HomeMy WebLinkAbout415 Alcazar St_BLD170_2025
Permit #: 170
Permit Date: 08/23/13
Permit Type: RESIDENTIAL ALTERATION
Project Name: Laurabeth & Josh Roundy
Applicant Name:
Applicant Address:
Applicant, City, State, Zip:
Contact:
Phone: 360-631-1531
Email:
Scope of Work: Detached Garage
Valuation: 25000.00
Square Feet: 1320
Number of Stories: 0
Construction Type:
Occupancy Group:
ID Code:
Permit Issued: 09/03/2013
Permit Expires:
Form Permit Type:
Status: COMPLETE
Assigned To: Launa Black
Property
Parcel # Address Legal Description Owner Name Owner Phone Zoning
NERLAND SYD & 111 Single Family
00605200000601 415 ALCAZAR ST
ELAINE Residence - Detached
Inspections
Date Inspection Type Description Scheduled Date Completed Date Inspector Status
C04. PLUMBING DWV and Domestic is on
04/14/2014 04/14/2014 04/14/2014 z.Christopher Young Approved
GROUNDWORK test - no leaks.
R20. ACCESSORY
09/16/2013 STRUCTURE Garage/Office 09/16/2013 z.Christopher Young Assigned
FINAL
Plan Reviews
Date Review Type Description Assigned To Review Status
08/23/2013 ASSESSORY STRUCTURE z.Christopher Young
08/23/2013 ASSESSORY STRUCTURE Launa Black
08/23/2013 ASSESSORY STRUCTURE Bathroom located in garage. PW-ADMIN-GIS
1. Proposed Bar Sink, Water Closet(Toilet) shows no
connection to Sanitary sewer.
08/23/2013 ASSESSORY STRUCTURE PW-SEW-REV
2. Proposed connection to Sanitary Sewer must be
provided to complete the review for sewer. FR and JL
08/23/2013 ASSESSORY STRUCTURE Bathroom located in garage.
08/23/2013 ASSESSORY STRUCTURE Bathroom located in garage. PW-WAT-REV
Fees
Fee Description Notes Amount
Building Permit Table 4-1 $511.33
State Surcharge - 1st DU Residential - 1st Unit $4.50
Building Plan Review Table 4-2 $332.36
Total $848.19
Attached Letters
Date Letter Description
08/30/2013 Building Permit
Payments
Date Paid By Description Payment Type Accepted By Amount
09/03/2013 Laura Roundy check #1130 Launa Black $848.19
Outstanding Balance $0.00
Notes
Date Note Created By:
Side sewer pipe from the new garage to the existing side sewer has been connected, inspected,
12/23/2014 Jay Lemke
and approved. JL
See attached floor plan. The bathroom will be located in the garage and it will also have a
08/26/2013 Launa Black
hydronic heating system.
Uploaded Files
Date File Name
08/26/2013 Floor Plan.pdf
08/23/2013 BLD-170.pdf