HomeMy WebLinkAbout18825 67th Ave Ne_BLD6645_2026 CITY OF ARLINGTON
18204 59th Avenue NE, Arlington, WA 98223
INSPECTIONS: 360-403-3417 - Permit Center: 360-403-3551
BUILDING PERMIT
18825 67TH AVE NE Permit #: 6645
PERMIT EXPIRES 180 DAYS AFTER
Parcel #: 31051400302700
DATE OF ISSUANCE.
Scope of Work: Commercial plumbing tenant improvement of office space Valuation: 45000.00
OWNER APPLICANT CONTRACTOR
M3 FINANCIAL MANAGEMENT LLC Lynden Sheet Metal Inc Lynden Sheet Metal, Inc.
7600 5TH AVE S 837 Evergreen St 837 Evergreen Street
SEATTLE, WA 98108 Lynden Lynden, WA 98264
3603543991 360 354 3991
LIC: 600 349 811 EXP: 12/31/2025
LIC: LYNDEI*206DM EXP: 04/03/2026
MECHANICAL CONTRACTOR PLUMBING CONTRACTOR
LIC #: EXP: LIC #: EXP:
JOB DESCRIPTION
PERMIT TYPE: COMMERCIAL PLUMBING CODE YEAR: 2021
STORIES: 1 CONST. TYPE: lA
DWELLING UNITS: OCC GROUP: B; Business
BUILDINGS: OCC LOAD:
PERMIT APPROVAL
The issuance or granting of this permit shall not be construed to be a permit for, or approval of, any violation of this Code or any
other ordinance or order of the City, of any state or federal law, or of any order, proclamation, guidance advice or decision of the
Governor of this State. To the extent the issuance or granting of this permit is interpreted to allow construction activity during any
period of time when such construction is prohibited or restricted by any state or federal law, or order, proclamation, guidance advice
or decision of the Governor of this State, this permit shall not authorize such work and shall not be valid. The building official is
authorized to prevent occupancy or use of a structure where in violation of this Code, any other City ordinances of this jurisdiction or
any other ordinance or executive order of the City, or of any state or federal law, or of any order, proclamation, guidance advice or
decision of the Governor. The building official is authorized to suspend or revoke this permit if it is determined to be issued in error or
on the basis of incorrect, inaccurate or incomplete information, or in violation of any City ordinance, regulation or order, state or
federal law, or any order, proclamation, guidance or decision of the Governor.
I AGREE TO COMPLY WITH CITY AND STATE LAWS REGULATING CONSTRUCTION AND IN DOING THE WORK
AUTHORIZED THEREBY; NO PERSON WILL BE EMPLOYED IN VIOLATION OF THE LABOR CODE OF THE
STATE OF WASHINGTON RELATING TO WORKMEN'S COMPENSATION INSURANCE AND RCW 18.27.
THIS APPLICATION IS NOT A PERMIT UNTIL SIGNED BY THE BUILDING OFFICIAL OR HIS/HER DEPUTY AND
ALL FEES ARE PAID.
IT IS UNLAWFUL TO USE OR OCCUPY A BUILDING OR STRUCTURE UNTIL A FINAL INSPECTION HAS BEEN
MADE AND APPROVAL OR A CERTIFICATE OF OCCUPANCY HAS BEEN GRANTED. IBC110/IRC110.
SALES TAX NOTICE: Sales tax relating to construction and construction materials in the City of Arlington must be reported on
your sales tax return form and coded City of Arlington #3101.
08/04/2025
Applicant Signature Date Building Official Date
CONDITIONS
Adhere to approved plans. Permit shall be onsite for inspections. Call for inspections.
The property owner shall ensure that the construction project complies with all applicable zoning codes and regulations. The property
owner shall also ensure that the construction project does not cause any adverse impact on the surrounding environment or
community. The property owner shall be responsible for obtaining all necessary permits and approvals from the relevant authorities
before commencing construction. The property owner shall ensure that the construction project complies with all applicable design
review requirements.
THIS PERMIT AUTHORIZES ONLY THE WORK NOTED. THIS PERMIT COVERS WORK TO BE DONE ON PRIVATE
PROPERTY ONLY. ANY CONSTRUCTION ON THE PUBLIC DOMAIN (CURBS, SIDEWALKS, DRIVEWAYS,
MARQUEES, ETC.) WILL REQUIRE SEPARATE PERMISSION.
PERMIT FEES
Date Description Fee Amount
08/04/2025 Web Only - Plumbing Commercial Plan Review $579.18
08/04/2025 Credit Card Service $17.38
08/04/2025 Processing/Technology $25.00
08/04/2025 Pipe Alteration or Repair $15.00
08/04/2025 Plumbing Misc. $15.00
08/04/2025 Sink (bar, service, etc.) $15.00
08/04/2025 Water Heater (Tank) $25.00
Total Due: $691.56
Total Payment: $691.56
Balance Due: $0.00
CALL FOR INSPECTIONS
Call by 3:30 pm for next day inspection, allow 48 hours for Fire Inspections
When calling for an inspection please leave the following information:
Permit Number, Type of Inspection being requested, and whether you prefer morning or afternoon
INSPECTION INFORMATION Pass/Fail
COMMERCIAL PLUMBING APPLICATION
Community & Economic Development
City of Arlington • 18204 59th Ave NE • Arlington, WA 98223 • Phone (360) 403-3551
WHEN is a PLUMBING PERMIT REQUIRED?
The City of Arlington requires a plumbing permit before a plumbing system or fixture is installed, altered, or
remodeled. This includes commercial, tenant improvements, multi-family buildings, roof drains, and overflows,
medical gas systems, commercial kitchens, grease traps and interceptors, sumps and cross connection backflow
devices.
The City of Arlington does not require a permit to stop leaks or clear stoppages, unless the piping is repaired, altered
or replaced.
SUBMIT THE FOLLOWING ELECTRONICALLY:
 Plumbing plans or drawings. (Minimum plan size is 18†X 24†scale, ¼†scale for details.)
 Fixture specifications and equipment (cut sheets) with locations.
 Location and type of all backflow assemblies for each fixture.
IN ADDITION TO ABOVE, SUBMIT THE FOLLOWING, IF APPLICABLE TO YOUR PROJECT:
 Calculations for Grease Interceptor.
 Pipe size and location of sanitary and potable water systems.
 Riser diagram of waste, vent, and rain water systems, including sizes.
 Medical gas piping riser diagram, type of gas, storage room and size of piping.
Type of Permit: ï² New Installation ï² Addition/Alteration/Repair ï² Industrial
Property Address: Project Valuation:
Lot #: Parcel ID No.: Preferred Contact: ï² Owner ï² Contractor
Project Description:
Owner Name: Office No.:
Email Address: Cell No.:
Mailing Address: City: State: Zip:
Contractor Name: Office No.:
Email Address: Cell No.:
Mailing Address: City: State: Zip:
L&I Contractor License Number: Expiration Date:
REV1.2020 Page 1 of 3
PLUMBING PERMIT FEES (per fixture)
Commercial plumbing permits are required to submit line drawings. A plan review fee of 65% per
Table 4-6 for plumbing permits will be assessed at time of submittal. Includes two (2) inspections with
permit.
Type of Fixture No. of Fixtures Cost per Fixture Subtotal
Additional Plan Review fees x $ 75.00 =
Alteration/repair piping x $ 15.00 =
Backflow Assembly x $25.00 =
Base Plumbing Fee $ 25.00 $25.00
Bath/Shower Combo x $ 15.00 =
Building Main Waste x $ 25.00 =
Clothes Washer x $ 15.00 =
Dishwasher x $ 15.00 =
Drinking Fountain x $ 15.00 =
Floor Drains x $ 15.00 =
Grease Interceptor x $ 75.00 =
Grease Trap x $ 25.00 =
Hose Bibb x $ 15.00 =
Icemaker/Refrigerator x $ 15.00 =
Irrigation – per meter x $ 25.00 =
Kitchen Sink & Disposal x $ 15.00 =
Laundry Tray x $ 15.00 =
Lavatory x $ 15.00 =
Medical Gas Piping ≤ 5 Inlets / Outlets x $ 60.00 =
Medical Gas Piping for each additional Inlet x $ 5.00 =
/ Outlet > 5
Miscellaneous – regulated by plumbing x $ 15.00 =
code (not otherwise specified)
Pretreatment Interceptor x $ 15.00 =
Re-inspection Fee (all) x $ 75.00 =
Roof Drains x $ 15.00 =
Shower (only) x $ 15.00 =
Sink (bar, service, etc.) x $ 15.00 =
Toilets x $ 15.00 =
Urinal x $ 15.00 =
Vacuum Breakers x $ 25.00 =
Water Heater x $ 25.00 =
Water Heater - Tankless x $ 25.00 =
Permit Fee
Table 4-6; Plan Review Fee
Processing/Technology Fee $25.00
Total
REV2.2024 Page 2 of 3
PROPOSED BUILDING USE
ï² New ï² Restaurant ï² Automotive Based
ï² Addition/Alteration ï² Office ï² Machine Shop
ï² Industrial ï² Medical ï² Other: ________________________
CROSS CONNECTION
Please check all appliances that are proposed or permanently connected to the water supply.
ï² Ice Machine ï² Dialysis Equip. ï² Air washers
ï² Coffee Urn/Espresso ï² Hydrotherapy Equip. ï² Steam Generators
ï² Carbonated Bev. ï² Dental Equip. ï² Dye Vats
ï² Fume Hoods ï² Laboratory Equip. ï² Pressure Washers
ï² Degreasers ï² Autoclave/Sterilizers ï² Cooling Towers
ï² Hot Tub/Spa ï² Decorative Fountain ï² Fire Sprinkler
ï² Aquarium ï² Swimming Pools ï² Sprinkler w/chemicals
ï² Lawn Irrigation ï² Well on property ï² Other: ________________________
WASTEWATER DISCHARGE
Does the plumbing system currently have a grease
ï² Yes ï² No ï² Don’t Know
interceptor?
Does the plumbing system currently have an oil/water
ï² Yes ï² No ï² Don’t Know
separator?
Is water used in the business process (washing, rinsing,
ï² Yes ï² No ï² Don’t Know
cooling)?
Does your business require a NPDES permit? ï² Yes ï² No ï² Don’t Know
I hereby certify that the above information is correct and that the construction on, and the occupancy and the use of
the above-described property will be in accordance with the laws, rules and regulation of the State of Washington.
Signature Print Name Date
FOR STAFF USE ONLY
PERMIT # ACCEPTED BY: DATE STAMP
REV2.2024 Page 3 of 3
ABBREVIATIONS ABBREVIATIONS (CONT.)
GENERAL NOTES:
LEGEND AND ABBREVIATIONS PIPING
GENERAL PLUMBING NOTES
ADA AMERICAN DISABILITIES ACT P PUMP
1. CONTRACT DOCUMENT DRAWINGS FOR MECHANICAL WORK
AD AREA DRAIN PD PRESSURE DROP, PIT DRAIN
(PLUMBING) ARE DIAGRAMMATIC AND ARE INTENDED TO CONVEY
1. COORDINATE PLUMBING SYSTEMS WITH WORK OF
ALL OTHER
COLD WATER PIPE
ADJ ADJACENT, ADJUST, ADJUSTABLE, ADJUSTMENT PH PHASE
SCOPE AND GENERAL ARRANGEMENT ONLY. THE CONTRACTOR
DCW
TRADES PRIOR TO ANY FABRICATION OR INSTALLATION.
PROVIDE
SHUT-OFF VALVE (S.O.V)
AFF ABOVE FINISHED FLOOR POC POINT OF CONNECTION
SHALL VISIT THE SITE AND FAMILIARIZE THEMSELVES TO THE SITE
ALL FITTINGS, OFFSETS, AND TRANSITIONS
AS REQUIRED FOR A
ALIGN ALIGNMENT PRELIM PRELIMINARY
CONDITIONS. THE CONTRACTOR SHALL IDENTIFY IN WRITING AND
DHW HOT WATER PIPE
COMPLETE WORKABLE INSTALLATION.
1273 SUNSET AVE BELLINGHAM, WA. 98226
BALANCING VALVE (BV)
AP ACCESS PANEL PRESS PRESSURE
AND ALL CONFLICTS, DISCREPANCIES AND ALL POSSIBLE AND
CONTACT: RANDY STEELE
APPROX APPROXIMATELY PRV PRESSURE REDUCING VALVE
NECASSARY ADJUSTMENTS OF MODIFICATIONS PRIOR TO
360-510-4968
DHWC HOT WATER CIRCULATION PIPE TEMPERATURE AND PRESSURE
RELIEF PSI POUNDS PER SQUARE INCH
INSTALLATION AND AWAIT RESPONSE BY THE OWNER/ARCHITECT 2. SEE ARCHITECTURAL DRAWINGS FOR EXACT LOCATION
OF
~
ARCH ARCHITECTURAL
PLUMBING FIXTURES AND EQUIPMENT.
~ VALVE
ASME AMERICAN SOCIETY OF MECHANICAL ENGINEERS PSIG POUNDS PER SQUARE INCH GAGE
FOR DIRECTION.
V VENT, OR HIDDEN BELOW GRADE
PRESSURE REDUCING VALVE
(PRV) AVG AVERAGE
3. ALL CLEANOUTS SHALL BE INSTALLED PER THE
APPLICABLE CODES
RD ROOF DRAIN
2. IF THERE ARE DISCREPANCY, DIFFERENCES, CONFLICTS BETWEEN
W WASTE OR SOIL PIPE
AND ORDINANCES.
BFF BELOW FINISH FLOOR RECIRC RECIRCULATING
DRAWINGS AND SPECS, AND OR CODES, THE CONTRACTOR SHALL
GREASE WASTE
BHP BRAKE HORSEPOWER RECT RECTANGULAR
NOTIFY THE ENGINEER FOR CLARIFICATION PRIOR TO MOVING 4. ALL NEW PIPING AND EQUIPMENT SHALL BE SEISMICALLY
BRACED
GW MANUAL AIR VENT
FORWARD WITH WORK. UNLESS OTHERWISE NOTED, CODE SHALL
BLDG BUILDING REF REFERENCE
AND/OR ANCHORED IN ACCORDANCE WITH SMACNA
"GUIDELINES
CHWS CHILLED WATER SUPPLY
REQD REQUIRED
TAKE PRECEDENCE.
BPD BACKFLOW PREVENTION DEVICE
FOR SEISMIC RESTRAINT OF MECHANICAL SYSTEMS",
IMC AND ALL
CHWR CHILLED WATER RETURN VALVE IN RISER (TYPE AS
SPECIFIED) BV BALANCING VALVE RND ROUND
OTHER APPLICABLE CODES.
837 EVERGREEN ST.
3. COMPLETE INSTALLATION OF THE MECHANICAL SYSTEM SHALL BE
RPBP REDUCED PRESSURE BACKFLOW PREVENTER
LYNDEN WA 98264
PER THE LATEST ADOPTED VERSION OF INTERNATIONAL BUILDING
GAS AAV
CFM CUBIC FEET PER MINUTE RPM REVOLUTIONS PER MINUTE
5. LAVATORIES IN PUBLIC RESTROOMS SHALL HAVE
HOT WATER
NG
RV RELIEF VALVE
CODE (IBC), INTERNATIONAL MECHANICAL CODE (IMC), WASHINGTON
(360) 317-2548
CI CAST IRON
CONTROLS THAT COMPLY WITH THE FOLLOWING
REQUIREMENTS. -
STATE ENERGY CODE (WSEC), UNIFORM PLUMBING CODE (UPC),
RO REVERSE OSMOSIS AUTOMATIC AIR VENT
CO CLEANOUT
INTERNATIONAL FUEL GAS CODE (IFGC), INTERNATIONAL FIRE CODE MAXIMUM FLOW RATE (GPM) 0.5 -FLOW RATE
(GAL/CYCLE) FOR SELF
CONN CONNECT, CONNECTED, CONNECTION SAN SANITARY
CLOSING VALVES 2.5 -MAXIMUM OUTLET TEMPERATURE
110°F.
(IFC), NFPA AND HEALTH CODES AND REGULATIONS AS ADOPTED BY
HWS HOT WATER SUPPLY
CONST CONSTRUCTION SCHED SCHEDULE
PROVIDE MIXING VALVE WHERE REQUIRED.
THE LOCAL JURISDICTIONS.
PRESSURE REDUCING/REGULATING
CONT CONTINUOUS, CONTINUATION SOV SHUT OFF VALVE
HWR HOT WATER RETURN VALVE(PRV), WITH EXTERNAL
PRESSURE TAP COORD COORDINATE SP STATIC PRESSURE
6. EACH PLUMBING VENT SHALL TERMINATE NOT LESS
THAN TEN (10)
4. ALL CONTROL WIRE AND CONDUIT SHALL COMPLY WITH THE
CORR CORRIDOR SPEC SPECIFICATION
NATIONAL ELECTRIC CODE. FEET FROM OR AT LEAST THREE (3) FEET ABOVE
ANY WINDOW,
CW/W CITY WATER/WATER PRESSURE REDUCING/REGULATING
COTG CLEANOUT TO GRADE SPECD SPECIFIED
DOOR, OPENING, AIR INTAKE OR VENT SHAFT.
VALVE(PRV), SELF CONTAINED
CU FT CUBIC FEET SST STAINLESS STEEL
5. WHEN PLUMBING WORK IS SUBCONTRACTED, IT SHALL BE THE
CYW CYCLE WATER VB
CU IN CUBIC INCHES SS SOIL STACK, SANITARY SEWER
MECHANICAL CONTRACTOR'S RESPONSIBILITY TO COORDINATE 7. RAIN WATER PIPING SHALL BE PROVIDED WITH
A CLEANOUT ABOVE
CW COLD WATER STRUCT STRUCTURAL
SUBCONTRACTORS AND THE ASSOCIATED CONTRACTS. WHEN FINISHED GRADE.
VACUUM BREAKER
DISCREPANCIES ARISE PERTAINING TO WHICH CONTRACTOR
ELBOW, TURNING UP OR TOWARD
DCV DEMAND CONTROL VENTILATION TBD TO BE DETERMINED
PROVIDES A PARTICULAR ITEM OF THE MECHANICAL CONTRACT OR 8. ROOF DRAIN AND OVERFLOW PIPING WITHIN THE
BUILDING SHALL
DCVA DOUBLE CHECK VALVE ASSEMBLY TEMP TEMPERATURE, TEMPORARY
WHICH CONTRACTOR PROVIDES FINAL CONNECTIONS FOR A UTILIZE APPROVED DRAINAGE FITTINGS.
DEG DEGREE THRU THROUGH
PARTICULAR ITEM OF THE MECHANICAL CONTRACT, IT SHALL BE
ELBOW, TURNING DOWN OR AWAY FLOOR CLEAN OUT
9. CLEANOUTS FOR BUILDING STORM DRAINS SHALL
COMPLY WITH THE
DET DETAIL TP TRAP PRIMER
BROUGHT TO THE ATTENTION OF THE MECHANICAL CONTRACTOR.
FCO
DFU DRAINAGE FIXTURE UNIT TS TEMPERATURE SENSOR
REQUIREMENTS OF THE LATEST WASHINGTON ADMINISTRATIVE
CODE.
DW DISTILLED WATER TYP TYPICAL
6. THE LOCATIONS OF ALL ITEMS SHOWN ON THE DRAWINGS OR
TEE, OUTLET UP OR TOWARD GROUND CLEAN OUT
DIA DIAMETER
CALLED FOR IN THE DOCUMENTS THAT ARE NOT DEFINITELY FIXED
10. ALL ROOF DRAINS AND OVERFLOW DRAINS SHALL
BE EQUIPPED
GCO
DIFF DIFFERENTIAL, DIFFERENT UPC UNIFORM PLUMBING CODE
BY DIMENSIONS ARE APPROXIMATE ONLY. THE EXACT LOCATIONS
WITH STRAINERS.
TEE, OUTLET DOWN OR AWAY
DIM DIMENSION UTR UP THRU ROOF
NECESSARY TO SECURE THE BEST CONDITIONS AND RESULTS MUST
DISCH DISCHARGE
BE DETERMINED BY THE PROJECT SITE CONDITIONS AND SHALL
11. STORM DRAINAGE SYSTEMS SHALL BE TESTED
IN COMPLIANCE WITH
DN DOWN VB VACUUM BREAKER
HAVE THE APPROVAL OF THE ENGINEER BEFORE BEING INSTALLED.
P-X FIXTURE & RISER TAG NUMBER
(WASTE)
THE THE LATEST WASHINGTON ADMINISTRATIVE CODE.
TEE, OUTLET DOWN OR AWAY(IN RISER)
DOM DOMESTIC VD VOLUME DAMPER
DO NOT SCALE DRAWINGS.
DR DRAIN VEL VELOCITY
12. PROVIDE FLEXIBLE PIPE CONNECTIONS FOR PIPING
CONNECTIONS
FLOOR DRAIN
DS DOWNSPOUT VERT VERTICAL
7. ALL GAS EQUIPMENT SHALL BE INSTALLED PER THEIR LISTINGS, IMC, TO VIBRATION ISOLATED EQUIPMENT AT ALL
BUILDING SEISMIC
DWG DRAWING VOL VOLUME
UPC, IFGC AND LOCAL CODES. SEPARATIONS.
ELBOW, 90°
FLOOR SINK
EA EACH VS VENT STACK
EFF EFFICIENCY VTR VENT TO ROOF
8. ALL ROOF PENETRATIONS SHALL BE MINIMUM OF 5 FEET AWAY 13. PLUMBING CONTRACTOR SHALL THOROUGHLY INVESTIGATE
PIPING CONNECTION
FROM THE AREA/OCCUPATION SEPARATION WALLS. ALL PIPE, DUCT
FLOOR SINK
ELECT ELECTRICAL
EXISTING CONDITIONS PRIOR TO INSTALLATION.
AND CONDUIT PENETRATIONS THROUGH RATED ASSEMBLIES SHALL
ELEV ELEVATION W WASTE
BE FIRE AND SMOKE STOPPED PER CODE.
PIPING INTERSECTION
EXIST/E EXISTING WCO WALL CLEAN OUT
14. PLUMBING CONTRACTOR SHALL VERIFY EXACT
EXISTING PLUMBING
ROOF DRAIN
EXP EXPANSION WG WATER GAGE
FIXTURES TO BE REMOVED,
9. ALL EQUIPMENT, PIPING, AND ACCESSORIES IN CONCEALED SPACES
WHA WATER HAMMER ARRESTOR
REQUIRING ACCESS SHALL HAVE ACCESS DOORS. ALL ACCESS
FLANGE ROOF DRAIN ABOVE
F FAHRENHEIT W/ WITH
15. AND NEW PLUMBING FIXTURE REPLACEMENT WHERE
REQUIRED,
DOORS IN FIRE RATED STRUCTURE SHALL BE FIRE RATED.
FCO FLOOR CLEANOUT W/O WITHOUT
PER ARCHITECT'S/INTERIOR DRAWINGS.
COORDINATE LOCATIONS WITH ARCHITECT. CONTRACTOR TO
UNION 2 WAY GATE VALVE (ADD ACTUATOR)
FD FIRE DAMPER, FLOOR DRAIN WS WASTE STACK
PROVIDE ACCESS DOORS.
FDC FIRE DEPARTMENT CONNECTION WT WEIGHT
16. PROVIDE WATER HAMMER ARRESTORS & ACCESS
PANELS TO ALL
CAP, SCREWED OR SOLDER JOINT 2 WAY GLOBE VALVE (ADD
ACTUATOR) FFE FINISHED FLOOR ELEVATION WSFU WATER SUPPLY FIXTURE UNIT
10. ALL EQUIPMENT SHALL BE FREE FROM DEFECTS IN MATERIAL, QUICK CLOSING VALVE OR SIMILAR FIXTURES
WHERE REQUIRED. 18825 67TH AVE. NE
FLA FULL LOAD AMP
WORKMANSHIP, AND SHALL BE OF THE KIND AND QUALITY
ARLINGTON WA 98223
3 WAY GLOBE VALVE (ADD
ACTUATOR) FLEX FLEXIBLE
DESCRIBED HEREIN. 17. CONTRACTOR SHALL CONNECT TO EACH PIECE
OF PLUMBING
BLIND FLANGE
FLR FLOOR
EQUIPMENT WITH REQUIRED ACCESSORIES AND
IN
RECOMMENDATIONS AND LOCAL CODES.
3 WAY GATE VALVE (ADD ACTUATOR)
FPM FEET PER MINUTE
11. ALL EQUIPMENT SHALL BE APPROVED FOR INSTALLATION IN THE
REDUCER, CONCENTRIC
FPS FEET PER SECOND
STATE OF WASHINGTON AND SHALL HAVE ALL CERTIFICATIONS AND
18. ALL WATER PIPING SHALL BE INSTALLED ON
THE WARM SIDE OF
FT FOOT, FEET
RATINGS REQUIRED TO MEET ALL ENERGY, POLLUTION,
INSULATION.
REDUCER, ECCENTRIC
FU FIXTURE UNITS
ENVIRONMENTAL, SEISMIC, ETC. CODES AND REGULATIONS.
HOSE BIBB
2021 WASHINGTON
STRAIGHT CROWN
19. CONTRACTOR SHALL COORDINATE PLUMBING VENT
STACKS WITH
G GAS
12. VERIFY ALL THE MECHANICAL EQUIPMENT'S ELECTRICAL LOADS
REDUCER, ECCENTRIC FUNNEL
THE EQUIPMENT TO MAINTAIN A MINIMUM OF
10 FT. FROM THE
GA GAGE STATE ENERGY CODE
VOLTAGE/PHASE, ETC. WITH ELECTRICAL CONTRACTOR PRIOR TO
STRAIGHT INVERT
OUTSIDE AIR INTAKES.
GAL GALLON
ORDERING.
SLOPE FLOW ARROW
GALV GALVANIZED
DIRECTION OF SLOPE
(WSEC) NOTES
20. CONTRACTOR SHALL CONNECT TO EACH PIECE
OF PLUMBING
GC GENERAL CONTRACTOR
13. PROVIDE ALL MATERIALS AND EQUIPMENT AND PERFORM ALL
EQUIPMENT W/ REQUIRED ACCESSORIES AND IN
ACCORDANCE WITH
GEN GENERAL
LABOR REQUIRED TO INSTALL COMPLETE AND OPERABLE
CONTROL ACTUATOR
MECHANICAL SYSTEMS AS IDENTIFIED ON THE DRAWINGS AND/OR CONTRACT DOCUMENTS, MANUFACTURER'S RECOMMENDATIONS
MID-MOUNTAIN MATERIALS
FLEXIBLE CONNECTOR
GND GROUND
1. ALL PIPING SHALL BE INSULATED AS
AS SPECIFIED AND/OR AS REQUIRED BY IMC, UPC, IBC, WASHINGTON AND LOCAL CODES.
GPH GALLONS PER HOUR
REQUIRED BY SECTION C403.2.9 OF THE SEC.
STATE ENERGY CODE AND ALL APPLICABLE LOCAL AMENDMENTS.
BASKET STRAINER SOLENOID ACTUATOR
GPM GALLONS PER MINUTE
21. PLUMBING CONTRACTOR SHALL VISIT THE SITE
AND VERIFY THE
GW GREASE WASTE 2. MOTOR EFFICIENCY SHALL NOT BE LESS
ROUTING AND INSTALLATION FEASIBILITY OF
ALL EQUIPMENT, PIPING
14. INSTALL ALL MECHANICAL EQUIPMENT AND APPURTENANCES IN
THAN THE MINIMUM CALLOUTS PER SECTION
AND ACCESSORIES AT SITE
ACCORDANCE WITH MANUFACTURERS' RECOMMENDATIONS,
ACTUATOR
H HEIGHT, HIGH C403.2.11 OF THE SEC FOR FULL LOAD
CONTRACT DOCUMENTS, AND APPLICABLE CODES AND
REVISIONS
THERMOMETER
HB HOSE BIBB EFFICIENCIES.
22. UNLESS OTHERWISE STATED, PROVIDE ELECTRIC
HEAT TAPE AND
REGULATIONS.
HP HORSEPOWER
INSULATION TO ALL WATER PIPING LOCATED
IN UNCONDITIONED NO. DATE BY DESCRIPTION
OS & Y ACTUATOR
HR HOUR 3. ELECTRIC WATER HEATERS LOCATED IN
15. COORDINATE CONSTRUCTION OF ALL PLUMBING WORK WITH SPACES AND OR OUTDOORS WHERE PIPES MAY
BE SUBJECT TO
PRESSURE GAUGE
HW HOT WATER UNCONDITIONED SPACES OR ON CONCRETE
ARCHITECTURAL, STRUCTURAL, ELECTRICAL WORK, ETC., SHOWN FREEZING.
HWC HOT WATER CIRCULATING FLOORS SHALL BE SEPARATED FROM THE
ON CONTRACT DOCUMENT DRAWINGS.
PIPE GUIDE ACTUATOR VALVE IN DROP
OR RISER HZ HERTZ SUPPORTING SURFACE WITH R-10 RIGID
INSULATION AS DESCRIBED IN SECTION
16. ALL TESTS SHALL BE COMPLETED BEFORE ANY PIPING INSULATION
ANCHOR
IBC INTERNATIONAL BUILDING CODE C404.5 OF THE SEC.
IS APPLIED. BASIS OF DESIGN
A&C
HOT & COLD WATER RISER
ICW INDUSTRIAL COLD WATER
CODE
- TAG NUMBER.
ID INDIRECT DRAIN 4. DOMESTIC HOT WATER CIRCULATION PUMPS
17. WHERE TWO OR MORE ITEMS OF THE SAME TYPE OF EQUIPMENT - 2021 WASHINGTON STATE BUILDING CODE
PUMP(WITH FLOW DIRECTION INDICATED)
IE INVERT ELEVATION SHALL BE AUTOMATICALLY SHUT DOWN
ARE REQUIRED, THE PRODUCT OF ONE MANUFACTURER SHALL BE - 2021 WASHINGTON STATE ENERGY CODE
IHW INDUSTRIAL HOT WATER DURING UNOCCUPIED PERIODS AS
USED. - 2021 WASHINGTON STATE PLUMBING CODE
- 2021 WASHINGTON STATE FUEL GAS CODE
BALL VALVE(NORMALLY OPEN) PEX MANIFOLD
IMC INTERNATIONAL MECHANICAL CODE REQUIRED BY SECTION C404.7 OF THE SEC
IN INCH AND AS DESCRIBED IN THE TEMPERATURE
18. LOCATIONS AND SIZES OF ALL FLOOR, WALL, AND ROOF OPENINGS
CALIBRATED BALANCING VALVE
INSUL INSULATE, INSULATION CONTROL SEQUENCES IF PROVIDED.
SHALL BE COORDINATED WITH ALL OTHER TRADES INVOLVED. PLUMBING SYSTEMS
- DOMESTIC WATER SIZING: 201 UPC APPENDIX A- TABLE A103.1,
CHARTS
IW INDIRECT WASTE
5. OPERATION AND MAINTENANCE MANUALS
19. REFER TO TYPICAL DETAILS FOR PIPING AND EQUIPMENT 103.1 & 105.1
PRESSURE/TEMPERATURE TEST PORT
KW KILOWATT SHALL BE PROVIDED TO THE OWNER AS
INSTALLATION. - DOMESTIC WASTE & VENT: 2021 UPC CHAPTER 7- TABLES 702.1,
703.2
KWH KILOWATT HOUR REQUIRED BY SECTION C408.1.3 OF THE SEC.
WYE STRAINER WITH HOSE END DRAIN VALVE
AS A MINIMUM, THE MANUALS SHALL
20. RECORD DRAWINGS SHALL BE PROVIDED TO THE OWNER WITHIN 90
L LENGTH INCLUDE:
DAYS AFTER THE DATE OF SYSTEM ACCEPTANCE AS REQUIRED BY
TITLE
WYE STRAINER
LA LAB COMPRESSED AIR A. SUBMITTAL DATA.
SECTION C103.6 OF THE WSEC. THE DRAWINGS SHALL INDICATE THE
LAV LAVATORY B. OPERATION AND MAINTENANCE DATA
LOCATION AND PERFORMANCE DATA OF EQUIPMENT, GENERAL
LAT LEAVING AIR TEMPERATURE FOR EQUIPMENT.
