HomeMy WebLinkAbout20702 CIRCLE BLUFF DR_014777_2026 -INSPECTION4777
REPORT /a �1,9
Permit No.: Lot #: `
C' Address:
• •
� Z Contractor:
O Owner:
4IN G� Date:
�4,APPROVAL ❑ PARTIAL APPROVAL
❑ VIOLATION ❑ CORRECTION REQUESTED
❑ Corrections listed below MUST BE MADE before work can be approved.
❑ Please contact inspector.
❑ Was not able to perform inspection.
❑ CALL 435-0674 FOR RE-INSPECTION - 24 hour notice required.
09, -Z ,��1Lr
Inspector: J Date: C 7
TYPE OF INSPECTION REQUESTED
❑ Under-floor ❑ Framing ❑ Gas Piping
❑ Footing ❑ Drywall, Nailing ❑ Consultation
❑ Foundation ❑ Shear Nailing ❑ Groundwork
❑ Mechanical ❑ Grid '*NA❑ Struct. Slab
ElWood Stove ❑ Rough-in Final
❑ Masonry ❑ Drainage ❑ Insulation
❑ Other:
INSPECTION REPOR"
/ 1NGr 47,.*- -Permit No.: /- Lot #: _
¢ O
Q Address: I-W70kZZ o
� Z Contractor:
��` b�
O Owner: �1 ?
IIIN G� Date:
❑ APPROVAL ❑ PARTIAL APPROVAL
❑ VIOLATION CORRECTION REQUESTED
Corrections listed below MUST BE MADE before work can be approved.
J Please contact inspector.
❑ Was not able to perform inspection.
-.a CALL 435-0674 FOR RE-INSPECTION - 24 hour notice required.
Jim C %-YS/.�., tt� n ear �Tl•-�F�1"n�iv�..%)
I--�F/A F i-i 4 77- J
n
r17 C.
Cam' �. '� iiY� �• �,v �� Y .:�.nt�:
=t c S i v.
t T1 1L
Li 11 L zC; v a^
Inspector: �� � Date: Z- z
TYPE OF INSPECTION REQUESTED
❑ Under-floor ❑ Framing ❑ Gas Piping
❑ Footing ❑ Drywall, Nailing ❑ Consultation
❑ Foundation ❑ Shear Nailing ❑ Groundwork
❑ Mechanical ❑ Grid ❑ Struct. Slab
❑ Wood Stove ❑ Rough-in al
❑ Masonry ❑ Drainage ❑ Insulation
❑ Other:
INSPECTION REPORT
IN G 4y Z/7 7 7 Lot ##: 15?' Permit No.:
T 0� Address 7O�
Contractor:
O Owner:
q`f j�INGS Date: ���d7 ✓
❑ APPROVAL ❑ PARTIAL APPROVAL
❑ VIOLATION ❑ CORRECTION REQUESTED
❑ Corrections listed below MUST BE MADE before work can be approved.
❑ Please contact inspector.
❑ Was not able to perform inspection.
❑ CALL 435-0674 FOR RE-INSPECTION - 24 hour notice required.
�EYY� .A7 /L1� r7 t GZ k- I' C_/ -37'-¢g77c
by i 74 3 7 ai C A'l�/t: � t4 7
Inspector: s - Date: Z 7 0�
TYPE OF INSPECTION REQUESTED
❑ Under-floor ❑ Framing ❑ Gas Piping
❑ Footing ❑ Drywall, Nailing ❑ Consultation
❑ Foundation ❑ Shear Nailing ❑ Groundwork
❑ Mechanical ❑ Grid ❑ Struct. Slab
❑ Wood Stove ❑ Rough-in I
❑ Masonry ❑ Drainage ❑ Insulation
❑ Other:
INSPECTION REPORT
- (ZZ70 l
1�G?' Permit No.: 1 ` Lot#:
ti
Q' O� Address:
Contractor: — C
O Owner:
j N G Date:Did,
APPROVAL ❑ PARTIAL APPROVAL
❑ VIOLATION ❑ CORRECTION REQUESTED
❑ Corrections listed below MUST BE MADE before work can be approved.
❑ Please contact inspector.
❑ Was not able to perform inspection.
❑ CALL 435-0674 FOR RE-INSPECTION - 24 hour notice required.
