HomeMy WebLinkAbout20716 CIRCLE BLUFF DR_024899_2026 INSPECTION REPORT_ 32k
ti1N G?' Permit No.: Lot #:
Q' O� Address: �y 7/6� fi—0
• • Q�� Z Contractor:
O Owner:
Date: „�-
`APPROVAL ❑ PARTIAL APPROVAL
❑ VIOLATION ❑ CORRECTION REQUESTED
❑ Corrections listed below MUST BE MADE before work can be approved.
❑ Please contact inspector.
❑ Was not able to perform inspection.
❑ CALL 435-0674 FOR RE-INSPECTION -24 hour notice required.
Inspector: Date: - 3
ffiPE OF INS ECTION REQUESTED
❑ Under-floor ❑ Framing ❑ Gas Piping
❑ Footing ❑ Drywall, Nailing ❑ Consultation
❑ Foundation ❑ Shear Nailing ❑ Groundwork
❑ Mechanical ❑ Grid ❑ Struct. Slab
❑ Wood Stove ❑ Rough-in nal
❑ Masonry ❑ Drainage ❑ Insulation
❑ Other:
INSPECTION REPORT y�
N G?'O Permit No.: p / Lot #:
4' Address: 0 tv
Contractor:
O Owner:
Date:
❑ APPROVAL ❑ PARTIAL APPROVAL
❑ VIOLATION CORRECTION REQUESTED
G Corrections listed below MUST BE MADE before work can be approved.
0 Please contact inspector.
❑ Was not able to perform inspection.
CALL 435-0674 FOR RE-INSPECTION -24 hour notice required.
IVL L d�-S fA< z�.,L4t Kit�o
r
Inspector: Date: &_4 `C 3
TYPE OF INSPECTION REQUESTED
❑ Under-floor ❑ Framing ❑ Gas Piping
❑ Footing ❑ Drywall, Nailing ❑ Consultation
❑ Foundation ❑ Shear Nailing ❑ Groundwork
❑ Mechanical ❑ Grid ❑ Struct. Slab
El Wood Stove ❑ Rough-in Final
❑ Masonry El Drainage ❑ Insulation
❑ Other:
�n INSPECTION REPORT
Permit No.:�
1N G l - b y� Lot#:
4ti O
F Address: o�7/��
ZContractor: 1 ttr, E'r
ys�I N O,SO Owner:
Date:
APPROVAL ❑ PARTIAL APPROVAL
❑ VIOLATION ❑ CORRECTION REQUESTED
❑ Corrections listed below MUST BE MADE before work can be approved.
❑ Please contact inspector.
❑ Was not able to perform inspection.
❑ CALL 435-0674 FOR RE-INSPECTION - 24 hour notice required.
Inspector:
Date; _ G3
YPE OF I SPECTION REQUESTED
❑ Under-floor ❑ Framing ❑ Gas Piping
❑ Footing Drywall, Nailing ❑ Consultation
❑ Foundation Shear Nailing Cl Groundwork
❑ Mechanical ❑ Grid ❑ Struct. Slab
❑ Wood Stove ❑ Rough-in ❑ Final
❑ Masonry ❑ Drainage ❑ Insulation
❑ Other:
�1 INSPECTION REPorow
tiIN G�' Permit No.: `7` Lot #:
� O
Address: Ll
_ E
� � Contractor:
O Owner:
C'� Date: aZ - J� �'�at
❑ APPROVAL ❑ PARTIAL APPROVAL
❑ VIOLATION rCORRECTION REQUESTED
.Corrections listed below MUST BE MADE before work can be approved.
❑ Please contact inspector.
❑ Was not able to perform inspection.
Ca-C6LL 435-0674 FOR RE-INSPECTION - 24 hour notice required.
-T
Inspector: Date: 7 L
TYPE OF INSPECTION REQUESTED
❑ Under-floor ❑ Framing ❑ Gas Piping
❑ Footing N,
Drywall, Nailing ❑ Consultation
❑ Foundation ❑ Shear Nailing ❑ Groundwork
❑ Mechanical ❑ Grid ❑ Struct. Slab
❑ Wood Stove ❑ Rough-in ❑ Final
❑ Masonry ❑ Drainage ❑ Insulation
❑ Other:
�1 INSPECTION REPORT
4ti1N G I'O Permit No.: o Z 44 89 9 Lot #: Z-Z-
F' Address: 2-,zZ 1 � L6 0
Z Contractor:
Owner:
IN C Date: j z.�, Z / C.v
APPROVAL ❑ PARTIAL APPROVAL
❑ VIOLATION ❑ CORRECTION REQUESTED
❑ Corrections listed below MUST BE MADE before work can be approved.
❑ Please contact inspector.
❑ Was not able to perform inspection.
❑ CALL 435-0674 FOR RE-INSPECTION -24 hour notice required.
Inspector: c-a--tr Date: 2--I/ Z-/a z�
TYPE OF INSPECTION REQUESTED
❑ Under-floor ?__XFraming ❑ Gas Piping
❑ Footing ❑ Drywall, Nailing ❑ Consultation
❑ Foundation ❑ Shear Nailing ❑ Groundwork
❑ Mechanical ❑ Grid ❑ Struct. Slab
❑ Wood Stove ❑ Rough-in ❑ Final
❑ Masonry ❑ Drainage §klnsulation
❑ Other:
INSPECTION^�REPORT
IN GT Permit No. Lot#:
F Address: r, f LO
Contractor: H- 1 g-_-
O Owner:
Date: 0"C:�'d Q
❑ APPROVAL O PARTIAL APPROVAL
❑ VIOLATION CORRECTION REQUESTED
*orrections listed below MUST BE MADE before work can be approved.
❑ Please contact inspector.
❑ Was not able to perform inspection.
CALL 435-0674 FOR RE-INSPECTION - 24 hour notice required.
14 it i
4
i'L /3 y P s rx}ys�
Inspector: �ac,o Date:
TYPE OF INSPECTION REQUESTED
❑ Under-floor Framing ❑ Gas Piping
❑ Footing ❑ Drywall, Nailing ❑ Consultation
❑ Foundation ❑ Shear Nailing ❑ Groundwork
❑ Mechanical ❑ Grid ❑ Struct. Slab
❑ Wood Stove ❑ Rough-in ❑ Final
❑ Masonry ❑ Drainage ❑ Insulation
❑ Other:
INSPECTION REPORT
41,IN G P Permit No.: -aM Lot #:
O�
Q' Address C)-. I L�
Z Contractor: t� +
O Owner:
9s11
O j N G� Date:
APPROVAL ❑ PARTIAL APPROVAL
❑ VIOLATION ❑ CORRECTION REQUESTED
❑ Corrections listed below MUST BE MADE before work can be approved.
❑ Please contact inspector.
❑ Was not able to perform inspection.
❑ CALL 435-0674 FOR RE-INSPECTION -24 hour notice required.
Inspector: 'T Date:
TYPE OF INSPECTION REQUESTED
❑ Under-floor ❑ Framing Gas Piping
❑ Footing ❑ Drywall, Nailing ` ❑ Consultation
❑ Foundation ❑ Shear Nailing ❑ Groundwork
❑ Mechanical ❑ Grid ❑ Struct. Slab
❑ Wood Stove ❑ Rough-in ❑ Final
❑ Masonry ❑ Drainage ❑ Insulation
❑ Other:_
INSPECTION REPORT
4tiZN G TD Permit No.: 44 99q Lot#:
F' Address: a0, I La
Z Contractor:
O Owner:
I N GN Date:
A NPPROVAL ❑ PARTIAL APPROVAL
❑ VIOLATION ❑ CORRECTION REQUESTED
❑ Corrections listed below MUST BE MADE before work can be approved.
❑ Please contact inspector.
❑ Was not able to perform inspection.
❑ CALL 435-0674 FOR RE-INSPECTION - 24 hour notice required.
Inspector: c.f, // Date: // / o Z--
TYPE OF INSPECTION REQUESTED
❑ Under-floor ❑ Framing ❑ Gas Piping
❑ Footing ❑ Drywall, Nailing ❑ Consultation
❑ Foundation ❑ Shear Nailing ❑ Groundwork
)TIMechanical ❑ Grid ❑ Struct. Slab
:1 Wood Stove ❑ Rough-in ❑ Final
❑ Masonry ❑ Drainage ❑ Insulation
❑ Other:
INSPECTION REPORT j
N G TO Permit No.: 0;'4 O/ 1 Lot#: ZZ
Q' Address: 7 J LO
Contractor:
O Owner:
s�
G IN Date: rQ9.
❑ APPROVAL ❑ PARTIAL APPROVAL
❑ VIOLATION O�CORRECTION REQUESTED
❑ Corrections listed below MUST BE MADE before work can be approved.
❑ Please contact inspector.
❑ Was not able to perform inspection.
❑ CALL 435-0674 FOR RE-INSPECTION -24 hour notice required.
Inspector: Date: 3 ��
TYPE OF INSPECTION REQUESTED
❑ Under-floor ❑ Framing ❑ Gas Piping
❑ Footing ❑ Drywall, Nailing ❑ Consultation
❑ Foundation ❑ Shear Nailing ❑ Groundwork
mechanical ❑ Grid ❑ Struct. Slab
❑ Wood Stove ❑ Rough-in ❑ Final
❑ Masonry ❑ Drainage ❑ Insulation
❑ Other:
INSPECTION REPORT g'6721 ft
¢�.0 G?'O Permit No.a_-�f � Lot#: _
Q' -- Address: G 7 16a e
Contractor:
O Owner:
9s4I N GIN Date:
❑ PARTIAL APPROVAL
g-VAPPROVAL
IOLATION ❑ CORRECTION REQUESTED
❑ Corrections listed below MUST BE MADE before work can be approved.
❑ Please contact inspector.
❑ Was not able to perform inspection.
❑ CALL 435-0674 FOR RE-INSPECTION -24 hour notice required.
Inspector: Date:
TYPE OF INSPECTION REQUESTED
❑ Under-floor ❑ Framing ❑ Gas Piping
❑ Footing ❑ Drywall, Nailing ❑ Consultation
❑ Foundation ❑ Shear Nailing ❑ Groundwork
❑ Mechanical ❑ Grid ❑ Struct. Slab
❑ Wood Stove Rough-in ❑ Final
❑ Masonry J Drainage ❑ Insulation
❑ Other:
INSPECTION REPORT
¢tiZN G l'O Permit No. y� ` Lot
F' Address:
Contractor:
O Owner:
9s�IN G� Date: —
12
❑ APPROVAL ❑ PARTIAL APPROVAL
❑ VIOLATION ❑ CORRECTION REQUESTED
❑ Corrections listed below MUST BE MADE before work can be approved.
❑ Please contact inspector.
❑ Was not able to perform inspection.
❑ CALL 435-0674 FOR RE-INSPECTION - 24 hour notice required.
Inspector: Date:
TYPE OF INSPECTION REQUESTED
❑ Under-floor ❑ Framing ❑ Gas Piping
❑ Footing ❑ Drywall, Nailing ❑ Consultation
❑ Foundation ❑ Shear Nailing ❑ Groundwork
❑ Mechanical ❑ Grid ❑ Struct. Slab
❑ Wood Stove ❑ Rough-in ❑ Final
❑ Masonry ❑ Drainage ❑ Insulation
❑ Other:
INSPECTION REPORT
V' AI � � n
¢titN G 7'0 Permit No.: 4 E� Lot
Q' Address: 1 i^07l l 69
Z
Contractor: / /��
O Owner:
9S'41 N GAS Date:
APPROVAL ❑ PARTIAL APPROVAL
❑ VIOLATION ❑ CORRECTION REQUESTED
❑ Corrections listed below MUST BE MADE before work can be approved.
❑ Please contact inspector.
❑ Was not able to perform inspection.
❑ CALL 435-0674 FOR RE-INSPECTION -24 hour notice required.
IV
Inspector:
Date�_� '' ?�
TYPE OF INSPECTION REQUESTED
❑ Under-floor ❑ Framing ❑ Gas Piping
❑ Footing ❑ Drywall, Nailing ❑ Consultation
❑ Foundation ❑ Shear Nailing ❑ Groundwork
❑ Mechanical ❑ Grid ❑ Struct. Slab
❑ Wood Stove ❑ Rough-in ❑ Final
❑ Masonry L Drainage ❑ Insulation
❑ Other:
INSPECTION REPORT
�}
GG
4ti1N GrO Permit No.: 6 -[�
P �" 0W Lot#:
4" Address: Z7J U G��J
Contractor: 17-"
Owner:
4I N O Date: L—Z3
❑ APPROVAL 4PARTIAL APPROVAL
❑ VIOLATION ❑ CORRECTION REQUESTED
❑ Corrections listed below MUST BE MADE before work can be approved.
❑ Please contact inspector.
❑ Was not able to perform inspection.
❑ CALL 435-0674 FOR RE-INSPECTION - 24 hour notice required.
Inspector: i Date:ZL�_
TYPE OF INSPECTION REQUESTED
❑ Under-floor ❑ Framing ❑ Gas Piping
❑ Footing ❑ Drywall, Nailing ❑ Consultation
❑ Foundation Shear Nailing ❑ Groundwork
❑ Mechanical O Grid ❑ Struct. Slab
❑ Wood Stove ❑ Rough-in ❑ Final
❑ Masonry ❑ Drainage ❑ Insulation
❑ Other:
\nn INSPECTION REPORT
}' 1tigN G T Permit No.: r �f k// Lot #:
� O
Q Address:
• -
� z
Contractor:
-ys, O Owner:
SING Date:
APPROVAL ❑ PARTIAL APPROVAL
❑ VIOLATION ❑ CORRECTION REQUESTED
❑ Corrections listed below MUST BE MADE before work can be approved
❑ Please contact inspector.
❑ Was not able to perform inspection.
❑ CALL 435-0674 FOR RE-INSPECTION - 24 hour notice required.
Inspector: Date: 4�'J - 42�
TYPE OF I 6PECTION REQUESTED
Under-floor ❑ Framing ❑ Gas Piping
❑ Footing ❑ Drywall, Nailing ❑ Consultation
❑ Foundation ❑ Shear Nailing ❑ Groundwork
❑ Mechanical ❑ Grid ❑ Struct. Slab
❑ Wood Stove ❑ Rough-in ❑ Final
❑ Masonry ❑ Drainage ❑ Insulation
❑ Other:
INSPECTION REPORT
Permit No.: ` Lot
Q' Address: 7 1
Contractor: III
Owner:
IqI N G Date:
_ ❑ PARTIAL APPROVAL
0 VIOLATION CORRECTION REQUESTED
,.4—Corrections listed below MUST BE MADE before work can be approved
❑ Please contact inspector.
❑ Was not able to perform inspection.
❑ CALL 435-0674 FOR RE-INSPECTION -24 hour notice required.
�Inspecto�r�
TYPE OF IN�pECTION REQUESTED
Under-floor ❑ Framing ❑ Gas Piping
Footing ❑ Drywall, Nailing ❑ Consultation
❑ Foundation ❑ Shear Nailing ❑ Groundwork
❑ Mechanical ❑ Grid ❑ Struct. Slab
❑ Wood Stove ❑ Rough-in ❑ Final
❑ Masonry ❑ Drainage ❑ Insulation
❑ Other:
INSPECTION REPORT
V o�
4titN G TO Permit No.: llt90 Lot #:
Q' Address Z6 _G ll�
Contractor: -
-�J, ,SO Owner:
4I N O Date:
❑ APPROVAL /0 PARTIAL APPROVAL
❑ VIOLATION ❑ CORRECTION REQUESTED
❑ Corrections listed below MUST BE MADE before work can be approved.
❑ Please contact inspector.
❑ Was not able to perform inspection.
❑ CALL 435-0674 FOR RE-INSPECTION - 24 hour notice required.
Inspector: Date:
TYPE OF INSPECTION REQUESTED
❑ Under-floor ❑ Framing ❑ Gas Piping
❑ Footing ❑ Drywall, Nailing ❑ Consultation
❑ Foundation ❑ Shear Nailing ❑ Groundwork
❑ Mechanical ❑ Grid ❑ Struct. Slab
❑ Wood Stove ❑ Rough-in ❑ Final
❑ Masonry Drainage ❑ Insulation
❑ Other:
INSPECTION REPORT
1;4
?' Permit No.: �- l Lot#:Address:�U 1 (� \c l� 1'r P)l vContractor:
�O Owner:� Date:
❑ APPROVAL ❑ PARTIAL APPROVAL
❑ VIOLATION ❑ CORRECTION REQUESTED
❑ Corrections listed below MUST BE MADE before work can be approved
❑ Please contact inspector.
❑ Was not able to perform inspection.
❑ CALL 435-0674 FOR RE-INSPECTION - 24 hour notice required.
1
Inspector:
Date:
TYPE OF INSPECTION REQUESTED
❑ Under-floor ❑ Framing ❑ Gas Piping
❑ Footing ❑ Drywall, Nailing ❑ Consultation
06�Foundation ❑ Shear Nailing ❑ Groundwork
❑ Mechanical ❑ Grid ❑ Struct. Slab
❑ Wood Stove ❑ Rough-in ❑ Final
❑ Masonry ❑ Drainage ❑ Insulation
❑ Other:
INSPECTION REPORT
¢y1N G?'O Permit No.: �c)-L/101 Lot#: 9�
Q Address: 7
Z Contractor: -
O Owner: �l
9`r�IN O� Date: 1 /' C70<
g�APPROVAL ❑ PARTIAL APPROVAL
❑ VIOLATION ❑ CORRECTION REQUESTED
❑ Corrections listed below MUST BE MADE before work can be approved
❑ Please contact inspector.
❑ Was not able to perform inspection.
❑ CALL 435-0674 FOR RE-INSPECTION - 24 hour notice required.
Inspector: Date:
TYPE OF INSPECTION REQUESTED
❑ Under-floor ❑ Framing ❑ Gas Piping
Tf'Footing ❑ Drywall, Nailing ❑ Consultation
❑ Foundation ❑ Shear Nailing ❑ Groundwork
❑ Mechanical ❑ Grid ❑ Struct. Slab
❑ Wood Stove ❑ Rough-in ❑ Final
❑ Masonry ❑ Drainage ❑ Insulation
❑ Other:
C I T Y OF A R L I N G T U N
C M NS T RUCTION P E R M I T
F31E FRM I T NO- n 02-489 9
Orner: ESPINO, JUAN 824 W CASINO ROAD *C26 EVERETT 98204
Value of Mork: $85, 000. 00 Tax ID: 00915800002200 Phone: 425-513-5562
Describe Work: NEW SINGLE FAMILY RESIDENCE
Proposed Use: SFR
Legal Description: THE BLUFF UNIT 22
Job Address: 20716 CIRCLE BLUFF DRIVE
Contractor's Name Type Address License*
P E R M I T F E E S
Equipment-and-Fixtures----------------- Number --Fee--- Total Charge
------------
--------- ------
PLUMBING FIXTURES 1@ $10. 00
FURNACE/UNIT HEATER 1 $15. 00 $15. 00
VENTILATION FANS 4 $7. 00 $28. 00
WATER HEATER 1 $15. 00 $15. 00
GAS PIPING 1-4 OUTLETS 1 $6. 00 $6. 00
DRYER 1 $11. @0 $11. 00
S U B T O T A L. . . . . . $175. 00
TOTALS Fee
Permit Fee $945. 65
Equipment $75. 00
Fixture $160. 00
Mech Permit $24. 00
Plan Fee $614. 67 �j
Plumb Permit $25. 00
State fee $4. 50
SIGNATURE.
TOTAL FEE. . . . . . . . . . . . . . . . . 01,788.82 I HEREBY CE T A I AVE READ
A EXAMINE THIS APF*LI TION AND
PAYMENTS. . . . . . . . . . . . . . . . . . $614.67 K THE SAME TO BE TRU AND COR-
K C ALL PRO VISI S OF LAWS AND
TOTAL �1E. . . . . . . . . . . . . . . . . $1, 174. 15 O MAN S G VER NG THIS TYPE OF
WI E COM IED WITH WHETHER
FIE EI R NOT.
DATE/ Da' RECEIPT #
(YA,
U I FFI IA
�g 13�U
PAID
MAR 0 5 2002
arm
FAX FROM HOUSING HOPE RibkL
5830 Evergreen way
Everett, WA 98203 C1?k
Fox (425) 353 5546 fjy�r
O/J
Org: c—ni or OFFIGAZ
Fax #: ~
Date: /z O Pages:
Message:
N r-�sr� � �rr�►�. Cr�� r
f�•1 f� �+�Jlo(.� �Q/�l�L`{ � '- � ���� F1T �Nc OFF ���! f�W/�-
rJ.
(` 0', �IEe- t � �C ►1�7 6 Nei �L 'n-r t-. c70
�r
A,_1 &JC1)iYS� tiANC Q�
�lZ
i0 'd 9 SS iSi SZt, AJOH ONIsnOH Wd 9S: V0 20-LZ-NUf
pl/_'3%0a 17:01 .FAA 30O 190E 6132 ELEVATOR SECTION Ia'o0!
STATE OF WASHINGTON
L)FRARTMLN`r OF LABOR AI4D INDUSTRIES
ELEVATOR SECTION
PO Box 44480, OLYMPIA WA 98504-4480
FAX COVER SHEET
I,''YTMWATER CENTRAL OFFICE
FAX # (360) 902-6132 PHONE (360) 902-6130
http://www.l.m'.wa.gov/scs/elevators/
TO-
FAX
I—`._
FROM. Becky Ernstes, Technical Specialist
NUMBER OF PAGES INCLUDING COVER LETTER_ ..
3;r�I.EVATOR�NFwFax��;;,"
Z0 'd 9trSS Si 9Zb 3dOH ONIsnOH Wd 99: b0 £O-.LZ-Nor
01 2,.+ '0.1 17:01 Fat 3Eo -02 m 132 ELEVA'ralt SECTION u(12
ti
6EC7'ION 2141..2101,3c AWE A1'7.1-1111%:
OCCTl0N 2101 same 2101.3 Driving Moan. and Sheav—
PRIVATE RESIDENCE INCLINED The driving moons shall be one of trio following: —
WHEELCHAIR LIFTS (al winding drum
(b) traction
Rule 21011 Runways (c) rope sprocket
2101-1s Free Passage Width. a fres passage width (d) chair sprocket
if not less then 20 in. (308 mm) shall Ilm provided (a) ecr3w
If the pletft)rm can be folded when nut In use, the M rock and pinion
distance will be mssaured from the folded position, (p) direct plunger hydraulic
(n) roped-hydraulic
2101.1b Clearances. Clearances between the plat (0 lever hydraulic
foram and adjacent surfaces shell not be less than If.
in. 110 mm). At no point in its travel shall the edge 2101,3a General Requirements
of the platform facing the upper Iknding be more 11) The factors of safety, based on the static load
than 24 in. (610 mml above a step or landing as (the rated Ived plus the weight of the car, ropes,
measured vertically. counterweights, etc.1, to be used In the design of
2101 1c Pits and Ramp%. A pit, floor-mounted driving machines and sheaves,shall not he leas thani
ramp,or retractable platform-mounted ramp shall be (a) 8 for steel, bronze, or other metals having
provided. Retractable romps shall conform to the an elongation of at least 14% in a !angth of 2 In.
requirements of Rule 2101,6.Where a pit Is provided, (51 mml;
R shall be proteat4d me required by the authority (b) 10 for cast iron or other metal* having an
having jurisdiction. elonaallon of less than 14% in a length of 2 in.
2101,1d Pipes In Runway Vieirity.Pipes conveying (61 mm).
Stearn,gas,or liquid which,if discharged into runway, (if) Set-screw fastenings shell not be used in lieu
would endanger life or health shall not be permitted. of keys or pins If the connection Is subject to torque
or toncion.
2101.1s 6truetursl $appert, The structure an (3) Friction gearing, c!ut.h me0h8ni4ms, or cow-
which the equipment Is installed shall be capable of plines shall not be used to connect the driving ma-
safely oupport►ng the toads Imposed. chine drum or Sheave to the main driving mechanism.
2101.1f Elecirte.al Equipment and Wiring fe) Gearing having cast iron teeth shell not be used. --
(f) The Inbiallatlon of sift-trical equipment and (5) Drlving-machine chains end sprockets shall no
wiring shall conform to the requirements of ANSI! of steel and shall conform to all particulars of design
NFPA 70• and dimensions to the requirement$ of ANSI 020.1
(11 Electrical squiprrant shall be cardfilad to the (6) Wnding drums,traction sheave*,and overhead
requirements of CSA 844.7/A$ME A17.5. and dellecting sheavea shall bo of cast iron or steel,
of a pitch diameter of not less than 30 times the
Role 2161.2 Guide ffalls and Tracks diameter of the suspension ropes,except that where
guide rails shell be of metal oonstrue- 0 " ,t stoat rope or 7 a 18 steel aircraft cable is
(s) Platform
g � used,the pitch diameter of drama and sheaves may
tion Steel construction shall conform to the require- be reduced to 21 times the diameter of the room or
merits of Rule 200.29, Metals other than steel shall cable. The rope grooves shall be machined.
r;onforrx to the requirerttents of Rut* 200.2b, 4uldo-
tail surfaces shell conform to the requirements of 21111.3b Hydraulic Driving Machines. Direct-
Pule 200.6.
(bJ The top er►d bottom ends of each run of guide plunger hydraulic driving machines, where used,
rally shall be an located In a relation to the f guide shall conform to the requirements of Section 302.
tailslaw She of travel c the platform that the platform requirRoped-hydroulic machines shell not conform to the
guiiing members cannot travel beyond the undo of 302.2, 02.3cments of d 302n 304,except for Rules 302.ta,
the guide rails. 302,2, 302.3e, and 302.3g.
14 The stresses and deflactions in the qulde rails 21013c Screw Machines, Screw machines, where
and their brackets shall conform to the requirements used, shall conform to the requirements of Section
rd Rules 200.58 and 200.5b•
(d) The f4mor of safety used in the design of guide 1504'
rails shall be riot less than 5,based on the rated load,
(a) The supporting track* or guide falls ,shall be NOTE lRsls 2101.391: Ratod apa*d shoe not eKveed 30 fV
securely anchored to the stairs, floor murfoos, or min (0,1$m/4),Ovempood shall not eRoead 76"in lo.3a
side wall, alai,
2911
20 'd 911:199 2192 SZIIP 3ddH 91,11 I Sr10H Wd 99: 170 20—LZ-11,110 '
r
CITY OF ARLINGTON
CONSTRUCTION �j G�
PERMIT ), OI
® COMBINATION ❑ BUILDING ❑ MECHANICAL ❑ PLUMBING ❑ SIGN PERMIT NO.
Q�)N R LL JUan PeyEoS C.SpiM MAILADDRESS CITY ZIP PHONE
aria onnyn ara A824 SW Sim Rd'. #C26 Everett bA 91 4 425-513-562; i _ D&IrNER MAIL CITY TIP PHONE
Jot1r> m ArcMtec.Wm & Planni_m 2124 Tlird Aye, g li to 200 Seattle, M 98121 2D5-448-7580
MAIL ADDRESS CITY ZIP PHONE UC UNSE/
Z8dnical Assistmm Agent: Ib rdM Hope, Inc. 5830 Evergmm Y+#3y Evemtt, 4A 98203 425-347-6556 HIERHO28RH
MECHANICAL CONTRACTOR MAIL ADDRESS CITY ZIP PHONE LICENSE /
flW's Heating, Inc. 5415 Happy aAlcw pd. Stmwood, WA 98292 360-6547-9392 HOEIIOOff-B
PLUMBING CONTRACTOR MAIL ADDRESS CITY ZIP PHONE LICENSE/
W3 fe Plullii ng, Inc. 12924 Old 3 ot)a[dsh41 nrce Hwy. 3rlAaldsh, 6k 98M 360-568-%53 IDCFEPI0333i
CLASS OF WORK
R]NLW ❑AUDITION ❑ALTERATION Cl REPAIR ❑DEMOLITION ❑BUILDING RELOCATION
VALUAI ION OF WORK
) 8s 06C)
DLS,LRI E WORK
04)er TAw OxEtmctigA CIE
PRUPOSE U USE OF BUILDING
I HEREBY CERTIFY THAT I HAVE READ AND EXAMINED THIS APPLICA-
2 (,Ails elf II E�I TION AND KNOW THE SAME TO BE TRUE AND CORRECT ALL PROVI-
LLC..�LUESCRIPIIUNUI PROPELRTRT ResiY(StfOWN BELOW UR ATTACH FOUR COPIES) SIONS OF LAWS AND ORDINANCES GOVERNING THIS TYPE OF WORK
LUI BLUCK OF S' Attachad WILL BE COMPLIED WITH WHETHER SPECIFIED HERIN OR NOT.THE
GRANTING OF A PERMIT DOES NOT PRESUME TO GIVE AUTHORITY TO
VIOLATE OR CANCEL THE PROVISIONS OF ANY OTHER STATE OR
TAX ID NUMBER LOCAL LAW REGULATING CONSTRUCTION OFTHE PERFORMANCE OF
See Attacl>e5 CONSTRUCTION.PERMIT EXPIRES 1 YEAR FROM DATE OF ISSUANCE.
)OB AUURLSS
SIGNATURE OF AUTHOR)ZEDAGENT DATE
(OFFICE USE ONLY)
PLUMBING MECHANICAL
NO. TYPE OF FIXTURE FEE NO. TYPE OF EQUIPMENT FEE
WATER CLOSET (TOILLI) AIR COND.UNITS -H.P.EA.
BA I III UB REFRIGERATION UNITS-H.P.EA.
LAVATURY (WASH BASIN) BOILERS-H.P.EA
SHOWLR GAS FIRED A.C.UNITS-TONNAGE EA.
KI ICI ILN SINK d DISP. FORCED AIR SYSTEMS- B.T.U. MEA
UISHWASIIER WALL HEATERS-B.T.U. M / IA
LAUNDRY TRAY UNI1 HEATERS- B.T.U. M
CLOI IILS WASHLR I EVAPURAI IVE COOLERS l��-
WAIER1(EATLR / CLOTHES DRYERS j
URINAL VENTILATION FAN ! /
DRINKING FUUN IAIN L RANGE HOOD COMMERCIAL
I"LOUR DRAIN AIR HANDLING UNIT- CPM L
VACUUM BREAKERS STOVE
RUUF DRAINS - RAINLEAUERS METAL FIREPLACE&CHIMNEY
SINK(SERVICE - BAR,ETC.) WATER HEATER
GAS PIPING
SUBTOTAL f SUBTOTAL f
PERMIT I PERMIT f
TOTAL FEE f TOTALFEE f
SIUL YARD SL BALK STRLLI SLTBACK REAR YARD SETBACK PLAN CHECK NUMBER /PLAN CHECK FEE
�' ` /v, — ' Z F EI I q' I RECEIPTO.
USE /UN! LOT AREA VACANT SITE
- I"!D [].YES ❑NO FEES VALUATION FEE
TYPE OF CONS OCCUP `�GR U'1 NO. DWELLING UNITS PLAN CHECKING NG
V- BUTDING f g
SILL OI L NO.OF STORIt5 MAX.OCC-LOAD
D C;� PLUMBING J
3 FIRE SPRINKLERS REQUIRED
I i �� �� ❑YES [7 NO MECHANICAL g �!
COMMENTS p Grg" STATE BLDG.CODE
/ r ENERGY CODE SURCHARGE -/•
RECEIVED PENALTY U.B.C.
SEC.303(a)
WATER/SEWER FEES
.BAN 10 2002 TOTAL
CITY OF ARLINGTON PERMIT VALIDATION v .
WHEN PROPERLY VALIDATED IIN THIS SPACE)THIS 15 YOUR PERMIT 6 RECEIPT
PAID CRN BY
Cc:ASSESSOR.APPLICANT,TREASURER.BLDG.DEPT. BUILDING OFFICIAL DATE
RECORDS COPY