HomeMy WebLinkAbout18011 CHAMPIONS DR_993575_2026 INSPECTION- REPORT =
4
Permit No.: -2 -13S7-S Lot#:
�~ Address: /&7z/ L'�'2zfaze7r
Contractor:
• Owner:
Date: ®/— 06 "-mod
APPROVAL ❑ PARTIAL APPROVAL
❑ VIOLATION ❑ CORRECTION REQUESTED
❑ Corrections listed below MUST BE MADE before work can be approved.
❑ Please contact inspector.
❑ Was not able to perform inspection.
❑ CALL 435-0674 FOR RE-INSPECTION -24 h r notice required.
I
Inspector: Date:
TYPE OF INSPECTION REQUESTED
❑ Under-floor ❑ Framing ❑ Gas Piping
❑ Footing ❑ Drywall, Nailing ❑ Consultation
❑ Foundation ❑ Shear Nailing ❑ Groundwork
❑ Mechanical ❑ Grid \^❑ 'Struct. Slab
❑ Wood Stove ❑ Rough-in Final
❑ Masonry ❑ Drainage _ ❑\Insulation
❑ Other:
\ INSPECTION REPORT
Permit No.: `T7���J`— Lot #:
Address: _/u'�//
Contractor: tiL-r
• Owner: —��
Date: /-q
❑ APPROVAL ❑ PARTIAL APPROVAL
❑ VIOLATION CORRECTION REQUESTED
❑ Corrections listed below MUST BE MADE before work can be approved.
❑ Please contact inspector.
❑ Was not able to perform inspection.
❑ CALL 435-0674 FOR RE-INSPECTION -24 hour notice required.
CM
5
Inspector: Date:
i'YPE OF INSPECTION REQUESTED
❑ Under-floor ❑ Framing ❑ Gas Piping
❑ Footing ❑ Drywall, Nailing ❑ Consultation
❑ Foundation ❑ Shear Nailing ❑ Groundwork
❑ Mechanical ❑ Grid XFinal
ruct. Slab
❑ Wood Stove ❑ Rough-in
❑ Masonry ❑ Drainage sulation
❑ Other:
INSPECTION REPORT --.,;
Permit No.: Lot#: _�
OP--
Address:
Contractor:
Owner:
Date: �r _CC
PROVAL ❑ PARTIAL APPROVAL
❑ VIOLATION ❑ CORRECTION REQUESTED
❑ Corrections listed below MUST BE MADE before work can be approved.
❑ Please contact inspector.
❑ Was not able to perform inspection.
❑ CALL 435-0674 FOR RE-INSPECTION - 24 hour notice required.
Inspector: Date:
TYPE F INSPECTION REQUESTED
❑ Under-floor ❑ Framing ❑ Gas Piping
ElFooting ��nDrywall, Nailing ❑ Consultation
❑ Foundation ear Nailing ❑ Groundwork
❑ Mechanical ❑ Grid ❑ Struct. Slab
❑ Wood Stove ❑ Rough-in ❑ Final
❑ Masonry ❑ Drainage ❑ Insulation
❑ Other:
INSPECTION REPORT
Permit No.: 9—3'�77-5 Lot #:
Address:
Contractor:
Owner:
Date:
APPROVAL ❑ PARTIAL APPROVAL
❑ VIOLATION ❑ CORRECTION REQUESTED
❑ Corrections listed below MUST BE MADE before work can be approved.
❑ Please contact inspector.
❑ Was not able to perform inspection.
❑ CALL 435-0674 FOR RE-INSPECTION -24 hour notice required.
Date:
Insp or:
- -
TYP OF INSPECTION REQUESTED
❑ Under-floor ❑ Framing ❑ Gas Piping
❑ Footing ❑ Drywall, Nailing ❑ Consultation
❑ Foundation ❑ Shear Nailing ❑ Groundwork
❑ Mechanical ❑ Grid ❑ Struct. Slab
❑ Wood Stove ❑ Rough-in ❑ Final
❑ Masonry ❑ Drainage
❑ Other: �<nsulation
INSPECTION REPORT
e Permit No.,l 1 Y2S Lot#:
Address: ��� �►
Contractor: )
• Owner: 4��
Date: //— l—'F
❑ APPROVAL ARTIAL APPROVAL
❑ VIOLATION O C-afa5ECTION REQUESTED
❑ Corrections listed below MUST BE MADE before work can be approved.
