HomeMy WebLinkAbout110 E Third St_BLD1775_2026 �� 1x
1 f1Z
Rt
fp
tj 1L1
}
q' I'J
r.
N trpn•
7.�Ml
4.,
O 37
gig,
sv
bob 5 �a FUN
_ 1 f
N I o)
QI N
� n �
����4 lj�l � 11 2A,►� ��
HNLehtinen
EBy. -_ Date n;;ineerin� - - --- ---
4120 Hoyt Ave. Page No. - of
Everett, WA 98203
(425) 252-237,1
STRUk:TIJRAL NOTES
Construction to meet International Building Code 20M IBC 2019
A. Live Loads
Roof/Snow Load ---25psf
Wind-4W MPH. Exp. "B"
Seismic—Category D
B. Soil and Foundation Data
1. Design hearing strength 2000 psf. Coefficient of friction 0.25.
Passive resistance=300 pef. Carry all footings down to undisturbed
soil, minimum depth =1'-6" unless noted.
2. Carry all footings down to undisturbed soil, minimum depth =V-6"
unless noted or compacted fill 95% per ASTM D-1557.
C. Concrete
L Detail, fabricate, and place re-steel as shown in ACI " Manual of
Standard Practice" ACI 315.
2. Concrete of following 28 day test strength.
a. f=3000 psi, 5-1/2 sack cement per cubic yard, ( no testing
required)
b. Precast walls i=3000 psi.
c. Maximum slump 4"
d. Reinforcing fy=40,000 psi.
3. Cover(Clear Dimensions).
a. Exterior faces of walls 1-1/2".
b. Vertical faces exposed to earth 2".
/ c. Bottom of elevated slabs 1" clear.
4. Lap all field splices 30 diameters. Bend wall and footing bars 18"
around
'r all corners, or use corner bars.
t� 5. Dowel all exterior projections to structure with #4 bars at 12"
' ►. y hooked into wall.
6. Place no baekfill against foundation walls until floors are in place_
7. Incorporate to calcium chloride admixtures where aluminum alloy
!i y r
materials are embedded.
8. All wood forms used for concrete in the ground or between
<< �„ foundation sills and the ground shall be removed.
�AJ�A• Y
� _ r
i
.,rue_ d q 1' 4 F,
e/k c, on
�O
x jo
dF
o
v ` o N
UI N
17
OC ,
"I �T
4
-R,00F 'P-R,,oL\MNC-� PL,,Lt�
CU
G ,
cv
1 �
o •�
M
o
1 Z
or
z
DI
,
r E LE VAT-1
v •'� � - r
*h r,. PT"~x�fi v
.Ci Q Q rni
w � �
-cr Lti
S
HNLehtinen
Engineering
4120 Hoyt Ave.
Everett, WA 98203
(425)252-2373
Ref:
INVOICE 17/
Structural and/or civil engineering services
Lateral Bracing Design
(Wind and Seismic Loads)
4W.6WJ W�5 ) 'D
Gravity Loads Design, requested by City or County
And any additional design or redesign-$110/ hour.
Please make check payable to: HNLehtincn En ineerin
4120 Hoyt Ave.
Everett, WA 98203
If you have any questions, please call (425)252-2373.
Thank vou.
■r
VVIM
Asii
0.17 Acres ,
7,603.12 ft2lit
40
0 25 50 100
Scale in Feet 1
i
City Of AI"lington
CityParks eta Legion Park
V ®Parking Q (South Parking)
C Aerial flown 2015
G) Scale: File:
Maps and UIS data aro dat-umd•AS•IS'Without wauam,os of any kind,either express or 1 inch = 50 feet LegionPark8.5x11 portrait_17
implied,including but not Inided to warranties of sudaaa ly for a particular purpose or use.Map
J date am compiled from a variety of sources which may contain errors and users who rely upon the
nlatmotion do so at their own risk.Users agree to indemnify,defend,and hold harmless the City of
Arlington for any and ON lability of any nature wising out of or resulting Itom the lack of accuracy or
conectness of the data.or the use of the data prosented In the maps Date: Cartographer:
1/19/2017 akc
's
1
I
1
1
,• 4'I 1�
�`. • a y - 1 ~ �'��� 1•" 4..-• _ � :` f�� - ��; r •'' ,sir.
CITY OF ARLINGTON
238 N. OLYMPIC AVE -ARLINGTON, WA. 98223
` PHONE; (360)403-3551
BUILDING PERMIT
Address: 114 N Olympic Ave Permit#:1775
Parcel#:31051100100600 Valuation: 15000.00
OWNER APPLICANT CONTRACTOR
Name:ARLINGTON CITY OF Name:City of Arlington Name:City of Arlington
Address:238 N OLYMPIC AVE Address:238 N Olympic Ave Address:238 N Olympic Ave
City,State Zip:ARLINGTON,WA 98223 City,State Zip:Arlington,WA 98223 City,State Zip:Arlington,WA 98223
Phone: Phone:360-403-3448 Phone:360-403-3448
MECHANICAL CONTRACTOR PLUMBING CONTRACTOR
Name: Name:
Address: Address:
City,State,Zip: City,State,Zip:
Phone: Phone:
LIC#: EXP: LIC#: EXP:
JOB DESCRIPTION
PERMIT TYPE: Mlsc CODE YEAR: 2015
STORIES: I CONST.TYPE `/-$
DWELLING UNITS: 0 OCC GROUP:
BUILDINGS: I OCC LOAD:
PERMIT APPROVAL
I AGREE TO COMPLY WITH CITY AND STATE LAWS REGULATING CONSTRUCTION AND IN DOING THE WORK AUTHORIZED
THEREBY;NO PERSON WILL BE EMPLOYED IN VIOLATION OF THE LABOR CODE OF THE STATE OF WASHINGTON RELATING TO
WORKMEN'S COMPENSATION INSURANCE AND RCW 18.27.
THIS APPLICATION IS NOT A PERMIT UNTIL SIGNED BY THE BUILDING OFFICIAL OR HIS/HER DEPUTY AND ALL FEES ARE PAID.
IT IS UNLAWFUL TO USE OR OCCUPY A BUILDING OR STRUCTURE UNTIL A FINAL INSPECTION HAS BEEN MADE AND APPROVAL OR
A CERTIFICATE OF OCCUPANCY HAS BEEN GRANTED. IBC110/IRC110.
SALES TAX NOTICE:Sales tax relating to construction and construction materials in the City of Arlington must be reported on your sales tax return form
and coded City of Arlington#3101.
3 8
Signature Print Name Date Released By ate
CONDITIONS
See red-lined drawings. Adhere to approved plans. Additional requirements: call for locates prior to the start
of construction to verify location of the structure meets appropriate setbacks from utility easements.
THIS PERMIT AUTHORIZS ONLY THE WORK NOTED.THIS PERMIT COVERS WORK TO BE DONE ON PRIVATE PROPERTY ONLY. ANY
CONSTRUCTION ON THE PUBLIC DOMAIN(CURBS,SIDEWALKS,DRIVEWAYS,MARQUEES,ETC.)WILL REQUIRE SEPARATE PERMISSION.
PERMIT FEES
Date Description Fee Amount
3/7/2018 Building Permit Fee $361.58
3/7/2018 Building Permit Fee ($361.58)
3/7/2018 Building Plan Review Fee ($235 03)
3/7/2018 Building Plan Review Fee $235.03
3/7/2018 Processing/Technology Fee $25.00
3/7/2018 Processing/Technology Fee ($25.00)
3/7/2018 State Building Code Surcharge Fee $4.50
3/7/2018 State Building Code Surcharge Fee ($4.50)
Total Due: $0.00
Total Payment: $0.00
Balance Due: $0.00
CALL FOR INSPECTIONS
BUILDING(360)403-3417
When calling for an inspection please leave the following information;
Permit Number,Type of Inspection being requested,and whether you prefer morning or afternoon
Kristin Foster
From: Kristin Foster
Sent: Wednesday, March 07, 2018 10:23 AM
To: Sarah Lopez
Cc: Marc Hayes; Kevin Olander; Launa Peterson
Subject: Legion Park Stage Building Permit
Attachments: 1175_Revised Permit for Signature.pdf
Sarah,
This email is confirmation that the fees for the Legion Park stage permit# 1775 have been waived per City
Administration. Attached is a revised permit for signature reflecting the change in balance due, please sign
and return.
Let me know if you have any questions.
Thanks,
Kristin Foster
Permit Technician
City of Arlington
18204 59th Ave NE
Arlington, WA 98223
360 403 3549
kfoster@arlingtonwa.gov
1
r
I
CITY OF ARLINGTON
238 N. OLYMPIC AVE -ARLINGTON, WA. 98223
4D PHONE; (360)403-3551
BUILDING PERMIT
Address: 114 N Olympic Ave Permit#:1775
Parcel#:31051100100600 Valuation:15000.00
OWNER APPLICANT CONTRACTOR
Name:ARLINGTON CITY OF Name:City of Arlington Name:City of Arlington
Address:238 N OLYMPIC AVE Address:238 N Olympic Ave Address:238 N Olympic Ave
City,State Zip:ARLINGTON,WA 98223 City,State Zip:Arlington,WA 98223 City,State Zip:Arlington,WA 98223
Phone: Phone:360-403-3448 Phone:360-403-3448
MECHANICAL CONTRACTOR PLUMBING CONTRACTOR
Name: Name:
Address: Address:
City,State,Zip: City,State,Zip:
Phone: Phone:
LIC#: EXP: LIC#: EXP:
JOB DESCRIPTION
PERMIT TYPE: Mlsc CODE YEAR: 2015
STORIES: I CONST.TYPE: V-B
DWELLING UNITS: 0 OCC GROUP:
BUILDINGS: I OCC LOAD:
PERMIT APPROVAL
I AGREE TO COMPLY WITH CITY AND STATE LAWS REGULATING CONSTRUCTION AND IN DOING THE WORK AUTHORIZED
THEREBY;NO PERSON WILL BE EMPLOYED IN VIOLATION OF THE LABOR CODE OF THE STATE OF WASHINGTON RELATING TO
WORKMEN'S COMPENSATION INSURANCE AND RCW 18.27.
THIS APPLICATION IS NOT A PERMIT UNTIL SIGNED BY THE BUILDING OFFICIAL OR HIS/HER DEPUTY AND ALL FEES ARE PAID.
IT IS UNLAWFUL TO USE OR OCCUPY A BUILDING OR STRUCTURE UNTIL A FINAL INSPECTION 14AS BEEN MADE AND APPROVAL OR
A CERTIFICATE OF OCCUPANCY HAS BEEN GRANTED. IBC110/IRC110.
SALES TAX NOTICE:Sales tax relating to construction and construction materials in the City of Arlington must be reported on your sales tax return form
and co e City of Arlin on#3101. I
/? &V4--4 L Doe 2- 7
Signature Print Name Date Released By Da
CONDITIONS
See red-lined drawings. Adhere to approved plans. Additional requirements: call for locates prior to the start
of construction to verify location of the structure meets appropriate setbacks from utility easements.
THIS PERMIT AUTHORIZS ONLY THE WORK NOTED.THIS PERMIT COVERS WORK TO BE DONE ON PRIVATE PROPERTY ONLY. ANY
CONSTRUCTION ON THE PUBLIC DOMAIN(CURBS,SIDEWALKS,DRIVEWAYS,MARQUEES,ETC.)WILL REQUIRE SEPARATE PERMISSION.
PERMIT FEES
Date Description Fee Amount
2/27/2018 Building Permit Fee $361.58
2/27/2018 Building Plan Review Fee $235.03
2/27/2018 Processing/Technology Fee $25.00
2/27/2018 State Building Code Surcharge Fee $4.50
Total Due: $626.11
Total Payment: $0.00
Balance Due: $626.11
CALL FOR INSPECTIONS
BUILDING(360)403-3417
When calling for an inspection please leave the following information:
Permit Number,Type of Inspection being requested,and whether you prefer morning or afternoon
5
Permit Information
Date 12/14/2017
Permit Number 1775
Project Name Legion Park Stage
Applicant Name City of Arlington
Applicant Address 238 N Olympic Ave
City,State,Zip Arlington,WA 98223
Contact Sarah Lopez
Phone 360-403-3448
Email slopez@arlingtonwa.gov
Permit Type Misc
Site Address 114 N Olympic Ave
Valuation 15000.00
Status Applied
Permit Issued
Permit Expires
Square Feet 480
Type of Construction/Occupancy Load
Number of Stories 1
Proposed Use Stage at Legion Park
Assigned To Kristin Foster
Property
Parcel Address Legal Owner Owner Phone Zoning
31051100100600 110 E Third St JARLINGTON CITY OF 761 Parks-General Recreation
Contractors
Contractor Name Primary Contact Phone Email Contractor Type License License#
City of Arlington 13ara Lopez 360-403-3448 1!;Iopez@arlingtonwa.gov APPLICANT
Review
Date Type Description Target Completed Assigned Status
Date Date To
12/14/2017 M isc See red-lined drawings 12/21/20172/21/2018 Building Approved with
Conditions
12/14/2017 Misc 12/21/2017 Marc In Review
Hayes
It looks like there might be a sewer line in this location,should IVova
12/14/2017 Misc probably check to make sure the stage is outside our sewer 12/21/2017 2/2/2018 Heaton Complete
)asements.
12/1412017Misc No comments,LT 12/21/2017 12/14/2017 PW Admin Complete
Rev
The proposed stage appears to be over the sewer main, it is PW-Sew-
12/14/2017Misc recommended that locates be called in to verify utility locations 12/21/2017 12/21/2017 Rev Complete
prior to construction of the stage JL
12/14/2017Misc no comments for this review.Gus 12/21/2017 12/14/2017 Rev Wat Complete
Fees
Fee Description Notes Amount
Building Permit Fee 322.10.00.00 $361.58
Building Plan Review Fee 345.83.00.00 $235.03
Processing/Technology Fee 341.43.00.02 $25.00
State Building Code Surcharge Fee 386.00.01.00 $4.50
Total $626.11
Uploaded Files Upload File
Date File Uploaded B
12/14/2017 9:51:59 AM 1775 Stage Renderinc.pdf Foster,Kristin x
12/14/2017 9:48:57 AM 1775 Application.pdf Foster,Kristin x
12/14/2017 9:48:57 AM 1//5 Sdc Nlan.pdt Foster,Kristin (
12/14/2017 9:48:57 AM 1775 Plans.pdf Foster,Kristin x
Permit Information
Date 12/14/2017
Permit Number 1775
Project Name Legion Park Stage
Applicant Name City of Arlington
Applicant Address 238 N Olympic Ave
City,State,Zip Arlington,WA 98223
Contact Sarah Lopez
Phone 360-403-3448
Email slopez@arlingtonwa.gov
Permit Type Misc
Site Address 114 N Olympic Ave
Valuation 15000.00
Status Applied
Permit Issued
Permit Expires
Square Feet 480
Type of Construction/Occupancy Load
Number of Stories 1
Proposed Use Stage at Legion Park
Assigned To Kristin Foster
Property
Parcel Address Legal Owner Owner Phone Zoning
31051100100600 110 E Third St ARLINGTON CITY OF 761 Parks-General Recreation
Contractors
Contractor Name Primary Contact Phone Email Contractor Type License License#
City of Arlington ISara Lopez 360-403-3448 5lopez@arlingtonwa.gov 4PPLICANT
Review
Date Type Description Target Date Completed Date Assigned To status
12/14/2017 PJlisc 12/21/2017 Kevin Olander In Review
12/14/2017 IUisc 12/21/2017 Marc Hayes In Review
'12/14/2017 Nlisc 12/21/2017 Nova Heaton In Review
12/14/2017 Misc '12/2112017 PW Admin Rev In Review
12/14/2017 IUisc '12/21/2017 PW-Sew-Rev In Review
12/14/2017 11wisc 12/21/2017 1 PW-Wat-Rev In Review
Uploaded Files
Upload File
Date File Uploaded B
12/14/2017 9:51:59 AM 1775 Stage Renderingjg Foster,Kristin x
12/14/2017 9:48:57 AM 1775 Aoplication,odf Foster,Kristin x
12/14/2017 9:48:57 AM 1775 Site Plan.pdf Foster,Kristin x
12/14/2017 9:48:57 AM 1775 Plans.pdf Foster,Kristin x
G�1 Y O f
COMMERCIAL APPLICATION
lNc,�o� PERMIT SUBMITTAL
Department of Community& Economic Development
City of Arlington • 18204 59th Ave NE •Arlington, WA 98223 • Phone (360)403-3551
The following minimum information is required for your Commercial/Multi-Family Building Permit
Application. Mark each box to designate that the information has been provided. Please submit this
checklist as part of your submittal documents. Incomplete applications will delay the review.
0/ One (1) City of Arlington Commercial/Multi-Family Permit Application
(One (1) permit application per building or structure is required)
❑ One (1) City of Arlington Commercial/Multi-Family Submittal Requirements Form
--,'/ Two (2)Architectural Drawings
L1X Two (2) Structural Drawings
❑ Two (2) Structural Calculations
❑ One (1) Project Specification Manuals (if applicable)
❑ One (1) NREC Code Compliance Forms
❑ One (1) Special Inspection Requirements Forms
❑ One (1) Occupant's Statement of Intended Use Form
Drawings shall be BOUND SEPARATELY BY TYPE, architectural, structural and landscape, and then
ROLLED TOGETHER IN COMPLETE SETS>
An intake appointment is required for all new Commercial or Multi-Family Building Permit Applications.
To schedule an appointment please contact the City of Arlington Permit Center at(360) 403 3551 or by
email to ced(Warlingtonwa.gov.
I acknowledge that all items designated above are included as part of this application.
REV 2015 Page 1 of 9
I
�I
I
COMMERCIAL APPLICATION
PERMIT SUBMITTAL
Department of Community& Economic Development
City of Arlington • 18204 59th Ave NE •Arlington, WA 98223 • Phone (360)403-3551
A. FEES DUE AT TIME OF PERMIT ISSUANCE
B. CODES
The City of Arlington currently enforces the following:
International Codes
1. 2015 International Building Code(IBC)
2 2015 International Residential Code(IRC)
3 2015 International Mechanical Code(IMC)
4 2015 International Fuel Gas Code (IFGC)
5 2015 International Fire Code(IFC)
6. 2015 International Plumbing Code(IPC)
7 2015 International Property Maintenance Code(IPMC)
8. 2015 International Existing Property Code(IEBC)
9. 2015 Washington State Energy Code(WESC)
10 2009 Accessible& Usable Buildings and Facilities(ICC/ANSI 1417.1)
Washington State Amendments
1 WAC 51-50 Washington State Building Code
2. WAC 51-51 Washington State Residential Code
3. WAC 51-52 Washington State Mechanical Code
4 WAC 51-54 Washington State Fire Code
5 WAC 51-56 &51-57 Washington State Plumbing Code and Standards
6 WAC 51-11 Washington State Energy Code
7 WAC 296-46B Electrical Safety Standards,Administration, and Installation
C. CITY OF ARLINGTON DESIGN REQUIREMENTS
Design Wind Speed: 85 miles per hour(Exposure C)
Ground Snow Load: 25 pounds per square foot
Seismic Zone: D2
Rainfall: 2 inches per hour for roof drainage design
Frost Line Depth: 12 inches
Soil Bearing Capacity: 1,500 psf unless a Geo-Technical Report is provided. (IBC Table 1804.2& IRC R401 4.1)
D. PLANS AND DRAWINGS
Submit two (2)complete sets of drawings and plans. Drawings and plans must be submitted on minimum 18"X 24", or maximum
30"X 42"paper.All sheets are to be the same size and sequentially labeled. Plans are required to be clearly legible,with scaled
dimensions, in indelible ink, blue line, or other professional media. Plans will not be accepted that are marked preliminary or not
for construction,that have red lines, cut and paste details or those that have been altered after the design professional has
signed the plans
Please Note:A separate submittal of plans is required for each building or structure
REV 2015 Page 2 of 9
i
�i
i
1Y O
COMMERCIAL APPLICATION
PERMIT SUBMITTAL
�lING Department of Community& Economic Development
City of Arlington • 18204 59th Ave NE •Arlington,WA 98223 • Phone (360) 403-3551
DETAILED SUBMITTAL REQUIREMENTS
Mark each box to designate that the information has been provided. Please submit this checklist as part of your submittal documents
A. SITE PLAN— REQUIRED WITH ALL SUBMITTALS
(May be included as part of the Architectural Drawing cover Sheet)
1. Drawing shall be prepared at scale not to exceed 1"=20 feet.
2. Show building outline and all exterior improvements.
3. Provide property legal description and show property lines.
4. Provide dimensions from the property lines to a minimum of two building corners(or two identifiable locations for
irregular plan shapes).
5. Show building setbacks, easements and street access locations.
6. Indicate North direction.
7. Indicate finish floor elevation for the first level
8. Provide topographical map of the existing grades and the proposed finished grades with maximum five feet elevation
contour lines.
9. Show the location of all existing underground utilities, including water, sewer,gas and electrical.
10. Flood hazard areas,floodways, and design flood elevations as applicable.
B. ❑ ARCHITECTURAL DRAWINGS
1. ❑ Cover Sheet
a) Building Information
1 Specify model code information.
2 Construction Type.
3. Number of stories and total height in feet.
4. Building square footage(per floor and total)
5. IBC Occupancy Type(show all types by floor and total).
6. Mixed-use ratio(if applicable)
7. Occupant load calculation (show by occupancy type and total)
8 List work to be performed under this permit
b) Design Team Information
1 Design Professional in Responsible Charge
2 Architects
3 Structural Engineers
4 Owner
5, Developer
6 Any other Design Team Members
2. ❑ Floor Plan
a) Plan view 1/8"minimum scale. Details a minimum %-inch scale.
b) Plans must show the entire tenant space.
c) Specify the use of each room/area.
d) Provide an occupant load calculation on the floor plan. (on every floor, in all rooms and spaces)
e) Show ALL exits on the plans; include new, existing or eliminated.
f) Show Barrier-Free information on the drawings.
g) Show the location of all permanent rooms,walls and shafts.
h) Note the uses in the adjacent tenant spaces, if applicable.
i) Provide a door and door hardware schedule.
REV 2015 Page 3 of 9
i
�t1 Y O f,
r COMMERCIAL APPLICATION
PERMIT SUBMITTAL
! t' Department of Community& Economic Development
City of Arlington • 18204 59th Ave NE •Arlington, WA 98223 • Phone (360)403-3551
j) Show the location of all new walls,doors,windows, etc.
k) Provide details and assembly numbers for any fire resistive assemblies
1) Indicate on the plans all rated walls,doors,windows and penetrations
m) Provide a legend that distinguishes existing walls,walls to be removed and new walls
3 [_1 Reflected Ceiling Plan
a) Plan view 1/8"minimum scale. Details a minimum '/4-inch scale.
b) Provide ceiling construction details.
c) Provide suspended ceiling details complying with IBC 803 9.1.1. Show seismic bracing details
d) Show the location of all emergency lighting and exit signage.
e) Detail the seismic bracing of the fixtures.
f) Include a lighting fixture schedule.
4 ❑ Framing Plan
a) Specify the size, spacing, span and wood species or metal gage for all stud walls
b) Indicate all wall, beam and floor connections
c) Detail the seismic bracing for all walls
d) Include a stair section showing rise, run, landings, headroom, handrail and guardrail dimensions.
5 ❑ Storage Racks (if applicable)
a) Structural calculations are required for seismic bracing of storage racks eight feet or greater in height.
b) Eight feet or less, show a positive connection to floor or walls.
NOTE: High pile storage shall meet the requirements of current International Building and Fire Codes
C. ❑ SPECIAL INSPECTION
1. Where special inspection is required by IBC 1704, the registered design professional in responsible charge shall prepare
a special inspection program that will be submitted to the City of Arlington and approved prior to issuance of the building
permit to comply with IBC 106 1
D. ❑ WASHINGTON STATE ENERGY CODE
1 One(1)completed Washington State Non-Residential Energy Code Envelope Summary forms.
E. OCCUPANT'S STATEMENT OF INTENDED USE
1. The Occupant's Statement of Intended Use form shall be completely filled out and may require the submittal of a
Hazardous Materials inventory Statement(HMIS) Contact the Arlington
REV 2015 Page 4 of 9
1
COMMERCIAL APPLICATION
PERMIT SUBMITTAL
Department of Community& Economic Development
City of Arlington • 18204 59th Ave NE • Arlington, WA 98223 • Phone (360)403-3551
The building permit does not include any mechanical, electrical, plumbing or fire sprinkler/alarm work. These permits are
issued separately. Mechanical, electrical, plumbing, or fire sprinkler/alarm permits require a separate permit application
and may also require separate plan review.
Please note that any tenant improvement work in a space that involves food handling or preparation requires Snohomish
County Health District approval before the permit can be issued. You must provide the Permit Center a copy of the
approval letter or the approved plans. Contact the Snohomish County Health District at (425) 339-5250 with any questions
or for more information.
An intake appointment is required for all large Tenant Improvement Building Permit Applications. To determine if your
project requires an intake appointment, to schedule an appointment or to ensure that you have the most current
information, please contact the City of Arlington Permit Center at(360)403-3551 or by email to ced@arlingtonwa.gov
Incomplete applications will not be accepted.
I acknowledge that all items designated as submittal requirements must accompany my Building Permit Application to be
considered a complete submittal.
REV 2015 Page 5 of 9
I
i
Y•01,
COMMERCIAL APPLICATION
o s
PERMIT SUBMITTAL
Department of Community& Economic Development
City of Arlington • 18204 59th Ave NE • Arlington, WA 98223 • Phone (360)403-3551
THIS APPLICATION TO BE USED FOR NEW COMMERCIAL STRUCTURES AND RESIDENTIAL DWELLINGS NOT REGULATED UNDER THE
IRC. THIS APPLICATION MUST BE ACCOMPANIED BY A COMMERCIAL APPLICATION SUBMITTAL CHECKLIST AND AN OCCUPANT'S
STATEMENT OF INTENDED USE,l /(L (/
Name of Project:bjlK !SY /71 �r.'��ln PL IIM AL�IC _6JeValuation: fN, Ob 0
Project Address: / >y• (��/ W/�► L 11"�
Parcel ID#: _ Legal Description
Owner: Cj-�li �� 0 Y (I.,' Phone Number: 40 (4 —3LI �
Address: -2, O /y bI N irk r L City: ik I I ,/t State: A- Zip Code: 3
e��%VI h
Engineer: 1 G L (; Phone Number: Lr25 �Z 5'2 'Z 3 7 �
Cell Phone: E-mail: _ G
Address: uTU y City: V State: in/fY Zip Code o 3
General Contractor: Phone Number:
Cell Phone: E-mail:
Address: City: State: Zip Code:
Contractor's License Number: Expiration:
Contact Person: 7L 4A La o e z )t n lr rl Phone Number: 3&0U 7 0 3
Cell Phone. yJ,��' �—�2�((p ;��;yyl, E-mail:
Address: City: State: Zip Code:
Proposed Scope of Work: (+J�OCCU�!C 1 L>�C S`rQ CG 04 L��l+ D n f &!"L
REV 2015 Page 6 of 9
��
I
. Y
COMMERCIAL APPLICATION
PERMIT SUBMITTAL
INGCo� Department of Community& Economic Development
City of Arlington • 18204 59th Ave NE • Arlington, WA 98223 • Phone (360)403-3551
Project Name/Tenant ( A (3 rt'� i t nG)fb �
Site Address Bldg/Unit/Suite
IBC Construction Type eo 'S+ aAd `Y10M IBC Occupancy Type
Description of Use Gj
Building Square Footage L4 '9U Number of Stories
Square Footage Per Floor. n/4
Will there be any installation, modification or removal of the following? (Check all that apply)
N/ ❑ Automatic fire extinguishing systems
❑ Compressed gas systems
❑ Fire alarm and detection systems
❑ Fire pumps
❑ Flammable and combustible liquids(tanks, piping etc. .)
