HomeMy WebLinkAbout7721 EAGLEFIELD DR_BLD6486_2026 CITY OF ARLINGTON
18204 59th Avenue NE,Arlington,WA 98223
INSPECTIONS:360-403-3417-Permit Center:360-403-3551
BUILDING PERMIT
7721 EAGLEF[ELD DR Permit#:6486
Parcel#:00865900005800 PERMIT EXPIRES 180 DAYS AFTER
DATE OF ISSUANCE.
Scope of Work:240 sq ft addition bed/bath Valuation:40000.00
OWNER APPLICANT CONTRACTOR
ATKINS JEFFREY/LINDA Jeff Atkins HOME OWNER
7721 EAGLEFIELD DR 7721 Eaglefield Dr
ARLINGTON,WA 98223-5989 ARLINGTON
4254786415
I1c: EXP:
MECHANICAL CONTRACTOR PLUMBING CONTRACTOR
LIC#: EXP: LIC#: EXP:
JOB DESCRIPTION
PERMIT TYPE: RESIDENTIAL ADDITION CODE YEAR: 2021
STORIES: I CONST.TYPE: VA
DWELLINGUNITS: OCC GROUP: R-1;Residential
BUILDINGS: OCC LOAD:
PERMIT APPROVAL
The issuance or granting of this permit shall not be construed to be a permit for,or approval of,any violation of this Code or any
other ordinance or order of the City,of any state or federal law,or of any order,proclamation,guidance advice or decision of the
Governor of this State.To the extent the issuance or granting of this permit is interpreted to allow construction activity during any
period of time when such construction is prohibited or restricted by any state or federal law,or order,proclamation,guidance advice
or decision of the Governor of this State,this permit shall not authorize such work and shall not be valid The budding official is
authorized to prevent occupancy or use of a structure where in violation of this Code,any other City ordinances of this jurisdiction or
any other ordinance or executive order of the City,or of any state or federal law,or of any order,proclamation,guidance advice or
decision of the Governor.The building official is authorized to suspend or revoke this permit if it is determined to be issued in error or
on the basis of incorrect,inaccurate or incomplete information,or in violation of any City ordinance,regulation or order,state or
federal law,or any order,proclamation,guidance or decision of the Governor.
I AGREE TO COMPLY WITH CITY AND STATE LAWS REGULATING CONSTRUCTION AND IN DOING THE WORK
AUTHORIZED THEREBY;NO PERSON WILL BE EMPLOYED IN VIOLATION OF THE LABOR CODE OF THE
STATE OF WASHINGTON RELATING TO WORKMEN'S COMPENSATION INSURANCE AND RCW 1827,
THIS APPLICATION IS NOT A PERMIT UNTIL SIGNED BY THE BUILDING OFFICIAL OR HIS/HER DEPUTY AND
ALL FEES ARE PAID.
IT IS UNLAWFUL TO USE OR OCCUPY A BUILDING OR STRUCTURE UNTIL A FINAL INSPECTION HAS BEEN
MADE AND APPROVAL OR A CERTIFICATE OF OCCUPANCY HAS BEEN GRANTED. IBC110/IRC110=
SALES TAX NOTICE:Sales tax relating to construction and construction materials in the City of Arlington must be reported on
your sales tax return form and coded City of Arlington#3101.
'-5- z- 06/06/2025
Applicant Signature Date Building Official Date
CONDITIONS
Adhere to approved plans.Permit shall be onsite for inspections.Call for inspections.
The property owner shall ensure that the construction project complies with all applicable zoning codes and regulations.The property
owner shall also ensure that the construction project does not cause any adverse impact on the surrounding environment or
community.The property owner shall be responsible for obtaining all necessary permits and approvals from the relevant authorities
before commencing construction.The property owner shall ensure that the construction project complies with all applicable design
review requirements.
THIS PERMIT AUTHORIZES ONLY THE WORK NOTED.THIS PERMIT COVERS WORK TO BE DONE ON PRIVATE
PROPERTY ONLY.ANY CONSTRUCTION ON THE PUBLIC DOMAIN(CURBS,SIDEWALKS,DRIVEWAYS,
MARQUEES,ETC.)WILL REQUIRE SEPARATE PERMISSION.
PERMIT,FEES
Date Description Fee Amount
06/06/2025 Building Plan Review $529.65
06/06/2025 Credit Card Service $15.89
06/06/2025 Process!ng/Technology $25.00
06/06/2025 Building Permit $814.84
06/06/2025 State Surcharge-1 st DU $6.50
06/06/2025 Credit Card Service $25.39
Total Due: $1,417.27
Total Payment: $1,417.27
Balance Due: $0.00
CALL FOR INSPECTIONS
Call by 3:30 pm for next day inspection,allow 48 hours for Fire Inspections
When calling for an inspection please leave the following information:
Permit Number,Type of Inspection being requested,and whether you prefer morning or afternoon
INSPECTION INFORMATION Pass/Fait
i
RESIDENTIAL BUILDING PERMIT APPLICATION
` Community and Economic Development
City of Arlington• 18204 59th Ave NE•Arlington,WA 98223 • Phone(360) 403-3551
The following information is required for Residential: Single Family, Duplex, Townhomes,Additions, and
Accessory Structure Building Permit Applications.
Mark each box to designate that the information has been provided. Please submit this checklist as part of
the submittal documents.
EACH BUILDING OR STRUCTURE REQUIRES A SEPARATE SUBMITTAL.
Incomplete applications will not be accepted.
SUBMIT ELECTRONIC FILES FOR EACH OF THE FOLLOWING:
REQUIRED DOCUMENTS
0 Proof of approved Zoning Verification
0 City of Arlington Residential Permit Application
0 Site Plan
0 Architectural Plans
0 Structural Plans
0 Structural Calculations
❑ Project Specification Manuals, if applicable
❑ WSEC Compliance Forms https:llwaenergycodes.com/
❑ Special Inspection and Testing Agreement, if applicable
❑ Deferred Submittal Request,if applicable
1. Plan Review fee is due at time of submittal and remaining balance will be due at time of issuance.
2. The City of Arlington does not review or inspect electrical systems. Contact Labor and Industries at
lni.wa.gov or 360-416-3000.
A. DEFERRED SUBMITTALS
If the project requires any of the following,a Deferred Submittal Request MUST be completed.Deferred submittals
require separate applications,plans and plan review.
1. Mechanical Plans (if not included in the plan set)
2. Plumbing Plans(if not included in the plan set)
3. Fire Sprinkler
B. SPECIAL INSPECTION AND TESTING AGREEMENT
A Special Inspection Firm is required to perform special inspections for the following type of work.
*The Special Inspection and Testing Agreement MUST be submitted with the Building Application.
❑Structural Masonry ❑Spray-Applied Fireproofing Other-Specify:
0 !acknowledge that all items designated as submittal requirements must accompany my Building Permit
Application to be considered a complete submittal.
RESIDENTIAL BUILDING
Type Of Permit: ❑Single-family ❑ Duplex ❑Townhouse 0 Addition/Alteration ❑Accessory Structure
IBC Construction Type: V IBC Occupancy Type: Residential
Building Square Footage: Number of Stories:
Square Footage Per Floor: B: 1st: 2nd: 3rd: Garage:
Property Address: 7721 Eaglefield Dr Project Valuation: 40,000
Lot#: 58 Parcel ID No.: 00865900005800 Preferred Contact: 71 Owner O Contractor
Project 240 sq ft addition bed/bath
Scope of Work:
Owner Name: Jeff and Michelle Atkins Home No.: 425-478-6415
Email Address:
atkii913@gmail.com Cell No.: same
Mailing Address: 7721 Eaglefield Dr City: Arlington State: WA Zip: 98223
Primary contractor: Cordell Construction & Property Managent Office No.:
Email Address: cordellcpm@gmail.com Cell No.: 425-770-3540
Mailing Address: City: State: Zip:
L&I Contractor License Number: Expiration Date:
MECHANICAL SYSTEM INFORMATION O Not Applicable
Type of Permit: ❑ New Installation 71 Addition/Alteration/Repair ❑ Gas Piping
Mechanical Contractor: Self Office No.:
Email Address: Cell No.:
Mailing Address: City: State: Zip:
L&I Contractor License Number: Expiration Date:
• New gas piping requires a pressure test hooking to any appliance
• Sediment traps (drips) are required on all gas lines
• Gas lines are required to be supported/secured every 6 to 8 feet
• Proper Combustion air and venting required for all appliances
• A shut-off valve is required within 6 feet of all appliances
REV03.2022 Page 2 of 6
RESIDENTIAL BUILDING
MECHANICAL PERMIT FEES (per unit)
Type of Fixture No.of Units Cost per Unit Subtotal Model No.
Additional Plan Review fees x $75.00 =
Air Cond.Unit<_100Btu h x $ 15.00 =
Air Cond.Unit>100Btu h x $25.00 =
Air Cond.Unit>500Btu h x $50.00 =
Air Handling Units x $ 15.00 =
Base Mechanical Fee 1 x $25.00 = $ 25.00
Boiler<100Btu h>3h x $ 15.00 =
Boiler>1 million Btu/h<50hp x $25.00 =
Boiler>1.5 million Btu/h<50hp x $50.00 =
Boiler>100Btu h 3-15h x $ 15.00 =
Boiler>500Btu h 15-30hp x $25.00 =
Diffusers x $ 15.00 =
Dryer Ducting x $ 15.00 =
Ductwork(drawings required) x $25.00 =
Evaporative Coolers x $ 15.00 =
Exhaust Ventilation Fans x $ 15.00 =
Fireplace/Insert/Stove x $ 15.00 =
Forced Air Heat<_100 Btu h x $ 15.00 =
Forced Air Heat>100 Btu h x $25.00 =
Gas Clothes Dryer x $ 15.00 =
Gas Fired AC<_100 Btu h x $ 15.00 =
Gas Fired AC>100 Btu h x $25.00 =
Gas Fired AC>500 Btu h x $50.00 =
Gas Pi in <_5 units x $ 15.00 =
Gas Piping>5 units(plus<5 units x $2.00 =
Heat Exchangers x $ 15.00 =
Heat Pump-Condensing Unit x $25.00 =
Hot Water Heat Coils x $ 15.00 =
Miscellaneous Appliance-regulated by x $ 15.00 =
mechanical code,not otherwise specified
Pkg.Units<_100btu x $25.00 =
Pkg.Units>100btu x $50.00 =
Range/Cook top-Gas Fired x $ 15.00 =
Refrigeration Unit<_100Btu h x $ 15.00 =
Refrigeration Unit>100Btu h x $25.00 =
Refrigeration.Unit>500Btu h x $50.00 =
Re-inspection fee x $75.00 =
Residential Range Hood x $ 15.00 =
Unit Heaters:5 100 Btu h x $ 15.00 =
Unit Heaters>100 Btu h x $25.00 =
AV Boxes(Variable Air Volume,part of air x $ 10.00 =
conditioning system)
Wall Heaters-Gas Fired x $25.00 =
Water Heater-Gas Fired x $25.00 =
Permit Fee
Inspection Fee $75.00
Processing/Technology Fee $25.00
Total
REV03.2022 Page 3 of 6
RESIDENTIAL BUILDING
GAS PIPING INFORMATION El Not Applicable
Proposed Piping Material: O CSST O Brass O Galvanized Steel O Black Steel O Other
Proposed Piping Size: O 1/2" O S/a" 03/a" O 1" O 11/2" O 2"
Distance from Meter to furthest Appliance: Total BTU's of all Appliances:
PRESSURE PIPING SCHEMATIC
COMPLETE FOR GAS PIPING ONLY- USE A SEPARATE SHEET, IF NECESSARY
❑ SCHEMATIC IS TO SCALE ❑ SCHEMATIC NOT TO SCALE
Show Pipe Size(s) and Length(s) from meter to all appliances
NOTE:Any interior pressure regulators must be indicated
REV03.2022 Page 4 of 6
RESIDENTIAL BUILDING
PLUMBING SYSTEM INFORMATION ❑ Not Applicable
Type of Permit: ❑ New Installation ✓❑ Addition/Alteration/Repair
Plumbing Contractor: self Office No.:
Email Address: Cell No.:
Mailing Address: City: State: Zip:
L&I Contractor License Number: Expiration Date:
• All hose bibs required to be equipped with Atmospheric Vacuum Breakers per ASSE 1019
• All water supplies at 80psi or greater shall have Pressure Reducing Valves (PRV)
• Cross-Connection-Control may be required
Proposed Interior Water Piping Size: O 1/2" ❑ 5/8" ❑ 3/4" ❑ 1"
❑ CPVC ❑ Brass ❑ PEX-AL-PEX 0 PEX
Proposed Interior Piping Material:
❑ Copper ❑ Galvanized Steel ❑ Other
Proposed Exterior Water Piping Size: O 1/2" ❑ 5/8" ❑ 3/4" ❑ 1" ❑ 11/2" ❑ 2"
❑ PVC ❑ Copper ❑ PEX-AL-PEX ❑ PEX-AL-PE
Proposed Exterior Piping Material:
❑ PE 0 PEX ❑ Other
Proposed Drain-Waste-Vent(DWV) 0 Schedule 40 ABS DWV ❑ Copper ❑ Galvanized Steel ❑ Cast Iron
Material:
❑ Schedule 40 PVC DWV ❑ Brass ❑ Other:
Proposed Drain-Waste-Vent (DWV) ❑ 1/2» ❑ 5/8» 713/4" ❑ 1" ❑ 11/2" ❑ 2" ❑ 3" 714"
Piping Size:
PLUMBING PERMIT FEES (per fixture)
Type of Fixture No.of Fixtures Cost per Fixture Subtotal
Additional Plan Review fees x $75.00 =
Alteration/repair piping x $15.00 =
Backflow Assembly x $25.00 =
Base Plumbing Fee 1 x $25.00 = $25.00
Bath Shower Combo x $15.00 =
Building Main Waste x $25.00 =
Clothes Washer x $15.00 =
Dishwasher x $15.00 =
Floor Drains x $15.00 =
Grease Interceptor x $75.00 =
Grease Trap x $25.00 =
Hose Bibb x $ 15.00 =
REV03.2022 Page 5 of 6
RESIDENTIAL BUILDING
PLUMBING PERMIT FEES (per fixture)
Icemaker Refri erator x $ 15.00 =
Irrigation-per meter x $25.00 =
Kitchen Sink&Disposal x $ 15.00 =
Laundry Tray x $ 15.00 =
Lavatory x $ 15.00 =
Miscellaneous-regulated by plumbing code,not x $15.00 =
otherwise specified
Re-inspection Fee x $75.00 =
Roof Drains x $15.00 =
Shower(only) x $15.00 =
Sink bar,service,etc. x $15.00 =
Toilets x $ 15.00 =
Urinal x $ 15.00 =
Vacuum Breakers x $25.00 =
Water Heater x $25.00 =
MODEL NO.:
Water Heater-Tankless x $25.00 =
MODEL NO.:
Permit Fee
Inspection Fee $75.00
Processing/Technology Fee $25.00
Total
1 hereby certify that 1 am the 0 Owner ❑ Architect ❑ Engineer ❑ Contractor and authorized to sign this
application and that the above information is correct and construction on, and the occupancy and the use of the above-
described property will be in accordance with the laws, rules and regulation of the State of Washington, and the City of
Arlington.
Jeffrey Y Atkins 5/9/2025
Signature Print Name Date
SAVE PRINT
REV03.2022 Page 6 of 6
+`
*�� • �� T:. T� �' � STAG E ' S J
ARLINGTON WAS
�.• �� A.
DESIGN NOTES:
' B. STRUCTURAL REQUIREMENTS
Design Wind Speed: Exposure C, 85-100 miles per hour
Roof Snow Load: 25 pounds per square foot DRAW
— Dead Snow Load: 10 pounds per square foot
Seismic Zone: D1
Climate Zone: 4-C
Rainfall: 2 inches per hour for roof drainage design.
Frost Line Depth: 18 in ches
Soil Bearing Capacity: 1,500 psf. unless a Geo-Technical Report is Sheet Al
PROJECT INFO :
.� PARCEL: 00865900005800 sheetA2
Sheet A3
DESCRIPTION : Section 23 Township31
Sheet A4
,•y ~ • - Range 05 Quarter NE GLENEAGLE
SECTOR III A BILK 000 D-00 LOT 58 Sheet A5
" EXISTING IMPERVIOUS : SheetA6
HOUSE AND GARAGE : 1505
Sheet A7
�=" ' •��• v �� PATIO : 516
M ,
O PROPOSED ADDITION : 240 Sheet A8
TOTAL: 2261 Sheet A9
LOT SIZE : 9583
SITE PHOTO Sheet A10
,lorth County Recycling O DYA SYSTEMS O Crazy Dog Man O
&Transfer Station - r 9 Pet Services _
Cuz concrete O — a
Momentum Vans O Products,Inc AVR O 4 5 Sheet All
Advanced Spa Co rs a p„e Sheet A 12
NQ SSpaICavaersl O R+L Carriers
192ne St NE O 4
9 agle Ballpark O
Sheet A13
O
198th St NE - Travel Time O
of Everett,Inc — Byrne Performing Sheet A 14
Smokey Point O ircur •u,- rts Center
Productions -
Bill Quake 9 s d
Memorial Park a �keo1
mod" Silver FOX Tactical O g •q Epd \
Qg \
p 9
Arlington
Municipal
Airport - -
(AWO) ^ $p e.W.rtte tx
ao„eetn Forest
Trail Park
Gleneagle Golf Course-® Yt \
`-twhW \Snohomish county Fir
_ 9 \District 21,Station 5
Tex Lake Q
;. S �Mtry CNA� m m
Pick-n-Pull
t -
1-
•
• � T
7
-� ;r
♦ �_
SITE PLAN
Scale:<Scale>
Structure Electrical
-Exterior/interior walls will be 2x4 -Ceiling fan in bedroom
hem/fir -Bathroom lighting will be i
-Header on exterior and shear lights wet/damp approved
walls will be 4x6 over windows and -2 or 3 bulb vanity light
doors. -GFCI outlet near vanity
-Ceiling framing will be 2x4 -Add 20 amp breaker for E
hem/fir with 2x4 rim joist -Add 20 amp breaker for a
outlets.
Roofing PLUMBING
-50 year architectural composition -Supply lines will be PEX E
-30# felt fittings
-7/16" OSB -Drain runs will be ABS or
-Shower will use mixer val
SLAB
-top of slab is 6" above grade
-slab 4" thick
-option for monolithic slab with turn down footing
-air freezing index > 1500 per TABLE R403.3(2)
FI R_
I � �
r
gill
k LI
jEr
ff
35' 4"
25' 5"
ADDITION 10,
43'
_ 6068 OX SGD
M 1/2 BATH
2030 SH 2O30 SH
O O O
= EXISTING HOME
N �
M
� M
N N
M LAUNDRY
3068 BD
rl
N
O x
N 0
Tt
0
a
N
N xo
po 0
M o
a
N
F)=-
12' GARAGE 81611
N
N
M
C
16'
221611
38'-4 7/8
rl
20'-0"
1
WEST ELEVATION WITH EXISTING NORTH ELEVATION WITI
SCALE 3/ 16" = 1' SCALE 3/ 16" _
a ❑ ❑
NORTHWEST ELEVATION WITH EXISTING SOUTH ELEVATION W]
SCALE 1:32 SCALE 3/ 16"
CF/L
CL EF
CL
VL
IN
TOP VIEW
SCALE 1/2" = 1' CF/L = CEILING FAN/LIGHT
EF = EXHAUST FAN/LIGHT/HEATER
E = EXHAUST
L = LIGHT
H = HEATER
VL = VANITY LIGHT
CL = CANLESS LIGHTS
2X4 CEILING FRAMING
@ 24" O.C.
W/ R-13 INSULATION
NORTHWEST FRAMING ELEVATION
SCALE 1:20
4X6 HEADER
2X4 STUDS @ 16" O.C.
W/ R-13 INSULATION
8" J BOLTS 36" > SPACING
12" > FROM DOOR WAYS
io
2X4 PT SOLE PLATE
OVER ADHESIVE VAPOR BARRIER
12'-0"
io
SOUTH ELEVATION 1'-0"
SCALE 3/ 16" = 1'
1/2" SHEETROCK
2X4 STUD/R13 INSULATION
7/16" OSB
TYVEK (OR EQUIVELENT) VAPOR BARRIER
4 1-k)�64"
M
N
M
5/8' C
M ..
rn
N
M
5
4A WELDED MESH REINFORCEMENT
1° ; #4 1/2" REBAR 5
r
EXISTING WALL
rl
APPROX LOCATION OF BORE THROUGH THE EXISTING STEM WALL
GOING FROM EXISTING BATHROOM ADDITION
r. - ------------
SOUTH ELEVATION
� e
0 1/4 1
�v v
TOP VIEV
- - - - SCALE 1/
r,'
0
2X8 RIDGE BOARD
2X4 COMMON RAFTERS
2X4 JACK RAFTERS
2X6 HIP RAFTER II
CONNECTION WILL BE SIMPSON RAFTER TIES
AFFIDAVIT IN LIEU OF CONTRACTOR
REGISTRATION
Community and Economic Development
City of Arlington• 18204 59th Ave NE•Arlington,WA 98223 • Phone(360)403-3551
We would like to advise you of the State of Washington's requirement for acting as your own contractor.As the owner of
the structure,whether residential or commercial or multi-family,you are allowed to act as your own general contractor.
As the owner,if you decide to act as a contractor,you will need to complete this form.
4?_ g& states as follows:
Name and Project Address el
1. I have made application for a building permit from the City of Arlington,Washington.
2. I understand that state law requires that all building construction contractors be registered with the State of
Washington.The exemptions to this requirement are stated under Section 18.27.090 of the Revised Code
Washington,a copy of which is printed on the reverse side of this Affidavit.I have read or am familiar with RCW
18.27.090.
3. 1 acknowledge that all construction work done pursuant to the proposed building permit for the property
described above will be done by the owner of the property or by a licensed contractor.
4. 1 understand that prior to issuance of a building permit for work which is to be done by any contractor,the City
of Arlington must verify that the contractor is registered by the State of Washington,or that one of the
exemptions stated under RCW 18.27.090 applies.
S. In order to provide verification to the City of Arlington of my compliance with these requirements,I hereby attest
that after reading the exemptions from the registration requirement of RCW 18.27.090,1 consider the work
authorized under this building permit to be exempt under No. This will therefore,not be
performed by a registered contractor.
I understand that I may be waiving certain rights that I might otherwise have under state law in any decision to engage an
unregistered contractor or to perform construction work myself.
DATED THIS t015 day of, 2025
Signature:
This record was acknowledged before me on kk&m by
(d te)
�e�� �t�r,,►�S as DWNtV- of Q
(name) (type of authority) tname Sf party/cofnpany)
1 .
� a� MJO fit
`��`�`\`N����ttttt���� //
(` q,�tA /�� 4 '
ry blic for the of Washington
rptAlQ)_ � 0 My Commission Expires:
o ZyA y
/,j '9T l'��►ttta.��`' \?
�llll'F OF \N AS?�,�I
REV2022
STAGE ' S ADDITION
ARLINGTON WASHINGTON
C
DESIGN NOTES:
B. STRUCTURAL REQUIREMENTS
Design Wind Speed: Exposure C, 85-100 miles per hour
Roof Snow Load: 25 pounds per square foot DRAWING INDEX
- Dead Snow Load: 10 pounds per square foot
Seismic Zone: D1
Climate Zone: 4-C
Rainfall: 2 inches per hour for roof drainage design. Sheet # Sheet Name
Frost Line Depth: 18 in ches
' + Soil Bearing Capacity: 1,500 psf. unless a Geo-Technical Report is
- Sheet Al COVER PAGE
. r r
PROJECT INFO
Sheet A2 SITE PLAN
PARCEL: 00865900005800
Sheet A3 NOTES
DESCRIPTION : Section 23 Township 31 0 N
00
Range 05 Quarter NE GLENEAGLE Sheet ELEVATIONS
;. 0
J .; SECTOR III A BILK 000 D-00 LOT 58 Sheet A5 FLOOR PLAN J a
Uj
EXISTING IMPERVIOUS : SheetA6 ADDITION ELEVATIONS ~
HOUSE AND GARAGE : 1505 SheetA7 ELECTRICAL Q LU z
4' PATIO : 516 J
M� Q 0
Sheet A8 STRUCTURE
PROPOSED ADDITION : 240 TOTAL. 2261 Sheet A9 WALL CUTAWAY/SLAB L Q w
LOT SIZE : 9583 U Z
SITE PHOTO Sheet A10 SLAB OPTION Q9 /T-a-i� H
,lorth County Recycling O DYA SYSTEMS O Crazy Dog Man O, < ttttttttttttttti
&Transfer Station _ r Pet Services
Cuz concrete - Sheet All PLUMBING 1//.�►`/
Momentum Vans O Products,Inc AVR O 4 5 A
a Advanced Spa Co rs Sheet Al2 PLUMBING 1
NQ �Wp.,l ae`r'st O R+I_Camers ��
192ne St NE 4
9 agle Ballpark O
Sheet A13 MECHANICAL COVER PAGE
; O
198ta St NE - Travel Time O Sheet A14 ROOFING
of Everett,Inc _ — Byrne Performing
Smokey Point O trcur •u,- rts Center m - 1 O F 14
Productions -
Bill 4uake d
Memorial Park
a �kte�i
Silver Fox Tactical o PSI E.a ` City of Arlington
Building Department
Arlington a M 2025
Municipal €� Y 23r
Airport APPROVED
(AWO) ^ $p e.W.rtte tx
Forest Kevin Olander - 06/06/2025
Trail Park
Gleneagle Golf Course
\
,waWNE v District 21,Slatiotation 5
Snohomishcounty nr No changes authorized unless approved by
9 \
Tex Lake o the Building Official
y_ aonay cam°t m
Pick-n-Pull
City of Arlington
Building Department
APPROVED
Kevin Olander - 06/06/2025
SITE PLAN No changes authorized unless approved by
Scale:<Scale> the Building Official
Structure Electrical
-Exterior/interior walls will be 2x4 -Ceiling fan in bedroom
hem/fir -Bathroom lighting will be can/canless
-Header on exterior and shear lights wet/damp approved
walls will be 4x6 over windows and -2 or 3 bulb vanity light
doors. -GFCI outlet near vanity
-Ceiling framing will be 2x4 -Add 20 amp breaker for EF (L/H/E)
hem/fir with 2x4 rim joist -Add 20 amp breaker for addition lights and
outlets.
M
DC N
z Q N
00
O Q M
� J
Roofing PLUMBING ~ W Q
-30 year architectural composition LL
Y p -Supply lines will be PEX B with crimp Q L.L
-30# felt fittings Q LU z
-7/16 Q OSB -Drain runs will be ABS or PVC as needed 0
-Shower will use mixer valve shower fixture
W
w z
(D
Q N J
� r--, �
SLAB
Q
-top of slab is 6" above grade City of Arlington
-slab 4" thick Building Department NOTES
-option for monolithic slab with turn down footing APPROVED
-air freezing index > 1500 per TABLE R403.3(2) Kevin Olander - 06/06/2025 3 OF 14
No changes authorized unless approved by
the Building Official May 23, 2025
- --_-
i
rN
z
SOUTH WEST 00
O 0 0)
W_
0 L
x 0 LU
(D
- � Q
C) r-s Q
EAST N O RT H
ELEVATIONS
City of Arlington 4 OF 14
Building Department
APPROVED
Kevin Olander - 06/06/2025 May 23, 2025
No changes authorized unless approved by
the Building Official
35' 4"
25' 5"
ADDITION 10,
43'
_ 6068 OX SGD
M 1/2 BATH
2030 SH 2O30 SH
00 0o O
= EXISTING HOME
N c
0 N
M
N N Add CO/ Smoke z
LAUNDRY 00
3068 BD Detector
rl
N 0
O X n W a
N o N
Q LL 5
Add CO/Smoke Q w z
Detector J
O
rn
N G V
po o ( /'1
M VJ , ^
w
w z
(D
Q N J
12' N � �
GARAGE 81611 Q
N 12'
City of Arlington FLOOR PLAN
N Building Department
M APPROVED
Kevin Olander- 06/06/2025 5 OF 14
No changes authorized unless approved by
the Building Official
1 FLOOR PLAN May 23, 2025
Scale:3/i6=1'
16'
221611
38'-4 7/8
20'-01' N
12'-011 N
WEST ELEVATION WITH EXISTING NORTH ELEVATI N WITH EXISTI G Z pp
SCALE 3/ 16" = 1' SCALE 3/ 16" = 1' Q 0 a1
w_ Q
0 LL
� J Z
QUO
� Q �
w �
w z
❑ ❑ Q N J
ADDITION
ELEVATIONS
6 OF 14
NORTHWEST ELEVATION WITH EXISTING SOUTH ELEVATION WITH EXISTING May 23, 2025
SCALE 1:32 SCALE 3/ 16" = 1' City of Arlington
Building Department
APPROVED
Kevin Olander-06/06/2025
No changes authorized unless approved by
the Building Official
119 1E
CF/L
N
CL EF
CL 0oC N
Z p N
Add CO/Smoke 00
detector O 0 M
V L LJU Q
LL
�
J Z
Q (JO
� QF---
w
w z
CD ,--i
,oz
Q N J
TOP VIEW N 0�
SCALE 1/2" = 1' CF/L = CEILING FAN/LIGHT City of Arlington Q
EF = EXHAUST FAN/LIGHT/HEATER Building Department
E = EXHAUST APPROVED ELECTRICAL
L = LIGHT Kevin Olander - 06/06/2025
H = HEATER 7 OF 14
VL = VANITY LIGHT No changes authorized unless approved by
CL = CANLESS LIGHTS the Building Official
May 23, 2025
2X4 CEILING FRAMING
@ 24" O.C.
W/ R-13 INSULATION
M
NORTHWEST FRAMING ELEVATION N
SCALE 1:20 z Q N
00
O 0 0)
4X6 HEADER
I--I w
2X4 STUDS @ 16" O.C. 3:
W/ R-13 INSULATION LL
0 w
Jz
QUO
IYM�4H _� Q W
8" J BOLTS 36" > SPACING H
12" > FROM DOOR WAYS N �JI L ill 11 /
2X4 PT SOLE PLATE I �1
OVER ADHESIVE VAPOR BARRIER
12'-0"
io
STRUCTURE
SOUTH ELEVATION 1'-0" City of Arlington
Building Department 8 OF 14
SCALE 3/ 16 = 11 APPROVED
Kevin Olander - 06/06/2025 May 23, 2025
No changes authorized unless approved by
the Building Official
1/2" SHEETROCK
Si
2X4 STUD/R13 INSULATION 2x6 wall required
R 20 insulation in wall
7/16" OSB R 5 exterior
TYVEK (OR EQUIVELENT) VAPOR BARRIER
oC N
z � N
00
O D 0)
� J Q
w_
0 LL
owz
QJO
� Q C�
w
w z
Q N J
41/64
c� V
WALL
4x4 WELDED MESH REINFORCEMENT CUTAWAY/ SL
City of Arlington
Building Department 9 OF 14
APPROVED #4 1/2" REBAR May 23, 2025
Kevin Olander - 06/06/2025 5/8„
No changes authorized unless approved by SLAB DETAILS
the Building Official M
S
4x4 WELDED MESH REINFORCEMENT
IL
000,
#4 1/2" REBAR
M
DC N
R-10Insulation z 0 N
required from top of 00
slab to bottom of o 0
footing � w
I--I
0 LL
owz
aJo
(J) Q �
w
w z
CD q
Q N J
(� Q
City of Arlington
Building Department SLAB OPTION
APPROVED
Kevin Olander - 06/06/2025 10 OF 14
No changes authorized unless approved by May 23, 2025
the Building Official
i
VENT PIPE
TO END OF
RUN
M
oC cv
z000
O
0
• _!2' PE X Q I I--I J
w Q
I--I I--I
LL
1/2" PIEx B 0 LU z
Q J O
TOILET
Ul Q �
DELETE P-TRAP Eu LW
_ (D
Q N J
LONG TURN TEE WYE p�
112~ PEx a
FITTING U) r--s Q
- SAN TEE
112• PExe SAN TEE SINK PLUMBING
DRAIN 11 OF 14
POSSIBLE 3" TO MATCH EXISTING
1/2" PEX B City of Arlington
Building Department May 23, 2025
SHOWER DRAIN APPROVED
SHOWER P-TRAP Kevin Olander - 06/06/2025
No changes authorized unless approved by
the Building Official
EXISTING WALL
rl
DC N
Z 0 N
00
O 0 0)
W_ Q
0 LL
0 J Z
Q (JO
APPROX LOCATION OF BORE THROUGH THE EXISTING STEM WALL FOR DRAIN PLUMBING Ln Q
GOING FROM EXISTING BATHROOM ADDITION ju LLJ
(D
Q N J
City of Arlington
Building Department PLUMBING
APPROVED
Kevin Olander - 06/06/2025 CONT
12 OF 14
No changes authorized unless approved by
the Building Official May 23, 2025
r.
IAi•-
( )
L sir
V "+ SOUTH ELEVATION N
1 4„ _ 1 , z 0 N
o / 00
00
�v � wQ
0 LL
o Jz
QUO
ur) Q �
w w
(D
Q N J
TOP VIEW
- - - - � SCALE 1/2" = 1'
MECHANICAL
City of Arlington
Building Department 13 OF 14
APPROVED
�Y
Kevin Olander - 06/06/2025
No changes authorized unless approved by May 23, 2025
the Building Official
C
II■I■I■III■I■I■I■I■I■I■II
II■I■I�III■II \I■I■I■I■II
II■I■I�IIII \I■I■I■II �"`
II�II�I►' \I�I�II
Z
Q
JL,
N
S O
C O �LL ,
EZZ86 VM NOIE) NI-1'*dV o
- � - NOIIIC] ad S ,DE)V-LS
T
�L L
o
0
C d Cfl a
m
� W Q T O
-TE
a� C7
D 0
cd To
as
a,
CO
N10
p o
z O
w
E:l VO4
'z
tD
00
w
O
zEn
M vl
1--I
X
W
0
Ln
o
t C) m O -
N ' w zo
*� n
O o QU
QD Q
T:
Lo
= o
a Z
ou5
0
N
119 I£ o
o �
m
O`
O
Z Qo
O n �
~ HS 0£OZ OX ObOb XO ObObC)
-
1
Q �-- oz
y i
„zElcT T
„9T/L Z ,ZT
1
City of Arlington
` Building Department
APPROVED
`k o Kevin Olander - 06/25/2025
No changes authorized unless approved by
the Building Official
� r
i
I
I
i
Lop
i
Job Truss Truss Type Qty Ply I Chinook Lumber Inc
J1185779 A01 California Girder 1 1
Job Reference(optional)
The Truss Company,Burlington,WA,98233,Tamara Klein Run:25.10 S Jun 12 2025 Print:25.1.0 S Jun 12 2025 MiTek Industries,Inc.Mon Jul 14 09:21:04 Page:1
I D:hKiksNyKT2DnV90CK5XCy8yyA73-QTW L6?KPVfPbW VHCsRyU?438gx53oTM3FgSXtzyy9yF
8-0-0 12-1-1
1,-1-6-01, 4-1-12 1, 7-10-15 12-0-0 15-10-4 20-0-0 .21-6-0
1-6-0 4-1-12 3-9-3 4-0-0 3-9-3 4-1-12 1-6-0
0-1-1 0-1-1
5x10�
8x10� City of Arlington
C 12 21 Building Department
tO 5 F 4 8 19 2 5 APPROVED
n M 0 Kevin Olander-07/30/2025
3x4 T2 3x4c
No changes authorized unless approved by
3 622 the Building Official
v v
N M c7 1 1
v
2 7 23
0-4-11-- 11700 nn 1 111 8
191 24 12 25 11 26 27 28 10 29 9 30
&12c 2x4ii 4x4= 4x8= 2x4ii 5x12c
NAILED NAILED LUS24 NAILED NAILED NAILED LUS24 NAILED NAILED
4-1-12 7-1-4 12-10-12 15-10-4 20-0-0
Scale=1:53.2 4-1-12 2-11-8 5-9-8 2-11-8 4-1-12
Plate Offsets(X,Y): [2:0-4-3,0-3-0],[7:0-4-3,0-3-0]
Loading (psf) Spacing 2-0-0 CSI DEFL in (loc) I/defl Ud PLATES GRIP
TCLL 25.0 Plate Grip DOL 1.15 TC 0.78 Vert(LL) -0.25 10-11 >953 240 MT20 185/148
(Roof Snow=25.0) Lumber DOL 1.15 BC 0.77 Vert(CT) -0.34 10-11 >698 180
TCDL 8.0 Rep Stress Incr NO WB 0.37 Horz(CT) 0.10 7 n/a n/a
BCLL 0.0* Code IRC2021/TP12014 Matrix-MS
BCDL 7.0 Weight:107 lb FT=20%
LUMBER 2) TCLL:ASCE 7-16;Pf=25.0 psf(Lum DOL=1.15 Plate Vert:12=-35(F),9=-35(F),18=-538,19=-293,
TOP CHORD 2x4 HF-N No.1/No.2*Except*T2:2x6 DF SS DOL=1.15);Is=1.0;Rough Cat B;Partially Exp.; 20=-538,24=-180(F),25=-641 (F),26=-78(F),
BOT CHORD 2x6 DF SS Ce=1.0;Cs=1.00;Ct=1.10 27=-82(F),28=-78(F),29=-641 (F),30=-180(F)
WEBS 2x4 DF Stud 3) Unbalanced snow loads have been considered for this
design.
BRACING
TOP CHORD Structural wood sheathing directly applied or 4) This truss has been designed for greater of min roof live
oc purlins,except load of 16.0 psf or 1.00 times flat roof load of 25.0 psf on
1-ruct 10-oc purlins(2-10-9 max.):4 overhangs non-concurrent with other live loads.
2- -5.
BOT CHORD Rigid ceiling directly applied or -5. oc 5) Provide adequate drainage to prevent water ponding.
racing. 6) This truss has been designed for a 10.0 psf bottom
chord live load nonconcurrent with any other live loads.
MiTek recommends that Stabilizers and 7) *This truss has been designed for a live load of 20.Opsf
required cross bracing be installed during on the bottom chord in all areas where a rectangle
truss erection,in accordance with Stabilizer 3-06-00 tall by 2-00-00 wide will fit between the bottom
Installation guide. chord and any other members.
REACTIONS (lb/size) 2=2558/0-5-8,(min.0-4-12), 8) All bearings are assumed to be HF No.2.
7=2558/0-5-8,(min.0-4-12) 9) Provide mechanical connection(by others)of truss to
Max Horiz 2=41(LC 49) bearing plate capable of withstanding 240 lb uplift at joint
Max Uplift 2=-240(LC 10),7=-237(LC 11) 2 and 237 lb uplift at joint 7.
Max Graft 2=2901 (LC 31),7=2904(LC 31) 10)Graphical purlin representation does not depict the size
or the orientation of the purlin along the top and/or
FORCES (lb)-Max.Comp./Max.Ten.-All forces 250 bottom chord.
(lb)or less except when shown. 11) Use Simpson Strong-Tie LUS24(4-10d Girder,2-10d
TOP CHORD 2-3=-6283/524,3-4=-5719/480, Truss,Single Ply Girder)or equivalent spaced at 7-10-8
4-18=-5129/439,18-19=-5128/439, oc max.starting at 6-0-12 from the left end to 13-11-4 to
19-20=-5127/439,20-21=-5125/439, connect truss(es)JG01 (1 ply 2x4 HF-N)to front face of
5-21=-5125/439,5-6=-5581/461, bottom chord.
6-22=-6174/515,7-22=-6272/509 12)Fill all nail holes where hanger is in contact with lumber.
BOT CHORD 2-24=-477/5755,12-24=-477/5755, 13)"NAILED"indicates 3-10d(0.148"x3")or 3-12d
12-25=-477/5755,11-25=-477/5755, (0.148"x3.25')toe-nails per NDS guidlines.
11-26=-411/5223,26-27=-411/5223, 14)Hanger(s)or other connection device(s)shall be
27-28=-411/5223,10-28=-411/5223, provided sufficient to support concentrated load(s)637 lb
10-29=-427/5742,9-29=-427/5742, down and 135 lb up at 7-11-11,and 358 lb down and 59
9-30=-427/5742,7-30=-427/5742 lb up at 10-0-0,and 637 lb down and 134 lb up at
WEBS 3-12=-23/365,3-11=-485/74,4-11=-1 2/928, 12-0-5 on top chord. The design/selection of such
4-10=-256/53,5-10=-19/1121,6-10=-707/92, connection device(s)is the responsibility of others.
6-9=-22/342 15)In the LOAD CASE(S)section,loads applied to the face
NOTES of the truss are noted as front(F)or back(B).
1) Wind:ASCE 7-16;Vult=110mph(3-second gust) LOAD CASE(S) Standard
Vasd=87mph;TCDL=4.8psf;BCDL=4.2psf;h=25ft;Cat. 1) Dead+Snow(balanced):Lumber Increase=1.15,Plate
11;Exp B;Enclosed;MWFRS(envelope)exterior zone; Increase=1.15
cantilever left and right exposed;end vertical left and Uniform Loads(lb/ft)
right exposed;Lumber DOL=1.60 plate grip DOL=1.60 Vert:1-4=-66,4-5=-66,5-8=-66,2-7=-14
Concentrated Loads(lb)
Job Truss Truss Type Qty Ply I Chinook Lumber Inc
J1185779 A02 Common 2 1
Job Reference(optional)
The Truss Company,Burlington,WA,98233,Tamara Klein Run:25.10 S Jun 12 2025 Print:25.1.0 S Jun 12 2025 MiTek Industries,Inc.Mon Jul 14 09:21:05 Page:1
ID:OFIWzo3c66UMii97vgYMFyyA6v-r2BTk1 MHnan9NzOnYZVBdihmn997?prVxehCTuyy9yC
1,-1-6-0 1, 5-3-14 10-0-0 14-8-2 20-0-0 [21-6-0
1-6-0 5-3-14 4-8-2 4-8-2 5-3-14 1-6-0
4x6=
12 4
5 r City of Arlington
Building Department
2X4o 17 ]>1 o APPROVED
3 5 Kevin Olander-07/30/2025
N.ne -ft,ed unl:epp—d by
m 16 19 mea adoyo ciai
v
`f 15 20
2 6
1 7
8
3x6 o 3x8= 3x6a
Scale=1:50.9 10-0-0 l 10-0-0
Plate Offsets(X,Y): [2:0-3-0,0-1-8],[6:0-3-0,0-1-8]
Loading (psf) Spacing 2-0-0 CSI DEFL in (loc) I/defl Ud PLATES GRIP
TCLL 25.0 Plate Grip DOL 1.15 TC 0.34 Vert(LL) -0.15 8-14 >999 240 MT20 185/148
(Roof Snow=25.0) Lumber DOL 1.15 BC 0.62 Vert(CT) -0.28 8-14 >873 180
TCDL 8.0 Rep Stress Incr YES WB 0.33 Horz(CT) 0.04 6 n/a n/a
BCLL 0.0* Code IRC2021/TP12014 Matrix-MS
BCDL 7.0 Weight:75 lb FT=20%
LUMBER 4) This truss has been designed for greater of min roof live
TOP CHORD 2x4 HF-N No.1/No.2 load of 16.0 psf or 1.00 times flat roof load of 25.0 psf on
BOT CHORD 2x4 HF-N No.1/No.2 overhangs non-concurrent with other live loads.
WEBS 2x4 DF Stud 5) This truss has been designed for a 10.0 psf bottom
BRACING chord live load nonconcurrent with any other live loads.
TOP CHORD Structural wood sheathing directly applied or 6) *This truss has been designed for a live load of 20.Opsf
4-ruc Structural
pwood. on the bottom chord in all areas where a rectangle
BOT CHORD Rigid ceiling directly applied or 10-0-0 oc 3-06-00 tall by 2-00-00 wide will fit between the bottom
bracin chord and any other members.
7) All bearings are assumed to be HF No.2.
MiTek recommends that Stabilizers and 8) Provide mechanical connection(by others)of truss to
required cross bracing be installed during bearing plate capable of withstanding 69 lb uplift at joint
truss erection,in accordance with Stabilizer 2 and 69 lb uplift at joint 6.
Installation guide. LOAD CASE(S) Standard
REACTIONS (lb/size) 2=899/0-5-8,(min.0-1-9),
6=899/0-5-8,(min.0-1-9)
Max Horiz 2=-54(LC 13)
Max Uplift 2=-69(LC 12),6=-69(LC 13)
Max Grav 2=952(LC 19),6=952(LC 20)
FORCES (lb)-Max.Comp./Max.Ten.-All forces 250
(lb)or less except when shown.
TOP CHORD 2-15=-1702/186,15-16=-1674/187,
3-16=-1601/201,3-17=-1139/130,
4-17=-1064/141,4-18=-1064/141,
5-18=-1139/130,5-19=-1601/201,
19-20=-1674/187,6-20=-1702/186
BOT CHORD 2-8=-115/1546,6-8=-115/1546
WEBS 4-8=-5/533,5-8=-648/126,3-8=-648/126
NOTES
1) Wind:ASCE 7-16;Vult=11 Omph(3-second gust)
Vasd=87mph;TCDL=4.8psf;BCDL=4.2psf;h=25ft;Cat.
II;Exp B;Enclosed;MWFRS(envelope)exterior zone
and C-C Exterior(2E)-1-6-0 to 1-6-0,Interior(1)1-6-0 to
7-0-0,Exterior(2R)7-0-0 to 13-0-0,Interior(1)13-0-0 to
18-6-0,Exterior(2E)18-6-0 to 21-6-0 zone;cantilever left
and right exposed;end vertical left and right exposed;C-
C for members and forces&MWFRS for reactions
shown;Lumber DOL=1.60 plate grip DOL=1.60
2) TCLL:ASCE 7-16;Pf=25.0 psf(Lum DOL=1.15 Plate
DOL=1.15);Is=1.0;Rough Cat B;Partially Exp.;
Ce=1.0;Cs=1.00;Ct=1.10
3) Unbalanced snow loads have been considered for this
design.
Job Truss Truss Type Qty Ply I Chinook Lumber Inc
J1185779 J01 Jack-Open 2 1
Job Reference(optional)
The Truss Company,Burlington,WA,98233,Tamara Klein Run:25.10 S Jun 12 2025 Print:25.1.0 S Jun 12 2025 MiTek Industries,Inc.Mon Jul 14 09:21:05 Page:1
ID:jRjR37FS_X7QFurLmmlvP7yyAAY-r2BTklMHnan9NzOnYZVBdihpJ91H?uyVxehCTuyy9yC
2-0-0
-1-6-0 1-10-15
1-6-0 1-10-15
0-1-1
5 F2
3
2 1
00 0-4-EZ- B1 0-3-
1 4 City of Arlington
Building Department
APPROVED
3x4= Kevin Olander-07/30/2025
No changes authored unless approved by
the Building--i
2-0-0
Scale=1:33.7
Plate Offsets(X,Y): [2:0-0-6,Edge]
Loading (psf) Spacing 2-0-0 CSI DEFL in (loc) I/defl L/d PLATES GRIP
TCLL 25.0 Plate Grip DOL 1.15 TC 0.18 Vert(LL) 0.00 4-7 >999 240 MT20 185/148
(Roof Snow=25.0) Lumber DOL 1.15 BC 0.03 Vert(CT) 0.00 4-7 >999 180
TCDL 8.0 Rep Stress Incr YES WB 0.00 Horz(CT) 0.00 2 n/a n/a
BCLL 0.0* Code IRC2021/TP12014 Matrix-MP
BCDL 7.0 Weight:7 lb FT=20%
LUMBER 7) All bearings are assumed to be HF No.2.
TOP CHORD 2x4 HF-N No.1/No.2 8) Refer to girder(s)for truss to truss connections.
BOT CHORD 2x4 HF-N No.1/No.2 9) Provide mechanical connection(by others)of truss to
BRACING bearing plate capable of withstanding 37 lb uplift at joint
TOP CHORD Structural wood sheathing directly applied or 2,5 lb uplift at joint 4 and 9 lb uplift at joint 3.
2-0-0 oc purlins. LOAD CASE(S) Standard
BOT CHORD Rigid ceiling directly applied or 10-0-0 oc
racing.
MiTek recommends that Stabilizers and
required cross bracing be installed during
truss erection,in accordance with Stabilizer
Installation guide.
REACTIONS (lb/size) 2=214/0-5-8,(min.0-1-8),3=32/
Mechanical,4=6/Mechanical
Max Horiz 2=35(LC 12)
Max Uplift 2=-37(LC 8),3=-9(LC 12),4=-5
(LC 18)
Max Grav 2=302(LC 19),3=44(LC 19),4=25
(LC 5)
FORCES (lb)-Max.Comp./Max.Ten.-All forces 250
(lb)or less except when shown.
NOTES
1) Wind:ASCE 7-16;Vult=11Omph(3-second gust)
Vasd=87mph;TCDL=4.8psf;BCDL=4.2psf;h=25ft;Cat.
II;Exp B;Enclosed;MWFRS(envelope)exterior zone
and C-C Exterior(2E)zone;cantilever left and right
exposed;end vertical left and right exposed;C-C for
members and forces&MWFRS for reactions shown;
Lumber DOL=1.60 plate grip DOL=1.60
2) TCLL:ASCE 7-16;Pf=25.0 psf(Lum DOL=1.15 Plate
DOL=1.15);Is=1.0;Rough Cat B;Partially Exp.;
Ce=1.0;Cs=1.00;Ct=1.10
3) Unbalanced snow loads have been considered for this
design.
4) This truss has been designed for greater of min roof live
load of 16.0 psf or 1.00 times flat roof load of 25.0 psf on
overhangs non-concurrent with other live loads.
5) This truss has been designed for a 10.0 psf bottom
chord live load nonconcurrent with any other live loads.
6) *This truss has been designed for a live load of 20.Opsf
on the bottom chord in all areas where a rectangle
3-06-00 tall by 2-00-00 wide will fit between the bottom
chord and any other members.
Job Truss Truss Type Qty Ply I Chinook Lumber Inc
J1185779 J02 Jack-Open 2 1
Job Reference(optional)
The Truss Company,Burlington,WA,98233,Tamara Klein Run:25.10 S Jun 12 2025 Print:25.1.0 S Jun 12 2025 MiTek Industries,Inc.Mon Jul 14 09:21:06 Page:1
I D:BdHpGTG4lq FGs2PXKTZ9yKyyAAX-J ElrxN NvYuvO?7bz5G 1 Q9wE_uZcpkLCf91QlOLyy9yB
-1-6-0 2-0-0 3-10-15
1-6-0 2-0-0 1-10-15
12 3
5r
1
(4 2
a 0-4-1 131
1 4
3x4= City of Arlington
Building Department
APPROVED
Kevin Olander-07/30/2025
No changes authorized unless approved by
the Building Official
2-0-0
Scale=1:28.3
Loading (psf) Spacing 2-0-0 CSI DEFL in (loc) I/dell Ud PLATES GRIP
TCLL 25.0 Plate Grip DOL 1.15 TC 0.19 Vert(LL) 0.00 4-7 >999 240 MT20 185/148
(Roof Snow=25.0) Lumber DOL 1.15 BC 0.14 Vert(CT) -0.01 4-7 >999 180
TCDL 8.0 Rep Stress Incr YES WB 0.00 Horz(CT) 0.00 3 n/a n/a
BCLL 0.0' Code IRC2021/TP12014 Matrix-MP
BCDL 7.0 Weight:10 lb FT=20%
LUMBER 8) Refer to girder(s)for truss to truss connections.
TOP CHORD 2x4 HF-N No.1/No.2 9) Provide mechanical connection(by others)of truss to
BOT CHORD 2x4 HF-N No.1/No.2 bearing plate capable of withstanding 28 lb uplift at joint
BRACING 3,34 lb uplift at joint 2 and 8 lb uplift at joint 4.
TOP CHORD Structural wood sheathing directly applied or LOAD CASE(S) Standard
2-0-0 oc purlins.
BOT CHORD Rigid ceiling directly applied or 10-0-0 oc
racing.
MiTek recommends that Stabilizers and
required cross bracing be installed during
truss erection,in accordance with Stabilizer
Installation guide.
REACTIONS (lb/size) 2=240/0-5-8,(min.0-1-8),3=87/
Mechanical,4=53/Mechanical
Max Horiz 2=56(LC 12)
Max Uplift 2=-34(LC 8),3=-28(LC 12),4=-8
(LC 12)
Max Grav 2=359(LC 19),3=133(LC 19),
4=75(LC 19)
FORCES (Ib)-Max.Comp./Max.Ten.-All forces 250
(Ib)or less except when shown.
NOTES
1) Wind:ASCE 7-16;Vult=11 Omph(3-second gust)
Vasd=87mph;TCDL=4.8psf;BCDL=4.2psf;h=25ft;Cat.
II;Exp B;Enclosed;MWFRS(envelope)exterior zone
and C-C Exterior(2E)zone;cantilever left and right
exposed;end vertical left and right exposed;C-C for
members and forces&MWFRS for reactions shown;
Lumber DOL=1.60 plate grip DOL=1.60
2) TCLL:ASCE 7-16;Pf=25.0 psf(Lum DOL=1.15 Plate
DOL=1.15);Is=1.0;Rough Cat B;Partially Exp.;
Ce=1.0;Cs=1.00;Ct=1.10
3) Unbalanced snow loads have been considered for this
design.
4) This truss has been designed for greater of min roof live
load of 16.0 psf or 1.00 times flat roof load of 25.0 psf on
overhangs non-concurrent with other live loads.
5) This truss has been designed for a 10.0 psf bottom
chord live load nonconcurrent with any other live loads.
6) 'This truss has been designed for a live load of 20.Opsf
on the bottom chord in all areas where a rectangle
3-06-00 tall by 2-00-00 wide will fit between the bottom
chord and any other members.
7) All bearings are assumed to be HF No.2.
Job Truss Truss Type Qty Ply I Chinook Lumber Inc
J1185779 J03 Jack-Open 2 1
Job Reference(optional)
The Truss Company,Burlington,WA,98233,Tamara Klein Run:25.10 S Jun 12 2025 Print:25.1.0 S Jun 12 2025 MiTek Industries,Inc.Mon Jul 14 09:21:06 Page:1
ID:BdHpGTG4lgFGs2PXKTZ9yKyyAAX-JElrxNNvYuvO?7bz5G1Q9wEw?ZXnkLCf91QlOLyy9yB
-1-6-0 2-0-0 5-10-15
1-6-0 2-0-0 3-10-15
3
512
� 1
v
Cl)
2
04-:17� 131
1
4
3x6 o City of Arlington
Building Department
APPROVED
Kevin Olander-07/30/2025
No cba autl m d unless appro by
B.Ildhe-1.1
2-0-0
Scale=1:31
Plate Offsets(X,Y): [2:0-3-0,0-1-8]
Loading (psf) Spacing 2-0-0 CSI DEFL in (loc) I/defl L/d PLATES GRIP
TCLL 25.0 Plate Grip DOL 1.15 TC 0.44 Vert(LL) -0.01 4-7 >999 240 MT20 185/148
(Roof Snow=25.0) Lumber DOL 1.15 BC 0.46 Vert(CT) -0.02 4-7 >999 180
TCDL 8.0 Rep Stress Incr YES WB 0.00 Horz(CT) 0.00 2 n/a n/a
BCLL 0.0* Code IRC2021/TP12014 Matrix-MP
BCDL 7.0 Weight:13 lb FT=20%
LUMBER 7) All bearings are assumed to be HF No.2.
TOP CHORD 2x4 HF-N No.1/No.2 8) Refer to girder(s)for truss to truss connections.
BOT CHORD 2x4 HF-N No.1/No.2 9) Provide mechanical connection(by others)of truss to
BRACING bearing plate capable of withstanding 44 lb uplift at joint
TOP CHORD Structural wood sheathing directly applied or 3,27 lb uplift atjoint 2 and 37lb uplift atjoint 4.
2-0-0 oc purlins. LOAD CASE(S) Standard
BOT CHORD Rigid ceiling directly applied or 10-0-0 oc
racing.
MiTek recommends that Stabilizers and
required cross bracing be installed during
truss erection,in accordance with Stabilizer
Installation guide.
REACTIONS (lb/size) 2=235/0-5-8,(min.0-1-8),3=137/
Mechanical,4=141/Mechanical
Max Horiz 2=78(LC 12)
Max Uplift 2=-27(LC 8),3=-44(LC 12),4=-37
(LC 12)
Max Grav 2=280(LC 19),3=210(LC 19),
4=226(LC 19)
FORCES (lb)-Max.Comp./Max.Ten.-All forces 250
(lb)or less except when shown.
NOTES
1) Wind:ASCE 7-16;Vult=11Omph(3-second gust)
Vasd=87mph;TCDL=4.8psf;BCDL=4.2psf;h=25ft;Cat.
II;Exp B;Enclosed;MWFRS(envelope)exterior zone
and C-C Exterior(2E)zone;cantilever left and right
exposed;end vertical left and right exposed;C-C for
members and forces&MWFRS for reactions shown;
Lumber DOL=1.60 plate grip DOL=1.60
2) TCLL:ASCE 7-16;Pf=25.0 psf(Lum DOL=1.15 Plate
DOL=1.15);Is=1.0;Rough Cat B;Partially Exp.;
Ce=1.0;Cs=1.00;Ct=1.10
3) Unbalanced snow loads have been considered for this
design.
4) This truss has been designed for greater of min roof live
load of 16.0 psf or 1.00 times flat roof load of 25.0 psf on
overhangs non-concurrent with other live loads.
5) This truss has been designed for a 10.0 psf bottom
chord live load nonconcurrent with any other live loads.
6) *This truss has been designed for a live load of 20.Opsf
on the bottom chord in all areas where a rectangle
3-06-00 tall by 2-00-00 wide will fit between the bottom
chord and any other members.
Job Truss Truss Type Qty Ply I Chinook Lumber Inc
J1185779 J04 Jack-Open 2 1
Job Reference(optional)
The Truss Company,Burlington,WA,98233,Tamara Klein Run:25.10 S Jun 12 2025 Print:25.1.0 S Jun 12 2025 MiTek Industries,Inc.Mon Jul 14 09:21:06 Page:1
ID:FWhUQbRUCR88AL3Qi7Kg3VyyAAI-JElrxNNvYuvO?7bz5G1 Q9wEwBZTpkLCf91QlOLyy9yB
-1-6-0 1-10-15 8-0-0
1-6-0 1-10-15 6-1-1
12
5r
3
v 2
ob 0-4 B1 0-3
1 8 9 10 4
3X8 G city of Arlington
Building Department
APPROVED
Kevin Olander-07/30/2025
No changes authon_d unless approved by
NAILED NAILED NAILED he Building ORcial
8-0-0
Scale=1:28.1
Plate Offsets(X,Y): [2:0-2-15,0-1-8]
Loading (psf) Spacing 2-0-0 CSI DEFL in (loc) I/defl Ud PLATES GRIP
TCLL 25.0 Plate Grip DOL 1.15 TC 0.43 Vert(LL) -0.18 4-7 >524 240 MT20 185/148
(Roof Snow=25.0) Lumber DOL 1.15 BC 0.72 Vert(CT) -0.27 4-7 >356 180
TCDL 8.0 Rep Stress Incr YES WB 0.00 Horz(CT) 0.00 3 n/a n/a
BCLL 0.0* Code IRC2021/TP12014 Matrix-MP
BCDL 7.0 Weight:15 lb FT=20%
LUMBER 7) All bearings are assumed to be HF No.2.
TOP CHORD 2x4 HF-N No.1/No.2 8) Refer to girder(s)for truss to truss connections.
BOT CHORD 2x4 HF-N No.1/No.2 9) Provide mechanical connection(by others)of truss to
BRACING bearing plate capable of withstanding 10 lb uplift at joint
TOP CHORD Structural wood sheathing directly applied or 3,49 lb uplift at joint 2 and 10 lb uplift at joint 4.
8-0-0 oc purlins. 10)"NAILED"indicates 3-10d(0.148"x3")or 3-12d
BOT CHORD Rigid ceiling directly applied or 10-0-0 oc (0.148"x3.25')toe-nails per NDS guidlines.
racing. 11) In the LOAD CASE(S)section,loads applied to the face
of the truss are noted as front(F)or back(B).
MiTek recommends that Stabilizers and LOAD CASE(S) Standard
required cross bracing be installed during 1) Dead+Snow(balanced):Lumber Increase=1.15,Plate
truss erection,in accordance with Stabilizer Increase=1.15
Installation guide. Uniform Loads(lb/ft)
REACTIONS (lb/size) 2=154/0-5-8,(min.0-1-8),3=256/ Vert:1-3=-66,4-5=-14
Mechanical,4=194/Mechanical Concentrated Loads(lb)
Max Horiz 2=34(LC 12) Vert:8=1 (B),9=-61 (B),10=-212(B)
Max Uplift 2=-49(LC 29),3=-10(LC 12),
4=-10(LC 13)
Max Grav 2=241 (LC 19),3=266(LC 19),
4=194(LC 20)
FORCES (lb)-Max.Comp./Max.Ten.-All forces 250
(lb)or less except when shown.
NOTES
1) Wind:ASCE 7-16;Vult=11Omph(3-second gust)
Vasd=87mph;TCDL=4.8psf;BCDL=4.2psf;h=25ft;Cat.
II;Exp B;Enclosed;MWFRS(envelope)exterior zone
and C-C Exterior(2E)zone;cantilever left and right
exposed;end vertical left and right exposed;C-C for
members and forces&MWFRS for reactions shown;
Lumber DOL=1.60 plate grip DOL=1.60
2) TCLL:ASCE 7-16;Pf=25.0 psf(Lum DOL=1.15 Plate
DOL=1.15);Is=1.0;Rough Cat B;Partially Exp.;
Ce=1.0;Cs=1.00;Ct=1.10
3) Unbalanced snow loads have been considered for this
design.
4) This truss has been designed for greater of min roof live
load of 16.0 psf or 1.00 times flat roof load of 25.0 psf on
overhangs non-concurrent with other live loads.
5) This truss has been designed for a 10.0 psf bottom
chord live load nonconcurrent with any other live loads.
6) *This truss has been designed for a live load of 20.Opsf
on the bottom chord in all areas where a rectangle
3-06-00 tall by 2-00-00 wide will fit between the bottom
chord and any other members.
Job Truss Truss Type Qty Ply I Chinook Lumber Inc
J1185779 J05 Jack-Open 2 1
Job Reference(optional)
The Truss Company,Burlington,WA,98233,Tamara Klein Run:25.10 S Jun 12 2025 Print:25.1.0 S Jun 12 2025 MiTek Industries,Inc.Mon Jul 14 09:21:06 Page:1
ID:BdHpGTG4lgFGs2PXKTZ9yKyyAAX-JElrxNNvYuvO?7bz5G1Q9wEyyZZwkLCf91QlOLyy9yB
-1-6-0 3-10-15 8-0-0
1-6-0 3-10-15 4-1-1
12
5r 3
1
CO 2
a 0-4-:1Z_ B1 0-3-8
1 4
4x4=
City of Arlington
Building Department
APPROVED
Kevin Olander-07/30/2025
No changes aulhonzed unless approved by
the Building Official
Scale=1:29.7
Plate Offsets(X,Y): [2:0-0-14,Edge]
Loading (psf) Spacing 2-0-0 CSI DEFL in (loc) I/defl Ud PLATES GRIP
TCLL 25.0 Plate Grip DOL 1.15 TC 0.31 Vert(LL) -0.11 4-7 >865 240 MT20 185/148
(Roof Snow=25.0) Lumber DOL 1.15 BC 0.32 Vert(CT) -0.19 4-7 >494 180
TCDL 8.0 Rep Stress Incr YES WB 0.00 Horz(CT) 0.00 3 n/a n/a
BCLL 0.0* Code IRC2021/TP12014 Matrix-MP
BCDL 7.0 Weight:17 lb FT=20%
LUMBER 8) Refer to girder(s)for truss to truss connections.
TOP CHORD 2x4 HF-N No.1/No.2 9) Provide mechanical connection(by others)of truss to
BOT CHORD 2x4 HF-N No.1/No.2 bearing plate capable of withstanding 18 lb uplift at joint
BRACING 3 and 23 lb uplift at joint 2.
TOP CHORD Structural wood sheathing directly applied or LOAD CASE(S) Standard
8-0-0 oc purlins.
BOT CHORD Rigid ceiling directly applied or 10-0-0 oc
racing.
MiTek recommends that Stabilizers and
required cross bracing be installed during
truss erection,in accordance with Stabilizer
Installation guide.
REACTIONS (lb/size) 2=292/0-5-8,(min.0-1-8),3=125/
Mechanical,4=47/Mechanical
Max Horiz 2=56(LC 12)
Max Uplift 2=-23(LC 12),3=-18(LC 12)
Max Grav 2=423(LC 19),3=178(LC 19),
4=106(LC 5)
FORCES (lb)-Max.Comp./Max.Ten.-All forces 250
(lb)or less except when shown.
NOTES
1) Wind:ASCE 7-16;Vult=11 Omph(3-second gust)
Vasd=87mph;TCDL=4.8psf;BCDL=4.2psf;h=25ft;Cat.
II;Exp B;Enclosed;MWFRS(envelope)exterior zone
and C-C Exterior(2E)zone;cantilever left and right
exposed;end vertical left and right exposed;C-C for
members and forces&MWFRS for reactions shown;
Lumber DOL=1.60 plate grip DOL=1.60
2) TCLL:ASCE 7-16;Pf=25.0 psf(Lum DOL=1.15 Plate
DOL=1.15);Is=1.0;Rough Cat B;Partially Exp.;
Ce=1.0;Cs=1.00;Ct=1.10
3) Unbalanced snow loads have been considered for this
design.
4) This truss has been designed for greater of min roof live
load of 16.0 psf or 1.00 times flat roof load of 25.0 psf on
overhangs non-concurrent with other live loads.
5) This truss has been designed for a 10.0 psf bottom
chord live load nonconcurrent with any other live loads.
6) *This truss has been designed for a live load of 20.Opsf
on the bottom chord in all areas where a rectangle
3-06-00 tall by 2-00-00 wide will fit between the bottom
chord and any other members.
7) All bearings are assumed to be HF No.2.
Job Truss Truss Type Qty Ply I Chinook Lumber Inc
J1185779 J06 Jack-Open 2 1
Job Reference(optional)
The Truss Company,Burlington,WA,98233,Tamara Klein Run:25.10 S Jun 12 2025 Print:25.1.0 S Jun 12 2025 MiTek Industries,Inc.Mon Jul 14 09:21:07 Page:1
ID:BdHpGTG4lgFGs2PXKTZ9yKyyAAX-nQJE9iOXJC1tdGA9f_Yfi7n00yg8ToRo0yAIYnyy9yA
I 8-0-0
-1-6-0 L 7-10-15
1-6-0 7-10-15
0-1-1
3
512 10
City of Arlington
Building Department
APPROVED
9 Kevin Olander-07/30/2025
No changes aWhonzed unless approved by
N 8 the Building Official
V
2
0-4-1:t- 1 B1 0-3--
4
3x6 o
8-0-0
Scale=1:40.2
Plate Offsets(X,Y): [2:0-3-0,0-1-8]
Loading (psf) Spacing 2-0-0 CSI DEFL in (loc) I/defl Ud PLATES GRIP
TCLL 25.0 Plate Grip DOL 1.15 TC 0.74 Vert(LL) -0.26 4-7 >364 240 MT20 185/148
(Roof Snow=25.0) Lumber DOL 1.15 BC 0.65 Vert(CT) -0.40 4-7 >237 180
TCDL 8.0 Rep Stress Incr YES WB 0.00 Horz(CT) 0.01 2 n/a n/a
BCLL 0.0* Code IRC2021/TP12014 Matrix-MP
BCDL 7.0 Weight:24 lb FT=20%
LUMBER 7) All bearings are assumed to be HF No.2.
TOP CHORD 2x4 DF 240OF 2.0E 8) Refer to girder(s)for truss to truss connections.
BOT CHORD 2x4 HF-N No.1/No.2 9) Provide mechanical connection(by others)of truss to
BRACING bearing plate capable of withstanding 50 lb uplift at joint
TOP CHORD Structural wood sheathing directly applied or 3 and 36 lb uplift at joint 2.
6-0-0 oc purlins. LOAD CASE(S) Standard
BOT CHORD Rigid ceiling directly applied or 10-0-0 oc
racing.
MiTek recommends that Stabilizers and
required cross bracing be installed during
truss erection,in accordance with Stabilizer
Installation guide.
REACTIONS (lb/size) 2=423/0-5-8,(min.0-1-8),3=228/
Mechanical,4=77/Mechanical
Max Horiz 2=94(LC 12)
Max Uplift 2=-36(LC 12),3=-50(LC 12)
Max Grav 2=506(LC 19),3=342(LC 19),
4=120(LC 5)
FORCES (lb)-Max.Comp./Max.Ten.-All forces 250
(lb)or less except when shown.
NOTES
1) Wind:ASCE 7-16;Vult=11 Omph(3-second gust)
Vasd=87mph;TCDL=4.8psf;BCDL=4.2psf;h=25ft;Cat.
II;Exp B;Enclosed;MWFRS(envelope)exterior zone
and C-C Exterior(2E)-1-6-0 to 1-6-0,Interior(1)1-6-0 to
3-7-4,Exterior(2R)3-7-4 to 7-10-3 zone;cantilever left
and right exposed;end vertical left and right exposed;C-
C for members and forces&MWFRS for reactions
shown;Lumber DOL=1.60 plate grip DOL=1.60
2) TCLL:ASCE 7-16;Pf=25.0 psf(Lum DOL=1.15 Plate
DOL=1.15);Is=1.0;Rough Cat B;Partially Exp.;
Ce=1.0;Cs=1.00;Ct=1.10
3) Unbalanced snow loads have been considered for this
design.
4) This truss has been designed for greater of min roof live
load of 16.0 psf or 1.00 times flat roof load of 25.0 psf on
overhangs non-concurrent with other live loads.
5) This truss has been designed for a 10.0 psf bottom
chord live load nonconcurrent with any other live loads.
6) *This truss has been designed for a live load of 20.Opsf
on the bottom chord in all areas where a rectangle
3-06-00 tall by 2-00-00 wide will fit between the bottom
chord and any other members.
Job Truss Truss Type Qty Ply I Chinook Lumber Inc
J1185779 J07 Jack-Open 1 1
Job Reference(optional)
The Truss Company,Burlington,WA,98233,Tamara Klein Run:25.10 S Jun 12 2025 Print:25.1.0 S Jun 12 2025 MiTek Industries,Inc.Mon Jul 14 09:21:07 Page:1
ID:fprBUpHiV8N7UC_ktB40VYyyAAW-nQJE9iOXJC1 tdGA9f_Yfi7nzHyq RToRoOyAlYnyy9yA
-1-6-0 8-0-0 9-10-3
1-6-0 8-0-0 1-10-3
4
3
5r 11 12
CP 10 ROVED City of Arlington
Building
o
� Kevin Olander-07/30/2025
No changes au honied unless approved by
9 the Building Official
2
B1
5
3x6 o
8-0-0
Scale=1:39.7
Plate Offsets(X,Y): [2:0-3-0,0-1-8]
Loading (psf) Spacing 2-0-0 CSI DEFL in (loc) I/defl L/d PLATES GRIP
TCLL 25.0 Plate Grip DOL 1.15 TC 0.92 Vert(LL) -0.27 5-8 >359 240 MT20 185/148
(Roof Snow=25.0) Lumber DOL 1.15 BC 0.69 Vert(CT) -0.42 5-8 >225 180
TCDL 8.0 Rep Stress Incr YES WB 0.00 Horz(CT) 0.01 2 n/a n/a
BCLL 0.0* Code IRC2021/TP12014 Matrix-MP
BCDL 7.0 Weight:27 lb FT=20%
LUMBER 6) *This truss has been designed for a live load of 20.Opsf
TOP CHORD 2x4 DF 180OF 1.6E or 2x4 DF No.1&Btr or on the bottom chord in all areas where a rectangle
2x4 DF-N 180OF 1.6E 3-06-00 tall by 2-00-00 wide will fit between the bottom
BOT CHORD 2x4 HF-N No.1/No.2 chord and any other members.
BRACING 7) All bearings are assumed to be HF No.2.
TOP CHORD Structural wood sheathing directly applied or 8) Refer to girder(s)for truss to truss connections.
2-2-0 oc purlins. 9) Provide mechanical connection(by others)of truss to
BOT CHORD Rigid ceiling directly applied or 10-0-0 oc bearing plate at joint(s)3.
racing. 10)Provide mechanical connection(by others)of truss to
bearing plate capable of withstanding 100 lb uplift at joint
MiTek recommends that Stabilizers and (s)4,2,3.
required cross bracing be installed during 11)Beveled plate or shim required to provide full bearing
truss erection,in accordance with Stabilizer surface with truss chord at joint(s)3.
Installation guide. LOAD CASE(S) Standard
REACTIONS All bearings 0-1-8.except 2=0-5-8,3=0-1-8
(lb)- Max Horiz 2=109(LC 12)
Max Uplift All uplift 100(lb)or less at joint(s)
2,3,4
Max Grav All reactions 250(lb)or less at joint
(s)4,5 except 2=471 (LC 19),
3=416(LC 19)
FORCES (lb)-Max.Comp./Max.Ten.-All forces 250
(lb)or less except when shown.
NOTES
1) Wind:ASCE 7-16;Vult=110mph(3-second gust)
Vasd=87mph;TCDL=4.8psf;BCDL=4.2psf;h=25ft;Cat.
II;Exp B;Enclosed;MWFRS(envelope)exterior zone
and C-C Exterior(2E)-1-6-0 to 1-6-0,Interior(1)1-6-0 to
5-6-8,Exterior(2R)5-6-8 to 9-9-7 zone;cantilever left
and right exposed;end vertical left and right exposed;C-
C for members and forces&MWFRS for reactions
shown;Lumber DOL=1.60 plate grip DOL=1.60
2) TCLL:ASCE 7-16;Pf=25.0 psf(Lum DOL=1.15 Plate
DOL=1.15);Is=1.0;Rough Cat B;Partially Exp.;
Ce=1.0;Cs=1.00;Ct=1.10
3) Unbalanced snow loads have been considered for this
design.
4) This truss has been designed for greater of min roof live
load of 16.0 psf or 1.00 times flat roof load of 25.0 psf on
overhangs non-concurrent with other live loads.
5) This truss has been designed for a 10.0 psf bottom
chord live load nonconcurrent with any other live loads.
Job Truss Truss Type Qty Ply I Chinook Lumber Inc
J1185779 JG01 Roof Special 2 1
Job Reference(optional)
The Truss Company,Burlington,WA,98233,Tamara Klein Run:25.10 S Jun 12 2025 Print:25.1.0 S Jun 12 2025 MiTek Industries,Inc.Mon Jul 14 09:21:07 Page:1
I D:BdHpGTG4lgFGs2PXKTZ9yKyyAAX-nQJ E9iOXJC1 tdGA9f_Yfi7n3FytlTmboOyAlYnyy9yA
-1-6-0 6-0-0 8-0-0
1-6-0 6-0-0 2-0-0 BuCity of Arlington
d ngDepartment
APPROVED
4x6 Kevin Olander-07/30/2025
3x6 n No changes authorized unless approved by
M 12 3 4 the Building Official
d M 5 r 0- -13
c14 o T2
v v 10 1 1 2 3 v
4? m cD m
"? N N N
C0
2
0-4 B1 5
1
6
3x6= 2x4 ii 3x4=
5-6-1 8-0-0
5-6-1 2-5-15
Scale=1:29.6
Plate Offsets(X,Y): [2:0-3-0,Edge]
Loading (psf) Spacing 2-0-0 CSI DEFL in (loc) I/defl L/d PLATES GRIP
TCLL 25.0 Plate Grip DOL 1.15 TC 0.54 Vert(LL) -0.06 6-9 >999 240 MT20 185/148
(Roof Snow=25.0) Lumber DOL 1.15 BC 0.51 Vert(CT) -0.09 6-9 >999 180
TCDL 8.0 Rep Stress Incr YES WB 0.18 Horz(CT) 0.01 5 n/a n/a
BCLL 0.0* Code IRC2021/TP12014 Matrix-MP
BCDL 7.0 Weight:32 lb FT=20%
LUMBER 5) Provide adequate drainage to prevent water ponding.
TOP CHORD 2x4 HF-N No.1/No.2 6) This truss has been designed for a 10.0 psf bottom
BOT CHORD 2x4 HF-N No.1/No.2 chord live load nonconcurrent with any other live loads.
WEBS 2x4 DF Stud 7) *This truss has been designed for a live load of 20.Opsf
BRACING on the bottom chord in all areas where a rectangle
TOP CHORD Structural wood sheathing directly applied or 3-06-00 tall by 2-00-00 wide will fit between the bottom
6-0-0 oc purlins, except end verticals,and chord and any other members.
2-0-0 oc purlins:3-4. 8) All bearings are assumed to be HF No.2.
BOT CHORD Rigid ceiling directly applied or 10-0-0 oc 9) Refer to girder(s)for truss to truss connections.
racing. 10)Provide mechanical connection(by others)of truss to
bearing plate capable of withstanding 27 lb uplift at joint
MiTek recommends that Stabilizers and 4,63 lb uplift at joint 2 and 53 lb uplift at joint 5.
required cross bracing be installed during 11)Graphical purlin representation does not depict the size
truss erection,in accordance with Stabilizer or the orientation of the purlin along the top and/or
Installation guide. bottom chord.
REACTIONS (lb/size) 2=505/0-5-8,(min.0-1-8),4=123/ 12)Gap between inside of top chord bearing and first
Mechanical,5=444/Mechanical diagonal or vertical web shall not exceed 0.500in.
Max Horiz 2=71(LC 11) 13)Hanger(s)or other connection device(s)shall be
Max Uplift 2=-63(LC 12),4=-27(LC 9),5=-53 provided sufficient to support concentrated load(s)416 lb
(LC 12) down and 140 lb up at 5-11-11 on top chord. The
720(LC 30),4=164(LC 29), design/selection of such connection device(s)is the
Max Grav 2=
5=720(LC 30) responsibility of others.
FORCES (lb)-Max.Comp./Max.Ten.-All forces 250 LOAD CASE(S) Standard
1) Dead+Snow(balanced):Lumber Increase=1.15,Plate
(lb)or less except when shown.
TOP CHORD 2-10=-683/67,3-10=-575/78 UniformIncreas Loa 5
BOT CHORD 2-6=-57/536,5-6=-59/526 Uniform Loads(Ib/ft)
WEBS 3-5=-748/101 Vert:1-3=-66,3-4=-66,5-7=-14
Concentrated Loads(lb)
NOTES
1) Wind:ASCE 7-16;Vult=110mph(3-second gust)
Vert:11=-344
Vasd=87mph;TCDL=4.8psf;BCDL=4.2psf;h=25ft;Cat.
11;Exp B;Enclosed;MWFRS(envelope)exterior zone
and C-C Exterior(2E)zone;cantilever left and right
exposed;end vertical left and right exposed;C-C for
members and forces&MWFRS for reactions shown;
Lumber DOL=1.60 plate grip DOL=1.60
2) TCLL:ASCE 7-16;Pf=25.0 psf(Lum DOL=1.15 Plate
DOL=1.15);Is=1.0;Rough Cat B;Partially Exp.;
Ce=1.0;Cs=1.00;Ct=1.10
3) Unbalanced snow loads have been considered for this
design.
4) This truss has been designed for greater of min roof live
load of 20.0 psf or 1.00 times flat roof load of 25.0 psf on
overhangs non-concurrent with other live loads.
Job Truss Truss Type Qty Ply I Chinook Lumber Inc
J1185779 JR01 Corner Rafter 2 1
Job Reference(optional)
The Truss Company,Burlington,WA,98233,Tamara Klein Run:25.10 S Jun 12 2025 Print:25.1.0 S Jun 12 2025 MiTek Industries,Inc.Mon Jul 14 09:21:07 Page:1
ID:ji FsdxS7zlG?nVecGgrvciyyAAH-nQJE9iOXJC1 tdGA9f_Yfi7n 1 ly_DToRoOyAlYnyy9yA
-2-1-7 8-4-5 14-0-3
2-1-7 8-4-5 5-7-14
Special
3.541? NAILED Special 5
NAILED Special 4
Special 3
0 8
d6 7
o V
6
3x6
2 4x4
0-4-1 4x4, City of Arlington
1 Building Department
4x4- APPROVED
3x6= Kevin Olander-07/30/2025
No changes authorized unless approved by
the Building Official
8-5-13
8-4-5 11-4-12
8-4-5 2-10-15
Scale=1:44.5 0-1-8
Plate Offsets(X,Y): [2:0-1-2,Edge],[2:2-0-4,0-1-10],[2:4-2-6,0-1-10],[3:0-2-10,8-4-11],[3:6-4-9,0-1-10]
Loading (psf) Spacing 2-0-0 CSI DEFL in (loc) I/defl L/d PLATES GRIP
TCLL 25.0 Plate Grip DOL 1.15 TC 0.70 Vert(LL) -0.21 2-3 >487 240 MT20 185/148
(Roof Snow=25.0) Lumber DOL 1.15 BC 0.00 Vert(CT) -0.29 2-3 >351 180
TCDL 8.0 Rep Stress Incr NO WB 0.00 Horz(CT) 0.00 4 n/a n/a
BCLL 0.0* Code IRC2021/TP12014 Matrix-MP
BCDL 7.0 Weight:32 lb FT=20%
LUMBER 8) Provide mechanical connection(by others)of truss to
TOP CHORD 2x4 HF-N No.1/No.2 bearing plate atjoint(s)3,4.
BRACING 9) Provide mechanical connection(by others)of truss to
TOP CHORD Structural wood sheathing directly applied or bearing plate capable of withstanding 100 lb uplift at joint
6-0-0 oc purlins. 2,99 lb uplift at joint 3 and 122 lb uplift at joint 4.
BOT CHORD Rigid ceiling directly applied or 10-0-0 oc 10)Beveled plate or shim required to provide full bearing
racing. surface with truss chord at joint(s)3,4.
11)"NAILED"indicates 3-10d(0.148"x3")or 2-12d
MiTek recommends that Stabilizers and (0.148"x3.25")toe-nails per NDS guidlines.
required cross bracing be installed during 12)Hanger(s)or other connection device(s)shall be
truss erection,in accordance with Stabilizer provided sufficient to support concentrated load(s)166 lb
Installation guide. down and 52 lb up at 8-5-6,and 298 lb down and 52 lb
REACTIONS (lb/size) 2=592/0-7-6,(min.0-5-13), up at 11-3-5 on top chord. The design/selection of such
3=529/0-2-2,(min.0-1-8), connection device(s)is the responsibility of others.
4=607/0-2-2,(min.0-1-8) 13)In the LOAD CASE(S)section,loads applied to the face
Max Horiz 2=127(LC 6) of the truss are noted as front(F)or back(B).
Max Uplift 2=-100(LC 6),3=-99(LC 10), LOAD CASE(S) Standard
4=-122(LC 7) 1) Dead+Snow(balanced):Lumber Increase=1.15,Plate
Max Grav 2=594(LC 16),3=531(LC 16), Increase=1.15
4=724(LC 16) Uniform Loads(lb/ft)
FORCES (lb)-Max.Comp./Max.Ten.-All forces 250 Vert:1-5=-66
(lb)or less except when shown. Concentrated Loads(lb)
NOTES Vert:3=-117(B),4=-249(F),6=-172(F),7=-125
1) Wind:ASCE 7-16;Vult=110mph(3-second gust) (F=-84,B=-41)
Vasd=87mph;TCDL=4.8psf;BCDL=4.2psf;h=25ft;Cat.
II;Exp B;Enclosed;MWFRS(envelope)exterior zone;
cantilever left and right exposed;end vertical left and
right exposed;Lumber DOL=1.60 plate grip DOL=1.60
2) TCLL:ASCE 7-16;Pf=25.0 psf(Lum DOL=1.15 Plate
DOL=1.15);Is=1.0;Rough Cat B;Partially Exp.;
Ce=1.0;Cs=1.00;Ct=1.10
3) Unbalanced snow loads have been considered for this
design.
4) Plates checked for a plus or minus 0 degree rotation
about its center.
5) *This truss has been designed for a live load of 20.Opsf
on the bottom chord in all areas where a rectangle
3-06-00 tall by 2-00-00 wide will fit between the bottom
chord and any other members.
6) All bearings are assumed to be HF No.2.
7) Bearing atjoint(s)2 considers parallel to grain value
using ANSI/TPI 1 angle to grain formula. Building
designer should verify capacity of bearing surface.
Job Truss Truss Type Qty Ply Chinook Lumber Inc
J1185779 Z JOIST 22 1
Job Reference(optional)
The Truss Company,Burlington,WA,98233,Tamara Klein Run:25.10 S Jun 12 2025 Print:25.1.0 S Jun 12 2025 MiTek Industries,Inc.Mon Jul 14 09:21:08 Page:1
ID:LKnY86g13Npfir26XxX7duyyA?g-FctcM2OA4V9kEQIMDh3uELJMMMJ7CFhxdcvs4Dyy9y9
1-10-6
City of Arlington
Building Department
RI B1 APPROVED
0-3- Kevin Olander-07/30/2025
No changes authorized unless approved by
the Building Official
2 1
1-10-6
Scale=1:21.2
Loading (psf) Spacing 2-0-0 CSI DEFL in (loc) I/dell Ud PLATES GRIP
TCLL 25.0 Plate Grip DOL 0.90 TC 0.00 Vert(LL) 0.00 1-2 >999 240
(Roof Snow=25.0) Plate Metal DOL 0.90 BC 0.02 Vert(CT) 0.00 1-2 >999 180
TCDL 8.0 Lumber DOL 0.90 WB 0.00 Horz(CT) n/a - n/a n/a
BCLL 0.0* Rep Stress Incr YES Matrix-MP
BCDL 7.0 Code IRC2021/TPI2014 Weight:2 lb FT=20%
LUMBER
TOP CHORD
BOT CHORD 2x4 HF-N No.1/No.2
BRACING
BOT CHORD Rigid ceiling directly applied or 10-0-0 oc
racing.
MiTek recommends that Stabilizers and
required cross bracing be installed during
truss erection,in accordance with Stabilizer
Installation guide.
REACTIONS (lb/size) 1=13/0-3-8,(min.0-1-8),
2=13/0-3-8,(min.0-1-8)
Max Grav 1=31 (LC 3),2=31 (LC 3)
FORCES (lb)-Max.Comp./Max.Ten.-All forces 250
(lb)or less except when shown.
NOTES
1) TCLL:ASCE 7-16;Pf=25.0 psf(Lum DOL=1.15 Plate
DOL=1.15);Is=1.0;Rough Cat B;Partially Exp.;
Ce=1.0;Cs=;Ct=1.10
2) This truss has been designed for a 10.0 psf bottom
chord live load nonconcurrent with any other live loads.
3) *This truss has been designed for a live load of 20.Opsf
on the bottom chord in all areas where a rectangle
3-06-00 tall by 2-00-00 wide will fit between the bottom
chord and any other members.
4) All bearings are assumed to be HF No.2.
LOAD CASE(S) Standard
Permit#: 6486
Permit Date: 05/09/25
Permit Type: RESIDENTIAL ADDITION
Project Name: Atkins
Applicant Name: Jeff Atkins
Applicant Address: 7721 Eaglefield Dr
Applicant, City, State, Zip: ARLINGTON
Contact: Jeff
Phone: 4254786415
Email: atkii913@gmail.com
Scope of Work: 240 sq ft addition bed/bath
Valuation: 40000.00
Square Feet: 240
Number of Stories: 1
Construction Type: VA
Occupancy Group: R-1; Residential
ID Code:
Permit Issued: 06/06/2025
Permit Expires: 03/17/2026
Form Permit Type: RESIDENTIAL ADDITION
Status: COMPLETE
Assigned To: Hannah Hardwick
Property
Parcel# Address Legal Description Owner Name Owner Phone Zoning
ATKINS 100 SINGLE
00865900005800 7721 EAGLEFIELD DR FAMILY
JEFFREY/LINDA RESIDENCE
Contractors
Contractor Primary Contact Phone Address Contractor Type License License
HOME OWNER OWNER
Inspections
Date Inspection Type Description Scheduled Date Completed Date Inspector Status
01/06/2026 R20. 01/07/2026 01/07/2026 BUILDING Approved
ADDITION/ALTERATION
FINAL
12/04/2025 R06.SHEARWALL 12/05/2025 12/05/2025 BUILDING Approved
11/20/2025 Rll.INSULATION 11/21/2025 11/21/2025 BUILDING Approved
He would like a time after
11/18/2025 R0T PLUMBING 3.He also wants framing 11/19/2025 CED INSPECTOR Assigned
ROUGH-IN inspection at the same
time.
LM to let them know it
would be Wednesday
also wants Plumbing
11/18/2025 R10.FRAMING rough in at same time. 11/19/2025 CED INSPECTOR Assigned
Call him if you are
wanting to come earlier
than 3-he can head that
way
09/17/2025 R02.1 FOOTING 09/18/2025 09/18/2025 BUILDING Completed
DRAINS/DOWNSPOUTS
09/17/2025 R06.SHEARWALL 09/18/2025 09/18/2025 BUILDING Completed
08/01/2025 CO3. After 2:30 PM 08/04/2025 08/04/2025 BUILDING Approved
FOUNDATION/SLAB
R0T PLUMBING After 2:30.The
06/27/2025 ROUGH-IN homeowner will be home 06/30/2025 06/30/2025 BUILDING Approved
at that time.
Plan Reviews
Date Review Type Description Assigned To Review Status
05/15/2025 RESIDENTIAL ADDITION Approved with red-lines of required conditions BUILDING Approved with
Conditions
Tie gutters and downspouts into existing storm drainage
system.
05/15/2025 RESIDENTIAL ADDITION It is the applicant/owner's responsibility to ensure that Development Approved with
stormwater runoff from new/replaced impervious surfaces Services Manager Conditions
will be managed on-site in a manner that does not
adversely affect neighboring properties.
05/15/2025 RESIDENTIAL ADDITION No land use concerns. PLANNING Approved
05/15/2025 RESIDENTIAL ADDITION No comments,KS< PW-ADMIN-GIS Approved
05/15/2025 RESIDENTIAL ADDITION No comments.Class 1.SB PW-SEW-REV Approved
05/15/2025 RESIDENTIAL ADDITION No comments,Timm PW-WAT-REV Approved
06/23/2025 RESIDENTIAL Plumbing revision in the bathroom of the addition BUILDING Approved
PLUMBING
07/29/2025 RESIDENTIAL ADDITION Please review the engineered truss drawings. BUILDING Approved
Fees
Fee Description Notes Amount
Building Plan Review Table 4-2 $529.65
Credit Card Service $15.89
Processing/Technology $25.00
Building Permit Table 4-1 $814.84
State Surcharge- 1st DU Residential- 1st Unit $6.50
Credit Card Service $25.39
Building Plan Review Table 4-2 $150.00
Credit Card Service $4.50
Total $1,571.77
Attached Letters
Date Letter Description
06/06/2025 Building Permit
05/09/2025 Web Form-Building Application
Payments
Date Paid By Description Payment Type Accepted By Amount
05/13/2025 Jeffrey Atkins 231258871 Hannah Hardwick $15.89
05/13/2025 XBP Conf: $529.65
231258871
06/05/2025 Linda Atkins 233418601 Hannah Hardwick $25.39
06/05/2025 XBP Con£ $846.34
233418601
06/25/2025 Jeffrey Y 235346567 $4.50
06/25/2025 XBP Conf: $150.00
235346567
Outstanding Balance $0.00
Notes
Date Note Created By:
05/14/2025 Homeowner will act as contractor.Need to get in Lieu of signed. Hannah Hardwick
Uploaded Files
Date File Name
08/04/2025 27636438-20250804 BLD6486 Approved Truss.pdf
06/23/2025 27006053-20250623 BLD6486 Revised Plans(I xdf
06/23/2025 27006054-20250623 BLD6486 Revised Plans(2),pdf
06/06/2025 26469543-2025 BLD6486 Issued Permit.pdf
05/28/2025 26137237-20250528 BLD6486 Revised Plans.pdf
05/15/2025 25974788-20250515 BLD6486 In Lieu of Contractor.pdf
05/09/2025 7facaa3ffde58065e3338de5babl5869 permit application.pdf
05/09/2025 edff52c69e6a9575e5a891653d2a17b7 permit document.pdf
0
LZU O z
LL �a
C
a
o z W
0 A02 � o c �Q
0
�- 0 O w .�
E O v 61
A02 o o .� �
o A01 � C\1 o �, � a3 NN
Q J J 0 4!
Al 0 wHw � A
J03 J03 0 0
m o
J0 J02 0
oo
a i
an
L n�+
-----ts-)
----- ----- r --- ------ -----
---- ----- -----
L � � O �O C� O O O U� O O
a�
N
� CA
20-00-00
� � o000
m
c o 00 -1A �1eza
BID IS FOR Truss Connector Total ListE k In -0j
Q
Manuf Product Qt ` Ng �- SE N�
PRICING N � ymo�� �� �� N
y o L���m� mNN E ��_�I
--�"a� m.� cLo-" °oNo
U Q O 0 0 ` LQ 3 U N
m�a ca..= m 000�
Simpson LUS24 2 - L E
C �a�`o � 'o N TUd
PURPOSES °' ���o� y°
Q�`w�a� ° �€ <
(� J�o ao-°
� E t` f` N U N y L
w Wed Eo �a��ao�
Q waya>Z m O1- m ooLo
ONLY! 2x4 VENTED BLOCKS (Z) - 22 �2' z 2 N � CUL EccLEo���mwma n aci�cnom oom= yo�2 w °m
��>U N�L L a � �?���9�
K.... . ... . -2 cry i-dzo
Q m a a o w 5 o F in a a
c p d
CIO
tn'oim}pa
i E
O
t/>c c a LL m m O U= ..O °m °a�
°>m-moon£ - °L o�
Q ~a a E E o
= y E y a=m m a
• Community and Economic Development
Building Division
INSPECTION RECORD SHALL REMAIN AT JOB Building construction shall not commence until permit
SITE holder or agent has posted this Inspection Record Card in a
conspicuous place on the premises.
OWNER:Jeff/ Linda Atkins CONTRACTOR:Home Owner
oB ADDRESS:7721 Eaglefield Dr OWNER ADDRESS:7721 Eaglefield Dr
USE ofBUILDING: SFR PLAT NAME: VB R3
Description of work:Bed/ Bath addition LOT#
PERMIT NO: BLD#6486 Sprinklered:NO
CONDITIONS:See Permit DATE ISSUED:6/6/2025 TYPE GROUP
DEPARTMENT INSPECTION DATE DATE PASS FAIL INITIALS
FOOTING
BUILDING FOUNDATION
INSPECTION LINE UNDERFLOOR
(360)403-3417 SHEARWALL
PLUMBING (groundwork)
GAS PIPING(groundwork)
ROUGH PLUMBING
ROUGH GAS PIPING
ROUGH HEATING&VENTILATION
FRAMING
INSULATION
WALLBOARD (SHEAR/RATING)
ROOF DRAINAGE
DEVELOPMENT STORM INFILTRATION
SERVICES GRADING
INSPECTION LINE CURB GUTTER&SIDEWALK
(360)403-3417 LANDSCAPE
DRIVEWAY
SEWER INSPECTION SIDE SEWER
LINE SEWER CLEANOUT/FINAL
(360)403-3508
WATER INSPECTION WATER SERVICE INSPECTION
LINE WATER SERVICE FINAL
(360)403-3526 CROSS CONNECTIONFINAL
(360)403-3417 FINAL INSPECTION All sections must be signed off prior to final inspection
Electrical must be signed off prior to final inspection
COMMENTS: