HomeMy WebLinkAbout18121 CHAMPIONS DR_004251_2026 n� INSPECTION REPORT
4ti1N G r® Permit No.: #:
F' Address: C, i�
Contractor:
O Owner:
'ysIq j N C$ Date:
ROVAL ❑ PARTIAL APPROVAL
❑ VIOLA ❑ CORRECTION REQUESTED
❑ Corrections listed below MUST BE MADE before work can be approved.
❑ Please contact inspector.
❑ Was not able to perform inspection.
❑ CALL 435-0674 FOR RE-INSPECTION - 24 hour notice required.
i
Inspector: Date: — �J
7
E OF INSPECTION REQUESTED
❑ Under-floor ❑ Framing ❑ Gas Piping
❑ Footing ❑ Drywall, Nailing ❑ Consultation
❑ Foundation ❑ Shear Nailing ❑ Groundwork
❑ Mechanical ❑ Grid ❑ truct. Slab
❑ Wood Stove ❑ Rough-in Final
❑ Masonry ❑ Drainage ❑ Insulation
❑ Other:
, " ` INSPECTION REPORT
N G?'O Permit No.: �—S L`ot #: 6 a
F Address:
Contractor: �
r
-� O Owner:
` IgIN G� Date:
PPROVAL ❑ PARTIAL APPROVAL
❑ VIOLATION ❑ CORRECTION REQUESTED
❑ Corrections listed below MUST BE MADE before work can be approved.
❑ Please contact inspector.
❑ Was not able to perform inspection.
❑ CALL 435-0674 FOR RE-INSPECTION -24 hour notice required.
Inspector: Date:
TYP OF INSPECTION REQUESTED
❑ Under floor ❑ Framing ❑ Gas Piping
❑ Footing Drywall, Nailing ❑ Consultation
❑ Foundation ❑ Shear Nailing ❑ Groundwork
❑ Mechanical ❑ Grid ❑ Struct. Slab
❑ Wood Stove ❑ Rough-in ❑ Final
❑ Masonry ❑ Drainage ❑ Insulation
❑ Other:
INSPECTION REPORT
i4IN
Permit No aS Lot #:Address:Contractor:Owner:G� Date:
,P�fROVAL ❑ PARTIAL APPROVAL
❑ VIOLATION ❑ CORRECTION REQUESTED
❑ Corrections listed below MUST BE MADE before work can be approved.
❑ Please contact inspector.
❑ Was not able to perform inspection.
❑ CALL 435-0674 FOR RE-INSPECTION - 24 hour notice required.
i
Inspector: ' Date:) 0
TYPE OF INSPECTION REQUESTED
❑ Under-floor ❑ Framing ❑ Gas Piping
❑ Footing ❑ Drywall, Nailing ❑ Consultation
❑ Foundation ❑ Shear Nailing ❑ Groundwork
❑ Mechanical ❑ Grid ❑ Struct. Slab
❑ Wood Stove ❑ Rough-in ❑ Final
❑ Masonry ❑ Drainage insulation
❑ Other:
\� \
INSPECTION REPORT
V N G1'O Permit No.: Z l Lot #:
Q' Address:
Z Contractor:
O Owner:
IN G� Date: a ��
❑ APPROVAL ❑ PARTIAL APPROVAL
❑ VIOLATION L�:;�RRECTION REQUESTED
❑ Corrections listed below MUST BE MADE before work can be approved.
❑ Please contact inspector.
❑ Was not able to perform inspection.
❑ CALL 435-0674 FOR RE-INSPECTION - 24 hour notice required.
1
Inspector: Date
' PE OF INSPECTION REQUESTED
❑ Under-floor ❑ Framing ❑ Gas Piping
❑ Footing ❑ Drywall, Nailing ❑ Consultation
❑ Foundation ❑ Shear Nailing ❑ Groundwork
❑ Mechanical ❑ Grid ❑ Struct. Slab
❑ Wood Stove ❑ Rough-in ❑ Final
❑ Masonry ❑ Drainage Insulation
❑ Other:
INSPECTION REPORT 7,1q3
4tiLN G TD Permit NP Lot#:
Q Address: `dl�1 c�10. ►��%ov�s
Contractor:
O Owner:
9`S41 N G� Date:
�PROVAL ❑ PARTIAL APPROVAL
❑ VIOLATION ❑ CORRECTION REQUESTED
❑ Corrections listed below MUST BE MADE before work can be approved.
❑ Please contact inspector.
❑ Was not able to perform inspection.
❑ CALL 435-0674 FOR RE-INSPECTION -24 hour notice required.
f
r �
Inspector: Date:
TYPE OF INSPECTION REQUESTED
❑ Under-floor Framing ❑ Gas Piping
❑ Footing ❑ Drywall, Nailing ❑ Consultation
❑ Foundation ❑ Shear Nailing ❑ Groundwork
❑ Mechanical ❑ Grid ❑ Struct. Slab
❑ Wood Stove ❑ Rough-in ❑ Final
❑ Masonry ❑ Drainage ❑ Insulation
❑ Other:
INSPECTION REPORT
¢ti1N G TD Permit No.: Lot #:
Address: I N2_1
� Z Contractor: nkn
-7 ,SO Owner:
41 N O Date:
❑ APPROVAL *PARTIAL APPROVAL
❑ VIOLATION ❑ CORRECTION REQUESTED
❑ Corrections listed below MUST BE MADE before work can be approved.
❑ Please contact inspector.
❑ Was not able to perform inspection.
❑ CALL 435-0674 FOR RE-INSPECTION - 24 hour notice required.
0 �
Inspector: ;4� Date:
/TYPE OF INSPECTION REQUESTED
❑ Under-floor ❑ Framing )3 Gas Piping
❑ Footing ❑ Drywall, Nailing ❑ Consultation
❑ Foundation ❑ Shear Nailing ❑ Groundwork
I,Mechanical ❑ Grid ❑ Struct. Slab
❑ Wood Stove 0 Rough-in ❑ Final
v
❑ Masonry D .Drainage ❑ Insulation
❑ Other: f4 ' l
INSPECTION REPORT
N G Tp Permit No.: 5-1 Lot#:
Q' Address: l k l"21
Z Contractor: e�/W
9s
O Owner:10I N G� Date: -1 s-6
APPROVAL ❑ PARTIAL APPROVAL
❑ VIOLATION ❑ CORRECTION REQUESTED
❑ Corrections listed below MUST BE MADE before work can be approved.
❑ Please contact inspector.
❑ Was not able to perform inspection.
❑ CALL 435-0674 FOR RE-INSPECTION - 24 hour notice required.
Inspector: Date:
*l PE OF INSPECTION REQUESTED
❑ Under-floor ❑ Framing ❑ Gas Piping
❑ Footing ❑ Drywall, Nailing ❑ Consultation
❑ Foundation 0 Shear Nailing ❑ Groundwork
❑ Mechanical ❑ Grid ❑ Struct. Slab
❑ Wood Stove ❑ Rough-in ❑ Final
❑ Masonry ❑ Drainage ❑ Insulation
❑ Other:
V� INSPECTION REPORT
4ti1N G 1'O Permit No.: I Lot
4' Address: C_Vl o_vim. 0�3
Contractor: IM e-- -�
O Owner:
, o
�S�IN G Date: 02
❑ APPROVAL ❑ PARTIAL APPROVAL
VIOLATION Q CORRECTION REQUESTED
❑ Corrections listed below MUST BE MADE before work can be approved.
❑ Please contact inspector.
❑ Was not able to perform inspection.
❑ CALL 435-0674 FOR RE-INSPECTION - 24 hour notice required.
Inspector: Date: �l
TYPE OF INSPECTION REQUESTED
❑ Under-floor ❑ Framing ❑ Gas Piping
❑ Footing ❑ Drywall, Nailing ❑ Consultation
❑ Foundation Shear Nailing ❑ Groundwork
❑ Mechanical ❑ Grid ❑ Struct. Slab
❑ Wood Stove ❑ Rough-in ❑ Final
❑ Masonry ❑ Drainage ❑ Insulation
❑ Other: Y4 04 b`�
04SPECTION REPORT
y1N G T Permit No.: a Lot#:
Q' Address:
Contractor:
9s, �O Owner: e
�I N O Date: 72
❑ APPROVAL ❑ PARTIAL APPROVAL
❑ VIOLATION CORRECTION REQUESTED
❑ Corrections listed below MUST BE MADE before work can be approved.
❑ Please contact inspector.
❑ Was not able to perform inspection.
❑ CALL 435-0674 FOR RE-INSPECTION - 24 hour notice required.
J '
( I
Inspector:
Date: 2—
YPE OF INSPECTION REQUESTED
❑ Under-floor ❑ Framing ❑ Gas Piping
❑ Footing J prywali, Nailing ❑ Consultation
❑ Foundation Shear Nailing ❑ Groundwork
❑ Mechanical ❑ Grid ❑ Struct. Slab
❑ Wood Stove ❑ Rough-in ❑ Final
❑ Masonry ❑ Drainage ❑ Insulation
❑ Other:
INSPECTION REPORT
iD,
Permit No.: ' � �� Loot #:
Address:Contractor:Owner:
Date:
❑ APPROVAL ❑ PARTIAL APPROVAL
VIOLATION ❑ CORRECTION REQUESTED
Corrections listed below MUST BE MADE before work can be approved.
Please contact inspector.
❑ Was not able to perform inspection.
❑ CALL 435-0674 FOR RE-INSPECTION - 24 hour notice required.
1 C9
jLr /v
t'
Inspector: Date:
PE OF INSP CTION REQUESTED
❑ Under-floor ❑ Framing ❑ Gas Piping
❑ Footing ❑ Drywall, Nailing ❑ Consultation
❑ Foundation ❑ Shear Nailing ❑ Groundwork
❑ Mechanical ❑ Grid ❑ Struct. Slab
❑ Wood Stove ❑ Rough-in ❑ Final
❑ Masonry ❑ Drainage ❑ Insulation
❑ Other:
-7
INSPECTION REPORT
ii
r0Permit NaAddress:Contractor:
O Owner:�� Date:
PPROVAL ❑ PARTIAL APPROVAL
"❑ VIOLATION ❑ CORRECTION REQUESTED
❑ Corrections listed below MUST BE MADE before work can be approved.
❑ Please contact inspector.
❑ Was not able to perform inspection.
❑ CALL 435-0674 FOR RE-INSPECTION - 24 hour notice required.
<Zrog:y��P
Inspector: Date: 0
PE OF INSPECTION REQUESTED
Under- oor ❑ Framing ❑ Gas Piping
❑ Footing ❑ Drywall, Nailing ❑ *Consultation
❑ Foundation ❑ Shear Nailing ❑ Groundwork
❑ Mechanical ❑ Grid ❑ Struct. Slab
❑ Wood Stove ❑ Rough-in ❑ Final
❑ Masonry ❑ Drainage ❑ Insulation
❑ Other:
INSPECTION REPORT
N G `l.
?'Q Permit No.: Lot#.
iIN
Address:Contractor:Owner:
O Date:
APPROVAL El PARTIAL APPROVAL
❑ IOLATION ❑ CORRECTION REQUESTED
❑ Corrections listed below MUST BE MADE before work can be approved.
❑ Please contact inspector.
❑ Was not able to perform inspection.
❑ CALL 435-0674 FOR RE-INSPECTION -24 hour notice required.
n
1
Inspector: Date
TYPE OF INSPECTION REQUESTED
❑ Under-floor ❑ Framing ❑ Gas Piping
❑ Footing ❑ Drywall, Nailing ❑ Consultation
❑ Foundation ❑ Shear Nailing ❑ Groundwork
❑ Mechanical ❑ Grid ❑ Struct. Slab
❑ Wood Stove ❑ Rough-in ❑ Final
❑ Masonry XDrainage ❑ Insulation
❑ Other:
INSPECTION REPORT
¢SIN GTO Permit No.: �' ��S Lot#:
Address: f��/c� L"m.oizm" /-7w_
Contractor: Zr-,"
ems, �4 Owner:
SING Date: f—Cl 'DO
APPROVAL ❑ PARTIAL APPROVAL
❑ VIOLATION ❑ CORRECTION REQUESTED
❑ Corrections listed below MUST BE MADE before work can be approved.
❑ Please contact inspector.
❑ Was not able to perform inspection.
❑ CALL 435-0674 FOR RE-INSPECTION - 24 hour notice required.
1
Inspector: Date:
E OF INSPECTION REQUESTED
❑ Under-floor ❑ Framing ❑ Gas Piping
❑ Footing ❑ Drywall, Nailing ❑ Consultation
Foundation ❑ Shear Nailing ❑ Groundwork
❑ Mechanical ❑ Grid ❑ Struct. Slab
❑ Wood Stove ❑ Rough-in ❑ Final
❑ Masonry ❑ Drainage ❑ Insulation
❑ Other:
INSPECTION REPORT
IN 4ti G?,O Permit No.: Lly— zl0�5 / Lot #: 6�;?S j,
Q" Address: / (F42/ C `7174W_11 10k
Contractor: 0_
9s, �O Owner:
j N G Date: I g tic)
A APPROVAL ❑ PARTIAL APPROVAL
❑ VIOLATION ❑ CORRECTION REQUESTED
❑ Corrections listed below MUST BE MADE before work can be approved.
❑ Please contact inspector.
❑ Was not able to perform inspection.
❑ CALL 435-0674 FOR RE-INSPECTION - 24 hour notice required.
Inspector: Date:
TYPE OF INSPECTION REQUESTED
❑ Under-floor ❑ Framing ❑ Gas Piping
❑ Drywall, Nailing ❑ Consultation
��Foofing
oundation ❑ Shear Nailing ❑ Groundwork
❑ Mechanical ❑ Grid ❑ Struct. Slab
❑ Wood Stove ❑ Rough-in ❑ Final
❑ Masonry ❑ Drainage ❑ Insulation
❑ Other:
p INSPECTION REPORT
N G, , Permit No.:60 �7aJ Lot#: 0;)9
Q' Address: l �I-)a ffL lG`_� �✓L
Contractor: P'te z
Owner:
9s�I N Cs,SO r.Date: _f �- 7 "—
0
❑ APPROVAL ❑ PARTIAL APPROVAL
❑ VIOLATION CORRECTION REQUESTED
❑ Corrections listed below MUST BE MADE before work can be approved.
❑ Please contact inspector.
❑ Was not able to perform inspection.
❑ CALL 435-0674 FOR RE-INSPECTION - 24 hour notice required.
Inspector: � � I Date:
TYPE OF INSPECTION REQUESTED
❑ Under-floor ❑ Framing ❑ Gas Piping
Footing ❑ Drywall, Nailing ❑ Consultation
❑ Foundation ❑ Shear Nailing ❑ Groundwork
❑ Mechanical ❑ Grid ❑ Struct. Slab
❑ Wood Stove ❑ Rough-in ❑ Final
❑ Masonry ❑ Drainage ❑ Insulation
❑ Other:
C I YY OF= R RL-I NOYON
CONOTRUCT I Chi PERM I T
QWner: Y!-777 11 F_Y2YES ^•?Tt_E r L Kr-- 4 II-:.fir.
Value of '` ..E
Describe Work. ti°ter
Proposed Use.
