HomeMy WebLinkAbout6719 Bovee Ln_BLD024946_2025 �,Aj INSPECTION REPORT
ti"N G r Permit No.: o� L� Lot#:
Address: /2 �.
ZContractor:
q3, ,SO Owner:
�z N C' Date:
Q APPROVAL ❑ PARTIAL APPROVAL
❑ VIOLATION ❑ CORRECTION REQUESTED
❑ Corrections listed below MUST BE MADE before work can be approved.
❑ Please contact inspector.
❑ Was not able to perform inspection.
❑ CALL 435-0674 FOR RE-INSPECTION - 24 hour notice required.
r
Inspector: Date.
TYPE OF INSPECTION REQUESTED
❑ Under-floor ❑ Framing ❑ Gas Piping
❑ Footing ❑ Drywall, Nailing ❑ Consultation
❑ Foundation ❑ Shear Nailing ❑ Groundwork
❑ Mechanical ❑ Grid ❑ Struct. Slab
❑ Wood Stove ❑ Rough-in anal
❑ Masonry ❑ Drainage rinsulation
❑ Other:.
INSPECTION REPORT
yIN G?' Permit No.: 4 � Lot#: `t
Q Address:
� Z Contractor:
O 9s� Owner:
Date:
❑ APPROVAL ARTIAL APPROVAL
❑ VIOLATION ❑ CORRECTION REQUESTED
❑ Corrections listed below MUST BE MADE before work can be approved.
❑ Please contact inspector.
❑ Was not able to perform inspection.
❑ CALL 435-0674 FOR RE-INSPECTION - 24 hour notice required.
Ir
�tr/iyss,�.
Inspector: Date:
PE OF IN ECTION REQUESTED
❑ Under-floor ❑ Framing ❑ Gas Piping
❑ Footing I Drywall, Nailing ❑ Consultation
❑ Foundation ❑ Shear Nailing ❑ Groundwork
❑ Mechanical ❑ Grid ❑ Struct. Slab
❑ Wood Stove ❑ Rough-in ❑ Final
❑ Masonry ❑ Drainage ❑ Insulation
❑ Other:
A� INSPECTION REPORT
iik // � J(�Permit No.: V 1 `' _Ot #: `*'�'CA/
Address:Contractor: 9 Owner:
Date: ho "d
P1_,APPROVAL ❑ PARTIAL APPROVAL
D VIOLATION ❑ CORRECTION REQUESTED
❑ Corrections listed below MUST BE MADE before work can be approved
❑ Please contact inspector.
❑ Was not able to perform inspection.
❑ CALL 435-0674 FOR RE-INSPECTION - 24 hour notice required.
Inspector: Date: f- l a—C
TYPE OFINSPECTION REQUESTED
❑ Under-floor ❑ Framing ❑ Gas Piping
❑ Footing ❑ Drywall, Nailing ❑ Consultation
❑ Foundation ❑ Shear Nailing ❑ Groundwork
❑ Mechanical ❑ Grid ❑ Struct. Slab
❑ Wood Stove ❑ Rough-in ❑ Final
❑ Masonry ❑ Drainage k Insulation
❑ Other: /
\\�\ INSPECTION REPORT
ti1N G TO Permit No.: �qL4 lSL Lot* 40
4� �L
Address: ` L
Contractor: VVL,5k-V(C_
Owner:
ING Date: �,� -� -
PPROVAL ❑ PARTIAL APPROVAL
❑ VIOLATION ❑ CORRECTION REQUESTED
❑ Corrections listed below MUST BE MADE before work can be approved.
❑ Please contact inspector.
❑ Was not able to perform inspection.
❑ CALL 435-0674 FOR RE-INSPECTION - 24 hour notice required.
Inspector: Date: -0c, -
YPE OF INSOECTION REQUESTED
❑ Under-floor � Framing ❑ Gas Piping
❑ Footing I "❑ Drywall, Nailing ❑ Consultation
❑ Foundation ❑ Shear Nailing ❑ Groundwork
❑ Mechanical ❑ Grid ❑ Struct. Slab
❑ Wood Stove ❑ Rough-in ❑ Final
❑ Masonry ❑ Drainage ❑ Insulation
❑ Other:
A$A INSPECTION REPORT 'T
ZN G Permit No.:T �Ti� Lot #:
¢ti �
Q' Address: 0-7
Contractor:
O Owner:
ING� Date: - --
❑ APPROVAL ❑ PARTIAL APPROVAL
❑ VIOLATION CORRECTION REQUESTED
corrections listed below MUST BE MADE before work can be approved
❑ Please contact inspector.
