Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
19206 VISTA DR_BLD946_2026
BUILDING INSPECTION REPORT – MECHANICAL (RESIDENTIAL) Permit No. 946 Address: 19206 Vista Drive Contractor: BARRON HEATING & A.C. Owner: Caroline Mundy Date: 4/12/2016 ☒ APPROVAL ☠PARTIAL APPROVAL ☠CORRECTION ☠OTHER APPLIANCE: Furnace and A/C CO DETECTOR: ☠HEAT PUMP/AC UNIT: ☠GAS PIPING: ☒ DISCONNECT: ☒ DRIP LEG: ☒ SEISMIC: ☒ VENTING: ☒ 3†PAD: ☒ ACCESS: ☒ INSULATION/PROTECTION: ☒ SHUT-OFF VALVE: ☒ DUCTS: N/A L&I: Yes Date: 4/12/2016 Inspector: Kevin Olander 19203 VISTA DRIVE ARLINGTON, WA 98223 REPLACE FURNACE AND ADD A/C CAROLINE MUNDY 19203 VISTA DRIVE ARLINGTON WA 98223 206-607-4177 CRYSTALW@BARRONHEATING.COM BRYANT MATTSON 5100 PACIFIC HWY #103 FERNDALE WA 98248 360-676-1131 BRYANTM@BARRONHEATING.COM BARRON HEATING & AIR 5100 PACIFIC HWY #103 FERNDALE WA 98248 BARROHA179D7 10/23/16 206-607-4177 BRYANTM@BARRONHEATING.COM 58CVA070-12 ✔ ✔ 24ACC624A003 ✔ ✔ ✔ ✔ ✔ ✔ ✔ ✔ 03/25/2016 CRYSTAL WITTEVEEN Permit #: 946 Permit Date: 03/25/16 Permit Type: RESIDENTIAL MECHANICAL Project Name: Caroline Mundy Applicant Name: Bryant Mattson Applicant Address: 5100 Pacific Hwy #103 Applicant, City, State, Zip: Ferndale, WA 98248 Contact: Crystal Witteveen Phone: 206-607-4177 Email: bryantm@barronheating.com Scope of Work: Replace Furnace and Add A/C Valuation: 0.00 Square Feet: 0 Number of Stories: 1 Construction Type: Occupancy Group: ID Code: Permit Issued: 03/28/2016 Permit Expires: Form Permit Type: Status: COMPLETE Assigned To: Kristin Foster Property Parcel # Address Legal Description Owner Name Owner Phone Zoning MUNDY 111 Single Family 00898100008200 19206 VISTA DR CAROLINE R Residence - Detached Contractors Contractor Primary Contact Phone Address Contractor Type License License # BARRON HEATING MAKENNA 5100 PACIFIC CONSTRUCTION 360-676-1131 COA 600092564 & AC INC STEINKAMP HWY STE 103 CONTRACTOR BARRON HEATING MAKENNA 5100 PACIFIC CONSTRUCTION LABOR & 360-676-1131 BARROHA179D7 & AC INC STEINKAMP HWY STE 103 CONTRACTOR INDUSTRIES Inspections Date Inspection Type Description Scheduled Date Completed Date Inspector Status R00. HEAT PUMP / 04/12/2016 04/12/2016 BUILDING Approved AC UNIT FINAL R00. FURNACE 04/12/2016 04/12/2016 BUILDING Approved FINAL Fees Fee Description Notes Amount Mechanical Fee (Enter Fixture Fee) $25.00 Mechanical Base Permit Fee $25.00 Total $50.00 Attached Letters Date Letter Description 03/28/2016 Building Permit Payments Date Paid By Description Payment Type Accepted By Amount 03/25/2016 BILL PINKEY 58876803 cc $50.00 Outstanding Balance $0.00 Notes Date Note Created By: 03/25/2016 Model #58CVA070-12 AFUE 80% Model #24ACC624A003 SEER 13 Kristin Foster Uploaded Files Date File Name 04/12/2016 1562987-19206 Vista Drive.docx 04/01/2016 1545658-BLD_946 Permit.pdf 03/25/2016 1535377-BLD_946 Application.pdf