Loading...
HomeMy WebLinkAbout17731 59th Ave Ne_BLD543_2026 Date: 02/27/2026 Permit #: 543 Permit Date: 12/15/2014 Review 12/15/2014 Date: Permit COMMERCIAL PLUMBING Type: Review COMMERCIAL PLUMBING Type: Target Date: 12/19/2014 Scheduled Time: Completed 12/16/2014 Date: Description: Under the current business license we have classified them as a domestic discharge only (i.e. only bathrooms). It appears they are plumbing for food production with the dishwasher, prep sinks, ejector pump and floor drains. Due to this their classification will change and the addition of pre- treatment devices may be warranted. The applicant will need to schedule an appointment with our Pre-Treatment Specialist to discuss their project to assure compliance. They will also be required to enter into a discharge agreement. Contact Sandy Boyd for Pre-Treatment(360)403- 3539 Review Status: Assigned To: PW-SEW-REV Time In: Time Out: Hours: Property Information ARLINGTON ADVANCED MANUFACTURING Parcel#: 31052200404400 PARK ARLINGTON ADVANCED MANUFACTURING 3316 FUHRMAN AVE E STE 200 PARK 17731 59TH AVE NE SEATTLE, WA 98102 Zoning: Lot: 16Block: Permit #: 543 Permit Date: 12/15/14 Permit Type: COMMERCIAL PLUMBING Project Name: Cleo, LLC Applicant Name: Topline Plumbing Applicant Address: 13110 NE 177th Place, #316 Applicant, City, State, Zip: Woodinville, WA 98072 Contact: David Claughton Phone: 206-941-9713 Email: toplineplumbing@comcast.net Scope of Work: Valuation: 8000.00 Square Feet: 0 Number of Stories: 0 Construction Type: Occupancy Group: ID Code: Permit Issued: 02/23/2015 Permit Expires: Form Permit Type: Status: COMPLETE Assigned To: Launa Black Property Parcel # Address Legal Description Owner Name Owner Phone Zoning ARLINGTON ADVANCED 31052200404400 17731 59TH AVE NE MANUFACTURING PARK Contractors Contractor Primary Contact Phone Address Contractor Type License License # 13110 NE 177th CONSTRUCTION Topline Plumbing David Claughton 206-941-9713 Labor & Industries TOPLIPL902JW Place, #316 CONTRACTOR Inspections Date Inspection Type Description Scheduled Date Completed Date Inspector Status C04. PLUMBING DWV and domestic on test 02/23/2015 02/20/2015 02/20/2015 z.Christopher Young Approved GROUNDWORK and installed per code. C19. PLUMBING Groundwork plumbing on 12/18/2014 12/17/2014 12/17/2014 z.Christopher Young Approved FINAL test. Work approved. Plan Reviews Date Review Type Description Assigned To Review Status COMMERCIAL 12/15/2014 Ok to issue z.Christopher Young PLUMBING COMMERCIAL 12/15/2014 No comments, LT PW-ADMIN-GIS PLUMBING Under the current business license we have classified them as a domestic discharge only (i.e. only bathrooms). It appears they are plumbing for food production with the dishwasher, prep sinks, ejector pump and floor drains. Due to this their classification will change and the addition of COMMERCIAL 12/15/2014 pre-treatment devices may be warranted. The applicant PW-SEW-REV PLUMBING will need to schedule an appointment with our Pre- Treatment Specialist to discuss their project to assure compliance. They will also be required to enter into a discharge agreement. Contact Sandy Boyd for Pre- Treatment(360)403-3539 COMMERCIAL Cross Connection inspection is required for in premise 12/15/2014 PW-WAT-REV PLUMBING protection. Gus Fees Fee Description Notes Amount Plumbing Base Permit Fee $25.00 Plumbing Plan Review Fees Valuation 8K $200.00 Mechanical Commercial Permit Table 4-7; Per Unit 7 fixtures $84.00 Total $309.00 Attached Letters Date Letter Description 12/18/2014 Building Permit Payments Date Paid By Description Payment Type Accepted By Amount Original Receipt # 02/23/2015 Topline cc 53620977 Launa Black $309.00 1205827 Outstanding Balance $0.00 Notes Date Note Created By: 02/24/2015 Payment did not post in iworqs. Deleted and reposted. Launa Black Spoke with Fred and he will have Sandy contact the client. Fred will update the review status as 12/17/2014 Launa Black soon as information and/or additional requirements are satisfied. - lp Uploaded Files Date File Name 02/23/2015 970338-543_Issued Permit.pdf 12/15/2014 884862-543_Application.pdf 12/15/2014 884863-543-Plan.pdf Date: 02/27/2026 Permit #: 543 Permit Date: 12/15/2014 Review Date: 12/15/2014 Permit Type: COMMERCIAL PLUMBING Review Type: COMMERCIAL PLUMBING Target Date: 12/19/2014 Scheduled Time: Completed Date: 12/16/2014 Description: Cross Connection inspection is required for in premise protection. Gus Review Status: Assigned To: PW-WAT-REV Time In: Time Out: Hours: Property Information ARLINGTON ADVANCED MANUFACTURING Parcel#: 31052200404400 PARK ARLINGTON ADVANCED MANUFACTURING 3316 FUHRMAN AVE E STE 200 PARK 17731 59TH AVE NE SEATTLE, WA 98102 Zoning: Lot: 16Block: