Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
17212 51st Ave Ne Ste 104_BLD6190_2025
i Permit Packet Coversheet Community and Economic Development City of Arlington • 18204 591h Avenue NE • Arlington,WA 98223 • Phone (360)403-3551 Permit Number: BLD6190 Permit Type: Commercial Mechanical Address/Parcel: 17212 51 st Ave Ne Ste 104 Completed (Month/Year): December 2024 Land Use ❑ Notice of Decision ❑ Bonding or Assignment of Funds ❑ Staff Report o Confidential Documents. Contact the ❑ Application City to obtain. ❑ Narrative ❑ Letters and Project Documents ❑ Legal Description ❑ Other: ❑ Vicinity Map ❑ Site Plan Civil ❑ Landscape Plan ❑ Issued Permit ❑ Complete Streets Checklist ❑ Application ❑ Traffic Impact Analysis ❑ Other Applications ❑ Snohomish County Traffic Mitigation Offer ❑ Construction Calculation Worksheet ❑ WSDOT Traffic Offer Form ❑ Approved Plans ❑ Tree Survey ❑ Review Comment Form ❑ Stormwater Drainage Report ❑ Letters and Project Documents ❑ Geotech Report ❑ Other Agency Permits ❑ Critical Area Evaluation Form ❑ Reports: ❑ SEPA Checklist o Drainage Report Pg: ❑ Public Notice Material o Stormwater Pg: ❑ Noticing and Related Documents o Geotech Pg: ❑ Water/Sewer Availability Certificate o All Other Reports ❑ Unanticipated Discovery Plan Form ❑ SEPA and Noticing Materials ❑ Aerial Photo of Site ❑ Inspections ❑ Proposed Building Materials ❑ As-Builts ❑ Lighting Plans and Lighting Cut Sheets ❑ Other: ❑ Color Elevations ❑ Design Matrix Building ❑ Plat Map ❑✓ Issued Permit ❑ Title Report ❑✓ Application ❑ Lot Closures ❑ Additional Applications ❑ Preliminary Civil Plans ❑✓ Approved Plans ❑ Archaeological Survey ❑ Site Plan o Confidential Documents. Contact the ❑ Letters and Project Documents City to obtain. ❑✓ Calculations ❑ Topography(Existing Conditions) ❑✓ Project Specification Manuals ❑ CC&R's ❑ Reports ❑ Deeds/Easements/Conveyances ❑ Certificate of Occupancy /Dedications ❑ Inspections ❑ Developer's Agreement ❑ Other: ❑ Recorded Copies Page 1 of 1 CITY OF ARLINGTON 18204 59th Avenue NE,Arlington,WA 98223 INSPECTIONS:360-403-3417-Permit Center:360-403-3551 BUILDING PERMIT 17212 51ST AVE NE STE 104 Permit#:6190 Parcel#:31052100400100 PERMIT EXPIRES 180 DAYS AFTER DATE OF ISSUANCE. Scope of Work:Install new heat pump and ERV systems Valuation:44800.00 OWNER APPLICANT CONTRACTOR SMARTCAP ARLINGTON AIRPORT Five Start Comfort/Andrey Heichenko Five Star Comfort INDUSTRIAL PARK QOZB,LLC 8201 164TH AVE NW,SUITE 110 22407 61st Ave SE 22407 61st Ave SE REDMOND,WA 98052 Bothell,WA 98021 Bothell,WA 98021 4253456416 425 345 6416 LIC:603 208 718 EXP:10/310-025 