HomeMy WebLinkAbout18211 CHAMPIONS DR_003969_2026 0 INSPECTION REPORT
N G TO Permit No. Lot#:
Q' Address: Z I
Z Contractor: � ,
O Owner:
9s�r N Cs� Date:
�PPROVAL ❑ PARTIAL APPROVAL
VIOLATION ❑ CORRECTION REQUESTED
❑ Corrections listed below MUST BE MADE before work can be approved.
❑ Please contact inspector.
❑ Was not able to perform inspection.
❑ CALL 435-0674 FOR RE-INSPECTION - 24 hour notice required.
r
t
i
l ;
Inspector. Date; C
TYPE OF INSPECTION REQUESTED
❑ Under-floor ❑ Framing ❑ Gas Piping
❑ Footing ❑ Drywall, Nailing ❑ Consultation
❑ Foundation ❑ Shear Nailing ❑ Groundwork
❑ Mechanical ❑ Grid ❑ Struct. Slab
❑ Wood Stove ❑ Rough-in Final
❑ Masonry ❑ Drainage ❑ Insulation
❑ Other:
INSPECTION REPORT
ytN G TO Permit No.: �� Lot #:
4
Address: )
Contractor:
9s, �O Owner:
IN O Date: / / - 3 0 `�0®
APPROVAL ❑ PARTIAL APPROVAL
❑ VIOLATION ❑ CORRECTION REQUESTED
❑ Corrections listed below MUST BE MADE before work can be approved.
❑ Please contact inspector.
❑ Was not able to perform inspection.
❑ CALL 435-0674 FOR RE-INSPECTION - 24 hour notice required.
Inspector: Date: ` —
PE OF INSPECTION REQUESTED
❑ Under-floor ❑ Framing ❑ Gas Piping
❑ Footing ❑ Drywall, Nailing ❑ Consultation
❑ Foundation ❑ Shear Nailing ❑ Groundwork
❑ Mechanical ❑ Grid ❑ Struct. Slab
❑ Wood Stove ❑ Rough-in Final
❑ Masonry ❑ Drainage ❑ Insulation
❑ Other:
INSPECTION REPORT
4y',N G T® Permit No.: bid- Lot *
Q Address:
Contractor:' "N
�s
O0 Owner:41
N G� Date:
,9,APPROVAL ❑ PARTIAL APPROVAL
VIOLATION ❑ CORRECTION REQUESTED
❑ Corrections listed below MUST BE MADE before work can be approved.
❑ Please contact inspector.
❑ Was not able to perform inspection.
❑ CALL 435-0674 FOR RE-INSPECTION - 24 hour notice required.
Inspector: Date: !/ a
TOE OF INSPECTION REQUESTED
❑ Under-floor ❑ Framing ❑ Gas Piping
❑ Footing Drywall, Nailing ❑ Consultation
❑ Foundation ❑ Shear Nailing ❑ Groundwork
❑ Mechanical ❑ Grid ❑ Struct. Slab
❑ Wood Stove ❑ Rough-in ❑ Final
❑ Masonry ❑ Drainage ❑ Insulation
❑ Other:
INSPECTION REPORT
y1N G?'O Permit No.: —3R(0� Lot It: �3
4 �
Q' Address:
Contractor: t '�
O Owner:
9s�I N G Date: 1��y1 �0rj
❑ APPROVAL ;�,,PARTIAL APPROVAL
❑ VIOLATION ❑ CORRECTION REQUESTED
❑ Corrections listed below MUST BE MADE before work can be approved.
❑ Please contact inspector.
❑ Was not able to perform inspection.
❑ CALL 435-0674 FOR RE-INSPECTION - 24 hour notice required.
n
Inspector: i• Date: �0
/1/1YPE OF INSPECTION REQUESTED
❑ Under-floor 0 Framing ❑ Gas Piping
❑ Footing Drywall, Nailing ❑ Consultation
❑ Foundation ❑ Shear Nailing ❑ Groundwork
❑ Mechanical ❑ Grid ❑ Struct. Slab
❑ Wood Stove ❑ Rough-in ❑ Final
❑ Masonry ❑ Drainage ','j-2<nsulation
❑ Other:
INSPECTION REPORT
Permit No.�'2
1N Gl Lot#: v'?
¢y Q
Q° Address:
Contractor:
Owner:
Date: 00
❑ A PROVAL ❑ PARTIAL APPROVAL
IOLATION *ORRECTION REQUESTED
11YCorrections listed below MUST BE MADE before work can be approved.
❑ Please contact inspector.
❑ Was not able to perform inspection.
❑ CALL 435-0674 FOR RE-INSPECTION - 24 hour notice required.
Inspector: Date:
TYPE OF INSPECTION REQUESTED
❑ Under-floor ❑ Framing ❑ Gas Piping
❑ Footing '�Drywall,
Nailing ❑ Consultation
❑ Foundation hear Nailing ❑ Groundwork
❑ Mechanical ❑ Grid ❑ Struct. Slab
❑ Wood Stove :1 Rough-in ❑ Final
❑ Masonry ❑ Drainage ❑ Insulation
❑ Other:
INSPECTION REPORT
4y1N G l0 Permit No.: �~ �I Lot #:
F' Address:
J
Contractor:
Owner: �1
Date: A 9 —ny
❑ APPROVAL PARTIAL APPROVAL
VIOLATION 4--c REQUESTED
❑ Corrections listed below MUST 4E MADE before work can be approved.
F
Please contact inspector.
as not able to perform inspection.
CALL 4P -0674 FOR RE-INSPECTION - 24 hour notice required.
Inspector. " ��� Date: — _`
TYPE OF INSPECTION REQUESTED
❑ Under-floor XFrarning -- ❑ Gas Piping
❑ Footing U ryw all, Nailing ❑ Consultation
❑ Foundation ❑ Shear Nailing ❑ Groundwork
❑ Mechanical ❑ Grid ❑ Struct. Slab
❑ Wood Stove ❑ Rough-in ❑ Final
❑ Masonry ❑ Drainage ❑ Insulation
❑ Other:
(� INSPECTION REPORT
N G r, Permit N�, r C Lot #: a
�° -- Address: 1 `� l 1 C��a
Z Contractor:
O Owner:
IN Date:
❑ APPROVAL ❑ PARTIAL APPROVAL
❑ VIOLATION RECTION REQUESTED
Qgf Corrections listed below MUST BE MADE eforork can b]7 approved.
❑ Please contact inspector.
❑ Was not able to perform inspection:
ALL 435-0674 FOR RE-INSPECTION - 24 hour notice required.
�716-1
IPOI
[-�
I Coll ,
Inspector: Date.
TYPE OF INSPECTION REQUESTED
❑ Under-floor ❑ Framing ❑ Gas Piping
❑ Footing ❑ Drywall, Nailing ❑ Consultation
❑ Foundation ❑ Shear Nailing ❑ Groundwork
❑ Mechanical ❑ Grid ❑ Struct. Slab
❑ Wood Stove ❑ Rough-in ❑ Final
❑ Masonry ❑ Drainage 'Insulation
❑ Other:
_ INSPECTION REPORT
y1N G?'O Permit No.: C�'- �C9C 7 Lot#:
4`
Q' Address: Ls./9 4' .,7 s �r
Contractor:
�s �o-y Owner: Zrf�.
G
IN Date: /C' -6- _
��.
❑ APPROVAL ❑ PARTIAL APPROVAL
❑ VIOLATION '2.CORRECTION REQUESTED
-Ef—Corrections listed below MUST BE MADE before work can be approved.
❑ Please contact inspector.
❑ Was not able to perform inspection.
❑ C 435-0674 FOR RE-INSPECTION - 24 hour notice required.
Inspector:
.-z%� Date:
TYPE OF INSPECTION REQUESTED
❑ Under-floor & Framing Eg� Gas Piping
❑ Footing ❑ Drywall, Nailing ❑ Consultation
❑ Foundation ❑ Shear Nailing ❑ Groundwork
Ad Mechanical ❑ Grid ❑ Struct. Slab
❑ Wood Stove a--Rough-in ❑ Final
❑ Masonry ❑ Drainage ❑ Insulation
❑ Other:
INSPECTION REPORT
4ti1N G TO Permit No.: ��� Lot #:
4' Address: / �n�� _/yy 1 t71t*w zTk_
Contractor:
Owner: 0 a4
IN G Date:
APPROVAL ❑ PARTIAL APPROVAL
❑ VIOLATION ❑ CORRECTION REQUESTED
❑ Corrections listed below MUST BE MADE before work can be approved.
❑ Please contact inspector.
❑ Was not able to perform inspection.
❑ CALL 435-0674 FOR RE-INSPECTION - 24 hour notice required.
n
Inspector:
Date:
PE OF INSPECTION REQUESTED
❑ Under-floor ❑ Framing ❑ Gas Piping
❑ Footing ❑ rywall, Nailing ❑ Consultation
❑ Foundation Shear Nailing ❑ Groundwork
❑ Mechanical rid ❑ Struct. Slab
❑ Wood Stove ❑ Rough-in ❑ Final
❑ Masonry ❑ Drainage ❑ Insulation
❑ Other:
iNSPECTION REPORT
y1N G rO permit No�-3 q (01 Lot#:
Q Address: I �) 1 I C"
• • Contractor: 1,
Owner:
�IIN G Date:
--ROVAL ❑ PARTIAL APPROVAL
❑ VIOLATION ❑ CORRECTION REQUESTED
❑ Corrections listed below MUST BE MADE before work can be approved.
❑ Please contact inspector.
❑ Was not able to perform inspection.
❑ CALL 4 5-0674 FOR RE-INSPECTION - 24 hour notice required.
Inspector: Date:
TYPE OF INSPECTION REQUEST
Under-floor ❑ Framing ❑ Gas Piping
Footing ❑ Drywall, Nailing ❑ Consultation
❑ Foundation ❑ Shear Nailing ❑ Groundwork
❑ Mechanical ❑ Grid ❑ Struct. Slab
❑ Wood Stove ❑ Rough-in ❑ Final
❑ Masonry ❑ Drainage ❑ Insulation
❑ Other:
INSPECTION REPORT
Permit No.: >G��G Lot it: �
Address: ` ( ',Nmo r
Contractor: ��011� �"��f�MQ A
• Owner:
Date:
❑ APPROVAL ❑ PARTIAL APPROVAL
❑ VIOLATION —E��ORRECTION REQUESTED
❑ Corrections listed below MUST BE MADE before work can be approved.
❑ Please contact inspector.
❑ Was not able to perform inspection.
❑ CALL 435-0674 FOR RE-INSPECTION -24 hour notice required.
1
Inspector: Date: < f/
TYPE OF INSPECTION REQUESTED
❑ Under-floor ❑ Framing ❑ Gas Piping
❑ Footing ❑ Drywall, Nailing ❑ Consultation
❑ Foundation ❑ Shear Nailing ❑ Groundwork
❑ Mechanical ❑ Grid ❑ Struct. Slab
❑ Wood Stove ❑ Rough-in ❑ Final
❑ Masonry ❑ Drainage ❑ Insulation
❑ Other:
INSPECTION REPORT rl'
Permit No.:C.ti 3� ` Lot#: n ,
Address:
4i Contractor: � �'�
Owner: 9; SY ?54—3P-9 3
Date: 4 --- 9— ��(Ilw
/`�APPROVAL ❑ PARTIAL APPROVAL
❑ VIOLATION ❑ CORRECTION REQUESTED
❑ Corrections listed below MUST BE MADE before work can be approved.
❑ Please contact inspector.
❑ Was not able/Ap perform inspeption.
❑ CALL 435-0614 FOR RE-INSPECTION - 24 hour notice required.
r
Inspector: / Date:
TYPE OF INSPECTION REQUESTED
❑ Under-floor ❑ Framing ❑ Gas Piping
❑ Footing ❑ Drywall, Nailing ❑ Consultation
foundation ❑ Shear Nailing ❑ Groundwork
❑ Mechanical ❑ Grid ❑ Struct. Slab
❑ Wood Stove ❑ Rough-in ❑ Final
❑ Masonry ❑ Drainage ❑ Insulation
❑ Other:
INSPECTION REPORT
//11 3
Permit No.: V ' Lot#: a
Address:
Contractor: >L ' 1
Contractor:
Owner:
Date:
,240PROVAL ❑ PARTIAL APPROVAL
❑ VIOLATION ❑ CORRECTION REQUESTED
❑ Corrections listed below MUST BE MADE before work can be approved.
❑ Please contact inspector.
❑ Was not able to perform inspection.
❑ CALL 435-0674 FOR RE-INSPECTION - 24 hour notice required.
Inspector Date:
TYPE OF INSPECTION REQUESTED
❑ Under-floor ❑ Framing ❑ Gas Piping
Footing ❑ Drywall, Nailing ❑ Consultation
❑ Foundation ❑ Shear Nailing ❑ Groundwork
❑ Mechanical ❑ Grid ❑ Struct. Slab
❑ Wood Stove ❑ Rough-in ❑ Final
❑ Masonry ❑ Drainage ❑ Insulation
❑ Other:
0 I-rV OF A RL I NO-rON
00NO-r RUO-r I Ohl FEE RM I T
BE RM I T MO_ 0 00—aS G S
Owner: METCO HOMES 1910 120TH PL SE EVERETT 98208
Value of Work: $119,784.00 Tax ID: GE 3C LOT 23 Phone: 425-316-0261
Describe Work: NEW CONSTRUCTION
Proposed Use: SFR
Legal Description: GLEN EAGLE 3C LOT 23
Job Address: 18211 CHAMPIONS DR
Contractor's Name Type Address License#
METCO HOMES G 1910 120TH PL SE EVT METCOHLO51C4
PUGET HEATING CO INC. M PO BOX 336 LK STEV PUGETH*2648D
WALTS PLUMBING P 3224 109TH ST EVT WALTP156BP
-- P E R M I- T- - F E -E S !'
Equipment and Fixtures Number Fee Total Charge
--------------- - - - - ------ ---- -- ------------ '
PLUMBING FIXTURES 14 $7.00 $98.00
FURNACE/UNIT HEATER 1 $14.80 $14.80
RANGE 1 $10.65 $10.65
VENTILATION FANS 4 $7.25 $29.00 !
DRYER 1 $10.65 $10.65 '
METAL FIREPLACE & CHIMNEY 1 $10.65 $10.65 �
WATER HEATER 1 $10.65 $10.65
GAS PIPING 1-4 OUTLETS 1 $4.75 $4.75
SUBTOTAL...... $189. 15
TOTALS Fee
Permit Fee $1, 105.75
Equipment $91. 15
Fixture $98.00
Mech Permit $23.50
Plan Fee $718.74
Plumb Permit $25.00
State fee $4.50
School Mitigation $941.00J
SIGNATURE:
TOTAL FEE. . . . . . . . . $3,007.64 I HEREBY _' IFY THRT i HAVE READ
AND EXAMINED THIS APPLICATION AND
PAYMENTS. : _ _ - _ $591.34 KNOW THE SAME TO BE TRUE AND COR-
RECT ALL PROVISIONS OF LAMS AND
TOTAL DUE...... ........... $2,416.30 ORDINANCES GOVERNING THIS TYPE OF
WORK WILL BE COMP I EL ''I TH WHETHER
SPECIFIED R
DATE RECEIPT # � I � 3 ��
T BUILDING OFF I
3�
f6l
I'S LhNDs4tPC r115,E:M E.FT
1ST
I
1600#014OUT LO-T �3
I
1 ,
I f�pRo*C1ec•(
1 301
+
l0 I
1 3oxS'S �;
I ,
Z 53' !Di
1
I I
� n
I 1
1
r �
1 r.
1
. ' • 2ysf
I
' 10 wmw
BASPAnOWT
+ e
hN
71
)—3q Kristi Park
Planner/Permit Coordinator
AECEIVED Office:(425)316-0261 ext.233
METCOHL015C4 Office:(425)481-0665 ext.233
METCOC*243K7 Mobile-(206)850-7653
MAR15 2000 E-mail:constr®metco-homes.com 1910-12C6 PI.S.E.
Internet:www.metco-homes.com Everett,WA 98208
CITY OF ARLINGTON
_ o
CITY OF ARLINGTON
CONSTRUCTION
PERMIT Lta�
COMBINATION ❑ BUILDING ❑ MECHANICAL ❑ PLUMBING
j O ❑ SIGN
OWNER PERMIT NO.
MAIL ADDRESS r� 7C
CITY 21r ►HONE
�- l o- I�o rt+ R . s uE v_ -C
ARCHITECT ORDESIG R r 9 Z� PZS• 31I •
MAIL ADDRESS p
WILL_lol P 5 �b12 - /-A/ CITY KIP PHONE -
GENERAL—IRA O sT DQ. N� GIB• ST PVOW$, 98Z$� �I
,,yy Q MAIL ADDRESSCITY y3�• �3T• 33l0�•
IC.-O �I�Iv1E5 1 l �� -I�VIf L. ZIP ►HONE LICNSEI
MLCIIAN ICAL CONTRACTOR �V a�•EZ'T CI£j �s. ,b•D��`Mt T�.c�y�slLy
MAIL ADDRESS CITY
P'{ FT t4EA-T`lN o zlr PHONE LICENSE F P 33o)c 33(v LL'. 5"«VS�l1S 9S2 N 33�.�Ill pu E
►IUMBINGCONTRACTOR � rH�.crIG�
MAIL ADDRESS CITY
WAL-TS •PLu ZIP ►HONE LICENSEI N CLASS OF WORK �gl Nt� 3 21.'-} (o atTH S'T: S� �V I✓I2 E-�"
0 916?t� ��s 338 .I�iK3� V)ALT Plrbj5p
R NLW ❑AUDITION ❑ALTERATION ❑REPAIR ❑UEMULITION
Q VALUATION OF WORK ❑BUILDING RELOCATION
s �t7 �� e&_3
W UfSCRIBE WURK
m3 M wl witiDB�K'' s►►J4f}Wt I L-Y i�aME
rRUPUStDUSf OF BUILDING
w R ES lDv=m TI fit, I HEREBY CERTIFY THAT I HAVE READ AND EXAMINED THIS APPLICA-
Z LLGX,,DLS('RIPIIONOI PRUPt RTY SHOWN BELOW UR ATTACH FOUR COPIES) TION AND KNOW THE SAME TO BE TRUE AND CORRECT ALL PROVI-
J SIONS OF LAWS AND ORDINANCES GOVERNING THIS TYPE OF WORK
L°' BLur K of N L 1= Sr� 3L WILL BE COMPLIED WITH WHETHER SPECIFIED HERIN OR NOT.THE
w GRANTING OF A PERMIT DOES NOT PRESUME TO GIVE AUTHORITY TO
Luu VIOLATE OR CANCEL THE PROVISIONS OF ANY OTHER STATE OR
J TAX ID NUMBER a FROM PROPERTY TAX STATEMENT LOCAL LAW REGULATING CONSTRUCTION OF THE PERFORMANCE OF
o 33 Co s- 1_ pp& _000 3 CONSTRUCTION.PERMIT EXPIRES 1 YEAR FROM DATE OF ISSUANCE.
L) IOB aUURLSS SCNATURE Of CONTRACTOR Olt AUTHORIZED AGENT DATE
t IoZD I CE•64WIP1DN5_
(OFFICE USB ONLY) d.
PLUMBING
E{C HAN ICAL
NO. TYPE OF FIXTURE FBB is FIXTURES NO. TYPE OF EQUIPMENT
WATER CLOSET ILET FEEL :'a FIXTURES
tR COND.UN[TS-HP. EA t••
ATIKTUB to .Il
ErR10ERATION UNtT3 EA. ui .pt..
VATDRY AS)I BAS➢N
O➢ERS-H3.BA ul .HotHowER
TCHF.N SIN[i DISPOSAL AS FIRED A.C.UNITS-TONNAGE EA_ W .Ut••
UNDRY B TRAY WALL
AIR SYSTEMS-B.T.U. MEA
I R ALL HBAT'ERS-B.T.U. M
NDRY
t.oTT I Fs wASIIBR NIT HEATERS-s,T.U. M
nTEtR HEATER wPORATI VB COOLERS
RIVAL LATTIBS DRYERS
ENTILATION FAN
KINKING FOUNTAIN
1.00R ORA1N
GE HOOD COMMERCIAL
'
VACUUM GREASERS 1R IIANDLING UNIT- CPM
VB
OOP DRAINS-RAINLFiSDBRg BTAL FiREPLACBt CFIINNBY
INS(SERVICE-BAR,ETC.) WATER HEATER
AS PIPING *(Uv to S-$3.00,addaL t.Ti
ul meat ILt mut be ptavided
SUB TOTAL
SUB TOTAL
PELN IT ELM IT
_ TOTAL FBE
SIUL YARD SL I BACK STRLLT SL TBACK REAR YARD SETBACK PLAN CHECK NUMBER EEP
L FBS
'r K PLAN CHECK FEE
Z.S _ 1� FEE,5q 1 ,r2 y RECEIPT NO.
USF/UNt LOT ARLA VACANT SITE J J—I
le-7 [l YES ❑NO FEES VALUATION FEE
1 YPL Ot 71. OCCUU"Y GROUP NO.OF DWELLING UNITS PLAN CHECKING VG I A O
SILL OI Kw. NO.OF S70RILS MAX.000.L BU'LDING
PLUMBING
F IRE SPRINKLERSREQUIRED
YES [)NO MECHANICAL
COMMENTS STATE BLDG.CODE
ENERGY CODE SURCHARGE
RECEIVED PENALTYSEC.3
SEC.303(a)
WATERISEWER FEES
MAR 115 2000 5e? TOTAL
PERMIT VALIDATION
CITY OF ARLINGTON WHEN PROPERLYVALIDATED ON THIS SPAM THIS IS YOUR PERMIT&RECEIPT
PAID CRR By
cc:ASSESSOR.APPLICANT.TREASURER,BLDG.DEPT BUILDING OFFICIAL DATE
RECORDS COPY