❑ Please contact inspector.
❑ Was not able to perform inspection.
❑ CALL 435-0674 FOR RE-INSPECTION -24 hour notice required.
f`
i
yiz-
Inspector: Date: '
TYPE OF INSPECTION REQUESTED
❑ Under-floor Framing Gas Piping
❑ Footing ❑ Drywall, Nailing ❑ Consultation
❑ Foundation ❑ Shear Nailing ❑ Groundwork
Mechanical ❑ Grid ❑ Struct. Slab
❑ Wood Stove Rough-in ❑ Final
ElMasonry ❑ Drainage ❑ Insulation
❑ Other:
INSPECTION REPORT
4io
Permit No.:! U � Lot#:
Address:Contractor:Owner:
Date. ��0�
PPROVAL ❑ PARTIAL APPROVAL
❑ VIOLATION ❑ CORRECTION REQUESTED
❑ Corrections listed below MUST BE MADE before work can be approved.
❑ Please contact inspector.
❑ Was not able to perform inspection.
❑ CALL 435-0674 FOR RE-INSPECTION - 24 hour notice required.
Ins ecto
Date: 7iL��' `
T PE OF INSPECTION REQUESTED
❑ Under-floor ❑ Framing ❑ Gas Piping
❑ Footing ❑ Drywall, Nailing ❑ Consultation
❑ Foundation Shear Nailing El Groundwork
Grid ❑ Struct. Slab
❑ Mechanical ❑
❑ Wood Stove ❑ Rough-in ❑ Final
❑ Masonry ❑ Drainage ❑ Insulation
❑ Other:
INSPECTION REPORT
Permit No.: #: n
Address: Zee// IiC��Gn-'V) I1► -
Contractor: A,L»taJ
• Owner:
C� ��
Date:
,a--KP—PROVAL ❑ PARTIAL APPROVAL
❑ VIOLATION ❑ CORRECTION REQUESTED
❑ Corrections listed below MUST BE MADE before work can be approved.
❑ Please contact inspector.
❑ Was not able to perform inspection.
❑ CALL 435-0674 FOR RE-INSPECTION - 24 hour notice required.
Date:
TYPE OF INSPECTION REQUESTED
❑ Under-floor ❑ Framing J Gas Piping
❑ Footing ❑ Drywall, Nailing ❑ Consultation
❑ Foundation Shear Nailing ❑ Groundwork
❑ Mechanical ❑ Grid ❑ Struct. Slab
❑ Wood Stove ❑ Rough-in ❑ Final
❑ Masonry ❑ Drainage ❑ Insulation
❑ Other:
r
�L INSPECTION REPORT
Permit No.: l l 2s /7Lot#:
-� Address:
Contractor:
Owner: 4�� 3� S
Date:
.2—APPROVAL ❑ PARTIAL APPROVAL
❑ VIOLATION ❑ CORRECTION REQUESTED
❑ Corrections listed below MUST BE MADE before work can be approved.
❑ Please contact inspector.
❑ Was not able to perform inspection.
❑ CALL 435-0674 FOR RE-INSPECTION - 24 hour notice required.
r--CT
InspeCo � Date:
TYPE OF INSPECTION REQUESTED
❑ Under-floor ❑ Framing ❑ Gas Piping
❑ Footing ❑ Drywall, Nailing ❑ Consultation
Foundation ❑ Shear Nailing ❑ Groundwork
Mechanical ❑ Grid ❑ Struct. Slab
❑ Wood Stove ❑ Rough-in ❑ Final
❑ Masonry ❑ Drainage ❑ Insulation
❑ Other:
INSPECTION REPORT
Permit No.: —35-�5 Lot#:
Address:
Contractor:
Owner: I/Zl T
Date:
❑ APPROVAL ❑ P IAL APPROVAL
❑ VIOLATION CORRECTION REQUESTED
❑ Corrections listed below MUST BE MADE before work can be approved.
❑ Please contact inspector.
❑ Was not able to perform inspection.
❑ CALL 435-0674 FOR RE-INSPECTION - 24 hour notice required.
Insp ctor: Date:
TYp OF INSPECTION REQUESTED
❑ Under-floor ❑ Framing ❑ Gas Piping
ooting ❑ Drywall, Nailing ❑ Consultation
❑Foundation ❑ Shear Nailing ❑ Groundwork
❑ Mechanical ❑ Grid ❑ Struct. Slab
❑ Wood Stove ❑ Rough-in ❑ Final
❑ Masonry ❑ Drainage ❑ Insulation
❑ Other:
4--1-Uy OV ARLLINO- ON
00NO-rRUCTION i:D,ERM I T
PERM1Y NO_ 99—a57M
Owner: METEO H5MES '910 1 0T1 PL SE EyERETT '8208
Value of Works $86, �-13.00 Tax 1'�= Phore. 42j-3=S
Describe Work: NEW --'DNSTRUCTION
Proposed Use: SFR
Legal Description: BE 3C LOT 41
Job Address: 18011 CHAMPi7ONS DR
Contractor' s Name Type Address License#
ME e'CO HOMES GEN 19 i O 12eT_y PL SE EVT ME-k COiHLQ51 4
PUGET HEATING CO TNC. MEC PO BOX 336 LK STEV PUGE H*O643D
WALTS PLUMBING ALE 3224 10STH ST EVT WALTP'i=68`=
P E R M! I T F E E S - - -
Equipment and Fixtures Number Fee Total Charge '
'LUMPING FIXTURES 13 $7.00 $91. 00 '
FURNACE/UNIT HEATER 1 $14.80 $14.80
RANGE 1 $10.65 $10.65
VENTILATION FANS 5 $7.25 $36.25
DRYER 1 $10.65 $1e. 65
METAL FIREPLACE & CHIMNEY 1 $10.65 $10.65
WATER HEATER 1 $10. 65 $10.E15
GAS PIPING 1-4 OUTLETS 1 $4. 755 $4. 75
SUBTOTAL...... $189.40
i ,
TOTALS Fee
Permit Fee $806.00
Equipment $96.40
F1xture $91.00
Mech Permit $23.50
Plan Fee $523.90
Plumb Permit $25. 00
State fee $4.50
School Mitigation $941.00
SIGNATURE:
TOTAL FEE.............. ... $2,513.30 I HEREBY HAVE READ
AND EXAMINED THIS APPLICATION AND
PAYMENTS.................. $324.98 KNOW THE SAME TO BE TRUE AND COR-
RECT ALL PROVISIONS OF LAWS AND
TOTAL DUE................. $2, 188.32 ORDINANCES _ -- NO IS TYPE OF
WORK =TH WHETHER
DATE -
--1 BUILDING OFFI ,
Q
U
J
I1
i�
2° '
Cje,eJ tc 5,55
75- dO
I
�-
r-
n
Io
, s
44
AO I I I
zz z14
40 =
i
loso
\ t
f ' _ • hb
- , • C R SAC -� 0.
CITY OF ARLINGTON
CONSTRUCTION
PERMIT -
COMBINATION ❑ BUILDING ❑ MECHANICAL ❑ PLUMBING ❑ SIGN PERMIT NO. 7
j OWNER / MAI/�Gq/D/DRESS///) / (\ `/ CI1_ ZIP PHONE / (J
ac 1 I 1 LC�O f �l�- V 1� G(/n/P �(�� ���2g Q) C./Z.
A CHITLCT OR DESIGNER MAIL ADDRESS ! CITY ZIP PHONE 1 I!
GENERAL CONTRACTOR MAIL ADDRESS CITY ZIP PHONE LICENSE I!