❑ Hazardous materials
❑ High piled/rack storage
❑ Industrial ovens/furnace
❑ Private fire hydrants
❑ Spraying or dipping operations
❑ Standpipe systems
❑ Temporary membrane structure,tents(>200sq ft)or canopies(>400 sq ft)
Provide details on any of the above checked items:
Installation, changes, modifications or removal of any of the above may require additional submittals,
information, or permits during the plan review or construction process.
Statement of Special Inspection
REV 2015 Page 7 of 9
;ir
I
• COMMERCIAL APPLICATION
PERMIT SUBMITTAL
Department of Community& Economic Development
City of Arlington• 18204 59th Ave NE • Arlington, WA 98223 • Phone (360) 403-3551
Name of Project: hk 1' I1 h biell an &,IL SIrt C,e_�
Project Address: 1 _[ /�/ Of UYti.P1 L Ave,' .—
Special Inspection Firm:
Address: 2' r �r
Contact Person: �fi1�Q.h U ff Z Phone: L»Q o_q d -3 L1 d
Email: b t)60INhA L6•
Special Inspection Firm Special Inspectors:
The Special inspection Firm of will perform special inspection for
the following types of work(separate forms must be submitted if more than one firm is to be employed).
( ) Reinforced Concrete
( ) Bolting in Concrete
( ) Pre-stressed Concrete
( ) Shotcrete
( ) Structural Masonry
( ) Structural Steel and Welding
( ) High-Strength Bolting
( ) Spray-Applied Fireproofing
( ) Smoke-Control Systems
( ) Other Specify:
All individual inspectors to be employed on this project will be WABO certified for the type of inspection they are to perform. If inspection
is for work that is not covered by the WABO categories, a detailed resume of the inspector and firm must be submitted.The resume
must show the inspector and firm are qualified to perform the work and testing required by the project design and specifications.
The work shall be inspected for conformance with the plans and specifications approved by the City. Revisions and addenda sheets will
not be used for inspection unless approved by the City.The special inspector shall report to the City revisions that are not approved.
A daily record will be maintained on site itemizing the inspections performed, for the review of all parties.Any nonconforming items shall
be brought to the immediate attention of the contractor for resolution.A weekly shall be submitted to the City;detailing the inspections
and testing performed, listing any nonconforming items and resolution of nonconforming items. Unresolved nonconforming items will be
detailed on a discrepancy report and presented to the building department.
A final report shall be submitted to the Building Division prior to the Certificate of Occupancy being issued.This report will indicate that
inspection and testing was completed in conformance with the approved plans, specifications and approved revisions and addenda.
Any unresolved discrepancies must be detailed in the final report.
The special inspector and special inspection firm serve in the role as"deputy"City of Arlington inspectors and as such are responsible
to the City of Arlington Building Division in the performance of the required work.
Contractor:
The contractor shall provide the special inspector or agency adequate notification of work requiring inspection.
The City approved plans and specifications must be made available, at the job site for the use of the special inspector and the City
Inspector. The contractor shall maintain all daily inspections reports, on site, for review.
REV 2015 Page 8 of 9
_ ��
I
`�
I
Y
COMMERCIAL APPLICATION
PERMIT SUBMITTAL
IN p� Department of Community& Economic Development
City of Arlington • 18204 59th Ave NE • Arlington,WA 98223 • Phone (360)403-3551
The special inspection functions are considered to be in addition to the normal inspections performed by the City and the contractor is
responsible for contacting the City to schedule regular inspections, No concrete shall be poured or other work covered until approved
by the City Inspector.
Building Division:
The Building Division shall review any revisions and addenda.Approved copies will be given to the contractor to maintain as part of the
approved plan set.
The City Inspector will monitor the special inspection functions for compliance with the agreement and the approved plans
The City Inspector shall be responsible for approving various stages of construction to be covered and work to proceed
Design Professionals:
The architect and engineer will clearly indicate on the plans and specifications for the specific types of special inspection required, and
shall include a schedule for inspection and testing.
The architect and engineer will coordinate their revisions and addenda process in such a way as to insure all required City approvals
are obtained, prior to work shown on the revisions being performed.
Owner:
The project owner, or the architect or engineer acting as the owners agent,shall employ the special inspector or agency
ENFORCEMENT:
A failure of the special inspector or firm to perform in keeping the requirements of the IBC,the approved plans and this document may
void this agreement and the Building Officials approval of the special inspector In such case a new special inspector and/or firm would
need to be proposed for approval.A failure of the design and/or construction parties to perform in accordance with this agreement may
result in a STOP WORK notice being posted on the project, until nonconforming items have been resolved
ACKNOWLEDGEMENTS
I have read and agree to comply with the terms and conditions of this agreement
Owner: _2qV_1C_ Date:
1 hereby certify that the above information is correct and that the construction on, and the occupancy and the use of the above-described
property will be in accordance with the laws, rules and regulation of the State of Washington
O "D�
Applicants Signature
Print Applicants Name Date
vz�c FOR STAFF USE ONLY
I�� J
Permit# Accepted By Amount Received Receipt# Date Received
REV 2015 Page 9 of 9
1
A
v
0
m
n
5n
3 o
of n
0
a
c m
f
cn
Q
o�
v
f
m
-z.
aCD
y
- -
a _ �IFr �tM���•'�- - - - - -
00
CL
Q 1 _
00
� I
A I
N
A i
01 i
N
co
f�0 I
N
� I
f
a i
(AI 7
CY
A I O
� I 7
or <C
� 1
i c
I �
m
v
I
CD
I
cz
i
1 �
♦
♦,�, .lire � �a
I
- v
fC T
I
- k
I
� 1
1
A.YF;1Pli; AV 1
r`VIF'I A%-F
-- _
I I �
'On pow
rJjw
4,V
M� t
1 I`I• � \
a I
_ r
�1
Ir
7
-44
0.17 Acres
r � ,� •
7,603.12 ft2 ,
I ..
0 25 50 100
Scale in Feet
City,of*lington
CityParks �,a N Leo
ion Park
Parking (South Parking)
Received
® �F=� �► ?r��'
C Aetial flown 2015
y Scale: File:
reaps and GIS data Oro d.11,buled-AS-IS'wdhout warrdrdies of any kind.dahar express or 1 inch = 50 feet LegionPark8.5x 11 portrait_17
rniplied.including but not IuoAed to warranties of suitability for a padlcular purpose or use.Map
J data are mmpiied from a variety of sources which may contain orrcra and users who rely upon the
mfoamatian do so at thou own risk.Usofs agree to Indemnify dolond,and hold harmless lho City ct
Artinglon for my and All liability of any nature arising out of or resulting from Iho lock of accumcy or
maad Date Cartographer:
ness of the data,or the use of the dot.presented In the maps.
1/19/2017 akc
1
. - -,
�, � . ,� ,
�. � .
N'�IS�Q S�'MZN07 -
\J)
CIL
ooC z W
jL z �►
DoQ CO c)WJ LL- I �,
m N z m L1_
3cl CL
-see
I Ft
� _ - -
� -
� ¥*
¥ � +
;; /
! � /�
- � » ! - . eJ
� . , , ,
| � \ \ � � / \J �
� 22 ! t : a2a
\: . \\ j \/ / \\ '
| / /\ �
< E ® �J / : /
� -wa `
. 2 2 : w ��
. ƒ g - ee
� ' . ~ � E/
. , \\ � wzp �)
�` /
. : w \k w �
. . . � R)
� q �a
� �}
QL W
L� o
T_vL
I
I
N I i
- 'vr
:vil�'Pv
_ ,�
I
3 ��� •,,.�
J
; �w ,� � �
'� �-� � 3 � ill
� � � � � �
� �--
r-, i N
I �
i d�-- i
1 �
� � � �
� -� �. �
� o � �
� , \
-�. . . .; �
s � �- � � �
I � � �
:�
� i � 1v ; � �
� � � i
`� � 1
� - � �
� � ��
I6 1
t
I
I
� �-- _ -
0
r)
3�� 4rr
' I
l
�� o� 3
F-INLehtinen
E,nlBy- _ Hate
IiE'e.ringyT - - ---
4120 Hoyt Ave. Page No. of - -
Everett, WA 98203
(425) 2-52-2373
STRUCTURAL NOTES
Construction to meet International Building Code 201,1k/ IBC 2019
A. Live Loads
Roof/Snow Load - 25psf
Wind—UO MPH. Exp. "B"
Seismic—Category D
B. Soil and Foundation Data
1. Design bearing strength 2000 psf. Coefficient of friction 0.25.
Passive resistance=300 pef. Carry all footings down to undisturbed
soil, minimum depth =V-6" unless noted.
2. Carry all footings down to undisturbed soil, minimum depth =1'-6"
unless noted or compacted fill 95% per ASTM D-1557.
C. Concrete
1. Detail, fabricate, and place re-steel as shown in ACI " Manual of
Standard Practice" ACI 315,
2. Concrete of following 28 day test strength.
a. f=3000 psi, 5-1/2 sack cement per cubic yard, ( no testing
required)
b. Precast walls f=3000 psi.
c. Maximum slump 4"
d. Reinforcing fy=40,000 psi.
3. Cover (Caear Dimensions).
a. Exterior faces of walls 1-1/2".
b. Vertical faces exposed to earth 2".
C. Bottom of elevated slabs 1" clear.
4. Lap all field splices 30 diameters. Bend wall and footing bars 18"
around
,. = �,��•� all corners, or use corner bars.
5. Dowel all exterior projections to structure with #4 bars at 12"
hooked into wall.
/=1, a 6. Place no backfill against foundation walls until Floors are in place.
' x ' 7. Incorporate to calcium chloride admixtures where aluminum alto
,
y
. materials are embedded.
8. All wood forms used for concrete in the ground or between
•,rj•I°^ ••v,:. 'y� foundation sills and the ground shall be removed.
al
1 .
.•
I
I
HNI-,ehtinen
BY Date
F.n 'neeri n �- -
4120 Hoyt Ave. Page No. _-- of _
Everett, WA 98203
(425) 252-2373
0
' — cn
TTl 44
Ulu � N
Q
fir-� .' '•�, / '� .�,
I
HNLehtinen Y
By Date
Engineering
4120 Hoyt Ave. Page No, of
Everett, WA 98203
(425) 752-2373
12 '
I
f
rl _
e
I � r
ti ra
i
I �
'f
1
HNLehtinen
n ineerin BY— Date - ---- - -- -
11120 floyl Ave. Page No, of y
Everett, WA 98203
(425) 252-2373
C � N
1 R
J
r�
I
e
HNLehtinen
Engineering
4120 Hoyt Ave.
Everett, WA 98203
(425)252-2373
INVOICE 17/
Structural and/or civil engineering services
Lateral Bracing Design
(Wind and Seismic Loads)
.WbW1� �
-$
Gravity Loads Design, requested by City or County
And any additional design or redesign-$110/ hour.
Please make check payable to: HNLehtinen Engineering
4120 Hoyt Ave.
Everett, WA 98203
If you have any questions, please call (425)252-2373.
Thank you.
� �
. _ �
I
'��
}
i
�R
,, _ `• ; :�
i
--
s.- ;..
�� `.
.af�`
�` � S
. �
�� �"
a� t ,�
� �.
r, �'
�,,1 � I
_ ��r � � \
i 1
��;r
. �� �,
�. -� � 1�r
�f, ,1� .�� :,
�!f� � �
,�
. �
r�.1 .� � �
�����,
`�
?�
s�
l 1 � ��
}
I
.i` �
'�./ �--
s
4 ,
,
�F-
J
r�.
�. )
-.
r a � � � •7
�-
o i
Cj
Cq
I �
0 N L11I
COT
U
�-
L1' s .-sip LIL
cc
�.:Ae�)
` I
i
Ll:
� I
�r
J J
� 1
s
c
Kristin Foster
From: Kristin Foster
Sent: Friday, March 23, 2018 9:43 AM
To: Sarah Lopez
Cc: Kevin Olander; Paul Ellis
Subject: RE: Stage- ramp
Sarah,
Exterior ramps will need to be a minimum of 44" between the two handrails.
Thanks,
Kristin Foster
Permit Technician
City of Arlington
18204 59th Ave NE
Arlington, WA 98223
360 403 3549
:fig-.ttrf_)_�rlIn tgIIv"o.C;o.
From: Kristin Foster
Sent:Thursday, March 22, 2018 3:15 PM
To:Sarah Lopez<slopez@arlingtonwa.gov>
Cc: Kevin Olander<kolander@arlingtonwa.gov>; Paul Ellis<pellis@arlingtonwa.gov>
Subject: RE: Stage-ramp
Sarah,
See responses below. Thanks
Kristin Foster
Permit Technician
City of Arlington
18204 59th Ave NE
Arlington, WA 98223
360 403 3549
kfoster@arlingtonwa.gov
From:Sarah Lopez
Sent:Thursday, March 22, 2018 1:57 PM
To: Kristin Foster<kfoster@arlingtonwa.gov>
Cc: Kevin Olander<kolander@arlingtonwa.gov>; Paul Ellis<pellis@arlingtonwa.gov>
Subject:Stage- ramp
Hi Kristin,
1
Can you please advise on the ramp for the stage.
Attached 2 drawings.
Questions:
Do we need 5 foot landings on both ends of the slope?Yes, on the top landing, and there must be a 60" radius circle
inside of the handrail/guardrail. See attached for details on the bottom landing.
Do we need handrails on both sides of the ramp?Yes,and there must be 44" clearance between the handrails—see
attached.
Is 36 inches wide the correct width (not including the 5ft radius landings)Yes, for interior width between the two
handrails.
For the concrete pour-can we do a monolithic pour like in the drawing?Yes, but the exterior foundation wall of the
ramp must have a 12"W x 6"H footing.The interior forms for the footing and foundation should be pressure treated as
they will not be removable once poured.
How thick does the exterior wall of the ramp need to be?The exterior foundation wall must be 6"thick.
