Loading...
HomeMy WebLinkAbout415 Alcazar St_BLD170_2025 Permit #: 170 Permit Date: 08/23/13 Permit Type: RESIDENTIAL ALTERATION Project Name: Laurabeth & Josh Roundy Applicant Name: Applicant Address: Applicant, City, State, Zip: Contact: Phone: 360-631-1531 Email: Scope of Work: Detached Garage Valuation: 25000.00 Square Feet: 1320 Number of Stories: 0 Construction Type: Occupancy Group: ID Code: Permit Issued: 09/03/2013 Permit Expires: Form Permit Type: Status: COMPLETE Assigned To: Launa Black Property Parcel # Address Legal Description Owner Name Owner Phone Zoning NERLAND SYD & 111 Single Family 00605200000601 415 ALCAZAR ST ELAINE Residence - Detached Inspections Date Inspection Type Description Scheduled Date Completed Date Inspector Status C04. PLUMBING DWV and Domestic is on 04/14/2014 04/14/2014 04/14/2014 z.Christopher Young Approved GROUNDWORK test - no leaks. R20. ACCESSORY 09/16/2013 STRUCTURE Garage/Office 09/16/2013 z.Christopher Young Assigned FINAL Plan Reviews Date Review Type Description Assigned To Review Status 08/23/2013 ASSESSORY STRUCTURE z.Christopher Young 08/23/2013 ASSESSORY STRUCTURE Launa Black 08/23/2013 ASSESSORY STRUCTURE Bathroom located in garage. PW-ADMIN-GIS 1. Proposed Bar Sink, Water Closet(Toilet) shows no connection to Sanitary sewer. 08/23/2013 ASSESSORY STRUCTURE PW-SEW-REV 2. Proposed connection to Sanitary Sewer must be provided to complete the review for sewer. FR and JL 08/23/2013 ASSESSORY STRUCTURE Bathroom located in garage. 08/23/2013 ASSESSORY STRUCTURE Bathroom located in garage. PW-WAT-REV Fees Fee Description Notes Amount Building Permit Table 4-1 $511.33 State Surcharge - 1st DU Residential - 1st Unit $4.50 Building Plan Review Table 4-2 $332.36 Total $848.19 Attached Letters Date Letter Description 08/30/2013 Building Permit Payments Date Paid By Description Payment Type Accepted By Amount 09/03/2013 Laura Roundy check #1130 Launa Black $848.19 Outstanding Balance $0.00 Notes Date Note Created By: Side sewer pipe from the new garage to the existing side sewer has been connected, inspected, 12/23/2014 Jay Lemke and approved. JL See attached floor plan. The bathroom will be located in the garage and it will also have a 08/26/2013 Launa Black hydronic heating system. Uploaded Files Date File Name 08/26/2013 Floor Plan.pdf 08/23/2013 BLD-170.pdf