Loading...
HomeMy WebLinkAbout17925 59th Ave NE_BLD584_2026 Date: 02/27/2026 Permit #: 584 Permit Date: 02/13/2015 Review Date: 02/13/2015 Permit Type: COMMERCIAL ALTERATION Review Type: COMMERCIAL ALTERATION Target Date: 02/20/2015 Scheduled Time: Completed Date: 02/20/2015 Description: Conducted site visit and provided contractor what was needed for the booths and ovens. Review Status: Assigned To: z.Christopher Young Time In: Time Out: Hours: Property Information ARLINGTON ADVANCED MANUFACTURING Parcel#: 31052200403000 PARK ARLINGTON ADVANCED MANUFACTURING 3316 FUHRMAN AVE E STE 200 PARK 17925 59th Ave SEATTLE, WA 98102 Zoning: 637 Warehousing & Storage ServicesLot: 1Block: Permit #: 584 Permit Date: 02/13/15 Permit Type: COMMERCIAL ALTERATION Project Name: Metal Finishing, Inc. Applicant Name: Kayak Point Construction, LLC Applicant Address: P.O. Box 745 Applicant, City, State, Zip: Darrington, WA 98241 Contact: Dean Mellon Phone: 425-238-4120 Email: kayakpointconst@gmail.com Scope of Work: Wall, Raised Floor, Industrial Oven, Spray Booth Valuation: 250000.00 Square Feet: 0 Number of Stories: 1 Construction Type: Occupancy Group: ID Code: Permit Issued: 02/24/2015 Permit Expires: Form Permit Type: Status: COMPLETE Assigned To: Launa Black Property Parcel # Address Legal Description Owner Name Owner Phone Zoning ARLINGTON ADVANCED 637 Warehousing & 31052200403000 17925 59th Ave MANUFACTURING Storage Services PARK Contractors License Contractor Primary Contact Phone Address Contractor Type License # Kayak Point Construction, CONSTRUCTION Dean Mellon 425-238-4120 P.O. Box 745 LLC CONTRACTOR Inspections Date Inspection Type Description Scheduled Date Completed Date Inspector Status C20. BUILDING 03/09/2015 T.I. for Universal Aerospace 02/20/2015 BUILDING Completed FINAL Plan Reviews Date Review Type Description Assigned To Review Status COMMERCIAL Conducted site visit and provided contractor what was 02/13/2015 z.Christopher Young ALTERATION needed for the booths and ovens. Fees Fee Description Notes Amount Building Permit Table 4-1 $2,500.25 State Surcharge - 1st DU Residential - 1st Unit $4.50 Building Plan Review Table 4-2 $1,625.16 Total $4,129.91 Attached Letters Date Letter Description 02/23/2015 Building Permit Payments Date Paid By Description Payment Type Accepted By Amount Metal 02/24/2015 Kakak Construction Finishing/Universal check #6337 Launa Black $4,129.91 Aerospace Outstanding Balance $0.00 Notes Date Note Created By: 02/25/2015 Addition of Crane Structural Calculations Launa Black 02/25/2015 Received structural calculations for the crane way. CJY Chris Young Uploaded Files Date File Name 02/24/2015 971258-584_Issued Permit.pdf 02/13/2015 960166-Application.pdf 02/13/2015 960167-SitePlan.pdf