MECHANICAL CON ACTOR MAIL ADDRESS CITY ZIP PHONE LICENSE I
PLIJM1349G CONTRACTOR v MAIL ADDRESS CITY ZIP PHONE LICENSE/
n yy1/�� ��JM 6.•f. �Z�y -���f�S� S� �ye-e �'82-y /z� ��f�- l`�Y�s
CLASS OF WORK
2 NLW ❑ADDITION ❑ALTERATION -E]REPAIR ❑DEMOLITION ❑BUILDING RELOCATION
Q VALLu
UAi ION OF RK
zs i
LU
DESCRIBE ORKLu
( /
PROPOSE D USE OF BUILDING
I HEREBY CERTIFY THAT I HAVE READ AND EXAMINED THIS APPLICA-
uj AND KNOW THE SAME TO BE TRUE AND CORRECT ALL PROVI-
Z LL(,AL ULSCRIPI ION Of PROPLRTY(SHOWN BELOW OR ATTACH FOUR COPIES)
7 /�J l I i SIONS OF LAWS AND ORDINANCES GOVERNING THIS TYPE OF WORK
J LUI�RLOCK - OF 2c 4- J v WILL BE COMPLIED WITH WHETHER SPECIFIED HERIN OR NOT.THE
a GRANTING OF A PERMIT DOES NOT PRESUME TO GIVE AUTHORITYTO
FW- 23 O, 00 -ct-)U 3 VIOLATE OR CANCEL THE PROVISIONS OF ANY OTHER STATE OR
Lu
TAX 1D N UMBER FROM PROP TY TAX STATEMENT LOCAL LAW REGULATING CONSTRUCTION OFTHE PERFORMANCE OF
1 /l CONSTRUCTION.PERMIT EXPIRES 1 YEAR FROM DATE OF ISSUANCE.
SIGNATURE OF CONTRACTOR OR AUTHORIZED AGENT DATE
V JOB AUURLSS
t X
(OFFICE USB ONLY)
PLUMBING MECHANICAL
NO. TYPE OF FIXTURE, FEE :'s FIXTURES NO. TYPE OF EQUIPMENT FEE :i FIXTURES
ATER CLOSET ILET IR COND.UNITS-HP. EA. jqdp.IIA*'
ATHTUg 11WRIGERATION UNITS-H-P.EA. 30tip.lit-
VATORY ASH BASIN OILERS-HP.EA. 34dp.lit-
HOWER OAS FIRED A.C.UNITS-TONNAGE FL& 3kidp.lit-
HEN SINK&DISPOSAL / TORCED AIR SYSTEMS-B.T.U. MEA
ISHWASHER ALL HEATERS-B.T.U. M _
UNDRY TRAY JNIT HEATERS-B.T.U. M
LOTHES WASHER 'EVAPORATIVE COOLERS
I *:.-LOTH US DRYERS
RINAL VENTILATION PAN
KINKING FOUNTAIN RANGE HOOD COMMERCIAL
'LOOR DRAIN Ilt HANDLING UNIT- CPM
VACUUM BREAKERS )TOVE
OOF DRAINS-RAINLEADERS VIRTAL FIREPLACE&CHIMNEY
'INK(SERVICE-BAR,ETC. WATER IIEATER
AS PIPING '(up to S-33.00.addol. S.75
-Equipment list must be provided
v
SUB TOTAL SUB TOTAL
PERMIT PERMIT
TOTAL FE8 TOTAL FEE
SIUL YARD SL I SALK STRLLTSLIBACK REARYARDSE PLA CI C PLAN CHECK FEE
FEE C/� RECEIPT NO.
USE'/ 1 LOT AREA VACANT SIZE ���� v � � "� 11-7
�, 1� /00 YES rIEMT VALUATION FEE
TYPE OF�COUri. ! OCCUP Y GROUP NO.OF DWELLING UNITS PLAN CHECKING VG `�
�~ ( BU'LDING $
SILL Of BLUG NO.Of S70RILLSS MAX.OCC.LOAD
J PLUMBING
F IRE SPRINKLLRS REWIRED
YES-, Q NO MECHANICAL
COMMENTS STATE BLDG.CODE
ENERGY CODE SURCHARGE
PENALTY U.B.C.
T / SEC.303(a)
t f GoµtlC �i I GD �TV WATER/SEWERFEES
(-�C,�J�) T O& l 0 2 �C(g L9 TOTAL
PERMITPlop, �;, _ OA kr f 1s6 8 WHEN
PROPERVAUDALY
WHEN PROPERLY VALIDATED (IN THIS SPACE)THIS IS YOUR PERMIT 6 RECEIPT
PAID CRII BY
cc:ASSESSOR.APPLICANT,TREASURER,BLDG.DEPT BUILDING OFFICIAL DATE
RECORDS COPY