HomeMy WebLinkAbout20706 CIRCLE BLUFF DR_014776_2026 INSPECTION REPORT
i;IN
T P -ermit No.: Dt It-7 7 4 Lot#:Address: 2-o-7 e� <_BContractor: N Ho PC
Owner:
� Date: Lf—Z
;CAPPROVAL ❑ PARTIAL APPROVAL
❑ VIOLATION ❑ CORRECTION REQUESTED
❑ Corrections listed below MUST BE MADE before work can be approved.
❑ Please contact inspector.
❑ Was not able to perform inspection.
❑ CALL 435-0674 FOR RE-INSPECTION - 24 hour notice required.
Inspector: Date: 'q'2•S c3
TYPE OF INSPECTION REQUESTED
❑ Under-floor ❑ Framing ❑ Gas Piping
❑ Footing ❑ Drywall, Nailing ❑ Consultation
❑ Foundation ❑ Shear Nailing ❑ Groundwork
❑ Mechanical ❑ Grid ❑ Struct. Slab
❑ Wood Stove ❑ Rough-in I`_IU<Final
❑ Masonry ❑ Drainage ❑ Insulation
❑ Other:
INSPECTION REPORT
7
tiZN G T Permit No.: �771,p_ Lot#: l r
� O
Address: o2b 70
Z Contractor: 1 �0 e
O Owner:
IN � Date: Z�_
❑ APPROVAL ❑ PARTIAL APPROVAL
❑ VIOLATION CORRECTION REQUESTED
Corrections listed below MUST BE MADE before work can be approved.
/❑ Please contact inspector.
❑ Was not able to perform inspection.
f : CALL 435-0674 FOR RE-INSPECTION - 24 hour notice required.
79
S 4' L.4-T7 i..-.� �'-. f'YI.J I /•�i:.J �i L/•L 7-16',�v�
z c ,�-7 6 /S— ✓ref' A/e 7—
S u L..4-7-7 C�� a ru b l:G%or'1 !'LAS S
Inspector: S 41- Date: 4/'
TYPE OF INSPECTION REQUESTED
❑ Under-floor ❑ Framing ❑ Gas Piping
❑ Footing ❑ Drywall, Nailing ❑ Consultation
❑ Foundation ❑ Shear Nailing ❑ Groundwork
❑ Mechanical ❑ Grid ❑ Struct. Slab
❑ Wood Stove ❑ Rough-in Final
❑ Masonry ❑ Drainage ❑ Insulation
❑ Other:
U ' INSPECTION REPOR"
iG�ti�N Gr Permit No.: 2_' Y /� Lot#:
Q' O� Address: 1070(0
• • / i er
� � Contractor: ,p tt
O Owner:
9s�I N
Date:
❑ APPROVAL ❑ PARTIAL APPROVAL
❑ VIOLATION �ORRECTION REQUESTED
corrections listed below MUST BE MADE before work can be approved.
❑ Please contact inspector.
❑ Was not able to perform inspection.
�LL 4,35-0674 FOR RE-INSPECTION - 24 hour notice required.
it. S L4-1--r9l- L (s` L 1>
nj�i C-1 LS --ye,-jr
`�7-a v t� •�T j 'n i'' 71 Li T'1 L..T7 Clt,
`�"�c_'Tx...c t/.►'TY'� Vi 7 +�i���'Cl_"s '� i.VS r,L�yi'?�`�:
Gl-�-j-7 L!� '7'Z� � S g/ /�'-t'7ti'!e� % L S•�L . �Fi'F<l=s
� ti� lf-r'7TL= /'r777L� /ILGc f� 1,2- 3'D
Inspector. Date: ��/9 /.r_
TYPE OF INSPECTION REQUESTED
❑ Under-floor ❑ Framing ❑ Gas Piping
❑ Footing ❑ Drywall, Nailing ❑ Consultation
❑ Foundation ❑ Shear Nailing ❑ Groundwork
❑ Mechanical ❑ Grid ❑ Struct. Slab
❑ Wood Stove ❑ Rough-in inal
❑ Masonry ❑ Drainage ❑ In ulation
❑ Other:
INSPECTION REPORT
ti1N G? Permit No.: �[ r ` 74 Lot, :
¢ O
Address: Q 70 6
Z Contractor:
O Owner:
I N O� Date: -0
PPROVAL ❑ PARTIAL APPROVAL
❑ VIOLATION ❑ CORRECTION REQUESTED
❑ Corrections listed below MUST BE MADE before work can be approved.
❑ Please contact inspector.
❑ Was not able to perform inspection.
❑ CALL 435-0674 FOR RE-INSPECTION - 24 hour notice required.
Ajn /L �Pf� � el D� 175 rti11J e0
Inspector: Date: 2S �L
TYPE OF INSPECTION REQUESTED
❑ Under-floor ? Framing ❑ Gas Piping
❑ Footing ryw+all, Nailing ❑ Consultation
❑ Foundation Shear Nailing ❑ Groundwork
❑ Mechanical ❑ Grid ❑ Struct. Slab
❑ Wood Stove ❑ Rough-in ❑ Final
❑ Masonry ❑ Drainage ❑ Insulation
❑ Other:
INSPECTION REPORT
N G?'O Permit No.: 0/_q77& Lot#: 7
Q' Address: 7��' l�4)
• �r /�
Contractor: .
O Owner:
IN � Date:
APPROVAL ❑ PARTIAL APPROVAL
❑ VIOLATION ❑ CORRECTION REQUESTED
❑ Corrections listed below MUST BE MADE before work can be approved.
❑ Please contact inspector.
❑ Was not able to perform inspection.
❑ CALL 435-0674 FOR RE-INSPECTION - 24 hour notice required.
Inspector: �'� � Date:
TYPE OF INSPECTION REQUESTED
❑ Under-floor ❑ Framing ❑ Gas Piping
Footing P&rC V) ❑ Drywall, Nailing ❑ Consultation
Foundation ❑ Shear Nailing ❑ Groundwork
❑ Mechanical ❑ Grid ❑ Struct. Slab
❑ Wood Stove ❑ Rough-in ❑ Final
❑ Masonry ❑ Drainage ❑ Insulation
❑ Other:
\fin '4SPECTION REPORT 714(A""-
VV �
N G r/ /�,
tii ?'G Permit No.. —`i"77&
Q" Address: C�
Contractor:
9s�j N OHO Owner:
Date:
APPROVAL ❑ PARTIAL APPROVAL
❑ VIOLATION ❑ CORRECTION REQUESTED
❑ Corrections listed below MUST BE MADE before work can be approved.
❑ Please contact inspector.
❑ Was not able to perform inspection.
❑ CALL 435-0674 FOR RE-INSPECTION -24 hour notice required.
Inspector: Date: /
TYPE OF INSPECTION REQUESTED
❑ Under-floor ❑ Framing ❑ Gas Piping
❑ Footing ❑ Drywall, Nailing ❑ Consultation
❑ Foundation ❑ Shear Nailing ❑ Groundwork
❑ Mechanical ❑ Grid ❑ Struct. Slab
❑ Wood Stove ❑ Rough-in ❑ Final
❑ Masonry ❑ Drainage N><Insulation
❑ Other: 1
INSPECTION REPORT
tiI NG 1'o o.: U -q 747 -) l7Permit N Lot#:
Q Address: 6!070�0
Z Contractor: I hInp�
Owner:
I N�'� Date:
❑ APPROVAL ❑ PARTIAL APPROVAL
❑ VIOLATION XCORRECTION REQUESTED
Corrections listed below MUST BE MADE before work can be approved.
❑ Please contact inspector.
❑ Was not able to perform inspection.
;CALL 435-0674 FOR RE-INSPECTION -24 hour notice required.
Inspector: ' Date: 1�// Y/c
TYPE OF INSPECTION REQUESTED
❑ Under-floor ❑ Framing ❑ Gas Piping
❑ Footing ❑ Drywall, Nailing ❑ Consultation
❑ Foundation ❑ Shear Nailing ❑ Groundwork
❑ Mechanical ❑ Grid ❑ Struct. Slab
❑ Wood Stove ❑ Rough-in ❑ Final
❑ Masonry ❑ Drainage D Insulation
❑ Other: 1`
INSPECTION REPORT
ZN G T O Permit No.: 77 Lot #: �
F Address:
• ` -
rN
� Z Contractor: Dzt
,SO Owner:
�I N C' Date: /0 � 1
❑ APPROVAL ❑ PARTIAL APPROVAL
❑ VIOLATION ,Q�CORRECTION REQUESTED
❑ Corrections listed below MUST BE MADE before work can be approved.
❑ Please contact inspector.
❑ Was not able to perform inspection.
❑ CALL 435-0674 FOR RE-INSPECTION - 24 hour notice required.
�LC•�;r ti �� L.-�T7.�- t
Inspector: r Date:
TYPE OF INSPECTION REQUESTED
❑ Under-floor ❑ Framing ❑ Gas Piping
❑ Footing ❑ Drywall, Nailing ❑ Consultation
❑ Foundation ❑ Shear Nailing ❑ Groundwork
❑ Mechanical ❑ Grid ❑ Struct. Slab
❑ Wood Stove ❑ Rough-in 0 Final
❑ Masonry ❑ Drainage ex(Insulation
❑ Other:
INSPECTION REPORT
1;4
-0Permit No.:®� �'7� Lot #:
Address: O 7®1- /-Z�Contractor:Owner:
� Date: C� r �e2
9APPROVAL ❑ PARTIAL APPROVAL
❑ VIOLATION ❑ CORRECTION REQUESTED
❑ Corrections listed below MUST BE MADE before work can be approved.
❑ Please contact inspector.
❑ Was not able to perform inspection.
❑ CALL 435-0674 FOR RE-INSPECTION - 24 hour notice required.
Inspector: 'C-al/ Date:
TYPE OF INSPECTION REQUESTED
❑ Under-floor / Framing ❑ Gas Piping
❑ Footing / ❑ Drywall, Nailing ❑ Consultation
❑ Foundation ❑ Shear Nailing ❑ Groundwork
❑ Mechanical ❑ Grid ❑ Struct. Slab
❑ Wood Stove ❑ Rough-in ❑ Final
❑ Masonry ❑ Drainage ❑ Insulation
❑ Other:
`N1 INSPECTION REPORT
'v N G? Permit No.: 7 77 Lot #: 1-7
Address: .-�2K, 76'
�T 'Contractor: Z7 :� T
O Owner:
INO�S Date: &I
❑ APPROVAL XPARTIAL APPROVAL
❑ VIOLATION X-CORRECTION REQUESTED
❑ Corrections listed below MUST BE MADE before work can be approved.
❑ Please contact inspector.
❑ Was not able to perform inspection.
❑ CALL 435-0674 FOR RE-INSPECTION -24 hour notice required.
Gw-K L_jz- et__A-r� �a
0/L TD l/-,
Inspector: [.C-77, Date: /d z.Z o_ �
TYPE OF INSPECTION REQUESTED
❑ Under-floor *Framing ❑ Gas Piping
❑ Footing ❑ Drywall, Nailing ❑ Consultation
❑ Foundation ❑ Shear Nailing ❑ Groundwork
❑ Mechanical ❑ Grid ❑ Struct. Slab
❑ Wood Stove ❑ Rough-in ❑ Final
❑ Masonry ❑ Drainage ❑ Insulation
❑ Other:
INSPECTION REPORT
¢LIN G?'O Permit No.: 1-T 77& Lot #: / 7
Q" -� Address D 7O
ZContractor:
-y�, �O Owner:
�I N 1 Date:
APPROVAL ❑ PARTIAL APPROVAL
'❑ VIOLATION ❑ CORRECTION REQUESTED
❑ Corrections listed below MUST BE MADE before work can be approved.
❑ Please contact inspector.
❑ Was not able to perform inspection.
❑ CALL 435-0674 FOR RE-INSPECTION - 24 hour notice required.
d
Inspector: -/ - Date:
TYPE OF INSPECTION REQUESTED
❑ Under-floor ❑ Framing Gas Piping
❑ Footing ❑ Drywall, Nailing ❑ Co sultation
❑ Foundation ❑ Shear Nailing ❑ Groundwork
❑ Mechanical ❑ Grid ❑ Struct. Slab
❑ Wood Stove ❑ Rough-in ❑ Final
❑ Masonry 0 Drainage ❑ Insulation
❑ Other:
INSPECTION REPORT
V �
4titN G TO Permit No.: � t L/774 Lot #: ��
Q Address: ;Z670
Contractor:
Owner:
SING Date: (]_o
APPROVAL ❑ PARTIAL APPROVAL
❑ VIOLATION ❑ CORRECTION REQUESTED
❑ Corrections listed below MUST BE MADE before work can be approved.
❑ Please contact inspector.
❑ Was not able to perform inspection.
❑ CALL 435-0674 FOR RE-INSPECTION - 24 hour notice required.
17 2B(_1 a/
V 7
Inspector: Date:
TYPE OF INSPECTION REQUESTED
❑ Under-floor ❑ Framing ❑ Gas Piping
❑ Footing ❑ Drywall, Nailing ❑ Consultation
❑� /F undation ❑ Shear Nailing ❑ Groundwork
Mechanical ❑ Grid ❑ Struct. Slab
❑ Wood Stove ❑ Rough-in ❑ Final
❑ Masonry ❑ Drainage ❑ Insulation
❑ Other:
INSPECTION REPORT 3
¢tit G?'0 Permit No.: (3 Ll 774 Lot #:
Address:
Z Contractor:
O Owner:
ING� Date:
❑ APPROVAL ❑ PARTIAL APPROVAL
;*/VIOLATION ❑ CORRECTION REQUESTED
❑ Corrections listed below MUST BE MADE before work can be approved.
❑ Please contact inspector.
❑ Was not able to perform inspection.
❑ CALL 435-0674 FOR RE-INSPECTION - 24 hour notice required.
r?a V
Inspector: Date:
TYPE OF INSPECTION REQUESTED
❑ Under-floor ❑ Framing ❑ Gas Piping
❑ Footing ❑ Drywall, Nailing ❑ Consultation
❑ Foundation ❑ Shear Nailing ❑ Groundwork
G� Mechanical ❑ Grid ❑ Struct. Slab
b Wood Stove ❑ Rough-in ❑ Final
❑ Masonry ❑ Drainage ❑ Insulation
❑ Other:
INSPECTION REPORT
r" 1tiZN G T Permit No.: �/ 77� Lot #:
F' 0� Address: 7��
Z Contractor:
O Owner: i Ef�Q
9s�IN 1G� Date: 2-2,'6D
❑ APPROVAL 0 ARTIAL APPROVAL
❑ VIOLATION :CORRECTION REQUESTED
V
❑ Corrections listed below MUST BE MADE before work can be approved.
❑ Please contact inspector.
❑ Was not able to perform inspection.
❑ CALL 435-0674 FOR RE-INSPECTION - 24 hour notice required.
Inspector: Date:
TYPE OF INSPECTION REQUESTED
❑ Under-floor ❑ Framing ❑ Gas Piping
❑ Footing ❑ Drywall, Nailing ❑ Consultation
❑ Foundation ❑ Shear Nailing ❑ Groundwork
Mechanical ❑ Grid ❑ Struct. Slab
❑ Wood Stove ❑ Rough-in ❑ Final
❑ Masonry ❑ Drainage ❑ Insulation
❑ Other:
INSPECTION REPORT
N G TO Permit No.: � Lot#:
Q' Address:
Contractor:
O Owner: —7
Date:
❑ APPROVAL ❑ PARTIAL APPROVAL
❑ VIOLATION ❑ CORRECTION REQUESTED
❑ Corrections listed below MUST BE MADE before work can be approved.
❑ Please contact inspector.
❑ Was not able to perform inspection.
❑ CALL 435-0674 FOR RE-INSPECTION -24 hour notice required.
L-
Inspector: Date
TYPE OF INSPECTION REQUESTED
❑ Under-floor ❑ Framing ❑ Gas Piping
❑ Footing ❑ Drywall, Nailing ❑ Consultation
❑ Foundation Shear Nailing ❑ Groundwork
❑ Mechanical ❑ Grid ❑ Struct. Slab
❑ Wood Stove ❑ Rough-in ❑ Final
❑ Masonry ❑ Drainage ❑ Insulation
❑ Other:
i1AJ INSPECTION REPORT
IN G -7 I -7
' ?® Permit No.: I Lot#:
Q' Address: -_Q&IL` C CeL
Contractor:
qs, ,SO Owner:
SIN Date: V
❑ APPROVAL ❑ PARTIAL APPROVAL
❑ VIOLATION CORRECTION REQUESTED
O Corrections listed below MUST BE MADE before work can be approved.
❑ Please contact inspector.
❑ Was not able to perform inspection.
❑ CALL 435-0674 FOR RE-INSPECTION -24 hour notice required.
v
A
Inspector: I Date:
TYPE OF INSPECTION REQUESTED
❑ Under-floor ❑ Framing ❑ Gas Piping
❑ Footing ❑ Drywall, Nailing ❑ Consultation
❑ Foundation Shear Nailing ❑ Groundwork
❑ Mechanical Grid ❑ Struct. Slab
❑ Wood Stove ❑ Rough-in ❑ Final
❑ Masonry ❑ Drainage ❑ Insulation
❑ Other:
INSPECTION REPORT
N G?' `Permit No.: 01 f 1-7-7 of#: 1-7
O
Q /Address: -20-1®LA C rZ:J-P-- (31%af=F'Or
/'Contractor: ifcm� rc"' t4o rzs--
-y�, SO ✓Owner. 0 r i
IN ✓Date: ®-7 -301 -0 Z
APPROVAL ❑ PARTIAL APPROVAL
❑ VIOLATION ❑ CORRECTION REQUES D,
❑ Corrections listed below MUST BE MADE before work can be app ved.
❑ Please contact inspector.
❑ Was not able to perform inspection.
❑ CALL 435-0674 FOR RE-INSPECTIO -24 hour notice required.
L�
0
Inspector: Date: _-- � 'L'�
TYPE OF INSPECTION REQUESTED
❑ Under-floor ❑ Framing ❑ Gas Piping
❑ Footing ❑ Drywall, Nailing ❑ Consultation
❑ Foundation ❑ Shear Nailing ❑ Groundwork
❑ Mechanical ❑ Grid ❑ Struct. Slab
❑ Wood Stove A Rough-in �V*6f,❑ Final
❑ Masonry ❑ Drainage ❑ Insulation
SVY
❑ Other: Af-n
INSPECTION REPORT J
1;4
?'OPermit No.: ®/- `/7 76 Lot #: /7
Address: a 0 71� r,'r-/� �/�Contractor:O Owner: 1/IS Date: Y ' - �
❑ APPROVAL PARTIAL APPROVAL
❑ VIOLATION ❑ CORRECTION REQUESTED
❑ Corrections listed below MUST BE MADE before work can be approved.
❑ Please contact inspector.
❑ Was not able to perform inspection.
❑ CALL 435-0674 FOR RE-INSPECTION - 24 hour notice required.
rl..�
Inspector: i i' Date:
TYPE OF IN PECTION REQUESTED
❑ Under-floor ❑ Framing ❑ Gas Piping
❑ Footing ❑ Drywall, Nailing ❑ Consultation
❑ Foundation a--Shear Nailing ❑ Groundwork
❑ Mechanical ❑ Grid ❑ Struct. Slab
❑ Wood Stove ❑ Rough-in ❑ Final
❑ Masonry ❑ Drainage ❑ Insulation
❑ Other:
N INSPECTION REPORT
ti1N G T O Permit No.: `� Lot#: [ 7
4-
Address:
Contractor: `t (�
9s �O Owner:
Date: �}�"d�-
❑ APPROVAL D PARTIAL APPROVAL
❑ VIOLATION kCORRECTION REQUESTED
❑ Corrections listed below MUST BE MADE before work can be approved
❑ Please contact inspector.
❑ Was not able to perform inspection.
❑ CALL 435-0674 FOR RE-INSPECTION - 24 hour notice required.
Gi G
Inspector.
Date:
TYPE OF INSPECTION REQUESTED
❑ Under-floor ❑ Framing ❑ Gas Piping
❑ Footing Drywall, Nailing ❑ Consultation
❑ Foundation Shear Nailing ❑ Groundwork
❑ Mechanical '❑ Grid ❑ Struct. Slab
❑ Wood Stove ❑ Rough-in ❑ Final
❑ Masonry ❑ Drainage ❑ Insulation
❑ Other:
` INSPECTION REPORT
¢ti1N G TO Permit No.: Lot #: Z
Q Address: " - A A0
� Z Contractor: —
ys �O Owner:
IN Date: 3
0,APPROVAL ❑ PARTIAL APPROVAL
❑ VIOLATION ❑ CORRECTION REQUESTED
❑ Corrections listed below MUST BE MADE before work can be approved.
❑ Please contact inspector.
❑ Was not able to perform inspection.
❑ CALL 435-0674 FOR RE-INSPECTION - 24 hour notice required.
Inspector:
Date:
TYPE OF INSPECTION REQUESTED
Under-floor ❑ Framing ❑ Gas Piping
'❑` Footing ❑ Drywall, Nailing ❑ Consultation
❑ Foundation ❑ Shear Nailing ❑ Groundwork
❑ Mechanical ❑ Grid ❑ Struct. Slab
❑ Wood Stove ❑ Rough-in ❑ Final
❑ Masonry Drainage ❑ Insulation
❑ Other:
INSPECTION REPORT
y1N G TO Permit No.: Lot#:
Address:
Z Contractor:
O Owner:
IN C'� Date:
❑ APPROVAL ❑ PARTIAL APPROVAL
❑ VIOLATION '-CORRECTION REQUESTED
❑ Corrections listed below MUST BE MADE before work can be approved.
❑,Please contact inspector.
---J }�yas not able to perform inspection.
❑ CALL 435-0674 FOR RE-INSPECTION - 24 hour notice required.
y
t
Inspector:
Date:3 L S�
TYPE OF INSPECTION REQUESTED
Under-floor ❑ Framing ❑ Gas Piping
❑ Footing ❑ Drywall, Nailing ❑ Consultation
❑ Foundation ❑ Shear Nailing ❑ Groundwork
❑ Mechanical ❑ Grid ❑ Struct. Slab
❑ Wood Stove ❑ Rough-in ❑ Final
❑ Masonry Drainage ❑ Insulation
❑ Other:
INSPECTION REPORT
¢ti1N G?'O Permit No.:0 i —4_1 (o Lot#: ,
4' Address: a0—1 0 G Yc I.9, LL U
z
Contractor: 140"1 r1r, H m --J
O Owner:
IN G� Date: oQ
❑ APPROVAL PARTIAL APPROVAL
❑ VIOLATION ❑ CORRECTION REQUESTED
❑ Corrections listed below MUST BE MADE before work can be approved.
❑ Please contact inspector.
❑ Was not able to perform inspection.
❑ CALL 435-0674 FOR RE-INSPECTION - 24 hour notice required.
Inspector.
Dat�';)
PE OF INSPECTION REQUESTED
❑ Under-floor ❑ Framing ❑ Gas Piping
❑ Footing ❑ Drywall, Nailing ❑ Consultation
❑ Foundation ❑ Shear Nailing ❑ Groundwork
❑ Mechanical ❑ Grid ❑ Struct. Slab
❑ Wood Stove ❑ Rough-in ❑ Final
❑ Masonry Drainage ❑ Insulation
❑ Other:
INSPECTION REPORT -)
?'0 Permit No..
IN G 61-477&Lot#:
y •
Q Address:
Contractor:
O Owner:
9s i N G Date:
APPROVAL ❑ PARTIAL APPROVAL
❑ VIOLATION ❑ CORRECTION REQUESTED
❑ Corrections listed below MUST BE MADE before work can be approved
❑ Please contact inspector.
❑ Was not able to perform inspection.
❑ CALL 435-0674 FOR RE-INSPECTION - 24 hour notice required.
Inspector: Date:
YPE OF INSPECTION REQUESTED
❑ Under-floor ❑ Framing ❑ Gas Piping
Footing ❑ Drywall, Nailing ❑ Consultation
21 Foundation ❑ Shear Nailing ❑ Groundwork
❑ Mechanical ❑ Grid ❑ Struct. Slab
❑ Wood Stove Rough-in ❑ Final
❑ Masonry rainage ❑ Insulation
❑ Other:
INSPECTION REPORT
ZN G N'L177& t #:
y ?'O Permit No.: Lo
Q Address: r5 ��� t
Contractor: [` P
� Z
O Owner:
9'4 j N G� Date:
J6_APPROVAL ❑ PARTIAL APPROVAL
❑ VIOLATION ❑ CORRECTION REQUESTED
❑ Corrections listed below MUST BE MADE before work can be approved.
❑ Please contact inspector.
❑ Was not able to perform inspection.
❑ CALL 435-0674 FOR RE-INSPECTION - 24 hour notice required.
ZX�
Date:
Inspector:
PE OF INSP96TION REQUESTED
❑ Under-floor ❑ Framing ❑ Gas Piping
Footing ❑ Drywall, Nailing ❑ Consultation
J Foundation ❑ Shear Nailing ❑ Groundwork
❑ Mechanical ❑ Grid ❑ Struct. Slab
❑ Wood Stove ❑ Rough-in ❑ Final
❑ Masonry ❑ Drainage ❑ Insulation
❑ Other:
C I YY OF= € RL-I NOYO I
CONOY RUCY I ON F'E:RM I T
F:3,ERRM I T NO- 01—Z+-7-7&
Owner: STEARNS. ALANA 13631 515T AVE NE ARLINGTON 98270
Value of Work: $725000.00 Tax ID: 00915800001700 Phone: 360-657-0735
Describe Work: NEW DUPLEX, ONE UNIT
Proposed Use: SFR
Legal Description: THE BLUFF UNIT 17
Job Address: 20706 CIRCLE BLUFF DRIVE
Contractor' s Name Type Address License#
HOUSING HOPE GEN 5830 EVERGREEN WAY HOUSIHI028RH
HUGO'S HEATING MEC 913 N VICF'Y PL. HUGOSH080R8
WOLFE PLUMBING INC p°LB 12924 OLD SNOHOMISH/MONROE HW WOLFEP1033CJ
- - - P E R M I T - F E E S i
Equipment and Fixtures Number Fee Total Charge '
-------------------------- - - - - ----- ------------ i
PLUMBING FIXTURES 10 $10.00 $100.00
FURNACE/UNIT HEATER 1 $15.00 $15.00
GAS STOVE 1 $11. 00 $11.00
VENTILATION FANS 4 $7.00 $28.00
DRYER 1 $11.00 $11.00
WATER HEATER 1 $15.00 Si5.00
GAS PIPING 1-4 OUTLETS 1 $6.00 $6.00
t
S U B T O T A L...... $186.00 `
TOTALS Fee
Permit Fee $829.25
Equipment $86. 00
Fixture $100.00
Mech Permit $24.00
Plan Fee $539.01
Plumb Permit $25.00 *HERY
State fee t4.50STOTAL FEE. . . . . . . . . . . . . . . . . $1,607.76 IERTI. . THAT I HAVE READ
AND EXAMINED THIS APPLICATION AND
PAYMENTS............ .. .... $539.01 KNOW THE SAME TO BE TRUE AND COR-
RECT ALL PROVISIONS OF LAWS AND
TOTAL DUE. . . . . . _ _ _ . . _ . < . , $1,068.75 ORDINANCES [OVERNI1` � THIS TYPE OF
WORT; WILL B OM IED ITH WHETHER
_ --- 7OR
DATE RECEIPT #
/V l'i r I OFFICIALir
zM
0
a >�
t T
a
foot �a i y'' Four„� oa.►.�
------------------- --------
23'
r
IT-
ya.r-tk
r,,j
Y Y�
RPFr2cx
h
5'
5 � r f
pUv72ase-o a *
n►
� .pal e a s e w.e,•t
Si deLv�-4k-
01
UNIT 17 SCALE:1"=16' UNIT 18 SCALE:1"=16'
THE BLUFF AT ARLINGTON,A CONDOMINIUM LUFF AT ARL TON,A CONDOMINIUM
SITE ADDRESS: 2-D 70 6 CIRCLE BLUFF DR. SITE A SS: VW CIRCLE BLUFF DR
CITY OF ARLINGTON,WA CITY OF AR -O`,WA
AFN 200107095007,SNOHOMISH COUNTY AFN 20010709 0 1IONIISH COUNTY
REP: HOUSING HOPE PROPERTIES REP: 'SING HO OPERTIES
SELF HELP HOUSING ELF HELP HOUSI,
5830 EVERGREEN WAY 5830 EVERGREEN WAY
EVERETT,WA98203 EVERETT,WA98203
TAX PARCEL#00915800001700 AX PARCEL#00915800001800
HOUSE PLAN: 3 BDRM;1,098 sq.M living space HOUSE PLAN: 3 BDRM;1,098 sq.fL living space
CITY OF ARLINGTON WATER&SEWER CITY OF ARLINGTON WATER&SEWER
CITY OF ARLINGTON
CONSTRUCTION
PERMIT G r (-1-7 -r U
® COMBINATION ❑ BUILDING ❑ MECHANICAL ❑ PLUMBING ❑ SIGN
PERMIT NO.
L111 R I.' Mana SteaYT1S MAIL ADDRESS 13631 — 51St Ave. NE CITY S71LLe, c � PHONE 360-657-0735
�1 MAIL ADDRESS CITY car PHONE
Jdnsm Arcbitecbim & Plxmi q 2124 Thi W Ave, 51aLe 2C0 mottle, M 98121 2D&A48-7 80
MAIL ADDRESS CITY ZIP PHONE LIC NSE I
Techn a1 Assistance Aga1t: HoLmng Hope, Inc. 5830 Eweit3Lem Way Everett, M 982M 425-347-6556 HJ_B=028M
h1LCHANICAL CONTRACTOR MAIL ADDRESS CITY ZIP PHONE LICENSE
Hxo's Heating, Inc. 5415 Happy Hollow Rd. Starb+>ood, WA 98292 360-654-9392 HJ33S II008LB
PLUMBING CONTRACTOR MAIL ADDRESS CITY ZIP PHONE LICENSE
Wolfe Plu"ng, Inc. 12924 Old grba[ddyNaum Hwy. gld�sh, WA 98290 360-568-9653 c\QL17I033:.J
CLASS OF WORK
®NLW ❑ADDITION ❑ALTERATION ❑REPAIR ❑DEMOLITION ❑BUILDING RELOCATION
VALUATION OF WORK
C 71,000
DESCRIBE WORK
Owner der naa Cnrntnr-ticn cf dLzolex
PROPOSE U USE OF BUILDING
I HEREBY CERTIFY THAT I HAVE READ AND EXAMINED THIS APPLICA-
2 units of S' e FxTdjy Rasi TION AND KNOW THE SAME TO BE TRUE AND CORRECT ALL PROVI-
LLUAL ULS('RIPI ION Of PROPLRTY(SHOWN BELOW OR ATTACH FOUR COPIES) SIONS OF LAWS AND ORDINANCES GOVERNINGTHIS TYPE OF WORK
Z%k I g: BLOCK OF IT11 4L ��{�I WILL BE COMPLIED WITH WHETHER SPECIFIED HERIN OR NOT.THE
GRANTING OF A PERMIT DOES NOT PRESUME TO GIVE AUTHORITY TO
0OR 15 ( ono; '7 OD VIOLATE OR CANCEL THE PROVISIONS OF ANY OTHER STATE OR
TAX ID NUMBER �, LOCAL LAW REGULATING CONSTRUCTION OF THE PERFORMANCE OF
��� LUG CONSTRUCTION.PERMIT EXPIRES 1 YEAR FROM DATE OF ISSUANCE.
SIGNATURE OF C AUTHORIZED AGENT DATE
IOB AUDRLSS
(OFFICE USE ONLY)
MECHANICAL
PLUMBING
NO. TYPE OF FIXTURE FEE NO. TYPE OF EQUIPMENT FEE
WATER CLOSET (TOILET) AIR COND.UNITS -H.P. EA.
BAI I11 UB REFRIGERATION UNITS-H.P.EA.
LAVATORY(WASH BASIN) BOILERS-•H.P. EA
SHOWER GAS FIRED A.C.UNITS-TONNAGE EA.
KI ICIILN SINK& DISP. FORCED AIR SYSTEMS-B.T.0 MEA
DISHWASHER WALL HEATERS-B.T.U. M
LAUNDRY TRAY UNI1 HEATERS- B.T.U. M
CLOIIILS WASIILR EVAPORAI IVE COOLERS
WA1L••R HEATLR CLOTHES DRYERS
URINAL VENTILATICN FAN
DRINKIN(,FOUN I AIN RANGE HOOD COMMERCIAL
FLOOR DRAIN AIR HANDLING UNIT- CPM
VACUUM BREAKERS STOVE
ROOF DRAINS•- RAINLEADERS METAL FIREPLACE&CHIMNEY
SINK(SERVICE - BAR,ETC.) WATER HEATER
GAS PIPING
SUBTOTAL ! SUBTOTAL f
PERMIT S PERMIT !
TOTAL FEE $1 TOTALFEE f
SIULYARUS IBACK STRLLISLTBACK REAR YARD SETBACK PLAN CHECK NUMBER PLAN CHECK FEE
5 / S/ f] ,.J /a a C�� FEF REC IPT O
USE U LOT AREA � VACANT SITE
` rl `-�I
- �J YES ❑NO FEES VALUATION FEE
TYPLOf CON if OCCUPANCY,G/ROU NO.OF D ELLING UNITS PLAN CHECKING VG 3 C �/
SILL Of BLDG. No.or 9TORILS MAX.OCC.LOAD BU'LDING
(J l ,
I 1 PLUMBING 0--
FIRE SPRINKLERS REQUIRED
p f
07 j^ �.: 3 ❑YES ❑NO MECHANICAL I
COMMENTS STATE BLDG.CODE
ENERGY CODE SURCHARGEd
n PENALTY U.B.C.
SEC.303(a)
OWATER/SEWER FEES
TOTAL l�< 7�
� �aR.. •,c i_:,: .. .,,.,-. PERMIT VALIDATION ,
WHEN PROPERLY VALIDATED (IN THIS SPACE)THIS IS YOUR PERMIT&RECEIPT
SEP 19 LOOi PAID CRn BY
C 11'y 0 i"A IR U'."� Q'Jib"J 5'�'4'
cc:ASSESSOR.APPLICANT,TREASURER,BLDG.DEPT. B ING ICIAL DATE
REAORDS COPY