September 1, 2016
STRUCTURAL CALCULATIONS
(Response to Permit Comments)
ARLINGTON BOYS & GIRLS CLUB
18513 59th Ave. NE
Arlington, WA 98223
Quantum Job Number: 16183.01
Prepared for:
2812 ARCHITECTURE
2812 Colby Avenue
Everett, Washington 98201
Prepared by:
QUANTUM CONSULTING ENGINEERS
1511 Third Avenue, Suite 323
Seattle, WA 98101
TEL 206.957.3900
FAX 206.957.3901
SW-6
HDU2
HDU2
SW-6
(2) 600S162-54
(2) 600S162-54
SW-6
SW-6
HDU2 HDU2
SW-6 (2) 600S162-54
(2) 600S162-54
GYM LOBBY SHEAR WALL LAYOUT
HDU2 HDU2
HDU2
(2) 600S162-54 (2) 600S162-54(2) 600S162-54
End 2
Wall SL (lb)
End 2
Page 1 of 3
Wall LL (lb)
Created By: AJS
Checked By: XXX
Loads Tributary to End 2
End 2
Wall DL (lb)
End 1
Wall SL (lb)
End 1
Wall LL (lb)
Loads Tributary to End 1
End 1
Wall DL (lb)
Wall
Wall SL (lb)
Holdown
Wall LL (lb) Wall
Loads Over Length of the Wall
2 2 2 2 2
Wall 166021201440 Studs
# of End
Wall DL (lb)
Wall
06/20/16 Wind (lb)
Wall Depth
of
PageDateDate
Wall 70012001200 Type
Seismic (lb) Shear Wall
MW Base? BaseBaseBase MarkGrid G Grid 5Grid 6SW-6 SW-6SW-6x6 x6 x62 HDU2
(3075DF,2215HF)2 2 No HDHDU2 (3075DF,2215HF)
16135.01 Grid G.4Grid F.2 SW-6SW-6 x6 x6 2 2 HDU2
(3075DF,2215HF)No HD
Interstory of SW Segment
Shear Wall Summary
By
Job #
Checked x6x6x6
al\Shear Wall Design.xls
12.00
Wall Depth
n) =
0.500.500.50
Specific Gravity G
Wall DF #2DF #2DF #2
Framing Species
/lSeg
& Girls Club\Calculations\Wood Frame Addition\Later
Yes 0.720.570.83
SW
(ft) h
House?:
sw 10.0010.0010.00
Gym Lobby
Depth of Floor Framing at Interstory SW Segments (i
(ft) h
Structure:Location: 13.8317.6712.00 59.92
lSeg
Arlington B+G Club2812 ArchGym Lobby
Worksheet: Lobby RoofFile: M:\2812 Architecture\16183.01 Arlington Boys
Shear Wall Line:
(ft) =
SW Mark lSW
Grid G Grid 5Grid 63.42 10.00 2.92 DF #2 0.50 x6 Base
500 410
Segment Grid G.4Grid F.2 13.00 10.00 0.77 DF #2 0.50 x6 Base
1200 1560
1511 Third Avenue, Suite 323Seattle, WA 98101Project Client Subject Base Floor Wood Shear Wall DesignPer IBC 2012, ASCE 7-10, SDPWS-2008, & NDS 2012Shear
Wall Line Loading:T. 206.957.3900Shear Wall Line InformationF. 206.957.3901
Page 2 of 3
Created By: AJS
Checked By: XXX
Shear
SeismicSeismicSeismicSeismicSeismic
Controlling
OKOKOKOKOK
Check
(plf) 416416416416416
Shear Wall Capacity
Type SW-6SW-6SW-6SW-6SW-6SW-6SW-6SW-4SW-4SW-3
Shear Wall
(plf) 214925168100
06/20/16
of Req'd Shear
a
PageDateDate
0 0 0 0
Shear (lb/in) (plf)
Sheathing Adjusted
0.8 Stiffness, G Wind Shear
=
φD
MW (plf) 1.001.001.001.00
16135.01 Species
Reduction % Different
LRFD Seismic SW Capacity
By
Job #
Checked 520 760 980 1280416 1520608 1960784 1025601024131216151568204820 26 40%3040%40%4040%40%40%40%40%40% Lever
al\Shear Wall Design.xls
Nominal Shear Increase OT Arm (ft)
Allowable User Input M
Seismic SW Capacity (plf)
(in) (plf) 0 0 0 0 NoNoNoNoNoNoNoNoNo
Override
Panel Edge Nail Spacing Wind Shear Lever Arm?