JLegal Description. N=A 3 2Z JT 'S
4b Address:
Contractor' s Name Type Address License#
F E R M : T - F E E S
i Equipyent and Fixtures Nu.ber= Fee Total Charge
OT
,C= U y
yRtJl�'a�9n'r�i _�6 -1"O1
"" dLATI..i dOe4 i n.w� Sv $: .
` .riR1 R r a i x 00. .ta + . 0-2 r
L,q Rr S _ 0I-rTiL T3 .. s00 t-f x 00,
,
S U B T 0 T A L......
TOTALS
Equiplaent
aP'--, --
rb:Imn lee
Plumb P2ra; t -- --
BIGNATi1RE: ;
TOTAL FEE. ....... ........ . f3,35@.39 F�� 7;5ER� _ ry
PAYMENTS..._.� _....... .a . . _ Sba2.3�r a YY `�pp
TOTAL DUE................. $2,676.05 - - C-� _-,.Y
a.i r..z•_ �� li�...f—ter Y YF` A—
:I AL -
J
.� . FFI IE. Copy Legends @ GlenEagle
. Lot 28
Plan: Oak
ISM 18121 Champions Dr.
tom'
ZI
I
N I
I
1
F.
t
ry ' too s �� '14
1
al �A
' s3 5
Ci
-Z 10 p` _ IU
ems+ants ° �
14
Kristi Park
Planner/Permit Coordinator !
Office:(425)316-0261 ext.233
METCOHL015C4 Office:(425)481-0665 ext.233 Ih�—' E I V E \
METCOC*243K7 Mobile:(206)850-7653 l
E-mail:con"metco-homes.com 1910-120th PI.S.E. i \
Intemet:www.metco-homes.com Everett,WA 98208 SEP 1 2000
CITY OF ARLINGTON )
. 1
CITY OF ARLINGTON
CONSTRUCTION
PERMIT 0-0 -
❑ COMBINATION ❑ BUILDING ❑ MECHANICAL ❑ PLUMBING ❑ SIGN
PERMIT NO. q3S
R MAIL ADDRESS CITY ZIP PHONE
'p,I:Tc c 4-om F s L y_ Ledo- 12o - PL s vE tz EZT 98
��� Zof3 `1is alb aa�f X ZARCHITECT vK DESIGNER MAIL ADDRESS CITY ZIP PHONE
POUh WILLI>+}MS /tO12 l�lsr Pa . /11� Ll�• 5'rrvENs 48ZS-8 y IT. 33'I• 33(p*
GENERAL CONTRACTOR MAIL ADDRESS CITY ZIP PHONE
MlTL11LOS�Gy
MGT[.o !-}-0M1:5 PL. SF3 �.V I=-12M-TT q8.�- 5 Lf;25.amp. G-Z,to
MECHANICAL CONTRACTOR MAIL ADDRESS CITY ZIP PHONE LICENSE f
P�FT NEA-1'INL7 1-In $o>c 33(o LIC 5-rEV�rUs 902S8 N�S33'L� ylll pu46rHcorlc�
PLUMBING CONTRACTOR MAIL ADURESS I CITY LIP PHONE
LICENSE d
3 WALTs 'PL_VrwljN67 32-..-1 IogTH s-r s v�12E7 98?1�8 33B�aS . �cer
CLASS OF WORK I 1NAl6TPI9b13R
¢&NLW ❑AUDITION ❑ALTERATION ❑REPAIR ❑DEMOLITION ❑BUILDING RELOCATION
M VALUATION OF WORK
ws I i01 ��
W DESCRIBE WQRK
3
M PRUPOSI O USE OF BUILDING
�' RES IOE-/'e1 T(P►l— I HEREBY CERTIFY THAT I HAVE READ AND EXAMINED THIS APPLICA-
TION AND KNOW THE SAME TO BE TRUE AND CORRECT ALL PROVI-
? Lt UAL UEu"RIP I(ON Ui PRUPLRTY(SHOWN BE LOW URATLACHFUURCUPIES] SIONSOF LAWS AND ORDINANCES GOVERNING THIS TYPE OFWORK
LLn S�BLOCK Or c-r-�v`r-s C !LI✓ - _ WILL BE COMPLIED WITH WHETHER SPECIFIED HERIN OR NOT.THE
a GRANTING OF A PERMIT DOES NOT PRESUME TO GIVE AUTHORITY TO
10 S — I — oe _ CA_-yo VIOLATE OR CANCEL THE PROVISIONS OF ANY OTHER STATE OR
a TAX ID NUMBER FROM PROPERTY TAX STATEMENT LOCAL LAW REGULATING CONSTRUCTION OF THE PERFORMANCE OF
CONSTRUCTION.PERMIT EXPIRES 1 YEAR FROM DATE OF ISSUANCE.
108 ADURLSS SIGNATUREOF CONTRACTOR OR AUTHORIZED AGENT DATE
t 1 z l G�1
(—'FICE USE ONLY)
PLUMBING MECHANICAL
NO. TYPE OF FIXTURE FEE s'+FIXTURES NO. TYPE OF EQUIPMENT FEE i t FIXTURES
ATBR CLOSET 1 3 1R COND.UNITS—HP. EA d .Bn••
ATHTUB RIGERATLON UNITS—H.P.EA d .itt••
AVATORY CWASH BASIN 0MRS—H.P.BA d .U-1,
HOWER 3AS FIRED A.C.UNITS—TONNAGE EA. dp.List•• _
17C"P_N SINS Sc DISPOSAI. 'UnCED nix SYSII:MS—S.T.U. MI&A
ISHWASHBR / ALL HEATERS—B.T.U. M _
UNDRY TRAY JNiT HEATERS—B.T.V. M
LOTHES WASHER / IVAPORATIVBCOOLIBtS
WATER HEATER ,LOTHBS DRYERS 1
RINAL ENTILATION PAN
KINKING FOUNTAIN XANGE HOOD COMMERCIAL
LOOR DRAIN lilit HANDLING UNIT— CPM
ACUUM BREAKERS VR '
OOP DRAINS—RAINL EADBRS WEMAL FIREPLACE A CHIMNEY
INK BRVICB—BAR,6TC. ATE HEATER i
AS PIPING *(Up to S-93.00.eddnL SJS
n
�+ *Bquipmaot Ibt must be provided
i
SUB AL SUB TOTAL
P PERMIT
TOTAL PEE TOTAL FBB
SIUL YARD SL I BACK STREET SL IBACK REAR YARD SETBACK PLAN CHECK NUMBER PLAN CHECK FEE
FEE RECEIPT NO.
Art LOT AREA VACANT SITE
6-,?,_js 5 DYES ❑NO FEES VALUATION FEE
IYPL OF CO I OCCUPANCY 'ROUP NO.OF DWELLING UNITS PLANCHECKING VG 8 l L
V — �! f(,11) I _ ,
SIZE UI BnLOG. NO,Of S RILS MAX.OCC.LOAD
BU'LDINC f , 3 0 /„ 7
�J 7 PLUMBING
FIRE SPRINKLERS REQUIRED
❑YES D NO MECHANICAL
COMMENTS- 3�'��� STATE BLDG.CODE
�G ENERGY CODE SURCHARGE
PENALTY U.B.C.io31+1
WATER/SEWER FEES
RECEIVED TOTAL
PERMIT VALIDATION
S E P 1 9 2000 WHEN PROPERLY VALIDATED(IN THIS SPACE)THIS IS YOUR PERMIT 6 RECEIPT
PAID CRII BY
(CITY OF ARLINGTON
cc:ASSESSOR.APPLICANT,TREASURER,BLDG. DEPT. BUILDING OFFICIAL DATE
RECORDS COPY