HomeMy WebLinkAbout5721 CIRCLE BLUFF DR_035393_2026 INSPECTION REPORT
1;4
TOPermit No.: C ? S3y 3Lot #: 57
Address:Contractor:,SO Owner:Date:
APPROVAL ❑ PARTIAL APPROVAL
0 VIOLATION ❑ CORRECTION REQUESTED
❑ Corrections listed below MUST BE MADE before work can be approved.
❑ Please contact inspector.
❑ Was not able to perform inspection.
❑ CALL 435-0674 FOR RE-INSPECTION - 24 hour notice required.
r
I ns pector: Date: -
TYPE OF INSPECTION REQUESTED
❑ Under-floor ❑ Framing ❑ Gas Piping
❑ Footing ❑ Drywall, Nailing ❑ Consultation
❑ Foundation ❑ Shear Nailing ❑ Groundwork
❑ Mechanical ❑ Grid ❑ Struct. Slab
❑ Wood Stove ❑ Rough-in el Final
❑ Masonry ❑ Drainage ❑ Insulation
❑ Other:
INSPECTION REPORT
¢titN G TD Permit No.:� ' e _�-tot#:
Q" Address:
Contractor:
-es, ov
O Owner:
�I N 1 Date:
❑ APPROVAL ❑ PARTIAL APPROVAL
❑ VIOLATION A CORRECTION REQUESTED
1)6 Corrections listed below MUST BE MADE before work can be approved.
❑ Please contact inspector.
❑ Was not able to perform inspection.
❑ CALL 435-0674 FOR RE-INSPECTION -24 hour notice required.
t��e
n
Inspector: Date:
TYPE OF INSPECTION REQUESTED
❑ Under-floor ❑ Framing ❑ Gas Piping
❑ Footing ❑ Drywall, Nailing ❑ Consultation
❑ Foundation ❑ Shear Nailing ❑ Groundwork
❑ Mechanical ❑ Grid ❑ Struct. Slab
❑ Wood Stove ❑ Rough-in Final
❑ Masonry ❑ Drainage ❑ Insulation
❑ Other:
INSPECTIC,", REPORT
c
G1T Y p� Permit No:a��✓� Date:
61,rl�lx
49
Address/Lot
Contractor: G ti k,
Owner:
Supervisor: 3 `
'WApproval ❑ Correction Required
❑ Corrections listed below MUST BE MADE before work can be approved
❑ Please contact inspector
❑ Was not able to perform inspection
❑ Call 360.435.0674 for re-inspection -24-hour notice required
Inspect Date: r2
TYPE OF INSPECTION REQUIRED
TESC STORM DRAIN ROAD LANDSCAPING
❑Slit Fence ❑Pipe ❑Sub-grade ❑Irrigation
❑Check Dam ❑Catch Basin(s) ❑Rock ❑Soil
❑Inlet Protection ❑Manhole(s) ❑Curb&Gutter ❑Fertilizer
❑Temp.Sed ❑Oil Seperator(s) ❑Sidewalk ❑Bark
❑Sheeting ❑Down Spouts ❑Approach(s) ❑Plants
❑Straw ❑Trash Rack/Overflow ❑ATB ❑Trees
❑Seeding ❑Restrictor ❑Cl.B Asphalt ❑Root Barriers
❑Final ❑Level Spreader ❑Striping ❑Play Equipment
❑Treatment ❑Signing ❑Final
jjnfiltration ❑Final
INSPECTION REPORT
N G r0 Permit No.: 3� Lot #:
F Address: 67 z i C 13
Z Contractor:
Owner:
IN Date: 5— 7--0 (-(
&APPROVAL 'PARTIAL APPROVAL
❑ VIOLATION ❑ CORRECTION REQUESTED
❑ Corrections listed below MUST BE MADE before work can be approved.
❑ Please contact inspector.
❑ Was not able to perform inspection.
❑ CALL 435-0674 FOR RE-INSPECTION - 24 hour notice required.