925168100 OKOKOKOKOK
Adjusted Seismic Shear (plf)
& Girls Club\Calculations\Wood Frame Addition\Later
1.001.001.001.00
Species 0.00%0.00%0.00%0.00%***NA******NA******NA******NA******NA***
No
Reduction % Different Status
OT
Ratio 1.001.001.001.00 (ft) 13.0013.8317.6712.00
Seismic Aspect
Reduction Actual MLever Arm
Gym Lobby
OT
Structure:Location: (plf) 925168100 13.0013.8317.6712.00
Sheathing Grade, Sheathing Thickness, & Nail Size
Arlington B+G Club2812 ArchGym Lobby APA Rated, 15/32", 8d CommonAPA Rated, 15/32", 8d CommonAPA Rated, 15/32", 8d CommonAPA Rated, 15/32", 8d CommonAPA
Rated, 15/32", 8d CommonAPA Rated, 15/32", 8d CommonAPA Rated, 15/32", 8d CommonSeismic Shear 6 4 3 2 4 Assumed M3 Lever Arm (ft)2 Worksheet: Lobby RoofFile: M:\2812 Architecture\16183.01
Arlington Boys
Shear Wall Line:
Type SW-6SW-4SW-3SW-22SW-42SW-32SW-2 SW MarkGrid G Grid 5Grid 6146 0.68SW Mark1.00Grid G Grid 5Grid
62143.42 0 3.42 40%0.00% 1.00 0
Segment Grid G.4Grid F.2 Segment Grid G.4Grid F.2
1511 Third Avenue, Suite 323Seattle, WA 98101Project Client Subject Base Floor Wood Shear Wall DesignPer IBC 2012, ASCE 7-10, SDPWS-2008, & NDS 2012Shear
Wall Schedule (LRFD)Shear Wall T. 206.957.3900F. 206.957.3901 Determine Shear Wall Type (LRFD) Determine Shear Wall Overturning Moment Lever Arm
Load
Lateral SeismicSeismicSeismicSeismicSeismic
Controll-ing
1134757465586811
Page 3 of 3
Controll-ing Comp. Load (lb)
Created By: AJS
Checked By: XXX
Controlling end ofwall compression1134lbs. Use 1500lbsconservatively fordesign
of light gaugebuilt up stud design.
593374465633
16-14
End 2 Max Eq. 16-13 &
2 2 2 2 2 2 2 2 2 2
757465586811
End 2 Studs Req'd
Eq. 16-12 # of End
per
16-14 593374465633 All 5156515651565156 Status
P Stud (lb)
End 1 Max Eq. 16-13 &
Sds = 0.76 (lb) 0 0 OKOK
End 1 757465586811 câ”´ 5156515651565156 (lb)-3075-3075 -3075OKOK
OK
Eq. 16-12 Holdown Capacity
0 0 0 0 (psi) P'
(lb) 1.00 625625625625
câ”´
End 2 Snow
=
Cb
No HDNo HD No HD
Holdown
0 0 0 0 (psi)25625625625F'625 625 5156 5156
câ”´ HDU2 (3075DF,2215HF)HDU2
(3075DF,2215HF)HDU2 (3075DF,2215HF)HDU2 (3075DF,2215HF)HDU2 (3075DF,2215HF)HDU2 (3075DF,2215HF)
End 2 Live (lb)
(lb) F
(lb) 100100100100 c 7865786578657865
End 2 Dead Controll-ing Lateral Load
(lb) 0 0 0 0 (psi) 953953P'953953 (lb) 13548 SeismicSeismic
06/20/16 F'c -922-186 Seismic-345Seismic
Seismic
Ten. Load
of End 1 Snow Controll-ing
PageDateDate
(lb) 0 0 0 0 P 16
0.40120.40120.40120.4012
End 1 Live
End 2 Eq. 16-
MW (lb) 100100100100 (psi) 108110811081C1081 15
16135.01 cE
End 1 Dead
End 2 Eq. 16-
By
Job #
Checked 0 0 0 0 (psi) F 16
1.00 c = 0.8
al\Shear Wall Design.xls
min 580000580000580000580000
Total (lb)
Wind Comp. End 1 Eq. 16-
=t
C
/d E'
e 21.0021.0021.0021.00 15
Comp.
ASD Wind Above (lb)
End 1 Eq. 16-
(lb) 0 0 0 0 (psi) l (lb)
1.00 c 2376237623762376
Wind Comp. s (ASD) End 2 Dead
ion Load (ASD)
= Load and Required Holdown (ASD)
CM
& Girls Club\Calculations\Wood Frame Addition\Later
(lb) 646354475700 (psi) F* (lb)
Seismic Fc 1350135013501350
Comp. Total End 1 Dead
CF
ASD 1.60 1.101.101.101.10
Seismic Comp.
Above (lb) Wind Ten. Total (lb)
Gym Lobby
=
CD
Structure:Location: 646354475700 d (in) 5.505.505.505.50
Seismic Total (lb)
Comp. (lb)
Arlington B+G Club2812 ArchGym Lobby Seismic Ten.
Worksheet: Lobby RoofFile: M:\2812 Architecture\16183.01 Arlington Boys
Shear Wall Line:
SW MarkGrid G Grid 5Grid 61023 SW MarkGrid G1023 Grid 5Grid 65.500 1.10SW MarkGrid G13500 Grid 5Grid
6-10232376100 -475-70021.000 0 0 5800002050 0 10607202051001081 10607201850.40120 954648-922953 480-3451857865 1134954648-902 6 876149-276 1134 876
Segment Grid G.4Grid F.2 Segment Grid G.4Grid F.2 Segment Grid G.4Grid F.2 -646-354
0 0 780830 780830 702747 -27304 702747 -186135
1511 Third Avenue, Suite 323Seattle, WA 98101Project Client Subject Base Floor Wood Shear Wall DesignPer IBC 2012, ASCE 7-10, SDPWS-2008, & NDS 2012Determine
Controlling Shear Wall End Axial CompressT. 206.957.3900F. 206.957.3901 Determine Number of Shear Wall End Compression StudDetermine Controlling Shear Wall End Axial Tension
2007 NASPEC
Project: Date: 8/31/2016
Model:
Unif Ld
20.0 lb/ft
R1 R2
12.00 ft
Section : (2) 600S162-54 Boxed C Stud (X-X Axis) Fy = 50.0 ksi
Maxo = 5054.2 Ft-Lb Moment of Inertia, I = 5.721 in^4 Va = 5645.8 lb
Loads have not been modified for strength checks
Loads have not been modified for deflection calculations
Flexural and Deflection Check
Mmax Mmax/ Mpos Bracing Ma(Brc) Mpos/ Deflection
Span Ft-Lb Maxo Ft-Lb (in) Ft-Lb Ma(Brc) (in) Ratio
Center Span 360.0 0.071 360.0 Full 5054.2 0.071 0.055 L/2604
Combined Bending and Web Crippling
Reaction or Load Brng Pa Pn Mmax Intr. Stiffen
Pt Load P(lb) (in) (lb) (lb) (Ft-Lb) Value Req'd ?
R1 120.0 1.00 1197.9 2096.3 0.0 0.05 No
R2 120.0 1.00 1197.9 2096.3 0.0 0.05 No
Combined Bending and Shear
Reaction or Vmax Mmax Va Intr. Intr.
Pt Load (lb) (Ft-Lb) Factor V/Va M/Ma Unstiffen Stiffen
R1 120.0 0.0 1.00 0.02 0.00 0.00 NA
R2 120.0 0.0 1.00 0.02 0.00 0.00 NA
Combined Bending and Axial Load
Axial Ld Bracing (in) Max K-phi Lm Brac Allow Ld Intr.
Span (lb) KyLy KtLt KL/r (in-lb/in) (in) (lb) P/Pa Value
Center Span 1500.0 (c) Third-Pt Third-Pt 64 0.0 0.0 13856.9 (c) 0.11 0.18
Member Interconnection Spacing = 12.00 in
See NASPEC C4.5 for add'nl interconnection requirements
MEMBER REPORT Roof, GRID 8 BEAM PASSED
1 piece(s) 5 1/8" x 13 1/2" 24F-V4 DF Glulam
All locations are measured from the outside face of left support (or left cantilever end).All dimensions are horizontal.
Design Results Actual @ Location Allowed Result LDF Load: Combination (Pattern) System : Floor
Member Reaction (lbs) 5652 @ 4" 11980 (5.50") Passed (47%) -- 1.0 D + 1.0 S (All Spans) Member Type : Drop Beam
Shear (lbs) 4643 @ 1' 7" 14057 Passed (33%) 1.15 1.0 D + 1.0 S (All Spans) Building Use : Residential
Pos Moment (Ft-lbs) 23231 @ 8' 10 1/2" 35805 Passed (65%) 1.15 1.0 D + 1.0 S (All Spans) Building Code : IBC 2012
Live Load Defl. (in) 0.393 @ 8' 10 1/2" 0.569 Passed (L/522) -- 1.0 D + 1.0 S (All Spans) Design Methodology : ASD
Total Load Defl. (in) 0.645 @ 8' 10 1/2" 0.854 Passed (L/318) -- 1.0 D + 1.0 S (All Spans)
• Deflection criteria: LL (L/360) and TL (L/240).
• Bracing (Lu): All compression edges (top and bottom) must be braced at 17' 9" o/c unless detailed otherwise. Proper attachment and positioning of lateral
bracing is required to achieve member stability.
• Critical positive moment adjusted by a volume factor of 1.00 that was calculated using length L = 17' 1".
• The effects of positive or negative camber have not been accounted for when calculating deflection.
• The specified glulam is assumed to have its strong laminations at the bottom of the beam. Install with proper side up as indicated by the manufacturer.
• Applicable calculations are based on NDS.
Bearing Length Loads to Supports (lbs)
Supports Roof
Total Available Required Dead Snow Total Accessories
Live
1 - Stud wall - SPF 5.50" 5.50" 2.59" 2213 2751 3439 8403 Blocking
2 - Stud wall - SPF 5.50" 5.50" 2.59" 2213 2751 3439 8403 Blocking
• Blocking Panels are assumed to carry no loads applied directly above them and the full load is applied to the member being designed.
Tributary Dead Roof Live Snow
Loads Location (Side) Width (0.90) (non-snow: 1.25) (1.15) Comments
0 - Self Weight (PLF) 0 to 17' 9" N/A 16.8
Residential - Living
1 - Uniform (PSF) 0 to 17' 9" (Top) 15' 6" 15.0 20.0 25.0
Areas
Weyerhaeuser Notes
Weyerhaeuser warrants that the sizing of its products will be in accordance with Weyerhaeuser product design criteria and published design values.
Weyerhaeuser expressly disclaims any other warranties related to the software. Refer to current Weyerhaeuser literature for installation details.
(www.woodbywy.com) Accessories (Rim Board, Blocking Panels and Squash Blocks) are not designed by this software. Use of this software is not intended to
circumvent the need for a design professional as determined by the authority having jurisdiction. The designer of record, builder or framer is responsible to
assure that this calculation is compatible with the overall project. Products manufactured at Weyerhaeuser facilities are third-party certified to sustainable
forestry standards. Weyerhaeuser Engineered Lumber Products have been evaluated by ICC ES under technical reports ESR-1153 and ESR-1387 and/or tested in
accordance with applicable ASTM standards. For current code evaluation reports refer to http://www.woodbywy.com/services/s_CodeReports.aspx.
The product application, input design loads, dimensions and support information have been provided by Forte Software Operator
Forte Software Operator Job Notes 8/31/2016 12:02:19 PM
Forte v5.1, Design Engine: V6.5.1.1
Matthew Wion
Quantum Roof Framing.4te
(206) 957-3900
mwion@quantumce.com Page 1
of 1
18204 59th Ave.
Arlington, WA 98223 REVIEW COMMENT FORM
(360) 403-3500
Project Name: Boys & Girls Club Permit No.: 1069 Review Date: 8/2016
Contact: Larz Hitchcock Phone No.:425-252-2153 Review Phase: 1st Round Report Date: 8/16/16
Reviewing Dept.: CED Applicant: 2812 DWG Issue Date:
# Rev. Dwg. or Add’l Ref.
City
Comment Response/Resolution
Spec. Ref. Check
off
1. CJY Fire Alarm and Manual Pulls required - deferred
2. CJY A2.01 IBC 801 & Interior gym wall finish – ¾ inch plywood?
803 ASTM E84 and NFPA 286
3. CJY A2.03 Emergency Lighting Locations
4. CJY A2.06 Gym flooring – Class II? Critical Radiant Flux
5. CJY A5.01 Panic Hardware Door locations – closures?
6. CJY IBC Bleachers – per ICC 300
1028.1.1
7. CJY A2.00 Gym lobby – no wood or separation
8.
9.
10.
11.
12.
13.
14.
15.
16.
17.
18.
19.
20.
21.
22.
23.
Page 1 of 2
18204 59th Ave.
Arlington, WA 98223 REVIEW COMMENT FORM
(360) 403-3500
Project Name: Boys & Girls Club Permit No.: 1069 Review Date: 8/2016
Contact: Larz Hitchcock Phone No.:425-252-2153 Review Phase: 1st Round Report Date: 8/16/16
Reviewing Dept.: CED Applicant: 2812 DWG Issue Date:
# Rev. Dwg. or Add’l Ref.
City
Comment Response/Resolution
Spec. Ref. Check
off
24.
25.
26.
27.
28.
29.
30.
31.
32.
33.
34.
35.
36.
37.
38.
39.
Page 2 of 2
18204 59th Ave.
Arlington, WA 98223 REVIEW COMMENT FORM
(360) 403-3500
Project Name: Boys & Girls Club Permit No.: 1069 Review Date: 8/2016
Contact: Adam Clark Phone No.:425-252-2153 Review Phase: 1st Round Report Date: 8/2016
Reviewing Dept.: CED Applicant: 2812 DWG Issue Date:
# Rev. Dwg. or Add’l Ref.
City
Comment Response/Resolution
Spec. Ref. Check
off
1. CJY S2.0 (4) 600S162-54 shown at GL G5 has no engineering
detail
2. CJY S2.0 (4) 600S162-54 shown at GL G5.5 – engineering calls
out (2) 600S200-54
3. CJY S2.0 (2) 600S162-54 shown at GL G5.5 corner – engineering
calls out (2) 600S200-54
4. CJY S2.0 (2) 600S162-54 shown at line 6 – engineering calls out
(2) 600S200-54
5. CJY S2.0 (2) 600S162-54 shown at line 6 – engineering calls out
(2) 600S200-54
6. CJY S2.2 Engineering calls out 5 1/8 X 15 24F-V8 and the plans
show 5 1/8 X 15 24F-V4
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.
17.
18.
19.
20.
21.
Page 1 of 2
18204 59th Ave.
Arlington, WA 98223 REVIEW COMMENT FORM
(360) 403-3500
Project Name: Boys & Girls Club Permit No.: 1069 Review Date: 8/2016
Contact: Adam Clark Phone No.:425-252-2153 Review Phase: 1st Round Report Date: 8/2016
Reviewing Dept.: CED Applicant: 2812 DWG Issue Date:
# Rev. Dwg. or Add’l Ref.
City
Comment Response/Resolution
Spec. Ref. Check
off
22.
23.
24.
25.
26.
27.
28.
29.
30.
31.
32.
33.
34.
35.
36.
37.
38.
39.
Page 2 of 2
Date: 03/10/2026
Permit #: 1069
Permit Date: 07/01/2016
Review Date: 07/01/2016
Permit Type: COMMERCIAL ADDITION
Review Type: COMMERCIAL ADDITION
Target Date: 07/08/2016
Scheduled
00:00
Time:
Completed
08/16/2016
Date:
Description: Architecturals completed Structural review completed. Will be ready to issue once we receive
comments on both reviews.
