HomeMy WebLinkAbout6826 Bovee Ln_BLD024943_2025 INSPECTION REPORT
ti1N G?' Permit No.: �'"'� Lot #:
� O
Address:
Contractor:
O Owner:
9s�j N G� Date:
�� APPROVAL ❑ PARTIAL APPROVAL
' ❑ VIOLATION ❑ CORRECTION REQUESTED
❑ Corrections listed below MUST BE MADE before work can be approved.
❑ Please contact inspector.
❑ Was not able to perform inspection.
❑ CALL 435-0674 FOR RE-INSPECTION - 24 hour notice required.
Inspector: / /� Date:TAPE OF INSPECTION REQUESTED
❑ Under-floor ❑ Framing ❑ Gas Piping
❑ Footing ❑ Drywall, Nailing ❑ Consultation
❑ Foundation ❑ Shear Nailing ❑ Groundwork
❑ Mechanical ❑ Grid ❑ Struct. Slab
❑ Wood Stove ❑ Rough-in X Final
❑ Masonry ❑ Drainage ❑ Insulation
❑ Other:
INSPECTION REPORT
D4�� Permit No.: 043 Lot
QAddress:
• Contractor:
� Owner:
Date: I
;APPROVAL ❑ PARTIAL APPROVAL
❑ VIOLATION ❑ CORRECTION REQUESTED
❑ Corrections listed below MUST BE MADE before work can be approved.
❑ Please contact inspector.
❑ Was not able to perform inspection.
❑ CALL 435-0674 FOR RE-INSPECTION - 24 hour notice required.
Inspector: i'
APE OF INSPECTION REQUESTED
❑ Under-floor ❑ Framing ❑ Gas Piping
❑ Footing Drywall, Nailing ❑ Consultation
❑ Foundation Shear Nailing ❑ Groundwork
❑ Mechanical ❑ Grid ❑ Struct. Slab
❑ Wood Stove ❑ Rough-in ❑ Final
❑ Masonry ❑ Drainage ❑ Insulation
❑ Other:
`M1 INSPECTION REPORT
��1 `1•� G?' Permit No.: �_ qw�_ot #:
Q' Address: l o
• w�-r�.
z Contractor:
O Owner:
INCs� Date:
PPROVAL ❑ PARTIAL APPROVAL
❑ VIOLATION ❑ CORRECTION REQUESTED
❑ Corrections listed below MUST BE MADE before work can be approved
❑ Please contact inspector.
❑ Was not able to perform inspection.
❑ CALL 435-0674 FOR RE-INSPECTION - 24 hour notice required.
Z 0
Inspector: Date: �C
-fYPE OF INSPECTION REQUESTED
❑ Under-floor ❑ Framing ❑ Gas Piping
❑ Footing ❑ Drywall, Nailing ❑ Consultation
❑ Foundation ❑ Shear Nailing ❑ Groundwork
❑ Mechanical ❑ Grid ❑ Struct. Slab
❑ Wood Stove ❑ Rough-in ❑ Final
❑ Masonry ❑ Drainage ] Insulation
❑ Other: I `
FM INSPECTION REPORT
¢tiZN G TO Permit No.:'C.�_ q r q z Lot#:
Q' Address: 6 — �}
Contractor: _ Y 11h.'4"j
,SO Owner:
101 N G Date: C>I2
❑ APPROVAL ❑ PARTIAL APPROVAL
❑ VIOLATION 'CORRECTION REQUESTED
§ Corrections listed below MUST BE MADE before work can be approved.
❑ Please contact inspector.
❑ Was not able to perform inspection.
❑ CALL 435-0674 FOR RE-INSPECTION - 24 hour notice required.