Inspector: '` Date: iz
TYPE OF INSPECTION REQUESTED
❑ Under-floor ❑ Framing ❑ Gas Piping
❑ Footing *-Qrywall, Nailing ❑ Consultation
❑ Foundation ❑ Shear Nailing ❑ Groundwork
❑ Mechanical ❑ Grid ❑ Struct. Slab
❑ Wood Stove ❑ Rough-in ❑ Final
❑ Masonry ❑ Drainage ❑ Insulation
❑ Other:
INSPECTION° REPORT
ti1N G?' Permit No.: llI_J 1711 Lot
) lT
4' Address: �v� (2 G&
Z Contractor: 117-71
O Owner:
NO� Date: /��.X
4 APPROVAL ❑ PARTIAL APPROVAL
❑ VIOLATION ❑ CORRECTION REQUESTED
❑ Corrections listed below MUST BE MADE before work can be approved.
❑ Please contact inspector.
❑ Was not able to perform inspection.
❑ CALL 435-0674 FOR RE-INSPECTION - 24 hour notice required.
Inspector: c �- Date: z-
TYPE OF INSPECTION REQUESTED
❑ Under-floor ❑ Framing ❑ Gas Piping
\l -Eooting ❑ Drywall, Nailing ❑ Consultation
�0 Foundation ❑ Shear Nailing ❑ Groundwork
❑ Mechanical ❑ Grid ❑ Struct. Slab
0 Wood Stove ❑ Rough-in ❑ Final
0 Masonry ❑ Drainage ❑ Insulation
❑ Other:
INSPECTION REPORT -7' S)
4y1N G l0 Permit No.: -6 t'q77 7 Lot#:
Address:
Z Contractor:
O Owner:
9s4 j N G� Date: —�
❑ APPROVAL PARTIAL APPROVAL
❑ VIOLATION CORRECTION REQUESTED
❑ Corrections listed below MUST BE MADE before work can be approved.
❑ Please contact inspector.
❑ pas not able to perform inspection.
L)2"\ALL 435-0674 FOR RE-INSPECTION - 24 hour notice required.
p �9.1—ice
ex-
Inspector: Date:
TYPE OF INSPECTION REQUESTED
❑ Under-floor ❑ Framing ❑ Gas Piping
❑ Footing rywall, Nailing El Consultation
❑ Foundation Shear Nailing ❑ Groundwork
❑ Mechanical ❑ Grid ❑ Struct. Slab
❑ Wood Stove ❑ Rough-in ❑ Final
❑ Masonry ❑ Drainage ❑ Insulation
❑ Other:
INSPECTION REPORT
41,ZN G 7'� Permit No.: /"417 Lot#: lS
Q Address:
Contractor:
O 9s� Owner:j N G� Date:
___9
❑ APPROVAL ® PARTIAL APPROVAL
❑ VIOLATION CORRECTION REQUESTED
❑ Corrections listed below MUST BE MADE before work can be approved.
❑ Please contact inspector.
❑ Was not able to perform inspection.
*CALl_435-0674 FOR RE-INSPECTION - 24 hour notice required.
Inspector: Date: /o Z 31 vjz,�-,
TYPE OF INSPECTION REQUESTED
❑ Under-floor ❑ Framing ❑ Gas Piping
❑ Footing �all, Nailing ❑ Consultation
❑ Foundation `0 Shear Nailing ❑ Groundwork
❑ Mechanical ❑ Grid ❑ Struct. Slab
❑ Wood Stove ❑ Rough-in ❑ Final
❑ Masonry ❑ Drainage ❑ Insulation
❑ Other:
INSPECTION�REPO�RT
>�
4ti1N 0 r0 Permit N `. Lot #: ..Q
F' Address: CZDLL C
Contractor:
• [ 4 - Ho
� �
O Owner: I /�
ING( Date:
—APPROVAL ❑ PARTIAL APPROVAL
❑ VIOLATION ❑ CORRECTION REQUESTED
❑ Corrections listed below MUST BE MADE before work can be approved.
❑ Please contact inspector.
❑ Was not able to perform inspection.
❑ CALL 435-0674 FOR RE-INSPECTION - 24 hour notice required.
_ / 9
(.
�r
Inspector: Date:
-tYPE OF INSPECTION REQUESTED
❑ Under-floor ;0--Framing ❑ Gas Piping
❑ Footing ❑ Drywall, Nailing ❑ Consultation
❑ Foundation ❑ Shear Nailing ❑ Groundwork
❑ Mechanical ❑ Grid ❑ Struct. Slab
❑ Wood Stove ❑ Rough-in ❑ Final
❑ Masonry ❑ Drainage Insulation
❑ Other:
INSPECTION REPORT g• 7'4*t
VV'
ICI G � 45
41,1 ?' Permit No.: Lot #•
Q" O� Address: 07� � /
ZContractor: 14 e.