What are the requirements for rebar? Footing rebar requirement is 1#4 bar. Foundation requirements are#4 bar ran
vertically 4 feet on center, 1#4 bar ran horizontally 4" below the top of the foundation wall, and 1#4 bar ran
horizontally 4" above the top of the footing. On the slope of the ramp the requirements are 2#4 bar ran down the slope
of the ramp 14"—15"on center, and across the slope of the ramp#4 bar 2' on center.
Please note that the landings must be flat and can't be included in the overall slope of the ramp.
The rebar that extends from the existing side wall to the landings and ramp must be epoxied into existing wall.
Thanks,
Sarah Lopez
Community Revitalization Project Manager
City of Arlington
360-403-3448
2
�o
2p
q4
� I E�-J�GI'� �,11 c�{✓i
Y�
a
ro
G
0
REVISED
m
\ Received
MAR 2 2 2018
p�' . �. r
,_ �
l
G
,.h
--
S
ED
Received
MAR 2 2 2018
r _ 7
' � � � J 'r
o �
k , , Z
or"
Q �
vt
14 ,
rJ
I �
leceivel
REVISEDMAR 1. 2H18
� 1--ns
:�' r ,
N�JIS�Q S�?dZNOr
vtMlA
9)W.
O ^- �I ,. l ^� -1 F
*,Y:,
w Nr-O u
g W o m
Q > to
' 1
o Paz
I
r
Q �Ito
`-D �
i
1 rj 4
V •1. I �1 i�_ __
<J '
Received
i
�11'15
'0,lb
fix
i
cs S
� I
t
yl Sr
� � I
1
1
1
> Received
i - - - --- - AR 1. 2 2018
P�DrnS
�„Y(�: ( `11R i��
CITY OF ARLINGTON
238 N. OLYMPIC AVE-ARLINGTON, WA, 98223
PHONE; (360)403-3551
_ BUILDING PERMIT
Address:114 N 01ymplc Ave Permit#:1775
Parcel#:3 105 1100100600 Valuation:15000 00
OWNER APPLICANT CONTRACTOR
Name:ARLINGTON CITY OF Name:City ot'Arlington Name:City of Arlington
Address:238 N OLYMPIC AVE Address:238 N Olympic Ave Address:238 N Olympic Ave
City,Slate Zip.ARLINGTON,WA 98223 City,State Zip:Arlington,WA 98223 City,State Zip:Arlington,WA 98223
Phone: Phone:360-403-3448 Phone.360.403-3448
MECHANICAL CONTRACTOR PLUMBING CONTRACTOR
Name: Name:
Address: Add ress:
City,State,Zip: City,State,Zip:
Phone: Phone:
LIC#: EXP: LIC#: EXP:
JOB DESCRIPTION
PERMIT TYPE: Mlsc CODE YEAR: 2015
STORIF'S: I CONSr.TYPE: V-13
DWFLI.ING UNITS: 0 OCC GROUP:
BUILDINGS: I OCC LOAD:
PERMIT APPROVAL
I AGREE TO COMPLY WITH CITY AND STATE LAWS REGULATING CONS T RUC 1 ION AND IN DOING TFIE WORK MITI IORIZED
Ti IERIEIFY;NO PERSON WILL BE EMPLOYED IN VIOLATION OF THE LABOR CODE OF THE STATE OF WASHING ION RELATiNGTO
WORKMEN'S COMPENSATION INSURANCE AND RCW 18.27.
THIS APPLICATION IS NOT A PERMIT UNTIL SIGNED BY TI IE BUILDING OFFICIAL.OR MIS/HER DEPUTY AND ALL FEES ARE PAID.
FI'IS UNLAWFUL TO USE OR OCCUPY A BUILDING OR STRUCT'URF,UNTIL A FINAL.INSPECTION HAS BEEN MADE AND APPROVAL OR
A CERTIFICATE OF OCCUPANCY HAS BEEN GRANTED. 1BC1 l0/IRCI 10
`.1LF:S'1'\\V0'rl('B:Sales tax relating to construction and vonsrructiun materials in the City of Arlington must be reported on your sales tax return form
and cud Ga�yy ol'Arlin Jun 03 1
-GGc �
Signature Print Name Date Released By Mtc
_ CONDITIONS
See red-lined drawings, Adhere to approved plans. Additional requirements: call for locates prior to the start
of construction to verify location of the structure meets appropriate setbacks from utility easements.
THIS PI;RMIT AUTIIORIZS CINLY THE WORK NOTED 'PHIS PERMIT COVERS WORK TO nE DONE ON PRIVATE PROPERTY ONLY ANY
CONS'rRUCTION ON THE PtMlJC DOMAIN(CURBS,SIDEWALKS,DRIVEWAYS,MARQUEES,ETC.)WILL Rl?QUIRE SEPARATE.PERMISSION
PERMIT FEES
Date Description Fee Amount
3/7/2018 Building Permit Fee $361.58
3/7/2018 Building Permit Fee ($361,58)
3/7/2018 Building Plan Review Fee ($235.03)
3/7/2016 Building Plan Review Fee $235.03
3/7/2018 Processing/Technology Fee $25-00
3,7/2018 Processing/Technology Fee ($25.00)
3/7/2018 State Building Code Surcharge Fee $4.50
3/7/2018 Slate Building Code Surcharge Fee ($4.50)
Total Due: S6,00
Total Payment: $0.00
Balance Due: $0.00
CALL FOR INSPECTIONS
IIUILDING(360)40"417
When calling for no lospeet(on please leave the following infor,natlom
Permit Number,Type of lospactlon being requested,And whether you prefer morning or afternoon
Date: 03/19/2026
Permit#: 1775
Permit Date: 12/14/2017
Review Date: 12/14/2017
Permit Type: ACCESSORY STRUCTURE
Review Type: Misc
Target Date: 12/21/2017
Scheduled 00:00
Time:
Completed 02/02/2018
Date:
Description: It looks like there might be a sewer line in this location, should probably check to make sure
the stage is outside our sewer easements.
Review Status:
Assigned To: Nova Heaton
Time In: 00:00
Time Out: 00:00
Hours: 0.0
Property Information
Parcel#: 31051100100600 ARLINGTON CITY OF
ARLINGTON CITY OF 238 N OLYMPIC AVE
110 E Third St ARLINGTON, WA 98223
Zoning: 761 Parks - General RecreationLot: Block:
Permit#: 1775
Permit Date: 12/14/17
Permit Type: ACCESSORY STRUCTURE
Project Name: Legion Park Stage
Applicant Name: City of Arlington
Applicant Address: 238 N Olympic Ave
Applicant, City, State, Zip: Arlington,WA 98223
Contact: Sarah Lopez
Phone: 360-403-3448
Email: slopez@arlingtonwa.gov
Scope of Work: Stage at Legion Park
Valuation: 15000.00
Square Feet: 480
Number of Stories: 1
Construction Type:
Occupancy Group:
ID Code:
Permit Issued: 03/07/2018
Permit Expires:
Form Permit Type:
Status: LASERFICHE
Assigned To: Kristin Foster
Property
Parcel# Address Legal Description Owner Name Owner Phone Zoning
31051100100600 110 E Third St ARLINGTON CITY 761 Parks-General
OF Recreation
Contractors
Contractor Primary Contact Phone Address Contractor Type License License
City of Arlington Sara Lopez 360-403-3448 238 N Olympic Ave APPLICANT
Plan Reviews
Date Review Type Description Assigned To Review Status
12/14/2017 Misc See red-lined drawings BUILDING
12/14/2017 Misc Marc Hayes
It looks like there might be a sewer line in this location,
12/14/2017 Misc should probably check to make sure the stage is outside Nova Heaton
our sewer easements.
12/14/2017 Misc No comments,LT PW-ADMIN-GIS
The proposed stage appears to be over the sewer main,it
12/14/2017 Misc is recommended that locates be called in to verify utility PW-SEW-REV
locations prior to construction of the stage JL
12/14/2017 Misc no comments for this review. pW-WAT-REV
us
Fees
Fee Description Notes Amount
Building Permit Table 4-1 $361.58
Building Plan Review Table 4-2 $235.03
Processing/Technology $25.00
State Surcharge- 1 st DU Residential- 1 st Unit ($4.50)
Building Permit Table 4-1 ($361.58)
Building Plan Review Table 4-2 ($235.03)
Processing/Technology ($25.00)
State Surcharge- 1st DU Residential- 1st Unit $4.50
Total $0.00
Attached Letters
Date Letter Description
02/27/2018 Building Permit
02/27/2018 Building Permit
Uploaded Files
Date File Name
03/26/2018 3187525-1775 Revised Ramp Plans on 3-23-2018.pdf
03/22/2018 3182701-RE Stage-ramp.msg
03/22/2018 3182699-1775 Revised Ramp Plans.pdf
03/08/2018 3141139-1775 Revised Issued Permit.pdf
03/07/2018 3135485-Revise Permit Email.pdf
12/14/2017 2854751-1775 Stage Rendering:pdf
12/14/2017 2854741-1775 Plans.pdf
12/14/2017 2854742-1775 Site Plan.pdf
12/14/2017 2854743-1775 Application.pdf
Permit#: 1775
Permit Date: 12/14/17
Permit Type: ACCESSORY STRUCTURE
Project Name: Legion Park Stage
Applicant Name: City of Arlington
Applicant Address: 238 N Olympic Ave
Applicant, City, State, Zip: Arlington,WA 98223
Contact: Sarah Lopez
Phone: 360-403-3448
Email: slopez@arlingtonwa.gov
Scope of Work: Stage at Legion Park
Valuation: 15000.00
Square Feet: 480
Number of Stories: 1
Construction Type:
Occupancy Group:
ID Code:
Permit Issued: 03/07/2018
Permit Expires:
Form Permit Type:
Status: COMPLETE
Assigned To: Kristin Foster
Property
Parcel# Address Legal Description Owner Name Owner Phone Zoning
31051100100600 110 E Third St ARLINGTON CITY 761 Parks-General
OF Recreation
Contractors
Contractor Primary Contact Phone Address Contractor Type License License
City of Arlington Sara Lopez 360-403-3448 238 N Olympic Ave APPLICANT
Plan Reviews
Date Review Type Description Assigned To Review Status
12/14/2017 Misc See red-lined drawings BUILDING
12/14/2017 Misc Marc Hayes
It looks like there might be a sewer line in this location,
12/14/2017 Misc should probably check to make sure the stage is outside Nova Heaton
our sewer easements.
12/14/2017 Misc No comments,LT PW-ADMIN-GIS
The proposed stage appears to be over the sewer main,it
12/14/2017 Misc is recommended that locates be called in to verify utility PW-SEW-REV
locations prior to construction of the stage JL
12/14/2017 Misc no comments for this review. pW-WAT-REV
us
Fees
Fee Description Notes Amount
Building Permit Table 4-1 $361.58
Building Plan Review Table 4-2 $235.03
Processing/Technology $25.00
State Surcharge- 1 st DU Residential- 1 st Unit ($4.50)
Building Permit Table 4-1 ($361.58)
Building Plan Review Table 4-2 ($235.03)
Processing/Technology ($25.00)
State Surcharge- 1st DU Residential- 1st Unit $4.50
Total $0.00
Attached Letters
Date Letter Description
02/27/2018 Building Permit
02/27/2018 Building Permit
Uploaded Files
Date File Name
03/26/2018 3187525-1775 Revised Ramp Plans on 3-23-2018.pdf
03/22/2018 3182701-RE Stage-ramp.msg
03/22/2018 3182699-1775 Revised Ramp Plans.pdf
03/08/2018 3141139-1775 Revised Issued Permit.pdf
03/07/2018 3135485-Revise Permit Email.pdf
12/14/2017 2854751-1775 Stage Rendering:pdf
12/14/2017 2854741-1775 Plans.pdf
12/14/2017 2854742-1775 Site Plan.pdf
12/14/2017 2854743-1775 Application.pdf
Date: 03/19/2026
Permit#: 1775
Permit Date: 12/14/2017
Review Date: 12/14/2017
Permit Type: ACCESSORY STRUCTURE
Review Type: Misc
Target Date: 12/21/2017
Scheduled Time: 00:00
Completed Date: 12/14/2017
Description: no comments for this review. Gus
Review Status:
Assigned To: PW-WAT REV
Time In: 00:00
Time Out: 00:00
Hours: 0.0
Property Information
Parcel#: 31051100100600 ARLINGTON CITY OF
ARLINGTON CITY OF 238 N OLYMPIC AVE
110 E Third St ARLINGTON, WA 98223
Zoning: 761 Parks - General RecreationLot: Block:
Date: 03/19/2026
Permit#: 1775
Permit Date: 12/14/2017
Review Date: 12/14/2017
Permit Type: ACCESSORY STRUCTURE
Review Type: Misc
Target Date: 12/21/2017
Scheduled 00:00
Time:
Completed 12/21/2017
Date:
Description: The proposed stage appears to be over the sewer main, it is recommended that locates be called
in to verify utility locations prior to construction of the stage JL
Review Status:
Assigned To: PW-SEW-REV
Time In: 00:00
Time Out: 00:00
Hours: 0.0
Property Information
Parcel#: 31051100100600 ARLINGTON CITY OF
ARLINGTON CITY OF 238 N OLYMPIC AVE
110 E Third St ARLINGTON, WA 98223
Zoning: 761 Parks - General RecreationLot: Block:
Date: 03/19/2026
Permit#: 1775
Permit Date: 12/14/2017
Review Date: 12/14/2017
Permit Type: ACCESSORY STRUCTURE
Review Type: Misc
Target Date: 12/21/2017
Scheduled Time: 00:00
Completed Date: 02/21/2018
Description: See red-lined drawings
Review Status:
Assigned To: BUILDING
Time In: 00:00
Time Out: 00:00
Hours: 0.0
Property Information
Parcel#: 31051100100600 ARLINGTON CITY OF
ARLINGTON CITY OF 238 N OLYMPIC AVE
110 E Third St ARLINGTON, WA 98223
Zoning: 761 Parks - General RecreationLot: Block: