HomeMy WebLinkAbout18205 CHAMPIONS DR_003925_2026 INSPECTION REPORT
\� N G
4ti1 ?'� Permit No.:�2 ��G�J mot #:
Q' Address: I g-aC5 r��W 52
.a
—
Contractor:Vozi
O Owner:
C �V
IN C" Date:
APPROVAL ❑ PARTIAL APPROVAL
❑ VIOLATION ❑ CORRECTION REQUESTED
❑ Corrections listed below MUST BE MADE before work can be approved.
❑ Please contact inspector.
❑ Was not able to perform inspection.
❑ CALL 435-0674 FOR RE-INSPECTION - 24 hour notice required.
l
Inspector: Date:
TYPE OF INSPECTION REQUESTED
❑ Under-floor ❑ Framing ❑ Gas Piping
❑ Footing ❑ Drywall, Nailing ❑ Consultation
❑ Foundation ❑ Shear Nailing ❑ Groundwork
❑ Mechanical ❑ Grid ❑ Struct. Slab
❑ Wood Stove ❑ Rough-in Final
❑ Masonry ❑ Drainage ❑ Insulation
❑ Other:
INSPECTION REPORT
N G T, Permit No z v �^�J Lot #:
Address:
Z Contractor ,
O Owner:
I N G Date: / � —,; CC
❑ APPROVAL ❑ PARTIAL APPROVAL
❑ VIOLATION 3a,-QORRECTION REQUESTED
❑ Corrections listed below MUST BE MADE before work can be approved.
❑ Please contact inspector.
❑ Was not able to perform inspection.
CALL 435-0674 FOR RE-INSPECTION - 24 hour notice required.
2.!
5..
Date:
Inspector:
TYPE OF INSPECTION REQUESTED
❑ Under-floor ❑ Framing ❑ Gas Piping
❑ Footing ❑ Drywall, Nailing ❑ Consultation
❑ Foundation ❑ Shear Nailing ❑ Groundwork
❑ Mechanical ❑ Grid ❑ truct. Slab
❑ Wood Stove ❑ Rough-in inal-
❑ Masonry ❑ Drainage ❑ Insulation
❑ Other:
I INSPECTION REPORT
411N G?'O Permit No.: �o� Lot#: C:)?
Q Address: l ex\5—
Contractor:
C/ tip
9s �O Owner:
I N O Date: AQ cP O 0
❑ APPROVAL ❑ PARTIAL APPROVAL
❑ VIOLATION >4_CORRECTION REQUESTED
❑ Corrections listed below MUST BE ADE before work can be approved.
❑ Please contact inspector.
❑ Was not able to perform inspection.
❑ CALL 435-0674 F R E-INSPECTION - 24 hour notice required.
p
v^-
Inspector: Date: �--
TYPE OF INSPECTION REQUESTED
❑ Under-floor ❑ Framing ❑ Gas Piping
❑ Footing ❑ Drywall, Nailing ❑ Consultation
❑ Foundation ❑ Shear Nailing ❑ Groundwork
❑ Mechanical ❑ Grid ❑ Struct. Slab
❑ Wood Stove ❑ Rough-in Final
❑ Masonry ❑ Drainage ❑ Insulation
❑ Other:
INSPECTION REPORT
�tiZN G TO Permit No v `��`� Lot#: aA
Address:
Z Contractor:
O Owner:
S4I N G Date:
❑ APPROVAL ❑ PARTIAL APPROVAL
❑ VIOLATION ❑ CORRECTION REQUESTED
❑ Corrections listed below MUST BE MADE before work can be approved.
❑ Please contact inspector.
❑ Was not able to perform inspection.
❑ CA L 435-0674 FOR RE-INSPECTION - 24 hour notice required.
Inspector: ' Date: `
TYPE OF INSPECTION REQUESTED
❑ Under-floor ❑ Framing ❑ Gas Piping
❑ Footing ❑ Drywall, Nailing ❑ Consultation
❑ Foundation ❑ Shear Nailing ❑ Groundwork
❑ Mechanical ❑ Grid Struct. Slab
❑ Wood Stove ❑ Rough-in Final
❑ Masonry ❑ Drainage ❑ Insulation
❑ Other:
INSPECTION REPORT
Permit Noa 1 of#: s2!
Q Address:
Z Contractor: 1
Ir1O,SO Owner:
Date: 91�d
APPROVAL ❑ PARTIAL APPROVAL
J❑ VIOLATION ❑ CORRECTION REQUESTED
❑ Corrections listed below MUST BE MADE before work can be approved.
❑ Please contact inspector.
❑ Was not able to perform inspection.
❑ CALL 435-0674 FOR RE-INSPECTION -24 hour notice required.
' -C
Inspector. Date:
YPE OF INSPECTION REQUESTED
❑ Under-floor ❑ raming ❑ Gas Piping
❑ Footing Drywall, Nailing ❑ Consultation
❑ Foundation ❑ Shear Nailing ❑ Groundwork
❑ Mechanical ❑ Grid ❑ Struct. Slab
❑ Wood Stove ❑ Rough-in ❑ Final
❑ Masonry ❑ Drainage ❑ Insulation
❑ Other:
INSPECTION REPORT
N G
ff�
4ti1 TO CQ
Permit No,3 13 ��J of #:
Q' Address:
Contractor:
j N�,54 Owner:
Date:
APPROVAL ❑ PARTIAL APPROVAL
❑ IOLATION ElCORRECTION REQUESTED
❑ Corrections listed below MUST BE MADE before work can be approved.
❑ Please contact inspector.
❑ Was not able to perform inspection.
❑ CALL 435-0674 FOR RE-INSPECTION - 24 hour notice required.
1
Inspector: Lk
Date:
TYPE F INSPECTION REQUES ED
Cl Under-floor Framing ❑ Gas Piping
❑ Footing ❑ Drywall, Nailing ❑ Consultation
❑ Foundation ❑ Shear Nailing ❑ Groundwork
❑ Mechanical ❑ Grid ❑ Struct. Slab
❑ Wood Stove ❑ Rough-in ❑ Final
❑ Masonry ❑ Drainage ❑ Insulation
❑ Other:
INSPECTION ``REPORT
ti1N GrO Permit No.•L{/— Lot #:
4
Q" Address: 1'5�P05 Lh4dl Odr7vl D -
Contractor:
Owner:
IN C' Date:
❑ APPROVAL 5( PARTIAL APPROVAL
❑ VIOLATION ❑ CORRECTION REQUESTED
❑ Corrections listed below MUST BE MADE before work can be approved.
❑ Please contact inspector.
❑ Was not able to perform inspection.
❑ CALL 435-0674 FOR RE-INSPECTION -24 hour notice required.
Inspector: Date:
PE OF INSPECTION REQUESTED
❑ Under-floor Framing ❑ Gas Piping
❑ Footing ❑ Drywall, Nailing ❑ Consultation
❑ Foundation Shear Nailing ❑ Groundwork
❑ Mechanical ❑ Grid ❑ Struct. Slab
❑ Wood Stove ❑ Rough-in ❑ Final
❑ Masonry ❑ Drainag insulation
❑ Other:
INSPECTION REPORT
4y1N G TO Permit No.: - Lot #:
, 02
Address: �aQ�
Contractor:
r
O Owner:
9`S'OIN OAS Date: /0 - a7_0�
❑ APPROVAL ❑ PARTIAL APPROVAL
❑ VIOLATION CORRECTION REQUESTED
❑ Corrections listed below MUST BE MA before work can be approved.
❑ Please contact inspector.
❑ Was not able to perform inspection.
❑ CALL 435-0674 FOR RE-INSPECTION - 24 hour otice required.
Cj7)"1
5 . o
Inspector: Date: U `
TYPE OF INSPECTION REQUESTED
❑ Under-floor A Framing — R ❑ Gas Piping
❑ Footing ❑ Drywall, Nailing ❑ Consultation
❑ Foundation Shear Nailing ❑ Groundwork
❑ Mechanical ❑ rid ❑ Struct. Slab
❑ Wood Stove ❑ Rough-in ❑ Final
❑ Masonry ❑ Drainage Insulation
❑ Other:
INSPECTION REPORT
1_ n l
iio
Permit Noa- 7�S Lot#:
Address:Contractor:
Owner:
Date: /e
❑ APPROVAL PARTIAL APPROVAL
❑ VIOLATION CORRECTION REQUESTED
❑ Corrections listed below MUST BE MADE before work can be approved.
❑ Please contact inspector.
❑ Was not able to perform inspection.
❑ CALI_435-0674 FOR E-INSPECTION - 24 hour notice required.
Inspector: �'' Date:
TYPE OF INSPECTION REQ ES ED
❑ Under-floor ` raming Gas Piping
❑ Footing ❑ D all, Nailing El
❑ Foundation Shear Nailin ❑ Groundwork
N
echanical O rid ❑ Struct. Slab
ood Stove ❑ Rough-in ❑ Final
❑ Masonry ❑ Drainage ❑ Insulation
fz-9 Other:
0'N1\ INSPECTION REPORT
N G 1'O Permit No.:(�t� C� Lot #:
Q' Address: ��C `� C�
• s
Contractor:
O Owner:74
9s4 j N G 'P Date: —/ I - CIO
❑ APPROVAL PARTIAL APPROVAL
❑ VIOLATION ❑ CORRECTION REQUESTED
❑ Corrections listed below MUST BE MADE before work can be approved.
❑ Please contact inspector.
❑ Was not able to perform inspection.
❑ CALL 435-0674 FOR RE-INSPECTION - 24 hour notice uired.
L' L P
C I }
--------------
n
f 4
r
Inspector: - Date: Z !
TYPE OF INSPECTION REQUESTED
❑ Under-floor ❑ Framing Gas Piping
❑ Footing ❑ Drywall, Nailing ❑ Consultation
❑ oundation ❑ Shear Nailing ❑ Groundwork
Mechanical ❑ Grid ❑ Struct. Slab
❑ Wood Stove Rough-in ❑ Final
❑ Masonry ❑ Drainage ❑ Insulation
❑ Other:
-INSPECTION DEPORT
41,IN G?'0 Permit No. � 7� Lot#:
F' Address:
Contractor:
O Owner:
01 N CG5 Date:
APPROVAL ❑ PARTIAL APPROVAL
❑ VIOLATION ❑ CORRECTION REQUESTED
❑ Corrections listed below MUST BE MADE before work can be approved.
❑ Please contact inspector.
❑ Was not able to perform inspection.
❑ CALL 435-0674 FOR RE-INSPECTION - 24 hour n 'ce required.
lw
:1nspector: Date. -
TYPE OF INSPECTION REQUESTED
Under-floor ElFraming ❑ Gas Piping
❑ On
❑ Drywall, Nailing ❑ Consultation
❑ Foundation ❑ Shear Nailing ❑ Groundwork
❑ Mechanical ❑ Grid ❑ Struct. Slab
❑ Wood Stove ❑ Rough-in ❑ Final
❑ Masonry ❑ Drainage ❑ Insulation
❑ Other:
INSPECTION REPORT
Permit No.:4r_'31�2SLot#: o�
Address:
Contractor:
• Owner: �.�-7. 3oZI�
Date: 24"3
-D-APPROVAL ❑ PARTIAL APPROVAL
❑ VIOLATION ❑ CORRECTION REQUESTED
❑ Corrections listed below MUST BE MADE before work can be approved.
❑ Please contact inspector.
❑ Was not able to perform inspection.
❑ CALL 435-0674 FOR RE-INSPECTION - 24 hour notice required.
I nspe or. i Date:
TY E OF INSPECTION REQUESTED
❑ I Inder-floor ElFraming ElGas Piping
ooting ❑ Drywall, Nailing ❑ Consultation
❑ Foundation ❑ Shear Nailing ❑ Groundwork
❑ Mechanical ❑ Grid ❑ Struct. Slab
❑ Wood Stove ❑ Rough-in ❑ Final
❑ Masonry Drainage ❑ Insulation
❑ Other:
INSPECTION REPORT J
Permit No.X c qO_5 Lot#:
Address:
Contractor: d&_ Q/z_
Owner: Jr/61,57- ?,_f-1-Sags
Date: 3 -23 -,2-000
APPROVAL ❑ PARTIAL APPROVAL
❑ VIOLATION ❑ CORRECTION REQUESTED
❑ Corrections listed below MUST BE MADE before work can be approved.
❑ Please contact inspector.
❑ Was not able to perform inspection.
❑ CALL 435-0674 FOR RE-INSPECTION - 24 hour notice required.
Inspector: Date: 3 Z�3 "a)c)
TYPE'OF INSPECTION REQUESTED
❑ Under-floor ❑ Framing ❑ Gas Piping
Footing ❑ Drywall, Nailing ❑ Consultation
XCO-3
oundation ❑ Shear Nailing ❑ Groundwork
echanical ❑ Grid ❑ Struct. Slab
❑ Wood Stove ❑ Rough-in ❑ Final
❑ Masonry ❑ Drainage ❑ Insulation
❑ Other:
INSPECTION REPORT
-
Permit No.:O Yla5_Lot#:
r
Address: C S
Contractor:
Owner:
Date: d�
❑ APPROVAL ❑ PARTIAL APPROVAL
❑ VIOLATION ❑ CORRECTION REQUESTED
❑ Corrections listed below MUST BE MADE before work can be approved.
❑ Please contact inspector.
❑ Was not able to perform inspection.
❑ CALL 435-0674 FOR RE-INSPECTION -24 hour notice required.
Inspector: %• Date: ^�
TYPE OF INSPECTION REQUESTED
❑ Under-floor ❑ Framing ❑ Gas Piping
Do Footing ❑ Drywall, Nailing ❑ Consultation
❑ Foundation ❑ Shear Nailing ❑ Groundwork
❑ Mechanical ❑ Grid ❑ Struct. Slab
❑ Wood Stove ❑ Rough-in ❑ Final
❑ Masonry ❑ Drainage ❑ Insulation
❑ Other:
INSPECTION REPORT vj
Permit No.: Lot#:
Address: (),5 r ez2?�1/
Contractor:
Owner: 4�S—
Date: c3 /'
,14-APPROVAL ❑ PARTIAL APPROVAL
❑ VIOLATION ❑ CORRECTION REQUESTED
❑ Corrections listed below MUST BE MADE before work can be approved.
❑ Please contact inspector.
❑ Was not able to perform inspection.
❑ CALL 435-0674 FOR RE-INSPECTION - 24 hour notice required.
I
� l
Inspector:
Date:
YPE OF INSPECTION REQUESTED
>4�Foo
nder-floor ❑ Framing ❑ Gas Piping
ting ❑ Drywall, Nailing ❑ Consultation
❑ Foundation ❑ Shear Nailing ❑ Groundwork
❑ Mechanical ❑ Grid ❑ Struct. Slab
❑ Wood Stove ❑ Rough-in ❑ Final
❑ Masonry ❑ Drainage ❑ Insulation
❑ Other:
C I-rY OF n RL I N0-rON
CONES-rRUCT I ON F}ERM I T
F}E RM I T NO- 00—aS an
Owner: METCO HOMES 1910 120TH PL SE EVERETT 98208
Value of Work: $109, 118.00 Tax ID: GE 3C LOT 24 Phone: 425-316-0261
Describe Work: NEW CONSTRUCTION
Proposed Use: SFR
Legal Description: GLEN EAGLE 3C LOT 24
Job Address: 18205 CHAMPIONS DR
Contractor's Name Type Address License#
METCO HOMES G 1910 120TH PL SE EVT METCOHLO51C4
WALTS PLUMBING P 3224 109TH ST EVT WALTP156BP
PUGET HEATING CO INC. M PO BOX 336 LK STEV PUGETH*2648D
p E R N I T F E E S
Equipment and Fixtures Number Fee Total Charge
PLUMBING FIXTURES 15 $7.00 — $105.00
FURNACE/UNIT HEATER 1 $14.80 $14.80
RANGE 1 $10.65 $10.65
VENTILATION FANS 4 $7.25 $29.00
DRYER 1 $10.65 $10. 65
METAL FIREPLACE & CHIMNEY 1 $10.65 $10.65
WATER HEATER 1 $10.65 $10.65
GAS PIPING 1-4 OUTLETS 1 $4.75 $4.75
S U B T O T A L...... $196. 15
TOTALS Fee
Permit Fee $1,049.75
Equipment $91. 15
Fixture $105.00
Mech Permit $23.50
Plan Fee $682.34
Plumb Permit $25.00
State fee $4.50
School Mitigation $941.00
SIGNATURE.
TOTAL FEE.............. ... $2,922.24 1 HEREBY C TIFY THA3 I HAVE READ
AND EXAMINED THIS APPLICATION AND
PAYMENTS....... ........... $586.79 KNOW THE SAME TO BE TRUE AND COR-
RECT ALL PROVISIONS OF LAWS AND
TOTAL DUE................. $2,335.45 ORDINANCES GOVERNING THIS TYPE OF
WORK WILL BE COMPLIED WITH ETHER
5PECIFI= IN
DATE _--.I F°T
0,110c) l 1�1 nn BUILDING OFFICI
lk
LOT Z4
yK.s
M
� S l 5 �
Z cA �•
•ls.S
sp.00
Cr�r4MA/ojv PR .
Kristi Park LOT
� D I Z-
'q
Planner/Permit Coordinator
Office:(425)316-0261 ext.233
METCOHLo15C4 Office:(425)481-0665 ext.233
METCOC*243K7 Mobile:(206)850-7653
E-mail:constr®metco-homes.com 1910-120th PI.S.E. RECEIVED
Intemet:www.metco-homes.com Everett,WA 98208
FEB 112000
CITY OF ARLINGTON
C7Z -3�d S
_ o
CITY OF ARLINGTON
CONSTRUCTION
PERMIT
g�
COMBINATION 0 BUILDING 0 MECHANICAL ❑ PLUMBING ❑ SIGN
j OWNER PERMIT NO.
MAIL ADDRESS CITY
ZIP ►HON E
lgto- I2oT Fes . s vE12-ET-T_ 9820f3
ARCHITECT OR DESIGN R r MAIL ADDRESS 442.tl-
POQ 31 ��(p� X Z3
CITY ZI► PHONE
� WIL1-TAMS /fol-2 - l3I=T pe. N� LIB• S GENERAL CONTR %- O T$VE/VS 98 2-r8 `/3S• 33`'f• 33Co}
MAIL ADDRESS CITY
ZIP PHONE LIC NSE r
MT✓5 1�to -�a0' L. SFs :tV ErRETT q8 � MtTGuNLOSIG
MLCIIlANfCAL CON7IRACTOR MAIL ADDRESS �S'ano. O�(ol
P'- (qFT HEAT/N CITY ZII PHONE
�l Po X 33(v `�. S-Z-�IJEAJ uceNSE r
Lv^+olrvt,CONTRACTOR MAIL ADDRESS 90Zs8 42a334 14111 pugErHCOrIL
CITY ZIP PHONE LKENSE r
In WALTS QL-ul'�1gIN 322�-I Ib°ITH ST. s -VI-P_FT
3 CLASS OF WORK '11S 33p .�48r �,c1q�7 p�sb�(�
O NLW ❑AUDITION ❑ALTERATION ❑REPAIR ❑DEMOLITION
❑BUILDING RELOCATION
Q vALUATIONOF WORK
I Sf7C] v l
DLSCRISE WORK
3 M i IV I Li sort" Z �412
M /RUPUSI U USE OF BUILDING
H R ES IDrdd
W Tl P►�- I HEREBY CERTIFY THAT I HAVE READ AND EXAMINED THIS APPLICA-
Z LLGnL DkS('RIPI IUN OI PROPERTY(SHOWN BELOW UR ATLACN FUUR COPIES) TION AND KNOW THE SAME TO BE TRUE AND CORRECT ALL PROVI-
J t� SIONS OF LAWS AND ORDINANCES GOVERNING THIS TYPE OF WORK
J lUl Z' l BLUCK OF LTV LE SQL 3� WILL BE COMPLIED WITH WHETHER SPECIFIED HERIN OR NOT.THE
a
W GRANTING OF A PERMIT DOES NOT PRESUME TO GIVE AUTHORITY TO
a~ VIOLATE OR CANCEL THE PROVISIONS OF ANY OTHER STATE OR
TAx to NUMBER FROM PROPERTY TAX STATEMENT LOCAL LAW REGULATING CONSTRUCTION OF THE PERFORMANCE OF
Z 3 3 l IoS- (— OD(A ppo3 CONSTRUCTION.PERMIT EXPIRES 1 YEAR FROM DATE OF ISSUANCE.
U 108 AUURLSS SIGNATURE OF ONTRACTORORAUTHORIZ DATE
t , ;2CS C1411,IPI0/VS D '
(OFFICE USE ONLY)
PLUMBING
VI
ECHANICAL
WATER CLOSKI' I
NO. TYPE OF FIXTURE FBB z'i FIXTURES NO.
TYPE OF EQUIPMENT FEB :4 JFOlJRES
IR COND.UNITS-H.P. EA. ui •Ot•,
ATHTUB @'RIOERATION UNITS-H.P.BA
VATORY ASH BASIN of •Gt••
OQ ERS-H.P.ROWER n.E at„
AS FIRED A.C.UNITS-TONNAGE EA Lip..Ut••
7CHF.N SINK t DISPOSAL
1SHWASHER ORCED AIR SYSTEMS-B.T.U. MFA
UNDRY TRAY ALL HBATERS-B.T.U. M
WASHER
NIT HEATERS-B.T.V. M
L.O ITi FS .
APORATI V B COOLERS
ATER 1IJI
LOTIIES DRYERSS
RINAL
ENTILATION FAN
RINRINU FOUNTAIN
GB HOOD COMMERCIAL
1,OOR DRAIN
IR IIANDLINO UNIT- CPM
ACUUM BREAKERS
VB
OOF DRAINS-RAINLEADERS IiIAL FIREPI ACER CFIIMNBY
IN[ ERVIC6-BAR,M. �J ATRR HEAT
AS PIP1N0 u to 5 S3.0o,�dd.L S.7S
ul meat Wt mut po ov{ded
SUBTOTAL
SUB TOTAL
PERMIT
PERMIT
TOTAL PEE a TOTAL FEE SIDL YARD Sk PLK S TRLLI SL IBACK REAR YARD/SETS K LAN CHECK NUMBER
y" T PLAN CHECK FEE
USP/ONt LO1 ARF'A 2•� VACANT SIT ���CJ FEE
�) RECEIPT No.
D � YES FEES VALUATION FEE
1 YPk OF CONS UCCyPA�7GRU�UNO.OF DWELLING UNITS PLAN CHECKING VG �I G�C
SOIL Of SLIX.. NO.Of STORILS MAX.000.LOAD BUILDING
/9J
�� 7
�J PLUMBING
FIRE SPRINKLERS REQUIRED
YES (a740 MECHANICAL
COMMENTS STATE BLDG.CODE
ENERGY CODE SURCHARGE
PENALTY U.B.C.
31a1
RECEIVED WATER/SEWER FEES
FEB 11 2000 TOTAL
PERMIT VALIDATION
CITY OF ARLINGTON WHEN PROPERLY VALIDATED ON THIS SPACE)THIS 15 YOUR PERMIT i RECENT
PAID CRN BY
CC:ASSESSOR,APPLICANT,TREASURER,BLDG.DEPT, BURDINGOFFICIAL DATE
RECORDS COPY