Loading...
HomeMy WebLinkAbout4010 172ND ST_BLD6508_2026 CITY OF ARLINGTON 18204 59th Avenue NE,Arlington,WA 98223 INSPECTIONS:360-403-3417-Permit Center:360-403-3551 BUILDING PERMIT 4010 172ND ST Permit#: 6508 Parcel#:00930300000301 PERMIT EXPIRES 180 DAYS AFTER DATE OF ISSUANCE. Scope of Work:MECHANICAL:REFRIGERATION SYSTEM UPGRADING, Valuation:700000.00 WHICH COMPRISES REPLACEMENT OF LT REACH-INS&ICE CREAM CAKE BUNKER,RACK UPGRADES,ADDITION OF(2)CO2 PUMP SKIDS, REPLACEMENT OF EVAPORATORS IN ICE CREAM FREEZER,DELI FREEZER,SEAFOOD FREEZER&GROCERY FREEZER,UPGRADE ALL EXISTING REFRIGERATION RACK CONTROLLERS,REPLACEMENT OF COMPRESSORS&OTHER RACK HOUSE CHANGES AND ADD LEAK DETECTION. STRUCTURAL:NEW RAE CORP PUMP SKID(5,650 LBS)ON CAPPED CURB.FOR MORE INFORMATION SEE STRUCTURAL DRAWINGS. OWNER APPLICANT W CONTRACTOR Walmart,Inc. Hargis Engineers Inc./Gurpreet Singh Jackson Dean Construction PO BOX 8050 M/S 0555 Hargis Engineers Inc./1201 3rd Avenue, 3414 116th St Suite 600 BENTONVILLE,AR 72712-8050 Seattle Seattle,WA 98168 2064483376 2068322943 LIC:601222 672 EXP:05/31/2026 LIC:JACKSDC962QR EXP:01/10/2027 MECHANICAL CONTRACTOR = PLUMBING CONTRACTOR LIC#: EXP: LIC#: EXP: JOB DESCRIPTION PERMIT TYPE: COMMERCIAL MECHANICAL CODE YEAR: 2021 STORIES: I CONST.TYPE: VA DWELLING UNITS: OCC GROUP: M;Mercantile BUILDINGS: OCC LOAD: - PERMIT APPROVAL The issuance or granting of this permit shall not be construed to be a permit for,or approval of,any violation of this Code or any other ordinance or order of the City,of any state or federal law,or of any order,proclamation,guidance advice or decision of the Governor of this State.To the extent the issuance or granting of this permit is interpreted to allow construction activity during any period of time when such construction is prohibited or restricted by any state or federal law,or order,proclamation,guidance advice or decision of the Governor of this State,this permit shall not authorize such work and shall not be valid.The building official is authorized to prevent occupancy or use of a structure where in violation of this Code,any other City ordinances of this jurisdiction or any other ordinance or executive order of the City,or of any state or federal law,or of any order,proclamation,guidance advice or decision of the Governor.The building official is authorized to suspend or revoke this permit if it is determined to be issued in error or on the basis of incorrect,inaccurate or incomplete information,or in violation of any City ordinance,regulation or order,state or federal law,or any order,proclamation,guidance or decision of the Governor. I AGREE TO COMPLY WITH CITY AND STATE LAWS REGULATING CONSTRUCTION AND IN DOING THE WORK AUTHORIZED THEREBY;NO PERSON WILL BE EMPLOYED IN VIOLATION OF THE LABOR CODE OF THE STATE OF WASHINGTON RELATING TO WORKMEN'S COMPENSATION INSURANCE AND RCW 18.27. THIS APPLICATION IS NOT A PERMIT UNTIL SIGNED BY THE BUILDING OFFICIAL OR HIS/HER DEPUTY AND ALL FEES ARE PAID. IT IS UNLAWFUL TO USE OR OCCUPY A BUILDING OR STRUCTURE UNTIL A FINAL INSPECTION HAS BEEN MADE AND APPROVAL OR A CERTIFICATE OF OCCUPANCY HAS BEEN GRANTED.IBCl l0/IRC110. SALES TAX NOTICE: Sales tax relating to construction and construction materials in the City of Arlington must be reported on your sales tax return form and coded City of Arlington#3101. ur�reet�in yfi oG�z3�zozr "to/ -� 06/23/2025 Applicant Signature Ji-jZate Building Official Date CONDITIONS Adhere to approved plans.Permit and plans shall be onsite for inspections. Call for inspections. The property owner shall ensure that the construction project complies with all applicable zoning codes and regulations.The property owner shall also ensure that the construction project does not cause any adverse impact on the surrounding environment or community.The property owner shall be responsible for obtaining all necessary permits and approvals from the relevant authorities before commencing construction.The property owner shall ensure that the construction project complies with all applicable design review requirements. THIS PERMIT AUTHORIZES ONLY THE WORK NOTED.THIS PERMIT COVERS WORK TO BE DONE ON PRIVATE PROPERTY ONLY.ANY CONSTRUCTION ON THE PUBLIC DOMAIN(CURBS,SIDEWALKS,DRIVEWAYS, MARQUEES,ETC.)WILL REQUIRE SEPARATE PERMISSION. PERMIT FEES W Date Description Fee Amount 06/23/2025 Web Only-Wchanical Commercial Plan Review $4,094.83 06/23/2025 Credit Card Service $122.84 06/23/2025 Processing/Technology $25.00 06/23/2025 rvbchanical Base $25.00 06/23/2025 Refrigeration Unit>500 BTU/h $1,000.00 Total Due: $5,267.67 Total Payment: $5,267.67 Balance Due: $0.00 CALL FOR INSPECTIONS Call by 3:30 pm for next day inspection,allow 48 hours for Fire Inspections When calling for an inspection please leave the following information: Permit Number,Type of Inspection being requested,and whether you prefer morning or afternoon INSPECTION INFORMATION I Pass/Fail TS CONTRACTOR IS RESPONSIBLE,NDORNCONDTO CO CONTACT NTACT AND VERIFY ES DATESTFIMES WITH GENERAL REQUIREMENTS EVERY VENDOR FURNISHING EQUIPMENT OR SERVICES,OR TO CHANGE ANY DATES OR DELIVERIES.CONTRACTOR MUST CONTACT WALMART CONSTRUCTION MANAGER LISTED BELOW.VENDOR CONTACT INFORMATION IS ' 1 THE PLANS SHOWN THROUGHOUT THESE DOCUMENTS 15 THE CONTRACTOR SHALL OBTAIN PERMISSION FROM AVAILABLE IN THE GCC EQUIPMENT PLATFORM AND IN THE PROJECT SPECIFICATIONS.THIS IS UNIQUE TO CAPITAL ARE BASED ON LIMITED INFORMATION PROVIDED BY WALMART FOR ALL INTERRUPTIONS OF UTILITY EXPENDITURES PROJECTS. ' WALMART AND A LIMITED SITE OBSERVATION SURVEY; SERVICES TO THE EXISTING BUILDING PRIOR TO THE PROJECT VENDORS a m a r , , THE DESIGN PROFESSIONAL CANNOT BE HELD INTERRUPTION.ACCIDENTAL INTERRUPTIONS SHALL BE RESPONSIBLE FOR THE ACCURACY OF THE EXISTING REMEDIED IMMEDIATELY WITH APPROPRIATE FORCES. AES INDUSTRIES CONDITIONS ILLUSTRATED. HUSSMANN CORPORATION 16 ALL CAP-X/SPECIAL REFRIGERATION PROJECTS ARE TO HONEYWELL INTERNATIONAL INC W2 THE CONTRACTOR IS TO INSPECT THE STORE PRIOR TO BE BID AS NIGHT WORK.THE CONTRACTOR IS TO RAE CORP COMMENCING WITH ANY WORK AND NOTIFY THE ASSUME ALL WORK IS TO BE CONDUCTED ONLY AS WALMART MECHANICAL CONSTRUCTION MANAGER OF OVERNIGHT WORK.SOME WORK MAY BE ALLOWED REFRIGERATION CA P X REF- 1 ANY DISCREPANCIES BETWEEN THESE PLANS AND THE DURING REGULAR WORKING HOURS TO FACILITATE _ EXISTING CONDITIONS. COMPLETION SCHEDULES.WORK WILL ONLY BE WALMART CONTACT LIST3 ALL WORK SHALL BE DONE IN A SAFE AND TPERMITTED DURING REGULAR WORKING HOURS WITH HE WALMART STORE MANAGEMENT'S MENT'S AND/OR CONTACT PHONE AND/OR EMAIL TITLE WORKMANLIKE MANNER AND IN STRICT ACCORDANCE WALMART MECHANICAL CONSTRUCTION MANAGER'S GREGORY BLANK 360 nk.s038 STORE MANAGER U S M V 0 4 3 8 9 5 WITH THE LOCAL GOVERNING BUILDING CODE,NATIONAL PERMISSION.WORK IL IN PERFORMED ON THE gblank.s03757.us@wal-mart.com ELECTRIC CODE,ADA-ADAAGS,OSHA REGULATIONS, EXTERIOR OF THE BUILDING,ROOFTOP,BACK ROOM, AND ALL APPLICABLE CODES,REGULATIONS AND BEHIND DUST WALLS,AND WORK THAT DOES NOT ORDINANCES HAVING JURISDICTION. SIGNIFICANTLY INTERFERE WITH STORE OPERATIONS o GINGER BOWLING 0:479-204-1494 C:479-790-5396 WALMART SENIOR PROJECT MAY BE ALLOWED WITH THE WALMART STORE w gingecbowling@walmart.com MANAGER A R L I N G T O N WA 4 THE EXISTING BUILDING SHALL PROTECTED FROM MANAGEMENT'S AND/OR WALMART MECHANICAL w MOISTURE,DUST AND DEBRIS.INSTALL DUST CONSTRUCTI IN MANAGER'S PERMISSION.THE O F� wgw36 PARTITIONS OR DRAPES AS SHOWN OR AS REQUIRED CONTRACTOR SHALL PAY FOR ADDITIONAL SECURITY PERMITTING REQUIREMENTS AND CONTACT INFO ' TOKEEP DUST AND MOISTURE FROM WALMART PERSONNELTO SUPERVISE ACCESS TO THE BUILDING < 3t°gw o3m PREMISES. AS REQUIRED BY WALMART STORE MANAGEMENT. LL ay Hz"` UN€p$ Z H.— 3`a wg w`�o UPON NOTIFICATION OF CONTRACT AWARD,CONTRACTOR SHALL CONTACT THE ENGINEER OF RECORD'S PERMIT CONTRACTOR SHALL PROVIDE ALL SAFETY EQUIPMENT 5 ANY DAMAGE TO WALMART PROPERTY WHICH OCCURS AND EXTERIOR LIGHTING AS REQUIRED TO MAINTAIN A COORDINATOR REGARDING BUILDING PERMIT STATUS.CONTRACTOR SHALL NOT CONTACT AHJ PRIOR TO CONTACTING PERMIT COORDINATOR TO VERIFY BUILDING PERMIT STATUS.WHEN NECESSARY,THE CONTRACTOR DURING THE PROCESS OF CONSTRUCTION SHALL BE SAFE WORKING ENVIRONMENT FOR WORK REQUIRED AT SHALL DELIVER PERMIT PLAN SETS AND PAY PERMIT FEES TO THE AHJ IN ORDER TO RECEIVE CONSTRUCTION STORE #3 7 5 7 1008 REPAIRED AT NO ADDITIONAL COST TO WALMART;THIS NIGHT.THE CONTRACTOR SHALL PREPARE,AND PERMITS.UPON REVIEW OF PROJECT SCOPE THE AHJ MAY REQUIRE THE CONTRACTOR TO COMPLETE INCLUDES ALL MERCHANDISE.CONTRACTOR SHALL PAY DELIVER TO WALMART STORE MANAGEMENT,A r w ADDITIONAL PERMITTING REQUIREMENTS FOR OR SUBMIT ADDITIONAL PLAN SETS FOR REVIEW TO ADDITIONAL WALMART THE COST FOR ALL DAMAGED MERCHANDISE. SCHEDULE OF WORK FOR THE ENTIRE PROJECT SCOPE LOCAL,COUNTY,STATE,AND/OR FEDERAL AUTHORITIES WHICH MAY NOT BE LOCATED WITHIN THE LOCAL AHJ'S INDEX O F DRAWINGS 6 THE CONTRACTOR SHALL BE RESPONSIBLE FOR OF WORK.THIS SCHEDULE SHALL INCLUDE ALL PHASES OFFICES.SUBMIT ANY PLAN REVIEW COMMENTS OR QUESTIONS THROUGH THE WALMART APPROVED RFI OF WORK TO BE PERFORMED AND SHALL LIST THE PROCESS.CONTRACTOR SHALL OBTAIN PERMIT(S)THE GREATER OF 10 WORKING DAYS OR 2 WEEKS PRIOR TO RECEIVING,HANDLING,AND STORAGE OF OWNER START AND COMPLETION TIMES FOR EACH PHASE OF THE START OF CONSTRUCTION TO AVOID UNNECESSARY DELAYS AND ADDITIONAL ENGINEERING FEES. FURNISHED EQUIPMENT.CONTRACTOR SHALL WORK.THE CONTRACTOR SHALL UPDATE THIS CONTRACTOR SHALL PICK UP AND PAY FOR ANY REQUIRED PERMIT(S)AND ALL ANCILLARY FEES.COST OF REFERENCE REFRIGERATION COORDINATE DELIVERY DATE CHANGES WITH WALMART SCHEDULE WEEKLY AS CONSTRUCTION PROGRESSES. REQUIRED PERMIT(S)WILL BE DETERMINED AT THE TIME OF PERMIT ISSUANCE.EXACT AMOUNT SHALL BE HVAC/REFRIGERATION ADMINISTRATOR.CONTRACTOR o COORDINATED WITH THE WALMART CONSTRUCTION MANAGER.CONTRACTOR SHALL EMAIL A COPY OF PERMIT(S) SHEET NUMBER SHEET NAME SHEET NUMBER SHEET NAME SHALL PROVIDE EITHER ON-SITE STORAGE CONTAINERS, 17 THE CONTRACTOR SHALL COORDINATE WITH THE WHEN OBTAINED TO PERMIT COORDINATOR LISTED BELOW.CONTRACTOR SHALL UPLOAD A COPY OF PERMIT(S) T1 TITLE SHEET BASR1 BUILDING AUTOMATION SYSTEM COORDINATE EQUIPMENT LAYDOWN AREA ON-SITE, ENGINEER OF RECORD ON DEVIATIONS IN INSTALLATION WHEN OBTAINED TO EVOCO WORKSPACE SUPPORT FOLDER.UPON COMPLETION OF THE PROJECT, AND/OR OFF-SITE STORAGE FOR OWNER FURNISHED AND CONSTRUCTION OF FIXTURES,PIPING,AND OTHER C4 w - CONTRACTOR SHALL EMAIL APPROVED FINAL INSPECTION REPORT AND CERTIFICATE OF COMPLETION TO PERMIT N7 RESPONSIBILITY MATRICES BASR2 BUILDING AUTOMATION SYSTEM EQUIPMENT AND ANY OTHER CONSTRUCTION ITEMS. ITEMS SPECIFIED IN THESE CONSTRUCTION M COORDINATOR LISTED BELOW.UPON COMPLETION OF THE PROJECT,CONTRACTOR SHALL UPLOAD APPROVED N2 EDGE PROTECTION BASR3 BUILDING AUTOMATION SYSTEM CONTRACTOR SHALL COORDINATE LOCATION OF ANY DOCUMENTS. to FINAL INSPECTION REPORT AND CERTIFICATE OF COMPLETION TO EVOCO WORKSPACE SUPPORT FOLDER. BASR4 BUILDING AUTOMATION SYSTEM ON-SITE STORAGE CONTAINERS AND/OR EQUIPMENT a <u g v R7 FRONT REFRIGERATION PLAN LAYDOWN AREA WITH WALMART STORE MANAGEMENT 18 SALES FLOOR TO BE ACCESSIBLE TO CUSTOMERS CONTACT EMAIL PHONE FIXTURE R7.1 REAR REFRIGERATION PLAN PRIOR TO PLACEMENT.CONTRACTOR IS RESPONSIBLE DURING NON-CONSTRUCTION HOURS.PROVIDE ALL N =W ERIC MILLS Eric.Mills@hargis.biz 206-436-0413 R1.2 PARTIAL ROOF REFRIGERATION PLAN FOR SECURITY AND CONDITION OF OWNER FURNISHED NECESSARYTEMPORARY BARRIERS AND COVERS Z SHEET NUMBER SHEET NAME EQUIPMENT KEPT IN STORAGE AND SHALL PROVIDE CAPABLE OF WITHSTANDING SHOPPING CART TRAFFIC U D1 DEMOLITION PLAN R2 REFRIGERATION SCHEDULES PERSONNEL TO RECEIVE AND MOVE EQUIPMENT.THE AND CUSTOMER INTERACTION TO PREVENT CUSTOMER VICINITY MAP F1 FRONT FIXTURE PLAN R2.1 REFRIGERATION SCHEDULES CONTRACTOR SHALL BE RESPONSIBLE FOR THE TIMELY ACCESS OR EXPOSURE TO ANY CONSTRUCTION R3 REFRIGERATION DETAILS ORDERING OF MATERIALS TO PROHIBIT DELAYS OF THE RELATED HAZARDS.COORDINATE WITH WALMART FIA REAR FIXTURE PLAN CONSTRUCTION SCHEDULE OF THIS PROJECT.IT IS THE STORE MANAGER AND/OR WALMART MECHANICAL x R3.1 REFRIGERATION DETAILS a F2 ROOF PLAN RESPONSIBILITY OF THE CONTRACTOR TO COORDINATE CONSTRUCTION MANAGER. R4 REFRIGERATION SUBMITTALS DELIVERY OF MATERIALS IN A TIMELY MANNER. U R4.1 REFRIGERATION SUBMITTALS 19 FURNISH AND INSTALL SEISMIC BRACING BASED ON O O STRUCTURAL SR1 ISEISMIC RESTRAINT 7 THE CONTRACTOR SHALL MAINTAIN THE INTEGRITY OF APPROPRIATE SEISMIC ZONE REQUIREMENTS PER THE EXISTING BUILDING SECURITY AT ALL TIMES.THIS SMACNA PUBLISHED SEISMIC DETAILS AND LOCAL AND � C=a SHEET NUMBER SHEET NAME ELECTRICAL INCLUDES KEEPING THE BUILDING SECURE OF NATIONAL CODES.CONTRACTOR'S RESPONSIBILITY O O S1 GENERAL NOTES AND DETAILS PERSONS,ENVIRONMENTAL ELEMENTS OR HAZARDS. INCLUDES STRUCTURAL ENGINEER'S CERTIFICATION ON SHEET NUMBER SHEET NAME THE CONTRACTOR SHALL BE RESPONSIBLE TO MAINTAIN DETAILS SUBMITTED FOR PERMITTING. S2 PARTIAL ROOF FRAMING PLAN AND EQUIPMENT 'A SUPPORT DETAILS RE1 REFRIGERATION ELECTRICAL PLAN THE INTEGRITY OF ALL EXISTING SECURITY SYSTEMS. 1LIl m o RE1.1 REFRIGERATION ELECTRICAL PLAN THE CONTRACTOR SHALL OBTAIN PERMISSION FROM 20 CONTRACTOR SHALL PAINT ALL NEW CONDUIT,DUCT, LJ p THE WALMART STORE MANAGER PRIOR TO THE PLUMBING PIPING,SPRINKLER PIPING,AND SUPPORTS Z O ' MODIFICATION OF ANY EXISTING SECURITY SYSTEM FOR EXPOSED TO SALES FLOOR WITHOUT EXCEPTIONS. OLo a THE OPENING(DEMOLITION)OF ANY EXTERIOR WALL. MATCH CEILING OR ADJACENT WALL COLOR(WHERE y APPLICABLE).CONDUIT AND PIPING SHALL BE PAINTED M m 11 TY s• sv 8 THE CONTRACTOR SHALL KEEP THIS AREA CLEAN AND PRIOR TO INSTALLATION O II 1 I ' JyA "/"''•'R' il. FREE OF DEBRIS AND IS TO REMOVE ALL TRASH AND Z m r "�'^:"''t �,• . DEBRIS FROM THE CONSTRUCTION AREA DAILY.NO 21 REFER TO SPECIFICATION SECTIONS 01600-PRODUCT `J FLAMMABLE MAT O ERIALS OR LIQUIDS MAYBE STORED IN REQUIREMENTS AND APPENDIX A-PRODUCTS AND J THE EXISTING BUILDING OR IN THE NEW ADDITION. WORK BY OWNER OR SEPARATE CONTRACTOR.THESE L SECTIONS INCLUDE SPECIFIC INFORMATION REGARDING W 9 REMOVE ANY EXISTING ITEMS,SERVICES,SIGNAGE, ITEMS AND SERVICES TO BE FURNISHED AND INSTALLED FINISHES/OR SURFACES AS REQUIRED FOR THE BY INDIVIDUALS OTHER THAN THE CONTRACTOR. INSTALLATION OF NEW CONSTRUCTION. LIB 22 REPORT ANY DISCREPANCIES FOUND IN THE FIELD 10 PROVIDE FURRING FOR CONDUITS AND PIPING,SHOWN IMMEDIATELY TO WALMART MECHANICAL w OR NOT,AND FINISH OUT FURRING TO MATCH ADJACENT CONSTRUCTION MANAGER AND THE ENGINEER PRIOR EXISTING FINISHES. TO MAKING ANY STRUCTURAL MODIFICATIONS OR ORDERING OF ANY MATERIALS. Z 11 REPAIR,REROUTE,AND EXTEND ALL SERVICES,PIPING, O CONDUIT OF EXISTING ITEMS AND EQUIPMENT AS 23 IT IS IMPERATIVE THAT THE ROOF FRAMING,DECKING REQUIRED DURING THE CONSTRUCTION PROCESS FOR AND ROOFING SYSTEM BE COMPLETED IMMEDIATELY THE COMPLETE INSTALLATION AND OPERATION OF NEW UPON THE DEMOLITION OF ANY PORTION OF AN EQUIPMENT.THIS INCLUDES ALL ITEMS SHOWN OR NOT EXTERIOR WALL OR MAKING ANY OPENINGS IN THE ISSUE BLOCK SHOWN ON THE DRAWINGS. ROOF TO ELIMINATE POTENTIAL WATER DAMAGE OR MOISTURE INFILTRATION.THE CONTRACTOR SHALL 12 RESET EXISTING EQUIPMENT OR RELATED ITEMS KEEP THE BUILDING WATERTIGHT AT ALL TIMES. INCLUDING SIGNAGE AS REQUIRED FOR PROPER PROVIDE TEMPORARY MEASURES AS NECESSARY TO OPERATION.WHERE EXISTING FINISHES ARE TO REMAIN, PREVENT WATER INFILTRATION/DAMAGE. CLEAN,REPAIR,PATCH,AND/OR RE-PAINT AS NECESSARY TO BLEND WITH ADJACENT SURFACES. 24 THE GENERAL CONTRACTOR SHALL RESPOND TO ALL REQUIREME1 2 3 4 5 6 7 V 9 I O 13 CONSULT WALMART MECHANICAL CONSTRUCTION RESPONSES N ENGINEERTS OF THE AND SUBMISS ONS.ALL AD ACENTATIONS, MANAGER FOR COMPLETE APPLICABLE SCOPE OF BUILDINGS(IF APPLICABLE)SHALL REMAIN IN SERVICE WORK.THE CONTRACTOR SHALL MAINTAIN THE DURING DEMOLITION/CONSTRUCTION. REQUIRED NUMBER OF EXITS WITHIN THE STORE. MAINTAIN EXIT SIGNS AND EMERGENCY LIGHTING AT ALL 25 MUD AND DEBRIS TRACKED ONTO OWNER PAVING OR TIMES,AS REQUIRED BY THE LOCAL BUILDING OFFICIAL. CITY STREETS SHALL BE CLEANED IMMEDIATELY. 14 WALMART SHALL OCCUPY THE BUILDING DURING 26 BUILDING COMPONENTS AFFECTED BY THE SCOPE OF 01 CONSTRUCTION.THE CONTRACTOR SHALL COORDINATE WORK AND ALLOWED TO REMAIN SHALL BE SECURED TO ® WITH WALMART STORE MANAGER AND THE WALMART PREVENT FALLING,LOOSENING,HAZARDOUS MECHANICAL CONSTRUCTION MANAGER ALL CONDITION,OR CREATING DAMAGE OF ANY KIND IN THE CONSTRUCTION PROCEDURES WHICH WILL INTERFERE FUTURE. WITH THE NORMAL DAILY OPERATIONS OF THE STORE. M K - oo _ _ _ SCOPE OF WORK SUMMARY INFORMATION SAFETY BOARD K ® ® � CHECKED BY: EJM NOTE:THE INTENT OF THIS SUMMARY IS TO ASSIST VENDORS IN SAFETY BOARDS AND OR POSTED CONSTRUCTION SCHEDULES ARE c �y,n,�yt, 8 — IDENTIFYING EQUIPMENT NEEDS.IT IS NOT INTENDED FOR USE REQUIRED ON CERTAIN CAP-X PROJECTS DEPENDING ON THE DRAWN BY: JTC \ \ a BY CONTRACTOR TO CAPTURE ALL SCOPE ISSUES.REFER TO PROJECT TYPE.CAP-X PROJECTS WILL BE LISTED AS ONE OF THE PLANS AND SPECIFICATIONS(WHERE APPLICABLE)FOR FOLLOWING TYPES:COMBO,REF-1,REF-2,REF-3,REF-4,HVAC-1, PROTO CYCLE: 04/26/2024 ' L--—-—-—-—-—-—-—-—-—-I ADDITIONAL INFORMATION. HVAC-2,HVAC-3,OR HVAC4. �y DOCUMENT DATE:12/27/2024 2 1 1 1 1 r V. IJI THIS IS A CAP-X REFRIGERATION PROJECT.REFER TO REF-1/REF-2/COMBO:INFORMATION SAFETY BOARD REQUIRED D1 F2 F1.1 R1.2 R1.1 I I I I ® ® ® _ SPECIFICATIONS SECTION 01500 FOR ADDITIONAL INFORMATION W/POSTED CONSTRUCTION SCHEDULE p REGARDING REQUIRED JOB SITE TEMPORARY FACILITIES. REF-3:INFORMATION SAFETY BOARD REQUIRED W/POSTED ® ® ® ® ® ® ® ® ® CONSTRUCTION SCHEDULE SCOPE OF WORK: REF-4:NOT REQUIRED ® REPLACE LT REACH-INS HVAC-1:INFORMATION SAFETY BOARD REQUIRED W/POSTED I \ I I 0 REPLACE ICE CREAM CAKE BUNKER CONSTRUCTION SCHEDULE ® REPLACE EVAPORATOR IN SEAFOOD FREEZER. HVAC-2:INFORMATION SAFETY BOARD REQUIRED W/POSTED 1 \ ® ® ® ® ® ® ® ® REPLACE EVAPORATOR IN DELI FREEZER. CONSTRUCTION SCHEDULE ASR1 I I \ L I I REPLACE EVAPORATORS IN GROCERY/ICE CREAM FREEZER. �L ADD TWO CO2 PUMP SKIDS HVAC-3:INFORMATION SAFETY BOARD REQUIRED W/POSTED \ I I L� ® ® ® ® ® ® ® ® UPGRADE ALL EXISTING REFRIGERATION RACK CONTROLLERS CONSTRUCTION SCHEDULE 0 41142 (�(�\� i i — - � •i L — REPLACE COMPRESSORS AND OTHER RACK HOUSE CHANGES. HVAC-4:NOT REQUIRED LEEAK L DETECTION NOTED ON OEM SUBMITTALS. REFER TO THE MECHANICAL CONSTRUCTION PROJECT / --�--.'-----r' I I �/ SPECIFICATION MANUAL SECTION 01500-TEMPORARY FACILITIES AND CONTROLS FOR COMPLETE TEMPORARY FACILITY AND 1 I I I ® Izgp ® ® ® ® ® ® ® ® CONTROLS FOR COMPLETE TEMPORARY FACILITY REQUIREMENTS. S2 - CODE COMPLIANCE _ - _ - _ - _ m NOTE TO BIDDING F I I I I I I r � � � � F ALL DRAWINGS 8 WORK THEREIN SHALL BE IN COMPLIANCE WITH I I ® ® ® ® ® ® ® ® ® THE FOLLOWING CODES: CONTRACTORS 1 1 1 I ------------------�I THE INTERNATIONAL BUILDING CODE,2021 EDITION;AMENDED BY THESE PLANS ARE TYPICALLY ISSUED FOR BID AS REDUCED"1/2 D1 F1 R1 -r a CHAPTERS 51-50 AND 51-51 WAC (HALF)SIZE"DOCUMENTS.SCALES SHOWN APPLY TO ORIGINAL ® T� ® ® ® THE INTERNATIONAL FIRE CODE,2021 EDITION;AMENDED BY FULL SIZE"DOCUMENTS ONLY.DO NOT SCALE DRAWINGS,FIELD CHAPTER 51-54A WAG VERIFY ALL DIMENSIONS. E I I T L JJ�� LL i — — THE INTERNATIONAL MECHANICAL CODE,2024 EDITION;AMENDED i fSF HS1 1 C / BY CHAPTER 51-52 WAG THE AWARDED CONTRACTOR SHALL BE RESPONSIBLE FOR THE THE NATIONAL ELECTRICAL CODE,2023 EDITION ENTIRE SCOPE OF WORK INDICATED ON THESE PLANS,THE I I ® THE WASHINGTON STATE ENERGY CODE,2021 EDITION ASSOCIATED SPECIFICATIONS AND WALMART SCOPE OF WORK ® ®I ® ®I ® 11 ® ® DOCUMENT.THIS CAPITAL EXPENDITURE SHALL BE COMPLETED AS USE AND OCCUPANCY GROUP:M A"TURN KEY"PROJECT BY THE AWARDED CONTRACTOR AND SHALL CONSTRUCTION TYPE:V INCLUDE BUT� NOT LIMITED TO ALL SHEETS ON THIS SET:HVAC, — — — BUILDING AREA:UNCHANGED REFRIGERATION,PLUMBING,ELECTRICAL,BAS CONTROLS SYSTEMS, D I D OCCUPANT LOAD:UNCHANGED t i I-===------ --------------------- o ® ® FIRE PROTECTION:YES ARCHITECTURAL AND STRUCTURAL DISCIPLINES. - -- m ---- PROJECT SITE ADDRESS - ___ -J - - - - CONSTRUCTION PHASING ARLI STREET: ST NE — — CITY: ARLINGTOGTON — — PHASING NOTES ARE INTENDED TO BE USED AS A GENERAL STATE: WA _ /gyp\\ GUIDE TO THE CONSTRUCTION AND PHASING OF PROJECT.IT IS COUNTY: SNOHOMISH COUNTY — ------ —------- — — — —— -__ ~~~ — ' — B / THE RESPONSIBILITY OF THE CONTRACTOR TO COORDINATE ALL AREAS,� AREAS OF PHASING WITH WALMART MECHANICAL �\�l�Q\� CONSTRUCTION MANAGER AND WALMART STORE MANAGER PRIOR TO AND DURING CONSTRUCTION. TITLE SHEET 1 2 3 4 5 6 7 8 9 1^ City of Arlington Building Department ^ APPROVED EXISTING CONDITIONS WERE TAKEN FROM EACH SUBCONTRACTOR IS RESPONSIBLE FOR HAVING KEY PLAN Kevin Olander-06/23/2025 ORIGINAL DRAWINGS AND MAY NOT REFLECT A THOROUGH KNOWLEDGE OF ALL DRAWINGS AND EXACT"AS-BUILT'CONDITIONS.CONTRACTOR SPECIFICATIONS IN THEIR RELATED FIELD.THE FAILURE No changes authorized unless approved b SHALL FIELD VERIFY ALL EXISTING CONDITIONS TO ACQUAINT THEMSELF WITH THIS KNOWLEDGE DOES 9 pp y PRIOR TO SUBMITTING FINAL BIDS.CONTRACTOR NOT RELIEVE THE RESPONSIBILITY OF PERFORMING the Building Official SHALL CAREFULLY COORDINATE NEW WORK AND THE WORK PROPERLY.NO ADDITIONAL SHEET: DEMOLITION WITH ALL OTHER DISCIPLINES AND COMPENSATION SHALL BE ALLOWED BECAUSE OF T 1 EXISTING CONDITIONS. CONDITIONS THAT OCCUR DUE TO FAILURE TO FAMILIARIZE WORKERS WITH THIS KNOWLEDGE. WALK-IN BOX PROJECTS KE2 THERM EVAPORATOR CONTROL PANEL INSTALLATION CASE INSTALLATION "'NOTE"` "`NOTE"' HIS —NOTE— THISDOCUMENTISINTENDEDTODESCRIBEIMPORTANTELEMENTSOFTHISPROJECTANDTODEFINETHERESPONSIBLEPARTIESFORTHISWORKSTREAM.IT IS NOT MEANT TO BE AN EXHAUSTIVE SOURCE OF INFORMATION ORA THIS DOCUMENT IS INTENDED TO DESCRIBE IMPORTANT ELEMENTS OF THIS PROJECT AND TO DEFINE THE RESPONSIBLE PARTIES FOR THIS WORK STREAM.IT IS TOR HIS WOKUMENT STREAM. TOTMEA T TO BEIMPORT EXHAUNT STIVE SOFTHISP INFORMATION AND TO DEFINE PETESPOPE OF PARTIES OMPLETE SCOPE OF WORK.IT SHALL BE READ AND USED IN CONJUNCTION WITH ADDITIONAL,DETAILED INFORMATION IN THE WALMART REALTY ONE BEST WAY STANDARDS LIBRARY,AND IN PUBLICATIONS AVAILABLE FROM THENOT MEANT TO BE AN EXHAUSTIVE SOURCE OF INFORMATION OR A COMPLETE SCOPE OF WORK.IT SHALL BE READ AND USED IN CONJUNCTION WITH ADDITIONAL, FOR THIS WORK STREAM.IT IS NOT MEANT TO BEAN EXHAUSTIVE SOURCE OF INFORMATION E A COMPLETE SCOPE E WORK.Y MANUFACTURER. DETAILED INFORMATION IN THE WALMART REALTY ONE BEST WAY STANDARDS LIBRARY,AND IN PUBLICATIONS AVAILABLE FROM THE MANUFACTURER. SHALL BE READ AND USED IN CONJUNCTION WITH ADDITIONAL,DETAILED INFORMATION IN THE FACTO WALMART REALTY ONE BEST WAY STANDARDS LIBRARY,AND IN PUBLICATIONS AVAILABLE FROM THE MANUFACTURER. RESPONSIBLE PARTY RESPONSIBLE PARTY RESPONSIBLE PARTY # SCOPE OF WORK BATTEN AND SEAL RELINE REPLACE EVAPORATOR/BOX # SCOPE OF WORK BASIC PANEL STANDARD PANEL # SCOPE OF WORK REPLACEMENTS NEW EQUIPMENT SELF REMODEL CAPX SELF REMODEL CAPX REMODEL CAPX REMODEL CAPX REMODEL CAPEX REMODEL CAPEX REMODEL CAPEX PERFORM PERFORM 1 FURNISH THE CASES. OEMIWMT OEMIWMT OEMIWMT OEM/WM7 FURNISH THE KE2 THERM EVAPORATOR CONTROL PANELS,SENSORS AND 2 FURNISH AND INSTALL ALL(REFRIGERANT AND DRAIN)PIPING. RC RC RC RC 1 DEPENDING ON THE SCOPE OF WORK,FURNISH BATTEN AND SEAL,RELINE OR WALK-IN PANELS MATERIALS. PSWMT PS/WMT PS/WMT PS/WMT PSWMT PSWMT 1 OTHER DEVICES AS REQUIRED TO COMPLETE THE PROJECT. WMT WMT WMT WMT WMT WMT 3 FURNISH ALL FIELD-INSTALLED REFRIGERATION VALVES. OEM/WMT OEMWMT OEMIWMT OEMIWMT 2 DEPENDING ON THE SCOPE OF WORK,FURNISH EVAPORATORS AS REQUIRED. OEMIWMT OEMWMT OEMWMT OEM/WMT OEMWMT OEM/WMT FURNISH AND INSTALL ALL REFRIGERANT PIPING,AND ALL FIELD INSTALLED WMT WMT 4 FURNISH AND INSTALL ALL ISOLATION BALL VALVES. RC RC RC RC 3 DEPENDING ON THE SCOPE OF WORK,FURNISH EVAPORATOR CONTROL PANELS EMSWMT EMSNVMT EMS/WMT EMS/WMT EMSIWMT EMS/WMT 2 REFRIGERATION VALVES NECESSARY TO COMPLETE THE WORK. TECHNICIAN RC RC TECHNICIAN RC RC 5 INSTALL ALL FIELD INSTALLED REFRIGERATION VALVES. RC RC RC RC 4 FURNISH AND INSTALL ALL(REFRIGERANT AND DRAIN)PIPING. RC RC RC RC RC RC FURNISH ALL CONTROLS CABLING AS NECESSARY TO COMPLETE THE WORK. WMT WMT 6 FURNISH AND INSTALL ALL FACTORY INSTALLED OEMIWMT OEMMMT OEMMMT OEMMMT 3 (24 VOLTS OR LESS) TECHNICIAN EMS EMS TECHNICIAN EMS EMS REFRIGERATION VALVES. 5 FURNISH ALL FIELD-INSTALLED REFRIGERATION VALVES. OEMMMT OEM/WMT OEM/WMT OEM/WMT OEMMMT OEMMMT FURNISH ALL CONTROLS CABLING AS NECESSARY TO INSTALL AND TERMINATE CONTROLS WIRING(24 VOLTS OR LESS)AS WMT IT T 7 EMS EMS EMS EMS 6 FURNISH ALL ISOLATION VALVES. RC RC RC RC DETAILED ON THE PRINTS. TECHNICIAN 4 RC RC TECHNICIAN RC RC COMPLETE THE WORK.(24 VOLTS OR LESS) PROVIDE TYPEWRITTEN SCHEDULES FOR ALL AFFECTED w � mw 8 GC RC GC RC m S `�- rzw� sw 7 FIELD-INSTALL ALL REFRIGERATION VALVES. RC RC RC RC RC RC FURNISH AND INSTALL ALL ELECTRICAL POWER CABLING FROM POWER WMT WMT ELECTRICAL PANELBOARDS. o 5 GC RC GC RC SOURCE. TECHNICIAN TECHNICIAN INSTALL AND TERMINATE FURNISHED CONTROLS W IRING(24 � 9 RC RC RC RC r" '$Wow3 8 FURNISH ALL CONTROLS CABLING AS NECESSARY TO COMPLETE THE WORK.(24 VOLTS OR LESS) EMS EMS EMS EMS EMS EMS VOLTS OR LESS)AS DETAILED ON THE PRINTS. 6 TERMINATE POWER CABLES TO THE KE2 PANEL(S). TE TECHNICIAN RC RC TECHNICIAN RC RC PROVIDEELECTRICAL POWER CABLING FROM POWER SOURCE Ny yoro�U"€p� 9 INSTALL AND TERMINATE CONTROLS WIRING(24 VOLTS OR LESS)AS DETAILED ON THE PRINTS. RC RC RC RC RC RC 10 TO THE FIRST CASE IN THE CIRCUIT. GC RC GC RC Z FURNISH AND INSTALL ALL ELECTRICAL POWER CABLING FROM POWER SOURCE TO THE EVAPORATOR COORDINATE THE INSTALLATION TIME WITH STORE MANAGEMENT. PROVIDE ALL"SLAVE"WIRING FROM FIRST CASE TO REMAINING i � o'a 10 GC RC GC RC GC RC 11 RC RC RC RC ��o� €rc� o CONTROL PANEL IF NECESSARY. PREFABRICATE AS MUCH OF THE ELECTRICAL CONDUIT AS POSSIBLE WMT WMT CASES ON THE CIRCUIT. g 3N=a?..yoo WOQON 7 POWER AND CONTROLS CABLES AND MOUNT ANY DEVICES PRIOR TO FINAL GC RC RC RC PREFABRICATE AS MUCH OF THE PIPE WORK AND ELECTRICAL a a�'°�' o J~ ; TECHNICIAN TECHNICIAN Fdo-a- :g 11 TERMINATE POWER CABLES TO THE EVAPORATOR CONTROL PANEL. RC RC RC RC RC RC CONNECTIONS BEING MADE IN ORDER TO REDUCE THE AMOUNT OF"DOWN CONDUIT AS POSSIBLE AND MOUNT ANY DEVICES IN ORDER TO r €y o y o o e TIME"NEEDED TO COMPLETE THE INSTALLATION. 12 RC RC RC RC vi REDUCE THE AMOUNT OF"DOWN TIME"NEEDED TO COMPLETE 12 PREFABRICATE AS MUCH OF THE PIPE WORK AND ELECTRICAL CONDUIT AS POSSIBLE AND MOUNT ANY THE INSTALLATION. DEVICES IN ORDER TO REDUCE THE AMOUNT OF"DOWN TIME" RC RC RC RC RC RC NEEDED TO COMPLETE THE INSTALLATION. IF THE KE2 PANEL IS BEING RETROFITTED TO AN EXISTING WALK-IN BOX, ENSURE THAT THE WALK-IN BOX DOOR IS KEPT CLOSED AS MUCH AS WMT WMT 13 COORDINATE THE INSTALLATION TIME WITH STORE GC RC GC RC W 13 COORDINATE THE INSTALLATION TIME WITH STORE MANAGEMENT. GC RC GC RC GC RC 8 POSSIBLE DURING THE TIME IN HICH THE CONVERSION WORK IS BEING TECHNICIAN RC RC TECHNICIAN RC RC MANAGEMENT. 14 OBTAIN HOT WORK PERMITS AS REQUIRED. GC RC GC RC GC RC CARRIED OUT. 14 OBTAIN HOT WORK PERMITS AS REQUIRED. GC RC GC RC N}- ^o 15 FURNISH TEMPORARY REFRIGERATED STORAGE AS NECESSARY. WMT WMT WMT WMT WMT WMT NOTIFY THE WMT BUILDING CONTROLS TEAM AND ADVISE THEM WHICH WMT WMT NOTIFY THE EMS VENDOR 24 HRS.IN ADVANCE OF THE WORK- W t 9 SYSTEM AND WHICH WALK-IN BOX W ILL BE IMPACTED BY THE WORK. TECHNICIAN RC RC TECHNICIAN RC RC 15 TELL THEM WHAT CASES ARE BEING INSTALLED AND WHAT RC RC RC RC w v m; NOTIFY THE EMS VENDOR 24 HRS.IN ADVANCE OF THE WORK-TELL THEM WHICH WALK-IN BOXES ARE BEING SYSTEMS WILL BE IMPACTED. 16 RC RC RC RC RC RC M IMPACTED. MOUNT THE BASIC KE2 EVAPORATOR CONTROL PANEL ON A WALL INSIDE THE WMT NOTIFY THE WMT BUILDING CONTROLS TEAM AND ADVISE F z 10 RACK HOUSE.NOTE THAT PANELS MUST BE INSTALLED WITH NEC REQUIRED RC RC N/A N/A N/A 16 THEM WHICH SYSTEMS AND WHICH CASES WILL BE IMPACTED RC RC N/A N/A NOTIFY T TECHNICIAN Z r CLEARANCES. 17 HE WMT BUILDING CONTROLS TEAM AND ADVISE THEM WHICH SYSTEM AND WHICH WALK-IN BOX RC RC RC RC RC RC BYTHEWORK. WILL BE IMPACTED BY THE WORK. N =W MOUNT THE STANDARD KE2 EVAPORATOR CONTROL PANEL ON THE 17 REMOVE ALL OF REFRIGERATED PRODUCTS FROM THE CASES WMT WMT NIA NIA EXTERNAL WALL OF THE FREEZER TO WHICH THE CONTROLLER IS THAT ARE BEING REPLACED. z 18 REMOVE ALL OF REFRIGERATED PRODUCTS FROM THE WALK-IN BOX THAT IS BEING IMPACTED. WMT WMT WMT WMT WMT WMT CONNECTED.INSTALL THE PANEL ON THE DOOR WALL OF THE BOX,IN AN WMT O 11 ACCESSIBLE POSITION THAT IS OUT OF THE WAY OF TRAFFIC WHICH MAY N/A N/A N/A TECHNICIAN RC RC REMOVE ALL OF THE ASSET PROTECTION(BUMP GUARDS) Q NOTE:ALLOW LOW TEMP ROOMS TO"DEFROST"FOR A PERIOD OF 72 HOURS TO ENSURE ALL ICE HAS MELTE SHUT DOWN THE WALK-IN BOX THAT IS BEING IMPACTED. DAMAGE THE PANEL.NOTE THAT PANELS MUST BE INSTALLED WITH NEC 18 FROM AROUND THE CASES. GC RC N/A N/A 19 RC RC RC RC RC RC REQUIRED CLEARANCES. DECOMMISSION AND REMOVE THE OLD CASES.IN TEXAS,ALL )C FROM THE PANELS.ICE MELT NEEDS TO BE KEPT CLEARED THROUGHOUT THIS TIME TO ENSURE THAT WATE IS NOT REABSORBED BY THE PANELS. DECOMMISSIONED CASES WILL BE REMOVED FROM THE STORE d REMOVE THE(CONTROL)WIRING FOR THE EVAPORATOR CONTROL HEATERS, U 20 REMOVE ALL OF THE RACKING FROM INSIDE THE WALK-IN BOX THAT IS BEING IMPACTED. WMT RC WMT RC WMT RC EVAPORATOR FANS AND THE LLSV FROM THE EXISTING CONTROL MODULE. BY QUICK REFRIGERATION. USING THE WIRING HARNESS FURNISHED W ITH THE KE2 INSTALLATION KIT, COORDINATE REMOVAL AND DISPOSAL WITH WMT O O 21 REMOVE ANY PROTECTION DEVICES/STRUCTURES THAT WILL IMPEDE THE COMPLETION OF THE WORK. GC RC GC RC GC RC WMT 19 CONSTRUCTION MANGER. RC RC N/A N/A 12 SPLICE INTO THESE CIRCUITS AND CONNECT THEM TO THE CORRECT RC RC N/A N/A N/A TERMINALS IN THE KE2 PANEL.LEAVE THE EXISTING FAN AND DEFROST TECHNICIAN WHEN REPLACING PRODUCE CASES,REMOVE WATER SUPPLY O O REMOVE ALL UTILITIES(CONDENSATE PIPING,CONDUITS,J-BOX,LIGHTING,FIRE SUPPRESSION ETC.)IN CONTACTORS IN PLACE.(NOTE:POWER TO THE KE2 THERM PANEL IS VIA THE FROM MISTING SYSTEM. 22 ORDER TO ALLOW FOR THE WORK TO BE CARRIED OUT. N/A N/A GC RC GC RC EXISTING CIRCUIT CONTROL CIRCUIT.) WHEN REPLACING DELI SERVE OVER CASES,COORDINATE THE O O REMOVAL OF THE DATA CABLING FOR THE DELI SCALES. REMOVE THE APX REPEATER FROM THE WALK-IN BOX THAT IS BEING IMPACTED.STORE THE DEVICE FOR INSTALL AMULTI-CORE CABLE FROM THE RACK HOUSE TO THE WALK-IN BOX 20 CLEAN THE FLOOR UNDER THE CASES AND JET THE DRAINS. RC RC NIA NIA 23 GC RC GC RC GC RC O REUSE FOLLOWING COMPLETION OF THE WALK-IN WORK. TO TERMINATE THE RETURN AIR SENSOR,TWO DEFROST TERMINATION WMT r 13 SENSORS AND THE DOOR SWITCH.NOTE THAT ALL KE2 SUPPLIED CONTROL TECHNICIAN RC RC N/A N/A N/A WHEN REPLACING MULTI-DECK AND/OR GLASS DOOR CASES, z 24 REMOVE THE REFRIGERATION EVAPORATOR(S)FROM THE AFFECTED WALK-IN BOX AS NEEDED. N/A N/A GC RC GC RC AND REUSING EXISTING PIPEWORK,RE-INSULATE THE O a WIRING IS COLOR CODED. REFRIGERATION PIPING BEHIND THE CASES THIS APPLIES TO PS 21 RC RC N/A N/A 25 FILL ANY GAPS IN THE PANEL JOINTS WITH SEALANT OR EXPANDABLE FOAM PRIOR TO TAPING THE JOINT. PS PS PS PS N/A N/A ALL PIPING THAT IS ACCESSIBLE WITHOUT DISTURBING M m 14 USE THE EXISTING DEFROST CIRCUIT TO POWER THE KE2 THERM PANEL. N/A N/A N/A WMT RC RC EXISTING CASES,INSIDE PITS/TUNNELS OR IN A CHASE THAT CLEAN WALLS AND REPAIR ANY FAULTY PANELS IN PREPARATION FOR BATTEN/SEALING OF THE WALL TECHNICIAN IS NOT BEING OTHERWISE DISTURBED. Z 26 PS PS N/A N/A N/A N/A r n JOINTS WITHIN THE BOX THAT IS BEING REPAIRED.CARRY OUT THE BATTEN AND SEAL PROCESS. CARRY OUT THE ELECTRICAL INSTALLATION IN LINE WITH THE N/A N/A N/A WMT 15 RC RC SET THE CASES IN THE POSITION DICTATED BY THE MANUFACTURER'S INSTRUCTIONS AND INFORMATION INCLUDED ON THE BLU... TECHNICIAN CONSTRUCTION PRINTS.ENSURE CASES ARE STRAIGHT AND Z O CLEAN WALLS AND REPAIR ANY FAULTY PANELS IN PREPARATION FOR RELINING THE BOX THAT IS BEING LEVEL,AND SHIMMED PER THE MANUFACTURER'S GUIDANCE. 27 REPAIRED.RE-LINE THE WALK-IN BOX AND BATTEN/SEAL THE CEILING JOINTS WITHIN THE BOX AFFECTED. N/A N/A PS PS N/A N/A MOUNT THE KE2 THERM ROOM TEMPERATURE SENSOR ADJACENT TO THE 22 RC RC RC RC r SEAL ALL CASES WITH BUTYL SEALANT.ALIGN GLASS DOORS (n EXISTING EMS RETURN AIR SENSOR(TYPICALLY 6"BEHIND CENTER OF J DISCONNECT ANY FALL PROTECTION NETTING FROM THE TOP OF THE WALK-IN BOX.LEAVING IT ATTACHED T EVAPORATOR COIL IN THE RETURN AIR STREAM).WIRE THE KE2 THERM PLUMB AND LEVEL TO PREVENT"SAW-TOOTHING"OF THE SENSOR TO THE T2 AIR TEMPERATURE TERMINALS. WMT WMT DOORS. 28 THE ROOF MEMBERS STOW IT OUT OF THE WAY FOR FUTURE RE-USE. N/A N/A N/A N/A PS PS 16 RC RC RC RC DEMOLISH AND REMOVE THE EXISTING WALK-IN BOX AS NOTED ON THE PROJECT PRINTS. **'NOTE**' TECHNICIAN TECHNICIAN THE EXISTING EMS TEMPERATURE CONTROL SENSOR REMAINS LOCATED IN 23 CO RC RC RC RC NNECT THE CASES(MECHANICAL,ELECTRICAL,PLUMBING Q PROVIDE SUPPORT FOR ANY ITEMS THAT MAYBE MOUNTED TO THE EXTERIOR THE WALK-IN BOX THAT AND CONTROLS)AS DETAILED ON THE PRINTS. w m 29 WILL REMAIN IN SERVICE DURING THE BOX REPLACEMENT.(FOR EXAMPLE PANELEL PLACE AND CONNECTED TO THE EXISTING EMS SYSTEM.BOARDS,EMS N/A N/A N/A N/A GC RC g BACKBOARDS ETC.) 24 EVACUATE AND PRESSURE TEST THE CASES AND ANY PIPING MOUNT THE DEFROST TERMINATION SENSOR ON THE FAN SIDE OF THE MODIFIED OR DISTURBED DURING THE WORK. RC RC RC RC z 30 REPLACE THE WOODEN THERMAL BREAKS AS NECESSARY. N/A N/A N/A N/A GC RC EVAPORATOR COIL.(RECOMMENDED LOCATION IS NEAR THE BOTTOM ON THE WMT WMT SWITCH ON AND COMMISSION THE CASES,VALVES AND 31 INSTALL NEW WALK-IN BOX.HANG THE DOOR AND ENSURE THAT ALL HARDWARE FUNCTIONS CORRECTLY. N/A N/A N/A N/A PS PS 17 SIDE OF THE COIL NEAR THE SUCTION HEADER.)WIRE THIS SENSOR TO THE TECHNICIAN RC RC IT RC RC CONTROLS AS REQUIRED.CHECK AND ADJUST MECHANICAL T3 COIL TERMINALS. 25 TXV SUPERHEATS TO OEM RECOMMENDATIONS AND EPR RC RC RC RC 32 RETRIEVE ANY FALL PROTECTION NETTING FROM THE ROOF MEMBERS,AND REATTACH IT TO THE TOP OF N/A N/A N/A N/A GC RC IF THE CIRCUIT HAS ONLY 1 EVAPORATOR COIL,MOUNT THE 2ND DEFROST SETTINGS PER LEGEND. THE WALK-IN BOX AS DESCRIBED ON THE PRINTS. TERMINATION SENSOR ON THE OPPOSITE END OF THE COIL.IF THE 26 INSTALL FURNISHED LIDS TO REFRIGERATED BUNKERS. RC RC RC RC ISSUE BLOCK REATTACH ANY ITEMS PREVIOUSLY MOUNTED TO THE EXTERIOR OF THE WALK-IN BOX THAT WERE 18 REFRIGERATION CIRCUIT HAS 2 COILS,MOUNT THE 2ND DEFROST WMT RC RC WMT RC RC FURNISH CONTROLS SUPPORT TO THE INSTALLING 33 TEMPORARILY SUPPORTED DURING THE WALK-IN BOX REPLACEMENT.(FOR EXAMPLE PANEL BOARDS,EMS N/A N/A N/A N/A GC RC TERMINATION SENSOR ON 2ND COIL.WIRE THIS SENSOR TO THE T4 AUXILIARY TECHNICIAN TECHNICIAN 27 CONTRACTOR. OEM OEM OEM OEM BACKBOARDS ETC.) TERMINALS.(NOTE:IF THE KE2 SUPPLIED DOOR SWITCH IS TO BE USED, INSTALL PROTECTION DEVICES AS INDICATED ON THE PRINTS.REINSTALL ANY EXISTING PROTECTION FOLLOW THE MANUFACTURER'S INSTRUCTIONS FOR INSTALLATION.) 28 WHEN REPLACING PRODUCE CASES,INSTALL MISTING SYSTEM RC RC RC RC 34 DEVICES OR STRUCTURES AS REQUIRED.ENSURE THAT ANY UNDISTURBED PROTECTION DEVICES ARE GC RC GC RC GC RC TO CASES AND CONNECT TO DEDICATED WATER SUPPLY. FIXED SECURELY. CONVERT THE EXISTING,MECHANICAL EVAPORATOR PRESSURE REGULATOR 19 (EPR)TO AN ELECTRIC EVAPORATOR PRESSURE REGULATOR(EEPR)BY WMT RC RC N/A N/A N/A 29 WHEN REPLACING DELI SERVE OVER CASES,COORDINATE THE WMT RCWMT WMT RCWMT INSTALL THE EVAPORATORS(MECHANICAL,ELECTRICAL,PLUMBING AND CONTROLS)AND CONTROL PANELS MEANS OF A CONVERSION KIT SUPPLIED BY THE VALVE MANUFACTURER. TECHNICIAN INSTALLATION OF THE DATA CABLING FOR THE DELI SCALES. 35 AS DETAILED ON THE PRINTS. N/A N/A N/A N/A RC RC CONNECT THE EEPR TO THE KE2 EVAPORATOR CONTROL PANEL. NOTIFY WMT BUILDING CONTROLS THAT THE CASES ARE REMOVE THE CIRCUIT LLSV FROM THE LIQUID MANIFOLD AT THE RACK 30 RUNNING AND ONLINE. RC RC RC RC 36 EVACUATE AND PRESSURE TEST THE EVAPORATORS AND ANY PIPING MODIFIED DURING THE WORK. N/A N/A NIA N/A RC RC AND PROVIDE A LLSV TO BE INSTALLED IN THE EVAPORATOR LIQUID LINE CARRY OUT A THOROUGH LEAK TEST ON ALL WELDED AND 37 INSTALL AND COMMISSION REFRIGERANT LEAK DETECTION SYSTEM AS NOTED ON THE PROJECT PRINTS. N/A N/A N/A N/A RC RC 20 PIPEWORK LOCATED ABOVE THE WALK-IN BOX.REMOVE THE MECHANICAL N/A N/A N/A WMT RC RC 31 MECHANICAL JOINTS INSTALLED OR DISTURBED DURING THE RC RC RC RC SUCTION STOP VALVE FROM THE RACK,AND PROVIDE AN EEPR TO TO BE TECHNICIAN PROJECT. INSTALL/MODIFY ALL UTILITIES FOR FINAL BOX CONFIGURATION.(CONDENSATE PIPING,CONDUITS,J-BOX, INSTALLED IN THE EVAPORATOR SUCTION LINE PIPEWORK LOCATED ABOVE HANDOVER THE CASES TO THE STORE. 38 LIGHTING,FIRE SUPPRESS ON ETC.)INSTALL CONDUIT FOR APX CABLING.SEAL ALL PENETRATIONS PER GC RC GC RC GC RC THE WALK-IN. 32 (CASES MUST BE CLEAN,AT OPERATIONAL TEMPERATURE AND RC RC RC RC SPECS FULLY FUNCTIONAL WITH ALL PANS AND SHELVING IN PLACE.) 39 SWITCH ON THE REFRIGERATION,LIGHTING AND OTHER SYSTEMS WITHIN THE WALK-IN. RC RC RC RC RC RC INSTALL A SUCTION LINE TRANSDUCER AND WIRE THE SIGNAL,GROUND AND SV W IRES TO THE TERMINALS INSIDE THE KE2 THERM PANEL.INSTALL A WMT 33 FILL THE CASE WITH PRODUCT. WMT WMT WMT WMT 21 N/A N/A N/A RC RC COMMISSION THE EVAPORATORS,VALVES AND CONTROLS AS REQUIRED.CHECK AND ADJUST MECHANICAL SUCTION LINE TEMPERATURE SENSOR AND CONNECT THE WIRES TO THE Ti TECHNICIAN 40 TXV SUPERHEATS TO OEM RECOMMENDATIONS AND EPR SETTINGS PER LEGEND. N/A N/A N/A N/A RC RC SUCTION(AUX)TERMINALS INSIDE THE KE2 THERM PANEL. REPLACE MISSING OR DAMAGED FLOOR TILES OR REPAIR GC WMT PREFERRED IF INSTALLING MORE THAN ONE KE2 THERM PANEL IN A SINGLE FACILITY, 34 VISIBLE,DAMAGED CONCRETE FLOOR AROUND THE CASES. FLOORING RC N/A N/A 41 FURNISH HCR AIR DOORAS REQUIRED. N/A N/A N/A N/A PSIWMT PS MT 22 FOLLOW THE MANUFACTURER'S INSTRUCTIONS TO INSTALL A GATEWAY TE HI CIAN RC RC WM TECHNICIAN RC RC (AS NEEDED) INSTALLER) 42 FIELD-INSTALL AND START-UP HCR AIR DOORS AS REQUIRED. N/A N/A N/A N/A PS pS ROUTER.(CAT 5 OR CAT 6 CABLE TO BE SUPPLIED BY INSTALLER.) 35 INSTALL CIRCUIT LABELS TO THE CASES AS REQUIRED. RC RC RC RC CHECKED BY: EJM 43 CARRY OUT ANY CONTROLS PARAMETER CHANGES. N/A N/A N/A N/A EMS EMS IF INSTALLING MORE THAN ONE KE2 THERM PANEL IN A SINGLE FACILITY, FOLLOW THE MANUFACTURER'S INSTRUCTIONS TO"BOND"THE PANELS 36 COMPLETE ASSET TAGGING PROCESS RC RC RC RC DRAWN BY: JTC 44 CARRY OUT ANY CONTROLS PARAMETER CHANGES AND PERFORM REMOTE CHECKOUT. N/A N/A NIA NIA RC RC 23 TOGETHER.THIS BONDING PROCESS PREVENTS EVAPORATORS FROM TE HI CIAN RC RC TECHNICIAN RC RC 45 FURNISH CONTROLS SUPPORT TO THE INSTALLING CONTRACTOR. N/A N/A N/A N/A EMS EMS DIFFERENT WALK-INS FROM DEFROSTING CONCURRENTLY,WHICH MAY PROTO CYCLE: 04/26/2024 OVERLOAD THE ELECTRIC DEFROST POWER CIRCUIT. 37 REPLACE THE SHOP FLOOR DRAW INGS AND INSTALL RC RC RC RC 46 NOTIFY WMT BUILDING CONTROLS THAT THE WALK-IN BOX IS RUNNING AND ONLINE. RC RC RC RC RC RC REPLACEMENT LEGENDS. DOCUMENT DATE:12/27/2024 CONNECTEEV EVAPORATOR HAS AN ELECTRONIC EXPANSION VALVE( ) 47 REINSTALL/RECOMMISSION THE APX REPEATER DEVICE. WMT WMT WMT WMT WMT WMT IF THE WMT 24 THE VALVE TOEVAPORATOR THE CORRECT TERMINALS WITHIN THE KE2 THERM N/A N/A N/A TECHNICIAN RC RC REINSTALL N(BUMP IOUSLY GUARDSRE OVEDSTALL(UNDAMAGED)ERFURNISHED ASSET 48 INSTALL SHELVING/RACKING AS INDICATED ON THE PLANS.RE-INSTALL RACKING AS NECESSARY. WMT RC WMT RC WMT RC EVAPORATOR CONTROLLER. 38 PROTECTION(BUMP GUARDS).INSTALL OWNER FURNISHED RC RC RC RC 49 ANCHOR RACKING AS INDICATED ON THE PLANS. GC RC GC RC GC RC PROTECTION EQUIPMENT AS NEEDED. PROGRAM THE CONTROLLER IN ACCORDANCE WITH GUIDANCE GIVEN IN THE WMT WMT 50 INSTALL CIRCUIT LABELS TO THE WALK-IN BOX,CONTROLLERS AND EVAPORATORS AS REQUIRED. RC RC RC RC RC RC 25 KE2 THERM INSTALLATION MATERIALS. TECHNICIAN RC RC TECHNICIAN RC RC AFTER ALL CHANGES HAVE BEEN MADE TO A RACK,REMOVE T'ANY COMPRESSOR SUCTION FILTERS/SOCKS AND REPLACE ♦G DURING THE PROJECT. CARRY OUT THE EMS CONTROLS PARAMETER CHANGES AND PERFORM A 39 THE RACK LIQUID LINE FILTERS.LEAVE THE OLD FILTERS/ RC RC RC RC w� CARRY OUT A THOROUGH LEAK TEST ON ALL WELDED AND MECHANICAL JOINTS INSTALLED OR DISTURBED 26 EMS EMS EMS EMS EMS EMS 51 RC RC RC RC RC RC REMOTE CHECKOUT. DRIERS IN THE RACK HOUSE TO BE INSPECTED BY THE MCM. y THE KE2 THERM EVAPORATOR CONTROL PANEL EXECUTES ALL SUBMIT REQUIRED VERISAE AND OTHER REGULATORY FORMS q HAND OVER THE COMPLETED WALK-IN BOX TO THE STORE.(WALK-IN BOX MUST BE CLEAN,AT OPERATIONAL TEMPERATURE CONTROL AND DEFROST FUNCTIONS.THEREFORE,IT IS y 52 GC RC GC RC GC RC AS REQUIRED BY THE END OF COMMISSIONING WEEK. O 41142 TEMPERATURE AND FULLY FUNCTIONAL) ESSENTIAL THAT ALL OF THE TEMPERATURE CONTROL AND DEFROST 40 RC RC RC RC FUNCTIONS FOR THE WALK-IN EVAPORATOR ARE REMOVED FROM THE VVMT WMT COMPLETED VERISAE FORMS ARE TO BE EMAILED TO 53 RESTOCK PRODUCT BACK INTO THE WALK-IN BOX. WMT WMT WMT WMT WMT WMT 27 EXISTING EMS CONTROLS SYSTEM.APART FROM A DEFROST SIGNAL CABLE TECHNICIAN RC RC TECHNICIAN RC RC MCEQUIP@WALMART.COM. 14 11, THAT MUST BE INSTALLED FROM THE KE2 TO THE EMS SYSTEM,ONLY REMOVE ALL OF THE OLD CASES AND CLEAR SITE OF ALL ��55 54 HAUL OFF ALL OF THE OLD WALK-IN PANELS FROM SITE(IF APPLICABLE). GC/PS RC/PS GC/PS RC/PS GC/PS RC/PS MONITORING AND ALARM FUNCTIONS FOR THE WALK-IN ARE TO REMAIN IN 41 GC RC GC RC TOOLS,UNUSED INSTALLATION MATERIALS AND TRASH. NOTE:QUICK REFRIGERATION TO HAUL OFF ALL WALK-IN BOX PANELS FROM TEXAS PROJECTS. THE EMS SYSTEM. 55 REMOVE THE OLD LEGENDS AND INSTALL REPLACEMENT LEGENDS AS SUPPLIED BY THE FOR/OEM.PROVIDERC RC RC RC RC RC 28 FURNISH CONTROLS SUPPORT TO THE INSTALLING CONTRACTOR. EMS EMS EMS EMS EMS EMS TYPEWRITTEN SCHEDULES FOR ANY AFFECTED ELECTRICAL PANELS. IF THE WALK-IN BOX HAS A REFRIGERANT LEAK DETECTION SYSTEM, 56 SHUT DOWN AND ARRANGE FOR THE REMOVAL OF ANY TEMPORARY,REFRIGERATED STORAGE. WMT WMT WMT WMT WMT WMT CONNECT THE SIGNAL FROM THE LEAK DETECTION SYSTEM TO THE AFTER ALL CHANGES HAVE BEEN MADE TO A RACK,REMOVE ANY COMPRESSOR SUCTION FILTERS/SOCKS 29 APPROPRIATE CIRCUIT FROM THE^LIEAK DETNALS ITHIN THE KE2 THERM PANEL.A ECTION SYSTEM S DIGITAL OUTPUT CAN BE TECHNICIAN LLEL RC RC TECHNICIAN RC RC MATRIX LEGEND 57 AND REPLACE THE RACK LIQUID LINE FILTERS.LEAVE THE OLD FILTERS/DRIERS IN THE RACK HOUSE TO BE RC RC RC RC RC RC USED TO POWER A SEPARATE RELAY TO PROVIDE THE NECESSARY SIGNAL INSPECTED BY THE MCM. TO THE KE2 PANEL(S). ABBREVIATION DESCRIPTION SUBMIT REQUIRED VERISAE AND OTHER REGULATORY FORMS AS REQUIRED BY THE END OF COMMISSIONING IN THE EVENT OF ANY QUESTIONS OR CONCERNS REGARDING CORRECT RC REFRIGERATION CONTRACTOR AND SUB-CONTRACTORS 58 WEEK.COMPLETED VERISAE FORMS ARE TO BE EMAILED TO MCEQUIP@WALMART.COM. RC RC RC RC RC RC 30 INSTALLATION,SET UP OR PROGRAMMING OF THE PANEL,CONTACT THE KE2 WMT RC RC WMT RC RC GC GENERAL CONTRACTOR AND SUB-CONTRACTORS THERM 24 HOUR TECH SUPPORT LINE.(636)266-0140 TECHNICIAN TECHNICIAN 59 CLEAR SITE OF ALL TOOLS,UNUSED INSTALLATION MATERIALS AND TRASH. RC/PS RC/PS RC/PS RC/PS RC/PS RC/PS EMS EMS VENDOR 31 NOTIFY WMT BUILDING CONTROLS THAT THE WALK-IN BOX IS RUNNING AND WMT RC RC WM7 RC RC ORIGINAL RACK EQUIPMENT MANUFACTURER,ORIGINAL CASE EQUIPMENT LOOSEN AND RE-TIGHTEN OR REMOVE AND RE-INSTALL UTILITIES(CONDENSATE PIPING,CONDUITS,J-BOX, ONLINE. TECHNICIAN TECHNICIAN OEM MANUFACTURER,AHU MANUFACTURER,RTU MANUFACTURER 60 FIRE SUPPRESSION,ETC.)AS REQUIRED IN ORDER TO ALLOW FOR THE WORK TO BE CARRIED OUT GC RC GC RC GC RC CONFIRM WITH STORE MANAGEMENT THAT THE WORK IS COMPLETE,THE PS WALK-IN BOX PANEL SUPPLIER 32 WALK-IN BOX IS DOWN TO OPERATING TEMPERATURE AND IS FULLY TE HN WMT RC RC TECHNICIAN FUNCTIONAL. RC RC WMT WALMART AES SUPPLIER OF AHU ADAPTER CURBS,RTU ADAPTER CURBS AND WALMART'S SUBMIT REQUIRED VERISAE AND OTHER REGULATORY FORMS AS REQUIRED EQUIPMENT SALVAGE PARTNER 33 BY THE END OF COMMISSIONING WEEK.COMPLETED VERISAE FORMS ARE TO TECHNICIAN RC RC TECHNICIAN RC RC WTC WATER TREATMENT CONTRACTOR BE EMAILED TO MCEQUIP@WALMART.COM. MC MECHANICAL CONTRACTOR AND SUB-CONTRACTORS 34 CLEAR SITE OF ALL TOOLS,UNUSED INSTALLATION MATERIALS AND TRASH. TECHNICIAN H RC RC TECHNICIAN RC RC RESPONSIBILITY MATRICES SHEET: N1 EDGE PROTECTION NET SYSTEM NOTES EDGE PROTECTION NET SYSTEM IS EXISTING TO REMAIN ABOVE WALK-INS BEING REPLACED. CONTACTOR SHALL CONTRACT WITH OWNER APPROVED INSTALLERS FOR THE DETACHMENT AND/OR DEMOLITION OF EDGE PROTECTION NET SYSTEM AS NECESSARY FOR DEMOLITION OF WALK-INS PRIOR TO START OF DEMOLITION. CONTACTOR SHALL CONTACT WITH OWNER APPROVED INSTALLERS FOR THE RE-ATTACHMENT AND/OR RE-INSTALLATION OF EDGE PROTECTION NET SYSTEM ABOVE WALK-INS BEING REPLACED AFTER CONSTRUCTION OF WALK-INS IS COMPLETE. EDGE PROTECTION NET SYSTEM IS FURNISHED BY OWNER. CONTACTOR SHALL COORDINATE WITH OWNER APPROVED EXTERIOR WALL INSTALLERS AND OWNER EDGE PROTECTION NET SYSTEM SUPPLIER FOR ACQUISITION OF ANY NEW REQUIRED EXISTING COMPONENTS. ROOF SYSTEM REF SPECIFICATION 13300 FOR EDGE PROTECTION NET SYSTEM. S gv sw CONTACTOR SHALL COORDINATE ALL WORK INVOLVING THE I I EXISTING EDGE PROTECTION NET SYSTEM WITH THE WALMART STRUCTURE MECHANICAL CONSTRUCTION MANAGER. p wa 3ta<a�uti�gm H'aoQo€-G€w$ O �Sa W 'pia N EU z 3 �wQo€<G�w SECURELY FASTEN WEB SECURELY FASTEN WEB EDGE PROTECTION NET SYSTEM SUPPLIER: S 3Qo$`g" STRAP THROUGH EVERY STRAP THROUGH EVERY HAINES,JONES,&CADBURY (800)459-7099 a oo"�,°��w:a- JOIST PANEL POINT,6'-0" JOIST PANEL POINT,6'-0" r= €j �o ysoeW OC MAX OC MAX WMT@hjcinacom m WALMART APPROVED INSTALLERS: WEB STRAP APOLLO (479)601-9484 REF SPEC JEFF ORNS jeff.orns@apolloretail.com IL,IN,KY,NC,OH,TN,VA,B WV 60+ NET SYSTEM CAN (201)996-9287 INSTALL NETTING 60°MAX '$" REF SPEC TIM BARRY tlbarry@can-usa.net W m; IN RELATION TO CT,DE,MA,MD,ME,NH,NJ,NY,PA,RI,&VT W HORIZONTAL WALK-IN GM NORTHRUP (952)226-3090 00 f CEILING PANELS z `r JASON FARMAKIS jfarmakis@gmnorthrup.com GREATER $° MI,MN,NO,SD,&WI = THAN 6" 3 GREATER THAN 2" ATTACH BOTTOM NET WEBBING YF 8 TO WALK-IN PANEL BLOCKING GREATER SOUTHWEST CONSTRUCTORS (817)596-3513 0 =W AT 2'-0"OC THROUGH INTEGRAL JOHN WILKINSON jwilkinson@century[el.net z0 GROMMETS WITH#10 x 3"WOOD AR,LA,OK,&TX O SCREWS AND#10 WASHERS AT MICHAEL STRAIN BUILDERS (760)751-5050 3/4"FROM EDGE OF WALK-IN SHERI COLVELL Shen@msbuildem.com PANEL AK,AZ,CA,HI,ID,MT,NM,NV,OR,UT,WA,&WY a WALK-IN PANEL NEWCO (352)735-3877 U BILL BROWN bill@newcocanstruction.com O O AL,FL,GA,MS,&SC QUAL-SERV (479)459-6349 (] C a JOSH PADGETT jpadgett@qualsewsolutions.com O O CO,IA,KS,M0,8NE NET SYSTEM ATTACHMENT PARALLEL TO STRUCTURE _ o 0 / NTS 7 O ^ � a � n M m fll Z m REF MEPFR FOR DUCT, `J W CONDUIT,AND PIPING LOCATIONS AND SIZES 0 O J CUT OPENING IN NETTING NO A/ LARGER THAN 1"GREATER LIB THAN PENETRATION 10, 1/2"SLEEVE ANCHOR WITH 3/8"ROD COUPLING WITH 1 1/2"MIN EMBEDMENT AND A 3/8"EYEBOLT NETTING SYSTEM REF SPECREFSPECS LOOP WEB STRAP LASH NETTING AT ALL CUT THROUGH EYE BOLT PENETRATIONS,REF SPECS WHERE NETTING HEIGHT IS LESS THAN 5',GATHER NETTING AT STRUCTURE TO WEAVE CONTINUOUS WEB ISSUE BLOCK WALK-IN PANEL ENSURE FULL TENSION FROM WALK-IN STRAP THROUGH NETTING PANEL TO JOIST TOP WEB STRAP AT TOP WEB STRAP AT AT EACH OPEN END CORNER FOR LOWER NET CORNER FOR UPPER NET PROVIDING 6"MIN OF NET ATTACH BOTTOM OF NETTING AT BEYOND STRAP EACH SIDE OF SPLICE WITH#10 x 3" WOOD SCREWS AND#10 WASHERS THROUGH GROMMETS,ADD ,--- -_, GROMMETS AS NEEDED NETTING PENETRATIONS 4 NTS GREATER GREATER `\ THAN 6" THAN 2" NETTING NETTING NETTING - TYPICAL WEB STRAP, INSIDE CORNER AT SPLIT INSIDE CORNER AT SPLIT WALL ANCHOR ENT ELEVATION ELEVATION BOX WALL WALK-IN BOXK-IN JOIST THROUGH POINT JOIST (TRANSVERSE(T ANSVERSE ET (PARALLEL NE DAWN W CHECKEDD BY: EJM PANEL ATTACHMEN WALK-IN EDGE WALK-IN AGAINST WALK-IN ADJACENT WALL TO WALK-IN NET SYSTEM / PROTO CYCLE: 04/26/2024 NOTIFY WALMART PROJECT REF SPECS - DOCUMENT DATE:12/27/2024 MANAGER IF ANY EXISTING GREATER i'NETTING WALK-IN BOXES DO NOT INSTALL � if NETTING THAN 2" HAVE EDGE PROTECTION NETTING PRESENT AT THE LOCATIONS WITHOUT SHOWN PRIOR TO THE SLACK CEILING WALK-IN WOAXK-IN COMMENCEMENT OF THE �`G..... TILE BOX PROJECT-ADD MISSING w EDGE PROTECT ION AND -� WALK-IN ADJACENT WALK-IN ADJACENT COORDINATE WITH AOR TO WEAVE CONTINUOUS WEB STRAP PROVIDE NECESSARY i THROUGH NETTING AT EACH OPEN TO CEILING TO COOLER OF A DETAILS AND SPECS END,TYP 0 41742 DIFFERENT HEIGHT EDGE PROTECTION FOR NET RUT WHERE FOR NET ATTACHMENT,LOCATE NTS WITHIN 3"OF JOIST PANEL POINTS EXISTING ROOF SYSTEM ATTACH BOTTOM NET WEBBING TO WALK-IN PANEL BLOCKING AT 24"OC THROUGH INTEGRAL GROMMETS W ITH(1)#10 x 3" WOOD SCREW AND#10 WASHERS 314" FROM EDGE OF WALK-IN PANEL ATTACH WEB STRAPS TO UNISTRUT USING a 5/16"EYEBOLT FASTENED TO UNISTRUT WITH 5/16"NUTS AND WASHERS EXISTING STRUCTURE CENTER OPENING IN NETTING WITH OPENING IN CEILING GRID SECURELY FASTEN WEB WEB STRAP STRAP THROUGH EVERY REF SPEC JOIST PANEL POINT,6'-0" CONTINUOUS WEB STRAP FROM 2" NET SYSTEM OC MAX FOOTMAN LOOP AT WALK-IN PANEL REF SPEC THROUGH JOIST PANEL POINT AT ALL INSIDE ATTACH BOTTOM NET INSTALL NETTING 60°MAX CEILING TILES AND OUTSIDE CORNERS AND NET WEBBING TO WALK-IN IN RELATION W OMITTED FOR TERMINATIONS PANEL BLOCKING AT 2'-0" $ HORIZONTAL WALK-IN CLARITY OC THROUGH INTEGRAL S" CEILING PANELS GROMMETS WITH#10 x 3" AT CORNERS PROVIDE ONE WEB STRAP TO TENSION NET GATHER NETTING AT CORNERS EDGE WOOD SCREWS AND#10 AT TOP CHORD AND ONE FROM JOIST PANEL POINT TO WASHERS AT 3/4"FROM FOOTMAN LOOP AT WALK-IN PANEL TIES,DSECURE WITH I HLASHING PROTECTION EDGE OF WALK-IN PANEL ATTACH FOOTMAN LOOP WITH(2)#10 x 3"WOOD SCREWS WALK-IN PANEL CENTERED ON WOOD BLOCKING 3/4"FROM EDGE OF WALK-IN BOX,PLACE SCREW ATTACHMENT 1"MIN FROM END OF BOX, REF SPEC ALTERNATE CONDITION CEILING AS SCHEDULED NET SYSTEM ATTACHMENT PERPENDICULAR TO STRUCTURE NET SYSTEM ON WALK-IN BOXSYSTEM ON WALK-IN BOX L NTS I NTS SHEET: N2 DEMOLITION LEGEND DEMOLITION REQUIREMENTS EXISTING TO REMAIN ----- DEMOLISH/REMOVE 1 ALL DEMOLITION SHALL BE CARRIED OUT IN A SAFE MANNER AND IN STRICT ACCORDANCE WITH OSHA ROOF DECK DUST DRAPE TO BE 6 MIL CLEAR POLY AREA TO BE DEMOLISHED REGULATIONS. SHEETING OVERLAPPED AT JOINTS A MIN OF 2'-0"AND CONTINUOUSLY TAPED JOINTS ---- RELOCATE 2 THE CONTRACTOR SHALL FIELD VERIFY THE EXTENT OF DUST DRAPE ATTACH SHEETING FROM ROOF DECK TO TOP DEMOLITION.THE WORK INCLUDES,BUT IS NOT LIMITED OF BARRIER AS SHOWN FOR A RUSTPROOF SALVAGE REQUIREMENTS TO,THE DEMOLITION AND REMOVAL OF WALLS,DOORS, DEMO AREA CONDITION,IF ATTACHMENT TO CEILING IS FLOORS,AND ELECTRICAL ITEMS INCLUDING CONDUITS AS IMPOSSIBLE,LIGHT FRAMING SHALL BE SHOWN ON DRAWING OR AS REQUIRED FOR THE DUST DRAPE INSTALLED WITH SHEETING ATTACHED AROUND 1. IMMEDIATE SALVAGE/LEGAL DISPOSAL OF ALL INSTALLATION OF NEW WORK FOR A COMPLETE JOB. IT TO PROHIBIT DUST PENETRATION DECOMMISSIONED EQUIPMENT AND CONSTRUCTION CONT 2"x 4" DEBRIS SHALL BE RESPONSIBILITY OF CONTRACTOR 3 WHEN UTILITIES ARE REMOVED,CAP AND SEAL A MINIMUM DUST DRAPE HOLD DOWN KEYNOTES OF 8"BELOW FINISH FLOOR OR A MINIMUM OF 6"ABOVE OF CEILING.SHOW ALL ABANDONED AND CAPPED UTILITIES ON AS-BUILTS,DRAWINGS,AND RECORDED 2 x 4 TOP PLATE 2,27 REMOVE EXISTING PIPE BOLLARDS.GRIND DOWN DOCUMENTS. FLUSH WITH FLOOR SLAB.PATCH AND REPAIR FLOOR AS NECESSARY. 4 IT IS THE CONTRACTOR'S RESPONSIBILITY TO PROVIDE 2 x 4 STUD AT 96"OC ADEQUATE SHORING,BRACING,AND SUPPORT SYSTEMS w o 1/2"CD PLYWOOD AND TO KEEP THE EXISTING STRUCTURE INTACT AND IN A w $ w o r A ATTACHED TO STUD AT SAFE CONDITION DURING THE REMOVAL OF STRUCTURAL �-+ F s2 x 4 BRACE 4 12"OC MAX ITEMS AND NEW CONSTRUCTION. wCONTRACTO m 1 2 3 5 THE CONTRACTOR SHALL RETAIN A REGISTERED m wwON ATTACHM O rcr y°zao<rc�uF€p$ PROFESSIONAL ENGINEER TO DESIGN THE SHORING AND IL SPECIFY DEMOLITION PROCEDURES. G 6 - r - - - - - 2x4 BOTTOM ICI r w ^mow a€a- o PLATE 6 IT IS THE CONTRACTOR'S RESPONSIBILITY FOR MEANS g gNo a?°roJy GzN q AND METHODS OF DEMOLITION AND NEW Qar orc3 II CONSTRUCTION.PRIOR TO THE EXCAVATION OF a 111 EXISTING PIPING PI FOUNDATIONQUATE ADJACENT TO THE FOR THEINGSTRUCTURE, FLOOR II REMAIN.NOT ALL PIPING PROVIDE ADEQUATE SUPPORT FOR THE SUB-BASE TO BAKERY SHOWN.TYP;UNO. PREVENT UNDERMINING. UTILITY I I REMOVE PORTION OF BULKHEAD TO 9`2"AFF. 7 DURING DEMOLITION AND RECONSTRUCTION,THE ANCHORS AT 96"OC I 2 4 CONTRACTOR SHALL COORDINATE WITH THE WALMART MECHANICAL CONSTRUCTION MANAGER ANY REQUIRED 11 F1.1 F1.1 SAFETY BARRIERS OR BARRICADES AND DUST WALLS. REFERTOTEMPORARY BARRIER/DUST DRAPE I MANAGER THE WALMARTND SCHEDULING DEMOLITION W 3 MANAGER FOR PHASING AND SCHEDULING DEMOLITION C?w mm BAKERY a C01 AND NEW CONSTRUCTION. m z NTS COOLER I r 11 m 8 DISPOSAL OF ALL DECOMMISSIONED EQUIPMENT,NOT 2 < 8 v I APPORTIONED TO WALMART'S DESIGNATED SALVAGE r GROCERY VENDOR,SHALL BE THE RESPONSIBILITY OF THE AREA CONTRACTOR IN ACCORDANCE WITH LOCAL CODES AND z X. ANY GOVERNMENTAL REGULATIONS;REFER TO WALMART O 1 2 3 DIRECTIVES AND SPECIFICATIONS.THE CONTRACTOR O SHALL COORDINATE THE PICK-UP DATE WITH THE �\ DESIGNATED SALVAGE VENDOR,PREPARE AND LOAD THE DESIGNATED SALVAGE ITEMS,KEEPING THEM x (�I�\\ INTACT AND IN ACCORDANCE WITH LOCAL CODES AND d K — — — — — — f\ / 1� ANY GOVERNMENTAL REGULATIONS;REFER TO WALMART �/ r II DIRECTIVES AND SPECIFICATIONS.ITEMS TO BE O O SALVAGED BY WALMART'S DESIGNATED SALVAGE 4 VENDOR SHALL BE LIMITED TO:VARIABLE FREQUENCY C:::D C= II DRIVES,CONDENSING UNITS,CONDENSERS, O O BAKERY I I u 1.2A ————————————— EVAPORATORS,COPPER PIPING,ROOF TOP UNITS,AIR —— 1.11A- HANDLING UNITS,AND COMPRESSOR HOUSES. II II � � MEAT DAIRYI F — — — — — — — — — — — — — — / C \ REFER TO SPECIFICATIONS SECTION 1500 FOR z o O L\ COOLER / — — — — — — — — — — — — — — — coOLEW r'i II --� -- \�I 9 ADDITIONAL INFORMATION REGARDING STORMWATER O RUNOFF CONTROL. O a ___________________ _____________r__________ -- r 10. CONDUCT ALL DEMOLITION AND REMOVAL OF DEBRIS AS M r y r r II A06 — -_——A06�—— - ——.A03-——-- .. °' i y OO _ r' / n -- _ __ __ __ ____ __ _ __ ___ __ __ __ ____ __ -- 2DRS ONRZH REQUIRED TO ENSURE MINIM UM INTERFERENCE WITH ' oo __�_ r / II 2 ORS ONRZH q q (REPLACE) BUILDING/SITE FACILITIES AND OPERATIONS. f n Z (REPLACE) 1.1B N M 9 DRS ONRZH `J r� / n 10 DRS ONRZH 111 11. NOTES INDICATING DEMOLITION WORK ARE NOT O w (REPLACE) (REPLACE) CONFINED SOLELY TO THE DEMOLITION PLANS.THE A07 A04 0 CONTRACTOR SHALL REVIEW ALL CONSTRUCTION I II S ONRIZH 10 DRS ONRIZH DOCUMENTS,INCLUSIVE OF SCHEDULES AND J q I 9 l R PLACE)- CREPLACE) SPECIFICATIONS,TO DETERMINE FULL EXTENT OF n/ `� II _ _ ____ LI_ _ RE _ C- -=4f DEMOLITION WORK. RCU1 I i}—___ A07-t-- I I-------- i/�l� 0 o REPLACE 2DRS ONRZH r -A04 Y m I TYP 2.27 q i I - - - SCSS-L n A i I I c—}la II - m L—RCU1--o ( ) n Ao7 I!-J _ r____-_qp�---I— -1-= Aoa DEMOLITION NOTES I II 2DRS ONRZH z I II (REPLACE) 1.113 0 (REPLACE) 1. REMOVAL OF ANY SALVAGE EQUIPMENT OR DEBRIS IS O' _ _ _ _ _ _ _ _ I i� 1.4A 19 DRS ONRII PROHIBITED.THIS INCLUDES THE SALE OF COPPER, J J (REPLACE) ALUMINUM,OR ANY RELATED MATERIALS. DEMOLISH RCU-1. II A09 A05 o STOCKROOM CAP ROOF CURB. it 9 DRS ONRIZH 10 DRS ONRIZH 2, WHERE APPLICABLE WALK-IN PANEL MANUFACTURER ISSUE BLOCK (REPLACE (REPLACE) SHALL DEMOLISH AND PROMPTLY HAUL OFF WALK-IN I - __ ____ - __ 1- II i+—1__—_qp�i--- ---------A05---- ice} PANELS AND DOORS TO BE REPLACED. q - —a d DURING DEMOLITION AND RECONSTRUCTION PHA o -- — — — — — — — — — — — — — — — II A09 —�--�— ------------ i� Co ORDINATE LOCATION OF ALL DUST WALLS ANDSE , o •& II — __ A10----- o I II 2DRS ONRZH - -- -- ---- -- -- -- ---- -- -- -- ---- -- -- -- A05 SECURITY ENCLOSURES WITH WALMART STORE (REPLACE) A 3 DRS ONRZH MANAGER.REFER TO DUST WALL DETAIL. I II N 19 DRS ONRIZH (REPLACE) I GROCERY q B08 4. ALL NEW EQUIPMENT MUST BE ON SITE PRIOR TO \ I AREA II 9 DRS ONRZH (REPLACE) B07 STARTING ANY DEMOLITION OR CONSTRUCTION. EDC \` I n B08 (REPLACEr 10 DRS ONRZH- 1 I EXISTING HYBRID HOUSE II — (REPLACE 5. PATCH/REPAIR FLOOR COVERING AS REQUIRED AFTER MTC(ON ROOF). q 3DRS ONRZH __ _ __ __ __ __ ____ __ __ __ ____ __�L_x__ ____ _ __ B07 INSTALLATION OF NEW CASES.MATCH EXISTING \ q (REPLACE) o - 3 DRS ONRZH FLOORING TYPE,COLOR,PATTERN,AND FINISH. —$0&� ________I_ _____ ____I....... _______ I / n I__ i______ --B07----------- (REPLACE) co ® _ STOCKROOM ii DEMO REFRIG TION I o a it ERA I lil PIPING BACKLOCATON M SEAFOOD I SHOWN AND CAP.TYP. < PROVIDE PROTECTION FOR ® FREEZER ��� ALL EXPOSED PIPING DURING REWORK.REFER TO A01 U �„ REFRIGERATION PLANS AND CHECKED BY: EJM LLE-102 GENERAL NOTES ON R1 FOR (REPLACE) DRY ADD D DITIONALGRANULATION DRAWN BY: JTC PRODUCE RE QUIREMENTS.TYP. PROTO CYCLE: 04/26/2024 �\ /� PREP — — — — — — — — ---IH \ DOCUMENT DATE:12/27/2024 GROCERY IC DEMO ALL CONDENSATE PIPING ,�I/I ((rr I/ / BO6b FREEZER I� i �:.1 ASSOCIATED WITH EVAPORATOR. � II BML-1 \ I II (REPLACE) / 2.27 I " GROCERY • � BOSb AREA BML-16 E) (REPLACE) EXISTING HYBRID HOUSE �' \" 0 41742 �r--_�--_— —J----_ DTB ON ROOF. (/�J EXISTING PIPING TO REMAIN.NOTALLPIPING > L R3.1 c UTILITYMEAT Q SHOWN.TYP;UNO. A Im — — — — — — — — — TYP / D EXISTING HYBRID HOUSE PRODUCE MECHANICAL LTA ON ROOF). COOLER m ( ) SERVICE I P �5Q�0 m DELI bo DEMO REFRIGERATION ` C B06a PIPING BACK TO _I LOCATION SHOWN DELI 65 BML-1 B06 HALLWAY (REPLACE) i AND CAP.TYP. SALAD 1.01B T Al DEMO ALL PREP O B06a I {w— DELI CONDENSATE PIPING ASSOCIATED WITH o REMOVE PORTION OF COOLER B05a �1.026� BUL2 HEAD 40 9'-2"AFF. A11 EVAPORATOR. BL BO5 -1 O — LLE-136 (REPLACE) F1.1 F1.1 (REPLACE) DELI DELI u 2 DELI UTILITY PREP GROCERY TYR R3.1 FREEZER AREA e --�— --r V/ A11---- A� QU N J' II �+ 1.1B f — — _ — X — — C I f 1.1A POULTR I COOLER 1 2 3 3 DEMOLITION PLAN REAR DEMOLITION PLAN FRONT DEMOLITION PLAN EXISTING CONDITIONS WERE TAKEN FROM EACH SUBCONTRACTOR IS RESPONSIBLE FOR HAVING ORIGINAL DRAWINGS AND MAY NOT REFLECT A THOROUGH KNOWLEDGE OF ALL DRAWINGS AND EXACT"AS-BUILT'CONDITIONS.CONTRACTOR SPECIFICATIONS IN THEIR RELATED FIELD.THE FAILURE SHALL FIELD VERIFY ALL EXISTING CONDITIONS TO ACQUAINT THEMSELF WITH THIS KNOWLEDGE DOES PRIOR TO SUBMITTING FINAL BIDS.CONTRACTOR NOT RELIEVE THE RESPONSIBILITY OF PERFORMING SHALL CAREFULLY COORDINATE NEW WORK AND THE WORK PROPERLY.NO ADDITIONAL SHEET: DEMOLITION WITH ALL OTHER DISCIPLINES AND COMPENSATION SHALL BE ALLOWED BECAUSE OF D 1 EXISTING CONDITIONS. CONDITIONS THAT OCCUR DUE TO FAILURE TO FAMILIARIZE WORKERS WITH THIS KNOWLEDGE. OCATION OF CASES LL DE REFRIGERATED CASE LEGEND KEYNOTES VERIFYEXACTLTRUCTIONMANAGER CONTRACTOR ATCHANDREP REPAIR ND SHEET NOTES WALMART CONSTRUCTION MANAGER FINISH TO PATCH AND REPAIR AROUND CASE 1.55 DIAMOND PLATE REFRIGERATED CASE FLOOR PRIOR TO STARTING CONSTRUCTION,TYR REFRIGERATED CASES. LENGTH/ MOUNTED RAILING OWNER FURNISHED GC INSTALLED MATCH EXISTING COLOR,FINISH,AND 1. STUD WALL DIMENSIONS ARE TO FACE OF STUDS 6. ALL JOINTS BETWEEN DISSIMILAR MATERIALS SHALL BE 11.DIMENSIONS OF REFRIGERATED CASES ARE TO PATCH AND REPAIR WALLS AND FINISHES PATTERN AS CLOSELY AS POSSIBLE 2. ROUTE ALL UTILITY SERVICE LINES,PIPES AND CONDUIT SEALED AS REQ'D FOR A COMPLETE AND PROPER OUTERMOST POINTS OF CASES;ENDCAPS AND BUMPERS WDS NUMBER QTY. DOOR NO. DESCRIPTION MFR OR SUPPLIER MODEL NO. NOTES 11.10 REFRIGERATED CASE FASCIA.REFERENCE TO MATCH ADJACENT WHERE IMPACTED SUBJECT TO THE APPROVAL OF THE WITHIN STUD WALLS WHEREVER POSSIBLE ON INSTALLATION,REGARDLESS OF WHETHER SHOWN ON ARE CONSIDERED PART OF CASE,WHERE THEY OCCUR RD0000 10 REFR VALANCE VARIES VARIES 13 EQUIPMENT NOTES. BY INSTALLATION OR MODIFICATION OF WALMART MECHANICAL CONSTRUCTION COOLER/FREEZER PANELS IN FOOD PREP AREAS WHERE DRAWINGS OR INDICATED IN SPECS 12.ALL NON-MOVEABLE EQUIPMENT INCLUDING SINKS, RS3002.142 3 3DR NARROW REACH-IN ICE CREAM(LED) HUSSMANN CORPORATION RUN 5 PLUMBING AND/OR ELECTRICAL UTILITIES MANAGER OR STORE MANAGER. UTILITIES MUST BE EXPOSED,CONTRACTOR TO HAVE a. SUCH JOINTS NOT SHOWN OR SCHEDULED SHALL BE OVENS,AND REFRIGERATED EQUIPMENT SHALL BE R83002.142 1 4DR NARROW REACH-IN ICE CREAM(LED) HUSSMANN CORPORATION RUN 5 OPTION OF FOLLOWING: SEALED WITH SEALANTS AS RECOMMENDED BY MFR SEALED TO WALLS RS3002.142 3 5DR NARROW REACH-IN ICE CREAM(LED) HUSSMANN CORPORATION RUN 5 CONTRACTOR SHALL PROVIDE FLOOR CASES FURNISHED BY WALMART, a. SURFACE MOUNT UTILITIES WITH NON-CORROSIVE FOR SPECIFIC APPLICATION a. BASE OR LEGS SHALL BESET IN A BED OF SEALANT TILE TO PATCH AND REPAIR AROUND INSTALLED BY CONTRACTOR.ALL NEW ANCHORS;SEAL BOTH SIDES OF PIPE/CONDUIT TO 7. INTERIOR SEALANTS USED IN FOOD PREPARATION AREAS WITH EXCESS REMOVED RS3002.242 6 2DR NARROW REACH-IN FROZEN FOOD(LED) HUSSMANN CORPORATION RUN 5 REFRIGERATED CASES.MATCH EXISTING EQUIPMENT MUST BE ON SITE PRIOR TO PANEL CONTINUOUSLY WITH SEALANT SHALL MEET REQUIREMENTS FOR USE IN USDA b. MOVEABLE EQUIPMENT SHALL NOT BE SEALED RS3002.242 2 3DR NARROW REACH-IN FROZEN FOOD(LED) HUSSMANN CORPORATION RUN 5 COLOR,FINISH,AND PATTERN AS STARTING ANY DEMOLITION OR b. INSTALL UTILITIES 1/2"OFF FACE OF PANEL TO ALLOW REGULATED FACILITIES 13.ALL COOLER BOX MODIFICATIONS TO BE PERFORMED BY RS3002.242 1 4DR NARROW REACH-IN FROZEN FOOD(LED) HUSSMANN CORPORATION RUN 5 CLOSELY AS POSSIBLE SUBJECT TO THE CONSTRUCTION. FOR CLEANING;USE ONLY NON-CORROSIVE 8. PROVIDE STEEL CLOSURE PANELS AT ALL VERTICAL GAPS COOLER/FREEZER MANUFACTURER,RELATED SLAB RS3002.242 3 5DR NARROW REACH-IN FROZEN FOOD(LED) HUSSMANN CORPORATION RUN 5 APPROVAL OF THE WALMART MATERIALS FOR SPACERS AND ANCHORS AND HORIZONTAL GAPS 52"OR LOWER BETWEEN WORK BY GC RS3003.242 2 4DR NARROW REACH-IN BACK TO BACK FROZEN HUSSMANN CORPORATION RLNI 5 MECHANICAL CONSTRUCTION MANAGER CONTRACTOR SHALL FURNISH AND c. COVER UTILITIES WITH 20 GAUGE STAINLESS STEEL REFRIGERATED CASES,WALLS AND/OR EQUIPMENT, 14.COOLER PANEL MFR'S TO FURNISH AND INSTALL LINERS, FOOD(LED) OR STORE MANAGER.CONTACT ALLISON INSTALL STAINLESS STEEL TRIM TO BENT PLATES MOUNTED TO WALL WITH NON- DOORS,PANELS,DOOR HARDWARE,STRIP CURTAINS, HARRIS,LINRON COMPANY(713)802-9137 COVER ANY GAPS THAT ARE LEFT CORROSIVE ANCHORS;APPLY CONTINUOUS SEALANT 9. COORDINATE REMOVAL AND DISPOSAL OF EXISTING BATTEN STRIPS,MATERIALS,ETC.(WHERE INDICATED ON RS3003.242 6 5DR NARROW REACH-IN BACK TO BACK FROZEN HUSSMANN CORPORATION RLNI 5 FOR ASSISTANCE LOCATING MATCHING BETWEEN THE CASES AND ADJACENT ALONG EDGES AND JOINTS REFRIGERATED CASES AND FIXTURES WITH MECHANICAL DRAWINGS) FOOD(LED) FLOOR TILE. CASES AND WALLS AFTER THE CASES 3. PROVIDE CONT USDA APPROVED SEALANT AT ALL JOINTS SERVICES CONSTRUCTION MANAGER. 15.COORDINATE RE-SKINNING OF EXISTING CASES TO ARE SET IN THEIR FINAL POSITION. BETWEEN MATERIALS ON WALLS AND FLOORSREMAIN WITH SEPARATE CONTRACTOR EQUIPMENT NOTES REFER TO CLOSURE PANEL DETAIL. PREPARATION COOLER A DFREEZER AREAS IN FOOD 0.REFRIGERATED CASES AND FIXTURES WITH XISTING 16.REPLACE DAMAGED OVERHE D REFRIGERATION PIPE 4. WALLS AND INFILL OF EXISTING OPENINGS ARE TO MATCH INSTALLATION OF REFRIGERATED CASES AND FIXTURES INSULATION,REF SHEET SAi FOR BID ALLOWANCE 5. FINISHES FOR OWNER SUPPLIED EQUIPMENT ARE SPECIFIED PER BID ALIGNMENT BETWEEN OWNER AND OEM CONSTRUCTION AND FINISHES OF ADJACENT EXISTING a. EXISTING REACH-IN FROZEN CASES TO BE 13.REFRIGERATED CASE FASCIA INSTALLED BY RC-COORDINATE WITH OWNER TO INSTALL FASCIA FFROM CASE CANOPY EDGE TO FACILITATE WALLS RELOCATED OR REMOVED SHALL BE USED ON A w w M.S e w'l'g INSTALLATION OF OWNER INSTALLED SIGNAGE-INSTALL PER MANUFACTURER'S INSTRUCTIONS AND COORDINATE WITH UTILITY CONNECTIONS. 5. PROPER INSTALLATION OF JOINT SEALANTS IS CRITICAL TEMPORARY BASIS DURING CONSTRUCTION OF NOW TO MEETING WALMART QUALITY ASSURANCE STANDARDS SERVICE SEAFOOD AREA w F� wgz3?P GENERAL EQUIPMENT NOTES a. PROVIDESEALANTSIN ACCORDANCE WITH DRAWINGS b. TEMPORARY CASES SHALL BE REMOVED ONCE CASESQ AND SPECS,REF SPECS FOR SEALANT SCHEDULE ARE DELIVERED AND OPERATIONAL O !12:5kaw Fypm A. ALL EQUIPMENT IS SUPPLIED BY OWNER,INSTALLED BY GC,GC TO MAKE FINAL UTILITY CONNECTIONS,UNLESS OTHERWISE NOTED z "� ',E wp�o�=ow$ B. REF SPECS FOR REFRIGERATED AND HOT DISPLAY CASES FOR SUPPLIED BY,INSTALLED BY,AND FINAL CONNECT BY O �<w p N - €°za C. REF SPECS FOR MFR AND MODEL NUMBERS NOT LISTED IN EQUIPMENT LEGENDS ~ w3 W o$ a G w D. OWNER TO SUPPLY SS FIXTURES BY WIN-HOLY 5 3N� 1 2 3 4 =°�_�� ww==o� a ooz�"w uw=pwo rc3 o�w-ayouwog r yw .tom ow =�w m � 8SysoHan_« UG IMPORTANT!!USE CAUTION WHEN EXCAVATING FOR � O O O BOLLARDS TO AVOID CONCEALED/BURIED ELECTRICAL 4n N o LINES,HIGH VOLTAGE ELECTRICAL LINES MAY BE PRESENT,CONTRACTOR SHALL VERIFY LOCATIONS OF BAKERY UTILITIES IN AREA OF BOLLARD BEFORE EXCAVATING UTILITY GROCERY w ; AREA FILL WITH CONCRETE z <u f 5 O AND ROUND OFF TOP r z =w BAKERY z0 4"DIA PIPE BOLLARD COOLER RAISE BULKHEAD AS U _ SAW CUT AND REMOVE SHOWN T09'-2"AFF. EXISTING CONCRETE/FILL AS REQ'D FOR INSTALLATION OF BOLLARD,PAINT p5 F7.1 F1.1 2 F11 SIM U CONCRETE FLOOR SLAB 8"DIA 34'-9" O O it CONCRETE FILL o O Z O O in K T 3" n a BOLLARD �° O M _ o W W REPLACEMENT PLATE, REMOVE EXISTING II 11.10 PLATE AND INSTALL TYP OF 3 Q REPLACEMENT PLATE - IN SAME LOCATION- II ATTACH SADDLEBAG REFRIGERATION PIPING II z TO REPLACEMENT 2" 3" WITH INSULATION WRAPPING 1 55 TVP PLATE FIXTURE / REFRIGERATION / k FIXTURE DIAMOND PLATE RAIL 4 ELECTRICAL CONDUIT F1 TYP ,� � SADDLEBAG FIXTURE DIAMOND PLATE RAIL LEG 23' ,1" ISSUE BLOCK ANCHOR SLEEVE,ENSURE REPLACEMENT LEG - SLEEVES ARE PLACED IN T-3" GROUND TO ACHIEVE INSTALLED OVER EXISTING LEGS SECURE RAIL a 23'-11" � - - '- SECTION• n SADDLEBAG SECTION} EF . d� / II .�. z O ' SO JOIST UI ITp3- p Hrr aE�x�.. .�.�.r w FIXTURE PAINT HORIZONTAL 1'-0" 6'-0" N 1'-0" REFRIGERATION LINES AND nEo _ SUSPENSION SYSTEM TO `v DIAMOND PLATE RAIL MATCH STRUCTURE; - - TERMINATE IN A CLEAN MANNER 3"BELOW TO ELBOW DIAMOND PLATE RAIL LEG, LOCATE V-0"MIN FROM n RAIL EDGE AN.6-13"MAX FROM NEXT RAIL LEG PAINT TO TRANSITION LINE ---- ❑ is .. .. - - DO NOT PAINT BELOW THIS —LINE CHECKED BY: EJM ELEVATION T-3 DRAWN BY: JTC PROTO DIAMOND PLATE PROTECTION RAIL REFRIGERATION DROP LINES a,�­ 4. DOCUMENT DATE. 12/27/2024 4 ,.=,_a• 3 NTS DOCUMENT DATE:12/27/2024 O NOTES: DRY � 1. REFRIGERATION CONTRACTOR TO PROVIDE GALVANIZED CLOSURE PANELS PRODUCE AT ALL VERTICAL GAPS AND AT ALL HORIZONTAL GAPS 52"OR LOWER AFF PREP BETWEEN REFRIGERATED CASE,WALLS,AND/OR EQUIPMENT2. PROVIDE SS CLOSURE PANELS LOCATED IN PREP AREAS3. REF FLOOR PLANS FOR ALL PARTITION TYPES AND LOCATIONS EASE EXPOSED EDGES TO SMALL UNIFORM RADIUS,NO SHARP EDGES EXPOSED TO PUBLIC. 5. SET CLOSURE PANEL IN A BED OF SEALANT EACH SIDE 6. FASTEN CLOSURE PANELS WITH#6 PAN HEAD SCREWS AT 9"OC IIII O 4D42 7. CLOSURE PANELS TO BE FASTENED ONLY TO BACK OF REFRIGERATED CASE OR END PANEL SKINS AS INDICATED IN DRAWINGS GROCERY CLOSURE AREA PANEL 1" a OVERLAP CLOSURE OVERLAP a 1/2"MAX TYP PANEL TYP REFRIGERATED CASES \ FASTENER P11 > ,"MAX I, CONT CLEAR COATED 20 GA GALVANIZED 4_____] FASTENER STEEL INFILL PANEL WITH HEMMED EDGES 1/2"MAX FRONT AT PARTITION --------- SET IN ABED OF SEALANT EACH SIDE FASTENER - - - - - - - - - - - - - - - - O REFRIGERATED 1 ,/2"MAX #6 SCREWS AT MAX 9"OC EACH SIDE, REFRIGERATED fREFRIGERATEd CASE F REFRIGERATED EVENLY SPACE FASTENERS PRODUCE MECHANICAL CLOSURE CASE II FASTENER rli PANEL CASE II z 1 AT CASE CASE zl w COOLER O O N (PLAN VIEW) 1 n PARTITION w l PARTITION OR li Q SERVICE II A WALL H DELI OR WALL SECTION AT TOP OF PLAN AT CASES PLAN AT REAR OF CASE a -- CASE AND WALL AND WALL < FOR OPENINGS OVER 24"IN WIDTH DELI I ag xU INSTALL BACKUP FRAMING PER DETAIL HALLWAY SALAD - I I K a � AND FASTEN TO HORIZONTAL FRAMING PREP Q w� >1 CLO SCREWS,EVENLY FASTENERS MEMBERS AT MAX 9"OC WITH#6 O 1^ > CLOSURE 1 DELI O SURE OVERLAP PANEL F COOLER PANEL TYP 1/2"MAX 1/2"MAX FASTENER FRONT 1"MAX --- z¢ FASTENER FV IA FASTENER a TYP CLOSURE AT PARTITION FRONT LL O DFLI DELI PARTITION PANEL REFRIGERATED 1/2"MAX " 2 UTILITY PREP I, ill"MAX CASE FASTENER 1 '�Yi"I DELI D OR WALL REFRIGERATED o1 1 r U ------- FASTENER ATCASE II r 111 w FREEZER WALK-IN CASE = PROVIDE 1"TOE KICK RETURN EACH SIDE O QUI NT PANEL OR WIATILLN PARTITION OR 1;K0 �J i WALL � C — — — — — — — — — — — FRONT PLAN AT WALK-IN PLAN AT FRONT OF PLAN AT FRONT OF CASE Fv Fv FIXTURE PLAN CASE AND WALL AND END OF WALL 1 2 3 4 CLOSURE PANEL DETAIL FRONT FIXTURE PLAN 31 EXISTING CONDITIONS WERE TAKEN FROM EACH SUBCONTRACTOR IS RESPONSIBLE FOR HAVING ORIGINAL DRAWINGS AND MAY NOT REFLECT A THOROUGH KNOWLEDGE OF ALL DRAWINGS AND EXACT"AS-BUILT'CONDITIONS.CONTRACTOR SPECIFICATIONS IN THEIR RELATED FIELD.THE FAILURE SHALL FIELD VERIFY ALL EXISTING CONDITIONS TO ACQUAINT THEMSELF WITH THIS KNOWLEDGE DOES PRIOR TO SUBMITTING FINAL BIDS.CONTRACTOR NOT RELIEVE THE RESPONSIBILITY OF PERFORMING SHALL CAREFULLY COORDINATE NEW WORK AND THE WORK PROPERLY.NO ADDITIONAL SHEET: DEMOLITION WITH ALL OTHER DISCIPLINES AND COMPENSATION SHALL BE ALLOWED BECAUSE OF F1 EXISTING CONDITIONS. CONDITIONS THAT OCCUR DUE TO FAILURE TO FAMILIARIZE WORKERS WITH THIS KNOWLEDGE. SHEET NOTES 4 2 1. REFER TO SHEET Fi FOR FIXTURE NOTES PERTAINING TO 2 F1.1 F1.1 THIS SHEET. F1.1 G 3 F1 1 I'll PREFINISHED GYP BD KEYNOTES F1.1 WITH DIVIDER TRIM CHHEIGHT EFINISHED GYP BD TO BE 1.55 DIAMOND PLATE REFRIGERATED CASE FLOOR 5 3 TALLED AT A CONSISTENT MOUNTED RAILING OWNER FURNISHED GC INSTALLED F1.1 F1.1 ALONG THE ENTIRE GTH OF BULKHEAD PREFINISHED GYP BD WITH DIVIDER TRIM y z w a - - Y - 4 _ T__ _T___________0___ T T-- --------- T T T----------- T 3ts ��=oa NEW OR EXISTING CASE BUTT JOINTS AT ENDS OF PREFINISHED MATCH LOCATIONS OF EXISTING GYP BD NEW OR EXISTING CASE TYP GYP BD PANELS CONTROL JOINTS TYP Z F iw=oaoNQo€a��� GA3.7 - GROCERY ELEVATION 6 a - x x N xW z 0 U U K 0 0 I I 00 EXISTING BULKHEAD TO REMAIN o O 3 5/8"x 20 GA METAL STUDS AT EACH EXISTING PREFINISHED GYP BD WITH in a O STUD 24"OC MAX DIVIDER TRIM,MATCH THICKNESS r� OF EXISTING GYPSUM BOARD M m O CONT 20 GA METAL FASTEN PREFINISHED GYP BD AT 12"OC Z TRACK USING#8-181 7/8"MODIFIED TRUSS HEAD 0 SELF-DRILLING DRYWALL SCREWS,PAINT HEADS WHITE AFTER INSTALLATION (3)#10 TEK SCREWS TYP AT I DEMOLISH GYPSUM BOARD TO A CONSISTENT HEIGHT ALONG THE u�J LLL..NLLL LAPPED CONNECTIONS ENTIRE LENGTH OF BULKHEAD m z CONT 20 GA TRACK THE HEIGHT WILL DEPEND ON w g g w ACCESS SPACE REO'D FOR WORK BEHIND BULKHEAD >Y v i z PREFINISHED GYPSUM _ BOARD WITH SNAP-ONLl \,... r-- ------ --- OUTSIDE CORNER TRIM AND r--------- -- END CAP TRIM,TRIM COLOR DEMOLISH GYPSUM ISSUE BLOCK E #10 FASTENERS D TO MATCH PANEL EACH EXISTING STUD BOARD AND METAL _ o _ - - AC T2 CEILING TILE STUDS FOR THE \ /ANDGRID EXTENTS SHOWN TOCOMPLETE DESIGNLl PRERNISHED GYP BD AND p LI OO GROCERY DIVIDETHICKRTRIMSOFETCH - GROCERY REFRIGERATED CASE H.H ° — — — — — — — — — — — — — — — — — — H.8 THICKNESS OF EXISTING FREEZER i GYPSUM BOARD FREEZER I I I NEW OR EXISTING i REFRIGERATED CASE 'LUMBING STOCKRO M CHANICAL BULKHEAD SECTION AT GROCERY FREEZER DEMO BULKHEAD SECTION AT GROCERY FREEZER 5 Fi 1/2"=1'-0" CHECKED BY: EJM X x CO2 REMOTE CHARGING STATION, DRAWN BY: JTC REFER TO REFRIGERATION PLAN �e FOR ADDITIONAL INFORMATION. PROTO CYCLE: 04/26/2024 DOCUMENT DATE:12/27/2024 SEAFOOD .� FREEZER O 41742 MEAT UTILITY EXISTING BULKHEAD / TO REMAIN /'\/// PREFINISHED GYP BD 1 SIM F1.1 WITH DIVIDER TRIM, MATCH THICKNESS OF EXISTING GYP BD 20'-2" GROCERY 3 5/8"x 20 GA METAL FREEZER •. , STUDS AT EACH EXISTING STUD 24"OC MAX FASTEN PREFINISHED GYP BD AT 12" 1.55 OC USING#8-18 1 7/8"MODIFIED TRUSS HEAD SELF-DRILLING DRYWALL SCREWS,PAINT HEADS I DEMOLISH GYP BD TO A 4 WHITE AFTER INSTALLATION CONSISTENT HEIGHT ALONG THE F, ENTIRE LENGTH OF BULKHEAD m z (3)#10 TEK SCREWS TYP AT LAPPED I THE HEIGHT WILL DEPEND ON CONNECTIONS EACH END ACCESS SPACE REO'D FOR >y q WORK BEHIND BULKHEAD RAISE BULKHEAD AS SHOWN TO 9'-2"AFF. PREFINISHED GYP BD -------- ---- WITH SNAP-ON r--------- - - OUTSIDE CORNER TRIM F1.1 F1.1 AND END CAP TRIM, DEMOLISH GYP BD AND METAL STUDS FOR THE TRIM COLOR TO MATCH EXTENTS SHOWN TO PANEL COMPLETE DESIGN GROCERY AREA ACT2 CEILING TILE AND GRID BAKERY&MEAT BAKERY&MEAT REFRIGERATED CASE Ll UTILITY UTILITY REAR FIXTURE PREFINISHED GYP BD G —- — — — — — — — — — — — — — — — REAR PLAN WITH DIVIDER TRIM, ^ PLAN MATCH THICKNESS OF / .3 EXISTING GYP BD � i \\\ GGGlll \\\�J�J�J//// ��1�"��+++//// REAR FIXTURE PLAN NEW OR EXISTING REFRIGERATED CASE EXISTING CONDITIONS WERE TAKEN FROM EACH SUBCONTRACTOR IS RESPONSIBLE FOR HAVING ORIGINAL DRAWINGS AND MAY NOT REFLECT A THOROUGH KNOWLEDGE OF ALL DRAWINGS AND EXACT"AS-BUILT'CONDITIONS.CONTRACTOR SPECIFICATIONS IN THEIR RELATED FIELD.THE FAILURE SHALL FIELD VERIFY ALL EXISTING CONDITIONS TO ACQUAINT THEMSELF WITH THIS KNOWLEDGE DOES BULKHEAD SECTION AT BAKERY & MEAT UTILITY DEMO BULKHEAD SECTION AT BAKERY & MEAT UTILITY PRIOR TO SUBMITTING FINAL BIDS CONTRACTOR NOT RELIEVE THE RESPONSIBILITY NO ADDITIONAL OF PERFORMING SHALL CAREFULLY COORDINATE NEW WORK AND THE WORK PROPERLY.NO ADDITIONAL SHEET: J INTS 1/2^=1•_p^ DEMOLITION WITH ALL OTHER DISCIPLINES AND COMPENSATION SHALL BE ALLOWED BECAUSE OF F1 .1 �� EXISTING CONDITIONS. CONDITIONS THAT OCCUR DUE TO FAILURE TO FAMILIARIZE WORKERS WITH THIS KNOWLEDGE. ROOFLEGEND ® EXISTING ROOF HATCH EXISTING RTU/AHU RTU/AHU ® EXISTING SKY LIGHT ® SKYLIGHT REFRIGERATION EQUIPMENT, REF REFRIGERATION ® EXISTING EXHAUST FAN METAL CAP AND CHANNELS EXHAUST FAN BY CURB MANUFACTURER NEOPRENE GASKETED FASTENERS @ 6"OC CAPPED CURB WITH MOUNTING CHANNELS CONTINUOUSAG T BY CURB SUPPLIER FULLY ADHEFLASHING 3tW ?�V MEMBRANE P TO LL rc TOP OF CUR 2 3 4 Z ��aw�„o�owo€° INSULATION 2x4 TREATED WOOD NAILER j Q z:o_Wo - rc 3 CONT EDGE AS N a _ REQUIRED BFR wSTEEL CURB REF SPEC K - - - - - - - - - - - - - - - - - - -EXISTING ROMEMBRANE INSULATIONIN-FAS NILL EEIDEDLBATT INSULATIONSTEEL CHANNELEXISTING RO REF STRUCT to Z e SKID CURB xW DN�TS Z � U NOTE:FOR ROOF a PENETRATIONS LOCATED WHERE < WALKWAY PADS ARE INSTALLED, — — — — — — — — _ _ _ _ _ _ _ _ O O TRIM WALKWAY PADS FROM CENTER WALKWAY PADS ON PROVIDE SINGLE ROW PROVIDE WALKWAY PADS PENETRATIONEDGE OF ROOF \�•J// JIB CRANE SPACED APART WALKWAY PADS ON SPACED 3"APART ALL O AC M O CIDFLASHING BEFORE PAD AND 6"FROM EDGE OF ROOF ACCESS SIDE OF UNIT, SIDES OF REFRIGERATION O O INSTALLATION OR PARAPET FIELD VERIFY AND CONDENSER RACKS NOTE:DO NOT NSTALL LOCATION WALK PADS P IS UNTIL o O ROOF PENETRATION z p FLASHINGS ARE COMPLETE -- --- - ^ L p r PROVIDE SINGLE ROW OF JIB CRANE ~ O WALKWAY PADS ON r n Z ACCESS SIDE OF UNIT, v N FIELD VERIFY LOCATION 8"FROM O CURB, TYP P /J// `n 8"FROM 52'-8" CURB, EXISTING HYBRID HOUSE MTC(ON ROOF). Q TYP RCU RT m L O Z 0 NEW ROOF PENETRATION 16"X16"OD.FO ELECTRICAL EQUIPMENT RCU RTU USE ONLY.REFER TO ELECTRICAL.J ISSUE BLOCK PROVIDE CRICKET AT ALL MECHANICAL AHU REFRIGERATION AND eREFRIGERATION EQUIPMENT II EQUIPMENT,RCU'S,RTU'S,ETC,INSTALL CONDENSER RACKS F2 WALKWAY.TYP. ROOFING INSULATION WITH 1/2"PER FOOT SLOPE TO PROVIDE POSITIVE DRAINAGE NEW PUMP SKID SCO2SB-1, AROUND UNITS e REF REFRIGERATION AND EXISTING HYBRID HOUSE F2 STRUCTURAL DRAWINGS FOR DTB(ON ROOF). ADDITIONAL INFORMATION. EXISTIIT PAD LAYOUT (TYP ALL UNITS) LTA(ON ROOF)-------HYBRID Y I \3 NTS � LTA(ON ROOF). IIII IIV V� I/-/� INSTALLATION NOTES: 1. ROOF PENETRATION CURB,HOOD AND CLOSURE PLATES ARE FURNISHED BY OWNER AND INSTALLED BY GENERAL CONTRACTOR 2. ALL HOOD PENETRATIONS SHALL BE THROUGH VERTICAL CLOSURE PLATES ONLY • PIPING AND CONDUIT SHALL BE INSTALLED BY TRADE CONTRACTORS WITH PIPE AND CONDUIT CENTERLINES 4"ABOVE TOP OF ROOF CURB WITH MINIMUM OF 1" EXISTING SKYLIGHT TO BE BETWEEN PIPE AND CONDUIT EXTERNAL SURFACE REMOVED.REFER TO STRUCTURAL ---- -- i6"X30"REFRIGERATION 2 3. GENERAL CONTRACTOR SHALL CUT AND INSTALL VERTICAL CLOSURE PLATES AFTER ALL PIPING AND CONDUITS ARE INSTALLED AND SEAL ALL PENETRATIONS AS FOR DECKING INFILL.PROVIDE NOTED IN DETAIL AND PROVIDE CONTINUOUS SEALANT AT PERIMETER JOINT BETWEEN CLOSURE PLATES,HOOD,CURB,AND WHERE CLOSURE PLATES OVERLAP,REF INSULATION TO MATCH ADJACENT. HOOD.TYP. F2 SPECS PROVIDE ROOF MEMBRANE TO EXPANDING FOAM SEALANT SHALL NOT BE USED WHERE SEALANT IS EXPOSED TO EXTERIOR MATCH ADJACENT.TYP OF 2. CHECKED BY: EJM 4. EXTEND EXTERIOR REFRIGERANT AND WATERLINE EXTERNAL PVC INSULATION JACKET 1"INSIDE HOOD METAL CLOSURE PLATES - - - - - - - - DRAWN BY: JTC GALVANIZED METAL TAPER HOOD SLOPE 1/4"PER FT. TTPROTO CYCLE: 04/26/2024 CAP WITH HOOD AT � �•. PIPE PENETRATIONS 2 PIECE GALVANIZED METAL VERTICAL CLOSURE G DOCUMENT DATE:12/27/2024 PLATES,INSTALLED BY GC.FIELD CUT TO FIT NEW ROOF PENETRATION 16"X16" INSULATED REFRIGERATION AROUND CONDUIT AND PIPE INSULATION(1/8" I`___ LINES AND CONDUIT MOUNTED MAX.GAP BETWEEN PIPE/CONDUIT AND PLATE), INSTALL UPPER PLATE TO OD.FOR ELECTRICAL EQUIPMENT TO UNISTRUT.UNISTRUT TO FASTEN TO HOOD AND CURB WITH SHEET USE ONLY.REFER TO ELECTRICAL. BE ATTACHED TO CURB 2" METAL SCREWS WITH NEOPRENE WASHERS(4) OVERLAP BOTTOM PLATE ON EXTERIOR SIDE WITH NEOPRENE TAPE GASKET EA SIDE AND 6"OC TOP AND BOTTOM REF PLAN MAX PENETRATION SIZE a GT• NEW PUMP SKID SCO2SA-1, PIPES TO REFRIGERATION CLEAR INSIDE OPENING 4 REF REFRIGERATION AND LLF STRU+1"MIN PLATE OVERLAP #12x2"SS SCREWS WITH �\ EQUIPMENT REF ADDITIONAL ONAL INFORMATION. OR _ F2 NEOPRENE/SS BONDED " REFRIGERATION WASHER AT 8"OC DRAWINGS FOR SIZE OF --- --- -- PLATE TO OVERLAP r77LI������ '7 �I�-/\� FASTENER AND PLATE iii p� PIPES - CURB MIN VFW FULLY ADHERED EXIST ROOF SYSTEM AND 0�41142 4 Oi FLASHING MEMBRANE STEEL DECKING !4//J LLI/ 13� CONT EDGE SEALANT ��� ? EXTEND UP AND 52'-8" AS REQUIRED BY MFR OVER TOP OF CURB ROOF MEMBRANE PER VENT PIPE STRAPS MFR WARRANTY ROOF MEMBRANE MANUFACTURED TYP EACH PIPE OR PER MFR WARRANTY NON-STRUCTUAL CURB CONDUIT Vim" I�1� i i n TREATED WOOD p y EXISTING BLOCKING FASTENED TO rywp INSULATION SHALL ROOF DECK-THICKNESS iii EXISTING JOIST SHALL MATCH ROOF w INSULATION,TYP NOTCHED 2" STEEL ANGLE SECTION INSULATION BOARD ELEVATION FRAME,REF STRUC STEEL ANGLE FRAME, REF STRUC BATT INSULATION SECTION ' VERTICAL PIPING AND MAINTAIN CLEARANCE CONDUIT PI N ATTACHED OPENING FOR r--- ---------------------------� BETWEEN PIP PIPE AND TO ANGLE.REFER TO REFRIGERATION LINES AND INSULATION BOARD,TYP PIPING/CONDUIT SUPPORT CONDUIT.COORDINATE DRAWINGS FOR CLAMP LOCATION WITH _ _ _ �._ GALVANIZED METAL REQUIREMENTS REFRIGERATION EQUIPMENT CAP WITH HOOD AT PIPE PENETRATIONS MANUFACTURED V�Y� NON-STRUCTUAL CURBLLV --------------------------- ELEVATION 3 4 ROOF PLAN PLAN REFRIGERATION LINE ROOF PENETRATION ENLARGED ROOF PLAN L /NTS , ' / 3/32"=1'-0" EXISTING CONDITIONS WERE TAKEN FROM EACH SUBCONTRACTOR IS RESPONSIBLE FOR HAVING ORIGINAL DRAWINGS AND MAY NOT REFLECT A THOROUGH KNOWLEDGE OF ALL DRAWINGS AND EXACT"AS-BUILT'CONDITIONS.CONTRACTOR SPECIFICATIONS IN THEIR RELATED FIELD.THE FAILURE SHALL FIELD VERIFY ALL EXISTING CONDITIONS TO ACQUAINT THEMSELF WITH THIS KNOWLEDGE DOES PRIOR TO SUBMITTING FINAL BIDS.CONTRACTOR NOT RELIEVE THE RESPONSIBILITY OF PERFORMING SHALL CAREFULLY COORDINATE NEW WORK AND THE WORK PROPERLY.NO ADDITIONAL SHEET: DEMOLITION WITH ALL OTHER DISCIPLINES AND COMPENSATION SHALL BE ALLOWED BECAUSE OF rf'� EXISTING CONDITIONS. CONDITIONS THAT OCCUR DUE TO FAILURE TO r L FAMILIARIZE WORKERS WITH THIS KNOWLEDGE. ABBREVIATIONS GENERAL NOTES SPECIAL INSPECTIONS REQUIRED DESIGN LOADS AFF ABOVE FINISHED FLOOR GENERAL SPECIAL INSPECTIONS AS REQUIRED BY 1.BUILDING CODE AHU AIR HANDLING UNIT 1.FURNISH ALL LABOR,MATERIALS AND EQUIPMENT NECESSARY TO COMPLETE THE WORK SHOWN OR IMPLIED BY THESE DRAWINGS.SHOP DRAWINGS SHALL BE SUBMITTED TO CHAPTER 17 OF THE 2021 WASHINGTON STATE A.BUILDING CODE 2021 WASHINGTON STATE AISC AMERICAN INSTITUTE OF STEEL CONSTRUCTION THE ENGINEER FOR REVIEW AND APPROVAL PRIOR TO COMMENCING WORK. BUILDING CODE OR BY THE ENGINEER OF RECORD BUILDING CODE AISI AMERICAN IRON AND STEEL INSTITUTE 2.EXISTING CONDITIONS SHOWN MAY NOT REFLECT EXACT"AS-BUILT"CONDITIONS.BIDDERS SHALL FIELD VERIFY EXISTING CONDITIONS PRIOR TO SUBMITTING FINAL BID.WITHIN ASTM AMERICAN SOCIETY FOR TESTING AND MATERIALS ONE WEEK FROM THE START OF CONSTRUCTION DATE GENERAL CONTRACTOR SHALL FIELD VERIFY ALL EXISTING MATERIAL,MEASUREMENTS,AND ELEVATIONS AND SHALL PERIODIC SPECIAL INSPECTIONS: 2.GRAVITY LOADS AWS AMERICAN WELDING SOCIETY NOTIFY THE STRUCTURAL ENGINEER OF RECORD AND THE OWNER'S CONSTRUCTION MANAGER OF ANY DISCREPANCIES OR FORESEEN PROBLEMS.GENERAL CONTRACTOR A.ROOF DEAD LOAD 17 PSF(PER ORIGINAL DRAWINGS) SHALL BE RESPONSIBLE FOR COORDINATING ALL FIELD MEASUREMENTS,EXISTING CONDITIONS,AND KNOWN COMPLICATIONS WITH THE MATERIAL SUPPLIERS, 1.WELDING-REFER TO APPENDIX B OF THE SPECIFICATION. BM BEAM 3.GENERAL CONTRACTOR SHALL CAREFULLY COORDINATE DEMOLITION AND NEW CONSTRUCTION WITH ALL OTHER DISCIPLINES AND EXISTING CONDITIONS. 2.JOIST REINFORCING-THE CTL SHALL INSPECT THE FINAL PLACEMENT AND BO BOTTOM OF 4.GENERAL CONTRACTOR SHALL PROTECT EXISTING STRUCTURES,UTILITIES,PROPERTY,ETC DURING CONSTRUCTION.RESTORE ALL ITEMS DAMAGED,AS REQUIRED BY WELDS OF ALL NEW REINFORCEMENT.UPON COMPLETION OF THE B.ROOF LIVE LOAD 20 PSF(MIN OR SNOW LOAD) BOS BOTTOM OF STEEL OWNER'S REPRESENTATIVE,TO THE OWNER'S SATISFACTION AT NO COST TO OWNER OR WITHOUT EXTENSION OF CONTRACT TIME. INSPECTIONS,THE CTL WILL SUBMIT THEIR REPORT TO JBA FOR FINAL BRG BEARING 5.BUILDING COMPONENTS ABANDONED BY THE SCOPE OF WORK SHALL BE SECURED TO PREVENT FALLING,LOOSENING OR CREATING DAMAGE OF ANY KIND IN THE FUTURE. APPROVAL. C.ROOF SNOW LOADS CL CENTER LINE 6.GENERAL CONTRACTOR IS RESPONSIBLE FOR PROVIDING TEMPORARY SUPPORT AND MAINTAINING STABILITY OF EXISTING STRUCTURE DURING ALL PHASES OF CONSTRUCTION. 1.GROUND SNOW LOAD(Pg) 17 PSF CLR CLEAR 7.GENERAL CONTRACTOR SHALL PROVIDE FIRE PROTECTION FOR THE EXISTING STRUCTURE AND BUILDING CONTENTS DURING WELDING OR ANY OTHER CONSTRUCTION CERTIFIED TESTING LAB(CTL): CMU CONCRETE MASONRY UNIT ACTIVITY THAT GENERATES SPARKS OR INTENSE HEAT. 3.LATERAL LOADS COL COLUMN 8.GENERAL CONTRACTOR SHALL COORDINATE THE SIZE AND LOCATION OF PENETRATIONS THROUGH THE STRUCTURE FOR MECHANICAL,ELECTRICAL AND PLUMBING WORK. THIS PROJECT REQUIRES SPECIAL INSPECTIONS THAT ARE TO BE PERFORMED BY A.WIND LOADS THE APPROVED CERTIFIED TESTING LAB(CTL).UPON RECEIVING THE AWARD 1.BASIC WIND SPEED(3-SECOND GUST) COND CONDENSER UNIT 9.THE STRUCTURAL ENGINEER OF RECORD,ITS EMPLOYEES,AND REPRESENTATIVES SHALL NOT BE RESPONSIBLE FOR,AND WILL NOT HAVE CONTROL OF,CONSTRUCTION NOTICE ISSUED BY OWNER,THE CONTRACTOR SHALL CONTACT THE APPROVED CONST CONSTRUCTION MEANS,METHODS,TECHNIQUES,SEQUENCES OR PROCEDURES,OR FOR SAFETY PRECAUTIONS AND PROGRAMS IN CONNECTION WITH THE CONSTRUCTION WORK;NOR WILL CTL AND JOHNSTON BURKHOLDER ASSOCIATES(JBA)TO PROVIDE A -ULTIMATE DESIGN WIND SPEED 98 MPH CONT CONTINUOUS THEY BE RESPONSIBLE FOR ANY FAILURE BY THE CONTRACTOR TO PERFORM OR COMPLETE CONSTRUCTION IN ACCORDANCE WITH THE CONTRACT DOCUMENTS. CONSTRUCTION SCHEDULE FOR WORK REQUIRING SPECIAL INSPECTIONS.CTL 2.WIND EXPOSURE CATEGORY C DIA DIAMETER STRUCTURAL STEEL AND JBA CONTACT INFORMATION IS PROVIDED BELOW.THE CTL SHALL BE 3.RISK CATEGORY II EC EVAPORATIVE COOLER 1.STRUCTURAL STEEL SHALL MEET THE FOLLOWING MINIMUM YIELD STRENGTH AND SPECIFICATIONS.FABRICATION AND ERECTION SHALL BE IN ACCORDANCE WITH THE LATEST RESPONSIBLE FOR COORDINATING THE SPECIAL INSPECTIONS AND COMPLETING y i 4 EDITION OF THE"AISC CODE OF STANDARD PRACTICE". INSPECTION REPORTS.THE CTL SHALL SEND COMPLETED REPORTS,A LIST OF B.SEISMIC LOADS SERVICE w °v o o.rc rc Z,;3 o EF EXHAUST FAN (SERVICE) rc °° STRUCTURAL STEEL YIELD ASTM SPECIFICATION DEVIATIONS AND SUPPORT DOCUMENTATION TO JBA IN A TIMELY MANNER.JBA 1.5%DAMPED MAPPED ACCELERATION PARAMETER Ss 1.066 ''- EL ELEVATION WILL REVIEW INSPECTION REPORTS AND RESPOND TO DEVIATIONS AS REQUIRED. ( ) wrc3h� -w° w A.CHANNELS,PLATES&ANGLES: 36 KSI A36,UNO O ELEC ELECTRICAL 2.1-SEC PERIOD MAPPED ACCELERATION PARAMETER(S1) 0.381 r p° EQ EQUAL B.ROUND BARS FOR JOIST REINFORCEMENT: 50 KSI A 529 TESTING LAB SHALL SEND OBSERVATION/TEST REPORTS TO: 3.5%DAMPED SPECTRAL RESPONSE COEFF.(Sds) 0.853 z `2�° w'M€_$ JOHNSTON BURKHOLDER ASSOCIATES O_ 3yw s 2.ALL STRUCTURAL STEEL SHALL HAVE ONE SHOP COAT OF RUST INHIBITOR PRIMER PAINT CONFORMING TO THE SPECIFICATIONS.FIELD TOUCH UP ALL UNPAINTED,NICKED AND 4.1-SEC PERIOD SPECTRAL RESPONSE COEFF.Sd1 0.487 � p w.�rc o o w ETR EXISTING TO REMAIN ATTN:TREVOR WRIGHT Qba-hei@jbaengccom) ( ) Z, w <Q�W WELDED AREAS.PAINT ALL STEEL EXPOSED TO VIEW TO MATCH EXISTING. 5.SITE CLASS D DEFAULT S 3wa EW EACH WAY ( ) w5-o-. N 3.WELDING SHALL MEET ANSI/AWS D1.1 STRUCTURAL WELDING CODE.ELECTRODES SHALL BE 70 KSI LOW HYDROGEN.ALL WELDING SHALL BE PERFORMED BY CERTIFIED TESTING LAB SHALL SEND BILLING INVOICE TO: EXIST EXISTING WELDERS. 6.RISK CATEGORY II a_ oa£k's�:3 g>i y�g EVOCO FUZE SYSTEM(OR AS DIRECTED BY 7.IMPORTANCE FACTOR le 1.0 ~ o f l w FS FAR SIDE STEEL JOISTS AND JOIST GIRDERS OWNER'S MECHANICAL CONSTRUCTION MANAGER) ( ) �o° FV FIELD VERIFY 1.EXISTING STEEL JOISTS AND JOIST GIRDERS ARE ASSUMED TO BE IN GOOD CONDITION AND IN COMPLIANCE WITH THE STEEL JOIST INSTITUTE SPECIFICATIONS.ANY DAMAGE 8.SEISMIC DESIGN CATEGORY D GA GAUGE TO EXISTING JOISTS OR GIRDERS SHALL BE REPORTED PRIOR TO ADDING LOAD TO FRAMING. GC GENERAL CONTRACTOR 2.PRIOR TO STARTING ANY WORK OR ADDING ANY ADDITIONAL LOADS TO THE ROOF STRUCTURE,CONTACTOR SHALL VISUALLY OBSERVE JOISTS AND JOIST GIRDERS FOR SIGNS H HEIGHT OF DAMAGE OR DISTRESS,INCLUDING BUT NOT LIMITED TO,BENT WEB AND/OR CHORD MEMBERS,CRACKED WELDS,MISSING WELDS,ETC.ANY DAMAGE TO EXISTING JOISTS CTL CONTACT INFORMATION: w HORIZ HORIZONTAL OR JOIST GIRDERS SHALL BE REPORTED TO THE FOR PRIOR TO REINFORCING OR ADDING LOAD TO THE ROOF STRUCTURE. COMPANY: KRAZAN&ASSOCIATES,INC z A E~ $n HIS HOLLOW STRUCTURAL SHAPE 3.NO WORK SHALL BE PERFORMED ON ANY EXISTING JOIST AND/OR JOIST GIRDER IDENTIFIED BY THE GENERAL CONTRACTOR TO BE DAMAGED OR DISTRESSES UNTIL SUCH TIME CONTACT: GREG WALKER O f p AS THE FOR HAS PROVIDED WRITTEN INSTRUCTION TO DO SO. PHONE: 661 837-9200 o INFO INFORMATION ( ) zz O ISO ISOLATION 4.ALL PAINT AND DEBRIS SHALL BE CLEANED FROM STUCTURAL MEMBER PRIOR TO WELDING. EMAIL: GmgWalker@kre n.com 5 .u �� 5.HANGERS SUPPORTING MECHANICAL EQUIPMENT FROM JOIST CHORDS SHALL BE LOCATED WITHIN 3 INCHES OF JOIST PANEL POINTS OR JOIST SHALL BE REINFORCED PER n JBE JOIST BEARING ELEVATION m �. ° JST JOIST JOIST REINFORCING DETAIL.HANGER LOADS GREATER THAN 100 POUNDS SHALL NOT BE ATTACHED TO THE EDGE OF CHORD ANGLES AND SHALL BE CENTERED ON JOIST z - g p CHORD. < a z JT JOINT 6.CONTRACTOR SHALL BE RESPONSIBLE FOR REMOVAL AND REPLACEMENT OF EXISTING BUILDING ELEMENTS THAT PREVENT ACCESS TO INSTALL JOIST REINFORCEMENT, - v m KSI KIPS PER SQUARE INCH INCLUDING BUT NOT LIMITED TO SUSPENDED CEILINGS,DUCTWORK,RTU PLENUMS,CABLES,LARGE PIPING,ETC. L LENGTH 7.JOIST W EB CONFIGURATION IS SHOWN FOR REFERENCE ONLY,FIELD VERIFY ACTUAL CONFIGURATION AND WEB TYPE. O LB POUNDS S.ALL JOIST REINFORCEMENT SHALL BE INSTALLED AND INSPECTED BEFORE APPLYING NEW LOADS.I.E.RTU'S,AHU'S,COOLING TOWERS,AND ROOF SUPPORTED ITEMS. O LLH LONG LEG HORIZONTAL 9.PRIOR TO INSTALLATION OF JOIST REINFORCEMENT,CONTRACTOR SHALL REMOVE ALL LIVE LOADS FROM JOISTS TO BE REINFORCED.THIS INCLUDES BUT IS NOT LIMITED TO LLV LONG LEG VERTICAL PONDED WATER,ICE,SNOW(REMOVE SNOW TO EXPOSE ROOF MATERIAL),STAGED CONSTRUCTION MATERIALS/EQUIPMENT,ETC. LONG LONGITUDINAL 10.IF EXISTING JOIST BRIDGING INTERFERES WITH INSTALLATION OF REINFORCING,REMOVE BRIDGING AND REPLACE IMMEDIATELY UPON COMPLETION OF REINFORCING x MAX MAXIMUM INSTALLATION.IF BRIDGING TABS FOR BOLTED BRIDGING INTERFERE WITH INSTALLATION OF REINFORCING,REMOVE TABS AND REPLACE IMMEDIATELY UPON COMPLETION OF MECH MECHANICAL REINFORCING INSTALLATION.NEW CONNECTIONS SHALL MATCH EXISTING. O MFR MANUFACTURER 11.STEEL ERECTOR SHALL FIELD CUT REINFORCING TO FIT FROM STOCK LENGTHS. 0 O MIN MINIMUM MISC MISCELLANOUS MTL METAL 0 O NS NEARSIDE f'I NTS NOT TO SCALE OC ON CENTER OD OUTSIDE DIAMETER �u----77 OH OPPOSITE HAND O M a PAF POWER ACTUATED FASTENER Ulf u�i PCF POUNDS PER CUBIC FOOT O o PL PLATE (D Z Lu PLF POUNDS PER LINEAR FOOT 7 O ry PLUMB PLUMBING L PSF POUNDS PER SQUARE FOOT PSI POUNDS PER SQUARE INCH J QTY QUANITY O RACK REFRIGERATION RACK REF REFER TO < m REINF REINFORCING g READ REQUIRED z REV REVERSE o RTU ROOF TOP UNIT SCHED SCHEDULE SDI STEEL DECK INSTITUTE SIM SIMILAR ISSUE BLOCK SJI STEEL JOIST INSTITUTE SPCS SPACES SPECS SPECIFICATIONS STRUC STRUCTURAL T&B TOP AND BOTTOM THK THICKNESS TO TOP OF TOS TOP OF STEEL TRANS TRANSVERSE TYP TYPICAL UNO UNLESS NOTED OTHERWISE VERT VERTICAL W WIDTH CHECKED BY: BWM DRAWN BY: CRIB DOCUMENT DATE: 08/07/24 _1 C w fee 'c q 1 y+ ±alw.uc FC �. A 3 EXISTING 11/2" S1 NEW 11/2"x 20 GAWIDE- 08/05/24 "B"Di ECKi I RIB"B"DECK(33 KSI,MIN) I II II ii II II II ii II II II ii II II � ii �� LAP DECK EDGES 6"AND ATTACH NEW DECK TO EXISTING DECK WITH#10 TEK SCREWS AT I2"OC i - iCL EXISTING JOIST EXISTING STL ANGLE FRAME TO REMAIN i FASTEN SIDELAPS WITH(2) #10 TEK SCREWS EQUALLY w O SPACED IN JOIST SPACE LE w LE REF PLAN ABOVE S2 REF PLAN FOR NEW ROOF DECK - � NOTE: IF EXISTING CONDITIONS - Fi ATTACH NEW DECK TO DO NOT MATCH DETAILS, i EXISTING JOIST WITH#12 - ` CONTACT STRUCTURAL 3"MIN DECK TEK SCREWS AT 6"OC,TYP - BRG,TYP EXISTING ROOF ENGINEER IMMEDIATELY -- / !• DECK,TYP ;; GENERAL --------- _ 1-_-11 --+-- -_+ - -- -_- -- -- _-- - _JCL J ----------------- ----- + -11_ EXISTINGJOIST --I / NOTES AND II II II II II II II DETAILS EXISTING JOIST I�EXTENT OF EXISTING SKYLIGHT I i i i i i i i i i i i NEW DECK INFILL CL OF EXISTING TOP CHORD,TYP ii ii ii ii ii JOIST,TYP i (FIELD VERIFY) PROOF DECK INFILL AT REMOVED SKYLIGHT ROOF DECK INFILL AT REMOVED SKYLIGHT --� J NTS 2 NTS SHEET. m BUILDING KEYPLAN 's s1 "a a 3 SIDES 5"MIN TOTAL PLATE TO 1/8 LENGTH,EACH SEAT,T&B END OF WEB (NS-FS) 1/8 REINF (2)L2x2z3/16 (2)L2x2x3/i6 1/8 2@8 3"EACH END - _ JOIST REINFORCEMENT NOTES 1/8 2@8 REF SECTION'A' f PLATE TO (2)1"DIA FOR WEB REINF 3/16"PLATE CUT TO FIT SEAT TYP 1/8 1. EXISTING STEEL JOISTS AND JOIST GIRDERS ARE ASSUMED TO BE IN ROUND BARS NEAR SIDE AND FAR GOOD CONDITION AND IN COMPLIANCE WITH THE STEEL JOIST INSTITUTE EXISTING EXISTING EXISTING DOUBLE SIDE(FIELD VERIFY SIZE) PLATE SPECIFICATIONS. ROD WEB ANGLEWEB ANGLE WEB C 2. PRIORTO STARTING ANYWORK OR ADDING ANY VISUALLY LOADS T COPE HORIZ LEG OF F s WEB THE ROOF STRUCTURE,CONTACTOR SHALL VISUALLY OBSERVE JOISTS ROD WEB SINGLE ANGLE WEB DOUBLE ANGLE WEB EXISTING SEAT AS REQD w a REINF,TYP AND JOIST GIRDERS FOR SIGNS OF DAMAGE OR DISTRESS,INCLUDING BUT TO PLACE WEB REINF ti wo N NOT LIMITED TO,BENT WEB AND/OR CHORD MEMBERS,CRACKED WELDS, MISSING WELDS,ETC.ANY DAMAGE TO EXISTING JOISTS OR JOIST TOP CHORD PANEL GENERAL CONTRACTOR TO PROVIDE AND INSTALL SECTION A-WEB REINF SECTION B-END WEB REINF SECTION C-ENDSEAT REINF GIRDERS SHALL BE REPORTED TO THE FOR PRIOR TO REINFORCING OR FIELD STRUT(L2x2x3/16)EACH SIDE OF JOIST AT ALL ADDING LOAD TO THE ROOF STRUCTURE. 3"OR LOCATIONS WHERE CONCENTRATED LOAD DOES NOT OCCUR WITHIN 3"OF A PANEL POINT.INSTALL 3, NO WORK SHALL BE PERFORMED ON ANY EXISTING JOIST AND/OR JOIST GREATE ANGLE WITH ONE END AT LOCATION OF LOAD AND GIRDER IDENTIFIED BY THE GENERAL CONTRACTOR TO BE DAMAGED OR OTHER END AT A PANEL POINT ON THE OPPOSITE DISTRESSES UNTIL SUCH TIME AS THE FOR HAS PROVIDED WRITTEN CHORD,TYP.ANGLES SHALL BE INSTALLED PRIOR w rc 3 y�_" a °o' INSTRUCTION TO DO SO. CONCENTRATED TO NEW LOAD BEING APPLIED TO THE JOIST ° y w�'w y z z / 4. JOIST WEB CONFIGURATION IS SHOWN FOR REFERENCE ONLY, LOAD,REF NOTE w �"�opro=�N3Gm Y 6'-0" VERIFY ACTUAL CONFIGURATION AND WEB TYPE. o �a3tp owp'w°ow ALL DIAGONAL WEB MEMBERS INSIDE OR 5, ALL PAINT AND DEBRIS SHALL BE CLEANED FROM JOIST BEFORE WELDING wFN° wa €w$ PARTIALLY INSIDE DIMENSION SHALL BE REINFORCED REINFORCEMENT. JOIST TOP O 3 wzI 6. STEEL ERECTOR SHALL FIELD CUT REINFORCING TO FIT FROM STOCK CHORD ~ zLL� a pprcLLa4 o'� 3 SIDES LENGTHS. g 3waw °'w'o op 3"MIN TOTAL B 7. IF EXISTING JOIST BRIDGING INTERFERES WITH INSTALLATION OF a oa 5 EXISTING ROOF LENGTH,EACH REINFORCING,REMOVE BRIDGING AND REPLACE IMMEDIATELY UPON JOIST BOTTOM a�worc�`z�`="'� DECK,TYP �1/83 COMPLETION OF REINFORCING INSTALLATION.IF BRIDGING TABS FOR N �o° END OF WEB CHORD BOLTED BRIDGING INTERFERE WITH INSTALLATION OF REINFORCING, REINF - REMOVE TABS AND REPLACE IMMEDIATELY UPON COMPLETION OF REINFORCING INSTALLATION.NEW CONNECTIONS SHALL MATCH EXISTING. o 8. CONTRACTOR SHALL BE RESPONSIBLE FOR REMOVAL AND REPLACEMENT CONCENTRATED p�',1. E.N OF EXISTING BUILDING ELEMENTS THAT PREVENT ACCESS TO INSTALL LOAD,REF NOTE - J 1/8 1 TYP EACH JOIST REINFORCEMENT,INCLUDING BUT NOT LIMITED TO SUSPENDED END EACH f u' CEILINGS,DUCTWORK,RTU PLENUMS,LARGE PIPING,ETC. 1/8 1 ANGLE 3"OR h M 9. PRIOR TO INSTALLATION OF JOIST REINFORCEMENT,CONTRACTOR SHALL , q REMOVE ALL LIVE LOADS FROM JOISTS TO BE REINFORCED.THIS NOTE: GREATER INCLUDES BUT IS NOT LIMITED TO PONDED WATER,ICE,SNOW(REMOVE PROVIDE JOIST REINF IN ACCORDANCE WITH THIS DETAIL BOTTOM CHORD PANEL F '- ° 8 O SNOW TO EXPOSE ROOF MATERIAL),STAGED CONSTRUCTION MATERIALS/ FOR ALL CONCENTRATED LOADS IN EXCESS OF 100 LBS. < 8 z REF SECTION B FOR EQUIPMENT,ETC. WHERE MORE THAN ONE CONCENTRATED LOAD EXISTS WEB REINF AT END 10.ALL JOIST REINFORCEMENT SHALL BE INSTALLED AND INSPECTED BEFORE WITHIN A CHORD PANEL AND THE SUM OF THOSE LOADS - _ BEVEL ANGLE DIAGONAL TYP APPLYING NEW LOADS.REF 4-S2 AND 6-S2 FOR ADDITIONAL EXCEEDS 100 LBS,PROVIDE JOIST REINFORCEMENT AS EXISTING JOIST AS SHOWN;WELD REINFORCEMENT REQUIRED AT CONCENTRATED LOADS. Z ° TO JOIST CHORD REF SECTION A FOR DETAILED SUCH THAT THE SUM OF THE LOADS WITHIN O WEB REINF,TYP THE REMAINING UNSUPPORTED CHORD LENGTH DOES NOT EXCEED 100 LBS. JOIST DIAGONAL WEB REINFORCEMENT JOIST REINFORCING AT CONCENTRATED LOAD 1'-0" 5.0-1 3/4"=1'-0" 5.0-2 0 0 C=D co 0 O ROOF FRAMING PLAN NOTES z o r to 1.REF 5-52 FOR SUPPORT FRAMING AT PIPE PENETRATION;FRAMING NOT REQUIRED O M FOR OPENINGS LESS THAN 10"x10";FIELD VERIFY LOCATION ONCE UNIT HAS BEEN uv INSTALLED.REF REFRIG FOR EXACT SIZE AND LOCATION OF PENETRATION. ^ Q ATTACH CURB TO 2.NEW RAE CORP PUMP SKID(5,650 LBS)ON CAPPED CURB,REF REFRIG;ALIGN ONE (`jL���—I Z n NOTE: DECKING WITH#12 SIDE OF CURB WITH EXISTING JOIST GIRDER BELOW. UJ REF REFG FOR TEK SCREWS AT 6"OC 7 NON-STRUCTURAL NON-STRUCTURAL 0 ` O EXACT LOCATION OF ATTACH CURB TO ROOF CURB ROOF CURB ROOF PENETRATION. ATTACH ROOF DECK DECKING WITH#12 ^ ^ ^ ��)) J U) TO ANGLE WITH#12 TEK SCREWS AT 6"OC ' FIELD TEK SCREWS AT 6"OC EXISTING ATTACH ROOF DECK EXISTING a VERIFY ROOF DECK TO ANGLE WITH#12 ROOF DECK m CL OF TEK SCREWS AT 6"OC EXISTING JOIST _ I I I m O I F In ISSUE BLOCK w w > > EXISTING JOIST L3z3z3/16,TYP CL OF TOP CHORD AHU ' EXISTING JOIST _ L3x3x3/i6,TYP � 3/16 2 ETR CL OF JOIST 3116 2 A 3/16 2 H 6 2 1/8 1 TYP -— 1/8 1 REINF JOISTS PER 7-52 REF NOTE#2 PLAN __—__—__—__ PLAN VIEW SECTION A SECTION B 2 TYP S2 PIPE PENETRATION SUPPORT FRAMING - - - - - NTS 6.0-2 3 Typ REF PLAN S2 �NOTE#1 II�II NOTE: EXISTING CMU WALL COMPRESSOR,ETR COND B VERTICAL WEB REINF IS ONLY ETR REQUIRED IF EXISTING JOIST HAS VERTICAL WEB MEMBERS. CONCENTRATED y F= z LOAD JOISTTOP 3"OR LESS O? a CHECKED BY: SWIM CHORD -- -------------�F DRAWN BY: CRIB r1 r DOCUMENT DATE: 08/07/24 w 'c.BE� 2 x d W 141 w O 'b 51 y 2 SLOPE DOWN CONDA nlrrup JOIST BOTTOM EXIST ROOF ETR ' CHORD PROVIDE AND INSTALL VERTICAL WEB G•2 --- ---------------------- ----------------- ------ --- - REINFORCEMENT PER 6-S2 AT ANY REF SECTION A,DETAIL LOCATIONS WHERE A NEW REF PLAN 08/05/24 FOR JOIST DIAGONAL WEB CONCENTRATED LOAD OCCURS REINF JOISTS NOTE#1 REINFORCEMENT,TYP WITHIN 3"OF THE VERTICAL WEB PER 7-52 TYP 2 REF PLAN JOIST VERTICAL WEB S2 NOTE#2 REINFORCING AT REFRIG EQUIP 4 -—- TYP 3/q^-1'-0" S2 EXISTING STL COL BELOW,TYP FASTEN EA SIDE OF SKID TO EA CURB SUPPORT RAIL RTU NOTE: WITH 518"DIA A304 BOLTS ETR REF 2-52 FOR INFORMATION SHOWN BUT NOT NOTED. CAPPED CURB \ SUPPORT RAIL REFRIGERATION SKYLIGHT a CAPPED CURB BY EQUIP,REF ETR F z REF 2-52 FOR EQUIPMENT CURB SUPPLIER REFRIGERATION U ' TO CURB SUPPORT RAIL O z CONNECTION ATTACH CURB TO CHANNEL w y WITH#12 TEK SCREWS AT w CAPPED CURB \ 12"OC,TYP 2 SIDES rrn p SUPPORT RAIL \ O r w C6x8.2 CONT INSTALLED Z NEW STL CHANNEL _ OVER EXISTING ROOF DECK INSTALLED OVER EXISTING CHANNEL TO w¢ LL ROOF DECK;REF 2-S2 EXISTING ROOF 1/8 1 JST THROUGH DECK TO REMAIN 1/8 1 DECK,TYP EXISTING ROOF ."TYP - ------------------ _--- ___-______ DECK TO REMAIN PROVIDE FIELD PRO PARTIAL STRUT PER 4-S2 OR PER 4I S2 OR FIELD STRUT ROOF 6-S2 AS READ 6-S2 AS READ EXISTING JOIST F - FRAMING TO REMAIN,TYP PLAN AND EQUIPMENT EXISTING JOIST SUPPORT IL TO REMAIN DETAILS n REFRIGERATION EQUIPMENT SUPPORT n REFRIGERATION EQUIPMENT SUPPORT n PARTIAL ROOF FRAMING PLAN SHEET 's a a 24 HOURS PRIOR TO DOWN ANY NG BAS EQUIPMENT SALVAGE REFRIGERATION SYSTEMS,IHVACSYSTEMS OR GENERAL REFRIGERATION BUILDING AUTOMATION CONTROLS SYSTEMS,SEND BAS NOTES REQUIREMENTS EMAIL TO NSRM@WALMART.COM.THE E-MAIL SHALL �z52z oa zs sz STATE WHAT,WHY,AND WHEN IT IS BEING SHUT DOWN ALL DEMOLISHED NOVAR BAS EQUIPMENT SHALL BE AND HOW LONG IT IS ANTICIPATED TO BE SHUT DOWN. 1. BAS CONTRACTOR SHALL CONTACT THE BAS RETURNED TO WALMART MECHANICAL SERVICES THEN SEND A FOLLOW UP EMAIL TO SUPPLIER(S)TO OBTAIN A CURRENT MODULE CONSTRUCTION MANAGER.EQUIPMENT TO BE NSRM@WALMART.COM AFTER THE WORK IS COMPLETE '� `L '3 4 CONFIGURATION PRINTOUT BEFORE TERMINATING RETURNED INCLUDES:EXECUTIVE CONTROLLER(S), AND THE SYSTEM IS BACK UP AND RUNNING. SENSOR LEADS AT INPUT MODULES.THE REQUEST Imp),CIM(S),CCM(S),RCC(S),CMS(S),ETC.PROVIDE EDC FOR THE CONFIGURATION PRINTOUT SHALL BE MADE DOCUMENTATION FOR ALL EQUIPMENT REMOVED IN WHERE EXISTING REFRIGERATION CHASES ARE BEING PRIOR TO THE INSTALLATION OF BAS CABLES.W IRING ACCORDANCE WITH SPECIFICATIONS AND REQUIRED I TERMINATIONS SHALL BE LANDED ACCORDING TO REMOVED,ANY DAMAGED OR IMPROPERLY CLOSE-OUT DOCUMENTS. 1 3 NEW BAS WALMART ISD PROVIDER THE BAS SUPPLIER CONFIGURATION SHEETS. SUPPORTED BAS CONDUITS WITHIN CHASE SHALL IN ASR ASR BACKBOARD IN EDC. TO PROVIDE CABLE BACK REPAIRED OR REPLACED AS REQUIRED.ANY EXISTING UPGRADE EXISTING RACK CONTRACTOR SHALL SEND EQUIPMENT TO ASSET BAS CABLING WITHIN CHASE NOT INSTALLED IN TO WALMART DATA MTC CONTROLLER.REFER 1 2. BAS CONTRACTOR SHALL PROVIDE COMPLETED TECHNOLOGIES AT THE ADDRESS BELOW. NETWORK FOR PUMP SKID. TO ONE-LINE DIAGRAM FOR REFRIGERATION SENSOR INPUT VERIFICATION CONTRACTOR SHALL APPLY FOR CHANGE ORDER CONDUIT SHALL BE RE-ROUTED THROUGH NEW BAS CONTRACTOR TO FORMS TO THE BAS SUPPLIER(S)AT THE BEGINNING CONDUIT.FINAL APPROVAL BY WALMART PLUMBING ADDITIONAL INFORMATION. FOR SHIPPING REIMBURSEMENT.BEFORE SENDING, CONSTRUCTION MANAGER.REFERENCE MECHANICAL COORDINATE DATE OF THE REFRIGERATION EQUIPMENT STARTUP.BAS CALL FOR"RMA"NUMBER AT 502-425-8702. ARCHITECTURAL DRAWINGS FOR REFRIGERATION I REQUIRED FOR THIS EXISTING HYBRID HOUSE INSTALLER SHALL PROVIDE ASSISTANCE TO THE BAS CHASES BEING REMOVED. CONFIRM EXISTING LEAK DETECTION I SERVICE WITH OWNER'S MTC(ON ROOF) SUPPLIERS)FOR SPOT CHECKING OF SENSORS FOR 3600 CHAMBERLAIN LANE I CONSTRUCTION ACCURACY. STE.122,LOUISVILLE,KY 40241 SENSOR IS COMPATABILE WITH CO2. COORDINATE WITH MANUFACTURER MANAGER.TYP OF PUMP TO REPLACE AS NEEDED. OCKROOM it SKIDS. 3. ALL BAS CABLE DU THE SALES FLOOR SHALL BE VI y o II PROVIDE RS-485 FROM ROUTED IN CONDUIT AND CONCEALED FROM VIEW, w a F r PUMP SKID CPCO TO RACK ROUTED ALONGSIDE OTHER PIPING OR CONDUIT AS m S F w z N ,tt A07 SCO2 MUCH AS POSSIBLE. ° si EXECUTIVE CONTROLLER. UPGRADE EXISTING RACK 1 w FNgw ,z�°� REFER TO ONE-LINE DTB CONTROLLER.REFER E SEAFOOD 4. BAS CONTRACTOR SHALL BE PRESENT AND ° z°am DIAGRAM FOR ADDITIONAL TO ONE DIAGRAM FOR ww 3t°g'�aw FREEZER AVAILABLE TO RESOLVE ISSUES AND PROVIDE O E, arcs INFORMATION.TYP OF ADDITIONAL INFORMATION LL ay PUMP SKIDS. REFRIGERATION STARTUP ASSISTANCE UNTIL Z w° ig,°"<=o _ RELEASED BY THE BAS SUPPLIER AND WALMART w � h zoo H IIpIIL 0 H CONSTRUCTION MANAGER. z_w;_�a$NQo€aG�w I/I o 5. DURING THE REFRIGERATION STARTUP,BAS a 3 N o'W ss\`l SCO25B-1 PUMP SKID, O o`z�iz H� 22,21'g MOUNTED ON ROOF. CONTRACTOR SHALL COMPLETE ALL UNRESOLVED N ° ,°�g_as"owog 0 REFER TO FIXTURE AND REFRIGERATION BAS WORK PRIOR TO WORKING ON €' `�°"�OipV CPCO� os -- STRUCTURAL PLANS OTHER BAS INSTALLATION ITEMS. FOR ADDITIONAL \ INFORMATION. 6 WHEN THE S SUPPLIER IS NOT SCHEDULED TO MEAT PERFORM THE ON SITE REFRIGERATION STARTUP, O UTILITY _ CONFIRM EXISTING LEAK DETECTION EXISTING HYBRID HOUSE THE BUILDING AUTOMATION CONTRACTOR IS {� o SENSOR IS COMPATABILE WITH CO2. DTB(ON ROOF) RESPONSIBLE FOR PERFORMING ALL CHECKS AND COORDINATE WITH MANUFACTURER TEST TO ENSURE A FULLY FUNCTIONAL ° INSTALL TEMPERATURE SENSOR \ :GCi;. 1 TO REPLACE AS NEEDED. 1 REFRIGERATION CONTROL SYSTEM.CONTACT THE w 3 CABLE AND VALVE CONTROL WIRING �•• .y BAS SUPPLIER FOR THE BLANK TEST VERIFICATION AND CABLING IN CONDUIT FROM TOP •,;F�;. GO UPGRADE EXISTING RACK FORMS AND INSTRUCTIONS FOR COMPLETING.ALL OF COOLER/FREEZER TO WALK-IN ^`' LTA CONTROLLER.REFER COMPLETED TEST VERIFICATION FORMS SHALL BE i CONTROLLER ENCLOSURE.FOR GROCERY ,UGi o TO ONE-LINE DIAGRAM FORRETURNED TO THE WALMART CONSTRUCTION CABLE RUNS>25',REFER TO BAS fEEZER �ti:' ADDITIONAL INFORMATION) MANAGER.VENDOR INSTRUCTIONS.TYP. PROVIDE A CUSTOM,DIGITALLY PRINTED GO e 7. REFER TO REFRIGERTATION AND ARCHITECTURAL z AND HIGH-DURABILITY LAMINATED LABEL o^ DRAWINGS FOR CONDUIT INSTALLATION AND 10j MOUNTED ON CONTROLLER ENCLOSURES SEALING REQUIREMENTS FOR DEVICES SHOWN ON INSTALL CONTROLLER ENCLOSURE. INDICATING THE REFRIGERATION CIRCUIT(S) - COOLER/FREEZER PANELS.DO NOT INSTALL CONDUIT CONTROLLER ENCLOSURE OWNER SERVED BY THE CONTROLLERS WITHIN. \\ EXISTING HYBRID HOUSE WITHIN COOLER/FREEZER PANELS. LETTERING SHALL BE WHITE,MINIMUM OF )C FURNISHED.ENCLOSURES CONTAIN ONE 3/4"HIGH,ON A BLACK BACKGROUND. LTA(ON ROOF). d CONTROLLER AND REMOTE DISPLAY. GROCERY 8. ROUTE ALL UTILITY SERVICE LINES(PIPES AND U o AREA CONDUIT)WITHIN STUD WALLS WHEREVER POSSIBLE. O O O ON COOLER/FREEZER PANELS IN FOOD PREP AREAS INSTALL BOTTOM OF CONTROLLER ENCLOSURE WHERE UTILITIES MUST BE EXPOSED,INSTALL 84"AFF MINIMUM ON COOLER/FREEZER.REF SCO2SA-1 PUMP SKID, 1 1 UTILITIES 1/2"OFF FACE OF PANEL TO ALLOW FOR O O a PLANS FOR QUANTITY AND LOCATION. 5 2 MOUNTED ON ROOF. CLEANING;USE ONLY NON-CORROSIVE MATERIALS O O COORDINATE PANEL LOCATION WITH DOOR TYP REFER TO FIXTURE AND FOR SPACERS AND ANCHORS. ASR AS OPENING,PROTECTION,AND RACKING.DO NOT _ STRUCTURAL PLANS MOUNT ENCLOSURES BELOW REFRIGERATION 7 FOR ADDITIONAL 9. REFERENCE ARCHITECTURAL DEMOLITION PLANS O EQUIPMENT EC PLUMBING LINES.VERIFY WITH <o CPCO; INFORMATION. �/'. FOR FULL EXTENT OF DEMOLITION WORK REQUIRED. WALMART MECHANICAL CONSTRUCTION �j ez p - - - 1J O n a MANAGER THAT ENCLOSURES ARE LOCATED INLo AN ACCESSIBLE SPACE. - n m REFER TO KE2 REFRIGERATION BAS M APPLICATION MATRIX BAKERY �� SYMBOLS UI z FOR DOOR SWITCH UTILITY j a.ss.v WALK-IN COOLER/FREEZER COIL CONTROLLER REQUIREMENTS.TYP. o z N OWNER FURNISHED E2E COPELAND RX-300 GATEWAY ENCLOSURE MOUNTING DETAIL (SPORLAN/KE2/CC200) DOOR SWITCH FIELD E51 NOVAR EDGE SERVER GATEWAY INSTALLED AND WIRED III......LLL G J I NTS TO KE2 MAIN BOARD w J w BAS BUILDING AUTOMATION SYSTEM AUX INPUT1.TYP. <00 m 0 TEMP TEMPERATURE Q w VFD VARIABLE FREQUENCY DRIVE z m PROVIDE CONDULET AT CEILING PENETRATION. TRANSFORMER O INSULATE AND SEAL GAP AROUND CONDULET PENETRATION WITH SILICONE PRIOR TO PROVIDE 2"CONDUITS TO COMM COMMUNICATION PORT/MODULE INSTALLING JUNCTION BOX,TYP JOIST LEVEL AS NEEDED FOR PROVIDE 1"EMT CONDUIT TO CABLING AND PROVIDE < XY REFRIGERATION CIRCUIT-REFRIGERANT TYPE ISSUE BLOCK BUSHINGS AT EACH END.(TYP) PROVIDE 1"EMT CONDUIT WALK-IN COIL CONTROLLER OWNER FURNISHED ESi REMOTE BAKERY PENETRATION.SEAL INSIDE FOR COIL CONTROL WIRING LCD SCREEN PROVIDED WITH 0 TEMPERATURE SENSOR CONDUIT WITH SILICONE 120V/24V TRANSFORMER.MOUNT SEALANT,TYP COOLER/FREEZER BOX CEILING ON BAS BACKBOARD.TYP. F - - - O iUl - ,U, - - F OD DEFROST TERMINATION SENSOR PROVIDE EMT CONDUIT AND WIRING TO LCD XFMR '� '�' IUD NEXT COIL CONTROL JUNCTION BOXES ON BAS BACKBOARD w E2-CC. KE2-CC. KE2-CCI .KE2-CC. SAME SYSTEM WHEN MULTIPLE COILS ARE IN LCD RFMR - _ ' " g Y'-�-`---- `--_ ----•---- -_�F-:y SAME COOLER/FREEZER BOX.CONDUIT AND '� DUAL TEMP SWITCH WIRING SAME SIZE AND QUANTITY AS WIRING LCD RFMR -s-- ---- II TO PANEL.COIL CONTROL CONDUIT SHALL _ IKE2-CC; RIB RELAY IN BOX BE 1". o a scQ MOUNT NEW BOSS CONTROLLER ON II BOSS BOSS CONTROLLER BOSS II BAS BACKBOARD.WALMART ISO O IO: iKE2-_C__C�—IKE2-CCI—IKE2-CC��KE2-CCI-��! ;CPCO; CPCO CONTROLLER PROVIDER TO PROVIDER CABLE BACK PROVIDE CEILING MOUNTED WP JUNCTION BOX WITH TO WALMART DATA NETWORK FOR I' �. `� ------ THREADED HUBS AND GASKETED COVERPLATE. BOSS CONTROLLER.BAS �� _Yj :KE2-CC! -CC'; �KE2-CC��KE2-CC' .[wyj 'CMS CASE MANAGEMENT SYSTEM MODULE TYPICAL COIL SEAL TOP OF JUNCTION BOX TO COOLER/FREEER CONTRACTOR TO COORDINATE DATE GROCERY II CEILING WITH SILICONE SEALANT,TYP. REQUIRED FOR THIS ERVICE WITH AREA COPELAND INPUT/OUTPUT MODULE OWNER'S CONSTRUCTION MANAGER. PROVIDE 1"LIQUID-TIGHT FLEXIBLE METAL II - - RCC NOVAR CIRCUIT CONTROLLER CONDUIT TO KNOCKOUT ON UNIT.FINAL II 1 O"� 1 S 1 S 13a SCO2 PROVIDE P3300 UNISTRUT,OR EQUAL, II CONNECTION TO COIL BY RC,TYP. PROVIDE 4"X4"WIREWAY II Uq� C�JKE2-CC` KE2-CCj 0 O XIO BACNET INPUT/OUTPUT MODULE AT LOCATIONS WHERE THE BACKBOARD 7 CAN NOT BE SECURELY FASTENED TO 'I N --------- --------- --------- PROVIDE PLYWOOD II ° HS HORN AND STROBE INDICATOR THE WALL.SECURE UNISTRUT TO E2-CCL_�KE2-CCLIKE2-CCL IKE2-CC' NOTE:DO NOT LOCATE WP JUNCTION BOX DIRECTLY IN FRONT OF DISCHARGE FAN,OFFSET TO SIDE. BACKBOARD -. •-------- --------- •--------- Y; CHECKED BY: EJM STRUCTURE AND FLOEQUIROVIm ) II m ,Y• O CROSS-BRACING AS REQUIRED. P II 6146 SCO��614c SCO2' 11a SCO B71b SCO2 m LDP LEAK DETECTION PANEL DRAWN BY: JTC NOTE:THE CONDUIT AND WIRING IN THIS DETAIL IS FOR LOW VOLTAGE AND CONTROL VOLTAGE WIRING ONLY. LEAK DETECTION SENSOR PROTO CYCLE: 04/26/2024 EVAPORATOR COIL POWER LINE VOLTAGE WIRING SHALL BE INSTALLED IN SEPARATE CONDUIT.REFER TO ELECTRICAL. 03.01.19 " II 156 SCO -,816a SC0 �Al2c SCO2 B12b SCO2 � AUDIO\VISUAL ALARM DOCUMENT DATE:12/27/2024 U? I E2i CC~~KE2-CCj~KE2-CC-1—KE2-CCj U) ZA ZONE ALARM SILENCE PANEL COOLER SENSOR WIRING PROVISIONS BAS BACKBOARD _ _(�y�UNIT NTS E - - n :. - - - - O E 0 II ° ;Y: Y; S3C SPORLAN WALK-IN CONTROLLER u 153C SPORLAN CASE CONTROLLER ♦ T""sc� PROVIDE JUNCTION BOX WITH D " IKE2-CCj KE2 CASE CONTROLLERFLEXIBLE CONDUIT OR SEALTITE AT CEILING FOR SOLENOID. PROVIDE CONDUIT AND TYP KE2-RE-2-00 KE2 WALK-IN CIRCUIT CONTROLLER-40 AMPS INSTALL SENSOR CABLE INSTALL WIRING FROM SOLENOID TO BUILDING AUTOMATION / SGR SPORLAN GATEWAY ROUTER O 41742 TO BAS KE2 CONTROLLER. SYSTEM.(TYP OF 2) INVERTED P-TRAP PROVIDE CONDULET AT DRY SNS SPORLAN NETWORK SWITCH L/2/lam' TYP OF SECONDARY CEILING PENETRATION ODU ((�' CO2 ONLY. FILLED WITH SEALANT n DS DOOR SWITCH COIL SENSOR LOCATIONS DUAL COIL UNIT COOLER GROCER AREA Y CC200 COPELAND WALK-IN CONTROLLER j—SUPPLY 1/4'PENETRATIONTHRU CONDUITAND SENSOR RETURN AIR TEMPERATURE 0 ROOF FOR SENSOR LEADS. CABLE TO BUILDING SENSOR INSTALLATION t, 1—RETUR SEAL INSIDE AND OUT WITH AUTOMATION SYSTEM. LC__C_2.0__0 COPELAND CASE CONTROLLER SILICONE OR EXPANDING (TYP) 2 � 3 FOAM AND SEALANT. •�� ASR ASR ASR TYP NEW FIELD INSTILLED EQUIPMENT PROVIDE 1/4"SCH 40 ""p EXISTING EQUIPMENT PLASTIC PLUMBER'S SUPPLY CEILING OF BOX SERVICE TUBE WITH CAPPED END. L DELI ` ----------- NEW FACTORY INSTALLED EQUIPMENT DRILL HOLE TO RUN INSTALL SENSOR 213 DOWN FROM CEILING CEILING - - - - - - - - - - - - - D SENSOR LEAD THROUGH. I I -—- EQUIPMENT TO BE DEMOLISHED THE TOP OF THE COIL,12"MINIMUM, OF BOX i OF BOX CONFIRM EXISTING LEAK DETECTION AND CENTERED ON COIL LENGTH. _ _ i i PRODUCE SENSOR IS COMPATABILE WITH CO2. COOLER COORDINATE WITH MANUFACTURER COM COMPRESSOR OUTPUT MODULE 0 TO REPLACE AS NEEDED. OWNER-FURNISHED RETURN AIR TEMP SENSOR R— ----i --___ - �o c RIM RACK INPUT MODULE IT \ ----- ROM RACK OUTPUT MODULE 8"-12" ALLWAY S OM AD O � A ANALOG OUTPUT MODULE ROUTE REFRIGERATION SENSOR WIRING DELI PRE TO 2 KNOCKOU WIRING PROVISIONS DETAIL.T.REFERENCE UNIT COOLER COOLER Y� BIM 8-INPUT MODULE COIL SENSOR INSTALL OWNER-FURNISHED COIL TEMPERATURE SENSORS SECURE SENSING ELEMENT AND CABLE WITH () INSTALL COIL 0 ----- ON THE AIR DISCHARGE SIDE OF THE COIL,APPROXIMATELY NYLON MOUNTING BRACKETS(PANDUIT#PP2S-S10.X) TEMPERATURE V TO 1-1/2"AWAY FROM THE RIGHT AND LEFT EDGES OF THE AT RIGHT ANGLES TO EACH OTHER.PLACE BULB SENSORS FOR DUAL ACTIVE COIL SURFACE,NEAR THE TOP OR BOTTOM THIRD OF APPROX.3"OFF CENTER IN MAXIMUM RETURN AIR DELI DELI COIL UNIT COOLERS ON L THE UNIT COOLER.INSTALL PER UNIT COOLER COIL STREAM.MOUNT BRACKET WITH EXISTING FAN THE SIDE OF THE COIL A08 SCO2 $ UTILITY PREP CONTROLLER MANUFACTURER'S INSTRUCTIONS,AND WIRE SHROUD MOUNTING SCREW.DO NOT DRILL HOLE IN CLOSEST TO THE DOOR - - i----------------� \ BACK TO THE CONTROLLER.(TYP OF 2) DRAIN PAN TOHI MOUNT BRACKETS.CABLE TO EXTEND ^ 4 - TO COIL ON HINGED SIDE OF DRAIN PAN. 1—L)l� '�° I� II _-> I� � t �1. Ie I�19 Ie L_ J_1_1, -1-II REFER TO MANUFACTURER'S INSTALLATION INSTRUCTIONS FOR ALL FIELD INSTALLED ITEMS.BAS CONTRACTOR REFER TO WALK-IN CONTROLLER WIRING DETAIL FOR TERMINATIONS SHALL CARRY OUT ALL FURNISHING,INSTALLATION,AND WIRE TERMINATIONS UNLESS NOTED OTHERWISE. DELI BUILDING FREEZER 23 4 AUTOMATION SYSTEM (WALK-IN UNIT COOLER CONTROL DEVICE LOCATION AND INSTALLATION (SECONDARY) REFRIGERATION BUILDING AUTOMATION SYSTEM PLAN 1 3/32"=V-0" EXISTING CONDITIONS WERE TAKEN FROM EACH SUBCONTRACTOR IS RESPONSIBLE FOR HAVING ORIGINAL DRAWINGS AND MAY NOT REFLECT A THOROUGH KNOWLEDGE OF ALL DRAWINGS AND EXACT"AS-BUILT'CONDITIONS.CONTRACTOR SPECIFICATIONS IN THEIR RELATED FIELD.THE FAILURE SHALL FIELD VERIFY ALL EXISTING CONDITIONS TO ACQUAINT THEMSELF WITH THIS KNOWLEDGE DOES PRIOR TO SUBMITTING FINAL BIDS.CONTRACTOR NOT RELIEVE THE RESPONSIBILITY OF PERFORMING SHALL CAREFULLY COORDINATE NEW WORK AND THE WORK PROPERLY.NO ADDITIONAL SHFFT- DEMOLITION WITH ALL OTHER DISCIPLINES AND COMPENSATION SHALL BE ALLOWED BECAUSE OF gqS R 1 EXISTING CONDITIONS. CONDITIONS THAT OCCUR DUE TO FAILURE TO FAMILIARIZE WORKERS WITH THIS KNOWLEDGE. KE2-RE2 DOOR SNATCH APPLICATION MATRIX APPLICATION EQUIPMENT DESIGN AIR CURTAIN DOOR CONTROLLER HCR SWING DOOR KE2-RE2 HCR DOOR SWITCH WIRED TO HCR CONTROLLER THIS DETAIL IS A SCHEMATIC REPRESENTATION AND MAY NOT �, w KE2 DOOR SWITCH WIRED TO BAS 1/0 BOARD REFLECT ALL WALK-IN COIL CONTROLLER CONFIGURATIONS. w TEMPERATURE SENSORS,DOOR SWITCH,AND REFERENCE MANUFACTURER FOR FACTORY INSTALLED U z ASSOCIATED WIRING FURNISHED BY OWNER WITH KE2 CONTROLLER,INSTALLED HCR ROLLSEAL KE2-RE2 ROLLSEAL DRY CONTACT WIRED TO HCR CONTROLLER AND BAS 1/0 BOARD(DOUBLE-TAP) COMPONENT INFORMATION. w O BY CONTRACTOR.SENSORS AND SWITCH ARE NOT SHOWN ON PLANS APO/PICKUP DISCARD KE2 AND HCR MAG SWITCH w FOR CLARITY.REFER TO MANUFACTURERS INSTALLATION AND WIRING w O 4 INSTRUCTIONS. ASI SWING DOOR KE2-RE2 KE2 DOOR SWITCH WIRED TO SAS 1/0 BOARD CONTACT NOVAR(NOVARTEC28@wal-mart.wm,800-341-7795) 00 a a. ROLLSEAL DRY CONTACT WIRED TO SAS 1/0 BOARD FOR INSTRUCTIONS REGARDING THE INSTALLATION AND a u WHEN LOW VOLTAGE CABLING INSTALLATION RUNS EXCEED THE MAXIMUM ASI ROLLSEAL KE2-RE2 DISCARD KE2 MAG SWITCH START-UP OF THE KE2THERM CONTROLLER AT THIS a Qo LENGTHS ALLOWED FOR THE CABLING FURNISHED BY OWNER WITH THE KE2 PARTICULAR SITE. O O.. H U CONTROLLER,FURNISH CABLE PER MANUFACTURER'S RECOMMENDATIONS FOR HCR DOOR SWITCH WIRED TO HCR CONTROLLER 0 n 00 r J r DISTANCES REQUIRED.REFER TO MANUFACTURER'S INSTRUCTION FOR HCR SWING DOOR KE2-RE2 KE2 DOOR SWITCH WIRED TO KE2-RE2 I- r rn a w O MAXIMUM DISTANCES ALLOWED FOR OWNER FURNISHED CABLES. REFER TO MANUFACTURER'S INSTALLATION INSTRUCTIONS FOR z in z z ROLLSEAL DRY CONTACT WIRED TO HCR CONTROLLER AND KE2-RE2(DOUBLE-TAP) ALL FIELD INSTALLED ITEMS.BAS CONTRACTOR SHALL CARRY z ¢ O w HCR ROLLSEAL KE2-RE2 OUT ALL FURNISHING,INSTALLATION,AND WIRE TERMINATIONS O LL O N LL O REFER TO REFRIGERATION PLANS FOR WALK-IN UNIT COOLER COIL QUANTITY OTHER DISCARD KE2 AND HCR MAG SWITCH UNLESS NOTED OTHERWISE. AND LOCATION. ASI SWING DOOR KE2-RE2 KE2 DOOR SWITCH WIRED TO KE2-RE2 ° ROLLSEAL DRY CONTACT WIRED TO KE2-RE2 SLSV:ONE PER COIL.TERMINATE 120VAC SUPPLY SLSV INCOMING POWER,DEFROST,AND FAN WIRING PROVIDED ASI ROLLSEAL KE2-RE2 LINE SOLENOID VALVE WIRING((2)#12 W/(1Nt12 BY ELECTRICAL CONTRACTOR,TERMINATED BY DISCARD KE2 MAG SWITCH GND)AT KE2 CONTROLLER.REFER TO REFRIGERATION CONTRACTOR.REFER TO ELECTRICAL ELECTRICAL.SUPPLY LINE SOLENOID VALVE r - -- - DRAWINGS FOR CIRCUITING OF KE2 CONTROLLER POWER rcr 3o°s'�aw<° FURNISHED BY REFRIGERATION MANUFACTURER. I - - ---- -- ----- --� AND WALK-IN UNIT COOLER FAN&ELECTRIC DEFROST. w a- H'6,2-`-'gi p I� __ I Z w� �g wa 0. LAND WIRE WITHIN KE2 CONTROLLER AT I' I TERMINATIONS AT CONTACTORS AND TRANSFORMER iw3 a 6H TRANSFORMER PER TRANSFORMER WIRING LOCATED IN THE RIGHT SIDE OF THE PANEL OPPOSITE THE g 3yt°a,.yo$€aG�w DIAGRAM AND SUPPLIED VOLTAGE. I I MAIN AND AUX BOARD(S)(NOT ABOVE MAIN BOARD AS a Qo=iz wr ww°'o�g I -------------------------------------------- I SHOWN HERE). �ou�pw° I I � so � FURNISH AND INSTALL#22 AWG 2 CONDUCTOR DIGITAL so I I DEFROST SIGNAL WIRING FROM MAIN BOARD AUX RELAY MAIN BOARD I OUTPUT TO LEGACY BAS SYSTEM INPUT MODULE TIED TO THE SAME RACK.DEFROST SIGNAL SHALL INHIBIT LEGACY BAS CONTROLLED DEFROSTS TO MANAGE DEFROST I I CONCURRENCY.REFER TO REFRIGERATION DEFROST {/} ^oa I I SCHEDULES. I I I I UNIT COOLER W COIL TEMPERATURE SENSOR 1(OF 2) w m 3 FIELD INSTALLED AND WIRED TO KE2 MAIN BOARD. S REFER TO PLANS AND ONE-LINE DIAGRAM FOR DOOR N M a < 8 v INSTALL OWNER FURNISHED RS-0 SWITCH WIRING. 85 BACNET � - COMM WIRING FROM GATEWAY OR I I PREVIOUS KE2 CONTROLLER ON COMM z W LOOP,REFER TO ONE-LINE DIAGRAM. I S U RS485 BACNET COMM WIRING TO NEXT KE2 I I CONTROLLER ON COMM LOOP,REFER TO I I XIO SCHEDULES ONE-LINE DIAGRAM. I x CAT-5E ETHERNET CABLE CONNECTING TO I XIO-8U-A1 SCHEDULE XIO-8U-B1 SCHEDULE XIO-8U-C1 SCHEDULE ta¢i KE2 NETWORK SWITCH,IF REQUIRED FOR I Ul/A1 RACK A PLM(N,DI,FI) U1/Al RACK B PLM(N,DI,FI) U1/A1 RACK C PLM(N,DI,FI) O O BONDING CONTROLLERS.REFER TO BASR ONE-LINE DIAGRAM. I I U2/A2 SPARE U2/A2 SPARE U2/A2 SPARE O O AUX BOARD 1 AND COMM WIRING BETWEEN AUX BOARD 1 I U3/A3 SPARE U3/A3 SPARE U3/A3 SPARE O O MAIN BOARD AND AUX BOARD 1 FACTORY I RETURN AIR TEMPERATURE SENSOR FIELD INSTALLED AT U4/A4 SPARE U4/A4 SPARE U4/A4 SPARE INSTALLED IN KE2 CONTROLLER. I I UNIT COOLER AND WIRED TO KE2 MAIN BOARD,(1)PER KE2 I I CONTROLLER.SENSOR TO BE MOUNTED AT COIL CLOSEST U5/A5 SPARE U5/A5 SPARE U5/A5 SPARE eD I I TO WALK-IN DOOR.REFER TO WALK-IN EVAP TEMPERATURE - o O r I S SENSOR LOCATION DETAIL.(TYP) U6/A6 SPARE U6/A6 SPARE U6/A6 SPARE z -0 I I INSTAL O L a UNIT COIL TEMPERATURE SENSOR 2(OF 2) U7/A7 SPARE U7/A7 SPARE U7/A7 SPARE M m FIELD INSTALLED AND WIRED TO AUX BOARD 1 INPUT 2. US/AS SPARE U8/A8 SPARE U8/A8 SPARE I I BAS ONE-LINE AND SCHEDULE NOTES COORDINATE WITH LEGACY BAS VENDOR Il Z m AUX BOARD 2 AND ASSOCIATED DEVICES ONLY (NOVAR)FOR THE REPROGRAMMING OF THEIR `J U/ a INSTALLED WHEN KE2 CONTROLLER SERVES 2 UNIT E - EXISTING BAS DEVICE,SENSOR,OR WIRE FOR REUSE. w ,•.__________7__________________________________________________________ O RACK CONTROLLER WITH THE REMOVAL OF 7 O llX"' COOLER COILS. RL EXISTING BAS DEVICE OR SENSOR TO RELOCATE AND CIRCUITS FROM THEIR CONTROL.VERIFY L_ AUX BOARD 2 RECONNECT.INSTALL NEW CABLE FOR RELOCATED DEFROST SCHEDULES ARE COORDINATED ES-1(RACK A) ES-1(RACK B) ES-1(RACK C) 0 UNIT COOLER W COIL TEMPERATURE SENSOR 1(OF 1) DEVICE OR SENSOR AS NECESSARY. BETWEEN THE EXISTING RACK CONTROLLER COMMUNICATION PORT COMMUNICATION PORT COMMUNICATION PORT I FIELD INSTALLED AND WIRED TO AUX BOARD 2INPUT2. RD REDESIGNATED BAS DEVICE OR SENSOR. AND THE NEW CASE CONTROLS. COM1 LCD COM1 LCD COMi LCD IF REQUIRED,FIELD INSTALL OWNER RP REPLACED BAS DEVICE OR SENSOR. UNLESS NOTED OTHERWISE,DEVICES AND FURNISHED AUX BOARD2 AND COMM. I I COM2 BACNET LOOP-KE2s/CPCO COM2 BACNET LOOP-KE2s/CPCO COM2 SPARE Q I S CABLING SHOWN IN THIS ONE-LINE DIAGRAM m WIRING FROM AUX BOARD 1 TO AUX N NEW BAS DEVICE OR SENSOR. ARE VENDOR FURNISHED;REFRIGERATION BOARD 21N KE2 CONTROLLER. I I BUILDING AUTOMATION CONTRACTOR TO I I FI NEW FIELD INSTALLED BAS DEVICE,SENSOR,OR WIRE. COM MODULE 1 COM MODULE 1 COM MODULE 1 z INSTALL CABLING AND DEVICES AND MAKE L.------ NEW FACTORY INSTALLED BAS DEVICE,SENSOR,OR WIRE. FINAL TERMINATIONS.REFER TO PLANS FOR COMMUNICATION PORT COMMUNICATION PORT COMMUNICATION PORT L. M BAS DEVICE OR SENSOR USED FOR MONITORING ONLY. DEVICE LOCATIONS. COM3 BACNET LOOP-XIO COM3 SPARE COM3 SPARE DI DIGITAL INPUT. REFRIGERATION BAS ONE-LINE REFLECTS THE - ---------------------- ----------- ---------`---------- COM4 SPARE COM4 BACNETLOOP-XIO COM4 BACNET LOOP-XIO L__—_____—__—_____J INTENDED DESIGN BASED ON NEW CASES AND ISSUE BLOCK Al ANALOG INPUT. EXISTING SYSTEM NUMBERS.VERIFYALL EX WALK-IN CONTROLLER WIRING (KE2, SECONDARY) 13ASEQUIPMNDIT PRIORON ROUGH-IN. OF ALL BAS EQUIPMENT PRIOR TO ROUGH-IN. COM MODULE 2 COM MODULE 2 COM MODULE 2 WIRE LEGEND L NTS COMMUNICATION PORT COMMUNICATION PORT COMMUNICATION PORT I WIR-1010(TAN CABLE 18-2,20-2 TWISTED PAIR) COM5 SPARE COM5 SPECTRUM NET-RACK/COND I/O COM5 SPECTRUM NET-RACK/COND I/O WIR-2020(BLUE CABLE 22-2 TWISTED PAIR) COM6 SPECTRUM NET-RACK/COND 1/0 COM6 SPECTRUM NET-CMS LOOP COM6 SPECTRUM NET-CMS LOOP NOTES: NOTE: NOTE: NOTE: 1. ALL CABLE WIR-2020 UNLESS NOTED OTHERWISE. 1.)NOT ALL CONNECTIONS SHOWN ON THIS SCHEDULE 1.)NOT ALL CONNECTIONS SHOWN ON THIS SCHEDULE 1.)NOT ALL CONNECTIONS SHOWN ON THIS SCHEDULE 2. ALL WIR-1010 AND WIR-2020 CABLE FURNISHED BY ARE PRESENT AT EACH REFRIGERATION GATEWAY.REFER ARE PRESENT AT EACH REFRIGERATION GATEWAY.REFER ARE PRESENT AT EACH REFRIGERATION GATEWAY.REFER NEW ETHERNET CABLE TO WALMART DATA OWNER FOR INSTALLATION BY CONTRACTOR. TO ONE-LINE DIAGRAM FOR CONNECTIONS SPECIFIC TO TO ONE-LINE DIAGRAM FOR CONNECTIONS SPECIFIC TO TO ONE-LINE DIAGRAM FOR CONNECTIONS SPECIFIC TO NETWORK BY WALMART CABLING ISO 3. ALL OTHER CABLE FURNISHED AND INSTALLED BY EACH REFRIGERATION GATEWAY. EACH REFRIGERATION GATEWAY. EACH REFRIGERATION GATEWAY. PROVIDER BAS CONTRACTOR TO CONTRACTOR. COORDINATE THE DATA REQUIRED FOR THIS SERVICE WITH THE WALMART CONSTRUCTION MANAGER.TYP. ES7 FACTORY INSTALLED IN BAS EXISTING HYBRID HOUSE LTA(ON ROOF) EXISTING HYBRID HOUSE DTB(ON ROOF) EXISTING HYBRID HOUSE MTC(ON ROOF) OWNER FURNISHED ENCLOSURE WITH 120V/24V TRANSFORMER. CAT5E r —, CAT5E —, CAT5E r —, REQUIRES 120VAC NEW RACK A'ES-l' I DEMO EXISTING RACK A'RC2-XE' I NEW RACK B'ES-l' DEMO EXISTING RACK B'RC2-XE' I NEW RACK C'ES-l' DEMO EXISTING RACK C'RC2-XE' I POWER SOURCE REFRIGERATION GATEWAY I REFRIGERATION CONTROLLER I REFRIGERATION GATEWAY REFRIGERATION CONTROLLER I REFRIGERATION GATEWAY REFRIGERATION CONTROLLER OWNER FURNISHED ES1 REMOTE COM1 COM2 COM3 COM4 COM5 COM6 WIR-2020 L------------ J COM1 COM2 COM3 COM4 COM5 COM6 L------------ J COM1 COM2 COM3 COM4 COM5 COM6 L------------ J LCD SCREEN PROVIDED WITH TYP. rI rI rI CHECKED BY: EJM 120V124V TRANSFORMER. y... ^^^ r-------------JJ ----------------J —————————————— DRAWN BY: JTC ES1 REMOTE XIO-8U-Al ES1 REMOTE ES1 REMOTE PROTO CYCLE: 04/26/2024 - LCD SCREEN I - LCD SCREEN XIO-BU-B1 - LCD SCREEN XIO-BU-C1 ES1 REMOTE ES1 REMOTE - E51 REMOTE TO EXISTING CMS CONTROLLERS LCD SCREEN PLM LCD SCREEN LCD SCREEN DOCUMENT DATE:12/27/2024 PLM PLM COM ADM COM AOM COM ADM ES1 REMOTE LCD SCREEN,REQUIRES RIM AOM RIM ADM RIM ADM 24VAC POWER SUPPLY.TYP. DEMO CMS MODULES WITH PROVIDE 208/12OV-24VAC CASEANALK-IN EVAPORATORS ROM AOM ROM AOM ROM ADM `GT• TRANSFORM ER.TYP. Q- RACK PHASE LOSS MONITOR WIRED FOR ALL RACK A CIRCUITS. ROM BIM ROM 81M ROM 81M BACK TO XIO.REFER TO XIO SCHEDULES CMS MODULE MOD COMM-C/24V , FOR ADDITIONAL INFORMATION.TYP. DC WIR-2020 TYP. BUILDING AUTOMATION CONTRACTOR ROM CCM ROM RIM ROM CCM TO PROVIDE RS-485 BACNET CABLE TO FIRST CASEICOIL CONTROLLER ON A O 41742 COMM LOOP ONLY.TYP. KE2-RE2;(AO7 SCO2 SFD FZR)(N) ;KE2-RE2;(B06a SCO2 GROC FZR)(N) `----c---' `----[---� WIRE EXISTING CONDENSER REFER TO WALK-IN COIL ;KE2-CC (A01a SCO2 FF DRS)(N) ;KE2-RE2:(BO6b SCO2 GROC FZR)(N) CMS ;(BOSa) (DEMO) CONTROL MODULE ONTO COMM CONTROLLER WIRING -=cxc=c� LOOP WITH OTHER RACK 1/0. 'KE2-CC (AO1b SCO2 FF DRS)(N) ;KE2-RE2:(B07a SCO2 GROC FZR)(N) CMS ;(BO5b) (DEMO) TYP. DETAIL.TYP _ REMOTE RACK LCD MOUNTED ON BAS BACKBOARD.REFER TO BAS CASE CONTROLLER QUANTITY TO ;KE2-CC (A04a SCO2 FF DRS)(N) ;KE2-RE2 (B07b SCO2 GROC FZR)(N) ; CMS ;(B06a) (DEMO) BACKBAARD DETAIL FOR BE DETERMINED.T THE CASE -___[___� ____L___ ADDITIONAL INFORMATION.TYP. MANUFACTURER.TYP. rKE2-CC;(A04b SCO2 FF DRS)(N) KE2-CC SCO2 IC CAKE)(N) CMS ;(B06b) (DEMO) CASE CONTROLLER FACTORY ;KE2-CC;(A04c SCO2 FF DRS)(N) ;KE2-CC;(B13a SCO2 FF DRS)(N) CMS BSOta INSTALLED IN NEW CASE.REFER ----[ + c-c-[c--. .( ) (E) ___ TO CASE SCHEMATIC DETAIL TYP. ;KE2-CC;(A02a SCO2 FF DRS)(N) ;KE2-CC;(1313b SCO2 FF DRS)(N) ---�--- REFER TO CASE CONTROLLER ;KE2-CC (AO2b SCO2 FF DRS)(N) ;KE2-CC (B13c SCO2 FF DRS)(N) ---t--- WIRING DETAIL.TYP. --cccc-c� [[[[[[[[, L_CMS_ (BSO4b) (E) KE2-CC (A02c SCO2 FF DRS)(N) ;KE2-CC (1313d SCO2 FF DRS)(N) KE2-CC;(A05a SCO2 FF DRS)(N) ;KE2-CC;(B14a SCO2 FF DRS)(N) CMS ;(RCU1) (DEMO) r -- KE2-CC;(AO5b SCO2 FF DRS)(N) ;KE2-CC;(B14b SCO2 FF DRS)(N) CMS ;(B08a) (DEMO) KE2-CC;(A05c SCO2 FF DRS)(N) ;KE2-CC;(B14c SCO2 FF DRS)(N) ; CMS ',(BO8b) (DEMO) KE2-CC;(AO5d SCO2 FF DRS)(N) ;KE2-CC;(B1la SCO2 FF DRS)(N) CMS ;(1308c) (DEMO) KE&CC (AO6a SCO2 FF DRS)(N) ;KE2.CC (Bi tb SCO2 FF DRS)(N) -------, __-c--- _--[-_- ; CMS ;(BS05a) (E) KE2-CC;(A06b SCO2 FF DRS)(N) ;KE2-CC;(Bile SCO2 FF DRS)(N) ---T--' KE2-CC (AO6c SCO2 FF DRS)(N) KE2-CC (B12a SCO2 IC DRS)(N) -- -- CMS ;(BSOSf) (E) PROVIDE RS-485 FOR RAE CORP ;KE2-CC (AO3a SCO2 FF DRS)(N) ;KE2-0C (B72b SCO2 DRS)(N) L SKID CONTROLLER.REFER TO '--'[---� ----[---i --------� PLANS FOR LOCATION. ;KE2-CC;(A03b SCO2 FF DRS)(N) ;KE2-CC;(B12c SCO2 IC DRS)(N) CMS '(B07a) (DEMO) BUILDING ETHERNET CABLING TO WALMART :�. CC;(A03c SCO2 FF DRS)(N) ;KE2-CC;(B15a SCO2 IC DRS)(N) CMS '(B07b) (DEMO) DATA NETWORK.REFER TO PLANS ---, [--[c---� ____c___' AUTOMATION FOR ADDITIONAL INFORMATION.TYPRE2 (AO8 SCO2 DELI FZR)(N) ;KE2-CC (B15b SCO2 IC DRS)(N) CMS (B07c) (DEMO) OF RA CORP PUMP SKIDS. c-ccc _ _ SYSTEM CPC--- (SCO2SA-1)(N) KE2-CC (B15c SCO2 IC DRS)(N) r-CMS ;(BS09a) (E) CPCO;(SCO2SB-1)(N) REFRIGERATION BAS ONE-LINE DIAGRAM (NOVAR/SPORLAN) NTS BAS R2 RACK LTA DISCHARGE AIR TEMPERATURE AND DEFROST PARAMETERS DISCHARGE AIR TEMP SETTINGS FOR CASES/ DEFROST DEFROST SCHEDULE RETURN AIR TEMP SETTING FOR WALK IN BOXES LL w LL Ii..., LL Y W r Q Z z a 0 z r w o z F a ar a o Q. z w N e m m r 0 U APPLICATION MODEL NUMBER MFR EQUIP NUMBER N w N 0 U ~ p I o Q o o >= o Q 0 o w r r o 0 0 0 0 0 0 0 U Z U H W W d O Z a—a. W K w Ili W o r N < Q J. ° F°= wgw3? -Ml SCO2 FF DRS ReacMn F.F. "RLN-VCT HUSSMANN RS=2.242//1M6r2023 .11 d EL 1 45 48 0 0:00 Ile "All—FF DRS RaaeMn F.F. "RLN-VCT HUSSMANN RS3002.2Q 111I M81 0 41 b EL 1 45 1 48 0 0:50 0LL "A03 SCO2 FF DRS ReacMn F.F. ^RLN-VCT/^RLNI-VCT HUWMMN RS3002.242 1 11=0 3 242 1I12M6/2023 41 d EL 1 45 48 0 1:40 Z w °gwo oN=Orc -M4 SCO2 FF DRS ReacMn F.F. "RLN-VCT HUSS11i RS3002.242//121 W023 -11 d EL 1 45 48 0 2:30 ua w>✓ z z -z o z 3zn¢w3aw�g "A055CO2 FF DRS Raaeh-In F.F. "RLNI-VCT HUSSMANN R33003.242//12M6M023 -11 d EL 1 45 48 0 4:10 ¢ 3 az o A w y 4a o N a o w -M6 W02 FF DRS Reach-In F.F. ^RLN-VCT/'"RLNI-VCT HUSSMANN R51002.242/RS3003242/I12MW2021 .11 d EL 1 45 4S 0 5:00 - - - 7 aW o °ww°wa a; "A07 SCW SFD FM Seafood Freers,W.I. "KRD2AE474CDAA ld A!( -11 .2 EL DEMAND DEFROST EMPLOYED BY Ills CONTROLLER d Y I o,g3 p N S i w ^A06 SCM DELI I M NO Freezer W.I. -l(RD34E411CDAA KRACK -11 .2 EL DEMAND DEFROST EMPLOYED BY KE2 CONTROLLER Information included in this schedule is taken from manufacturer's submittals. Contractor to vedfy information against latest submittals available at time cases/ooils are delivered. Pammeters above are to be used in programming new/replaced cases/coils only. �w �o- RACK DTB DISCHARGE AIR TEMPERATURE AND DEFROST PARAMETERS w m; DISCHARGE AIR TEMP M SETTINGS FOR CASES/ N DEFROST DEFROSTSCHEDULE a <u g 4 RETURN AIR TEMP r i SETTING FOR WALK IN BOXES of =w z 0 U of °L IL L w ) o Q 2 X O it z w a a z F a K w z0 w N M rn m n m U U APPLICATION MODEL NUMBER MFR EQUIP NUMBER u) w a 0 U z0 2 2 m � z �i w ¢ a 0 0 0 0 0 0 0 0 O C= z a ¢ o 0 It o 00 a z a Z) w w > m o r o 0 z 0 a "BOB SCO2 GROC FZR 1M Grorsryll.C.Frs 2"KRD54E-165CDAA KRACK -211 40 EL DEMAND DEFROST EMPLOYED BY KE2 CONTROLLER. O r ^BOT SCO2 GROC FZR 1M Groceryll.C.Frs 2"KWME-166CDAA KRACK - -20 40 EL DEMAND DEFROST EMPLOYED BY KE2 CONTROLLER. M m "BOO SCO2 IC CAIM Rwc1,4n I.C. "RLN-VCT HUSSMANN R53002.142//11/LW2023 -19 42 EL 1 45 46 0 "B11 SCO2 FF DRS RaaeMn F.F. 'RLN-VCT/`RLNI-VCT HIJWMANN RS3002.2421R53003242//12M6/2023 49 3 EL 1 d5 N 0 0:00 fn Z "B128CO21CDRS R 1,4n I "RLN-VCT HUSSMANN RS3002.142//121 W023 .19 .12 EL 1 45 M 0 0:50 v W "B13 SCW FF DRS RaaeMn F.F. "RLNI-VCT HUSSMANN 1253003.242//12/2W2023 -19 b FL 1 45 4B 0 1:40 O 0 ^B14 SCO2 FF DRS Reach-In F.F. ^RLN-VCT/••RLNI-VCT HUSSMANN R51002.242/RS3003242II12MW2023 49 d El. "B155CO2ICDRS R 1,4.I.C. "RLN-VCT HUNIANNN RS3002.142//121 W023 -19 42 EL 1 49 48 0 9:20 (n Information included in this schedule is taken from manufacturer's submittals. I f 1 U) Contractor to verify information against latest submittals available at time cases/coils are delivered. Paremelere above are b be used in programming new/replaced cases/wile only. K w m z ob 07 O ISSUE BLOCK CHECKED BY: EJM DRAWN BY: JTC PROTO CYCLE: 04/26/2024 DOCUMENT DATE:12/27/2024 ��`1CI.1 �1P 2 O 41742 JJ �4//1 BUILDING AUTOMATION SYSTEM SHFFT BASR3 LEAK ALARM AND CONTROL SEQUENCE OF OPERATIONS REFRIGERANT LEAK CONTROL SEQUENCE OF OPERATION FOR COOLERS AND FREEZERS: THE LEAK DETECTION CONTROL MODULES,UPON REGISTERING A CONCENTRATION THAT IS:ONE-HALF OF THE IDLH OR AT THE DEL;WHICHEVER IS LESS,SHALL: 1. ACTIVATE VISUAL AND AUDIBLE ALARMS FOR THE ZONE INDICATING THE LEAK 2. ENABLE AN AUTOMATIC SHUTDOWN OF THE LLSV TO ISOLATE THE REFRIGERANT FLOW IN THE CIRCUIT IN ALARM. THE LEAK DETECTION CONTROL MODULE,UPON REGISTRATION A CONCENTRATION THAT IS AT VAPOR DETECTOR'S UPPER DETECTION LIMIT OR UPON ACTIVATION OF THE BREAK GLASS SWITCH, SHALL ALSOA. AUTOMATICALLY SHUT OFF REFRIGERANT COMPRESSORS,REFRIGERANT PUMPS,AND NORMALLY CLOSED,AUTOMATIC REFRIGERANT VALVES LOCATED IN MACHINE ROOM. AUDIBLE/VISUAL DEVICES INSIDE COOLERS AND FREEZERS SHALL BE INSTALLED IN WEATHERPROOF JUNCTION BOXES,REFERENCE LEAK DETECTOR INSTALLATION DETAIL. AUDIBLE/VISUAL DEVICES SHALL ANNUNCIATE AT A SOUND PRESSURE LEVE THAT IS A MINIMUM OF 15 DBA ABOVE THE AMBIENT NOISE LEVEL. LEGEND JOEL' OCCUPATIONAL EXPOSURE LIMIT TWA: TIME WEIGHTED AVERAGE LLSV: LIQUID LINE SOLENOID VALVE IDLH: IMMEDIATELY DANGEROUS TO LIFE OR HEALTH SPL: SOUND PRESSURE LEVEL EPR: EVAPORATOR PRESSURE REGULATOR m S IFS s �? 3`a w �a °"xoo�a r �w3oaWyoo€<G�w a o6 °xg F z =W z 0 U X d U 0o Q 00 � �J 0 .z 0 O n a V�� Lo n M m fll Z m o z o REFRIGERATION CONTRACTOR TO REFER TO MANUFACTURER'S DETAIL IS A SCHEMATIC REPRESENTATION AND REFER TO MANUFACTURER'S INSTALLATION INSTRUCTIONS � FIELD WIRING PROVIDE AND TERMINATE ALL 120V INSTALLATION INSTRUCTIONS FOR MAY NOT REFLECT ALL CASE CONFIGURATIONS. FOR COMPLETE FACTORY WIRING DIAGRAMS. �`JJ FACTORY WIRING ------- AND 208V SLAVE WIRING AND CONDUIT FACTORY WIRING DIAGRAMS,FIELD SOME FACTORY INSTALLEDCOMPONENTS AND BETWEEN CASES.REF ELECTRICAL. WIRING TERMINATIONS AND RS485 WIRING ARE NOT SHOWN FOR CLARITY.CONTACT BACNET WIRING DETAILS. REFRIGERATED CASE MANUFACTURER FOR m FACTORY INSTALLED COMPONENT INFORMATION. REFRIGERATION CONTRACTOR THIS DIAGRAM SHOULD NOT BE USED FOR z TO VERIFY MAC ADDRESSING IS INTERNAL CASE COMPONENT WIRING. FACTORY WIRING TO UNIQUE FOR EACH CONTROLLER. LLSV CONTACT STRIP � p ISSUE BLOCK W. mmm mmm mmm mm mmm mm mm mm m m _ e 120V POWER SUPPLY FEED.IN CASE REPLACEMENT e ^-� APPLICATION WIRING C AUX BOA BE EXISTING TO REMAIN. O e AUX BOAA RD VERIFY RE-USE OF EXISTING WIRING WITH ELECTRICAL. e OTHERWISE ELECTRICAL CONTRACTOR TO PROVIDE NEW POWER FEED.REFRIGERATION CONTRACTOR TO TERMINATE WIRING.REF ELECTRICAL. FACTORY INSTALLEDINSTALLED WIRING BETWEEN KE2 CASE CONTROLLER FAN/LIGHT/ANTI-SWEAT HEATER TERMINALS AT EVERY CASE.IN CASE REPLACEMENT APPLICATION WHERE WIRING IS EXISTING TO REMAIN,REMOVE FACTORY JUMPERS. REF ELECTRICAL. -e e � FANS B1"�°""`"� _ ELECTRIC DEFROST CASES:IN CASE e e o 0 0 0 0 0 o CAT- ETHERNET CABLE CONNECTING 0 12pVAC(+ 0 ) 0 pp�������� ��" TO KE2 NETWORK SWITCH,IF REQUIRED 0 120VAC- 0_F 120 VAC REPLACEMENT APPLICATION WIRING 6 6 Q FOR BONDING CONTROLLERS.REFER TO 0 GND 0 ))) COULD BE EXISTING TO REMAIN.VERIFY e e LIGHTS REFRIGERATION SAS ONE-LINE DIAGRAM. RE-USE OF EXISTING WIRING WITH G w 0 BAT(; 0—BATTERY BACKUP 0 BAT- 0—24VDC CONNECTION ELECTRICAL.OTHERWISE ELECTRICAL ! 1'6 6 0 CNT(SIG) 0—420 MA CONTRACTOR TO PROVIDE 208V POWER ANTI-SWEAT HEATERS INSTALL OWNER FURNISHED RS485 BACNET 0 CNT(GND) 0—OUTPUT FEED.REFRIGERATION CONTRACTOR TO ---e 6 COMM WIRING FROM GATEWAY OR 0 SEN(SIG) 0—)) TERMINATE WIRING.REF ELECTRICAL. 6 6 PREVIOUS KE2 CONTROLLER ON COMM 0 SEN(24V) 0—t TO SENSOR LOOP,REFER TO ONE-LINE DIAGRAM. 0 SEN GND 0— 6 6 208V ELECTRIC m H/S(24V) 0— CHECKED BY: EJM DEFROST RS485 BACNET COMM WIRING TO NEXT KE2 0 H/S GND 0—TO HORN/STROBE 6 6 CONTROLLER ON COMM LOOP,REFER TO % . ONE-LINE DIAGRAM. DRAWN BY: JTC I SLSV —• e e SUPPLY LINE 0 ALM#1(NO) 0—2N.0 CONTACT ALARM#1 TO pR0T0 CYCLE: 04/26/2024 SOLENOID VALVE 0 ALM#1(GND 0—)REFRIGERATION CONTROLLER COMM.WIRING TO NEXT CONTROLLER 0 ALM#2(NO) 0—N.0 CONTACT ALARM#2 TO DOCUMENT DATE:12/27/2024 ON COMM.LOOP.REFER TO 0 ALM#2((GND 0—FIRE ALARM PANEL SLSV:FACTORY INSTALLED SUPPLY LINE -- SUPPLY LINE SOLENOID VALVE: REFRIGERATION BUILDING 0 ALM#3(NO) 0—N.0 CONTACT ALARM#3 TO AUX SOLENOID VALVE AT EACH CASE. FACTORY INSTALLED PER CASE. AUTOMATION SYSTEM PLANS FOR 0 ALM#3 GND 0—CONTROLLED EQUIPMENT AS ONE-LINE DIAGRAM.(TYP) REQUIRED REFRIGERATED CASE.TYP. MANNING( `g 1.Ili HORN AND STROBE FACTORY INSTALLED FACTORY MOUNTED ON FACE OF CABINET TERMINAL BLOCK AT EVERY 2 CASE.FULL BLOCK NOT SHOWN FOR CLARITY.(TYP) O 41742 A B C D TERMINAL PROVIDE COMM.WIRING TO PROOF OF BLOCK L/2/lam' PREVIOUS CONTROLLER ON CALL FOR COMM.LOOP.REFER TO REFRIGERATION BUILDING AUTOMATION SYSTEMS CASE CONTROLLER(S)FURNISHED SHUTDOWN MANNING DUAL AND INSTALLED BY CASE RELAY MODULE REFRIGERATION BUILDING CONTRACTOR TO TERMINATE COMM.WIRING AT MANUFACTURER AT EVERY CASE. m AUTOMATION SYSTEM PLANS CASE CONTROLLER MASTER/SLAVE 1/0 24VDC DRM FOR ONE-LINE DIAGRAM.(TYP) POWER STATUS THRESHOLD SWITCH SET TO 33%/100 CONNECTION SCHEMATIC (KE2, SECONDARY) KNOCKOUT FOR 120 VAC INDOOR HORN (�yCASE POWER STATUS INSIDE"LEAK AND STROBE NTS FRONT DETECTION DETECTION PANEL"VIEW PANEL"VIEW /INSTALL 22 GA OWNER FURNISHED SHIELDED / CABLE FOR 4-20 MA SIGNAL AND 22 GA OR 120V POWER REF ELEC LARGER SHIELDED CABLE FOR"DRY"CONTACT TO RACK LOCATED EMS INPUT MODULE. t�SUPPLY COMPRESSOR HOUSE SEAL ALL PROVIDE 1"EMT STUB UP TO STRUCTURE _______ PENETRATIONS INSTALL LEAK DETECTION PANEL 6"FROM RETURN DIGITAL WIRING TO INPUT WITH SILICONE TOP OF WALK-IN MODULE AT RACK. RIM SEALANT ANALOG WIRING TO INSTALL MANNI [ i / NG PROVIDE SENSOR CONNECTION IN12- INPUT MODULE AT RACK. SIM HS-24 t CONDUIT ALONG EXTERIOR OF BOX LEAK DETECTION PANEL. L--------� HORN/STROBE(S) TO SENSOR LOCATED IN PER ZONE. W/WP BACK REFRIGERATED SPACE WALK-IN LEAK BOX.REFER TO DETECTION ZONE. D MRLDS LEAK PLANS FOR LP QUANTITY A SENSOR r-- -- LOCATION EVAP L HORN/STROBE PENETRATE SIDE OF FAN/ ALARM TYP. INSTALL MANNING WALK-IN @ 24-AFF BUILDING COIL AIRSCAN-IRSENSOR UNIT IX DAISY CHAIN TO ADDITIONAL AUTOMATION REFER TO LEAK DETECTION L.. ..— HORN/STROBES AS NECESSARY. SEAL ALL SYSTEM PANEL INSTALLATION AND REFER TO PLAN FOR WALK-IN INSTALL DEFROST TERMINATION PENETRATIONS SENSOR TUCKED AND SECURED IN WIRING DETAIL FOR CABLE HORN/STROBE QUANTITY. WITH SILICON PLACE BETWEEN COIL FINS AT END TYPES. SEALANT OF COIL,1 PER ELECTRIC DEFROST SIDE VIEW COIL.CONNECT TO APPLICABLE EVAPORATOR MODULE. SIDE VIEW FRONT VIEW ELECTRIC DEFROST TERMINATION SENSOR LEAK DETECTION ZONE DEVICES ONE-LINE DIAGRAM �LEAK DETECTOR INSTALLATION DETAIL J NTS L NTS � NTS SHFFi BAS R4 PRIOR TO START NG DEOLITION WORK, FLOOR DRAINS AIND/OR FLLOOR SINKS UNDERG ALL PIPING AND REFRIGERATION PIPING SCHEDULE RACK LTA(DX) REFRIGERATED CASES TO BE REPLACED WITH SCHEDULE SYMBOLS REFRIGERATION SYMBOLS KEYNOTES EPA CLEAN AIR ACT EXPANDABLE MECHANICAL PLUG(SIMILAR TO CHERNE VERTICAL ESTIMATED ECON-O-GRIP).AFTER WORK IN THE AREA IS COMPLETE, Rwtilo.a.z9 RI-9.25.18 11.02.1s PIPE HORIZONTAL SUCTION RISER TOTAL AND PRIOR TO SETTING NEW REFRIGERATED CASES, MODIFY CIRCUIT OR PIPE LENGTH XXX CIRCUIT NUMBER (CIRCUIT INFO) COMPLY WITH CLEAN AIR ACT,TITLE VI,SECTION 608 THOROUGHLY CLEAN ALL DEBRIS FROM FLOOR DRAIN 15.603 SUPPORT HORIZONTAL RUNS OF REFRIGERANT AND CODE OF FEDERAL REGULATION TITLE 40,PART 82 DESIGNATION SUCTION AS REQUIRED LIQUID LENGTH •* NEW CASE,COIL,CIRCUIT OR VALVE #XXX QUANTITY/MODEL NUMBER LINES ON 1-5/8"X 1-5/8"UNISTRUT CHANNELS. AND/OR FLOOR SINK GRATES AND BODIES,REMOVE WHEN ADDING OR REMOVING REFRIGERATED """"Al2 2-5/8 1-3/8&15/8 70 PLUG AND HYDRO-JET EACH FLOOR DRAIN AND/OR CHANGE EXISTING PIPE SIZE AS INDICATED OR COIF CLEANOUT(CO) REFER TO SPECIFICATIONS FOR PIPE HANGER EQUIPMENT.RECORD ALL EQUIPMENT IDENTIFICATION 7/8 FLOOR SINK TO THE MAIN.CAMERA SCOPE MAIN LINE TO **** NEW PIPE SPACING. NUMBERS,MODEL AND SERIAL NUMBERS,THE AMOUNT *'""/""A13 2-5/8 1-3/8&15/8 80 CONFIRM LINE IS CLEAR.IF MAIN LINE HAS ANY CONDENSATE DRAIN LINE(CD) 15.610 PROVIDE AIRTIGHT SEAL AROUND ALL PIPING OF REFRIGERANT RECOVERED FROM EACH UNIT,THE OBSTRUCTIONS,COORDINATE SOW WITH CM AS AN ^ RISER SIZE IS SHOWN EVEN WHERE A RISER IS CONNECT TO EXISTING AND BOLT PENETRATIONS THROUGH DATE OF DECOMMISSIONING,COMPANY NAME AND ADDITIONAL SERVICE. NOT EXPECTED.THIS IS FOR REFERENCE ONLY COOLER/FREEZER BOX WALLS OR CEILINGS. SIGNATURE OF ON-SITE SUPERVISOR. 1)ESTIMATED TOTAL LENGTH INCLUDES HORIZONTAL AND VERTICAL PIPE SECTIONS.THIS AND IS TO BE USED IN THE EVENT THAT A PIPING CONTINUATION CONFLICT CAUSES THE NEED FOR A RISER.IF 15.611 SUPPORT UNIT COOLERS WITH BOLTS THROUGH IS ONLY AN ESTIMATE AND ACTUAL LENGTH WILL VARY. CONTRACTOR TO RE-USE EXISTING CASE DRAINS. ROOF TO 1-5/8"X 1-5/8"X 10'LONG 14 GA. REPLACE DRAIN IF.MORE THAN 1/2 OF DRAIN EXPOSED THE RISER LENGTH EXCEEDS 4 FEET,IT MUST BE X DETAIL NUMBER GALVANIZED UNISTRUT SPANNING THREE ROOF GENERAL NOTES TO SALES FLOOR.FIELD VERIFY EXACT LOCATIONS. APPROVED BY ENGINEER OF RECORD. pL SHEET NUMBER (DETAIL REFERENCE) PANELS.PROVIDE DOUBLE NUTS ON EACH BOLT. 2)ALL EXISTING PIPE SIZES ARE BASED ON ORIGINAL REFRIGERATION LEGENDS N, NEW PIPING CONNECTED TO EXISTING PIPING 15.612 SEE SCHEDULES FOR UNIT COOLER TYPES, 24 HOURS PRIOR TO SHUTTING DOWN ANY TO REMAIN.REFER TO REFRIGERATION PIPING SIZES,AND CAPACITIES;CONTROL METHOD;AND 1. PLANS INDICATE GENERAL ROUTING OF REFRIGERATION SYSTEMS,HVAC SYSTEMS OR ENERGY PLAN FOR APPROXIMATE LOCATION OF NEW ALL REFRIGERATION PIPING SIZES,ETC. NEW PIPING MANAGEMENT CONTROLS SYSTEMS,SEND EMAIL TO AND EXISTING PIPING. ® EVAPORATOR COIL REFRIGERANT LINES,WITH A SINGLE LINE "^ * NSRM@WALMART.COM.THE E-MAIL SHALL STATE WHAT, 15.615 CONDENSATE DRAIN;PITCH DRAIN LINES DOWN SHOWN INDICATING BOTH SUCTION AND LIQUID NEW PIPING CONNECTED TO EXISTING PIPING TO REMAIN.REFER TO REFRIGERATION CONTRACTOR TO FIELD VERIFY EXISTING RISER APPROXIMATELY 1/8"PER 12"TOWARD DRAIN. LINE ROUTING FOR EACH SYSTEM. WHY,AND WHEN IT IS BEING SHUT DOWN AND HOW LONG # PROVIDE COPPER PIPING WITH ELECTRIC HEAT PIPING PLAN FOR APPROXIMATE LOCATION OF NEW AND EXISTING PIPING. IT IS ANTICIPATED TO BE SHUT DOWN.THEN SEND A SIZE.IF EXISTING PIPE SIZE DOES NOT MATCH CO2 VALVE STATION TAPE AND INSULATION ON ALL CONDENSATE 2. REFRIGERATION SYSTEM INSTALLATION SHALL w W S e FOLLOW UP EMAIL TO NSRM WALMART.COM AFTER THE SCHEDULE,REPLACE EXISTING RISER WITH NEW T "RISER SIZE IS SHOWN EVEN WHEREA RISER IS NOT EXPECTED.THIS IS FOR @ ELBOW-TURNED DOWN LINES EXPOSED TO FREEZING TEMPERATURES. BE IN COMPLETE CONFORMANCE WITH WORK IS COMPLETE AND THE SYSTEM IS BACK UP AND SIZE AS SHOWN. _ - REFERENCE ONLY AND IS TO BE USED IN THE EVENT THATA PIPING CONFLICT CAUSES RUNNING. 15.616 END CONDENSATE LINE OVER RECEPTOR WIAIR SPECIFICATIONS,AND WITH ALL REQUIREMENTS REFER TO SCHEDULE NOTES FOR ADDITIONAL � ELBOW-TURNED UP OF REFRIGERATION EQUIPMENT THE NEED FOR A RISER. IF RISER LENGTH EXCEEDS 4 FEET,IT MUST BE INFORMATION. GAP.CONTRACTOR SHALL ENSURE FLOOR " '$ XX.XXX REFRIGERATION KEYNOTE REFERENCE DRAIN(S)AND DRAIN LINE(S)SERVING WALK-IN MANUFACTURER. 8 nF 3t ag��wy°pm APPROVED BY ENGINEER OF RECORD. ARE FREE OF OBSTRUCTIONS AND FUNCTION REFRIGERATION PIPING(ABOVE) PROPERLY.WHERE EXTENSIVE DAMAGE EXISTS 3. REFRIGERATION DRAWINGS ARE PROVIDED AS z SEISMIC NOTES -___-- AND/OR PROPER DRAINAGE CANNOT BE AN AID TO BIDDERS AND TO INDICATE DESIRED zw3� rcw3¢w�o°'� REFRIGERATION PIPING(BELOW) OBTAINED COORDINATE WITH WALMART ROUTING OF REFRIGERATION LINES; a°yoo€m 3 3Q=a_ 12.20.13 --� REFRIG PIPING CASE CONNECTION MECHANICAL CONSTRUCTION MANAGER. CONTRACTOR SHALL ASSUME FULL oo��W REFER TO SEISMIC RESTRAINT SHEET SR1 FOR 15.617 PROVIDE PVC DRAIN LINE FROM EACH CASE RESPONSIBILITY FOR CORRECT INSTALLATION r w PZ INSTALLATION DETAILS.REFER TO THE SPECIFICATIONS ETR EXISTING TO REMAIN DRAIN CONNECTION SAME SIZE AS CASE OF PIPING AND ACCESSORIES TO PROVIDE A rn E PIPING SCHEDULE RACK LTA(SCO2) FOR FURTHER INFORMATION. SIM SIMILAR OUTLET,AND END OVER FLOOR RECEPTOR COMPLETE AND FULLY OPERATING SYSTEM. W/AIR GAP;PITCH DRAINS 1/8"PER 12".PROVIDE UNO UNLESS NOTED OTHERWISE DRAIN COVER GRATE TO MATCH EXISTING. 4. REFER TO SPECIFICATION 15600 FOR VERTICAL ESTIMATED CONTRACTOR SHALL ENSURE RECEPTOR(S)AND INSULATION THICKNESS.INSIDE DIAMETER OF TYP TYPICAL DRAIN LINE(S)SERVING CASE LINE-UP ARE FREE INSULATION SHALL MATCH PIPE DIAMETER TO PIPE GPM HORIZONTAL RETURN RISER TOTAL OF OBSTRUCTIONS AND FUNCTION PROPERLY. MINIMIZE AIR GAPS BETWEEN PIPING AND �� boa DESIGNATION RETURN AS REQUIRED LIQUID LENGTH .I WHERE EXTENSIVE DAMAGE EXISTS AND/OR INSULATION.PROVIDE FACTORY PRE- I 3 4 PROPER DRAINAGE CANNOT BE OBTAINED MANUFACTURED FITTINGS AT ALL TRAPS AND IA SCO2 3.14 15/8 1-3/8 7/8 25 2 '* t COORDINATE WITH WALMART MECHANICAL ELBOWS.WHERE PRE-MANUFACTURED -1.01A SCO2 0.00 1/2 "1/2 318 0 CONSTRUCTION MANAGER. FITTINGS ARE UNAVAILABLE MITER CUT ALL M FITTINGS TO ENSURE PROPER SEAL BETWEEN N z 1.02A SCO2 0.47 1/2 ^1/2 1/2 70 15.623 ROUTE REFRIGERATION LINES IN BASE OF CASE INSULATION SEGMENTS. z u r A01 SCO2 0.22 1/2 3/8 3/8 25 FORALL BOTTOM FED CONNECTED CASES. SLOPE BACK TO LEAD CASE AT 1"PER 20'-0"OF A07 SCO2 0.25 1/2 3/8 3/8 25 RUN. 5. PIPE INSULATION SHALL BE BLACK,UNLESS OTHERWISE STATED ON PLANS OR 1AA SCO2 2.67 1-3/8 ^1-3/8 7/8 50 it 0 15.624 ROUTE REFRIGERATION LINES ON TOP OF CASE SPECIFICATIONS U 1.2A SCO2 0.84 7/8 "7/8 112 45 BAKERY rn FOR ALL TOP FED CONNECTED CASES.SLOPE UTILITY L ¢ BACK TO LEAD CASE AT 1"PER 20'-0"OF RUN. 6. COORDINATE REFRIGERATION DEMOLITION A02 SCO2 0.42 5/8 1/2 1/2 35 REFER TO TOP FED PIPING DETAIL. ISSUES WITH THE ARCHITECTURAL DRAWINGS. A03 SCO2 0.42 5/8 5/8 1/2 50 15.661 REFRIGERATION CONTRACTOR SHALL INSTALL REFER TO ARCHITECTURAL PLANS FOR x REFRIGERATION RACK REFRIGERATION EQUIPMENT DEMOLITION AND < 1.3A SCO2 1.83 1-1/8 ^1-1/8 5/8 5 rn 3 8 MANUFACTURER-FURNISHED LIQUID LINE COOLER REPAIR AND REMODELING. Q SOLENOID VALVE,SUCTION LINE CHECK VALVE, O O A04 SCO2 0.39 5/8 5/8 112 35 m m R3.1 R3.1 15.681 TYP AND CO2 VALVE STATIONS IN A SERVICE 7. REFRIGERATION SYSTEM SHALL REMAIN 1.4A SCO2 1.44 7/8 "7/8 518 15 w ACCESSIBLE LOCATION ON TOP OF WALK-IN OPERATIONAL DURING REMODELING.DURING A05 SCO2 0.67 7/8 7/8 1/2 50 �QDi BOX.REFER TO CO2 VALVE STATION DETAIL. THE PHASING OF OLD TO NEW SYSTEMS,BOTH O O A05 SCO2 0.39 5/8 5/8 3/8 35 INSTALL CONTROL WIRING FROM SOLENOID NEW AND OLD REFRIGERATION SYSTEMS MAY m 0 VALVE BACK TO CIRCUIT CONTROLLER.REFER BE REQUIRED TO OPERATE AT THE SAME TIME A08 SCO2 0.38 5/8 1/2 112 155 N TO SPECIFICATIONS FOR ASSET TAGGING FOR A SHORT PERIOD. 1b REQUIREMENTS. o O 1)PIPE MAINS INCLUDE ADDITIONAL CAPACITY FOR FUTURE CONNECTED LOADS. 15.666 REFRIGERATION CONTRACTOR SHALL INSTALL 8. WHERE NEW REFRIGERATED EQUIPMENT IS z 7 0 REFRIGERATION RACK INDICATED ON THE DRAWINGS,PROVIDE C ORDINATE ROUTING OF a MANUFACTURER-FURNISHED CO2 VALVE DEMOLITION,REMOVAL,AND TEMPORARY O REFRIGERATIONO PIPING STATIONS IN A SERVICE ACCESSIBLE LOCATION STORAGE OF OLD EQUIPMENT PER WALMART M m 2)ESTIMATED TOTAL LENGTH IS FOR ONE DIRECTION;SUPPLY OR RETURN.THE TOTAL IS O WITH EXISTING PIPING, ON TOP OF CASE.REFER TO CO2 VALVE MECHANICAL SERVICES CONSTRUCTION ONLY AN ESTIMATE AND ACTUAL LENGTH WILL VARY. riCl DUCTWORK,AND LIGHTS. STATION DETAIL.FULLY INSULATE ALL MANAGER'S INSTRUCTIONS,AND f n Z �l TYR SURFACES. REFRIGERATION DEMO NOTES. `J W 1 15.617 15.617 15.667 REFRIGERATION CONTRACTOR SHALL INSTALL O Z O 3)-PIPE STUB FOR FUTURE CONNECTION. 9. COORDINATE REMOVAL AND DISPOSAL OF 15.624 15.624 REFRIGERATION RACK EXISTING EVAPORATORS,REFRIGERATED l� 15.666 15.666 MANUFACTURER-FURNISHED CO2 VALVE CASES,AND CONDENSING UNITS,WITH STATIONS IN A SERVICE ACCESSIBLE LOCATION "RISER SIZE IS SHOWN EVEN WHEREA RISER IS NOT EXPECTED.THIS IS FOR A04 SCO2 A02 SCO2 INSIDE CASE DRAIN PAN.REFER TO CO2 VALVE WALMART MECHANICAL SERVICES /1/ BAKERY 1.3A SCO2 CONSTRUCTION MANAGER. LL REFERENCE ONLY AND IS TO BE USED IN THE EVENT THAT A PIPING CONFLICT CAUSES 2 DRS RLN-VCT 2 DRS RLN-VCT STATION DETAIL.FULLY INSULATE ALL THE NEED FOR A RISER. IF RISER LENGTH EXCEEDS 4 FEET,IT MUST BE (REPLACED) 1.2A SCO (REPLACED) SURFACES. Q APPROVED BY ENGINEER OF RECORD. F - - - - - - - - - - - - _ - - 10. REMOVE COPPER LINES,EVAPORATORS,AND r� I 15.668 REFRIGERATION CONTRACTOR SHALL INSTALL m 4 REFRIGERATION MANUFACTURER-FURNISHED CONDENSATE LINES FROM COOLERS/ FREEZERS BEING REMOVED FROM SITE. z CO2 VALVE STATIONS.REFER TO CO2 VALVE z COORDINATE WITH WALK-IN PANEL VENDOR 1 R3 STATIONS DETAIL.FULLY INSULATE ALL FOR TIME LINE OF REPLACEMENT.REFERENCE p TYP 15.684 A04 SCO2- A02 SCOI SURFACES. R3 15.668 -� SPECIFICATION FOR CONTACT INFORMATION. PIPING SCHEDULE RACK DTB(DX) 88 TYP =-- 15.681 SLOPE REFRIGERANT LINES DOWN TOWARDS VERTICAL ESTIMATED __ _ 5.617 1A02 C CO2 PUMP SKID AT V PER 20'OF RUN.LOCATE 11. WALK-IN PANEL VENDOR SHALL PROPERLY _� 1.2B:CO 15.624 HIGHEST POINT OF REFRIGERATION LINES JUST PREPARE ALL COOLER/FREEZER PANELS, 9 DRS RLN-VC - 10 DRS RLN-VCT Q ISSUE BLOCK PIPE HORIZONTAL SUCTION RISER TOTAL 1.4A SCO2 (REPLACED) 15.666 h BELOW BOTTOM CHORD OF JOIST OR BEAM. GLASS DOORS,SLIDER OR SWING DOORS, DESIGNATION SUCTION AS REQUIRED LIQUID LENGTH BOS SCO A-SCO2 (REPLACED) 0 5 COORDINATE TO AVOID CONFLICTS WITH PALLETIZE,AND PREPARE THE EQUIPMENT TO 19 DRS RLNI-VCY R3 TYP DUCTWORK,LIGHTING,SKYLIGHTS,PIPING,ETC. SHIP OFF SITE. ^"1B 2-5/8 1-5/8&2-1/8 61 �.617 15.684 AT ALL POINTS WHERE CO2 RETURN LINES RISE, 15.623 % (REPLACED ***"B09 2-1/8 ^2-1/8 7/8 40 15.617 - PROVIDE AN INVERTED SUCTION LINE TRAP AT 12. COORDINATE WITH FIRE PROTECTION 15.667 15.617 THE TOP OF THE RISER. CONTRACTOR FOR THE REMOVAL OF 15.624 - A06 SCO "**"B10 2-1/8 1-5/8&2-1/8 65 B08 SCO2 15.666 -� 15.624 COOLER/FREEZER RB REMOVED 3 DRS RLN-VCT A06 SCO2 �t 15.666 COOLER/FREEZER BOXES. 1)ESTIMATED TOTAL LENGTH INCLUDES HORIZONTAL AND VERTICAL PIPE SECTIONS.THIS �i'i 2 DRS RUN-1 CT -�. - 07 SCO2 -A03 SCO A03 SCO2 RE-INSULATION 13. COORDINATE WITH ELECTRICAL CONTRACTOR (REPLACED) A REPLACED 2 DRS RLN-VCT GROCERY (REPLACED) �� 1.38 SCO ) SCOPE OF WORK FOR THE REMOVAL OF ALLELECTRIC IS ONLY AN ESTIMATE AND ACTUAL LENGTH WILL VARY. (REPLACED) o7n1� MOVED AREA -- -- AB � �� 03 O y- COOLER/FREEZER BOXES ELECTRICAL WIRING 15.617 DEVICES. 9 DRS RLNI-VCT 10 DRS RLNI-VCT 1. WHEN REPLACING,REMOVING,OR RELOCATING 2)ALL EXISTING PIPE SIZES ARE BASED ON ORIGINAL REFRIGERATION LEGENDS 15:6 (REPLACED) B'13 SCO2 (REPLACED) 15.617 MULTI-DECK AND DOOR CASES,RE INSULATE _ w 14. COORDINATE WITH BAS CONTRACTOR FOR THE 19 DRS RLNI-VCT- - 15.624 - 15.617 ANY EXISTING OR REUSED PIPING LOCATED B14 SCO2 'm REMOVAL OF ALL REMOVED COOLER/FREEZER (REPLACED 15.666 15.624 BEHIND THE AFFECTED CASES.THIS APPLIES TO BOXES BAS WIRING AND DEVICES. NEW PIPING 2 DRS RLN-VCT =__ 15.666 PIPING SERVING THE AFFECTED CASES AND ^A NEW PIPING CONNECTED TO EXISTING PIPING TO REMAIN.REFER TO REFRIGERATION REPLACED - B73 SCO - ANY ETR ADJACENT CASES.CONTRACTOR TO (REPLACED) B71 SCO2 15. EXISTING REFRIGERATION PIPING MAY BE RE- PIPING PLAN FOR APPROXIMATE LOCATION OF NEW AND EXISTING PIPING. __- INSPECT CONDITION OF INSULATION LOCATED 2 DRS RLN-VCT USED UNLESS OTHERWISE NOTED ON PLANS. ( ) REPLACED IN THOSE CHASES EXPOSED BY CASE AND REFER TO SCHEDULES FOR PIPE SIZE ^RISER SIZE IS SHOWN EVEN WHEREA RISER IS NOT EXPECTED.THIS IS FOR - - B14 SCO2- 11 SCO - WALK-IN WORK,AND RE-INSULATE CHASE REQUIREMENTS. REFERENCE ONLY AND IS TO BE USED IN THE EVENT THAT A PIPING CONFLICT CAUSES 15.624 PIPING NI THE DIRECTION IO THE OWNER'S ,7� B SC 2 15.624 MECHANICAL CONSTRUCTION MANAGER. 16. BUILDING COMPONENTS ABANDONED BY THE THE NEED FOR A RISER. IF RISER LENGTH EXCEEDS 4 FEET,IT MUST BE 15.617 O 1 DRS RLNI-VCT - 15.666 SCOPE OF WORK SHALL BE SECURED TO 10 DRS RLNI-VCT A APPROVED BY ENGINEER OF RECORD. n 15.666 (REPLACED) (REPLACED) B12 I'lRLN- GENERAL PIPING DAMAGPREVEE LLING, KIND OOSENING, FUTURE. CREATING CHECKED BY: EJM 15.666B07 615 SCO2 DAMAGE OF ANY KIND IN THE FUTURE. p 13 DRS RLN-VCT B15SCO2 BO \-,�'� 9DRS RLN-VCT (REPLACED) RE-INSULATION NOTES 17 IF ANY RACK SYSTEMS WILL BE OPENED TO ADD DRAWN BY: JTC (REPLACED) 3 DRS RLN-VCT - ___ __ RE-INSULATION NOTES ARE APPLICABLE FOR PIPING 24 REPLACE CASES,EVAPORATORS,ETC.THEN pROTO CYCLE: 04/26/2024 n (REPLACED) 15 SCO2- B12 SCO THAT IS INDICATED TO BE RE-INSULATED,OR PIPING 24 TO 48 HOURS AFTER THE WORK IS THAT REQUIRES RE-INSULATION DUE TO COMPLETED AND ALL FINAL ADJUSTMENTS DOCUMENT DATE:12/27/2024 E - - - - 0O2CO3- MODIFICATIONS SHOWN ON PLANS.REFER TO HAVE BEEN MADE,PROVIDE AND CHANGE PIPING SCHEDULE RACK DTB(SCO2) ❑ SPECIFICATIONS FOR NEW PIPING INSULATION LIQUID LINE FILTER CORES,OIL SYSTEM FILTER REQUIREMENTS. USING SPORLAN OF STYLE FILTER,AND VERTICAL ESTIMATED REPLACE SUCTION FILTERS.FILTERS ARE TO BE 1. REFER TO SPECIFICATION 15600 FOR RATED FOR WAX REMOVAL.CONTRACTOR TO PIPE GPM HORIZONTAL RETURN RISER TOTAL o 0 1.21 INSULATION AND JACKETING REQUIREMENTS. PROPERLY DISPOSE OF OIL AND COMPONENTS DESIGNATION RETURN AS REQUIRED LIQUID LENGTH OO INSIDE DIAMETER OF INSULATION SHALL MATCH REPLACED.REFER TO SPECIFICATION 15600. �tC'T""ot 1B SCO2 2.12 2-1/8 2-1/8 1-1/8 35 PIPE DIAMETER TO MINIMIZE AIR GAPS 0 - °p BETWEEN PIPING AND INSULATION PROVIDE 18. REFER TO GROCERY ARCHITECTURAL 1.01E SCO2 2.12 1-3/8 ^1-3/8 5/8 25 D ¢ FACTORY PRE-MANUFACTURED FI.TTINGS AT ALL DRAWINGS FOR ADDITIONAL WORK BY ' -1.02B SCO2 0.00 1/2 "1/2 318 0 TRAPS AND ELBOWS.WHERE PRE- REFRIGERATION CONTRACTOR. MANUFACTURED FITTINGS ARE UNAVAILABLE, O 41742 1.03E SCO2 2.12 1-3/8 "1-1/8 518 20 �� MITER CUT ALL FITTINGS TO ENSURE PROPER 19. INSTALL ASSET TAGS ON ALL NEW SEAL BETWEEN INSULATION SEGMENTS. REFRIGERATED CASES AND COMPLETE THE DATA L BO6 SCO2 1.06 1-1/8 7/8 1/2 20 COLLECTION INFORMATION.DELETE B06a SCO2 0.53 5/8 5/8 3/8 20 2. ALL SALES FLOOR WORK SHALL BE PERFORMED DEMOED ASSETS FROM ASSET TAGGING BO6b SCO2 0.53 5/8 5/8 3/8 5 AT NIGHT AND/OR ACCOMODATE STORE APPLICATION.REFER TO SPECIFICATIONS. DRY MANAGER AS THEY DIRECT.DETERMINE THIS B07 SCO2 1.06 1-1/8 7/8 112 25 P ODU ��// ASPECT PRIOR TO BID. 20. UPON START-UP OF ALL NEW REFRIGERATED B07a SCO2 0.53 5/8 1/2 318 5 RE EQUIPMENT,CONSTRUCTION MANAGER SHALL 53 5/8 1/2 3/8 20 3. PIPE INSULATION SHALL BE BLACK.REFER TO REQUEST THE BUILDING PERFORMANCE 807b SCO2 0. 1 ^1- 31 8 45 SPECIFICATION 15600. REPORT FOR ALL RACKS AND SUCTION GROUPS 1.1 B SCO2 2.4853 5/8 WHERE WORK IS PERFORMED.ANY DEVIATIONS -1.11 B SCO2 0.00 1/2 ^1/2 3/8 0 \\ l� 4. KEEP SEAMS AT OR NEAR 12 O'CLOCK POSITION. NOTED ON THE REPORT MUST BE CORRECTED USE NOMACO K-FLEX R320(YELLOW),R620 PRIOR TO PROJECT CLOSE OUT.REQUEST VIA 1.2B SCO2 2.48 1-3/8 ^1-3/8 518 50 (BLACK),OR ARMAFLEX 520 INSULATION EMAIL AT B.PTEAM1@WAL-MART.COM B08 SCO2 0.11 1/2 3/8 318 60 ADHESIVE ON BUTT JOINTS. ALL WORK ON THIS SHEET IS TO BE COMPLETED BY A 1.313 SCO2 2.37 1-3/8 ^1-1/8 5/8 15 5. PUMP DOWN,DEFROST,AND CLEAN OLD WALMART APPROVED CONTRACTOR. 1.4B SCO2 0.88 7/8 ^7/8 1/2 50 \ \ COPPER BEFORE REINSULATING.IF POSSIBLE, �1.31C DO NOT CUT ANY COPPER.CONTACT OWNER'S REFRIGERATION CONTRACTOR IS RESPONSIBLE FOR ALL B11 SCO2 0.42 5/8 1/2 3/8 35 SERVICE MECHANICAL CONSTRUCTION MANAGER IF FINAL REFRIGERATION ELECTRICAL TERMINATIONS TO B12 SCO2 0.46 5/8 1/2 318 50 DELI o COPPER MUST BE CUT. REFRIGERATION EQUIPMENT. 1.513 SCO2 1.49 1-1/8 ^1-1/8 5/8 10 � �\ ��'''� /� I 'OF VERIFY EXACT LOCATION OF ALL REFRIGERATED CASES B13 SCO2 0.67 7/8 5/8 1/2 55 D \ U 6. INSULATIONNSTALL WITH VAPOR STOPS AT EVERY 18 RUNS.(GLUE INSULATION TO PIPE WITH FINAL MERCHANDISE PLAN. B14 SCO2 0.39 5/8 1/2 3/8 40 \\ BYAPPLYING 2"BAND OF INSULATION ADHESIVE PRODUCE TO THE COPPER PIPING EVERY 18') COORDINATE LOCATION OF REFRIGERATED CASES WITH B15 SCO2 0.43 5/8 1/2 3/8 55 COOLER 'e PLUMBING CONTRACTOR PRIOR TO CUTTING OF FLOOR 7. FREEZER WALK-INS AND LT CASE AND SETTING DRAINS. PENETRATIONS REQUIRE THE HOLE TO BE 1)PIPE MAINS INCLUDE ADDITIONAL CAPACITY FOR FUTURE CONNECTED LOADS. ----- PATCHED WITH 26 GAUGE GALVANIZED SHEET REMOVE EXISTING REFRIGERATION EQUIPMENT NOTED f METAL TRIM,FOAM SEALED AND TRIMMED FOR DEMO OR REPLACEMENT,INCLUDING(BUT NOT 2 ESTIMATED TOTAL LENGTH IS FOR ONE DIRECTION;SUPPLY OR RETURN.THE TOTAL IS DELI FLUSH,THEN COATED WITH SILICONE SEALANT LIMITED TO):REFRIGERATED CASES,WALK-IN COILS, ONLY AN ESTIMATE AND ACTUAL LENGTH WILL VARY. HALLWAY - ON BOTH THE INSIDE AND OUTSIDE OF THE BOX. ASSOCIATED VALVES,REFRIGERATION AND 5 2 HAPLWA CONDENSATE PIPING,HANGERS AND SUPPORTS,AND Sim15.615 R3.1 SALAD 8. INSTALL PIPE INSULATION IN STRICT CONTROLS NOT BEING REUSED.COORDINATE DISPOSAL R3.1 PREP O ACCORDANCE WITH MANUFACTURER'S OF EQUIPMENT WITH CONSTRUCTION MANAGER.PATCH 3)-PIPE STUB FOR FUTURE CONNECTION. DELI 6 INSTALLATION INSTRUCTIONS. PENETRATIONS TO MATCH EXISTING.REFER TO A08 SCO2 COOLS ARCHITECTURAL DRAWINGS. KRD34E-111 R3.1 9. REPLACE ALL PIPE SADDLES WITH FRONT "RISER SIZE IS SHOWN EVEN WHEREA RISER IS NOT EXPECTED.THIS IS FOR (REPLACED) p PREMANUFACTURED PIPE SADDLE SECURED TO ALL EXISTING REFRIGERATED CASES ARE TO REMAIN I RI UNISTRUT OF ADEQUATE SIZE TO UNLESS NOTED OTHERWISE. REFRIGERATION REFERENCE ONLY AND I BE USED IN THE EVENT THAT PIPING CONFLICT CAUSES ACCOMMODATE NEW INSULATION THICKNESS. THE NEED FOR A RISER. F RISER LENGTH EXCEEDS 4 FEET,IT MUST BE 7 / COORDINATE WITH OWNER'S MECHANICAL DELI L � PRIOR TO INSTALLING ANY EQUIPMENT OR ADJUSTING R3.1 15.616 PLAN 15.610 APPROVED BY ENGINEER OF RECORD. DELI DELI PREP D CONSTRUCTION MANAGER THE EXTENT OF RACK PARAMETERS,REFRIGERATION CONTRACTOR 15.661 UTILITY ---- REPLACEMENT. SHALL REQUEST A SUCTION GROUP REPORT FOR ALL FREEZER 15.611 ^ RACKS AND SUCTION GROUPS WHERE WORK IS 15.612 ' PERFORMED.REQUEST VIA EMAIL AT c TYP B.PTEAM1@WAL-MART.COM .I NGS AND �f �] ,1 EXISTING CONDITIONS WERE TAKEN FROM EACH SUBCONTRACTOR IS RESPONSIBLE FOR HAVING ORIGINAL I 2 3 4 EXACT AS-DRAWINGS U LJTNCONDITIONS.NCOONTRACTOR SPECT REFLECT A IFICATIONS NUGH YTHEIR RELATED FILEDGE OF ALL ELD.THE FAILURE SHALL FIELD VERIFY ALL EXISTING CONDITIONS TO ACQUAINT THEMSELF WITH THIS KNOWLEDGE DOES FRONT REFRIGERATION PLAN PRIOR TO SUBMITTING FINAL BIDS.CONTRACTOR NOT RELIEVE THE RESPONSIBILITY OF PERFORMING 1 SHALL CAREFULLY COORDINATE NEW WORK AND THE WORK PROPERLY.NO ADDITIONAL SHEET: DEMOLITION WITH ALL OTHER DISCIPLINES AND COMPENSATION SHALL BE ALLOWED BECAUSE OF R 1 EXISTING CONDITIONS. CONDITIONS THAT OCCUR DUE TO FAILURE TO FAMILIARIZE WORKERS WITH THIS KNOWLEDGE. GENERAL NOTES REFER TO SHEET R1 FOR GENERAL NOTES PERTAINING TO THIS SHEET. KEYNOTES 15.603 SUPPORT HORIZONTAL RUNS OF REFRIGERANT LINES ON 1-5/8'X 1-5/8"UNISTRUT CHANNELS. REFER TO SPECIFICATIONS FOR PIPE HANGER SPACING. 15.605 UTILIZE EXISTING ROOF OPENING AS INDICATED WHEN POSSIBLE.IF LARGER OPENING IS REQUIRED REINFORCE ROOF STRUCTURE AS NECESSARY,CUT THE ROOF FOR THE REFRIGERATION PIPE PENETRATION,AND INSTALL OWNER-FURNISHED PIPE PENETRATION RAIN HOOD.PROPERLY FLASH,PATCH,AND w M., p o REPAIR ROOF AS REQUIRED FOR NEW s °�g �f PENETRATION.SEAL THE ROOF OPENING 1 Z 3 4 ACCORDING TO SPECIFICATIONS AS SOON AS �yww�G THE PIPING THROUGH THE ROOF OPENING IS m a ;t55 °gw=°3m COMPLETE.COORDINATE WITH OTHER TRADES O K I,( UTILIZING PENETRATION FOR SPACE Z a� ogN<=ow=a $ ' �// ALLOCATION. O m;w o o h €°za �ror3` a°'a 15.607 COORDINATE REFRIGERATION LINE ° 5 3NoaaLL�� s PENETRATIONS THROUGH ROOF.REINFORCE a ooz�owr°ww°'sir °w�pw° 3 ROOF STRUCTURE AS NECESSARY,CUT ROOF €= �Q�gopN ��w OPENING FOR THE REFRIGERATION PIPE ai PENETRATION,AND INSTALL OWNER-FURNISHED ROOF CURB WITH W EATHERTIGHT SHEETMETAL MEAT DAIRY COVER.PROPERLY FLASH,PATCH,AND REPAIR COOLER COOLER \\'� ROOF AS REQUIRED FOR NEW PENETRATION. ------------_-----------_--- P SEAL THE ROOF OPENING ACCORDING TO yi SPECIFICATIONS AS SOON AS THE PIPING to o THROUGH THE ROOF OPENING IS COMPLETE. COORDINATE EXACT SIZE AND LOCATION OF w t ROOF PENETRATIONS WITH STRUCTURAL (?w =; DRAWINGS.COORDINATE W ITH OTHER TRADES m UTILIZING PENETRATION FOR SPACE m OC z ALLOCATION. < < 8>e 15.609 COORDINATE REFRIGERATION LINE ROUTING z .. THROUGH ROOF.ROOF REINFORCEMENTS, / PENETRATION,AND HOOD SUPPLIED BY o =w y y y OTHERS.COORDINATE EXACT SIZE AND p �\ LOCATION OF ROOF PENETRATIONS WITH ARCHITECTURAL AND STRUCTURAL DRAWINGS. COORDINATE W IT H OTHER TRADES UTILIZING PENETRATION FOR SPACE ALLOCATION. x a 15.610 PROVIDE AIRTIGHT SEAL AROUND ALL PIPING U AND BOLT PENETRATIONS THROUGH COOLER/FREEZER BOX WALLS OR CEILINGS. 15.611 SUPPORT UNIT COOLERS WITH BOLTS THROUGH ROOF TO 1-5/8"X 1-5/8"X 10'LONG 14 GA. � C o _ GALVANIZED UNISTRUT SPANNING THREE ROOF O O LI PANELS.PROVIDE DOUBLE NUTS ON EACH BOLT. H• - - - - - - - - - - - - - - - - - H•� 15.612 SEE SCHEDULES FOR UNIT COOLER TYPES, SIZES,AND CAPACITIES;CONTROL METHOD;AND o O ALL REFRIGERATION PIPING SIZES,ETC. p ds .8 15.615 CONDENSATE DRAIN;PITCH DRAIN LINES DOWN Lo n a APPROXIMATELY 1/8"PER 12"TOWARD DRAIN. O PROVIDE COPPER PIPING W ITH ELECTRIC HEAT 0 M m TAPE AND INSULATION ON ALL CONDENSATE 0 LINES EXPOSED TO FREEZING TEMPERATURES. r 1.1' Z ro 15.616 END CONDENSATE LINE OVER RECEPTOR W/AIR v LEN GAP.CONTRACTOR SHALLENSURE FLOOR O Z 0 DRAINS)AND DRAIN LINE(S)SERVING WALK-IN ARE FREE OF OBSTRUCTIONS AND FUNCTION PLUMBING MTC(ON ROOF). PROPERLY.WHERE EXTENSIVE DAMAGE EXISTS ag J co MECHANICAL AND/OR PROPER DRAINAGE CANNOT BE N OBTAINED COORDINATE WITH WALMART 9 LIB TOCKROOM MECHANICAL CONSTRUCTION MANAGER. 15.617 PROVIDE PVC DRAIN LINE FROM EACH CASE CO2 REMOTE CHARGING m 10 STATION.SHIP LOOSE PARTS DRAIN CONNECTION SAME SIZE AS CASE 7� OUTLET,AND END OVER FLOOR RECEPTOR R3 PROVIDED BY OWNER,FIELD Z INSTALLED BY CONTRACTOR. W/AIR GAP;PITCH DRAINS 1/8"PER 12".PROVIDE m REMOTE CO2 CHARGING O FULL SIZE LIQUID LINE POINT DRAIN COVER GRATE EN MATCH EXISTING. STATION PIPING. CONTRACTOR SHALL ENSURE RECEPTOR(S)AND id OF CONNECTION.REFER TO U PIPING SCHEDULES FOR DRAIN LINE(S)SERVING CASE LINE-UP ARE FREE �® ° ADDITIONAL INFORMATION. OF OBSTRUCTIONS AND FUNCTION PROPERLY. WHERE EXTENSIVE DAMAGE EXISTS AND/OR ISSUE BLOCK A07 SCO2 PROPER DRAINAGE CANNOT BE OBTAINED TVP;SIM 2 KRD24E-074 PROVIDE NEW CONNECTION TO COORDINATE WITH WALMART MECHANICAL R3.1 CO (REPLACED) HEADER.DO NOT USE EXISTING STUBS. CONSTRUCTION MANAGER. EXTEND HEADER TO ACCOMMODATE - - SEAFOOD 15.623 ROUTE REFRIGERATION LINES IN BASE OF CASE FREEZER NEW STUB IF NEEDED.NP OF 2. O FOR ALL BOTTOM FED CONNECTED CASES. SLOPE BACK TO LEAD CASE AT 1"PER 20'-0"OF �- 15.881 4 SIM;TYR OF 2 RUN. R3.1 15.637 AT ALL POINTS WHERE SUCTION LINES RISE, PROVIDE A SUCTION LINE TRAP AT THE BASE AND TOP OF THE RISER. CO \. D - - 15.638 PROVIDE INTERMEDIATE SUCTION LINE TRAP IN MEAT 15.616 WALL OR VOID SPACE.INTERMEDIATE TRAP BO6a SCO2 KRD54E-185 p O UTILITY m SHOULD BE PLACED AT THE MIDPOINT OF ANY (REPLACED) 4 _8 5 O SUCTION LINE RISE WHICH EXCEEDS 16 FEET. m m 15.639 PROVIDE VERTICAL SUCTION DOUBLE RISER IN BO6b SCO2 c B06b SCO2 ¢ ^ R3 _r - 1 1C THIS LOCATION.REFER TO VERTICAL SUCTION KRD54E-185 606 SCO2 / 1 61�� DTB(ON ROOF). DOUBLE RISER DETAIL AND PIPING SCHEDULES FOR SIZES. (REPLACED) 607 SCO2 R3 15.684 TYR OF CO2 15.642 COORDINATE WALL AND/OR ROOF OPENINGS 15.661 1.03B SCO2 1.01B SCO2 DRAIN PAN 15.605 FOR REFRIGERATION PIPING,WATER PIPING, 1.02A SCOLo RACK A AND/OR ELECTRICAL CONDUIT WITH OWNER'S \17 15.609 15.637 SA CIRCUIT. TYP OF 2 GENERAL CONTRACTOR.SEAL PENETRATIONS NP 15.615 1.028 SCO2 15.637 15.638 R3.1 R3.1 15 617 PER SPECIFICATIONS. 15.639 15.661 REFRIGERATION CONTRACTOR SHALL INSTALL B07a SCO2 15.661 OO 1� 15.623 4 LTA(ON ROOF). REFRIGERATION RACK CHECKED BY: EJM 11.667 R3 15.681 TYR OF CO2 MANUFACTURER-FURNISHED LIQUID LINE A01 SC SOLENOID VALVE,SUCTION LINE CHECK VALVE, DRAWN BY: JTC c B07a SCO2- 6 DRS RLN-VCT 15.668 AND CO2 VALVE STATIONS IN A SERVICE (REPLACED) 1YP O ACCESSIBLE LOCATION ON TOP OF WALK-IN PROTO CYCLE: 04/26/2024 O BOX.REFER TO CO2 VALVE STATION DETAIL. GROCERY FULL SIZE LIQUID LINE POINT m m INSTALL CONTROL WIRING FROM SOLENOID DOCUMENT DATE:12/27/2024 15.610 FREEZER OF CONNECTION.REFER TO m VALVE BACK TO CIRCUIT CONTROLLER.REFER 15.611 PIPING SCHEDULES FOR TO SPECIFICATIONS FOR ASSET TAGGING 15.612 ADDITIONAL INFORMATION. _ REQUIREMENTS. 607a SCO2 1.0113 A13 ¢ 15.667 REFRIGERATION CONTRACTOR SHALL INSTALL GROCERY REFRIGERATION RACK KRD54E-ED) ryP 6 AREA MANUFACTURER-FURNISHED CO2 VALVE `GT• (REPLACED) OF DX R3 3 STATIONS IN A SERVICE ACCESSIBLE LOCATION cjB07b SCO 15.603 TYP INSIDE CASE DRAIN PAN.REFER TO CO2 VALVE B07b SCO2 R3.1 STATION DETAIL.FULLY INSULATE ALL - KRD54E-185 PROVIDE TWO SUCTION LINES SURFACES. (REPLACED) A13 AND ONE LIQUID LINE BACK TO 150 m RACK FOR PUMP SKID.REFER 15.668 REFRIGERATION CONTRACTOR SHALL INSTALL O 41142 7 TO PIPING SCHEDULES FOR REFRIGERATION MANUFACTURER-FURNISHED 1.01A SCO2 ADDITIONAL INFORMATION. CO2 VALVE STATIONS.REFER TO CO2 VALVE !4/J�. R3.1 15.610 - RNEW OOF.ICOORDINATEECHASE N3 15.607 STATIONS DETAIL.FULLY INSULATE ALL 15.811 SIZE AND a SURFACES. LINES DOWN 15.612 15.616 TYP V 0O WITH STRUCTURE. R3 15.642 15.681 CO2 PUMP SKID ATNTPER 20'OF RUN.L CATE m HIGHEST POINT OF REFRIGERATION LINES JUST TYP _ ¢ TYR BELOW BOTTOM CHORD OF JOIST OR BEAM. DRAIN PAN �\\ COORDINATE TO AVOID CONFLICTS WITH =CD= _ - - - _ - - - - - - - - - - V / DUCTWORK,LIGHTING,SKYLIGHTS,PIPING,ETC. 1A SCO2 15.684 AT ALL POINTS WHERE CO2 RETURN LINES RISE, g PROVIDE AN INVERTED SUCTION LINE TRAP AT 15.681 TYP OF CO2 THE TOP OF THE RISER. 1.11 B SCO2 R3.1 1.1ASCO2 .2B SCO2 i PIPE STUB FOR FUTURE 1 CONNECTION.TYP.REFER TO 'z 3 4 PIPING SCHEDULES FOR ADDITIONAL INFORMATION. REAR REFRIGERATION PLAN REAR REFRIGERATION PLAN EXISTING CONDITIONS WERE TAKEN FROM EACH SUBCONTRACTOR IS RESPONSIBLE FOR HAVING ORIGINAL DRAWINGS AND MAY NOT REFLECT A THOROUGH KNOWLEDGE OF ALL DRAWINGS AND EXACT"AS-BUILT'CONDITIONS.CONTRACTOR SPECIFICATIONS IN THEIR RELATED FIELD.THE FAILURE SHALL FIELD VERIFY ALL EXISTING CONDITIONS TO ACQUAINT THEMSELF WITH THIS KNOWLEDGE DOES PRIOR TO SUBMITTING FINAL BIDS.CONTRACTOR NOT RELIEVE THE RESPONSIBILITY OF PERFORMING SHALL CAREFULLY COORDINATE NEW WORK AND THE WORK PROPERLY.NO ADDITIONAL SHEET' DEMOLITION WITH ALL OTHER DISCIPLINES AND COMPENSATION SHALL BE ALLOWED BECAUSE OF R 1 .1 EXISTING CONDITIONS. CONDITIONS THAT OCCUR DUE TO FAILURE TO FAMILIARIZE WORKERS WITH THIS KNOWLEDGE. GENERAL NOTES REFER TO SHEET R1 FOR GENERAL NOTES PERTAINING TO THIS SHEET. KEYNOTES 15.602 PROVIDE 0.020"UV-RESISTANT WHITE PVC JACKET ON ALL REFRIGERATION LINES EXTERIOR TO BUILDING. 15.605 UTILIZE EXISTING ROOF OPENING AS INDICATED WHEN POSSIBLE.IF LARGER OPENING IS REQUIRED REINFORCE ROOF STRUCTURE AS NECESSARY,CUT THE ROOF FOR THE REFRIGERATION PIPE PENETRATION,AND INSTALL OWNER-FURNISHED PIPE PENETRATION RAIN HOOD.PROPERLY FLASH,PATCH,AND REPAIR ROOF AS REQUIRED FOR NEW PENETRATION.SEAL THE ROOF OPENING w ACCORDING TO SPECIFICATIONS AS SOON AS THE PIPING THROUGH THE ROOF OPENING IS COMPLETE.COORDINATE WITH OTHER TRADES mg 3t Sga <°a3 UTILIZING PENETRATION FOR SPACE O ww H �<rcs°N€g� ALLOCATION. Z w� °g wa=oya 15.607 COORDINATE REFRIGERATION LINE PENETRATIONS THROUGH ROOF.REINFORCE g gNo o?.yoo,€,aGw ROOF STRUCTURE AS NECESSARY,CUT ROOF O Q ffl w r H o rc a OPENING FOR THE REFRIGERATION PIPE PENETRATION,AND INSTALL OWNER-FURNISHED N €� $o po'9e"n E.I. w ROOF CURB WITH WEATHERTIGHT SHEETMETAL COVER.PROPERLY FLASH,PATCH,AND REPAIR ROOF AS REQUIRED FOR NEW PENETRATION. SEAL THE ROOF OPENING ACCORDING TO SPECIFICATIONS AS SOON AS THE PIPING THROUGH THE ROOF OPENING IS COMPLETE. 4n- b o a COORDINATE EXACT SIZE AND LOCATION OF - ROOF PENETRATIONS WITH STRUCTURAL 1 2 3 4 DRAWINGS.COORDINATE WITH OTHER TRADES UTILIZING PENETRATION FOR SPACE ��{ ALLOCATION. K 15.609 COORDINATE REFRIGERATION LINE ROUTING ¢ o„g THROUGH ROOF.ROOF REINFORCEMENTS, <i PENETRATION,AND HOOD SUPPLIED BY N =W y OTHERS.COORDINATE EXACT SIZE AND z LOCATION OF ROOF PENETRATIONS WITH O ARCHITECTURAL AND STRUCTURAL DRAWINGS. O COORDINATE WITH OTHER TRADES UTILIZING PENETRATION FOR SPACE ALLOCATION. 15.636 SLOPE REFRIGERANT LINES BACK TO a COMPRESSORS AT 1"PER 20'OF RUN.LOCATE U HIGHEST POINT OF REFRIGERATION LINES JUST O O BELOW BOTTOM CHORD OF JOIST OR BEAM. COORDINATE TO AVOID CONFLICTS W ITH DUCTWORK,LIGHTING,SKYLIGHTS,PIPING,ETC. O O Q u/ u/ 15.637 ATALL POINTS WHERE SUCTION LINES RISE, O O PROVIDE A SUCTION LINE TRAP AT THE BASE AND TOP OF THE RISER. cc) 15,638 PROVIDE INTERMEDIATE SUCTION LINE TRAP IN oWALL O SHOULD E PLACED AT THE MIDPOINT OOR VOID SPACE.INTERMEDIATE FAANY rL OW SUCTION LINE RISE WHICH EXCEEDS 16 FEET. O n a 15.639 PROVIDE VERTICAL SUCTION DOUBLE RISER IN � M m THIS LOCATION.REFER TO VERTICAL SUCTION DOUBLE RISER DETAIL AND PIPING SCHEDULES f n Z FOR SIZES. `J W N 15,642 COORDINATE WALL AND/OR ROOF OPENINGS Z O FOR REFRIGERATION PIPING,WATER PIPING, r_ AND/OR ELECTRICAL CONDUIT WITH OWNER'S ~ J — — — — — — — — — — — — — — — J GENERAL CONTRACTOR.SEAL PENETRATIONS J C/) PER SPECIFICATIONS. 15.669 IF THE FACTORY-INSTALLED CO2 PRESSURE RELIEF VALVE IS LOCATED LESS THAN 20'AWAY Q 10, FROMANY MECHANICAL FRESH AIR INTAKE, EXTEND THE PRESSURE RELIEF PIPING AND WIRING AWAY FROM THE INTAKE AND RELOCATE THE VALVE TO THE END OF THE LINE. 15.676 REFRIGERATION CONTRACTOR SHALL INSTALL SECONDARY REFRIGERATION SYSTEM VENDOR-FURNISHED PUMP SKID.SET,LEVEL, AND ANCHOR ACCORDING TO MANUFACTURER'S INSTRUCTIONS.CONNECT PIPING AS SHOWN, ISSUE BLOCK CHARGE SYSTEM,AND START-UP ACCORDING TO SPECIFICATIONS AND MANUFACTURER'S INSTRUCTIONS.REFER TO MANUFACTURER EXISTING HYBRID HOUSE DOCUMENTATION,BAS, MTC(ON ROOF). ARCHITECTURAL/FIXTURE,AND STRUCTURAL. PROVIDE TWO SUCTION LINES AND ONE LIQUID LINE BACK TO RACK FOR PUMP SKID.REFER To PIPING SCHEDULES FOR Ll ADDITIONAL INFORMAkG YP TYP OF DX PROVIDE NEW CONNECTION TO BO HEADER.DO NOT USE EXISTING STUBSB1 EXTEND HEADER TO ACCOMMODATE— — — NEW STUB IF NEEDED.TYP OF 2.i s.669 SCO2B-1CO21 s.676 PUMP SKIDF 2 (ON ROOF). CHECKED BY: EJM DRAWN BY: JTC PROTO CYCLE: 04/26/2024 D> DOCUMENT DATE:12/27/2024 CO2 CHARGINGEXISTING HYBRID HOUSE DTB(ON ROOF). TYP w�`GI AZ(L 15.805 2 TYP OF 2 15.637 15.638 EXISTING HYBRID HOUSE 15.639 LTA(ON ROOF). O 41742 CO2 CHARGING PIPING TYP 6 PROVIDE TWO SUCTION LINES OF DX R3 AND ONE LIQUID LINE BACK TO RACK FOR PUMP SKID.REFER TO PIPING SCHEDULES FOR 7 ADDITIONAL INFORMATION. TYP R3 NEW PIPE CHASE IN ROOF.COORDINATE 3 15.601 Al2 SIZE AND LOCATION R3 15.642 A13 WITH STRUCTURE. SCO2A-1 CO2 TYP (ON Ro REFER TO ELECTRICAL FOR CO2 SKID BATTER BACKUP LOCATION AND INSTALLATION(BB-1). 1 2 "13 4 PARTIAL ROOF PARTIAL ROOF REFRIGERATION PLAN REFRIGERATION va=r-o PLAN EXISTING CONDITIONS WERE TAKEN FROM EACH SUBCONTRACTOR IS RESPONSIBLE FOR HAVING ORIGINAL DRAWINGS AND MAY NOT REFLECT A THOROUGH KNOWLEDGE OF ALL DRAWINGS AND EXACT"AS-BUILT'CONDITIONS.CONTRACTOR SPECIFICATIONS IN THEIR RELATED FIELD.THE FAILURE SHALL FIELD VERIFY ALL EXISTING CONDITIONS TO ACQUAINT THEMSELF WITH THIS KNOWLEDGE DOES PRIOR TO SUBMITTING FINAL BIDS.CONTRACTOR NOT RELIEVE THE RESPONSIBILITY OF PERFORMING SHALL CAREFULLY COORDINATE NEW WORK AND THE WORK PROPERLY.NO ADDITIONAL SHEET' DEMOLITION WITH ALL OTHER DISCIPLINES AND COMPENSATION SHALL BE ALLOWED BECAUSE OF R 1 .2 EXISTING CONDITIONS. CONDITIONS THAT OCCUR DUE TO FAILURE TO FAMILIARIZE WORKERS WITH THIS KNOWLEDGE. REFRIGERATIONSCHEDULE-EXISTING RACK LTA Refrigerant: R-407A Refig.EMS: Novar Condenser Type: Air H/R Media: Water Subcooler Liquid Temps SG7 Comp RGT-F: 1 DESIGN DB T: 92 EXTERIOR DRY BULB(DB)'F: 92 LIQUID OVERFEED CO2 Formal: Supercenter Store#: 03757 System Type: Hybrid House/CO2 Skid Secondary Refrigerant: (CIRCULATION RATE:2) System Elec: 460V 3Ph 60 Hz Sat.Cond.Temp°F: 107 H/R Use: Dom.Hot Water SG1 Uq Temp°F: 50 SG2 Comp RGT-F DESIGN WB'F: 69 Based on 5 yr Extreme DB-ASHRAE Pub.: 2021 Prof.Size: 150 City/State: Arington,WA Consultant: Hargis Engineers Estimated Refrigerant Charge Defrost Elec: 208V 60 Hz 1 or 3Ph Cond Design TO-1: 15 H/RWater GPM: 4.0 SG2 Uq Temp T; SG3 Comp RGT T: DESIGN INTERIOR DRY BULB'F: 75 EXTERIOR WET BULB(WB)'F: 69 ProtoCycle Dec.: 04/26/2024 Date Prepared 11/25/2024 Prepared by: Jordan Crowe Rack and Condenser(IN) Sys.Pilot Elec: 208V 1Ph Summer H/R Avail: N/A H/R Glycol Type: WA SG3 Uq Temp°F: Evap.Superheat°F: 10 DESIGN INTERIOR RH%: 55% Based on 0.4%Monthly Max W B-ASHRAE Pub.: 2021 Fixture and Field Piping(Ibs) Cond.El. 460V 3Ph 60 Hz Winter FVRAvail: N/A H/R Glycol%: WA ASHRAE Design Conditions Weather Station:Arlington,WA(WMO:727945) ELEVATION ft 137 Climate Zone 4C CIRCUIT INFORMATION FIXTURE ELECTRICAL INFORMATION MISC INFORMATION Case I'Mure Length/Quantity Walk-In Box Size LSHX Y or N? Evaporator Case/ CO2 Lights Anti-Sweat Drain Pan &Model # Coil TXV/ Sub-Circuit Load Circuit Evap. Walk-In Flow Circuit Control Valves Defrost Defrost Heatere Fans Amps Amps Amps CKT# FT Nof Doore 2 Dr/4' 3 Dr16' 4 Dr/8' 5 Dr/12' L W H Case/Cdl Motlel Cese/Coil MenuF. Application WI Evaps Distributor N.zze MBH Load MBH SST Air Temp GpM EPR LLSV Type Amps Voltage Amps Voltage 12pv 120v 120v Comments Equip Number CKT# -MI=02 6 DRS 2 RUN-VCT HUSSMANN Reach-In F.F. 5.7 -11 S 0.22 BY OEM EL 202 20811 1.8 1211111 0.6 7.0 2.5 REPLACED CASES R33002242II1212W2023 _A013CO2 _"2 SCM 12 DRS 1 2 RLN-VCT HU93MANN Reach-In F.F. 11.5 .11 S 0.42 BY OEM EL 29.1 am 3.6 fan 12 13.8 5.8 REPLACED CASES RS3002242 It 122W2023 _"2 SCM _A03 SCO2 12 DRS 1 2 RLN.VCT/RLNI-VCT HUSSMANN Ree.Wo F.F. 11.5 41 S 0A2 BY OEM EL 29.1 am 3.6 120M 12 13.9 5.8 REPLACED CASES R530022/2/R33003.242//11/2612023 -A03 SCO2 _A04 SCO2 11 DRS 1 1 1 RLN-VCT HUSSMANN Reach-Im F.F. 10.6 41 S 0.39 BY OEM EL 26.3 20813 33 120/1 1.1 12.6 &2 REPLACED CASES RSS0022421I1212W2023 _A(ul W02 ""A053CO2 19 DRS 1 3 RLNI-VCT HUSSMANN Res.Nn F.F. 18.2 41 S 0.67 BY OEM EL 41.3 20813 5.7 fan 1.9 21.9 9.7 REPLACED CASES R33003.242 It 12cmM3 -M5 SCO2 _A06SCO2 11 DRS 1 1 1 RUN-VCTI RLNI-VCT HUSSMANN ReacMn F.F. 10.5 .11 S am BY OEM EL 26.3 20M 33 fan 1.1 12.6 5.2 REPLACED CASES RWOO2.242 I RS3003.242 H 12/2W2023 _A06 SCUP w M� ¢worms 'A0]SCO2 ] e 10 KRD24E41]dfAM KRACK Seafood Freezer W.I. 7.1 -11 -2 025 •'%SP23130 EL 5.8 23013 12 208f1 REPLACED EVAPS •"'AO]SCO2 _A08 SCO2 10 13 10 KRD34E-111CDAA KRACK Dell Freezer W.I. 10.9 -11 .2 0.38 ^XSRslw EL 8.7 23013 13 20W1 REPLACED EVAPS -me SCO2 8.8 PUMP System Heat GanPu andPi in � ;GGG_a IS o<3�;2a m Total Load MBH: 90.7 -12 F CO2 Te &13 CO2 Total Flow I11GPM - n� H oaowyr€pa 'A01 SPARE EVAPS REMOVED FROM CIRCUIT .Ml-AD2 SPARE CASES RMMO�D FROM CIRCUIT 'AD2 F zw3�giir30€aO� •A03 SPARE - CASES REMOVED FROM CIRCUIT `A03 Q U oa w A,.o 5 3Qoa o � N `A04 SPARE CASES REMOVED FROM CIRCUIT ,AOq w r w 'A05 SPARE - CASES REMOVED FROM CIRCUIT 'A05 •A06 SPAR AS E CES REMOVED FROM CIRCUIT •A06 N u� •AO] SPARE CASES REMOVED FROM CIRCUIT •A07 -ADS SPARE CASES REMOVED FROM CIRCUIT M 'A09 SPARE CASES REMOVED FROM CIRCUIT `A09 'A10 SPARE CASES REMOVED FROM CIRCUIT 'A10 •AtI SPARE IN%PS REMOVED FROM CIRCUIT 'All w o a •Al2 la CO2 SKID 47.3 48 `Al2 - -A13 la CO2 SKID 47.3 46 -A13 w c 3 Sadism Gmu#1 Re uiretl Ca ai MBH 80.7 "1 °F Saturstar Suction Tem retire n General Notes: 1, Refrigeration OEM:Hussmann Z \U 21 CaselEvap changes result in a net DECREASE.(20.5 MBH. H `2 3. Hussmann to reevaluate Rack A at-19°F saturated suction temperature. N =w 41 Hussmann shall furnish CO2 valve stations,LLSVs,CO2 charging station,etc. Z 5.1 Hussmann shall provide pressure drops and coil selections for all liquid overfeed coils.Sized on entering fluid temp of-12°F and a CR of 2. 0 REFRIGERATION SCHEDULE-EXISTING RACK DTB Refrigerant: R-407A Refig.EMS: Novar Condenser Type: Air HIR Media: Water Subcooler Liquid Temps SG1 Comp RGT eF: -7 DESIGN IDS'F: 92 EXTERIOR DRY BULB(DB)'F: 92 U LIQUID OVERFEED CO2 O O Format: Supercenter Store#: 03757 System Type: Hybrid House,I002 Skid Secondary Refrigerant: (CIRCULATION RATE:2) System Elec: 460V 3Ph 60 Hz Sat.Cond.Temp°F: 107 H/R Use: Dom.Hot Water SG1 Uq Temp'F: 50 SG2 Comp RGT-F - DESIGN WB'F: 69 Based on 5 yr Extreme DB-ASHRAE Pub.: 2021 0 C= Prolo Size: 150 City/State: Arington,WA Consultant Hargis Engineers Estimated Refrigerant Charge _ Defrost Be.: 208V 60 Hz 1 or 3Ph Cond Design TO-1: 15 H/RWatuGPM: 4.0 SG2 Uq Temp eF: 75 SG3 Comp RGT-F: _ DESIGN INTERIOR DRY BULB'F 75 EXTERIOR WET BULB(WB)'F: 69 00 ProtoCycle Dale: 04/26/2024 Data Prepared 11/25/2024 Prepared by: Jordan Crowe Rack and Condenser(Ibs) - Sys.Pilot Elso: 208V 1Ph Summer H/R Avail: N/A H/R Glycol Type: N/A SG3 Uq Temp°F: _ Evap.Superheat'F: 10 DESIGN INTERIOR RH%: 55% Based on 0.4%Monthly Max WB-ASHRAE Pub.: 2021 �L-� O O 6 K Fixture and Field Piping(Ibs) - Cond.Elec: 460V 3Ph 60 Hz Winter HIR Avail: N/A H/R Glycol%: N/A ASHRAE Design Conditions Weather Station:Arlington,WA(WM0:727945) ELEVATION ft 137 Climate Zone 4C 0 CIRCUIT INFORMATION FIXTURE ELECTRICAL INFORMATION MISC INFORMATION Case Fizture Length/Quantity Walk-In Box Size LSHX V or N7 Evaporator Case/ CO2 Lights Anti-Sweat Drain Pan &Model# Coil TXV/ Sub-Circuit Load Circuit Evap. Walk-In Flow Circuit Control Valves Defrost Defrost Heaters Fans Amps Amps Amps O CKT# FT Nof Doors 1 2 Dr/4'1 3 Dr/6' 4 Dr/8 T5 Dr/IZ L W I H Case/Coil Model Case/Coil Manuf. Application WI Evaps Distributor Nozzle MBH Load(MBH1 SST Air Temp EPR LLSV Type Amps Voltage Amps Voltage 120v 120v 120v Comments Equip Number CKT# Z -BO6 SCO2 MAIN CIRCUIT-SUBCIRCUITS ARE BELOW - - 1Q Grocery/I.C.Frs - TOTAL MAIN CIRCUIT: 30.5 40 .10 - - EL - - - - _ - ""BOB SCO2 WoI ""'BO6a SCO2 16 17 12 KRD54E-185CDAA KRACK 114 Grocery l l.C.Frs - 15.3 .20 -10 033 ^XSP24130 EL 21.7 23W1 3.0 20W1 REPLACED EVAPS '"•'BOBa SCO2 z O -8066 SCOT 16 17 12 KRDS 485CDM KRACK 114 Grocery,l I.C.F. - 1Al - .0 .10 am -SPal" EL 211 23W1 3.0 20W1 REPLACED I-S ""BO66 W02 0 � 'B07 SCO2 MAIN CIRCUIT-SUMIRCUITS ARE BELOW - - 1Q Grocery I I.C.F. TOTAL MAIN CIRCUIT: s03 -20 40 - - EL - - - - _ - -807SCO2 I I� "'•`B07aW02 16 17 12 KRD54E-1WCDAA KRACK 114 Grocary/1.C.F. - 133 .20 -10 0.53 •'XSP23130 EL 21.7 23VI 3A 20811 _ REPLACED EVAPS -B07.SCO2 -B07b SCO2 16 17 12 KRD54E-185CDAA KRACK 114 Grocery l I.C.F. - 10.3 - 40 -10 0.53 "XSP2S130 EL 21.7 23W1 3.0 20M1 - - - REPLACED EVAPS - "B07b W02 -BOB W02 3 DRS 1 RUN-VCT HU93MANN Reach4n I.C.Cake 3.2 .19 -12 1 0.11 - BY OEM EL 10.1 20M 0.9 1201 03 3.5 1.3 REPLACED CASES RS1002.142111212M023 ""BOB W02 -Bit SCO2 12 DRS 1 2 RUN-VCT I RLNI-VCT HUSSMANN Ra,,W,F.F. - 11.5 Is S OA2 BY OEM EL 29.1 20M 3.6 12W1 12 13.8 AB REPLACED CASES RW002242/R39003-1112cilipa3 ""Bit SCO2 m -B12SCO2 13 DRS 1 2 RLN-VCT HUSSMANN Reach-Ira I.C. 12A 49 42 am BY OEM EL 29.1 am 33 12W1 13 1&0 BA REPLACED CASES RS3002.14211122W2023 ""B12=02 ^`R133CO2 19 DRS 1 3 RWI-VCT HUSSMANN Reach9n F.F. 10.2 -19 S 0.87 BY OEM EL 41.3 M8I3 5.7 120/1 1.9 21.9 9.7 REPLACED CASES R4300S.242II12RW2023 "^B135CO2 Z ^B14SCO2 11 DRS 1 1 1 RUN-VCTI RLNI-VCT HUSSMANN Rea.Wo F.F. 10.5 -19 S 0.30 BY OEM EL 26.3 am 33 12W1 1.1 12.6 32 REPLACED CASES RS3002242/RS3003.2QH 1=612023 ^B14SCO2 ro O ""B153CO2 12 DRS 1 1 1 RLN-VCT HUSSMANN ReecM1-In I.C. 11.5 -19 12 0.43 BY OEM EL 263 208p 9.6 120H 12 13.8 AB REPLACED CASES R33002.1421112I2W4029 ""B15 SCO2 PUMP tam Heat Galn(Pump and Piping) 92 PUMP Total Lead MBH I: 137.4 -20 F CO2 Te 4.80 CO2 Total Flow fGPMI B01 8 FT 1 FWGFF HUSSMANN Dual Temp Coffin Island 5.0 -20 -12 CDST-0-7 EVR3NC-0 EL 1- 2-1 2.2 120/1 ETR ETR But ISSUE BLOCK B02 12 FT 2 FWEGFF HUSSMANN DualTemp Coffin Ends 5.1 -a -12 CDST-0.7 EVR3NC4 EL 13.1 20M1 1.5 12011 ETR ETR B02 B03 12 FT 1 PNGFF HUSSMANN Dual Temp Cohn lslantl 7.5 -a -12 0DST47 EVR3NC-0 EL 23.1 2=1 3.1 12011 ETR ETR B03 B04 12 FT 2 FNEG-FF HUSSMANN DualTemp Coffin Entla 5.1 -20 -12 Co- EVR3NC-0 EL 13.1 -1 1.5 12.1 ETR ETR B. `BOS SPARE - - - - _ `805 'BOSa SPARE EVAPS REMOVED FROM CIRCUIT 'BM 'BOSb SPARE EVAPS REMOVED FROM CIRCUR 'BOSb •BOB SPARE •M •1306s SPARE EVAPS REMOVED FROM CIRCUIT •1306s 11066 SPARE EVAPS REMOVED FROM CIRCUIT 11066 'BO] SPARE CASES REMOVED FROM CIRCUIT 'B07 'BOB SPARE CASES REMOVED FROM CIRCUIT 'BOB •M V2 CO2 SKID M7 46 BY OEM BY OEM •M _B10 1/2 CO2 SKID M7 46 BY OEM BY OEM -B10 Succor GIUD#1 Re abed Ga ac MBH I INN 47 •F SeNrsted Suction Tem - eS01 W FT 3 FPW-EXA SANYO MID Meat 40.9 24 31 CDST-]-11 EVRMN 5 OT 5.8 12011 8.5 ETR ETR 8Sol .S02 24 FT 1 1 2 1 1 FPW-EXA SANYO to Meat 27.2 24 31 CDST-7-9 EVR6N" OT 3.1 12011 5.7 ETR ETR 8S02 BS03 20 FT 1 1 SHVSS HUSSMANN MID Cake 17.2 20 30 CDST-7-5 EVR3NC-0 OT 3.5 12W1 5.2 ETR ETR BS03 BSO4 8 FT 1 E2V-SVO HUSSMANN Self-Service Dell 7.2 27 CDST-2-0 E2S140 OT 0.4 120/1 0.8 ETR ETR BSO4 BS05 26FT/2ENDS 4 2 PFI-R4G51 HILL PHOENIX MD Produce Island 24.1 24 28 CDST-47 EfiS140 OT 3.6 12011 2.1 ETR ETR BS05 .806 24 FT 3 DX6XN KYSOR WARREN MID Deli 24.7 27 33 CDST-0-7 E5S140 OT 2.0 12011 3.5 ETR ETR 8SO6 BS07 8 FT 1 ESBDS HUSSMANN Service Deli 2.9 20 25 CDST-2-0 E25140 OT 0.2 12.1 1.0 as ETR ETR BS07 BS08 9 9 10 SME-130 BOHN Pouley Cooler W.I. N EGVE-1-C/#3/4 10.0 20 28 CDST-7-5 EVR3N04 EL 15.7 20fl/1 1.5 20811 ETR ETR BS08 BS09 28 FT 2 2 PF-50R BARKER HMR Island Center 21.8 1 20 30 CDST-7-9 lW.NC4 OT 2.7 12011 1 5.7 1 1.9 ETR ETR BS09 CHECKED BY: EJM BS10 12FT/2ENDS 2 1 FWGFWEG HUSSMANN M.T.Coffin lslantl w/Ends 8.5 19 24 CDST-7-5 EVR3NC4 EL 21.3 20W3 4.6 12011 0.5 ETR ETR BS10 Ball 8FT/2ENDS 2 1 FWGM'EG HUSSMANN M.T.Coffin Island col Ends 6.7 19 24 CDST-7-5 EVR3NC-0 EL 18.2 208/3 3.8 12011 0.4 ETR ETR BS11 DRAWN BY: JTC BS12 8M 2ENDS 2 1 1 1 1 1 F`NG/FWEG HUSSMANN M.T.-Island col Ends - - - 6.7 19 24 CDST-]-5 EVR3NC-0 EL 18.2 208I3 3.8 12011 - OA _ ETR ETR BS12 pR0T0 CYCLE: 04/26/2024 B813 MAIN CIRCUIT-SUBCIRCUITS ARE BELOW 28 29 10 Mee[Coder W.I. TOTAL MAIN CIRCUIT 36.8 19 28 CDST-9-9 EV.04 EL ..2 2-1 4.0 308/1 ETR ETR BS13 B513a WKE-210 BOHN 112Meat Cooler W.I. N EGVE-2C/#1-1/2 18.4 19 28 EL 22.6 20M1 2.0 208/1 ETR ETR BS13a DOCUMENT DATE:12/27/2024 BS13b WKE210 BOHN 1/2Meat Cooler W.I. N EGVE-2C/#1-1/2 18.4 19 28 EL 22.6 2MI 2.0 208/1 ETR ETR BS13b •BS14 Subeoolar Load Rack B 3].5 35 ETR ETR •BS14 BS15 SMBT HUSSMANN Service Dell Is 18 24 CDST-2-0 EIS140 OT 0.6 fall 0.3 ETR ETR BS15 Suclim Group#2 Re ulred Ca acitv(MRHn 2T6.8 17 °F SaWretetl Suction Tem reWre General Notes: 1 Refrigeration OEM:Hussmann �{t� GT• 2, ...[Evap changes result in a net INCREASE of 50.2 MBH for SG#1. 3. CaselEvap changes result in a net INCREASE of 30.2 MBH for SG#2. q Hussmann to mevaluate Rack B at-27°F saturated suction temp. .Q 51 Hussmann shall furnish CO2 valve stations,LLSVs,CO2 charging station,etc. y0 6, Hussmann shall provide pressure drops and coil selections for all liquid overfeed coils.Sized on entering fluid temp of.20°F and a CR of 2. 41T42 OWNER FURNISHED REFRIGERATION CONTROLS&EQUIPMENT SCHEDULE BATTERY BACKUP SYSTEM SCHEDULE VENDOR BATTERY CABINET BATTERIES INVERTER TRANSFORMER NOTES VENDOR SAP# Type VOLTAGE Count NOTES CABINET USABLE ENERGY BATTERY MODULES MAX OUTPUT CURRENT CIRCUIT BREAKER RATING VOLTAGE HONEYWELL INTERNATIONAL INC 1000211094 KE2 Door Switch 4 - MARK BRAND MODEL (Qm (kWh) (YM BRAND MODEL VOLTAGE (AMPS) (AMPS) OTY (kVa) PHASE (PRIMARY,SECONDARY) OTY HONEYWELL INTERNATIONAL INC 1000211094 KE2-RE2 Evap 40A(20178/20844) 6 HONEYWELL INTERNATIONAL INC 1000211094 Novar ES1 w/XFMR 3 BB-1 GENERAC PWRCELL IR M3 DCB 1 18 6 GENERAC XVT076A03 120/240,1P VAC 32 50 1 10 SINGLE 480V,120/240V 1 A,B,C HONEYWELL INTERNATIONAL INC 1000211094 Novar xcm.LCD w/XFMR 6 HUSSMANN CORPORATION 1000048208 KR24E-074 208 V 1 A GENERAL NOTES HUSSMANN CORPORATION 1000048208 KR34E-111 208 V 1 A HUSSMANN CORPORATION 1000048208 KR54E-185 208 V 4 A 1.) BATTERY CABINET,INVERTER,AND TRANSFORMER SUPPLIED BY OWNER'S DESIGNATED REFRIGERATION EQUIPMENT MANUFACTURER:RAE CORPORATION. GENERAL INFORMATION(ALL COILS): 2.) REFER TO RE SHEETS FOR WIRING DETAILS,ELECTRICAL REQUIREMENTS,AND EQUIPMENT LOCATIONS. 1. COILS FURNISHED BY OWNER AND INSTALLED BY CONTRACTOR. 3.) REFER TO CO2 BACKUP BATTERY&INVERTER DETAIL FOR CONTRACTOR FURNISHED ITEMS. 2. INFORMATION CONTAINED WITHIN THIS SCHEDULE IS FOR OWNER'S PURCHASING REPRESENTATIVE.REFER TO REFRIGERATION SCHEDULE(S)FOR SPECIFIC NOTES: INFORMATION REGARDING EQUIPMENT. 3. SUPPLIER SHALL VERIFY PRODUCT REQUIREMENTS INCLUDING BUT NOT LIMITED TO LIQUID TO SUCTION HEAT EXCHANGER,EXPANSION DEVICE TYPE,ELECTRICAL A.) BATTERY BACKUP SERVES SYSTEM LTA SCO2(SCO2A-1)AND LTB SCO2(SCO2B-1). REQUIREMENTS,ETC.WITH REFRIGERATION SCHEDULE(S). B.) BATTERY BACKUP SERVES BREAKER BOX. NOTES: C.) BATTERY BACKUP SERVES SMART MANAGEMENT MODULE. A. EVAPORATOR COIL SHALL BE FURNISHED WITH FACTORY INSTALLED VALVES,SENSORS,TRANSDUCERS,AND ALL OTHER APPURTENANCES,AS OUTLINED IN THE 15690 EQUIPMENT SPECIFICATION,INCLUDING:ELECTRONIC EXPANSION VALVEE SEEN OR,SUCTION VALVES(TWO IN THE SUCTION LINE,ONE IN THE LIQUID LINE, RACK A MODIFICATIONS(REFER TO OEM SUBMITTALS FOR ADDITIONAL INFORMATION) PUMP SKID SCHEDULE UPSTREAM OF THE OTHER SUCTION PRESSURE TRANSDUCER,AIR TEMPERATURE SENSOR,SUCTION TEMPERATURE SENSOR,DEFROST TERMINATION TEMPERATURE NEW MCA:214.4 SENSOR AND ALL OTHER COMPONENTS.REFER TO DETAILS FOR FIELD INSTALLED CONTROL WIRING BETWEEN EVAPORATOR COIL AND WALK-IN UNIT CONTROLLER. NEW COMPRESSOR:4TES-12Y-2NU -SUCTION GROUP LTA COMPRESSOR POSITION 2 REFRIGERATION Skid Capaci Design Skid Max Skid Desi Skid Max Skid Desi Skid Max Skid Design _12 HP MARK SYSTEM SERVED MANUFACTURER Model (MBH) ty (MBH Flow(GPM) Flow(GPM) Head(FT) Head(FT) RPM RPM V/PH MCA MOPD 410 WIRE SIZE -30A BREAKER SCO2A.1 LTA RAE Corporation WMT-SEC-CO2.1/10460 348.0 94.7 10 3.14 100 50.9 1800 916 46013 15 15 -30A CONTACTOR(PROVIDED) SCO2B-1 DTB RAE Corporation WMTSEC-CO2-1/10460 348.0 134.2 10 4.49 100 49.8 1800 896 460/3 15 15 -23.6 RLA NEW SUCTION MANIFOLD SIZE:2-518" GENERAL NOTES: REFRIGERATION 1.UNIT DESIGN HEAD AND RPM ARE ESTIMATES TO ASSIST WITH UNIT STARTUP. RACK B MODIFICATIONS(REFER TO OEM SUBMITTALS FOR ADDITIONAL INFORMATION) SCHEDULES NEW MCA:314.2 2.UNIT SUPPLIED BY MANUFACTURER WITH SHIP LOOSE SPOOLS.FIELD INSTALLED BY CONTRACTOR. NEW COMPRESSOR:4GE-23Y-2NU 3.CONVENIENCE RECEPTACLE FILED PROVIDED BY CONTRACTOR.REFER TO MAUFACTURER'S ONE-LINE DIAGRAM CONNECTION TO SKID CIRCUITRY. -SUCTION GROUP 1 COMPRESSOR POSITION 2 -23 HP 4.ROOF CURB AND ANCHOR BRACKETS FURNISHED BY OWNER,INSTALLED BY CONTRACTOR.REFER TO MANUFACTURER'S INSTALLATION INSTRUCTIONS. 48 WIRE SIZE 5.IF UNITS ARE TO BE INSTALLED WITHIN 5 MILES OF ANY SALT OR BRACKISH WATER,UNITS SHALL BE FURNISHED WITH FACTORY CORROSION PROTECTION OPTIONS PER EQUIPMENT SPECIFICATION. -50A BREAKER 40A CONTACTOR(PROVIDED) _32.1 RLA NEW COMPRESSOR:4GE-23Y-2NU -SUCTION GROUP 1 COMPRESSOR POSITION 3 -23 HP 48 WIRE SIZE -50A BREAKER 40A CONTACTOR(PROVIDED) SHEET: -3 SUCTION NEW SUCTIOTIO N MANIFOLD SIZE:3-1/8" K1 SCO2 PHASING SCHEDULE-RACK A MODIFIED COMPRESSOR SCHEDULE-EXISTING RACK LTA Existing Design Conditions New Design Conditions General Specifications CIRCUIT LOAD CIRCUIT PHASELOAD PHASE FLOWRATE Required Load(MBH) 115.2 Required Load(MBH) 94.7 Refrigerant R-407a SYSTEM CIRCUIT NUMBER (MBH) APPLICATION FLOWRATE(GPM) PHASE SETPOINT(MBH) (GPM) NOTES Available Compressor NRE(MBH) 121.2 Available Compressor NRE(MBH) 105A SAS Controller OEM NOVAR A02 SCO2 11.5 Reach-In F.F. 0.42 A04 SCO2 10.5 Reach In F.F 0.39 1 3z 9 1 19 Suction Group Temperature(F) -12 Suction Group Temperature(F) -19 . ' Free:erw.I o.3a. EXISTING COMPRESSOR INFORMATION Aoescot 10.9 DeII A03 SCO2 11.5 Reach-In F.F. 0.42 LTA SCO2 A05 SCO2 18.2 Reach-In F.F. 0.67 2 73.0 2.67 A,B Compressor Compressor Capacity as Entered A06 SCO2 10.5 Reach-In F.F. 0.39 Capacity Comp.Capacity% Into Controller Minimum Capacity A01 SCO2 5.7 Reach-In F.F. 0.22 Comp.Position Model (MBH) of Load (MBH) Unloader QTY Unloader% (MBH) Notes 3 e5.9 3.14 A.B 1 4CO770SL-4SU 19.2 20.3% VFD 8.05 A07 SCO2 7.1 Seafood Freezer W.I. 0.25 Total g5.9 3.14 2 *4C1145SL-4SU 29.2 30.8% 1 50 14.6 COMPRESSOR REPLACED GENERALNOTES 3 4C1385KIW 35.6 37.6% - 0 - - w w8 pro 0 1.PHASING SCHEDULE SHOWN IS RECOMMENDED BASED ON EQUIPMENT MINIMUM OPERATING CONDITIONS OF 33 MBH AND 1 GPM. 4 4C1480PL-2NU 37.2 39.3% - 1 50 18.6 2.REFRIGERATION CONTRACTOR TO CONFIRM PHASING WITH WALMART MECHANICAL CONSTRUCTION MANAGER PRIOR TO CONSTRUCTION START. NEW COMPRESSOR INFORMATION o Fywgo���e NOTES O A.'PHASE LOAD'INCLUDES PREVIOUS PHASES LOAD. Compressor Z w g y o o w a w Capacity as Entered iwa3w�oo B.'PHASE FLOWRATE'INCLUDES PREVIOUS PHASES FLOWRATE. Compressor NRE Comp.Capacity% Into Controller Minimum Capacity ~ a2yoo€a�'�rwi Comp.Position g PRO- Model (MBH) of Load (MBH) Unloader QTY Unloader (MBH) Notes a oow�ap,°w, N=g 1 4CO770SL-4SU 14.7 15.5% VFD 8.05 � soyso � SCO2 PHASING SCHEDULE-RACK B 2 *4TES-12Y-2NU 34.8 36.7% 1 50 17.4 A,B,C 3 4C1385SL-4SU 27.5 29.0% 0 4 4C1480PL-2NU 28.4 30.0% 1 50 14.2 CIRCUIT LOAD CIRCUIT PHASELOAD PHASE FLOWRATE GENERALNOTES SYSTEM CIRCUIT NUMBER (MBH) APPLICATION FLOWRATE(GPM) PHASE SETPOINT(MBH) (GPM) NOTES §oa B06 SCO2 30.5 1/2 Grocery/I.C.Fm 1.06 1.COMPRESSSOR MODIFICATIONS COORDINATED WITH HUSSMANN. 1 61.0 2.12 - -2 B07 SCO2 30.5 1/2 Grocery/I.C.Fm 1.06 NOTES w 3 B08 SCO2 3.2 Reach-In I.C.Cake 0.11 A.NEW COMPRESSOR CAPACITY CONTROL METHOD B11 SCO2 11.5 Reach-In F.F. 0.42 B.REVISED COMPRESSOR CAPACITY CONTROL METHOD i r r LTB SCO2 2 104.3 3.71 A,B 313SCO2 18.2 Reach-In F.F. 0.67 C.REVISED COMPRESSOR MODEL NUMBER D. of =w B145CO2 10.5 Reach-In F.F. 0.39 NEWLY ADDED COMPRESSOR MODEL Z B12 SCO2 12.4 Reach In I . 0.46 COMPRESSOR STAGING 0 B15 SCO2 11.5 Reach-In I 0.43 3 128.2 4.6o A,B EXISTING COMPRESSOR STAGING NEW COMPRESSOR STAGING(Up to 110%of Load) . Total 128.2 4.60 Step%Relative to x Compressors Capacity Capacity Step Compressors Capacity Capacity Step Available d GENERALNOTES Compressor Staging Positions On MBH MBH Compressor Staging Compressor NRE (MBH) (MBH) P 9 9 Positions On (MBH) (MBH) P Notes 1.PHASING SCHEDULE SHOWN IS RECOMMENDED BASED ON EQUIPMENT MINIMUM OPERATING CONDITIONS OF 33 MBH AND iGPM. Step 1 _ _ Step 1 1U 8.05 8.05 7.6% O O 2.REFRIGERATION CONTRACTOR TO CONFIRM PHASING WITH WALMART MECHANICAL CONSTRUCTION MANAGER PRIOR TO CONSTRUCTION START. Step _ _ Stop 1 14.7 6.7 6.3% 0 oQ Nores Step 3 _ _ Step 3 7 U&4U 25.3 10.6 10.0% A.'PHASE LOAD INCLUDE PREVIOUS PHASES'LOAD. Step 4 Step 4 1U&3 35.6 10.3 9.8% S B.PHASE FLOWRATE INCLUDE PREVIOUS PHASES'FLOWRATES. Step 5 _ _ Step 5 1U&2 45.9 10.3 9.8% co Step 6 _ _ Step 6 3&4 55.9 10.1 9.5% z o 0 Step _ _ Step 1U,3&4 66.5 10.6 10.0% O L a Step 8 _ _ Step 8 1,2&3 77.0 10.6 10.0% Step 9 _ _ Step 9 1 U,2,3&4U 87.6 10.6 10.0% p Step 10 _ _ Step 10 1 U,2,3&4 98.8 11.2 10.6% Z Ste 11 _ _ Ste 11 1,2,3&4 W P P 105.4 6.7 6.3% Z O o� GENERALNOTES 1. J 1.REFRIGERATION CONTRACTOR TO COORDINATE STAGING PROGRAM CHANGES WITH NOVAR AFTER ALL MODIFICATIONS ARE COMPLETE. w m MODIFIED COMPRESSOR SCHEDULE-EXISTING RACK DTB '_ m Existing Design Conditions New Design Conditions General Specifications o' Required Load(MBH) 109.9 Required Load(MBH) 160.1 Refrigerant R-407a Available Compressor NRE(MBH) 119.0 Available Compressor NRE(MBH) 172.2 EMS Controller OEM NOVAR ISSUE BLOCK Suction Group Temperature(F) -23 Suction Group Temperature(F) -27 EXISTING COMPRESSOR INFORMATION Compressor Capacity as Entered Compressor NRE Comp.Capacity% Into Controller Minimum Capacity Comp.Position Model (MBH) of Load (MBH) Unloader QTY Unloader% (MBH) Notes 1 4C1385SL-4SU 20.9 19.0% VFD 8.78 2 *4C1761PL-2NU 26.2 23.8% 1 50 13.1 COMPRESSOR REPLACED 3 *4C2067PL-2NU 30.1 27.41/6 0 COMPRESSOR REPLACED 4 4B2707PL-2NU 41.8 38.0% 1 50 20.9 NEW COMPRESSOR INFORMATION Compressor Capacity as Entered Compressor NRE Comp.Capacity% Into Controller Minimum Capacity Comp.Position Model (MBH) of Load (MBH) Unloader QTY Unloader% (MBH) Notes 1 4C1385SL-4SU 20.0 12.5% VFD 8.78 2 *4GE-23Y-2NU 56.1 35.0% 1 50 28.1 A,B,C CHECKED BY: EJM 3 *4GE-23Y-2NU 56.1 35.0% 0 A,B,C DRAWN BY: JTC 4 4B2707PL-2NU 40.0 25.0% - 1 50 20.0 GENERALNOTES PROTO CYCLE: 04/26/2024 1.COMPRESSSOR MODIFICATIONS COORDINATED WITH HUSSMANN. DOCUMENT DATE:12/27/2024 NOTES A.NEW COMPRESSOR CAPACITY CONTROL METHOD B.REVISED COMPRESSOR CAPACITY CONTROL METHOD C.REVISED COMPRESSOR MODEL NUMBER D.NEWLY ADDED COMPRESSOR MODEL �V COMPRESSOR STAGING y EXISTING COMPRESSOR STAGING NEW COMPRESSOR STAGING(Up to 110%of Load) �O 41742 Step%Relative to I CAPACITY CAPACITY STEP CAPACITY CAPACITY STEP Available Compressor Staging Compressors On (MBH) (MBH) Compressor Staging Compressors On (MBH) (MBH) Compressor NRE Notes Step 1 Step 1 1U 17.2 17.2 10.0% Step 2 Step 2 1 U&4U 33.8 16.6 9.60/6 Step 3 _ _ _ Step 3 1 U&4 50.8 17.0 9.9% Step 4 _ _ _ Step 4 1 U&2 67.9 17.1 9.9% Step 5 _ _ _ Step 5 1 U,2&4U 84.9 17.0 9.91/6 Step 6 _ _ _ Step 6 1 U,2U&3 101.9 17.1 9.91/6 Step 7 _ _ _ Step 7 1,2&4 116.1 14.2 8.20/6 Step 8 _ _ _ Step 8 2,3&4U 132.2 16.1 9.30/6 Step 9 _ _ _ Step 9 1 U,2,3&4U 149.0 16.8 9.70/6 Step 10 _ _ _ Step 10 1U,2,3&4 161.0 12.0 7.01/6 Step 11 Step 11 1,2,3&4 172.2 11.2 6.5% GENERALNOTES 1.REFRIGERATION CONTRACTOR TO COORDINATE STAGING PROGRAM CHANGES WITH NOVAR AFTER ALL MODIFICATIONS ARE COMPLETE. REFRIGERATION SCHEDULES SHEET' R2.1 RETURN LINE SUPPLY LINE OPTION 1: HIDDEN PIPING SUPPORT OPTION 2: VISIBLE PIPING SUPPORT TYPICAL SUCTION LINE INSULATION(TYP) TYPICAL INSULATION INSULATION I LIQUID I LNE I >m o I I Q OWNER FURNISHED FIELD INSTALLED LL wN H'a o`rcwy H€�' 1/4"FLARE ACCESS PORT. I I I UNISTRUT REFER TO ARCHITECTURAL OWNER FURNISHED FIELD INSTALLED 650 PSIG I I I I I IQo BawNoo Wao N; DETAIL FOR INSTALLATION SERVICE PRESSURE RELIEF VALVE ON ROOF. _ _ I I I OF MANUFACTURED METAL =_= LOCATE VALVE AT LEAST 20 FT FROM ANY RTU, 0 -- - -- -- - - 1 i I UNISTRUT CURB,INSULATION,AND AHU OR EXHAUST FAN.MOUNT VERTICALLY. SHEET METAL ENCLOSURE �� CONNECTS TO RACK VIA BOLT(TYP) — I1 3/8"CHARGING HOSE. I I 1 O r CAP WHEN NOT IN USE. PROVIDE 3/8"COPPER I I SUPPORT PIPING ON ROOF. I I ( 1 I I I I BUTT INSULATION AGIANST I I I 4A PIPING FROM CO2 11 REFER TO REFRIGERATION I I 1 I I PROVIDE 3/8"FLARE I 1 I I o a CHARGING STATION PIPING SUPPORT DETAIL. PIPE SUPPORT,AND SEAL I I BOLT MALE CONNECTION. I APPLY EXPANDING FOAM TO I I m TO RACK. CONNECTION SHALL BE INSULATION AT EDGE OF CLAMPS AND COVER WITH ROOF OPENING TO I m; EQUAL TO OR HIGHER COUPLING. INSULATION IN A CLEAN AND I I I I I (?w ACCOMMODATE THAN THE TOP MOST REFRIGERANT RETURN (TYPICAL OF OPTION 2) WORKMAN LIKE MANNER. I I REFRIGERATION PIPING AND SIGHT GLASS ON THE LINES SPACED 8"O.C. TYPICAL OF ELECTRICAL CONDUIT.REFER CO2 VESSEL. MOUNTED ON UNISTRUT I TO ARCH ANAD REFRIG PLANS. I ¢ (TYP) REFRIGERANT SUCTION NOTE:OWNER FURNISHED CHARGING STATION LINES SPACED 8"O.C. 4 EQUIPMENT SHIPED LOOSE BY REFRIGERATION 020"THICK PVC JACKET FOR ALL ELEVATION MOUNTED ON UNISTRUT z W VERTICAL PIPING RACK EQUIPMENT MANUFACTURER. REFRIGERATION LINES EXTERIOR KLO-SHURE 7-SERIES (TYP) BUTT INSULATION AGIANST PIPE U SUPPORT.REFER RE BUILDING(TYPICAL) STRUT MOUNTED SUPPORT,AND SEAL INSULATION AT TO VERTICAL PIPE SUPPORT.REFER TO COUPLING FOR ELEVATION EDGE OF COUPLING. REFRIGERANT LINE HORIZONTAL REFRIGERANT NOTE:CONNECT SYSTEM AND REFRIGERANT TANKS TO EXPOSED PIPING.(TYP) .020"THICK PVC JACKET FOR ALL (TYPICAL OF OPTION 2) a SUPPORT DETAIL LINE SUPPORT DETAIL CHARGING STATION WITH HEAVY DUN REFRIGERATION LINES EXTERIOR 2 P VACUUM/PRESSURE REFRIGERATION HOSES RATED TO BUILDING(TYPICAL) OWNER FURNISHED FIELD INSTALLED 800 PSIG FOR A MINIMUM BURST PRESSURE RATING OF 4000 PSIG. #022 CUSH-A CLAMP KLO-SHURE 7-SERIES U DISCHARGE PRESSURE GAUGE. FIRMLY CLAMPED TO PIPE. STRUT MOUNTED O O NOTE:VALVE STATIONS MUST BE RETURN SUPPLY (TYPICAL OF OPTION 1) COUPLING FOR INSTALL OWNER FURNISHED SPORLAN EBV VALVE.REFER TO CO2 VALVE ORIENTED WITH INTERNAL CHECK LINE o LINE O EXPOSED PIPING. PROVIDE RIGID PVC SIGN WITH STATIONS DETAIL. VALVE ALLOWING FLOW AWAY FROM PIPING INSULATION (TYPICAL OF OPTION 2) O O \ PRINT TEXT,MINIMUM 2"TEXT (BEYOND) HEIGHT.SIGN SHALL BE LOCATED OWNER FURNISHED FIELD INSTALLED 1/4"FLARE ACCESS PORT. THE FILTER DRIER AND TO THE LIQUID NEXT TO THE CO2 CHARGING PRESSURE RELEIF VALVE ON FOOF. SUCTION LINE LINE m OWNER FURNISHED FIELD INSTALLED REPLACEABLE CORE FILTER �� ^ o p STATION AND READ:"DO NOT DRIER WITH 1/4"FLARE SERVICE PORT AT CHARGING STATION. 7 TRAP LIQUID BY CLOSING NOTE:DO NOT TRAP LIQUID BV L O CHARGING STATION AND RACK OWNER FURNISHED FIELD INSTALLED 3/8"ISOLATION BALL VALVE(TYP) CLOSING CHARGING STATION O ^ O Lo 0- ISOLATION VALVES WHEN AND RACK ISOLATION VALVES SERVICING.ALWAYS VACUUM PROVIDE 3/8"FLARE MALE CONNECTION.CAP WHEN NOT IN USE. WHEN SERVICING.ALWAYS CHARGING LINE AFTER 1 5/8"x1 5/8"GALVANIZED VACUUM CHARGING LINE AFTER O CHARGING IS COMPLETE" CONNECTS TO CO2 RERIGERATION CYLINDERS VIA 3/8" UNISTRUT P-1000,10'-0" CHARGING IS COMPLETE. PLAN (n Z CHARGING HOSE.MOUNT EQUIPMENT TO TERMINATE AT 72"AFF. MAXIMUM ON CENTERS VV W N USE BOLLARD OR FENCING TO PROTECT CHARGING STATION.DO NOT BLOCK VALVE OR NOTE:MAINTAIN TIGHT SPACING BETWEEN PIPING 1 5/8"x1 5/8"GALVANIZED Z O CONNECTION ACCESS.ALLOW ADEQUATE SPACE TO POSITION CHARGING TANKS/SYSTEM. PLAN UNISTRUT P-1000,10'-0" 0 NOTE:MAINTAIN TIGHT SPACING BETWEEN PIPING MAXIMUM ON CENTERS ^ , g10yREMOTE CO2 CHARGING STATION D UNISTRUT PIPING SUPPORT DETAIL (SECONDARY)NTS ($ UNISTRUT PIPING SUPPORT DETAIL (DX)NTS LLL^^^QLLL/// w DROP BRANCH INTO TOP OF RETURN MAIN z LINE.REF CO2 PIPING DETAILS MAIN LIQUID SUPPLY LINE EXTERNAL CHECK VALVE INTERNAL CHECK VALVE(SPORLAN MODEL EBV-- MAIN TWO-PHASE RETURN LINE ALLOWABLE IN LINES 1 1/8"AND SMALLER) INSTALL ONE VALVE INSTALL ONE VALVE ISSUE BLOCK STATION PER CIRCUIT AND STATION PER CIRCUIT AND AT OTHER LOCATION(S) AT OTHER LOCATION(S) SPECIFIED ON PLANS SPECIFIED ON PLANS INSIDECOMPONENTS SUCTION LINE TO RACK DASHED LINES ARE FROM SYSTEM TO SYSTEM INSTALL CIRCUIT RETURN VALVE ON TOP U CASES WHERE POSSIBLE SYSTEM TO SYSTEM ADJUST LOCATION OF DROPS AS REQUIRED TYP FACTORY-ASSEMBLED. FROM ROUTE SUPPLY AND RETURN HEADERS NORMAL f + } 0 CUSH-A-CLAMP FIRMLY INSULATION STATION.REFER TO CO2 VALVE FePalceenHi BALL VALVE WITH RUN CONDUIT ON OW(TYP) �� INTEGRATED CLAMPED TO PIPE(TYP) STATIONS DETAIL �� UNISTRUT AS 1"EXPANDED POLYSTYRENE OR EQUAL O� Ol PRESSURE RELIEF I I I I � I � NEEDED REFRIGERATION PIPING LIQUID LINE FROM RACK (TYP) (TYP) INSTALL CIRCUIT SUPPLY VALVE STATION.REFER TO CO2 VALVE 6"MINIMUM WIDTH.LENGTH UNISTRUT STATIONS DETAIL I I I I DURA-BLOK DB6-SERIES OR PROVIDE NORMALLY AS REQUIRED TYP i 1 P-1000(TYP.) EQUIVALENT CHANNEL 1 OPEN FULL PORT BALL L_____ J L_____ _J L__ _ __J L__ SUPPORT.(TYP) ® VALVE WITH INTEGRAL WHERE APPLICABLE REFER TO SPECIFICATIONS SCHRADER VALVE IN FOR PIPING SUPPORT AN ACCESSIBLE REAR HALF OF F TO CASE/EVAPORATOR FROM CASE/EVAPORATOR TO CASE/EVAPORATOR FROM CASE/EVAPORATOR O O LOCATION.ENSURE REFRIGERATED CASE REFRIGERATION CASE MANUFACTURER SPACING REQUIREMENTS. SCHRADER VALVE IS DESIGNATED FOR TO PROVIDE CASES WITH TOP FED PIPING SUPPLY VALVE RETURN VALVE SUPPLY VALVE RETURN VALVE NOT ATTACH BLOCK TO ROOF. . ORIENTATED AS PIPING AND VALVES. LlCONNECTIONS,FACTORY INSTALLED STATION STATION STATION STATION N PROVIDE 60 MIL WHITE TPO SHOWN.PROVIDE —_ _ _ _ _ _ _ _ _ _ _ _ _ _ SUPPLY SOLENOID VALVE,AND NSF MEMBRANE SET ON BARE INSULATION FOR BOTH INSULATION FOR EACH CASE.REF FRONT HALF OF PROVIDE INSULATION THAT COMPLETELY ENCAPSULATES ALL SURFACES.REFER TO g ROOF MEMBRANE VALVES.DO NOTTRAP SPECIFICATIONS. SPECIFICATIONS. CHECKED BY: EJM LIQUID BY CLOSING REFRIGERATED CASE LOOP AND CASE DESIGNATED FOR ROOF MEMBRANE ISOLATION VALVES ELECTRICAL AND BAS VALVE STATIONS MUST BE ORIENTED WITH CHECK VALVE(INTERNAL OR EXTERNAL) DRAWN BY: JTC z_ WHEN SERVICING. COMPONENTS. ALLOWING FLOW AWAY FROM UNIT COOLER AND BACK TO RACK SYSTEM. PROTO CYCLE: 04/26/2024 SIDE VIEW SECTION VIEW CO2 VALVE STATIONS FURNISHED BY REFRIGERATION RACK EQUIPMENT MANUFACTURERAND INSTALLED BY REFRIGERATION CONTRACTOR. DOCUMENT DATE:12/27/2024 REFRIGERATION 26 GAUGE SHEET METAL DRIP SPACE AT 4'INTERVALS TYP PAN WITH MASTIC COATING (D�REFRIGERATION PIPING SUPPORT (ON ROOF) ISOLATION VALVES �SECONDARY CO2 CASE PIPING SECONDARY CO2 VALVE STATIONS V NTS J NTS 4 NTS OPTION 1: VERTICAL REFRIGERATION PIPING MOUNTED TO WALL OPTION 2:VERTICAL REFRIGERATION PIPING SUSPENDED VIA HANGERS 2 �O 41142 INSTALL INVERTED I/2/la7 P-TRAP AT TOP OF ALL SECONDARY GLYCOL RETURN TOP BEAM SECONDAY CO2 RETURN RISERS CLAMP(TYP) REFER TO HORIZONTAL (TYP) THREADED REFRIGERANT LINE SECONDARY GLYCOL SUPPLY ROD(TYP) SUPPORT DETAIL.(TYP) SECONDARY CO2 RETURN MAXIMUM 12"BETWEEN 12" (TYP OF 2) HIGHEST PIPING JOINT AND MAX SECURE ALL VERTICAL INVERTED HORIZONTAL UNISTRUT. J/ 1/2"RETAINING THREADED ROD REFRIGERATION PIPING TO SUCTION LINE SECONDARY CO2 SUPPLY BOLT TO WALL STUD ONLY (TYP) NUT,UNISTRUT UNISTRUT MOUNTED THE WALL TRAP TOP OF SUCTION (TYP OF 2) P4010T OR SECURED VIA HANGERS.REFER LINE RISER(TYP) " TO VERTICAL REFRIGERATION LINE REFER TO UNISTRUT SQUARE WASHER, SUPPORT DETAIL.(TYP) PIPING SUPPORT DETAIL UNISTRUT P1064 SECONDARY CO2 RETURN (TYP OF 2) SUCTION LINE(TYP) SECONDARY CO2 SUPPLY REFER TO UNISTRUT (TYP OF 2) REFER TO ARCHITECTURAL SUPPORT PIPING ON INTERMEDIATE SUCTION LINE TRAP IN PIPING SUPPORT DETAIL DETAIL FOR INSTALLATION OF ROOF FOR ADEQUATE WALL,VOID SPACE,OR HIDDEN FROM MANUFACTURED METAL SLOPE AND SPACING. VIEW.INTERMEDIATE TRAP SHOULD BE LIQUID CURB,INSULATION,AND PLACED AT THE MIDPOINT OF ANY LINE(TYP) SHEET METAL ENCLOSURE SUCTION LINE RISE WHICH EXCEEDS 16 ROOF OPENING TO FEET OR PLACED AT THE HIGHEST INSTALL VERTICAL PIPING AS ACCOMMODATE BOTH POINT THAT IS HIDDEN FROM VIEW. COMPLETELY SELF-SUPPORTING REFRIGERATION PIPING AND ELECTRICAL BEFORE CONNECTING TO OTHER CONDUIT CONSTRUCT INTERMEDIATE PIPING. SUPPORT ROD SUCTION LINE TRAPS FROM SECONDARY GLYCOL RETURN (TYP) PRE-MANUFACTURED TRAPS. (TYP) SECONDARY GLYCOL SUPPLY T-0"WIDE,18 GAUGE REFER TO LINE RACKING BEHIND SHEET METAL DRAIN PAN REFRIGERATED CASES DETAIL WITH INTERNAL MASTIC OR VERTICAL FACE PIPING 12" REFRIGERATION MAXIMUM 12"BETWEEN VERTICAL PIPING SHALL COATING SUPPORT DETAIL. MAX REDUCE RISER LOW EST PIPING JOINT AND BE SQUARE WITH PIPE SUPPORT REFER TO PROVIDE A 3/4"PVC DRAIN FOR ANY PIPE SIZE AFTER HORIZONTAL UNISTRUT. FLOOR.(TYP) DETAILS HORIZONTAL REFRIGERANT PENETRATION WHOSE WIDTH IS 16"-24". BASE TRAP (TYP) LINE SUPPORT DETAIL PROVIDE A 1'PVC DRAIN FOR ANY PENETRATION WHOSE WIDTH IS 30"-36", AND PROVIDE A 1 1/2"PVC DRAIN FOR ANY PENETRATIONS WHOSE WIDTH IS SUCTION LINE TRAP GREATER THAN 36".SLOPE PVC DRAIN AT THE BASE OF LINE 1/8"PER 12"AND TERMINATE OVER THE RISER AT ALL UNISTRUT POST BASE P1887. DRAIN WITH 2"AIR GAP. POINTS WHERE TYP. SUCTION LINES RISES. INTERMEDIATE C3)�ROOF PENETRATION (SINGLE CIRCUIT, SECONDARY) SUCTION LINE TRAP VERTICAL REFRIGERANT LINE SUPPORT (SECONDARY) r��3 NTS 2 NTS NTS INSTALL SUPPLY AND RETURN VALVE STATIONS PER CIRCUIT.REFER TO CO2 VALVE STATIONS DETAIL. INSTALL SUPPLY SOLENOID VALVE PER COIL, INVERTED TRAP CO2 FURNISHED BY REFRIGERATION OEM.ELECTRICAL RETURN LINES.RE F CO2 TERMINATIONS BY THE REFRIGERATION CONTRACTOR. SECONDARY PIPING DETAILS. Z SUPPLY DRILL HOLE IN COOLER/FREEZER BOX WALLS,CENTER PIPE g j—RETURN INSULATION PIPE IN OPENING,AND SEAL WITH EXPANDING FOAM. w F� wgz3?P TWO-PHASE AFTER FOAM CURES,TRIM FLUSH TO PANEL.BUTT RETURN MAIN EXPANDING INSULATION TO THE BOUNDARY OF BOX PENETRATION. pTWO-PH rcr 3t°g��w °3m RETURNASE RISER FOAM TOPS OF BOLT FOAM SEAL WHERE INSULATION BUTTS AGAINST THE PANEL ZED.— AND AROUND PERIMETER OF INSULATION TO CREATE ow PENETRATIONS.TYP g � VAPOR BARRIER.TYP OF ALL PIPE PENETRATIONS p: v THROUGH BOX WALL. TOP OF BOX INSULATED WALL a m �a8o-1s �=g SUPPORT EVAPORATORS WITH SILICONE SEALANT SUPPLY RETURN INSTALL WALK-IN RETURN VALVE STATION. LIQUID SUPPLY A TWO-PHASE RETURN LINES SHALL BOLTS THRU CEILING PANEL TO REFER TO CO2 VALVE STATIONS DETAIL. MAIN HAVE AN INVERTED TRAP 1 5/8"X 1 5/8"X 10 FT.LONG 14 HOLE DIAMETER V GREATER THAN PIPE DROP TO TOP OF BOX. GAUGE.GALVANIZED UNISTRUT SECONDARY OR CONDENSATE PIPE REF CO2 SECONDARY INVERTED P-TRAP SAME SPANNING THREE FAN/COIL UNIT DETAIL SIZE AS VERTICAL RISER COOLER/FREEZER CEILING §o PANELS.PROVIDE DOUBLE NUTS _--^r_ MOUNT COIL ACCORDING TO ON EACH BOLT.(TYP) UNIT MANUFACTURER'S RECOMMENDATIONS.(TYP) w v m;A SEAL AROUND BOLT SERVICE ACCESS VALVE INSTALL WALK-IN SUPPLY 8 PENETRATIONS THRU UNION VALVE STATION.REFER TO RETURN FROM LAST COIL. F du COOLER/FREEZER BOX WALLS COPPER TO PVC CONNECTION OUTSIDE OF WALL CO2 VALVE STATIONS DETAIL Z r TRANSITION TO DRAIN PAN SMALLER PIPE SIZE OR CEILINGS WITH BACKER AS REQUIRED.INSULATE COPPER PIPE OUTSIDE TOP OF BOX i ROD AND SEALANT.(TYP) COOLER WALL PER SPECIFICATIONS N =W LIQUID SUPPLY SUPPLY TO FIRST COIL. Z BRANCH U TRAP INSTALL SUPPLY SOLENOID PROVIDE COPPER CONDENSATE DRAIN VALVE PER COIL. PIPING FULL SIZE OF COIL DRAIN PAN REFERENCE EVAPORATOR COIL LIQUID SUPPLY LINES BRANCHING TRANSITION SHOULD BE DONE JUST PRIOR TO ELBOW AT CONNECTION AND SLOPE il8"PER 12" CONDENSATE PIPING DETAIL x THE BOTTOM OF THE RISER.DO NOT PROVIDE A P-TRAP AT TOWARD DRAIN OR HEADER. FAN/COIL UNIT 2 FROM THE MAIN MUST EXIT FROM THE BOTTOM OF RISER.PROVIDE AN INVERTED P-TRAP AT O THE SIDE OF THE MAIN RISER TRANSITION TO HORIZONTAL. SECONDARY CO2 PIPING DETAILS SECONDARY CO2 COOLING FAN-COIL UNIT SECONDARY CO2 COOLING FAN-COIL PIPING � Q 0 NTS 7 NTS V NTS Z 0 O K O Lo n a WALK-INS WITH TEMPERATURES WALK-INS WITH TEMPERATURES M ° ABOVE OR BELOW FREEZING BELOW FREEZING n ZLU EXIT WALK-IN AS SOON AS WHEN HEADER CANNOT `7J O POSSIBLE AND RUN HEADER USE COPPER PIPING WITH RUN ALONG BOX EXTERIOR L ALONG EXTERIOR OF BOX. ELECTRIC HEAT TRACE AND USE ELECTRIC HEAT TRACE AND W INSULATION ON CONDENSATE LINES INSULATION ON CONDENSATE J EXPOSED TO FREEZING AND WHEN LINES EXPOSED TO FREEZING AND A/ COPPER PIPING WHEN OTHERWISE NOTED.TYP LL FOR ALL INDIVIDUAL OTHERWISE NOTED.TYP DRAINS.TYP INSTALL TRAP AT EACH EACH INDIVIDUAL w INDIVIDUAL DRAIN m UPSTREAM OF HEADER. EVAPORATOR DRAIN MUST CONNECT DIRECTLY TO TERMINATE CONDENSATE DRAIN TYP HEADER.TYP OVER HUB DRAIN OR SERVICE m TERMINATE CONDENSATE DRAIN SINK WITH AIR GAP.INSTALL OVER HUB DRAIN OR SERVICE TRAP UPSTREAM OF HUB DRAIN SINK WITH AIR GAP.INSTALL OR SERVICE SINK.TYP TRAP UPSTREAM OF HUB DRAIN TERMINATE INDIVIDUAL COPPER DRAINS TO2" OR SERVICE SINK.TYP UTILIZE A UNION AT COPPER TO ISSUE BLOCK COMMON PVC HEADER AND MAINTAIN SLOPE TERMINATE COPPER DRAINS TO PVC TRANSITION.INSULATE OF 1/8"PER 12"TOWARD DRAIN.UTILIZE A DIRECT COORDINATE HEADERS COMMON COPPER HEADER ONE COPPER PIPE OUTSIDE WALK-IN UNION AT ALL COPPER TO PVC TRANSITIONS. CONNECTION TO WITH FIXTURES AND SIZE LARGER THAN COIL DRAIN COORDINATE HEADERS WITH WALL PER SPECIFICATIONS INSULATE COPPER PIPE OUTSIDE WALK-IN HEADER.TYP EQUIPMENT OUTSIDE AND MAINTAIN SLOPE OF 1/8"PER 12" FIXTURES AND EQUIPMENT WALL PER SPECIFICATIONS WALK-IN BOX.TYP TOWARD DRAIN. INSIDE WALK-IN BOX.TYP CONDENSATE DRAINS SERVING WALK-INS WITH TEMPERATURES REFER TO ARCHITECTURAL I� SUPPORT PIPING ON MULTIPLE WALK-INS ABOVE FREEZING DETAIL FOR INSTALLATION ROOF FOR ADEQUATE OF MANUFACTURED METAL — SLOPE AND SPACING. WHEN HEADER CANNOT WHEN HEADER CANNOT CURB,INSULATION,AND I I RUN ALONG BOX EXTERIOR RUN ALONG BOX EXTERIOR SHEET METAL ENCLOSURE I I ROOF OPENING TO USE 2"COMMON PVC HEADER I I ACCOMMODATE BOTH AND MAINTAIN SLOPE OF 1I8" I I REFRIGERATION PIPING BELOW FREEZING ABOVE FREEZING PER 12"TOWARD DRAIN. COORDINATE HEADERS WITH AND ELECTRICAL FIXTURES AND EQUIPMENT CONDUIT EACH INDIVIDUAL EVAPORATOR INSIDE WALK-IN BOX.TYP SUPPORT ROD DRAIN MUST CONNECT REF WALK-INS WITH mt DIRECTLY TO HEADER.TYP TERMINATE CONDENSATE DRAIN (TYP) BELOW FREEZING REF WALK-INS WITH OVER HUB DRAIN OR SERVICE 2'-0"WIDE,18 GAUGE PLAN VIEW. TEMPERATURES PROVIDE D SINK WITH AIR GAP.INSTALL WITH MSHEET ITERNALETAL D MASTIC RAIN N ABOVE FREEZING CLEANOUT FOR TRAP UPSTREAM OF HUB DRAIN COATING PLAN VIEW. ALL HEADERS.TYP OR SERVICE SINK.TYP CHECKED BY: EJM PIPE SUPPORT.REFER TO PROVIDE A 3/4"PVC DRAIN FOR ANY HORIZONTAL REFRIGERANT PENETRATION WHOSE WIDTH IS 16"-24". LINE SUPPORT DETAIL PROVIDE A 1'PVC DRAIN FOR ANY DRAWN BY: JTC PROVIDE RUNNING TRAP FOR INTERIOR CONDENSATE HEADERS PROVIDE TRAP UPSTREAM TERMINATE COPPER DRAINS TO 2,0"MAX. PENETRATION WHOSE WIDTH IS 30"-36", pROTO CYCLE: 04/26/2024 OF INDIRECT CONNECTION COMMON PVC HEADER.UTILIZE AAND PROVIDE A 1 1/2"PVC DRAIN FOR RUNNING BETWEEN MULTIPLE WALK-INS OPERATING AT FROM COPPER TO PVC. UNION AT ALL COPPER TO PVC ANY PENETRATIONS WHOSE WIDTH IS TEMPERATURES ABOVE FREEZING.IF A CONDENSATE PIPE TRANSITIONS.TYP AL GREATER THAN 36".SLOPE PVC DRAIN DOCUMENT DATE:12/27/2024 FROM ONE WALK-IN MUST BE ROUTED THROUGH A WALK-IN LINE 1/8"PER 12"AND TERMINATE OVER EXPOSED TO FREEZING TEMPERATURES,USE A SEPARATE DRAIN WITH 2"AIR GAP. DEDICATED CONDENSATE PIPE FOR EACH WALK-IN. PROVIDE NEW CONDENSATE PIPING,REFER TO SPECIFICATIONS 15600.SUPPORT WITH STRUT AND CLAMPS OR SPLIT RING CLAMPS WITH STAND-OFFS.REFERTO SPECIFICATIONS 15050. UNIT COOLER COIL CONDENSATE PIPING DOUBLE SUCTION RISER ROOF PENETRATION J NTS 4 NTS y TOP CHORD OF JOISTO 4D42 / MAX TOP BEAM ROOF MAX BETWEEN CLAMP(TYP.) BETWEEN REFRIGERATED CASES BETWEEN REFRIGERATED CASE AND WALL = REFRIGERATED = CASES WALL i LOADS MUST BE HUNG WITHIN 3" THREADED OF PANEL POINTS ROD TYP BOTTOM OFUR STRUCTET UP TO 8'-0"POST: PROCEDURE FOR PATCHING HOLES: ELECTRICAL CONDUITS P1000 INSUGUARD OR COOPER B-LINE 1.ATTACH 26 GAUGE GALVANIZED SHEET METAL TRIM TO BOTTOM OF HOLE AND MOUNTED ON UNISTRUT PARTIALLY TRIM TOP OF HOLE LEAVING 1"GAP AT TOP FOR EXPANDING FOAM SNAP N'SHIELD PIPE SADDLE SEALANT FILL. SECURED TO UNISTRUT.MATCH REFER TO UNISTRUT DO NOT ATTACH COLOR OF INSULATION.(TYP) 2.FILL OPENING WITH EXPANDING FOAM SEALANT,LET EXPAND AND CURE AND PIPING SUPPORT DETAIL UNISTRUT TO CASE TRIM EXCESS FOAM FROM FILL OPENING. 3.SEAL ALL EDGES AND EXPANDING FOAM SEALANT OPENING WITH SILICONE ANCHOR WITHIN 0'-6"OF 1/2"RETAINING SEALANT. EACH END OF UNISTRUT. NUT,UNISTRUT MAXIMUM ANCHOR P1010T PIPING O 4.VERIFY SPECIFIC APPLICATION WITH THE WALK-IN PANEL MANUFACTURER. SPACING NOT TO INSULATION O SEAL FILL OPENING EXCEED 8'. SQUARE WASHER, WITH SILICONE UNSISTRUT P1064 O O EXPANDING FOAM :j ________ _____ __ SEALANT(TYP.) ill"CHANNEL REFER TO UNISTRUT REFRIGERATION NUT WITH NOTE:FOR OVERHEAD LINES,UNISTRUT HORIZONTAL,TRAPEZE HUNG ATTACH PATCH WITH#8X3/4 HEX SEAL PATCH WITH PIPING TO UNISTRUT TDETAIL DETAILS SPRING, HEAD SELF TAPPING SCREWS(TYP.) FREEZER/COOLER UNISTRUT P1010 SILICONE(TYP.) 1 UNISTRUT 5/8"GALVANIZED BOX CEILING OR SECURE UNISTRUT BY UNISTRUT S,T-, MA MAXIMUM PATCH HOLE WITH 26 GAUGE WALL SECURE UNISTRUT BY BOLTING BOLTING TO WALL STUD ON CENTERS,OW MAXIMUM GALVANIZED SHEET METAL BRACKET TO FLOOR ONLY UNISTRUT POST P1887. ONLY. FROM ANY ELBOW. TRIM(TOP AND BOTTOM) HORIZONTAL REFRIGERANT LINE SUPPORT COOLER/FREEZER BOX PENETRATION PLUG rj_-�PIPE MOUNTING BEHIND REFRIGERATED CASES J NTS L NTS NTS SHEET T R3.1 Sorel Cusl: uperceMer OEM Hill PHOENIX EMS Manufeclurer NNer Location: ng n, inR n Plrone# 80068554]5 Rack EMS Model#RC2XE LTA Quota/Job: 5-5reps Y: kevlM Model No: P-HAD Pmlo Slip: 150 Hybitl House 105Amb 06-2009 pale &25 Wb Eg1IPmenl Type:LTA Hy...House Field Connection: See remde manildd Rack Vdlage: 460/60/3 460V Mein Pwr Trenabnner Rev, Date BY OesMpWn Powrer 46Ng013 NIA COMrd Vdla9e (KVA) 2 12&2025 q 208reW1 ]5 MCA 214A WA MOPD 225 WA gereM Ypa: Ri07A Cm.enser Mcdd# 13--A014J-WNi-BG w h T.D. �✓%re O Fen RPM 830 Coekd(YM) V lac qe 1 Reclaim qw Receiver SUbNoler N g M.u w w OLL E .D. 11M Rn Specn g(FPU 10 Manfold Siu 13re' Wde 11 L Wek:r ine siu from receiver O]IB" r bd.n H.- a gr otlel B1oTao FlA g.8 tic. eggs r WA superheating or u u at Manibld 1-1re" ie.x eng H1- EGA SuI,-b,-,(-H) ani� MOPD 15 Mein Condenser Suppty 1-1re' Heal ExcM1anger Mold# AC30-4 GPM frier DCR-967 Lbs.M00%PUm 1- 205 S.G.25U b,Loatl(MBH) 0 Weigh(lb.) 630 Heal Redalm Valve EVR22S8 Sightglass SA-17S ontlenser 1boding-M1 10 Told SUbmder Load(MBH) 28.6 a 3t g n ¢oa VFD -102-P41-d-P55 System GPM 4 Main Cond.Return 1I8" Rack&Cond.Rd.Cha 156 Sal Suct Tem °F) 35 n r y 0 a p w y r€p Salenoitl 1 EVR18 0Mbd 1�AVR18N0] WA q Rear�gN�il Sepambr OSA4-0]-RES lad.Valve Fmm 1-118'DRwd e9Usaur ABAOE/]EPX]BCC Rergever Pre..ud7a0on A9-R OM1u C B ^Ion Valve#r Model Subwd-9EIa.5 3 LL<w g w a LL O w 0 0 zQ IaDI.VeNe To ]OT]IB' WA ren YP. CPI BVASoIea[LT-32 Ylassa re EVR18N0] x pera0n9 ree 450k F�anslon Valve WA H i w; ii 3 a w y o IaDI.Valve Fmm ]IB-]IB" WA Oil QOaenliel VeNa Y12% d igu o rwi ve WAn?w r o O y o p ; Liq.i,1 rwi ve WA d H. Hig mup Un egwremenb Nan roup yarem pe ipin9 Rw Suction Ddrost SubNoler EPR VeNe PORTI9 �e 55 egwre u INI7 Net 1-g EB.d Av 1-(MBH) 1%.4 ]IB- 1d'8' None I"I. CDr.ansing Temp.(°F) 107 9 111.3% 1A S.d ON Riw, None 1a18' None Isol.Veive From 1-ire' Design Amb'rent Temp(°F) 92 Tdel Heel of Rel.Nwn(-H) 1]S.fi Pere 71W fare' None Saluratetl Suction Temp(°F) -10 Sudlon Manibld$1. 2.1 N/A WA WA WA R.-Gas Temp(°F) 30 S.-Fllter BT 175V(1)WA WA WA WA SUbcooled Uquitl Temp(°F) % SUIXion Accumu.br A8-21 WA WA WA WA $uperbeat br NRE(°F) 10°F WA WA WA WA §o- ompressor ud mup t Po.Npn r Mol No. Min-, Vr b..., Un-% mper MBH dd R HMH Capty C.P-y w -2 1 4C077OSLdSU 10.7 15.5% 25J Vea AKD102-P11 KT4-21 8.05 22.23 0 100 3 17. 9 40 w c 3 2 YTES•12Y-2NU 30.8 38.m -No WA WA WA 1 50 12 17. - 1. 3 4C13055LiSU 27.5 29.0% d61 ND WA WA WA 0 1. 6 17. 16 % m z 3 m 4 4C1400PL-2NU 28A..0% d8A No WA WA WA 1 50 6 17. 13.5 75 - - 5 NIA WA WA WA WA NIA WA WA WA WA WA WA WA Q <a 6 NIA WA WA WA WA NIA WA WA WA WA WA WA WA 7 NIA WA WA WA WA WA WA WA WA WA WA WA WA 7 e NIA WA WA WA WA NIA WA WA WA WA WA WA WA N Z Nde.: O conaenserT.D.aemrea by a% .Ch b,,I.goutcompressar2wkh(1)4TE-12Y-2NU. .auction Manifold will...d to be-h dirom 2-i18"to 2d18". X li U 0o Q 00 � o (T - oo Sorel Qratow Wal-Mad 150-2009 HM1 Superc nler#3]57 OEM Hill PHOENIX EMSManu-1 Novar (1/u n R Loratlan: 4010172ntl Strad N E.A Pbane# BOfY685d475 Rack EMS Model k RC2XE `�U O n DTB Ouole IJob: 53385 Prepared By: kevind m T klpdel N. PS8131-1- 8 Prot Size: /n Dose Date: BYt�r2010 wpmeM YP.: n d Hdd- 0 Fie.Conn.Non: See remde manibld Rack Vafage: 4- f n Z LU Rev. DeM By. Revision Povi.r 480V Main Pvrt 480reW3 NIA COMrd Vdte9e TMnslonnx v w ry 3 129 15 TW en9eab regw 200?Al1 1 1i z 0 MCA 31d1 WA 0 � MOPD 350 WA 1�.kJr' Refdgerenl Type: R107A 1..V COMenser Model# BNL-0OB-A048i-WN -BG Fan RPM 830 Rn S (YM) V d Si Heat Retlaim quid Receiver Subcooler T.O. ifi.6 Fln Spacng FPI 10 Manfoltl Size 2-1re' Wdarlgir Water Line size from reNiver 1a18' OdenbBon Horrsanlal Heat ExcM1gr Motlel B80x40 FLA 19.8 uabr WA a ed ngw u esupe sal MenOo. 1518' H12x108 S.G.1 Subcooler Load(MBH) 13.6 W MORD 25 .........upp 2-1/8' t anger AC50-10 GPM Drier DCR-14411 awn 3]6$.G.2 Subwoler-d(MBH) 42.0 m W.igM(lb.) 21. Heel Reclaim Valve a EVR32S17 m t9 a.. SA-211 um^e r9e 43 Tabl Submpler Lead(MBH) - VFD AKD102-P15KT4-P21 Yatem GPM 10 Mein Gnd.RaWm 15I8' r9e 32]Sat SUIX Temp(°F) fi0 Z Pit %%50% WA x eq. 1 .p b- OS6-21-RES lad.Valve To 2-ire' e9u b AB1 B-11IBP%15IBC A/D Receiver Preeaudution A9-SIBPXSreCB Subcooler C.-Iler Motlel SUbwd-0-Mdic m Solerro. (1)EVR32513(1)EVR32519 WA Oil Resenroir WA Isd.Valve Fmm 2-1/8' gun ree g OE-13reP%13reC A/D u_D EVR25M511 S- ImI.VeNeTo 15I8'1dre" WA YP. CPI BVASoIed LT-32 EVR25N011 _0 x pere0n9 450# WA Isol.VeNe From 1-3I8'fare" WA OI DiOereMal VeNe Y12% RU na EVR%5 Rw WA Suction Group 1 Desgn Requirements 1-(Group 1 System Cepebiti0es SYctem Plqng Connections Uquitl Sudbn Ddresl Subwoler EPR Valve PORT]8 ISSUE BLOCK Thal Load Requiretl 1%.1 Nel Refdg ERecl Aveileb.(MBH) 1721 Loop lB wl Suct Mein Riser Ire' 2-11a" None I'll.VeNe To &8' co-,Temp.(°F) 107 % d R 107.fi%Loop 1B Suct Cd Riser Nane 1-Sr8" Nane Isol.VeNa Fmm 1-1re" Design Ambient Temp(°F) 92 Thal Heal of Re)eclbn M8H) 3%.0 Pare ]/6" 1-518" None Sabreted Suction Temp IT -27 I--Manibld Size 3-12"N/A IN. IWA NIA Rdum Gas Temp(°F) 1 30 au-Fifer I KM-I$V(1)NIA N IWA NIA Sub.-Liquid Temp IT) 1 75 -ion-urbu- 1 A10-25 jbvA NIA SupedeatforNRE(°F) I 10°F IN. IN. WA NIA mpe.... mup VFD Motlel No. Min.Vet. hex.Ver. Unbeder U^laader% HP RPM RW LRA -.n Compressor Motlel ERect(MBH)%di-d Reladion(MBH epe ) Cdg? Capeay Capacity 1 4C13055L45U 2e.0 180% 35.8 Ves AXD102-P181-1 8.78 24.24 0 1. 8 1750 16 00 2'40E43Y-2NU %.1 35.0% Wa No WA WA WA 1 % 23 17% W in 3'4GE-23Y-214U %A 35.0% 00.8 No WA WA WA 0 100 m 17% 32.1 1m 4 482707PL-2NU o.0 25.0% 70.6 No NIA WA NIA 50 13 26.5 14] 5 NIA WA WA WA WA NIA NIA NIA NIA WA NIA WA WA 6 NIA WA WA WA WA NIA NIA NIA NIA WA NIA WA WA 7 NIA WA WA WA WA NIA NIA NIA NIA WA NIA WA WA 8 NIA WA WA WA NIA NIA NIA NIA NIA WA NIA WA WA Ndea: 'Contlenaer TD.tleret.tl by- .Changing out compreamr 2 and compressor 3 with(2)4GE-23Y-2NU. .S.-Manifold will-d to be changed fmm 2-to 3-1re". CHECKED BY: mup Mn .guaem.nm uN- mup yamm spa f ydem �p�n9 a qm spdbn mhoat DRAWN BY: - 2- NM 1-g EXed Availabb(MBH) SO6A . 1-1I8' 2-1I8" Nan. COMendn9 Temp.(°F) 107 d e 9 vei 11V% pP 5'0" 1-1I8" None Ou._Air Temp CF) Q Tdd Heat of Relactbn(-H) ".600p None 1-SIB" None PROTO CYCLE: 04/26/2024 S-Rd Suction Temp(°F) 17 auction.-Id Siu --L..p 2BS Su. None ]re" None Rdum Gee Temp(°F) % Su-Fdbr -421 SV(2) rem Ire^ 1,Vw Nwe DOCUMENT DATE:12/27/2024 Subcooletl Uquitl Temp(°F) 75 Sudbn Acwmu.br Al-NIA NIA WA NIA SUp.-br NRE(°F) W-F NIA NIA WA NIA Compressor Suction-up2 Rdr9_ Condenser H-.f Varnble VFD Model No. Min.Var. Mu.Var. Unbader Unlcetler% HP RPM RI LRA P..id.n Compressor Model tbct(MBH) Re)edbn MBH Gapadly! Capacfy Capadly 1 4C1145-IJ fie.8 23.0% 83.7 Vea A-02-P151-NI 25.07 R.11 0 1. 5 17. 12.7 67 2 4C13055LdSU ]2.9 2'i.6% -4 No NIA WA NIA 1 50 6 17. 16 % 3 4C1460PL-2NU T/.8 29.5% 1%.6 No NIA WA NIA 0 1m 6 17. 13.5 75 4 4C1]fi1PL-2NU 90.9 35.8% 129.9 No NIA WA NIA 1 m 8 17. 16. 90 5 NIA WA WA WA WA NIA NIA NIA NIA WA N/A WA WA 6 NIA WA WA WA WA N/A NIA NIA NIA WA WA WA WA 7 NIA WA WA WA WA N/A NIA N/A NIA WA N/A WA WA e NIA WA WA WA WA NIA NIA N/A NIA WA N/A WA WA Nobs: FOR REFERENCE ONLY z wz aui� c�- }YmW Qm ipawLL=UQO KK inWFO� a r/iQ�rj Q>g SOU=ZUiiQ mmmF-gw�N mwa}Q'mwz rmwD3 �� warn ODUO� yw��w�NzO =o�,w Hsu ZmU3aawZW O'Ti OHFwz�mmw FzmmwlYN00 a Ow am�wIx<_- o wouaiZ O YZOfZ o QN 000HaUQUQ 2 ILwm=ZZOZO omwo3o-zow REFRIGERATION SUBMITTALS SHEET: R4 2E Refrigeration Existi Equipment New"SEC" Equipment Net Change New"SEC'RackCa New"SEC'%of Rack Store#Seq# City State Proto type New or Replace? Equipment Type Area Served Circuit Information Existing Rack Capacity Rack SST Load(MBX) %of Rack Capacity %of Store Capacity load Equipment Load (MBH) Wory Capacity (MBH) (MBH) 3757 1008 Arlington WA 150 Secondary CO2 New ZE Skin Wa4r-SEC-0O2-111040 RACK LTA-R407a 121.2 -12 115.2 94.7 78% low 3757 1008 Arington WA 150 Secondary CO2 Replace Ceses R. -in Fmzen Food(EOL) A2A10 972 80% 8% 1..0 10.8 89% 3757 1008 Arington WA 150 Secondary CO2 Replace Evep Seale.Freezer Al _ - 7.1 6% 1% 7.1 0.0 - 6% 6'SPACING 6 3757 1008 AAmgton WA 150 Secondary CO2 Replace Evap DeoF.—, All - - 10.9 9% 1% 10.9 0.0 - 9% 161NSTANCES MINIMUM RECOMMENDED SERVICE CLEARANCES 3757 1008 Adington WA 150 Secondary CO2 New ZE Skid WN7-SEC 02-1110460 RACK DT8-R407a 119.0 -23 109.9 _ _ _ _ 1W.1 135% F 1' 3757 1008 Aningtan WA 150 Secondary CO2 Rep.- —re Gmcary 1 I.C.Freezer BS,Be - - 81 51% 5% 61 0.0 51% I 3757 1008 Arington WA 150 Secondary CO2 RePere Ceses R—Mn Ice Cream(EOL) 44.1 37% 4% M.3 0.2 - 37% 1 �/�)rr w z i 3757 1008 Arington WA 150 Secondary CO2 Replace Ceses Ice Cream Cake Bunker(ADDED SCOPE) RCU-1 - - ].4 6% 1% 3.2 -4.2 - 3% ♦ " W t N F U~g 3 r 387,C t 36" 42" 0 E, 0 3'c``a wmoiOya€ I ~ 3Q3�A°NQos`aZa Za J OL a Q6H21W 152MS. CIRCUIT 1 I'DIA LIFT LUG m r m SUCTION IRRACK CIRCUIT1 ITYPIC.LL 41 2 d8'RACK LIOUID FROM RACK w 3 vw 005 F �� gam Q 7 — r CIRCUIT 2 001 LIOUID FROM RACK Z 71w ODS O U CO2 H�'� BIN--LL HINGED HINGED HINGED 2 LB-.i AC,L AOCE�'_ ACCESS ACCESS CNCUIT2 PANE. PANEL PANEL HM10E0 X $ UCTION TO RACK ACCESS d 2 sw DOS PANEL U r f ECU NOwFUSED O O DISCONNECT UNIT NON-FUSED C--D C a ELECTRICAL DISCONNECT O O i—1SM.COS PANEL PryWER ENTRY ECU 1 COS ACCESS V ]IR'Pkrg �J'� PANEL 00 � �J 0 O ?� O 18 22 hi: ___ }'FPT GRAIN REMOVABLE I— m I 1g 9Ha' I � � LU tow CATCH PAN �'1 1317l16' 1978' W N o z 0 TITLE: N N OOALI REV I3ED BY' WIE: REV.NO AJ' ®2-112"Rigging Holes . TNg""TC APPROVED 81 , APPROVED Y; ORAM1 er.CN 5/8" Mounting Holes Unit Drawing DAre rvgpg, FILE LOC a rrwwrto8w rs Ii Est.Shipping Weigh1:4.848# 1? A - WMT-SEC-0O2-1/10 IRIS-TITLE: DRAwnD Nuggnt < m Est.Operating Weight:5.848# WMT-0O2-1/10-460 z m 0 ISSUE BLOCK NOTES , r.i rrr.r.i cr D ■ �iar,Rt M""KE�rIE]c20 ri4�aM�T•w D... � -- - uu.fKCORK noes mrP.w..rNxrrw - D�,.Iw N. m DaorT' w'no, ■. . Y Y Y Y N.ake.la- Y° Y RM, . I,f_ Pz b b b I o�aca cD..Ta �va. I Y C o,r -1 A.„`I.`M°D•N„ b b I o„ ¢r"`.rt r.D 4.. I ■a,. g+,., 5 I O w•rvuD Nuoacc• I C.."ir.usa mna.cc• 1 L 1, p^wwDaw a._ G O CHECKED BY: - DRAWN BY: - PksP.�..r 4 a•V%c..aw. - O O PROTO CYCLE: 04/26/2024 - DOCUMENT DATE:12/27/2024 . � P6: II P,a roe N PaA - - - PZD v21 v22 v23 p2" FOR REFERENCE C ONLY P2a All z I 1 P2a Luz ° IL; D— LL mYmcD am C1UO�W U¢O ul qa QwFO�� ' uamWr0ll'�r~i1 h_14 —1-1-25 RFDa14 f�W a>¢m w z »- _ JW�mIpUy Z0 =O��w HQ ZmU Qaw?W RCp"14 RED•IB r RCDe10 RCCp,d eH]eld 0 W w 3 F N W Q m Z Z 00 m . ,.. OHFW—� W F zal�wW 102 - ¢OW amWSJ� �ZK,OW Z2� I_ I 1 "4+ OOU,�Kz OCZ QW u ::1 ?g"=Z0000 _ 000~QU¢U¢ Y Y Zawwga�ga� k W m w_ _rn 7 I l O=w 030z gFS ., N8 m P.aLKN�4 —.14 ■■■ REFRIGERATION 1 ,<, 4 SUBMITTALS mq e I I � 4w.i6i s o hu g b < Ploo SHEET' R4.1 THE MECHANICAL, ELECTRICAL, AND REFRIGERATION SYSTEMS FOR THIS PROJECT SHALL BE SEISMICALLY RESTRAINED. THIS SHEET DEPICTS SCHEMATIC INSTALLATION DETAILS AND IS FOR INFORMATIONAL PURPOSES ONLY. SPECIFIC INSTALLATION SEISMIC JOIST INFORMATION REGARDING SEISMIC RESTRAINT SHALL BE ATTACHMENT SEISMIC CABLE OBTAINED FROM THE SEISMIC RESTRAINT MANUFACTURER. HARDWARE TYR BRACE TYP 7 REFER TO THE SPECIFICATIONS FOR FURTHER INFORMATION. AIRCRAFT CABLE BY SEISMIC RESTRAINT ALLTHREAD MANUFACTURER ROD TYR ° t 45°t15° J g 3Q;�a° Qo€a / � Q=oaolW a =g a SEISMIC CABLE BRACE WITH HOOK EQUIPMENT ONLY SHOWN IN TWO DIRECTIONS FOR CLARITY.ADDITIONAL BRACING IS REQUIRED AS SHOWN IN PLAN VIEW BELOW. boa (?w q3 ~ du e 2 u 41 2 w O U X Q U LOCATION A O O 0 ocO 00 � ALL-DIRECTIONAL SEISMIC CABLE _ 0 z � ° �1 BRACE FOR SUSPENDED EQUIPMENT n NTS m m fll Z m SEISMIC JOIST SEISMIC JOIST 0 0 ATTACHMEN ATTACHMENT � J (/7 HARDWARE HARDWARE TYR SEISMIC JOIST SEISMIC CABLE ��ll ATTACHMENT BRACETYP HARDWARE SEISMIC JOIST ATTACHMENT SEISMIC SOLID HARDWARE TYR BRACE TYP Z ALLTHREAD SEISMIC CABLE ROD TYR SEISMIC BRACE TYR ALLTHREAD ROD SOLID BRACE ALLTHREAD ROD PIPE CLAMP PIPE CLAMP OR U-BOLT ISSUE BLOCK ALLTHREAD ROD OR U-BOLT SEISMICBSEISMIC RACE HOOK CABLE J STEEL BRACE J J 45°t15° J J TYR AIRCRAFT CABLE BY 45°315° SEISMIC RESTRAINT MANUFACTURER t SEISMIC CABLE BRACE WITH HOOK t J I ATTACHMENT ONLY SHOWN IN SEISMIC CABLE STEEL BRACE TRANSVERSE DIRECTION FOR CLARITY. BRACE HOOK TYP 45°±15° 45°i:15° ADDITIONAL BRACING IS REQUIRED AS / AIRCRAFT CABLE SEISMIC STEEL BRACE ONLY SHOWN IN SHOWN IN PLAN VIEW BELOW. 11 BY SEISMIC TRANSVERSE DIRECTION FOR CLARITY. TRAPEZE SUPPORT TRAPEZE SUPPORT ® O REST MANURESTFACTURER SHOWNNT IINP AL BRACING BELOW.IRED AS O PIPE CLAMP MAY BE ® - - ROTATED TO GAIN ACCESS A CHECKED BY: EJM TO STRUCTURE ABOVE PIPE CLAMP MAYBE ROTATED TO GAIN ACCESS MAXIMUM 4IN. TO STRUCTURE ABOVE DRAWN BY: JTC MAXIMUM 4" PROTO CYCLE: 04/26/2024 LONGITUDINAL SEISMIC SOLID BRACE LONGITUDINAL SEISMIC CABLE BRACE ALL-DIRECTIONAL SEISMIC SOLID BRACE ALL-DIRECTIONAL SEISMIC CABLE BRACE DOCUMENT DATE:12/27/2024 (DFOR CLEVIS SUPPORTED PIPE/CONDUIT (DFOR CLEVIS SUPPORTED PIPE/CONDUIT (j)FOR TRAPEZE SUPPORTED PIPE/CONDUIT (D�?R TRAPEZE SUPPORTED PIPE/CONDUIT NTS NTS J. SEISMIC JOIST SEISMIC JOIST ATTACHMENT ATTACHMEN HARDWARE TYP HARDWARE SEISMIC CABLE BRACE TYP 41742 SEISMIC SOLID BRACE TYP ALLTHREAD SEISMIC JOIST ROD TYR ATTACHMENT HARDWARE SEISMIC JOIST ALLTHREAD ROD PIPE CLAMP ATTACHMENT OR U-BOLT HARDWARE TYR PIPE CLAMP OR U-BOLT SEISMIC CABLE BRACE TYP J 45°t15° J J SEISMIC STEEL BRACE / SOLID BRACE J J / +II AIRCRAFT CABLE BY SEISMIC RESTRAINT 45°t15° MANUFACTURER ALLTHREAD ROD ALLTHREAD ROD SEISMIC CABLE BRACE HOOK IF TRAPEZE SUPPORT TRAPEZE SUPPORT STEEL BRACE J J J L— 45°:15* J L AIRCRAFT CABLE BY 45°t15° SEISMIC RESTRAINT MANUFACTURER ® ® I PIPE HANGER PIPE HANGER SEISMIC CABLE BRACE HOOK TYR SEISMIC RESTRAINT TRANSVERSE SEISMIC SOLID BRACE TRANSVERSE SEISMIC CABLE BRACE TRANSVERSE SEISMIC SOLID BRACE TRANSVERSE SEISMIC CABLE BRACE FOR TRAPEZE SUPPORTED PIPE/CONDUIT , FOR TRAPEZE SUPPORTED PIPE/CONDUIT FOR CLEVIS SUPPORTED PIPE/CONDUIT FOR CLEVIS SUPPORTED PIPE/CONDUIT 4INTS J NTS SHEET. SR1 FEEDER SCHEDULE GENERAL REFRIGERATION 08.20.20 ELECTRICAL NOTES ALLCONDUITAND CONDUCTOR SIZES ARE BASEDON EMTwRH qo� 1. COORDINATE ALL WORK WITH REFRIGERATION FILL,75°C RATED TERMINATIONS AND TYPE THHN77HWN-21NSULATION. CONTRACTOR(R.C.)PRIOR TO INSTALLATION. FOR NON-EMT CONDUIT OR TERMINATIONS OR INSULATION TYPES RATED LESS THAN 7VC,MODIFY SIZES ACCORDING TO NEC. XXX FEEDER 0 OR GROUND SIZE 2. REFRIGERATED CASES:E.C.SHALL PROVIDE CONDUIT AND WIRE FOR REFRIGERATED CASE FANS,LIGHTS 33 (3#10,(1#10 G,1/2"C AND ANTI-SWEAT HEATERS,AND(IF APPLICABLE) ELECTRICAL DEFROST.PROVIDE ADEQUATE 63 (3)#6,(1#10 G,3/4"C CONDUCTOR LENGTH TO ALLOW TERMINATION. NEATLY BUNDLE CIRCUITS AND CLEARLY TAG AND LABEL EACH CIRCUIT WITH BRANCH CIRCUIT DESIGNATION AND REFRIGERATION SYSTEM NUMBER FOR FINAL TERMINATION AT CASE BY R.C.REF CASE CONNECTION WIRING DETAIL. 3. IF NEW CASES ARE PROVIDED WITH A FACTORY INSTALLED TERMINAL STRIP AND JUMPERS FOR CONNECTION TO A SINGLE CIRCUIT FOR 120V CASE LOADS.RC SHALL REMOVE FACTORY INSTALLED JUMPERS AS REQUIRED TO UTILIZE EXISTING W w rye o SEPARATE 120V FAN/LIGHT/ANTI-SWEAT CIRCUITS AS =o swap' INDICATED ON PLANS AND/OR PANELBOARD o SCHEDULES.ANY EXISTING ANTI-SWEAT CONTROL w t�z� wgz3:4 (SWEATMISER)SHALL BE BY-PASSED.CASES UTILIZINGQ 3tpk'LLS000wB ELECTRICAL DEFROST WILL BE PROVIDED WITH p rcr a<a�u`"pm SEPARATE 208V TERMINATIONS ATTHETERMINAL -�€n STRIP FOR CONNECTION TO THE 208V ELECTRIC z0 3`a- oa'oNsz€o DEFROST CIRCUIT.RC SHALL MAKE FINAL r iw3 zprcw3�-T."H TERMINATIONS OF 120V AND 208V POWER CIRCUIT(S) g 3 o°�a� N AT CASE TERMINAL STRIP.REFER TO CASE p Qo�sz�C„a CONNECTION SCHEMATIC ON REFRIGERATION SHEETS. n 4. WALK-IN UNITS:PROVIDE CONDUIT AND WIRE FOR EVAPORATOR COIL FANS(CF)AND(IF APPLICABLE) ELECTRIC DEFROST(ED).PROVIDE ADEQUATE CONDUCTOR LENGTH TO ALLOW TERMINATION. NEATLY BUNDLE CIRCUITS AND CLEARLY TAG AND oa LABEL EACH CIRCUIT WITH BRANCH CIRCUIT - DESIGNATION AND REFRIGERATION SYSTEM NUMBER w v_2 FOR FINAL TERMINATION AT COIL BY R.C.REF EVAPORATOR COIL WIRING DETAIL. rn du o s m F -q 5. ROUTE REFRIGERATED CASE AND WALK-IN UNIT COIL ¢ FAN,LIGHTS,ANTI-SWEAT AND DEFROST BRANCH i CIRCUITS TO WIREWAYS PROVIDED AT N =W REFRIGERATION EQUIPMENT AND/OR PANELBOARDS z �\ AS REQUIRED. U �ll 6. REFRIGERATED CASE WIRING COMPARTMENT REPRESENTED ON DRAWING BY JUNCTION BOX. x 7. KEEP PENETRATIONS THROUGH WALK-IN UNITS ta¢i TO A MINIMUM.ROUTE ALL CONDUITS SERVING FREEZERS AND COOLERS ON INSIDE OF BOX. O 0 8. ALL CONDUITS INSTALLED ON TOP OF WALK-IN UNITS (__D C=Q SHALL BE A MINIMUM OF 6"FROM ANY EDGE TO ALLOW SPACE FOR EDGE PROTECTION NETTING.DO NOT S ROUTE CONDUITS ABOVE THE CEILING GRID ACCESS UNLESS CONDUITS ARE INSTALLED IN JOIST SPACE, REF ARCH. . Or O 9. UNDERSLAB CIRCUITS SHALL NOT BE ROUTED UNDER �) I j a 63 (ED) 63 (ED) WALK-IN FREEZERS AND SHALL BE ROUTED ABOVE I(11)\ O M m 16.780 16.780 REFRIGERANT LINES WHERE THEY CROSS. u\_l 0 C16 145 CHA-25,27,29 CHA-7,9,11 10.CIRCUITS FOR REFRIGERATED CASES SERVED BY r n Z m F O UNDERSLAB REFRIGERATION PIPING ARE TO BE v W 16.145 16.145 ROUTED UNDERSLAB AND EMENDED TO THE FIRST Z p 0 O CASE IN EACH SYSTEM.WIRING AND CONDUIT FOR O 0 0 u N SLAVE WIRING BETWEEN CASES SHALL BE PROVIDED 0 4 SCO2 A04 SCO2 A02 SCO2 A02 SCO2 G J J J J WIRING DETAIL FER TO UNDERSLAB CASE CONNECTION Inn\ -I a 63 (ED) 11.ALL UNDERSLAB CONDUITS SHALL BE 3/4"MIN. u�J CHA-32 w J❑ 16.780 16.145 2 O 12.CIRCUITS FOR REFRIGERATED CASES SERVED BY BOS SCO2 CHA-40 CHA-31,33,35 �/ J OVERHEAD REFRIGERATION PIPING ARE TO BE z ROUTED D WN FROM STRUCTURE AT THE c, 16.145-- - LOCATION AS THE REFRIGERATION PIPING P NG AND E L4D1-24 O 16.145 EMENDED TO THE FIRST CASE IN EACH SYSTEM.WIRE J� 16.145 p _ J J❑ J --[J� J❑ p AND CONDUIT FOR SLAVE WIRING BETWEEN CASES f° COORDINATE GATEWAY SHALL BE PROVIDED BY THE R.C.REFER TO 7 SCO2 A07�SC� - EDC4 RECEPTACLE LOCATION WITH OVERHEAD CASE CONNECTION WIRING DETAIL. ISSUE BLOCK REFRIGERATION BAS INSTALLER 63 (ED) 13.ON GROUPS OF THREE OR MORE REFRIGERATED L4D1-10 CASES WITH ELECTRIC DEFROST,R.C.SHALL 16.780 CHA-34 CONNECT CASES TO CREATE ATHREE-PHASE HEATER 2,4,6,8 CHA-13,15,17 16.145 CIRCUIT. CHA-42 13,15 HEATER LOADS SHALL BE BALANCED CHA- i 645 I BETWEEN PHASES AS EVENLY AS POSSIBLE.REF 16.145 2 PUMP SKID EXACT LOCATION WITH WALMARTDTH CASE DEFROST WIRING DETAIL. COORDIN L H4B-31,33 RE1.1 CONSTRUCTION MANAGER PRIOR TO ROUGH-IN. 14.PROVIDE A SEPARATE NEUTRAL FOR EACH NEW p 13 SCO2 813 SCO2 B13 SCO2 B13 SCO2 p 33 BRANCH CIRCUIT SERVING REFRIGERATED CASES OR m ai WALK-IN UNITS. 63 (ED) m 14 SCO2 J❑ 814 SCO2 B11 SCO2 B11 SCO2 ro 15.PROVIDE CIRCUIT BREAKER LOCKING DEVICE(LOCK- I ® OFF FOR MAINTENANCE)ON NEW AND/OR EXISTING 16.780 63 (ED) ® CIRCUIT BREAKERS SERVING REFRIGERATED CASES. CHB1-15,17,19 16780 - CHA-36 16.145 16.REFERENCE ARCHITECTURAL DEMOLITION PLANS FOR CHB1-14 CHB1 9,11,13 16.145 SCO2B1 PUMP SKID, FULL EXTENT OF DEMOLITION WORK REQUIRED. 16145 1 SEAFOOD MOUNTED ON ROOF. \ FREEZER EXISTING RACK B H A07SCO2 CONTROLLER. Q 15 SCO2 B15 SCO2 ° B12 SCO2 �12 SCO2 - 1� fl� - VED - - - - - - - - KEYNOTES - - - - - - - TYPLULL EDWPNJR CFCHECKED BY: RS TO BATTERY INVERTER. 16.145 CONNECT CIRCUIT(S)TO EXISTING BRANCH 4 4 C REF2/RE1.1 CIRCUITRY.MINIMUM WIRE SIZE AND DRAWN BY: AT 16.711 TYP PANELBOARD CIRCUIT ARE NOTED.VERIFY SIZE, CIF H4B-19,21,23 RATING AND CONDITION OF EXISTING BRANCH PROTO CYCLE: 04/26/2024 ASR RE1.1 16.145 L TYP 16.708 16.145 (CFIED) CIRCUIT CONDUIT AND WIRE PRIOR TO USE TO 16.780 16.258 ENSURE THAT THEY MEET REQUIRED SIZE,AND DOCUMENT DATE:12/27/2024 _ ALL U.L.RATINGS AND REPLACE AS REQUIRED. 16.250 CONNECT CIRCUITRY TO FACTORY PROVIDED �p GROCERY MAINTENANCE RECEPTACLE.ROUTE CIRCUIT TO FREEZER FEED FACTORY REMOTE SHUTDOWN NEAREST RTU OR AHU MAINTENANCE /�7 N SWITCH FROM BATTERY BACKUP RECEPTACLE CIRCUIT. �!' y EQUIPMENT.REF2/RE1.1 16.258 CONNECT CIRCUITRY TO FACTORY PROVIDED °7 ED yG0 DISCONNECT SWITCH. CF 16.708 PROVIDE WIRING AND FINAL CONNECTIONS TO EXISTING RACK A RECEPTACLE.RECEPTACLE FURNISHED WITH II O q TyP CONTROLLER. REFRIGERATED CASE. II 5G ASR 16.711 POINT OF TRANSITION FROM EMT TO FLEX. PROVIDE CONDUIT AND BRANCH CIRCUITS FOR ^� 4 Q REFRIGERATED CASE FANS,LIGHTS, II 16.711 NP ANTI-SWEAT HEATERS AND ELECTRICAL CHA-1,3.5 p RE1.1 DEFROST ION TO REFRIGERATED CASE ELECTRICAL G CONNECTION l� T--: POINT BV R.C.REFER TO CASE CONNECTION EDWIRING DETAIL. 33 (ED) 16.780A E.C.SHALL REMOVE EXISTING CONTACTOR IN CIF 16.145 16.78� RACK CABINET AND CONNECT CIRCUITRY DIRECTLY TO CIRCUIT OVERCURRENT PROTECTION DEVICE.REFRIGERATION SYSTEM EVAPORATOR FAN/DEFROST CIRCUITS SHALL BE SCO2A7 PUMP SKID, MOUNTED ON ROOF. CONTROLLED BY FACTORY INSTALLED CONTROLS IN NEW CASES OR BY FIELD o INSTALLED CONTROLS IN WALK-INS.IF rn REQUIRED,E.C.SHALL INSTALL NEW VENDOR WP/WR FURNISHED OVERCURRENT PRECTION ED 16.250 DEVICE FOR REFRIGERATION SYSTEM CF 0 16.988 EVAPORATOR FANIDEFROST CIRCUIT.PROVIDE A NEW NEMA 1 ENCLOSURE FOR FAN/DEFROST 1 TO BATTERY INVERTER. PROTECTIONCIRCUIT OVERCURRIENT NEEDED. OUNT NEMA 1 ENCLOSURE AS CLOSE REF 2/RE1.1 AS POSSIBLE TO EXISTING RACK CABINET. H4B-13,15,17 REFER TO REFRIGERATION LEGEND(S). G C C 4I �I 6.988 ROUTE CONDUITS,FOLLOWING REFRIGERATION IF _ 16'258 PIPING,FOR REFRIGERATION UNIT TO THIS < 16.145 I) LOCATION TERIOR OF ROOF PENETRATION vi 16.780 (CF/ED) FEED FACTORY REMOTE SHUTDOWN TO INTERIOR OF STORE.DO NOT ROUTE 0� 974,Oh� CONDUITS ACROSS THE ROOF STRUCTURE. 2 SWITCH FROM BATTERY BACKUP y. 16.145 (CF/ED) EQUIPMENT.REF2/RE1.1 16.780 DELI FREEZER - A08 SCO2 16.145 (CF/ED) 16.780 ��r 01/30/2025 ED CF REFRIGERATION 3 _ ELECTRICAL PLAN RE1.1 EXISTING CONDITIONS WERE TAKEN FROM EACH SUBCONTRACTOR IS RESPONSIBLE FOR HAVING ORIGINFRONT REFRIGERATION ELECTRICAL PLAN REAR REFRIGERATION ELECTRICAL PLAN EXACTAS-BUIL DRAWINGS AND MAY NOT REFLECT ATHOROUGH KNOWLEDGE OF ELATE DRAWINGS AND EXACT"AS-BUILT'CONDITIONS.CONTRACTOR SPECIFICATIONS IN THEIR RELATED FIELD.THE FAILURE 1/8"=1'-0=1'-0" �1/8"=1'_0" SHALL FIELD VERIFY ALL EXISTING CONDITIONS TO ACQUAINT THEMSELF WITH THIS KNOWLEDGE DOES PRIOR TO SUBMITTING FINAL BIDS.CONTRACTOR NOT RELIEVE THE RESPONSIBILITY OF PERFORMING SHALL CAREFULLY COORDINATE NEW WORK AND THE WORK PROPERLY.NO ADDITIONAL SHEET. DEMOLITION WITH ALL OTHER DISCIPLINES AND COMPENSATION SHALL BE ALLOWED BECAUSE OF RE1 EXISTING CONDITIONS. CONDITIONS THAT OCCUR DUE TO FAILURE TO FAMILIARIZE WORKERS WITH THIS KNOWLEDGE. FEEDER SCHEDULE ONE-LINE DIAGRAM LEGEND PANELBOARD NOTES Q 11.19.10 01.26.24 PANEL SCHEDULE:12M&2024 E PANEL'H4B' PRCNECT:WM 3757 ANMMan,WA ALL CONDUIT AND CONDUCTOR SIZES ARE BASED ON EMT WITH 40% 1. TERMINATE GROUND ON ISOLATED GROUND BUS. ( ) FILL,75°C RATED TERMINATIONS AND TYPE THHNI INSULATION. NEW EQUIPMENT CLASSIFICATION:NORMAL VOLTAGE:48(IYmN 30,-IFE SECTION.1011 FORNON-EMT CONDUIT OR TERMINATIONS OR INSULATION TYPES RATED LESS THAN 75"C,MODIFY SIZES ACCORDING TO NEC. 2. INSTALL LOCKING DEVICE(LOCK-OFF FOR FED FROM'. NEINSUTRAL L 100%IR LUGS ONLY EXISTING EQUIPMENT MAINTENANCE).LOCKING DEVICE SHALL BE ILL MOUNTING:FIELD VERIFY NEUTRAL:100%RATED 0 FEEDER OR GROUND SIZE LISTED.MANUFACTURER SHALL MATCH EXISTING CKT BREAKER LOAD LOAD BREAKER CrcT ----- EQUIPMENT TO BE DEMOLISHED pANELBOARD MANUFACTURER. NOTE ITEM DESCRIPTION NO.AMP POLE VA 0 VA AMP ROL NO. ITEM DESCRIPTION NOT E TRANSFORM ER'T4D' 1 3s0 3 54MO A 5690 60 3 z E PANEL'H4c' NOTE: 3. INSTALL LOCKING DEVICE(LOCK-ON FOR CRITICAL 3 - - SOON B 5070 - - 4 ALL OF THE ELECTRICAL DEVICES SHOWN ON THE RISER LOAD). 5 - - 58870 c 3480 - - 8 NOTE:TAP DEFROST CIRCUIT IN CONDULET AT CEILING PENETRATION DIAGRAM ARE EXISTING AND ARE BASED UPON AS-BUILT ) HU1 7 80 3 18370 A 10M 50 3 9 3005L PAN WASHER FILLED WITH SILICONE DRAWINGS.E.C.SHALL VERIFY THE EXACT EXISTING 9 18370 B f02B0 10 JUNCTION BOX WITH#10 AWG FOR 4. GFI BREAKER FOR PERSONNEL PROTECTION(5MA). 11 18370 C 102M - - 12 CONNECTION TO UNIT.MAXIMUM COIL FAN/DEFROST POWER EMT CONDUIT CONDITIONS,SIZES AND LOCATIONS OF EQUIPMENT 1 PUMP SKID 8CO2&11 13 15 J N55 A 9]00 as 3 14 DOSBA FRYER LENGTH OF TAP CONDUCTOR 18" PRIOR TO ROUGH-IN.THIS RISER S SHOWN FOR 5. GFI BREAKER FOR EQUIPMENT PROTECTION SOMA. 1"EMT CONDUIT AND WIRING TO DESIGNATED PANEL VIA ( ) 15 - - 4155 B 97W - - 16 INFORMATIONAL PURPOSES ONLY AND ANY NEW 17 - - 41. c 9700 - 18 PENETRATION SEALED WALK-IN FAN/DEFROST CONTROL DEVICE. DEVICES ARE SHOWN IN BOLD AND ARE NOTED.DURING 1 PUMPSKIDSCO28B1 19 15 3 4165 A - - 20 HUNT-TRIP BREAKER WITH SILICONE SEALANT. FINAL CONNECTION BY RC. 6. CONDUCTOR SIZE HAS BEEN INCREASED FOR CONSTRUCTION,THE STORE SHALL STAY OPEN FOR VOLTAGE DROP.SIZE EQUIPMENT GROUNDING 21 - 4155 B 119N eo 3 22 DOSBC FRYER BUSINESS.ANY NECESSARY POWER DOWNTIME SHALL 23 - - slss c 11- - - 24 CONDUCTOR PROPORTIONATELY PER NEC. SUS-METERING 1 25 15 3 10 A 11920 - - z6 COOLER/FREEZER BOX CEILING BE SCHEDULED AND APPROVED BY WALMART 27 - - 10 B - - ze HUNT-TRIP BREAKER EMT CONDUIT AND WIRING TO NEXT CONSTRUCTION MANAGER. 7. REFERTO ONE-LINE DIAGRAM FOR AVAILABLE FAULT w w 29 - - 140 C 11920 fi0 3 30 DO58C FRYER COIL POWER JUNCTION BOX ON SAME CEILING MOUNTED WP JUNCTION BOX WITH THREADED HUBS CURRENT FOR INTERRUPT RATINGS. w 1 02 PUMP SKID ECU%FMfl m 3o z ae0 A ne2o 32 SYSTEM WHEN MULTIPLE COILS ARE IN lo oFu szzz AND GASKETED COVERPLATE.SEAL TOP OF JUNCTION BOX 33 a40 a n92a - - 3a SAME COOLER/FREEZER BOX.POWER w t�z� wgz3. TO COOLER/FREEZER CEILING WITH SILICONE SEALANT. B. REFER TO ONE-LINE DIAGRAMS FOR WIRE SIZES. PACE 05 - C 36 HUNT-TRIP BREAKER CONDUIT AND WIRING SAME SIZE AND KEYNOTE - Q �I PACE 1 37 - A SPACE QUANTITY AS WIRING TO PANEL. ww 3tag'�awa�pm PACE 39 B - 4o PACE PROVIDE CEILING MOUNTED MANUAL SWITCH'HUBBELUCLASS 9. FACTORY WIRED TO LOAD. O rcr rcs PACE 41 c 4z PACE HBLDS3 OR'EATON'CLASS AHDS30.IF OVER 30 AMPS PROVIDE Z LOAD CALCULATIONS 'HUBBEU CLASS HBLDS6 OR'EATON'AHDS60.WITH NEMA 4X 10.BREAKER SHALL BE HIGH MAGNETIC TYPE. O LOAD DESCRIPTION CONN.(VA) DEMAND FACTOR CAM(VAT TYPICAL COIL WATERTIGHT NON-METALLIC ENCLOSURE FOR CONNECTION MISCELLANEOUS CONTINUOUS: - 125% - LOAD SUMMARY OF EVAPORATOR COIL FANS(CF)AND/OR ELECTRIC DEFROST 11.BREAKER REMOVAL-FIELD VERIFY CIRCUIT Q oo ' EQUIPMENT&MISCELLANEOUS: 202130 loose M213D - - (ED),(WHERE SHOWN ON DRAWINGS).PROVIDE PLACARD ON BREAKER IS NOT SERVING AN EXISTING LOAD.IF NO a LIGHTING: 14240 12596 17800 TOTAL t'o CEILING DETAILING PURPOSE OF EACH MANUAL SWITCH AND EXISTING LOAD,REMOVE CIRCUIT BREAKER AND r q LARGEST MOTOR: - 125% - CONNECTED LOAD AMPS N € <S c y u p rc MOTORS: - loll - PRABEA:135.42OVA 489A THE ELECTRICAL SOURCE(PANEL AND CIRCUIT NUMBER). PROVIDE FILLER PLATE.IF BREAKER IS SERVING A RECEPTACLE: - fool - 1"LIQUID-TIGHT FLEXIBLE METAL CONDUIT LOAD,IDENTIFY LOAD SERVED.UPDATE CIRCUIT RECEPTACLES OVER IOWA: 5D% PHASE B:136,530 VA -A TO KNOCKOUT ON UNIT.FINAL IDENTIFICATION SCHEDULE AS"SPACE"OR INDICATE COOL NO: silo l00% 5511° CONNECTION TO COIL BY RC. LOAD SERVED. KITCHEN(EQUIP=4): 131460 Bo% 105185 PHASEC:130,990 VA 473A NOTE:DO NOT LOCATE WP JUNCTION BOX DIRECTLY IN FRONT OF DISCHARGE FAN,OFFSET TO SIDE. 12.DUAL TAP REMOTELY OPERATED BREAKER. TOTAL CALCULATED LOAD:350,205 VA CONNECT EMERGENCY/NIGHT LIGHTING TO TOTAL CALCULATED AMPS:458 A UNSW ITCHED TERM(NATION. w „ot TOTALS: 40294D 380209 NOTES xARGIS ENGINEERS,INC. �,�EVAPORATOR COIL WIRING 13.EXISTING CIRCUIT AND/OR CIRCUIT BREAKER. o3m 1.PROMDENOlN LNBNBREN(ERTOWCHE%MTINGNCM NGMDM UFACTLRER 120E THIRD AVENUE,SUITE 60D 1 J N �" V q✓j 2. 9EATTLE.WA 8B101 J NTS 14.ROUTE CIRCUIT THROUGH CONTACTOR. Q 2 J 0 R 4. PH.(206)446.3376 15.PROVIDE INTERLOCK WIRING WITH EXHAUST HOOD m <z ., 5. FAX.(206)448-4450 ANSUL SYSTEM. N =W Z 16.RELOCATED CIRCUIT FROM EXISTING PANELBOARD. aOj PANEL SCHEDULE:I- (E)PANEL'L4D7(SECTION I)' PROJECT:WIN 3757 Mho,,WA 17.PROVIDE BLANK CIRCUIT BREAKER FILLER PLATE CLASSIFICATION:NORMAL VOLTAGE'.20EYn2OV 3G,WWIRE SECTION 1 IF ECU ASSEMBLY EQUIPMENT LOCATED FOR EXPOSED SPACE IN PANELBOARD. 35 FED FROM: MAINS:zzsA MLo.FEEo-THRu wcs TOGETHER INSIDE STORE UNLESS REFER TO PLANS 18.PROVIDE U.L.LISTED OVERCURRENT DEVICE TO a NOTED OTHERWISE.REFER TO TYPICAL REFRIGERATED CASE SYSTEM U MOUNTING:FIELD VERIFY NEUTRAL.mo%RaED COORDINATE AND MAINTAIN MANUFACTURER'S OO PLANS FOR LOCATION.EACH FOR 480V/2P ECU SERIES RATED SYSTEM. COT BREAKER LOAD LOAD BREAKER NO. SECONDARY CO2 SKID REQUIRES ITS ASSEMBLY CIRCUIT NOT ITEM DESCRIPTION NO.AMP POLE VA B 1 AMP POL NO. ITEM DESCRIPTION Nor OWN SEPARATE ASSEMBLY.REFER 5 DOOR CASE 5 DOOR CASE 4 DOOR CASE CONTACTORS C2lC3 CNTRL 1 20 1 20 A iW 20 1 2 EAFOOD FREEZER LTG 19.EXISTING CIRCUIT BREAKER TO REMAIN.VERIFY O O Q EDCO RECEPTACLE/I.C. 3 20 1 360 B 230 20 1 ! EAF000 FREEZER HIRE TO SKID MANUFACTURER 1OKVA,SINGLE PHASE,480V PRIMARY-120/240V CONDITION OF CIRCUIT BREAKER TO ENSURE THAT IT O O ASTEOILTANK 5 20 1 1940 C S40 20 1 6 MONSCALE/RECEPTS SUBMITTALS FOR WIRING SECONDARY TRANSFORMER FURNISHED AND 12.6A 12.6A 9.9A IS OPERATIONAL AND MEETS ALL U.L.RATINGS. RFIDSCANNERS 7 20 1 so A Soo 20 1 e OCIPDOOR TERMINATION DETAILS. INSTALLED BY CONTRACTOR.SUSPEND RFIDSCANNERS 9 20 1 50 B 1. 20 1 10 GATEWAY RECEPTACLE XFMR TRANSFOMER FROM STRUCTURE ABOVE / V V\ 20.ROUTE CIRCUIT THROUGH EXISTING LCU CABINET Do MEAT COOLER HTRS 11 20 1 410 C 20 1 12 PARE 24 o p ROLLSEAL DOOR 13 20 1 1200 A 20 1 Id PARE 24 BATTERY AND INVERTER.REFER TO SUSPENDED A B B C A C UTILIZING EXISTING RELAYAND CONTROLS.UPDATE J o r LEAK DETECTION 15 20 1 500 B 20 1 16 PARE 34 #8 COPPER GROUND,3/4"C TRANSFORMER MOUNTING DETAIL. LCU IDENTIFICATION SCHEDULE W ITH LOAD4 Z RTU IE,AHU2.RACK ABC 17 20 1 1220 c - - 18 PACE AO IDENTIFICATION. O Lj a WH GROC/RECIRC PUMPS 19 20 1 720 A - - 20 PACE I I PARE 24 21 20 1 B - - 2z PACE REFER TO MANUFACTURER'S = B0 21.REMOTELY OPERATED CIRCUIT BREAKER.REFER TO M m PARE 34 D 20 1 c Sao 20 1 24 RCU-1 FANS,LIGHTS 8A5 INSTRUCTIONS FOR MOUNTING AND (3#6,(1)#8 SSBJ,1"C C0 BUILDING AUTOMATION SYSTEM PLANS FOR CIRCUIT O DANNON COOLER zs zo z lsaa A z880 30 3 ze Rcu CLEARANCE REQUIREMENTS FOR ALL NOTE:(3�#6 WIRES CONSIST OF(2)HOT PROVIDE 208/30 HOME RUN TO DESIGNATED PANEL BREAKER CONTROL. 1.1� Z � 27 1500 a 2E90 2b 40A zoan EQUIPMENT.PROVIDE UNISTRUT CONDUCTORS AND 1 NEUTRAL CONDUCTOR. BOARD.FINAL CONNECTION AT CASE BY R.C. �+ w N PACE 39 C 890 2 30 () SUPPORT AS NECESSARY FOR 22.EXISTING LOAD-TRACE EXISTING CIRCUIT,IDENTIFY NOTES: LOAD AND UPDATE CIRCUIT IDENTIFICATION 0 O MOUNTING EQUIPMENT. 40A-3P ENCLOSED CIRCUIT BREAKER SCHEDULE FOR LOAD SERVED.IF CIRCUIT IS NOT IN Fn DISCONNECT DISCONNECT FURNISHED AND INSTALLED ON SYSTEMS WITH UNEQUAL LOADS,REC USE,REFER TO LOAD SERVE NOTE(CU BY CONTRACTOR.LABEL DISCONNECT IN ACCORDANCE WITH NEC 706.15(C) (REFRIGERATION ELECTRICAL CONTRACTOR)SHALL �1 U 1 INSTALL OWNER FURNISHED CT ARRANGE CONNECTIONS FOR MAXIMUM BALANCE 23.ROUTE CIRCUIT THROUGH ENCLOSED GFI BREAKER LOAD DESCRIPTION CONN(VA) DEMAND FACTOR CAL..(VA) ENCLOSURE �l LOAD CALCULATIONS CONNECTED LOAD-SEC.2:sL220 VA ADAPTER INSIDE INVERTER (3#8,(1#10G,1/2"C FOR PERSONNEL PROTECTION(5MA). Q o: w MISCELLANEOUS CONTINUOUS: - 125% - LOADSUMMARY CD EQUIPMENT a MISCELLANEOUS: 43880 loll 43890 FIELD INSTALL AND WIRE CT-1 AND CALCULATION OF 30 UNBALANCED LOAD 24.SPARE-FIELD VERIFY CIRCUIT BREAKER IS NOT D LIGHTING: E30 12s% I.G TOTAL A LOAD=(12.6 A+9.9 A)x.866=19.5 A SERVING AN EXISTING LOAD.IF NO EXISTING LOAD, z LARGEST MOTOR: - 125% - CONNECTED LOAD AMPS CATS CT CT-2 ON CONDUCTORS INSIDE B LOAD=(12.6 A+12.6 A)x.866=21.8 A(HIGH LEG) PROVIDE LOCK OFF DEVICE TO LOCK SPARE D3 MOTORS: - 10016 - PHASE/a 18,3Oo VA 153 A (2)it10,(i)iF10G,1/2"C INVERTER ENCLSOURE C LOAD=(12.6 A+9,9 A)x.866=19.5 A BREAKER IN THE OFF POSITION.IF BREAKER IS O' RECEPTACLE: - 10038 - SERVING A LOAD,IDENTIFY LOAD SERVED.UPDATE RECEPTACLES OVER IOM/A: - 50% - PHASEB:15.20OVA 127A OWNER FURNISHED,CONTRACTOR CTS AC CIRCUIT IDENTIFICATION SCHEDULE AS"SPARE"OR PHASEC:11,zz0 VA MA GRID NSTALLE (XVTOBA03)WRCELL CASE DEFROST WIRING IN DICATE LOAD SERVED. ISSUE BLOCK OWNER FURNISHED, REBUS REBUS C TOTAL GLCULATED LOAD:44,921111A V NTS 25.EXISTING LOAD-T CIRCUIT GCICATIO IDENTIFY CONTRACTOR BATTERY INVERTER TOTAL CALCVIATEDAMPB:125A INSTALLED GENERA. LOAD AND UPDATE CIRCUIT IDENTIFICATION SCHEDULE FOR LOAD SERVED.IF CIRCUIT IS NOT IN TOTALS: ".72D 44.92e PWRCELL BATTERY BATTERY USE,REFER TO PANELBOARD NOTE(24). NOTES', NARGIS ENGINEERS,INC. STOP INVERTER PROTECTED 1. 1201 THIRD AVENUE SUITE EDO PROVIDE LABEL ON BATTERY STOP LOAD 26.SUBMETERED LOAD-INSTALL CT'S AND ROUTE 2. SEATTLE,WA9B101 CABINET WITH THE FOLLOWING: (2)#8,1/2"C LEADS TO POWER METER INDICATED IN SUBMETER 3. SCHEDULE.FINAL TERMINATIONS AT METER AND 1. PH.(208)4463378 WARNING: i5A-2P ENCLOSED CIRCUIT BREAKER DISCONNECT CONDUITS FOR REFRIGERATED CASE SYSTEM:CONDUIT(S)WILL COMMISSIONING BY OTHERS. s. FAX.(2D6)446445D INCREASING CAPACITY OF FURNISHED AND INSTALLED BY CONTRACTOR AT SERVE 120V CASE FAN,CASE LIGHT AND CASE ANTI-SWEAT DISCONNECT INVERTER.LABEL DISCONNECT IN ACCORDANCE INSTALLED BATTERY BACKUP 20 AWG CIRCUITS.IN ADDITION,CONDUIT(S)WILL SERVE 208V CASE 27.ADJUSTABLE TRIP BREAKER-ADJUST BREAKER SYSTEM BY ADDING BATTERY WITH NEC 706,15(C) ELECTRIC DEFROST CIRCUIT(IF APPLICABLE).NOTE:CIRCUITS MAY SETTINGS PER PROTECTIVE DEVICE SETTINGS (E)PANEL (SECTION 2)' PROJECT:WM 3]5]MlMpon,WA MODULES IS PROHIBITED.TOTAL REMOTE SHUTDOWN (2)#12.1/2"C BE GROUPED TOGETHER TO MINIMIZE NUMBER OF CONDUITS REPORT IN SPECIFICATIONS. PANEL SCHEDULE:12HDn024 INSTALLED CAPACITY OF ALL PROVIDED THAT ALL NEC REQUIREMENTS ARE MET CLASSIFICATION:NORMAL VOLTAGE:208Y/120V 304WIRE SECTION:2 OF ELECTRICAL STORAGE SYSTEMS SWITCH FACTORY 30A-2P NON-FUSED DISCONNECT 28.REPLACE EXISTING CIRCUIT BREAKER WITH NEW INSTALLED AT FED FROM:(E)PANEL'L4D1(SECTION 1)' MAINS:225A MAIN LUGS ONLY IN THIS FIRE AREA IS REQUIRED FURNISHED AND INSTALLED BY CIRCUIT BREAKER.REFERENCE PROTECTIVE DEVICE TO REMAIN UNDER 20KWH. SECONDARYSKID DISCONNECT CONTRACTOR AT SECONDARY SKID SETTINGS REPORT FOR MANUFACTURER,BREAKER MOUNTING:FIELD VERIFY NEUTRAL:IOD%RATED ELECTRICAL ENCLOSURE cKT BREAKER LOADJA - AD BREAKER cKT TERMINATION TO REFRIGERATED CASE TYPE,AND SETTINGS. NOT ITEM DESCRIPTION No.AMP POLE AMP POL NO. ITEM DESCRIPTION NOT (2)#12,1/2"C ELECTRICAL CONNECTION POINT BY R.C. B03EG RACK OVEN 31 20 3 530 0 20 1 32 FRZR a PENDANT LTG ECU 15A; GENERAL NOTES: 33 - - 530 0 20 1 34 RDDERY FREEZER HTR FUSE--- EMERSON ECU AND FUSE BLOCK PROVIDE TRANSITION FROM PVC TO EMT 1. NEW BRANCH CIRCUIT OVERCURRENT PROTECTIVE 3s - - s30 0 20 1 3a eoa/ems/82e ------,-- DEVICES PLACED IN EXISTING PANELBOARDS OR B043G RACK WEN 37 15 1 1390 0 40 2 3E 8049 DONUT MACHINE FACTORY INSTALLED AT TYPICAL REFRIGERATED CASE SYSTEM DISTRIBUTION BOARDS SHALL MATCH THE TYPE AND B03M OVEN CONTROLS 39 20 1 1920 0 40 -------- SECONDARYSKID AIC RATING OF EXISTING OVERCURRENT PARE m 20 1 0 u 2 42 a033ICING TABLE ; ECU ROUTE EMT CONDUITS(UNDER CASES,ABOVE PROTECTION DEVICES IN SAID BOARD. BAKERY FREEZER DRAIN HEAT 43 20 1 1500 - - 4a ____ SLAB)TOPOINTOF TRANSITION TO FLEX 2. E.C.SHALL TRACE ALL ELECTRICAL CIRCUITS FORCHECKED BY: RS PACE 45 20 1 80 20 1 /6 8020/W21PACE 47 20 1 O 20 1 0 B007 BREAD SLICER - EVERY EXISTING PANELBOARD AFFECTED BY THIS PACE 49 20 1 60 20 1 50 B007A BRE40 SLICER 12"WIRE PIGTAILS TYP PROJECT.IDENTIFY LOADS ON EACH CIRCUIT.PACE 51 20 1 0 20 1 52 BOIBB BAKERY DISPLAY CO2 SKID BACKUP BATTERY& INVERTER 5'FLEX CONDUIT TYP PROVIDE A COMPLETE TYPEWRITTEN CIRCUITDRAWN BY: AT PACE 53 20 1 0 20 1 54 F BAKERY AROMA I FLOOR IDENTIFICATION SCHEDULE FOR EVERY AFFECTED PROTO CYCLE: 04/26/2024 PACE 55 20 1 00 20 1 56 uouoR cAe NTS PANELBOARD.PROVIDE THE DATE THAT THE PACE 5] 20 1 00 20 1 58 LIQUOR CAB BRACKET CONDUIT TO FLOOR SCHEDULE S CREATED. PACE 59 z0 1 c 20 1 w PARE AS REQUIRED PER CODE TYP DOCUMENT DATE:12/27/2024 3. ALL 0 ERCURRENT DEVICES ARE NEW UNLESS PROVIDE TRANSITION FROM EMT TO FLEX NOTED OTHERWISE. REFRIGERATION PIT UNDERSLAB PVC CONDUIT FOR SOURCE OF SUPPLY NOTE LOAD CALCULATIONS - TI EXISTING REFRIGERATED CASE BRANCH CIRCUITS LOAD DESCRIPTION CONN.(VAT DEMAND FACTOR CALC.(VA) UT I LITY TRANSFORMER CONTRACTOR TO VERIFY THE FEEDER ORIGINATION MISCELLANEOUS CONTINUOUS: - 125% - LOADSUMMARY 480YI277V,30,4W SEC POINT SOURCE OF POWER FOR ALL DISTRIBUTION EQUIPMENT G MISCELLANEOUS: 23390 loll 2339D 94A BOARDS,PANELBOARDS,AND BUSWAY AFFECTED BY LIGHTING: wo 125%096 103e TOTAL L--- --_J U N D E RS LAB CASE CONNECTION WIRING THE REMODEL SCOPE OF WORK.PROVIDE A LARGEST MOTOR: - iz5% - CONNECTED LOAD Amps (E)8 SETS OF 4#500KCMIL EACH IN 4"C. ( J / LAMINATED PLASTIC NAMEPLATE PER SPECIFICATIONS MOTORS: - 10 - PXASEA 11,230 VA �� NTS RECEPTAaE: - l00% - __ __ _ __ __ __ __ __ INDICATING THIS INFORMATION. RECEPTACLES OVER IOLVA: - 5- - PHASEB:B,DEOVA 75A PHASE C:4.030 VA MA MSB1 ELEC ROOM 1 EXISTING HATED FROM MSWB TOTAL CALCULATED L1 D FED FROM H1 B VIA T1 D 1. 120E THIRD AVENUED 29928 VA f--- -1 __ __ 3000 AMPS 480Y/277V 304W TOTALS: 24,3z0 L428 S:68A --- � I --- I I ROUTE CONDUIT FOR BRANCH CIRCUITS FROM OVERHEAD ARC FLASH TOTAL GLCUTATED AMP ® ALONG WITH REFRIGERATION PIPING.CONDUIT SHALL BE NOTES. HARGIS ENGINEERS,INC. / ROUTED THROUGH CHASE WHERE INDICATED ON PLANS ST -GVR ST -GAR \ 300A sulTE boo L-O A gp I 2. SEA TTLE.WA9E 1600A 3000A ETR PROVIDE(2)CONDUITS AND BRANCH CIRCUITS PER REFRIGERATED ARC FLASH HAZARD WARNING LABELING REQUIREMENTS 3_ 3P,"QC" 3P CASE SYSTEM.ONE CONDUIT WILL SERVE 120V CASE FANS,LIGHTS PER NEC ARE PROVIDED BY OWNER UNDER SEPARATE 4. PH.(206)4463376 ETR ETR AND ANTI-SWEAT CIRCUITS.ONE CONDUIT WILL SERVE 208V CASE CONTRACT. 5. FAX.(206)4464450 ELECTRIC DEFROST CIRCUIT.ON SYSTEMS WITHOUT ELECTRIC DEFROST,ONLY PROVIDE ONE CONDUIT. ADDITIONAL BAS CONDUITAT CHASE LOCATION..ENCE PLANS FOR POWER INTERRUPTION NOTE (E)2 SETS OF 4#350KCMIL ELECTRICAL ROOM 1 &1#1 GND EACH IN 2.5"C. PVC CHASE WHERE INDICATED ON PLANS COORDINATE ALL WORK THAT REQUIRES POWER INTERRUPTIONS TO THE STORE WITH THE STORE EXISTING SUBMETERING:IF IT IS NECESSARY TO REMOVE MANAGER AND THE WALMART CONSTRUCTION MANAGER A METER,RTU SERVER,CT OR DISRUPT THE EXISTING A MINIMUM OF 48 HOURS IN ADVANCE OF ALL STORE COMMUNICATION OF THE SUBMETERING SYSTEM IN ANY PNLBD TERMINATION TO REFRIGERATED CASE POWER INTERRUPTIONS.IN ADDITION,IF THE MAIN WAY,THE CONTRACTOR IS RESPONSIBLE TO RESTORE H4B ELECTRICAL CONNECTION POINT BY R.C. ELECTRICAL SWITCHGEAR REQUIRES WORK AND DOES THE SUBMETERING SYSTEM TO THE SAME LEVEL OF 480Y/277V NOT HAVE A MAIN SERVICE DISCONNECTING MEANS, OPERATION THAT EXISTED PRIOR TO THE WORK BEING COORDINATE WITH THE UTILITY COMPANY A MINIMUM OF INITIATED.THE EXISTENCE AND FUNCTIONALITY OF THE TWO WEEKS IN ADVANCE OF THE STORE POWER SUBMETERING SYSTEM SHALL BE VERIFIED BY CALLING ROUTE EMT CONDUITS TO INTERRUPTION.IF STORE IS NOT OPEN 24 HOURS PER WALMART BUILDING PERFORMANCE TEAM AT 479-204-0432 (E)2 SETS OF 3#2/0& VOICE/DATA ROUGH-IN SCHEDULE BETWEEN THE HOURS OF 7 AM AND 5 PM CENTRAL TIME. 1#3 GND EACH IN I.5"C. POINT OF TRANSITION TO FLEX DAY,ALL STORE POWER INTERRUPTIONS ARE TO BE q ACCOMPLISHED AFTER NORMAL STORE BUSINESS fiz4.z2 T4D _ HOURS.PROVIDE TEMPORARY POWER AS REQUIRED q 150VA 12"WIRE PIGTAILS TYP PER SPECIFICATIONS.INSTALLATION OF NEW EQUIPMENT P ram, DROP ROUGH-IN NOTES: 208Y/120V 5'FLEX CONDUIT TYP SHALL BE COMPLETED AND THE POWER SYSTEM TESTED 4�0)A141�L�OC3�w EXISTING DISTRIBUTION SYSTEM IS _ (EXISTING) AND RE-ENERGIZED PRIOR TO THE TIME ESTABLISHED BY gLCT' -) SURFACE MOUNT JUNCTION BOX ADJACENT TO PACK CONTROLLER WITH(1)3/4"CONDUIT STUBBED TO BUILDING ACCESSIBLE CEILING SPACE. SERIES RATED.E.C.SHALL PROVIDE - THE STORE MANAGER AND THE WALMART COORDINATE PACK CONTROLLER JUNCTION BOX LOCATION WITH BAS INSTALLER. CIRCUIT BREAKER(S)THAT WILL (E)3 SETS OF 4#30OKCMIL& SECURE CONDUIT TO FLOOR OR CONSTRUCTION MANAGER. 01/30/2G25 MAINTAIN EXISTING MANUFACTURER'S 2#2/0 GND/IG EACH IN 2.5"C. TOP OF CASE AS REQUIRED BY SCHEDULE GENERAL NOTES: U.L.LISTED SERIES RATED SYSTEM. EXISTING EXISTING CODE,TYP FLOOR OR TOP OF CASE. REFRIGERATION PROVIDE TRANSITION FROM EMT TO COORDINATE TOP OR BOTTOM 1. ALL JUNCTION BOXES SHALL BE DOUBLE GANG WITH SINGLE GANG PLASTER RING UNLESS NOTED OTHERWISE ON SCHEDULE. PNLBD pL4LDB, ELECTRICAL LIQUID-TIGHT FLEXIBLE METAL CONDUIT FED CASE ELECTRICAL 2. ALL JUNCTION BOXES TO BE ROUGHED IN AT SCHEDULED HEIGHT UNLESS NOTED OTHERWISE ON DRAWINGS. 208Y/120V 208Y/120V BRANCH CIRCUIT CONDUITS TO OTHER CONNECTION WITH PLAN ARCHITECTURAL PLANS 3. ALL CONDUITS SHALL BE TERMINATED WITH BUSHINGS. REFRIGERATED CASE SYSTEMS,TYP 4. PROVIDE PULL WIRE WITH EACH EMPTY RACEWAY(JUNCTION BOX/CONDUIT)INSTALLED. 1 OVERHEAD CASE CONNECTION WIRING E.- (E)4#3/0&2#6 GND/IG IN 2"C. A 5. CONDUIT RUNS SHALL HAVE NO MORE THAN 90 DEGREES OF TRANSITION BETWEEN PULL BOXES. -- -- -- -- Y NTS EXISTING CONDITIONS WERE TAKEN FROM EACH SUBCONTRACTOR IS RESPONSIBLE FOR HAVING 6. WHERE CONDUIT(S)TRAVERSE AREAS WITH CEILINGS OPEN TO STRUCTURE,CONDUIT(S)SHALL BE CONCEALED AS WELL AS POSSIBLE FROM VIEW ORIGINAL DRAWINGS AND MAY NOT REFLECT A THOROUGH KNOWLEDGE OF ALL DRAWINGS AND FROM CUSTOMER AREA. FOR LOCKOUT TAG OUT PROCEDURES REFER TO EXACT"AS-BUILT'CONDITIONS.CONTRACTOR SPECIFICATIONS IN THEIR RELATED FIELD.THE FAILURE SPECIFICATION SECTION 0135E AND THE MASTERCONSTRUCTION AGREEMENT FOR WALMART SHALL FIELD VERIFY ALL EXISTING CONDITIONS TO ACQUAINT THEMSELF WITH THIS KNOWLEDGE DOES 7. FOR CONDUIT RUNS SCHEDULED WITH 1-1/2"OR LARGER CONDUIT UTILIZE LARGE RADIUS SWEEPS AT POINTS OF TRANSITION. ��PARTIAL ON E-LI N E D IAG RAM PRIOR TO SUBMITTING FINAL BIDS.CONTRACTOR NOT RELIEVE THE RESPONSIBILITY OF PERFORMING 11 .II / SHALL CAREFULLY COORDINATE NEW WORK AND THE WORK PROPERLY.NO ADDITIONAL SHEFT 8. ACCESSIBLE CEILING SPACE SHALL BE CONSIDERED 12INCHES ABOVE A LAY-IN CEILING OR ABOVE BAR JOIST ACCESSIBLE BY A SCISSOR LIFT FOR NTS GLOBAL ETHICS AND COMPLIANCE,"COMPLIANCE DEMOLITION WITH ALL OTHER DISCIPLINES AND COMPENSATION SHALL BE ALLOWED BECAUSE OF R E 1 .1 AREAS OPEN TO STRUCTURE. PERFORMANCE STANDARD FOR CONSTRUCTION." EXISTING CONDITIONS. CONDITIONS THAT OCCUR DUE TO FAILURE TO FAMILIARIZE WORKERS WITH THIS KNOWLEDGE. TS CONTRACTOR IS RESPONSIBLE,NDORNCONDTO CO CONTACT NTACT AND VERIFY ES DATESTFIMES WITH GENERAL REQUIREMENTS EVERY VENDOR FURNISHING EQUIPMENT OR SERVICES,OR TO CHANGE ANY DATES OR DELIVERIES.CONTRACTOR MUST CONTACT WALMART CONSTRUCTION MANAGER LISTED BELOW.VENDOR CONTACT INFORMATION IS ' 1 THE PLANS SHOWN THROUGHOUT THESE DOCUMENTS 15 THE CONTRACTOR SHALL OBTAIN PERMISSION FROM AVAILABLE IN THE GCC EQUIPMENT PLATFORM AND IN THE PROJECT SPECIFICATIONS.THIS IS UNIQUE TO CAPITAL ARE BASED ON LIMITED INFORMATION PROVIDED BY WALMART FOR ALL INTERRUPTIONS OF UTILITY EXPENDITURES PROJECTS. ' WALMART AND A LIMITED SITE OBSERVATION SURVEY; SERVICES TO THE EXISTING BUILDING PRIOR TO THE PROJECT VENDORS a m a r , , THE DESIGN PROFESSIONAL CANNOT BE HELD INTERRUPTION.ACCIDENTAL INTERRUPTIONS SHALL BE RESPONSIBLE FOR THE ACCURACY OF THE EXISTING REMEDIED IMMEDIATELY WITH APPROPRIATE FORCES. AES INDUSTRIES CONDITIONS ILLUSTRATED. HUSSMANN CORPORATION 16 ALL CAP-X/SPECIAL REFRIGERATION PROJECTS ARE TO HONEYWELL INTERNATIONAL INC W2 THE CONTRACTOR IS TO INSPECT THE STORE PRIOR TO BE BID AS NIGHT WORK.THE CONTRACTOR IS TO RAE CORP COMMENCING WITH ANY WORK AND NOTIFY THE ASSUME ALL WORK IS TO BE CONDUCTED ONLY AS WALMART MECHANICAL CONSTRUCTION MANAGER OF OVERNIGHT WORK.SOME WORK MAY BE ALLOWED REFRIGERATION CA P X REF- 1 ANY DISCREPANCIES BETWEEN THESE PLANS AND THE DURING REGULAR WORKING HOURS TO FACILITATE _ EXISTING CONDITIONS. COMPLETION SCHEDULES.WORK WILL ONLY BE WALMART CONTACT LIST3 ALL WORK SHALL BE DONE IN A SAFE AND TPERMITTED DURING REGULAR WORKING HOURS WITH HE WALMART STORE MANAGEMENT'S MENT'S AND/OR CONTACT PHONE AND/OR EMAIL TITLE WORKMANLIKE MANNER AND IN STRICT ACCORDANCE WALMART MECHANICAL CONSTRUCTION MANAGER'S GREGORY BLANK 360 nk.s038 STORE MANAGER U S M V 0 4 3 8 9 5 WITH THE LOCAL GOVERNING BUILDING CODE,NATIONAL PERMISSION.WORK IL IN PERFORMED ON THE gblank.s03757.us@wal-mart.com ELECTRIC CODE,ADA-ADAAGS,OSHA REGULATIONS, EXTERIOR OF THE BUILDING,ROOFTOP,BACK ROOM, AND ALL APPLICABLE CODES,REGULATIONS AND BEHIND DUST WALLS,AND WORK THAT DOES NOT ORDINANCES HAVING JURISDICTION. SIGNIFICANTLY INTERFERE WITH STORE OPERATIONS o GINGER BOWLING 0:479-204-1494 C:479-790-5396 WALMART SENIOR PROJECT MAY BE ALLOWED WITH THE WALMART STORE w gingecbowling@walmart.com MANAGER A R L I N G T O N WA 4 THE EXISTING BUILDING SHALL PROTECTED FROM MANAGEMENT'S AND/OR WALMART MECHANICAL w MOISTURE,DUST AND DEBRIS.INSTALL DUST CONSTRUCTI IN MANAGER'S PERMISSION.THE O F� wgw36 PARTITIONS OR DRAPES AS SHOWN OR AS REQUIRED CONTRACTOR SHALL PAY FOR ADDITIONAL SECURITY PERMITTING REQUIREMENTS AND CONTACT INFO ' TOKEEP DUST AND MOISTURE FROM WALMART PERSONNELTO SUPERVISE ACCESS TO THE BUILDING < 3t°gw o3m PREMISES. AS REQUIRED BY WALMART STORE MANAGEMENT. LL ay Hz"` UN€p$ Z H.— 3`a wg w`�o UPON NOTIFICATION OF CONTRACT AWARD,CONTRACTOR SHALL CONTACT THE ENGINEER OF RECORD'S PERMIT CONTRACTOR SHALL PROVIDE ALL SAFETY EQUIPMENT 5 ANY DAMAGE TO WALMART PROPERTY WHICH OCCURS AND EXTERIOR LIGHTING AS REQUIRED TO MAINTAIN A COORDINATOR REGARDING BUILDING PERMIT STATUS.CONTRACTOR SHALL NOT CONTACT AHJ PRIOR TO CONTACTING PERMIT COORDINATOR TO VERIFY BUILDING PERMIT STATUS.WHEN NECESSARY,THE CONTRACTOR DURING THE PROCESS OF CONSTRUCTION SHALL BE SAFE WORKING ENVIRONMENT FOR WORK REQUIRED AT SHALL DELIVER PERMIT PLAN SETS AND PAY PERMIT FEES TO THE AHJ IN ORDER TO RECEIVE CONSTRUCTION STORE #3 7 5 7 1008 REPAIRED AT NO ADDITIONAL COST TO WALMART;THIS NIGHT.THE CONTRACTOR SHALL PREPARE,AND PERMITS.UPON REVIEW OF PROJECT SCOPE THE AHJ MAY REQUIRE THE CONTRACTOR TO COMPLETE INCLUDES ALL MERCHANDISE.CONTRACTOR SHALL PAY DELIVER TO WALMART STORE MANAGEMENT,A r w ADDITIONAL PERMITTING REQUIREMENTS FOR OR SUBMIT ADDITIONAL PLAN SETS FOR REVIEW TO ADDITIONAL WALMART THE COST FOR ALL DAMAGED MERCHANDISE. SCHEDULE OF WORK FOR THE ENTIRE PROJECT SCOPE LOCAL,COUNTY,STATE,AND/OR FEDERAL AUTHORITIES WHICH MAY NOT BE LOCATED WITHIN THE LOCAL AHJ'S INDEX O F DRAWINGS 6 THE CONTRACTOR SHALL BE RESPONSIBLE FOR OF WORK.THIS SCHEDULE SHALL INCLUDE ALL PHASES OFFICES.SUBMIT ANY PLAN REVIEW COMMENTS OR QUESTIONS THROUGH THE WALMART APPROVED RFI OF WORK TO BE PERFORMED AND SHALL LIST THE PROCESS.CONTRACTOR SHALL OBTAIN PERMIT(S)THE GREATER OF 10 WORKING DAYS OR 2 WEEKS PRIOR TO RECEIVING,HANDLING,AND STORAGE OF OWNER START AND COMPLETION TIMES FOR EACH PHASE OF THE START OF CONSTRUCTION To AVOID UNNECESSARY DELAYS AND ADDITIONAL ENGINEERING FEES. FURNISHED EQUIPMENT.CONTRACTOR SHALL WORK.THE CONTRACTOR SHALL UPDATE THIS CONTRACTOR SHALL PICK UP AND PAY FOR ANY REQUIRED PERMIT(S)AND ALL ANCILLARY FEES.COST OF REFERENCE REFRIGERATION COORDINATE DELIVERY DATE CHANGES WITH WALMART SCHEDULE WEEKLY AS CONSTRUCTION PROGRESSES. REQUIRED PERMIT(S)WILL BE DETERMINED AT THE TIME OF PERMIT ISSUANCE.EXACT AMOUNT SHALL BE HVAC/REFRIGERATION ADMINISTRATOR.CONTRACTOR o COORDINATED WITH THE WALMART CONSTRUCTION MANAGER.CONTRACTOR SHALL EMAIL A COPY OF PERMIT(S) SHEET NUMBER SHEET NAME SHEET NUMBER SHEET NAME SHALL PROVIDE EITHER ON-SITE STORAGE CONTAINERS, 17 THE CONTRACTOR SHALL COORDINATE WITH THE WHEN OBTAINED TO PERMIT COORDINATOR LISTED BELOW.CONTRACTOR SHALL UPLOAD A COPY OF PERMIT(S) Ti TITLE SHEET BASR1 BUILDING AUTOMATION SYSTEM COORDINATE EQUIPMENT LAYDOWN AREA ON-SITE, ENGINEER OF RECORD ON DEVIATIONS IN INSTALLATION WHEN OBTAINED TO EVOCO WORKSPACE SUPPORT FOLDER.UPON COMPLETION OF THE PROJECT, AND/OR OFF-SITE STORAGE FOR OWNER FURNISHED AND CONSTRUCTION OF FIXTURES,PIPING,AND OTHER C4 w - CONTRACTOR SHALL EMAIL APPROVED FINAL INSPECTION REPORT AND CERTIFICATE OF COMPLETION TO PERMIT N7 RESPONSIBILITY MATRICES BASR2 BUILDING AUTOMATION SYSTEM EQUIPMENT AND ANY OTHER CONSTRUCTION ITEMS. ITEMS SPECIFIED IN THESE CONSTRUCTION M COORDINATOR LISTED BELOW.UPON COMPLETION OF THE PROJECT,CONTRACTOR SHALL UPLOAD APPROVED N2 EDGE PROTECTION BASR3 BUILDING AUTOMATION SYSTEM CONTRACTOR SHALL COORDINATE LOCATION OF ANY DOCUMENTS. to FINAL INSPECTION REPORT AND CERTIFICATE OF COMPLETION TO EVOCO WORKSPACE SUPPORT FOLDER. BASR4 BUILDING AUTOMATION SYSTEM ON-SITE STORAGE CONTAINERS AND/OR EQUIPMENT a <u g v R7 FRONT REFRIGERATION PLAN LAYDOWN AREA WITH WALMART STORE MANAGEMENT 18 SALES FLOOR TO BE ACCESSIBLE TO CUSTOMERS CONTACT EMAIL PHONE FIXTURE R7.1 REAR REFRIGERATION PLAN PRIOR TO PLACEMENT.CONTRACTOR IS RESPONSIBLE DURING NON-CONSTRUCTION HOURS.PROVIDE ALL N =W ERIC MILLS Eric.Mills@hargis.biz 206-436-0413 R1.2 PARTIAL ROOF REFRIGERATION PLAN FOR SECURITY AND CONDITION OF OWNER FURNISHED NECESSARYTEMPORARY BARRIERS AND COVERS Z SHEET NUMBER SHEET NAME EQUIPMENT KEPT IN STORAGE AND SHALL PROVIDE CAPABLE OF WITHSTANDING SHOPPING CART TRAFFIC U Di DEMOLITION PLAN R2 REFRIGERATION SCHEDULES PERSONNEL TO RECEIVE AND MOVE EQUIPMENT.THE AND CUSTOMER INTERACTION TO PREVENT CUSTOMER VICINITY MAP Fi FRONT FIXTURE PLAN R2.1 REFRIGERATION SCHEDULES CONTRACTOR SHALL BE RESPONSIBLE FOR THE TIMELY ACCESS OR EXPOSURE TO ANY CONSTRUCTION R3 REFRIGERATION DETAILS ORDERING OF MATERIALS TO PROHIBIT DELAYS OF THE RELATED HAZARDS.COORDINATE WITH WALMART FIA REAR FIXTURE PLAN CONSTRUCTION SCHEDULE OF THIS PROJECT.IT IS THE STORE MANAGER AND/OR WALMART MECHANICAL x R3.1 REFRIGERATION DETAILS a F2 ROOF PLAN RESPONSIBILITY OF THE CONTRACTOR TO COORDINATE CONSTRUCTION MANAGER. R4 REFRIGERATION SUBMITTALS DELIVERY OF MATERIALS IN A TIMELY MANNER. U R4.1 REFRIGERATION SUBMITTALS 19 FURNISH AND INSTALL SEISMIC BRACING BASED ON O O STRUCTURAL SR1 ISEISMIC RESTRAINT 7 THE CONTRACTOR SHALL MAINTAIN THE INTEGRITY OF APPROPRIATE SEISMIC ZONE REQUIREMENTS PER THE EXISTING BUILDING SECURITY AT ALL TIMES.THIS SMACNA PUBLISHED SEISMIC DETAILS AND LOCAL AND � C=a SHEET NUMBER SHEET NAME ELECTRICAL INCLUDES KEEPING THE BUILDING SECURE OF NATIONAL CODES.CONTRACTOR'S RESPONSIBILITY O O Si GENERAL NOTES AND DETAILS PERSONS,ENVIRONMENTAL ELEMENTS OR HAZARDS. INCLUDES STRUCTURAL ENGINEER'S CERTIFICATION ON SHEET NUMBER SHEET NAME THE CONTRACTOR SHALL BE RESPONSIBLE TO MAINTAIN DETAILS SUBMITTED FOR PERMITTING. S2 PARTIAL ROOF FRAMING PLAN AND EQUIPMENT 'A SUPPORT DETAILS RE1 REFRIGERATION ELECTRICAL PLAN THE INTEGRITY OF ALL EXISTING SECURITY SYSTEMS. 1LIl m o RE1.1 REFRIGERATION ELECTRICAL PLAN THE CONTRACTOR SHALL OBTAIN PERMISSION FROM 20 CONTRACTOR SHALL PAINT ALL NEW CONDUIT,DUCT, LJ p THE WALMART STORE MANAGER PRIOR TO THE PLUMBING PIPING,SPRINKLER PIPING,AND SUPPORTS Z O ' MODIFICATION OF ANY EXISTING SECURITY SYSTEM FOR EXPOSED TO SALES FLOOR WITHOUT EXCEPTIONS. OLo a THE OPENING(DEMOLITION)OF ANY EXTERIOR WALL. MATCH CEILING OR ADJACENT WALL COLOR(WHERE y APPLICABLE).CONDUIT AND PIPING SHALL BE PAINTED M m 11 TY s• sv 8 THE CONTRACTOR SHALL KEEP THIS AREA CLEAN AND PRIOR TO INSTALLATION O II 1 I ' JyA "/"''•'R' il. FREE OF DEBRIS AND IS TO REMOVE ALL TRASH AND Z m r "�'^:"''t �,• . DEBRIS FROM THE CONSTRUCTION AREA DAILY.NO 21 REFER TO SPECIFICATION SECTIONS 01600-PRODUCT `J FLAMMABLE MAT O ERIALS OR LIQUIDS MAYBE STORED IN REQUIREMENTS AND APPENDIX A-PRODUCTS AND J THE EXISTING BUILDING OR IN THE NEW ADDITION. WORK BY OWNER OR SEPARATE CONTRACTOR.THESE L SECTIONS INCLUDE SPECIFIC INFORMATION REGARDING W 9 REMOVE ANY EXISTING ITEMS,SERVICES,SIGNAGE, ITEMS AND SERVICES TO BE FURNISHED AND INSTALLED FINISHES/OR SURFACES AS REQUIRED FOR THE BY INDIVIDUALS OTHER THAN THE CONTRACTOR. INSTALLATION OF NEW CONSTRUCTION. LIB 22 REPORT ANY DISCREPANCIES FOUND IN THE FIELD 10 PROVIDE FURRING FOR CONDUITS AND PIPING,SHOWN IMMEDIATELY TO WALMART MECHANICAL w OR NOT,AND FINISH OUT FURRING TO MATCH ADJACENT CONSTRUCTION MANAGER AND THE ENGINEER PRIOR EXISTING FINISHES. TO MAKING ANY STRUCTURAL MODIFICATIONS OR ORDERING OF ANY MATERIALS. Z 11 REPAIR,REROUTE,AND EXTEND ALL SERVICES,PIPING, O CONDUIT OF EXISTING ITEMS AND EQUIPMENT AS 23 IT IS IMPERATIVE THAT THE ROOF FRAMING,DECKING REQUIRED DURING THE CONSTRUCTION PROCESS FOR AND ROOFING SYSTEM BE COMPLETED IMMEDIATELY THE COMPLETE INSTALLATION AND OPERATION OF NEW UPON THE DEMOLITION OF ANY PORTION OF AN EQUIPMENT.THIS INCLUDES ALL ITEMS SHOWN OR NOT EXTERIOR WALL OR MAKING ANY OPENINGS IN THE ISSUE BLOCK SHOWN ON THE DRAWINGS. ROOF TO ELIMINATE POTENTIAL WATER DAMAGE OR MOISTURE INFILTRATION.THE CONTRACTOR SHALL 12 RESET EXISTING EQUIPMENT OR RELATED ITEMS KEEP THE BUILDING WATERTIGHT AT ALL TIMES. INCLUDING SIGNAGE AS REQUIRED FOR PROPER PROVIDE TEMPORARY MEASURES AS NECESSARY TO OPERATION.WHERE EXISTING FINISHES ARE TO REMAIN, PREVENT WATER INFILTRATION/DAMAGE. CLEAN,REPAIR,PATCH,AND/OR RE-PAINT AS NECESSARY TO BLEND WITH ADJACENT SURFACES. 24 THE GENERAL CONTRACTOR SHALL RESPOND TO ALL REQUIREME1 2 3 4 5 6 7 V 9 I O 13 CONSULT WALMART MECHANICAL CONSTRUCTION RESPONSES N ENGINEERTS OF THE AND SUBMISS ONS.ALL AD ACENTATIONS, MANAGER FOR COMPLETE APPLICABLE SCOPE OF BUILDINGS(IF APPLICABLE)SHALL REMAIN IN SERVICE WORK.THE CONTRACTOR SHALL MAINTAIN THE DURING DEMOLITION/CONSTRUCTION. REQUIRED NUMBER OF EXITS WITHIN THE STORE. MAINTAIN EXIT SIGNS AND EMERGENCY LIGHTING AT ALL 25 MUD AND DEBRIS TRACKED ONTO OWNER PAVING OR TIMES,AS REQUIRED BY THE LOCAL BUILDING OFFICIAL. CITY STREETS SHALL BE CLEANED IMMEDIATELY. 14 WALMART SHALL OCCUPY THE BUILDING DURING 26 BUILDING COMPONENTS AFFECTED BY THE SCOPE OF 01 CONSTRUCTION.THE CONTRACTOR SHALL COORDINATE WORK AND ALLOWED TO REMAIN SHALL BE SECURED TO ® WITH WALMART STORE MANAGER AND THE WALMART PREVENT FALLING,LOOSENING,HAZARDOUS MECHANICAL CONSTRUCTION MANAGER ALL CONDITION,OR CREATING DAMAGE OF ANY KIND IN THE CONSTRUCTION PROCEDURES WHICH WILL INTERFERE FUTURE. WITH THE NORMAL DAILY OPERATIONS OF THE STORE. M K - oo _ _ _ SCOPE OF WORK SUMMARY INFORMATION SAFETY BOARD K ® ® � CHECKED BY: EJM NOTE:THE INTENT OF THIS SUMMARY IS TO ASSIST VENDORS IN SAFETY BOARDS AND OR POSTED CONSTRUCTION SCHEDULES ARE c �y,n,�yt, 8 — IDENTIFYING EQUIPMENT NEEDS.IT IS NOT INTENDED FOR USE REQUIRED ON CERTAIN CAP-X PROJECTS DEPENDING ON THE DRAWN BY: JTC \ \ a BY CONTRACTOR TO CAPTURE ALL SCOPE ISSUES.REFER TO PROJECT TYPE.CAP-X PROJECTS WILL BE LISTED AS ONE OF THE PLANS AND SPECIFICATIONS(WHERE APPLICABLE)FOR FOLLOWING TYPES:COMBO,REF-1,REF-2,REF-3,REF-4,HVAC-1, PROTO CYCLE: 04/26/2024 ' L--—-—-—-—-—-—-—-—-—-I ADDITIONAL INFORMATION. HVAC-2,HVAC-3,OR HVAC4. �y DOCUMENT DATE:12/27/2024 2 1 1 1 1 r V. IJI THIS IS A CAP-X REFRIGERATION PROJECT.REFER TO REF-1/REF-2/COMBO:INFORMATION SAFETY BOARD REQUIRED D1 F2 F1.1 R1.2 R1.1 I I I I ® ® ® _ SPECIFICATIONS SECTION 01500 FOR ADDITIONAL INFORMATION W/POSTED CONSTRUCTION SCHEDULE p REGARDING REQUIRED JOB SITE TEMPORARY FACILITIES. REF-3:INFORMATION SAFETY BOARD REQUIRED W/POSTED ® ® ® ® ® ® ® ® ® CONSTRUCTION SCHEDULE SCOPE OF WORK: REF-4:NOT REQUIRED ® REPLACE LT REACH-INS HVAC-1:INFORMATION SAFETY BOARD REQUIRED W/POSTED I \ I I 0 REPLACE ICE CREAM CAKE BUNKER CONSTRUCTION SCHEDULE ® REPLACE EVAPORATOR IN SEAFOOD FREEZER. HVAC-2:INFORMATION SAFETY BOARD REQUIRED W/POSTED 1 \ ® ® ® ® ® ® ® ® REPLACE EVAPORATOR IN DELI FREEZER. CONSTRUCTION SCHEDULE ASR1 I I \ L I I REPLACE EVAPORATORS IN GROCERY/ICE CREAM FREEZER. �L ADD TWO CO2 PUMP SKIDS HVAC-3:INFORMATION SAFETY BOARD REQUIRED W/POSTED \ I I L� ® ® ® ® ® ® ® ® UPGRADE ALL EXISTING REFRIGERATION RACK CONTROLLERS CONSTRUCTION SCHEDULE 0 41142 (�(�\� l i — - � •l L — REPLACE COMPRESSORS AND OTHER RACK HOUSE CHANGES. HVAC-4:NOT REQUIRED LEEAK L DETECTION NOTED ON OEM SUBMITTALS. REFER TO THE MECHANICAL CONSTRUCTION PROJECT / --�--.'-----r' I I �/ SPECIFICATION MANUAL SECTION 01500-TEMPORARY FACILITIES AND CONTROLS FOR COMPLETE TEMPORARY FACILITY AND 1 I I I ® Izgp ® ® ® ® ® ® ® ® CONTROLS FOR COMPLETE TEMPORARY FACILITY REQUIREMENTS. S2 - CODE COMPLIANCE _ - _ - _ - _ m NOTE TO BIDDING F I I I I I I r � � � � F ALL DRAWINGS 8 WORK THEREIN SHALL BE IN COMPLIANCE WITH I I ® ® ® ® ® ® ® ® ® THE FOLLOWING CODES: CONTRACTORS 1 1 1 I ------------------�1 THE INTERNATIONAL BUILDING CODE,2021 EDITION;AMENDED BY THESE PLANS ARE TYPICALLY ISSUED FOR BID AS REDUCED"1/2 D1 Fi R1 -r a CHAPTERS 51-50 AND 51-51 WAC (HALF)SIZE"DOCUMENTS.SCALES SHOWN APPLY TO ORIGINAL ® T� ® ® ® THE INTERNATIONAL FIRE CODE,2021 EDITION;AMENDED BY FULL SIZE"DOCUMENTS ONLY.DO NOT SCALE DRAWINGS,FIELD CHAPTER 51-54A WAG VERIFY ALL DIMENSIONS. E I I T L JJ�� LL i — — THE INTERNATIONAL MECHANICAL CODE,2024 EDITION;AMENDED l fSF HS1 1 C / BY CHAPTER 51-52 WAG THE AWARDED CONTRACTOR SHALL BE RESPONSIBLE FOR THE THE NATIONAL ELECTRICAL CODE,2023 EDITION ENTIRE SCOPE OF WORK INDICATED ON THESE PLANS,THE I I ® THE WASHINGTON STATE ENERGY CODE,2021 EDITION ASSOCIATED SPECIFICATIONS AND WALMART SCOPE OF WORK ® ®I ® ®I ® 11 ® ® DOCUMENT.THIS CAPITAL EXPENDITURE SHALL BE COMPLETED AS USE AND OCCUPANCY GROUP:M A"TURN KEY"PROJECT BY THE AWARDED CONTRACTOR AND SHALL CONSTRUCTION TYPE:V INCLUDE BUT� NOT LIMITED TO ALL SHEETS ON THIS SET:HVAC, — — — BUILDING AREA:UNCHANGED REFRIGERATION,PLUMBING,ELECTRICAL,BAS CONTROLS SYSTEMS, D I D OCCUPANT LOAD:UNCHANGED t l I-===------ --------------------- o ® ® FIRE PROTECTION:YES ARCHITECTURAL AND STRUCTURAL DISCIPLINES. - -- m ---- PROJECT SITE ADDRESS - ___ -J - - - - CONSTRUCTION PHASING ARLI STREET: ST NE — — CITY: ARLINGTOGTON — — PHASING NOTES ARE INTENDED TO BE USED AS A GENERAL STATE: WA _ /gyp\\ GUIDE TO THE CONSTRUCTION AND PHASING OF PROJECT.IT IS COUNTY: SNOHOMISH COUNTY — ------ —------- — — — —— -__ ~~~ — ' — B / THE RESPONSIBILITY OF THE CONTRACTOR TO COORDINATE ALL AREAS,� AREAS OF PHASING WITH WALMART MECHANICAL CONSTRUCTION MANAGER AND WALMART STORE MANAGER PRIOR TO AND DURING CONSTRUCTION. TITLE SHEET 1 2 3 4 5 6 7 8 9 10 City of Arlington Building Department APPROVED KEY Kevin Olander-06/23/2025 EXISTING CONDITIONS WERE TAKEN FROM EACH SUBCONTRACTOR IS RESPONSIBLE FOR HAVING PLAN ORIGINAL DRAWINGS AND MAY NOT REFLECT A THOROUGH KNOWLEDGE OF ALL DRAWINGS AND EXACT"AS-BUILT'CONDITIONS.CONTRACTOR SPECIFICATIONS IN THEIR RELATED FIELD.THE FAILURE No changes authorized unless approved by SHALL FIELD VERIFY ALL EXISTING CONDITIONS TO ACQUAINT THEMSELF WITH THIS KNOWLEDGE DOES the Building Official PRIOR TO SUBMITTING FINAL BIDS.CONTRACTOR NOT RELIEVE THE RESPONSIBILITY OF PERFORMING SHALL CAREFULLY COORDINATE NEW WORK AND THE WORK PROPERLY.NO ADDITIONAL SHEET: DEMOLITION WITH ALL OTHER DISCIPLINES AND COMPENSATION SHALL BE ALLOWED BECAUSE OF T 1 EXISTING CONDITIONS. CONDITIONS THAT OCCUR DUE TO FAILURE TO FAMILIARIZE WORKERS WITH THIS KNOWLEDGE. WALK-IN BOX PROJECTS KE2 THERM EVAPORATOR CONTROL PANEL INSTALLATION CASE INSTALLATION "'NOTE"` "`NOTE"' HIS —NOTE— THISDOCUMENTISINTENDEDTODESCRIBEIMPORTANTELEMENTSOFTHISPROJECTANDTODEFINETHERESPONSIBLEPARTIESFORTHISWORKSTREAM.IT IS NOT MEANT TO BE AN EXHAUSTIVE SOURCE OF INFORMATION ORA THIS DOCUMENT IS INTENDED TO DESCRIBE IMPORTANT ELEMENTS OF THIS PROJECT AND TO DEFINE THE RESPONSIBLE PARTIES FOR THIS WORK STREAM.IT IS TOR HIS WOKUMENT STREAM. TOTMEA T TO BEIMPORT EXHAUNT STIVE SOFTHISP INFORMATION AND TO DEFINE PETESPOPE OF PARTIES OMPLETE SCOPE OF WORK.IT SHALL BE READ AND USED IN CONJUNCTION WITH ADDITIONAL,DETAILED INFORMATION IN THE WALMART REALTY ONE BEST WAY STANDARDS LIBRARY,AND IN PUBLICATIONS AVAILABLE FROM THENOT MEANT TO BE AN EXHAUSTIVE SOURCE OF INFORMATION OR A COMPLETE SCOPE OF WORK.IT SHALL BE READ AND USED IN CONJUNCTION WITH ADDITIONAL, FOR THIS WORK STREAM.IT IS NOT MEANT TO BEAN EXHAUSTIVE SOURCE OF INFORMATION E A COMPLETE SCOPE E WORK.Y MANUFACTURER. DETAILED INFORMATION IN THE WALMART REALTY ONE BEST WAY STANDARDS LIBRARY,AND IN PUBLICATIONS AVAILABLE FROM THE MANUFACTURER. SHALL BE READ AND USED IN CONJUNCTION WITH ADDITIONAL,DETAILED INFORMATION IN THE FACTO WALMART REALTY ONE BEST WAY STANDARDS LIBRARY,AND IN PUBLICATIONS AVAILABLE FROM THE MANUFACTURER. RESPONSIBLE PARTY RESPONSIBLE PARTY RESPONSIBLE PARTY # SCOPE OF WORK BATTEN AND SEAL RELINE REPLACE EVAPORATOR/BOX # SCOPE OF WORK BASIC PANEL STANDARD PANEL # SCOPE OF WORK REPLACEMENTS NEW EQUIPMENT SELF REMODEL CAPX SELF REMODEL CAPX REMODEL CAPX REMODEL CAPX REMODEL CAPEX REMODEL CAPEX REMODEL CAPEX PERFORM PERFORM 1 FURNISH THE CASES. OEMIWMT OEMIWMT OEMIWMT OEM/WM7 FURNISH THE KE2 THERM EVAPORATOR CONTROL PANELS,SENSORS AND 2 FURNISH AND INSTALL ALL(REFRIGERANT AND DRAIN)PIPING. RC RC RC RC 1 DEPENDING ON THE SCOPE OF WORK,FURNISH BATTEN AND SEAL,RELINE OR WALK-IN PANELS MATERIALS. PSWMT PS/WMT PS/WMT PS/WMT PSWMT PSWMT 1 OTHER DEVICES AS REQUIRED TO COMPLETE THE PROJECT. WMT WMT WMT WMT WMT WMT 3 FURNISH ALL FIELD-INSTALLED REFRIGERATION VALVES. OEM/WMT OEMWMT OEMIWMT OEMIWMT 2 DEPENDING ON THE SCOPE OF WORK,FURNISH EVAPORATORS AS REQUIRED. OEMIWMT OEMWMT OEMWMT OEM/WMT OEMWMT OEM/WMT FURNISH AND INSTALL ALL REFRIGERANT PIPING,AND ALL FIELD INSTALLED WMT WMT 4 FURNISH AND INSTALL ALL ISOLATION BALL VALVES. RC RC RC RC 3 DEPENDING ON THE SCOPE OF WORK,FURNISH EVAPORATOR CONTROL PANELS EMSWMT EMSNVMT EMS/WMT EMS/WMT EMSIWMT EMS/WMT 2 REFRIGERATION VALVES NECESSARY TO COMPLETE THE WORK. TECHNICIAN RC RC TECHNICIAN RC RC 5 INSTALL ALL FIELD INSTALLED REFRIGERATION VALVES. RC RC RC RC 4 FURNISH AND INSTALL ALL(REFRIGERANT AND DRAIN)PIPING. RC RC RC RC RC RC FURNISH ALL CONTROLS CABLING AS NECESSARY TO COMPLETE THE WORK. WMT WMT 6 FURNISH AND INSTALL ALL FACTORY INSTALLED OEMIWMT OEMMMT OEMMMT OEMMMT 3 (24 VOLTS OR LESS) TECHNICIAN EMS EMS TECHNICIAN EMS EMS REFRIGERATION VALVES. 5 FURNISH ALL FIELD-INSTALLED REFRIGERATION VALVES. OEMMMT OEM/WMT OEM/WMT OEM/WMT OEMMMT OEMMMT FURNISH ALL CONTROLS CABLING AS NECESSARY TO INSTALL AND TERMINATE CONTROLS WIRING(24 VOLTS OR LESS)AS WMT IT T 7 EMS EMS EMS EMS 6 FURNISH ALL ISOLATION VALVES. RC RC RC RC DETAILED ON THE PRINTS. TECHNICIAN 4 RC RC TECHNICIAN RC RC COMPLETE THE WORK.(24 VOLTS OR LESS) PROVIDE TYPEWRITTEN SCHEDULES FOR ALL AFFECTED w � mw 8 GC RC GC RC m S `�- rzw� sw 7 FIELD-INSTALL ALL REFRIGERATION VALVES. RC RC RC RC RC RC FURNISH AND INSTALL ALL ELECTRICAL POWER CABLING FROM POWER WMT WMT ELECTRICAL PANELBOARDS. o 5 GC RC GC RC SOURCE. TECHNICIAN TECHNICIAN INSTALL AND TERMINATE FURNISHED CONTROLS W IRING(24 � 9 RC RC RC RC r" '$Wow3 8 FURNISH ALL CONTROLS CABLING AS NECESSARY TO COMPLETE THE WORK.(24 VOLTS OR LESS) EMS EMS EMS EMS EMS EMS VOLTS OR LESS)AS DETAILED ON THE PRINTS. 6 TERMINATE POWER CABLES TO THE KE2 PANEL(S). TE TECHNICIAN RC RC TECHNICIAN RC RC PROVIDEELECTRICAL POWER CABLING FROM POWER SOURCE Ny yoro�U"€p� 9 INSTALL AND TERMINATE CONTROLS WIRING(24 VOLTS OR LESS)AS DETAILED ON THE PRINTS. RC RC RC RC RC RC 10 TO THE FIRST CASE IN THE CIRCUIT. GC RC GC RC Z FURNISH AND INSTALL ALL ELECTRICAL POWER CABLING FROM POWER SOURCE TO THE EVAPORATOR COORDINATE THE INSTALLATION TIME WITH STORE MANAGEMENT. PROVIDE ALL"SLAVE"WIRING FROM FIRST CASE TO REMAINING i � o'a 10 GC RC GC RC GC RC 11 RC RC RC RC ��o� €rc� o CONTROL PANEL IF NECESSARY. PREFABRICATE AS MUCH OF THE ELECTRICAL CONDUIT AS POSSIBLE WMT WMT CASES ON THE CIRCUIT. g 3N=a?..yoo WOQON 7 POWER AND CONTROLS CABLES AND MOUNT ANY DEVICES PRIOR TO FINAL GC RC RC RC PREFABRICATE AS MUCH OF THE PIPE WORK AND ELECTRICAL a a�'°�' o J~ ; TECHNICIAN TECHNICIAN Fdo-a- :g 11 TERMINATE POWER CABLES TO THE EVAPORATOR CONTROL PANEL. RC RC RC RC RC RC CONNECTIONS BEING MADE IN ORDER TO REDUCE THE AMOUNT OF"DOWN CONDUIT AS POSSIBLE AND MOUNT ANY DEVICES IN ORDER TO r €y o y o o e TIME"NEEDED TO COMPLETE THE INSTALLATION. 12 RC RC RC RC vi REDUCE THE AMOUNT OF"DOWN TIME"NEEDED TO COMPLETE 12 PREFABRICATE AS MUCH OF THE PIPE WORK AND ELECTRICAL CONDUIT AS POSSIBLE AND MOUNT ANY THE INSTALLATION. DEVICES IN ORDER TO REDUCE THE AMOUNT OF"DOWN TIME" RC RC RC RC RC RC NEEDED TO COMPLETE THE INSTALLATION. IF THE KE2 PANEL IS BEING RETROFITTED TO AN EXISTING WALK-IN BOX, ENSURE THAT THE WALK-IN BOX DOOR IS KEPT CLOSED AS MUCH AS WMT WMT 13 COORDINATE THE INSTALLATION TIME WITH STORE GC RC GC RC W 13 COORDINATE THE INSTALLATION TIME WITH STORE MANAGEMENT. GC RC GC RC GC RC 8 POSSIBLE DURING THE TIME IN HICH THE CONVERSION WORK IS BEING TECHNICIAN RC RC TECHNICIAN RC RC MANAGEMENT. 14 OBTAIN HOT WORK PERMITS AS REQUIRED. GC RC GC RC GC RC CARRIED OUT. 14 OBTAIN HOT WORK PERMITS AS REQUIRED. GC RC GC RC N}- ^o 15 FURNISH TEMPORARY REFRIGERATED STORAGE AS NECESSARY. WMT WMT WMT WMT WMT WMT NOTIFY THE WMT BUILDING CONTROLS TEAM AND ADVISE THEM WHICH WMT WMT NOTIFY THE EMS VENDOR 24 HRS.IN ADVANCE OF THE WORK- W t 9 SYSTEM AND WHICH WALK-IN BOX W ILL BE IMPACTED BY THE WORK. TECHNICIAN RC RC TECHNICIAN RC RC 15 TELL THEM WHAT CASES ARE BEING INSTALLED AND WHAT RC RC RC RC w v m; NOTIFY THE EMS VENDOR 24 HRS.IN ADVANCE OF THE WORK-TELL THEM WHICH WALK-IN BOXES ARE BEING SYSTEMS WILL BE IMPACTED. 16 RC RC RC RC RC RC M IMPACTED. MOUNT THE BASIC KE2 EVAPORATOR CONTROL PANEL ON A WALL INSIDE THE WMT NOTIFY THE WMT BUILDING CONTROLS TEAM AND ADVISE F z 10 RACK HOUSE.NOTE THAT PANELS MUST BE INSTALLED WITH NEC REQUIRED RC RC N/A N/A N/A 16 THEM WHICH SYSTEMS AND WHICH CASES WILL BE IMPACTED RC RC N/A N/A NOTIFY T TECHNICIAN Z r CLEARANCES. 17 HE WMT BUILDING CONTROLS TEAM AND ADVISE THEM WHICH SYSTEM AND WHICH WALK-IN BOX RC RC RC RC RC RC BYTHEWORK. WILL BE IMPACTED BY THE WORK. N =W MOUNT THE STANDARD KE2 EVAPORATOR CONTROL PANEL ON THE 17 REMOVE ALL OF REFRIGERATED PRODUCTS FROM THE CASES WMT WMT NIA NIA EXTERNAL WALL OF THE FREEZER TO WHICH THE CONTROLLER IS THAT ARE BEING REPLACED. z 18 REMOVE ALL OF REFRIGERATED PRODUCTS FROM THE WALK-IN BOX THAT IS BEING IMPACTED. WMT WMT WMT WMT WMT WMT CONNECTED.INSTALL THE PANEL ON THE DOOR WALL OF THE BOX,IN AN WMT O 11 ACCESSIBLE POSITION THAT IS OUT OF THE WAY OF TRAFFIC WHICH MAY N/A N/A N/A TECHNICIAN RC RC REMOVE ALL OF THE ASSET PROTECTION(BUMP GUARDS) Q NOTE:ALLOW LOW TEMP ROOMS TO"DEFROST"FOR A PERIOD OF 72 HOURS TO ENSURE ALL ICE HAS MELTE SHUT DOWN THE WALK-IN BOX THAT IS BEING IMPACTED. DAMAGE THE PANEL.NOTE THAT PANELS MUST BE INSTALLED WITH NEC 18 FROM AROUND THE CASES. GC RC N/A N/A 19 RC RC RC RC RC RC REQUIRED CLEARANCES. DECOMMISSION AND REMOVE THE OLD CASES.IN TEXAS,ALL )C FROM THE PANELS.ICE MELT NEEDS TO BE KEPT CLEARED THROUGHOUT THIS TIME TO ENSURE THAT WATE IS NOT REABSORBED BY THE PANELS. DECOMMISSIONED CASES WILL BE REMOVED FROM THE STORE d REMOVE THE(CONTROL)WIRING FOR THE EVAPORATOR CONTROL HEATERS, U 20 REMOVE ALL OF THE RACKING FROM INSIDE THE WALK-IN BOX THAT IS BEING IMPACTED. WMT RC WMT RC WMT RC EVAPORATOR FANS AND THE LLSV FROM THE EXISTING CONTROL MODULE. BY QUICK REFRIGERATION. USING THE WIRING HARNESS FURNISHED W ITH THE KE2 INSTALLATION KIT, COORDINATE REMOVAL AND DISPOSAL WITH WMT O O 21 REMOVE ANY PROTECTION DEVICES/STRUCTURES THAT WILL IMPEDE THE COMPLETION OF THE WORK. GC RC GC RC GC RC WMT 19 CONSTRUCTION MANGER. RC RC N/A N/A 12 SPLICE INTO THESE CIRCUITS AND CONNECT THEM TO THE CORRECT RC RC N/A N/A N/A TERMINALS IN THE KE2 PANEL.LEAVE THE EXISTING FAN AND DEFROST TECHNICIAN WHEN REPLACING PRODUCE CASES,REMOVE WATER SUPPLY O O REMOVE ALL UTILITIES(CONDENSATE PIPING,CONDUITS,J-BOX,LIGHTING,FIRE SUPPRESSION ETC.)IN CONTACTORS IN PLACE.(NOTE:POWER TO THE KE2 THERM PANEL IS VIA THE FROM MISTING SYSTEM. 22 ORDER TO ALLOW FOR THE WORK TO BE CARRIED OUT. N/A N/A GC RC GC RC EXISTING CIRCUIT CONTROL CIRCUIT.) WHEN REPLACING DELI SERVE OVER CASES,COORDINATE THE O O REMOVAL OF THE DATA CABLING FOR THE DELI SCALES. REMOVE THE APX REPEATER FROM THE WALK-IN BOX THAT IS BEING IMPACTED.STORE THE DEVICE FOR INSTALL AMULTI-CORE CABLE FROM THE RACK HOUSE TO THE WALK-IN BOX 20 CLEAN THE FLOOR UNDER THE CASES AND JET THE DRAINS. RC RC NIA NIA 23 GC RC GC RC GC RC O REUSE FOLLOWING COMPLETION OF THE WALK-IN WORK. TO TERMINATE THE RETURN AIR SENSOR,TWO DEFROST TERMINATION WMT r 13 SENSORS AND THE DOOR SWITCH.NOTE THAT ALL KE2 SUPPLIED CONTROL TECHNICIAN RC RC N/A N/A N/A WHEN REPLACING MULTI-DECK AND/OR GLASS DOOR CASES, z 24 REMOVE THE REFRIGERATION EVAPORATOR(S)FROM THE AFFECTED WALK-IN BOX AS NEEDED. N/A N/A GC RC GC RC AND REUSING EXISTING PIPEWORK,RE-INSULATE THE O a WIRING IS COLOR CODED. REFRIGERATION PIPING BEHIND THE CASES THIS APPLIES TO PS 21 RC RC N/A N/A 25 FILL ANY GAPS IN THE PANEL JOINTS WITH SEALANT OR EXPANDABLE FOAM PRIOR TO TAPING THE JOINT. PS PS PS PS N/A N/A ALL PIPING THAT IS ACCESSIBLE WITHOUT DISTURBING M m 14 USE THE EXISTING DEFROST CIRCUIT TO POWER THE KE2 THERM PANEL. N/A N/A N/A WMT RC RC EXISTING CASES,INSIDE PITS/TUNNELS OR IN A CHASE THAT CLEAN WALLS AND REPAIR ANY FAULTY PANELS IN PREPARATION FOR BATTEN/SEALING OF THE WALL TECHNICIAN IS NOT BEING OTHERWISE DISTURBED. Z 26 PS PS N/A N/A N/A N/A r n JOINTS WITHIN THE BOX THAT IS BEING REPAIRED.CARRY OUT THE BATTEN AND SEAL PROCESS. CARRY OUT THE ELECTRICAL INSTALLATION IN LINE WITH THE N/A N/A N/A WMT 15 RC RC SET THE CASES IN THE POSITION DICTATED BY THE MANUFACTURER'S INSTRUCTIONS AND INFORMATION INCLUDED ON THE BLU... TECHNICIAN CONSTRUCTION PRINTS.ENSURE CASES ARE STRAIGHT AND Z O CLEAN WALLS AND REPAIR ANY FAULTY PANELS IN PREPARATION FOR RELINING THE BOX THAT IS BEING LEVEL,AND SHIMMED PER THE MANUFACTURER'S GUIDANCE. 27 REPAIRED.RE-LINE THE WALK-IN BOX AND BATTEN/SEAL THE CEILING JOINTS WITHIN THE BOX AFFECTED. N/A N/A PS PS N/A N/A MOUNT THE KE2 THERM ROOM TEMPERATURE SENSOR ADJACENT TO THE 22 RC RC RC RC r SEAL ALL CASES WITH BUTYL SEALANT.ALIGN GLASS DOORS (n EXISTING EMS RETURN AIR SENSOR(TYPICALLY 6"BEHIND CENTER OF J DISCONNECT ANY FALL PROTECTION NETTING FROM THE TOP OF THE WALK-IN BOX.LEAVING IT ATTACHED T EVAPORATOR COIL IN THE RETURN AIR STREAM).WIRE THE KE2 THERM PLUMB AND LEVEL TO PREVENT"SAW-TOOTHING"OF THE SENSOR TO THE T2 AIR TEMPERATURE TERMINALS. WMT WMT DOORS. 28 THE ROOF MEMBERS STOW IT OUT OF THE WAY FOR FUTURE RE-USE. N/A N/A N/A N/A PS PS 16 RC RC RC RC DEMOLISH AND REMOVE THE EXISTING WALK-IN BOX AS NOTED ON THE PROJECT PRINTS. **'NOTE**' TECHNICIAN TECHNICIAN THE EXISTING EMS TEMPERATURE CONTROL SENSOR REMAINS LOCATED IN 23 CO RC RC RC RC NNECT THE CASES(MECHANICAL,ELECTRICAL,PLUMBING Q PROVIDE SUPPORT FOR ANY ITEMS THAT MAYBE MOUNTED TO THE EXTERIOR THE WALK-IN BOX THAT AND CONTROLS)AS DETAILED ON THE PRINTS. w m 29 WILL REMAIN IN SERVICE DURING THE BOX REPLACEMENT.(FOR EXAMPLE PANELEL PLACE AND CONNECTED TO THE EXISTING EMS SYSTEM.BOARDS,EMS N/A N/A N/A N/A GC RC g BACKBOARDS ETC.) 24 EVACUATE AND PRESSURE TEST THE CASES AND ANY PIPING MOUNT THE DEFROST TERMINATION SENSOR ON THE FAN SIDE OF THE MODIFIED OR DISTURBED DURING THE WORK. RC RC RC RC z 30 REPLACE THE WOODEN THERMAL BREAKS AS NECESSARY. N/A N/A N/A N/A GC RC EVAPORATOR COIL.(RECOMMENDED LOCATION IS NEAR THE BOTTOM ON THE WMT WMT SWITCH ON AND COMMISSION THE CASES,VALVES AND 31 INSTALL NEW WALK-IN BOX.HANG THE DOOR AND ENSURE THAT ALL HARDWARE FUNCTIONS CORRECTLY. N/A N/A N/A N/A PS PS 17 SIDE OF THE COIL NEAR THE SUCTION HEADER.)WIRE THIS SENSOR TO THE TECHNICIAN RC RC IT RC RC CONTROLS AS REQUIRED.CHECK AND ADJUST MECHANICAL T3 COIL TERMINALS. 25 TXV SUPERHEATS TO OEM RECOMMENDATIONS AND EPR RC RC RC RC 32 RETRIEVE ANY FALL PROTECTION NETTING FROM THE ROOF MEMBERS,AND REATTACH IT TO THE TOP OF N/A N/A N/A N/A GC RC IF THE CIRCUIT HAS ONLY 1 EVAPORATOR COIL,MOUNT THE 2ND DEFROST SETTINGS PER LEGEND. THE WALK-IN BOX AS DESCRIBED ON THE PRINTS. TERMINATION SENSOR ON THE OPPOSITE END OF THE COIL.IF THE 26 INSTALL FURNISHED LIDS TO REFRIGERATED BUNKERS. RC RC RC RC ISSUE BLOCK REATTACH ANY ITEMS PREVIOUSLY MOUNTED TO THE EXTERIOR OF THE WALK-IN BOX THAT WERE 18 REFRIGERATION CIRCUIT HAS 2 COILS,MOUNT THE 2ND DEFROST WMT RC RC WMT RC RC FURNISH CONTROLS SUPPORT TO THE INSTALLING 33 TEMPORARILY SUPPORTED DURING THE WALK-IN BOX REPLACEMENT.(FOR EXAMPLE PANEL BOARDS,EMS N/A N/A N/A N/A GC RC TERMINATION SENSOR ON 2ND COIL.WIRE THIS SENSOR TO THE T4 AUXILIARY TECHNICIAN TECHNICIAN 27 CONTRACTOR. OEM OEM OEM OEM BACKBOARDS ETC.) TERMINALS.(NOTE:IF THE KE2 SUPPLIED DOOR SWITCH IS TO BE USED, INSTALL PROTECTION DEVICES AS INDICATED ON THE PRINTS.REINSTALL ANY EXISTING PROTECTION FOLLOW THE MANUFACTURER'S INSTRUCTIONS FOR INSTALLATION.) 28 WHEN REPLACING PRODUCE CASES,INSTALL MISTING SYSTEM RC RC RC RC 34 DEVICES OR STRUCTURES AS REQUIRED.ENSURE THAT ANY UNDISTURBED PROTECTION DEVICES ARE GC RC GC RC GC RC TO CASES AND CONNECT TO DEDICATED WATER SUPPLY. FIXED SECURELY. CONVERT THE EXISTING,MECHANICAL EVAPORATOR PRESSURE REGULATOR 19 (EPR)TO AN ELECTRIC EVAPORATOR PRESSURE REGULATOR(EEPR)BY WMT RC RC N/A N/A N/A 29 WHEN REPLACING DELI SERVE OVER CASES,COORDINATE THE WMT RCWMT WMT RCWMT INSTALL THE EVAPORATORS(MECHANICAL,ELECTRICAL,PLUMBING AND CONTROLS)AND CONTROL PANELS MEANS OF A CONVERSION KIT SUPPLIED BY THE VALVE MANUFACTURER. TECHNICIAN INSTALLATION OF THE DATA CABLING FOR THE DELI SCALES. 35 AS DETAILED ON THE PRINTS. N/A N/A N/A N/A RC RC CONNECT THE EEPR TO THE KE2 EVAPORATOR CONTROL PANEL. NOTIFY WMT BUILDING CONTROLS THAT THE CASES ARE REMOVE THE CIRCUIT LLSV FROM THE LIQUID MANIFOLD AT THE RACK 30 RUNNING AND ONLINE. RC RC RC RC 36 EVACUATE AND PRESSURE TEST THE EVAPORATORS AND ANY PIPING MODIFIED DURING THE WORK. N/A N/A NIA N/A RC RC AND PROVIDE A LLSV TO BE INSTALLED IN THE EVAPORATOR LIQUID LINE CARRY OUT A THOROUGH LEAK TEST ON ALL WELDED AND 37 INSTALL AND COMMISSION REFRIGERANT LEAK DETECTION SYSTEM AS NOTED ON THE PROJECT PRINTS. N/A N/A N/A N/A RC RC 20 PIPEWORK LOCATED ABOVE THE WALK-IN BOX.REMOVE THE MECHANICAL N/A N/A N/A WMT RC RC 31 MECHANICAL JOINTS INSTALLED OR DISTURBED DURING THE RC RC RC RC SUCTION STOP VALVE FROM THE RACK,AND PROVIDE AN EEPR TO TO BE TECHNICIAN PROJECT. INSTALL/MODIFY ALL UTILITIES FOR FINAL BOX CONFIGURATION.(CONDENSATE PIPING,CONDUITS,J-BOX, INSTALLED IN THE EVAPORATOR SUCTION LINE PIPEWORK LOCATED ABOVE HANDOVER THE CASES TO THE STORE. 38 LIGHTING,FIRE SUPPRESS ON ETC.)INSTALL CONDUIT FOR APX CABLING.SEAL ALL PENETRATIONS PER GC RC GC RC GC RC THE WALK-IN. 32 (CASES MUST BE CLEAN,AT OPERATIONAL TEMPERATURE AND RC RC RC RC SPECS FULLY FUNCTIONAL WITH ALL PANS AND SHELVING IN PLACE.) 39 SWITCH ON THE REFRIGERATION,LIGHTING AND OTHER SYSTEMS WITHIN THE WALK-IN. RC RC RC RC RC RC INSTALL A SUCTION LINE TRANSDUCER AND WIRE THE SIGNAL,GROUND AND SV W IRES TO THE TERMINALS INSIDE THE KE2 THERM PANEL.INSTALL A WMT 33 FILL THE CASE WITH PRODUCT. WMT WMT WMT WMT 21 N/A N/A N/A RC RC COMMISSION THE EVAPORATORS,VALVES AND CONTROLS AS REQUIRED.CHECK AND ADJUST MECHANICAL SUCTION LINE TEMPERATURE SENSOR AND CONNECT THE WIRES TO THE Ti TECHNICIAN 40 TXV SUPERHEATS TO OEM RECOMMENDATIONS AND EPR SETTINGS PER LEGEND. N/A N/A N/A N/A RC RC SUCTION(AUX)TERMINALS INSIDE THE KE2 THERM PANEL. REPLACE MISSING OR DAMAGED FLOOR TILES OR REPAIR GC WMT PREFERRED IF INSTALLING MORE THAN ONE KE2 THERM PANEL IN A SINGLE FACILITY, 34 VISIBLE,DAMAGED CONCRETE FLOOR AROUND THE CASES. FLOORING RC N/A N/A 41 FURNISH HCR AIR DOORAS REQUIRED. N/A N/A N/A N/A PSIWMT PS MT 22 FOLLOW THE MANUFACTURER'S INSTRUCTIONS TO INSTALL A GATEWAY TE HI CIAN RC RC WM TECHNICIAN RC RC (AS NEEDED) INSTALLER) 42 FIELD-INSTALL AND START-UP HCR AIR DOORS AS REQUIRED. N/A N/A N/A N/A PS pS ROUTER.(CAT 5 OR CAT 6 CABLE TO BE SUPPLIED BY INSTALLER.) 35 INSTALL CIRCUIT LABELS TO THE CASES AS REQUIRED. RC RC RC RC CHECKED BY: EJM 43 CARRY OUT ANY CONTROLS PARAMETER CHANGES. N/A N/A N/A N/A EMS EMS IF INSTALLING MORE THAN ONE KE2 THERM PANEL IN A SINGLE FACILITY, FOLLOW THE MANUFACTURER'S INSTRUCTIONS TO"BOND"THE PANELS 36 COMPLETE ASSET TAGGING PROCESS RC RC RC RC DRAWN BY: JTC 44 CARRY OUT ANY CONTROLS PARAMETER CHANGES AND PERFORM REMOTE CHECKOUT. N/A N/A NIA NIA RC RC 23 TOGETHER.THIS BONDING PROCESS PREVENTS EVAPORATORS FROM TE HI CIAN RC RC TECHNICIAN RC RC 45 FURNISH CONTROLS SUPPORT TO THE INSTALLING CONTRACTOR. N/A N/A N/A N/A EMS EMS DIFFERENT WALK-INS FROM DEFROSTING CONCURRENTLY,WHICH MAY PROTO CYCLE: 04/26/2024 OVERLOAD THE ELECTRIC DEFROST POWER CIRCUIT. 37 REPLACE THE SHOP FLOOR DRAW INGS AND INSTALL RC RC RC RC 46 NOTIFY WMT BUILDING CONTROLS THAT THE WALK-IN BOX IS RUNNING AND ONLINE. RC RC RC RC RC RC REPLACEMENT LEGENDS. DOCUMENT DATE:12/27/2024 CONNECTEEV EVAPORATOR HAS AN ELECTRONIC EXPANSION VALVE( ) 47 REINSTALL/RECOMMISSION THE APX REPEATER DEVICE. WMT WMT WMT WMT WMT WMT IF THE WMT 24 THE VALVE TOEVAPORATOR THE CORRECT TERMINALS WITHIN THE KE2 THERM N/A N/A N/A TECHNICIAN RC RC REINSTALL N(BUMP IOUSLY GUARDSRE OVEDSTALL(UNDAMAGED)ERFURNISHED ASSET 48 INSTALL SHELVING/RACKING AS INDICATED ON THE PLANS.RE-INSTALL RACKING AS NECESSARY. WMT RC WMT RC WMT RC EVAPORATOR CONTROLLER. 38 PROTECTION(BUMP GUARDS).INSTALL OWNER FURNISHED RC RC RC RC 49 ANCHOR RACKING AS INDICATED ON THE PLANS. GC RC GC RC GC RC PROTECTION EQUIPMENT AS NEEDED. PROGRAM THE CONTROLLER IN ACCORDANCE WITH GUIDANCE GIVEN IN THE WMT WMT 50 INSTALL CIRCUIT LABELS TO THE WALK-IN BOX,CONTROLLERS AND EVAPORATORS AS REQUIRED. RC RC RC RC RC RC 25 KE2 THERM INSTALLATION MATERIALS. TECHNICIAN RC RC TECHNICIAN RC RC AFTER ALL CHANGES HAVE BEEN MADE TO A RACK,REMOVE T'ANY COMPRESSOR SUCTION FILTERS/SOCKS AND REPLACE ♦G DURING THE PROJECT. CARRY OUT THE EMS CONTROLS PARAMETER CHANGES AND PERFORM A 39 THE RACK LIQUID LINE FILTERS.LEAVE THE OLD FILTERS/ RC RC RC RC w� CARRY OUT A THOROUGH LEAK TEST ON ALL WELDED AND MECHANICAL JOINTS INSTALLED OR DISTURBED 26 EMS EMS EMS EMS EMS EMS 51 RC RC RC RC RC RC REMOTE CHECKOUT. DRIERS IN THE RACK HOUSE TO BE INSPECTED BY THE MCM. y THE KE2 THERM EVAPORATOR CONTROL PANEL EXECUTES ALL SUBMIT REQUIRED VERISAE AND OTHER REGULATORY FORMS q HAND OVER THE COMPLETED WALK-IN BOX TO THE STORE.(WALK-IN BOX MUST BE CLEAN,AT OPERATIONAL TEMPERATURE CONTROL AND DEFROST FUNCTIONS.THEREFORE,IT IS y 52 GC RC GC RC GC RC AS REQUIRED BY THE END OF COMMISSIONING WEEK. O 41142 TEMPERATURE AND FULLY FUNCTIONAL) ESSENTIAL THAT ALL OF THE TEMPERATURE CONTROL AND DEFROST 40 RC RC RC RC FUNCTIONS FOR THE WALK-IN EVAPORATOR ARE REMOVED FROM THE VVMT WMT COMPLETED VERISAE FORMS ARE TO BE EMAILED TO 53 RESTOCK PRODUCT BACK INTO THE WALK-IN BOX. WMT WMT WMT WMT WMT WMT 27 EXISTING EMS CONTROLS SYSTEM.APART FROM A DEFROST SIGNAL CABLE TECHNICIAN RC RC TECHNICIAN RC RC MCEQUIP@WALMART.COM. 14 11, THAT MUST BE INSTALLED FROM THE KE2 TO THE EMS SYSTEM,ONLY REMOVE ALL OF THE OLD CASES AND CLEAR SITE OF ALL ��55 54 HAUL OFF ALL OF THE OLD WALK-IN PANELS FROM SITE(IF APPLICABLE). GC/PS RC/PS GC/PS RC/PS GC/PS RC/PS MONITORING AND ALARM FUNCTIONS FOR THE WALK-IN ARE TO REMAIN IN 41 GC RC GC RC TOOLS,UNUSED INSTALLATION MATERIALS AND TRASH. NOTE:QUICK REFRIGERATION TO HAUL OFF ALL WALK-IN BOX PANELS FROM TEXAS PROJECTS. THE EMS SYSTEM. 55 REMOVE THE OLD LEGENDS AND INSTALL REPLACEMENT LEGENDS AS SUPPLIED BY THE FOR/OEM.PROVIDERC RC RC RC RC RC 28 FURNISH CONTROLS SUPPORT TO THE INSTALLING CONTRACTOR. EMS EMS EMS EMS EMS EMS TYPEWRITTEN SCHEDULES FOR ANY AFFECTED ELECTRICAL PANELS. IF THE WALK-IN BOX HAS A REFRIGERANT LEAK DETECTION SYSTEM, 56 SHUT DOWN AND ARRANGE FOR THE REMOVAL OF ANY TEMPORARY,REFRIGERATED STORAGE. WMT WMT WMT WMT WMT WMT CONNECT THE SIGNAL FROM THE LEAK DETECTION SYSTEM TO THE AFTER ALL CHANGES HAVE BEEN MADE TO A RACK,REMOVE ANY COMPRESSOR SUCTION FILTERS/SOCKS 29 APPROPRIATE CIRCUIT FROM THE^LIEAK DETNALS ITHIN THE KE2 THERM PANEL.A ECTION SYSTEM S DIGITAL OUTPUT CAN BE TECHNICIAN LLEL RC RC TECHNICIAN RC RC MATRIX LEGEND 57 AND REPLACE THE RACK LIQUID LINE FILTERS.LEAVE THE OLD FILTERS/DRIERS IN THE RACK HOUSE TO BE RC RC RC RC RC RC USED TO POWER A SEPARATE RELAY TO PROVIDE THE NECESSARY SIGNAL INSPECTED BY THE MCM. TO THE KE2 PANEL(S). ABBREVIATION DESCRIPTION SUBMIT REQUIRED VERISAE AND OTHER REGULATORY FORMS AS REQUIRED BY THE END OF COMMISSIONING IN THE EVENT OF ANY QUESTIONS OR CONCERNS REGARDING CORRECT RC REFRIGERATION CONTRACTOR AND SUB-CONTRACTORS 58 WEEK.COMPLETED VERISAE FORMS ARE TO BE EMAILED TO MCEQUIP@WALMART.COM. RC RC RC RC RC RC 30 INSTALLATION,SET UP OR PROGRAMMING OF THE PANEL,CONTACT THE KE2 WMT RC RC WMT RC RC GC GENERAL CONTRACTOR AND SUB-CONTRACTORS THERM 24 HOUR TECH SUPPORT LINE.(636)266-0140 TECHNICIAN TECHNICIAN 59 CLEAR SITE OF ALL TOOLS,UNUSED INSTALLATION MATERIALS AND TRASH. RC/PS RC/PS RC/PS RC/PS RC/PS RC/PS EMS EMS VENDOR 31 NOTIFY WMT BUILDING CONTROLS THAT THE WALK-IN BOX IS RUNNING AND WMT RC RC WM7 RC RC ORIGINAL RACK EQUIPMENT MANUFACTURER,ORIGINAL CASE EQUIPMENT LOOSEN AND RE-TIGHTEN OR REMOVE AND RE-INSTALL UTILITIES(CONDENSATE PIPING,CONDUITS,J-BOX, ONLINE. TECHNICIAN TECHNICIAN OEM MANUFACTURER,AHU MANUFACTURER,RTU MANUFACTURER 60 FIRE SUPPRESSION,ETC.)AS REQUIRED IN ORDER TO ALLOW FOR THE WORK TO BE CARRIED OUT GC RC GC RC GC RC CONFIRM WITH STORE MANAGEMENT THAT THE WORK IS COMPLETE,THE PS WALK-IN BOX PANEL SUPPLIER 32 WALK-IN BOX IS DOWN TO OPERATING TEMPERATURE AND IS FULLY TE HN WMT RC RC TECHNICIAN FUNCTIONAL. RC RC WMT WALMART AES SUPPLIER OF AHU ADAPTER CURBS,RTU ADAPTER CURBS AND WALMART'S SUBMIT REQUIRED VERISAE AND OTHER REGULATORY FORMS AS REQUIRED EQUIPMENT SALVAGE PARTNER 33 BY THE END OF COMMISSIONING WEEK.COMPLETED VERISAE FORMS ARE TO TECHNICIAN RC RC TECHNICIAN RC RC WTC WATER TREATMENT CONTRACTOR BE EMAILED TO MCEQUIP@WALMART.COM. MC MECHANICAL CONTRACTOR AND SUB-CONTRACTORS 34 CLEAR SITE OF ALL TOOLS,UNUSED INSTALLATION MATERIALS AND TRASH. TECHNICIAN H RC RC TECHNICIAN RC RC RESPONSIBILITY MATRICES SHEET: N1 EDGE PROTECTION NET SYSTEM NOTES EDGE PROTECTION NET SYSTEM IS EXISTING TO REMAIN ABOVE WALK-INS BEING REPLACED. CONTACTOR SHALL CONTRACT WITH OWNER APPROVED INSTALLERS FOR THE DETACHMENT AND/OR DEMOLITION OF EDGE PROTECTION NET SYSTEM AS NECESSARY FOR DEMOLITION OF WALK-INS PRIOR TO START OF DEMOLITION. CONTACTOR SHALL CONTACT WITH OWNER APPROVED INSTALLERS FOR THE RE-ATTACHMENT AND/OR RE-INSTALLATION OF EDGE PROTECTION NET SYSTEM ABOVE WALK-INS BEING REPLACED AFTER CONSTRUCTION OF WALK-INS IS COMPLETE. EDGE PROTECTION NET SYSTEM IS FURNISHED BY OWNER. CONTACTOR SHALL COORDINATE WITH OWNER APPROVED EXTERIOR WALL INSTALLERS AND OWNER EDGE PROTECTION NET SYSTEM SUPPLIER FOR ACQUISITION OF ANY NEW REQUIRED EXISTING COMPONENTS. ROOF SYSTEM REF SPECIFICATION 13300 FOR EDGE PROTECTION NET SYSTEM. S gv sw CONTACTOR SHALL COORDINATE ALL WORK INVOLVING THE I I EXISTING EDGE PROTECTION NET SYSTEM WITH THE WALMART STRUCTURE MECHANICAL CONSTRUCTION MANAGER. p wa 3ta<a�uti�gm H'aoQo€-G€w$ O �Sa W 'pia N EU z 3 �wQo€<G�w SECURELY FASTEN WEB SECURELY FASTEN WEB EDGE PROTECTION NET SYSTEM SUPPLIER: S 3Qo$`g" STRAP THROUGH EVERY STRAP THROUGH EVERY HAINES,JONES,&CADBURY (800)459-7099 a oo"�,°��w:a- JOIST PANEL POINT,6'-0" JOIST PANEL POINT,6'-0" r= €j �o ysoeW OC MAX OC MAX WMT@hjcinacom m WALMART APPROVED INSTALLERS: WEB STRAP APOLLO (479)601-9484 REF SPEC JEFF ORNS jeff.orns@apolloretail.com IL,IN,KY,NC,OH,TN,VA,B WV 60+ NET SYSTEM CAN (201)996-9287 INSTALL NETTING 60°MAX '$" REF SPEC TIM BARRY tlbarry@can-usa.net W m; IN RELATION TO CT,DE,MA,MD,ME,NH,NJ,NY,PA,RI,&VT W HORIZONTAL WALK-IN GM NORTHRUP (952)226-3090 00 f CEILING PANELS z `r JASON FARMAKIS jfarmakis@gmnorthrup.com GREATER $° MI,MN,NO,SD,&WI = THAN 6" 3 GREATER THAN 2" ATTACH BOTTOM NET WEBBING YF 8 TO WALK-IN PANEL BLOCKING GREATER SOUTHWEST CONSTRUCTORS (817)596-3513 0 =W AT 2'-0"OC THROUGH INTEGRAL JOHN WILKINSON jwilkinson@century[el.net z0 GROMMETS WITH#10 x 3"WOOD AR,LA,OK,&TX O SCREWS AND#10 WASHERS AT MICHAEL STRAIN BUILDERS (760)751-5050 3/4"FROM EDGE OF WALK-IN SHERI COLVELL Shen@msbuildem.com PANEL AK,AZ,CA,HI,ID,MT,NM,NV,OR,UT,WA,&WY a WALK-IN PANEL NEWCO (352)735-3877 U BILL BROWN bill@newcocanstruction.com O O AL,FL,GA,MS,&SC QUAL-SERV (479)459-6349 (] C a JOSH PADGETT jpadgett@qualsewsolutions.com O O CO,IA,KS,M0,8NE NET SYSTEM ATTACHMENT PARALLEL TO STRUCTURE _ o 0 / NTS 7 O ^ � a � n M m fll Z m REF MEPFR FOR DUCT, `J W CONDUIT,AND PIPING LOCATIONS AND SIZES 0 O J CUT OPENING IN NETTING NO A/ LARGER THAN 1"GREATER LIB THAN PENETRATION 10, 1/2"SLEEVE ANCHOR WITH 3/8"ROD COUPLING WITH 1 1/2"MIN EMBEDMENT AND A 3/8"EYEBOLT NETTING SYSTEM REF SPECREFSPECS LOOP WEB STRAP LASH NETTING AT ALL CUT THROUGH EYE BOLT PENETRATIONS,REF SPECS WHERE NETTING HEIGHT IS LESS THAN 5',GATHER NETTING AT STRUCTURE TO WEAVE CONTINUOUS WEB ISSUE BLOCK WALK-IN PANEL ENSURE FULL TENSION FROM WALK-IN STRAP THROUGH NETTING PANEL TO JOIST TOP WEB STRAP AT TOP WEB STRAP AT AT EACH OPEN END CORNER FOR LOWER NET CORNER FOR UPPER NET PROVIDING 6"MIN OF NET ATTACH BOTTOM OF NETTING AT BEYOND STRAP EACH SIDE OF SPLICE WITH#10 x 3" WOOD SCREWS AND#10 WASHERS THROUGH GROMMETS,ADD ,--- -_, GROMMETS AS NEEDED NETTING PENETRATIONS 4 NTS GREATER GREATER `\ THAN 6" THAN 2" NETTING NETTING NETTING - TYPICAL WEB STRAP, INSIDE CORNER AT SPLIT INSIDE CORNER AT SPLIT WALL ANCHOR ENT ELEVATION ELEVATION BOX WALL WALK-IN BOXK-IN JOIST THROUGH POINT JOIST (TRANSVERSE(T ANSVERSE ET (PARALLEL NE DAWN W CHECKEDD BY: EJM PANEL ATTACHMEN WALK-IN EDGE WALK-IN AGAINST WALK-IN ADJACENT WALL TO WALK-IN NET SYSTEM / PROTO CYCLE: 04/26/2024 NOTIFY WALMART PROJECT REF SPECS - DOCUMENT DATE:12/27/2024 MANAGER IF ANY EXISTING GREATER i'NETTING WALK-IN BOXES DO NOT INSTALL � if NETTING THAN 2" HAVE EDGE PROTECTION NETTING PRESENT AT THE LOCATIONS WITHOUT SHOWN PRIOR TO THE SLACK CEILING WALK-IN WOAXK-IN COMMENCEMENT OF THE �`G..... TILE BOX PROJECT-ADD MISSING w EDGE PROTECT ION AND -� WALK-IN ADJACENT WALK-IN ADJACENT COORDINATE WITH AOR TO WEAVE CONTINUOUS WEB STRAP PROVIDE NECESSARY i THROUGH NETTING AT EACH OPEN TO CEILING TO COOLER OF A DETAILS AND SPECS END,TYP 0 41742 DIFFERENT HEIGHT EDGE PROTECTION FOR NET RUT WHERE FOR NET ATTACHMENT,LOCATE NTS WITHIN 3"OF JOIST PANEL POINTS EXISTING ROOF SYSTEM ATTACH BOTTOM NET WEBBING TO WALK-IN PANEL BLOCKING AT 24"OC THROUGH INTEGRAL GROMMETS W ITH(1)#10 x 3" WOOD SCREW AND#10 WASHERS 314" FROM EDGE OF WALK-IN PANEL ATTACH WEB STRAPS TO UNISTRUT USING a 5/16"EYEBOLT FASTENED TO UNISTRUT WITH 5/16"NUTS AND WASHERS EXISTING STRUCTURE CENTER OPENING IN NETTING WITH OPENING IN CEILING GRID SECURELY FASTEN WEB WEB STRAP STRAP THROUGH EVERY REF SPEC JOIST PANEL POINT,6'-0" CONTINUOUS WEB STRAP FROM 2" NET SYSTEM OC MAX FOOTMAN LOOP AT WALK-IN PANEL REF SPEC THROUGH JOIST PANEL POINT AT ALL INSIDE ATTACH BOTTOM NET INSTALL NETTING 60°MAX CEILING TILES AND OUTSIDE CORNERS AND NET WEBBING TO WALK-IN IN RELATION W OMITTED FOR TERMINATIONS PANEL BLOCKING AT 2'-0" $ HORIZONTAL WALK-IN CLARITY OC THROUGH INTEGRAL S" CEILING PANELS GROMMETS WITH#10 x 3" AT CORNERS PROVIDE ONE WEB STRAP TO TENSION NET GATHER NETTING AT CORNERS EDGE WOOD SCREWS AND#10 AT TOP CHORD AND ONE FROM JOIST PANEL POINT TO WASHERS AT 3/4"FROM FOOTMAN LOOP AT WALK-IN PANEL TIES,DSECURE WITH I HLASHING PROTECTION EDGE OF WALK-IN PANEL ATTACH FOOTMAN LOOP WITH(2)#10 x 3"WOOD SCREWS WALK-IN PANEL CENTERED ON WOOD BLOCKING 3/4"FROM EDGE OF WALK-IN BOX,PLACE SCREW ATTACHMENT 1"MIN FROM END OF BOX, REF SPEC ALTERNATE CONDITION CEILING AS SCHEDULED NET SYSTEM ATTACHMENT PERPENDICULAR TO STRUCTURE NET SYSTEM ON WALK-IN BOXSYSTEM ON WALK-IN BOX L NTS I NTS SHEET: N2 DEMOLITION LEGEND DEMOLITION REQUIREMENTS EXISTING TO REMAIN ----- DEMOLISH/REMOVE 1 ALL DEMOLITION SHALL BE CARRIED OUT IN A SAFE MANNER AND IN STRICT ACCORDANCE WITH OSHA ROOF DECK DUST DRAPE TO BE 6 MIL CLEAR POLY AREA TO BE DEMOLISHED REGULATIONS. SHEETING OVERLAPPED AT JOINTS A MIN OF 2'-0"AND CONTINUOUSLY TAPED JOINTS ---- RELOCATE 2 THE CONTRACTOR SHALL FIELD VERIFY THE EXTENT OF DUST DRAPE ATTACH SHEETING FROM ROOF DECK TO TOP DEMOLITION.THE WORK INCLUDES,BUT IS NOT LIMITED OF BARRIER AS SHOWN FOR A RUSTPROOF SALVAGE REQUIREMENTS TO,THE DEMOLITION AND REMOVAL OF WALLS,DOORS, DEMO AREA CONDITION,IF ATTACHMENT TO CEILING IS FLOORS,AND ELECTRICAL ITEMS INCLUDING CONDUITS AS IMPOSSIBLE,LIGHT FRAMING SHALL BE SHOWN ON DRAWING OR AS REQUIRED FOR THE DUST DRAPE INSTALLED WITH SHEETING ATTACHED AROUND 1. IMMEDIATE SALVAGE/LEGAL DISPOSAL OF ALL INSTALLATION OF NEW WORK FOR A COMPLETE JOB. IT TO PROHIBIT DUST PENETRATION DECOMMISSIONED EQUIPMENT AND CONSTRUCTION CONT 2"x 4" DEBRIS SHALL BE RESPONSIBILITY OF CONTRACTOR 3 WHEN UTILITIES ARE REMOVED,CAP AND SEAL A MINIMUM DUST DRAPE HOLD DOWN KEYNOTES OF 8"BELOW FINISH FLOOR OR A MINIMUM OF 6"ABOVE OF CEILING.SHOW ALL ABANDONED AND CAPPED UTILITIES ON AS-BUILTS,DRAWINGS,AND RECORDED 2 x 4 TOP PLATE 2,27 REMOVE EXISTING PIPE BOLLARDS.GRIND DOWN DOCUMENTS. FLUSH WITH FLOOR SLAB.PATCH AND REPAIR FLOOR AS NECESSARY. 4 IT IS THE CONTRACTOR'S RESPONSIBILITY TO PROVIDE 2 x 4 STUD AT 96"OC ADEQUATE SHORING,BRACING,AND SUPPORT SYSTEMS w o 1/2"CD PLYWOOD AND TO KEEP THE EXISTING STRUCTURE INTACT AND IN A w $ w o r A ATTACHED TO STUD AT SAFE CONDITION DURING THE REMOVAL OF STRUCTURAL �-+ F s2 x 4 BRACE 4 12"OC MAX ITEMS AND NEW CONSTRUCTION. wCONTRACTO m 1 2 3 5 THE CONTRACTOR SHALL RETAIN A REGISTERED m wwON ATTACHM O rcr y°zao<rc�uF€p$ PROFESSIONAL ENGINEER TO DESIGN THE SHORING AND IL SPECIFY DEMOLITION PROCEDURES. G 6 - r - - - - - 2x4 BOTTOM ICI r w ^mow a€a- o PLATE 6 IT IS THE CONTRACTOR'S RESPONSIBILITY FOR MEANS g gNo a?°ro y GzN q AND METHODS OF DEMOLITION AND NEW Qar orc3 II CONSTRUCTION.PRIOR TO THE EXCAVATION OF a 111 EXISTING PIPING PI FOUNDATIONQUATE ADJACENT TO THE FOR THEINGSTRUCTURE, FLOOR II REMAIN.NOT ALL PIPING PROVIDE ADEQUATE SUPPORT FOR THE SUB-BASE TO BAKERY SHOWN.TYP;UNO. PREVENT UNDERMINING. UTILITY I I REMOVE PORTION OF BULKHEAD TO 9`2"AFF. 7 DURING DEMOLITION AND RECONSTRUCTION,THE ANCHORS AT 96"OC I 2 4 CONTRACTOR SHALL COORDINATE WITH THE WALMART MECHANICAL CONSTRUCTION MANAGER ANY REQUIRED 11 F1.1 F1.1 SAFETY BARRIERS OR BARRICADES AND DUST WALLS. REFERTOTEMPORARY BARRIER/DUST DRAPE I MANAGER THE WALMARTND SCHEDULING DEMOLITION W 3 MANAGER FOR PHASING AND SCHEDULING DEMOLITION C?w mm BAKERY a C01 AND NEW CONSTRUCTION. m z NTS COOLER I r 11 m 8 DISPOSAL OF ALL DECOMMISSIONED EQUIPMENT,NOT 2 < 8 v I APPORTIONED TO WALMART'S DESIGNATED SALVAGE r GROCERY VENDOR,SHALL BE THE RESPONSIBILITY OF THE AREA CONTRACTOR IN ACCORDANCE WITH LOCAL CODES AND z X. ANY GOVERNMENTAL REGULATIONS;REFER TO WALMART O 1 2 3 DIRECTIVES AND SPECIFICATIONS.THE CONTRACTOR O SHALL COORDINATE THE PICK-UP DATE WITH THE �\ DESIGNATED SALVAGE VENDOR,PREPARE AND LOAD THE DESIGNATED SALVAGE ITEMS,KEEPING THEM x (�I�\\ INTACT AND IN ACCORDANCE WITH LOCAL CODES AND d K — — — — — — f\ / 1� ANY GOVERNMENTAL REGULATIONS;REFER TO WALMART �/ r II DIRECTIVES AND SPECIFICATIONS.ITEMS TO BE O O SALVAGED BY WALMART'S DESIGNATED SALVAGE 4 VENDOR SHALL BE LIMITED TO:VARIABLE FREQUENCY C:::D C= II DRIVES,CONDENSING UNITS,CONDENSERS, O O BAKERY I I u 1.2A ————————————— EVAPORATORS,COPPER PIPING,ROOF TOP UNITS,AIR —— 1.11A- HANDLING UNITS,AND COMPRESSOR HOUSES. II II � � MEAT DAIRYI F — — — — — — — — — — — — — — / C \ REFER TO SPECIFICATIONS SECTION 1500 FOR z o O L\ COOLER / — — — — — — — — — — — — — — — coOLEW r'i II --� -- \�I 9 ADDITIONAL INFORMATION REGARDING STORMWATER O RUNOFF CONTROL. O a ___________________ _____________r__________ -- r 10. CONDUCT ALL DEMOLITION AND REMOVAL OF DEBRIS AS M r y r r II A06 — -_——A06�—— - ——.A03-——-- .. °' i y OO _ r' / n -- _ __ __ __ ____ __ _ __ ___ __ __ __ ____ __ -- 2DRS ONRZH REQUIRED TO ENSURE MINIM UM INTERFERENCE WITH ' oo __�_ r / II 2 ORS ONRZH q q (REPLACE) BUILDING/SITE FACILITIES AND OPERATIONS. f n Z (REPLACE) 1.1B N M 9 DRS ONRZH `J r� / n 10 DRS ONRZH 111 11. NOTES INDICATING DEMOLITION WORK ARE NOT O w (REPLACE) (REPLACE) CONFINED SOLELY TO THE DEMOLITION PLANS.THE A07 A04 0 CONTRACTOR SHALL REVIEW ALL CONSTRUCTION I II S ONRIZH 10 DRS ONRIZH DOCUMENTS,INCLUSIVE OF SCHEDULES AND J q I 9 l R PLACE)- CREPLACE) SPECIFICATIONS,TO DETERMINE FULL EXTENT OF n/ `� II _ _ ____ LI_ _ RE _ C- -=4f DEMOLITION WORK. RCU1 I i}—___ A07-t-- I I-------- i/�l� 0 o REPLACE 2DRS ONRZH r -A04 Y m I TYP 2.27 q i I - - - SCSS-L n A i I I c—}la II - m L—RCU1--o ( ) n Ao7 I!-J _ r____-_qp�---I— -1-= Aoa DEMOLITION NOTES I II 2DRS ONRZH z I II (REPLACE) 1.113 0 (REPLACE) 1. REMOVAL OF ANY SALVAGE EQUIPMENT OR DEBRIS IS O' _ _ _ _ _ _ _ _ I i� 1.4A 19 DRS ONRII PROHIBITED.THIS INCLUDES THE SALE OF COPPER, J J (REPLACE) ALUMINUM,OR ANY RELATED MATERIALS. DEMOLISH RCU-1. II A09 A05 o STOCKROOM CAP ROOF CURB. it 9 DRS ONRIZH 10 DRS ONRIZH 2, WHERE APPLICABLE WALK-IN PANEL MANUFACTURER ISSUE BLOCK (REPLACE (REPLACE) SHALL DEMOLISH AND PROMPTLY HAUL OFF WALK-IN I - __ ____ - __ 1- II i+—1__—_qp�i--- ---------A05---- ice} PANELS AND DOORS TO BE REPLACED. q - —a d DURING DEMOLITION AND RECONSTRUCTION PHA o -- — — — — — — — — — — — — — — — II A09 —�--�— ------------ i� Co ORDINATE LOCATION OF ALL DUST WALLS ANDSE , o •& II — __ A10----- o I II 2DRS ONRZH - -- -- ---- -- -- -- ---- -- -- -- ---- -- -- -- A05 SECURITY ENCLOSURES WITH WALMART STORE (REPLACE) A 3 DRS ONRZH MANAGER.REFER TO DUST WALL DETAIL. I II N 19 DRS ONRIZH (REPLACE) I GROCERY q B08 4. ALL NEW EQUIPMENT MUST BE ON SITE PRIOR TO \ I AREA II 9 DRS ONRZH (REPLACE) B07 STARTING ANY DEMOLITION OR CONSTRUCTION. EDC \` I n B08 (REPLACEr 10 DRS ONRZH- 1 I EXISTING HYBRID HOUSE II — (REPLACE 5. PATCH/REPAIR FLOOR COVERING AS REQUIRED AFTER MTC(ON ROOF). q 3DRS ONRZH __ _ __ __ __ __ ____ __ __ __ ____ __�L_x__ ____ _ __ B07 INSTALLATION OF NEW CASES.MATCH EXISTING \ q (REPLACE) o - 3 DRS ONRZH FLOORING TYPE,COLOR,PATTERN,AND FINISH. —$0&� ________I_ _____ ____I....... _______ I / n I__ i______ --B07----------- (REPLACE) co ® _ STOCKROOM ii DEMO REFRIG TION I o a it ERA I lil PIPING BACKLOCATON M SEAFOOD I SHOWN AND CAP.TYP. < PROVIDE PROTECTION FOR ® FREEZER ��� ALL EXPOSED PIPING DURING REWORK.REFER TO A01 U �„ REFRIGERATION PLANS AND CHECKED BY: EJM LLE-102 GENERAL NOTES ON R1 FOR (REPLACE) DRY ADD D DITIONALGRANULATION DRAWN BY: JTC PRODUCE RE QUIREMENTS.TYP. PROTO CYCLE: 04/26/2024 �\ /� PREP — — — — — — — — ---IH \ DOCUMENT DATE:12/27/2024 GROCERY IC DEMO ALL CONDENSATE PIPING ,�I/I ((rr I/ / BO6b FREEZER I� i �:.1 ASSOCIATED WITH EVAPORATOR. � II BML-1 \ I II (REPLACE) / 2.27 I " GROCERY • � BOSb AREA BML-16 E) (REPLACE) EXISTING HYBRID HOUSE �' \" 0 41742 �r--_�--_— —J----_ DTB ON ROOF. (/�J EXISTING PIPING TO REMAIN.NOTALLPIPING > L R3.1 c UTILITYMEAT Q SHOWN.TYP;UNO. A Im — — — — — — — — — TYP / D EXISTING HYBRID HOUSE PRODUCE MECHANICAL LTA ON ROOF). COOLER m ( ) SERVICE I P �5Q�0 m DELI bo DEMO REFRIGERATION ` C B06a PIPING BACK TO _I LOCATION SHOWN DELI 65 BML-1 B06 HALLWAY (REPLACE) i AND CAP.TYP. SALAD 1.01B T Al DEMO ALL PREP O B06a I {w— DELI CONDENSATE PIPING ASSOCIATED WITH o REMOVE PORTION OF COOLER B05a �1.026� BUL2 HEAD 40 9'-2"AFF. A11 EVAPORATOR. BL BO5 -1 O — LLE-136 (REPLACE) F1.1 F1.1 (REPLACE) DELI DELI u 2 DELI UTILITY PREP GROCERY TYR R3.1 FREEZER AREA e --�— --r V/ A11---- A� QU N J' II �+ 1.1B f — — _ — X — — C I f 1.1A POULTR I COOLER 1 2 3 3 DEMOLITION PLAN REAR DEMOLITION PLAN FRONT DEMOLITION PLAN EXISTING CONDITIONS WERE TAKEN FROM EACH SUBCONTRACTOR IS RESPONSIBLE FOR HAVING ORIGINAL DRAWINGS AND MAY NOT REFLECT A THOROUGH KNOWLEDGE OF ALL DRAWINGS AND EXACT"AS-BUILT'CONDITIONS.CONTRACTOR SPECIFICATIONS IN THEIR RELATED FIELD.THE FAILURE SHALL FIELD VERIFY ALL EXISTING CONDITIONS TO ACQUAINT THEMSELF WITH THIS KNOWLEDGE DOES PRIOR TO SUBMITTING FINAL BIDS.CONTRACTOR NOT RELIEVE THE RESPONSIBILITY OF PERFORMING SHALL CAREFULLY COORDINATE NEW WORK AND THE WORK PROPERLY.NO ADDITIONAL SHEET: DEMOLITION WITH ALL OTHER DISCIPLINES AND COMPENSATION SHALL BE ALLOWED BECAUSE OF D 1 EXISTING CONDITIONS. CONDITIONS THAT OCCUR DUE TO FAILURE TO FAMILIARIZE WORKERS WITH THIS KNOWLEDGE. OCATION OF CASES LL DE REFRIGERATED CASE LEGEND KEYNOTES VERIFYEXACTLTRUCTIONMANAGER CONTRACTOR ATCHANDREP REPAIR ND SHEET NOTES WALMART CONSTRUCTION MANAGER FINISH TO PATCH AND REPAIR AROUND CASE 1.55 DIAMOND PLATE REFRIGERATED CASE FLOOR PRIOR TO STARTING CONSTRUCTION,TYR REFRIGERATED CASES. LENGTH/ MOUNTED RAILING OWNER FURNISHED GC INSTALLED MATCH EXISTING COLOR,FINISH,AND 1. STUD WALL DIMENSIONS ARE TO FACE OF STUDS 6. ALL JOINTS BETWEEN DISSIMILAR MATERIALS SHALL BE 11.DIMENSIONS OF REFRIGERATED CASES ARE TO PATCH AND REPAIR WALLS AND FINISHES PATTERN AS CLOSELY AS POSSIBLE 2. ROUTE ALL UTILITY SERVICE LINES,PIPES AND CONDUIT SEALED AS REQ'D FOR A COMPLETE AND PROPER OUTERMOST POINTS OF CASES;ENDCAPS AND BUMPERS WDS NUMBER QTY. DOOR NO. DESCRIPTION MFR OR SUPPLIER MODEL NO. NOTES 11.10 REFRIGERATED CASE FASCIA.REFERENCE TO MATCH ADJACENT WHERE IMPACTED SUBJECT TO THE APPROVAL OF THE WITHIN STUD WALLS WHEREVER POSSIBLE ON INSTALLATION,REGARDLESS OF WHETHER SHOWN ON ARE CONSIDERED PART OF CASE,WHERE THEY OCCUR RD0000 10 REFR VALANCE VARIES VARIES 13 EQUIPMENT NOTES. BY INSTALLATION OR MODIFICATION OF WALMART MECHANICAL CONSTRUCTION COOLER/FREEZER PANELS IN FOOD PREP AREAS WHERE DRAWINGS OR INDICATED IN SPECS 12.ALL NON-MOVEABLE EQUIPMENT INCLUDING SINKS, RS3002.142 3 3DR NARROW REACH-IN ICE CREAM(LED) HUSSMANN CORPORATION RUN 5 PLUMBING AND/OR ELECTRICAL UTILITIES MANAGER OR STORE MANAGER. UTILITIES MUST BE EXPOSED,CONTRACTOR TO HAVE a. SUCH JOINTS NOT SHOWN OR SCHEDULED SHALL BE OVENS,AND REFRIGERATED EQUIPMENT SHALL BE R83002.142 1 4DR NARROW REACH-IN ICE CREAM(LED) HUSSMANN CORPORATION RUN 5 OPTION OF FOLLOWING: SEALED WITH SEALANTS AS RECOMMENDED BY MFR SEALED TO WALLS RS3002.142 3 5DR NARROW REACH-IN ICE CREAM(LED) HUSSMANN CORPORATION RUN 5 CONTRACTOR SHALL PROVIDE FLOOR CASES FURNISHED BY WALMART, a. SURFACE MOUNT UTILITIES WITH NON-CORROSIVE FOR SPECIFIC APPLICATION a. BASE OR LEGS SHALL BESET IN A BED OF SEALANT TILE TO PATCH AND REPAIR AROUND INSTALLED BY CONTRACTOR.ALL NEW ANCHORS;SEAL BOTH SIDES OF PIPE/CONDUIT TO 7. INTERIOR SEALANTS USED IN FOOD PREPARATION AREAS WITH EXCESS REMOVED RS3002.242 6 2DR NARROW REACH-IN FROZEN FOOD(LED) HUSSMANN CORPORATION RUN 5 REFRIGERATED CASES.MATCH EXISTING EQUIPMENT MUST BE ON SITE PRIOR TO PANEL CONTINUOUSLY WITH SEALANT SHALL MEET REQUIREMENTS FOR USE IN USDA b. MOVEABLE EQUIPMENT SHALL NOT BE SEALED RS3002.242 2 3DR NARROW REACH-IN FROZEN FOOD(LED) HUSSMANN CORPORATION RUN 5 COLOR,FINISH,AND PATTERN AS STARTING ANY DEMOLITION OR b. INSTALL UTILITIES 1/2"OFF FACE OF PANEL TO ALLOW REGULATED FACILITIES 13.ALL COOLER BOX MODIFICATIONS TO BE PERFORMED BY RS3002.242 1 4DR NARROW REACH-IN FROZEN FOOD(LED) HUSSMANN CORPORATION RUN 5 CLOSELY AS POSSIBLE SUBJECT TO THE CONSTRUCTION. FOR CLEANING;USE ONLY NON-CORROSIVE 8. PROVIDE STEEL CLOSURE PANELS AT ALL VERTICAL GAPS COOLER/FREEZER MANUFACTURER,RELATED SLAB RS3002.242 3 5DR NARROW REACH-IN FROZEN FOOD(LED) HUSSMANN CORPORATION RUN 5 APPROVAL OF THE WALMART MATERIALS FOR SPACERS AND ANCHORS AND HORIZONTAL GAPS 52"OR LOWER BETWEEN WORK BY GC RS3003.242 2 4DR NARROW REACH-IN BACK TO BACK FROZEN HUSSMANN CORPORATION RLNI 5 MECHANICAL CONSTRUCTION MANAGER CONTRACTOR SHALL FURNISH AND c. COVER UTILITIES WITH 20 GAUGE STAINLESS STEEL REFRIGERATED CASES,WALLS AND/OR EQUIPMENT, 14.COOLER PANEL MFR'S TO FURNISH AND INSTALL LINERS, FOOD(LED) OR STORE MANAGER.CONTACT ALLISON INSTALL STAINLESS STEEL TRIM TO BENT PLATES MOUNTED TO WALL WITH NON- DOORS,PANELS,DOOR HARDWARE,STRIP CURTAINS, HARRIS,LINRON COMPANY(713)802-9137 COVER ANY GAPS THAT ARE LEFT CORROSIVE ANCHORS;APPLY CONTINUOUS SEALANT 9. COORDINATE REMOVAL AND DISPOSAL OF EXISTING BATTEN STRIPS,MATERIALS,ETC.(WHERE INDICATED ON RS3003.242 6 5DR NARROW REACH-IN BACK TO BACK FROZEN HUSSMANN CORPORATION RLNI 5 FOR ASSISTANCE LOCATING MATCHING BETWEEN THE CASES AND ADJACENT ALONG EDGES AND JOINTS REFRIGERATED CASES AND FIXTURES WITH MECHANICAL DRAWINGS) FOOD(LED) FLOOR TILE. CASES AND WALLS AFTER THE CASES 3. PROVIDE CONT USDA APPROVED SEALANT AT ALL JOINTS SERVICES CONSTRUCTION MANAGER. 15.COORDINATE RE-SKINNING OF EXISTING CASES TO ARE SET IN THEIR FINAL POSITION. BETWEEN MATERIALS ON WALLS AND FLOORSREMAIN WITH SEPARATE CONTRACTOR EQUIPMENT NOTES REFER TO CLOSURE PANEL DETAIL. PREPARATION COOLER A DFREEZER AREAS IN FOOD 0.REFRIGERATED CASES AND FIXTURES WITH XISTING 16.REPLACE DAMAGED OVERHE D REFRIGERATION PIPE 4. WALLS AND INFILL OF EXISTING OPENINGS ARE TO MATCH INSTALLATION OF REFRIGERATED CASES AND FIXTURES INSULATION,REF SHEET SAi FOR BID ALLOWANCE 5. FINISHES FOR OWNER SUPPLIED EQUIPMENT ARE SPECIFIED PER BID ALIGNMENT BETWEEN OWNER AND OEM CONSTRUCTION AND FINISHES OF ADJACENT EXISTING a. EXISTING REACH-IN FROZEN CASES TO BE 13.REFRIGERATED CASE FASCIA INSTALLED BY RC-COORDINATE WITH OWNER TO INSTALL FASCIA FFROM CASE CANOPY EDGE TO FACILITATE WALLS RELOCATED OR REMOVED SHALL BE USED ON A w w M.S e w'l'g INSTALLATION OF OWNER INSTALLED SIGNAGE-INSTALL PER MANUFACTURER'S INSTRUCTIONS AND COORDINATE WITH UTILITY CONNECTIONS. 5. PROPER INSTALLATION OF JOINT SEALANTS IS CRITICAL TEMPORARY BASIS DURING CONSTRUCTION OF NOW TO MEETING WALMART QUALITY ASSURANCE STANDARDS SERVICE SEAFOOD AREA w F� wgz3?P GENERAL EQUIPMENT NOTES a. PROVIDESEALANTSIN ACCORDANCE WITH DRAWINGS b. TEMPORARY CASES SHALL BE REMOVED ONCE CASESQ AND SPECS,REF SPECS FOR SEALANT SCHEDULE ARE DELIVERED AND OPERATIONAL O !12:5kaw Fypm A. ALL EQUIPMENT IS SUPPLIED BY OWNER,INSTALLED BY GC,GC TO MAKE FINAL UTILITY CONNECTIONS,UNLESS OTHERWISE NOTED z "� ',E wp�o�=ow$ B. REF SPECS FOR REFRIGERATED AND HOT DISPLAY CASES FOR SUPPLIED BY,INSTALLED BY,AND FINAL CONNECT BY O �<w p N - €°za C. REF SPECS FOR MFR AND MODEL NUMBERS NOT LISTED IN EQUIPMENT LEGENDS ~ w3 W o$ a G w D. OWNER TO SUPPLY SS FIXTURES BY WIN-HOLY 5 3N� 1 2 3 4 =°�_�� ww==o� a ooz�"w uw=pwo rc3 o�w-ayouwog r yw .tom ow =�w m � 8SysoHan_« UG IMPORTANT!!USE CAUTION WHEN EXCAVATING FOR � O O O BOLLARDS TO AVOID CONCEALED/BURIED ELECTRICAL 4n N o LINES,HIGH VOLTAGE ELECTRICAL LINES MAY BE PRESENT,CONTRACTOR SHALL VERIFY LOCATIONS OF BAKERY UTILITIES IN AREA OF BOLLARD BEFORE EXCAVATING UTILITY GROCERY w ; AREA FILL WITH CONCRETE z <u f 5 O AND ROUND OFF TOP r z =w BAKERY z0 4"DIA PIPE BOLLARD COOLER RAISE BULKHEAD AS U _ SAW CUT AND REMOVE SHOWN T09'-2"AFF. EXISTING CONCRETE/FILL AS REQ'D FOR INSTALLATION OF BOLLARD,PAINT p5 F7.1 F1.1 2 F11 SIM U CONCRETE FLOOR SLAB 8"DIA 34'-9" O O it CONCRETE FILL o O Z O O in K T 3" n a BOLLARD �° O M _ o W W REPLACEMENT PLATE, REMOVE EXISTING II 11.10 PLATE AND INSTALL TYP OF 3 Q REPLACEMENT PLATE - IN SAME LOCATION- II ATTACH SADDLEBAG REFRIGERATION PIPING II z TO REPLACEMENT 2" 3" WITH INSULATION WRAPPING 1 55 TVP PLATE FIXTURE / REFRIGERATION / k FIXTURE DIAMOND PLATE RAIL 4 ELECTRICAL CONDUIT F1 TYP ,� � SADDLEBAG FIXTURE DIAMOND PLATE RAIL LEG 23' ,1" ISSUE BLOCK ANCHOR SLEEVE,ENSURE REPLACEMENT LEG - SLEEVES ARE PLACED IN T-3" GROUND TO ACHIEVE INSTALLED OVER EXISTING LEGS SECURE RAIL a 23'-11" � - - '- SECTION• n SADDLEBAG SECTION} EF . d� / II .�. z O ' SO JOIST UI ITp3- p Hrr aE�x�.. .�.�.r w FIXTURE PAINT HORIZONTAL 1'-0" 6'-0" N 1'-0" REFRIGERATION LINES AND nEo _ SUSPENSION SYSTEM TO `v DIAMOND PLATE RAIL MATCH STRUCTURE; - - TERMINATE IN A CLEAN MANNER 3"BELOW TO ELBOW DIAMOND PLATE RAIL LEG, LOCATE V-0"MIN FROM n RAIL EDGE AN.6-13"MAX FROM NEXT RAIL LEG PAINT TO TRANSITION LINE ---- ❑ is .. .. - - DO NOT PAINT BELOW THIS —LINE CHECKED BY: EJM ELEVATION T-3 DRAWN BY: JTC PROTO DIAMOND PLATE PROTECTION RAIL REFRIGERATION DROP LINES a,�­ 4. DOCUMENT DATE. 12/27/2024 4 ,.=,_a• 3 NTS DOCUMENT DATE:12/27/2024 O NOTES: DRY � 1. REFRIGERATION CONTRACTOR TO PROVIDE GALVANIZED CLOSURE PANELS PRODUCE AT ALL VERTICAL GAPS AND AT ALL HORIZONTAL GAPS 52"OR LOWER AFF PREP BETWEEN REFRIGERATED CASE,WALLS,AND/OR EQUIPMENT2. PROVIDE SS CLOSURE PANELS LOCATED IN PREP AREAS3. REF FLOOR PLANS FOR ALL PARTITION TYPES AND LOCATIONS EASE EXPOSED EDGES TO SMALL UNIFORM RADIUS,NO SHARP EDGES EXPOSED TO PUBLIC. 5. SET CLOSURE PANEL IN A BED OF SEALANT EACH SIDE 6. FASTEN CLOSURE PANELS WITH#6 PAN HEAD SCREWS AT 9"OC IIII O 4D42 7. CLOSURE PANELS TO BE FASTENED ONLY TO BACK OF REFRIGERATED CASE OR END PANEL SKINS AS INDICATED IN DRAWINGS GROCERY CLOSURE AREA PANEL 1" a OVERLAP CLOSURE OVERLAP a 1/2"MAX TYP PANEL TYP REFRIGERATED CASES \ FASTENER P11 > ,"MAX I, CONT CLEAR COATED 20 GA GALVANIZED 4_____] FASTENER STEEL INFILL PANEL WITH HEMMED EDGES 1/2"MAX FRONT AT PARTITION --------- SET IN ABED OF SEALANT EACH SIDE FASTENER - - - - - - - - - - - - - - - - O REFRIGERATED 1 ,/2"MAX #6 SCREWS AT MAX 9"OC EACH SIDE, REFRIGERATED fREFRIGERATEd CASE F REFRIGERATED EVENLY SPACE FASTENERS PRODUCE MECHANICAL CLOSURE CASE II FASTENER rli PANEL CASE II z 1 AT CASE CASE zl w COOLER O O N (PLAN VIEW) 1 n PARTITION w l PARTITION OR li Q SERVICE II A WALL H DELI OR WALL SECTION AT TOP OF PLAN AT CASES PLAN AT REAR OF CASE a -- CASE AND WALL AND WALL < FOR OPENINGS OVER 24"IN WIDTH DELI I ag xU INSTALL BACKUP FRAMING PER DETAIL HALLWAY SALAD - I I K a � AND FASTEN TO HORIZONTAL FRAMING PREP Q w� >1 CLO SCREWS,EVENLY FASTENERS MEMBERS AT MAX 9"OC WITH#6 O 1^ > CLOSURE 1 DELI O SURE OVERLAP PANEL F COOLER PANEL TYP 1/2"MAX 1/2"MAX FASTENER FRONT 1"MAX --- z¢ FASTENER FV IA FASTENER a TYP CLOSURE AT PARTITION FRONT LL O DFLI DELI PARTITION PANEL REFRIGERATED 1/2"MAX " 2 UTILITY PREP I, ill"MAX CASE FASTENER 1 '�Yi"I DELI D OR WALL REFRIGERATED o1 1 r U ------- FASTENER ATCASE II r 111 w FREEZER WALK-IN CASE = PROVIDE 1"TOE KICK RETURN EACH SIDE O QUI NT PANEL OR WIATILLN PARTITION OR 1;K0 �J i WALL � C — — — — — — — — — — — FRONT PLAN AT WALK-IN PLAN AT FRONT OF PLAN AT FRONT OF CASE Fv Fv FIXTURE PLAN CASE AND WALL AND END OF WALL 1 2 3 4 CLOSURE PANEL DETAIL FRONT FIXTURE PLAN 31 EXISTING CONDITIONS WERE TAKEN FROM EACH SUBCONTRACTOR IS RESPONSIBLE FOR HAVING ORIGINAL DRAWINGS AND MAY NOT REFLECT A THOROUGH KNOWLEDGE OF ALL DRAWINGS AND EXACT"AS-BUILT'CONDITIONS.CONTRACTOR SPECIFICATIONS IN THEIR RELATED FIELD.THE FAILURE SHALL FIELD VERIFY ALL EXISTING CONDITIONS TO ACQUAINT THEMSELF WITH THIS KNOWLEDGE DOES PRIOR TO SUBMITTING FINAL BIDS.CONTRACTOR NOT RELIEVE THE RESPONSIBILITY OF PERFORMING SHALL CAREFULLY COORDINATE NEW WORK AND THE WORK PROPERLY.NO ADDITIONAL SHEET: DEMOLITION WITH ALL OTHER DISCIPLINES AND COMPENSATION SHALL BE ALLOWED BECAUSE OF F1 EXISTING CONDITIONS. CONDITIONS THAT OCCUR DUE TO FAILURE TO FAMILIARIZE WORKERS WITH THIS KNOWLEDGE. SHEET NOTES 4 2 1. REFER TO SHEET Fi FOR FIXTURE NOTES PERTAINING TO 2 F1.1 F1.1 THIS SHEET. F1.1 G 3 F1 1 I'll PREFINISHED GYP BD KEYNOTES F1.1 WITH DIVIDER TRIM CHHEIGHT EFINISHED GYP BD TO BE 1.55 DIAMOND PLATE REFRIGERATED CASE FLOOR 5 3 TALLED AT A CONSISTENT MOUNTED RAILING OWNER FURNISHED GC INSTALLED F1.1 F1.1 ALONG THE ENTIRE GTH OF BULKHEAD PREFINISHED GYP BD WITH DIVIDER TRIM y z w a - - Y - 4 _ T__ _T___________0___ T T-- --------- T T T----------- T 3ts ��=oa NEW OR EXISTING CASE BUTT JOINTS AT ENDS OF PREFINISHED MATCH LOCATIONS OF EXISTING GYP BD NEW OR EXISTING CASE TYP GYP BD PANELS CONTROL JOINTS TYP Z F iw=oaoNQo€a��� GA3.7 - GROCERY ELEVATION 6 a - x x N xW z 0 U U K 0 0 I I 00 EXISTING BULKHEAD TO REMAIN o O 3 5/8"x 20 GA METAL STUDS AT EACH EXISTING PREFINISHED GYP BD WITH in a O STUD 24"OC MAX DIVIDER TRIM,MATCH THICKNESS r� OF EXISTING GYPSUM BOARD M m O CONT 20 GA METAL FASTEN PREFINISHED GYP BD AT 12"OC Z TRACK USING#8-181 7/8"MODIFIED TRUSS HEAD 0 SELF-DRILLING DRYWALL SCREWS,PAINT HEADS WHITE AFTER INSTALLATION (3)#10 TEK SCREWS TYP AT I DEMOLISH GYPSUM BOARD TO A CONSISTENT HEIGHT ALONG THE u�J LLL..NLLL LAPPED CONNECTIONS ENTIRE LENGTH OF BULKHEAD m z CONT 20 GA TRACK THE HEIGHT WILL DEPEND ON w g g w ACCESS SPACE REO'D FOR WORK BEHIND BULKHEAD >Y v i z PREFINISHED GYPSUM _ BOARD WITH SNAP-ONLl \,... r-- ------ --- OUTSIDE CORNER TRIM AND r--------- -- END CAP TRIM,TRIM COLOR DEMOLISH GYPSUM ISSUE BLOCK E #10 FASTENERS D TO MATCH PANEL EACH EXISTING STUD BOARD AND METAL _ o _ - - AC T2 CEILING TILE STUDS FOR THE \ /ANDGRID EXTENTS SHOWN TOCOMPLETE DESIGNLl PRERNISHED GYP BD AND p LI OO GROCERY DIVIDETHICKRTRIMSOFETCH - GROCERY REFRIGERATED CASE H.H ° — — — — — — — — — — — — — — — — — — H.8 THICKNESS OF EXISTING FREEZER i GYPSUM BOARD FREEZER I I I NEW OR EXISTING i REFRIGERATED CASE 'LUMBING STOCKRO M CHANICAL BULKHEAD SECTION AT GROCERY FREEZER DEMO BULKHEAD SECTION AT GROCERY FREEZER 5 Fi 1/2"=1'-0" CHECKED BY: EJM X x CO2 REMOTE CHARGING STATION, DRAWN BY: JTC REFER TO REFRIGERATION PLAN �e FOR ADDITIONAL INFORMATION. PROTO CYCLE: 04/26/2024 DOCUMENT DATE:12/27/2024 SEAFOOD .� FREEZER O 41742 MEAT UTILITY EXISTING BULKHEAD / TO REMAIN /'\/// PREFINISHED GYP BD 1 SIM F1.1 WITH DIVIDER TRIM, MATCH THICKNESS OF EXISTING GYP BD 20'-2" GROCERY 3 5/8"x 20 GA METAL FREEZER •. , STUDS AT EACH EXISTING STUD 24"OC MAX FASTEN PREFINISHED GYP BD AT 12" 1.55 OC USING#8-18 1 7/8"MODIFIED TRUSS HEAD SELF-DRILLING DRYWALL SCREWS,PAINT HEADS I DEMOLISH GYP BD TO A 4 WHITE AFTER INSTALLATION CONSISTENT HEIGHT ALONG THE F, ENTIRE LENGTH OF BULKHEAD m z (3)#10 TEK SCREWS TYP AT LAPPED I THE HEIGHT WILL DEPEND ON CONNECTIONS EACH END ACCESS SPACE REO'D FOR >y q WORK BEHIND BULKHEAD RAISE BULKHEAD AS SHOWN TO 9'-2"AFF. PREFINISHED GYP BD -------- ---- WITH SNAP-ON r--------- - - OUTSIDE CORNER TRIM F1.1 F1.1 AND END CAP TRIM, DEMOLISH GYP BD AND METAL STUDS FOR THE TRIM COLOR TO MATCH EXTENTS SHOWN TO PANEL COMPLETE DESIGN GROCERY AREA ACT2 CEILING TILE AND GRID BAKERY&MEAT BAKERY&MEAT REFRIGERATED CASE Ll UTILITY UTILITY REAR FIXTURE PREFINISHED GYP BD G —- — — — — — — — — — — — — — — — REAR PLAN WITH DIVIDER TRIM, ^ PLAN MATCH THICKNESS OF / .3 EXISTING GYP BD � i \\\ GGGlll \\\�J�J�J//// ��1�"��+++//// REAR FIXTURE PLAN NEW OR EXISTING REFRIGERATED CASE EXISTING CONDITIONS WERE TAKEN FROM EACH SUBCONTRACTOR IS RESPONSIBLE FOR HAVING ORIGINAL DRAWINGS AND MAY NOT REFLECT A THOROUGH KNOWLEDGE OF ALL DRAWINGS AND EXACT"AS-BUILT'CONDITIONS.CONTRACTOR SPECIFICATIONS IN THEIR RELATED FIELD.THE FAILURE SHALL FIELD VERIFY ALL EXISTING CONDITIONS TO ACQUAINT THEMSELF WITH THIS KNOWLEDGE DOES BULKHEAD SECTION AT BAKERY & MEAT UTILITY DEMO BULKHEAD SECTION AT BAKERY & MEAT UTILITY PRIOR TO SUBMITTING FINAL BIDS CONTRACTOR NOT RELIEVE THE RESPONSIBILITY NO ADDITIONAL OF PERFORMING SHALL CAREFULLY COORDINATE NEW WORK AND THE WORK PROPERLY.NO ADDITIONAL SHEET: J INTS 1/2^=1•_p^ DEMOLITION WITH ALL OTHER DISCIPLINES AND COMPENSATION SHALL BE ALLOWED BECAUSE OF F1 .1 �� EXISTING CONDITIONS. CONDITIONS THAT OCCUR DUE TO FAILURE TO FAMILIARIZE WORKERS WITH THIS KNOWLEDGE. ROOFLEGEND ® EXISTING ROOF HATCH EXISTING RTU/AHU RTU/AHU ® EXISTING SKY LIGHT ® SKYLIGHT REFRIGERATION EQUIPMENT, REF REFRIGERATION ® EXISTING EXHAUST FAN METAL CAP AND CHANNELS EXHAUST FAN BY CURB MANUFACTURER NEOPRENE GASKETED FASTENERS @ 6"OC CAPPED CURB WITH MOUNTING CHANNELS CONTINUOUSAG T BY CURB SUPPLIER FULLY ADHEFLASHING 3tW ?�V MEMBRANE P TO LL rc TOP OF CUR 2 3 4 Z ��aw�„o�owo€° INSULATION 2x4 TREATED WOOD NAILER j Q z:o_Wo - rc 3 CONT EDGE AS N a _ REQUIRED BFR wSTEEL CURB REF SPEC K - - - - - - - - - - - - - - - - - - -EXISTING ROMEMBRANE INSULATIONIN-FAS NILL EEIDEDLBATT INSULATIONSTEEL CHANNELEXISTING RO REF STRUCT to Z e SKID CURB xW DN�TS Z � U NOTE:FOR ROOF a PENETRATIONS LOCATED WHERE < WALKWAY PADS ARE INSTALLED, — — — — — — — — _ _ _ _ _ _ _ _ O O TRIM WALKWAY PADS FROM CENTER WALKWAY PADS ON PROVIDE SINGLE ROW PROVIDE WALKWAY PADS PENETRATIONEDGE OF ROOF \�•J// JIB CRANE SPACED APART WALKWAY PADS ON SPACED 3"APART ALL O AC M O CIDFLASHING BEFORE PAD AND 6"FROM EDGE OF ROOF ACCESS SIDE OF UNIT, SIDES OF REFRIGERATION O O INSTALLATION OR PARAPET FIELD VERIFY AND CONDENSER RACKS NOTE:DO NOT NSTALL LOCATION WALK PADS P IS UNTIL o O ROOF PENETRATION z p FLASHINGS ARE COMPLETE -- --- - ^ L p r PROVIDE SINGLE ROW OF JIB CRANE ~ O WALKWAY PADS ON r n Z ACCESS SIDE OF UNIT, v N FIELD VERIFY LOCATION 8"FROM O CURB, TYP P /J// `n 8"FROM 52'-8" CURB, EXISTING HYBRID HOUSE MTC(ON ROOF). Q TYP RCU RT m L O Z 0 NEW ROOF PENETRATION 16"X16"OD.FO ELECTRICAL EQUIPMENT RCU RTU USE ONLY.REFER TO ELECTRICAL.J ISSUE BLOCK PROVIDE CRICKET AT ALL MECHANICAL AHU REFRIGERATION AND eREFRIGERATION EQUIPMENT II EQUIPMENT,RCU'S,RTU'S,ETC,INSTALL CONDENSER RACKS F2 WALKWAY.TYP. ROOFING INSULATION WITH 1/2"PER FOOT SLOPE TO PROVIDE POSITIVE DRAINAGE NEW PUMP SKID SCO2SB-1, AROUND UNITS e REF REFRIGERATION AND EXISTING HYBRID HOUSE F2 STRUCTURAL DRAWINGS FOR DTB(ON ROOF). ADDITIONAL INFORMATION. EXISTIIT PAD LAYOUT (TYP ALL UNITS) LTA(ON ROOF)-------HYBRID Y I \3 NTS � LTA(ON ROOF). IIII IIV V� I/-/� INSTALLATION NOTES: 1. ROOF PENETRATION CURB,HOOD AND CLOSURE PLATES ARE FURNISHED BY OWNER AND INSTALLED BY GENERAL CONTRACTOR 2. ALL HOOD PENETRATIONS SHALL BE THROUGH VERTICAL CLOSURE PLATES ONLY • PIPING AND CONDUIT SHALL BE INSTALLED BY TRADE CONTRACTORS WITH PIPE AND CONDUIT CENTERLINES 4"ABOVE TOP OF ROOF CURB WITH MINIMUM OF 1" EXISTING SKYLIGHT TO BE BETWEEN PIPE AND CONDUIT EXTERNAL SURFACE REMOVED.REFER TO STRUCTURAL ---- -- i6"X30"REFRIGERATION 2 3. GENERAL CONTRACTOR SHALL CUT AND INSTALL VERTICAL CLOSURE PLATES AFTER ALL PIPING AND CONDUITS ARE INSTALLED AND SEAL ALL PENETRATIONS AS FOR DECKING INFILL.PROVIDE NOTED IN DETAIL AND PROVIDE CONTINUOUS SEALANT AT PERIMETER JOINT BETWEEN CLOSURE PLATES,HOOD,CURB,AND WHERE CLOSURE PLATES OVERLAP,REF INSULATION TO MATCH ADJACENT. HOOD.TYP. F2 SPECS PROVIDE ROOF MEMBRANE TO EXPANDING FOAM SEALANT SHALL NOT BE USED WHERE SEALANT IS EXPOSED TO EXTERIOR MATCH ADJACENT.TYP OF 2. CHECKED BY: EJM 4. EXTEND EXTERIOR REFRIGERANT AND WATERLINE EXTERNAL PVC INSULATION JACKET 1"INSIDE HOOD METAL CLOSURE PLATES - - - - - - - - DRAWN BY: JTC GALVANIZED METAL TAPER HOOD SLOPE 1/4"PER FT. TTPROTO CYCLE: 04/26/2024 CAP WITH HOOD AT � �•. PIPE PENETRATIONS 2 PIECE GALVANIZED METAL VERTICAL CLOSURE G DOCUMENT DATE:12/27/2024 PLATES,INSTALLED BY GC.FIELD CUT TO FIT NEW ROOF PENETRATION 16"X16" INSULATED REFRIGERATION AROUND CONDUIT AND PIPE INSULATION(1/8" I`___ LINES AND CONDUIT MOUNTED MAX.GAP BETWEEN PIPE/CONDUIT AND PLATE), INSTALL UPPER PLATE TO OD.FOR ELECTRICAL EQUIPMENT TO UNISTRUT.UNISTRUT TO FASTEN TO HOOD AND CURB WITH SHEET USE ONLY.REFER TO ELECTRICAL. BE ATTACHED TO CURB 2" METAL SCREWS WITH NEOPRENE WASHERS(4) OVERLAP BOTTOM PLATE ON EXTERIOR SIDE WITH NEOPRENE TAPE GASKET EA SIDE AND 6"OC TOP AND BOTTOM REF PLAN MAX PENETRATION SIZE a GT• NEW PUMP SKID SCO2SA-1, PIPES TO REFRIGERATION CLEAR INSIDE OPENING 4 REF REFRIGERATION AND LLF STRU+1"MIN PLATE OVERLAP #12x2"SS SCREWS WITH �\ EQUIPMENT REF ADDITIONAL ONAL INFORMATION. OR _ F2 NEOPRENE/SS BONDED " REFRIGERATION WASHER AT 8"OC DRAWINGS FOR SIZE OF --- --- -- PLATE TO OVERLAP r77LI������ '7 �I�-/\� FASTENER AND PLATE iii p� PIPES - CURB MIN VFW FULLY ADHERED EXIST ROOF SYSTEM AND 0�41142 4 Oi FLASHING MEMBRANE STEEL DECKING !4//J LLI/ 13� CONT EDGE SEALANT ��� ? EXTEND UP AND 52'-8" AS REQUIRED BY MFR OVER TOP OF CURB ROOF MEMBRANE PER VENT PIPE STRAPS MFR WARRANTY ROOF MEMBRANE MANUFACTURED TYP EACH PIPE OR PER MFR WARRANTY NON-STRUCTUAL CURB CONDUIT Vim" I�1� i i n TREATED WOOD p y EXISTING BLOCKING FASTENED TO rywp INSULATION SHALL ROOF DECK-THICKNESS iii EXISTING JOIST SHALL MATCH ROOF w INSULATION,TYP NOTCHED 2" STEEL ANGLE SECTION INSULATION BOARD ELEVATION FRAME,REF STRUC STEEL ANGLE FRAME, REF STRUC BATT INSULATION SECTION ' VERTICAL PIPING AND MAINTAIN CLEARANCE CONDUIT PI N ATTACHED OPENING FOR r--- ---------------------------� BETWEEN PIP PIPE AND TO ANGLE.REFER TO REFRIGERATION LINES AND INSULATION BOARD,TYP PIPING/CONDUIT SUPPORT CONDUIT.COORDINATE DRAWINGS FOR CLAMP LOCATION WITH _ _ _ �._ GALVANIZED METAL REQUIREMENTS REFRIGERATION EQUIPMENT CAP WITH HOOD AT PIPE PENETRATIONS MANUFACTURED V�Y� NON-STRUCTUAL CURBLLV --------------------------- ELEVATION 3 4 ROOF PLAN PLAN REFRIGERATION LINE ROOF PENETRATION ENLARGED ROOF PLAN L /NTS , ' / 3/32"=1'-0" EXISTING CONDITIONS WERE TAKEN FROM EACH SUBCONTRACTOR IS RESPONSIBLE FOR HAVING ORIGINAL DRAWINGS AND MAY NOT REFLECT A THOROUGH KNOWLEDGE OF ALL DRAWINGS AND EXACT"AS-BUILT'CONDITIONS.CONTRACTOR SPECIFICATIONS IN THEIR RELATED FIELD.THE FAILURE SHALL FIELD VERIFY ALL EXISTING CONDITIONS TO ACQUAINT THEMSELF WITH THIS KNOWLEDGE DOES PRIOR TO SUBMITTING FINAL BIDS.CONTRACTOR NOT RELIEVE THE RESPONSIBILITY OF PERFORMING SHALL CAREFULLY COORDINATE NEW WORK AND THE WORK PROPERLY.NO ADDITIONAL SHEET: DEMOLITION WITH ALL OTHER DISCIPLINES AND COMPENSATION SHALL BE ALLOWED BECAUSE OF rf'� EXISTING CONDITIONS. CONDITIONS THAT OCCUR DUE TO FAILURE TO r L FAMILIARIZE WORKERS WITH THIS KNOWLEDGE. ABBREVIATIONS GENERAL NOTES SPECIAL INSPECTIONS REQUIRED DESIGN LOADS AFF ABOVE FINISHED FLOOR GENERAL SPECIAL INSPECTIONS AS REQUIRED BY 1.BUILDING CODE AHU AIR HANDLING UNIT 1.FURNISH ALL LABOR,MATERIALS AND EQUIPMENT NECESSARY TO COMPLETE THE WORK SHOWN OR IMPLIED BY THESE DRAWINGS.SHOP DRAWINGS SHALL BE SUBMITTED TO CHAPTER 17 OF THE 2021 WASHINGTON STATE A.BUILDING CODE 2021 WASHINGTON STATE AISC AMERICAN INSTITUTE OF STEEL CONSTRUCTION THE ENGINEER FOR REVIEW AND APPROVAL PRIOR TO COMMENCING WORK. BUILDING CODE OR BY THE ENGINEER OF RECORD BUILDING CODE AISI AMERICAN IRON AND STEEL INSTITUTE 2.EXISTING CONDITIONS SHOWN MAY NOT REFLECT EXACT"AS-BUILT"CONDITIONS.BIDDERS SHALL FIELD VERIFY EXISTING CONDITIONS PRIOR TO SUBMITTING FINAL BID.WITHIN ASTM AMERICAN SOCIETY FOR TESTING AND MATERIALS ONE WEEK FROM THE START OF CONSTRUCTION DATE GENERAL CONTRACTOR SHALL FIELD VERIFY ALL EXISTING MATERIAL,MEASUREMENTS,AND ELEVATIONS AND SHALL PERIODIC SPECIAL INSPECTIONS: 2.GRAVITY LOADS AWS AMERICAN WELDING SOCIETY NOTIFY THE STRUCTURAL ENGINEER OF RECORD AND THE OWNER'S CONSTRUCTION MANAGER OF ANY DISCREPANCIES OR FORESEEN PROBLEMS.GENERAL CONTRACTOR A.ROOF DEAD LOAD 17 PSF(PER ORIGINAL DRAWINGS) SHALL BE RESPONSIBLE FOR COORDINATING ALL FIELD MEASUREMENTS,EXISTING CONDITIONS,AND KNOWN COMPLICATIONS WITH THE MATERIAL SUPPLIERS, 1.WELDING-REFER TO APPENDIX B OF THE SPECIFICATION. BM BEAM 3.GENERAL CONTRACTOR SHALL CAREFULLY COORDINATE DEMOLITION AND NEW CONSTRUCTION WITH ALL OTHER DISCIPLINES AND EXISTING CONDITIONS. 2.JOIST REINFORCING-THE CTL SHALL INSPECT THE FINAL PLACEMENT AND BO BOTTOM OF 4.GENERAL CONTRACTOR SHALL PROTECT EXISTING STRUCTURES,UTILITIES,PROPERTY,ETC DURING CONSTRUCTION.RESTORE ALL ITEMS DAMAGED,AS REQUIRED BY WELDS OF ALL NEW REINFORCEMENT.UPON COMPLETION OF THE B.ROOF LIVE LOAD 20 PSF(MIN OR SNOW LOAD) BOS BOTTOM OF STEEL OWNER'S REPRESENTATIVE,TO THE OWNER'S SATISFACTION AT NO COST TO OWNER OR WITHOUT EXTENSION OF CONTRACT TIME. INSPECTIONS,THE CTL WILL SUBMIT THEIR REPORT TO JBA FOR FINAL BRG BEARING 5.BUILDING COMPONENTS ABANDONED BY THE SCOPE OF WORK SHALL BE SECURED TO PREVENT FALLING,LOOSENING OR CREATING DAMAGE OF ANY KIND IN THE FUTURE. APPROVAL. C.ROOF SNOW LOADS CL CENTER LINE 6.GENERAL CONTRACTOR IS RESPONSIBLE FOR PROVIDING TEMPORARY SUPPORT AND MAINTAINING STABILITY OF EXISTING STRUCTURE DURING ALL PHASES OF CONSTRUCTION. 1.GROUND SNOW LOAD(Pg) 17 PSF CLR CLEAR 7.GENERAL CONTRACTOR SHALL PROVIDE FIRE PROTECTION FOR THE EXISTING STRUCTURE AND BUILDING CONTENTS DURING WELDING OR ANY OTHER CONSTRUCTION CERTIFIED TESTING LAB(CTL): CMU CONCRETE MASONRY UNIT ACTIVITY THAT GENERATES SPARKS OR INTENSE HEAT. 3.LATERAL LOADS COL COLUMN 8.GENERAL CONTRACTOR SHALL COORDINATE THE SIZE AND LOCATION OF PENETRATIONS THROUGH THE STRUCTURE FOR MECHANICAL,ELECTRICAL AND PLUMBING WORK. THIS PROJECT REQUIRES SPECIAL INSPECTIONS THAT ARE TO BE PERFORMED BY A.WIND LOADS THE APPROVED CERTIFIED TESTING LAB(CTL).UPON RECEIVING THE AWARD 1.BASIC WIND SPEED(3-SECOND GUST) COND CONDENSER UNIT 9.THE STRUCTURAL ENGINEER OF RECORD,ITS EMPLOYEES,AND REPRESENTATIVES SHALL NOT BE RESPONSIBLE FOR,AND WILL NOT HAVE CONTROL OF,CONSTRUCTION NOTICE ISSUED BY OWNER,THE CONTRACTOR SHALL CONTACT THE APPROVED CONST CONSTRUCTION MEANS,METHODS,TECHNIQUES,SEQUENCES OR PROCEDURES,OR FOR SAFETY PRECAUTIONS AND PROGRAMS IN CONNECTION WITH THE CONSTRUCTION WORK;NOR WILL CTL AND JOHNSTON BURKHOLDER ASSOCIATES(JBA)TO PROVIDE A -ULTIMATE DESIGN WIND SPEED 98 MPH CONT CONTINUOUS THEY BE RESPONSIBLE FOR ANY FAILURE BY THE CONTRACTOR TO PERFORM OR COMPLETE CONSTRUCTION IN ACCORDANCE WITH THE CONTRACT DOCUMENTS. CONSTRUCTION SCHEDULE FOR WORK REQUIRING SPECIAL INSPECTIONS.CTL 2.WIND EXPOSURE CATEGORY C DIA DIAMETER STRUCTURAL STEEL AND JBA CONTACT INFORMATION IS PROVIDED BELOW.THE CTL SHALL BE 3.RISK CATEGORY II EC EVAPORATIVE COOLER 1.STRUCTURAL STEEL SHALL MEET THE FOLLOWING MINIMUM YIELD STRENGTH AND SPECIFICATIONS.FABRICATION AND ERECTION SHALL BE IN ACCORDANCE WITH THE LATEST RESPONSIBLE FOR COORDINATING THE SPECIAL INSPECTIONS AND COMPLETING y i 4 EDITION OF THE"AISC CODE OF STANDARD PRACTICE". INSPECTION REPORTS.THE CTL SHALL SEND COMPLETED REPORTS,A LIST OF B.SEISMIC LOADS SERVICE w °v o o.rc rc Z,;3 o EF EXHAUST FAN (SERVICE) rc °° STRUCTURAL STEEL YIELD ASTM SPECIFICATION DEVIATIONS AND SUPPORT DOCUMENTATION TO JBA IN A TIMELY MANNER.JBA 1.5%DAMPED MAPPED ACCELERATION PARAMETER Ss 1.066 ''- EL ELEVATION WILL REVIEW INSPECTION REPORTS AND RESPOND TO DEVIATIONS AS REQUIRED. ( ) wrc3h� -w° w A.CHANNELS,PLATES&ANGLES: 36 KSI A36,UNO O ELEC ELECTRICAL 2.1-SEC PERIOD MAPPED ACCELERATION PARAMETER(S1) 0.381 r p° EQ EQUAL B.ROUND BARS FOR JOIST REINFORCEMENT: 50 KSI A 529 TESTING LAB SHALL SEND OBSERVATION/TEST REPORTS TO: 3.5%DAMPED SPECTRAL RESPONSE COEFF.(Sds) 0.853 z `2�° w'M€_$ JOHNSTON BURKHOLDER ASSOCIATES O_ 3yw s 2.ALL STRUCTURAL STEEL SHALL HAVE ONE SHOP COAT OF RUST INHIBITOR PRIMER PAINT CONFORMING TO THE SPECIFICATIONS.FIELD TOUCH UP ALL UNPAINTED,NICKED AND 4.1-SEC PERIOD SPECTRAL RESPONSE COEFF.Sd1 0.487 � p w.�rc o o w ETR EXISTING TO REMAIN ATTN:TREVOR WRIGHT Qba-hei@jbaengccom) ( ) Z, w <Q�W WELDED AREAS.PAINT ALL STEEL EXPOSED TO VIEW TO MATCH EXISTING. 5.SITE CLASS D DEFAULT S 3wa EW EACH WAY ( ) w5-o-. N 3.WELDING SHALL MEET ANSI/AWS D1.1 STRUCTURAL WELDING CODE.ELECTRODES SHALL BE 70 KSI LOW HYDROGEN.ALL WELDING SHALL BE PERFORMED BY CERTIFIED TESTING LAB SHALL SEND BILLING INVOICE TO: EXIST EXISTING WELDERS. 6.RISK CATEGORY II a_ oa£k's�:3 g>i y�g EVOCO FUZE SYSTEM(OR AS DIRECTED BY 7.IMPORTANCE FACTOR le 1.0 ~ o f l w FS FAR SIDE STEEL JOISTS AND JOIST GIRDERS OWNER'S MECHANICAL CONSTRUCTION MANAGER) ( ) �o° FV FIELD VERIFY 1.EXISTING STEEL JOISTS AND JOIST GIRDERS ARE ASSUMED TO BE IN GOOD CONDITION AND IN COMPLIANCE WITH THE STEEL JOIST INSTITUTE SPECIFICATIONS.ANY DAMAGE 8.SEISMIC DESIGN CATEGORY D GA GAUGE TO EXISTING JOISTS OR GIRDERS SHALL BE REPORTED PRIOR TO ADDING LOAD TO FRAMING. GC GENERAL CONTRACTOR 2.PRIOR TO STARTING ANY WORK OR ADDING ANY ADDITIONAL LOADS TO THE ROOF STRUCTURE,CONTACTOR SHALL VISUALLY OBSERVE JOISTS AND JOIST GIRDERS FOR SIGNS H HEIGHT OF DAMAGE OR DISTRESS,INCLUDING BUT NOT LIMITED TO,BENT WEB AND/OR CHORD MEMBERS,CRACKED WELDS,MISSING WELDS,ETC.ANY DAMAGE TO EXISTING JOISTS CTL CONTACT INFORMATION: w HORIZ HORIZONTAL OR JOIST GIRDERS SHALL BE REPORTED TO THE FOR PRIOR TO REINFORCING OR ADDING LOAD TO THE ROOF STRUCTURE. COMPANY: KRAZAN&ASSOCIATES,INC z A E~ $n HIS HOLLOW STRUCTURAL SHAPE 3.NO WORK SHALL BE PERFORMED ON ANY EXISTING JOIST AND/OR JOIST GIRDER IDENTIFIED BY THE GENERAL CONTRACTOR TO BE DAMAGED OR DISTRESSES UNTIL SUCH TIME CONTACT: GREG WALKER O f p AS THE FOR HAS PROVIDED WRITTEN INSTRUCTION TO DO SO. PHONE: 661 837-9200 o INFO INFORMATION ( ) zz O ISO ISOLATION 4.ALL PAINT AND DEBRIS SHALL BE CLEANED FROM STUCTURAL MEMBER PRIOR TO WELDING. EMAIL: GmgWalker@kre n.com 5 .u �� 5.HANGERS SUPPORTING MECHANICAL EQUIPMENT FROM JOIST CHORDS SHALL BE LOCATED WITHIN 3 INCHES OF JOIST PANEL POINTS OR JOIST SHALL BE REINFORCED PER n JBE JOIST BEARING ELEVATION m �. ° JST JOIST JOIST REINFORCING DETAIL.HANGER LOADS GREATER THAN 100 POUNDS SHALL NOT BE ATTACHED TO THE EDGE OF CHORD ANGLES AND SHALL BE CENTERED ON JOIST z - g p CHORD. < a z JT JOINT 6.CONTRACTOR SHALL BE RESPONSIBLE FOR REMOVAL AND REPLACEMENT OF EXISTING BUILDING ELEMENTS THAT PREVENT ACCESS TO INSTALL JOIST REINFORCEMENT, - v m KSI KIPS PER SQUARE INCH INCLUDING BUT NOT LIMITED TO SUSPENDED CEILINGS,DUCTWORK,RTU PLENUMS,CABLES,LARGE PIPING,ETC. L LENGTH 7.JOIST W EB CONFIGURATION IS SHOWN FOR REFERENCE ONLY,FIELD VERIFY ACTUAL CONFIGURATION AND WEB TYPE. O LB POUNDS S.ALL JOIST REINFORCEMENT SHALL BE INSTALLED AND INSPECTED BEFORE APPLYING NEW LOADS.I.E.RTU'S,AHU'S,COOLING TOWERS,AND ROOF SUPPORTED ITEMS. O LLH LONG LEG HORIZONTAL 9.PRIOR TO INSTALLATION OF JOIST REINFORCEMENT,CONTRACTOR SHALL REMOVE ALL LIVE LOADS FROM JOISTS TO BE REINFORCED.THIS INCLUDES BUT IS NOT LIMITED TO LLV LONG LEG VERTICAL PONDED WATER,ICE,SNOW(REMOVE SNOW TO EXPOSE ROOF MATERIAL),STAGED CONSTRUCTION MATERIALS/EQUIPMENT,ETC. LONG LONGITUDINAL 10.IF EXISTING JOIST BRIDGING INTERFERES WITH INSTALLATION OF REINFORCING,REMOVE BRIDGING AND REPLACE IMMEDIATELY UPON COMPLETION OF REINFORCING x MAX MAXIMUM INSTALLATION.IF BRIDGING TABS FOR BOLTED BRIDGING INTERFERE WITH INSTALLATION OF REINFORCING,REMOVE TABS AND REPLACE IMMEDIATELY UPON COMPLETION OF MECH MECHANICAL REINFORCING INSTALLATION.NEW CONNECTIONS SHALL MATCH EXISTING. O MFR MANUFACTURER 11.STEEL ERECTOR SHALL FIELD CUT REINFORCING TO FIT FROM STOCK LENGTHS. 0 O MIN MINIMUM MISC MISCELLANOUS MTL METAL 0 O NS NEARSIDE f'I NTS NOT TO SCALE OC ON CENTER OD OUTSIDE DIAMETER �u----77 OH OPPOSITE HAND O M a PAF POWER ACTUATED FASTENER Ulf u�i PCF POUNDS PER CUBIC FOOT O o PL PLATE (D Z Lu PLF POUNDS PER LINEAR FOOT 7 O ry PLUMB PLUMBING L PSF POUNDS PER SQUARE FOOT PSI POUNDS PER SQUARE INCH J QTY QUANITY O RACK REFRIGERATION RACK REF REFER TO < m REINF REINFORCING g READ REQUIRED z REV REVERSE o RTU ROOF TOP UNIT SCHED SCHEDULE SDI STEEL DECK INSTITUTE SIM SIMILAR ISSUE BLOCK SJI STEEL JOIST INSTITUTE SPCS SPACES SPECS SPECIFICATIONS STRUC STRUCTURAL T&B TOP AND BOTTOM THK THICKNESS TO TOP OF TOS TOP OF STEEL TRANS TRANSVERSE TYP TYPICAL UNO UNLESS NOTED OTHERWISE VERT VERTICAL W WIDTH CHECKED BY: BWM DRAWN BY: CRIB DOCUMENT DATE: 08/07/24 _1 C w fee 'c q 1 y+ ±alw.uc FC �. A 3 EXISTING 11/2" S1 NEW 11/2"x 20 GAWIDE- 08/05/24 "B"Di ECKi I RIB"B"DECK(33 KSI,MIN) I II II ii II II II ii II II II ii II II � ii �� LAP DECK EDGES 6"AND ATTACH NEW DECK TO EXISTING DECK WITH#10 TEK SCREWS AT I2"OC i - iCL EXISTING JOIST EXISTING STL ANGLE FRAME TO REMAIN i FASTEN SIDELAPS WITH(2) #10 TEK SCREWS EQUALLY w O SPACED IN JOIST SPACE LE w LE REF PLAN ABOVE S2 REF PLAN FOR NEW ROOF DECK - � NOTE: IF EXISTING CONDITIONS - Fi ATTACH NEW DECK TO DO NOT MATCH DETAILS, i EXISTING JOIST WITH#12 - ` CONTACT STRUCTURAL 3"MIN DECK TEK SCREWS AT 6"OC,TYP - BRG,TYP EXISTING ROOF ENGINEER IMMEDIATELY -- / !• DECK,TYP ;; GENERAL --------- _ 1-_-11 --+-- -_+ - -- -_- -- -- _-- - _JCL J ----------------- ----- + -11_ EXISTINGJOIST --I / NOTES AND II II II II II II II DETAILS EXISTING JOIST I�EXTENT OF EXISTING SKYLIGHT I i i i i i i i i i i i NEW DECK INFILL CL OF EXISTING TOP CHORD,TYP ii ii ii ii ii JOIST,TYP i (FIELD VERIFY) PROOF DECK INFILL AT REMOVED SKYLIGHT ROOF DECK INFILL AT REMOVED SKYLIGHT --� J NTS 2 NTS SHEET. m BUILDING KEYPLAN 's s1 "a a 3 SIDES 5"MIN TOTAL PLATE TO 1/8 LENGTH,EACH SEAT,T&B END OF WEB (NS-FS) 1/8 REINF (2)L2x2z3/16 (2)L2x2x3/i6 1/8 2@8 3"EACH END - _ JOIST REINFORCEMENT NOTES 1/8 2@8 REF SECTION'A' f PLATE TO (2)1"DIA FOR WEB REINF 3/16"PLATE CUT TO FIT SEAT TYP 1/8 1. EXISTING STEEL JOISTS AND JOIST GIRDERS ARE ASSUMED TO BE IN ROUND BARS NEAR SIDE AND FAR GOOD CONDITION AND IN COMPLIANCE WITH THE STEEL JOIST INSTITUTE EXISTING EXISTING EXISTING DOUBLE SIDE(FIELD VERIFY SIZE) PLATE SPECIFICATIONS. ROD WEB ANGLEWEB ANGLE WEB C 2. PRIORTO STARTING ANYWORK OR ADDING ANY VISUALLY LOADS T COPE HORIZ LEG OF F s WEB THE ROOF STRUCTURE,CONTACTOR SHALL VISUALLY OBSERVE JOISTS ROD WEB SINGLE ANGLE WEB DOUBLE ANGLE WEB EXISTING SEAT AS REQD w a REINF,TYP AND JOIST GIRDERS FOR SIGNS OF DAMAGE OR DISTRESS,INCLUDING BUT TO PLACE WEB REINF ti wo N NOT LIMITED TO,BENT WEB AND/OR CHORD MEMBERS,CRACKED WELDS, MISSING WELDS,ETC.ANY DAMAGE TO EXISTING JOISTS OR JOIST TOP CHORD PANEL GENERAL CONTRACTOR TO PROVIDE AND INSTALL SECTION A-WEB REINF SECTION B-END WEB REINF SECTION C-ENDSEAT REINF GIRDERS SHALL BE REPORTED TO THE FOR PRIOR TO REINFORCING OR FIELD STRUT(L2x2x3/16)EACH SIDE OF JOIST AT ALL ADDING LOAD TO THE ROOF STRUCTURE. 3"OR LOCATIONS WHERE CONCENTRATED LOAD DOES NOT OCCUR WITHIN 3"OF A PANEL POINT.INSTALL 3, NO WORK SHALL BE PERFORMED ON ANY EXISTING JOIST AND/OR JOIST GREATE ANGLE WITH ONE END AT LOCATION OF LOAD AND GIRDER IDENTIFIED BY THE GENERAL CONTRACTOR TO BE DAMAGED OR OTHER END AT A PANEL POINT ON THE OPPOSITE DISTRESSES UNTIL SUCH TIME AS THE FOR HAS PROVIDED WRITTEN CHORD,TYP.ANGLES SHALL BE INSTALLED PRIOR w rc 3 y�_" a °o' INSTRUCTION TO DO SO. CONCENTRATED TO NEW LOAD BEING APPLIED TO THE JOIST ° y w�'w y z z / 4. JOIST WEB CONFIGURATION IS SHOWN FOR REFERENCE ONLY, LOAD,REF NOTE w �"�opro=�N3Gm Y 6'-0" VERIFY ACTUAL CONFIGURATION AND WEB TYPE. o �a3tp owp'w°ow ALL DIAGONAL WEB MEMBERS INSIDE OR 5, ALL PAINT AND DEBRIS SHALL BE CLEANED FROM JOIST BEFORE WELDING wFN° wa €w$ PARTIALLY INSIDE DIMENSION SHALL BE REINFORCED REINFORCEMENT. JOIST TOP O 3 wzI 6. STEEL ERECTOR SHALL FIELD CUT REINFORCING TO FIT FROM STOCK CHORD ~ zLL� a pprcLLa4 o'� 3 SIDES LENGTHS. g 3waw °'w'o op 3"MIN TOTAL B 7. IF EXISTING JOIST BRIDGING INTERFERES WITH INSTALLATION OF a oa 5 EXISTING ROOF LENGTH,EACH REINFORCING,REMOVE BRIDGING AND REPLACE IMMEDIATELY UPON JOIST BOTTOM a�worc�`z�`="'� DECK,TYP �1/83 COMPLETION OF REINFORCING INSTALLATION.IF BRIDGING TABS FOR N �o° END OF WEB CHORD BOLTED BRIDGING INTERFERE WITH INSTALLATION OF REINFORCING, REINF - REMOVE TABS AND REPLACE IMMEDIATELY UPON COMPLETION OF REINFORCING INSTALLATION.NEW CONNECTIONS SHALL MATCH EXISTING. o 8. CONTRACTOR SHALL BE RESPONSIBLE FOR REMOVAL AND REPLACEMENT CONCENTRATED p�',1. E.N OF EXISTING BUILDING ELEMENTS THAT PREVENT ACCESS TO INSTALL LOAD,REF NOTE - J 1/8 1 TYP EACH JOIST REINFORCEMENT,INCLUDING BUT NOT LIMITED TO SUSPENDED END EACH f u' CEILINGS,DUCTWORK,RTU PLENUMS,LARGE PIPING,ETC. 1/8 1 ANGLE 3"OR h M 9. PRIOR TO INSTALLATION OF JOIST REINFORCEMENT,CONTRACTOR SHALL , q REMOVE ALL LIVE LOADS FROM JOISTS TO BE REINFORCED.THIS NOTE: GREATER INCLUDES BUT IS NOT LIMITED TO PONDED WATER,ICE,SNOW(REMOVE PROVIDE JOIST REINF IN ACCORDANCE WITH THIS DETAIL BOTTOM CHORD PANEL F '- ° 8 O SNOW TO EXPOSE ROOF MATERIAL),STAGED CONSTRUCTION MATERIALS/ FOR ALL CONCENTRATED LOADS IN EXCESS OF 100 LBS. < 8 z REF SECTION B FOR EQUIPMENT,ETC. WHERE MORE THAN ONE CONCENTRATED LOAD EXISTS WEB REINF AT END 10.ALL JOIST REINFORCEMENT SHALL BE INSTALLED AND INSPECTED BEFORE WITHIN A CHORD PANEL AND THE SUM OF THOSE LOADS - _ BEVEL ANGLE DIAGONAL TYP APPLYING NEW LOADS.REF 4-S2 AND 6-S2 FOR ADDITIONAL EXCEEDS 100 LBS,PROVIDE JOIST REINFORCEMENT AS EXISTING JOIST AS SHOWN;WELD REINFORCEMENT REQUIRED AT CONCENTRATED LOADS. Z ° TO JOIST CHORD REF SECTION A FOR DETAILED SUCH THAT THE SUM OF THE LOADS WITHIN O WEB REINF,TYP THE REMAINING UNSUPPORTED CHORD LENGTH DOES NOT EXCEED 100 LBS. JOIST DIAGONAL WEB REINFORCEMENT JOIST REINFORCING AT CONCENTRATED LOAD 1'-0" 5.0-1 3/4"=1'-0" 5.0-2 0 0 C=D co 0 O ROOF FRAMING PLAN NOTES z o r to 1.REF 5-52 FOR SUPPORT FRAMING AT PIPE PENETRATION;FRAMING NOT REQUIRED O M FOR OPENINGS LESS THAN 10"x10";FIELD VERIFY LOCATION ONCE UNIT HAS BEEN uv INSTALLED.REF REFRIG FOR EXACT SIZE AND LOCATION OF PENETRATION. ^ Q ATTACH CURB TO 2.NEW RAE CORP PUMP SKID(5,650 LBS)ON CAPPED CURB,REF REFRIG;ALIGN ONE (`jL���—I Z n NOTE: DECKING WITH#12 SIDE OF CURB WITH EXISTING JOIST GIRDER BELOW. UJ REF REFG FOR TEK SCREWS AT 6"OC 7 NON-STRUCTURAL NON-STRUCTURAL 0 ` O EXACT LOCATION OF ATTACH CURB TO ROOF CURB ROOF CURB ROOF PENETRATION. ATTACH ROOF DECK DECKING WITH#12 ^ ^ ^ ��)) J U) TO ANGLE WITH#12 TEK SCREWS AT 6"OC ' FIELD TEK SCREWS AT 6"OC EXISTING ATTACH ROOF DECK EXISTING a VERIFY ROOF DECK TO ANGLE WITH#12 ROOF DECK m CL OF TEK SCREWS AT 6"OC EXISTING JOIST _ I I I m O I F In ISSUE BLOCK w w > > EXISTING JOIST L3z3z3/16,TYP CL OF TOP CHORD AHU ' EXISTING JOIST _ L3x3x3/i6,TYP � 3/16 2 ETR CL OF JOIST 3116 2 A 3/16 2 H 6 2 1/8 1 TYP -— 1/8 1 REINF JOISTS PER 7-52 REF NOTE#2 PLAN __—__—__—__ PLAN VIEW SECTION A SECTION B 2 TYP S2 PIPE PENETRATION SUPPORT FRAMING - - - - - NTS 6.0-2 3 Typ REF PLAN S2 �NOTE#1 II�II NOTE: EXISTING CMU WALL COMPRESSOR,ETR COND B VERTICAL WEB REINF IS ONLY ETR REQUIRED IF EXISTING JOIST HAS VERTICAL WEB MEMBERS. CONCENTRATED y F= z LOAD JOISTTOP 3"OR LESS O? a CHECKED BY: SWIM CHORD -- -------------�F DRAWN BY: CRIB r1 r DOCUMENT DATE: 08/07/24 w 'c.BE� 2 x d W 141 w O 'b 51 y 2 SLOPE DOWN CONDA nlrrup JOIST BOTTOM EXIST ROOF ETR ' CHORD PROVIDE AND INSTALL VERTICAL WEB G•2 --- ---------------------- ----------------- ------ --- - REINFORCEMENT PER 6-S2 AT ANY REF SECTION A,DETAIL LOCATIONS WHERE A NEW REF PLAN 08/05/24 FOR JOIST DIAGONAL WEB CONCENTRATED LOAD OCCURS REINF JOISTS NOTE#1 REINFORCEMENT,TYP WITHIN 3"OF THE VERTICAL WEB PER 7-52 TYP 2 REF PLAN JOIST VERTICAL WEB S2 NOTE#2 REINFORCING AT REFRIG EQUIP 4 -—- TYP 3/q^-1'-0" S2 EXISTING STL COL BELOW,TYP FASTEN EA SIDE OF SKID TO EA CURB SUPPORT RAIL RTU NOTE: WITH 518"DIA A304 BOLTS ETR REF 2-52 FOR INFORMATION SHOWN BUT NOT NOTED. CAPPED CURB \ SUPPORT RAIL REFRIGERATION SKYLIGHT a CAPPED CURB BY EQUIP,REF ETR F z REF 2-52 FOR EQUIPMENT CURB SUPPLIER REFRIGERATION U ' TO CURB SUPPORT RAIL O z CONNECTION ATTACH CURB TO CHANNEL w y WITH#12 TEK SCREWS AT w CAPPED CURB \ 12"OC,TYP 2 SIDES rrn p SUPPORT RAIL \ O r w C6x8.2 CONT INSTALLED Z NEW STL CHANNEL _ OVER EXISTING ROOF DECK INSTALLED OVER EXISTING CHANNEL TO w¢ LL ROOF DECK;REF 2-S2 EXISTING ROOF 1/8 1 JST THROUGH DECK TO REMAIN 1/8 1 DECK,TYP EXISTING ROOF ."TYP - ------------------ _--- ___-______ DECK TO REMAIN PROVIDE FIELD PRO PARTIAL STRUT PER 4-S2 OR PER 4I S2 OR FIELD STRUT ROOF 6-S2 AS READ 6-S2 AS READ EXISTING JOIST F - FRAMING TO REMAIN,TYP PLAN AND EQUIPMENT EXISTING JOIST SUPPORT IL TO REMAIN DETAILS n REFRIGERATION EQUIPMENT SUPPORT n REFRIGERATION EQUIPMENT SUPPORT n PARTIAL ROOF FRAMING PLAN SHEET 's a a 24 HOURS PRIOR TO DOWN ANY NG BAS EQUIPMENT SALVAGE REFRIGERATION SYSTEMS,IHVACSYSTEMS OR GENERAL REFRIGERATION BUILDING AUTOMATION CONTROLS SYSTEMS,SEND BAS NOTES REQUIREMENTS EMAIL TO NSRM@WALMART.COM.THE E-MAIL SHALL �z52z oa zs sz STATE WHAT,WHY,AND WHEN IT IS BEING SHUT DOWN ALL DEMOLISHED NOVAR BAS EQUIPMENT SHALL BE AND HOW LONG IT IS ANTICIPATED TO BE SHUT DOWN. 1. BAS CONTRACTOR SHALL CONTACT THE BAS RETURNED TO WALMART MECHANICAL SERVICES THEN SEND A FOLLOW UP EMAIL TO SUPPLIER(S)TO OBTAIN A CURRENT MODULE CONSTRUCTION MANAGER.EQUIPMENT TO BE NSRM@WALMART.COM AFTER THE WORK IS COMPLETE '� `L '3 4 CONFIGURATION PRINTOUT BEFORE TERMINATING RETURNED INCLUDES:EXECUTIVE CONTROLLER(S), AND THE SYSTEM IS BACK UP AND RUNNING. SENSOR LEADS AT INPUT MODULES.THE REQUEST Imp),CIM(S),CCM(S),RCC(S),CMS(S),ETC.PROVIDE EDC FOR THE CONFIGURATION PRINTOUT SHALL BE MADE DOCUMENTATION FOR ALL EQUIPMENT REMOVED IN WHERE EXISTING REFRIGERATION CHASES ARE BEING PRIOR TO THE INSTALLATION OF BAS CABLES.W IRING ACCORDANCE WITH SPECIFICATIONS AND REQUIRED I TERMINATIONS SHALL BE LANDED ACCORDING TO REMOVED,ANY DAMAGED OR IMPROPERLY CLOSE-OUT DOCUMENTS. 1 3 NEW BAS WALMART ISD PROVIDER THE BAS SUPPLIER CONFIGURATION SHEETS. SUPPORTED BAS CONDUITS WITHIN CHASE SHALL IN ASR ASR BACKBOARD IN EDC. TO PROVIDE CABLE BACK REPAIRED OR REPLACED AS REQUIRED.ANY EXISTING UPGRADE EXISTING RACK CONTRACTOR SHALL SEND EQUIPMENT TO ASSET BAS CABLING WITHIN CHASE NOT INSTALLED IN TO WALMART DATA MTC CONTROLLER.REFER 1 2. BAS CONTRACTOR SHALL PROVIDE COMPLETED TECHNOLOGIES AT THE ADDRESS BELOW. NETWORK FOR PUMP SKID. TO ONE-LINE DIAGRAM FOR REFRIGERATION SENSOR INPUT VERIFICATION CONTRACTOR SHALL APPLY FOR CHANGE ORDER CONDUIT SHALL BE RE-ROUTED THROUGH NEW BAS CONTRACTOR TO FORMS TO THE BAS SUPPLIER(S)AT THE BEGINNING CONDUIT.FINAL APPROVAL BY WALMART PLUMBING ADDITIONAL INFORMATION. FOR SHIPPING REIMBURSEMENT.BEFORE SENDING, CONSTRUCTION MANAGER.REFERENCE MECHANICAL COORDINATE DATE OF THE REFRIGERATION EQUIPMENT STARTUP.BAS CALL FOR"RMA"NUMBER AT 502-425-8702. ARCHITECTURAL DRAWINGS FOR REFRIGERATION I REQUIRED FOR THIS EXISTING HYBRID HOUSE INSTALLER SHALL PROVIDE ASSISTANCE TO THE BAS CHASES BEING REMOVED. CONFIRM EXISTING LEAK DETECTION I SERVICE WITH OWNER'S MTC(ON ROOF) SUPPLIERS)FOR SPOT CHECKING OF SENSORS FOR 3600 CHAMBERLAIN LANE I CONSTRUCTION ACCURACY. STE.122,LOUISVILLE,KY 40241 SENSOR IS COMPATABILE WITH CO2. COORDINATE WITH MANUFACTURER MANAGER.TYP OF PUMP TO REPLACE AS NEEDED. OCKROOM it SKIDS. 3. ALL BAS CABLE DU THE SALES FLOOR SHALL BE VI y o II PROVIDE RS-485 FROM ROUTED IN CONDUIT AND CONCEALED FROM VIEW, w a F r PUMP SKID CPCO TO RACK ROUTED ALONGSIDE OTHER PIPING OR CONDUIT AS m S F w z N ,tt A07 SCO2 MUCH AS POSSIBLE. ° si EXECUTIVE CONTROLLER. UPGRADE EXISTING RACK 1 w FNgw ,z�°� REFER TO ONE-LINE DTB CONTROLLER.REFER E SEAFOOD 4. BAS CONTRACTOR SHALL BE PRESENT AND ° z°am DIAGRAM FOR ADDITIONAL TO ONE DIAGRAM FOR ww 3t°g'�aw FREEZER AVAILABLE TO RESOLVE ISSUES AND PROVIDE O E, arcs INFORMATION.TYP OF ADDITIONAL INFORMATION LL ay PUMP SKIDS. REFRIGERATION STARTUP ASSISTANCE UNTIL Z w° ig,°"<=o _ RELEASED BY THE BAS SUPPLIER AND WALMART w � h zoo H IIpIIL 0 H CONSTRUCTION MANAGER. z_w;_�a$NQo€aG�w I/I o 5. DURING THE REFRIGERATION STARTUP,BAS a 3 N o'W ss\`l SCO25B-1 PUMP SKID, O o`z�iz H� 22,21'g MOUNTED ON ROOF. CONTRACTOR SHALL COMPLETE ALL UNRESOLVED N ° ,°�g_as"owog 0 REFER TO FIXTURE AND REFRIGERATION BAS WORK PRIOR TO WORKING ON €' `�°"�OipV CPCO� os -- STRUCTURAL PLANS OTHER BAS INSTALLATION ITEMS. FOR ADDITIONAL \ INFORMATION. 6 WHEN THE S SUPPLIER IS NOT SCHEDULED TO MEAT PERFORM THE ON SITE REFRIGERATION STARTUP, O UTILITY _ CONFIRM EXISTING LEAK DETECTION EXISTING HYBRID HOUSE THE BUILDING AUTOMATION CONTRACTOR IS {� o SENSOR IS COMPATABILE WITH CO2. DTB(ON ROOF) RESPONSIBLE FOR PERFORMING ALL CHECKS AND COORDINATE WITH MANUFACTURER TEST TO ENSURE A FULLY FUNCTIONAL ° INSTALL TEMPERATURE SENSOR \ :GCi;. 1 TO REPLACE AS NEEDED. 1 REFRIGERATION CONTROL SYSTEM.CONTACT THE w 3 CABLE AND VALVE CONTROL WIRING �•• .y BAS SUPPLIER FOR THE BLANK TEST VERIFICATION AND CABLING IN CONDUIT FROM TOP •,;F�;. GO UPGRADE EXISTING RACK FORMS AND INSTRUCTIONS FOR COMPLETING.ALL OF COOLER/FREEZER TO WALK-IN ^`' LTA CONTROLLER.REFER COMPLETED TEST VERIFICATION FORMS SHALL BE i CONTROLLER ENCLOSURE.FOR GROCERY ,UGi o TO ONE-LINE DIAGRAM FORRETURNED TO THE WALMART CONSTRUCTION CABLE RUNS>25',REFER TO BAS fEEZER �ti:' ADDITIONAL INFORMATION) MANAGER.VENDOR INSTRUCTIONS.TYP. PROVIDE A CUSTOM,DIGITALLY PRINTED GO e 7. REFER TO REFRIGERTATION AND ARCHITECTURAL z AND HIGH-DURABILITY LAMINATED LABEL o^ DRAWINGS FOR CONDUIT INSTALLATION AND 10j MOUNTED ON CONTROLLER ENCLOSURES SEALING REQUIREMENTS FOR DEVICES SHOWN ON INSTALL CONTROLLER ENCLOSURE. INDICATING THE REFRIGERATION CIRCUIT(S) - COOLER/FREEZER PANELS.DO NOT INSTALL CONDUIT CONTROLLER ENCLOSURE OWNER SERVED BY THE CONTROLLERS WITHIN. \\ EXISTING HYBRID HOUSE WITHIN COOLER/FREEZER PANELS. LETTERING SHALL BE WHITE,MINIMUM OF )C FURNISHED.ENCLOSURES CONTAIN ONE 3/4"HIGH,ON A BLACK BACKGROUND. LTA(ON ROOF). d CONTROLLER AND REMOTE DISPLAY. GROCERY 8. ROUTE ALL UTILITY SERVICE LINES(PIPES AND U o AREA CONDUIT)WITHIN STUD WALLS WHEREVER POSSIBLE. O O O ON COOLER/FREEZER PANELS IN FOOD PREP AREAS INSTALL BOTTOM OF CONTROLLER ENCLOSURE WHERE UTILITIES MUST BE EXPOSED,INSTALL 84"AFF MINIMUM ON COOLER/FREEZER.REF SCO2SA-1 PUMP SKID, 1 1 UTILITIES 1/2"OFF FACE OF PANEL TO ALLOW FOR O O a PLANS FOR QUANTITY AND LOCATION. 5 2 MOUNTED ON ROOF. CLEANING;USE ONLY NON-CORROSIVE MATERIALS O O COORDINATE PANEL LOCATION WITH DOOR TYP REFER TO FIXTURE AND FOR SPACERS AND ANCHORS. ASR AS OPENING,PROTECTION,AND RACKING.DO NOT _ STRUCTURAL PLANS MOUNT ENCLOSURES BELOW REFRIGERATION 7 FOR ADDITIONAL 9. REFERENCE ARCHITECTURAL DEMOLITION PLANS O EQUIPMENT EC PLUMBING LINES.VERIFY WITH <o CPCO; INFORMATION. �/'. FOR FULL EXTENT OF DEMOLITION WORK REQUIRED. WALMART MECHANICAL CONSTRUCTION �j ez p - - - 1J O n a MANAGER THAT ENCLOSURES ARE LOCATED INLo AN ACCESSIBLE SPACE. - n m REFER TO KE2 REFRIGERATION BAS M APPLICATION MATRIX BAKERY �� SYMBOLS UI z FOR DOOR SWITCH UTILITY j a.ss.v WALK-IN COOLER/FREEZER COIL CONTROLLER REQUIREMENTS.TYP. o z N OWNER FURNISHED E2E COPELAND RX-300 GATEWAY ENCLOSURE MOUNTING DETAIL (SPORLAN/KE2/CC200) DOOR SWITCH FIELD E51 NOVAR EDGE SERVER GATEWAY INSTALLED AND WIRED III......LLL G J I NTS TO KE2 MAIN BOARD w J w BAS BUILDING AUTOMATION SYSTEM AUX INPUT1.TYP. <00 m 0 TEMP TEMPERATURE Q w VFD VARIABLE FREQUENCY DRIVE z m PROVIDE CONDULET AT CEILING PENETRATION. TRANSFORMER O INSULATE AND SEAL GAP AROUND CONDULET PENETRATION WITH SILICONE PRIOR TO PROVIDE 2"CONDUITS TO COMM COMMUNICATION PORT/MODULE INSTALLING JUNCTION BOX,TYP JOIST LEVEL AS NEEDED FOR PROVIDE 1"EMT CONDUIT TO CABLING AND PROVIDE < XY REFRIGERATION CIRCUIT-REFRIGERANT TYPE ISSUE BLOCK BUSHINGS AT EACH END.(TYP) PROVIDE 1"EMT CONDUIT WALK-IN COIL CONTROLLER OWNER FURNISHED ESi REMOTE BAKERY PENETRATION.SEAL INSIDE FOR COIL CONTROL WIRING LCD SCREEN PROVIDED WITH 0 TEMPERATURE SENSOR CONDUIT WITH SILICONE 120V/24V TRANSFORMER.MOUNT SEALANT,TYP COOLER/FREEZER BOX CEILING ON BAS BACKBOARD.TYP. F - - - O iUl - ,U, - - F OD DEFROST TERMINATION SENSOR PROVIDE EMT CONDUIT AND WIRING TO LCD XFMR '� '�' IUD NEXT COIL CONTROL JUNCTION BOXES ON BAS BACKBOARD w E2-CC. KE2-CC. KE2-CCI .KE2-CC. SAME SYSTEM WHEN MULTIPLE COILS ARE IN LCD RFMR - _ ' " g Y'-�-`---- `--_ ----•---- -_�F-:y SAME COOLER/FREEZER BOX.CONDUIT AND '� DUAL TEMP SWITCH WIRING SAME SIZE AND QUANTITY AS WIRING LCD RFMR -s-- ---- II TO PANEL.COIL CONTROL CONDUIT SHALL _ IKE2-CC; RIB RELAY IN BOX BE 1". o a scQ MOUNT NEW BOSS CONTROLLER ON II BOSS BOSS CONTROLLER BOSS II BAS BACKBOARD.WALMART ISO O IO: iKE2-_C__C�—IKE2-CCI—IKE2-CC��KE2-CCI-��! ;CPCO; CPCO CONTROLLER PROVIDER TO PROVIDER CABLE BACK PROVIDE CEILING MOUNTED WP JUNCTION BOX WITH TO WALMART DATA NETWORK FOR I' �. `� ------ THREADED HUBS AND GASKETED COVERPLATE. BOSS CONTROLLER.BAS �� _Yj :KE2-CC! -CC'; �KE2-CC��KE2-CC' .[wyj 'CMS CASE MANAGEMENT SYSTEM MODULE TYPICAL COIL SEAL TOP OF JUNCTION BOX TO COOLER/FREEER CONTRACTOR TO COORDINATE DATE GROCERY II CEILING WITH SILICONE SEALANT,TYP. REQUIRED FOR THIS ERVICE WITH AREA COPELAND INPUT/OUTPUT MODULE OWNER'S CONSTRUCTION MANAGER. PROVIDE 1"LIQUID-TIGHT FLEXIBLE METAL II - - RCC NOVAR CIRCUIT CONTROLLER CONDUIT TO KNOCKOUT ON UNIT.FINAL II 1 O"� 1 S 1 S 13a SCO2 PROVIDE P3300 UNISTRUT,OR EQUAL, II CONNECTION TO COIL BY RC,TYP. PROVIDE 4"X4"WIREWAY II Uq� C�JKE2-CC` KE2-CCj 0 O XIO BACNET INPUT/OUTPUT MODULE AT LOCATIONS WHERE THE BACKBOARD 7 CAN NOT BE SECURELY FASTENED TO 'I N --------- --------- --------- PROVIDE PLYWOOD II ° HS HORN AND STROBE INDICATOR THE WALL.SECURE UNISTRUT TO E2-CCL_�KE2-CCLIKE2-CCL IKE2-CC' NOTE:DO NOT LOCATE WP JUNCTION BOX DIRECTLY IN FRONT OF DISCHARGE FAN,OFFSET TO SIDE. BACKBOARD -. •-------- --------- •--------- Y; CHECKED BY: EJM STRUCTURE AND FLOEQUIROVIm ) II m ,Y• O CROSS-BRACING AS REQUIRED. P II 6146 SCO��614c SCO2' 11a SCO B71b SCO2 m LDP LEAK DETECTION PANEL DRAWN BY: JTC NOTE:THE CONDUIT AND WIRING IN THIS DETAIL IS FOR LOW VOLTAGE AND CONTROL VOLTAGE WIRING ONLY. LEAK DETECTION SENSOR PROTO CYCLE: 04/26/2024 EVAPORATOR COIL POWER LINE VOLTAGE WIRING SHALL BE INSTALLED IN SEPARATE CONDUIT.REFER TO ELECTRICAL. 03.01.19 " II 156 SCO -,816a SC0 �Al2c SCO2 B12b SCO2 � AUDIO\VISUAL ALARM DOCUMENT DATE:12/27/2024 U? I E2i CC~~KE2-CCj~KE2-CC-1—KE2-CCj U) ZA ZONE ALARM SILENCE PANEL COOLER SENSOR WIRING PROVISIONS BAS BACKBOARD _ _(�y�UNIT NTS E - - n :. - - - - O E 0 II ° ;Y: Y; S3C SPORLAN WALK-IN CONTROLLER u 153C SPORLAN CASE CONTROLLER ♦ T""sc� PROVIDE JUNCTION BOX WITH D " IKE2-CCj KE2 CASE CONTROLLERFLEXIBLE CONDUIT OR SEALTITE AT CEILING FOR SOLENOID. PROVIDE CONDUIT AND TYP KE2-RE-2-00 KE2 WALK-IN CIRCUIT CONTROLLER-40 AMPS INSTALL SENSOR CABLE INSTALL WIRING FROM SOLENOID TO BUILDING AUTOMATION / SGR SPORLAN GATEWAY ROUTER O 41742 TO BAS KE2 CONTROLLER. SYSTEM.(TYP OF 2) INVERTED P-TRAP PROVIDE CONDULET AT DRY SNS SPORLAN NETWORK SWITCH L/2/lam' TYP OF SECONDARY CEILING PENETRATION ODU ((�' CO2 ONLY. FILLED WITH SEALANT n DS DOOR SWITCH COIL SENSOR LOCATIONS DUAL COIL UNIT COOLER GROCER AREA Y CC200 COPELAND WALK-IN CONTROLLER j—SUPPLY 1/4'PENETRATIONTHRU CONDUITAND SENSOR RETURN AIR TEMPERATURE 0 ROOF FOR SENSOR LEADS. CABLE TO BUILDING SENSOR INSTALLATION t, 1—RETUR SEAL INSIDE AND OUT WITH AUTOMATION SYSTEM. LC__C_2.0__0 COPELAND CASE CONTROLLER SILICONE OR EXPANDING (TYP) 2 � 3 FOAM AND SEALANT. •�� ASR ASR ASR TYP NEW FIELD INSTILLED EQUIPMENT PROVIDE 1/4"SCH 40 ""p EXISTING EQUIPMENT PLASTIC PLUMBER'S SUPPLY CEILING OF BOX SERVICE TUBE WITH CAPPED END. L DELI ` ----------- NEW FACTORY INSTALLED EQUIPMENT DRILL HOLE TO RUN INSTALL SENSOR 213 DOWN FROM CEILING CEILING - - - - - - - - - - - - - D SENSOR LEAD THROUGH. I I -—- EQUIPMENT TO BE DEMOLISHED THE TOP OF THE COIL,12"MINIMUM, OF BOX i OF BOX CONFIRM EXISTING LEAK DETECTION AND CENTERED ON COIL LENGTH. _ _ i i PRODUCE SENSOR IS COMPATABILE WITH CO2. COOLER COORDINATE WITH MANUFACTURER COM COMPRESSOR OUTPUT MODULE 0 TO REPLACE AS NEEDED. OWNER-FURNISHED RETURN AIR TEMP SENSOR R— ----i --___ - �o c RIM RACK INPUT MODULE IT \ ----- ROM RACK OUTPUT MODULE 8"-12" ALLWAY S OM AD O � A ANALOG OUTPUT MODULE ROUTE REFRIGERATION SENSOR WIRING DELI PRE TO 2 KNOCKOU WIRING PROVISIONS DETAIL.T.REFERENCE UNIT COOLER COOLER Y� BIM 8-INPUT MODULE COIL SENSOR INSTALL OWNER-FURNISHED COIL TEMPERATURE SENSORS SECURE SENSING ELEMENT AND CABLE WITH () INSTALL COIL 0 ----- ON THE AIR DISCHARGE SIDE OF THE COIL,APPROXIMATELY NYLON MOUNTING BRACKETS(PANDUIT#PP2S-S10.X) TEMPERATURE V TO 1-1/2"AWAY FROM THE RIGHT AND LEFT EDGES OF THE AT RIGHT ANGLES TO EACH OTHER.PLACE BULB SENSORS FOR DUAL ACTIVE COIL SURFACE,NEAR THE TOP OR BOTTOM THIRD OF APPROX.3"OFF CENTER IN MAXIMUM RETURN AIR DELI DELI COIL UNIT COOLERS ON L THE UNIT COOLER.INSTALL PER UNIT COOLER COIL STREAM.MOUNT BRACKET WITH EXISTING FAN THE SIDE OF THE COIL A08 SCO2 $ UTILITY PREP CONTROLLER MANUFACTURER'S INSTRUCTIONS,AND WIRE SHROUD MOUNTING SCREW.DO NOT DRILL HOLE IN CLOSEST TO THE DOOR - - i----------------� \ BACK TO THE CONTROLLER.(TYP OF 2) DRAIN PAN TOHI MOUNT BRACKETS.CABLE TO EXTEND ^ 4 - TO COIL ON HINGED SIDE OF DRAIN PAN. 1—L)l� '�° I� II _-> I� � t �1. Ie I�19 Ie L_ J_1_1, -1-II REFER TO MANUFACTURER'S INSTALLATION INSTRUCTIONS FOR ALL FIELD INSTALLED ITEMS.BAS CONTRACTOR REFER TO WALK-IN CONTROLLER WIRING DETAIL FOR TERMINATIONS SHALL CARRY OUT ALL FURNISHING,INSTALLATION,AND WIRE TERMINATIONS UNLESS NOTED OTHERWISE. DELI BUILDING FREEZER 23 4 AUTOMATION SYSTEM (WALK-IN UNIT COOLER CONTROL DEVICE LOCATION AND INSTALLATION (SECONDARY) REFRIGERATION BUILDING AUTOMATION SYSTEM PLAN 1 3/32"=V-0" EXISTING CONDITIONS WERE TAKEN FROM EACH SUBCONTRACTOR IS RESPONSIBLE FOR HAVING ORIGINAL DRAWINGS AND MAY NOT REFLECT A THOROUGH KNOWLEDGE OF ALL DRAWINGS AND EXACT"AS-BUILT'CONDITIONS.CONTRACTOR SPECIFICATIONS IN THEIR RELATED FIELD.THE FAILURE SHALL FIELD VERIFY ALL EXISTING CONDITIONS TO ACQUAINT THEMSELF WITH THIS KNOWLEDGE DOES PRIOR TO SUBMITTING FINAL BIDS.CONTRACTOR NOT RELIEVE THE RESPONSIBILITY OF PERFORMING SHALL CAREFULLY COORDINATE NEW WORK AND THE WORK PROPERLY.NO ADDITIONAL SHFFT- DEMOLITION WITH ALL OTHER DISCIPLINES AND COMPENSATION SHALL BE ALLOWED BECAUSE OF gqS R 1 EXISTING CONDITIONS. CONDITIONS THAT OCCUR DUE TO FAILURE TO FAMILIARIZE WORKERS WITH THIS KNOWLEDGE. KE2-RE2 DOOR SNATCH APPLICATION MATRIX APPLICATION EQUIPMENT DESIGN AIR CURTAIN DOOR CONTROLLER HCR SWING DOOR KE2-RE2 HCR DOOR SWITCH WIRED TO HCR CONTROLLER THIS DETAIL IS A SCHEMATIC REPRESENTATION AND MAY NOT �, w KE2 DOOR SWITCH WIRED TO BAS 1/0 BOARD REFLECT ALL WALK-IN COIL CONTROLLER CONFIGURATIONS. w TEMPERATURE SENSORS,DOOR SWITCH,AND REFERENCE MANUFACTURER FOR FACTORY INSTALLED U z ASSOCIATED WIRING FURNISHED BY OWNER WITH KE2 CONTROLLER,INSTALLED HCR ROLLSEAL KE2-RE2 ROLLSEAL DRY CONTACT WIRED TO HCR CONTROLLER AND BAS 1/0 BOARD(DOUBLE-TAP) COMPONENT INFORMATION. w O BY CONTRACTOR.SENSORS AND SWITCH ARE NOT SHOWN ON PLANS APO/PICKUP DISCARD KE2 AND HCR MAG SWITCH w FOR CLARITY.REFER TO MANUFACTURERS INSTALLATION AND WIRING w O 4 INSTRUCTIONS. ASI SWING DOOR KE2-RE2 KE2 DOOR SWITCH WIRED TO SAS 1/0 BOARD CONTACT NOVAR(NOVARTEC28@wal-mart.wm,800-341-7795) 00 a a. ROLLSEAL DRY CONTACT WIRED TO SAS 1/0 BOARD FOR INSTRUCTIONS REGARDING THE INSTALLATION AND a u WHEN LOW VOLTAGE CABLING INSTALLATION RUNS EXCEED THE MAXIMUM ASI ROLLSEAL KE2-RE2 DISCARD KE2 MAG SWITCH START-UP OF THE KE2THERM CONTROLLER AT THIS a Qo LENGTHS ALLOWED FOR THE CABLING FURNISHED BY OWNER WITH THE KE2 PARTICULAR SITE. O O.. H U CONTROLLER,FURNISH CABLE PER MANUFACTURER'S RECOMMENDATIONS FOR HCR DOOR SWITCH WIRED TO HCR CONTROLLER 0 n 00 r J r DISTANCES REQUIRED.REFER TO MANUFACTURER'S INSTRUCTION FOR HCR SWING DOOR KE2-RE2 KE2 DOOR SWITCH WIRED TO KE2-RE2 I- r rn a w O MAXIMUM DISTANCES ALLOWED FOR OWNER FURNISHED CABLES. REFER TO MANUFACTURER'S INSTALLATION INSTRUCTIONS FOR z in z z ROLLSEAL DRY CONTACT WIRED TO HCR CONTROLLER AND KE2-RE2(DOUBLE-TAP) ALL FIELD INSTALLED ITEMS.BAS CONTRACTOR SHALL CARRY z ¢ O w HCR ROLLSEAL KE2-RE2 OUT ALL FURNISHING,INSTALLATION,AND WIRE TERMINATIONS O LL O N LL O REFER TO REFRIGERATION PLANS FOR WALK-IN UNIT COOLER COIL QUANTITY OTHER DISCARD KE2 AND HCR MAG SWITCH UNLESS NOTED OTHERWISE. AND LOCATION. ASI SWING DOOR KE2-RE2 KE2 DOOR SWITCH WIRED TO KE2-RE2 ° ROLLSEAL DRY CONTACT WIRED TO KE2-RE2 SLSV:ONE PER COIL.TERMINATE 120VAC SUPPLY SLSV INCOMING POWER,DEFROST,AND FAN WIRING PROVIDED ASI ROLLSEAL KE2-RE2 LINE SOLENOID VALVE WIRING((2)#12 W/(1Nt12 BY ELECTRICAL CONTRACTOR,TERMINATED BY DISCARD KE2 MAG SWITCH GND)AT KE2 CONTROLLER.REFER TO REFRIGERATION CONTRACTOR.REFER TO ELECTRICAL ELECTRICAL.SUPPLY LINE SOLENOID VALVE r - -- - DRAWINGS FOR CIRCUITING OF KE2 CONTROLLER POWER rcr 3o°s'�aw<° FURNISHED BY REFRIGERATION MANUFACTURER. I - - ---- -- ----- --� AND WALK-IN UNIT COOLER FAN&ELECTRIC DEFROST. w a- H'6,2-`-'gi p I� __ I Z w� �g wa 0. LAND WIRE WITHIN KE2 CONTROLLER AT I' I TERMINATIONS AT CONTACTORS AND TRANSFORMER iw3 a 6H TRANSFORMER PER TRANSFORMER WIRING LOCATED IN THE RIGHT SIDE OF THE PANEL OPPOSITE THE g 3yt°a,.yo$€aG�w DIAGRAM AND SUPPLIED VOLTAGE. I I MAIN AND AUX BOARD(S)(NOT ABOVE MAIN BOARD AS a Qo=iz wr ww°'o�g I -------------------------------------------- I SHOWN HERE). �ou�pw° I I � so � FURNISH AND INSTALL#22 AWG 2 CONDUCTOR DIGITAL so I I DEFROST SIGNAL WIRING FROM MAIN BOARD AUX RELAY MAIN BOARD I OUTPUT TO LEGACY BAS SYSTEM INPUT MODULE TIED TO THE SAME RACK.DEFROST SIGNAL SHALL INHIBIT LEGACY BAS CONTROLLED DEFROSTS TO MANAGE DEFROST I I CONCURRENCY.REFER TO REFRIGERATION DEFROST {/} ^oa I I SCHEDULES. I I I I UNIT COOLER W COIL TEMPERATURE SENSOR 1(OF 2) w m 3 FIELD INSTALLED AND WIRED TO KE2 MAIN BOARD. S REFER TO PLANS AND ONE-LINE DIAGRAM FOR DOOR N M a < 8 v INSTALL OWNER FURNISHED RS-0 SWITCH WIRING. 85 BACNET � - COMM WIRING FROM GATEWAY OR I I PREVIOUS KE2 CONTROLLER ON COMM z W LOOP,REFER TO ONE-LINE DIAGRAM. I S U RS485 BACNET COMM WIRING TO NEXT KE2 I I CONTROLLER ON COMM LOOP,REFER TO I I XIO SCHEDULES ONE-LINE DIAGRAM. I x CAT-5E ETHERNET CABLE CONNECTING TO I XIO-8U-A1 SCHEDULE XIO-8U-B1 SCHEDULE XIO-8U-C1 SCHEDULE ta¢i KE2 NETWORK SWITCH,IF REQUIRED FOR I Ul/A1 RACK A PLM(N,DI,FI) U1/Al RACK B PLM(N,DI,FI) U1/A1 RACK C PLM(N,DI,FI) O O BONDING CONTROLLERS.REFER TO BASR ONE-LINE DIAGRAM. I I U2/A2 SPARE U2/A2 SPARE U2/A2 SPARE O O AUX BOARD 1 AND COMM WIRING BETWEEN AUX BOARD 1 I U3/A3 SPARE U3/A3 SPARE U3/A3 SPARE O O MAIN BOARD AND AUX BOARD 1 FACTORY I RETURN AIR TEMPERATURE SENSOR FIELD INSTALLED AT U4/A4 SPARE U4/A4 SPARE U4/A4 SPARE INSTALLED IN KE2 CONTROLLER. I I UNIT COOLER AND WIRED TO KE2 MAIN BOARD,(1)PER KE2 I I CONTROLLER.SENSOR TO BE MOUNTED AT COIL CLOSEST U5/A5 SPARE U5/A5 SPARE U5/A5 SPARE eD I I TO WALK-IN DOOR.REFER TO WALK-IN EVAP TEMPERATURE - o O r I S SENSOR LOCATION DETAIL.(TYP) U6/A6 SPARE U6/A6 SPARE U6/A6 SPARE z -0 I I INSTAL O L a UNIT COIL TEMPERATURE SENSOR 2(OF 2) U7/A7 SPARE U7/A7 SPARE U7/A7 SPARE M m FIELD INSTALLED AND WIRED TO AUX BOARD 1 INPUT 2. US/AS SPARE U8/A8 SPARE U8/A8 SPARE I I BAS ONE-LINE AND SCHEDULE NOTES COORDINATE WITH LEGACY BAS VENDOR Il Z m AUX BOARD 2 AND ASSOCIATED DEVICES ONLY (NOVAR)FOR THE REPROGRAMMING OF THEIR `J U/ a INSTALLED WHEN KE2 CONTROLLER SERVES 2 UNIT E - EXISTING BAS DEVICE,SENSOR,OR WIRE FOR REUSE. w ,•.__________7__________________________________________________________ O RACK CONTROLLER WITH THE REMOVAL OF 7 O llX"' COOLER COILS. RL EXISTING BAS DEVICE OR SENSOR TO RELOCATE AND CIRCUITS FROM THEIR CONTROL.VERIFY L_ AUX BOARD 2 RECONNECT.INSTALL NEW CABLE FOR RELOCATED DEFROST SCHEDULES ARE COORDINATED ES-1(RACK A) ES-1(RACK B) ES-1(RACK C) 0 UNIT COOLER W COIL TEMPERATURE SENSOR 1(OF 1) DEVICE OR SENSOR AS NECESSARY. BETWEEN THE EXISTING RACK CONTROLLER COMMUNICATION PORT COMMUNICATION PORT COMMUNICATION PORT I FIELD INSTALLED AND WIRED TO AUX BOARD 2INPUT2. RD REDESIGNATED BAS DEVICE OR SENSOR. AND THE NEW CASE CONTROLS. COM1 LCD COM1 LCD COMi LCD IF REQUIRED,FIELD INSTALL OWNER RP REPLACED BAS DEVICE OR SENSOR. UNLESS NOTED OTHERWISE,DEVICES AND FURNISHED AUX BOARD2 AND COMM. I I COM2 BACNET LOOP-KE2s/CPCO COM2 BACNET LOOP-KE2s/CPCO COM2 SPARE Q I S CABLING SHOWN IN THIS ONE-LINE DIAGRAM m WIRING FROM AUX BOARD 1 TO AUX N NEW BAS DEVICE OR SENSOR. ARE VENDOR FURNISHED;REFRIGERATION BOARD 21N KE2 CONTROLLER. I I BUILDING AUTOMATION CONTRACTOR TO I I FI NEW FIELD INSTALLED BAS DEVICE,SENSOR,OR WIRE. COM MODULE 1 COM MODULE 1 COM MODULE 1 z INSTALL CABLING AND DEVICES AND MAKE L.------ NEW FACTORY INSTALLED BAS DEVICE,SENSOR,OR WIRE. FINAL TERMINATIONS.REFER TO PLANS FOR COMMUNICATION PORT COMMUNICATION PORT COMMUNICATION PORT L. M BAS DEVICE OR SENSOR USED FOR MONITORING ONLY. DEVICE LOCATIONS. COM3 BACNET LOOP-XIO COM3 SPARE COM3 SPARE DI DIGITAL INPUT. REFRIGERATION BAS ONE-LINE REFLECTS THE - ---------------------- ----------- ---------`---------- COM4 SPARE COM4 BACNETLOOP-XIO COM4 BACNET LOOP-XIO L__—_____—__—_____J INTENDED DESIGN BASED ON NEW CASES AND ISSUE BLOCK Al ANALOG INPUT. EXISTING SYSTEM NUMBERS.VERIFYALL EX WALK-IN CONTROLLER WIRING (KE2, SECONDARY) 13ASEQUIPMNDIT PRIORON ROUGH-IN. OF ALL BAS EQUIPMENT PRIOR TO ROUGH-IN. COM MODULE 2 COM MODULE 2 COM MODULE 2 WIRE LEGEND L NTS COMMUNICATION PORT COMMUNICATION PORT COMMUNICATION PORT I WIR-1010(TAN CABLE 18-2,20-2 TWISTED PAIR) COM5 SPARE COM5 SPECTRUM NET-RACK/COND I/O COM5 SPECTRUM NET-RACK/COND I/O WIR-2020(BLUE CABLE 22-2 TWISTED PAIR) COM6 SPECTRUM NET-RACK/COND 1/0 COM6 SPECTRUM NET-CMS LOOP COM6 SPECTRUM NET-CMS LOOP NOTES: NOTE: NOTE: NOTE: 1. ALL CABLE WIR-2020 UNLESS NOTED OTHERWISE. 1.)NOT ALL CONNECTIONS SHOWN ON THIS SCHEDULE 1.)NOT ALL CONNECTIONS SHOWN ON THIS SCHEDULE 1.)NOT ALL CONNECTIONS SHOWN ON THIS SCHEDULE 2. ALL WIR-1010 AND WIR-2020 CABLE FURNISHED BY ARE PRESENT AT EACH REFRIGERATION GATEWAY.REFER ARE PRESENT AT EACH REFRIGERATION GATEWAY.REFER ARE PRESENT AT EACH REFRIGERATION GATEWAY.REFER NEW ETHERNET CABLE TO WALMART DATA OWNER FOR INSTALLATION BY CONTRACTOR. TO ONE-LINE DIAGRAM FOR CONNECTIONS SPECIFIC TO TO ONE-LINE DIAGRAM FOR CONNECTIONS SPECIFIC TO TO ONE-LINE DIAGRAM FOR CONNECTIONS SPECIFIC TO NETWORK BY WALMART CABLING ISO 3. ALL OTHER CABLE FURNISHED AND INSTALLED BY EACH REFRIGERATION GATEWAY. EACH REFRIGERATION GATEWAY. EACH REFRIGERATION GATEWAY. PROVIDER BAS CONTRACTOR TO CONTRACTOR. COORDINATE THE DATA REQUIRED FOR THIS SERVICE WITH THE WALMART CONSTRUCTION MANAGER.TYP. ES7 FACTORY INSTALLED IN BAS EXISTING HYBRID HOUSE LTA(ON ROOF) EXISTING HYBRID HOUSE DTB(ON ROOF) EXISTING HYBRID HOUSE MTC(ON ROOF) OWNER FURNISHED ENCLOSURE WITH 120V/24V TRANSFORMER. CAT5E r —, CAT5E —, CAT5E r —, REQUIRES 120VAC NEW RACK A'ES-l' I DEMO EXISTING RACK A'RC2-XE' I NEW RACK B'ES-l' DEMO EXISTING RACK B'RC2-XE' I NEW RACK C'ES-l' DEMO EXISTING RACK C'RC2-XE' I POWER SOURCE REFRIGERATION GATEWAY I REFRIGERATION CONTROLLER I REFRIGERATION GATEWAY REFRIGERATION CONTROLLER I REFRIGERATION GATEWAY REFRIGERATION CONTROLLER OWNER FURNISHED ES1 REMOTE COM1 COM2 COM3 COM4 COM5 COM6 WIR-2020 L------------ J COM1 COM2 COM3 COM4 COM5 COM6 L------------ J COM1 COM2 COM3 COM4 COM5 COM6 L------------ J LCD SCREEN PROVIDED WITH TYP. rI rI rI CHECKED BY: EJM 120V124V TRANSFORMER. y... ^^^ r-------------JJ ----------------J —————————————— DRAWN BY: JTC ES1 REMOTE XIO-8U-Al ES1 REMOTE ES1 REMOTE PROTO CYCLE: 04/26/2024 - LCD SCREEN I - LCD SCREEN XIO-BU-B1 - LCD SCREEN XIO-BU-C1 ES1 REMOTE ES1 REMOTE - E51 REMOTE TO EXISTING CMS CONTROLLERS LCD SCREEN PLM LCD SCREEN LCD SCREEN DOCUMENT DATE:12/27/2024 PLM PLM COM ADM COM AOM COM ADM ES1 REMOTE LCD SCREEN,REQUIRES RIM AOM RIM ADM RIM ADM 24VAC POWER SUPPLY.TYP. DEMO CMS MODULES WITH PROVIDE 208/12OV-24VAC CASEANALK-IN EVAPORATORS ROM AOM ROM AOM ROM ADM `GT• TRANSFORM ER.TYP. Q- RACK PHASE LOSS MONITOR WIRED FOR ALL RACK A CIRCUITS. ROM BIM ROM 81M ROM 81M BACK TO XIO.REFER TO XIO SCHEDULES CMS MODULE MOD COMM-C/24V , FOR ADDITIONAL INFORMATION.TYP. DC WIR-2020 TYP. BUILDING AUTOMATION CONTRACTOR ROM CCM ROM RIM ROM CCM TO PROVIDE RS-485 BACNET CABLE TO FIRST CASEICOIL CONTROLLER ON A O 41742 COMM LOOP ONLY.TYP. KE2-RE2;(AO7 SCO2 SFD FZR)(N) ;KE2-RE2;(B06a SCO2 GROC FZR)(N) `----c---' `----[---� WIRE EXISTING CONDENSER REFER TO WALK-IN COIL ;KE2-CC (A01a SCO2 FF DRS)(N) ;KE2-RE2:(BO6b SCO2 GROC FZR)(N) CMS ;(BOSa) (DEMO) CONTROL MODULE ONTO COMM CONTROLLER WIRING -=cxc=c� LOOP WITH OTHER RACK 1/0. 'KE2-CC (AO1b SCO2 FF DRS)(N) ;KE2-RE2:(B07a SCO2 GROC FZR)(N) CMS ;(BO5b) (DEMO) TYP. DETAIL.TYP _ REMOTE RACK LCD MOUNTED ON BAS BACKBOARD.REFER TO BAS CASE CONTROLLER QUANTITY TO ;KE2-CC (A04a SCO2 FF DRS)(N) ;KE2-RE2 (B07b SCO2 GROC FZR)(N) ; CMS ;(B06a) (DEMO) BACKBAARD DETAIL FOR BE DETERMINED.T THE CASE -___[___� ____L___ ADDITIONAL INFORMATION.TYP. MANUFACTURER.TYP. rKE2-CC;(A04b SCO2 FF DRS)(N) KE2-CC SCO2 IC CAKE)(N) CMS ;(B06b) (DEMO) CASE CONTROLLER FACTORY ;KE2-CC;(A04c SCO2 FF DRS)(N) ;KE2-CC;(B13a SCO2 FF DRS)(N) CMS BSOta INSTALLED IN NEW CASE.REFER ----[ + c-c-[c--. .( ) (E) ___ TO CASE SCHEMATIC DETAIL TYP. ;KE2-CC;(A02a SCO2 FF DRS)(N) ;KE2-CC;(1313b SCO2 FF DRS)(N) ---�--- REFER TO CASE CONTROLLER ;KE2-CC (AO2b SCO2 FF DRS)(N) ;KE2-CC (B13c SCO2 FF DRS)(N) ---t--- WIRING DETAIL.TYP. --cccc-c� [[[[[[[[, L_CMS_ (BSO4b) (E) KE2-CC (A02c SCO2 FF DRS)(N) ;KE2-CC (1313d SCO2 FF DRS)(N) KE2-CC;(A05a SCO2 FF DRS)(N) ;KE2-CC;(B14a SCO2 FF DRS)(N) CMS ;(RCU1) (DEMO) r -- KE2-CC;(AO5b SCO2 FF DRS)(N) ;KE2-CC;(B14b SCO2 FF DRS)(N) CMS ;(B08a) (DEMO) KE2-CC;(A05c SCO2 FF DRS)(N) ;KE2-CC;(B14c SCO2 FF DRS)(N) ; CMS ',(BO8b) (DEMO) KE2-CC;(AO5d SCO2 FF DRS)(N) ;KE2-CC;(B1la SCO2 FF DRS)(N) CMS ;(1308c) (DEMO) KE&CC (AO6a SCO2 FF DRS)(N) ;KE2.CC (Bi tb SCO2 FF DRS)(N) -------, __-c--- _--[-_- ; CMS ;(BS05a) (E) KE2-CC;(A06b SCO2 FF DRS)(N) ;KE2-CC;(Bile SCO2 FF DRS)(N) ---T--' KE2-CC (AO6c SCO2 FF DRS)(N) KE2-CC (B12a SCO2 IC DRS)(N) -- -- CMS ;(BSOSf) (E) PROVIDE RS-485 FOR RAE CORP ;KE2-CC (AO3a SCO2 FF DRS)(N) ;KE2-0C (B72b SCO2 DRS)(N) L SKID CONTROLLER.REFER TO '--'[---� ----[---i --------� PLANS FOR LOCATION. ;KE2-CC;(A03b SCO2 FF DRS)(N) ;KE2-CC;(B12c SCO2 IC DRS)(N) CMS '(B07a) (DEMO) BUILDING ETHERNET CABLING TO WALMART :�. CC;(A03c SCO2 FF DRS)(N) ;KE2-CC;(B15a SCO2 IC DRS)(N) CMS '(B07b) (DEMO) DATA NETWORK.REFER TO PLANS ---, [--[c---� ____c___' AUTOMATION FOR ADDITIONAL INFORMATION.TYPRE2 (AO8 SCO2 DELI FZR)(N) ;KE2-CC (B15b SCO2 IC DRS)(N) CMS (B07c) (DEMO) OF RA CORP PUMP SKIDS. c-ccc _ _ SYSTEM CPC--- (SCO2SA-1)(N) KE2-CC (B15c SCO2 IC DRS)(N) r-CMS ;(BS09a) (E) CPCO;(SCO2SB-1)(N) REFRIGERATION BAS ONE-LINE DIAGRAM (NOVAR/SPORLAN) NTS BAS R2 RACK LTA DISCHARGE AIR TEMPERATURE AND DEFROST PARAMETERS DISCHARGE AIR TEMP SETTINGS FOR CASES/ DEFROST DEFROST SCHEDULE RETURN AIR TEMP SETTING FOR WALK IN BOXES LL w LL Ii..., LL Y W r Q Z z a 0 z r w o z F a ar a o Q. z w N e m m r 0 U APPLICATION MODEL NUMBER MFR EQUIP NUMBER N w N 0 U ~ p I o Q o o >= o Q 0 o w r r o 0 0 0 0 0 0 0 U Z U H W W d O Z a—a. W K w Ili W o r N < Q J. ° F°= wgw3? -Ml SCO2 FF DRS ReacMn F.F. "RLN-VCT HUSSMANN RS=2.242//1M6r2023 .11 d EL 1 45 48 0 0:00 Ile "All—FF DRS RaaeMn F.F. "RLN-VCT HUSSMANN RS3002.2Q 111I M81 0 41 b EL 1 45 1 48 0 0:50 0LL "A03 SCO2 FF DRS ReacMn F.F. ^RLN-VCT/^RLNI-VCT HUWMMN RS3002.242 1 11=0 3 242 1I12M6/2023 41 d EL 1 45 48 0 1:40 Z w °gwo oN=Orc -M4 SCO2 FF DRS ReacMn F.F. "RLN-VCT HUSS11i RS3002.242//121 W023 -11 d EL 1 45 48 0 2:30 ua w>✓ z z -z o z 3zn¢w3aw�g "A055CO2 FF DRS Raaeh-In F.F. "RLNI-VCT HUSSMANN R33003.242//12M6M023 -11 d EL 1 45 48 0 4:10 ¢ 3 az o A w y 4a o N a o w -M6 W02 FF DRS Reach-In F.F. ^RLN-VCT/'"RLNI-VCT HUSSMANN R51002.242/RS3003242/I12MW2021 .11 d EL 1 45 4S 0 5:00 - - - 7 aW o °ww°wa a; "A07 SCW SFD FM Seafood Freers,W.I. "KRD2AE474CDAA ld A!( -11 .2 EL DEMAND DEFROST EMPLOYED BY Ills CONTROLLER d Y I o,g3 p N S i w ^A06 SCM DELI I M NO Freezer W.I. -l(RD34E411CDAA KRACK -11 .2 EL DEMAND DEFROST EMPLOYED BY KE2 CONTROLLER Information included in this schedule is taken from manufacturer's submittals. Contractor to vedfy information against latest submittals available at time cases/ooils are delivered. Pammeters above are to be used in programming new/replaced cases/coils only. �w �o- RACK DTB DISCHARGE AIR TEMPERATURE AND DEFROST PARAMETERS w m; DISCHARGE AIR TEMP M SETTINGS FOR CASES/ N DEFROST DEFROSTSCHEDULE a <u g 4 RETURN AIR TEMP r i SETTING FOR WALK IN BOXES of =w z 0 U of °L IL L w ) o Q 2 X O it z w a a z F a K w z0 w N M rn m n m U U APPLICATION MODEL NUMBER MFR EQUIP NUMBER u) w a 0 U z0 2 2 m � z �i w ¢ a 0 0 0 0 0 0 0 0 O C= z a ¢ o 0 It o 00 a z a Z) w w > m o r o 0 z 0 a "BOB SCO2 GROC FZR 1M Grorsryll.C.Frs 2"KRD54E-165CDAA KRACK -211 40 EL DEMAND DEFROST EMPLOYED BY KE2 CONTROLLER. O r ^BOT SCO2 GROC FZR 1M Groceryll.C.Frs 2"KWME-166CDAA KRACK - -20 40 EL DEMAND DEFROST EMPLOYED BY KE2 CONTROLLER. M m "BOO SCO2 IC CAIM Rwc1,4n I.C. "RLN-VCT HUSSMANN R53002.142//11/LW2023 -19 42 EL 1 45 46 0 "B11 SCO2 FF DRS RaaeMn F.F. 'RLN-VCT/`RLNI-VCT HIJWMANN RS3002.2421R53003242//12M6/2023 49 3 EL 1 d5 N 0 0:00 fn Z "B128CO21CDRS R 1,4n I "RLN-VCT HUSSMANN RS3002.142//121 W023 .19 .12 EL 1 45 M 0 0:50 v W "B13 SCW FF DRS RaaeMn F.F. "RLNI-VCT HUSSMANN 1253003.242//12/2W2023 -19 b FL 1 45 4B 0 1:40 O 0 ^B14 SCO2 FF DRS Reach-In F.F. ^RLN-VCT/••RLNI-VCT HUSSMANN R51002.242/RS3003242II12MW2023 49 d El. "B155CO2ICDRS R 1,4.I.C. "RLN-VCT HUNIANNN RS3002.142//121 W023 -19 42 EL 1 49 48 0 9:20 (n Information included in this schedule is taken from manufacturer's submittals. I f 1 U) Contractor to verify information against latest submittals available at time cases/coils are delivered. Paremelere above are b be used in programming new/replaced cases/wile only. K w m z ob 07 O ISSUE BLOCK CHECKED BY: EJM DRAWN BY: JTC PROTO CYCLE: 04/26/2024 DOCUMENT DATE:12/27/2024 ��`1CI.1 �1P 2 O 41742 JJ �4//1 BUILDING AUTOMATION SYSTEM SHFFT BASR3 LEAK ALARM AND CONTROL SEQUENCE OF OPERATIONS REFRIGERANT LEAK CONTROL SEQUENCE OF OPERATION FOR COOLERS AND FREEZERS: THE LEAK DETECTION CONTROL MODULES,UPON REGISTERING A CONCENTRATION THAT IS:ONE-HALF OF THE IDLH OR AT THE DEL;WHICHEVER IS LESS,SHALL: 1. ACTIVATE VISUAL AND AUDIBLE ALARMS FOR THE ZONE INDICATING THE LEAK 2. ENABLE AN AUTOMATIC SHUTDOWN OF THE LLSV TO ISOLATE THE REFRIGERANT FLOW IN THE CIRCUIT IN ALARM. THE LEAK DETECTION CONTROL MODULE,UPON REGISTRATION A CONCENTRATION THAT IS AT VAPOR DETECTOR'S UPPER DETECTION LIMIT OR UPON ACTIVATION OF THE BREAK GLASS SWITCH, SHALL ALSOA. AUTOMATICALLY SHUT OFF REFRIGERANT COMPRESSORS,REFRIGERANT PUMPS,AND NORMALLY CLOSED,AUTOMATIC REFRIGERANT VALVES LOCATED IN MACHINE ROOM. AUDIBLE/VISUAL DEVICES INSIDE COOLERS AND FREEZERS SHALL BE INSTALLED IN WEATHERPROOF JUNCTION BOXES,REFERENCE LEAK DETECTOR INSTALLATION DETAIL. AUDIBLE/VISUAL DEVICES SHALL ANNUNCIATE AT A SOUND PRESSURE LEVE THAT IS A MINIMUM OF 15 DBA ABOVE THE AMBIENT NOISE LEVEL. LEGEND JOEL' OCCUPATIONAL EXPOSURE LIMIT TWA: TIME WEIGHTED AVERAGE LLSV: LIQUID LINE SOLENOID VALVE IDLH: IMMEDIATELY DANGEROUS TO LIFE OR HEALTH SPL: SOUND PRESSURE LEVEL EPR: EVAPORATOR PRESSURE REGULATOR m S IFS s �? 3`a w �a °"xoo�a r �w3oaWyoo€<G�w a o6 °xg F z =W z 0 U X d U 0o Q 00 � �J 0 .z 0 O n a V�� Lo n M m fll Z m o z o REFRIGERATION CONTRACTOR TO REFER TO MANUFACTURER'S DETAIL IS A SCHEMATIC REPRESENTATION AND REFER TO MANUFACTURER'S INSTALLATION INSTRUCTIONS � FIELD WIRING PROVIDE AND TERMINATE ALL 120V INSTALLATION INSTRUCTIONS FOR MAY NOT REFLECT ALL CASE CONFIGURATIONS. FOR COMPLETE FACTORY WIRING DIAGRAMS. �`JJ FACTORY WIRING ------- AND 208V SLAVE WIRING AND CONDUIT FACTORY WIRING DIAGRAMS,FIELD SOME FACTORY INSTALLEDCOMPONENTS AND BETWEEN CASES.REF ELECTRICAL. WIRING TERMINATIONS AND RS485 WIRING ARE NOT SHOWN FOR CLARITY.CONTACT BACNET WIRING DETAILS. REFRIGERATED CASE MANUFACTURER FOR m FACTORY INSTALLED COMPONENT INFORMATION. REFRIGERATION CONTRACTOR THIS DIAGRAM SHOULD NOT BE USED FOR z TO VERIFY MAC ADDRESSING IS INTERNAL CASE COMPONENT WIRING. FACTORY WIRING TO UNIQUE FOR EACH CONTROLLER. LLSV CONTACT STRIP � p ISSUE BLOCK W. mmm mmm mmm mm mmm mm mm mm m m _ e 120V POWER SUPPLY FEED.IN CASE REPLACEMENT e ^-� APPLICATION WIRING C AUX BOA BE EXISTING TO REMAIN. O e AUX BOAA RD VERIFY RE-USE OF EXISTING WIRING WITH ELECTRICAL. e OTHERWISE ELECTRICAL CONTRACTOR TO PROVIDE NEW POWER FEED.REFRIGERATION CONTRACTOR TO TERMINATE WIRING.REF ELECTRICAL. FACTORY INSTALLEDINSTALLED WIRING BETWEEN KE2 CASE CONTROLLER FAN/LIGHT/ANTI-SWEAT HEATER TERMINALS AT EVERY CASE.IN CASE REPLACEMENT APPLICATION WHERE WIRING IS EXISTING TO REMAIN,REMOVE FACTORY JUMPERS. REF ELECTRICAL. -e e � FANS B1"�°""`"� _ ELECTRIC DEFROST CASES:IN CASE e e o 0 0 0 0 0 o CAT- ETHERNET CABLE CONNECTING 0 12pVAC(+ 0 ) 0 pp�������� ��" TO KE2 NETWORK SWITCH,IF REQUIRED 0 120VAC- 0_F 120 VAC REPLACEMENT APPLICATION WIRING 6 6 Q FOR BONDING CONTROLLERS.REFER TO 0 GND 0 ))) COULD BE EXISTING TO REMAIN.VERIFY e e LIGHTS REFRIGERATION SAS ONE-LINE DIAGRAM. RE-USE OF EXISTING WIRING WITH G w 0 BAT(; 0—BATTERY BACKUP 0 BAT- 0—24VDC CONNECTION ELECTRICAL.OTHERWISE ELECTRICAL ! 1'6 6 0 CNT(SIG) 0—420 MA CONTRACTOR TO PROVIDE 208V POWER ANTI-SWEAT HEATERS INSTALL OWNER FURNISHED RS485 BACNET 0 CNT(GND) 0—OUTPUT FEED.REFRIGERATION CONTRACTOR TO ---e 6 COMM WIRING FROM GATEWAY OR 0 SEN(SIG) 0—)) TERMINATE WIRING.REF ELECTRICAL. 6 6 PREVIOUS KE2 CONTROLLER ON COMM 0 SEN(24V) 0—t TO SENSOR LOOP,REFER TO ONE-LINE DIAGRAM. 0 SEN GND 0— 6 6 208V ELECTRIC m H/S(24V) 0— CHECKED BY: EJM DEFROST RS485 BACNET COMM WIRING TO NEXT KE2 0 H/S GND 0—TO HORN/STROBE 6 6 CONTROLLER ON COMM LOOP,REFER TO % . ONE-LINE DIAGRAM. DRAWN BY: JTC I SLSV —• e e SUPPLY LINE 0 ALM#1(NO) 0—2N.0 CONTACT ALARM#1 TO pR0T0 CYCLE: 04/26/2024 SOLENOID VALVE 0 ALM#1(GND 0—)REFRIGERATION CONTROLLER COMM.WIRING TO NEXT CONTROLLER 0 ALM#2(NO) 0—N.0 CONTACT ALARM#2 TO DOCUMENT DATE:12/27/2024 ON COMM.LOOP.REFER TO 0 ALM#2((GND 0—FIRE ALARM PANEL SLSV:FACTORY INSTALLED SUPPLY LINE -- SUPPLY LINE SOLENOID VALVE: REFRIGERATION BUILDING 0 ALM#3(NO) 0—N.0 CONTACT ALARM#3 TO AUX SOLENOID VALVE AT EACH CASE. FACTORY INSTALLED PER CASE. AUTOMATION SYSTEM PLANS FOR 0 ALM#3 GND 0—CONTROLLED EQUIPMENT AS ONE-LINE DIAGRAM.(TYP) REQUIRED REFRIGERATED CASE.TYP. MANNING( `g 1.Ili HORN AND STROBE FACTORY INSTALLED FACTORY MOUNTED ON FACE OF CABINET TERMINAL BLOCK AT EVERY 2 CASE.FULL BLOCK NOT SHOWN FOR CLARITY.(TYP) O 41742 A B C D TERMINAL PROVIDE COMM.WIRING TO PROOF OF BLOCK L/2/lam' PREVIOUS CONTROLLER ON CALL FOR COMM.LOOP.REFER TO REFRIGERATION BUILDING AUTOMATION SYSTEMS CASE CONTROLLER(S)FURNISHED SHUTDOWN MANNING DUAL AND INSTALLED BY CASE RELAY MODULE REFRIGERATION BUILDING CONTRACTOR TO TERMINATE COMM.WIRING AT MANUFACTURER AT EVERY CASE. m AUTOMATION SYSTEM PLANS CASE CONTROLLER MASTER/SLAVE 1/0 24VDC DRM FOR ONE-LINE DIAGRAM.(TYP) POWER STATUS THRESHOLD SWITCH SET TO 33%/100 CONNECTION SCHEMATIC (KE2, SECONDARY) KNOCKOUT FOR 120 VAC INDOOR HORN (�yCASE POWER STATUS INSIDE"LEAK AND STROBE NTS FRONT DETECTION DETECTION PANEL"VIEW PANEL"VIEW /INSTALL 22 GA OWNER FURNISHED SHIELDED / CABLE FOR 4-20 MA SIGNAL AND 22 GA OR 120V POWER REF ELEC LARGER SHIELDED CABLE FOR"DRY"CONTACT TO RACK LOCATED EMS INPUT MODULE. t�SUPPLY COMPRESSOR HOUSE SEAL ALL PROVIDE 1"EMT STUB UP TO STRUCTURE _______ PENETRATIONS INSTALL LEAK DETECTION PANEL 6"FROM RETURN DIGITAL WIRING TO INPUT WITH SILICONE TOP OF WALK-IN MODULE AT RACK. RIM SEALANT ANALOG WIRING TO INSTALL MANNI [ i / NG PROVIDE SENSOR CONNECTION IN12- INPUT MODULE AT RACK. SIM HS-24 t CONDUIT ALONG EXTERIOR OF BOX LEAK DETECTION PANEL. L--------� HORN/STROBE(S) TO SENSOR LOCATED IN PER ZONE. W/WP BACK REFRIGERATED SPACE WALK-IN LEAK BOX.REFER TO DETECTION ZONE. D MRLDS LEAK PLANS FOR LP QUANTITY A SENSOR r-- -- LOCATION EVAP L HORN/STROBE PENETRATE SIDE OF FAN/ ALARM TYP. INSTALL MANNING WALK-IN @ 24-AFF BUILDING COIL AIRSCAN-IRSENSOR UNIT IX DAISY CHAIN TO ADDITIONAL AUTOMATION REFER TO LEAK DETECTION L.. ..— HORN/STROBES AS NECESSARY. SEAL ALL SYSTEM PANEL INSTALLATION AND REFER TO PLAN FOR WALK-IN INSTALL DEFROST TERMINATION PENETRATIONS SENSOR TUCKED AND SECURED IN WIRING DETAIL FOR CABLE HORN/STROBE QUANTITY. WITH SILICON PLACE BETWEEN COIL FINS AT END TYPES. SEALANT OF COIL,1 PER ELECTRIC DEFROST SIDE VIEW COIL.CONNECT TO APPLICABLE EVAPORATOR MODULE. SIDE VIEW FRONT VIEW ELECTRIC DEFROST TERMINATION SENSOR LEAK DETECTION ZONE DEVICES ONE-LINE DIAGRAM �LEAK DETECTOR INSTALLATION DETAIL J NTS L NTS � NTS SHFFi BAS R4 PRIOR TO START NG DEOLITION WORK, FLOOR DRAINS AIND/OR FLLOOR SINKS UNDERG ALL PIPING AND REFRIGERATION PIPING SCHEDULE RACK LTA(DX) REFRIGERATED CASES TO BE REPLACED WITH SCHEDULE SYMBOLS REFRIGERATION SYMBOLS KEYNOTES EPA CLEAN AIR ACT EXPANDABLE MECHANICAL PLUG(SIMILAR TO CHERNE VERTICAL ESTIMATED ECON-O-GRIP).AFTER WORK IN THE AREA IS COMPLETE, Rwtilo.a.z9 RI-9.25.18 11.02.1s PIPE HORIZONTAL SUCTION RISER TOTAL AND PRIOR TO SETTING NEW REFRIGERATED CASES, MODIFY CIRCUIT OR PIPE LENGTH XXX CIRCUIT NUMBER (CIRCUIT INFO) COMPLY WITH CLEAN AIR ACT,TITLE VI,SECTION 608 THOROUGHLY CLEAN ALL DEBRIS FROM FLOOR DRAIN 15.603 SUPPORT HORIZONTAL RUNS OF REFRIGERANT AND CODE OF FEDERAL REGULATION TITLE 40,PART 82 DESIGNATION SUCTION AS REQUIRED LIQUID LENGTH •* NEW CASE,COIL,CIRCUIT OR VALVE #XXX QUANTITY/MODEL NUMBER LINES ON 1-5/8"X 1-5/8"UNISTRUT CHANNELS. AND/OR FLOOR SINK GRATES AND BODIES,REMOVE WHEN ADDING OR REMOVING REFRIGERATED """"Al2 2-5/8 1-3/8&15/8 70 PLUG AND HYDRO-JET EACH FLOOR DRAIN AND/OR CHANGE EXISTING PIPE SIZE AS INDICATED OR COIF CLEANOUT(CO) REFER TO SPECIFICATIONS FOR PIPE HANGER EQUIPMENT.RECORD ALL EQUIPMENT IDENTIFICATION 7/8 FLOOR SINK TO THE MAIN.CAMERA SCOPE MAIN LINE TO **** NEW PIPE SPACING. NUMBERS,MODEL AND SERIAL NUMBERS,THE AMOUNT *'""/""A13 2-5/8 1-3/8&15/8 80 CONFIRM LINE IS CLEAR.IF MAIN LINE HAS ANY CONDENSATE DRAIN LINE(CD) 15.610 PROVIDE AIRTIGHT SEAL AROUND ALL PIPING OF REFRIGERANT RECOVERED FROM EACH UNIT,THE OBSTRUCTIONS,COORDINATE SOW WITH CM AS AN ^ RISER SIZE IS SHOWN EVEN WHERE A RISER IS CONNECT TO EXISTING AND BOLT PENETRATIONS THROUGH DATE OF DECOMMISSIONING,COMPANY NAME AND ADDITIONAL SERVICE. NOT EXPECTED.THIS IS FOR REFERENCE ONLY COOLER/FREEZER BOX WALLS OR CEILINGS. SIGNATURE OF ON-SITE SUPERVISOR. 1)ESTIMATED TOTAL LENGTH INCLUDES HORIZONTAL AND VERTICAL PIPE SECTIONS.THIS AND IS TO BE USED IN THE EVENT THAT A PIPING CONTINUATION CONFLICT CAUSES THE NEED FOR A RISER.IF 15.611 SUPPORT UNIT COOLERS WITH BOLTS THROUGH IS ONLY AN ESTIMATE AND ACTUAL LENGTH WILL VARY. CONTRACTOR TO RE-USE EXISTING CASE DRAINS. ROOF TO 1-5/8"X 1-5/8"X 10'LONG 14 GA. REPLACE DRAIN IF.MORE THAN 1/2 OF DRAIN EXPOSED THE RISER LENGTH EXCEEDS 4 FEET,IT MUST BE X DETAIL NUMBER GALVANIZED UNISTRUT SPANNING THREE ROOF GENERAL NOTES TO SALES FLOOR.FIELD VERIFY EXACT LOCATIONS. APPROVED BY ENGINEER OF RECORD. pL SHEET NUMBER (DETAIL REFERENCE) PANELS.PROVIDE DOUBLE NUTS ON EACH BOLT. 2)ALL EXISTING PIPE SIZES ARE BASED ON ORIGINAL REFRIGERATION LEGENDS N, NEW PIPING CONNECTED TO EXISTING PIPING 15.612 SEE SCHEDULES FOR UNIT COOLER TYPES, 24 HOURS PRIOR TO SHUTTING DOWN ANY TO REMAIN.REFER TO REFRIGERATION PIPING SIZES,AND CAPACITIES;CONTROL METHOD;AND 1. PLANS INDICATE GENERAL ROUTING OF REFRIGERATION SYSTEMS,HVAC SYSTEMS OR ENERGY PLAN FOR APPROXIMATE LOCATION OF NEW ALL REFRIGERATION PIPING SIZES,ETC. NEW PIPING MANAGEMENT CONTROLS SYSTEMS,SEND EMAIL TO AND EXISTING PIPING. ® EVAPORATOR COIL REFRIGERANT LINES,WITH A SINGLE LINE "^ * NSRM@WALMART.COM.THE E-MAIL SHALL STATE WHAT, 15.615 CONDENSATE DRAIN;PITCH DRAIN LINES DOWN SHOWN INDICATING BOTH SUCTION AND LIQUID NEW PIPING CONNECTED TO EXISTING PIPING TO REMAIN.REFER TO REFRIGERATION CONTRACTOR TO FIELD VERIFY EXISTING RISER APPROXIMATELY 1/8"PER 12"TOWARD DRAIN. LINE ROUTING FOR EACH SYSTEM. WHY,AND WHEN IT IS BEING SHUT DOWN AND HOW LONG # PROVIDE COPPER PIPING WITH ELECTRIC HEAT PIPING PLAN FOR APPROXIMATE LOCATION OF NEW AND EXISTING PIPING. IT IS ANTICIPATED TO BE SHUT DOWN.THEN SEND A SIZE.IF EXISTING PIPE SIZE DOES NOT MATCH CO2 VALVE STATION TAPE AND INSULATION ON ALL CONDENSATE 2. REFRIGERATION SYSTEM INSTALLATION SHALL w W S e FOLLOW UP EMAIL TO NSRM WALMART.COM AFTER THE SCHEDULE,REPLACE EXISTING RISER WITH NEW T "RISER SIZE IS SHOWN EVEN WHEREA RISER IS NOT EXPECTED.THIS IS FOR @ ELBOW-TURNED DOWN LINES EXPOSED TO FREEZING TEMPERATURES. BE IN COMPLETE CONFORMANCE WITH WORK IS COMPLETE AND THE SYSTEM IS BACK UP AND SIZE AS SHOWN. _ - REFERENCE ONLY AND IS TO BE USED IN THE EVENT THATA PIPING CONFLICT CAUSES RUNNING. 15.616 END CONDENSATE LINE OVER RECEPTOR WIAIR SPECIFICATIONS,AND WITH ALL REQUIREMENTS REFER TO SCHEDULE NOTES FOR ADDITIONAL � ELBOW-TURNED UP OF REFRIGERATION EQUIPMENT THE NEED FOR A RISER. IF RISER LENGTH EXCEEDS 4 FEET,IT MUST BE INFORMATION. GAP.CONTRACTOR SHALL ENSURE FLOOR " '$ XX.XXX REFRIGERATION KEYNOTE REFERENCE DRAIN(S)AND DRAIN LINE(S)SERVING WALK-IN MANUFACTURER. 8 nF 3t ag��wy°pm APPROVED BY ENGINEER OF RECORD. ARE FREE OF OBSTRUCTIONS AND FUNCTION REFRIGERATION PIPING(ABOVE) PROPERLY.WHERE EXTENSIVE DAMAGE EXISTS 3. REFRIGERATION DRAWINGS ARE PROVIDED AS z SEISMIC NOTES -___-- AND/OR PROPER DRAINAGE CANNOT BE AN AID TO BIDDERS AND TO INDICATE DESIRED zw3� rcw3¢w�o°'� REFRIGERATION PIPING(BELOW) OBTAINED COORDINATE WITH WALMART ROUTING OF REFRIGERATION LINES; a°yoo€m 3 3Q=a_ 12.20.13 --� REFRIG PIPING CASE CONNECTION MECHANICAL CONSTRUCTION MANAGER. CONTRACTOR SHALL ASSUME FULL oo��W REFER TO SEISMIC RESTRAINT SHEET SR1 FOR 15.617 PROVIDE PVC DRAIN LINE FROM EACH CASE RESPONSIBILITY FOR CORRECT INSTALLATION r w PZ INSTALLATION DETAILS.REFER TO THE SPECIFICATIONS ETR EXISTING TO REMAIN DRAIN CONNECTION SAME SIZE AS CASE OF PIPING AND ACCESSORIES TO PROVIDE A rn E PIPING SCHEDULE RACK LTA(SCO2) FOR FURTHER INFORMATION. SIM SIMILAR OUTLET,AND END OVER FLOOR RECEPTOR COMPLETE AND FULLY OPERATING SYSTEM. W/AIR GAP;PITCH DRAINS 1/8"PER 12".PROVIDE UNO UNLESS NOTED OTHERWISE DRAIN COVER GRATE TO MATCH EXISTING. 4. REFER TO SPECIFICATION 15600 FOR VERTICAL ESTIMATED CONTRACTOR SHALL ENSURE RECEPTOR(S)AND INSULATION THICKNESS.INSIDE DIAMETER OF TYP TYPICAL DRAIN LINE(S)SERVING CASE LINE-UP ARE FREE INSULATION SHALL MATCH PIPE DIAMETER TO PIPE GPM HORIZONTAL RETURN RISER TOTAL OF OBSTRUCTIONS AND FUNCTION PROPERLY. MINIMIZE AIR GAPS BETWEEN PIPING AND �� boa DESIGNATION RETURN AS REQUIRED LIQUID LENGTH .I WHERE EXTENSIVE DAMAGE EXISTS AND/OR INSULATION.PROVIDE FACTORY PRE- I 3 4 PROPER DRAINAGE CANNOT BE OBTAINED MANUFACTURED FITTINGS AT ALL TRAPS AND IA SCO2 3.14 15/8 1-3/8 7/8 25 2 '* t COORDINATE WITH WALMART MECHANICAL ELBOWS.WHERE PRE-MANUFACTURED -1.01A SCO2 0.00 1/2 "1/2 318 0 CONSTRUCTION MANAGER. FITTINGS ARE UNAVAILABLE MITER CUT ALL M FITTINGS TO ENSURE PROPER SEAL BETWEEN N z 1.02A SCO2 0.47 1/2 ^1/2 1/2 70 15.623 ROUTE REFRIGERATION LINES IN BASE OF CASE INSULATION SEGMENTS. z u r A01 SCO2 0.22 1/2 3/8 3/8 25 FORALL BOTTOM FED CONNECTED CASES. SLOPE BACK TO LEAD CASE AT 1"PER 20'-0"OF A07 SCO2 0.25 1/2 3/8 3/8 25 RUN. 5. PIPE INSULATION SHALL BE BLACK,UNLESS OTHERWISE STATED ON PLANS OR 1AA SCO2 2.67 1-3/8 ^1-3/8 7/8 50 it 0 15.624 ROUTE REFRIGERATION LINES ON TOP OF CASE SPECIFICATIONS U 1.2A SCO2 0.84 7/8 "7/8 112 45 BAKERY rn FOR ALL TOP FED CONNECTED CASES.SLOPE UTILITY L ¢ BACK TO LEAD CASE AT 1"PER 20'-0"OF RUN. 6. COORDINATE REFRIGERATION DEMOLITION A02 SCO2 0.42 5/8 1/2 1/2 35 REFER TO TOP FED PIPING DETAIL. ISSUES WITH THE ARCHITECTURAL DRAWINGS. A03 SCO2 0.42 5/8 5/8 1/2 50 15.661 REFRIGERATION CONTRACTOR SHALL INSTALL REFER TO ARCHITECTURAL PLANS FOR x REFRIGERATION RACK REFRIGERATION EQUIPMENT DEMOLITION AND < 1.3A SCO2 1.83 1-1/8 ^1-1/8 5/8 5 rn 3 8 MANUFACTURER-FURNISHED LIQUID LINE COOLER REPAIR AND REMODELING. Q SOLENOID VALVE,SUCTION LINE CHECK VALVE, O O A04 SCO2 0.39 5/8 5/8 112 35 m m R3.1 R3.1 15.681 TYP AND CO2 VALVE STATIONS IN A SERVICE 7. REFRIGERATION SYSTEM SHALL REMAIN 1.4A SCO2 1.44 7/8 "7/8 518 15 w ACCESSIBLE LOCATION ON TOP OF WALK-IN OPERATIONAL DURING REMODELING.DURING A05 SCO2 0.67 7/8 7/8 1/2 50 �QDi BOX.REFER TO CO2 VALVE STATION DETAIL. THE PHASING OF OLD TO NEW SYSTEMS,BOTH O O A05 SCO2 0.39 5/8 5/8 3/8 35 INSTALL CONTROL WIRING FROM SOLENOID NEW AND OLD REFRIGERATION SYSTEMS MAY m 0 VALVE BACK TO CIRCUIT CONTROLLER.REFER BE REQUIRED TO OPERATE AT THE SAME TIME A08 SCO2 0.38 5/8 1/2 112 155 N TO SPECIFICATIONS FOR ASSET TAGGING FOR A SHORT PERIOD. 1b REQUIREMENTS. o O 1)PIPE MAINS INCLUDE ADDITIONAL CAPACITY FOR FUTURE CONNECTED LOADS. 15.666 REFRIGERATION CONTRACTOR SHALL INSTALL 8. WHERE NEW REFRIGERATED EQUIPMENT IS z 7 0 REFRIGERATION RACK INDICATED ON THE DRAWINGS,PROVIDE C ORDINATE ROUTING OF a MANUFACTURER-FURNISHED CO2 VALVE DEMOLITION,REMOVAL,AND TEMPORARY O REFRIGERATIONO PIPING STATIONS IN A SERVICE ACCESSIBLE LOCATION STORAGE OF OLD EQUIPMENT PER WALMART M m 2)ESTIMATED TOTAL LENGTH IS FOR ONE DIRECTION;SUPPLY OR RETURN.THE TOTAL IS O WITH EXISTING PIPING, ON TOP OF CASE.REFER TO CO2 VALVE MECHANICAL SERVICES CONSTRUCTION ONLY AN ESTIMATE AND ACTUAL LENGTH WILL VARY. riCl DUCTWORK,AND LIGHTS. STATION DETAIL.FULLY INSULATE ALL MANAGER'S INSTRUCTIONS,AND f n Z �l TYR SURFACES. REFRIGERATION DEMO NOTES. `J W 1 15.617 15.617 15.667 REFRIGERATION CONTRACTOR SHALL INSTALL O Z O 3)-PIPE STUB FOR FUTURE CONNECTION. 9. COORDINATE REMOVAL AND DISPOSAL OF 15.624 15.624 REFRIGERATION RACK EXISTING EVAPORATORS,REFRIGERATED l� 15.666 15.666 MANUFACTURER-FURNISHED CO2 VALVE CASES,AND CONDENSING UNITS,WITH STATIONS IN A SERVICE ACCESSIBLE LOCATION "RISER SIZE IS SHOWN EVEN WHEREA RISER IS NOT EXPECTED.THIS IS FOR A04 SCO2 A02 SCO2 INSIDE CASE DRAIN PAN.REFER TO CO2 VALVE WALMART MECHANICAL SERVICES /1/ BAKERY 1.3A SCO2 CONSTRUCTION MANAGER. LL REFERENCE ONLY AND IS TO BE USED IN THE EVENT THAT A PIPING CONFLICT CAUSES 2 DRS RLN-VCT 2 DRS RLN-VCT STATION DETAIL.FULLY INSULATE ALL THE NEED FOR A RISER. IF RISER LENGTH EXCEEDS 4 FEET,IT MUST BE (REPLACED) 1.2A SCO (REPLACED) SURFACES. Q APPROVED BY ENGINEER OF RECORD. F - - - - - - - - - - - - _ - - 10. REMOVE COPPER LINES,EVAPORATORS,AND r� I 15.668 REFRIGERATION CONTRACTOR SHALL INSTALL m 4 REFRIGERATION MANUFACTURER-FURNISHED CONDENSATE LINES FROM COOLERS/ FREEZERS BEING REMOVED FROM SITE. z CO2 VALVE STATIONS.REFER TO CO2 VALVE z COORDINATE WITH WALK-IN PANEL VENDOR 1 R3 STATIONS DETAIL.FULLY INSULATE ALL FOR TIME LINE OF REPLACEMENT.REFERENCE p TYP 15.684 A04 SCO2- A02 SCOI SURFACES. R3 15.668 -� SPECIFICATION FOR CONTACT INFORMATION. PIPING SCHEDULE RACK DTB(DX) 88 TYP =-- 15.681 SLOPE REFRIGERANT LINES DOWN TOWARDS VERTICAL ESTIMATED __ _ 5.617 1A02 C CO2 PUMP SKID AT V PER 20'OF RUN.LOCATE 11. WALK-IN PANEL VENDOR SHALL PROPERLY _� 1.2B:CO 15.624 HIGHEST POINT OF REFRIGERATION LINES JUST PREPARE ALL COOLER/FREEZER PANELS, 9 DRS RLN-VC - 10 DRS RLN-VCT Q ISSUE BLOCK PIPE HORIZONTAL SUCTION RISER TOTAL 1.4A SCO2 (REPLACED) 15.666 h BELOW BOTTOM CHORD OF JOIST OR BEAM. GLASS DOORS,SLIDER OR SWING DOORS, DESIGNATION SUCTION AS REQUIRED LIQUID LENGTH BOS SCO A-SCO2 (REPLACED) 0 5 COORDINATE TO AVOID CONFLICTS WITH PALLETIZE,AND PREPARE THE EQUIPMENT TO 19 DRS RLNI-VCY R3 TYP DUCTWORK,LIGHTING,SKYLIGHTS,PIPING,ETC. SHIP OFF SITE. ^"1B 2-5/8 1-5/8&2-1/8 61 �.617 15.684 AT ALL POINTS WHERE CO2 RETURN LINES RISE, 15.623 % (REPLACED ***"B09 2-1/8 ^2-1/8 7/8 40 15.617 - PROVIDE AN INVERTED SUCTION LINE TRAP AT 12. COORDINATE WITH FIRE PROTECTION 15.667 15.617 THE TOP OF THE RISER. CONTRACTOR FOR THE REMOVAL OF 15.624 - A06 SCO "**"B10 2-1/8 1-5/8&2-1/8 65 B08 SCO2 15.666 -� 15.624 COOLER/FREEZER RB REMOVED 3 DRS RLN-VCT A06 SCO2 �t 15.666 COOLER/FREEZER BOXES. 1)ESTIMATED TOTAL LENGTH INCLUDES HORIZONTAL AND VERTICAL PIPE SECTIONS.THIS �i'i 2 DRS RUN-1 CT -�. - 07 SCO2 -A03 SCO A03 SCO2 RE-INSULATION 13. COORDINATE WITH ELECTRICAL CONTRACTOR (REPLACED) A REPLACED 2 DRS RLN-VCT GROCERY (REPLACED) �� 1.38 SCO ) SCOPE OF WORK FOR THE REMOVAL OF ALLELECTRIC IS ONLY AN ESTIMATE AND ACTUAL LENGTH WILL VARY. (REPLACED) o7n1� MOVED AREA -- -- AB � �� 03 O y- COOLER/FREEZER BOXES ELECTRICAL WIRING 15.617 DEVICES. 9 DRS RLNI-VCT 10 DRS RLNI-VCT 1. WHEN REPLACING,REMOVING,OR RELOCATING 2)ALL EXISTING PIPE SIZES ARE BASED ON ORIGINAL REFRIGERATION LEGENDS 15:6 (REPLACED) B'13 SCO2 (REPLACED) 15.617 MULTI-DECK AND DOOR CASES,RE INSULATE _ w 14. COORDINATE WITH BAS CONTRACTOR FOR THE 19 DRS RLNI-VCT- - 15.624 - 15.617 ANY EXISTING OR REUSED PIPING LOCATED B14 SCO2 'm REMOVAL OF ALL REMOVED COOLER/FREEZER (REPLACED 15.666 15.624 BEHIND THE AFFECTED CASES.THIS APPLIES TO BOXES BAS WIRING AND DEVICES. NEW PIPING 2 DRS RLN-VCT =__ 15.666 PIPING SERVING THE AFFECTED CASES AND ^A NEW PIPING CONNECTED TO EXISTING PIPING TO REMAIN.REFER TO REFRIGERATION REPLACED - B73 SCO - ANY ETR ADJACENT CASES.CONTRACTOR TO (REPLACED) B71 SCO2 15. EXISTING REFRIGERATION PIPING MAY BE RE- PIPING PLAN FOR APPROXIMATE LOCATION OF NEW AND EXISTING PIPING. __- INSPECT CONDITION OF INSULATION LOCATED 2 DRS RLN-VCT USED UNLESS OTHERWISE NOTED ON PLANS. ( ) REPLACED IN THOSE CHASES EXPOSED BY CASE AND REFER TO SCHEDULES FOR PIPE SIZE ^RISER SIZE IS SHOWN EVEN WHEREA RISER IS NOT EXPECTED.THIS IS FOR - - B14 SCO2- 11 SCO - WALK-IN WORK,AND RE-INSULATE CHASE REQUIREMENTS. REFERENCE ONLY AND IS TO BE USED IN THE EVENT THAT A PIPING CONFLICT CAUSES 15.624 PIPING NI THE DIRECTION IO THE OWNER'S ,7� B SC 2 15.624 MECHANICAL CONSTRUCTION MANAGER. 16. BUILDING COMPONENTS ABANDONED BY THE THE NEED FOR A RISER. IF RISER LENGTH EXCEEDS 4 FEET,IT MUST BE 15.617 O 1 DRS RLNI-VCT - 15.666 SCOPE OF WORK SHALL BE SECURED TO 10 DRS RLNI-VCT A APPROVED BY ENGINEER OF RECORD. n 15.666 (REPLACED) (REPLACED) B12 I'lRLN- GENERAL PIPING DAMAGPREVEE LLING, KIND OOSENING, FUTURE. CREATING CHECKED BY: EJM 15.666B07 615 SCO2 DAMAGE OF ANY KIND IN THE FUTURE. p 13 DRS RLN-VCT B15SCO2 BO \-,�'� 9DRS RLN-VCT (REPLACED) RE-INSULATION NOTES 17 IF ANY RACK SYSTEMS WILL BE OPENED TO ADD DRAWN BY: JTC (REPLACED) 3 DRS RLN-VCT - ___ __ RE-INSULATION NOTES ARE APPLICABLE FOR PIPING 24 REPLACE CASES,EVAPORATORS,ETC.THEN pROTO CYCLE: 04/26/2024 n (REPLACED) 15 SCO2- B12 SCO THAT IS INDICATED TO BE RE-INSULATED,OR PIPING 24 TO 48 HOURS AFTER THE WORK IS THAT REQUIRES RE-INSULATION DUE TO COMPLETED AND ALL FINAL ADJUSTMENTS DOCUMENT DATE:12/27/2024 E - - - - 0O2CO3- MODIFICATIONS SHOWN ON PLANS.REFER TO HAVE BEEN MADE,PROVIDE AND CHANGE PIPING SCHEDULE RACK DTB(SCO2) ❑ SPECIFICATIONS FOR NEW PIPING INSULATION LIQUID LINE FILTER CORES,OIL SYSTEM FILTER REQUIREMENTS. USING SPORLAN OF STYLE FILTER,AND VERTICAL ESTIMATED REPLACE SUCTION FILTERS.FILTERS ARE TO BE 1. REFER TO SPECIFICATION 15600 FOR RATED FOR WAX REMOVAL.CONTRACTOR TO PIPE GPM HORIZONTAL RETURN RISER TOTAL o 0 1.21 INSULATION AND JACKETING REQUIREMENTS. PROPERLY DISPOSE OF OIL AND COMPONENTS DESIGNATION RETURN AS REQUIRED LIQUID LENGTH OO INSIDE DIAMETER OF INSULATION SHALL MATCH REPLACED.REFER TO SPECIFICATION 15600. �tC'T""ot 1B SCO2 2.12 2-1/8 2-1/8 1-1/8 35 PIPE DIAMETER TO MINIMIZE AIR GAPS 0 - °p BETWEEN PIPING AND INSULATION PROVIDE 18. REFER TO GROCERY ARCHITECTURAL 1.01E SCO2 2.12 1-3/8 ^1-3/8 5/8 25 D ¢ FACTORY PRE-MANUFACTURED FI.TTINGS AT ALL DRAWINGS FOR ADDITIONAL WORK BY ' -1.02B SCO2 0.00 1/2 "1/2 318 0 TRAPS AND ELBOWS.WHERE PRE- REFRIGERATION CONTRACTOR. MANUFACTURED FITTINGS ARE UNAVAILABLE, O 41742 1.03E SCO2 2.12 1-3/8 "1-1/8 518 20 �� MITER CUT ALL FITTINGS TO ENSURE PROPER 19. INSTALL ASSET TAGS ON ALL NEW SEAL BETWEEN INSULATION SEGMENTS. REFRIGERATED CASES AND COMPLETE THE DATA L BO6 SCO2 1.06 1-1/8 7/8 1/2 20 COLLECTION INFORMATION.DELETE B06a SCO2 0.53 5/8 5/8 3/8 20 2. ALL SALES FLOOR WORK SHALL BE PERFORMED DEMOED ASSETS FROM ASSET TAGGING BO6b SCO2 0.53 5/8 5/8 3/8 5 AT NIGHT AND/OR ACCOMODATE STORE APPLICATION.REFER TO SPECIFICATIONS. DRY MANAGER AS THEY DIRECT.DETERMINE THIS B07 SCO2 1.06 1-1/8 7/8 112 25 P ODU ��// ASPECT PRIOR TO BID. 20. UPON START-UP OF ALL NEW REFRIGERATED B07a SCO2 0.53 5/8 1/2 318 5 RE EQUIPMENT,CONSTRUCTION MANAGER SHALL 53 5/8 1/2 3/8 20 3. PIPE INSULATION SHALL BE BLACK.REFER TO REQUEST THE BUILDING PERFORMANCE 807b SCO2 0. 1 ^1- 31 8 45 SPECIFICATION 15600. REPORT FOR ALL RACKS AND SUCTION GROUPS 1.1 B SCO2 2.4853 5/8 WHERE WORK IS PERFORMED.ANY DEVIATIONS -1.11 B SCO2 0.00 1/2 ^1/2 3/8 0 \\ l� 4. KEEP SEAMS AT OR NEAR 12 O'CLOCK POSITION. NOTED ON THE REPORT MUST BE CORRECTED USE NOMACO K-FLEX R320(YELLOW),R620 PRIOR TO PROJECT CLOSE OUT.REQUEST VIA 1.2B SCO2 2.48 1-3/8 ^1-3/8 518 50 (BLACK),OR ARMAFLEX 520 INSULATION EMAIL AT B.PTEAM1@WAL-MART.COM B08 SCO2 0.11 1/2 3/8 318 60 ADHESIVE ON BUTT JOINTS. ALL WORK ON THIS SHEET IS TO BE COMPLETED BY A 1.313 SCO2 2.37 1-3/8 ^1-1/8 5/8 15 5. PUMP DOWN,DEFROST,AND CLEAN OLD WALMART APPROVED CONTRACTOR. 1.4B SCO2 0.88 7/8 ^7/8 1/2 50 \ \ COPPER BEFORE REINSULATING.IF POSSIBLE, �1.31C DO NOT CUT ANY COPPER.CONTACT OWNER'S REFRIGERATION CONTRACTOR IS RESPONSIBLE FOR ALL B11 SCO2 0.42 5/8 1/2 3/8 35 SERVICE MECHANICAL CONSTRUCTION MANAGER IF FINAL REFRIGERATION ELECTRICAL TERMINATIONS TO B12 SCO2 0.46 5/8 1/2 318 50 DELI o COPPER MUST BE CUT. REFRIGERATION EQUIPMENT. 1.513 SCO2 1.49 1-1/8 ^1-1/8 5/8 10 � �\ ��'''� /� I 'OF VERIFY EXACT LOCATION OF ALL REFRIGERATED CASES B13 SCO2 0.67 7/8 5/8 1/2 55 D \ U 6. INSULATIONNSTALL WITH VAPOR STOPS AT EVERY 18 RUNS.(GLUE INSULATION TO PIPE WITH FINAL MERCHANDISE PLAN. B14 SCO2 0.39 5/8 1/2 3/8 40 \\ BYAPPLYING 2"BAND OF INSULATION ADHESIVE PRODUCE TO THE COPPER PIPING EVERY 18') COORDINATE LOCATION OF REFRIGERATED CASES WITH B15 SCO2 0.43 5/8 1/2 3/8 55 COOLER 'e PLUMBING CONTRACTOR PRIOR TO CUTTING OF FLOOR 7. FREEZER WALK-INS AND LT CASE AND SETTING DRAINS. PENETRATIONS REQUIRE THE HOLE TO BE 1)PIPE MAINS INCLUDE ADDITIONAL CAPACITY FOR FUTURE CONNECTED LOADS. ----- PATCHED WITH 26 GAUGE GALVANIZED SHEET REMOVE EXISTING REFRIGERATION EQUIPMENT NOTED f METAL TRIM,FOAM SEALED AND TRIMMED FOR DEMO OR REPLACEMENT,INCLUDING(BUT NOT 2 ESTIMATED TOTAL LENGTH IS FOR ONE DIRECTION;SUPPLY OR RETURN.THE TOTAL IS DELI FLUSH,THEN COATED WITH SILICONE SEALANT LIMITED TO):REFRIGERATED CASES,WALK-IN COILS, ONLY AN ESTIMATE AND ACTUAL LENGTH WILL VARY. HALLWAY - ON BOTH THE INSIDE AND OUTSIDE OF THE BOX. ASSOCIATED VALVES,REFRIGERATION AND 5 2 HAPLWA CONDENSATE PIPING,HANGERS AND SUPPORTS,AND Sim15.615 R3.1 SALAD 8. INSTALL PIPE INSULATION IN STRICT CONTROLS NOT BEING REUSED.COORDINATE DISPOSAL R3.1 PREP O ACCORDANCE WITH MANUFACTURER'S OF EQUIPMENT WITH CONSTRUCTION MANAGER.PATCH 3)-PIPE STUB FOR FUTURE CONNECTION. DELI 6 INSTALLATION INSTRUCTIONS. PENETRATIONS TO MATCH EXISTING.REFER TO A08 SCO2 COOLS ARCHITECTURAL DRAWINGS. KRD34E-111 R3.1 9. REPLACE ALL PIPE SADDLES WITH FRONT "RISER SIZE IS SHOWN EVEN WHEREA RISER IS NOT EXPECTED.THIS IS FOR (REPLACED) p PREMANUFACTURED PIPE SADDLE SECURED TO ALL EXISTING REFRIGERATED CASES ARE TO REMAIN I RI UNISTRUT OF ADEQUATE SIZE TO UNLESS NOTED OTHERWISE. REFRIGERATION REFERENCE ONLY AND I BE USED IN THE EVENT THAT PIPING CONFLICT CAUSES ACCOMMODATE NEW INSULATION THICKNESS. THE NEED FOR A RISER. F RISER LENGTH EXCEEDS 4 FEET,IT MUST BE 7 / COORDINATE WITH OWNER'S MECHANICAL DELI L � PRIOR TO INSTALLING ANY EQUIPMENT OR ADJUSTING R3.1 15.616 PLAN 15.610 APPROVED BY ENGINEER OF RECORD. DELI DELI PREP D CONSTRUCTION MANAGER THE EXTENT OF RACK PARAMETERS,REFRIGERATION CONTRACTOR 15.661 UTILITY ---- REPLACEMENT. SHALL REQUEST A SUCTION GROUP REPORT FOR ALL FREEZER 15.611 ^ RACKS AND SUCTION GROUPS WHERE WORK IS 15.612 ' PERFORMED.REQUEST VIA EMAIL AT c TYP B.PTEAM1@WAL-MART.COM .I NGS AND �f �] ,1 EXISTING CONDITIONS WERE TAKEN FROM EACH SUBCONTRACTOR IS RESPONSIBLE FOR HAVING ORIGINAL I 2 3 4 EXACT AS-DRAWINGS U LJTNCONDITIONS.NCOONTRACTOR SPECT REFLECT A IFICATIONS NUGH YTHEIR RELATED FILEDGE OF ALL ELD.THE FAILURE SHALL FIELD VERIFY ALL EXISTING CONDITIONS TO ACQUAINT THEMSELF WITH THIS KNOWLEDGE DOES FRONT REFRIGERATION PLAN PRIOR TO SUBMITTING FINAL BIDS.CONTRACTOR NOT RELIEVE THE RESPONSIBILITY OF PERFORMING 1 SHALL CAREFULLY COORDINATE NEW WORK AND THE WORK PROPERLY.NO ADDITIONAL SHEET: DEMOLITION WITH ALL OTHER DISCIPLINES AND COMPENSATION SHALL BE ALLOWED BECAUSE OF R 1 EXISTING CONDITIONS. CONDITIONS THAT OCCUR DUE TO FAILURE TO FAMILIARIZE WORKERS WITH THIS KNOWLEDGE. GENERAL NOTES REFER TO SHEET R1 FOR GENERAL NOTES PERTAINING TO THIS SHEET. KEYNOTES 15.603 SUPPORT HORIZONTAL RUNS OF REFRIGERANT LINES ON 1-5/8'X 1-5/8"UNISTRUT CHANNELS. REFER TO SPECIFICATIONS FOR PIPE HANGER SPACING. 15.605 UTILIZE EXISTING ROOF OPENING AS INDICATED WHEN POSSIBLE.IF LARGER OPENING IS REQUIRED REINFORCE ROOF STRUCTURE AS NECESSARY,CUT THE ROOF FOR THE REFRIGERATION PIPE PENETRATION,AND INSTALL OWNER-FURNISHED PIPE PENETRATION RAIN HOOD.PROPERLY FLASH,PATCH,AND w M., p o REPAIR ROOF AS REQUIRED FOR NEW s °�g �f PENETRATION.SEAL THE ROOF OPENING 1 Z 3 4 ACCORDING TO SPECIFICATIONS AS SOON AS �yww�G THE PIPING THROUGH THE ROOF OPENING IS m a ;t55 °gw=°3m COMPLETE.COORDINATE WITH OTHER TRADES O K I,( UTILIZING PENETRATION FOR SPACE Z a� ogN<=ow=a $ ' �// ALLOCATION. O m;w o o h €°za �ror3` a°'a 15.607 COORDINATE REFRIGERATION LINE ° 5 3NoaaLL�� s PENETRATIONS THROUGH ROOF.REINFORCE a ooz�owr°ww°'sir °w�pw° 3 ROOF STRUCTURE AS NECESSARY,CUT ROOF €= �Q�gopN ��w OPENING FOR THE REFRIGERATION PIPE ai PENETRATION,AND INSTALL OWNER-FURNISHED ROOF CURB WITH W EATHERTIGHT SHEETMETAL MEAT DAIRY COVER.PROPERLY FLASH,PATCH,AND REPAIR COOLER COOLER \\'� ROOF AS REQUIRED FOR NEW PENETRATION. ------------_-----------_--- P SEAL THE ROOF OPENING ACCORDING TO yi SPECIFICATIONS AS SOON AS THE PIPING to o THROUGH THE ROOF OPENING IS COMPLETE. COORDINATE EXACT SIZE AND LOCATION OF w t ROOF PENETRATIONS WITH STRUCTURAL (?w =; DRAWINGS.COORDINATE W ITH OTHER TRADES m UTILIZING PENETRATION FOR SPACE m OC z ALLOCATION. < < 8>e 15.609 COORDINATE REFRIGERATION LINE ROUTING z .. THROUGH ROOF.ROOF REINFORCEMENTS, / PENETRATION,AND HOOD SUPPLIED BY o =w y y y OTHERS.COORDINATE EXACT SIZE AND p �\ LOCATION OF ROOF PENETRATIONS WITH ARCHITECTURAL AND STRUCTURAL DRAWINGS. COORDINATE W IT H OTHER TRADES UTILIZING PENETRATION FOR SPACE ALLOCATION. x a 15.610 PROVIDE AIRTIGHT SEAL AROUND ALL PIPING U AND BOLT PENETRATIONS THROUGH COOLER/FREEZER BOX WALLS OR CEILINGS. 15.611 SUPPORT UNIT COOLERS WITH BOLTS THROUGH ROOF TO 1-5/8"X 1-5/8"X 10'LONG 14 GA. � C o _ GALVANIZED UNISTRUT SPANNING THREE ROOF O O LI PANELS.PROVIDE DOUBLE NUTS ON EACH BOLT. H• - - - - - - - - - - - - - - - - - H•� 15.612 SEE SCHEDULES FOR UNIT COOLER TYPES, SIZES,AND CAPACITIES;CONTROL METHOD;AND o O ALL REFRIGERATION PIPING SIZES,ETC. p ds .8 15.615 CONDENSATE DRAIN;PITCH DRAIN LINES DOWN Lo n a APPROXIMATELY 1/8"PER 12"TOWARD DRAIN. O PROVIDE COPPER PIPING W ITH ELECTRIC HEAT 0 M m TAPE AND INSULATION ON ALL CONDENSATE 0 LINES EXPOSED TO FREEZING TEMPERATURES. r 1.1' Z ro 15.616 END CONDENSATE LINE OVER RECEPTOR W/AIR v LEN GAP.CONTRACTOR SHALLENSURE FLOOR O Z 0 DRAINS)AND DRAIN LINE(S)SERVING WALK-IN ARE FREE OF OBSTRUCTIONS AND FUNCTION PLUMBING MTC(ON ROOF). PROPERLY.WHERE EXTENSIVE DAMAGE EXISTS ag J co MECHANICAL AND/OR PROPER DRAINAGE CANNOT BE N OBTAINED COORDINATE WITH WALMART 9 LIB TOCKROOM MECHANICAL CONSTRUCTION MANAGER. 15.617 PROVIDE PVC DRAIN LINE FROM EACH CASE CO2 REMOTE CHARGING m 10 STATION.SHIP LOOSE PARTS DRAIN CONNECTION SAME SIZE AS CASE 7� OUTLET,AND END OVER FLOOR RECEPTOR R3 PROVIDED BY OWNER,FIELD Z INSTALLED BY CONTRACTOR. W/AIR GAP;PITCH DRAINS 1/8"PER 12".PROVIDE m REMOTE CO2 CHARGING O FULL SIZE LIQUID LINE POINT DRAIN COVER GRATE EN MATCH EXISTING. STATION PIPING. CONTRACTOR SHALL ENSURE RECEPTOR(S)AND id OF CONNECTION.REFER TO U PIPING SCHEDULES FOR DRAIN LINE(S)SERVING CASE LINE-UP ARE FREE �® ° ADDITIONAL INFORMATION. OF OBSTRUCTIONS AND FUNCTION PROPERLY. WHERE EXTENSIVE DAMAGE EXISTS AND/OR ISSUE BLOCK A07 SCO2 PROPER DRAINAGE CANNOT BE OBTAINED TVP;SIM 2 KRD24E-074 PROVIDE NEW CONNECTION TO COORDINATE WITH WALMART MECHANICAL R3.1 CO (REPLACED) HEADER.DO NOT USE EXISTING STUBS. CONSTRUCTION MANAGER. EXTEND HEADER TO ACCOMMODATE - - SEAFOOD 15.623 ROUTE REFRIGERATION LINES IN BASE OF CASE FREEZER NEW STUB IF NEEDED.NP OF 2. O FOR ALL BOTTOM FED CONNECTED CASES. SLOPE BACK TO LEAD CASE AT 1"PER 20'-0"OF �- 15.881 4 SIM;TYR OF 2 RUN. R3.1 15.637 AT ALL POINTS WHERE SUCTION LINES RISE, PROVIDE A SUCTION LINE TRAP AT THE BASE AND TOP OF THE RISER. CO \. D - - 15.638 PROVIDE INTERMEDIATE SUCTION LINE TRAP IN MEAT 15.616 WALL OR VOID SPACE.INTERMEDIATE TRAP BO6a SCO2 KRD54E-185 p O UTILITY m SHOULD BE PLACED AT THE MIDPOINT OF ANY (REPLACED) 4 _8 5 O SUCTION LINE RISE WHICH EXCEEDS 16 FEET. m m 15.639 PROVIDE VERTICAL SUCTION DOUBLE RISER IN BO6b SCO2 c B06b SCO2 ¢ ^ R3 _r - 1 1C THIS LOCATION.REFER TO VERTICAL SUCTION KRD54E-185 606 SCO2 / 1 61�� DTB(ON ROOF). DOUBLE RISER DETAIL AND PIPING SCHEDULES FOR SIZES. (REPLACED) 607 SCO2 R3 15.684 TYR OF CO2 15.642 COORDINATE WALL AND/OR ROOF OPENINGS 15.661 1.03B SCO2 1.01B SCO2 DRAIN PAN 15.605 FOR REFRIGERATION PIPING,WATER PIPING, 1.02A SCOLo RACK A AND/OR ELECTRICAL CONDUIT WITH OWNER'S \17 15.609 15.637 SA CIRCUIT. TYP OF 2 GENERAL CONTRACTOR.SEAL PENETRATIONS NP 15.615 1.028 SCO2 15.637 15.638 R3.1 R3.1 15 617 PER SPECIFICATIONS. 15.639 15.661 REFRIGERATION CONTRACTOR SHALL INSTALL B07a SCO2 15.661 OO 1� 15.623 4 LTA(ON ROOF). REFRIGERATION RACK CHECKED BY: EJM 11.667 R3 15.681 TYR OF CO2 MANUFACTURER-FURNISHED LIQUID LINE A01 SC SOLENOID VALVE,SUCTION LINE CHECK VALVE, DRAWN BY: JTC c B07a SCO2- 6 DRS RLN-VCT 15.668 AND CO2 VALVE STATIONS IN A SERVICE (REPLACED) 1YP O ACCESSIBLE LOCATION ON TOP OF WALK-IN PROTO CYCLE: 04/26/2024 O BOX.REFER TO CO2 VALVE STATION DETAIL. GROCERY FULL SIZE LIQUID LINE POINT m m INSTALL CONTROL WIRING FROM SOLENOID DOCUMENT DATE:12/27/2024 15.610 FREEZER OF CONNECTION.REFER TO m VALVE BACK TO CIRCUIT CONTROLLER.REFER 15.611 PIPING SCHEDULES FOR TO SPECIFICATIONS FOR ASSET TAGGING 15.612 ADDITIONAL INFORMATION. _ REQUIREMENTS. 607a SCO2 1.0113 A13 ¢ 15.667 REFRIGERATION CONTRACTOR SHALL INSTALL GROCERY REFRIGERATION RACK KRD54E-ED) ryP 6 AREA MANUFACTURER-FURNISHED CO2 VALVE `GT• (REPLACED) OF DX R3 3 STATIONS IN A SERVICE ACCESSIBLE LOCATION cjB07b SCO 15.603 TYP INSIDE CASE DRAIN PAN.REFER TO CO2 VALVE B07b SCO2 R3.1 STATION DETAIL.FULLY INSULATE ALL - KRD54E-185 PROVIDE TWO SUCTION LINES SURFACES. (REPLACED) A13 AND ONE LIQUID LINE BACK TO 150 m RACK FOR PUMP SKID.REFER 15.668 REFRIGERATION CONTRACTOR SHALL INSTALL O 41142 7 TO PIPING SCHEDULES FOR REFRIGERATION MANUFACTURER-FURNISHED 1.01A SCO2 ADDITIONAL INFORMATION. CO2 VALVE STATIONS.REFER TO CO2 VALVE !4/J�. R3.1 15.610 - RNEW OOF.ICOORDINATEECHASE N3 15.607 STATIONS DETAIL.FULLY INSULATE ALL 15.811 SIZE AND e SURFACES. LINES DOWN 15.612 15.616 TYP V 0O WITH STRUCTURE. R3 15.642 15.681 CO2 PUMP SKID ATNTPER 20'OF RUN.L CATE m HIGHEST POINT OF REFRIGERATION LINES JUST TYP _ ¢ TYR BELOW BOTTOM CHORD OF JOIST OR BEAM. DRAIN PAN �\\ COORDINATE TO AVOID CONFLICTS WITH =CD= _ - - - _ - - - - - - - - - - V / DUCTWORK,LIGHTING,SKYLIGHTS,PIPING,ETC. 1A SCO2 15.684 AT ALL POINTS WHERE CO2 RETURN LINES RISE, g PROVIDE AN INVERTED SUCTION LINE TRAP AT 15.681 TYP OF CO2 THE TOP OF THE RISER. 1.11 B SCO2 R3.1 1.1ASCO2 .2B SCO2 i PIPE STUB FOR FUTURE 1 CONNECTION.TYP.REFER TO 'z 3 4 PIPING SCHEDULES FOR ADDITIONAL INFORMATION. REAR REFRIGERATION PLAN REAR REFRIGERATION PLAN EXISTING CONDITIONS WERE TAKEN FROM EACH SUBCONTRACTOR IS RESPONSIBLE FOR HAVING ORIGINAL DRAWINGS AND MAY NOT REFLECT A THOROUGH KNOWLEDGE OF ALL DRAWINGS AND EXACT"AS-BUILT'CONDITIONS.CONTRACTOR SPECIFICATIONS IN THEIR RELATED FIELD.THE FAILURE SHALL FIELD VERIFY ALL EXISTING CONDITIONS TO ACQUAINT THEMSELF WITH THIS KNOWLEDGE DOES PRIOR TO SUBMITTING FINAL BIDS.CONTRACTOR NOT RELIEVE THE RESPONSIBILITY OF PERFORMING SHALL CAREFULLY COORDINATE NEW WORK AND THE WORK PROPERLY.NO ADDITIONAL SHEET' DEMOLITION WITH ALL OTHER DISCIPLINES AND COMPENSATION SHALL BE ALLOWED BECAUSE OF R 1 .1 EXISTING CONDITIONS. CONDITIONS THAT OCCUR DUE TO FAILURE TO FAMILIARIZE WORKERS WITH THIS KNOWLEDGE. GENERAL NOTES REFER TO SHEET R1 FOR GENERAL NOTES PERTAINING TO THIS SHEET. KEYNOTES 15.602 PROVIDE 0.020"UV-RESISTANT WHITE PVC JACKET ON ALL REFRIGERATION LINES EXTERIOR TO BUILDING. 15.605 UTILIZE EXISTING ROOF OPENING AS INDICATED WHEN POSSIBLE.IF LARGER OPENING IS REQUIRED REINFORCE ROOF STRUCTURE AS NECESSARY,CUT THE ROOF FOR THE REFRIGERATION PIPE PENETRATION,AND INSTALL OWNER-FURNISHED PIPE PENETRATION RAIN HOOD.PROPERLY FLASH,PATCH,AND REPAIR ROOF AS REQUIRED FOR NEW PENETRATION.SEAL THE ROOF OPENING w ACCORDING TO SPECIFICATIONS AS SOON AS THE PIPING THROUGH THE ROOF OPENING IS COMPLETE.COORDINATE WITH OTHER TRADES mg 3t Sga <°a3 UTILIZING PENETRATION FOR SPACE O ww H �<rcs°N€g� ALLOCATION. Z w� °g wa=oya 15.607 COORDINATE REFRIGERATION LINE PENETRATIONS THROUGH ROOF.REINFORCE g gNo o?.yoo,€,aGw ROOF STRUCTURE AS NECESSARY,CUT ROOF O Q ffl w r H o rc a OPENING FOR THE REFRIGERATION PIPE PENETRATION,AND INSTALL OWNER-FURNISHED N €� $o po'9e"n E.I. w ROOF CURB WITH WEATHERTIGHT SHEETMETAL COVER.PROPERLY FLASH,PATCH,AND REPAIR ROOF AS REQUIRED FOR NEW PENETRATION. SEAL THE ROOF OPENING ACCORDING TO SPECIFICATIONS AS SOON AS THE PIPING THROUGH THE ROOF OPENING IS COMPLETE. 4n- b o a COORDINATE EXACT SIZE AND LOCATION OF - ROOF PENETRATIONS WITH STRUCTURAL 1 2 3 4 DRAWINGS.COORDINATE WITH OTHER TRADES UTILIZING PENETRATION FOR SPACE ��{ ALLOCATION. K 15.609 COORDINATE REFRIGERATION LINE ROUTING ¢ o„g THROUGH ROOF.ROOF REINFORCEMENTS, <i PENETRATION,AND HOOD SUPPLIED BY N =W y OTHERS.COORDINATE EXACT SIZE AND z LOCATION OF ROOF PENETRATIONS WITH O ARCHITECTURAL AND STRUCTURAL DRAWINGS. O COORDINATE WITH OTHER TRADES UTILIZING PENETRATION FOR SPACE ALLOCATION. 15.636 SLOPE REFRIGERANT LINES BACK TO a COMPRESSORS AT 1"PER 20'OF RUN.LOCATE U HIGHEST POINT OF REFRIGERATION LINES JUST O O BELOW BOTTOM CHORD OF JOIST OR BEAM. COORDINATE TO AVOID CONFLICTS W ITH DUCTWORK,LIGHTING,SKYLIGHTS,PIPING,ETC. O O Q u/ u/ 15.637 ATALL POINTS WHERE SUCTION LINES RISE, O O PROVIDE A SUCTION LINE TRAP AT THE BASE AND TOP OF THE RISER. cc) 15,638 PROVIDE INTERMEDIATE SUCTION LINE TRAP IN oWALL O SHOULD E PLACED AT THE MIDPOINT OOR VOID SPACE.INTERMEDIATE FAANY rL OW SUCTION LINE RISE WHICH EXCEEDS 16 FEET. O n a 15.639 PROVIDE VERTICAL SUCTION DOUBLE RISER IN � M m THIS LOCATION.REFER TO VERTICAL SUCTION DOUBLE RISER DETAIL AND PIPING SCHEDULES f n Z FOR SIZES. `J W N 15,642 COORDINATE WALL AND/OR ROOF OPENINGS Z O FOR REFRIGERATION PIPING,WATER PIPING, r_ AND/OR ELECTRICAL CONDUIT WITH OWNER'S ~ J — — — — — — — — — — — — — — — J GENERAL CONTRACTOR.SEAL PENETRATIONS J C/) PER SPECIFICATIONS. 15.669 IF THE FACTORY-INSTALLED CO2 PRESSURE RELIEF VALVE IS LOCATED LESS THAN 20'AWAY Q 10, FROMANY MECHANICAL FRESH AIR INTAKE, EXTEND THE PRESSURE RELIEF PIPING AND WIRING AWAY FROM THE INTAKE AND RELOCATE THE VALVE TO THE END OF THE LINE. 15.676 REFRIGERATION CONTRACTOR SHALL INSTALL SECONDARY REFRIGERATION SYSTEM VENDOR-FURNISHED PUMP SKID.SET,LEVEL, AND ANCHOR ACCORDING TO MANUFACTURER'S INSTRUCTIONS.CONNECT PIPING AS SHOWN, ISSUE BLOCK CHARGE SYSTEM,AND START-UP ACCORDING TO SPECIFICATIONS AND MANUFACTURER'S INSTRUCTIONS.REFER TO MANUFACTURER EXISTING HYBRID HOUSE DOCUMENTATION,BAS, MTC(ON ROOF). ARCHITECTURAL/FIXTURE,AND STRUCTURAL. PROVIDE TWO SUCTION LINES AND ONE LIQUID LINE BACK TO RACK FOR PUMP SKID.REFER To PIPING SCHEDULES FOR Ll ADDITIONAL INFORMAkG YP TYP OF DX PROVIDE NEW CONNECTION TO BO HEADER.DO NOT USE EXISTING STUBSB1 EXTEND HEADER TO ACCOMMODATE— — — NEW STUB IF NEEDED.TYP OF 2.i s.669 SCO2B-1CO21 s.676 PUMP SKIDF 2 (ON ROOF). CHECKED BY: EJM DRAWN BY: JTC PROTO CYCLE: 04/26/2024 D> DOCUMENT DATE:12/27/2024 CO2 CHARGINGEXISTING HYBRID HOUSE DTB(ON ROOF). TYP w�`GI AZ(L 15.805 2 TYP OF 2 15.637 15.638 EXISTING HYBRID HOUSE 15.639 LTA(ON ROOF). O 41742 CO2 CHARGING PIPING TYP 6 PROVIDE TWO SUCTION LINES OF DX R3 AND ONE LIQUID LINE BACK TO RACK FOR PUMP SKID.REFER TO PIPING SCHEDULES FOR 7 ADDITIONAL INFORMATION. TYP R3 NEW PIPE CHASE IN ROOF.COORDINATE 3 15.601 Al2 SIZE AND LOCATION R3 15.642 A13 WITH STRUCTURE. SCO2A-1 CO2 TYP (ON Ro REFER TO ELECTRICAL FOR CO2 SKID BATTER BACKUP LOCATION AND INSTALLATION(BB-1). 1 2 "13 4 PARTIAL ROOF PARTIAL ROOF REFRIGERATION PLAN REFRIGERATION va=r-o PLAN EXISTING CONDITIONS WERE TAKEN FROM EACH SUBCONTRACTOR IS RESPONSIBLE FOR HAVING ORIGINAL DRAWINGS AND MAY NOT REFLECT A THOROUGH KNOWLEDGE OF ALL DRAWINGS AND EXACT"AS-BUILT'CONDITIONS.CONTRACTOR SPECIFICATIONS IN THEIR RELATED FIELD.THE FAILURE SHALL FIELD VERIFY ALL EXISTING CONDITIONS TO ACQUAINT THEMSELF WITH THIS KNOWLEDGE DOES PRIOR TO SUBMITTING FINAL BIDS.CONTRACTOR NOT RELIEVE THE RESPONSIBILITY OF PERFORMING SHALL CAREFULLY COORDINATE NEW WORK AND THE WORK PROPERLY.NO ADDITIONAL SHEET' DEMOLITION WITH ALL OTHER DISCIPLINES AND COMPENSATION SHALL BE ALLOWED BECAUSE OF R 1 .2 EXISTING CONDITIONS. CONDITIONS THAT OCCUR DUE TO FAILURE TO FAMILIARIZE WORKERS WITH THIS KNOWLEDGE. REFRIGERATIONSCHEDULE-EXISTING RACK LTA Refrigerant: R-407A Refig.EMS: Novar Condenser Type: Air H/R Media: Water Subcooler Liquid Temps SG7 Comp RGT-F: 1 DESIGN DB T: 92 EXTERIOR DRY BULB(DB)'F: 92 LIQUID OVERFEED CO2 Formal: Supercenter Store#: 03757 System Type: Hybrid House/CO2 Skid Secondary Refrigerant: (CIRCULATION RATE:2) System Elec: 460V 3Ph 60 Hz Sat.Cond.Temp°F: 107 H/R Use: Dom.Hot Water SG1 Uq Temp°F: 50 SG2 Comp RGT-F DESIGN WB'F: 69 Based on 5 yr Extreme DB-ASHRAE Pub.: 2021 Prof.Size: 150 City/State: Arington,WA Consultant: Hargis Engineers Estimated Refrigerant Charge Defrost Elec: 208V 60 Hz 1 or 3Ph Cond Design TO-1: 15 H/RWater GPM: 4.0 SG2 Uq Temp T; SG3 Comp RGT T: DESIGN INTERIOR DRY BULB'F: 75 EXTERIOR WET BULB(WB)'F: 69 ProtoCycle Dec.: 04/26/2024 Date Prepared 11/25/2024 Prepared by: Jordan Crowe Rack and Condenser(IN) Sys.Pilot Elec: 208V 1Ph Summer H/R Avail: N/A H/R Glycol Type: WA SG3 Uq Temp°F: Evap.Superheat°F: 10 DESIGN INTERIOR RH%: 55% Based on 0.4%Monthly Max W B-ASHRAE Pub.: 2021 Fixture and Field Piping(Ibs) Cond.El. 460V 3Ph 60 Hz Winter FVRAvail: N/A H/R Glycol%: WA ASHRAE Design Conditions Weather Station:Arlington,WA(WMO:727945) ELEVATION ft 137 Climate Zone 4C CIRCUIT INFORMATION FIXTURE ELECTRICAL INFORMATION MISC INFORMATION Case I'Mure Length/Quantity Walk-In Box Size LSHX Y or N? Evaporator Case/ CO2 Lights Anti-Sweat Drain Pan &Model # Coil TXV/ Sub-Circuit Load Circuit Evap. Walk-In Flow Circuit Control Valves Defrost Defrost Heatere Fans Amps Amps Amps CKT# FT Nof Doore 2 Dr/4' 3 Dr16' 4 Dr/8' 5 Dr/12' L W H Case/Cdl Motlel Cese/Coil MenuF. Application WI Evaps Distributor N.zze MBH Load MBH SST Air Temp GpM EPR LLSV Type Amps Voltage Amps Voltage 12pv 120v 120v Comments Equip Number CKT# -MI=02 6 DRS 2 RUN-VCT HUSSMANN Reach-In F.F. 5.7 -11 S 0.22 BY OEM EL 202 20811 1.8 1211111 0.6 7.0 2.5 REPLACED CASES R33002242II1212W2023 _A013CO2 _"2 SCM 12 DRS 1 2 RLN-VCT HU93MANN Reach-In F.F. 11.5 .11 S 0.42 BY OEM EL 29.1 am 3.6 fan 12 13.8 5.8 REPLACED CASES RS3002242 It 122W2023 _"2 SCM _A03 SCO2 12 DRS 1 2 RLN.VCT/RLNI-VCT HUSSMANN Ree.Wo F.F. 11.5 41 S 0A2 BY OEM EL 29.1 am 3.6 120M 12 13.9 5.8 REPLACED CASES R530022/2/R33003.242//11/2612023 -A03 SCO2 _A04 SCO2 11 DRS 1 1 1 RLN-VCT HUSSMANN Reach-Im F.F. 10.6 41 S 0.39 BY OEM EL 26.3 20813 33 120/1 1.1 12.6 &2 REPLACED CASES RSS0022421I1212W2023 _A(ul W02 ""A053CO2 19 DRS 1 3 RLNI-VCT HUSSMANN Res.Nn F.F. 18.2 41 S 0.67 BY OEM EL 41.3 20813 5.7 fan 1.9 21.9 9.7 REPLACED CASES R33003.242 It 12cmM3 -M5 SCO2 _A06SCO2 11 DRS 1 1 1 RUN-VCTI RLNI-VCT HUSSMANN ReacMn F.F. 10.5 .11 S am BY OEM EL 26.3 20M 33 fan 1.1 12.6 5.2 REPLACED CASES RWOO2.242 I RS3003.242 H 12/2W2023 _A06 SCUP w M� ¢worms 'A0]SCO2 ] e 10 KRD24E41]dfAM KRACK Seafood Freezer W.I. 7.1 -11 -2 025 •'%SP23130 EL 5.8 23013 12 208f1 REPLACED EVAPS •"'AO]SCO2 _A08 SCO2 10 13 10 KRD34E-111CDAA KRACK Dell Freezer W.I. 10.9 -11 .2 0.38 ^XSRslw EL 8.7 23013 13 20W1 REPLACED EVAPS -me SCO2 8.8 PUMP System Heat GanPu andPi in � ;GGG_a IS o<3�;2a m Total Load MBH: 90.7 -12 F CO2 Te &13 CO2 Total Flow I11GPM - n� H oaowyr€pa 'A01 SPARE EVAPS REMOVED FROM CIRCUIT .Ml-AD2 SPARE CASES RMMO�D FROM CIRCUIT 'AD2 F zw3�giir30€aO� •A03 SPARE - CASES REMOVED FROM CIRCUIT `A03 Q U oa w A,.o 5 3Qoa o � N `A04 SPARE CASES REMOVED FROM CIRCUIT ,AOq w r w 'A05 SPARE - CASES REMOVED FROM CIRCUIT 'A05 •A06 SPAR AS E CES REMOVED FROM CIRCUIT •A06 N u� •AO] SPARE CASES REMOVED FROM CIRCUIT •A07 -ADS SPARE CASES REMOVED FROM CIRCUIT M 'A09 SPARE CASES REMOVED FROM CIRCUIT `A09 'A10 SPARE CASES REMOVED FROM CIRCUIT 'A10 •AtI SPARE IN%PS REMOVED FROM CIRCUIT 'All w o a •Al2 la CO2 SKID 47.3 48 `Al2 - -A13 la CO2 SKID 47.3 46 -A13 w c 3 Sadism Gmu#1 Re uiretl Ca ai MBH 80.7 "1 °F Saturstar Suction Tem retire n General Notes: 1, Refrigeration OEM:Hussmann Z \U 21 CaselEvap changes result in a net DECREASE.(20.5 MBH. H `2 3. Hussmann to reevaluate Rack A at-19°F saturated suction temperature. N =w 41 Hussmann shall furnish CO2 valve stations,LLSVs,CO2 charging station,etc. Z 5.1 Hussmann shall provide pressure drops and coil selections for all liquid overfeed coils.Sized on entering fluid temp of-12°F and a CR of 2. 0 REFRIGERATION SCHEDULE-EXISTING RACK DTB Refrigerant: R-407A Refig.EMS: Novar Condenser Type: Air HIR Media: Water Subcooler Liquid Temps SG1 Comp RGT eF: -7 DESIGN IDS'F: 92 EXTERIOR DRY BULB(DB)'F: 92 U LIQUID OVERFEED CO2 O O Format: Supercenter Store#: 03757 System Type: Hybrid House,I002 Skid Secondary Refrigerant: (CIRCULATION RATE:2) System Elec: 460V 3Ph 60 Hz Sat.Cond.Temp°F: 107 H/R Use: Dom.Hot Water SG1 Uq Temp'F: 50 SG2 Comp RGT-F - DESIGN WB'F: 69 Based on 5 yr Extreme DB-ASHRAE Pub.: 2021 0 C= Prolo Size: 150 City/State: Arington,WA Consultant Hargis Engineers Estimated Refrigerant Charge _ Defrost Be.: 208V 60 Hz 1 or 3Ph Cond Design TO-1: 15 H/RWatuGPM: 4.0 SG2 Uq Temp eF: 75 SG3 Comp RGT-F: _ DESIGN INTERIOR DRY BULB'F 75 EXTERIOR WET BULB(WB)'F: 69 00 ProtoCycle Dale: 04/26/2024 Data Prepared 11/25/2024 Prepared by: Jordan Crowe Rack and Condenser(Ibs) - Sys.Pilot Elso: 208V 1Ph Summer H/R Avail: N/A H/R Glycol Type: N/A SG3 Uq Temp°F: _ Evap.Superheat'F: 10 DESIGN INTERIOR RH%: 55% Based on 0.4%Monthly Max WB-ASHRAE Pub.: 2021 �L-� O O 6 K Fixture and Field Piping(Ibs) - Cond.Elec: 460V 3Ph 60 Hz Winter HIR Avail: N/A H/R Glycol%: N/A ASHRAE Design Conditions Weather Station:Arlington,WA(WM0:727945) ELEVATION ft 137 Climate Zone 4C 0 CIRCUIT INFORMATION FIXTURE ELECTRICAL INFORMATION MISC INFORMATION Case Fizture Length/Quantity Walk-In Box Size LSHX V or N7 Evaporator Case/ CO2 Lights Anti-Sweat Drain Pan &Model# Coil TXV/ Sub-Circuit Load Circuit Evap. Walk-In Flow Circuit Control Valves Defrost Defrost Heaters Fans Amps Amps Amps O CKT# FT Nof Doors 1 2 Dr/4'1 3 Dr/6' 4 Dr/8 T5 Dr/IZ L W I H Case/Coil Model Case/Coil Manuf. Application WI Evaps Distributor Nozzle MBH Load(MBH1 SST Air Temp EPR LLSV Type Amps Voltage Amps Voltage 120v 120v 120v Comments Equip Number CKT# Z -BO6 SCO2 MAIN CIRCUIT-SUBCIRCUITS ARE BELOW - - 1Q Grocery/I.C.Frs - TOTAL MAIN CIRCUIT: 30.5 40 .10 - - EL - - - - _ - ""BOB SCO2 WoI ""'BO6a SCO2 16 17 12 KRD54E-185CDAA KRACK 114 Grocery l l.C.Frs - 15.3 .20 -10 033 ^XSP24130 EL 21.7 23W1 3.0 20W1 REPLACED EVAPS '"•'BOBa SCO2 z O -8066 SCOT 16 17 12 KRDS 485CDM KRACK 114 Grocery,l I.C.F. - 1Al - .0 .10 am -SPal" EL 211 23W1 3.0 20W1 REPLACED I-S ""BO66 W02 0 � 'B07 SCO2 MAIN CIRCUIT-SUMIRCUITS ARE BELOW - - 1Q Grocery I I.C.F. TOTAL MAIN CIRCUIT: s03 -20 40 - - EL - - - - _ - -807SCO2 I I� "'•`B07aW02 16 17 12 KRD54E-1WCDAA KRACK 114 Grocary/1.C.F. - 133 .20 -10 0.53 •'XSP23130 EL 21.7 23VI 3A 20811 _ REPLACED EVAPS -B07.SCO2 -B07b SCO2 16 17 12 KRD54E-185CDAA KRACK 114 Grocery l I.C.F. - 10.3 - 40 -10 0.53 "XSP2S130 EL 21.7 23W1 3.0 20M1 - - - REPLACED EVAPS - "B07b W02 -BOB W02 3 DRS 1 RUN-VCT HU93MANN Reach4n I.C.Cake 3.2 .19 -12 1 0.11 - BY OEM EL 10.1 20M 0.9 1201 03 3.5 1.3 REPLACED CASES RS1002.142111212M023 ""BOB W02 -Bit SCO2 12 DRS 1 2 RUN-VCT I RLNI-VCT HUSSMANN Ra,,W,F.F. - 11.5 Is S OA2 BY OEM EL 29.1 20M 3.6 12W1 12 13.8 AB REPLACED CASES RW002242/R39003-1112cilipa3 ""Bit SCO2 m -B12SCO2 13 DRS 1 2 RLN-VCT HUSSMANN Reach-Ira I.C. 12A 49 42 am BY OEM EL 29.1 am 33 12W1 13 1&0 BA REPLACED CASES RS3002.14211122W2023 ""B12=02 ^`R133CO2 19 DRS 1 3 RWI-VCT HUSSMANN Reach9n F.F. 10.2 -19 S 0.87 BY OEM EL 41.3 M8I3 5.7 120/1 1.9 21.9 9.7 REPLACED CASES R4300S.242II12RW2023 "^B135CO2 Z ^B14SCO2 11 DRS 1 1 1 RUN-VCTI RLNI-VCT HUSSMANN Rea.Wo F.F. 10.5 -19 S 0.30 BY OEM EL 26.3 am 33 12W1 1.1 12.6 32 REPLACED CASES RS3002242/RS3003.2QH 1=612023 ^B14SCO2 ro O ""B153CO2 12 DRS 1 1 1 RLN-VCT HUSSMANN ReecM1-In I.C. 11.5 -19 12 0.43 BY OEM EL 263 208p 9.6 120H 12 13.8 AB REPLACED CASES R33002.1421112I2W4029 ""B15 SCO2 PUMP tam Heat Galn(Pump and Piping) 92 PUMP Total Lead MBH I: 137.4 -20 F CO2 Te 4.80 CO2 Total Flow fGPMI B01 8 FT 1 FWGFF HUSSMANN Dual Temp Coffin Island 5.0 -20 -12 CDST-0-7 EVR3NC-0 EL 1- 2-1 2.2 120/1 ETR ETR But ISSUE BLOCK B02 12 FT 2 FWEGFF HUSSMANN DualTemp Coffin Ends 5.1 -a -12 CDST-0.7 EVR3NC4 EL 13.1 20M1 1.5 12011 ETR ETR B02 B03 12 FT 1 PNGFF HUSSMANN Dual Temp Cohn lslantl 7.5 -a -12 0DST47 EVR3NC-0 EL 23.1 2=1 3.1 12011 ETR ETR B03 B04 12 FT 2 FNEG-FF HUSSMANN DualTemp Coffin Entla 5.1 -20 -12 Co- EVR3NC-0 EL 13.1 -1 1.5 12.1 ETR ETR B. `BOS SPARE - - - - _ `805 'BOSa SPARE EVAPS REMOVED FROM CIRCUIT 'BM 'BOSb SPARE EVAPS REMOVED FROM CIRCUR 'BOSb •BOB SPARE •M •1306s SPARE EVAPS REMOVED FROM CIRCUIT •1306s 11066 SPARE EVAPS REMOVED FROM CIRCUIT 11066 'BO] SPARE CASES REMOVED FROM CIRCUIT 'B07 'BOB SPARE CASES REMOVED FROM CIRCUIT 'BOB •M V2 CO2 SKID M7 46 BY OEM BY OEM •M _B10 1/2 CO2 SKID M7 46 BY OEM BY OEM -B10 Succor GIUD#1 Re abed Ga ac MBH I INN 47 •F SeNrsted Suction Tem - eS01 W FT 3 FPW-EXA SANYO MID Meat 40.9 24 31 CDST-]-11 EVRMN 5 OT 5.8 12011 8.5 ETR ETR 8Sol .S02 24 FT 1 1 2 1 1 FPW-EXA SANYO to Meat 27.2 24 31 CDST-7-9 EVR6N" OT 3.1 12011 5.7 ETR ETR 8S02 BS03 20 FT 1 1 SHVSS HUSSMANN MID Cake 17.2 20 30 CDST-7-5 EVR3NC-0 OT 3.5 12W1 5.2 ETR ETR BS03 BSO4 8 FT 1 E2V-SVO HUSSMANN Self-Service Dell 7.2 27 CDST-2-0 E2S140 OT 0.4 120/1 0.8 ETR ETR BSO4 BS05 26FT/2ENDS 4 2 PFI-R4G51 HILL PHOENIX MD Produce Island 24.1 24 28 CDST-47 EfiS140 OT 3.6 12011 2.1 ETR ETR BS05 .806 24 FT 3 DX6XN KYSOR WARREN MID Deli 24.7 27 33 CDST-0-7 E5S140 OT 2.0 12011 3.5 ETR ETR 8SO6 BS07 8 FT 1 ESBDS HUSSMANN Service Deli 2.9 20 25 CDST-2-0 E25140 OT 0.2 12.1 1.0 as ETR ETR BS07 BS08 9 9 10 SME-130 BOHN Pouley Cooler W.I. N EGVE-1-C/#3/4 10.0 20 28 CDST-7-5 EVR3N04 EL 15.7 20fl/1 1.5 20811 ETR ETR BS08 BS09 28 FT 2 2 PF-50R BARKER HMR Island Center 21.8 1 20 30 CDST-7-9 lW.NC4 OT 2.7 12011 1 5.7 1 1.9 ETR ETR BS09 CHECKED BY: EJM BS10 12FT/2ENDS 2 1 FWGFWEG HUSSMANN M.T.Coffin lslantl w/Ends 8.5 19 24 CDST-7-5 EVR3NC4 EL 21.3 20W3 4.6 12011 0.5 ETR ETR BS10 Ball 8FT/2ENDS 2 1 FWGM'EG HUSSMANN M.T.Coffin Island col Ends 6.7 19 24 CDST-7-5 EVR3NC-0 EL 18.2 208/3 3.8 12011 0.4 ETR ETR BS11 DRAWN BY: JTC BS12 8M 2ENDS 2 1 1 1 1 1 F`NG/FWEG HUSSMANN M.T.-Island col Ends - - - 6.7 19 24 CDST-]-5 EVR3NC-0 EL 18.2 208I3 3.8 12011 - OA _ ETR ETR BS12 pR0T0 CYCLE: 04/26/2024 B813 MAIN CIRCUIT-SUBCIRCUITS ARE BELOW 28 29 10 Mee[Coder W.I. TOTAL MAIN CIRCUIT 36.8 19 28 CDST-9-9 EV.04 EL ..2 2-1 4.0 308/1 ETR ETR BS13 B513a WKE-210 BOHN 112Meat Cooler W.I. N EGVE-2C/#1-1/2 18.4 19 28 EL 22.6 20M1 2.0 208/1 ETR ETR BS13a DOCUMENT DATE:12/27/2024 BS13b WKE210 BOHN 1/2Meat Cooler W.I. N EGVE-2C/#1-1/2 18.4 19 28 EL 22.6 2MI 2.0 208/1 ETR ETR BS13b •BS14 Subeoolar Load Rack B 3].5 35 ETR ETR •BS14 BS15 SMBT HUSSMANN Service Dell Is 18 24 CDST-2-0 EIS140 OT 0.6 fall 0.3 ETR ETR BS15 Suclim Group#2 Re ulred Ca acitv(MRHn 2T6.8 17 °F SaWretetl Suction Tem reWre General Notes: 1 Refrigeration OEM:Hussmann �{t� GT• 2, ...[Evap changes result in a net INCREASE of 50.2 MBH for SG#1. 3. CaselEvap changes result in a net INCREASE of 30.2 MBH for SG#2. q Hussmann to mevaluate Rack B at-27°F saturated suction temp. .Q 51 Hussmann shall furnish CO2 valve stations,LLSVs,CO2 charging station,etc. y0 6, Hussmann shall provide pressure drops and coil selections for all liquid overfeed coils.Sized on entering fluid temp of.20°F and a CR of 2. 41T42 OWNER FURNISHED REFRIGERATION CONTROLS&EQUIPMENT SCHEDULE BATTERY BACKUP SYSTEM SCHEDULE VENDOR BATTERY CABINET BATTERIES INVERTER TRANSFORMER NOTES VENDOR SAP# Type VOLTAGE Count NOTES CABINET USABLE ENERGY BATTERY MODULES MAX OUTPUT CURRENT CIRCUIT BREAKER RATING VOLTAGE HONEYWELL INTERNATIONAL INC 1000211094 KE2 Door Switch 4 - MARK BRAND MODEL (Qm (kWh) (YM BRAND MODEL VOLTAGE (AMPS) (AMPS) OTY (kVa) PHASE (PRIMARY,SECONDARY) OTY HONEYWELL INTERNATIONAL INC 1000211094 KE2-RE2 Evap 40A(20178/20844) 6 HONEYWELL INTERNATIONAL INC 1000211094 Novar ES1 w/XFMR 3 BB-1 GENERAC PWRCELL IR M3 DCB 1 18 6 GENERAC XVT076A03 120/240,1P VAC 32 50 1 10 SINGLE 480V,120/240V 1 A,B,C HONEYWELL INTERNATIONAL INC 1000211094 Novar xcm.LCD w/XFMR 6 HUSSMANN CORPORATION 1000048208 KR24E-074 208 V 1 A GENERAL NOTES HUSSMANN CORPORATION 1000048208 KR34E-111 208 V 1 A HUSSMANN CORPORATION 1000048208 KR54E-185 208 V 4 A 1.) BATTERY CABINET,INVERTER,AND TRANSFORMER SUPPLIED BY OWNER'S DESIGNATED REFRIGERATION EQUIPMENT MANUFACTURER:RAE CORPORATION. GENERAL INFORMATION(ALL COILS): 2.) REFER TO RE SHEETS FOR WIRING DETAILS,ELECTRICAL REQUIREMENTS,AND EQUIPMENT LOCATIONS. 1. COILS FURNISHED BY OWNER AND INSTALLED BY CONTRACTOR. 3.) REFER TO CO2 BACKUP BATTERY&INVERTER DETAIL FOR CONTRACTOR FURNISHED ITEMS. 2. INFORMATION CONTAINED WITHIN THIS SCHEDULE IS FOR OWNER'S PURCHASING REPRESENTATIVE.REFER TO REFRIGERATION SCHEDULE(S)FOR SPECIFIC NOTES: INFORMATION REGARDING EQUIPMENT. 3. SUPPLIER SHALL VERIFY PRODUCT REQUIREMENTS INCLUDING BUT NOT LIMITED TO LIQUID TO SUCTION HEAT EXCHANGER,EXPANSION DEVICE TYPE,ELECTRICAL A.) BATTERY BACKUP SERVES SYSTEM LTA SCO2(SCO2A-1)AND LTB SCO2(SCO2B-1). REQUIREMENTS,ETC.WITH REFRIGERATION SCHEDULE(S). B.) BATTERY BACKUP SERVES BREAKER BOX. NOTES: C.) BATTERY BACKUP SERVES SMART MANAGEMENT MODULE. A. EVAPORATOR COIL SHALL BE FURNISHED WITH FACTORY INSTALLED VALVES,SENSORS,TRANSDUCERS,AND ALL OTHER APPURTENANCES,AS OUTLINED IN THE 15690 EQUIPMENT SPECIFICATION,INCLUDING:ELECTRONIC EXPANSION VALVEE SEEN OR,SUCTION VALVES(TWO IN THE SUCTION LINE,ONE IN THE LIQUID LINE, RACK A MODIFICATIONS(REFER TO OEM SUBMITTALS FOR ADDITIONAL INFORMATION) PUMP SKID SCHEDULE UPSTREAM OF THE OTHER SUCTION PRESSURE TRANSDUCER,AIR TEMPERATURE SENSOR,SUCTION TEMPERATURE SENSOR,DEFROST TERMINATION TEMPERATURE NEW MCA:214.4 SENSOR AND ALL OTHER COMPONENTS.REFER TO DETAILS FOR FIELD INSTALLED CONTROL WIRING BETWEEN EVAPORATOR COIL AND WALK-IN UNIT CONTROLLER. NEW COMPRESSOR:4TES-12Y-2NU -SUCTION GROUP LTA COMPRESSOR POSITION 2 REFRIGERATION Skid Capaci Design Skid Max Skid Desi Skid Max Skid Desi Skid Max Skid Design _12 HP MARK SYSTEM SERVED MANUFACTURER Model (MBH) ty (MBH Flow(GPM) Flow(GPM) Head(FT) Head(FT) RPM RPM V/PH MCA MOPD 410 WIRE SIZE -30A BREAKER SCO2A.1 LTA RAE Corporation WMT-SEC-CO2.1/10460 348.0 94.7 10 3.14 100 50.9 1800 916 46013 15 15 -30A CONTACTOR(PROVIDED) SCO2B-1 DTB RAE Corporation WMTSEC-CO2-1/10460 348.0 134.2 10 4.49 100 49.8 1800 896 460/3 15 15 -23.6 RLA NEW SUCTION MANIFOLD SIZE:2-518" GENERAL NOTES: REFRIGERATION 1.UNIT DESIGN HEAD AND RPM ARE ESTIMATES TO ASSIST WITH UNIT STARTUP. RACK B MODIFICATIONS(REFER TO OEM SUBMITTALS FOR ADDITIONAL INFORMATION) SCHEDULES NEW MCA:314.2 2.UNIT SUPPLIED BY MANUFACTURER WITH SHIP LOOSE SPOOLS.FIELD INSTALLED BY CONTRACTOR. NEW COMPRESSOR:4GE-23Y-2NU 3.CONVENIENCE RECEPTACLE FILED PROVIDED BY CONTRACTOR.REFER TO MAUFACTURER'S ONE-LINE DIAGRAM CONNECTION TO SKID CIRCUITRY. -SUCTION GROUP 1 COMPRESSOR POSITION 2 -23 HP 4.ROOF CURB AND ANCHOR BRACKETS FURNISHED BY OWNER,INSTALLED BY CONTRACTOR.REFER TO MANUFACTURER'S INSTALLATION INSTRUCTIONS. 48 WIRE SIZE 5.IF UNITS ARE TO BE INSTALLED WITHIN 5 MILES OF ANY SALT OR BRACKISH WATER,UNITS SHALL BE FURNISHED WITH FACTORY CORROSION PROTECTION OPTIONS PER EQUIPMENT SPECIFICATION. -50A BREAKER 40A CONTACTOR(PROVIDED) _32.1 RLA NEW COMPRESSOR:4GE-23Y-2NU -SUCTION GROUP 1 COMPRESSOR POSITION 3 -23 HP 48 WIRE SIZE -50A BREAKER 40A CONTACTOR(PROVIDED) SHEET: -3 SUCTION NEW SUCTIOTIO N MANIFOLD SIZE:3-1/8" K1 SCO2 PHASING SCHEDULE-RACK A MODIFIED COMPRESSOR SCHEDULE-EXISTING RACK LTA Existing Design Conditions New Design Conditions General Specifications CIRCUIT LOAD CIRCUIT PHASELOAD PHASE FLOWRATE Required Load(MBH) 115.2 Required Load(MBH) 94.7 Refrigerant R-407a SYSTEM CIRCUIT NUMBER (MBH) APPLICATION FLOWRATE(GPM) PHASE SETPOINT(MBH) (GPM) NOTES Available Compressor NRE(MBH) 121.2 Available Compressor NRE(MBH) 105A SAS Controller OEM NOVAR A02 SCO2 11.5 Reach-In F.F. 0.42 A04 SCO2 10.5 Reach In F.F 0.39 1 3z 9 1 19 Suction Group Temperature(F) -12 Suction Group Temperature(F) -19 . ' Free:erw.I o.3a. EXISTING COMPRESSOR INFORMATION Aoescot 10.9 DeII A03 SCO2 11.5 Reach-In F.F. 0.42 LTA SCO2 A05 SCO2 18.2 Reach-In F.F. 0.67 2 73.0 2.67 A,B Compressor Compressor Capacity as Entered A06 SCO2 10.5 Reach-In F.F. 0.39 Capacity Comp.Capacity% Into Controller Minimum Capacity A01 SCO2 5.7 Reach-In F.F. 0.22 Comp.Position Model (MBH) of Load (MBH) Unloader QTY Unloader% (MBH) Notes 3 e5.9 3.14 A.B 1 4CO770SL-4SU 19.2 20.3% VFD 8.05 A07 SCO2 7.1 Seafood Freezer W.I. 0.25 Total g5.9 3.14 2 *4C1145SL-4SU 29.2 30.8% 1 50 14.6 COMPRESSOR REPLACED GENERALNOTES 3 4C1385KIW 35.6 37.6% - 0 - - w w8 pro 0 1.PHASING SCHEDULE SHOWN IS RECOMMENDED BASED ON EQUIPMENT MINIMUM OPERATING CONDITIONS OF 33 MBH AND 1 GPM. 4 4C1480PL-2NU 37.2 39.3% - 1 50 18.6 2.REFRIGERATION CONTRACTOR TO CONFIRM PHASING WITH WALMART MECHANICAL CONSTRUCTION MANAGER PRIOR TO CONSTRUCTION START. NEW COMPRESSOR INFORMATION o Fywgo���e NOTES O A.'PHASE LOAD'INCLUDES PREVIOUS PHASES LOAD. Compressor Z w g y o o w a w Capacity as Entered iwa3w�oo B.'PHASE FLOWRATE'INCLUDES PREVIOUS PHASES FLOWRATE. Compressor NRE Comp.Capacity% Into Controller Minimum Capacity ~ a2yoo€a�'�rwi Comp.Position g PRO- Model (MBH) of Load (MBH) Unloader QTY Unloader (MBH) Notes a oow�ap,°w, N=g 1 4CO770SL-4SU 14.7 15.5% VFD 8.05 � soyso � SCO2 PHASING SCHEDULE-RACK B 2 *4TES-12Y-2NU 34.8 36.7% 1 50 17.4 A,B,C 3 4C1385SL-4SU 27.5 29.0% 0 4 4C1480PL-2NU 28.4 30.0% 1 50 14.2 CIRCUIT LOAD CIRCUIT PHASELOAD PHASE FLOWRATE GENERALNOTES SYSTEM CIRCUIT NUMBER (MBH) APPLICATION FLOWRATE(GPM) PHASE SETPOINT(MBH) (GPM) NOTES §oa B06 SCO2 30.5 1/2 Grocery/I.C.Fm 1.06 1.COMPRESSSOR MODIFICATIONS COORDINATED WITH HUSSMANN. 1 61.0 2.12 - -2 B07 SCO2 30.5 1/2 Grocery/I.C.Fm 1.06 NOTES w 3 B08 SCO2 3.2 Reach-In I.C.Cake 0.11 A.NEW COMPRESSOR CAPACITY CONTROL METHOD B11 SCO2 11.5 Reach-In F.F. 0.42 B.REVISED COMPRESSOR CAPACITY CONTROL METHOD i r r LTB SCO2 2 104.3 3.71 A,B 313SCO2 18.2 Reach-In F.F. 0.67 C.REVISED COMPRESSOR MODEL NUMBER D. of =w B145CO2 10.5 Reach-In F.F. 0.39 NEWLY ADDED COMPRESSOR MODEL Z B12 SCO2 12.4 Reach In I . 0.46 COMPRESSOR STAGING 0 B15 SCO2 11.5 Reach-In I 0.43 3 128.2 4.6o A,B EXISTING COMPRESSOR STAGING NEW COMPRESSOR STAGING(Up to 110%of Load) . Total 128.2 4.60 Step%Relative to x Compressors Capacity Capacity Step Compressors Capacity Capacity Step Available d GENERALNOTES Compressor Staging Positions On MBH MBH Compressor Staging Compressor NRE (MBH) (MBH) P 9 9 Positions On (MBH) (MBH) P Notes 1.PHASING SCHEDULE SHOWN IS RECOMMENDED BASED ON EQUIPMENT MINIMUM OPERATING CONDITIONS OF 33 MBH AND iGPM. Step 1 _ _ Step 1 1U 8.05 8.05 7.6% O O 2.REFRIGERATION CONTRACTOR TO CONFIRM PHASING WITH WALMART MECHANICAL CONSTRUCTION MANAGER PRIOR TO CONSTRUCTION START. Step _ _ Stop 1 14.7 6.7 6.3% 0 oQ Nores Step 3 _ _ Step 3 7 U&4U 25.3 10.6 10.0% A.'PHASE LOAD INCLUDE PREVIOUS PHASES'LOAD. Step 4 Step 4 1U&3 35.6 10.3 9.8% S B.PHASE FLOWRATE INCLUDE PREVIOUS PHASES'FLOWRATES. Step 5 _ _ Step 5 1U&2 45.9 10.3 9.8% co Step 6 _ _ Step 6 3&4 55.9 10.1 9.5% z o 0 Step _ _ Step 1U,3&4 66.5 10.6 10.0% O L a Step 8 _ _ Step 8 1,2&3 77.0 10.6 10.0% Step 9 _ _ Step 9 1 U,2,3&4U 87.6 10.6 10.0% p Step 10 _ _ Step 10 1 U,2,3&4 98.8 11.2 10.6% Z Ste 11 _ _ Ste 11 1,2,3&4 W P P 105.4 6.7 6.3% Z O o� GENERALNOTES 1. J 1.REFRIGERATION CONTRACTOR TO COORDINATE STAGING PROGRAM CHANGES WITH NOVAR AFTER ALL MODIFICATIONS ARE COMPLETE. w m MODIFIED COMPRESSOR SCHEDULE-EXISTING RACK DTB '_ m Existing Design Conditions New Design Conditions General Specifications o' Required Load(MBH) 109.9 Required Load(MBH) 160.1 Refrigerant R-407a Available Compressor NRE(MBH) 119.0 Available Compressor NRE(MBH) 172.2 EMS Controller OEM NOVAR ISSUE BLOCK Suction Group Temperature(F) -23 Suction Group Temperature(F) -27 EXISTING COMPRESSOR INFORMATION Compressor Capacity as Entered Compressor NRE Comp.Capacity% Into Controller Minimum Capacity Comp.Position Model (MBH) of Load (MBH) Unloader QTY Unloader% (MBH) Notes 1 4C1385SL-4SU 20.9 19.0% VFD 8.78 2 *4C1761PL-2NU 26.2 23.8% 1 50 13.1 COMPRESSOR REPLACED 3 *4C2067PL-2NU 30.1 27.41/6 0 COMPRESSOR REPLACED 4 4B2707PL-2NU 41.8 38.0% 1 50 20.9 NEW COMPRESSOR INFORMATION Compressor Capacity as Entered Compressor NRE Comp.Capacity% Into Controller Minimum Capacity Comp.Position Model (MBH) of Load (MBH) Unloader QTY Unloader% (MBH) Notes 1 4C1385SL-4SU 20.0 12.5% VFD 8.78 2 *4GE-23Y-2NU 56.1 35.0% 1 50 28.1 A,B,C CHECKED BY: EJM 3 *4GE-23Y-2NU 56.1 35.0% 0 A,B,C DRAWN BY: JTC 4 4B2707PL-2NU 40.0 25.0% - 1 50 20.0 GENERALNOTES PROTO CYCLE: 04/26/2024 1.COMPRESSSOR MODIFICATIONS COORDINATED WITH HUSSMANN. DOCUMENT DATE:12/27/2024 NOTES A.NEW COMPRESSOR CAPACITY CONTROL METHOD B.REVISED COMPRESSOR CAPACITY CONTROL METHOD C.REVISED COMPRESSOR MODEL NUMBER D.NEWLY ADDED COMPRESSOR MODEL �V COMPRESSOR STAGING y EXISTING COMPRESSOR STAGING NEW COMPRESSOR STAGING(Up to 110%of Load) �O 41742 Step%Relative to I CAPACITY CAPACITY STEP CAPACITY CAPACITY STEP Available Compressor Staging Compressors On (MBH) (MBH) Compressor Staging Compressors On (MBH) (MBH) Compressor NRE Notes Step 1 Step 1 1U 17.2 17.2 10.0% Step 2 Step 2 1 U&4U 33.8 16.6 9.60/6 Step 3 _ _ _ Step 3 1 U&4 50.8 17.0 9.9% Step 4 _ _ _ Step 4 1 U&2 67.9 17.1 9.9% Step 5 _ _ _ Step 5 1 U,2&4U 84.9 17.0 9.91/6 Step 6 _ _ _ Step 6 1 U,2U&3 101.9 17.1 9.91/6 Step 7 _ _ _ Step 7 1,2&4 116.1 14.2 8.20/6 Step 8 _ _ _ Step 8 2,3&4U 132.2 16.1 9.30/6 Step 9 _ _ _ Step 9 1 U,2,3&4U 149.0 16.8 9.70/6 Step 10 _ _ _ Step 10 1U,2,3&4 161.0 12.0 7.01/6 Step 11 Step 11 1,2,3&4 172.2 11.2 6.5% GENERALNOTES 1.REFRIGERATION CONTRACTOR TO COORDINATE STAGING PROGRAM CHANGES WITH NOVAR AFTER ALL MODIFICATIONS ARE COMPLETE. REFRIGERATION SCHEDULES SHEET' R2.1 RETURN LINE SUPPLY LINE OPTION 1: HIDDEN PIPING SUPPORT OPTION 2: VISIBLE PIPING SUPPORT TYPICAL SUCTION LINE INSULATION(TYP) TYPICAL INSULATION INSULATION I LIQUID I LNE I >m o I I Q OWNER FURNISHED FIELD INSTALLED LL wN H'a o`rcwy H€�' 1/4"FLARE ACCESS PORT. I I I UNISTRUT REFER TO ARCHITECTURAL OWNER FURNISHED FIELD INSTALLED 650 PSIG I I I I I IQo BawNoo Wao N; DETAIL FOR INSTALLATION SERVICE PRESSURE RELIEF VALVE ON ROOF. _ _ I I I OF MANUFACTURED METAL =_= LOCATE VALVE AT LEAST 20 FT FROM ANY RTU, 0 -- - -- -- - - 1 i I UNISTRUT CURB,INSULATION,AND AHU OR EXHAUST FAN.MOUNT VERTICALLY. SHEET METAL ENCLOSURE �� CONNECTS TO RACK VIA BOLT(TYP) — I1 3/8"CHARGING HOSE. I I 1 O r CAP WHEN NOT IN USE. PROVIDE 3/8"COPPER I I SUPPORT PIPING ON ROOF. I I ( 1 I I I I BUTT INSULATION AGIANST I I I 4A PIPING FROM CO2 11 REFER TO REFRIGERATION I I 1 I I PROVIDE 3/8"FLARE I 1 I I o a CHARGING STATION PIPING SUPPORT DETAIL. PIPE SUPPORT,AND SEAL I I BOLT MALE CONNECTION. I APPLY EXPANDING FOAM TO I I m TO RACK. CONNECTION SHALL BE INSULATION AT EDGE OF CLAMPS AND COVER WITH ROOF OPENING TO I m; EQUAL TO OR HIGHER COUPLING. INSULATION IN A CLEAN AND I I I I I (?w ACCOMMODATE THAN THE TOP MOST REFRIGERANT RETURN (TYPICAL OF OPTION 2) WORKMAN LIKE MANNER. I I REFRIGERATION PIPING AND SIGHT GLASS ON THE LINES SPACED 8"O.C. TYPICAL OF ELECTRICAL CONDUIT.REFER CO2 VESSEL. MOUNTED ON UNISTRUT I TO ARCH ANAD REFRIG PLANS. I ¢ (TYP) REFRIGERANT SUCTION NOTE:OWNER FURNISHED CHARGING STATION LINES SPACED 8"O.C. 4 EQUIPMENT SHIPED LOOSE BY REFRIGERATION 020"THICK PVC JACKET FOR ALL ELEVATION MOUNTED ON UNISTRUT z W VERTICAL PIPING RACK EQUIPMENT MANUFACTURER. REFRIGERATION LINES EXTERIOR KLO-SHURE 7-SERIES (TYP) BUTT INSULATION AGIANST PIPE U SUPPORT.REFER RE BUILDING(TYPICAL) STRUT MOUNTED SUPPORT,AND SEAL INSULATION AT TO VERTICAL PIPE SUPPORT.REFER TO COUPLING FOR ELEVATION EDGE OF COUPLING. REFRIGERANT LINE HORIZONTAL REFRIGERANT NOTE:CONNECT SYSTEM AND REFRIGERANT TANKS TO EXPOSED PIPING.(TYP) .020"THICK PVC JACKET FOR ALL (TYPICAL OF OPTION 2) a SUPPORT DETAIL LINE SUPPORT DETAIL CHARGING STATION WITH HEAVY DUN REFRIGERATION LINES EXTERIOR 2 P VACUUM/PRESSURE REFRIGERATION HOSES RATED TO BUILDING(TYPICAL) OWNER FURNISHED FIELD INSTALLED 800 PSIG FOR A MINIMUM BURST PRESSURE RATING OF 4000 PSIG. #022 CUSH-A CLAMP KLO-SHURE 7-SERIES U DISCHARGE PRESSURE GAUGE. FIRMLY CLAMPED TO PIPE. STRUT MOUNTED O O NOTE:VALVE STATIONS MUST BE RETURN SUPPLY (TYPICAL OF OPTION 1) COUPLING FOR INSTALL OWNER FURNISHED SPORLAN EBV VALVE.REFER TO CO2 VALVE ORIENTED WITH INTERNAL CHECK LINE o LINE O EXPOSED PIPING. PROVIDE RIGID PVC SIGN WITH STATIONS DETAIL. VALVE ALLOWING FLOW AWAY FROM PIPING INSULATION (TYPICAL OF OPTION 2) O O \ PRINT TEXT,MINIMUM 2"TEXT (BEYOND) HEIGHT.SIGN SHALL BE LOCATED OWNER FURNISHED FIELD INSTALLED 1/4"FLARE ACCESS PORT. THE FILTER DRIER AND TO THE LIQUID NEXT TO THE CO2 CHARGING PRESSURE RELEIF VALVE ON FOOF. SUCTION LINE LINE m OWNER FURNISHED FIELD INSTALLED REPLACEABLE CORE FILTER �� ^ o p STATION AND READ:"DO NOT DRIER WITH 1/4"FLARE SERVICE PORT AT CHARGING STATION. 7 TRAP LIQUID BY CLOSING NOTE:DO NOT TRAP LIQUID BV L O CHARGING STATION AND RACK OWNER FURNISHED FIELD INSTALLED 3/8"ISOLATION BALL VALVE(TYP) CLOSING CHARGING STATION O ^ O Lo 0- ISOLATION VALVES WHEN AND RACK ISOLATION VALVES SERVICING.ALWAYS VACUUM PROVIDE 3/8"FLARE MALE CONNECTION.CAP WHEN NOT IN USE. WHEN SERVICING.ALWAYS CHARGING LINE AFTER 1 5/8"x1 5/8"GALVANIZED VACUUM CHARGING LINE AFTER O CHARGING IS COMPLETE" CONNECTS TO CO2 RERIGERATION CYLINDERS VIA 3/8" UNISTRUT P-1000,10'-0" CHARGING IS COMPLETE. PLAN (n Z CHARGING HOSE.MOUNT EQUIPMENT TO TERMINATE AT 72"AFF. MAXIMUM ON CENTERS VV W N USE BOLLARD OR FENCING TO PROTECT CHARGING STATION.DO NOT BLOCK VALVE OR NOTE:MAINTAIN TIGHT SPACING BETWEEN PIPING 1 5/8"x1 5/8"GALVANIZED Z O CONNECTION ACCESS.ALLOW ADEQUATE SPACE TO POSITION CHARGING TANKS/SYSTEM. PLAN UNISTRUT P-1000,10'-0" 0 NOTE:MAINTAIN TIGHT SPACING BETWEEN PIPING MAXIMUM ON CENTERS ^ , g10yREMOTE CO2 CHARGING STATION D UNISTRUT PIPING SUPPORT DETAIL (SECONDARY)NTS ($ UNISTRUT PIPING SUPPORT DETAIL (DX)NTS LLL^^^QLLL/// w DROP BRANCH INTO TOP OF RETURN MAIN z LINE.REF CO2 PIPING DETAILS MAIN LIQUID SUPPLY LINE EXTERNAL CHECK VALVE INTERNAL CHECK VALVE(SPORLAN MODEL EBV-- MAIN TWO-PHASE RETURN LINE ALLOWABLE IN LINES 1 1/8"AND SMALLER) INSTALL ONE VALVE INSTALL ONE VALVE ISSUE BLOCK STATION PER CIRCUIT AND STATION PER CIRCUIT AND AT OTHER LOCATION(S) AT OTHER LOCATION(S) SPECIFIED ON PLANS SPECIFIED ON PLANS INSIDECOMPONENTS SUCTION LINE TO RACK DASHED LINES ARE FROM SYSTEM TO SYSTEM INSTALL CIRCUIT RETURN VALVE ON TOP U CASES WHERE POSSIBLE SYSTEM TO SYSTEM ADJUST LOCATION OF DROPS AS REQUIRED TYP FACTORY-ASSEMBLED. FROM ROUTE SUPPLY AND RETURN HEADERS NORMAL f + } 0 CUSH-A-CLAMP FIRMLY INSULATION STATION.REFER TO CO2 VALVE FePalceenHi BALL VALVE WITH RUN CONDUIT ON OW(TYP) �� INTEGRATED CLAMPED TO PIPE(TYP) STATIONS DETAIL �� UNISTRUT AS 1"EXPANDED POLYSTYRENE OR EQUAL O� Ol PRESSURE RELIEF I I I I � I � NEEDED REFRIGERATION PIPING LIQUID LINE FROM RACK (TYP) (TYP) INSTALL CIRCUIT SUPPLY VALVE STATION.REFER TO CO2 VALVE 6"MINIMUM WIDTH.LENGTH UNISTRUT STATIONS DETAIL I I I I DURA-BLOK DB6-SERIES OR PROVIDE NORMALLY AS REQUIRED TYP i 1 P-1000(TYP.) EQUIVALENT CHANNEL 1 OPEN FULL PORT BALL L_____ J L_____ _J L__ _ __J L__ SUPPORT.(TYP) ® VALVE WITH INTEGRAL WHERE APPLICABLE REFER TO SPECIFICATIONS SCHRADER VALVE IN FOR PIPING SUPPORT AN ACCESSIBLE REAR HALF OF F TO CASE/EVAPORATOR FROM CASE/EVAPORATOR TO CASE/EVAPORATOR FROM CASE/EVAPORATOR O O LOCATION.ENSURE REFRIGERATED CASE REFRIGERATION CASE MANUFACTURER SPACING REQUIREMENTS. SCHRADER VALVE IS DESIGNATED FOR TO PROVIDE CASES WITH TOP FED PIPING SUPPLY VALVE RETURN VALVE SUPPLY VALVE RETURN VALVE NOT ATTACH BLOCK TO ROOF. . ORIENTATED AS PIPING AND VALVES. LlCONNECTIONS,FACTORY INSTALLED STATION STATION STATION STATION N PROVIDE 60 MIL WHITE TPO SHOWN.PROVIDE —_ _ _ _ _ _ _ _ _ _ _ _ _ _ SUPPLY SOLENOID VALVE,AND NSF MEMBRANE SET ON BARE INSULATION FOR BOTH INSULATION FOR EACH CASE.REF FRONT HALF OF PROVIDE INSULATION THAT COMPLETELY ENCAPSULATES ALL SURFACES.REFER TO g ROOF MEMBRANE VALVES.DO NOTTRAP SPECIFICATIONS. SPECIFICATIONS. CHECKED BY: EJM LIQUID BY CLOSING REFRIGERATED CASE LOOP AND CASE DESIGNATED FOR ROOF MEMBRANE ISOLATION VALVES ELECTRICAL AND BAS VALVE STATIONS MUST BE ORIENTED WITH CHECK VALVE(INTERNAL OR EXTERNAL) DRAWN BY: JTC z_ WHEN SERVICING. COMPONENTS. ALLOWING FLOW AWAY FROM UNIT COOLER AND BACK TO RACK SYSTEM. PROTO CYCLE: 04/26/2024 SIDE VIEW SECTION VIEW CO2 VALVE STATIONS FURNISHED BY REFRIGERATION RACK EQUIPMENT MANUFACTURERAND INSTALLED BY REFRIGERATION CONTRACTOR. DOCUMENT DATE:12/27/2024 REFRIGERATION 26 GAUGE SHEET METAL DRIP SPACE AT 4'INTERVALS TYP PAN WITH MASTIC COATING (D�REFRIGERATION PIPING SUPPORT (ON ROOF) ISOLATION VALVES �SECONDARY CO2 CASE PIPING SECONDARY CO2 VALVE STATIONS V NTS J NTS 4 NTS OPTION 1: VERTICAL REFRIGERATION PIPING MOUNTED TO WALL OPTION 2:VERTICAL REFRIGERATION PIPING SUSPENDED VIA HANGERS 2 �O 41142 INSTALL INVERTED I/2/la7 P-TRAP AT TOP OF ALL SECONDARY GLYCOL RETURN TOP BEAM SECONDAY CO2 RETURN RISERS CLAMP(TYP) REFER TO HORIZONTAL (TYP) THREADED REFRIGERANT LINE SECONDARY GLYCOL SUPPLY ROD(TYP) SUPPORT DETAIL.(TYP) SECONDARY CO2 RETURN MAXIMUM 12"BETWEEN 12" (TYP OF 2) HIGHEST PIPING JOINT AND MAX SECURE ALL VERTICAL INVERTED HORIZONTAL UNISTRUT. J/ 1/2"RETAINING THREADED ROD REFRIGERATION PIPING TO SUCTION LINE SECONDARY CO2 SUPPLY BOLT TO WALL STUD ONLY (TYP) NUT,UNISTRUT UNISTRUT MOUNTED THE WALL TRAP TOP OF SUCTION (TYP OF 2) P4010T OR SECURED VIA HANGERS.REFER LINE RISER(TYP) " TO VERTICAL REFRIGERATION LINE REFER TO UNISTRUT SQUARE WASHER, SUPPORT DETAIL.(TYP) PIPING SUPPORT DETAIL UNISTRUT P1064 SECONDARY CO2 RETURN (TYP OF 2) SUCTION LINE(TYP) SECONDARY CO2 SUPPLY REFER TO UNISTRUT (TYP OF 2) REFER TO ARCHITECTURAL SUPPORT PIPING ON INTERMEDIATE SUCTION LINE TRAP IN PIPING SUPPORT DETAIL DETAIL FOR INSTALLATION OF ROOF FOR ADEQUATE WALL,VOID SPACE,OR HIDDEN FROM MANUFACTURED METAL SLOPE AND SPACING. VIEW.INTERMEDIATE TRAP SHOULD BE LIQUID CURB,INSULATION,AND PLACED AT THE MIDPOINT OF ANY LINE(TYP) SHEET METAL ENCLOSURE SUCTION LINE RISE WHICH EXCEEDS 16 ROOF OPENING TO FEET OR PLACED AT THE HIGHEST INSTALL VERTICAL PIPING AS ACCOMMODATE BOTH POINT THAT IS HIDDEN FROM VIEW. COMPLETELY SELF-SUPPORTING REFRIGERATION PIPING AND ELECTRICAL BEFORE CONNECTING TO OTHER CONDUIT CONSTRUCT INTERMEDIATE PIPING. SUPPORT ROD SUCTION LINE TRAPS FROM SECONDARY GLYCOL RETURN (TYP) PRE-MANUFACTURED TRAPS. (TYP) SECONDARY GLYCOL SUPPLY T-0"WIDE,18 GAUGE REFER TO LINE RACKING BEHIND SHEET METAL DRAIN PAN REFRIGERATED CASES DETAIL WITH INTERNAL MASTIC OR VERTICAL FACE PIPING 12" REFRIGERATION MAXIMUM 12"BETWEEN VERTICAL PIPING SHALL COATING SUPPORT DETAIL. MAX REDUCE RISER LOW EST PIPING JOINT AND BE SQUARE WITH PIPE SUPPORT REFER TO PROVIDE A 3/4"PVC DRAIN FOR ANY PIPE SIZE AFTER HORIZONTAL UNISTRUT. FLOOR.(TYP) DETAILS HORIZONTAL REFRIGERANT PENETRATION WHOSE WIDTH IS 16"-24". BASE TRAP (TYP) LINE SUPPORT DETAIL PROVIDE A 1'PVC DRAIN FOR ANY PENETRATION WHOSE WIDTH IS 30"-36", AND PROVIDE A 1 1/2"PVC DRAIN FOR ANY PENETRATIONS WHOSE WIDTH IS SUCTION LINE TRAP GREATER THAN 36".SLOPE PVC DRAIN AT THE BASE OF LINE 1/8"PER 12"AND TERMINATE OVER THE RISER AT ALL UNISTRUT POST BASE P1887. DRAIN WITH 2"AIR GAP. POINTS WHERE TYP. SUCTION LINES RISES. INTERMEDIATE C3)�ROOF PENETRATION (SINGLE CIRCUIT, SECONDARY) SUCTION LINE TRAP VERTICAL REFRIGERANT LINE SUPPORT (SECONDARY) r��3 NTS 2 NTS NTS INSTALL SUPPLY AND RETURN VALVE STATIONS PER CIRCUIT.REFER TO CO2 VALVE STATIONS DETAIL. INSTALL SUPPLY SOLENOID VALVE PER COIL, INVERTED TRAP CO2 FURNISHED BY REFRIGERATION OEM.ELECTRICAL RETURN LINES.RE F CO2 TERMINATIONS BY THE REFRIGERATION CONTRACTOR. SECONDARY PIPING DETAILS. Z SUPPLY DRILL HOLE IN COOLER/FREEZER BOX WALLS,CENTER PIPE g j—RETURN INSULATION PIPE IN OPENING,AND SEAL WITH EXPANDING FOAM. w F� wgz3?P TWO-PHASE AFTER FOAM CURES,TRIM FLUSH TO PANEL.BUTT RETURN MAIN EXPANDING INSULATION TO THE BOUNDARY OF BOX PENETRATION. pTWO-PH rcr 3t°g��w °3m RETURNASE RISER FOAM TOPS OF BOLT FOAM SEAL WHERE INSULATION BUTTS AGAINST THE PANEL ZED.— AND AROUND PERIMETER OF INSULATION TO CREATE ow PENETRATIONS.TYP g � VAPOR BARRIER.TYP OF ALL PIPE PENETRATIONS p: v THROUGH BOX WALL. TOP OF BOX INSULATED WALL a m �a8o-1s �=g SUPPORT EVAPORATORS WITH SILICONE SEALANT SUPPLY RETURN INSTALL WALK-IN RETURN VALVE STATION. LIQUID SUPPLY A TWO-PHASE RETURN LINES SHALL BOLTS THRU CEILING PANEL TO REFER TO CO2 VALVE STATIONS DETAIL. MAIN HAVE AN INVERTED TRAP 1 5/8"X 1 5/8"X 10 FT.LONG 14 HOLE DIAMETER V GREATER THAN PIPE DROP TO TOP OF BOX. GAUGE.GALVANIZED UNISTRUT SECONDARY OR CONDENSATE PIPE REF CO2 SECONDARY INVERTED P-TRAP SAME SPANNING THREE FAN/COIL UNIT DETAIL SIZE AS VERTICAL RISER COOLER/FREEZER CEILING §o PANELS.PROVIDE DOUBLE NUTS _--^r_ MOUNT COIL ACCORDING TO ON EACH BOLT.(TYP) UNIT MANUFACTURER'S RECOMMENDATIONS.(TYP) w v m;A SEAL AROUND BOLT SERVICE ACCESS VALVE INSTALL WALK-IN SUPPLY 8 PENETRATIONS THRU UNION VALVE STATION.REFER TO RETURN FROM LAST COIL. F du COOLER/FREEZER BOX WALLS COPPER TO PVC CONNECTION OUTSIDE OF WALL CO2 VALVE STATIONS DETAIL Z r TRANSITION TO DRAIN PAN SMALLER PIPE SIZE OR CEILINGS WITH BACKER AS REQUIRED.INSULATE COPPER PIPE OUTSIDE TOP OF BOX i ROD AND SEALANT.(TYP) COOLER WALL PER SPECIFICATIONS N =W LIQUID SUPPLY SUPPLY TO FIRST COIL. Z BRANCH U TRAP INSTALL SUPPLY SOLENOID PROVIDE COPPER CONDENSATE DRAIN VALVE PER COIL. PIPING FULL SIZE OF COIL DRAIN PAN REFERENCE EVAPORATOR COIL LIQUID SUPPLY LINES BRANCHING TRANSITION SHOULD BE DONE JUST PRIOR TO ELBOW AT CONNECTION AND SLOPE il8"PER 12" CONDENSATE PIPING DETAIL x THE BOTTOM OF THE RISER.DO NOT PROVIDE A P-TRAP AT TOWARD DRAIN OR HEADER. FAN/COIL UNIT 2 FROM THE MAIN MUST EXIT FROM THE BOTTOM OF RISER.PROVIDE AN INVERTED P-TRAP AT O THE SIDE OF THE MAIN RISER TRANSITION TO HORIZONTAL. SECONDARY CO2 PIPING DETAILS SECONDARY CO2 COOLING FAN-COIL UNIT SECONDARY CO2 COOLING FAN-COIL PIPING � Q 0 NTS 7 NTS V NTS Z 0 O K O Lo n a WALK-INS WITH TEMPERATURES WALK-INS WITH TEMPERATURES M ° ABOVE OR BELOW FREEZING BELOW FREEZING n ZLU EXIT WALK-IN AS SOON AS WHEN HEADER CANNOT `7J O POSSIBLE AND RUN HEADER USE COPPER PIPING WITH RUN ALONG BOX EXTERIOR L ALONG EXTERIOR OF BOX. ELECTRIC HEAT TRACE AND USE ELECTRIC HEAT TRACE AND W INSULATION ON CONDENSATE LINES INSULATION ON CONDENSATE J EXPOSED TO FREEZING AND WHEN LINES EXPOSED TO FREEZING AND A/ COPPER PIPING WHEN OTHERWISE NOTED.TYP LL FOR ALL INDIVIDUAL OTHERWISE NOTED.TYP DRAINS.TYP INSTALL TRAP AT EACH EACH INDIVIDUAL w INDIVIDUAL DRAIN m UPSTREAM OF HEADER. EVAPORATOR DRAIN MUST CONNECT DIRECTLY TO TERMINATE CONDENSATE DRAIN TYP HEADER.TYP OVER HUB DRAIN OR SERVICE m TERMINATE CONDENSATE DRAIN SINK WITH AIR GAP.INSTALL OVER HUB DRAIN OR SERVICE TRAP UPSTREAM OF HUB DRAIN SINK WITH AIR GAP.INSTALL OR SERVICE SINK.TYP TRAP UPSTREAM OF HUB DRAIN TERMINATE INDIVIDUAL COPPER DRAINS TO2" OR SERVICE SINK.TYP UTILIZE A UNION AT COPPER TO ISSUE BLOCK COMMON PVC HEADER AND MAINTAIN SLOPE TERMINATE COPPER DRAINS TO PVC TRANSITION.INSULATE OF 1/8"PER 12"TOWARD DRAIN.UTILIZE A DIRECT COORDINATE HEADERS COMMON COPPER HEADER ONE COPPER PIPE OUTSIDE WALK-IN UNION AT ALL COPPER TO PVC TRANSITIONS. CONNECTION TO WITH FIXTURES AND SIZE LARGER THAN COIL DRAIN COORDINATE HEADERS WITH WALL PER SPECIFICATIONS INSULATE COPPER PIPE OUTSIDE WALK-IN HEADER.TYP EQUIPMENT OUTSIDE AND MAINTAIN SLOPE OF 1/8"PER 12" FIXTURES AND EQUIPMENT WALL PER SPECIFICATIONS WALK-IN BOX.TYP TOWARD DRAIN. INSIDE WALK-IN BOX.TYP CONDENSATE DRAINS SERVING WALK-INS WITH TEMPERATURES REFER TO ARCHITECTURAL I� SUPPORT PIPING ON MULTIPLE WALK-INS ABOVE FREEZING DETAIL FOR INSTALLATION ROOF FOR ADEQUATE OF MANUFACTURED METAL — SLOPE AND SPACING. WHEN HEADER CANNOT WHEN HEADER CANNOT CURB,INSULATION,AND I I RUN ALONG BOX EXTERIOR RUN ALONG BOX EXTERIOR SHEET METAL ENCLOSURE I I ROOF OPENING TO USE 2"COMMON PVC HEADER I I ACCOMMODATE BOTH AND MAINTAIN SLOPE OF 1I8" I I REFRIGERATION PIPING BELOW FREEZING ABOVE FREEZING PER 12"TOWARD DRAIN. COORDINATE HEADERS WITH AND ELECTRICAL FIXTURES AND EQUIPMENT CONDUIT EACH INDIVIDUAL EVAPORATOR INSIDE WALK-IN BOX.TYP SUPPORT ROD DRAIN MUST CONNECT REF WALK-INS WITH mt DIRECTLY TO HEADER.TYP TERMINATE CONDENSATE DRAIN (TYP) BELOW FREEZING REF WALK-INS WITH OVER HUB DRAIN OR SERVICE 2'-0"WIDE,18 GAUGE PLAN VIEW. TEMPERATURES PROVIDE D SINK WITH AIR GAP.INSTALL WITH MSHEET ITERNALETAL D MASTIC RAIN N ABOVE FREEZING CLEANOUT FOR TRAP UPSTREAM OF HUB DRAIN COATING PLAN VIEW. ALL HEADERS.TYP OR SERVICE SINK.TYP CHECKED BY: EJM PIPE SUPPORT.REFER TO PROVIDE A 3/4"PVC DRAIN FOR ANY HORIZONTAL REFRIGERANT PENETRATION WHOSE WIDTH IS 16"-24". LINE SUPPORT DETAIL PROVIDE A 1'PVC DRAIN FOR ANY DRAWN BY: JTC PROVIDE RUNNING TRAP FOR INTERIOR CONDENSATE HEADERS PROVIDE TRAP UPSTREAM TERMINATE COPPER DRAINS TO 2,0"MAX. PENETRATION WHOSE WIDTH IS 30"-36", pROTO CYCLE: 04/26/2024 OF INDIRECT CONNECTION COMMON PVC HEADER.UTILIZE AAND PROVIDE A 1 1/2"PVC DRAIN FOR RUNNING BETWEEN MULTIPLE WALK-INS OPERATING AT FROM COPPER TO PVC. UNION AT ALL COPPER TO PVC ANY PENETRATIONS WHOSE WIDTH IS TEMPERATURES ABOVE FREEZING.IF A CONDENSATE PIPE TRANSITIONS.TYP AL GREATER THAN 36".SLOPE PVC DRAIN DOCUMENT DATE:12/27/2024 FROM ONE WALK-IN MUST BE ROUTED THROUGH A WALK-IN LINE 1/8"PER 12"AND TERMINATE OVER EXPOSED TO FREEZING TEMPERATURES,USE A SEPARATE DRAIN WITH 2"AIR GAP. DEDICATED CONDENSATE PIPE FOR EACH WALK-IN. PROVIDE NEW CONDENSATE PIPING,REFER TO SPECIFICATIONS 15600.SUPPORT WITH STRUT AND CLAMPS OR SPLIT RING CLAMPS WITH STAND-OFFS.REFERTO SPECIFICATIONS 15050. UNIT COOLER COIL CONDENSATE PIPING DOUBLE SUCTION RISER ROOF PENETRATION J NTS 4 NTS y TOP CHORD OF JOISTO 4D42 / MAX TOP BEAM ROOF MAX BETWEEN CLAMP(TYP.) BETWEEN REFRIGERATED CASES BETWEEN REFRIGERATED CASE AND WALL = REFRIGERATED = CASES WALL i LOADS MUST BE HUNG WITHIN 3" THREADED OF PANEL POINTS ROD TYP BOTTOM OFUR STRUCTET UP TO 8'-0"POST: PROCEDURE FOR PATCHING HOLES: ELECTRICAL CONDUITS P1000 INSUGUARD OR COOPER B-LINE 1.ATTACH 26 GAUGE GALVANIZED SHEET METAL TRIM TO BOTTOM OF HOLE AND MOUNTED ON UNISTRUT PARTIALLY TRIM TOP OF HOLE LEAVING 1"GAP AT TOP FOR EXPANDING FOAM SNAP N'SHIELD PIPE SADDLE SEALANT FILL. SECURED TO UNISTRUT.MATCH REFER TO UNISTRUT DO NOT ATTACH COLOR OF INSULATION.(TYP) 2.FILL OPENING WITH EXPANDING FOAM SEALANT,LET EXPAND AND CURE AND PIPING SUPPORT DETAIL UNISTRUT TO CASE TRIM EXCESS FOAM FROM FILL OPENING. 3.SEAL ALL EDGES AND EXPANDING FOAM SEALANT OPENING WITH SILICONE ANCHOR WITHIN 0'-6"OF 1/2"RETAINING SEALANT. EACH END OF UNISTRUT. NUT,UNISTRUT MAXIMUM ANCHOR P1010T PIPING O 4.VERIFY SPECIFIC APPLICATION WITH THE WALK-IN PANEL MANUFACTURER. SPACING NOT TO INSULATION O SEAL FILL OPENING EXCEED 8'. SQUARE WASHER, WITH SILICONE UNSISTRUT P1064 O O EXPANDING FOAM :j ________ _____ __ SEALANT(TYP.) ill"CHANNEL REFER TO UNISTRUT REFRIGERATION NUT WITH NOTE:FOR OVERHEAD LINES,UNISTRUT HORIZONTAL,TRAPEZE HUNG ATTACH PATCH WITH#8X3/4 HEX SEAL PATCH WITH PIPING TO UNISTRUT TDETAIL DETAILS SPRING, HEAD SELF TAPPING SCREWS(TYP.) FREEZER/COOLER UNISTRUT P1010 SILICONE(TYP.) 1 UNISTRUT 5/8"GALVANIZED BOX CEILING OR SECURE UNISTRUT BY UNISTRUT S,T-, MA MAXIMUM PATCH HOLE WITH 26 GAUGE WALL SECURE UNISTRUT BY BOLTING BOLTING TO WALL STUD ON CENTERS,OW MAXIMUM GALVANIZED SHEET METAL BRACKET TO FLOOR ONLY UNISTRUT POST P1887. ONLY. FROM ANY ELBOW. TRIM(TOP AND BOTTOM) HORIZONTAL REFRIGERANT LINE SUPPORT COOLER/FREEZER BOX PENETRATION PLUG rj_-�PIPE MOUNTING BEHIND REFRIGERATED CASES J NTS L NTS NTS SHEET T R3.1 Sorel Cusl: uperceMer OEM Hill PHOENIX EMS Manufeclurer NNer Location: ng n, inR n Plrone# 80068554]5 Rack EMS Model#RC2XE LTA Quota/Job: 5-5reps Y: kevlM Model No: P-HAD Pmlo Slip: 150 Hybitl House 105Amb 06-2009 pale &25 Wb Eg1IPmenl Type:LTA Hy...House Field Connection: See remde manildd Rack Vdlage: 460/60/3 460V Mein Pwr Trenabnner Rev, Date BY OesMpWn Powrer 46Ng013 NIA COMrd Vdla9e (KVA) 2 12&2025 q 208reW1 ]5 MCA 214A WA MOPD 225 WA gereM Ypa: Ri07A Cm.enser Mcdd# 13--A014J-WNi-BG w h T.D. �✓%re O Fen RPM 830 Coekd(YM) V lac qe 1 Reclaim qw Receiver SUbNoler N g M.u w w OLL E .D. 11M Rn Specn g(FPU 10 Manfold Siu 13re' Wde 11 L Wek:r ine siu from receiver O]IB" r bd.n H.- a gr otlel B1oTao FlA g.8 tic. eggs r WA superheating or u u at Manibld 1-1re" ie.x eng H1- EGA SuI,-b,-,(-H) ani� MOPD 15 Mein Condenser Suppty 1-1re' Heal ExcM1anger Mold# AC30-4 GPM frier DCR-967 Lbs.M00%PUm 1- 205 S.G.25U b,Loatl(MBH) 0 Weigh(lb.) 630 Heal Redalm Valve EVR22S8 Sightglass SA-17S ontlenser 1boding-M1 10 Told SUbmder Load(MBH) 28.6 a 3t g n ¢oa VFD -102-P41-d-P55 System GPM 4 Main Cond.Return 1I8" Rack&Cond.Rd.Cha 156 Sal Suct Tem °F) 35 n r y 0 a p w y r€p Salenoitl 1 EVR18 0Mbd 1�AVR18N0] WA q Rear�gN�il Sepambr OSA4-0]-RES lad.Valve Fmm 1-118'DRwd e9Usaur ABAOE/]EPX]BCC Rergever Pre..ud7a0on A9-R OM1u C B ^Ion Valve#r Model Subwd-9EIa.5 3 LL<w g w a LL O w 0 0 zQ IaDI.VeNe To ]OT]IB' WA ren YP. CPI BVASoIea[LT-32 Ylassa re EVR18N0] x pera0n9 ree 450k F�anslon Valve WA H i w; ii 3 a w y o IaDI.Valve Fmm ]IB-]IB" WA Oil QOaenliel VeNa Y12% d igu o rwi ve WAn?w r o O y o p ; Liq.i,1 rwi ve WA d H. Hig mup Un egwremenb Nan roup yarem pe ipin9 Rw Suction Ddrost SubNoler EPR VeNe PORTI9 �e 55 egwre u INI7 Net 1-g EB.d Av 1-(MBH) 1%.4 ]IB- 1d'8' None I"I. CDr.ansing Temp.(°F) 107 9 111.3% 1A S.d ON Riw, None 1a18' None Isol.Veive From 1-ire' Design Amb'rent Temp(°F) 92 Tdel Heel of Rel.Nwn(-H) 1]S.fi Pere 71W fare' None Saluratetl Suction Temp(°F) -10 Sudlon Manibld$1. 2.1 N/A WA WA WA R.-Gas Temp(°F) 30 S.-Fllter BT 175V(1)WA WA WA WA SUbcooled Uquitl Temp(°F) % SUIXion Accumu.br A8-21 WA WA WA WA $uperbeat br NRE(°F) 10°F WA WA WA WA §o- ompressor ud mup t Po.Npn r Mol No. Min-, Vr b..., Un-% mper MBH dd R HMH Capty C.P-y w -2 1 4C077OSLdSU 10.7 15.5% 25J Vea AKD102-P11 KT4-21 8.05 22.23 0 100 3 17. 9 40 w c 3 2 YTES•12Y-2NU 30.8 38.m -No WA WA WA 1 50 12 17. - 1. 3 4C13055LiSU 27.5 29.0% d61 ND WA WA WA 0 1. 6 17. 16 % m z 3 m 4 4C1400PL-2NU 28A..0% d8A No WA WA WA 1 50 6 17. 13.5 75 - - 5 NIA WA WA WA WA NIA WA WA WA WA WA WA WA Q <a 6 NIA WA WA WA WA NIA WA WA WA WA WA WA WA 7 NIA WA WA WA WA WA WA WA WA WA WA WA WA 7 e NIA WA WA WA WA NIA WA WA WA WA WA WA WA N Z Nde.: O conaenserT.D.aemrea by a% .Ch b,,I.goutcompressar2wkh(1)4TE-12Y-2NU. .auction Manifold will...d to be-h dirom 2-i18"to 2d18". X li U 0o Q 00 � o (T - oo Sorel Qratow Wal-Mad 150-2009 HM1 Superc nler#3]57 OEM Hill PHOENIX EMSManu-1 Novar (1/u n R Loratlan: 4010172ntl Strad N E.A Pbane# BOfY685d475 Rack EMS Model k RC2XE `�U O n DTB Ouole IJob: 53385 Prepared By: kevind m T klpdel N. PS8131-1- 8 Prot Size: /n Dose Date: BYt�r2010 wpmeM YP.: n d Hdd- 0 Fie.Conn.Non: See remde manibld Rack Vafage: 4- f n Z LU Rev. DeM By. Revision Povi.r 480V Main Pvrt 480reW3 NIA COMrd Vdte9e TMnslonnx v w ry 3 129 15 TW en9eab regw 200?Al1 1 1i z 0 MCA 31d1 WA 0 � MOPD 350 WA 1�.kJr' Refdgerenl Type: R107A 1..V COMenser Model# BNL-0OB-A048i-WN -BG Fan RPM 830 Rn S (YM) V d Si Heat Retlaim quid Receiver Subcooler T.O. ifi.6 Fln Spacng FPI 10 Manfoltl Size 2-1re' Wdarlgir Water Line size from reNiver 1a18' OdenbBon Horrsanlal Heat ExcM1gr Motlel B80x40 FLA 19.8 uabr WA a ed ngw u esupe sal MenOo. 1518' H12x108 S.G.1 Subcooler Load(MBH) 13.6 W MORD 25 .........upp 2-1/8' t anger AC50-10 GPM Drier DCR-14411 awn 3]6$.G.2 Subwoler-d(MBH) 42.0 m W.igM(lb.) 21. Heel Reclaim Valve a EVR32S17 m t9 a.. SA-211 um^e r9e 43 Tabl Submpler Lead(MBH) - VFD AKD102-P15KT4-P21 Yatem GPM 10 Mein Gnd.RaWm 15I8' r9e 32]Sat SUIX Temp(°F) fi0 Z Pit %%50% WA x eq. 1 .p b- OS6-21-RES lad.Valve To 2-ire' e9u b AB1 B-11IBP%15IBC A/D Receiver Preeaudution A9-SIBPXSreCB Subcooler C.-Iler Motlel SUbwd-0-Mdic m Solerro. (1)EVR32513(1)EVR32519 WA Oil Resenroir WA Isd.Valve Fmm 2-1/8' gun ree g OE-13reP%13reC A/D u_D EVR25M511 S- ImI.VeNeTo 15I8'1dre" WA YP. CPI BVASoIed LT-32 EVR25N011 _0 x pere0n9 450# WA Isol.VeNe From 1-3I8'fare" WA OI DiOereMal VeNe Y12% RU na EVR%5 Rw WA Suction Group 1 Desgn Requirements 1-(Group 1 System Cepebiti0es SYctem Plqng Connections Uquitl Sudbn Ddresl Subwoler EPR Valve PORT]8 ISSUE BLOCK Thal Load Requiretl 1%.1 Nel Refdg ERecl Aveileb.(MBH) 1721 Loop lB wl Suct Mein Riser Ire' 2-11a" None I'll.VeNe To &8' co-,Temp.(°F) 107 % d R 107.fi%Loop 1B Suct Cd Riser Nane 1-Sr8" Nane Isol.VeNa Fmm 1-1re" Design Ambient Temp(°F) 92 Thal Heal of Re)eclbn M8H) 3%.0 Pare ]/6" 1-518" None Sabreted Suction Temp IT -27 I--Manibld Size 3-12"N/A IN. IWA NIA Rdum Gas Temp(°F) 1 30 au-Fifer I KM-I$V(1)NIA N IWA NIA Sub.-Liquid Temp IT) 1 75 -ion-urbu- 1 A10-25 jbvA NIA SupedeatforNRE(°F) I 10°F IN. IN. WA NIA mpe.... mup VFD Motlel No. Min.Vet. hex.Ver. Unbeder U^laader% HP RPM RW LRA -.n Compressor Motlel ERect(MBH)%di-d Reladion(MBH epe ) Cdg? Capeay Capacity 1 4C13055L45U 2e.0 180% 35.8 Ves AXD102-P181-1 8.78 24.24 0 1. 8 1750 16 00 2'40E43Y-2NU %.1 35.0% Wa No WA WA WA 1 % 23 17% W in 3'4GE-23Y-214U %A 35.0% 00.8 No WA WA WA 0 100 m 17% 32.1 1m 4 482707PL-2NU o.0 25.0% 70.6 No NIA WA NIA 50 13 26.5 14] 5 NIA WA WA WA WA NIA NIA NIA NIA WA NIA WA WA 6 NIA WA WA WA WA NIA NIA NIA NIA WA NIA WA WA 7 NIA WA WA WA WA NIA NIA NIA NIA WA NIA WA WA 8 NIA WA WA WA NIA NIA NIA NIA NIA WA NIA WA WA Ndea: 'Contlenaer TD.tleret.tl by- .Changing out compreamr 2 and compressor 3 with(2)4GE-23Y-2NU. .S.-Manifold will-d to be changed fmm 2-to 3-1re". CHECKED BY: mup Mn .guaem.nm uN- mup yamm spa f ydem �p�n9 a qm spdbn mhoat DRAWN BY: - 2- NM 1-g EXed Availabb(MBH) SO6A . 1-1I8' 2-1I8" Nan. COMendn9 Temp.(°F) 107 d e 9 vei 11V% pP 5'0" 1-1I8" None Ou._Air Temp CF) Q Tdd Heat of Relactbn(-H) ".600p None 1-SIB" None PROTO CYCLE: 04/26/2024 S-Rd Suction Temp(°F) 17 auction.-Id Siu --L..p 2BS Su. None ]re" None Rdum Gee Temp(°F) % Su-Fdbr -421 SV(2) rem Ire^ 1,Vw Nwe DOCUMENT DATE:12/27/2024 Subcooletl Uquitl Temp(°F) 75 Sudbn Acwmu.br Al-NIA NIA WA NIA SUp.-br NRE(°F) W-F NIA NIA WA NIA Compressor Suction-up2 Rdr9_ Condenser H-.f Varnble VFD Model No. Min.Var. Mu.Var. Unbader Unlcetler% HP RPM RI LRA P..id.n Compressor Model tbct(MBH) Re)edbn MBH Gapadly! Capacfy Capadly 1 4C1145-IJ fie.8 23.0% 83.7 Vea A-02-P151-NI 25.07 R.11 0 1. 5 17. 12.7 67 2 4C13055LdSU ]2.9 2'i.6% -4 No NIA WA NIA 1 50 6 17. 16 % 3 4C1460PL-2NU T/.8 29.5% 1%.6 No NIA WA NIA 0 1m 6 17. 13.5 75 4 4C1]fi1PL-2NU 90.9 35.8% 129.9 No NIA WA NIA 1 m 8 17. 16. 90 5 NIA WA WA WA WA NIA NIA NIA NIA WA N/A WA WA 6 NIA WA WA WA WA N/A NIA NIA NIA WA WA WA WA 7 NIA WA WA WA WA N/A NIA N/A NIA WA N/A WA WA e NIA WA WA WA WA NIA NIA N/A NIA WA N/A WA WA Nobs: FOR REFERENCE ONLY z wz aui� c�- }YmW Qm ipawLL=UQO KK inWFO� a r/iQ�rj Q>g SOU=ZUiiQ mmmF-gw�N mwa}Q'mwz rmwD3 �� warn ODUO� yw��w�NzO =o�,w Hsu ZmU3aawZW O'Ti OHFwz�mmw FzmmwlYN00 a Ow am�wIx<_- o wouaiZ O YZOfZ o QN 000HaUQUQ 2 ILwm=ZZOZO omwo3o-zow REFRIGERATION SUBMITTALS SHEET: R4 2E Refrigeration Existi Equipment New"SEC" Equipment Net Change New"SEC'RackCa New"SEC'%of Rack Store#Seq# City State Proto type New or Replace? Equipment Type Area Served Circuit Information Existing Rack Capacity Rack SST Load(MBX) %of Rack Capacity %of Store Capacity load Equipment Load (MBH) Wory Capacity (MBH) (MBH) 3757 1008 Arlington WA 150 Secondary CO2 New ZE Skin Wa4r-SEC-0O2-111040 RACK LTA-R407a 121.2 -12 115.2 94.7 78% low 3757 1008 Arington WA 150 Secondary CO2 Replace Ceses R. -in Fmzen Food(EOL) A2A10 972 80% 8% 1..0 10.8 89% 3757 1008 Arington WA 150 Secondary CO2 Replace Evep Seale.Freezer Al _ - 7.1 6% 1% 7.1 0.0 - 6% 6'SPACING 6 3757 1008 AAmgton WA 150 Secondary CO2 Replace Evap DeoF.—, All - - 10.9 9% 1% 10.9 0.0 - 9% 161NSTANCES MINIMUM RECOMMENDED SERVICE CLEARANCES 3757 1008 Adington WA 150 Secondary CO2 New ZE Skid WN7-SEC 02-1110460 RACK DT8-R407a 119.0 -23 109.9 _ _ _ _ 1W.1 135% F 1' 3757 1008 Aningtan WA 150 Secondary CO2 Rep.- —re Gmcary 1 I.C.Freezer BS,Be - - 81 51% 5% 61 0.0 51% I 3757 1008 Arington WA 150 Secondary CO2 RePere Ceses R—Mn Ice Cream(EOL) 44.1 37% 4% M.3 0.2 - 37% 1 �/�)rr w z i 3757 1008 Arington WA 150 Secondary CO2 Replace Ceses Ice Cream Cake Bunker(ADDED SCOPE) RCU-1 - - ].4 6% 1% 3.2 -4.2 - 3% ♦ " W t N F U~g 3 r 387,C t 36" 42" 0 E, 0 3'c``a wmoiOya€ I ~ 3Q3�A°NQos`aZa Za J OL a Q6H21W 152MS. CIRCUIT 1 I'DIA LIFT LUG m r m SUCTION IRRACK CIRCUIT1 ITYPIC.LL 41 2 d8'RACK LIOUID FROM RACK w 3 vw 005 F �� gam Q 7 — r CIRCUIT 2 001 LIOUID FROM RACK Z 71w ODS O U CO2 H�'� BIN--LL HINGED HINGED HINGED 2 LB-.i AC,L AOCE�'_ ACCESS ACCESS CNCUIT2 PANE. PANEL PANEL HM10E0 X $ UCTION TO RACK ACCESS d 2 sw DOS PANEL U r f ECU NOwFUSED O O DISCONNECT UNIT NON-FUSED C--D C a ELECTRICAL DISCONNECT O O i—1SM.COS PANEL PryWER ENTRY ECU 1 COS ACCESS V ]IR'Pkrg �J'� PANEL 00 � �J 0 O ?� O 18 22 hi: ___ }'FPT GRAIN REMOVABLE I— m I 1g 9Ha' I � � LU tow CATCH PAN �'1 1317l16' 1978' W N o z 0 TITLE: N N OOALI REV I3ED BY' WIE: REV.NO AJ' ®2-112"Rigging Holes . TNg""TC APPROVED 81 , APPROVED Y; ORAM1 er.CN 5/8" Mounting Holes Unit Drawing DAre rvgpg, FILE LOC a rrwwrto8w rs Ii Est.Shipping Weigh1:4.848# 1? A - WMT-SEC-0O2-1/10 IRIS-TITLE: DRAwnD Nuggnt < m Est.Operating Weight:5.848# WMT-0O2-1/10-460 z m 0 ISSUE BLOCK NOTES , r.i rrr.r.i cr D ■ �iar,Rt M""KE�rIE]c20 ri4�aM�T•w D... � -- - uu.fKCORK noes mrP.w..rNxrrw - D�,.Iw N. m DaorT' w'no, ■. . Y Y Y Y N.ake.la- Y° Y RM, . I,f_ Pz b b b I o�aca cD..Ta �va. I Y C o,r -1 A.„`I.`M°D•N„ b b I o„ ¢r"`.rt r.D 4.. I ■a,. g+,., 5 I O w•rvuD Nuoacc• I C.."ir.usa mna.cc• 1 L 1, p^wwDaw a._ G O CHECKED BY: - DRAWN BY: - PksP.�..r 4 a•V%c..aw. - O O PROTO CYCLE: 04/26/2024 - DOCUMENT DATE:12/27/2024 . � P6: II P,a roe N PaA - - - PZD v21 v22 v23 p2" FOR REFERENCE C ONLY P2a All z I 1 P2a Luz ° IL; D— LL mYmcD am C1UO�W U¢O ul qa QwFO�� ' uamWr0ll'�r~i1 h_14 —1-1-25 RFDa14 f�W a>¢m w z »- _ JW�mIpUy Z0 =O��w HQ ZmU Qaw?W RCp"14 RED•IB r RCDe10 RCCp,d eH]eld 0 W w 3 F N W Q m Z Z 00 m . ,.. OHFW—� W F zal�wW 102 - ¢OW amWSJ� �ZK,OW Z2� I_ I 1 "4+ OOU,�Kz OCZ QW u ::1 ?g"=Z0000 _ 000~QU¢U¢ Y Y Zawwga�ga� k W m w_ _rn 7 I l O=w 030z gFS ., N8 m P.aLKN�4 —.14 ■■■ REFRIGERATION 1 ,<, 4 SUBMITTALS mq e I I � 4w.i6i s o hu g b < Ploo SHEET' R4.1 THE MECHANICAL, ELECTRICAL, AND REFRIGERATION SYSTEMS FOR THIS PROJECT SHALL BE SEISMICALLY RESTRAINED. THIS SHEET DEPICTS SCHEMATIC INSTALLATION DETAILS AND IS FOR INFORMATIONAL PURPOSES ONLY. SPECIFIC INSTALLATION SEISMIC JOIST INFORMATION REGARDING SEISMIC RESTRAINT SHALL BE ATTACHMENT SEISMIC CABLE OBTAINED FROM THE SEISMIC RESTRAINT MANUFACTURER. HARDWARE TYR BRACE TYP 7 REFER TO THE SPECIFICATIONS FOR FURTHER INFORMATION. AIRCRAFT CABLE BY SEISMIC RESTRAINT ALLTHREAD MANUFACTURER ROD TYR ° t 45°t15° J g 3Q;�a° Qo€a / � Q=oaolW a =g a SEISMIC CABLE BRACE WITH HOOK EQUIPMENT ONLY SHOWN IN TWO DIRECTIONS FOR CLARITY.ADDITIONAL BRACING IS REQUIRED AS SHOWN IN PLAN VIEW BELOW. boa (?w q3 ~ du e 2 u 41 2 w O U X Q U LOCATION A O O 0 ocO 00 � ALL-DIRECTIONAL SEISMIC CABLE _ 0 z � ° �1 BRACE FOR SUSPENDED EQUIPMENT n NTS m m fll Z m SEISMIC JOIST SEISMIC JOIST 0 0 ATTACHMEN ATTACHMENT � J (/7 HARDWARE HARDWARE TYR SEISMIC JOIST SEISMIC CABLE ��ll ATTACHMENT BRACETYP HARDWARE SEISMIC JOIST ATTACHMENT SEISMIC SOLID HARDWARE TYR BRACE TYP Z ALLTHREAD SEISMIC CABLE ROD TYR SEISMIC BRACE TYR ALLTHREAD ROD SOLID BRACE ALLTHREAD ROD PIPE CLAMP PIPE CLAMP OR U-BOLT ISSUE BLOCK ALLTHREAD ROD OR U-BOLT SEISMICBSEISMIC RACE HOOK CABLE J STEEL BRACE J J 45°t15° J J TYR AIRCRAFT CABLE BY 45°315° SEISMIC RESTRAINT MANUFACTURER t SEISMIC CABLE BRACE WITH HOOK t J I ATTACHMENT ONLY SHOWN IN SEISMIC CABLE STEEL BRACE TRANSVERSE DIRECTION FOR CLARITY. BRACE HOOK TYP 45°±15° 45°i:15° ADDITIONAL BRACING IS REQUIRED AS / AIRCRAFT CABLE SEISMIC STEEL BRACE ONLY SHOWN IN SHOWN IN PLAN VIEW BELOW. 11 BY SEISMIC TRANSVERSE DIRECTION FOR CLARITY. TRAPEZE SUPPORT TRAPEZE SUPPORT ® O REST MANURESTFACTURER SHOWNNT IINP AL BRACING BELOW.IRED AS O PIPE CLAMP MAY BE ® - - ROTATED TO GAIN ACCESS A CHECKED BY: EJM TO STRUCTURE ABOVE PIPE CLAMP MAYBE ROTATED TO GAIN ACCESS MAXIMUM 4IN. TO STRUCTURE ABOVE DRAWN BY: JTC MAXIMUM 4" PROTO CYCLE: 04/26/2024 LONGITUDINAL SEISMIC SOLID BRACE LONGITUDINAL SEISMIC CABLE BRACE ALL-DIRECTIONAL SEISMIC SOLID BRACE ALL-DIRECTIONAL SEISMIC CABLE BRACE DOCUMENT DATE:12/27/2024 (DFOR CLEVIS SUPPORTED PIPE/CONDUIT (DFOR CLEVIS SUPPORTED PIPE/CONDUIT (j)FOR TRAPEZE SUPPORTED PIPE/CONDUIT (D�?R TRAPEZE SUPPORTED PIPE/CONDUIT NTS NTS J. SEISMIC JOIST SEISMIC JOIST ATTACHMENT ATTACHMEN HARDWARE TYP HARDWARE SEISMIC CABLE BRACE TYP 41742 SEISMIC SOLID BRACE TYP ALLTHREAD SEISMIC JOIST ROD TYR ATTACHMENT HARDWARE SEISMIC JOIST ALLTHREAD ROD PIPE CLAMP ATTACHMENT OR U-BOLT HARDWARE TYR PIPE CLAMP OR U-BOLT SEISMIC CABLE BRACE TYP J 45°t15° J J SEISMIC STEEL BRACE / SOLID BRACE J J / +II AIRCRAFT CABLE BY SEISMIC RESTRAINT 45°t15° MANUFACTURER ALLTHREAD ROD ALLTHREAD ROD SEISMIC CABLE BRACE HOOK IF TRAPEZE SUPPORT TRAPEZE SUPPORT STEEL BRACE J J J L— 45°:15* J L AIRCRAFT CABLE BY 45°t15° SEISMIC RESTRAINT MANUFACTURER ® ® I PIPE HANGER PIPE HANGER SEISMIC CABLE BRACE HOOK TYR SEISMIC RESTRAINT TRANSVERSE SEISMIC SOLID BRACE TRANSVERSE SEISMIC CABLE BRACE TRANSVERSE SEISMIC SOLID BRACE TRANSVERSE SEISMIC CABLE BRACE FOR TRAPEZE SUPPORTED PIPE/CONDUIT , FOR TRAPEZE SUPPORTED PIPE/CONDUIT FOR CLEVIS SUPPORTED PIPE/CONDUIT FOR CLEVIS SUPPORTED PIPE/CONDUIT 4INTS J NTS SHEET. SR1 FEEDER SCHEDULE GENERAL REFRIGERATION 08.20.20 ELECTRICAL NOTES ALLCONDUITAND CONDUCTOR SIZES ARE BASEDON EMTwRH qo� 1. COORDINATE ALL WORK WITH REFRIGERATION FILL,75°C RATED TERMINATIONS AND TYPE THHN77HWN-21NSULATION. CONTRACTOR(R.C.)PRIOR TO INSTALLATION. FOR NON-EMT CONDUIT OR TERMINATIONS OR INSULATION TYPES RATED LESS THAN 7VC,MODIFY SIZES ACCORDING TO NEC. XXX FEEDER 0 OR GROUND SIZE 2. REFRIGERATED CASES:E.C.SHALL PROVIDE CONDUIT AND WIRE FOR REFRIGERATED CASE FANS,LIGHTS 33 (3#10,(1#10 G,1/2"C AND ANTI-SWEAT HEATERS,AND(IF APPLICABLE) ELECTRICAL DEFROST.PROVIDE ADEQUATE 63 (3)#6,(1#10 G,3/4"C CONDUCTOR LENGTH TO ALLOW TERMINATION. NEATLY BUNDLE CIRCUITS AND CLEARLY TAG AND LABEL EACH CIRCUIT WITH BRANCH CIRCUIT DESIGNATION AND REFRIGERATION SYSTEM NUMBER FOR FINAL TERMINATION AT CASE BY R.C.REF CASE CONNECTION WIRING DETAIL. 3. IF NEW CASES ARE PROVIDED WITH A FACTORY INSTALLED TERMINAL STRIP AND JUMPERS FOR CONNECTION TO A SINGLE CIRCUIT FOR 120V CASE LOADS.RC SHALL REMOVE FACTORY INSTALLED JUMPERS AS REQUIRED TO UTILIZE EXISTING W w rye o SEPARATE 120V FAN/LIGHT/ANTI-SWEAT CIRCUITS AS =o swap' INDICATED ON PLANS AND/OR PANELBOARD o SCHEDULES.ANY EXISTING ANTI-SWEAT CONTROL w t�z� wgz3:4 (SWEATMISER)SHALL BE BY-PASSED.CASES UTILIZINGQ 3tpk'LLS000wB ELECTRICAL DEFROST WILL BE PROVIDED WITH p rcr a<a�u`"pm SEPARATE 208V TERMINATIONS ATTHETERMINAL -�€n STRIP FOR CONNECTION TO THE 208V ELECTRIC z0 3`a- oa'oNsz€o DEFROST CIRCUIT.RC SHALL MAKE FINAL r iw3 zprcw3�-T."H TERMINATIONS OF 120V AND 208V POWER CIRCUIT(S) g 3 o°�a� N AT CASE TERMINAL STRIP.REFER TO CASE p Qo�sz�C„a CONNECTION SCHEMATIC ON REFRIGERATION SHEETS. n 4. WALK-IN UNITS:PROVIDE CONDUIT AND WIRE FOR EVAPORATOR COIL FANS(CF)AND(IF APPLICABLE) ELECTRIC DEFROST(ED).PROVIDE ADEQUATE CONDUCTOR LENGTH TO ALLOW TERMINATION. NEATLY BUNDLE CIRCUITS AND CLEARLY TAG AND oa LABEL EACH CIRCUIT WITH BRANCH CIRCUIT - DESIGNATION AND REFRIGERATION SYSTEM NUMBER w v_2 FOR FINAL TERMINATION AT COIL BY R.C.REF EVAPORATOR COIL WIRING DETAIL. rn du o s m F -q 5. ROUTE REFRIGERATED CASE AND WALK-IN UNIT COIL ¢ FAN,LIGHTS,ANTI-SWEAT AND DEFROST BRANCH i CIRCUITS TO WIREWAYS PROVIDED AT N =W REFRIGERATION EQUIPMENT AND/OR PANELBOARDS z �\ AS REQUIRED. U �ll 6. REFRIGERATED CASE WIRING COMPARTMENT REPRESENTED ON DRAWING BY JUNCTION BOX. x 7. KEEP PENETRATIONS THROUGH WALK-IN UNITS ta¢i TO A MINIMUM.ROUTE ALL CONDUITS SERVING FREEZERS AND COOLERS ON INSIDE OF BOX. O 0 8. ALL CONDUITS INSTALLED ON TOP OF WALK-IN UNITS (__D C=Q SHALL BE A MINIMUM OF 6"FROM ANY EDGE TO ALLOW SPACE FOR EDGE PROTECTION NETTING.DO NOT S ROUTE CONDUITS ABOVE THE CEILING GRID ACCESS UNLESS CONDUITS ARE INSTALLED IN JOIST SPACE, REF ARCH. . Or O 9. UNDERSLAB CIRCUITS SHALL NOT BE ROUTED UNDER �) I j a 63 (ED) 63 (ED) WALK-IN FREEZERS AND SHALL BE ROUTED ABOVE I(11)\ O M m 16.780 16.780 REFRIGERANT LINES WHERE THEY CROSS. u\_l 0 C16 145 CHA-25,27,29 CHA-7,9,11 10.CIRCUITS FOR REFRIGERATED CASES SERVED BY r n Z m F O UNDERSLAB REFRIGERATION PIPING ARE TO BE v W 16.145 16.145 ROUTED UNDERSLAB AND EMENDED TO THE FIRST Z p 0 O CASE IN EACH SYSTEM.WIRING AND CONDUIT FOR O 0 0 u N SLAVE WIRING BETWEEN CASES SHALL BE PROVIDED 0 4 SCO2 A04 SCO2 A02 SCO2 A02 SCO2 G J J J J WIRING DETAIL FER TO UNDERSLAB CASE CONNECTION Inn\ -I a 63 (ED) 11.ALL UNDERSLAB CONDUITS SHALL BE 3/4"MIN. u�J CHA-32 w J❑ 16.780 16.145 2 O 12.CIRCUITS FOR REFRIGERATED CASES SERVED BY BOS SCO2 CHA-40 CHA-31,33,35 �/ J OVERHEAD REFRIGERATION PIPING ARE TO BE z ROUTED D WN FROM STRUCTURE AT THE c, 16.145-- - LOCATION AS THE REFRIGERATION PIPING P NG AND E L4D1-24 O 16.145 EMENDED TO THE FIRST CASE IN EACH SYSTEM.WIRE J� 16.145 p _ J J❑ J --[J� J❑ p AND CONDUIT FOR SLAVE WIRING BETWEEN CASES f° COORDINATE GATEWAY SHALL BE PROVIDED BY THE R.C.REFER TO 7 SCO2 A07�SC� - EDC4 RECEPTACLE LOCATION WITH OVERHEAD CASE CONNECTION WIRING DETAIL. ISSUE BLOCK REFRIGERATION BAS INSTALLER 63 (ED) 13.ON GROUPS OF THREE OR MORE REFRIGERATED L4D1-10 CASES WITH ELECTRIC DEFROST,R.C.SHALL 16.780 CHA-34 CONNECT CASES TO CREATE ATHREE-PHASE HEATER 2,4,6,8 CHA-13,15,17 16.145 CIRCUIT. CHA-42 13,15 HEATER LOADS SHALL BE BALANCED CHA- i 645 I BETWEEN PHASES AS EVENLY AS POSSIBLE.REF 16.145 2 PUMP SKID EXACT LOCATION WITH WALMARTDTH CASE DEFROST WIRING DETAIL. COORDIN L H4B-31,33 RE1.1 CONSTRUCTION MANAGER PRIOR TO ROUGH-IN. 14.PROVIDE A SEPARATE NEUTRAL FOR EACH NEW p 13 SCO2 813 SCO2 B13 SCO2 B13 SCO2 p 33 BRANCH CIRCUIT SERVING REFRIGERATED CASES OR m ai WALK-IN UNITS. 63 (ED) m 14 SCO2 J❑ 814 SCO2 B11 SCO2 B11 SCO2 ro 15.PROVIDE CIRCUIT BREAKER LOCKING DEVICE(LOCK- I ® OFF FOR MAINTENANCE)ON NEW AND/OR EXISTING 16.780 63 (ED) ® CIRCUIT BREAKERS SERVING REFRIGERATED CASES. CHB1-15,17,19 16780 - CHA-36 16.145 16.REFERENCE ARCHITECTURAL DEMOLITION PLANS FOR CHB1-14 CHB1 9,11,13 16.145 SCO2B1 PUMP SKID, FULL EXTENT OF DEMOLITION WORK REQUIRED. 16145 1 SEAFOOD MOUNTED ON ROOF. \ FREEZER EXISTING RACK B H A07SCO2 CONTROLLER. Q 15 SCO2 B15 SCO2 ° B12 SCO2 �12 SCO2 - 1� fl� - VED - - - - - - - - KEYNOTES - - - - - - - TYPLULL EDWPNJR CFCHECKED BY: RS TO BATTERY INVERTER. 16.145 CONNECT CIRCUIT(S)TO EXISTING BRANCH 4 4 C REF2/RE1.1 CIRCUITRY.MINIMUM WIRE SIZE AND DRAWN BY: AT 16.711 TYP PANELBOARD CIRCUIT ARE NOTED.VERIFY SIZE, CIF H4B-19,21,23 RATING AND CONDITION OF EXISTING BRANCH PROTO CYCLE: 04/26/2024 ASR RE1.1 16.145 L TYP 16.708 16.145 (CFIED) CIRCUIT CONDUIT AND WIRE PRIOR TO USE TO 16.780 16.258 ENSURE THAT THEY MEET REQUIRED SIZE,AND DOCUMENT DATE:12/27/2024 _ ALL U.L.RATINGS AND REPLACE AS REQUIRED. 16.250 CONNECT CIRCUITRY TO FACTORY PROVIDED �p GROCERY MAINTENANCE RECEPTACLE.ROUTE CIRCUIT TO FREEZER FEED FACTORY REMOTE SHUTDOWN NEAREST RTU OR AHU MAINTENANCE /�7 N SWITCH FROM BATTERY BACKUP RECEPTACLE CIRCUIT. �!' y EQUIPMENT.REF2/RE1.1 16.258 CONNECT CIRCUITRY TO FACTORY PROVIDED °7 ED yG0 DISCONNECT SWITCH. CF 16.708 PROVIDE WIRING AND FINAL CONNECTIONS TO EXISTING RACK A RECEPTACLE.RECEPTACLE FURNISHED WITH II O q TyP CONTROLLER. REFRIGERATED CASE. II 5G ASR 16.711 POINT OF TRANSITION FROM EMT TO FLEX. PROVIDE CONDUIT AND BRANCH CIRCUITS FOR ^� 4 Q REFRIGERATED CASE FANS,LIGHTS, II 16.711 NP ANTI-SWEAT HEATERS AND ELECTRICAL CHA-1,3.5 p RE1.1 DEFROST ION TO REFRIGERATED CASE ELECTRICAL G CONNECTION l� T--: POINT BV R.C.REFER TO CASE CONNECTION EDWIRING DETAIL. 33 (ED) 16.780A E.C.SHALL REMOVE EXISTING CONTACTOR IN CIF 16.145 16.78� RACK CABINET AND CONNECT CIRCUITRY DIRECTLY TO CIRCUIT OVERCURRENT PROTECTION DEVICE.REFRIGERATION SYSTEM EVAPORATOR FAN/DEFROST CIRCUITS SHALL BE SCO2A7 PUMP SKID, MOUNTED ON ROOF. CONTROLLED BY FACTORY INSTALLED CONTROLS IN NEW CASES OR BY FIELD o INSTALLED CONTROLS IN WALK-INS.IF rn REQUIRED,E.C.SHALL INSTALL NEW VENDOR WP/WR FURNISHED OVERCURRENT PRECTION ED 16.250 DEVICE FOR REFRIGERATION SYSTEM CF 0 16.988 EVAPORATOR FANIDEFROST CIRCUIT.PROVIDE A NEW NEMA 1 ENCLOSURE FOR FAN/DEFROST 1 TO BATTERY INVERTER. PROTECTIONCIRCUIT OVERCURRIENT NEEDED. OUNT NEMA 1 ENCLOSURE AS CLOSE REF 2/RE1.1 AS POSSIBLE TO EXISTING RACK CABINET. H4B-13,15,17 REFER TO REFRIGERATION LEGEND(S). G C C 4I �I 6.988 ROUTE CONDUITS,FOLLOWING REFRIGERATION IF _ 16'258 PIPING,FOR REFRIGERATION UNIT TO THIS < 16.145 I) LOCATION TERIOR OF ROOF PENETRATION vi 16.780 (CF/ED) FEED FACTORY REMOTE SHUTDOWN TO INTERIOR OF STORE.DO NOT ROUTE 0� 974,Oh� CONDUITS ACROSS THE ROOF STRUCTURE. 2 SWITCH FROM BATTERY BACKUP y. 16.145 (CF/ED) EQUIPMENT.REF2/RE1.1 16.780 DELI FREEZER - A08 SCO2 16.145 (CF/ED) 16.780 ��r 01/30/2025 ED CF REFRIGERATION 3 _ ELECTRICAL PLAN RE1.1 EXISTING CONDITIONS WERE TAKEN FROM EACH SUBCONTRACTOR IS RESPONSIBLE FOR HAVING ORIGINFRONT REFRIGERATION ELECTRICAL PLAN REAR REFRIGERATION ELECTRICAL PLAN EXACTAS-BUIL DRAWINGS AND MAY NOT REFLECT ATHOROUGH KNOWLEDGE OF ELATE DRAWINGS AND EXACT"AS-BUILT'CONDITIONS.CONTRACTOR SPECIFICATIONS IN THEIR RELATED FIELD.THE FAILURE 1/8"=1'-0=1'-0" �1/8"=1'_0" SHALL FIELD VERIFY ALL EXISTING CONDITIONS TO ACQUAINT THEMSELF WITH THIS KNOWLEDGE DOES PRIOR TO SUBMITTING FINAL BIDS.CONTRACTOR NOT RELIEVE THE RESPONSIBILITY OF PERFORMING SHALL CAREFULLY COORDINATE NEW WORK AND THE WORK PROPERLY.NO ADDITIONAL SHEET. DEMOLITION WITH ALL OTHER DISCIPLINES AND COMPENSATION SHALL BE ALLOWED BECAUSE OF RE1 EXISTING CONDITIONS. CONDITIONS THAT OCCUR DUE TO FAILURE TO FAMILIARIZE WORKERS WITH THIS KNOWLEDGE. FEEDER SCHEDULE ONE-LINE DIAGRAM LEGEND PANELBOARD NOTES Q 11.19.10 01.26.24 PANEL SCHEDULE:12M&2024 E PANEL'H4B' PRCNECT:WM 3757 ANMMan,WA ALL CONDUIT AND CONDUCTOR SIZES ARE BASED ON EMT WITH 40% 1. TERMINATE GROUND ON ISOLATED GROUND BUS. ( ) FILL,75°C RATED TERMINATIONS AND TYPE THHNI INSULATION. NEW EQUIPMENT CLASSIFICATION:NORMAL VOLTAGE:48(IYmN 30,-IFE SECTION.1011 FORNON-EMT CONDUIT OR TERMINATIONS OR INSULATION TYPES RATED LESS THAN 75"C,MODIFY SIZES ACCORDING TO NEC. 2. INSTALL LOCKING DEVICE(LOCK-OFF FOR FED FROM'. NEINSUTRAL L 100%IR LUGS ONLY EXISTING EQUIPMENT MAINTENANCE).LOCKING DEVICE SHALL BE ILL MOUNTING:FIELD VERIFY NEUTRAL:100%RATED 0 FEEDER OR GROUND SIZE LISTED.MANUFACTURER SHALL MATCH EXISTING CKT BREAKER LOAD LOAD BREAKER CrcT ----- EQUIPMENT TO BE DEMOLISHED pANELBOARD MANUFACTURER. NOTE ITEM DESCRIPTION NO.AMP POLE VA 0 VA AMP ROL NO. ITEM DESCRIPTION NOT E TRANSFORM ER'T4D' 1 3s0 3 54MO A 5690 60 3 z E PANEL'H4c' NOTE: 3. INSTALL LOCKING DEVICE(LOCK-ON FOR CRITICAL 3 - - SOON B 5070 - - 4 ALL OF THE ELECTRICAL DEVICES SHOWN ON THE RISER LOAD). 5 - - 58870 c 3480 - - 8 NOTE:TAP DEFROST CIRCUIT IN CONDULET AT CEILING PENETRATION DIAGRAM ARE EXISTING AND ARE BASED UPON AS-BUILT ) HU1 7 80 3 18370 A 10M 50 3 9 3005L PAN WASHER FILLED WITH SILICONE DRAWINGS.E.C.SHALL VERIFY THE EXACT EXISTING 9 18370 B f02B0 10 JUNCTION BOX WITH#10 AWG FOR 4. GFI BREAKER FOR PERSONNEL PROTECTION(5MA). 11 18370 C 102M - - 12 CONNECTION TO UNIT.MAXIMUM COIL FAN/DEFROST POWER EMT CONDUIT CONDITIONS,SIZES AND LOCATIONS OF EQUIPMENT 1 PUMP SKID 8CO2&11 13 15 J N55 A 9]00 as 3 14 DOSBA FRYER LENGTH OF TAP CONDUCTOR 18" PRIOR TO ROUGH-IN.THIS RISER S SHOWN FOR 5. GFI BREAKER FOR EQUIPMENT PROTECTION SOMA. 1"EMT CONDUIT AND WIRING TO DESIGNATED PANEL VIA ( ) 15 - - 4155 B 97W - - 16 INFORMATIONAL PURPOSES ONLY AND ANY NEW 17 - - 41. c 9700 - 18 PENETRATION SEALED WALK-IN FAN/DEFROST CONTROL DEVICE. DEVICES ARE SHOWN IN BOLD AND ARE NOTED.DURING 1 PUMPSKIDSCO28B1 19 15 3 4165 A - - 20 HUNT-TRIP BREAKER WITH SILICONE SEALANT. FINAL CONNECTION BY RC. 6. CONDUCTOR SIZE HAS BEEN INCREASED FOR CONSTRUCTION,THE STORE SHALL STAY OPEN FOR VOLTAGE DROP.SIZE EQUIPMENT GROUNDING 21 - 4155 B 119N eo 3 22 DOSBC FRYER BUSINESS.ANY NECESSARY POWER DOWNTIME SHALL 23 - - slss c 11- - - 24 CONDUCTOR PROPORTIONATELY PER NEC. SUS-METERING 1 25 15 3 10 A 11920 - - z6 COOLER/FREEZER BOX CEILING BE SCHEDULED AND APPROVED BY WALMART 27 - - 10 B - - ze HUNT-TRIP BREAKER EMT CONDUIT AND WIRING TO NEXT CONSTRUCTION MANAGER. 7. REFERTO ONE-LINE DIAGRAM FOR AVAILABLE FAULT w w 29 - - 140 C 11920 fi0 3 30 DO58C FRYER COIL POWER JUNCTION BOX ON SAME CEILING MOUNTED WP JUNCTION BOX WITH THREADED HUBS CURRENT FOR INTERRUPT RATINGS. w 1 02 PUMP SKID ECU%FMfl m 3o z ae0 A ne2o 32 SYSTEM WHEN MULTIPLE COILS ARE IN lo oFu szzz AND GASKETED COVERPLATE.SEAL TOP OF JUNCTION BOX 33 a40 a n92a - - 3a SAME COOLER/FREEZER BOX.POWER w t�z� wgz3. TO COOLER/FREEZER CEILING WITH SILICONE SEALANT. B. REFER TO ONE-LINE DIAGRAMS FOR WIRE SIZES. PACE 05 - C 36 HUNT-TRIP BREAKER CONDUIT AND WIRING SAME SIZE AND KEYNOTE - Q �I PACE 1 37 - A SPACE QUANTITY AS WIRING TO PANEL. ww 3tag'�awa�pm PACE 39 B - 4o PACE PROVIDE CEILING MOUNTED MANUAL SWITCH'HUBBELUCLASS 9. FACTORY WIRED TO LOAD. O rcr rcs PACE 41 c 4z PACE HBLDS3 OR'EATON'CLASS AHDS30.IF OVER 30 AMPS PROVIDE Z LOAD CALCULATIONS 'HUBBEU CLASS HBLDS6 OR'EATON'AHDS60.WITH NEMA 4X 10.BREAKER SHALL BE HIGH MAGNETIC TYPE. O LOAD DESCRIPTION CONN.(VA) DEMAND FACTOR CAM(VAT TYPICAL COIL WATERTIGHT NON-METALLIC ENCLOSURE FOR CONNECTION MISCELLANEOUS CONTINUOUS: - 125% - LOAD SUMMARY OF EVAPORATOR COIL FANS(CF)AND/OR ELECTRIC DEFROST 11.BREAKER REMOVAL-FIELD VERIFY CIRCUIT Q oo ' EQUIPMENT&MISCELLANEOUS: 202130 loose M213D - - (ED),(WHERE SHOWN ON DRAWINGS).PROVIDE PLACARD ON BREAKER IS NOT SERVING AN EXISTING LOAD.IF NO a LIGHTING: 14240 12596 17800 TOTAL t'o CEILING DETAILING PURPOSE OF EACH MANUAL SWITCH AND EXISTING LOAD,REMOVE CIRCUIT BREAKER AND r q LARGEST MOTOR: - 125% - CONNECTED LOAD AMPS N € <S c y u p rc MOTORS: - loll - PRABEA:135.42OVA 489A THE ELECTRICAL SOURCE(PANEL AND CIRCUIT NUMBER). PROVIDE FILLER PLATE.IF BREAKER IS SERVING A RECEPTACLE: - fool - 1"LIQUID-TIGHT FLEXIBLE METAL CONDUIT LOAD,IDENTIFY LOAD SERVED.UPDATE CIRCUIT RECEPTACLES OVER IOWA: 5D% PHASE B:136,530 VA -A TO KNOCKOUT ON UNIT.FINAL IDENTIFICATION SCHEDULE AS"SPACE"OR INDICATE COOL NO: silo l00% 5511° CONNECTION TO COIL BY RC. LOAD SERVED. KITCHEN(EQUIP=4): 131460 Bo% 105185 PHASEC:130,990 VA 473A NOTE:DO NOT LOCATE WP JUNCTION BOX DIRECTLY IN FRONT OF DISCHARGE FAN,OFFSET TO SIDE. 12.DUAL TAP REMOTELY OPERATED BREAKER. TOTAL CALCULATED LOAD:350,205 VA CONNECT EMERGENCY/NIGHT LIGHTING TO TOTAL CALCULATED AMPS:458 A UNSW ITCHED TERM(NATION. w „ot TOTALS: 40294D 380209 NOTES xARGIS ENGINEERS,INC. �,�EVAPORATOR COIL WIRING 13.EXISTING CIRCUIT AND/OR CIRCUIT BREAKER. o3m 1.PROMDENOlN LNBNBREN(ERTOWCHE%MTINGNCM NGMDM UFACTLRER 120E THIRD AVENUE,SUITE 60D 1 J N �" V q✓j 2. 9EATTLE.WA 8B101 J NTS 14.ROUTE CIRCUIT THROUGH CONTACTOR. Q 2 J 0 R 4. PH.(206)446.3376 15.PROVIDE INTERLOCK WIRING WITH EXHAUST HOOD m <z ., 5. FAX.(206)448-4450 ANSUL SYSTEM. N =W Z 16.RELOCATED CIRCUIT FROM EXISTING PANELBOARD. aOj PANEL SCHEDULE:I- (E)PANEL'L4D7(SECTION I)' PROJECT:WIN 3757 Mho,,WA 17.PROVIDE BLANK CIRCUIT BREAKER FILLER PLATE CLASSIFICATION:NORMAL VOLTAGE'.20EYn2OV 3G,WWIRE SECTION 1 IF ECU ASSEMBLY EQUIPMENT LOCATED FOR EXPOSED SPACE IN PANELBOARD. 35 FED FROM: MAINS:zzsA MLo.FEEo-THRu wcs TOGETHER INSIDE STORE UNLESS REFER TO PLANS 18.PROVIDE U.L.LISTED OVERCURRENT DEVICE TO a NOTED OTHERWISE.REFER TO TYPICAL REFRIGERATED CASE SYSTEM U MOUNTING:FIELD VERIFY NEUTRAL.mo%RaED COORDINATE AND MAINTAIN MANUFACTURER'S OO PLANS FOR LOCATION.EACH FOR 480V/2P ECU SERIES RATED SYSTEM. COT BREAKER LOAD LOAD BREAKER NO. SECONDARY CO2 SKID REQUIRES ITS ASSEMBLY CIRCUIT NOT ITEM DESCRIPTION NO.AMP POLE VA B 1 AMP POL NO. ITEM DESCRIPTION Nor OWN SEPARATE ASSEMBLY.REFER 5 DOOR CASE 5 DOOR CASE 4 DOOR CASE CONTACTORS C2lC3 CNTRL 1 20 1 20 A iW 20 1 2 EAFOOD FREEZER LTG 19.EXISTING CIRCUIT BREAKER TO REMAIN.VERIFY O O Q EDCO RECEPTACLE/I.C. 3 20 1 360 B 230 20 1 ! EAF000 FREEZER HIRE TO SKID MANUFACTURER 1OKVA,SINGLE PHASE,480V PRIMARY-120/240V CONDITION OF CIRCUIT BREAKER TO ENSURE THAT IT O O ASTEOILTANK 5 20 1 1940 C S40 20 1 6 MONSCALE/RECEPTS SUBMITTALS FOR WIRING SECONDARY TRANSFORMER FURNISHED AND 12.6A 12.6A 9.9A IS OPERATIONAL AND MEETS ALL U.L.RATINGS. RFIDSCANNERS 7 20 1 so A Soo 20 1 e OCIPDOOR TERMINATION DETAILS. INSTALLED BY CONTRACTOR.SUSPEND RFIDSCANNERS 9 20 1 50 B 1. 20 1 10 GATEWAY RECEPTACLE XFMR TRANSFOMER FROM STRUCTURE ABOVE / V V\ 20.ROUTE CIRCUIT THROUGH EXISTING LCU CABINET Do MEAT COOLER HTRS 11 20 1 410 C 20 1 12 PARE 24 o p ROLLSEAL DOOR 13 20 1 1200 A 20 1 Id PARE 24 BATTERY AND INVERTER.REFER TO SUSPENDED A B B C A C UTILIZING EXISTING RELAYAND CONTROLS.UPDATE J o r LEAK DETECTION 15 20 1 500 B 20 1 16 PARE 34 #8 COPPER GROUND,3/4"C TRANSFORMER MOUNTING DETAIL. LCU IDENTIFICATION SCHEDULE W ITH LOAD4 Z RTU IE,AHU2.RACK ABC 17 20 1 1220 c - - 18 PACE AO IDENTIFICATION. O Lj a WH GROC/RECIRC PUMPS 19 20 1 720 A - - 20 PACE I I PARE 24 21 20 1 B - - 2z PACE REFER TO MANUFACTURER'S = B0 21.REMOTELY OPERATED CIRCUIT BREAKER.REFER TO M m PARE 34 D 20 1 c Sao 20 1 24 RCU-1 FANS,LIGHTS 8A5 INSTRUCTIONS FOR MOUNTING AND (3#6,(1)#8 SSBJ,1"C C0 BUILDING AUTOMATION SYSTEM PLANS FOR CIRCUIT O DANNON COOLER zs zo z lsaa A z880 30 3 ze Rcu CLEARANCE REQUIREMENTS FOR ALL NOTE:(3�#6 WIRES CONSIST OF(2)HOT PROVIDE 208/30 HOME RUN TO DESIGNATED PANEL BREAKER CONTROL. 1.1� Z � 27 1500 a 2E90 2b 40A zoan EQUIPMENT.PROVIDE UNISTRUT CONDUCTORS AND 1 NEUTRAL CONDUCTOR. BOARD.FINAL CONNECTION AT CASE BY R.C. �+ w N PACE 39 C 890 2 30 () SUPPORT AS NECESSARY FOR 22.EXISTING LOAD-TRACE EXISTING CIRCUIT,IDENTIFY NOTES: LOAD AND UPDATE CIRCUIT IDENTIFICATION 0 O MOUNTING EQUIPMENT. 40A-3P ENCLOSED CIRCUIT BREAKER SCHEDULE FOR LOAD SERVED.IF CIRCUIT IS NOT IN Fn DISCONNECT DISCONNECT FURNISHED AND INSTALLED ON SYSTEMS WITH UNEQUAL LOADS,REC USE,REFER TO LOAD SERVE NOTE(CU BY CONTRACTOR.LABEL DISCONNECT IN ACCORDANCE WITH NEC 706.15(C) (REFRIGERATION ELECTRICAL CONTRACTOR)SHALL �1 U 1 INSTALL OWNER FURNISHED CT ARRANGE CONNECTIONS FOR MAXIMUM BALANCE 23.ROUTE CIRCUIT THROUGH ENCLOSED GFI BREAKER LOAD DESCRIPTION CONN(VA) DEMAND FACTOR CAL..(VA) ENCLOSURE �l LOAD CALCULATIONS CONNECTED LOAD-SEC.2:sL220 VA ADAPTER INSIDE INVERTER (3#8,(1#10G,1/2"C FOR PERSONNEL PROTECTION(5MA). Q o: w MISCELLANEOUS CONTINUOUS: - 125% - LOADSUMMARY CD EQUIPMENT a MISCELLANEOUS: 43880 loll 43890 FIELD INSTALL AND WIRE CT-1 AND CALCULATION OF 30 UNBALANCED LOAD 24.SPARE-FIELD VERIFY CIRCUIT BREAKER IS NOT D LIGHTING: E30 12s% I.G TOTAL A LOAD=(12.6 A+9.9 A)x.866=19.5 A SERVING AN EXISTING LOAD.IF NO EXISTING LOAD, z LARGEST MOTOR: - 125% - CONNECTED LOAD AMPS CATS CT CT-2 ON CONDUCTORS INSIDE B LOAD=(12.6 A+12.6 A)x.866=21.8 A(HIGH LEG) PROVIDE LOCK OFF DEVICE TO LOCK SPARE D3 MOTORS: - 10016 - PHASE/a 18,3Oo VA 153 A (2)it10,(i)iF10G,1/2"C INVERTER ENCLSOURE C LOAD=(12.6 A+9,9 A)x.866=19.5 A BREAKER IN THE OFF POSITION.IF BREAKER IS O' RECEPTACLE: - 10038 - SERVING A LOAD,IDENTIFY LOAD SERVED.UPDATE RECEPTACLES OVER IOM/A: - 50% - PHASEB:15.20OVA 127A OWNER FURNISHED,CONTRACTOR CTS AC CIRCUIT IDENTIFICATION SCHEDULE AS"SPARE"OR PHASEC:11,zz0 VA MA GRID NSTALLE (XVTOBA03)WRCELL CASE DEFROST WIRING IN DICATE LOAD SERVED. ISSUE BLOCK OWNER FURNISHED, REBUS REBUS C TOTAL GLCULATED LOAD:44,921111A V NTS 25.EXISTING LOAD-T CIRCUIT GCICATIO IDENTIFY CONTRACTOR BATTERY INVERTER TOTAL CALCVIATEDAMPB:125A INSTALLED GENERA. LOAD AND UPDATE CIRCUIT IDENTIFICATION SCHEDULE FOR LOAD SERVED.IF CIRCUIT IS NOT IN TOTALS: ".72D 44.92e PWRCELL BATTERY BATTERY USE,REFER TO PANELBOARD NOTE(24). NOTES', NARGIS ENGINEERS,INC. STOP INVERTER PROTECTED 1. 1201 THIRD AVENUE SUITE EDO PROVIDE LABEL ON BATTERY STOP LOAD 26.SUBMETERED LOAD-INSTALL CT'S AND ROUTE 2. SEATTLE,WA9B101 CABINET WITH THE FOLLOWING: (2)#8,1/2"C LEADS TO POWER METER INDICATED IN SUBMETER 3. SCHEDULE.FINAL TERMINATIONS AT METER AND 1. PH.(208)4463378 WARNING: i5A-2P ENCLOSED CIRCUIT BREAKER DISCONNECT CONDUITS FOR REFRIGERATED CASE SYSTEM:CONDUIT(S)WILL COMMISSIONING BY OTHERS. s. FAX.(2D6)446445D INCREASING CAPACITY OF FURNISHED AND INSTALLED BY CONTRACTOR AT SERVE 120V CASE FAN,CASE LIGHT AND CASE ANTI-SWEAT DISCONNECT INVERTER.LABEL DISCONNECT IN ACCORDANCE INSTALLED BATTERY BACKUP 20 AWG CIRCUITS.IN ADDITION,CONDUIT(S)WILL SERVE 208V CASE 27.ADJUSTABLE TRIP BREAKER-ADJUST BREAKER SYSTEM BY ADDING BATTERY WITH NEC 706,15(C) ELECTRIC DEFROST CIRCUIT(IF APPLICABLE).NOTE:CIRCUITS MAY SETTINGS PER PROTECTIVE DEVICE SETTINGS (E)PANEL (SECTION 2)' PROJECT:WM 3]5]MlMpon,WA MODULES IS PROHIBITED.TOTAL REMOTE SHUTDOWN (2)#12.1/2"C BE GROUPED TOGETHER TO MINIMIZE NUMBER OF CONDUITS REPORT IN SPECIFICATIONS. PANEL SCHEDULE:12HDn024 INSTALLED CAPACITY OF ALL PROVIDED THAT ALL NEC REQUIREMENTS ARE MET CLASSIFICATION:NORMAL VOLTAGE:208Y/120V 304WIRE SECTION:2 OF ELECTRICAL STORAGE SYSTEMS SWITCH FACTORY 30A-2P NON-FUSED DISCONNECT 28.REPLACE EXISTING CIRCUIT BREAKER WITH NEW INSTALLED AT FED FROM:(E)PANEL'L4D1(SECTION 1)' MAINS:225A MAIN LUGS ONLY IN THIS FIRE AREA IS REQUIRED FURNISHED AND INSTALLED BY CIRCUIT BREAKER.REFERENCE PROTECTIVE DEVICE TO REMAIN UNDER 20KWH. SECONDARYSKID DISCONNECT CONTRACTOR AT SECONDARY SKID SETTINGS REPORT FOR MANUFACTURER,BREAKER MOUNTING:FIELD VERIFY NEUTRAL:IOD%RATED ELECTRICAL ENCLOSURE cKT BREAKER LOADJA - AD BREAKER cKT TERMINATION TO REFRIGERATED CASE TYPE,AND SETTINGS. NOT ITEM DESCRIPTION No.AMP POLE AMP POL NO. ITEM DESCRIPTION NOT (2)#12,1/2"C ELECTRICAL CONNECTION POINT BY R.C. B03EG RACK OVEN 31 20 3 530 0 20 1 32 FRZR a PENDANT LTG ECU 15A; GENERAL NOTES: 33 - - 530 0 20 1 34 RDDERY FREEZER HTR FUSE--- EMERSON ECU AND FUSE BLOCK PROVIDE TRANSITION FROM PVC TO EMT 1. NEW BRANCH CIRCUIT OVERCURRENT PROTECTIVE 3s - - s30 0 20 1 3a eoa/ems/82e ------,-- DEVICES PLACED IN EXISTING PANELBOARDS OR B043G RACK WEN 37 15 1 1390 0 40 2 3E 8049 DONUT MACHINE FACTORY INSTALLED AT TYPICAL REFRIGERATED CASE SYSTEM DISTRIBUTION BOARDS SHALL MATCH THE TYPE AND B03M OVEN CONTROLS 39 20 1 1920 0 40 -------- SECONDARYSKID AIC RATING OF EXISTING OVERCURRENT PARE m 20 1 0 u 2 42 a033ICING TABLE ; ECU ROUTE EMT CONDUITS(UNDER CASES,ABOVE PROTECTION DEVICES IN SAID BOARD. BAKERY FREEZER DRAIN HEAT 43 20 1 1500 - - 4a ____ SLAB)TOPOINTOF TRANSITION TO FLEX 2. E.C.SHALL TRACE ALL ELECTRICAL CIRCUITS FORCHECKED BY: RS PACE 45 20 1 80 20 1 /6 8020/W21PACE 47 20 1 O 20 1 0 B007 BREAD SLICER - EVERY EXISTING PANELBOARD AFFECTED BY THIS PACE 49 20 1 60 20 1 50 B007A BRE40 SLICER 12"WIRE PIGTAILS TYP PROJECT.IDENTIFY LOADS ON EACH CIRCUIT.PACE 51 20 1 0 20 1 52 BOIBB BAKERY DISPLAY CO2 SKID BACKUP BATTERY& INVERTER 5'FLEX CONDUIT TYP PROVIDE A COMPLETE TYPEWRITTEN CIRCUITDRAWN BY: AT PACE 53 20 1 0 20 1 54 F BAKERY AROMA I FLOOR IDENTIFICATION SCHEDULE FOR EVERY AFFECTED PROTO CYCLE: 04/26/2024 PACE 55 20 1 00 20 1 56 uouoR cAe NTS PANELBOARD.PROVIDE THE DATE THAT THE PACE 5] 20 1 00 20 1 58 LIQUOR CAB BRACKET CONDUIT TO FLOOR SCHEDULE S CREATED. PACE 59 z0 1 c 20 1 w PARE AS REQUIRED PER CODE TYP DOCUMENT DATE:12/27/2024 3. ALL 0 ERCURRENT DEVICES ARE NEW UNLESS PROVIDE TRANSITION FROM EMT TO FLEX NOTED OTHERWISE. REFRIGERATION PIT UNDERSLAB PVC CONDUIT FOR SOURCE OF SUPPLY NOTE LOAD CALCULATIONS - TI EXISTING REFRIGERATED CASE BRANCH CIRCUITS LOAD DESCRIPTION CONN.(VAT DEMAND FACTOR CALC.(VA) UT I LITY TRANSFORMER CONTRACTOR TO VERIFY THE FEEDER ORIGINATION MISCELLANEOUS CONTINUOUS: - 125% - LOADSUMMARY 480YI277V,30,4W SEC POINT SOURCE OF POWER FOR ALL DISTRIBUTION EQUIPMENT G MISCELLANEOUS: 23390 loll 2339D 94A BOARDS,PANELBOARDS,AND BUSWAY AFFECTED BY LIGHTING: wo 125%096 103e TOTAL L--- --_J U N D E RS LAB CASE CONNECTION WIRING THE REMODEL SCOPE OF WORK.PROVIDE A LARGEST MOTOR: - iz5% - CONNECTED LOAD Amps (E)8 SETS OF 4#500KCMIL EACH IN 4"C. ( J / LAMINATED PLASTIC NAMEPLATE PER SPECIFICATIONS MOTORS: - 10 - PXASEA 11,230 VA �� NTS RECEPTAaE: - l00% - __ __ _ __ __ __ __ __ INDICATING THIS INFORMATION. RECEPTACLES OVER IOLVA: - 5- - PHASEB:B,DEOVA 75A PHASE C:4.030 VA MA MSB1 ELEC ROOM 1 EXISTING HATED FROM MSWB TOTAL CALCULATED L1 D FED FROM H1 B VIA T1 D 1. 120E THIRD AVENUED 29928 VA f--- -1 __ __ 3000 AMPS 480Y/277V 304W TOTALS: 24,3z0 L428 S:68A --- � I --- I I ROUTE CONDUIT FOR BRANCH CIRCUITS FROM OVERHEAD ARC FLASH TOTAL GLCUTATED AMP ® ALONG WITH REFRIGERATION PIPING.CONDUIT SHALL BE NOTES. HARGIS ENGINEERS,INC. / ROUTED THROUGH CHASE WHERE INDICATED ON PLANS ST -GVR ST -GAR \ 300A sulTE boo L-O A gp I 2. SEA TTLE.WA9E 1600A 3000A ETR PROVIDE(2)CONDUITS AND BRANCH CIRCUITS PER REFRIGERATED ARC FLASH HAZARD WARNING LABELING REQUIREMENTS 3_ 3P,"QC" 3P CASE SYSTEM.ONE CONDUIT WILL SERVE 120V CASE FANS,LIGHTS PER NEC ARE PROVIDED BY OWNER UNDER SEPARATE 4. PH.(206)4463376 ETR ETR AND ANTI-SWEAT CIRCUITS.ONE CONDUIT WILL SERVE 208V CASE CONTRACT. 5. FAX.(206)4464450 ELECTRIC DEFROST CIRCUIT.ON SYSTEMS WITHOUT ELECTRIC DEFROST,ONLY PROVIDE ONE CONDUIT. ADDITIONAL BAS CONDUITAT CHASE LOCATION..ENCE PLANS FOR POWER INTERRUPTION NOTE (E)2 SETS OF 4#350KCMIL ELECTRICAL ROOM 1 &1#1 GND EACH IN 2.5"C. PVC CHASE WHERE INDICATED ON PLANS COORDINATE ALL WORK THAT REQUIRES POWER INTERRUPTIONS TO THE STORE WITH THE STORE EXISTING SUBMETERING:IF IT IS NECESSARY TO REMOVE MANAGER AND THE WALMART CONSTRUCTION MANAGER A METER,RTU SERVER,CT OR DISRUPT THE EXISTING A MINIMUM OF 48 HOURS IN ADVANCE OF ALL STORE COMMUNICATION OF THE SUBMETERING SYSTEM IN ANY PNLBD TERMINATION TO REFRIGERATED CASE POWER INTERRUPTIONS.IN ADDITION,IF THE MAIN WAY,THE CONTRACTOR IS RESPONSIBLE TO RESTORE H4B ELECTRICAL CONNECTION POINT BY R.C. ELECTRICAL SWITCHGEAR REQUIRES WORK AND DOES THE SUBMETERING SYSTEM TO THE SAME LEVEL OF 480Y/277V NOT HAVE A MAIN SERVICE DISCONNECTING MEANS, OPERATION THAT EXISTED PRIOR TO THE WORK BEING COORDINATE WITH THE UTILITY COMPANY A MINIMUM OF INITIATED.THE EXISTENCE AND FUNCTIONALITY OF THE TWO WEEKS IN ADVANCE OF THE STORE POWER SUBMETERING SYSTEM SHALL BE VERIFIED BY CALLING ROUTE EMT CONDUITS TO INTERRUPTION.IF STORE IS NOT OPEN 24 HOURS PER WALMART BUILDING PERFORMANCE TEAM AT 479-204-0432 (E)2 SETS OF 3#2/0& VOICE/DATA ROUGH-IN SCHEDULE BETWEEN THE HOURS OF 7 AM AND 5 PM CENTRAL TIME. 1#3 GND EACH IN I.5"C. POINT OF TRANSITION TO FLEX DAY,ALL STORE POWER INTERRUPTIONS ARE TO BE q ACCOMPLISHED AFTER NORMAL STORE BUSINESS fiz4.z2 T4D _ HOURS.PROVIDE TEMPORARY POWER AS REQUIRED q 150VA 12"WIRE PIGTAILS TYP PER SPECIFICATIONS.INSTALLATION OF NEW EQUIPMENT P ram, DROP ROUGH-IN NOTES: 208Y/120V 5'FLEX CONDUIT TYP SHALL BE COMPLETED AND THE POWER SYSTEM TESTED 4�0)A141�L�OC3�w EXISTING DISTRIBUTION SYSTEM IS _ (EXISTING) AND RE-ENERGIZED PRIOR TO THE TIME ESTABLISHED BY gLCT' -) SURFACE MOUNT JUNCTION BOX ADJACENT TO PACK CONTROLLER WITH(1)3/4"CONDUIT STUBBED TO BUILDING ACCESSIBLE CEILING SPACE. SERIES RATED.E.C.SHALL PROVIDE - THE STORE MANAGER AND THE WALMART COORDINATE PACK CONTROLLER JUNCTION BOX LOCATION WITH BAS INSTALLER. CIRCUIT BREAKER(S)THAT WILL (E)3 SETS OF 4#30OKCMIL& SECURE CONDUIT TO FLOOR OR CONSTRUCTION MANAGER. 01/30/2G25 MAINTAIN EXISTING MANUFACTURER'S 2#2/0 GND/IG EACH IN 2.5"C. TOP OF CASE AS REQUIRED BY SCHEDULE GENERAL NOTES: U.L.LISTED SERIES RATED SYSTEM. EXISTING EXISTING CODE,TYP FLOOR OR TOP OF CASE. REFRIGERATION PROVIDE TRANSITION FROM EMT TO COORDINATE TOP OR BOTTOM 1. ALL JUNCTION BOXES SHALL BE DOUBLE GANG WITH SINGLE GANG PLASTER RING UNLESS NOTED OTHERWISE ON SCHEDULE. PNLBD pL4LDB, ELECTRICAL LIQUID-TIGHT FLEXIBLE METAL CONDUIT FED CASE ELECTRICAL 2. ALL JUNCTION BOXES TO BE ROUGHED IN AT SCHEDULED HEIGHT UNLESS NOTED OTHERWISE ON DRAWINGS. 208Y/120V 208Y/120V BRANCH CIRCUIT CONDUITS TO OTHER CONNECTION WITH PLAN ARCHITECTURAL PLANS 3. ALL CONDUITS SHALL BE TERMINATED WITH BUSHINGS. REFRIGERATED CASE SYSTEMS,TYP 4. PROVIDE PULL WIRE WITH EACH EMPTY RACEWAY(JUNCTION BOX/CONDUIT)INSTALLED. 1 OVERHEAD CASE CONNECTION WIRING E.- (E)4#3/0&2#6 GND/IG IN 2"C. A 5. CONDUIT RUNS SHALL HAVE NO MORE THAN 90 DEGREES OF TRANSITION BETWEEN PULL BOXES. -- -- -- -- Y NTS EXISTING CONDITIONS WERE TAKEN FROM EACH SUBCONTRACTOR IS RESPONSIBLE FOR HAVING 6. WHERE CONDUIT(S)TRAVERSE AREAS WITH CEILINGS OPEN TO STRUCTURE,CONDUIT(S)SHALL BE CONCEALED AS WELL AS POSSIBLE FROM VIEW ORIGINAL DRAWINGS AND MAY NOT REFLECT A THOROUGH KNOWLEDGE OF ALL DRAWINGS AND FROM CUSTOMER AREA. FOR LOCKOUT TAG OUT PROCEDURES REFER TO EXACT"AS-BUILT'CONDITIONS.CONTRACTOR SPECIFICATIONS IN THEIR RELATED FIELD.THE FAILURE SPECIFICATION SECTION 0135E AND THE MASTERCONSTRUCTION AGREEMENT FOR WALMART SHALL FIELD VERIFY ALL EXISTING CONDITIONS TO ACQUAINT THEMSELF WITH THIS KNOWLEDGE DOES 7. FOR CONDUIT RUNS SCHEDULED WITH 1-1/2"OR LARGER CONDUIT UTILIZE LARGE RADIUS SWEEPS AT POINTS OF TRANSITION. ��PARTIAL ON E-LI N E D IAG RAM PRIOR TO SUBMITTING FINAL BIDS.CONTRACTOR NOT RELIEVE THE RESPONSIBILITY OF PERFORMING 11 .II / SHALL CAREFULLY COORDINATE NEW WORK AND THE WORK PROPERLY.NO ADDITIONAL SHEFT 8. ACCESSIBLE CEILING SPACE SHALL BE CONSIDERED 12INCHES ABOVE A LAY-IN CEILING OR ABOVE BAR JOIST ACCESSIBLE BY A SCISSOR LIFT FOR NTS GLOBAL ETHICS AND COMPLIANCE,"COMPLIANCE DEMOLITION WITH ALL OTHER DISCIPLINES AND COMPENSATION SHALL BE ALLOWED BECAUSE OF R E 1 .1 AREAS OPEN TO STRUCTURE. PERFORMANCE STANDARD FOR CONSTRUCTION." EXISTING CONDITIONS. CONDITIONS THAT OCCUR DUE TO FAILURE TO FAMILIARIZE WORKERS WITH THIS KNOWLEDGE. COMMERCIAL BUILDING PERMIT APPLICATION ` Community and Economic Development City of Arlington• 18204 59th Ave NE•Arlington,WA 98223 • Phone (360)403-3551 The following information is required for Commercial, Multi-Family,and Mixed-Use Building Permit Applications. Mark each box to designate that the information has been provided. Please submit this checklist as part of the submittal documents.See ASSISTANCE BULLETIN#30 for detailed design requirements. EACH BUILDING OR STRUCTURE REQUIRES A SEPARATE SUBMITTAL. SUBMIT ELECTRONIC FILES FOR EACH OF THE FOLLOWING; Incomplete applications will not be accepted. REQUIRED DOCUMENTS Site Plan Architectural Plans Structural Plans Structural Calculations ,/ Mechanical System Modifications, (if applicable) Plumbing System Modifications,(if applicable) Project Specification Manuals, (if applicable) WSEC Compliance Forms, (if applicable) htt12s:4Jwaenergycodes.com� Special Inspection and Testing Agreement Deferred Submittal Request Airport Property Lease (if building is located within the Arlington Airport Property Boundary) 1. Plan Review fee is due at time of submittal and remaining balance will be due at time of issuance. 2. The City of Arlington does not review or inspect electrical systems.Contact Labor and Industries at lni.wa.gov or 360-416-3000. A. DEFERRED SUBMITTALS If the project requires any of the following,a Deferred Submittal Request MUST be completed.Deferred submittals require separate applications,plans and plan review. 1. Mechanical Plans (if not included in the plan set) 2. Plumbing Plans (if not included in the plan set) 3. Fire Sprinkler 4. Fire Alarm 5. Signage B. SPECIAL INSPECTION AND TESTING AGREEMENT A Special Inspection Firm is required to perform special inspections for the following type of work. *The Special Inspection and Testing Agreement MUST be submitted with the Building Application. ❑ Reinforced Concrete ❑■ Structural Steel and Welding ❑ Bolting in Concrete ❑ High-Strength Bolting ❑ Pre-stressed Concrete ❑ Spray-Applied Fireproofing ❑ Shotcrete ❑ Smoke-Control Systems ❑ Structural Masonry ❑ Other-Specify: ■❑ I acknowledge that all items designated as submittal requirements must accompany my Commercial Building Permit Application to be considered a complete submittal. COMMERCIAL BUILDING INSTALLATION,MODIFICATION OR REMOVAL MAY REQUIRE A SEPARATE PERMIT SUBMITAL *CHECKALL THAT APPLY ❑ Automatic fire extinguishing systems ❑ Compressed gas systems ❑ Fire pumps ❑ Flammable and combustible liquids (tanks,piping etc.) ❑ Standpipe systems ❑ Hazardous materials ❑ Private fire hydrants ❑ Industrial ovens/furnace ❑ Fire alarm and detection systems ❑ Spraying or dipping operations ❑ High piled/rack storage ❑ Temporary membrane structure,tents(>200 sq.ft.)or canopies(>400 sq.ft.) ❑ Provide details on any of the above checked items: Type of Permit: ❑ Commercial ❑ Mulit-Family ❑ Mixed-Use Property Address: 4010 172ND ST NE, ARLINGTON, WA 98223 project Valuation: $700,000 Lot#: 1 Parcel ID No.: 009303-000-003-01 Subdivision: j Work: REFRIGERATION SYSTEM UPGRADING,WHICH COMPRISES REPLACEMENT OF LT REACH-INS&ICE CREAM CAKE BUNKER,RACK UPGRADES,ADDITION OF(2)CO2 PUMP SKIDS,REPLACEMENT OF Project Scope of V V ork: EVAPORATORS IN ICE CREAM FREEZER,DELI FREEZER,SEAFOOD FREEZER&GROCERY FREEZER,UPGRADE ALL EXISTING REFRIGERATION RACK CONTROLLERS,REPLACEMENT OF COMPRESSORS&OTHER RACK HOUSE CHANGES AND ADD LEAK DETECTION. STRUCTURAL:NEW RAE CORP PUMP SKID(5,650 LBS)ON CAPPED CURB,FOR MORE INFORMATION SEE STRUCTURAL DRAWINGS, IBC Construction Type: V IBC Occupancy Type: M Building/Space Square Footage: 152222 Number of Stories: 1 Square Footage Per Floor: 1st 2nd 3rd 4th Sth 6th Primary Contact: ❑■ Owner APPLICANT ❑ Architect ❑ Engineer ❑ Contractor Owner Name: WALMART (APPLICANT: GURPREET SINGH) Office No.: 206-448-3376 Email Address: Gurpreet.Singh@hargis.biz Cell No.: 206-859-5348 Mailing Address: City: State: Zip: 98101 Architect Name: NOT APPLICABLE Office No.: Email Address: Cell No.: Mailing Address: City: State: Zip: Professional License Number: Expiration Date: Engineer Name: Brian C Belden-SE(CO:JOHNSTON BURKHOLDER ASSOCIATES) Office No.: Email Address: brian.belden@jbaengr.com Cell No.: Mailing Address: 930 Central St City: Kansas State: MO Zip: 64105 Professional License Number: 20104445 Expiration Date: Primary Contractor: TO BE DECIDED. Office No.: Email Address: Cell No.: Mailing Address: City: State: Zip: L&I Contractor License Number: Expiration Date: REV03.2022 Page 2 of 6 COMMERCIAL BUILDING MECHANICAL SYSTEM INFORMATION Type of Permit: ❑ New Installation ALTERATION ❑ Gas Pipin GAS PIPING NOT APPLICAB E Mechanical Contractor: TO BE DECIDED Office No.: Email Address: Cell No.: Mailing Address: City: State: Zip: L&I Contractor License Number: Expiration Date: • New gas piping requires a pressure test hooking to any appliance • Sediment traps (drips) are required on all gas lines • Gas lines are required to be supported/secured per IFGS, Section 415 • Proper Combustion air and venting required for all appliances • A shut-off valve is required within 6 feet of each appliance Gas Piping Specification and complete Schematic PAGE 4 O Not Applicable Proposed Piping Material: ❑ CSST ❑ Brass ❑ Black Steel ❑ Galvanized Steel ❑ Other Proposed Piping Size: ❑ 1/z" ❑ S/s" ❑ 3/4" 711 ❑ 11/z" ❑ 2" Inlet Pressure: Pressure Drop: Specific Gravity: MECHANICAL PERMIT FEES (per unit) Type of Fixture No. of Units Cost per Unit Subtotal Additional Plan Review fees x $ 75.00 = $ Air Cond.Unit<_100Btu/h x $ 15.00 = $ Air Cond. Unit>10013tu h x $ 25.00 = $ Air Cond. Unit>50013tu h x $ 50.00 = $ Air Handling Units x $ 15.00 = $ Base Mechanical Fee $ 25.00 $ 25.00 Boiler<10013tu/h >3hp x $ 15.00 = $ Boiler>1 million Btu/h<50hp x $ 25.00 = $ Boiler>1.5 million Btu/h<50hp x $ 50.00 = $ Boiler>100Btu h 3-15h x $ 15.00 = $ Boiler>50013tu h 15-30hp x $ 25.00 = $ Diffusers x $ 15.00 = $ Dryer Ducting x $ 15.00 = $ Ductwork(drawings required) x $ 25.00 = $ Evaporative Coolers x $ 15.00 = $ Exhaust Ventilation Fans x $ 15.00 = $ Fire lace Insert Stove x $ 15.00 = $ Forced Air Heat<_100 Btu/h x $ 15.00 = $ Forced Air Heat>100 Btu/h x $ 25.00 = $ Gas Clothes Dryer x $ 15.00 = $ Gas Fired AC :5100 Btu h x $ 15.00 = $ Gas Fired AC >100 Btu h x $ 25.00 = $ Gas Fired AC > 500 Btu h x $ 50.00 = $ Gas Pi in <_ 5 units x $ 15.00 = $ REV03.2022 Page 3 of 6 COMMERCIAL BUILDING MECHANICAL PERMIT FEES (per unit) Gas Piping> 5 units (plus <5 units x $ 2.00 = $ Heat Exchangers x $ 15.00 = $ Heat Pump-Condensing Unit x $ 25.00 = $ Hot Water Heat Coils x $ 15.00 = $ Miscellaneous Appliance -regulated by x $ 15.00 — $ mechanical code,not otherwise specified Pkg.Units <_100btu x $ 25.00 = $ Pkg. Units >100btu x $ 50.00 = $ Range/Cook top-Gas Fired x $ 15.00 = $ Refrigeration Unit<_100Btu h x $ 15.00 = $ Refrigeration Unit>100Btu h x $ 25.00 = $ Refrigeration Unit>500Btu h 20 x $ 50.00 = $1000 Re-inspection fee all x $ 75.00 = $ Unit Heaters <_ 100 Btu/h x $ 15.00 = $ Unit Heaters >100 Btu h x $ 25.00 = $ VAV Boxes (Variable Air Volume,part of air x $ 10.00 _ $ conditioning system) Wall Heaters - Gas Fired x $ 25.00 = $ Water Heater- Gas Fired x $ 25.00 = $ Permit Fee $1000 Table 4-8; Plan Review Fee $ Processing/Technology Fee $25.00 Total $ PRESSURE PIPING SCHEMATIC FOT APPLICABLE COMPLETE FOR GAS PIPING ONLY— USE A SEPARATE SHEET, IF NECESSARY ❑ SCHEMATIC IS TO SCALE ❑ SCHEMATIC NOT TO SCALE Show Pipe Size(s) and Length(s) from meter to all appliances NOTE:Any interior pressure regulators must be indicated REV03.2022 Page 4 of 6 COMMERCIAL BUILDING I NOT APPLICABLE PLUMBING SYSTEM INFORMATION Plumbing Contractor: Office No.: Email Address: Cell No.: Mailing Address: City: State: Zip: L&I Contractor License Number: Expiration Date: The following items need to be specified on the plans: O Fixture specifications and equipment with locations. O Location and type of all backflow assemblies for each fixture. O Calculations for Grease Interceptor. O Pipe size and location of sanitary and potable water systems. O Riser diagram of waste,vent,and rain water systems,including sizes. O Medical gas piping riser diagram,type of gas,storage room and size of piping. PLUMBING PERMIT FEES (per fixture) Commercial plumbing permits are required to submit line drawings.A plan review fee of 65% per Table 4-6 for plumbing permits will be assessed at time of submittal. Includes two 2 ins ections with permit. Type of Fixture No. of Fixtures Cost per Fixture Subtotal Additional Plan Review fees x $ 75.00 = Alteration/repair piping x $ 15.00 = Backflow Assembly x $25.00 = Base Plumbing Fee 1 $ 25.00 $25.00 Bath Shower Combo x $ 15.00 = Building Main Waste x $ 25.00 = Clothes Washer x $ 15.00 = Dishwasher x $ 15.00 = Drinking Fountain x $ 15.00 = Floor Drains x $ 15.00 = Grease Interceptor x $ 75.00 = Grease Trap x $ 25.00 = Hose Bibb x $ 15.00 = Icemaker Refri erator x $ 15.00 = Irrigation-per meter x $ 25.00 = Kitchen Sink&Disposal x $ 15.00 = Laundry Tray x $ 15.00 = Lavatory x $ 15.00 = Med Gas Pipin <- 5 inlets/outlets x $ 60.00 = Med Gas Piping> 5 inlets/outlets (plus <_ 5 x $ 5.00 = inlets outlets Miscellaneous-regulated by plumbing x $ 15.00 = code,not otherwise specified Pretreatment Interceptor x $ 15.00 = REV03.2022 Page 5 of 6 COMMERCIAL BUILDING I NOT APPLICABLE PLUMBING PERMIT FEES (per fixture) Re-inspection Fee all x $ 75.00 = Roof Drains x $ 15.00 = Shower (only) x $ 15.00 = Sink bar, service, etc. x $ 15.00 = Toilets x $ 15.00 = Urinal x $ 15.00 = Vacuum Breakers x $ 25.00 = Water Heater x $ 25.00 = Water Heater-Tankless x $ 25.00 = Permit Fee Table 4-6; Plan Review Fee Processing/Technology Fee $25.00 Total PROPOSED BUILDING USE BUILDING IS EXISTING - RETAIL ❑ New EV Retail ❑ Medical ❑ Automotive Based ❑ Industrial ❑ Office ❑ Restaurant ❑ Machine Shop ❑ Other: CROSS CONNECTION Please check all appliances that are proposed or permanently connected to the water supply. ❑ Ice Machine ❑ Dialysis Equip. ❑ Air washers ❑ Coffee Urn/Espresso ❑ Hydrotherapy Equip. ❑ Steam Generators ❑ Carbonated Bev. ❑ Dental Equip. ❑ Dye Vats ❑ Fume Hoods ❑ Laboratory Equip. ❑ Pressure Washers ❑ Degreasers ❑ Autoclave/Sterilizers ❑ Cooling Towers ❑ Hot Tub/Spa ❑ Decorative Fountain ❑ Fire Sprinkler ❑ Aquarium ❑ Swimming Pools ❑ Sprinkler w/chemicals ❑ Lawn Irrigation ❑ Well on property ❑ Other: WASTEWATER DISCHARGE I NOT APPLICABLE Does the plumbing system currently have a grease interceptor? ❑ Yes 0 No ❑ Don't Know Does the plumbing system currently have an oil/water ❑ Yes 0 No ❑ Don't Know separator? Is water used in the business process (washing,rinsing, ❑ Yes 0 No ❑ Don't Know cooling)? Does your business require a NPDES permit? ❑ Yes 0 No ❑ Don't Know I hereby certify that the above information is correct and that the construction on,and the occupancy and the use of the above-described property will be in accordance with the laws,rules and regulation of the State of Washington. Gurpreet Singh o�,202505tl19Y11,3254o;ooef9s =G°�fBe's°9^ GURPREET SINGH 05/19/2025 Signature Print Name Date REV03.2022 Page 6 of 6 i COMMERCIAL MECHANICAL APPLICATION • Community&Economic Development City of Arlington• 18204 59th Ave NE•Arlington,WA 98223 • Phone(360) 403-3551 This application is for new, addition, altered or replaced mechanical installation and new or altered gas piping and must be accompanied by ELECTRONIC CONSTRUCTION DRAWINGS and CUT SHEETS and/or information outlined in the MECHANICAL SUBMITTAL REQUIREMENTS,if applicable. Type of Permit: ❑ New Installation ❑ Addition 0 Alteration ❑ Replaced ❑ Gas Piping Type I and Type II Hood Systems required submittal of the Commercial Mechanical Addenda - N/A Property Address: 4010 172ND ST NE, ARLINGTON, WA 98223 project Valuation: $700,000 Lot#: 1 Parcel ID No.: 009303-000-003-01 Preferred Contact: 0 Owner 0 Contractor REFRIGERATION SYSTEM UPGRADING,WHICH COMPRISES REPLACEMENT OF LT REACH-INS&ICE CREAM CAKE BUNKER,RACK UPGRADES,ADDITION OF(2)CO2 PUMP SKIDS, REPLACEMENT OF EVAPORATORS IN ICE CREAM FREEZER,DELI FREEZER,SEAFOOD FREEZER&GROCERY FREEZER,UPGRADE ALL EXISTING REFRIGERATION RACK CONTROLLERS, Project Description: REPLACEMENT OF COMPRESSORS&OTHER RACK HOUSE CHANGES AND ADD LEAK DETECTION. Owner Name: WALMART (APPLICANT: GURPREET SINGH) Office No.: 206-448-3376 Email Address: Gurpreet.Singh@hargis.biz Cell No.: 206-859-5348 Mailing Address: 1201 3RD AVE, SUITE 600 City: SEATTLE State: WA Zip: 98101 Contractor Name: TO BE DECIDED Office No.: Email Address: Cell No.: Mailing Address: City: State: Zip: L&I Contractor License Number: Expiration Date: • New gas piping requires a pressure test hooking to any appliance • Sediment traps (drips) are required on all gas lines • Gas lines are required to be supported/secured per IFGS,Section 415 • Proper Combustion air and venting required for all appliances • A shut-off valve is required within 6 feet of each appliance Gas Piping Specification and complete Schematic PAGE 3 O Not Applicable O CSST O Brass O Other Proposed Piping Material: O Black Steel O Galvanized Steel Proposed Piping Size: O 1/2" O 5/8 O 3/4" O 1" O 11/2" O 2" Inlet Pressure: Pressure Drop: Specific Gravity: I hereby certify that the above information is correct and that the construction on,and the occupancy and the use of the above described property will be in accordance with the laws,rules and regulation of the State of Washington. Gurpreet Singh Gurpreet Singh 5/19/2025 Signature Print Name Date REV03.2022 Page 1 of 3 MECHANICAL PERMIT FEES (per unit Type of Fixture No.of Units Cost per Unit Subtotal Additional Plan Review fees x $ 75.00 = $ Air Conditioning Unit 15 100 Btu h x $ 15.00 = $ Air Conditioning Unit> 100 Btu h x $ 25.00 = $ Air Conditioning Unit> 500 Btu/hp x $ 50.00 = $ Air Handling Units x $ 15.00 = $ Base Mechanical Fee $ 25.00 $ 25.00 Boiler<100Btu h>3h x $ 15.00 = $ Boiler>1 million Btu/h<50hp x $ 25.00 = $ Boiler>1.5 million Btu/h<50hp x $ 50.00 = $ Boiler>100Btu h 3-15h x $ 15.00 = $ Boiler>500Btu h 15-30hp x $ 25.00 = $ Commercial Hoods-Type I x $ 25.00 = $ Commercial Hoods-Type II x $ 50.00 = $ Diffusers x $ 15.00 = $ Dryer Ducting x $ 15.00 = $ Ductwork(drawings required) x $ 25.00 = $ Evaporative Coolers x $ 15.00 = $ Exhaust Ventilation Fans x $ 15.00 = $ Fireplace/Insert/Stove x $ 15.00 = $ Forced Air Heat<_100 Btu h x $ 15.00 = $ Forced Air Heat>100 Btu h x $ 25.00 = $ Gas Clothes Dryer x $ 15.00 = $ Gas Fired Air Conditioning Unit 15 100 Btu h x $ 15.00 = $ Gas Fired Air Conditioning Unit> 100 Btu h x $ 25.00 = $ Gas Fired Air Conditioning Unit> 500 Btu/hp x $ 50.00 = $ Gas Pi in <_ 5 units x $ 15.00 = $ Gas Piping for each additional unit > 5 x $ 2.00 = $ Heat Exchangers x $ 15.00 = $ Heat Pump-Condensing Unit x $ 25.00 = $ Hot Water Heat Coils x $ 15.00 = $ Miscellaneous Appliance-regulated by x $ 15.00 _ $ mechanical code,not otherwise specified Package Units:5 100 Btu > 100 Btu x $ 25.00 $50.00 = $ Range/Cook top-Gas Fired x $ 15.00 = $ Refrigeration Unit<_100Btu h x $ 15.00 = $ Refrigeration Unit>100Btu h x $ 25.00 = $ Refrigeration Unit>500Btu h 20 x $ 50.00 = $1000 Re-inspection fee all x $ 75.00 = $ Unit Heaters <_ 100 Btu h x $ 15.00 = $ Unit Heaters>100 Btu h x $ 25.00 = $ Variable Air Volume Boxes (part of Air x $ 10.00 = $ Conditioning System) Wall Heaters-Gas Fired x $ 25.00 = $ Water Heater- Gas Fired x $ 25.00 = $ Permit Fee $1000 Table 4-8; Plan Review Fee $ Processing/Technology Fee $25.00 Total $ REV2.2024 Page 2 of 3 PRESSURE PIPING SCHEMATIC NOT APPLICABLE COMPLETE FOR GAS PIPING ONLY ❑ SCHEMATIC IS TO SCALE ❑ SCHEMATIC NOT TO SCALE Show Pipe Size(s) and Length(s) from meter to all appliances NOTE: Any interior pressure regulators must be indicated REV2.2024 Page 3 of 3 i COMMERCIAL MECHANICAL APPLICATION • Community&Economic Development City of Arlington• 18204 59th Ave NE•Arlington,WA 98223 • Phone(360) 403-3551 This application is for new, addition, altered or replaced mechanical installation and new or altered gas piping and must be accompanied by ELECTRONIC CONSTRUCTION DRAWINGS and CUT SHEETS and/or information outlined in the MECHANICAL SUBMITTAL REQUIREMENTS,if applicable. Type of Permit: ❑ New Installation ❑ Addition 0 Alteration ❑ Replaced ❑ Gas Piping Type I and Type II Hood Systems required submittal of the Commercial Mechanical Addenda - N/A Property Address: 4010 172ND ST NE, ARLINGTON, WA 98223 project Valuation: $700,000 Lot#: 1 Parcel ID No.: 009303-000-003-01 Preferred Contact: 0 Owner 0 Contractor REFRIGERATION SYSTEM UPGRADING,WHICH COMPRISES REPLACEMENT OF LT REACH-INS&ICE CREAM CAKE BUNKER,RACK UPGRADES,ADDITION OF(2)CO2 PUMP SKIDS, REPLACEMENT OF EVAPORATORS IN ICE CREAM FREEZER,DELI FREEZER,SEAFOOD FREEZER&GROCERY FREEZER,UPGRADE ALL EXISTING REFRIGERATION RACK CONTROLLERS, Project Description: REPLACEMENT OF COMPRESSORS&OTHER RACK HOUSE CHANGES AND ADD LEAK DETECTION. Owner Name: WALMART (APPLICANT: GURPREET SINGH) Office No.: 206-448-3376 Email Address: Gurpreet.Singh@hargis.biz Cell No.: 206-859-5348 Mailing Address: 1201 3RD AVE, SUITE 600 City: SEATTLE State: WA Zip: 98101 Contractor Name: TO BE DECIDED Office No.: Email Address: Cell No.: Mailing Address: City: State: Zip: L&I Contractor License Number: Expiration Date: • New gas piping requires a pressure test hooking to any appliance • Sediment traps (drips) are required on all gas lines • Gas lines are required to be supported/secured per IFGS,Section 415 • Proper Combustion air and venting required for all appliances • A shut-off valve is required within 6 feet of each appliance Gas Piping Specification and complete Schematic PAGE 3 O Not Applicable O CSST O Brass O Other Proposed Piping Material: O Black Steel O Galvanized Steel Proposed Piping Size: O 1/2" O 5/8 O 3/4" O 1" O 11/2" O 2" Inlet Pressure: Pressure Drop: Specific Gravity: I hereby certify that the above information is correct and that the construction on,and the occupancy and the use of the above described property will be in accordance with the laws,rules and regulation of the State of Washington. Gurpreet Singh Gurpreet Singh 5/19/2025 Signature Print Name Date REV03.2022 Page 1 of 3 MECHANICAL PERMIT FEES (per unit Type of Fixture No.of Units Cost per Unit Subtotal Additional Plan Review fees x $ 75.00 = $ Air Conditioning Unit 15 100 Btu h x $ 15.00 = $ Air Conditioning Unit> 100 Btu h x $ 25.00 = $ Air Conditioning Unit> 500 Btu/hp x $ 50.00 = $ Air Handling Units x $ 15.00 = $ Base Mechanical Fee $ 25.00 $ 25.00 Boiler<100Btu h>3h x $ 15.00 = $ Boiler>1 million Btu/h<50hp x $ 25.00 = $ Boiler>1.5 million Btu/h<50hp x $ 50.00 = $ Boiler>100Btu h 3-15h x $ 15.00 = $ Boiler>500Btu h 15-30hp x $ 25.00 = $ Commercial Hoods-Type I x $ 25.00 = $ Commercial Hoods-Type II x $ 50.00 = $ Diffusers x $ 15.00 = $ Dryer Ducting x $ 15.00 = $ Ductwork(drawings required) x $ 25.00 = $ Evaporative Coolers x $ 15.00 = $ Exhaust Ventilation Fans x $ 15.00 = $ Fireplace/Insert/Stove x $ 15.00 = $ Forced Air Heat<_100 Btu h x $ 15.00 = $ Forced Air Heat>100 Btu h x $ 25.00 = $ Gas Clothes Dryer x $ 15.00 = $ Gas Fired Air Conditioning Unit 15 100 Btu h x $ 15.00 = $ Gas Fired Air Conditioning Unit> 100 Btu h x $ 25.00 = $ Gas Fired Air Conditioning Unit> 500 Btu/hp x $ 50.00 = $ Gas Pi in <_ 5 units x $ 15.00 = $ Gas Piping for each additional unit > 5 x $ 2.00 = $ Heat Exchangers x $ 15.00 = $ Heat Pump-Condensing Unit x $ 25.00 = $ Hot Water Heat Coils x $ 15.00 = $ Miscellaneous Appliance-regulated by x $ 15.00 _ $ mechanical code,not otherwise specified Package Units:5 100 Btu > 100 Btu x $ 25.00 $50.00 = $ Range/Cook top-Gas Fired x $ 15.00 = $ Refrigeration Unit<_100Btu h x $ 15.00 = $ Refrigeration Unit>100Btu h x $ 25.00 = $ Refrigeration Unit>500Btu h 20 x $ 50.00 = $1000 Re-inspection fee all x $ 75.00 = $ Unit Heaters <_ 100 Btu h x $ 15.00 = $ Unit Heaters>100 Btu h x $ 25.00 = $ Variable Air Volume Boxes (part of Air x $ 10.00 = $ Conditioning System) Wall Heaters-Gas Fired x $ 25.00 = $ Water Heater- Gas Fired x $ 25.00 = $ Permit Fee $1000 Table 4-8; Plan Review Fee $ Processing/Technology Fee $25.00 Total $ REV2.2024 Page 2 of 3 PRESSURE PIPING SCHEMATIC NOT APPLICABLE COMPLETE FOR GAS PIPING ONLY ❑ SCHEMATIC IS TO SCALE ❑ SCHEMATIC NOT TO SCALE Show Pipe Size(s) and Length(s) from meter to all appliances NOTE: Any interior pressure regulators must be indicated REV2.2024 Page 3 of 3 Johnston Burkholder Associates JOB TITLE 3757 ARLINGTON, WA 930 Central Street ARLINGTON, WA Kansas City, MO 6410E JOB No.2401505056 SHEET NO. CALCULATED BY CRIB DATE CHECKED BY BWM DATE www.struware.com STRUCTURAL CALCULATIONS FOR 3757 ARLINGTON, WA 4010 172nd St Ne ?►rt C. BE o�WASH,�� ,1 g t T 08/05/24 Johnston Burkholder Associates JOB TITLE 3757 ARLINGTON,WA 930 Central Street ARLINGTON, WA Kansas City, MO 64105 JOB No. 2401505056 SHEET NO. Phone CALCULATED BY CRIB DATE CHECKED BY BWM DATE www.struware.com Code Search Code: International Building Code 2021 Occupancy: Occupancy Group= B Business Risk Category & Importance Factors: Risk Category= 11 Wind factor= 1.00 Snow factor= 1.00 Seismic factor= 1.00 Type of Construction: Fire Rating: Roof= 0.0 hr Floor= 0.0 hr Building Geometry: Roof angle (0) 0.25/12 1.2 deg Building length 467.6 ft Least width 300.6 ft Mean Roof Ht (h) 21.5 ft Parapet ht above grd 25.0 ft Minimum parapet ht 4.0 ft MECH AND ELEC COMPONENTS SEISMIC COEFFICIENTS Seismic Design Category D&Ip=1.0,therefore see ASCE7 Section 13.1.4 for exceptions Mech or Electrical Component: Wet-side HVAC, boilers,furnaces, atmospheric tanks and bins, chillers,water heaters, etc plus other mechanical components constructed of high-deformability materials. Importance Factor(Ip) : 1.0 component Amplmcation Factor(ad= 1 h= 20.3 feet tromp Kesponse Moditication Factor(F<P)= 2.5 z= 20.3 feet z/h = 1.00 Over-Strength Factor(Qo)= 2 Fp=0.4apSdslpWp(1+2z/h)/Rp= 0.366 Wp not greater than Fp= 1.6SdslpWp= 1.221 Wp but not less than Fp=0.3SdslpWp= 0.229 Wp use Fp= 0.366 Wp Johnston Burkholder Associates JOB TITLE 3757 ARLINGTON,WA 930 Central Street ARLINGTON,WA Kansas City,MO 64105 JOB No. 2401505056 SHEET NO. Phone CALCULATED BY CRB DATE CHECKED BY BWM DATE Snow Loads : ASCE 7- 16 Nominal Snow Forces Roof slope = 1.2 deg Horiz.eave to ridge dist(W)= 300.6 ft Roof length parallel to ridge(L)= 467.6 ft Type of Roof Monoslope Ground Snow Load Pg = 17.0 psf Risk Category = II Importance Factor I = 1.0 Thermal Factor Ct = 1.00 Exposure Factor Ce = 1.0 Pf=0.7*Ce*Ct*I*Pg = 11.9 psf Unobstructed Slippery Surface no Sloped-roof Factor CS = 1.00 Balanced Snow Load = 11.9 psf Near ground level surface balanced snow load= 17.0 psf Rain on Snow Surcharge Angle 6.01 deg Code Maximum Rain Surcharge 5.0 psf Rain on Snow Surcharge = 5.0 psf Ps plus rain surcharge = 16.9 psf Minimum Snow Load Pm = 17.0 psf NOTE:Alternate spans of continuous beams shall be loaded with half the design roof snow Uniform Roof Design Snow Load = 17.0 psf load so as to produce the greatest possible effect-see code for loading diagrams and exceptions for gable roofs.. Johnston Burkholder Associates JOB TITLE 3757 ARLINGTON,WA 930 Central Street ARLINGTON,WA Kansas City,MO 64105 JOB No.2401505056 SHEET NO. Phone CALCULATED BY CRIB DATE CHECKED BY BWM DATE Seismic Loads: IBC 2021 Strength Level Forces Risk Category: 11 Importance Factor(le): 1.00 Site Class: D Ss(0.2 sec)= 106.60%g A site specific ground motion analysis is required for seismically S1 (1.0 sec)= 38.10%g isolated structures or with damping systems,see ASCE7 11.4.8 Site specific ground motion analysis performed: Fa= 1.074 Sms= 1.144 SDS= 0.763 Design Category= D Fv= 1.919 Sm1 = 0.731 Sol= 0.487 Design Category= D Seismic Design Category= D Johnston Burkholder Associates JOB TITLE 3757 ARLINGTON,WA 930 Central Street ARLINGTON,WA Kansas City, MO 64105 JOB No. 2401505056 SHEET NO. Phone CALCULATED BY CRB DATE CHECKED BY BWM DATE Wind Loads : ASCE 7- 16 Ultimate Wind Speed 98 mph Nominal Wind Speed 75.9 mph Risk Category II Exposure Category C Enclosure Classif. Enclosed Building Internal pressure +/-0.18 Directionality (Kd) 0.85 Kh case 1 0.916 Kh case 2 0.916 Type of roof Monoslope Johnston Burkholder Associates JOB TITLE 3757 ARLINGTON,WA 930 Central Street ARLINGTON,WA Kansas City,MO 64105 JOB No. 2401505056 SHEET NO. Phone CALCULATED BY CRB DATE CHECKED BY BW M DATE Wind Loads - Rooftop Structures & Canopies Ultimate Wind Pressures Building (L)= 467.6 ft Building (B)= 300.6 ft Directionality (Kd)= 0.85 Rooftop Structures&Equipment#1 Equipment length parallel to L= 4.0 ft Equipment length parallel to B= 10.0 ft Height of equipment = 6.0 ft Base pressure(qh)= 19.1 psf 4" Vertical wind pressure Wind normal to building B Wind normal to building L Ar= 40.0 sf Af = 60.0 sf Af = 24.0 sf GCr= 1.500 GCr= 1.90 GCr= 1.90 F=ghGCr Ar= 28.7 Ar(psf) F=ghGCr Af= 36.4 Af(psf) F=ghGCr Af= 36.4 Af(psf) Fv= 1.1 kips Fh= 2.2 kips Fh= 0.9 kips Johnston Burkholder Associates JOB TITLE #3850 Walmart CAPX Remodel 930 Central Street JOB No. 2401505056 Kansas City, MO 64105 CALCULATED BY CRB DATE 8/5/2024 Scope of work : Add (1) new REFG rack Original Roof Design Loads Dead load : roofing 3.0 psf Roof Live Load 20 psf deck psf steel 3.0 psf Roof Snow Load 0 psf MEP 6.0 psf TOTAL 12.0 psf New unitized refrigeration skid REFG Rack Joist Loads (bottom to top) Total weight : Ibs Joist 1 : 0.883 kips* REFG rack wt : 5650 Ibs Joist 2 : 1.766 kips* REFG rack length : 11 ft Joist 3 : 0.883 kips* REFG rack plf: 257 plf per side 7.064 kips (total) Gas Cooler wt : 3000 Ibs Gas Cooler len : 6 ft Gas Cooler Joist Loads (bottom to top) Gas Cooler plf: 250 plf per side Joist 1 : 0.47 kips* Joist 2 : 0.94 kips* Joist 3 : 0.47 kips* 3.76 kips (total) * includes 10% load sharing Project No. Pro-Name Made By: Date: EXISTING FRAMING EVALUATION&ANALYSIS WORKSHEET zaolsosos6 #3850 Wa mad CAPX Remodel CRB 8/512024 'ENVELOPE ANALYSIS OF A SIMPLY SUPPORTED SECTION- Original Building Code:2003 IBC Current Building Code'.2021 IBC Notes 8 Comments Conclusions -REFG rack:middle ldst(SOUTH UNIT) -Shear reinf left and: one(less than 200#) -Shear reinf righl and: 6 -DL+LL -Mornent reinf: none General and Design Information Results Summai at Each End Mazlmum Moment and Users ecIII Locations Loading Kay Diagram(Does Not Reflect Actual Loading) Origin"W Original Od9. c c Location from Original New Shaar(k) New Moment Key Plan Mark/Refaronce= J3 Shearwl Moment Memont w/ No. L/F(fi) Shear(k) 8 N.C.) (k-ft)8(U.C.) Left/Front Reference z ADS k (k-ft) AOS k-fi RighVRear Reference= 3 L/F 0 9.99 10.43 9.11 0.918 - - L TwwououMa mwic Tributary Width(fp= 5.75 Rl 55.6 .61 -7.11 -6.67 0.986 -Span(fQ= 55.6 MIST 25.85—as - 100.6 tom III 0.8 c` �w %End Reaction for Min.Shear= 25% 1 Allowable Overstress(ADS)= 5% 2 O Stress Reference= 120% 3 Total Trib(sgfl)= 320 4 Reduced Roof Live Load 17.61 5 wuwswns sTurrnl u=s'rimo Use LL retlucdon] in 6 Deflection Check 8 Maalmum Stress Rados Maximum Added Forces E(ksi)= 290D0 9 Shad:UC=1.01 at 50.735 ft Shear:0.06 kips at 50.735 fl 1(104)= 0 10 Moment:UC=0.896 at 25.99 ft Marred:0 ft-Mps at 25.99 ft App—Original DeBecdon(in)= Note:Manmum allowable Overstress(AOS)in gravity members is donned per the applicable building code Approx.New Doi(In)_ Approx.Deflection Ratio=Ll #VALUEI Original Loading("As-Built","As-Designed",or"In-Placa"Capacity) Naw Loading Point Loads Point Loads No. Mark Magnitude(k) Location(ft) No. Mack Magnitude(k) Location(ft) 1 1 skid 0.883 50.6 2 2 3 3 3 3 4 4 5 5 6 6 8 8 9 9 10 10 Uniform Loads(FUII or Pardal) Uniform Loads(Full or Partial) No. Mark Magnitude(k#) Location(ft) No. Mark Magnitude(k#) Location(ft) Stem End Start End 1 Original TL 0.228 0 55.6 39.7 1 0.098 0 55.6 17 ledDL 2 2 0.098 0 55.6 17 psf WSL 3 3 4 4 5 5 6 6 ] 8 8 9 9 10 10 0.228 0.196 Triangular Loads(Full or Partial) Triangular Loads(Full or Partial) No. Mark Magnitude(k#) Peek Meg. Location(ft) No. Mark Magnitude(k#) Peak Mal Location(ft) Orientation Stem End Orientation Start End 1 DRIFT 0."8 Left/Fronl 0 18 1 DRIFT 0."8 Left/Front 0 18 2 2 3 3 4 4 5 5 6 6 8 8 9 9 10 10 Percent Stress Diagram PERCENT OVERSTRESS 1.050 E 1.000 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 W 31 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 x(I —Shear(Vnew/Vod9) —Moment(Mnaw l Mang) 1 Project No. Project Name Made By: Date: EXISTING FRAMING EVALUATION&ANALYSIS WORKSHEET zaolsosos6 #3850 Wama CAPX Remodel CR6 8/512024 'ENVELOPE ANALYSIS OF A SIMPLY SUPPORTED SECTION' Original Building Code:2003 IBC Current Building Code'.2021 IBC Shear Diagrams SHEAR DIAGRAM 10 8 6 4 m 0 115 2 2 25 40 45 f5 -2 -4 -6 � rr —New Shear —Original 5"hkear w/AOS -------Original Shear SHEAR COMPARISION(ABSOLUTE VALUE) 1 0.9 0.8 0.7 0.6 x 0.5 e 0.4 0.3 0.2 0.1 0 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 ss —Difference in Shear(Vnew-Vorig) — -Differencein Shear(Vnew-AOSNorig) --DeRn Stress Reversal(Negaeve on Chart) —Stress Reversal(Negaeve on Chart-For Info Only) Moment Dlagrama MOMENT DIAGRAM — — — ---------------------- 90 E 30 0 0 5 10 15 20 25 30 35 40 45 50 55 x(fi) —New Momenl Original Moment wl AOS Original MomeM 110 MOMENT COMPARISON DIAGRAM 105 \ g / \ E E / _ _ _ _ _ _ _ _ __________ _ _ _ _ _ _ _ _ _ _ _ 100 9s 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 ss x(fl) New MomeM —-Original Moment wl AOS ----Original MomeM —Maz New MomeM ---Maz Original Moment —Reinfordn9 Reference(Horiz Line,If Req'd) 1 Project No. Pro-Name Made By: Date: EXISTING FRAMING EVALUATION&ANALYSIS WORKSHEET zaolsosos6 #3850 Wa mad CAPX Remodel CRB 8/512024 'ENVELOPE ANALYSIS OF A SIMPLY SUPPORTED SECTION- Original Building Code:2003 IBC Current Building Code'.2021 IBC Notes 8 Comments Conclusions -REFG rack:middle pat(SOUTH UNIT) -Shear reinf left and: one(less than 200#) -Shear reinf Highland: 6 -DL+LL -Mornent reinf: none General and Design Information Results Summai at Each End Mazlmum Moment and Users ecIII Locations Loading Kay Diagram(Does Not Reflect Actual Loading) Origin"W Original Odg. c c Location from Original New Shaar(k) New Moment Key Plan Mark/Refaronce= J3 Shearwl Moment Memont w/ No. L/F(fi) Shear(k) 8 N.C.) (k-ft)8(U.C.) Left/Front Reference z ADS k (k-ft) AOS k-fi RighVRear Reference= 3 L/F 0 9.99 10.43 9.19 0.928 - - L TwwououMa mwic Tributary Width(ft)= 5.75 R/R 55.6 .61 -7.11 -7.46 1.104 -Span(fQ= 55.6 MIST 25.85626.41 - 100.6 tom 92.3 0.91 c` �w %End Reaction for Min.Shear= 25% 1 Allowable Overstress(ADS)= 5% 2 O Stress Reference= 120% 3 Total Trib(sgfl)= 320 4 Reduced Roof Live Load 17.61 5 wuwswns sTurrnl u=s'rimo Use LL retluctlm7 in 6 T Deflection Check 8 Maalmum Stress Rados Maximum Added Forces E(ksi)= 290D0 9 Shaer:UC=1.152 al 50.]35 ft Shear:0.87 kips at 50335 ft 1(104)= 0 10 Moment:UC=0.917 at 26.41 ft Marred:0 ft-kips at 26.41 ft App—Original De8ec8on(in)= Note:Manmum allowable Overstress(AOS)in gravity members is donned per the applicable building code Approx.New Doi(In)_ Approx.Deflection Ratio=Ll #VALUEI Original Loading("As-Built","As-Designed",or"In-Placa"Capacity) Naw Loading Point Loads Point Loads No. Mark Magnitude(k) Location(ft) No. Mack Magnitude(k) Location(ft) 1 1 skid 1.766 50.6 2 2 3 3 3 3 4 4 5 5 6 6 8 8 9 9 10 10 Uniform Loads(FUII or Pargal) Uniform Loads(Full or Partial) No. Mark Magnitude(k#) Location(ft) No. Mark Magnitude(k#) Location(ft) Start End Start End 1 Original TL 0.228 0 55.6 39.7 1 0.098 0 55.6 17 ledDL 2 2 0.098 0 55.6 17 psf WSL 3 3 4 4 5 5 6 6 8 8 9 9 10 10 0.228 0.196 Triangular Loads(Full or Partial) Triangular Loads(Full or Partial) No. Mark Magnitude(k#) Peek Meg. Location(ft) No. Mark Magnitude(k#) Peak Mal Location(ft) Orientation Start End Orientation Start End 1 DRIFT 0."8 Left/Fronl 0 18 1 DRIFT 0."8 Left/Front 0 18 2 2 3 3 4 4 5 5 6 6 8 8 9 9 10 10 Percent Stress Diagram PERCENT OVERSTRESS 1.200 1.150 E 1100 1 050 1.000 0 1 2 3 4 5 6 T 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 W 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 x(I —Shear(Vnew/Vod9) —Moment(Mnaw l Mang) 1 Project No. Project Name Mede By: Date: EXISTING FRAMING EVALUATION&ANALYSIS WORKSHEET zaolsosos6 #3850 wa ma CAPX Remodel CR6 8/512024 'ENVELOPE ANALYSIS OF A SIMPLY SUPPORTED SECTION' Original Building Code:2003 IBC Current Building Code'.2021 IBC Shear Diagrams SHEAR DIAGRAM 10 8 6 4 n q p 1 25 40 4 -2 � rr —New Shear —Original Shnear W ACS -------Original Shear SHEAR COMPARISION(ABSOLUTE VALUE) 1 os o.a o.� 0.6 0.5 0.4 0.3 0.2 n 0.1 0 1 1 1 1 1 1 1 7 1 1 1 1 35 38 Z 9 4 3 41 4 4 44 !2 53 5 m-0.2 -0.3 -0.1 (n) —Difference in Shear(Vnew-Vorig) — —Differeneein Shear(Vnew-AOSNorig) Design Stress Reversal(NegaBve on Chart) —Stress Reversal(NegaBve on Chart-For Info Only) Moment Dlagrama MOMENT DIAGRAM — — — ---------------------- 90 30 0 0 5 10 15 20 25 30 35 40 45 50 55 x(n) —New Momenl Original Moment wl ADS Onginal Moment 110 MOMENT COMPARISON DIAGRAM 105 \ g / \ E E / _ _ _ _ _ _ _ _ __________ _ _ _ _ _ _ _ _ _ _ _ 100 95 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 x(n) —New Moment ——Original Momentwl AOS ----Original Moment —Max New Moment ---Max Original Moment —Reinforang Reference(Horiz Line,If Req'd) 1 Johnston Burkholder Associates JOB TITLE #3850 Walmart CAPX Remodel 930 Central Street JOB No. 2401505056 Kansas City,MO 64105 CALCULATED BY CRIB DATE 8/5/2024 Joist/JG Angle Web Strut (SJI Specification/AISC Specification 360-16-ASD) Project Name: SJI TD 12 Design Example Date 2/21/2023 ..................................................................................._._.._._.._._......................................................................... Project Number: Engineer ..................._....._..........._....._.._._.._..........._.._._.._._.._._.._._._.._._.._._.._._.._....._.._._.._._.._......I........................� ...............................�....................... ................................................................. — — — Design Methodology ASD Input Data Length F, F Angle Size Number Compression Tension in. ksi ksi of Angles kips kips 38 36 601 L2X2X3116 2 14.8 4 AISC Tensile Strength AISC Compressive Strength Yielding Rupture Fe Fcr Pn Pn10 Pn Pn/() Pn Pn/0 Lira Ur bit ksi ksi kips kips Pr1�Pn/i2) ki s __kips kips kips Pr/(Pn/()) 62.1 118.6 10.60 20.4 17.2 24.8 14.9 T.T F-1 52.0 31.1 32.9 16.5 1.00 REINFORCEMENT IS NOT REQUIRED Angle Welds Weld strength. FEyx 70 ;ksi Fillet weld size 0-1875in. ................................. Required force per angle 8.2 kips Available weld strength 2.78 kips/in. Required weld length per side 1.47 in. .................................. Specified weld length per side 1.50 in. ................................: Shear lag factor,U 0.39 r To increase the shear lag factor,increase the specified weld length. Note:forces shown above are not actual forces but rather the limits for an L2x2x3/16 each side of joist tension&compression forces being forced for is«than allowable tension/compression listed above Johnston Burkholder Associates JOB TITLE #3850 Walmart CAPX Remodel 930 Central Street JOB No. 2401505056 Kansas City,MO 64105 CALCULATED BY CRB DATE 8/5/2024 Hold down calculations for : REFG Rack WIND Seismic Unit Information Pressure (ultimate) Forces (ultimate) Unit Length 11.00 ft Normal to L 36.400 psf Sds 0.853 Unit Width 6.92 ft Normal to W 36.400 psf Fp 0.366 Unit Height 8.25 ft Vertical 28.700 psf Normal to L 2.068 kips Curb Length 11 ft *Loads from Struware Roof W Normal to W 2.068 kips Curb Width 7.00 ft Vertical 0.964 kips Curb Height above roof 0 ft Center of gravity 4.13 ft Unit Weight 5650 lbs Applied Overturning (service) Applied Overturning (service) Normal to L 8.176 k-ft Normal to L 5.971 k-ft Normal to W 5.141 k-ft Normal to W 5.971 k-ft Full Resisting Moment Net Holdown Force Req'd Net Holdown Force Req'd Normal to L 19.54 k-ft Normal to L 0.142 k Normal to L 0.000 k Normal to W 31.08 k-ft Normal to W 0.00 k Normal to W 0.000 k DL used Hold down Unity Hold down Unity 0.6DL+0.6WL 0.60 #of bolts 3 #of hold downs provided 2 0.6DL+0.7E 0.60 Total hold down capacity 4.500 k Total hold down capacity 3.000 k Tension per hold down 0.047 k Tension per hold down 0.000 k Unity 0.032 Unity 0.000 Hold dow clip capacity 1.50 k • . Permit#: 6508 Permit Date: 05/19/25 Permit Type: COMM IRCIAL M ECHANICAL Project Nam a WALM ART STORE#3757 -1008 - REFRIGERATION CAP-X REF-1 Applicant Hargis Engineers Inc. /Gurpreet Singh Nam e Applicant Hargis Engineers Inc. / 1201 3rd Avenue, Suite 600 Address: Applicant, City, State, Seattle Zip: Contact: Gurpreet Singh Phone: 2064483376 Em al: Gurpreet.singh@bargis.biz Scope of MECHANICAL: REFRIGERATION SYSTEM UPGRADING, WHICH COMPRISES REPLACEMENT OF LT REACH-INS & Work: ICE CREAM CAKE BUNKER, RACK UPGRADES,ADDITION OF (2) CO2 PUMP SKIDS, REPLACEMENT OF EVAPORATORS IN ICE CREAM FREEZER, DELI FREEZER, SEAFOOD FREEZER& GROCERY FREEZER, UPGRADE ALL EXISTING REFRIGERATION RACK CONTROLLERS, REPLACEMENT OF COMPRESSORS & OTHER RACK HOUSE CHANGES AND ADD LEAK DETECTION. STRUCTURAL: NEW RAE CORP PUMP SKID (5,650 LBS) ON CAPPED CURB. FOR MORE INFORMATION SEE STRUCTURAL DRAWINGS. Valuation: 700000.00 Square Feet: 152222 Num ber of 1 Stories: Construction VA Type: O wupancy M;M ercantile G ioup: ID Code: Perm t Issued: 06/23/2025 Perm f 02/07/2026 Expires: Form Perm t COMM IRCIAL MECHANICAL Type: Status: COMPLETE Assigned To: Hannah Hardwick Property Parcel# A ddress L egal Description O wner Nam e Omer Phone Z oning 00930300000301 4 010 172ND ST W lm a-t,Inc. 569 Other Retail Trade- Apparel&Accessories NEC Contractors Contractor P rim ay Contact P hone A ddress C ontractor Type L icense License# Jackson Dean Construction 2 068322943 3 414 116th St CONSTRUCTION UBI 601 222 672 CONTRACTOR Jackson Dean Construction 2 068322943 3 414 116th St CONSTRUCTION Construction Contractor JACKSDC962QR CONTRACTOR Inspections Date Inspection Type D escription S cheduled Date C om lieted Date I nspector Status 01/20/2026 C14.MECHANICAL 01/20/2026 0 1/20/2026 B UILDING Approved FINAL 08/14/2025 C12.GAS PIPING onsite contact will be,Dayton,360- 08/18/2025 0 8/18/2025 B UILDING Approved PRESSURE TEST 399-8312 Plan Reviews Date Review Type D escription A ssigned To R eview Status 05/19/2025 COMM IRCIAL MECHANICAL AIRPORT N o Comm art Received 05/19/2025 COMMIRCIAL MECHANICAL BUILDING Approved 05/19/2025 C OMMHMCIAL MECHANICAL N o land use concerns. P LANNING A pproved 05/19/2025 C OMMIRCIAL MECHANICAL N o civil corn m nts.All interior work. Developm ait Services Approved M anager 05/19/2025 C OMMIRCIAL MECHANICAL PW ADMIN-GIS N o Com m at Received 05/19/2025 C a OMMIRCIAL MECHANICAL M rysville utilities,no com m ats.JWP WSEW REV A pproved 05/19/2025 C a OMMIRCIAL MECHANICAL M rysville utilities,no com m ats.Gus P W WAT--REV A pproved Fees Fee D escription N otes A m Wnt Enter 1 if perm i is for com m ecial m e hanical Web Only-Mechanical Com m ecial Plan Review $4,094.83 (Table 4-1) Credit Card Service $122.84 Processing/Technology $25.00 Mechanical Base Perm i Fee $25.00 Refrigeration Unit>500 BTU/h E nter#of units $1,000.00 Credit Card Service $31.50 Total $5,299.17 Attached Letters Date L etter D escription 06/23/2025 Building Penn i 05/19/2025 Web Form-Building Application Paym ants Date P aid By D escription P aym mt Type A ccepted By A m cant 05/19/2025 Eric Mills 2 31809412 H annah Hardwick $122.84 05/19/2025 XBP Conf:231809412 $4,094.83 06/23/2025 Eric Singh 2 35009772 H annah Hardwick $31.50 06/23/2025 XBP Conf:235009772 $1,050.00 O astanding Balance $0.00 Notes Date N ote C reated By: 12/29/2025 sent expiration notice Hannah Hardwick 10/24/2025 Expiration notice sent LaNay Hendrick Uploaded Files Date File Nam e 06/23/2025 26997027-2025 BLD6508 IssuedPenn i.pdf 05/19/2025 c034ld7aOaf2f3219cfc2ca62c2e7e6d arlington wa 3757-1008 cap-X perm i.pdf 05/19/2025 dbl88efee951706d250dl2e26d5fl4c8 structural calculations 03757.pdf 05/19/2025 e349b541713688963b88cd3a9847ecO8 20814771-com m ecial m e hanical.pdf 05/19/2025 Obc23 dab 8da547a9c7c47f4aO2f5967f 20803073-com m ecial building_perm t anplication.ndf 05/19/2025 e349b541713688963b88cd3a9847ecO8 20814771-com m ecial m whanical.pdf 05/19/2025 c034ld7aOaf2f3219cfc2ca62c2e7e6d arlington wa 3757-1008 cap-X perm i.pdf