Review Status:
Assigned To: z.Christopher Young
Time In: 00:00
Time Out: 00:00
Hours: 7.0
Notes
09/06/2016 Received review comments for both architectural and structural with revised drawings. CJY
Property Information
Parcel#: 31052200103100 ARLINGTON CITY OF
ARLINGTON CITY OF 18204 59TH DRIVE NE
18513 59TH AVE NE ARLINGTON, WA 98223
Zoning: 431 Airports & Flying FieldsLot: Block:
Permit #: 1069
Permit Date: 07/01/16
Permit Type: COMMERCIAL ADDITION
Project Name: Arlington Boys and Girls Club
Applicant Name: 2812 Architecture
Applicant Address: 2812 Colby Avenue
Applicant, City, State, Zip: Everett, WA 98201
Contact: Larz Hitchcock
Phone: 425-252-2153
Email: larz@2812architecture.com
Scope of Work: Addition for Teen Center and Gymnasium
Valuation: 1401500.00
Square Feet: 12835
Number of Stories: 1
Construction Type:
Occupancy Group:
ID Code:
Permit Issued: 09/13/2016
Permit Expires: 03/13/2017
Form Permit Type:
Status: COMPLETE
Assigned To: Kristin Foster
Property
Parcel # Address Legal Description Owner Name Owner Phone Zoning
ARLINGTON CITY 431 Airports &
31052200103100 18513 59TH AVE NE
OF Flying Fields
Contractors
Contractor Primary Contact Phone Address Contractor Type License License #
GAFFNEY 8105 Broadway CONSTRUCTION
425-355-5500 UBI 600 173 764
CONSTRUCTION Avenue CONTRACTOR
GAFFNEY 8105 Broadway CONSTRUCTION Labor &
425-355-5500 GAFFNCI104K3
CONSTRUCTION Avenue CONTRACTOR Industries
Inspections
Date Inspection Type Description Scheduled Date Completed Date Inspector Status
C20. BUILDING Gym entry insulation
03/07/2017 03/06/2017 BUILDING Approved
FINAL approved. 3/6/17 KO.
Gym masonry stem walls
C20. BUILDING
02/27/2017 insulated with vapor barrier. 02/24/2017 BUILDING Approved
FINAL
2/27/17 KO.
Gym walls steel stud
C20. BUILDING
02/22/2017 framing approved 02/21/2017 BUILDING Approved
FINAL
KO.2/21/17
C20. BUILDING Exterior wire/stucco 2/13/17
02/13/2017 02/13/2017 BUILDING Approved
FINAL KO.
Gym entry ceiling joists &
C20. BUILDING
02/07/2017 pan deck Approved 2/7/17 02/07/2017 BUILDING Approved
FINAL
KO.
C20. BUILDING Gym entry framing & shear
02/01/2017 01/31/2017 BUILDING Approved
FINAL walls Approved 1/31/17 KO.
C20. BUILDING Shear wall at gym entry
01/27/2017 01/26/2017 BUILDING Approved
FINAL approved
C20. BUILDING
01/27/2017 Densglass 01/27/2017 BUILDING Approved
FINAL
C20. BUILDING Wall cap sheathing nailing
01/17/2017 01/17/2017 BUILDING Approved
FINAL approved 1/17/17 KO.
Wall cap base channel from
C20. BUILDING exist gym to new gym
01/11/2017 01/11/2017 BUILDING Approved
FINAL transition, Approved 1/11/17
KO.
Teen center roof sheathing
C20. BUILDING
11/23/2016 and parapet wall hold downs 11/23/2016 BUILDING Approved
FINAL
approved 11/23/16
C20. BUILDING
10/07/2016 04/14/2017 BUILDING Completed
FINAL
Plan Reviews
Date Review Type Description Assigned To Review Status
Architecturals completed
COMMERCIAL Structural review completed.
07/01/2016 z.Christopher Young
ADDITION Will be ready to issue once we receive comments on both
reviews.
COMMERCIAL
07/01/2016 No comments, LT PW-ADMIN-GIS
ADDITION
RPBA for premise isolation which will be moved during
construction will need to be retested after re-installation
COMMERCIAL
07/01/2016 and annually thereafter. When plumbing permit is PW-WAT-REV
ADDITION
submitted there may be additional comments regarding
cross connection, GT
Fees
Fee Description Notes Amount
Building Permit Table 4-1 $9,847.19
Building Plan Review Table 4-2 $6,400.67
State Surcharge - 1st DU Residential - 1st Unit $4.50
Photocopies $10.00
Total $16,262.36
Attached Letters
Date Letter Description
09/07/2016 Building Permit
Payments
Date Paid By Description Payment Type Accepted By Amount
09/22/2016 Boys and Girls Club Check #55222 Kristin Foster $16,262.36
Outstanding Balance $0.00
Notes
Date Note Created By:
Emailed Adam to let him know the permit is ready once drainage is issued and we have received
09/07/2016 Kristin Foster
contractor info. KF
09/07/2016 Don't issue until drainage has been issued. Kristin Foster
07/01/2016 Plans are available for view in the CED review room. Kristin Foster
07/01/2016 Contractor TBD. KF Kristin Foster
Uploaded Files
Date File Name
09/22/2016 1857625-1069_Issued Permit.pdf
09/06/2016 1827059-1069_9-1-2016 Revised Plans_Part2.pdf
09/06/2016 1827060-1069_9-1-2016 Revised Plans_Part1.pdf
09/06/2016 1827037-1069_9-1-2016 Revised Structural Calcs.pdf
08/25/2016 1810353-Plan Review Comment Letter_Structural.docx
08/16/2016 1790639-Boys and Girls Club.docx
07/01/2016 1708422-1069_Boys and Girls Club Structural Calcs.pdf
07/01/2016 1707771-1069_Boys and Girls Club Application.pdf
07/01/2016 1707770-1069_Boys and Girls Club NREC Forms Bldg c.pdf
07/01/2016 1707768-1069_Boys and Girls Club NREC Forms Bldg B.pdf
Date: 03/10/2026
Permit #: 1069
Permit Date: 07/01/2016
Review Date: 07/01/2016
Permit Type: COMMERCIAL ADDITION
Review Type: COMMERCIAL ADDITION
Target Date: 07/08/2016
Scheduled
00:00
Time:
Completed
07/08/2016
Date:
Description: RPBA for premise isolation which will be moved during construction will need to be retested
after re-installation and annually thereafter. When plumbing permit is submitted there may be
additional comments regarding cross connection, GT
Review
Status:
Assigned To: PW-WAT-REV
Time In: 00:00
Time Out: 00:00
Hours: 0.0
Property Information
Parcel#: 31052200103100 ARLINGTON CITY OF
ARLINGTON CITY OF 18204 59TH DRIVE NE
18513 59TH AVE NE ARLINGTON, WA 98223
Zoning: 431 Airports & Flying FieldsLot: Block:
18204 59th Ave.
Arlington, WA 98223 REVIEW COMMENT FORM
(360) 403-3500
Project Name: Boys & Girls Club Permit No.: 1069 Review Date: 8/2016
Contact: Adam Clark Phone No.:425-252-2153 Review Phase: 1st Round Report Date: 8/2016
Reviewing Dept.: CED Applicant: 2812 DWG Issue Date:
# Rev. Dwg. or Add’l Ref.
City
Comment Response/Resolution
Spec. Ref. Check
off
1. CJY S2.0 (4) 600S162-54 shown at GL G5 has no engineering See revised drawings and response to plan check
detail calcs. (2) 600S162-54 are adequate at this location.
2. CJY S2.0 (4) 600S162-54 shown at GL G5.5 – engineering calls See revised drawings and response to plan check
out (2) 600S200-54 calcs. (2) 600S162-54 are adequate at this location.
3. CJY S2.0 (2) 600S162-54 shown at GL G5.5 corner – engineering See revised drawings and response to plan check
calls out (2) 600S200-54 calcs. (2) 600S162-54 are adequate at this location.
4. CJY S2.0 (2) 600S162-54 shown at line 6 – engineering calls out See revised drawings and response to plan check
(2) 600S200-54 calcs. (2) 600S162-54 are adequate at this location.
5. CJY S2.0 (2) 600S162-54 shown at line 6 – engineering calls out See revised drawings and response to plan check
(2) 600S200-54 calcs. (2) 600S162-54 are adequate at this location.
6. CJY S2.2 Engineering calls out 5 1/8 X 15 24F-V8 and the plans See response to plan check structural calculations.
show 5 1/8 X 15 24F-V4
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.
17.
18.
19.
20.
21.
Page 1 of 2
18204 59th Ave.
Arlington, WA 98223 REVIEW COMMENT FORM
(360) 403-3500
Project Name: Boys & Girls Club Permit No.: 1069 Review Date: 8/2016
Contact: Adam Clark Phone No.:425-252-2153 Review Phase: 1st Round Report Date: 8/2016
Reviewing Dept.: CED Applicant: 2812 DWG Issue Date:
# Rev. Dwg. or Add’l Ref.
City
Comment Response/Resolution
Spec. Ref. Check
off
22.
23.
24.
25.
26.
27.
28.
29.
30.
31.
32.
33.
34.
35.
36.
37.
38.
39.
Page 2 of 2