HomeMy WebLinkAbout17731 59th Ave Ne_BLD543_2026
Date: 02/27/2026
Permit #: 543
Permit Date: 12/15/2014
Review
12/15/2014
Date:
Permit
COMMERCIAL PLUMBING
Type:
Review
COMMERCIAL PLUMBING
Type:
Target Date: 12/19/2014
Scheduled
Time:
Completed
12/16/2014
Date:
Description: Under the current business license we have classified them as a domestic discharge only (i.e. only
bathrooms). It appears they are plumbing for food production with the dishwasher, prep sinks,
ejector pump and floor drains. Due to this their classification will change and the addition of pre-
treatment devices may be warranted. The applicant will need to schedule an appointment with
our Pre-Treatment Specialist to discuss their project to assure compliance. They will also be
required to enter into a discharge agreement. Contact Sandy Boyd for Pre-Treatment(360)403-
3539
Review
Status:
Assigned To: PW-SEW-REV
Time In:
Time Out:
Hours:
Property Information
ARLINGTON ADVANCED MANUFACTURING
Parcel#: 31052200404400
PARK
ARLINGTON ADVANCED MANUFACTURING
3316 FUHRMAN AVE E STE 200
PARK
17731 59TH AVE NE SEATTLE, WA 98102
Zoning: Lot: 16Block:
Permit #: 543
Permit Date: 12/15/14
Permit Type: COMMERCIAL PLUMBING
Project Name: Cleo, LLC
Applicant Name: Topline Plumbing
Applicant Address: 13110 NE 177th Place, #316
Applicant, City, State, Zip: Woodinville, WA 98072
Contact: David Claughton
Phone: 206-941-9713
Email: toplineplumbing@comcast.net
Scope of Work:
Valuation: 8000.00
Square Feet: 0
Number of Stories: 0
Construction Type:
Occupancy Group:
ID Code:
Permit Issued: 02/23/2015
Permit Expires:
Form Permit Type:
Status: COMPLETE
Assigned To: Launa Black
Property
Parcel # Address Legal Description Owner Name Owner Phone Zoning
ARLINGTON
ADVANCED
31052200404400 17731 59TH AVE NE
MANUFACTURING
PARK
Contractors
Contractor Primary Contact Phone Address Contractor Type License License #
13110 NE 177th CONSTRUCTION
Topline Plumbing David Claughton 206-941-9713 Labor & Industries TOPLIPL902JW
Place, #316 CONTRACTOR
Inspections
Date Inspection Type Description Scheduled Date Completed Date Inspector Status
C04. PLUMBING DWV and domestic on test
02/23/2015 02/20/2015 02/20/2015 z.Christopher Young Approved
GROUNDWORK and installed per code.
C19. PLUMBING Groundwork plumbing on
12/18/2014 12/17/2014 12/17/2014 z.Christopher Young Approved
FINAL test. Work approved.
Plan Reviews
Date Review Type Description Assigned To Review Status
COMMERCIAL
12/15/2014 Ok to issue z.Christopher Young
PLUMBING
COMMERCIAL
12/15/2014 No comments, LT PW-ADMIN-GIS
PLUMBING
Under the current business license we have classified them
as a domestic discharge only (i.e. only bathrooms). It
appears they are plumbing for food production with the
dishwasher, prep sinks, ejector pump and floor drains. Due
to this their classification will change and the addition of
COMMERCIAL
12/15/2014 pre-treatment devices may be warranted. The applicant PW-SEW-REV
PLUMBING
will need to schedule an appointment with our Pre-
Treatment Specialist to discuss their project to assure
compliance. They will also be required to enter into a
discharge agreement. Contact Sandy Boyd for Pre-
Treatment(360)403-3539
COMMERCIAL Cross Connection inspection is required for in premise
12/15/2014 PW-WAT-REV
PLUMBING protection. Gus
Fees
Fee Description Notes Amount
Plumbing Base Permit Fee $25.00
Plumbing Plan Review Fees Valuation 8K $200.00
Mechanical Commercial Permit Table 4-7; Per Unit 7 fixtures $84.00
Total $309.00
Attached Letters
Date Letter Description
12/18/2014 Building Permit
Payments
Date Paid By Description Payment Type Accepted By Amount
Original Receipt #
02/23/2015 Topline cc 53620977 Launa Black $309.00
1205827
Outstanding Balance $0.00
Notes
Date Note Created By:
02/24/2015 Payment did not post in iworqs. Deleted and reposted. Launa Black
Spoke with Fred and he will have Sandy contact the client. Fred will update the review status as
12/17/2014 Launa Black
soon as information and/or additional requirements are satisfied. - lp
Uploaded Files
Date File Name
02/23/2015 970338-543_Issued Permit.pdf
12/15/2014 884862-543_Application.pdf
12/15/2014 884863-543-Plan.pdf
Date: 02/27/2026
Permit #: 543
Permit Date: 12/15/2014
Review Date: 12/15/2014
Permit Type: COMMERCIAL PLUMBING
Review Type: COMMERCIAL PLUMBING
Target Date: 12/19/2014
Scheduled Time:
Completed Date: 12/16/2014
Description: Cross Connection inspection is required for in premise protection. Gus
Review Status:
Assigned To: PW-WAT-REV
Time In:
Time Out:
Hours:
Property Information
ARLINGTON ADVANCED MANUFACTURING
Parcel#: 31052200404400
PARK
ARLINGTON ADVANCED MANUFACTURING
3316 FUHRMAN AVE E STE 200
PARK
17731 59TH AVE NE SEATTLE, WA 98102
Zoning: Lot: 16Block: