO BOX 336 PUGETH*2648D
PUGET SOUND T AND A P 620 S. INDUSTRIAL WAY PUGETJT150DE
j P E R M I T F E E S
i
Equipment and Fixtures Number Fee Total Charge
3 - ------
--- ---- --- -- -
------------------------------
1 PLUMBING FIXTURES 11 $7.00 $77.00
RANGE 1 $9.50 $9.50
,I VENTILATION FANS 4 $6.50 $26.00
DRYER 1 $9.50 $9.50
METAL FIREPLACE R CHIMNEY 1 $9.50 $9.50
t WATER HEATER 1 $9.50 $9.50
GAS PIPING 1-5 OUTLETS 1 $5.00 $5.00
FURNACE/UNIT HEATER 1 $13.25 $13.25
S U B T 0 T A L...... $159.25 l
TOTALS Fee
Equipment $82.25
Fixture $77.00
Mech Permit $22.00
Permit Fee $693.50
Plan Fee $450.78
Plumb Permit $15.00
State fee $4.50
School Mitigation $941.00
S I6MTURE
�. TOTAL FEE. .. . . . . . . . . . . . . . . $2,286.03 I HEREBY COTHIS
I VE READ
AND EXAMIN _CATION AND
T
x PAYMENTS.................. '$417. 14 KNOW THE SAME TO BE TRUE AND COR-
RECT ALL PROVISIONS OF LAWS AND
-� TOTAL DUE.... . ............ $1,868.89 ORDINANCES GOVERNING THIS TYPE OF
WORK WILL BE COMPLIED WITH WHETHER
SPECIFIED HEREIN OR NOT.
DATE FWD
BUILDING OFFICIAL
-�
CITY OF ARLINGTON
CONSTRUCTION
PERMIT _
❑ COMBINATION Qy"13UILDING ❑ MECHANICAL ❑ PLUMBING ❑ SIGN
PERMIT NO. -
OWNER MAIL ADDRESS city ZIP PIIONE
ARCIU I ECI OR DESIGNER AIL ADDRESS CITY ZIP PIIONE
GENERAL ONIRACIOR MAIL ADDRESS CITY LIP PHONE LIC NSE
v �C
MLCII A CONTRACTOR IL ADDRESS City zip PIIONE LICENSE
r cx 7/0-0 7f Z,
PLUMBING CONTRACTOR MAIL ADDRESS CITY ZIP PHONE LICENSE
3 CLA!'Sp WORK
NLW ❑AUUI TION ❑ALTERATION ❑REPAIR ❑UEMOLI I ION ❑BUILDING RELOCATION
LL VAL (tIONOf WORK
�a s ` rya "m� Ier
ly] U LR E WUt (
Co PRUPUS!U USE Of BUILDING -
m I HEREBY CERTIFY THAT I HAVE READ AND EXAMINED THIS APPLICA-
TION AND KNOW THE SAME TO BE TRUE AND CORRECT ALL PROVI-
Z LLOAL ES(- I Not P ER OW RIPt R ER. $IIUWT'1 U
� � �°S� �TIACI1 to IE� �'� SIGNS OF LAWS AND ORDINANCES GOVERNING THIS TYPE OF WORK
Lu1 �E1L(X K Dr WILL BE COMPLIED WITH WHETHER SPECIFIED HERIN OR NOT.THE
a GRANTING OF A PERMIT DOES NOT PRESUME TO GIVE AUTHORITYTO
VIOLATE OR CANCEL THE PROVISIONS OF ANY OTHER STATE OR
TAX ID NUMBER FROM PROPERTY TAX STATEMENT LOCAL LAW REGULATING CONSTRUCTION OF THE PERFORMANCE OF
(L CONSTR CTION.PERMIT AR FROM DATE OF ISSUANCE.
SIGNA7c, c0 TRA RORA HORIZEOAGENf DATE
V IUB AUURLSS
'S (' L---L7
(6 i'1010511ONI,Y)
PLUMBINU WgL;AINICAL
NO. TYPD OP PIXTURE PBD PIXTURDS O. TYPD OP DQUIPMBNT PDD ii PIXTURIIS
ATRIL CLOSET(TOILItr) IR COND.UNITS-II.P. PA. Istd .Ip Id••
lAl'II'1'UB 1.11PRIULMATION UNITS-II.P.IIA. Islip.lit"
VATORY ASII BASIN OILERS-II.P.H.A. ui .IIt"
11OWER AS PIRDD A.C.UNITS-TONNAGD EA. 1 ti .lit"
(ITCH EN SINK do DISPOSAL 11CIRCUD AIR SYSTEMS—D.T.U. MEA
ISRWASI IER NALL IIEATBRS B.T.U. M
.AUNDRY TRAY NIT IIISATERS—D.T.V. M
T
'1.0'I'TIES WASIIEIt IVAPORATIVRCOOLMt5
ATUR HEATER L0111139 DRYERS
RINAL ENTRATION PAN
7RINKINU POUNTAIN 4AS
EIIOOD COMMERCIAL
'LOUR DRAIN ANULING UNIT- CPM
ACUUMDRDAKBRS DoOP DRAINS—RAINLEADDRS L PTRBPLACS&CIIIMNDY
INK SERVICE—BAR,ITI'C. R IIEATE RIPING *(up to 5-33.00,eddnl. 5.75
ul mcnt 111t wut be provided
SUB TOTAL
PERMIT u P ERM I'r
TOTAL PEE TOTALPBD`
SIV1, ,tit SLIBACK SIRLLI/LI ACK. REAL. SETBACK PLAN ClIEEJICKNUMBFR FEE CEIPf E
USI' / LOT n En V cA $IRE v ����
YES ❑NO FEES VALUATION FEE
IYPLIJ CUNSI. tx:CUPA ;Ro 7 NO.OrUWEI,LINGUNIIS PLAN CI-IECKINGVG �, �
SI/.L of BLUG.
NU,UI SIURILS l/)/ MAX.UCC.1_IYVAU BU'LDING f � f
9
PLUMBING
rIRE SPRINKLERS , UIRED
0 YES ONO MECHANICAL
/c STATE BLDG.CODE
COMMENTS �� ` ��>� '� ENERGY CODE SURCHARGE `
coo � PENALTY SEC. 03(�)OF � vtM
WATERISEWER FEES
ft TOTAL
PERMIT VALIDATION
mD N
ARLI N GTON wI,EN PROPERLY VALIDATED ION THIS SPACE) Tt IIS IS YOUR PERMIT 6 RECEIPT
PAID CRII BY
q7- Z6-VY
eel ASSESSOR, APPLIGANT,TREASURER, BOG, DEFT, RUIIDINClorrICIAt I DATA
nr:ront,)s COPY