Fie,c� �.5�'3 7
Inspector: Date:
TYPE OF INSPECTION REQUESTED
❑ Under-floor ❑ Framing ❑ Gas Piping
❑ Footing ❑ Drywall, Nailing ❑ Consultation
❑ Foundation ❑ Shear Nailing ❑ Groundwork
❑ Mechanical ❑ Grid ❑ Struct. Slab
❑ Wood Stove ❑ Rough-in ❑ Final
❑ Masonry Drainage ❑ Insulation
❑ Other:
%f :a30
INSPECTION REPORT
ii
Permit No.: t, 3 53 93 Lot#: �Address: S 7 LI ed.DContractor:Owner:
� Date: 4 -�i -o k
V(-APPROVAL ❑ PARTIAL APPROVAL
❑ VIOLATION ❑ CORRECTION REQUESTED
❑ Corrections listed below MUST BE MADE before work can be approved.
❑ Please contact inspector.
❑ Was not able to perform inspection.
❑ CALL 435-0674 FOR RE-INSPECTION - 24 hour notice required.
od
Inspector: Date:
YPE OF INSPECTION REQUESTED
❑ Under-floor ❑ Framing ❑ Gas Piping
❑ Footing I Drywall, Nailing ❑ Consultation
❑ Foundation ❑ Shear Nailing ❑ Groundwork
❑ Mechanical ❑ Grid ❑ Struct. Slab
❑ Wood Stove ❑ Rough-in ❑ Final
❑ Masonry ❑ Drainage ❑ Insulation
❑ Other:
s 5 Z
INSPECTION REPORT
PermitNo.: o 3 S3 93 Lot#
ii
.Address: S?zI c-6 0
Contractor:
Owner:
GG Date: �►'7—D�l
❑ APPROVAL (,PARTIAL APPROVAL
❑ VIOLATION ❑ CORRECTION REQUESTED
❑ Corrections listed below MUST BE MADE before work can be approved.
❑ Please contact inspector.
❑ Was not able to perform inspection.
❑ CALL 435-0674 FOR RE-INSPECTION - 24 hour notice required.
Inspector: Date:
PE OF INSPECTION REQUESTED
❑ Under-floor ❑ Framing ❑ Gas Piping
❑ Footing Drywall, Nailing ❑ Consultation
❑ Foundation ❑ Shear Nailing ❑ Groundwork
❑ Mechanical ❑ Grid ❑ Struct. Slab
❑ Wood Stove ❑ Rough-in ❑ Final
❑ Masonry ❑ Drainage ❑ Insulation
❑ Other:
3 5 2
PIS INSPECTION REPORT
N G r0 Permit No.: _o 3 5345 Lot #: �S
Address: 5"7 Z 1 C& d
Z Contractor: H-o�6'
9s, ,So Owner:
�jNC' Date: g-7—Del
❑ APPROVAL PARTIAL APPROVAL
❑ VIOLATION ❑ CORRECTION REQUESTED
❑ Corrections listed below MUST BE MADE before work can be approved.
❑ Please contact inspector.
❑ Was not able to perform inspection.
❑ CALL 435-0674 FOR RE-INSPECTION - 24 hour notice required.
Inspector: Date:
YPE OF INSPECTION REQUESTED
❑ Under-floor ❑ Framing ❑ Gas Piping
❑ Footing Drywall, Nailing ❑ Consultation
❑ Foundation ❑ Shear Nailing ❑ Groundwork
❑ Mechanical ❑ Grid ❑ Struct. Slab
❑ Wood Stove ❑ Rough-in ❑ Final
❑ Masonry ❑ Drainage ❑ Insulation
❑ Other:
Io o8
INSPECTION REPORT
4'S'41
1�ZN GPermit No.: 01 S393 Lot#: 2-%
QAddress: 5 77-1 C-6 D
Contractor: N�rt s r
Owner:
YN O Date: 'i —1 - Oct
❑ APPROVAL ❑ PARTIAL APPROVAL
❑ VIOLATION A CORRECTION REQUESTED
A)-Qorrections listed below MUST BE MADE before work can be approved.
❑ Please contact inspector.
❑ Was not able to perform inspection.
❑ CALL 435-0674 FOR RE-INSPECTION - 24 hour notice required.
L&_ s���s.d L oG/
Inspector: Date:
TYPE OF INSPECTION REQUESTED
❑ Under-floor ❑ Framing ❑ Gas Piping
❑ Footing ❑ Drywall, Nailing ❑ Consultation
❑ Foundation ❑ Shear Nailing ❑ Groundwork
❑ Mechanical ❑ Grid ❑ Struct. Slab
❑ Wood Stove ❑ Rough-in ❑ Final
❑ Masonry ❑ Drainage fi4r Insulation
❑ Other:
INSPECTION REPORT w
1;4
PermitNo.: 0-3 539z Lot#: L)- 7Address: 5-717 c_Q P
Contractor: 4 ►-fo POwner:Date: L/ - v
❑ APPROVAL ❑ PARTIAL APPROVAL
❑ VIOLATION O'CORRECTION REQUESTED
A-Gorrections listed below MUST BE MADE before work can be approved.
❑ Please contact inspector.
❑ Was not able to perform inspection.
❑ CALL 435-0674 FOR RE-INS ECTION -24 hour noti a required.
Inspector: Date:
YPE OF INSPECTION REQUESTED
❑ Under-floor ❑ Framing ❑ Gas Piping
❑ Footing ❑ Drywall, Nailing ❑ Consultation
❑ Foundation ❑ Shear Nailing ❑ Groundwork
❑ Mechanical ❑ Grid ❑ Struct. Slab
❑ Wood Stove ❑ Rough-in ❑ Final
ElMasonry ❑ Drainage ( 00 Insulation
❑ Other:
INSPECTION REPORT
4y1N GTO Permit No.: 53V Lot *: �9
Address: 7d / C
Contractor: L4— ��Zx e!!7-
O Owner:
sI NG Date: -�
&APPROVAL ❑ PARTIAL APPROVAL
❑ VIOLATION ❑ CORRECTION REQUESTED
❑ Corrections listed below MUST BE MADE before work can be approved.
❑ Please contact inspector.
❑ Was not able to perform inspection.
❑ CALL 435-0674 FOR RE-INSPECTION - 24 hour notice required.
i
Inspector: Date:
TYPE O PECTION REQUESTED
❑ Under-floor Framing ❑ Gas Piping
❑ Footing L� Drywall, Nailing ❑ Consultation
❑ Foundation n Shear Nailing ❑ Groundwork
❑ Mechanical ❑ Grid ❑ Struct. Slab
❑ Wood Stove ❑ Rough-in ❑ Final
❑ Masonry ❑ Drainage ❑ Insulation
❑ Other:
N G '
INSPECTION REPORT
L
1� I0 Permit No.: 03 5353 Lot #: :;L-8
F' Address: 5-7 Z 1 G6 o
Contractor: "I r
�s Owner:I N G'� Date: 3-► 5- O4 —
❑ APPROVAL ❑ PARTIAL APPROVAL
❑ VIOLATION CORRECTION REQUESTED
9.Corrections listed below MUST BE MADE before work can be approved.
❑ Please contact inspector.
❑ Was not able to perform inspection.
C CALL 435-0674 FOR RE-INSPECTION - 24 hour notice required.
5 T/.-� c-vf 7-
I NS:i-L t7(Ij— Tax9T ,,5 .ST r_L,>r
teu s r�q& S D r"R
fll 1" S 7T F' r cf T /�l e>2'�L— rt i /3 L:r �'- •1 r�/7x 7Z Ld.�FvL!
AS .s T/+-;_� f✓ 1-4— a ..1 6 Ld 6 eF�4�11
t A) A—r-
r
Inspector: 5Z.cS'tt` Date:
TYPE OF INSPECTION REQUESTED
❑ Under-floor A Framing ❑ Gas Piping
❑ Footing ❑ Drywall, Nailing ❑ Consultation
❑ Foundation ;d Shear Nailing ❑ Groundwork
❑ Mechanical ❑ Grid ❑ Struct. Slab
❑ Wood Stove ❑ Rough-in ❑ Final
❑ Masonry ❑ Drainage ❑ Insulation
❑ Other:
INSPECTION REPORT
J
ii
T Permit No.: 9 Lot#: cAddress:Contractor:Owner:
Date:
APPROVAL ElPARTIAL APPROVAL
❑ VIOLATION ❑ CORRECTION REQUESTED
❑ Corrections listed below MUST BE MADE before work can be approved
❑ Please contact inspector.
❑ Was not able to perform inspection.
❑ CALL 435-0674 FOR RE-INSPECTION - 24 hour notice required.
� L
Inspector: Date:
YPE OF INSPECTION REQUESTED
❑ Under-floor ❑ Framing ❑ Gas Piping
❑ Footing ❑ Drywall, Nailing ❑ Consultation
❑ Foundation ❑ Shear Nailing ❑ Groundwork
Mechanical El Grid ❑ Struct. Slab
❑ Wood Stove ❑ Rough-in ❑ Final
❑ Masonry ❑ Drainage ❑ Insulation
❑ Other:
\n� INSPECTION REPORT 107
P�Y1
iN cr 3..�3y�
¢L O Permit No.: Lot ff#:''\\2
Address: `� Zal '_bL)
Contractor: �Z- j
9s �O Owner:
Date: ;
❑ APPROVAL ❑ PARTIAL APPROVAL
❑ VIOLATION ❑ CORRECTION REQUESTED
❑ Corrections listed below MUST BE MADE before work can be approved.
❑ Please contact inspector.
❑ Was not able to perform inspection.
❑ CALL 435-0674 FOR RE-INSPECTION -24 hour notice required.
Inspector: Date: - �
YPE OF INSPECTION REQUESTED
❑ Under-floor ❑ Framing ❑ Gas Piping
❑ Footing ❑ Drywall, Nailing ❑ Consultation
❑ Foundation ❑ Shear Nailing ❑ Groundwork
❑ Mechanical ❑ Grid ❑ Struct. Slab
❑ Wood Stove --4_Bz4h-in ❑ Final
❑ Masonry ❑ Drainage ❑ Insulation
❑ Other:
/!.5J7-
INSPECTION REPOF-
4ti1N G?'o Permit No.: 5393 Lot#: Z 8
`Z Address: 5-7 7--1 6 8 D
• • r
z Contractor: t4-
93, ,t4 Owner:
LINO Date: /- 2-7-o Y
t- -- A-PARTIAL APPROVAL
❑ VIOLATION ❑ CORRECTION REQUESTED
❑ Corrections listed below MUST BE MADE before work can be approved.
❑ Please contact inspector.
❑ Was not able to perform inspection.
❑ CALL 435-0674 FOR RE-INSPECTION - 24 hour notice required.
z
Inspector: ��-< i— Date: _/�2- 7-0
TYPE OF INSPECTION REQUESTED
❑ Under-floor ❑ Framing ❑ Gas Piping
❑ Footing ❑ Drywall, Nailing ❑ Consultation
❑ Foundation Shear Nailing ❑ Groundwork
❑ Mechanical ❑ Grid ❑ Struct. Slab
❑ Wood Stove ❑ Rough-in ❑ Final
❑ Masonry ❑ Drainage ❑ Insulation
❑ Other:
INSPECTION REPORT
4ti1N G 7'0 Permit No.: /nLot #:
Q' Address: 72
Z Contractor: .
i N OHO Owner:
Date: 1 Z
A APPROVAL ❑ PARTIAL APPROVAL
❑ VIOLATION ❑ CORRECTION REQUESTED
❑ Corrections listed below MUST BE MADE before work can be approved.
❑ Please contact inspector.
❑ Was not able to perform inspection.
❑ CALL 435-0674 FOR RE-INSPECTION -24 hour notice required.
Inspector: �-L " Date: lz-3o cl
TYPE OF INSPECTION REQUESTED
❑ Under-floor ❑ Framing ❑ Gas Piping
❑ Footing ❑ Drywall, Nailing ❑ Consultation
❑ Foundation Shear Nailing ❑ Groundwork
❑ Mechanical fJ Grid ❑ Struct. Slab
❑ Wood Stove ❑ Rough-in ❑ Final
❑ Masonry ❑ Drainage ❑ Insulation
❑ Other:
INSPECTION REPORT
n�
ii
TO Permit No.: _ �/ LotAddress: 5 7Contractor: -0 Owner:
O Date: �� -
r
APPROVAL 0 PARTIAL APPROVAL
❑ VIOLATION ❑ CORRECTION REQUESTED
❑ Corrections listed below MUST BE MADE before work can be approved.
❑ Please contact inspector.
❑ Was not able to perform inspection.
❑ CALL 435-0674 FOR RE-INSPECTION - 24 hour notice required.
� fry
Inspector: Date/"2.
l PE OF INSPECTION REQUESTED
Under-floor ❑ Framing ❑ Gas Piping
!❑ Footing ❑ Drywall, Nailing ❑ Consultation
❑ Foundation ❑ Shear Nailing ❑ Groundwork
❑ Mechanical ❑ Grid ❑ Struct. Slab
❑ Wood Stove ❑ Rough-in ❑ Final
❑ Masonry ❑ Drainage ❑ Insulation
❑ Other:
INSPECTION REPORT If,,r!G
iIN
NG?' Permit No.: 5395 Lot#: 28
Address: S7 z1 �6o
Contractor:Owner:
O Date: f d -3 i-103
APPROVAL ❑ PARTIAL APPROVAL
❑ VIOLATION ❑ CORRECTION REQUESTED
❑ Corrections listed below MUST BE MADE before work can be approved.
❑ Please contact inspector.
❑ Was not able to perform inspection.
❑ CALL 435-0674 FOR RE-INSPECTION - 24 hour notice required.
0 u tsL}Ar�i CH,--
Inspector: 5 Date:
TYPE OF INSPECTION REQUESTED
❑ Under-floor ❑ Framing ❑ Gas Piping
❑ Footing ❑ Drywall, Nailing ❑ Consultation
Foundation ❑ Shear Nailing ❑ Groundwork
❑ Mechanical ❑ Grid ❑ Struct. Slab
❑ Wood Stove ❑ Rough-in ❑ Final
❑ Masonry ❑ Drainage ❑ Insulation
❑ Other:
(,^ INSPECTION REPORT gZ 7
IN
9G
Permit No.: J:S W3 Lo t D#:
Address: 5791
Contractor: N- 141D)011?1�
Owner:
Cate 11-2' Je�
a�
3
❑ APPROVAL ❑ PARTIAL APPROVAL
❑ VIOLATION ❑ CORRECTION REQUESTED
❑ Corrections listed below MUST BE MADE before work can be approved.
❑ Please contact inspector.
❑ Was not able to perform inspection.
❑ CALL 435-0674 FOR RE-INSPECTION -24 hour notice required.
Inspector: Date:
TYPE OF INSPECTION REQUESTED
❑ Under-floor ❑ Framing ❑ Gas Piping
❑ Footing ❑ Drywall, Nailing ❑ Consultation
undation ❑ Shear Nailing ❑ Groundwork
Mechanical ❑ Grid ❑ Struct. Slab
❑ Wood Stove ❑ Rough-in ❑ Final
❑ Masonry ❑ Drainage ❑ Insulation
❑ Other:
to ss
P INSPECTION REPORT
1C¢tiIN G 1'o Permit No.: 5313 Lot#: 2-5
Q' Address: 5-7 2-1 C 6.D
Z Contractor: tea$�� zaN�
`Y�, Owner: /� tfo"C
SIN
Date: /0 - 8- 03
,)4 APPROVAL ❑ PARTIAL APPROVAL
❑ VIOLATION ❑ CORRECTION REQUESTED
❑ Corrections listed below MUST BE MADE before work can be approved.
❑ Please contact inspector.
❑ Was not able to perform inspection.
❑ CALL 435-0674 FOR RE-INSPECTION - 24 hour notice required.
boa r�6Ji z2?Ygov e-'o
S--�,4rks Ali o.�✓�J� I__
Inspector: Date:
TYPE OF INSPECTION REQUESTED
❑ Under-floor ❑ Framing ❑ Gas Piping
I&( Footing ❑ Drywall, Nailing ❑ Consultation
❑ Foundation ❑ Shear Nailing ❑ Groundwork
❑ Mechanical ❑ Grid ❑ Struct. Slab
❑ Wood Stove ❑ Rough-in ❑ Final
❑ Masonry ❑ Drainage ❑ Insulation
❑ Other:
C I TY OF ARL I IVCGTON
C O N S T R U C T I O N P E R M I T
P E R M I T N O _ O 3—5 3 9 3
Owner: HOUSING HOPE 5830 EVERGREEN WAY EVERETT 98203
Value of Work: $117, 000. 00 Tax ID: 009158-000-028-00 Phone: 425-347-6556
Describe Work: NEW SINGLE FAMILY RESIDENCE
Proposed Use: SFR
Legal Description: THE BLUFF UNIT 28
Job Address: 5721 CIRCLE BLUFF DRIVE
Contractor's Name Type Address License#
HOUSING HOPE GEN 5830 EVERGREEN WAY HOUSIHI028RH
ALL WAYS AIR CONTROL NEC 11674 HIGGINS AIRPORT WY ALLWAAC074C3
WOLFE PLUMBING INC PLB 12924 OLD SNOHOMISH/MONROE HW WOLFEPI033CJ
P E R H I T F E E S
Equipment and Fixtures Number Fee Total Charge
----- ------------ - - -- - - - - - -- - - - - - - - - - - - - - ------- ----
PLUMBING FIXTURES 13 $10. 00 $130. @0
FURNACE/UNIT HEATER i $15. 00 $15. 00
' VENTILATION FANS 5 $7. 00 $35. @@
DRYER
1 $11, @@ $il. @@
WATER HEATER 1 $15. @0 $15. 0@
GAS PIPING 1-4 OUTLETS 1 $6. 00 $6. 00
i
S U B T O T A L. . . . . . $212.00
TOTALS Fee
Permit Fee $1, 179. 20
Equipment $82. 00
Fixture $130. 00
Mech Permit $24. 00
Plan Fee $766. 48
Plumb Permit $25. 00
State fee $4. 50 E
SIGAATURE'_=
TOTAL FEE. . . . . . . . . . . . . . . . . $2, 211. 18 I HEREBY C Y HAT' I HAVE READ
A EXAMIN D THIS APPL ATION AND
PAYMENTS. . . . . . . . . . . . . . . . . . $818. 02 K O THE SAME TO BE T E AND COR-
K C ALL P OVI ION OF LAWS AND
TOTAL DUE. . . . . . . . . . . . . . . . . $1, 393. 16 DI ANCES GOV NI THIS TYPE OF
K WILL PL D WITH WHETHER
C FIED NOT.
DATE 7- j0-4Z� RECEIPT #
UI ICI L
� � 1
7�
'- � � a •�•mot, •�
l
INSPECTOR'S DAILY REPORT
o
DATE JOB PROJECT
5/4/04 The Bluff Z-67-0��<
OWNER CONTRACTOR
Housing Hope Housing Hope
SUBCONTRACTORS
Chrome Construction
WEATHER AM: 9:00 rain
WEATHER PM:
RECORD
Met onsite with Jeff Neese and Ray Ashcraft from Housing Hope
Jim of Chrome Construction to discuss lot's #25 thru 30 infiltration
Beds. The infiltration beds were installed incorrectly and not to the
City of Arlington standards. I informed the parties present that the
lot's in question will not receive C of 0 until the correction are made .
All parties present agreed and are gong to work on correcting the
issue.
EQUIPTMENT
LABOR
SIGNED TITLE
GAT Y ()4
INSPECTOR'S DAILY REPORT
7�l�NG'SO
DATE JOB/PROJECT
4/28/04 The Bluff
OWNER 1CONTRACTOR
Housing Hope Chrome Construction
SUBCONTRACTORS
LOT #28
WEATHER AM: 10:00 Sunny
WEATHER PM:
RECORD
Went to site with Marc Hayes to look at lots 25-30 to look at the
infiltration beds . Met Ray Ashcroft from housing hope informed
him he must expose the infiltration beds so they can be inspected .
Ray was aware that they had not been inspected and is willing to
dig the lots in question up for inspection. He is going to get a hold
of me when they are dug up. So I can inspect them. Also is going to
dig up their sewer pump lines for Virgil to inspect and sign off .
EQUIPTMENT
LABOR
SIGNED TITLE
CITY OF ARLINGTON J
CONSTRUCTION
PERMIT
® COMBINATION ❑ BUILDING ❑ MECHANICAL ❑ PLUMBING ❑ SIGN
PERMIT NO.