Inspector: Date:TyfPE OF IN ECTION REQUESTED
❑ Under-floor ❑ Framing ❑ Gas Piping
❑ Footing ❑ Drywall, Nailing ❑ Consultation
❑ Foundation ❑ Shear Nailing ❑ Groundwork
❑ Mechanical ❑ Grid ❑ Struct. Slab
❑ Wood Stove ❑ Rough-in ❑ Final
❑ Masonry ❑ Drainage OL Insulation
❑ Other:
INSPECTION REPORT
tiIN G r Permit No.: 7 Lot#:
Address:
• s
Z Contractor:
Owner:
41 N O Date:
APPROVAL ❑ PARTIAL APPROVAL
❑ VIOLATION ❑ CORRECTION REQUESTED
❑ Corrections listed below MUST BE MADE before work can be approved
❑ Please contact inspector.
❑ Was not able to perform inspection.
❑ CALL 435-0674 FOR RE-INSPECTION - 24 hour notice required.
Inspector:
Date:-
YPE O INSPECTION REQUESTED
❑ Under-floor Framing ❑ Gas Piping
❑ Footing Drywall, Nailing ❑ Consultation
❑ Foundation ❑ Shear Nailing ❑ Groundwork
❑ Mechanical ❑ Grid ❑ Struct. Slab
❑ Wood Stove ❑ Rough-in ❑ Final
❑ Masonry ❑ Drainage ❑ Insulation
❑ Other:
r INSPECTION REPORT
ti1N G?'O Permit No.: t t4,3 Lo #:
Address:
• e
Z Contractor:
O Owner:
9s�j N G� Date: �— 2 )
APPROVAL ❑ PARTIAL APPROVAL
❑ VIOLATION ❑ CORRECTION REQUESTED
❑ Corrections listed below MUST BE MADE before work can be approved
❑ Please contact inspector.
❑ Was not able to perform inspection.
❑ CALL 435-0674 FOR RE-INSPECTION - 24 hour notice required.
12
Inspector: Date:
YPE OF IN'8rPECTION REQUESTED
❑ Under-floor ❑ Framing A Gas Piping
❑ Footing ❑ Drywall, Nailing ❑ Consultation
Foundation ❑ Shear Nailing ❑ Groundwork
XMechanical
❑ Grid ❑ Struct. Slab
Wood Stove ❑ Rough-in ❑ Final
❑ Masonry ❑ Drainage ❑ Insulation
❑ Other:
INSPECTION REPORT
4tiIN G?'� Permit No.: Yg� 3 Lot#: /
Address: o ir f-
� z
Contractor:
O Owner:
INC'� Date:
�PROVAL ❑ PARTIAL APPROVAL
❑ VIOLATION ❑ CORRECTION REQUESTED
❑ Corrections listed below MUST BE MADE before work can be approved.
❑ Please contact inspector.
❑ Was not able to perform inspection.
❑ CALL 435-0674 FOR RE-INSPECTION - 24 hour notice required.
Inspector: Date: ! ��—
PE OF INSP ION REQUESTED
❑ Under-floor ❑ Framing ❑ Gas Piping
❑ Footing ❑ Drywall, Nailing ❑ Consultation
❑ Foundation XShear Nailing ❑ Groundwork
❑ Mechanical ❑ Grid ❑ Struct. Slab
❑ Wood Stove OK Rough-in ❑ Final
❑ Masonry ❑ Drainage ❑ Insulation
❑ Other:
K INSPECTION REPORT
-
4ti1N G TO Permit No.: - 3 Lot #:
Q' Address:
� Z Contractor:
O Owner:
ING Date:
❑ APPROVAL ❑ PARTIAL APPROVAL
❑ VIOLATION CORRECTION REQUESTED
❑ Corrections listed below MUST BE MADE before work can be approved
❑ Please contact inspector.
❑ Was not able to perform inspection.
❑ CALL 435-0674 FOR RE-INSPECTION - 24 hour notice required.
