HomeMy WebLinkAbout20501 Olympic Pl Ne Ste 101_BLD6013_2025
Permit Packet Coversheet
Community and Economic Development
City of Arlington • 18204 59th Avenue NE • Arlington, WA 98223 • Phone (360) 403-3551
Page 1 of 1
Permit Number: Permit Type:
Address/Parcel: Completed (Month/Year):
Land Use
Notice of Decision
Staff Report
Application
Narrative
Legal Description
Vicinity Map
Site Plan
Landscape Plan
Complete Streets Checklist
Traffic Impact Analysis
Snohomish County Traffic Mitigation Offer
WSDOT Traffic Offer Form
Tree Survey
Stormwater Drainage Report
Geotech Report
Critical Area Evaluation Form
SEPA Checklist
Public Notice Material
Noticing and Related Documents
Water / Sewer Availability Certificate
Unanticipated Discovery Plan Form
Aerial Photo of Site
Proposed Building Materials
Lighting Plans and Lighting Cut Sheets
Color Elevations
Design Matrix
Plat Map
Title Report
Lot Closures
Preliminary Civil Plans
Archaeological Survey
o Confidential Documents. Contact the
City to obtain.
Topography (Existing Conditions)
CC&R’s
Deeds / Easements / Conveyances
/Dedications
Developer’s Agreement
Recorded Copies
Bonding or Assignment of Funds
o Confidential Documents. Contact the
City to obtain.
Letters and Project Documents
Other:
Civil
Issued Permit
Application
Other Applications
Construction Calculation Worksheet
Approved Plans
Review Comment Form
Letters and Project Documents
Other Agency Permits
Reports:
o Drainage Report Pg:
o Stormwater Pg:
o Geotech Pg:
o All Other Reports
SEPA and Noticing Materials
Inspections
As-Builts
Other:
Building
Issued Permit
Application
Additional Applications
Approved Plans
Site Plan
Letters and Project Documents
Calculations
Project Specification Manuals
Reports
Certificate of Occupancy
Inspections
Other:
BLD6013 Fire Sprinkler
20501 Olympic Pl Ne Ste 101 February 2025
✔
✔
✔
✔
✔
CITY OF ARLINGTON
18204 59th Avenue NE, Arlington, WA 98223
INSPECTIONS: 360-403-3417 - Permit Center: 360-403-3551
BUILDING PERMIT
20501 OLYMPIC PLACE, SUITE 101
Parcel #: 00847300001300
Permit #: 6013
PERMIT EXPIRES 180 DAYS AFTER
DATE OF ISSUANCE.
Scope of Work: Installation of UL300 fire suppression system Valuation: 1500.00
OWNER APPLICANT CONTRACTOR
GRANDVIEW NORTH LLC Alexander Gow Alexander Gow Fire Equipment
PO BOX 159, ARLINGTON 1436 NW 53rd ST 1436 NW 53rd St
ARLINGTON, WA 98223 Seattle Seattle, WA 98107
253-881-9731 2066322810
LIC: 601 291 837 EXP: 05/31/2025
LIC: ALEXAGF835QB EXP: 11/04/2025
MECHANICAL CONTRACTOR PLUMBING CONTRACTOR
LIC #:EXP:LIC #:EXP:
JOB DESCRIPTION
PERMIT TYPE:FIRE SPRINKLER CODE YEAR:2021
STORIES:1 CONST. TYPE:VB
DWELLING UNITS:OCC GROUP:A-3; Assembly
BUILDINGS:OCC LOAD:
PERMIT APPROVAL
The issuance or granting of this permit shall not be construed to be a permit for, or approval of, any violation of this Code or any
other ordinance or order of the City, of any state or federal law, or of any order, proclamation, guidance advice or decision of the
Governor of this State. To the extent the issuance or granting of this permit is interpreted to allow construction activity during any
period of time when such construction is prohibited or restricted by any state or federal law, or order, proclamation, guidance advice
or decision of the Governor of this State, this permit shall not authorize such work and shall not be valid. The building official is
authorized to prevent occupancy or use of a structure where in violation of this Code, any other City ordinances of this jurisdiction or
any other ordinance or executive order of the City, or of any state or federal law, or of any order, proclamation, guidance advice or
decision of the Governor. The building official is authorized to suspend or revoke this permit if it is determined to be issued in error or
on the basis of incorrect, inaccurate or incomplete information, or in violation of any City ordinance, regulation or order, state or
federal law, or any order, proclamation, guidance or decision of the Governor.
I AGREE TO COMPLY WITH CITY AND STATE LAWS REGULATING CONSTRUCTION AND IN DOING THE WORK
AUTHORIZED THEREBY; NO PERSON WILL BE EMPLOYED IN VIOLATION OF THE LABOR CODE OF THE
STATE OF WASHINGTON RELATING TO WORKMEN'S COMPENSATION INSURANCE AND RCW 18.27.
THIS APPLICATION IS NOT A PERMIT UNTIL SIGNED BY THE BUILDING OFFICIAL OR HIS/HER DEPUTY AND
ALL FEES ARE PAID.
IT IS UNLAWFUL TO USE OR OCCUPY A BUILDING OR STRUCTURE UNTIL A FINAL INSPECTION HAS BEEN
MADE AND APPROVAL OR A CERTIFICATE OF OCCUPANCY HAS BEEN GRANTED. IBC110/IRC110.
SALES TAX NOTICE: Sales tax relating to construction and construction materials in the City of Arlington must be reported on
your sales tax return form and coded City of Arlington #3101.
07/16/2024
Applicant Signature Date Building Official Date
7/16/24
CONDITIONS
Approved job copy shall be onsite for inspection. Adhere to approved plans. Call for inspections.
The property owner shall ensure that the construction project complies with all applicable zoning codes and regulations. The property
owner shall also ensure that the construction project does not cause any adverse impact on the surrounding environment or
community. The property owner shall be responsible for obtaining all necessary permits and approvals from the relevant authorities
before commencing construction. The property owner shall ensure that the construction project complies with all applicable design
review requirements.
THIS P ERMIT AUTHORIZES ONLY THE WORK NOTED. THIS P ERMIT COVERS WORK TO BE DONE ON P RIVATE
PROPERTY ONLY. ANY CONSTRUCTION ON THE P UBLIC DOMAIN (CURBS, SIDEWALKS, DRIVEWAYS,
MARQUEES, ETC.) WILL REQUIRE SEP ARATE PERMISSION.
PERM IT FEES
Date De s cription Fe e Amount
07/16/2024 Fire System Plan Review $200.00
07/16/2024 Credit Card Service $6.00
07/16/2024 Processing/Technology $25.00
07/16/2024 Suppression System $200.00
07/16/2024 Credit Card Service $6.75
Total Due :$437.75
Total Payme nt:$437.75
B alance Due :$0.00
CALL FOR INSPECTIONS
Call by 3:30 pm for ne xt day ins pe ction, allow 48 hours for Fire Ins pe ctions
Whe n calling for an ins pe ction ple as e le ave the following information:
Pe rmit Numbe r, Type of Ins pe ction be ing re que s te d, and whe the r you pre fe r morning or afte rnoon
INSPECTION INFORM ATION Pas s /Fail
FIRE SPRINKLER PERMIT APPLICATION
Community and Economic Development
City of Arlington • 18204 59th Ave NE • Arlington, WA 98223 • Phone (360) 403-3551
REV11.2020 Page 1 of 3
SUBMITTAL REQUIREMENTS: Provide Information on All Equipment to be Installed Prior to Installation ELECTRONIC FILES OF THE FOLLOW:
Complete and Scaled Plans
Hydraulic Calculations
Equipment Specifications for Each Fire Sprinkler Permit Application
Specification Sheets
Wiring Diagrams (Point to Point Wiring)
Electrical Plans, if applicable
FIRE SPRINKLER SYSTEMS (105.7.1, 105.7.4, 105.7.11)
** DEVICES include separate individual portions of a Fire Sprinkler System such as: Sprinklers Heads, Risers, Valves, Pull Stations, and other such devices. (Each piece is one device)
PLAN REVIEW FEES Less than $5,000.00 = $100.00 $5,000.00 & over – based on project valuation (Plan Review Fee is 65% of project valuation as calculated per Table 4-1)
Type of Permit: New Installation System Modification Phased InstallationProperty Address: Suite No.: Lot #: Parcel ID No.: Project Valuation: Preferred Contact: Owner Applicant
ContractorProject Description:
Owner Name: Phone No.: Email Address: Cell No.: Mailing Address: City: State: Zip: Applicant Name: Phone No.: Email Address: Cell No.: Mailing Address: City: State: Zip: Contractor Name: Office No.: Email Address: Cell No.: Mailing Address: City: State: Zip: L&I Contractor License Number: Expiration Date:
REV2022 Page 2 of 3
REINSPECTION / PHASED INSTALLATION INSPECTIONS
Submit Phasing Plan with Application – review and approval required
REINSPECTION FEES SHALL BE PAID PRIOR TO INSPECTION FEE Reinspection/Phased Installation fee is charged per hour (1 hour minimum) $75.00 Hydrostatic Pressure Test (1 test included per permit) $150.00 Cover Inspection (1 cover inspection included per permit) $75.00 Fire Pump (1 fire pump inspection per permit) inspection requires 2 hours $150.00
TENANT IMPROVEMENT OR SYSTEM MODIFICATION (NFPA 13/13R)
Number of Devices** Device Fee Subtotal 1 to 2 $ 75.00 = $ 3 to 5 $125.00 = $ 6 to 10 $175.00 = $ 11 to 20 $225.00 = $ 21 to 40 $300.00 = $ 41 to 100 $375.00 = $ 101 to 200 $475.00 = $ 201 to 300 $575.00 = $ > 300 $600.00 plus $50.00 per 100 additional devices (round up) Total Number of Devices = $600.00 + $ = $ Hydraulically Designed Systems Yes / No Yes = Permit Fee x 2 $ PERMIT FEE SUBTOTAL $
NEW COMMERCIAL SYSTEM (NFPA 13/13R)
Number of Devices** Device Fee Subtotal 1 to 100 $375.00 = $ 101 to 200 $475.00 = $ 201 to 300 $600.00 = $ > 300 $625.00 plus $50.00 per 100 additional devices (round up) Total Number of Devices = $625.00 + $ = $ Hydraulically Designed Systems Yes / No Yes = Permit Fee x 2 $ PERMIT FEE SUBTOTAL $
RESIDENTIAL (NFPA 13D)
Number of Devices** Device Fee Subtotal 1 to 10 $175.00 = $ 11 to 25 $225.00 = $ 26 + $275.00 = $
* NFPA 13D SYSTEM INSTALLED (NOT REQUIRED) Permit Fee Reduced 50% = $ PERMIT FEE SUBTOTAL $
REV2022 Page 3 of 3
HOOD SUPPRESSION SYSTEM
Type of System No. of Units Cost per Unit Subtotal Pre-Engineered x $200.00 = $ Custom Engineered x $275.00 = $ PERMIT FEE SUBTOTAL $
STANDPIPE SYSTEM
Type of Standpipe No. of Units Cost per Unit Subtotal Class I – new or existing x $150.00 = $ Class II – new or existing x $150.00 = $ PERMIT FEE SUBTOTAL $
FIRE PUMP Fire Pump x $300.00 each = $ PERMIT FEE SUBTOTAL $
SPRAY BOOTHS (105.7) & INDUSTRIAL OVENS (105.7.7) NOTE: SEPARATE SPRINKLER PERMIT REQUIRED
Type of Booth No. of Units Cost per Unit Subtotal Pre-Engineered w/documents x $150.00 = $ Site-built or used w/o documents x $250.00 = $ x $250.00 = $ PERMIT FEE SUBTOTAL $
Plan review fee due at time of submittal TOTAL PERMIT FEE $ PLAN REVIEW FEE $ Processing/Technology Fee $25.00
TOTAL $
I hereby certify that I am the Owner, Applicant, Contractor, and authorized to sign this application and that the above
information is correct and construction on, and the occupancy and the use of the above-described property will be in accordance
with the laws, rules and regulation of the State of Washington, and the City of Arlington.
Signature Print Name Date
ALEXANDER GOW
FIRE EQUIPMENT CO.
1436 NW 53RD STREET
SEATTLE, WA 98107
P H : ( 2 0 6 ) 6 3 2 - 2 8 1 0
F X : ( 2 0 6 ) 6 3 3 - 0 4 3 4
INITIALS REVISION DATE
AA Issued For Construction 5/28/24
SHEET TITLE:
SHEET NUMBER:
PLOT DATE:
FIRE SUPPRESSION SYSTEM SCHEMATIC
Bourbon Creek
20501 Olympic Ave
Suite 103,Arlington, Wa 98233FA-15/28/24
CHECKED BY:Rustin Barth
DRAWN BY:Jose Rios
TYPE 1 - Kitchen Hood
40 TOTAL FLOWS / 10 NOZZLES
Captive Aire Tank 8 Gallon
Fire suppression system
(40 Flow Points Possible)
Revised PlansJR 12/20/2024
TANK
4
GALLON
CYLINDER
20 Flow Points
5 nozzles
Captive Aire
Controller and
TANK
4
GALLON
CYLINDER
20 Flow Points
5 nozzles
OL-F OL-F OL-F OL-F
OL-F OL-F
OL-F
360 deg.
electronic
heat detector
K
CLASS
6 Ltr K Class
Extinguisher
[located within 30’
of all cooking appliances]
PUSH
PULL
STATION
(10-20ft
from hood)
[located in
path of egress]
Electric Gas Valve
To Shut Down Upon
System Activation.
(If Applicable)
GENERAL NOTES:
1. 3/8” pipe used in all distribution piping.
2. Fire Suppression System to be tied into
3.All sources of fuel (gas and, or electric) shall shut
down upon system activation.
36” Range 24” Broiler 36” Griddle 14” Fryer
10’1” Hood
16” Dia. Duct
System Utilizes overlapping
appliance protection
35-50” from
nozzle to
cooking
surface
(OL-F)
35-50” from
nozzle to
cooking
surface
(OL-F)
3/8” pipe used in all distribution piping.
AA Revisions made to drawings 7/12/24
OL-F
OL-F OL-F
ANTHONY ALLISON
Pre-engineered Kitchen Fire Extinguishing Systems Technician
Given this day January 19, 2024
Certificate No. 9898668
Model TANK Fire Suppression Extinguishing System
Installation, Operation, and Maintenance Manual
TANK Fire Suppression Extinguishing System Typical Hood End Cabinet Installation
RECEIVING AND INSPECTION
Check for any signs of damage upon receipt, and if found, report it immediately to the carrier.
Check that all items are accounted for and free of damage.
WARNING!
The TANK Fire Suppression extinguishing system unit is to be installed, inspected, recharged
and maintained in accordance with NFPA 17A, NFPA 96, and the National Fire Code of Canada
as applicable.
Installation and maintenance of the TANK Fire Suppression extinguishing system must be
performed in accordance with this manual by a factory trained distributor. Improper installation
poses serious risk of injury due to electric shock and other potential hazards. Read this manual
thoroughly before installing or servicing this equipment. ALWAYS disconnect power prior to
working on equipment.
Save these instructions. This document is the property of the owner of this equipment and is required
for future maintenance. Leave this document with the owner when installation or service is complete.
Part No. A0029342
2023 Rev 23
2
3
WARRANTY ....................................................................4
Certifications and Approvals..........................................4
System Overview...........................................................4
COMPONENTS ...............................................................5
Cylinder Tank Assembly................................................6
Cylinder Tank and Actuator Bracket..............................7
Discharge Adapter.........................................................7
Nozzles..........................................................................8
Primary Actuator Kit (PAK) ............................................8
Secondary Valve Actuator (SVA) and Hose ..................9
Supervisory Pressure Switch.........................................9
Gas Shut-Off Valves....................................................10
Electric Remote Manual Release ................................10
Firestat (Heat) Detector ...............................................10
INSTALLATION .............................................................11
Cylinder Tanks.............................................................11
Removing Full Cylinder Tanks (Optional)....................12
Primary and Secondary Actuator Installation...............12
Primary Actuator Kit (PAK) ......................................13
Secondary Valve Actuator (SVA) .............................13
Supervisory Pressure Switch.......................................14
Duct and Plenum Protection........................................15
Plenum Protection ....................................................15
Duct Protection ........................................................16
Ventilation Exhaust and Dampers ...............................18
Electrostatic Precipitators (ESP)..................................18
Appliance Protection....................................................19
Overlapping Appliance Protection ............................19
Appliance Coverage ....................................................20
Coverage Exceptions ...............................................21
Overlapping Protection ............................................22
Overlapping Coverage - Group Protection ...............22
Upright Broiler/Salamander Protection ....................24
Appliance with Shelf .................................................25
Wok Protection .........................................................26
Large Wok Protection ..............................................27
Appliance with Upright Obstruction ..........................28
Appliance with Overhead Salamander .....................29
Pizza Ovens .............................................................30
Agent Distribution Piping .............................................32
Cylinder Nozzle and Piping Parameters ..................34
Nozzle Installation ....................................................34
Gas Shut-Off Valves....................................................35
Hood Riser Sensor Replacement ................................37
Fire Protection Manual Actuation Device.....................38
Trouble Input Wiring ....................................................38
Fire Protection System Printed Circuit Board ..............39
Electrical ......................................................................42
Wire Ampacity Rating ..............................................43
Distance Limitations .................................................43
Fire Alarm Contacts .................................................43
Fire Group ................................................................44
Fire Protection System Supervised Loops...................45
Supervised Loop Electrical Details ..........................46
PCU Fire System.........................................................47
PCU Fire System Nozzles .......................................48
OPERATION .................................................................49
Test Mode Overview....................................................50
Reset Overview ...........................................................50
Battery Backup ............................................................51
Power Supply Adjustment............................................51
Fire Protection System Firestat ...................................52
Non-Solid Fuel Appliances (Rated 450°F) ...............52
Non-Solid Fuel Appliances (Rated 600°F) ...............52
Solid Fuel Appliances (Rated 700°F) .......................52
TROUBLESHOOTING ..................................................53
CORE Board Faults.....................................................54
Appliance Shutdown in Fault Conditions .....................55
Local Alarm Muting ..................................................55
Test Mode ................................................................55
Supervised Loop Wiring Troubleshooting....................56
DIP Switch Settings .................................................57
Typical DIP Switch Arrangement .............................58
START-UP/INSPECTION TEST PROCEDURE ...........59
Fire System Wiring Connections .................................59
Preparing System for Test...........................................59
Connecting Service Test Kit ........................................60
Balloon Test Procedure ...............................................62
Firestat Test Procedure...............................................63
Disconnecting Service Cylinder Tank..........................63
Re-arming System.......................................................63
Leakage Testing..........................................................64
Every Month (System Owner)......................................65
Every Six Months (Factory Trained Distributor)...........66
Every 2 Years..............................................................66
Every Twelve-Years.....................................................66
Decommissioning ........................................................66
Agent Cylinder Tanks ..............................................66
Actuation Hoses .......................................................66
Conditional Maintenance.............................................67
Replacing A Primary Actuation Kit ...........................67
Replacing A Secondary Valve Actuator ...................67
Adding Nitrogen to Tank(s) ......................................68
POST-DISCHARGE MAINTENANCE ...........................69
General Information.....................................................69
Appliance Cleanup.......................................................69
Cleaning Distribution System.......................................69
Cleaning Nozzles.........................................................69
Flushing the Distribution Pipe Network........................70
Flushing Procedure with Spare/Test Cylinder .............70
Flushing Procedure with an External Water Supply ....71
Flush the System .....................................................71
Dry the Lines ............................................................72
Cylinder Tank Maintenance.........................................73
Removing a Cylinder Tank (Empty or Storage) .......73
Install New Cylinder Tank(s) ....................................74
Depressurizing a Cylinder Tank ...............................75
Rechecking the System ...........................................75
Mobile Kitchen/Seasonal Shutdown ........................76
TANK FIRE SUPPRESSION SYSTEM PARTS ............77
Start-Up and Maintenance Documentation..................80
Job Information............................................................80
4
WARRANTY
Model TANK Fire Suppression extinguishing system is warranted to be free from defects in materials and
workmanship, under normal use and service, for a period of 60-months from date of shipment. Warranty
does not cover consumable products such as batteries and nitrogen. This warranty is null and void if:
1. The system is not installed by a factory trained installer per the MANUFACTURERS installation
instructions shipped with the product.
2. The equipment is not installed in accordance with Federal, State, Local codes, and regulations.
3. The system is misused or neglected, or not maintained per the MANUFACTURERS maintenance
instructions.
4. The system is not installed and operated within the limitations set forth in this manual.
5. The invoice is not paid within the terms of the sales agreement.
The MANUFACTURER shall not be liable for incidental and consequential losses and damages potentially
attributable to malfunctioning equipment. Should any part of the equipment prove to be defective in
material or workmanship within the 60-month warranty period, upon examination by the
MANUFACTURER, such part will be repaired or replaced by MANUFACTURER at no charge. The BUYER
shall pay all labor costs incurred in connection with such repair or replacement. Equipment shall not be
returned without MANUFACTURERS prior authorization, and all returned equipment shall be shipped by
the BUYER, freight prepaid to a destination determined by the MANUFACTURER.
NOTE: To receive warranty coverage for this product, copy and print out the Start-Up and
Maintenance Documentation on page 80. Fill in all required information. Fax the page to 1-919-
516-8710 or call 1-866-784-6900 for emailing information.
Certifications and Approvals
The Tank Fire Suppression system is ETL Listed in accordance with ANSI/CAN/UL/ULC 300, ULCORD-
C1254.6.
The microprocessor-based control board is ETL Listed to UL Standard 864 and CAN/ULC-S527-11.
The Tank Fire Suppression system is acceptable for use in New York City, and is approved per FDNY
COA #5870.
System Overview
The Tank Fire Suppression extinguishing system provides fire protection for commercial cooking
appliances and ventilation. The Tank Fire Suppression extinguishing system is electrically released via a
24V DC solenoid valve. Extinguishing system units with electrical detection, activation, and control require
the use of a Listed Control Panel, which has been found acceptable for releasing device service and which
is compatible with the electrical actuators used on the extinguishing system. In addition, all electrical
detectors, notification devices, and pull stations are required to be Listed and compatible with the Control
Panel.
5
COMPONENTS
The following section lists the major components used in the TANK Fire Suppression extinguishing
system.
Figure 1 - Shipping/Test View
Figure 2 - Exploded View
NOTE: Tanks should never be filled with agent in the field.
1. Unit is shown in Shipping/Test
Position
2. Tank Straps
3. Tank Mounting Bracket
(Secured to cabinet with rivets)
4. Cylinder Tanks (Up to four
tanks may be installed
depending on cabinet size.)
1. Tank Mounting Brackets
2. Secondary Supervisory Pressure
Switch (Optional)
3. Secondary Cylinder (Optional)
4. Primary Cylinder
5. Supervisory Pressure Switch
6. Primary Actuator Kit
7. Secondary Actuator Hose (Optional)
8. Secondary Valve Actuator (Optional)
9. Primary Valve with Siphon Tube
10. Secondary Valve with Siphon Tube
(Optional)
Tank straps not shown.
6
Cylinder Tank Assembly
The TANK Fire Suppression cylinder assembly (p/n 87-300001-001) uses a mild steel cylinder, conforming
to 4BW250 DOT & 4BWM-17 TC specifications, and a nickel-plated brass valve with pressure indicator
gauge. Each valve includes a Schrader valve for connection to the primary actuator hose (for primary
cylinders) or the supervisory pressure switch (optional for secondary cylinders).
Each cylinder assembly is factory-filled with TANK liquid fire suppressant and pressurized to 200 psig
(1379 kPA) at 70°F (21°C). Each cylinder supports up to 5 nozzles for a total of 20 flow points.
Figure 3 - Cylinder Tank Details
The pressure of a cylinder will vary with the ambient temperature, as detailed in Table 1. The gauge
indicator (shown in Figure 3) should be in the acceptable green range for a cylinder that is properly
pressurized and within the listed operating temperature range. For a cylinder at the lowest listed operating
temperature of 32°F (0°C), the pressure gauge should read approximately 175 psig (the lower end of the
green range). For a cylinder at the highest listed operating temperature of 130°F (54.4°C), the pressure
gauge should read approximately 225 psig (the upper end of the green range).
NOTE: The agent itself may be stored down to -20°F (not operational system temperature).
Table 1 - Cylinder Temperature Vs Pressure
1. Pressure Gauge
2. Primary Schrader Valve
3. Secondary Schrader Valve
4. Discharge Outlet
A. Tank to Actuator Distance = 23-1/4
B. Tank Diameter = 10
7
Cylinder Tank and Actuator Bracket
Each cylinder assembly is secured to a factory-installed cylinder bracket in the cabinet (p/n TFS-
UCTANKBRACKET). The cylinder is secured to the cylinder bracket via three (3) stainless steel straps.
The cylinder bracket also includes a platform for securing a primary actuator kit or secondary valve
actuator during shipping and maintenance procedures.
Figure 4 - Cylinder Tank and Actuator Bracket
Discharge Adapter
The discharge adapter (p/n WK-283952-000) is used to connect the TANK Fire Suppression cylinder valve
outlet to the agent distribution pipe network. The 1/2-inch NPT internal thread of the discharge adapter
outlet is connected to the supply line via an elbow and adapter.
The discharge adapter uses an O-ring (p/n WK-108019-000) at the valve port to eliminate leaks during
discharge.
Figure 5 - Discharge Adapter
8
Nozzles
The Overlapping Female Nozzle(s) (p/n OL-F) are used for plenum, duct, and dedicated appliance
coverage (e.g., salamanders, upright broilers, chain broilers, and appliance with upright obstructions). The
nozzles include a cap (p/n 3074-1-1). The cap prevents contamination from entering the pipe network and
is designed to pop-off upon system discharge, allowing the agent to flow to the protected hazard area.
Refer to Duct and Plenum Protection on page 15.
Figure 6 - Fire System Nozzle
Primary Actuator Kit (PAK)
The Primary Actuator Kit (PAK) (p/n 87-300030-001) is installed on each primary cylinder assembly to
pneumatically open the cylinder valve and provide actuation pressure for up to three secondary valve actu-
ators. A vent limiting orifice is present to allow easier resetting of SVA pistons during inspections.
The PAK consists of a pneumatic actuator, 24V DC solenoid valve, solenoid strainer (recommended by the
manufacturer), check valve, primary actuator hose, and associated fittings.
When activated, through automatic or manual system actuation, the control panel sends a momentary 24V
DC release signal. The solenoid strainer will filter out debris from entering the system. The PAK solenoid
will open, allowing pressure from the primary cylinder to pass through the solenoid and check valve. The
pressure flows into the primary actuator (actuating the primary cylinder), and into the interconnected sec-
ondary valve actuators (actuating the secondary cylinders).
The primary actuator has a 1/8 NPT inlet port for connection to the primary system cylinder, and a 1/8
NPT outlet port for connection to the secondary cylinder actuation line or actuation line vent limiting orifice
for single cylinder system. The primary actuator includes a piston with a spring-loaded locking pin which
locks the piston in the discharge position, ensuring complete discharge of the cylinder contents. When
testing/inspecting, if a component fails inspection, replace the PAK assembly.
Figure 7 - Primary Actuator Kit
NOTE: The primary supervisory pressure switch is standard on primary tanks. Secondary
supervisory pressure switches are optional on secondary tanks.
Nozzle P/N: OL-F
Previously P/N 3070-3/8H-10-SS
1. Schrader Service Valve
2. Check Valve
3. Solenoid Valve
4. Supervisory Pressure Switch Connection
5. Solenoid Strainer (internal to assembly)
6. Knurled Fitting
7. Primary Actuator
8. Primary Actuator Hose (Stainless Steel)
9. Locking Pin
10. Piston
11. Hex Fitting
12. Vent Limiting Orifice
9
Secondary Valve Actuator (SVA) and Hose
A Secondary Valve Actuator (SVA) (p/n 87-120042-001) is installed on each secondary cylinder assembly
to pneumatically open the cylinder valve(s). The SVA has 1/8 NPT inlet and outlet ports for connection to
the system actuation line via the SVA hose. All secondary hoses require a 1 minimum bend radius. The
SVA includes a spring-loaded locking pin that locks the actuator piston in the discharge position, ensuring
complete discharge of the cylinder contents.
Figure 8 - Secondary Valve Actuator
Supervisory Pressure Switch
The primary and (optional) secondary supervisory pressure switch (p/n 87-300040-001) are preset to
alarm at a cylinder pressure of ~10% below the lowest operating system pressure of 175 psig (pressure at
the lowest listed operation temperature of 32°F). The supervisory pressure switch uses a diaphragm
sensor to detect pressure changes. At the predetermined set point, the unit actuates a SPDT snap-acting
switch, converting a pressure signal into an electrical signal. The supervisory pressure switch can be used
on primary and/or secondary cylinders. For primary cylinders, the pressure switch is mounted on the
primary actuator kit. For secondary cylinders, the pressure switch is mounted on the Schrader fitting
installed on the cylinder valve. Apply Leak Lock joint sealing compound on the sealing surface of the
Schrader valve when connecting/replacing the supervisory pressure switch.
Figure 9 - Supervisory Pressure Switch
1. Vent Limiting Orifice
2. Locking Pin
3. Piston
4. Secondary Valve Actuator Hose
7.5 hose option (p/n 87-120045-001)
24 hose option (p/n 87-120045-002)
60 hose option (p/n 87-120045-003)
1. Supervisory Pressure Switch
(Primary)
2. Wrench Flats
3. Secondary Supervisory
Pressure Switch (Optional)
4. Schrader Valve
10
Gas Shut-Off Valves
Electric gas shut-off valves are used to shut down the flow of fuel gas to the kitchen appliances upon
actuation of the TANK Fire Suppression system. An energized solenoid is used to hold the gas valve in the
open position. The solenoid closes the valve when de-energized via the output relay of the control panel.
The gas valves are available in 120V AC and 24V DC, ranging from 3/4 to 3 pipe sizes (Table 2).
Electric Remote Manual Release
An electrically operated manual release that is listed must be used with the TANK Fire Suppression
extinguishing system. The electric remote manual release is used to actuate the TANK Fire Suppression
extinguishing system manually and must be properly located and supervised in accordance with NFPA
17A and NFPA 96.
Firestat (Heat) Detector
The Firestat (Fenwal Detect-a-Fire) is a listed electric thermal detector available in a variety of temperature
settings and used to actuate the TANK Fire Suppression extinguishing system automatically. When a
Firestat senses a temperature higher than its setpoint, the Firestat contacts will close and energize the
TANK Fire Suppression system via the control panel.
Figure 10 - Firestat
Table 2 - Electric Gas Valves
Size P/N (ASCO) 120V AC P/N (ASCO) 24V AC
3/4 8214235 8214G236-24VDC
1 8214250 8214G251-24VDC
1-1/4 8214265 8214G266-24VDC
1-1/2 8214275 8214G276-24VDC
2 8214280 8214G281-24VDC
2-1/2 8214290 -
3 8214240 -
11
INSTALLATION
The extinguishing system consists of pressurized agent storage cylinders tanks, agent distribution piping,
valve actuators, supervisory pressure switches, and agent discharge nozzles. All primary components and
piping are factory-installed. Systems may be comprised of single or multiple cylinders depending on the
size and configuration of the protected hazards.
Cylinders can be piped independently, or manifolded. On two-cylinder systems, the cylinders will be in a
manifold configuration. Refer to Agent Distribution Piping on page 32 for a two-cylinder system
example. On three-cylinder systems, two cylinders will be in a manifold configuration and one
independent. On four-cylinder systems, there will be two separate manifolds.
In a fire condition or upon manual actuation, the solenoid valve is opened, allowing pressure from the
primary cylinder to flow to the primary and secondary cylinder valve actuators, opening the cylinder valves
and discharging liquid fire suppressant to the protected hazard areas.
Figure 11 - Cylinder Assemblies
Cylinder Tanks
Figure 12 - Dual Cylinder Mounted in Cabinet
Cylinders are typically factory-installed, pressurized, and
may be located anywhere within the hood end cabinet.
Additional cylinders may be field installed, as needed, in
the additional hood end or wall mount cabinet. Figure 12
shows a dual cylinder system mounted to the right of the
hood control unit. Each cylinder assembly is secured to a
factory-installed cylinder bracket in the hood end cabinet.
The cylinder is secured to the cylinder bracket via three
(3) stainless steel straps.
WARNING!
System must be installed and operated in a conditioned space between 32°F and 130°F.
1. Primary Cylinder Assembly
2. Secondary Cylinder Assembly (Optional)
Right side cabinet mount shown.
12
Removing Full Cylinder Tanks (Optional)
Figure 13 - Removing Full Cylinders
When installing the hood, to reduce weight, you may
remove the cylinder(s).
1. Verify the actuators are in the shipped position
(Figure 14). If the system contains multiple tanks,
check all additional actuators.
2. Use a 1/2" and 9/16" box end wrench to remove
the two mounting bolts holding the tank on the
bracket.
3. Loosen the straps.
4. Remove the tanks. Repeat for additional tanks.
5. Always reinstall tank(s) after the hood is secured.
Refer to Install New Cylinder Tank(s) on
page 74.
NOTE: When tightening the tank straps, use zip
ties to secure excess banding.
Primary and Secondary Actuator Installation
Figure 14 - PAK in Ship/Test and Installed Positions
WARNING!
Do not complete PAK or secondary valve actuator installation until system test and commission-
ing are complete. The cylinder bracket includes a platform for securing a primary actuator kit or
secondary valve actuator during shipping and maintenance procedures. The system actuators
must be in the ship/test position for all commissioning and test procedures. Testing with actuators
in place will result in discharge of the agent cylinders.
Refer to START-UP/INSPECTION TEST PROCEDURE on page 59 for the testing and commission-
ing unit.
1. Cylinder 1
2. Mounting Bolts
3. Cylinder Straps
4. Cylinder 2
(Optional)
1. Shipping Bolts
2. Nut
3. Valve Protection Plate
4. Mounting Bolts
5. Primary Actuator Kit (In Transport Position)
6. Supervisory Pressure Switch
13
Primary Actuator Kit (PAK)
Figure 15 - Actuator Valve
The primary actuator kit is mounted to the primary cylinder
bracket during shipment and when testing the system. With the
cylinders securely mounted and connected to the system
piping, the primary actuator kit can be installed onto the
primary cylinder for the final setup.
1. Remove the valve protection plate and nuts. Retain the
mounting bolts for installation of the PAK.
2. Ensure the primary actuator piston is in the set position.
3. Loosen the PAK shipping bolts from the top of the bracket,
slide the unit back and lower it into position on the valve
actuation flange.
4. Insert the mounting bolts through the bottom of the valve
flange into the PAK mounting holes and tighten securely.
5. Connect the primary actuator hose to the Schrader valve
on the primary cylinder valve. The primary hose requires a
1.5 minimum bend radius.
Secondary Valve Actuator (SVA)
With the cylinders securely mounted and connected to the system piping, the secondary valve actuators
(SVA) can be installed onto each of the secondary cylinder(s).
1. Remove the valve protection plate and nuts. Retain the mounting bolts for installation of the SVA.
2. Loosen the SVA shipping bolts from the top of the bracket, slide the unit back and lower it into position
on the valve actuation flange.
3. Insert the mounting bolts through the bottom of the valve flange into the SVA mounting holes and
tighten securely.
4. Ensure the secondary actuator hose is securely connected to the primary actuator output port and
SVA input port.
Key Limitations
Total length of secondary actuation flex hose must not exceed 75 of flex hose. Refer to Secondary
Valve Actuator (SVA) and Hose on page 9 for secondary hose information.
Secondary actuator hose(s) require 1 minimum bend radius.
Maximum number of secondary valve actuators operating from the primary actuator unit is three (3).
WARNING!
Installation of the primary actuator hose is the FINAL step performed.
Connecting this hose earlier may result in accidental system discharge. Refer to START-UP/
INSPECTION TEST PROCEDURE on page 59 for the testing and commissioning procedure.
When inspecting the primary actuator hose, replace O-ring. Refer to TANK FIRE SUPPRESSION
SYSTEM PARTS on page 77.
The primary and secondary actuation hoses cannot be interchanged. The primary actuation hose
must be used with the PAK.
WARNING!
The Valve Protection Plate must remain on the valve actuation port until the valve actuator is
installed.
The primary and secondary actuation hoses cannot be interchanged. The secondary actuation
hose (7", 24" or 60" length) must be used with secondary valve actuators.
14
Supervisory Pressure Switch
A supervisory pressure switch will always be located on the primary cylinder by the Primary Actuator Kit
(PAK). For secondary cylinders, this is an optional component that may be added on. For primary cylin-
ders, the pressure switch is mounted on the primary actuator kit. For all secondary cylinders, the pressure
switch is mounted on the Schrader fitting on the cylinder valve.
1. Remove cap from applicable Schrader fitting.
2. Thread the switch onto the Schrader using the brass wrench flats only.
3. Apply Leak Lock joint sealing compound on the sealing surface of the Schrader valve when connect-
ing/replacing the supervisory pressure switch, and PAK hose.
Figure 16 - Supervisory Pressure Switch Installation
NOTE: Pressure switches do not contain any field replaceable parts. Refer to applicable control
panel manual for wiring of the supervisory pressure switch. Wire in accordance with local and
national electrical codes.
The electrical rating is rated to 5A resistive and 3A inductive at 30V DC; gold flashing over silver contact for
loads down to 1mA at 24V DC.
Supervisory pressure switches are connected in series to the control panel supervisory input.
WARNING!
Proof pressure (*) limits stated on the nameplate must never be exceeded, even by surges in the
system. Occasional operation of unit up to proof pressure is acceptable (e.g., start-up, testing).
Continuous operation should not exceed the designated over range pressure (**).
*Proof pressure - the maximum pressure to which a pressure sensor may be occasionally
subjected, which causes no permanent damage (e.g., start-up, testing).
**Over Range Pressure - the maximum pressure to which a pressure sensor may be continuously
subjected without causing damage and maintaining set point repeatability.
WARNING!
Disconnect all supply circuits before wiring pressure switch. Electrical ratings stated in literature
and on nameplate must not be exceeded - overload on a switch can cause failure on the first cycle.
Wiring Color Code
Red
Black
White
Terminals
NO (NC under Pressure)
NC (NO under Pressure)
Com
1. Supervisory Pressure Switch (Primary)
2. Wrench Flats
3. Schrader Valve
4. Optional Secondary Supervisory Pressure
Switch
15
Duct and Plenum Protection
The TANK Fire Suppression extinguishing system for duct and plenum coverage can be provided by inde-
pendent fire suppression tanks and piping or integrated with the fire suppression tanks and piping used for
protection of the appliances. Max of 5 nozzles per TANK for duct and plenum coverage only. Each duct
and plenum nozzle protection is 4 flow points.
Plenum Protection
The nozzle(s) (page 8), are used to protect plenum areas in both single bank and V-bank plenum configu-
rations. The nozzle will protect up to a 4' wide x 10' long plenum section. For larger plenum areas, addi-
tional nozzles are added as required, with each nozzle protecting no more than a 4' wide by 10' long
plenum section. Nozzles may be installed pointing in the same direction, and/or at opposite ends of the
plenum, pointing toward each other. The nozzles must not be installed back-to-back when protecting ple-
num areas. When positioned at the end of the plenum, nozzles must be installed from 0 to 6" into plenum.
If the riser is not centered on the plenum, the plenum nozzle is placed on the side of the plenum closest to
the riser.
The nozzle locations for plenum protection are shown in Figure 17 and Figure 18.
Figure 17 - Single Bank Filter Plenum
16
Figure 18 - Dual V-Bank Filter Plenum
Duct Protection
The nozzle(s) (page 8) is used for the protection of exhaust ductwork and can protect any duct cross-
section type (e.g. round, square, or rectangular). A sufficient quantity of nozzles must be provided to
ensure that no single nozzle coverage exceeds 75" in perimeter.
A single nozzle will protect a duct up to 75 perimeter (22 nominal diameter) and unlimited length. Two
nozzles are required for protection of 75-150 perimeter and unlimited length. A minimum of 3 nozzles is
required for protection of ducts exceeding 150" perimeter (36 nominal diameter) and unlimited length.
When using multiple nozzles (modular protection), the coverage area for each nozzle must not exceed 75"
perimeter.
Figure 19 - Nozzle Duct Protection
1. Duct
2. Hood
3. Single Nozzle
4. Dual Nozzle
17
Nozzles must be installed from 0" to 6" into the protected area of the duct. When more than one nozzle is
required (modular protection), each nozzle must be located at the center of its protected module area.
Additional nozzles are not required for changes in direction*. Duct obstructions and common ductwork
must be protected in accordance with this manual, NFPA 17A and NFPA 96.
The nozzle location and aim for duct protection are shown in Figure 20 and Figure 21.
*When a change in direction occurs less than 6" from the duct entrance, the nozzle must be aimed as
shown in Figure 20 and Figure 21.
Figure 20 - Single Nozzle Placement (0-75 Perimeter Duct)
Duct perimeter up to and including 75 (1270mm).
To determine the perimeter: 2(A) + 2(B) = 75 (1905 mm).
1. Nozzle
2. Horizontal Duct Centerline (CL)
3. Aim Point
4. Vertical Duct Centerline (CL)
5. Duct Entrance
A. Rectangular Duct Width
B. Rectangular Duct Length
18
Figure 21 - Dual Nozzle Placement (75-150 Perimeter Duct)
Ventilation Exhaust and Dampers
The TANK Fire Suppression extinguishing system can be used with the exhaust fan either on or off when
the system is discharged. It is recommended that the exhaust fan remain on at the time of discharge to aid
in the removal of smoke, gases, and other airborne materials from the hazard area in the event of a fire. If
the Authority Having Jurisdiction (AHJ) requires that the damper closes in the event of a fire system
discharge, the system designer shall provide for protection downstream of the damper in compliance with
NFPA 96, local codes, and/or as approved by the AHJ.
Electrostatic Precipitators (ESP)
An Electrostatic Precipitator (ESP) is designed to remove smoke and other airborne contaminants from the
air flowing through the exhaust ductwork as a means of pollution control. Exhaust ductwork using ESPs
requires Overlapping Male nozzle(s) (p/n OL-M [previously 3070-3/8HH-10-SS]) upstream, before the
ESP. Distribution piping to the nozzles must not interfere with the function of the ESP unit.
A Pollution Control Unit (PCU) and/or Electrostatic Precipitator (ESP) covered with this fire system can
utilize up to 12 nozzles per tank.
1. Nozzle
2. Vertical Duct Centerline (CL)
3. Aim Point
4. Horizontal Duct Centerline (CL)
5. Duct Entrance
A. 1/4 of dimension X
B. 1/2 of dimension X
C. 1/4 of Duct Diameter
D. 1/2 of Duct Diameter
19
Appliance Protection
The TANK Fire Suppression system utilizes both overlapping and dedicated nozzle appliance coverage,
depending on the type of cooking appliance(s) requiring protection. The Hazard Zone consists of the cook-
ing surface of each appliance underneath each hood. For dedicated and overlapping nozzle information,
refer to Nozzles on page 8.
Overlapping appliance coverage allows a given area under the hood, defined as the hazard zone, to be
protected by overlapping nozzles. Nozzles are evenly spaced at the same height and alignment (front-to-
back) relative to the hazard zone.
Dedicated appliance protection utilizes a nozzle, or nozzles, for protection of an individual appliance.
Overlapping, dedicated appliance, plenum, and duct protection may be incorporated in a single pipe
network on the TANK Fire Suppression extinguishing system, as long as the number of nozzles per tank
does not exceed five.
The following sections detail the different nozzle coverage and placement parameters for overlapping and
dedicated nozzle appliance protection methodologies. Double row coverage is allowed for TANK.
Overlapping Appliance Protection
A single hazard zone utilizing overlapping coverage is 30 deep, by the total length of the hazard zone for
the protected appliances. The cooking surface of all appliances protected by overlapping nozzles must be
located within the defined hazard zone area. Cooking appliances eligible for overlapping protection are
outlined in Table 3 on page 20. The lowest and highest cooking surface will determine the height of the
fire suppression nozzles. All overlapping nozzles must be mounted at the same height in a single hazard
zone.
For applications where overlapping protection cannot be used, such as an upright boiler, dedicated appli-
ance protection must be used.
Figure 22 - Overlapping Protection Option
20
Appliance Coverage
Table 3 illustrates the maximum permitted hazard zone dimensions of each appliance that can be pro-
tected within a single overlapping zone. It is important to note that the hazard zone (area requiring protec-
tion) is different than the total appliance size.
Notes:
1. All dimensions shown are based on overlapping protection.
2. All dimensions and areas shown reference the hazard zone of the appliance, which is typically smaller
than the outside dimensions of the appliance itself.
3. For multi-vat fryers, no single fryer module (vat & drip board) can exceed the above limitations. Nozzle
height(s) for fryers should be taken from the fryers minimum level indicator.
4. Protection for tilt skillets and braising pans are to be based on the coverage parameters provided for
fryer protection. Tilt skillets should be placed at the back of the hazard zone. Tilt skillet coverage must
not interfere with the edge of the nozzle discharge pattern.
5. All appliance hazard surfaces must be located within the hazard zone.
6. Smaller appliances can be positioned anywhere in the zone (e.g., moved left, right, forward, or
backward, provided the cooking hazard does not extend beyond the perimeter of the zone).
7. When the depth of the appliance exceeds maximum cooking hazard dimensions, a second row of
nozzle coverage should be added.
8. Deep Fat/Industrial Fryer/Tilt Skillets over 14 wide and up to 34 max depth will be overlapping with 4
nozzles per tank, 30 max spacing. Max oil capacity: 24.75 gallons. Refer to Table 4 on page 21.
Figure 22 illustrates the placement of nozzles for TANK Fire Suppression overlapping protection.
Appliances denoted with an (*), or if there is an obstruction as defined on Table 6 on page 21, dedicated
coverage will be required. Refer to page 24, page 25, and page 29 for details.
Table 3 - Standard Overlapping Protection 5 nozzles per tank (20 flow points),
36 max nozzle spacing
Hazard Fuel Source Maximum Depth of
Hazard Zone
Maximum Length of
Hazard Zone
Maximum Height
of Fuel
Multi Vat Fryer (3) (8)
(with or without
Drip-board)
Gas or Electric 30 deep Unlimited N/A
Split Vat Fryer (3) (8)
(with or without
Drip-board)
Gas or Electric 30 deep Unlimited N/A
Tilt Skillet (8) (4)Gas or Electric 30 deep Unlimited N/A
Griddle Gas or Electric 30 deep Unlimited N/A
Gas/Electric Radiant
Charbroiler Gas or Electric 30 deep Unlimited N/A
Upright Charbroiler/ Sal-
amander, Chain*Gas or Electric 30 deep Unlimited N/A
Appliance without
Shelf/Obstruction*Gas or Electric 30 deep Unlimited N/A
Range without
Shelf/Obstruction*Gas or Electric 30 deep Unlimited N/A
Wok Gas or Electric 11-24 diameter 11-24 diameter 6-3/4 deep
21
Coverage Exceptions
Deep Fat, Industrial, Pressure Fryers, and Skillets over 14 wide and up to 34 max depth will be
overlapping with 4 nozzles per tank, 30 max spacing. Max oil capacity: 24.75 gallons.
Nozzle height(s) for fryers should be taken from the fryers minimum level indicator.
* Henny Penny fryer models 690, 691, and 692 are allowed with standard 30 max nozzle spacing as long
as the nozzle flow pattern is not obstructed by the lid while in the fully open position. A nozzle is required
on both sides of the lid.
Shelves or protrusions from appliances measuring 6 or less are not considered shelves, standard
overlapping coverage applies. Refer to Table 3 on page 20.
Shelves or obstructions greater than 6 and up to 12 require 4 nozzles per tank, 36 max nozzle spac-
ing.
Shelves exactly at 12 depth require 35 distance from nozzle tip to cooking surface. Shelves less than
12 may use nozzle distance from cooking surface of 35 to 50, every effort should be taken to mini-
mize nozzle spray pattern obstruction with the shelf. Refer to Appliance with Shelf on page 25 for
more information.
Table 4 - Overlapping Protection 4 nozzles per tank (20 flow points), 30 max nozzle spacing
Hazard Fuel Source Maximum Depth of
Hazard Zones
Maximum Length of
Hazard Zones
Maximum
Height of Fuel
Deep Fat/Industrial Fryers
(with or w/o Drip-board)Gas or Electric 34 deep Unlimited N/A
Pressure Fryers* Gas or Electric 34 deep Unlimited N/A
Tilt Skillet Gas or Electric 34 deep Unlimited N/A
Wok Gas or Electric Greater than 24, up to 30
diameter 30 inch diameter 9-1/2 deep
Table 5 - Appliances using 3 nozzles per tank, 24 max nozzle spacing
Hazard Fuel Source Maximum Depth of
Hazard Zones
Maximum Length of
Hazard Zones
Maximum
Height of Fuel
Natural Charcoal Broiler Charcoal 30 deep Unlimited 4
Solid Fuel Charbroiler Mesquite or Hardwood 30 deep Unlimited 6
Lava Rock Charbroiler Gas or Electric 30 deep Unlimited 3 Depth
Table 6 - Appliance with Back Shelf 4 nozzles per tank (20 flow points), 36 max nozzle spacing
Hazard Fuel Source Maximum Depth of
Hazard Zones
Maximum Length of
Hazard Zones
Maximum Height
of Fuel
Less than 12 Back Shelf Gas or Electric 30 deep Unlimited N/A
12 Back Shelf Gas or Electric 30 deep Unlimited N/A
22
Overlapping Protection
Standard overlapping protection is 5 nozzles (20 flow points) at 36 max spacing. Exceptions are noted
below. All overlapping nozzles must be spaced no more than 12 from each end of the appliance, and
located at the centerline of the 30 hazard zone (front to back), at the same height, and aimed straight
down. The nozzle height must be 35 to 50 above the appliance cooking surface, except for woks, where
the height is measured 3 inches below the top rim of the wok. The nozzles must be positioned along the
total hazard zone length to allow protection of each appliance in the hazard zone.
Exceptions to standard overlapping protection:
Large/Industrial fryers over 14 wide, 4 nozzles at 30 max nozzle spacing per tank.
Woks larger than 24 inch diameter, 4 nozzles at 30 max spacing per tank.
Appliance with shelves, 4 nozzles at 36 max spacing per tank.
Solid Fuel Appliances, 3 nozzles at 24 max spacing per tank.
Refer to Coverage Exceptions on page 21 for more information.
Overlapping Coverage - Group Protection
Overlapping protection provides coverage for a continuous hazard zone, with all nozzles at consistent
position (i.e., zone centerline), spacing, and height.
When there is an area within a hazard zone for which continuous overlapping coverage is not applicable,
the overlapping protection zone may be ended, and a new zone started for the new group of appliances.
Examples where continuous protection may be interrupted include a counter, storage or prep area,
appliance not requiring protection (e.g., enclosed oven) or an appliance requiring dedicated appliance
coverage.
The examples on page 23 provide details of group overlapping protection for interrupted zones. This
section illustrates the methodology for defining when a new hazard zone is required, as described above.
For appliance specific overlapping coverage parameters (e.g., nozzle spacing and height requirements),
refer to page 24 through page 31.
23
NOTE: Overlapping nozzle spacing and height requirements are based on the appliances protected
for each individual zone. Nozzles must always be located at the start and end of each zone, no
more than 12 from the end of the hazard zone (edge of 1st/last cooking appliance surface). Refer
to Overlapping Appliance Protection on page 19. Zones cannot overlap.
NOTE: All hazard surfaces in a zone must be within 35-50 of the nozzles in that zone.
Group Protection Example 1 Appliance line separated by unprotected space.
End nozzles must be located 12 or less (horizontally) from the end of the hazard zone. Standard
overlapping nozzles must be spaced no further than the maximum allowed interval 36 on center. Refer to
Coverage Exceptions on page 21 for more details on coverage exceptions.
Figure 23 - Example 1
Example 2 Appliance lines with overlapping nozzles at different heights
Figure 24 - Example 2
A. Zone 1 Overlapping Nozzle Spacing
B. Zone 1 Overlapping Nozzle Height
C. Zone 2 Overlapping Nozzle Spacing
D. Zone 2 Overlapping Nozzle Height
A. Zone 1 Overlapping Nozzle Spacing
B. Zone 1 Overlapping Nozzle Height
C. Zone 2 Overlapping Nozzle Spacing
D. Zone 2 Overlapping Nozzle Height
24
Upright Broiler/Salamander Protection
Upright broilers, chain broilers, and cheesemelters have specific coverage requirements. Unlike
appliances with an exposed flat cooking surface, these appliances have an internal cooking surface and
only have a small opening in the face or end of the appliance.
To cover the internal hazard posed by these appliances, an Overlapping Female (OL-F) nozzle must be
placed at the opening and aimed at the opposite rear corner of the appliance. This nozzle must be
branched off one of the nozzle drops and piped to the appliance opening. No more than 2 nozzles per
drop. The drawing below illustrates how this should be accomplished. Should the cooking surface of the
appliance exceed 1,050 in2, an additional nozzle will be required on the opposite of the appliance for
added fire protection. Refer to Figure 25 for details.
1. Pipe and fittings above the hood will be 1/2 copper pipe/Pro-Press, Grade L copper tubing and copper
Pro-Press fittings.
2. Pipe and fittings inside the hood capture volume will be 3/8 NPT stainless steel or chrome-plated
black iron. No sleeving permitted.
3. Appliance coverage piping that is field piped - unions, elbows, and nozzles factory provided.
4. Nozzle heights above cooking surface (DIM A).
5. In addition to Standard Overlapping Protection, additional nozzles may be utilized for supplemental
appliance specific protection. No more than two (2) nozzles may be used on a single drop.
6. Appliance drop fittings may be sealed with pipe dope or Teflon tape.
Figure 25 - Broiler/Salamander Protection
1. Nozzle: OL-F (previously 3070-3/8H-10-SS)
2. Install union in pipe leading to nozzle to allow
for appliance removal and cleaning.
3. Nozzle aimed at opposite interior corner of
appliance.
4. Cooking Surface.
25
Appliance with Shelf
Appliance top cooking equipment are available with multiple burner assemblies. Some appliances are
equipped with shelving behind the appliance for additional storage. Figure 26 illustrates the shelf cannot
overhang the appliance more than 12 from the back of the cooking surface.
All dimensions fixed unless otherwise noted (e.g., min/max).
1. Pipe and fittings above the hood will be 1/2 copper pipe/Pro-Press, Grade L copper tubing/fittings.
2. Pipe and fittings inside the hood capture volume will be 3/8 NPT stainless steel or chrome-plated
black iron. No sleeving permitted.
3. Appliance coverage piping that is field piped - unions, elbows, and nozzles factory provided.
4. Nozzle heights above cooking surface (DIM A).
5. Appliance drop fittings may be sealed with pipe dope or Teflon tape.
6. Shelves or protrusions from appliances measuring 6 or less are not considered shelves, standard
overlapping coverage applies. Refer to Appliance Coverage on page 20.
Figure 26 - Appliance Top with Shelf
1. Nozzle: OL-F (previously 3070-3/8H-10-SS) 2. Shelf - 12 maximum distance from the rear
edge of the cooking hazard to the front edge of
the shelf.
26
Wok Protection
Nozzle for Wok protection must be located within 12 from the left or right of the Wok and 15 from the front
or back of the Wok. The Wok diameter range for protection is 11 to 24 diameter.
1. Pipe and fittings above the hood will be 1/2 copper pipe/Pro-Press, Grade L copper tubing/fittings.
2. Pipe and fittings inside the hood capture volume will be 3/8 NPT stainless steel or chrome-plated
black iron. No sleeving permitted.
3. Nozzle heights above cooking surface (DIM A).
4. Appliance coverage piping that is field piped - unions, elbows, and nozzles factory provided.
5. Install drops at 36 maximum spacing. Drops must be installed with an internal pipe wrench or other
no-marring pipe tool.
6. Appliance drop fittings may be sealed with pipe dope or Teflon tape.
Figure 27 - Wok Diameter Protection (up to 24)
1. Nozzle: OL-F (previously 3070-3/8H-10-SS) 2. UL300 defines the wok cooking surface as 3
below the rim of the wok.
27
Large Wok Protection
Nozzle for Wok protection must be located within 12 from the left or right of the Wok and 15 from the front
or back of the Wok. The Wok diameter range for protection is 30 diameter. 4 nozzles per tank, 30 max
nozzle spacing
1. Pipe and fittings above the hood will be 1/2 copper pipe/Pro-Press, Grade L copper tubing/fittings.
2. Pipe and fittings inside the hood capture volume will be 3/8 NPT stainless steel or chrome-plated
black iron. No sleeving permitted.
3. Appliance coverage piping that is field piped - unions, elbows, and nozzles factory provided.
4. Nozzle heights above cooking surface (DIM A).
5. Install drops at 30 maximum spacing. Drops must be installed with an internal pipe wrench or other
no-marring pipe tool.
6. Appliance drop fittings may be sealed with pipe dope or Teflon tape.
Figure 28 - Wok Diameter Protection (up to 30)
1. Nozzle: OL-F (previously 3070-3/8H-10-SS) 2. UL300 defines the wok cooking surface as 3
below the rim of the wok.
28
Appliance with Upright Obstruction
Salamanders/Cheesemelters have specific coverage requirements, unlike appliances with an exposed flat
cooking surface, these appliances have an internal cooking surface and only have a small opening in the
face or end of the appliance.
To cover the internal hazard posed by these appliances, an Overlapping Female (OL-F) nozzle is placed at
the opening and aimed at the opposite rear corner of the appliance. The nozzle may be branched off one
of the nozzle drops with a tee or have a dedicated nozzle drop and piped to the appliance opening. No
more than two nozzles can be utilized for a single drop. Should the cooking surface of the appliance
exceed 1050 in2, an additional nozzle will be required on the opposite side of the appliance for added fire
protection, refer to Figure 29. Salamander/Cheesemelters should follow Upright Broiler/Salamander
Protection on page 24.
Additional nozzles may be piped from nozzle drops nearest the appliance, or have a dedicated nozzle drop
to cover the hazard underneath the salamander. The nozzles are aimed at the centerline of the cooking
surface, a minimum of 35-50 away (DIM A). Overlapping coverage is required for appliance specific
coverage.
All dimensions fixed unless otherwise noted (e.g., min/max).
1. Pipe and fittings above the hood will be 1/2 copper pipe/Pro-Press, Grade L copper tubing/fittings.
2. Pipe and fittings inside the hood capture volume will be 3/8 NPT stainless steel or chrome-plated
black iron. No sleeving permitted.
3. Appliance coverage piping that is field piped - unions, elbows, and nozzles factory provided.
4. In addition to Standard Overlapping Protection, additional nozzles may be utilized for supplemental
appliance specific protection. No more than two (2) nozzles may be used on a single drop.
5. Appliance drop fittings may be sealed with pipe dope or Teflon tape.
6. The spacing between nozzles will be either 36 or 30 maximum, based on the overlapping protection
required for the appliance hazard below the obstruction.
Figure 29 - Appliance with Upright Obstruction
1. Nozzle: OL-F (previously 3070-3/8H-10-SS)
2. Shelf/obstruction that extends more than 10-
12 from the rear edge of the cooking hazard
to the front edge of shelf/obstruction.
3. Nozzle, per Upright Broiler/Salamander
protection
4. Cooking Surface
29
Appliance with Overhead Salamander
The following Salamander/Cheesemelter example does not require overlapping protection. Unlike
appliances with an exposed flat cooking surface, these appliances have an internal cooking surface and
only have a small opening in the face or end of the appliance.
To cover the internal hazard posed by these appliances, a nozzle must be placed at the opening and
aimed at the opposite rear corner of the appliance. No more than two nozzles can be utilized for a single
drop. Should the appliance have an area over 1050 in2, an additional nozzle will be required on the
opposite side of the appliance for added fire protection, refer to Figure 30.
Nozzles covering Cheesemelters/Salamanders placed above an appliance can be branched off from
existing overlapping nozzles or use dedicated nozzle protection. Appliance with Overhead Salamander
equipment type will use dedicated nozzle protection. This nozzle is aimed at the centerline of the cooking
surface, a minimum of 35-50 away (DIM A).
All dimensions fixed unless otherwise noted (e.g., min/max).
1. Pipe and fittings above the hood will be 1/2 copper pipe/Pro-Press, Grade L copper tubing/fittings.
2. Pipe and fittings inside the hood capture volume will be 3/8 NPT stainless steel or chrome-plated
black iron. No sleeving permitted.
3. Appliance coverage piping that is field piped - unions, elbows, and nozzles factory provided.
4. Additional nozzles may be utilized for supplemental appliance specific protection. No more than two
(2) nozzles may be used on a single drop.
5. Appliance drop fittings may be sealed with pipe dope or Teflon tape.
6. The spacing between nozzles will be either 36 or 30 maximum, based on the overlapping protection
required for the appliance hazard below the obstruction.
Figure 30 - Appliance with Overhead Salamander
1. Nozzle: OL-F (previously 3070-3/8H-10-SS)
2. Nozzle, per Salamander protection
3. Cooking Surface
30
Pizza Ovens
Pizza ovens have specific coverage requirements, unlike appliances with an exposed flat cooking surface,
these appliances have an internal cooking area and only have a small opening in the face or end of the
appliance. When installing the appliance, make sure the nozzle does not obstruct cooking operations.
To cover the internal hazard posed by these appliances, a nozzle must be placed at the opening and
aimed at the opposite rear corner of the appliance. No more than two nozzles can be utilized for a single
drop. Refer to Figure 31 for single stack ovens. Figure 32 and Figure 33 on page 31 show dual and three
stack oven installation examples. Should the cooking area of the appliance exceed 1200 in2, an additional
nozzle will be required on the opposite side of the appliance for added fire protection. Each nozzle can
cover 1200 in2.
All dimensions fixed unless otherwise noted (e.g., min/max).
1. Pipe and fittings above the hood will be 1/2 copper pipe/Pro-Press, Grade L copper tubing/fittings.
2. Pipe and fittings inside the hood capture volume will be 3/8 NPT stainless steel or chrome-plated
black iron. No sleeving permitted.
3. Appliance coverage piping that is field piped - unions, elbows, and nozzles factory provided.
4. No more than two (2) nozzles may be used on a single drop.
5. Appliance drop fittings may be sealed with pipe dope or Teflon tape.
Figure 31 - Single Stack Pizza Oven
1. Nozzle: OL-F (previously 3070-3/8H-10-SS) 2. Conveyor Opening
31
Figure 32 - Double Stack Pizza Oven
Figure 33 - Triple Stack Pizza Oven
1. Nozzle: OL-F (previously 3070-3/8H-10-SS) 2. Conveyor Opening
1. Nozzle: OL-F (previously 3070-3/8H-10-SS)
2. Conveyor Opening
3. Additional drop for third nozzle. No more than
two nozzles are allowed per drop.
32
Agent Distribution Piping
The agent distribution piping shall be 3/8 NPT Schedule 40 black iron, 3/8 NPT Schedule 40 stainless
steel, or 1/2 Pro-Press copper fittings. Fittings shall be minimum class 150. Nozzle drops cannot be
sleeved in steel but can be made from polished stainless steel, or polished chrome-plated black iron.
Galvanized pipe or fittings must not be used. Pipe thread or compound should be used to help seal fittings.
Distribution piping can be run in single cylinder or dual cylinder manifold configurations. Refer to page 34
for single cylinder and dual cylinder configuration details.
The distribution network consists of a supply line and all applicable branches depending on the protected
hazards. Branch lines include the plenum branch, duct branch, overlapping nozzle appliance branch, and
dedicated nozzle appliance branch.
The supply line is defined as the run of all pipe and fittings from the tank outlet to the last branch line,
including fittings at the start of all branch lines. All branch lines start at the outlet of the applicable supply
line fitting and do not include the supply tee.
A plenum branch is defined as the run of all pipe and fittings from the supply line tee outlet to the plenum
nozzle(s). Refer to Figure 34 on page 33.
A duct branch is defined as the run of all pipe and fittings from the supply line tee outlet to the duct noz-
zle(s). Duct branch lines on risers greater than 75 inch perimeter can have a tee installed. Two separate
duct branch lines are not required. Refer to Figure 34 on page 33.
An overlapping nozzle appliance branch is defined as the run of all pipe and fittings from the supply line tee
outlet to the nozzle. Refer to Figure 34 on page 33.
A dedicated nozzle appliance branch is defined as the run of all pipe and fittings from the supply line tee
outlet to the nozzle. Refer to Figure 34 on page 33.
33
Refer to Cylinder Nozzle and Piping Parameters on page 34 for supply line and branch piping limita-
tions.
Figure 34 - Distribution Piping
34
Cylinder Nozzle and Piping Parameters
A single cylinder supports up to 5 nozzles, 20 flow points. Max supply line up to 42 feet to the first overlap-
ping nozzle.
A dual cylinder system supports up to 40 flow points and 10 nozzles. Dual cylinder systems can be piped
in series or parallel. Max supply line up to 42 feet to the first overlapping nozzle.
Notes:
1. One (1) tee allowed per appliance drop.
2. No more than two nozzles can be utilized for a single appliance drop.
3. Additional elbows are permitted on branch lines and horizontal supply piping, provided linear pipe
length is reduced by corresponding equivalent length (1.3 ft per 90° elbow, 0.6 ft per 45° elbow).
For example: a 3/8 steel elbow has an equivalent length of 1.3 ft. An appliance branch may use
4 elbows, provided the total linear pipe is reduced by 1.3 ft (e.g., from 5 ft to 3.7 ft). Additional pipe cannot
be added in lieu of fittings, as pipe volume limits could be exceeded.
4. Maximum 6 ft vertical rise of supply line above cylinder outlet.
5. Minimum 7 ft. of supply line to first overlapping nozzle.
6. If hoods are piped to the same tank, the sum of piping between hoods plus distance to first overlapping
nozzle should NOT exceed 42 feet.
Nozzle Installation
Distribution piping and nozzles are factory-installed. Verify that the nozzles and distribution network are
installed in accordance with the design and installation parameters for all protected hazards, as set forth in
this manual.
NOTE: The TANK Fire Suppression extinguishing system design must be reviewed if any hazard
changes have been made, including (but not limited to): appliance type, appliance sizes, appliance
location, factory pre-piping or nozzles, plenum size or configuration, and duct size or
configuration.
1. Ensure nozzles are securely installed. DO NOT OVERTIGHTEN.
NOTE: Do not over-tighten or nozzles may be damaged.
2. Ensure all nozzle types, placement, and aim are in accordance with the limitations in this manual.
Nozzles can be used to achieve proper aim on dedicated appliance protection nozzles only.
3. Refer to Figure 6 on page 8 for details on nozzle(s).
Table 7 - Agent Distribution Piping Limitations
Pipe Section Max Pipe Length (ft)
Max Supply Line to First Overlapping Nozzle 42
Overlapping Nozzle Appliance Branch 10
Dedicated Nozzle Appliance Branch 10
35
Gas Shut-Off Valves
The electric gas valve is held open in the energized state, and closes when de-energized via the output
relay of the control panel. A listed manual reset relay is required to ensure manual reset prior to fuel being
restored in accordance to NFPA17A.
Gas valves (Figure 35) are designed to shut off the flow of gas to the kitchen appliances in the event of fire
system activation. Electric gas shutoff valves must be installed with an upstream strainer to prevent debris
from prohibiting gas valve function. New pipe, properly reamed and cleaned of metal burrs, should be
used. Proper care is needed to ensure that the gas flow is in the same direction as indicated on the gas
valve and strainer. Do not over-tighten pipe connections. Apply pipe dope to the male threads only. If
necessary, install a drip leg in the gas line in accordance with the Authority Having Jurisdiction (AHJ).
120V AC gas valves 3/4 - 2 can be mounted with the solenoid in any position above horizontal.
120V AC gas valves 2-1/2 - 3 must be mounted with the solenoid vertical and upright. The pipe must be
horizontal.
All 24V DC gas valves must be mounted with the solenoid vertical and upright. The pipe must be
horizontal.
Proper clearance must be provided in order to service the strainers. A minimum of 4 clearance distance
must be provided at the base of the strainer.
Figure 35 - Electric Gas Valve
A gas strainer is supplied with the unit and recommended to be installed.
Table 8 - Gas Valve Details
Gas Valve
ASCO Size DIM ADIM BDIM CDIM DDIM FDIM G
8214235 3/4 6-15/16 5-15/16 4 4-1/2 11-15/16 9-7/8
8214250 1 6-15/16 5-15/16 4-7/8 5-3/16 12-13/16 10-11/16
8214265 1-1/4 7-5/8 6-3/8 5-1/8 5-15/16 13-1/2 12-1/16
8214275 1-1/2 7-5/8 6-3/8 5-3/4 6-3/16 14-1/8 12-5/16
8214280 2 7-5/8 6-3/8 7-1/4 7-13/16 15-5/8 13-15/16
8214290 2-1/2 10-5/16 8-1/16 8-7/8 9-7/8 18-15/16 18-5/8
8214240 3 10-5/16 8-1/16 10 10-15/16 20-1/16 19-11/16
36
Figure 36 - Firestat Installation Details
Firestat Components
1. Hood Riser Firestat
Fenwal Part Number - 12-F28021-32144-OT-360 - Normally Open, Close on Rise @ 360°F
Fenwal Part Number - 12-H28021-12144-OT-600 - Normally Open, Close on Rise @ 600°F
2. Wiring - 2 black wires/2 white wires.
3. Seal threads with Teflon Tape before installation
4. 1/2 NPT Quick Seal (Adapter Body) - Part Number Kit 32-00002
5. 1/2 NPT Quik Seal (Gasket) - Part Number Kit 32-00002
6. External Surface of hood/duct.
7. 1 1/8 - 1 1/4 diameter hole.
8. 1/2 NPT Quik Seal (Lock Washer) - Part Number Kit 32-00002
9. 1/2 NPT Quik Seal (Nut) - Part Number Kit 32-00002
10. 1/2 flex conduit connector - Part Number A009088
11. Flex metallic conduit to ECP junction box (closest to the hood) - Part Number A0005719
12. Duct Protection Firestat
Fenwal Part Number 12-F28021-005360 - Normally Open, Close on Rise @ 360°F
Fenwal Part Number 12-H28021-005-0T-600 - Normally Open, Close on Rise @ 600°F
13. Extension Ring - Part Number 59361-1/2
14. Extension Ring Cover - Part Number 100-BW
* Application specific, refer to page 52 for details.
37
Hood Riser Sensor Replacement
The following instructions are for replacing a hood duct stat or fire stat located in the riser.
NOTE: Make sure the fire system is deactivated and all controls are powered down before servicing the
unit. Service should only be performed by trained personnel.
1. Locate faulty sensor in hood riser. Remove the hood filters to access from the hood plenum.
2. Determine the location of the sensors lead ends. This will either be on the top of the hood, in the junction box
which has conduit routed to the riser, or in the electrical control package that is mounted on the hood (if it is a
stand-alone hood).
3. Access the sensors lead ends and remove Wago connectors. Attach a fish tape (or pulling rope) to the lead
ends.
4. Unscrew the sensor from the quick seal in hood plenum. Pull leads completely out, pulling the fish tape until
exposed.
5. Attach replacement sensor to fish tape and pull back through conduit until lead ends are back in the original
location.
6. Replace Wago connectors on the new sensors lead ends.
7. Twist new sensor counterclockwise, 2-1/2 turns to pre-tension wires. Thread sensor in riser quick seal (using
Teflon tape on threads).
8. Replace hood filters.
9. Power up the system to test functionality.
Figure 37 - Sensor Replacement
38
Fire Protection Manual Actuation Device
The push/pull station (Figure 38) is a remote manual actuation device to activate the fire system. This remote man-
ual actuation device (push/pull station) contains one set of normally open contacts and mounts to any standard sin-
gle gang junction box. When the front button is pressed, the electrical connection to the fire system is completed,
thus activating the fire system.
The remote manual actuation device (push/pull station) should be mounted at a point of egress and positioned at a
height determined by the Authority Having Jurisdiction (AHJ). This position is usually 10 to 20 feet from hood and
42 to 48 inches above the floor. Multiple remote manual actuation devices (push/pull stations) are acceptable to
use in the fire system and are wired in parallel per the electrical schematic. The remote manual actuation device
(push/pull station) is reset by twisting the push-button clockwise until the internal latch is released.
The clear protective cover must be installed to protect the device from accidental activations. This cover is pro-
vided as part of the manual actuation device. Refer to Table 9 for device part numbers and replacement parts.
NOTE: When connecting the wires to the push/pull station, do not twist the wire ends together. Insert each
wire on the opposite side of the screw.
Figure 38 - Manual Activation Device
Trouble Input Wiring
Trouble contacts and supervision switches from each device may be connected to the optional trouble input of the
building fire alarm panel to indicate a trouble condition.
Figure 39 - Optional Wiring Connection for Trouble Contact
Table 9 - Activation Device Part Numbers
Part Description Part Number
Push-Button with Clear Cover SS2031ZA-EN
Push-Button with Clear Cover and Horn SS2041ZA-EN
Red Junction Box with Deep Back for Surface Mount STI-KIT71101AR
Normally Open Contact STI-10196
Contact Housing Assembly SF-10197H
1. Building Fire Alarm
2. CORE Control Panel Trouble Contact
3. End of Line Device
4. Building Fire Alarm - Trouble Input Wiring
39
Fire Protection System Printed Circuit Board
The fire protection system printed circuit board (PCBCORE) is a microprocessor-based controller that pro-
vides all the necessary monitoring, timing, and supervision functions required for the reliable operation of
the fire system.
Under normal conditions, the Fire System Activated light is on. This indicates the system is armed and
active. If a fault is detected anywhere in the system, an audible alarm will periodically sound, and the Fire
System Activated light will flash a fault code to indicate the fault that was detected. The HMI, located on
the hood or Electrical Control Package (ECP), will display the fault text to explain where the issue is
located in the system. Refer to CORE Board Faults on page 54.
NOTE: CORE Boards with software version 1.68 and prior will use one brief flash every 3-seconds
to indicate there are no faults in the fire system.
When viewing the CORE Board, if a series of flashes followed by a pause exists, there is a fault in the sys-
tem. Count the number of flashes between the pauses and refer to CORE Board Faults on page 54.
Any fault is extremely important and must be corrected and rectified immediately to ensure proper opera-
tion of the fire system.
The optional connections for building fire panels are located at AL1 and AL2 as dry contacts.
For remote mounted Ansul Automans, use terminals AU1 and AU2. This will provide a dry contact connec-
tion point to provide power for activating the Ansul Automan.
NOTE: When a CORE board is connected to an ECPM03 board, if a fire condition happens, the
Last Fire Info will be stored on the ECPM03 screen. Last Fire Info will be available on CASLINK
as well.
Figure 40 - Printed Circuit Board
40
Connector Descriptions
Note: Some connections may not be used dependent on system configurations.
Connector J1 contains battery pack connections for
battery charging and monitoring.
Pin 1 Battery Positive Pin 2 Battery Negative
Connector J2 contains Supervised Sensor Loop
connections
Pin 1 Start Positive Loop
Pin 2 Start Negative Loop
Pin 3 Finish Negative Loop
Pin 4 Finish Positive Loop
Connector J3 contains Power Supply and Device
connections
Pin 1 and Pin 2 Positive Input, Power Supply
Pin 3 and Pin 4 Negative Input, Power Supply
Pin 5 Positive Output, Gas Valve Solenoid
Pin 6 Positive Output, Surfactant Pump
Pin 7 Positive Output, Release Valve Solenoid
Pin 8 and Pin 9 24V DC Input, Shutoff Valve
Supervision
Pin 10 N/A
Pin 11 Drive Output, Fire Relay
Pin 12 Drive Output, 100% Relay
Pin 13 Drive Output, Trouble Relay
Pin 14 Drive Output, Wash Relay
Pin 15 Drive Output, Spare Relay
Pin 16 Drive Output, Auto-Man Relay
Connector J4 contains Power Supply and Device
connections
Pin 1 Positive Input, Power Supply
Pin 2 Output, Panel Mounted Audible Alarm
Pin 3 Output, Panel Mounted LED Fire/Fault
Indicator
Pin 4 N/A
Pin 5 Drive Output, Cooking Equipment Disable
Relay
Pin 6 Negative Input, Power Supply
Pin 7 N/A
Pin 8 Input, Pump Prime/Reset Push Button
Pin 9 Input, Gas Cartridge/Pressure Switch
Pin 10 Input, Fan Switch
Pin 11 Input, Gas Valve Reset Push Button
Pin 12 Input, Door/Tamper Switch
Pin 13 Input, Test Mode
Pin 14 Modbus Network, Common Signal (C)
Pin 15 Modbus Network, Negative Signal (A)
Pin 16 Modbus Network, Positive Signal (B)
41
Connector J5 and J6 is for RJ-45 connections
These two connections are for the Modbus Network. This network may be used by non-fire system
related equipment to monitor operating conditions of the electrical (PCBCORE) board.
Connector J7 Interlock Network connections
Pin 1 Interlock Network, Common Signal (C)
Pin 2 Interlock Network, Negative Signal (A)
Pin 3 Interlock Network, Positive Signal (B)
Connector J8 Interlock Network connections
Factory Use Only
Connector J9 is for Building Fire Alarm connections.
A set of optional normally open dry contacts are
available for signaling a building fire alarm panel if a
fire condition is present.
Pin 1 Dry Contact Closure Pin 2 Dry Contact Closure
Connector J10 contains Supervised Sensor Loop
connections
Pin 1 Start Positive Loop
Pin 2 Start Negative Loop
Pin 3 Finish Negative Loop
Pin 4 Finish Positive Loop
42
Electrical
Before connecting power to the control package, read and understand the entire section of this document. As-built
wiring diagrams are furnished with each control package from the factory and are either attached to the door of the
unit or provided with the paperwork packet.
Electrical wiring and connections must be made in accordance with local ordinances and the National Electric
Code, ANSI/NFPA70. Verify the voltage and phase of the power supply, and the wire amperage capacity is in
accordance with the units nameplate.
ATTENTION: LOW-VOLTAGE DC OR SIGNALING WIRE SHOULD BE ROUTED IN SEPARATE CONDUIT
FROM ALL AC VOLTAGE SOURCES.
1. Always disconnect power before working on or near this equipment. Lock and tag the disconnect switch or
breaker to prevent accidental power-up.
2.There are multiple electrical connections required for this control. 120V AC should be wired to terminals H1
and N1. If the hood is equipped with a separate light circuit, 120V AC should power this circuit per the as-built
schematic. H1 and N1 should not be connected to a shunt trip breaker.
3. Verify that the power source is compatible with the requirements of your equipment. The system wiring sche-
matic identifies the proper phase and voltage of the equipment.
4. Before connecting the control package to a power source, verify power source wiring is de-energized.
5. Secure the power cable to prevent contact with sharp objects.
6. Do not kink power cable and never allow the cable to come in contact with oil, grease, hot surfaces, or chemi-
cals. Solenoid cables must not come in contact with hood surfaces.
7.The supervised loop must be run through metallic conduit. Do not run wiring with high voltage
wires. Verify all supervised loop wires are free from damage/stress. All supervised loop wires must be termi-
nated in terminal blocks, junction boxes, and push-stations.
8. If the system contains additional firestats, they must be wired into the supervised loop.
9. If the control package is a wall-mount system, a duct mounted temperature sensor will need to be wired. The
temperature sensor must be wired to terminal blocks, as indicated on the wiring schematic.
10. If the control package is a wall-mount system, the hood lights wiring will need to be wired to terminals B and
W. Verify connections on wiring schematic.
11. Before powering up the system, make sure that the interior of the control package is free of loose debris or
shipping materials.
12. If any original internal wire supplied with the system must be replaced, use type THHN wire or equivalent.
13. All field-supplied wire for the optional fire system release solenoid or firestat must be high temp wire rated for
842°F minimum (#441601C6.FE9 White and #441601C6.FE0 Black).
14. The battery must be plugged in at connector J1 on the electrical board (PCBCORE) after wiring is complete.
15. All gas appliances under the hood must shut down in the event of an AC power loss. All electric appliances will
shut down on building power loss.
16. Use Belden #6320UL,18 Gauge, plenum-rated wire or similar, for the supervised loop that does not come in
contact with the hood. Use Belden #88760 or similar for the fire system interlock network and CAT-5 for Mod-
bus communications.
17. All exterior wiring connections to the PCU must be run inside liquid tight conduit. This includes the supervised
loop and airflow switch wiring.
IMPORTANT!: The battery backup for the fire protection system produces output power even when main
power is disconnected from system. When performing major electrical service to the control, the battery
backup must be disconnected then reconnected before commissioning.
WARNING!
Disconnect power before installing or servicing control. High voltage electrical input is needed for this
equipment. A qualified electrician should perform this work.
43
Wire Ampacity Rating
The load current rating and the over-current protection for conductor types shall not exceed 15 amperes for 14
AWG, 20 amperes for 12 AWG, and 30 amperes for 10 AWG aluminum and copper-clad aluminum after any
correction factors for ambient temperature and number of conductors have been applied. Refer to Table 10.
Distance Limitations
Wiring connections to remote fire protection system(s) must use shielded twisted pair wire. The maximum length of
this connection is 1000 feet.
Wire size is an important consideration when making the connections between the fire protection system control
package and a gas valve. Refer to Table 11 for maximum wiring distance between the system and remote gas
valve.
Fire Alarm Contacts
The fire protection system is equipped with optional normally open contacts (terminals AL1 and AL2) for building
applications that connect to the premise Fire Alarm Control Panel (FACP). Refer to Figure 41 for wiring reference.
During a fire condition, the contacts will close and trigger the premise FACP to initiate a general fire alarm.
Figure 41 - Fire Alarm Reference
Table 10 - Copper Wire Ampacity @ 75°C
Wire Size AWG Maximum Amps
14 15
12 20
10 30
8 50
6 65
4 85
Table 11 - Wiring Maximum Distance
Wire Gauge Distance (Feet)
12 1049
14 660
16 414
18 260
20 164
22 103
24 64
1. Building Fire Alarm
2. Control Panel Fire Alarm Contact
3. End of Line Device
4. Alarm Input
44
Fire Group
Fire Groups are for the purpose of using multiple CORE controlled fire systems and grouping specific fire systems
together. This will allow the user the ability to assign different zones for independent activation.
In order to set a fire group, you will need to set the CORE board DIP switches as shown in Table 12.
Note: Every panel with matching fire group settings (DIP switches 6 and 7) will activate simultaneously in a
fire condition.
Figure 42 shows an example of different zones on separate fire groups, but still connected via the interlock
network. In the example, when 2 Fire groups (01 and 02) are assigned on the CORE boards, and if a fire condition
exists in any one group, it will NOT activate the other fire group. However, both are connected to the same
interlock network.
Fire Group 01 CORE board DIP switch setting will be set to: Switch 6 Open and Switch 7 Open.
Fire Group 02 CORE board DIP switch setting will be set to: Switch 6 Closed and Switch 7 Open.
Refer to Typical DIP Switch Arrangement on page 58 for setting multiple CORE controlled fire systems.
Figure 42 - Fire Group Reference
Table 12 - Fire Group DIP Switch Position
6 7 Fire Group Number
Open Open 1
Closed Open 2
Open Closed 3
Closed Closed 4
45
Fire Protection System Supervised Loops
The supervised loops are integral to proper operation and activation of the Fire Protection System. All systems
have two supervised loops; each loop consists of two conductors, one positive and one negative. One loop is ded-
icated to all sensors, while the other is dedicated to all manual actuation devices (push/pull stations). The super-
vised loop connections are located at the front edge of the hoods for accessibility. Connections beyond the hood,
like the connections at the manual actuation device, must be made with a plenum-rated wire. It is recommended to
use a two-conductor Belden 6320UL, 18 AWG, wire, or similar for these connections. Refer to Figure 43 for super-
vised loop details.
The supervised loop must be run through metallic conduit. Do not run wiring with high voltage wires. Verify all
supervised loop wires are free from damage/stress. All supervised loop wires must be terminated in terminal
blocks, junction boxes, and push-stations.
Connections to the firestat will use two Wago connectors. One for an incoming loop and one for an outgoing
loop.
Flexible metallic conduit is used to route the wiring that connects the firestat to the remote loop junction box.
Secure conduit to hood hat channel when possible.
Figure 43 - Supervised Loop Connections
For connections on or above the hood, use Type MG or MGT wiring with Wago connectors. A Supervised Loop
Connection kit is available to connect back to back or end to end hoods. This kit will come with the necessary
hardware and wire.
Table 13 - Supervised Loop Components
Connection Kit Part Number Length Location
SLPCON-03 3 Feet End to End Hoods
SLPCON-05 5 Feet End to End Hoods
SLPCON-10 10 Feet End to End and Back to Back Hoods
SLPCON-15 15 Feet End to End and Back to Back Hoods
SLPCON-20 20 Feet End to End and Back to Back Hoods
High Temperature Supervised Loop Components Part Number
Type MG Wire, White, 16 AWG 441601C6.FE9
Type MG Wire, Black, 16 AWG 441601C6.FE0
Wago Connectors 221-412
1. Firestat
2. Conduit
3. Junction Box
4. Wago Connector
46
Supervised Loop Electrical Details
NOTE: Place the panel in test mode when checking the supervised loop circuit.
Before checking the supervised loop circuit (Figure 44), verify all CORE power supplies (PS-02) are set to 27.5V
DC. Check all supervised loop connections. Verify wiring is properly connected and secure. If any of the readings
in Table 14 are out of range or other faults are present, there is an issue with that loop or associated components/
wiring. Refer to page 56 for troubleshooting.
Figure 44 - Wiring for Supervised Loop
Table 14 - Supervised Loop Circuit Readings
Connections Circuit Readings
Firestat Loop Check
Check for continuity between Terminals 21 and 24 then Terminals 22 and 23 There should be continuity
Measure voltage between PS-02 (DC-) and Terminal 21 then PS-02 (DC-) and Terminal 24
Measure voltage between Terminal 21 and Terminal 22 then Terminal 23 and Terminal 24 26.5 +/- 0.2V DC
Measure voltage between PS-02 (DC-) and Terminal 22 then PS-02 (DC-) and Terminal 23 0 +/- 0.2V DC
Measure voltage between Terminal 24 and Chassis Ground 1.8 +/- 0.2V DC
Microswitch/Manual Activation Device
Check for continuity between Terminals 101 and 104 then Terminals 102 and 103 There should be continuity
Measure voltage between PS-02 (DC-) and Terminal 101 then PS-02 (DC-) and Terminal 104
Measure voltage between Terminal 101 and Terminal 102 then Terminal 103 and Terminal 104 26.5 +/- 0.2V DC
Measure voltage between PS-02 (DC-) and Terminal 102 then PS-02 (DC-) and Terminal 103 0 +/- 0.2V DC
Measure voltage between Terminal 104 and Chassis Ground 1.8 +/- 0.2V DC
Power Supply
Measure voltage between PS-02 (DC+) and PS-02 (DC-) 27.5 +/- 0.1V DC
47
PCU Fire System
Pollution Control Units require a fire system to be installed for Type 1 applications. Current International
Mechanical Code (IMC) requires that the fire system be installed by the manufacturer (2018 IMC). CORE
and EWC fire systems are available for the PCU. PCU fire systems use electric sensors set at 360°F to
activate the fire system. Outdoor EWC Systems require a climate controlled utility cabinet to ensure that
the fire system does not drop below 32°F and does not exceed 130°F. See below for more information
about outdoor installations. It is highly recommended that the PCU fire system be interlocked to the
corresponding hood fire system so that if the hood system activates, the PCU system activates. Reverse
activation requirements are determined by local code or at the discretion of the Authority Having
Jurisdiction, but are recommended for safety.
In the event that the fire system is accidentally activated, all disposable filters must be replaced and the
pre-filter cleaned. The water or chemical agent used in the fire system can cause the filters to fail
prematurely.
In the event that a fire occurs in the ductwork leading to the PCU or inside the PCU, the following must be
completed.
The unit must be cleaned of all fire suppression chemicals and grease.
The filters must be replaced, this includes the pre-filter.
If an ESP module is present, the ESP cells must be removed, and cleaned in warm soapy water. Wash
cells until all chemical residue is removed. ESP pre and post filters must be replaced. When re-
installing cell(s), make sure to install with the airflow in the correct direction as indicated on the cell.
If any of the gasketing is damaged, replace the gasketing between modules and between the doors.
If any of the components that make-up the Pollution Control Unit are damaged by fire, then that
component must be replaced and inspected by factory trained service personnel.
Installation, commissioning, or resetting of the fire system must be done by a licensed fire system
installer. Use the guidelines set forth by the appropriate fire system manual; PCU with CORE Fire
Suppression System manual, Model TANK (Electric Wet Chemical) Extinguishing System, or other
fire system manufacturer.
For electric wet chemical fire systems for PCU, external piping that connects the PCU fire system nozzles
to the fire system tanks is factory-installed using Grade L 1/2 copper tubing and pro-press fittings. If a
remote (wall mount) EWC fire system is utilized, distribution piping shall be Grade L 1/2 copper tubing and
pro-press fittings or 3/8 NPT Schedule 40 black iron, chrome-plated, or stainless-steel pipe and fittings. If
distribution piping is exposed to an outdoor environment it must be Grade L 1/2 copper tubing and pro-
press fittings or 3/8 NPT Schedule 40 stainless-steel pipe and fittings.
48
PCU Fire System Nozzles
The Overlapping Male Nozzle(s) (p/n OL-M) are used to protect the PCU.
The nozzles include a cap (p/n 3074-1-1).
Refer to Figure 45. The cap prevents contamination from entering the pipe network and is designed to pop-off
upon system discharge, allowing the fire system to flow to the protected hazard area.
Figure 45 - Fire System Nozzle
Table 15 provides details on PCU size, modules, and nozzle quantity per unit. Pollution Control Units (PCU) cov-
ered by a TANK Fire System can utilize up to 12 nozzles per tank.
PCU Fire System type REFS is covered by TANK.
Example:
Table 15 - PCU Fire System Chart
Unit Nozzle Count (OL-M)Duct Nozzle
Count (OL-M)
Last Module
Only
PCU Size 1 Module 2 Modules 3 Modules 4 Modules 5 Modules
1 4 8 12 16 20 2
2 4 8 12 16 20 4
3 5 10 15 20 25 4
4 6 12 18 24 30 4
5 7 14 21 28 35 4
6 7 14 21 28 35 6
7 11 22 33 44 55 6
Nozzle P/N: OL-M
Previously P/N: 3070-3/8HH-10-SS
49
OPERATION
The TANK Fire Suppression extinguishing system is electrically operated via the applicable fire alarm con-
trol panel. The system can be activated automatically via an electric thermal detector or manually via a
remote manual actuator. The extinguishing system is electrically operated via the PCBCORE control
board. The system can be activated automatically via a Firestat or manually via a remote manual actuator.
Since the TANK Fire Suppression extinguishing system is electrically operated, the applicable fire alarm
control panel requires AC input power with a battery backup system. Reference the applicable control
panel manual for wiring and compatibility.
When one of the systems Firestat(s) detectors senses a temperature hotter than its internal set-point (e.g.,
in the event of a hood fire), or when a remote manual actuation device (push/pull station) is pushed, an
electric signal is sent to the tank-based fire protection release solenoid via the fire alarm control panel
releasing circuit. The electric release solenoid is energized, allowing pressurization of the pneumatic actu-
ator(s). The actuators plunger(s) will depress into the tank valve body, releasing agent to flow to the hood
duct, plenum, and appliance nozzles.
When the fire extinguishing system is activated, the applicable fire alarm control panel simultaneously
shuts down all gas and electric appliances under the protected hood(s), shuts down make-up air and/or
exhaust where applicable, and activates the building fire alarm where applicable.
The electrically operated fire system requires a battery backup system. In the event of a loss of building
electrical power, all gas and electric appliances under the hood must be electrically interlocked to shut off.
This is achieved via a gas valve relay and/or a shunt trip breaker. The battery backup will automatically
energize upon a loss of power. The battery backup will monitor the fire system circuit for up to 24 hours
and be able to operate the fire system circuit for a minimum of 30 minutes. Once power is restored, the
battery will automatically recharge.
A means of manual reset is required for shut-off devices to ensure manual reset prior to fuel or power
being restored in accordance with NFPA 17 and NFPA 96. The electric gas shut-off valve is used in con-
junction with a UL/ULC listed manual reset relay, refer to Gas Shut-Off Valves on page 35.
Appliance and electrical shut down is achieved via the applicable fire alarm control panel relay, in conjunc-
tion with UL/ULC listed enclosed industrial control equipment or magnetic contactors of appropriate rating.
These must be used in conjunction with a UL/ULC listed manual reset relay, refer to Figure 46. All wiring is
to be in accordance with the applicable manufacturers instructions for the fire alarm control panel, gas
shut-off valve, manual reset relay, and contractor supplied shut-off devices. All wiring must be in accor-
dance to NFPA 70 and the Authority Having Jurisdiction (AHJ).
The TANK Fire Suppression System is not required to be interlocked to a buildings fire alarm control panel
to function. When a building fire alarm system is present, the fire alarm control panel may be connected
such that the actuation of the TANK Fire Suppression extinguishing system also activates the fire alarm.
Reference the applicable control panel manual for wiring and compatibility.
Figure 46 - Reset Relay
50
Test Mode Overview
The fire protection system has an integrated option for testing. When in test mode, the release solenoid is
disabled and will prevent the fire extinguishing agent from spraying on the appliances. For testing
purposes, this will allow the activation of the fire system, audible alarm, shunt trip breaker (if applicable),
and shut down of appliances via gas valve reset relay.
All additional PCBCORE controlled packages that are attached to the system must be in Test mode. This
includes additional fire protection systems, Pollution Control Unit with CORE, and other hood-mounted
CORE controlled protection systems.
Please note that the appliances must be started before test mode is entered on any PCBCORE protection
package for proper demonstration of this function. If the fire protection system is left in Test mode for
more than 15 minutes, the appliances will shut down. This is to prevent cooking operations from occurring
while the appliances and ventilation system are not protected.
ATTENTION: All interlocked PCBCORE controlled packages must be placed into Test mode
before cleaning the hood, Pollution Control Unit (PCU), or any other interlocked units.
Reset Overview
There are multiple actions required to reset the fire system. The following must be completed by a
Certified Fire System Technician.
1. The duct firestat must be cooled below its internal set point.
2. The remote manual actuation device (push/pull station) must be reset by twisting the button clockwise
until it resets.
3. Press the Push To Reset Fire System button.
4. Reset the pneumatic actuators (PAK, SVA), refer to Re-arming System on page 63.
Note: The firestat must be cool, and the remote manual actuation device (push/pull station) must
be reset for this button to work.
The fire system must be re-commissioned per the manufacturers recommendations and guidelines by an
authorized fire system distributor and/or authorized service agent.
WARNING: In the event of an actual fire, further inspections are required after the fire has been extin-
guished to verify the integrity of the hood, ductwork, fire sensors, fan, and fire suppression system has
not been compromised. With approval from the Authority Having Jurisdiction (AHJ) or the Fire Depart-
ment, proceed to restarting the fire system.
Figure 47 - Fire System Reset
1. LED Indicator
2. Alarm Speaker
3. Panel Latch
4. Reset Button
5. Test Mode/Fire System Armed
Switch
51
Battery Backup
Figure 48 - Battery Backup
The fire protection system contains a battery backup. During a power loss,
the Fire System Activated light will flash 11 times between pauses
indicating the power loss.
The batteries must be replaced every 2 years, from the date of fire system
commissioning. Part number PS-1270-F2, two are required. Although the
batteries are hot-swappable, which means they can be replaced while
there is input power to the control, for your safety, all sources of power
must be removed from the control before replacing the batteries. To
replace the batteries, unplug the battery cable from the J1 connector on
the electrical board (PCBCORE). Then remove the retaining strap holding
the batteries in place. Remove the batteries from the cabinet. Transfer the
fuse and cable set from the old batteries to the new batteries being
extremely careful to observe the RED and BLACK lead and terminal
colors. Reinstall the batteries in the cabinet and reconnect the battery plug
to J1. The batteries are lead-acid type and are recyclable; please
dispose of the old batteries properly.
During extended periods of inactivity where the fire protection system will
be without AC power for more than 2 days, such as a shutdown or natural
disaster, it is best to decommission the fire system by disconnecting the
batteries. This will prevent any damage to the batteries through complete
discharge. When the system becomes active again, commission the
system by reconnecting the batteries and allow the batteries to charge for
48 hours.
The TANK suppression system is supplied with 14-amp hours of backup battery capacity. Per NFPA 72 10.5.6.3,
the system requires 1.66 amp hours of battery capacity.
Power Supply Adjustment
Figure 49 - Power Supply
To properly charge the batteries, the power supply must be adjusted to
output 27.5V DC. This can be checked with an accurate digital voltmeter
placed across Terminals H1D and N1D. To adjust the output voltage,
place a small flat-bladed screwdriver into the yellow dial. Turn the dial
clockwise, this will increase the voltage.
Important!
The battery backup system requires that the batteries be changed every 2 years, from the date of fire
system commissioning, maximum. Failure to do this will result in a void in product reliability and may
cause severe damage to facility due to loss of fire protection.
52
Fire Protection System Firestat
The Firestat (page 36) is a device installed in the riser of the hood, at the duct connection, that measures
temperature. One sensor shall be installed in each exhaust riser. Secondary downstream detectors in the duct are
not required except as outlined in the Non-Solid Fuel Appliances and Solid Fuel Appliances section. Sensors
are not required above each appliance or in the hood grease plenum. The standard temperature setting is 360°F.
Depending on heat produced by appliance, a higher rated temperature Firestat will be required. If a temperature
higher than the setpoint is sensed, the Firestat contacts will close and energize the electrical control board. The fire
system will activate.
The supervised loop must be run through metallic conduit. Do not run wiring with high voltage wires. Verify all
supervised loop wires are free from damage/stress. All supervised loop wires must be terminated in terminal
blocks, junction boxes, and push-stations.
The Firestat has 2 black wires and 2 white wires. These wires must be connected to the supervised loop. Use high-
temperature wiring when installing Firestat components. Wago connectors (part number: 221-412) must be used.
Multiple sensors are wired in parallel in the supervised loop. The Firestat may be installed on the opposite side of
the quick seal for access in the duct.
Non-Solid Fuel Appliances (Rated 450°F)
Non-solid fuel appliances rated for 450°F will not require additional firestats, regardless of the configuration and
length of ductwork.
Non-Solid Fuel Appliances (Rated 600°F)
Non-solid fuel appliances rated for 600°F will require downstream detection if the duct run contains any horizontal
section over 25 feet in length. Downstream detection should be installed at the end of a horizontal section. Duct
layouts that include less than 25 feet of horizontal ductwork will not require additional detection.
Solid Fuel Appliances (Rated 700°F)
Solid fuel appliances produce effluents that can accumulate inside the duct, especially in long horizontal duct runs.
Sparks from solid fuel appliances can travel into the ductwork and create fires that occur beyond the point where
the hood riser Firestat can detect them. Additional downstream Firestats ensure that these duct fires are detected
and the fire system actuates. Solid fuel applications require 600°F rated Firestats, and SOLO filters. Exhaust fan(s)
used with solid fuel appliances must use a steel wheel.
In addition to the 600°F rated Firestat, located in the hood riser, a second Firestat is required at the duct discharge
for solid fuel applications when the ductwork exceeds 10 feet in length or contains horizontal runs. Even if the
entire duct run is inaccessible, this additional Firestat is still needed. Mounting a Firestat in the fan may be an
option. On duct runs longer than 50 feet, a third Firestat will be required somewhere in the duct run, ideally at the
end of a horizontal run, if present. Duct runs longer than 100 feet will require additional Firestats, contact your
local sales office for more information.
NOTE: When additional Firestats are required, install in an accessible location near an access door, hood
riser, or fan. The door will provide access to install, clean, and replace the Firestat when needed. If a PCU
is equipped with electronic detection, PCU Firestats can serve as downstream detectors, if present. The
temperature rating of the Firestat in the duct must always match the temperature rating of the Firestat in
the riser.
53
TROUBLESHOOTING
Table 16 lists out causes and corrective actions for possible problems with the system. Review this list prior to
consulting the manufacturer.
Table 16 - Fire Protection System Troubleshooting
Problem Potential Cause Corrective Action
Exhaust Fan is On and Supply Fan
will not Start
Broken supply fan belt Replace fan belt.
Fire system not armed Fire system distributor must arm fire
system.
Fire System Activated Light On Fire system is activated Verify fire is out and reset fire
system.
Audible Alarm is On Fire system is activated Verify fire is out and reset fire
system.
A fault code is flashing on the Fire
System Activated light
A fault has been detected in the Fire
Protection System
Count the flashes and refer to
Appliance Shutdown in Fault
Conditions on page 55.
Gas Valve does not Close Debris on gas valve seal Fully clean gas valve and strainer.
Fire System will not Turn Off
Duct sensor is hot
Heat has activated the duct sensor.
Remove heat source or let the
system extinguish the fire. Once heat
source or problem is resolved, press
reset button on the face of the
electrical control package.
Remote Manual Actuation Device
has been pushed
Reset remote push station once fire
is out and press reset button on the
face of the electrical control package.
Reset remote push station by
twisting clockwise until reset.
54
CORE Board Faults
When there are no faults in the fire system, the LED light will stay solid. When there is a fault, the LED light
will flash with a short break. Count the flashes then wait for the short break to determine the fault.
NOTE: CORE Boards with software version 1.68 and prior will use one brief flash every 3-seconds
to indicate there are no faults in the fire system.
Catastrophic faults
Critical faults
Important faults
Number of
Flashes Fault Condition Corrective Action
1 Invalid Activation Check for external voltage being applied at J3-7 and J3-10.
2 Release Solenoid Check solenoid and wiring to solenoid, replace as needed.
3 Pressure Switch Check solenoid and wiring to solenoid, replace as needed.
4 Auxiliary Fault Check supervised Pressure Regulating Valves (optional) and
Pressure Switches (optional).
5 Microcontroller Fault Replace CORE printed circuit board.
Number of
Flashes Fault Condition Corrective Action
6 N/A N/A
7 Supervised Loop
Check the wiring to all the manual actuation devices
(push/pull stations) and fire sensors for shorts to ground,
replace as needed.
Refer to Supervised Loop Electrical Details on page 46.
Number of
Flashes Fault Condition Corrective Action
8 Ground Fault
Check the wiring to all the manual actuation devices
(push/pull stations) and fire sensors for shorts to ground,
replace as needed.
Refer to Supervised Loop Electrical Details on page 46.
9 N/A N/A
10 Battery Voltage Low Replace batteries, wait for batteries to recharge if there was a
power failure.
11 AC Power Failure Check breakers, call power company.
12 Door Tamper Switch Close cabinet door.
13 Test Mode Place switch in armed position when testing is complete.
14 CORE Interlock Check Dip Switches on all boards and RS-485 network wires
connecting boards.
15 Fault on Hood in
Network Check all hoods in CORE network for faults.
16 Fault on PCU in
Network Check all PCUs in CORE network for faults.
55
Appliance Shutdown in Fault Conditions
The system is equipped to shut down the appliances if a fault condition is present. Table 17 displays fault
conditions that affect the appliances fuel and power sources, alarm muting, and local trouble relay.
NOTE: CORE Boards with software version 1.68 and prior will use one brief flash every 3-seconds to
indicate there are no faults in the fire system.
NOTE: The low pressure switch option is not required per product safety listings and standards. The fault
is for monitoring purposes. When the fault is present for 24 hours, cooking operation will shut down.
Local Alarm Muting
Pressing the fire system reset button can mute the local alarm. This will disable the sounder for 4 hours under
specific conditions. Table 17 shows which errors can be muted. It should be noted that the fault will not clear until
the fault condition is corrected.
Test Mode
Test Mode allows the system to be tested with operational appliances without discharging the system on the appli-
ances. Once the appliances are started, test mode can be entered without the appliances shutting down for 15
minutes. However, once the fire system is activated, the shunt trip (electric appliances) and the gas valve will be
locked out until test mode is deactivated. **During AC power failure, all gas appliances will be shut down.
Electrical appliances will shut down on building power loss.
Table 17 - Appliance Fault Conditions
Number of
Flashes Fault Condition
Gas Valve Shut Down Shut Down Shunt Trip Breaker
and UDS Kill Switch Mute Local
Alarm 4
Hour Reset
Local
Trouble
RelayLocal System Networked System Local System Networked
System
Catastrophic Faults
1 Invalid Activation X X X X X
2 Release Solenoid X X X X X
3 Pressure Switch X X X X X
4 Auxiliary Fault X X X X X
5 Microcontroller Fault X X X X
Critical Faults
6 N/A - - - - - -
7 Supervised Loop Fault X X X X X
Important Faults
8 Ground Fault X
9 N/A - - - -- -
10 Battery Voltage Low X X
11 AC Power Failure X X X** X** X
12 Door Tamper Switch X
13 Test Mode X X X X
14 CORE Interlock X
15 Fault on Hood in
Network X
16 Fault on PCU in
Network X
56
Supervised Loop Wiring Troubleshooting
NOTE: Place the panel in test mode during diagnostic testing.
Before troubleshooting, verify all power supplies (PS-02) are set to 27.5V DC. Verify all circuit checks from
Supervised Loop Electrical Details on page 46. If any readings are not in range, there is an issue with that
loop or associated components/wiring. Refer to Table 18 for troubleshooting.
* Components that may cause this fault are: Gas Valve, Surfactant Pump, Water Solenoid(s), Release
Solenoid(s).
** Components that may cause this fault are: 24V Relays, Trouble Relay (when energized), 24V LED Lights.
NOTE: If an abnormal reading is present, disconnect potential components/wiring one at a time, while
continuing to take readings, to locate the source of the ground fault.
Table 18 - Common Wiring Troubleshooting Chart
Problem Potential Cause Expected Results +/- 0.2 Corrective Action
Supervised
Loop
Fault
Open Supervised Loop
between Terminals
21 and 24.
Terminal 21 to PS-02 (DC-) = 26.5V DC
Terminal 21 to Terminal 22 = 26.5V DC
Terminal 24 to PS-02 (DC-) = 26.5V DC
Terminal 24 to Ground = 1.8V DC
Locate and repair faulty wiring in
the 21-24 supervised loop.
Open Supervised Loop
between Terminals
22 and 23.
Terminal 22 to PS-02 (DC-) = 0V DC
Terminal 23 to PS-02 (DC-) = 0V DC
Terminal 23 to Terminal 24 = 26.5V DC
Locate and repair faulty wiring in
the 22-23 supervised loop.
Open Supervised Loop Push-
Station
(Terminals 101 and 104)
Terminal 101 to PS-02 (DC-) = 26.5V DC
Terminal 101 to Terminal 102 = 26.5V DC
Terminal 104 to PS-02 (DC-) = 26.5V DC
Terminal 104 to Ground = 1.8V DC
Locate and repair faulty wiring in
the 101-104 supervised loop.
Open Supervised Loop Push-
Station
(Terminals 102 and 103)
Terminal 102 to PS-02 (DC-) = 0V DC
Terminal 103 to PS-02 (DC-) = 0V DC
Terminal 103 to Terminal 104 = 26.5V DC
Locate and repair faulty wiring in
the 102-103 supervised loop.
Ground
Fault
Terminals 22 or 23 are shorted to
chassis ground. *24V DC PS-02
(DC-) Wiring or Components.
Chassis Ground to PS-02 (DC-) = 24.4V DC
Locate and repair shorted wiring
between 22-23 supervised loop
and ground.
Terminals 21 or 24 are shorted to
chassis ground. **24V DC PS-02
(DC+) Wiring or Components.
Chassis Ground to PS-02 (DC+) = 2.7V DC
Locate and repair shorted wiring
between 21-24 supervised loop
and ground.
Interlock Network Issue Check battery voltage and supervised loop wiring with
other packages that are interlocked in the network.
Locate and repair faulty wiring in
the circuit.
Replace batteries.
AC
Power
Failure
120V AC Input Power Supply
Interrupted. H1 to N1 = 110V to 125V AC
Verify constant input power
between H1 and N1. Check
wiring to L/N terminals on PS-02.
Locate and repair faulty wiring in
the circuit.
Battery
Voltage
Low
Faulty Battery or
Power Supply (PS-02).J1-1 to J1-2 = 23.5V to 24.5V DC
Verify there is 12V DC to each
battery connection. Locate and
repair faulty wiring in the circuit.
Replace batteries.
Interlock Network Issue.Check battery voltage and supervised loop wiring with
other packages that are interlocked in the network.
Locate and repair faulty wiring in
the circuit.
Replace batteries.
Release
Solenoid
Solenoid wiring incorrect.
Check RS to N1D when:
Wire removed from RS terminal = 15.5DC V +/- 2V
RS terminal wired, connector removed = 6.5DC V +/- 2V
RS terminal wired, connector installed = 0.2-0.4DC V
Check wiring at terminals.
Locate and repair faulty wiring in
the circuit.
Connector is not secured to
solenoid.
Verify the connector is secured
to the valve.
57
DIP Switch Settings
When set from the factory (Figure 50), switches 1, 5, and 8 are in the Closed (On) positions. Switch 2, 3, 4, 6, 7 are
in the Open (Off) position. This should be considered the default positions and should not be changed.
Figure 50 - DIP Switch
Each unit has a unique address based on the DIP switch 1-4 settings, 15 units max on a network.
If address is 0 (all switches off), the unit will not accept or send any network traffic.
The unit that has switch 5 set to on will be the master and will be in charge of polling all the units below it and
waiting for a reply. The lack of 3 replies in a row will cause an interlock network supervision fault. All units will
be polled in a burst every 3 seconds.
For all non-master units, the lack of being polled for 10 seconds will cause an interlock network supervision
fault.
Any unit detecting a fire condition will broadcast the notification once every second for as long as the condition
persists.
When the Fire condition is cleared, 10 notifications will be sent, one every second.
Any unit detecting a supervisory fault will broadcast the notification every 2 seconds until the condition is
cleared.
When the supervisory fault condition is cleared, 10 notifications will be sent, one every 2 seconds.
Table 19 - DIP Switch Settings
DIP Switch #Description
1 through 4
DIP Switch Position Interlock Network Address1 2 3 4
Closed Open Open Open 1
Open Closed Open Open 2
Closed Closed Open Open 3
Open Open Closed Open 4
Closed Open Closed Open 5
Open Closed Closed Open 6
Closed Closed Closed Open 7
Open Open Open Closed 8
Closed Open Open Closed 9
Open Closed Open Closed 10
Closed Closed Open Closed 11
Open Open Closed Closed 12
Closed Open Closed Closed 13
Open Closed Closed Closed 14
Closed Closed Closed Closed 15
Open Open Open Open This unit is not part of an interlock network
5 Set this switch to Closed (On) if this unit has the highest address on the interlock network. Otherwise, this
switch must be Open (Off)
6 and 7
Fire Group
6 7 Fire Group Number
Open Open 1
Closed Open 2
Open Closed 3
Closed Closed 4
8 Setting switch 8 to its Closed (On) position connects a 120 Ohm terminating resistor to the interlock network.
This switch must be Closed if this unit is at either physical end of the interlock network cable. Otherwise, it must
be Open (Off).
58
Typical DIP Switch Arrangement
Only One Fire Protection System Panel on the network:
Two Fire Protection System (or CORE) Panels on the network:
Two Fire Protection System (or CORE) Panels on the network:
Three Fire Protection System (or CORE) Panels on the network:
Four Fire Protection System (or CORE) Panels on the network:
For additional configurations, refer to Table 19 for the electrical board (PCBCORE) DIP switch settings.
The configurations above are shown with all electrical boards (PCBCORE) in the same Fire Group and may be
configured differently, even if the control panels are on the same network. Every panel with matching fire group
settings (DIP switches 6 and 7) will activate simultaneously in a fire condition.
Core Board #DIP 1 DIP 2 DIP 3 DIP 4 DIP 5 DIP 6 DIP 7 DIP 8
#1 (Hood Master) Closed Open Open Open Closed Open Open Closed
Core Board #DIP 1 DIP 2 DIP 3 DIP 4 DIP 5 DIP 6 DIP 7 DIP 8
#1 (2nd Hood Slave) Closed Open Open Open Open Open Open Closed
#2 (Hood Master) Open Closed Open Open Closed Open Open Closed
Core Board #DIP 1 DIP 2 DIP 3 DIP 4 DIP 5 DIP 6 DIP 7 DIP 8
#1 (PCU Slave) Closed Open Open Open Open Open Open Closed
#2 (Hood Master) Open Closed Open Open Closed Open Open Closed
Core Board #DIP 1 DIP 2 DIP 3 DIP 4 DIP 5 DIP 6 DIP 7 DIP 8
#1 (2nd Hood Slave) Closed Open Open Open Open Open Open Closed
#2 (PCU Slave) Open Closed Open Open Open Open Open Open
#3 (Hood Master) Closed Closed Open Open Closed Open Open Closed
Core Board #DIP 1 DIP 2 DIP 3 DIP 4 DIP 5 DIP 6 DIP 7 DIP 8
#1 (2nd Hood Slave) Closed Open Open Open Open Open Open Closed
#2 (PCU Slave) Open Closed Open Open Open Open Open Open
#3 (2nd PCU Slave) Closed Closed Open Open Open Open Open Open
#4 (Hood Master) Open Open Closed Open Closed Open Open Closed
59
START-UP/INSPECTION TEST PROCEDURE
NOTE: This service procedure covers a single manifold system however a duplicate manifold and tank
setup is possible. If you have a two manifold system, a second service kit will be required along with
fittings to connect it properly. Refer to Table 23 on page 77 for service parts.
Required Tools:
Precision Slotted Screwdriver
Heat Gun
Nitrogen Service Kit - single manifold only
Balloons
Warm Soapy Water
1/4" SAE Tee Connector with cap and valve core. 1/4" female knurl and 1/4" SAE male connections. Used for
multiple manifold systems only.
Micro Leak Detector
In-Line Filter
Digital Pressure Gauge
CAUTION!: Never use magnetic tools or cause excessive vibration when the actuators are bolted to the
cylinder(s).
Parts:
Supervised Loop Wiring: Black Wire - Part #: 441601C6.FE0 & White Wire - Part #: 441601C6.FE9
Pull Station Wiring: Belden Wire - Part #: 6320UL (or similar)
WAGO connectors - Part #: 221-412
Replacement PAK O-rings
Fire System Wiring Connections
Connect the Manual Activation Device (MAD) using Belden #6320UL, 18 Gauge plenum rated wire.
Connect all Firestats using Belden #6320UL (or similar), 18 Gauge plenum high temperature rated wire. Single
hood systems with a hood mounted utility cabinet may not have any additional stats.
The supervised loop must be run through metallic conduit. Do not run wiring with high voltage
wires. Verify all supervised loop wires are free from damage/stress. All supervised loop wires must be termi-
nated in terminal blocks, junction boxes, and push-stations.
Install the 24V DC or 120V AC gas valve.
Verify that all solenoid wires and electrical control panel wiring are secured. Any supervised loop wiring within
18 inches of the top of the hood must be high-temp wire, type MG or MGT with WAGO connectors (Part # 221-
412). Type MG White (Part # 441601C6. FE0), Type MG Black (Part # 441601C6.FE9).
Preparing System for Test
Place all building alarm systems in test mode. Place the electric control panel in Test mode. Refer to
Figure 51. Verify there are no supervision faults on the HMI.
Verify that the hood, duct, and kitchen appliances have not changed (including type, dimensions, and location)
from the approved design. Appliance drops must be between 35-50 inches from the hazard surface.
Verify that all cylinder discharge outlets are connected to the system.
Verify that all cylinders are secured in their bracket(s).
Verify that a valve cap or supervisory pressure switch (optional) is installed on each secondary cylinder
Schrader valve.
Verify that nozzle caps are installed.
NOTE: If this is the first service after installation, the PAK hose should be disconnected, and the primary
and secondary valve actuators should be in the ship/test position. Refer to Figure 52 on page 60.
Figure 51 - Electric Control Panel Test Mode
60
Connecting Service Test Kit
CAUTION!: Supplied Nitrogen Pressure Shall Not Exceed 250 psig Maximum.
NOTE: The PAK hose is shipped disconnected, and the PAK/SVA(s) are shipped in the Ship/Test position
Check the quantity of Schrader valves on the tank cylinder assembly.
Tank assemblies with one Schrader valve:
- Quickly disconnect the PAK hose to minimize nitrogen loss. Verify a Supervisory Pressure Switch is
active on the HMI.
Tank assemblies with dual Schrader valves:
- If this is the first installation/start-up procedure, confirm a Supervisory Pressure Switch fault is
active. Then, connect the PAK hose to the tank Schrader valve after the PAK/SVA actuators are con-
firmed in the ship/test position. Apply Leak Lock joint sealing compound on the sealing surface of the
Schrader valve when connecting the PAK hose to the tank assembly.
- NEVER DISCONNECT the PAK hose from the tank during normal 6-month inspections. The pri-
mary tank secondary Schrader valve will be utilized for servicing the system. A Supervisory Pres-
sure Switch fault should not be active on the HMI.
NOTE: PAK hoses with knurled fitting must ONLY be tightened by hand and not with a tool. If the PAK
hose with a hex fitting was loosened for any reason, this fitting must be torqued to 15 in-lbs.
Remove the PAK and any Secondary Valve Actuators (SVA) from their cylinder. Place PAK and SVAs in the
ship/test position. Verify that the PAK and SVAs are securely mounted to the bracket. Refer to Figure 52.
Figure 52 - System Preparation
Connect the Nitrogen Service Cylinder via the 1/4 refrigerant test hose with an inline filter. If the filter has a
directional airflow arrow, verify correct orientation. Refer to Figure 53 on page 61.
For a single Schrader valve, connect the PAK hose to the inline filter.
For dual Schrader valves, connect a secondary 1/4 refrigerant test hose to the open secondary tank
Schrader valve. Connect the end of the hose to the filter.
Verify that the pistons in the PAK and SVAs are in the set position. The plunger is not actuated. Refer to
Figure 55 on page 62.
Connect a 1/4 pressure gauge to the Schrader service valve of the PAK assembly. Verify the pressure reads 0
psi. Refer to Figure 53.
Verify all secondary actuator hoses are connected to the appropriate PAK/SVAs. Tighten connections.
Verify the actuation line vent limiting orifice is installed and tight in the last actuator on the system (last SVA or
PAK if there are no secondary cylinders). Do not use pipe dope or tape on the orifice.
Verify that the Primary Supervisory Pressure Switch is installed securely on the PAK.
Optional Feature: Secondary tanks may also have Supervisory Pressure Switches installed, verify all
switches are properly secured to all secondary tanks.
Verify the PAK solenoid is de-energized.
Open the Nitrogen Cylinder. Adjust the pressure to 225 psig.
Monitor the pressure gauge on the PAK. The pressure must not read above 0.5 psi for 15 minutes. This indi-
cates the primary actuator solenoid is in the de-energized state and will not let pressure through as
intended. The gauge may fluctuate between 0 and 0.5 psi.
CAUTION!: If pressure reads above 0.5 psi, contact Service at 1-866-784-6900.
WARNING!
If the PAK or SVAs are installed on the cylinder valve during the test, the cylinders will discharge.
1. Primary Supervisory Pressure Switch
2. PAK Hose Disconnected
3. Secondary Supervisory Pressure Switch
(optional)
4. PAK/SVA in the Ship/Test Position
61
Close the Nitrogen Cylinder.
Remove the pressure gauge on the PAK.
Figure 53 - Service Test Tank Details
NOTE: Pressure gauge minimum requirements; 1/4 female flare, 0-250 psi, resolution 0.5 psi, accuracy
+/- 1% FS. The inline filter minimum requirements; 1/4 male flare, 40 micron, 250 psi.
1. Nitrogen Service Cylinder with regulator attached
2. 1/4 Refrigerant Test Hose (Long)
Additional hoses/lengths required for servicing.
3. 1/4 Male to Male Inline Filter
4. PAK Hose Connection
5. Secondary Actuator Hose
6. Vent Limiting Orifice
7. Digital Pressure Gauge
8. Primary Actuator Solenoid
62
Balloon Test Procedure
NOTE: The following should be tested with battery power only (A/C power disconnected) and then tested
with A/C power connected.
Figure 54 - Additional 1/4 Test Hose
Connect an additional 1/4 refrigerant test hose from the service
Schrader valve of the PAK assembly (45° depressor connection) to
the distribution piping service port (low-loss fitting threaded into
hose straight connection). Refer to Figure 54.
Check that the pistons in the PAK and SVAs are still in the set posi-
tion.
Remove the nozzle caps from the nozzles.
Remove hood filters. This will expose the Firestat(s) and the duct
and plenum drops.
Place testing balloons over all nozzles (appliance, duct, and ple-
num).
Open the Nitrogen Service Cylinder. Adjust the pressure to 200
psig.
CAUTION!: Supplied Nitrogen Pressure Shall Not Exceed 250 psig
Maximum.
Place the system in Armed mode.
Lift the cover to the manual activation device and push to activate
the fire system. Refer to Figure 55.
When testing with A/C power, verify the Electrical Control Package
(ECP) has activated. The audible alarm will sound, and the system
is in a fire condition. The HMI will flash FIRE on the screen.
Verify the PAK and all SVAs have actuated. The piston should be fully extended and in a locked position. Refer
to Figure 55.
Verify that there are no leaks in the actuation line, except through the vent limiting orifice.
Verify that the solenoid is in the energized state.
Verify all balloons are filled.
Verify fuel to all appliances under the protected hood has shut off.
Verify the makeup air supplied to the hood has shut off.
If all of the above is confirmed, reset the control panel. The manual activation device can be reset by twisting
the push button in a clockwise motion. Press the Push To Reset button. Refer to Reset Overview on
page 50.
Close the Nitrogen Cylinder. Remove all balloons from the nozzles.
Figure 55 - Balloon Test
1. Schrader service valve of the PAK
assembly
2. 1/4 Refrigerant Test Hose (Short)
Additional hoses/lengths required
for servicing.
3. Low-loss Fitting Straight Adapter
4. Distribution Piping Service Port
1. PAK Actuated
2. SVA Actuated
63
Firestat Test Procedure
NOTE: The following should be tested with battery power only (A/C power disconnected) and then tested
with A/C power connected.
ATTENTION: You do not need nitrogen for this test.
CAUTION!: The use of a torch or flame is strictly prohibited.
Figure 56 - Firestat Riser Location
Use a portable heat source to apply heat to the duct Firestat in accor-
dance with the manufacturers instructions. Please refer to applicable
detector manufacturers manual. Refer to Figure 56.
When the Firestats heat set point is reached, the fire system will acti-
vate. Some residual nitrogen from the test cylinder may release.
- When performing this test with battery power only, check the CORE-
board fire status light.
- When performing this test with A/C power, the exhaust fan will acti-
vate. Depending on the hood lights activation setting, they will turn
on or off.
Check all Firestats in the system.
After the system is tested, install nozzle caps, and install hood filters.
Disconnecting Service Cylinder Tank
Place the TANK fire system into Test mode.
Relieve pressure from the Nitrogen Cylinder.
Cylinder assemblies with one Schrader valve:
- Slowly disconnect the inline filter from the PAK hose.
Cylinder assemblies with dual Schrader valves:
- Check all cylinder gauges to confirm proper pressure is within the green range. If pressure is low, refer
to Adding Nitrogen to Tank(s) on page 68.
- Slowly disconnect the test hose with inline filter from the tank cylinder.
Relieve pressure in the actuation line. Slowly disconnect the test hose from the PAK service valve.
Disconnect the test hose from the fire system distribution piping service port. Remove low-loss fitting adapter.
Re-arming System
Reset each PAK and any SVAs by pushing the spring-loaded pin on the piston. Press the piston into the body
of the actuator.
Verify residual pressure is relieved at Schrader valve.
NOTE: If a PAK/SVA fails to operate or cannot be properly reset, the unit must be replaced. Refer to
page 67 for replacement procedures.
Verify all of the actuation lines between the PAK and SVA(s) are secure and tight. Place Schrader valve cap on
the fire system distribution piping service port.
Check all cylinder gauges to confirm proper pressure is within the green range. If pressure is low, add nitro-
gen. Refer to Adding Nitrogen to Tank(s) on page 68.
Re-arm the control panel by placing the package in Armed mode.
Figure 57 - Resetting PAK/SVA(s)
1. Firestat
2. Heat Gun
1. PAK in Ship/Test Position
2. SVA in Ship/Test Position
3. Distribution Piping Service Schrader
Valve
4. Primary Actuator Hose
5. Actuator Activated
6. Actuator Set Position
NOTE: Tanks should never be filled
with agent in the field.
64
Leakage Testing
Connect a 1/4 pressure gauge to the Schrader service valve of the PAK assembly. Verify the pressure reads 0
psi. Refer to Figure 58.
Prepare the tank cylinder assembly for leakage testing.
Cylinder assemblies with one Schrader valve:
- Inspect the PAK hose O-ring. Replace O-ring if damaged or deformed. Refer to TANK FIRE SUPPRES-
SION SYSTEM PARTS on page 77.
- Quickly connect the PAK hose to the Schrader valve on the primary cylinder to minimize nitrogen loss.
Apply Leak Lock joint sealing compound on the sealing surface of the Schrader valve when connecting
the PAK hose to the tank assembly.
Cylinder assemblies with dual Schrader valves:
- Place Schrader cap back on the tank cylinder secondary Schrader valve.
NOTE: PAK hoses with knurled fitting must ONLY be tightened by hand and not with a tool. If the PAK
hose with a hex fitting was loosened for any reason, this fitting must be torqued to 15 in-lbs.
Monitor the pressure gauge on the PAK. The pressure must not read above 0.5 psi for 15 minutes. This indi-
cates the solenoid is in the de-energized state and will not let pressure through as intended. The gauge may
fluctuate between 0 and 0.5 psi.
CAUTION!: If pressure reads above 0.5 psi, immediately remove the primary actuator hose from the pri-
mary tank. Contact Service at 1-866-784-6900.
Verify that the pistons in the PAK and SVAs are in the set position and not actuated. Refer to Figure 57 on
page 63.
Figure 58 - Leakage Test Setup
Install the PAK and any SVAs onto their respective cylinders. Refer to Figure 59.
Remove the pressure gauge on the PAK. Place the Schrader valve cap back onto the service port of the PAK
assembly. Tighten the cap.
Spray the primary charge hose connection with a micro leak detector to check for leaks.
Verify that the Supervisory Pressure Switches have reset per the control panel manual instructions.
The system should be in the Armed position, and no faults should be active on the HMI when finished testing.
Figure 59 - PAK/SVA(s) Installed
1. PAK Reset and in the Ship/Test Position
2. SVA Reset and in the Ship/Test Position
3. PAK Hose Connected to Tank
4. Digital Pressure Gauge
1. PAK Installed
2. Schrader Cap
3. SVA Installed
65
MAINTENANCE
NOTE: It is the responsibility of the system installer to review system operation and owner obliga-
tions, and to provide any necessary literature to the owner at the time of system installation.
This section contains the inspection and maintenance instructions for the TANK Fire Suppression extin-
guishing system. These procedures must be performed in accordance with NFPA 17A and the National
Fire Code of Canada as applicable. If problems arise, corrective action must be taken.
Every Month (System Owner)
Refer to the cylinder nameplate for proper inspection and maintenance instructions. Inspections are
required to ascertain that the system is operable and that no changes have occurred, which would compro-
mise the effectiveness of the system. A record of the monthly inspection is to be kept reflecting the date
inspected, initials of the person performing the inspection, and any corrections required. If any discrepan-
cies are noted while making this inspection, DO NOT CONTINUE OPERATING COOKING APPLI-
ANCES. Immediately contact a factory trained distributor for service and/or repair.
The following procedure is to be performed by the Owner of the system on a monthly basis:
Table 20 - Owners Monthly Maintenance
Checkbox Procedure
Verify the extinguishing system is in its proper location.
Inspect all system components, agent distribution pipe, and conduit runs for physical damage
and/or displacement.
Inspect all nozzles caps are in place and intact. Check for possible obstructions to the
discharge of the wet chemical.
Inspect each Cylinder and Valve Assembly. The indicator on the pressure gauge should be in
the green range (200 psig). The cylinder should not show evidence of corrosion or damage.
Verify that manual release stations are unobstructed and in clear view and are labeled for
intended use.
Verify all tamper seals are intact, and the system is in a ready condition.
Verify the inspection tag or certificate is in place and current.
Verify the hood, duct, and protected cooking appliances have not been replaced, modified, or
relocated.
66
Every Six Months (Factory Trained Distributor)
All systems shall be inspected and serviced semi-annually by a factory trained distributor.
1. Place the control panel in Test mode and ensure there are no supervision faults, refer to Reset
Overview on page 50.
2. Verify that the system design and installation are adequate to protect the hazard area and conform to
the instructions in this manual. Check the following:
All equipment requiring fire protection within the hazard area is protected.
There have been no unauthorized alterations to the protected area or equipment, or to the wet chemi-
cal system.
All cylinder mounting brackets are securely fastened to the hood.
Verify all cylinders are pressurized within the green range.
Leak Lock joint sealing compound was applied when connecting the PAK hose to the tank assembly.
Check hose connections with soapy water to check for leaks.
All nozzles are properly aimed, secured, and located within the proper distance from the protected
equipment. Each nozzle should be clean and equipped with a cap.
All piping joints and pipe supports are securely fastened.
The pipe lengths, sizes, fittings, and material are as specified in this manual.
All wiring is in compliance with local codes.
All field wiring is free of ground fault or short-circuit conditions.
All system components and installation material are as specified in this manual.
3. Perform Start-up/Test Procedure. Refer to START-UP/INSPECTION TEST PROCEDURE on
page 59.
Every 2 Years
1. Replace batteries. The replacement battery part number is PS-1270-F2; two are required. Once the
battery is disconnected, the connected equipment is not protected from power outages. The new bat-
tery must be installed immediately. Refer to the replacement battery installation guide for more details.
2. Inspect the condition of all wires and plumbing. Plumbing should be free of corrosion, and wire insula-
tion must be in good condition.
Every Twelve-Years
The 12-year maintenance is typically done in conjunction with the semi-annual maintenance. These proce-
dures shall be performed in addition to the tests conducted at Semi-Annual intervals. Refer to Every Six
Months (Factory Trained Distributor).
Decommissioning
If it should become necessary to disconnect the CORE system from AC power for an extended period of
time (more than 2 days), the batteries should be disconnected to prevent them from being damaged due to
complete discharge.
Agent Cylinder Tanks
Each cylinder must be replaced every 12 years. For information on replacing cylinders, refer to POST-
DISCHARGE MAINTENANCE on page 69.
Actuation Hoses
All actuation hoses must be hydrostatically tested (at 500 psi test pressure) or replaced every 12 years in
accordance with NFPA 17A.
67
Conditional Maintenance
Replacing A Primary Actuation Kit
If a PAK fails to operate during system testing, follow these steps to replace the PAK:
1. Ensure the primary actuation hose is not connected to the primary cylinder or a nitrogen pressure sup-
ply system.
2. Remove the supervisory pressure switch installed on the PAK.
3. If applicable, disconnect the secondary actuation hose from the PAK.
4. Loosen the PAK shipping bolts from the top of the bracket, slide the unit back and remove it from the
bracket.
5. Loosen the shipping bolts on the new PAK. Slide the unit into the bracket. Tighten the shipping bolts to
ensure the PAK is held firmly but can still be slid back for installation to the cylinder valve.
6. If applicable, remove the side vent limiting orifice on the PAK and install in the secondary actuation
hose.
7. Install the supervisory pressure switch onto the new PAK.
Replacing A Secondary Valve Actuator
If an SVA fails to operate during system testing, follow these steps to replace the SVA:
1. Ensure the primary actuation hose is not connected to the primary cylinder or a nitrogen pressure sup-
ply system.
2. Disconnect any secondary actuation hose connecting the SVA to the PAK or other SVAs.
3. Loosen the SVA shipping bolts from the top of the bracket, slide the unit back and remove it from the
bracket.
4. Loosen the shipping bolts on the new SVA. Slide the unit into the bracket. Tighten the shipping bolts to
ensure the SVA is held firmly but can still be slid back for installation to the cylinder valve.
5. If applicable, remove the side vent limiting orifice(s) on the SVA and connect the SVA to any applicable
secondary actuation hoses.
68
Adding Nitrogen to Tank(s)
NOTE: Verify the pressure loss is not due to a discharge or unknown issue. Spray the pressurized PAK,
SVA, and tank cylinder assemblies (PAK hose connection and pressure switches) at all fittings with a
micro leak detector. Repair or replace components that show signs of leaking/damage.
Table 23 on page 77 provides all required components/part numbers to service low pressure tank(s). Refer to Fig-
ure 60 for assembling service kit. After the low pressure condition is identified and fixed, follow these steps to add
nitrogen.
Place the system in Test mode.
Unbolt PAKs/SVAs from tank(s) and secure to tank bracket.
Determine TANK Schrader valve ports. Refer to Refer to Figure 60.
Cylinder assemblies with one Schrader valve, disconnect the PAK hose from the primary Schrader valve, if
already connected.
Cylinder assemblies with dual Schrader valves, remove Schrader cap from the secondary Schrader valve.
Connect a Nitrogen Service Cylinder via the 1/4 refrigerant test hoses with an inline filter to the 1/4 to the
Schrader valve fill port.
If the filter has a directional airflow arrow, verify correct orientation. Arrow should be pointing away from the
nitrogen tank and toward the fire system tank.
CAUTION!: Supplied Nitrogen Pressure Shall Not Exceed 250 psig Maximum.
Open the Nitrogen Service Cylinder. Adjust the pressure to 225 psig.
Pressurize the tank to 200 psig. The green indicator range is 175 to 225 psig.
Close the Nitrogen Service Cylinder.
Remove test hoses from the Schrader valve.
Prepare tanks for final connections.
Cylinder assemblies with one Schrader valve, connect the PAK hose to the primary Schrader valve.
Cylinder assemblies with dual Schrader valves, place the Schrader cap on the secondary Schrader valve.
Verify PAK/SVA are still in the set position.
Remove PAKs/SVAs from the tank bracket and secure to the tanks. Tighten hardware.
Connect a 1/4 pressure gauge to the Schrader service valve of the PAK assembly. Pressure should read 0 psi.
Spray the pressurized system components and fittings with micro leak detector. Monitor the pressure gauge on
the PAK. The pressure must not read above 0.5 psi for 15 minutes. Pressure may fluctuate between 0 - 0.5 psi.
CAUTION!: If pressure reads above 0.5 psi, contact Service at 1-866-784-6900.
Place the system in Armed mode.
Finalize Start-up/Test procedure. Continue to START-UP/INSPECTION TEST PROCEDURE on page 59.
Figure 60 - Service Kit Set-up
1. Nitrogen Service Cylinder
2. Pressure Regulator
3. 1/4 Refrigerant Test Hose
(60 Long)
4. 1/4 Male to Male Inline Filter
5. 1/4 Refrigerant Test Hose
(36 Long)
6. Digital Pressure Gauge
7. Primary Schrader Valve
(Single Schrader Port)
8. Secondary Schrader Valve
(Dual Schrader Port)
9. PAK Hose (Connected to
TANK)
69
POST-DISCHARGE MAINTENANCE
General Information
Liquid Fire Suppressant, the Aqueous Potassium Carbonate (APC) base wet chemical used in the TANK
Fire Suppression extinguishing system, is non-toxic. However, any food or cooking oils that have been
contaminated with wet chemical agent should be discarded. Refer to Safety Data Sheet (SDS).
After any system discharge, it is best to clean the area as soon as it is safe to do so. Prolonged exposure
of equipment to wet chemical can result in localized corrosion due to moisture in the air. Clean up should
be completed within 24 hours of any system discharge.
TANK Fire Suppression cylinders need to be replaced every 12 years, and after any system discharge.
Appliance Cleanup
No unusual cleanup procedure is required. The reaction of the wet agent and the grease is one of
saponification, and it produces a foam that can be wiped off. After the appliances have completely cooled,
the residue from the discharge may be cleaned up using a wet cloth or sponge. Ensure that all fuel and
electric power to the area has been shut down. Wear rubber gloves and eye protection while cleaning. If
skin or eyes come in contact with the agent, flush thoroughly with water.
Cleaning Distribution System
The TANK Fire Suppression extinguishing system must have all discharge piping and nozzles flushed out
with water after any discharge, as detailed in the following procedures.
Cleaning Nozzles
1. Remove all nozzles from the system.
2. Inspect each nozzle & filter and remove any debris.
3. Clean nozzle and strainer by flushing thoroughly with warm soapy water. Remove any foreign matter
that could impede flow.
4. Run water through the nozzle tip to ensure the orifice is not clogged.
5. Thoroughly dry nozzles with dry air or nitrogen and set aside.
WARNING!
Do not disturb the foam until the cooking appliances, plenum, and duct have cooled sufficiently.
Do not put water on hot grease as this will cause violent steaming and spattering.
WARNING!
APC wet agent is electrically conductive. To avoid electrical shock, de-energize all electric circuits
to appliances, outlets, and wiring by disconnecting or turning off the electric power at the main
fuse or circuit breaker box. Do not cleanup APC wet agent or touch electric appliances, outlets,
power cords, or other wiring with electric power on.
70
Flushing the Distribution Pipe Network
Before starting the flushing procedure, inspect the complete piping network, and replace any pipe or fit-
tings that have been subjected to direct flame or excessive heating. The following procedure describes
flushing the pipe network with a spare/test cylinder. The pipe network can also be flushed utilizing an
external water supply if available.
Flushing Procedure with Spare/Test Cylinder
Check the pressure gauge on each cylinder to ensure it has been depressurized.
Clean the area with warm soapy water, and rinse with water. Dry thoroughly with dry air or nitrogen.
Disconnect the Primary Actuator Kit (PAK) stainless steel hose from the primary cylinder valve.
Remove all cylinders from the system. Refer to Removing a Cylinder Tank (Empty or Storage) on
page 73.
Fill test cylinder(s) with water and pressurize.
Install a test cylinder for each removed cylinder. Refer to Install New Cylinder Tank(s) on page 74.
Attach a suitable container (or hose to a container or other point of disposal) at each pipe outlet where
a nozzle was installed to collect the water discharge.
Install the PAK and SVAs onto their respective cylinders.
Re-arm the control panel by placing the package in Armed mode.
Connect the primary actuator hose securely to the Schrader valve on the primary cylinder.
NOTE: PAK hoses with knurled fitting must ONLY be tightened by hand and not with a tool. If the
PAK hose with a hex fitting was loosened for any reason, this fitting must be torqued to 15 in-lbs.
Activate the system using the manual activation device.
Once the system is fully discharged of water, reset the system. Refer to Reset Overview on
page 50.
Remove containers or hoses from all nozzle location pipe outlets.
Remove test cylinders.
Connect a nitrogen service tank to system piping service port and blow out the discharge piping to
remove all excess water. Disconnect the nitrogen service tank. Refer to Dry the Lines on page 72.
Install new cylinders at each location. Refer to Install New Cylinder Tank(s) on page 74.
Re-install nozzles, ensuring that all nozzles are in the correct location and properly aimed.
Complete the Start-up/Test Procedure. Refer to START-UP/INSPECTION TEST PROCEDURE on
page 59.
NOTE: Tank cylinder(s) should never be filled in the field with agent.
71
Flushing Procedure with an External Water Supply
The procedure is used for flushing out the fire system piping after a fire system discharge. Tank cylin-
der(s) must be in place when flushing the system. Refer to Figure 61 for testing setup.
Parts:
Flush the System
Remove the appliance nozzle that is furthest away from the utility cabinet.
Use a 3/8 to 3/4 flushing adapter to attach the hose to the nozzle drop. Attach a water hose to the
flushing adapter and the other end to a water source.
Hang the bucket support brackets and buckets on the applicable drops. If possible, connect a hose to
the grease spout and route the hose to the nearest floor drain.
Flush with water for a minimum of one minute. Larger systems will take longer than a minute.
Figure 61 - Flushing System with External Water Supply
Remove flushing adapter. Reinstall the nozzle and hang a bucket.
When reinstalling nozzles, ensure that all nozzles are in the correct location and properly aimed.
Tank Flushing Adapter
Bucket Support Bracket
Buckets
Water Hose
Nitrogen Service Kit
Silicone Lubricant
1/4" SAE Tee Connector with cap and valve
core. 1/4" female knurl and 1/4" SAE male con-
nections. Used for multiple manifold systems
only.
1. Nozzle Furthest from Utility Cabinet
2. 3/8 to 3/4 Tank Flushing Adapter
3. Bucket Support Bracket
4. Buckets
5. External Water Supply
6. Utility Cabinet
72
Dry the Lines
Connect the nitrogen line directly to the distribution piping service Schrader valve on the manifold line.
Refer to Figure 62.
Set your pressure regulator to 100 psi and blow down the lines for a minimum of 30 seconds. Larger
systems may take longer.
Figure 62 - Connecting Nitrogen to Dry Lines
Remove nitrogen line from the distribution piping service Schrader valve.
Remove all hoses and buckets.
Install nozzle caps on nozzles.
1. Nitrogen Service Cylinder
2. Regulator
3. Refrigerant Test Hose
4. Inline Filter
5. Additional Test Hose
6. Distribution Piping Service
Schrader Valve
73
Cylinder Tank Maintenance
TANK Fire Suppression cylinders need to be replaced every 12 years, and after any system discharge.
Removing a Cylinder Tank (Empty or Storage)
Unbolt the actuators from the tanks and bolt into shipped position. Repeat for all additional actuators.
Disconnect the PAK hose.
IMPORTANT: If tank(s) will be stored for an extended period, you must prevent debris from
entering the system. Cover the discharge outlet (tank) and discharge adapter (system piping).
Install the Valve Protection Plate and Anti-recoil Plate onto the cylinder.
Use a 1/2 and 9/16 box end wrench to remove the cylinder mounting bolts from the bracket.
Loosen the tank straps, and remove the tank. Repeat for additional tanks.
For each secondary cylinder, perform the following before moving to the next cylinder:
- Remove the Supervisory Pressure Switch from the cylinder valve if applicable.
- Loosen the cylinder bolts holding the valve to the discharge adapter and cylinder bracket.
- Loosen the tank straps holding the cylinder in place.
Pull the cylinder out from the bracket. Refer to Figure 63.
Figure 63 - Tank Removal Process
WARNING!
Never assume that a cylinder is unpressurized. Handle all cylinders as if they are pressurized until
verified otherwise. Pressurized cylinders are extremely hazardous.
When performing any cylinder maintenance procedure, the cylinder must be properly secured to a
rigid structure capable of withstanding the full thrust that would result if the valve were to open
inadvertently.
Any time a cylinder assembly is unsecured, the anti-recoil plate must be installed on the valve
outlet to provide a safe, controlled discharge in the event of accidental actuation.
Failure to take proper precautions could result in death, serious personal injury and/or property
damage.
1. PAK in Ship/Test Position
2. SVA in Ship/Test Position
3. PAK Hose
4. Secondary Supervisor Pressure Switch
(Optional)
5. Cylinder Mounting Bolts
6. Tank Straps
NOTE: Tanks should never be filled with agent
in the field.
74
Install New Cylinder Tank(s)
Remove the anti-recoil plate.
Install the tank by fully inserting the tank into the adapter. Apply some silicone lubricant to the adapter
and o-ring to ensure a smooth installation.
Install and tighten the 2 bolts to hold the tank onto the bracket. The square nut can be tightened with a
9/16 box end wrench; the bolt head can be tightened with a 1/2 box end wrench.
Tighten the middle tank strap to help support the weight of the tank and to assist in lining up the bolts.
Tighten the other two tank straps.
Repeat for all other tank cylinder(s) in the system.
Complete the Start-up/Test Procedure. Refer to START-UP/INSPECTION TEST PROCEDURE on
page 59.
Figure 64 - Installing Tank Cylinder(s)
1. Anti-Recoil Plate
2. Valve Protection Plate
3. Cylinder Assembly
4. Discharge Adapter
5. Cylinder Mounting Bolts
6. Tank Straps
75
Depressurizing a Cylinder Tank
1. Secure the cylinder in a chain vice, strap vice, or similar device.
2. Prepare high-pressure discharge hose with a spare nozzle on the end.
3. Remove the anti-recoil plate from the cylinder outlet and install the discharge adapter.
4. Install a ball valve onto the discharge adapter outlet. Refer to Figure 65.
5. Attach the discharge hose with nozzle to the ball valve outlet.
6. Attach the hose and discharge adapter assembly to the cylinder valve outlet.
7. Insert the opposite end of the hose into an appropriate container for the wet chemical agent.
8. Ensure that the hose is secure and will not come loose or separate from the container.
9. Install a Secondary Valve Actuator (SVA) onto the cylinder valve.
10. Connect the nitrogen service cylinder to one of the SVA ports, and a SVA vent limiting orifice in the
opposite port.
11. Ensure that the ball valve on the discharge assembly is in the closed position.
12. Open the nitrogen supply, slowly increase pressure until the SVA actuates. Turn off nitrogen supply.
13. Carefully open the discharge valve.
14. Monitor the discharge to prevent spillage and to ensure that the hose remains secure.
15. Control the rate of discharge via the ball valve.
16. If applicable, stop the flow and change containers.
17. When the discharge is complete, turn off the nitrogen service cylinder supply.
18. Check that the cylinder gauge indicates no pressure, and carefully depress the Schrader on the
cylinder valve. Check for any possible flow/leakage of nitrogen.
19. Slowly disconnect the nitrogen supply, relieving pressure from the SVA.
20. Remove the SVA from the valve.
21. Remove the valve/siphon tube assembly by unthreading the valve counterclockwise from the cylinder.
22. Invert the cylinder to remove any residual wet chemical.
23. Clean the cylinder and threads with warm soapy water and rinse with clean water.
24. Blow out any residual moisture from the cylinder and threads with dry air or nitrogen.
Figure 65 - Cylinder Discharge Assembly
Rechecking the System
After the inspections and procedures described previously in this section, the fire-suppression system is
ready to be fully checked out before installation of the replacement wet chemical cylinders.
1. Follow the system commissioning and test procedures outlined in START-UP/INSPECTION TEST
PROCEDURE on page 59.
2. Be sure to check the system for all modes of operation.
WARNING!
Failure to correctly secure the hose could result in death, serious bodily injury, and/or property
damage.
76
Mobile Kitchen/Seasonal Shutdown
Figure 66 provides details on components that require attention when decommissioning/commissioning mobile
kitchens or kitchens used for seasonal occasions.
When the kitchen is not in use for an extended period:
1. Verify incoming power to the hood is OFF or DISCONNECTED.
2. Disconnect the battery connection from the CORE Board at connector J1 located inside the control package.
Alternatively, you may remove the fuse (5 amp blade fuse) from the battery connector kit.
3. Disconnect the PAK and SVA(s) from the tank(s).
4. Place the PAK and SVA(s) in the ship/test position. Install valve protection plate.
NOTE: If the space drops below -20°F, the tanks must be removed and stored in a conditioned space.
When starting the kitchen backup from an extended shutdown:
1. Verify incoming power to the hood is OFF or DISCONNECTED.
2. Verify the PAK and SVA(s) are in the set position.
3. Install the battery connection to the CORE Board at connector J1. If the fuse (5 amp blade fuse) is removed,
install fuse to the connector kit at the batteries. If a replacement connector kit is required, order part number -
CORECONKIT12. If replacement batteries are required (12V, 7AH,.250 terminals, AGM), order part number -
PS-1270-F2 (must order two).
4. Check the pressure gauge is in the green range. If the pressure is low, refer to Adding Nitrogen to
Tank(s) on page 68. If the tank(s) were removed for storage, install the tank(s).
5. Restore incoming power to the hood.
6. Remove the valve protection plate. Place the PAK and SVA(s) in the installed position. Refer to START-UP/
TEST PROCEDURE on page 57 to finish start-up.
Figure 66 - Actuator and Battery/Fuse Details
77
TANK FIRE SUPPRESSION SYSTEM PARTS
Table 21 - System Components
Description Part Number
TFS Cylinder Assembly, Filled & Pressurized 87-300001-001
Bracket, TFS Cylinder TFS-UCTANKBRACKET
Discharge Adapter WK-283952-000
Discharge Adapter Tank Locking Plate DATANKLOCK
O-Ring for Discharge Adapter WK-108019-000
Primary Actuator Kit (PAK) 87-300030-001
O-ring 1/4 PAK Hose - Knurled Fitting 19020
O-ring 1/4 PAK Hose - Hex Fitting PAKHOSEORING
Secondary Valve Actuator (SVA) 87-120042-001
Secondary Valve Actuator Hose 7 87-120045-001
Secondary Valve Actuator Hose 24 87-120045-002
Secondary Valve Actuator Hose 60 87-120045-003
Cylinder Supervisory Pressure Switch 87-300040-001
Vent Limiting Orifice 12A06
Gas Shut-off Valve, 3/4 (ASCO) 8214235
Gas Shut-off Valve, 1 (ASCO) 8214250
Gas Shut-off Valve, 1-1/4 (ASCO) 8214265
Gas Shut-off Valve, 1-1/2 (ASCO) 8214275
Gas Shut-off Valve, 2 (ASCO) 8214280
Gas Shut-off Valve, 2-1/2 (ASCO) 8214290
Gas Shut-off Valve, 3 (ASCO) 8214240
Table 22 - Maintenance Components
Description Part Number
Valve Protection Plate WK-255096-000
Anti-Recoil Plate WK-255681-000
Discharge Adapter Kit (includes mounting flange) 83-844908-000
Schrader Cap (used with valve for test and service ports) 87-300140-001
Schrader Valve (used for test and service ports) 87-300141-001
SVA bolts 87-300152-001
Balloons ADRITE11IN
Bucket Support Bracket BUCKSUP
Table 23 - Service Parts (not supplied with system)
Description Part Number
TANK Fire Suppression Service Kit (Individual Parts Below) TANK Fire Suppression-S-Kit
Fitting 1/4 Male to Male Thread Union U24
Low-Loss Fitting 1/4 Straight Adapter Male to Female Thread NABS
1/4 Refrigerant Test Hose, 36" Long NHD1436
1/4 Refrigerant Test Hose, 60" Long NHD1460
Nitrogen Service Cylinder (Ships empty) HP20
Pressure Regulator GEN450F
Inline Refrigerant Filter C-032
Digital Pressure Gauge Varies
78
Notes
79
Service Record
Date Service Performed
80
Factory Service Department | Phone: 1-866-784-6900 | Fax: 1-919-516-8710
Start-Up and Maintenance Documentation
START-UP AND MEASUREMENTS SHOULD BE PERFORMED AFTER THE SYSTEM HAS BEEN
INSTALLED (Warranty will be void without completion of this form)
Job Information
Cleaning and Maintenance Record
Job Name Service Company
Address Address
City City
State State
Zip Zip
Phone Number Phone Number
Fax Number Fax Number
Contact Contact
Purchase Date Start-Up Date
Date Service Performed
!"!#$%&# '!$ #(!)&#*"