CONFIGURATION OF DUCTWORK AND PIPING DISTRIBUTION
AUTOMATIC CONTROL VALVE 2-WAY
LBS POUNDS C. NAMES AND ADDRESSES OF SERVICE
SYSTEMS, INCLUDING FLOW RATES AS A MINIMUM, THAT HAVE BEEN
LV LAB VACUUM AGENCIES.
DEVIATED FROM THESE DOCUMENTS. A COMPLETE RECORD OF PLUMBING DRAWING INDEX
D. HVAC CONTROLS SYSTEM
CHANGES SHALL BE KEPT TO DATE ON A DAILY BASIS AND MADE
AUTOMATIC CONTROL VALVE 3-WAY
MAX MAXIMUM MAINTENANCE AND CALIBRATION
ACCESSIBLE TO OWNER AND ENGINEER. SHEET # SHEET NAME
Drawn By LEGENDS &
INFORMATION.
MCA MINIMUM CIRCUIT AMPACITY
P0.0 LEGENDS & NOTES PLUMBING
HRS
CHECK VALVE
E. NARRATIVE OF HOW SYSTEM IS
MECH MECHANICAL
NOTES
MFR MANUFACTURER INTENDED TO OPERATE.
P0.1 PLUMBING SCHEDULES
HRS
F.
MIN MINIMUM, MINUTE
TRIPLE DUTY VALVE
6. IF NOT SPECIFICALLY STATED ABOVE,
P2.1 LEVEL 1 PLUMBING PLAN
HRS PLUMBING
MISC MISCELLANEOUS
CONTRACTOR SHALL COMPLY WITH THE SEC
MTD MOUNTED
RELIEF VALVE
ITEMS THAT DO APPLY TO THIS PROJECT.
MTG MOUNTING
T
NA NOT APPLICABLE
E
GATE VALVE
NC NOISE CRITERIA
NTS NOT TO SCALE
S
GLOBE VALVE
OD OUTSIDE DIAMETER, OVERALL DIAMETER
IT
BUTTERFLY VALVE
OH OVERHEAD
DESIGNED HRS
ORD OVERFLOW ROOF DRAIN
M
S SOLENOID VALVE
R DRAWN HRS
E CHECKED BB
AUTOMATIC FLOW CONTROL VALVE
P
DATE 07/24/2025
ANGLE VALVE
52
PLUG VALVE
0 JOB NUMBER 2025-C010
M
/2
MOTORIZED VALVE
4
/2 P0.0
7
0
HANGERS AND SUPPORTS
MATERIALS TYPES OF JOINTS HORIZONTAL VERTICAL
CAST LEAD AND OAKUM 5 FEET, EXCEPT 10 FEET WHERE 10 FOOT LENGTH... BASE AND EACH FLOOR, NOT TO EXCEED 15 FEET
PLUMBING FIXTURE SCHEDULE
1273 SUNSET AVE BELLINGHAM, WA. 98226
COMPRESSION GASKET EVERY OTHER JOINT UNLESS OVER 4 FEET THEN... BASE AND EACH FLOOR, NOT TO EXCEED 15 FEET
(BASIS OF DESIGN)
CONTACT: RANDY STEELE
360-510-4968
CAST-IRON HUBLESS
SHEILDED COUPLING EVERY OTHER JOINT UNLESS OVER 4 FEET THEN... BASE AND EACH FLOOR, NOT TO EXCEED 15 FEET
COPPER& CU ALLOY SOLDERED, BRAZED, THREADED OR... 1-1/2 INCHES AND SMALLER, 6 FEET; 2 INCHES AN... EACH FLOOR, NOT TO EXCEED 10 FEET 5
TAG FIXTURE DESCRIPTION
STEEL PIPE FOR WATER OR...
THREADED OR WELDED 3/4 INCH AND SMALLER, 10 FEET; 1 INCH AND... EVERY OTHER FLOOR, NOT TO EXCEED 25 FEET 5
Klinger Trading EIT1DL18 Freestanding 24X24X14 Stainless
837 EVERGREEN ST.
SK-1 FREESTANDING SINK
STEEL PIPE FOR GAS THREADED OR WELDED 1/2 INCH, 6 FEET; 3/4 INCH AND 1 INCH, 8 FEET;... 1/2 INCH, 6 FEET; 3/4 INCH AND 1 INCH, 8 FEET;...
Steel Sink with 18" Drainboard on the Left w/Speakman SC-5811-RCP service sink faucet
LYNDEN WA 98264
(360) 317-2548
SCHEDULE 40 PVC AND ABS ALL SIZES, 4 FEET; ALLOW FOR EXPANSION EVERY BASE AND EACH FLOOR; PROVIDE MID-STORY
DWV SOLVENT CEMENTED 30 FEET 3 GUIDES PROVIDE FOR EXPANSION EVERY 30 FEET
TP-1 TRANSFER PUMP SANISWIFT GREY WATER PUMP, MODEL #021 UNDERCOUNTER MOUNT, 115V.
CPVC SOLVENT CEMENTED 1 INCH AND SMALLER, 3 FEET; 1-1/4 INCHES AND... BASE AND EACH FLOOR; PROVIDE MID-STORY...
CPVPC-AL-CPVC SOLVENT CEMENTED 1/2 INCH, 5 FEET; 3/4 INCH, 65 INCHES; 1 INCH, 6... BASE AND EACH FLOOR; PROVIDE MID-STORY...
WH-1 POINT OF USE WATER HEATER EeMax-HA24240 240 V, 100 AMP, ON DEMAND ELECTRIC WATER HEATER
LEAD WIPED OR BURNED CONTINUOUS SUPPORT NOT TO EXCEED 4 FEET
STEEL MECHANICAL IN ACCORDANCE WITH STANDARDS ACCEPTABLE TO AHJ
PEX COLD EXPANSION, INSERT AND... 1 INCH AND SMALLER, 32 INCHES; 1-1/4 INCHES... BASE AND EACH FLOOR; PROVIDE MID-STORY...
PEX-AL-PEX METAL INSERT AND METAL... ALL SIZES, 98 INCHES BASE AND EACH FLOOR; PROVIDE MID-STORY...
PIPING MATERIAL AND CONNECTION SCHEDULE
PE-AL-PE METAL INSERT AND METAL... ALL SIZES, 98 INCHES BASE AND EACH FLOOR; PROVIDE MID-STORY...
SYSTEM MATERIAL JOINT CONNECTION TYPE
PE-RT INSERT AND COMPRESSION 1 INCH AND SMALLER, 32 INCHES; 1-1/4 INCHES... BASE AND EACH FLOOR; PROVIDE MID-STORY...