-.0000
Inspector: Da e:
�fYPE OF INS CTION REQUESTED
❑ Under-floor ❑ Framing ❑ Gas Piping
❑ Footing ❑ Drywall, Nailing ❑ Consultation
❑ Foundation hear Nailing ❑ Groundwork
❑ Mechanical ❑ Grid ❑ Struct. Slab
❑ Wood Stove ❑ Rough-in ❑ Final
❑ Masonry ❑ Drainage ❑ Insulation
❑ Other:
INSPECTION REPORT
tiIN G T� Permit No.: �F Lot #: _
Address:
Contractor: El Ig
O Owner:
IN G1W Date: L3 —62—
❑ APPROVAL PARTIAL APPROVAL
❑ VIOLATION ❑ CORRECTION REQUESTED
❑ Corrections listed below MUST BE MADE before work can be approved
❑ Please contact inspector.
❑ Was not able to perform inspection.
❑ CALL 435-0674 FOR RE-INSPECTION - 24 hour notice required.
Inspector: ate:
PE OF INSPECTION REQUESTED
❑ Under-floor ❑ Framing ❑ Gas Piping
❑ Footing ❑ Drywall, Nailing ❑ Consultation
❑ Foundation Shear Nailing ❑ Groundwork
❑ Mechanical Grid We ❑ Struct. Slab
❑ Wood Stove ❑ Rough-in . r ❑ Final
❑ Masonry ❑ Drainage ❑ Insulation
❑ Other:
�- INSPECTION REPORT
¢tiIN G 1'� Permit No.: 0,�--Y 9/3 Lot #:
Address: C 6 &c e
• ,6 l/ l
� Z Contractor: � �a�
O
9s O Owner:
j N Date:
APPROVAL ❑ PARTIAL APPROVAL
❑ VIOLATION ❑ CORRECTION REQUESTED
❑ Corrections listed below MUST BE MADE before work can be approved
❑ Please contact inspector.
❑ Was not able to perform inspection.
❑ CALL 435-0674 FOR RE-INSPECTION - 24 hour notice required.
Inspector: Date: L7 -./ pr�
YPE OF INSPE TION REQUESTED
tn der-floor ❑ Framing ❑ Gas Piping
oting ❑ Drywall, Nailing ❑ Consultation
❑ Foundation ❑ Shear Nailing ❑ Groundwork
❑ Mechanical ❑ Grid ❑ Struct. Slab
❑ Wood Stove ❑ Rough-in ❑ Final
❑ Masonry ❑ Drainage ❑ Insulation
❑ Other:
INSPECTION REPORT
¢ti1N G?O Permit No.:()Z 4143 Lot #:
Q' Address: �6 ,6p IJalZ
Contractor:
� Z
® Owner: I
N G� Date: 4 • Ho - O -Z,
APPROVAL ❑ PARTIAL APPROVAL
❑ VIOLATION ❑ CORRECTION REQUESTED
❑ Corrections listed below MUST BE MADE before work can be approved
❑ Please contact inspector.
❑ Was not able to perform inspection.
❑ CALL 435-0674 FOR RE-INSPECTION - 24 hour notice required.
Inspector: - Date: G
APE OF INSPE TION REQUESTED
❑ Under-floor ❑ Framing ❑ Gas Piping
❑ Footing ❑ Drywall, Nailing ❑ Consultation
❑ Foundation ❑ Shear Nailing K Groundwork
❑ Mechanical ❑ Grid ❑ Struct. Slab
❑ Wood Stove ❑` Rough-in ❑ Final
❑ Masonry ❑ Drainage ❑ Insulation
❑ Other:
4-111 INSPECTION REPORT
¢tiZN G r0 Permit No.: Lot#:
Q" Address: 6 r L
Z Contractor: XelAai
ys �O Owner:
SIN O Date: '�C6
AAPPROVAL ❑ PARTIAL APPROVAL
❑ VIOLATION ❑ CORRECTION REQUESTED
❑ Corrections listed below MUST BE MADE before work can be approved
❑ Please contact inspector.
❑ Was not able to perform inspection.
❑ CALL 435-0674 FOR RE-INSPECTION - 24 hour notice required.
Inspector: Date:
/fYPE OF IN CTION REQUESTED
❑ Under-floor ❑ Framing ❑ Gas Piping
❑ Footing ❑ Drywall, Nailing ❑ Consultation
❑ Foundation ❑ Shear Nailing ❑ Groundwork
❑ Mechanical ❑ Grid ❑ Struct. Slab
❑ Wood Stove ❑ Rough-in ❑ Final
❑ Masonry ( 1.Drainage ❑ Insulation
❑ Other:
INSPECTION REPORT
41,ZN G rO Permit No.: 4 43 Lot#: l
Address: (0 2{r
� Z
Contractor: )b�M_Ck /�_--
O Owner:
9s�I N G� Date: do-_
APPROVAL ❑ PARTIAL APPROVAL
❑ VROLATION ❑ CORRECTION REQUESTED
❑ Corrections listed below MUST BE MADE before work can be approved
❑ Please contact inspector.
❑ Was not able to perform inspection.
❑ CALL 435-0674 FOR RE-INSPECTION - 24 hour notice required.
l�
TMAX
Inspector: Date: —
TYPE OF INSPECTION REQUESTED
❑ Under-floor ❑ Framing ❑ Gas Piping
❑ Footing ❑ Drywall, Nailing ❑ Consultation
Foundation ❑ Shear Nailing ❑ Groundwork
❑ Mechanical ❑ Grid ❑ Struct. Slab
❑ Wood Stove ❑ Rough-in ❑ Final
❑ Masonry ❑ Drainage ❑ Insulation
❑ Other:
INSPECTION REPORT
¢S•IN G 7'O Permit No.: no '_O �ot #:
Q' Address:
Contractor:
4 Owner:
Date:
PPROVAL ❑ PARTIAL APPROVAL
❑ VIOLATION ❑ CORRECTION REQUESTED
❑ Corrections listed below MUST BE MADE before work can be approved
❑ Please contact inspector.
❑ Was not able to perform inspection.
❑ CALL 435-0674 FOR RE-INSPECTION - 24 hour notice required.
Inspector: Date:
TYP OF INSPECTION REQUESTED
❑ Under-floor ❑ Framing ❑ Gas Piping
Footing ❑ Drywall, Nailing ❑ Consultation
Foundation ❑ Shear Nailing ❑ Groundwork
❑ Mechanical ❑ Grid ❑ Struct. Slab
❑ Wood Stove ❑ Rough-in ❑ Final
❑ Masonry ❑ Drainage ❑ Insulation
❑ Other:
OFFICE COPY
Z 60.7 7'
00
0 o I- - - - - 00
rnL
w nl �
l I
mI I
I I
I I
I I
I I
44'-0" I
I I
PATIO I
12'X10
I — —
>7
I II
PLAN I -
i
I 17 3 ` I o RECE1�$ED
II o
8 191 /I I FEB 2 8 2002
CITY OF ARLIN TON
BSBL (TIP
CONC.