O Owner:
9`r'qI N C'� Date:
❑ APPROVAL ❑ PARTIAL APPROVAL
❑ VIOLATION ,CORRECTION REQUESTED
❑ Corrections listed below MUST BE MADE before work can be approved.
❑ Please contact inspector.
❑ Was not able to perform inspection.
❑ CALL 435-0674 FOR RE-INSPECTION - 24 hour notice required.
Inspector: Date:
YPE OF INSO ECTION REQUESTED
❑ Under-floor -- Framing ❑ Gas Piping
❑ Footing Drywall, Nailing ❑ Consultation
❑ Foundation ❑ Shear Nailing ❑ Groundwork
❑ Mechanical ❑ Grid ❑ Struct. Slab
❑ Wood Stove ❑ Rough-in ❑ Final
❑ Masonry ❑ Drainage ❑ Insulation
❑ Other:
INSPECTION REPORT
/ 71 15
ti1N TO Permit No.: L9 � ` Lot #•
Q" Address: r4O 70,;�-
•
Contractor:
�O Owner:
Al N C' Date:
❑ APPROVAL m PARTIAL APPROVAL
❑ VIOLATION CORRECTION REQUESTED
,Uj Corrections listed below MUST BE MADE before work can be approved.
❑ Please contact inspector.
❑ Was not able to perform inspection.
❑ CALL 435-0674 FOR RE-INSPECTION - 24 hour notice required.
4 _� ✓�rr..,s
Inspector: r Date:
TYPE OF INSPECTION REQUESTED
❑ Under-floor Framing ❑ Gas Piping
❑ Footing ❑ Drywall, Nailing ❑ Consultation
❑ Foundation ❑ Shear Nailing ❑ Groundwork
❑ Mechanical ❑ Grid ❑ Struct. Slab
❑ Wood Stove ❑ Rough-in ❑ Final
❑ Masonry ❑ Drainage ❑ Insulation
❑ Other:
INSPECTION REPORT
4ti1N G rO Permit No.:6 �77 Lot#: _
Q' Address: �0701 G
Z Contractor:
Owner:
Date:
❑ APPROVAL PARTIAL APPROVAL
❑ VIOLATION CORRECTION REQUESTED
❑ Corrections listed below MUST BE MADE before work can be approved.
❑ Please contact inspector.
❑ Was not able to perform inspection.
❑ CALL 435-0674 FOR RE-INSPECTION -24 hour notice required.
. 7 I
r
Inspector: I W Date:
TYPE OF INSPECTION REQUESTED
❑ Under-floor gaming ❑ Gas Piping
❑ Footing ❑ Drywall, Nailing ❑ Consultation
❑ Foundation ❑ Shear Nailing ❑ Groundwork
❑ Mechanical ❑ Grid ❑ Struct. Slab
❑ Wood Stove ❑ Rough-in ❑ Final
❑ Masonry ❑ Drainage Insulation
❑ Other:
INSPECTION REPORT
G?'O Permit No.: a L7 � Lot #:
4
Q Address: 67( �
Z Contractor:
O Owner:
Date: —� "G)_
❑ APPROVAL ❑ PARTIAL APPROVAL
❑ VIOLATION ❑ CORRECTION REQUESTED
❑ Corrections listed below MUST BE MADE before work can be approved.
❑ Please contact inspector.
❑ Was not able to perform inspection.
❑ CALL 435-0674 FOR RE-INSPECTION - 24 hour notice required.
Q
Inspector: Date:
TYPE OF INSPECTION REQUESTED
❑ Under-floor Framing ❑ Gas Piping
❑ Footing ❑ Drywall, Nailing ❑ Consultation
❑ Foundation ❑ Shear Nailing ❑ Groundwork
x1oMechanical ❑ Grid ❑ Struct. Slab
❑ Wood Stove ❑ Rough-in ❑ Final
❑ Masonry ❑ Drainage ❑ Insulation
❑ Other:
W INSPECTION REPORT
U4,4�� o
Permit No.0/ - q Lot#:
Address: 0-7 dContractor:Owner:
Date:
❑ APPROVAL ❑ PARTIAL APPROVAL
❑ VIOLATION t1 CORRECTION REQUESTED
❑ Corrections listed below MUST BE MADE before work can be approved.
❑ Please contact inspector.
❑ Was not able to perform inspection.
❑ CALL 435-0674 FOR RE-INSPECTION -24 hour notice required.
GAS
Inspector:
i' Date:
TYPE OF INSPECTION REQUESTED
❑ Under-floor raming ElGas Piping
❑ Footing tl-FDrywall, Nailing ❑ Consultation
❑ Foundation ❑ Shear Nailing ❑ Groundwork
❑ Mechanical ❑ Grid ❑ Struct. Slab
❑ Wood Stove ❑ Rough-in ❑ Final
❑ Masonry ❑ Drainage )�Insulation
ElOther:
INSPECTION REPORT- W-
tN G?'O Permit No.: 0/- y777 Lot #:
Address: Q2D� C b
Z Contractor: -
O Owner:
ma`s IN C'� Date:
❑ APPROVAL ❑ PARTIAL APPROVAL
❑ VIOLATION ❑ CORRECTION REQUESTED
❑ Corrections listed below MUST BE MADE before work can be approved.
❑ Please contact inspector.
❑ Was not able to perform inspection.
❑ CALL 435-0674 FOR RE-INSPECTION - 24 hour notice required.
r
Inspector:
Date:
TYPE OF INSPECTION REQUESTED
❑ Under-floor ❑ Framing ❑ Gas Piping
❑ Footing ❑ Drywall, Nailing ❑ Consultation
❑ Foundation ❑ Shear Nailing ❑ Groundwork
Mechanical ❑ Grid ❑ Struct. Slab
❑ Wood Stove ❑ Rough-in ❑ Final
❑ Masonry ❑ Drainage ❑ Insulation
❑ Other:
INSPECTION REPORT jfM
¢titN G TO Permit No.: 0l-1-17 77 Lot #:
Address:
Z Contractor:
O Owner:
9`r'6ING� Date:
❑ APPROVAL ❑ PARTIAL APPROVAL
❑ VIOLATION CORRECTION REQUESTED
❑ Corrections listed below MUST BE MADE before work can be approved.
❑ Please contact inspector.
❑ Was not able to perform inspection.
❑ CALL 435-0674 FOR RE-INSPECTION - 24 hour notice required.
I _r�� uvt s u
Inspector: Date:
TYPE OF INSPECTION REQUESTED
❑ Under-floor ❑ Framing ❑ Gas Piping
❑ Footing ❑ Drywall, Nailing ❑ Consultation
❑ Foundation ❑ Shear Nailing ❑ Groundwork
Mechanical ❑ Grid ❑ Struct. Slab
❑ Wood Stove Rough-in ❑ Final
❑ Masonry Drainage ❑ Insulation
❑ Other:
INSPECTION REPORT
ti1N G J,, Permit No.: / /7 Lot #:
Address:
Contractor:
ems, �O Owner:
la NO Date:
.APPROVAL ❑ PARTIAL APPROVAL
❑ VIOLATION ❑ CORRECTION REQUESTED
❑ Corrections listed below MUST BE MADE before work can be approved.
❑ Please contact inspector.
❑ Was not able to perform inspection.
❑ CALL 435-0674 FOR RE-INSPECTION - 24 hour notice required.
Inspector: �' 1 ,
Date:/, `
TYPE OF INSPECTION REQUESTED
❑ Under-floor ❑ Framing Gas Piping
❑ Footing ❑ Drywall, Nailing 11 Consultation
❑ Foundation ❑ Shear Nailing ❑ Groundwork
❑ Mechanical ❑ Grid ❑ Struct. Slab
❑ Wood Stove ❑ Rough-in ❑ Final
❑ Masonry ❑ Drainage ❑ Insulation
❑ Other:
INSPECTION REPORT
N G T Permit No.: i 77 7Lot #:
Q Address: c9-07C)X rJ�
Z Contractor: Iu
O Owner: l,(,Si
IN G� Date:
PPROVAL ❑ PARTIAL APPROVAL
❑ VIOLATION ❑ CORRECTION REQUESTED
❑ Corrections listed below MUST BE MADE before work can be approved.
❑ Please contact inspector.
❑ Was not able to perform inspection.
❑ CALL 435-0674 FOR RE-INSPECTION -24 hour notice required.
Inspector: Date:
oz
,OiY
PE OF SPECTION REQUESTED
❑ Under-floor ❑ Framing ❑ Gas Piping
❑ Footing ❑ Drywall, Nailing ❑ Consultation
❑ Foundation ❑ Shear Nailing ❑ Groundwork
❑ Mechanical ❑ Grid ❑ Struct. Slab
❑ Wood Stove Rough-in ❑ Final
❑ Masonry ❑ Drainage ❑ Insulation
❑ Other:
INSPECTION REPORT
ti1N G rO Permit No.: 477 7 Lot#: ` S
4
Address: 0p�
Contractor:
O Owner:
�s'qrNG� Date:
APPROVAL ❑ PARTIAL APPROVAL
❑ VIOLATION ❑ CORRECTION REQUESTED
❑ Corrections listed below MUST BE MADE before work can be approved
❑ Please contact inspector.
❑ Was not able to perform inspection.
❑ CALL 435-0674 FOR RE-INSPECTION - 24 hour notice required.
Inspector: Dat
,fYPE OF INSPECTION REQUESTED
❑ Under-floor ❑ Framing ❑ Gas Piping
❑ Footing ❑ Drywall, Nailing ❑ Consultation
❑ Foundation Shear Nailing ❑ Groundwork
❑ Mechanical ❑ Grid ❑ Struct. Slab
❑ Wood Stove ❑ Rough-in ❑ Final
❑ Masonry ❑ Drainage ❑ Insulation
❑ Other:
INSPECTION REPORT
ti1N G l0 Permit No.: 77 Lot#:
Q Address:
Z Contractor:
O Owner:
9`r I N G( Date:
❑ APPROVAL ❑ PARTIAL APPROVAL
❑ VIOLATION Y CORRECTION REQUESTED
Corrections listed below MUST BE MADE before work can be approved
❑ Please contact inspector.
❑ Was not able to perform inspection.
❑ CALL 435-0674 FOR RE-INSPECTION - 24 hour notice required.
Inspector: Date: > 3 -
YPE OF INSPECTION REQUESTED
❑ Under-floor ❑ Framing ❑ Gas Piping
❑ Footing ❑ Drywall, Nailing ❑ Consultation
❑ Foundation A
Shear Nailing ElGroundwork
ElMechanical ❑ Grid ❑ Struct. Slab
❑ Wood Stove ❑ Rough-in ❑ Final
❑ Masonry ❑ Drainage ❑ Insulation
❑ Other:
INSPECTION REPORT
ING 177 !S
t. Permit No.: Lot
Q" Address: 7On-
s s
Z Contractor:
O Owner:
G
SHIN `� Date:
❑ APPROVAL PLPARTIAL APPROVAL
❑ VIOLATION ❑ CORRECTION REQUESTED
❑ Corrections listed below MUST BE MADE before work can be approved
❑ Please contact inspector.
❑ Was not able to perform inspection.
❑ CALL 435-0674 FOR RE-INSPECTION - 24 hour notice required.
�i
Inspector.
YPE OF INSPECTION REQUESTED
❑ Under-floor ❑ Framing ❑ Gas Piping
❑ Footing ❑ Drywall, Nailing ❑ Consultation
❑ Foundation Shear Nailing ❑ Groundwork
❑ Mechanical ❑ Grid ❑ Struct. Slab
❑ Wood Stove ❑ Rough-in ❑ Final
❑ Masonry ❑ Drainage ❑ Insulation
❑ Other:
INSPECTION REPORT
NG
¢tit �'0 Permit No.: 24777 Lot #: / .
F' Address: 7
Contractor: 2L
,SO owner:
�IN� Date:
APPROVAL ❑ PARTIAL APPROVAL
❑ VIOLATION ❑ CORRECTION REQUESTED
❑ Corrections listed below MUST BE MADE before work can be approved.
❑ Please contact inspector.
❑ Was not able to perform inspection.
❑ CALL 435-0674 FOR RE-INSPECTION - 24 hour notice required.
Inspector: Date:
YPE OF INSPECTION REQUESTED
Under-floor ❑ Framing ❑ Gas Piping
Footing ❑ Drywall, Nailing ❑ Consultation
❑ Foundation ❑ Shear Nailing ❑ Groundwork
❑ Mechanical ❑ Grid ❑ Struct. Slab
❑ Wood Stove ❑ Rough-in ❑ Final
❑ Masonry ❑ Drainage ❑ Insulation
❑ Other: -
INSPECTION REPORT
4�1N G To Permit No.: 47 7 Lot #.
F' Address:
Z Contractor: /`
O Owner:
93,4IN G� Date: ��
❑ APPROVAL ❑ PARTIAL APPROVAL
❑ VIOLATION ❑ CORRECTION REQUESTED
❑ Corrections listed below MUST BE MADE before work can be approved
❑ Please contact inspector.
❑ Was not able to perform inspection.
❑ CALL 435-0674 FOR RE-INSPECTION -24 hour notice required.
Inspector: Date:��
YPE OF INSPECTION REQUESTED
Under-floor ❑ Framing ❑ Gas Piping
❑ Footing ❑ Drywall, Nailing ❑ Consultation
❑ Foundation ❑ Shear Nailing ❑ Groundwork
❑ Mechanical ❑ Grid ❑ Struct. Slab
❑ Wood Stove ❑ Rough-in ❑ Final
❑ Masonry ❑ Drainage ❑ Insulation
❑ Other:
IPA
INSPECTION REPORT
titN G T Permit No.: " r -4` 1 7 Lot #: 15
Address: D 7�� b
e •
Z Contractor: S r
93, ,SO Owner:
ING Date:
APPROVAL ❑ PARTIAL APPROVAL
❑ VIOLATION ❑ CORRECTION REQUESTED
❑ Corrections listed below MUST BE MADE before work can be approved
❑ Please contact inspector.
❑ Was not able to perform inspection.
❑ CALL 435-0674 FOR RE-INSPECTION - 24 hour notice required.
L —
Inspector: Date:
PE OF INSP TION REQUESTED
❑ Under-floor ❑ Framing ❑ Gas Piping
❑ Footing ❑ Drywall, Nailing ❑ Consultation
❑ Foundation ❑ Shear Nailing ❑ Groundwork
❑ Mechanical ❑ Grid ❑ Struct. Slab
❑ Wood Stove ❑ Rough-in ❑ Final
❑ Masonry Drainage ❑ Insulation
❑ Other:
nn INSPECTION REPORT
UV\ J /
ti1N G?'O Permit No.: q777 Lot#: 6
Q Address: blz #
• s
OContractor: ✓� e_
Owner:
ZINC' Date: l -oj-O�--
9f�PPROVAL ❑ PARTIAL APPROVAL
❑ VIOLATION ❑ CORRECTION REQUESTED
❑ Corrections listed below MUST BE MADE before work can be approved.
❑ Please contact inspector.
❑ Was not able to perform inspection.
❑ CALL 435-0674 FOR RE-INSPECTION - 24 hour notice required.
Inspector: sA Date: .�
PE OF INSPECTION REQUESTED
❑ Under-floor ❑ Framing ❑ Gas Piping
❑ Footing ❑ Drywall, Nailing ❑ Consultation
Foundation ❑ Shear Nailing ❑ Groundwork
Mechanical ❑ Grid ❑ Struct. Slab
❑ Wood Stove ❑ Rough-in ❑ Final
❑ Masonry ❑ Drainage ❑ Insulation
❑ Other:
'NSPECTION REPORT
y1N G r0 Permit No.: Z / ` Lot
Q" Address:
Contractor:
O Owner:
9s�i N G� Date:
❑ APPROVAL ❑ PARTIAL APPROVAL
❑ VIOLATION 000RRECTION REQUESTED
❑ Corrections listed below MUST BE MADE before work can be approved.
❑ Please contact inspector.
❑ Was not able to perform inspection.
❑ CALL 435-0674 FOR RE-INSPECTION - 24 hour notice required.
,8L
Inspector: Date:
PE OF INSPECTION REQUESTED
Under-floor ❑ Framing ❑ Gas Piping
Footing ❑ Drywall, Nailing ❑ Consultation
❑ Foundation ❑ Shear Nailing ❑ Groundwork
❑ Mechanical ❑ Grid ❑ Struct. Slab
❑ Wood Stove ❑ Rough-in ❑ Final
❑ Masonry ❑ Drainage ❑ Insulation
❑ Other:
k INSPECTION REPORT
1T Permit No.: 7777 Lot#: `�14G
Address: r-1-67Odt L1t�GL;Contractor: y5irtj �''
T�Owner:
Date: - �Q
❑ APPROVAL ❑ PARTIAL APPROVAL
❑ VIOLATION ❑ CORRECTION REQUESTED
❑ Corrections listed below MUST BE MADE before work can be approved.
❑ Please contact inspector.
❑ Was not able to perform inspection.
❑ CAL -0674 OR RE-INS E TION - 24 hour notice req red.
Inspector: Date: /--/,7—
YPE OF INSPECTION REQUESTED
❑ Under-floor ❑ Framing ❑ Gas Piping
'Footing ❑ Drywall, Nailing ❑ Consultation
❑ Foundation ❑ Shear Nailing ❑ Groundwork
❑ Mechanical ❑ Grid ❑ Struct. Slab
❑ Wood Stove ❑ Rough-in ❑ Final
❑ Masonry ❑ Drainage ❑ Insulation
❑ Other:
C I Tlf OF= GIRL I NGTON
O ONST RUGT I ON FEE R M I T
BERM I Y NO- z O I—4-7-7?
Owner: ARISKiN, S=RGEY/VALENTIN 1415 MAPLE ST EVERE4T 9820i ���-��_`J
Value of Work: $85,000,00 Tax ID: 00915800001500 Phone: 425-���
Describe Work: NEW DUPLEX, ONE UNIT
Proposed Use: SFR-2
Legal Description: THE BLUFF UNIT 15
Job Address: 20702 CIRCLE BLUFF DRIVE
Contractor's Name Type Address License##
GEN 5830 EVERGREEN WAY HOUSIH102ERH
HOUSING HOPE HUGOSH080F8
HUS03S HEATING MEC 913 N OLCKY PL.