DWV ABS SOLVENT WELD
POLYPROPYLENE (PP) FUSION WELD (SOCKET, BUTT,
1 INCH AND SMALLER, 32 INCHES; 1-1/4 INCHES BASE AND EACH FLOOR; PROVIDE MID-STORY
SADDLE, ELECTROFUSION), THREADED
DOM COLD/HOT WATER (BELOW GRADE & THRU BLDG) COPPER OR REHAU PEX COMPRESSION/SOLDER/EXPANSION
AND LARGER, 4 FEET GUIDES
(METAL THREADS ONLY) OR...
NOTES:
DOM COLD/HOT WATER (THRU BLDG) COPPER OR REHAU PEX COMPRESSION/SOLDER/EXPANSION
1 SUPPORT ADJACENT TO JOINT, NOT TO EXCEED 18 INCHES.
2 BRACE NOT TO EXCEED 40 FOOT INTERVALS TO PREVENT HORIZONTAL MOVEMENT.
3 SUPPORT AT EACH HORIZONTAL BRANCH CONNECTION.
4 HANGERS SHALL NOT BE PLACED ON THE COUPLING.
18825 67TH AVE. NE
5 VERTICAL WATER LINES SHALL BE PERMITTED TO BE SUPPORTED IN ACCORDANCE WITH RECOGNIZED ENGINEERING PRINCIPLES WITH REGARD TO EXPANSION AND...
ARLINGTON WA 98223
PLUMBING PIPE INSULATION SCHEDULE - WASHINGTON
MID-MOUNTAIN MATERIALS
ENERGY CODE: 2021 INTERNATIONAL ENERGY CODE WITH WASHINGTON AMENDMENTS TABLE C403.2
SPECIFICATION: 220716 PLUMBING PIPING INSULATION
PIPING SYSTEM TEMP RANGE THERMAL MEAN RATING INSULATION NOTES
(DEG F) COND. TEMPERATURE MATERIAL <1" 1" TO... 1-1/2" TO 4" 4" - 8" OVER 8"
REVISIONS
DOMESTIC COLD WATER 40-60 0.21-0.27 75 MPI 0.5 0.5 1.0 1.0 1.0 1, 2,
4 NO.
DATE BY DESCRIPTION
NON-POTABLE COLD... 40-60 0.21-0.27 75 MPI 0.5 0.5 1.0 1.0 1.0 1, 2,
4
DOMESTIC HOT WATER 105-140 0.21-0.28 100 MPI 1.0 1.0 1.5 1.5 1.5 1, 2, 4,
5
NON-POTABLE HOT WATER 105-140 0.21-0.28 100 MPI 1.0 1.0 1.5 1.5 1.5 1, 2, 4,
5
RAINWATER DRAINAGE ALL 0.21-0.28 75 MPI 1.0 1.0 1.0 1.0 1.0 6
FOR FURTHER INFORMATION ON INSULATING SYSTEMS AND EQUIPMENT EITHER LISTED OR NOT LISTED, SEE SPECIFICATION SECTION 220700 "PLUMBING INSULATION."
MPI: MINERAL WOOL PREFORMED PIPE INSULATION
E: ELASTOMERIC CLOSED CELL INSULATION
PF: POLYURETHANE FOAM
CGPI: CELLULAR GLASS PIPE INSULATION
CAL-SIL: CALCIUM SILICATE
TITLE
NOTES:
1. FOR PIPING CLAMPED TO UNISTRUCT SUPPORTS, UTILIZE RIGID INSERTS WITH SHEETMETAL SHIELDS CONTINUOUS THROUGH THE HANGER; UTILIZE CALCIUM SILICATE
INSERTS OR STYRENE INSERTS.
2. FOR PIPING SUPPORTED FROM CLEVIS HANGERS, IF RIGID INSERTS ARE NOT UTILIZED THE INSULATION SHALL FULLY ENCLOSE THE HANGER AND BE SEALED AT THE TOP
PLUMBING
AROUND THE SUPPORT ROD; IF RIGID INSERTS ARE UTILIZED THE INSULATION SHALL BE CONTINUOUS THROUGH THE HANGER; INSERT MATERIAL TO BE CALCIUM SILICATE
INSERTS OR STYRENE INSERTS.
SCHEDULES
3. DOMESTIC WATER PIPING AND WASTE DRAIN TRAPS EXPOSED TO OUTDOOR CONDITIONS SUCH AS THE GARAGE ENTRY AND FIRST GARAGE LEVEL BELOW GRADE SHALL BE
HEAT TRACED AND INSULATED.
T
4. JACKETING: ALUMINUM ROLLED JACKETING (ARJ) APPLIED TO EXTERIOR PIPING INSULATION EXPOSED TO WEATHER (I.E. ROOFTOP PIPING). PVC JACKETING WILL BE
E
UTILIZED ON ALL EXPOSED INSULATION WITHIN 6 FEET OF THE FLOOR (PUBLIC AREAS).
S
5. FOR PIPES SMALLER THAN 1-1/2 INCH AND LOCATED IN PARTIONS WITHIN A CONDITIONED SPACE, MAY REDUCE THICKNESSES BY 1 INCH BUT TOTAL THICKNESS TO NOT
BELOW 1" AS ALLOWED BY ENERGY CODE.
IT
6. PROVIDE INSULATION ON ALL HORIZONTAL PRIMARY AND OVERFLOW ROOF DRAINAGE BELOW THE ROOF DECK. WHERE THE HORIZZONTAL RUN IS LESS THAN 15',
M DESIGNED
HRS
PROVIDE INSULATION ON THE RISER DOWN THROUGH THE NEXT FLOOR BELOW THE ROOF DECK, OR A MINIMUM OF 15'.
R DRAWN
HRS
7. DIRECT BURIED PIPING THAT CONVEYS FLUID AT OR BELOW 60 DEG F IS EXEMPT FROM INSULATION PER WSEC....
E CHECKED
BB
P
5 DATE
07/24/2025
2
0 JOB
NUMBER 2025-C010
/2
4
/2
P0.1
7
0
POC TO EXISTING VENT
5
CONNECT PUMPED GREY
WATER FROM SK-1 TO 1273 SUNSET AVE BELLINGHAM,
WA. 98226
CONTACT: RANDY STEELE
BREAKROOM SINK GRAVITY 360-510-4968
DRAIN TO SS
POC TO EXITING CW SUPPLY
L-1
WH-1
TP-1
837 EVERGREEN ST.
V
/2"
1 1 LYNDEN WA 98264
1" W
(360) 317-2548
1" W
1 1/2" V
" CW
3/4
1/2" CW POC 3/4" CW
4
1" W POC
1-1/2" V POC
1" W
3/4" CW
SK-1
1 1/2" V
WH-1
3
TP-1
2
18825
67TH AVE. NE
ARLINGTON WA 98223
1
PLUMBING
ISO
2
C B A
MID-MOUNTAIN MATERIALS
REVISIONS
NO. DATE BY DESCRIPTION
Level 1-PLUMBING
1
1/8" = 1'-0"
PLUMBING FIXTURE SCHEDULE...
TITLE
TAG FIXTURE DESCRIPTION
Klinger Trading EIT1DL18 Freestanding 24X24X14 Stainless
SK-1 FREESTANDING SINK
Steel Sink with 18" Drainboard on the Left w/Speakman SC-5811-RCP service sink faucet
LEVEL 1
PLUMBING
TP-1 TRANSFER PUMP SANISWIFT GREY WATER PUMP, MODEL #021 UNDERCOUNTER MOUNT, 115V.
PLAN
POINT OF USE WATER
T
WH-1 EeMax-HA24240 240 V, 100 AMP, ON DEMAND ELECTRIC WATER HEATER
HEATER
E
S
IT
M DESIGNED
HRS
R DRAWN
HRS
E CHECKED
BB
P
5 DATE 07/24/2025
2
0 JOB NUMBER 2025-C010
/2
4
/2 P2.1
7
0
From: Luke Rades – Lynden Sheet Metal
To: LaNay Pray
Cc: Britton Brink – Lynden Sheet Metal
Subject: RE: Second expiration notice
Date: Wednesday, January 28, 2026 3:20:31 PM
Attachments: image002.png
image003.png
image004.png
image005.png
image006.png
image007.png
image008.png
This message is from an External Sender
This message came from outside the City of Arlington
LaNay,
Our plumbing sub has requested an extension due to material delays, per their message below.
Luke Rades
Installation Manager
837 Evergreen St
Lynden, WA 98264
(360) 354-3991
luke@lyndensheetmetal.com
www.lyndensheetmetal.com
From: LaNay Pray <lpray@arlingtonwa.gov>
Sent: Tuesday, January 27, 2026 2:49 PM
To: Luke Rades – Lynden Sheet Metal <luke@lyndensheetmetal.com>
Subject: Second expiration notice
CAUTION: This email originated from outside of the organization. Do not click links or open attachments unless you recognize the sender and know the content
is safe.
Hello,
This email is to inform you of the upcoming expiration date for permit 6645. This permit will expire on 2/3/2026. Please ensure that an inspection has been requested
and
approved prior to the expiration date. If you are not ready an inspection prior to the expiration date, please reply requesting an extension. The request needs
to state cause for
the extension and requires approval by the Building Official once received. Additional fees may be required upon extension approval.
Please use the link below to view and request an inspection. You can also call in an inspection at 360-403-3417.
Permits - Arlington (iworq.net)
Sincerely,
LaNay Pray
Community & Economic Development, Permit Technician I
18204 59th Ave NE, Arlington, WA 98223
O: 360.403.3437
lpray@arlingtonwa.gov | www.arlingtonwa.gov
Note: Emails and attachments sent to and from the City of Arlington are public records and may be subject to disclosure pursuant to the Public Records Act.
Permit #: 6645
Permit Date: 07/25/25
Permit Type: COMMERCIAL PLUMBING
Project Name: Faber - Mid Mountain Materials
Applicant Name: Lynden Sheet Metal Inc
Applicant Address: 837 Evergreen St
Applicant, City, State, Zip: Lynden
Contact: Luke Rades
Phone: 3603543991
Email: luke@lyndensheetmetal.com
Scope of Work: Commercial plumbing tenant improvement of office space
Valuation: 45000.00
Square Feet: 700
Number of Stories: 1
Construction Type: lA
Occupancy Group: B; Business
ID Code:
Permit Issued: 08/04/2025
Permit Expires: 02/03/2026
Form Permit Type: COMMERCIAL PLUMBING
Status: COMPLETE
Assigned To: Hannah Hardwick
Property
Parcel # Address Legal Description Owner Name Owner Phone Zoning
M3 FINANCIAL
637 Warehousing &
31051400302700 18825 67TH AVE NE MANAGEMENT
Storage Services
LLC
Contractors
Contractor Primary Contact Phone Address Contractor Type License License #
Lynden Sheet Metal, 837 Evergreen CONSTRUCTION
Bill Sweet 360 354 3991 COA 600 349 811
Inc. Street CONTRACTOR
Lynden Sheet Metal, 837 Evergreen CONSTRUCTION Labor and
Bill Sweet 360 354 3991 LYNDEI*206DM
Inc. Street CONTRACTOR Industries
Inspections
Date Inspection Type Description Scheduled Date Completed Date Inspector Status
C19. PLUMBING
03/02/2026 01/21/2026 BUILDING Approved
FINAL
Plan Reviews
Date Review Type Description Assigned To Review Status
COMMERCIAL
07/25/2025 BUILDING Approved
PLUMBING
COMMERCIAL Development
07/25/2025 No civil comments Approved
PLUMBING Services Manager
PERMIT EXTENSION
01/30/2026 BUILDING In Review
REQUEST
Fees
Fee Description Notes Amount
Web Only - Plumbing Commercial Plan
(Table 4-1) $579.18
Review
Credit Card Service $17.38
Processing/Technology $25.00
Pipe Alteration or Repair $15.00
Plumbing Misc. Not otherwise specified $15.00
Sink (bar, service, etc.) $15.00
Water Heater (Tank) $25.00
Credit Card Service $2.85
Total $694.41
Attached Letters
Date Letter Description
08/04/2025 Building Permit
07/25/2025 Web Form - Building Application
Payments
Date Paid By Description Payment Type Accepted By Amount
07/25/2025 Luke Rades 238272591 Hannah Hardwick $17.38
XBP Conf:
07/25/2025 $579.18
238272591
08/04/2025 Luke Rades 239115483 $2.85
XBP Conf:
08/04/2025 $95.00
239115483
Outstanding Balance $0.00
Notes
Date Note Created By:
01/30/2026 Extension request received via email LaNay Hendrick
01/27/2026 second expiration notice sent LaNay Hendrick
12/29/2025 sent expiration notice Hannah Hardwick
Uploaded Files
Date File Name
01/30/2026 30471913-permit extension request .pdf
08/04/2025 27649526-20250725_BLD6645_Approved Plans.pdf
08/04/2025 27649525-2025_BLD6645_Issued Permit.pdf
07/25/2025 7ffb8935173a8cde0d521e3dc7cca0b4_commercial_plumbing_application_-_mid_mtn_materials.pdf
07/25/2025 dbdfd8b1ff627ce1f3e0dc8d962b160a_7-24-2025_mid_mtn_plumbing_permit_set...pdf