MAIL ADDRESS CITY ZIP PHONE
uuLLLI Housing Hope 5830 Evergreen Way, Everett, WA 98203 425-347-6556
ARCHI7Ei:TUTi DESIGNER MAIL ADDRESS CITY ZIP PHONE
Jdr>`sm Artbitsctzure & P 2124 M ird Ave, sAte 200 mottle j,�A 98121 206-448-75-00
MAIL ADDRESS CITY ZIP PHONE LIC NSE/
HotmiM Hope, Inc. 5830 E\e imm Way Evemtt, m 982M 425-347-65% HJZlHH02ffi4i
MECHANICAL CONTRACTOR MAIL ADDRESS CITY ZIP PHONE LICENSE/
All-�4ays Air Control 11674 Hi!Tgins Air ort way, Rur1 i nnton rota, CIPQ3 W-757--1',M.l AUkAYTM:Q
PLUMBING,CONTRACTOR MAIL ADDRESS CITY ZIP PHONE LICENSE/
Wblfe Plumbing, Inc. 12924 Old &xiu dsYy4� Hwy. &-dlaTdsh, Ilk 98290 360-56&-%53 VU=I033CJ
CLASS OF WORK
®NLW ❑ADDITION ❑ALTERATION ❑REPAIR ❑DEMOLITION []BUILDING RELOCATION
VALUATION OF WORK
1 13®,000-
DLSCRIBE WORK
nEw ca-sLnutiQ1 of
PRUPUSt D USE OF BUILDING
I HEREBY CERTIFY THAT I HAVE READ AND EXAMINED THIS APPLICA-
2 Units E II e F`al i�51 TION AND KNOW THE SAME TO BE TRUE AND CORRECT ALL PROVI-
SIONS UESG RIPIIUN OF PROPELRTRT Y(SHOWN BELOW OR ATTACH FOUR COPIES) OF LAWS AND ORDINANCES GOVERNING THIS TYPE OF WORK
LU( BLOCK • OF �' Attached WILL BE COMPLIED WITH WHETHER SPECIFIED HERIN OR NOT.THE
GRANTING OF PERMIT DOES NOT PRESUME TO GIVE AUTHORITY TO
VIOLATE OR CANCEL THE PROVISIONS OF ANY OTHER STATE OR
TAX I D NUMBER LOCAL LAW REGULATING CONSTRUCTION OFTHE PERFORMANCE OF
See Attadi CONSTRUCTION.PERMIT EXPIRES 1 YEAR FROM DATE OF ISSUANCE.
108AUD�S� SIGNATURE OFC �AUTHORIZEOAGENT DATE
/t7 ! See Attadied X •- 3 /2 0
(OFFICE USE ONLY)
PLUMBING MECHANICAL
NO. TYPE OF FIXTURE FEE NO. TYPE OF EQUIPMENT FEE
WATER CLUSEI (TOILE]) AIR COND.UNITS -H.P.EA.
BA I I11 UB REFRIGERATION UNITS-H.P.EA.
LAVATORY(WASH BASIN) BOILERS-H.P.EA
SHOWLR GAS FIRED A.C.UNITS-TONNAGE EA. /
KI ICIILN SINK 6 DISP. FORCED AIR SYSTEMS-B.T.U. MEA V
DISHWASIIER WALL HEATERS-B.T.U. M
LAUNDRY 1 RAY J ' UN11 HEATERS- B.T.U. M
CLOI IILS WASIIER EVAPORAI IVE COOLERS
WA 1 ER HEATLR CLOTHES DRYERS
URINAL VENTILATICN FAN
DRINKING FUUNIAIN RANGE FIOODCOMMERCIAL h
FLUOR DRAIN AIR HANDLING UNIT- CPM
VACUUM BREAKERS STOVE
ROOF DRAINS - RAINLEAUERS METAL FIREPLACE d CHIMNEY 1A
SINK (SERVICE - BAR,ETC.) WATER HEATER
GAS PIPING j
SUB TOTAL f SUB TOTAL f
PERMIT S PERMIT f
TOTAL FEE f TOTAL FEE f
SIUL YARU SL I BALK STREET SLTBACK REAR YARD SETBACK PLAN CHECK NUMBER PLAN CHECK FEE
) ISOJ /v, ' FEE RECEIPT NO.
USE /UNI LOT AREA ` �-03 .1 125`VACANT SITE �f J /
AV ❑YES igNO FEES VALUATION FEE
TYPL OF CO,NS1. OCCUPANCY G//OUP NO.OF DWELU G UNITS PLAN CHECKING VG =ar
� --r�' - - GA—
SIZED BLtX,. NO. STURILS MAX.000.LOAD BUILDING f 1//1 l` 1
r PLUMBING
FIRE SPRINKLERS REQUIRED
[:]YES L,NO MECHANICAL
COMMENTS STATE BLDG.CODE
ENERGY CODE SURCHARGE /
PENALTY U.B.C.
SEC.303(a)
R E C E I V E CI WATER/SEWER FEES
TOTAL
MAR 14 2003 PERMIT VALIDATION
WHEN PROPERLY VALIDATED (IN THIS SPACE)THIS IS YOUR PERMIT 6 RECEIPT
CITY
I C0k
L GTON PAID CRR BY
cc:ASSESSOR,APPLICANT,TREASURER,BLDG.DEPT. BUILDING OFFICIAL DATE