WOLFS PLUMBING INC. PLB 12924 OLD SI�OHtO�IISf-i!�O�dROE Hsi WO'tFEF'I033G.;
P E R M I T F E E S
Equipment and Fixtures Number Fee Total Charge
____ ___ ___ -------- ---
------
' PLUMBING FIXTURES ------ 10 $10.00 8100,00
FURNACE/UNIT HEATER i vs5,00 $15,00
GAS STOVE 1 $11.00 $11.00
j VENTILATION FANS 4 $7.0028.00
DRYER 1 $11.00 $11.00
15.
WATER HEATER 1 315,00 $6.00
GAS PIPING 1-4 OUTLETS 16,0000
S U B T O T A L...... $186.00
TOTALS Fee
Permit Fee $923.50
Equipment $86.00
Fixture $100.00
Mech Permit $24.00
Plan Fee $600.28
Plumb Permit $2 5.00
State fee4,50
SI -
I HAVE
TOTAL FEE..... ............ i�$1,763. 8 AND EXAMINEDTTF.IS�HAT APPLICATIONREAD AND
$595.56 KNOW THE SAME TO BE TRUE AND COR-
RAYMENTS..................
RECT ALL PROVISIONS OF LAWS AND
c _ THIS TYPE OF
TOTAL DUE................ . f1, 167.7E WORiiNWiLLSBEOC�RNLI- WITH WHETHER
SPEC_ =i i; is NO(
DATE RECEIPT #
BU t DI OFFICIAL
r
29 .01 '
SMA�c
pRAi,N
"G
• a
T
1
�7oo�'D?A,�1 ;9 -F4 ro or"JI ORA
.n _- rJ �
ys ...._ . ...._. .. -_ - -.--- ......... -
----------�.`= -------- ---- r...
$':ide-yo-r a `" ? S' side- Yard
:~ tLElJ%3 9� •i
- a
CPCLA
-------+----- ....... 'y� M
I6'
10� pUk) e&6'eMewk
3
V
� a
/� �,S'StcQews lk ens,@�..r
_ AV �ppaon
_O µ',
N
s;a
e NJ
UNIT 15 SCALE:1"=161
THE BLUFF AT ARLINGTON,A CONDOMINIUM NIT 16 S E:V,=16'
SITE ADDRESS: 20 70 Z CIRCLE BLUFF DR. T LUFF AT ARLINGTON A CONDOMINIUM
CITY OF ARLINGTON,WA SITE SS: Zc 7 o'f CIRCLE BLUFF DR.
AFN 200107095007,SNOHOMISH COUNTY CITY OF GTON, A
REP: . HOUSING HOPE PROPERTIES AFN 20010709500 , OMISH COUNTY
SELF HELP HOUSING REP: HOUSING PROPERTIES
5830 EVERGREEN WAY �. SELF H HOU
EVERETT,WA 98203 5830 RGREEN WA
TAX PARCEL#00915800001500 E RETT,WA 98203
IIOUSE PLAN: 4 BDRM;1,322 sq.t't.living space TAX P L#00915800001600
CITY OF ARLINGTON WATER&SEWER IIOUS LAN: 4 BDRM;1,322 sq.ft.living space
CI T OF ARLINGTON WATER&SEWER
CITY OF ARLINGTON
CONSTRUCTION
PERMIT Q j_ g717
Vyyvv®k COMBINATION ❑ BUILD(IINN,G��Q❑ MECHANICAL ❑ PLUMBING ❑ SIGN PERMIT NO.
l Yil YR 1,C
< y & v31H1t1I]3 L�C151Qi1DRE55 1415 Maple Sty CITY Ott, �ZIP98201 PHONE 4���r2�025
AKI, .K Utal.;n ..vurct» Lily PHONE
Jch'9m ArdlitecWre & Plar>rdm 2124 laird Ave, Slzite 200 Seattle, 6,A 98121 20Fr94&-7--)80
MAIL ADDRESS CITY ZIP PHONE LIC NSE0
`fecimcal Assistance Pugh: Housing Hope, Im. 5830 Ew-Lgrtam Way Everett, iA 982M 425-347-i556 FU SIHI028RH
MECHANICAL CONTRACTOR MAIL ADDRESS CITY ZIP PHONE LICENSE N
Hugo's Keating, Inc. 5415 Hippy Hollow lei. stmwood, WA 98292 360--654-9392 HfJ3CSHI00ff B
PLUMBING CONTRACTOR MAIL ADDRESS CITY ZIP PHONE LICENSE N
Wolfe Plurbing, Inc. 12924 Old Sld=sTy"m ru Hwy. snci dsh, 6a 98290 360-568-9653 NDF;PI03_-CJ
CLASS OF WORK
FX]NLW ❑ADDITION ❑ALTERATION ❑REPAIR ❑DEMOLI TION ❑BUILDING RELOCATION
VALUATION OF WORK
r 84,000 X ►6-6, C c'o
DESLRIBE WORK
Okdler/alilder new C'oristi'L>rtign of duglex CLx'Kd. i ni tm 1 rx%1�
PROPOSE D USE OF BUILDING
I HEREBY CERTIFY THAT I HAVE READ AND EXAMINED THIS APPLICA-
2 units CIf Sirrae F'amil n-_sida-ce TION AND KNOW THE SAME TO BE TRUE AND CORRECT ALL PROVI-
r'LLGAL DEEVCRIPI ION Of PROPERTY(SHOWN BELOW OR ATTACH FOUR COPIES) SIONS OF LAWS AND ORDINANCES GOVERNING THIS TYPE OF WORK
at4_15 BLOCK_____L_OF See Attached WILL BE COMPLIED WITH WHETHER SPECIFIED HERIN OR NOT.THE
GRANTING OFA PERMIT DOES NOT PRESUME TO GIVE AUTHORITYTO
cl VIOLATE OR CANCEL THE PROVISIONS OF ANY OTHER STATE OR
TAX ID NUMBER LOCAL LAW REGULATING CONSTRUCTION OFTHE PERFORMANCE OF
See Attad7ed CONSTRUCTION.PERMIT EXPIRES 1 YEAR FROM DATE OF ISSUANCE.
SIGNATURE OF AUTHORIZED AGENT DATE
IOB DDRLSS 7_ /
Lr
(OFFICE USE ONLY)
PLUMBING MECHANICAL
NO. TYPE OF FIXTURE FEE NO, TYPE OF EQUIPMENT FEE
WATER CLOSET (TOILLI) AIR COND.UNITS -H.P. EA.
BA I H I UB REFRIGERATION UNITS-H.P.EA.
LAVATORY (WASH BASIN) BOILERS--Ii.P.EA
SHOWER I GAS FIRED A.C.UNITS-TONNAGE EA.
KI ICIIEN SINK& DISP. FORCED AIR SYSTEMS- B T.U. MEA
DISHWASHER WALL HEATERS- B.T.0 M
LAUNDRY T RAY I UNI1 HEATERS- B.T.U. M
CLOIHLS WASIILR EVAPORAI WE COOLERS
WAIERHEATER CLOTHES DRYERS
URINAL VENTILATION FAN
DRINKING FOUNIAIN RANGE FIOODCOMMERCIAL
FLUOR DRAIN AIR HANDLING UNIT- CPM
VACUUM BREAKERS STOVE
ROOF DRAINS - RAINLEADERS METAL FIREPLACE&CHIMNEY
SINK (SERVICE - BAR,ETC.) WATER HEATER
GAS PIPING
SUBTOTAL f SUBTOTAL f
PERMIT f PERMIT f
TOTALFEE f TOTALFEE I.
SIDE,YARIJ So BACK STRLLI SLTBACK REAR YARD SETBACK PLAN CHECK NUMBER PLAN CHECK,FEE
FF7 ' RECEIPT NO.
USE/ONI LOT-AREA VACANT SITE � 15 C90910
M7 0 J YES ❑NO FEES VALUATION FEE
TYPE OF.CON Sl J OC C PANC / ROUP NO.OF DWELLING UNITS PLAN CHECKING NG I,
$ILE OI BLUG. NO.I
uRILsMAX.OCC.LOAD BU'LDING fORILS
51ZL 01 BLD(,. NO.
'7 PLUMBING
% - FIRE SPRINKLERS REQUIRED �g
�- 3�� ❑YES ❑NO MECHANICAL V 1
COMMEN STATE BLDG.CODE " G
ENERGY CODE SURCHARGE 7
PENALTY
SEC.303(a)
WATERISEWER FEES'
TOTAL
PERMIT VALIDATION
WHEN PROPERLY VALIDATED (IN THIS SPACE)THIS IS YOUR PERMIT&RECEIPT
PAID CR►1 BY
cc: ASSESSOR,APPLICANT,TREASURER,BLDG. DEPT. BUILDING OFFICIAL DATE
RECORDS COPY