❑ Was not able to perform inspection.
❑ CALL 435-0674 FOR RE-INSPECTION - 24 hour notice required.
L
V
J _
Inspect r: Date:
YPE OF INSPECTION REQUESTED-
El Under-floor Framing ❑ Gas Piping
❑ Footing 6Drywall, Nailing ❑ Consultation
❑ Foundation ❑ Shear Nailing ❑ Groundwork
❑ Mechanical ❑ Grid ❑ Struct. Slab
❑ Wood Stove ❑ Rough-in ❑ Final
❑ Masonry ❑ Drainage ❑ Insulation
❑ Other:
14— INSPECTION REPORT
�N G?' Permit No.: l - 40LO #:
Q Address: �7
Contractor:
O Owner:
9s�i N G� Date: " "�� -eu=
,APPROVAL ❑ PARTIAL APPROVAL
❑ VIOLATION ❑ CORRECTION REQUESTED
❑ Corrections listed below MUST BE MADE before work can be approved
❑ Please contact inspector.
❑ Was not able to perform inspection.
❑ CALL 435-0674 FOR RE-INSPECTION - 24 hour notice required.
Inspector:
Date:
PE OF INSWCTION REQUESTED
❑ Under-floor ❑ Framing A Gas Piping
❑ Footing ❑ Drywall, Nailing ❑ Consultation
❑ Foundation ❑ Shear Nailing ❑ Groundwork
Mechanical ❑ Grid ❑ Struct. Slab
1J Wood Stove ❑ Rough-in ❑ Final
❑ Masonry ❑ Drainage ❑ Insulation
❑ Other:
INSPECTION REPORT
C
G P Permit No.: `�" Lot#:�' Address: 1671V AY
Contractor:
�OOwner:
G Date: S '2-q- 10 �— --
P�APPROVAL ❑ PARTIAL APPROVAL
❑ VIOLATION ❑ CORRECTION REQUESTED
❑ Corrections listed below MUST BE MADE before work can be approved
❑ Please contact inspector.
❑ Was not able to perform inspection.
❑ CALL 435-0674 FOR RE-INSPECTION - 24 hour notice required.
r
Inspector: Date: C-�
PE OF INSPE &ION REQUESTED
❑ Under-floor ❑ Framing ❑ Gas Piping
❑ Footing ❑ Drywall, Nailing ❑ Consultation
❑ Foundation ❑ Shear Nailing ❑ Groundwork
❑ Mechanical Grid ❑ Struct. Slab
❑ Wood Stove Rough-in ❑ Final
❑ Masonry Drainage ❑ Insulation
❑ Other:
INSPECTION REPORT
1N G `"'�7 F'Lk Lot #• q0_
¢y p0
Permit No.:..
Q" Address:
Contractor:
O Owner:
IN C'� Date:
ZAPPROVAL ❑ PARTIAL APPROVAL
❑ VIOLATION ❑ CORRECTION REQUESTED
❑ Corrections listed below MUST BE MADE before work can be approved
❑ Please contact inspector.
❑ Was not able to perform inspection.
❑ CALL 435-0674 FOR RE-INSPECTION - 24 hour notice required.
Inspector: r Date:'T
YPE OF IN ECTION REQUESTED
❑ Under-floor ❑ Framing ❑ Gas Piping
❑ Footing ❑ Drywall, Nailing ❑ Consultation
❑ Foundation Shear Nailing ❑ Groundwork
❑ Mechanical ❑ Grid ❑ Struct. Slab
❑ Wood Stove ❑ Rough-in ❑ Final
❑ Masonry ❑ Drainage ❑ Insulation
❑ Other:
INSPECTION REPORT
IN G Y'
4�• 1'o Permit No.: Lot #:
Q Address: 7 r
Contractor:, v
O Owner:
9s�IN�'� Date:
❑ APPROVAL PPARTIAL APPROVAL
❑ VIOLATION CI CORRECTION REQUESTED
❑ Corrections listed below MUST BE MADE before work can be approved.
❑ Please contact inspector.
❑ Was not able to perform inspection.
❑ CALL 435-0674 FOR RE-INSPECTION - 24 hour notice required.
Date:
Inspector:
PE OF INSPECTION REQUESTED
❑ Under-floor ❑ Framing ❑ Gas Piping
❑ Footing ❑ Drywall, Nailing ❑ Consultation
❑ Foundation Shear Nailing; ❑ Groundwork
❑ Mechanical �:—Grid ❑ Struct. Slab
❑ Wood Stove ❑ Rough-in ❑ Final
❑ Masonry ❑ Drainage ❑ Insulation
❑ Other:
\ INSPECTION REPORT
IN G T - J /'>�6t#:
4ti O Permit No.. G
Address:
Z Contractor: F�
O Owner:
,41 N G� Date: Z7
APPROVAL ❑ PARTIAL APPROVAL
❑ VIOLATION ❑ CORRECTION REQUESTED
❑ Corrections listed below MUST BE MADE before work can be approved
❑ Please contact inspector.
❑ Was not able to perform inspection.
❑ CALL 435-0674 FOR RE-INSPECTION - 24 hour notice required.
Inspector: Date:
T PE OF IN ECTION REQUESTED
Under-floor ❑ Framing ❑ Gas Piping
❑ Footing ❑ Drywall, Nailing ❑ Consultation
❑ Foundation ❑ Shear Nailing ❑ Groundwork
❑ Mechanical ❑ Grid ❑ Struct. Slab
❑ Wood Stove ❑ Rough-in ❑ Final
❑ Masonry ❑ Drainage ❑ Insulation
❑ Other:
A INSPECTION REPORT
ii
rPermit No.: Z 0&1 Lot #: `'tAddress:Contractor:O Owner:
Date:
N.N.PPROVAL El PARTIAL APPROVAL
❑ VIOLATION ❑ CORRECTION REQUESTED
❑ Corrections listed below MUST BE MADE before work can be approved
❑ Please contact inspector.
❑ Was not able to perform inspection.
❑ CALL 435-0674 FOR RE-INSPECTION - 24 hour notice required.
Inspector: Date:
PE OF INS CTION REQUESTED
❑ Under-floor ❑ Framing ❑ Gas Piping
❑ Footing ❑ Drywall, Nailing ❑ Consultation
❑ Foundation ❑ Shear Nailing ❑ Groundwork
❑ Mechanical ❑ Grid ❑ Struct. Slab
❑ Wood Stove ❑ Rough-in ❑ Final
❑ Masonry Drainage ❑ Insulation
❑ Other:
INSPECTION REPORT
1IN G jjt'O Permit No.:Os)�t `t ` Lot
'
¢ U Y1L.
4" �~ Address: Z
Contractor:
�s �O Owner:
14I N O Date: ray
APPROVAL ❑ PARTIAL APPROVAL
❑ VIOLATION ❑ CORRECTION REQUESTED
❑ Corrections listed below MUST BE MADE before work can be approved
❑ Please contact inspector.
❑ Was not able to perform inspection.
❑ CALL 435-0674 FOR RE-INSPECTION - 24 hour notice required.
Inspector: Date: —11—
G�-
YPE OF MPECTION REQUESTED
❑ Under-floor ❑ Framing ❑ Gas Piping
❑ Footing ❑ Drywall, Nailing ❑ Consultation
Foundation ❑ Shear Nailing ❑ Groundwork
❑ Mechanical ❑ Grid ❑ Struct. Slab
❑ Wood Stove ❑ Rough-in ❑ Final
❑ Masonry ❑ Drainage ❑ Insulation
❑ Other:
INSPECTION REPORT
4tit&NG
Permit No.O-; - �� Lot#: `-tQ
Address:Contractor:Owner:
IN Date:
APPROVAL ❑ PARTIAL APPROVAL
❑ IOLATION ❑ CORRECTION REQUESTED
❑ Corrections listed below MUST BE MADE before work can be approved
❑ Please contact inspector.
❑ Was not able to perform inspection.
❑ CALL 435-0674 FOR RE-INSPECTION - 24 hour notice required.
7 2_
Inspector:
Date:
TYPE OF INSPECTION REQUESTED
❑ Under-floor ❑ Framing ❑ Gas Piping
I Footing ❑ Drywall, Nailing ❑ Consultation
❑ Foundation ❑ Shear Nailing ❑ Groundwork
❑ Mechanical ❑ Grid ❑ Struct. Slab
❑ Wood Stove ❑ Rough-in ❑ Final
❑ Masonry ❑ Drainage ❑ Insulation
❑ Other:
C I T V OF A R L I N G T OtV
CONSTRUCT I "" PEFZM I T
t:311=-:FtM I T NO _ 02-49 46
Orner: BOVEE ACRES LLC 505 CEDAR AVE SUITE B-1 MARYSVILLE 98270
Value of Work: $107, 000. 00 Tax ID: Phone: 360-653-3634
Describe Work: NEW SINGLE FAMILY RESIDENCE
Proposed Use:- SFR
Legal Description: BOVEE ACRES LOT 40
Job Address: 6719 BOVEE LANE
Contractor's Name Type Address License#
BOVEE ACRES LLC GEN 5505 CEDAR AVE BOVEEAL995P9
P E R N I T F E E S
Equipment and Fixtures----------------- Number Fee Total Charge
---------------------- ------ -------- ------------
PLUMBING FIXTURES 13 $10.00 $130. 00
FURNACE/UNIT HEATER 1 $15. 00 $15. 00
VENTILATION FANS 5 $7. 00 $35. 00
DRYER 1 $11. 00 $11. 00
METAL FIREPLACE 8 CHIMNEY 1 $11. 00 $11. 00
WATER HEATER 1 $15. 00 $15. 00
GAS PIPING 1-4 OUTLETS 1 $6. 00 $6. 00
S U B T O T A L. . . . . . *223.60
TOTALS Fee
Permit Fee $1, 096. 50
Equipment $93.00
Fixture . $130. 00
Mech Permit $24. 00
Plan Fee $712. 73
Plumb Permit $25. 00
State fee $4. 50
SIGNATURE: M J Lj 4 -(T
'
TOTAL FEE. . . . . . . . . . . . . . . . . $2,0a5.73 I HEREBY CERTIFY THAT I HAVE READ
A EXAMINED THIS APPLICATION AND
PAYMENTS. . . . . . . . . . . . . . . . . . $704.93 K THE SAKE TO BE TRUE AND COR-
R C0AOVIS NS LAWS AND
TOTAL DUE. . . . . . . . . . . . . . . . . 81, 38®.a8 O DOV ING HIS TYPE OF
R I D WITH WHETHER
E R T.
DATE RECEIPT #
V� kWIDING tbFFICIAL
Or
G
80.00'
— — _BSBL (TYP.) —\
Z10' DRAINAGE
ESMT. (PVT.) ,
co
i \CO
N (0 I
� I
I
I I `
I I
40 10D, ,h
v\ 81112 SF ,
' Al
I 62./
7,3) 2.39" (� r
\ � I
I
\ I '
\ I I
I N
N
RECEIVED
FFR 2 6 2002
CITY OF ARLINGTON cro
z=
i
56ALE: 20'
ULLB0VEE LANE O 5 10 15 20
_ _ - _ M5/02 TGW Bl"T40
ACRES
ALSO KNOWN As RI M6EA00P PARKlmmlmMRRl -'
Sufi Avenue
Lot # 40 PLAN #: 1404 ' Marysville, 0) 253-3
PHONE: (360) 653-3634
ww .b welmarkhomes.com FAX: (360) 653-96I9
ADDRESS:
CITY OF ARLINGTON
CONSTRUCTION
PERMIT 14 Ul
❑ COMBINATION 1-8 BUILDING
❑ MECHANICAL ❑ PLUMBING ❑ SIGN PERMIT NO.
10 Ppl;cah MAIL ADDRLSS CITY LIP /HONE
�ovee cve-5 ILC_ , 5uj- Cedar Ave. Sure --I ftr of le g8a-)b 360- (o53-5 e,�
ARCIIIILCT OR DESIGNER MAIL ADDRESS city jl/ �P►IONE
lc -r WafSov) Ig53j 55*4,_,4 N� 5ea�Ile 4$l55
GENERALCCN K.< <� �o(o- 5s -a m5�
MAIL ADURESS city LIP ►►IONS LIC N E/
6oyeeAcm L _&- — 505 Cedar Ave SLX14 6-1 r�rla�vsvi�le g8a_)o %0-03-3634 OOUEEk-g15_P9
MLCIIANICALCONIRACTOq MAIL ADDRESS City ZIP PIIONE LICENSE
911 Seg5ons Heo4ly Cool Pp &x 9q0 �.arnQ�ioh 92014 LAX-0-0011D4 4u5Ewmle8
PLUMBING CONTRACTOR MAIL ADDRESS CITY zip PHONE LICENSL
to Aoct\15 CuSlom Ov-. Abe, 920 Iba"dsTN� komn 'Dn G8aa3 31�o-c g a5b1 �OckJC�o�1N8 3 CLASS Of WORK
O NI.W ❑AUDITION ❑ALTERATION REPAIR
a ❑ ❑DEMOLI I ION ❑BUILDING RELOCATION
Q VAL//UATIONOf WORK]
W I
W ULSCRIBL WORK
Wm PRUrOSI U USL I BUILDING
I HEREBY CERTIFY THAT I HAVE READ AND EXAMINED THIS APPLICA-
z LLGAL DI\('RIPI IUN UI PROPLRTY 51f05VN fIEIOW UR AI TACIT f UUR COPY51 TION AND KNOW THE SAME TO BE TRUE AND CORRECT ALL PROVI-
L/ ` SIONS OF LAWS AND ORDINANCES GOVERNING THIS TYPE OF WORK
� un i L nLUCK Or OVe� Y'eS WILL BE COMPLIED WITH WHETHER SPECIFIED HERIN OR NOT.THE
a GRANTING OFA PERMIT DOES NOT PRESUMETO GIVEAUTHORITYTO
VIOLATE OR CANCEL THE PROVISIONS OF ANY OTHER STATE OR
i TAX 10NUMBER F OM PROPERTY TAX STATEMENT LOCAL LAW REGULATING CONSTRUCTION OF THE PERFORMANCE OF
,, LC4 Y CONSTRUCTION.PERMIT EXPIRES 1 YEAR FROM DATE OF ISSUANCE.
IUBAUURI.tS SIGNATURE OF CONTRACTOR Olt AUTHORIZED AGENT DATE
(OPPICII USn ONLY)
PLUMBING MPCIIANICAL
NO. TYPO or PIXTURB reR 7's PIXTURCS NO. TYPn Or eQUIrMl]NT FOR is PIXTURP3
ATOR CLOSDI IL[r[ Rt COND.UNITS—H.P. PA. Iqwp.[lot "
IATITUB 113PRIGEMAMON UNITS—II.P.BA. Igule.1110to,
-AVATORY ASII BASIN tOILBRS—II.P.RA. + sd .Ilst•"
110WI7t AS PIRRD A.C.UNITS—TONNAOB IIA. + si .tlsl•"
ITC]IBN SINK dl DISPOSAL 7ORC13D AIR SYSTEMS—B.T.U. MZA
ISHWASI MR NALL I IPATURS—D.T.U. M _
AUNDRY TRAY JNIT 11BATDRS D.T.U. M /
I OTIMS WASHOR / SVAPORATIVRCOOLMS
ATOR IIRATFR .LOTIIL4 DRY13LS
RINALVENTILATION PAN
)RINKINO POUNTAIN tANCIIIII00D COMMORCIAL
FLOOR DRAIN AIR HANDLING UNIT— CPM
ACUUM BRRAKORS TOVO
tOOF DRAINS—RAINLEADOR9 AUTAL PIRRPLAC11A CIIIMNBY
INK(SRRVICO—BAR,ITC.) WATUR 1I11ATITR
AS PIPING *(up to S-13.00 addnl..2.75 •
"Equipment Ild must be roftded
SUB TOTAL SUB TOTAL
PI!RMIT PIRRMIT
_ TOTAL PI?O TOTAL PBB
SIUi.YARU LIIIALK $FRLL'I�SLIBACK REAR YARD SEIBACK ►LANCIILCKNUMBLR PLAN CHECK FEE
5 � JC• FEE � aE PT I�
USI' /UNI LUI 0.A VACANT SITE
-l4Q D-YES ONO FEES VALUATION FEE
IYPL of c NSL. OCCUPA7Y �UUP NO.OF DWELLING UNITS PLAN CHECKING VG (�_
lIAAYYII II// eu'Lo1Nc s f o
SIZL Of BLU(.. NO.Of fJURIIA MAX.OCCG-LOAO
C� PLUMBING
g I IRE SPRINKLLP.SRI.QUIREU'
Cl YES G NO MECHANICAL
COMMENTS � STATE BLDG.CODE
ENERGY CODE SURCHARGE
PENALTY U.B.C.
SEC.30.1(a)
WATERISEWER FEES
TOTAL
PERMIT VALIDATION
WHEN PROPERLY VALIDATED IIN THIS SPACEI THIS IS YOUR PERMIT 6 RECEIPT
PAID CRN BY