Q _
o DRIVE
N 10' UTIL. ESMT
60.77'
I =Z
--- - - - —
I
Z
BOVEE LANE
_ -— 5GALE: 20'
UIL
O ' 5 10 15 20
!!�' � \0Y/ M-W02 TGw BVLOT04
25EE
ALSO KNOWN As RIDGENOOD PARK I-sEimMARI ' Evi`B Avenue
L o t� # I PLAN #: 1133 PI-tONE•'11OW) 653-3634
ADDRESS: ww4belmorkhome5.Gom FAX: (360) 653-9b14
C I T Y O F A R L I NG T O N
C O N S T RU C T I O N P E RM I T
PEFtM I T NO- a 02—le*943
Ovner: BOVEE ACRES LLC 505 CEDAR AVE SUITE B-1 MARYSVILLE 98270
Value of cork: $112, 000. 00 Tax ID: Phone: 360-653-3634
Describe Work: NEW SINGLE FAMILY RESIDENCE
Proposed Use: SFR
Legal Description: BOVEE ACRES LOT 9
Job Address: 6826 BOVEE LANE
Contractor's Name Type Address License#
BOVEE ACRES LLC GEN 5505 CEDAR AVE BOVEEAL995P9
ROCKYS CUSTOM PLUMBING PLB 9510 132ND ST HE ROCKYCP03INB
ALL SEASONS HEAT-N-COOL NEC PO BOX 940 ALLSEHC001C8
P E R M I T F E S S
Equipment and Fixtures Humber Fee Total Charge
--------------------------------------- ------ -------- ------------
PLUMBING FIXTURES 13 $10. 00 $130. 00
FURNACE/UNIT HEATER 1 $15. 00 $15. 00
VENTILATION FANS 4 $7. 00 $28. 00
DRYER 1 $11. 00 $11. 00
WATER HEATER 1 $15. 00 $15. 00
GAS PIPING 1-4 OUTLETS 1 $6. 00 $6. 00
S U B T O T A L. . . . . . $205.00
TOTALS Fee
Permit Fee $1, 126.50
Equipment $75.00
Fixture $130. 00
Mech Permit $24. 00
Plan Fee $732. 23
Plumb Permit $25.00 (���✓� d
State fee $4. 50 f 1
SI TURE: 1 1, v
vAeN
TOTAL FEE. . . . . . . . . . . . . . . . . $2. 117. 23 I BY CERTIFY THAT I HA E READ
AN E AIiINED THIS APPLICATION AND
PAYMENTS. . . . . . . . . . . . . . . . . . $732. 23 KN W HE S Y, N
E TRUE AND COR-
RE T LE
P OS OF LAWS AHD
TOTAL DUE. . . . . . . . . . . . . . . . . $1, 385. 00 OR IN N�CES GG IS TYPE OF
W ILL EIED IT
WHETHER
DATE I lG� L w S I IED E
RECEIPT
1-46, O L
MAR 14 2002
`eY�
CITY OF ARLINGTON
CONSTRUCTION
PERMIT O) _ 4�q3
❑ COMBINATION r BUILDING ❑ MECHANICAL ❑ PLUMBING ❑ SIGN PERMIT NO.
OWNER/�PpI;Cqn r MAIL ADDRESS
city 21► PHONEeoUee /Icyes L-Q, C6 Cgdo c Ay--Skiffs-[ Wary)u ;l►e qy, -7-76 b53 -3co3�
ARC I IIttCI OR DESIGNER MAIL ADDRESS CITY ?1► PHONE�err1 (9� 'j 55 -4vc A� Seine 98155 aOb- 365- a �5-7
GLNERAL LION IRAC U MAIL AUL)RESS CITY LIP PIIONL LIC NSE
P?ov er- 4re5 LLO- 5Q5 Ceda r b-[ 1'Y10.r jS v I I I P `tSa- a -la E-,3 jb-5 q 60U EEA L1Z5 P 1
MLOIANICAL CONTRACTOR MAIL ADDRESS CITY lie LICENSE 1
,A-J 1 tSeaSons aea�4-n-Ccjl PG fox qvD
Cakna4icorl q�Cl� �{d5-&y'I ONE 66oy 4LLSE714c are
PLUMBING CONTRACTOR MAIL ADDRESS CITY LIP PHONE LICENSE I
'LL►nbinq gSlb 15Aq YIVE 4rh"h)✓J ?iFaa3 36,J 659-9561 RoCK�CPp31N 8
LLA55 Of WORK
O NI W ❑AUDITION ❑ALTERATION ❑REPAIR ❑DEMOLI IION
❑BUILDING RELOCATION
Q VALLIIAIrION Of WORK(
Z S
w
w ULSCRISL WORK
m PRUPUSI U USL 01 BUILDING
I HEREBY CERTIFY THAT I HAVE READ AND EXAMINED THIS APPLICA-
TIONZ LLGAL DL>('RIPIIUNUI PROPLRTY SHOWN BELOW OR AI IALH 1UUR COIlI51 AND KNOW THE SAME TO BE TRUE AND CORRECT ALL PROVI-
SIONS OF LAWS AND ORDINANCES GOVERNING TH15 TYPE OF WORK
LOI RLUCK Dr �V f C I��r�S WILL BE COMPLIED WITH WHETHER SPECIFIED HERIN OR NOT,THE
a GRANTING OF A PERMIT DOES NOT PRESUMETO GIVE AUTHORITYTO
w
VIOLATE OR CANCEL THE PROVISIONS OF ANY OTHER STATE OR
i TAX 10 NUMBER FROM PROPERTY TAX STATEMENT LOCAL LAW REGULATING CONSTRUCTION OFTHE PERFORMANCE OF
:E �S OVe e Lan e- CONSTRUCTION. PERMIT EXPIRES 1 YEAR FROM DATE OF ISSUANCE.
UO TUB AUURLct SIGNATURE OF CONTRACTOR OR AVIHORIZLDAGCNt DATE
(OPPICH LISR ONLY)
PLUMBING P_CIIA.NICAL
NO. TYPE OP PIXFURII ITIM a i FIXTURES NO. TYPE OP P,OUIPM13IT PEiR Wo PI TURES
ATIIR CLOSLT ILCIr M COND.UNITS—I I.P. VA. T W ,Bst••
]ATIITUB iCTRIOE RATION UNITS—11.P.BA. lqtdp.II.t-
-AVAT.00.Y ffASIT BASIN _ IOIUIRS—ILP.RA. ,ILK••
;I IOw[71 �� AS PIP nD A.C.UNITS—TONNAOIS 11A. r ti .Ila—
ITCIiBN SINK A DISPOSAL 1 S ORCIID AIR SYSTTIMS—B.T.U. MF-A y
1STIWASIIER aWALL IIMATQRS—B.T.U. M
/\UNDRY TRAY )NIT IIIIATP,RS—B.T.U. M V
I,OTTI[:SWASIIDR [ IVAPORATIVnCOOLM9 - • I
ATER 111IATFA LOT)!l5 D0.YF'AS
RINAL '�O` ENII'IL-ATION PAN
>RINKlNO FOUNTAIN OE llOOD COMMERCIAL
'LOOR DRAIN AIR HANDLINO UNIT— CPM s i'
ACUUM 11RITAKERS ! :TOVB (�
(OOV DRAINS—RAINLPADERS TrTAL PIRRPLACE h CI IIMNEY
'INK .nRVIC11—BAR In-C. ! A MTt IIRATER
AS rmNO up to S m 13.00 addni.w 1.75
-UguI mart Iht mutt be pro,lded
sun TO•rAL SUR TOTAL
r131MIT PMMIT
TOTAL P P E TOTAL 12II11
ARU7� 11ALX SFRLI.1 SL I BACK REAR YAR EIIBACK PLAN CIILCK NU BLR PLAN CHECK FEE
FEE RECEIPT
/NO,
�1 �1 LUT AREA VACANT SITE
v P,/ ' OYES ONO FEES VALUATION FEE
CONj). UCCUPANCYX,KUUP NO.Or DWELLING UNITS PLAN CHECKING VG
I NO.Or STORMS MAX.000. OAD
BU'LDING 1 J s
-
3� PLUMBING
I IRE SPRINKLERS REQUIRED
7 �
7) i O� ❑YES V]NO MECHANICAL
TS `b STATE BLDG.CODE �-
ENERGY CODE SURCHARGE J C
PENALTY SEC. 01114
RECEIV
ED WATER/SEWER FEES
. 1/FEB 2 B 2002 TOTAL
PERMIT VALIDATION
WHEN PROPERLY VALIDATED IIN THIS SPACE)THIS IS YOUR PERMIT IL RECEIPT
CITY OF ARLINGTON PAID CRM BY
.. cr/in kvr,! IF"A}JT TvrASITFIF'R tat nr. r,VnT O(!'tiSRJ(1(1TFIrtAI C1AR