LIC:FIVESSC881L2 EXP:06/2 O26 MECHANICAL CONTRACTOR PLUMBING CONTRACTOR LIC#: EXP: LIC#: EXP: JOB DESCRIPTION PERMIT TYPE: COMMERCIAL MECHANICAL CODE YEAR: 2021 STORIES: i CONST.TYPE: IIIB DWELLING UNITS: OCC GROUP: B;Business BUILDINGS: OCC LOAD: PERMIT APPROVAL The issuance or granting of this permit shall not be construed to be a permit for,or approval of,any violation of this Code or any other ordinance or order of the City,of any state or federal law,or of any order,proclamation,guidance advice or decision of the Governor of this State.To the extent the issuance or granting of this permit is interpreted to allow construction activity during any period of time when such construction is prohibited or restricted by any state or federal law,or order,proclamation,guidance advice or decision of the Governor of this State,this permit shall not authorize such work and shall not be valid.The building official is authorized to prevent occupancy or use of a structure where in violation of this Code,any other City ordinances of this jurisdiction or any other ordinance or executive order of the City,or of any state or federal law,or of any order,proclamation,guidance advice or decision of the Governor.The building official is authorized to suspend or revoke this permit if it is determined to be issued in error or on the basis of incorrect,inaccurate or incomplete information,or in violation of any City ordinance,regulation or order,state or federal law,or any order,proclamation,guidance or decision of the Governor. I AGREE TO COMPLY WITH CITY AND STATE LAWS REGULATING CONSTRUCTION AND IN DOING THE WORK AUTHORIZED THEREBY;NO PERSON WILL BE EMPLOYED IN VIOLATION OF THE LABOR CODE OF THE STATE OF WASHINGTON RELATING TO WORKMEN'S COMPENSATION INSURANCE AND RCW 18.27. THIS APPLICATION IS NOT A PERMIT UNTIL SIGNED BY THE BUILDING OFFICIAL OR HIS/HER DEPUTY AND ALL FEES ARE PAiD. IT IS UNLAWFUL TO USE OR OCCUPY A BUILDING OR STRUCTURE UNTIL A FINAL INSPECTION HAS BEEN MADE AND APPROVAL OR A CERTIFICATE OF OCCUPANCY HAS BEEN GRANTED. IBC110/IRCI 10. SALES TAX NOTICE:Sales tax relating to construction and construction materials in the City of Arlington must be reported on your sales tax etum form and cod ity of Arlington#3101. 11/04/2024 Applicant Signature Date Building Official Date CONDITIONS ADHERE TO THE APPROVED PLANS.APPROVED JOB COPY SHALL BE ONSITE FOR INSPECTIONS.CALL FOR INSPECTIONS. The property owner shall ensure that the construction project complies with all applicable zoning codes and regulations.The property owner shall also ensure that the construction project does not cause any adverse i npact on the surrounding environment or community.The property owner shall be responsible for obtaining all necessary pennks and approvals from the relevant authorities before commencing construction.The property owner shall ensure that the construction project complies with all applicable design review requirements. THIS PERMIT AUTHORIZES ONLY THE WORK NOTED.THIS PERMIT COVERS WORK TO BE DONE ON PRIVATE PROPERTY ONLY.ANY CONSTRUCTION ON THE PUBLIC DOMAIN(CURBS,SIDEWALKS,DRIVEWAYS, MARQUEES,ETC.)WILL REQUIRE SEPARATE PERMISSION. PERMIT FEES Date Description Fee Amount 11/04/2024 Web Only-Mechanical Commercial Plan Review $577.19 11/04/2024 Credit Card Service $17.32 11/0412024 Processinglrechnology $25.00 11/0412024 Diffusers $255.00 11/04/2024 DryerDucdng $15.00 11/04/2024 E*ausMnts/Vent Fans $15.00 11/04/2024 Heat Pump-Condensing Unit $25.00 11/04/2024 Credit Card Service $10.05 Total Due: $939.56 Total Payment: $939.56 Balance Due: $0.00 CALL FOR INSPECTIONS Call by 3:30 pm for next day inspection,allow 48 hours for Fire Inspections When calling for an inspection please leave the following information: Permit Number,Type of Inspection being requested,and whether you prefer morning or afternoon INSPECTION INFORMATION Pass/Fail i COMMERCIAL MECHANICAL APPLICATION • Community&Economic Development City of Arlington• 18204 59th Ave NE•Arlington,WA 98223 • Phone(360) 403-3551 This application is for new, addition, altered or replaced mechanical installation and new or altered gas piping and must be accompanied by ELECTRONIC CONSTRUCTION DRAWINGS and CUT SHEETS and/or information outlined in the MECHANICAL SUBMITTAL REQUIREMENTS,if applicable. Type of Permit: X New Installation ❑ Addition ❑ Alteration ❑ Replaced ❑ Gas Piping Type I and Type II Hood Systems required submittal of the Commercial Mechanical Addenda Property Address: 17212 51 st Ave N E Project Valuation: 44800 Lot#:A-104 Parcel ID No.: 31052100400100 Preferred Contact: O Owner 0 Contractor Project Description: Install new Heat Pump system and ventilation system (ERV) for new office. Owner Name: Chris Sweeney Office No.: (425)896-8561 Email Address: chris@smartcapgroup.com Cell No.: (425)896-8561 Mailing Address: 8201 164th Ave Se city: Redmond State: WA Zip: 98052 Contractor Name: Five Star Comfort Office No.: - Email Address: andrey@fivestarcomfort.com Cell No.: (425)345-6416 Mailing Address: 22407 61 st Ave SE City: Bothell State: WA Zip: 98021 L&I Contractor License Number: FIVESSC881 L2 Expiration Date: 6/22/2026 • New gas piping requires a pressure test hooking to any appliance • Sediment traps (drips) are required on all gas lines • Gas lines are required to be supported/secured per IFGS,Section 415 • Proper Combustion air and venting required for all appliances • A shut-off valve is required within 6 feet of each appliance Gas Piping Specification and complete Schematic PAGE 3 O Not Applicable O CSST O Brass O Other Proposed Piping Material: O Black Steel O Galvanized Steel Proposed Piping Size: O 1/2" O 5/8 O 3/4" O 1" O 11/2" O 2" Inlet Pressure: Pressure Drop: Specific Gravity: I hereby certify that the above information is correct and that the construction on,and the occupancy and the use of the above described property will be in accordance with the laws,rules and regulation of the State of Washington. Andrey Heichenko 10/4/2024 Signature Print Name Date REV03.2022 Page 1 of 3 MECHANICAL PERMIT FEES (per unit Type of Fixture No.of Units Cost per Unit Subtotal Additional Plan Review fees x $ 75.00 = $ Air Conditioning Unit 15 100 Btu h x $ 15.00 = $ Air Conditioning Unit> 100 Btu h x $ 25.00 = $ Air Conditioning Unit> 500 Btu/hp x $ 50.00 = $ Air Handling Units x $ 15.00 = $ Base Mechanical Fee $ 25.00 $ 25.00 Boiler<100Btu h>3h x $ 15.00 = $ Boiler>1 million Btu/h<50hp x $ 25.00 = $ Boiler>1.5 million Btu/h<50hp x $ 50.00 = $ Boiler>100Btu h 3-15h x $ 15.00 = $ Boiler>500Btu h 15-30hp x $ 25.00 = $ Commercial Hoods-Type I x $ 25.00 = $ Commercial Hoods-Type II x $ 50.00 = $ Diffusers 17 x $ 15.00 = $ Dryer Ducting x $ 15.00 = $ Ductwork(drawings required) x $ 25.00 = $ Evaporative Coolers x $ 15.00 = $ Exhaust Ventilation Fans x $ 15.00 = $ Fireplace/Insert/Stove x $ 15.00 = $ Forced Air Heat<_100 Btu h x $ 15.00 = $ Forced Air Heat>100 Btu h x $ 25.00 = $ Gas Clothes Dryer x $ 15.00 = $ Gas Fired Air Conditioning Unit 15 100 Btu h x $ 15.00 = $ Gas Fired Air Conditioning Unit> 100 Btu h x $ 25.00 = $ Gas Fired Air Conditioning Unit> 500 Btu/hp x $ 50.00 = $ Gas Pi in <_ 5 units x $ 15.00 = $ Gas Piping for each additional unit > 5 x $ 2.00 = $ Heat Exchangers x $ 15.00 = $ Heat Pump-Condensing Unit x $ 25.00 = $ Hot Water Heat Coils x $ 15.00 = $ Miscellaneous Appliance-regulated by x $ 15.00 _ $ mechanical code,not otherwise specified Package Units:5 100 Btu > 100 Btu x $ 25.00 $50.00 = $ Range/Cook top-Gas Fired x $ 15.00 = $ Refrigeration Unit<_100Btu h x $ 15.00 = $ Refrigeration Unit>100Btu h x $ 25.00 = $ Refrigeration Unit>500Btu h x $ 50.00 = $ Re-inspection fee all x $ 75.00 = $ Unit Heaters <_ 100 Btu h x $ 15.00 = $ Unit Heaters>100 Btu h x $ 25.00 = $ Variable Air Volume Boxes (part of Air x $ 10.00 = $ Conditioning System) Wall Heaters-Gas Fired x $ 25.00 = $ Water Heater- Gas Fired x $ 25.00 = $ Permit Fee $ Table 4-8; Plan Review Fee $ Processing/Technology Fee $25.00 Total $ REV2.2024 Page 2 of 3 PRESSURE PIPING SCHEMATIC COMPLETE FOR GAS PIPING ONLY ❑ SCHEMATIC IS TO SCALE ❑ SCHEMATIC NOT TO SCALE Show Pipe Size(s) and Length(s) from meter to all appliances NOTE: Any interior pressure regulators must be indicated REV2.2024 Page 3 of 3 ' HVAC GENERAL NOTES DUCT NOTES LEGAL DESCRIPTION: SYMBOLS SCHEDULE ,e 1. VERIFY SITE CONDITIONS, 1. DUCT CONSTRUCTION AND INSTALLATION PER LATEST SMACNA STANDARDS SYMBOL DESCRIPTION SYMBOL DESCRIPTION I^ µµ? uuN e nears � 1. THAT ' v OF THE en" S QUrRTFR PE SOW HEAST QUARTER OF 2. THERMOSTAT LOCATIONS:VERIFY ALL WALL MOUNTED CONTROL LOCATIONS WITH AND THE 2021 IMC AS REQUIRED BY THE LOCAL CODE. PROVIDE METAL DUCT, SECT13N r RAN E T DESCRIBED AS 'JWS: ® ® SUPPLY DUCT ® SMOKE DETECTOR 22407 slst Ave SE Bothell,INA 98021 ARCHITECT/GC. EXCEPT AS NOTED. COMM ti CIN 0.? HE SO HE S .�A�c - SF TION THFNCE,tiORTH RETURN/EXHAUST DUCT T Phene.y425l399-0811 3. CODES:COMPLY WITH ALL LOCAL&STATE GOVERNING CODES. 2. BALANCING DAMPERS:PROVIDE ON ALL SUPPLY RUN OUT DUCTS UP STREAM ❑ TIMER O-4 HR ADJUSTABLE G `3' WES tiLGN� �E 1E ,'_ 'JrD TaNCE 55,03 ---- Contracrorsl No FIVESSC89t12 4. COORDINATE DUCTWORK AND GRILLE LOCATIONS WITH LIGHTING AND OTHER RELATED TRADES OF DIFFUSERS. _E CU tiOH S c r SOUNDLINED DUCT QT THERMOSTAT WITH ARCHITECT APPROVAL.VERIFY CLEARANCES&CEILING ELEVATIONS BEFORE 3. DUCT INSULATION:DUCTS,SHAFTS AND PLENUMS SHALL BE INSULATED TO _ v .x FEE ,' -C ti FEET BEGlixv vC �NE'Vs X`F," DISTr,NC 2'.FEET � MANUAL DAMPER 0 SENSOR ' INSTALLATION. MINIMUM OF R-8 AND IN ACCORDANCE WITH THE SECTION C403.2.8 OF 2021 T HE C% a RF I Hr F LOG ANGENT CURVE TO 5. DRAWINGS ARE SCHEMATIC IN SOME AREAS AND MAY NOT SHOW EXACT ROUTING OR EVERY WSEC. ,E CONCAVE E ti rc h ,NG A RADIUS Son r6 FEET AND MOTORIZED DAMPER SENSOR(CEILING MOUNT) OFFSET WHICH MAY BE REQUIRED. 4. DUCT SEALING-GENERAL OTC 2"STATIC PRESSURE-SEAL ALL TRANSVERSE R; --C NTR E J1F'_C , M 0 EXHAUST FAN 6. SEISMIC BRACING:PROVIDE TO MEET LOCAL CODE REQUIREMENTS. REFER TO THE ASHRAE JOINTS AND LONGITUDINAL SEAMS ON ALL DUCTS.ABOVE 2"-SEAL SEAMS, T I-EP CI 1S'ANCE OF 1095,75 FEET;THENCE SOUTH FLEX DUCT C9 EXHAUST UP STANDARDS"PRACTICAL GUIDE TO SEISMIC RESTRAINT",2021. JOINTS AND WALL PENETRATIONS.INSIDE BUILD:DURODYNE"DDS-181"GRAY 2 �ST= 5 AN L- 6 FEET; TURNING VANES 7. EXHAUST FAN TERMINATION:SHALL NOT BE LESS THAN 3 FEET FROM A PROPERTY LINE OR OR APPROVED EQUAL PER UL 181 A-M,1816-M LISTED.OUTSIDE: THENCE SOUTH 8 342T FAST A DISTANCE OF 112625 FEET TO THE POINT OF --0 PIPE/DUCT UP I OPENINGS INTO A BUILDING,E.G.,OPERABLE WINDOWS AND DOORS,OR DISTANCE AS REQUIRED POLYURETHANE,MAMECO VULKEM 116. OR APPROVED=Q'UAL. BEGiNNdNG. END CAP D PIPE/DUCT DOWN PER LOCAL CODE. 5. TURN VANES:PROVIDE SINGLE THICKNESS TURN VANES(SEE DETAIL)IN ALL ® SUPPLY DIFFUSER/MAKEUP AIR PIPE TEE DOWN 8. TEST,.ADJUST,&BALANCE:PROVIDE PROPER SYSTEM TESTING,ADJUSTING,AND BALANCING, MAJOR SQUARE DUCT ELBOWS,TEES,OR TURNS WITH INSIDE RADIUS LESS TAX PARCEL NUMBER: GRILLE r1, INCLUDING WRITTEN REPORTS TO BE PROVIDED TO OWNER.BALANCE TO WITHIN 10%OF DESIGN. THAN 3/4 DUCT WIDTH,SQUARE BRANCH DUCT TAPS SHALL BE 45 DEGREE PIPE TEE UP 9. OPERATION&MAINTENANCE BOOKLET:PROVIDE 0&M MANUAL TO OWNER. INCLUDE CUT TYPE PER SMACNA STANDARD. 31u r4�J100 z RETURN/EXHAUSTITRA.NS FER -�-- VALVE SHEETS ON MAIN EQUIPMENT AND CONTROLS,MAINTENANCE INSTRUCTIONS,AND MARKED UP 6. FLEX DUCT(INSULATED):FOR GRILLE RUN OUTS UP TO a FT LONG,EXCEPT AS GRILLE AS-BUILT DRAWING. NOTED.PROVIDE ADJUSTABLE METAL ELBOWS ON ALL TURNS UNLESS, ® BACKDRAFT DAMPER �- BALANCING VALVE 10, COMMISSIONING:PRIOR TO PASSING THE FINAL INSPECTION OR OBTAINING A CERTIFICATE OF SMOOTH FULL RADIUS TURN IS MADE. SECURE COP h TH,,PPROVEC "ON R„ ® -{- DUCT REDUCERS HIDDEN/EXISTING EQUIPMENT OCCUPANCY.PROVIDE THE EVIDENCE OF SYSTEM COMMISSIONING AND COMPLETION IN OR METAL WORM DRIVE CLAMPS.NO DUCT TAPE CvN C&SCREWS ALLOWED d` SIDEWALL SUPPLY/MAKEUP NEW EQUIPMENT ACCORDANCE VNITH THE PROVISIONS OF SECTION C408 OF THE 2021 WSEC 7. SOUND LINER:PROVIDE SOUND LINED METAL SUPP'L1 3 RETURN DUCTS AS r sp�� 11, WALK-THRU INSTRUCTION:PROVIDE ON SITE WALK-THRU FOR CUSTOMER TO DEMONSTRATE SHOWN ON PLANS.MANVILLE PERMACOTE LINACOUSTIC FLEXIBLE £ �`` -V` SIDEWALL RETURN/EXHAUST �- CONTINUATION BREAKLINES 0 OPERATION OF SYSTEM AND ANSWER QUESTIONS. FIBERGLASS LINER,WITH ACRYLIC SURFACE TREATMENT OR EQUAL, „" - AREA OF NaQ 12. ROOF TOP UNITS ON CURB:SEAL HOLES AND CRACKS BETWEEN DUCT AND ROOF DECK INSIDE FABRICATE AND INSTALL PER DUCT LINER STANDARD OF NORTH AMERICAN XX-# EQUIPMENT TAG CM, DEMO (� FACTORY ROOF CURB FOR NOISE CONTROL. INSULATION MANUFACTURER'S ASSOC. OUTSIDE AIR DUCT IS NOT Z J 13. GAS PIPE:SCHEDULE 40,BLACK STEEL.PAINT PIPE EXPOSED TO WEATHER. INSULATED THROUGH UNCONDITIONED AREA. f� r C REVISION CLOUD t3 14. SIZES ALL PIPE SIZES SHOWN ARE MINIMUM. 8. FLEX CONNECTORS:PROVIDE ON ALL DUCT HOOK-UPS TO ISOLATE AIR �f X 15. PIPE HANGERS:SV;!IVEL LOOP STYLE,MICHIGAN NO.1000R CLEVIS STYLE,NO.4000R EQUAL HANDLING EQUIPMENT.(NEOPRENE COATED FIBERGLASS FABRIC TYPE1 "'" „„;;_`� "'" � � t;r �� N �^` '?? AIR TERMINAL LEGEND _ BRAND..Vt TH,4LTHERED STEEL ROD SIZED PER INDUSTRY STANDARDS. 9, DUCT SIZE CHANGES: ROUND GALVANIZED DUCTS MAYBE SUBST u i Ev F F- OR 16. ELECTRIC IAL.A,L EQUIPMENT TO HAVE A POSITIVE MEANS OF DISCONNECT ADJACENT TO AND IN RECTANGULAR DUCTS THAT ARE NOT LINED PROVIDE CIRCULAR „, - H.i XX 8xE VECK S ZE 'AtxH SQUARE OR SIGH'FROM EQUIPMENT SERVED.PROVIDE A 120 VOLT RECEPTACLE LOCATED WITHIN 25 FEET EQUIVALENT OF RECTANGULAR DUCT. OTHER EQUIVALENT RECTANGULAR GRILLE,REGISTER, 4 T. .i FOR SERVICE&MAINTENANCE PURPOSES 2021 IMC SECTION 301.10 LINE DUCT SIZES MAY BE SUBSTITUTED TO BETTER FIT SPACE. f � DIFFUSER IN LEGEND ` C HN< LA OF EQUIPMENT ( ) AIR OJ NTi?Y(CFM) VOLTAGE WORK BY OTHERS, 10. TEMPORARY DUCT CLOSURE: SEAL OFF DUCTWORK DURING CONSTRUCTION s" t 'r s »I `�� z < 17, SUSPENDED MECHANICAL EQUIPMENT AND APPLIANCES SHALL HAVE RIGID VERTICAL HANGERS TO KEEP OUT CONSTRUCTION DUST,ESPECIALLY FLOOR BOOTS AND LOW XX 80 ---NECK SIZE ROUND Cy � AND BE BRACED IN BOTH HORIZONTAL DIRECTIONS. WALL OPENINGS. V✓I CI Iv I7 t`MAP 140 W - ---E AIR QUALITY(CFM) �- AIR TERMINAL LEGEND NOTES 1. ALL DUCT AND GRILLE SIZES ARE IN INCHES UNLESS NOTED OTHERWISE. 0. 0. I 2. -A- ARROWS INDICATE AIR PATTERN FOR CEILING DIFFUSERS.NO ARROWS INDICATE FOUR WAY PATTERN. HEAT PUMP SCHEDULE SHEET INDEX z z COOLING(MBH) DESIGN ESP TOTAL MCA/MOP VOLTAGE FILTERUj TAG MANUFACTURER/ NOM TOTAL AUX HEATING JEER/SEER SUPPLY FAN WT(LBS) NOTES SHEET# DRA',,WING TITLE 0 MODEL# TONS TOTAL BEN HEATING (MBH) ATAHRI BH'r" RPM TYPE (IN.. CFM (AMPS} (VlHZIPH) TYPE ____ 8BBREVIATIONS > CARRIER/ M-1 LEGEND&r ErEVIATIONS VICINITY MAP,NOTES,EQUIPMENT SCHEDULE HP-1 6.0 74.99 59.58 12.9 KW 65.10 15/11 1.09 2177 MED 0,92 2400 36.0140.0 460/60/3 765 MERV 13 1-7 ABBREVIATION DEFINITION ABBREVIATION DEFINITION _ 50FCQM07A2A6.0AOA0 NOTES M-2 NL,MECHA i y_RCP AFF ABOVE FINISHED FLOOR NTS NOT TO SCALE P 1. INSTALL W 1100°lo OA LOW LEAK ECONOMIZER. M-3 NEW ROOF R STRUCTURAL LAYOUT PLANLb 2.INSTALL PER STRUCTURAL ENGINEERS NOTES AND STRUCTURAL REVIEW REPORT.(STRUCTURAL UPGRADES BY OTHERS) ADJ HDJHCENI OA,OSA OUTSIDE AIR 3.ELECTRICAL CONNECTIONS BY OTHERS. M 4 DETAILS C 09 ___ BD,BDD BACKDRAFT DAMPER OA1 OUTSIDE AIR INTAKE q 4.OSA PROVIDED BY ERV-1. BS BIRD SCREEN OTS OPEN TO STRUCTURE 5.WITH 7-DAY PROGRAMMABLE THERMOSTAT. GRILLE AND DIF FUSER SCHEDULE BBC BIOLOGICAL SAFETY CABNET (R) RELOCATED � 6.SMOKE DETECTOR IN THE UNIT,(RETURN SIDE) TAG MA.NUF DEL. SIZE(W X H) BWG BOTTOM PIA�L GRILL RA RETURN AIR 7.18"TALL ROOFCURB _.. =)-1 6HOEMAKER OMA 24"x24" CFH CHEMICAL FUME HOOD RD ROUND DIFFUSER G-1 I SHOEMAKER 35P 24"x 24" ,T CFM CUBIC FEET PER MINUTE RG RETURN GRILLE va31za Permit Issue 4 12 SHOEMAKER o00 6"x$" __- ,.._. I ;'TES: DB DUCT BOARD SA SUPPLY AIR OUTSIDE AIR REQUIRMENTS(IMC TABLE 403.3) 1 NECK COLLAR SIZES PER PRINT. ON DOWN SO SMOKE DETECTOR { CODE OUTSIDE AIR REQUIREMENTS ACTUAL OUTSIDE AIR(CFM PER UNIT) ¢ ' AREA GROSSFLOOR EA EXHAUSTAIR SC SOUND CAN PURPOSE AREA(SQ FT} CFM PER CFM PER OCUPANCY N0.OF CFM REQ'D ---- SO FT PERSON DENSITY PEOPLE EC END CAP SHC SENSIBLE HEATING CAPACITY - t "-______-------_ HP-1 2215 1 0.06 5 5 16 1 213 280 SCOPE OF WORK: EG EXHAUST GRILL SL SOUNDLINED DUCT - - ENERGY RECOVERY 1.INSTALL A NEVI-TON HEAT PUMP ROOFTOP UNIT AND AIR DISTRIBUTION ERV VENTI �,rCR TIC TOTAL COOLING SYSTEM. (E)/EXIST EXISTIr TG TRANSFER GRILLE ENERGY RECOVERY UNIT SCHEDULE ISTALLERV UNIT FOR EXHAUST AND VENTILATION. FC FLEX COv iE^SOR TV TRANSFER VANES SERVICEAX TEMP. MAX N?Hd.LPY ELECTRICAL MAXMAXAIRFLO W HEIGHT SOUND _� TAG MANUFACTURER I MODEL# (CFM) RECOVERY RECOVERY (LBS) (DB} NOTES °ERrORMF BALr;NCE.LOCATION EFFICIECY EFFICIENCY VOLTS PH I HZ MEMOCI L,S LIQUID,SUCTION TWG TOP WALL GRILLE A" aMG MAKEUP GRILLE TYR TYPICAL AH IB ERV-1 ALL LOSSNAY-TLGHF030ORVX02A 300 83% 81.5% 75 18-37 208-23011160 4 1-6 N NECK VD VOLUME DAMPER As NOTEo 2020430 i NOTES. (N) NEW w 1. DISCONNECT SWITCH BY ELECTRICAL CONTRACTOR. VEL VELOCITY LEGEND&ABBRt 2.FROVIDE 2"MER-8 PLEATED THROW-AWAY AIR FILTERS IN EACH AIRSTREAM. NIC NOT IN CONTRACT WH WATER HEATER 1r,n 'vGTFS AND �IONS /i^PiIT'�' EQUIPMENT 3.PROVIDE N TH SPRING VIBRATION ISOLATION AND ALL-THREAD HANGING RODS. CITY OF ARLINGTON SCHEDULES 4.PROVIDE`JLI T H INTAKE AND RETURN AIR LOW LEAKAGE DAMPER. BUILDING DEPARTMENT -- -- 5.INSTALL A WALL CONTROLLER. AP 30VED 6.SCHEDULE"ERV"OPERATION FOR BUSINESS HOURS WITH ADDITIONAL ONE HOUR BEFORE AND AFTER. // / NC J ,l T'+!1RI.ED _VFB' NE Bi JINLo INSPECTORF� weer uuwra AREA OF WORK RECEIVED M KEYPLAN -AREA OF WORK OcT o 7 io24 1 OF 4 FIVE STAR WA 2a'se *4COMFORT YOUR HEATING AND COOLING EXPERTS 22407 Stet Ave SE Bothell,WA 98021 Phone:(425)398.0811 Contractor's Licenee No.:FIVESSCS81 L2 W W W.fivestarcomfort.com fi 2 14„ NEY ,.. -•,, SD - k1T D 80 XNOTES RG-2 8 X 8ALL ROUND DUCT INSULATION SHALL BE EXTERIOR,ALL DUCTS SHALL HAVE R-6 INSULATION. 0 - CFM I - j RG 1 10Qj Los O CONNECT ERV OSA SUPPLY DUCT TO SUPPLY DROP,SEE SECTION CUT(51 M-4). 1 �' - tf�rry�th - # -__.. O DOORS TO BE UNDERCUT. 325 _.... � ' I. 3._-- ; I 1 SD 1 OQ� L4 YP 4 MEN'S RESTROOM NEEDS A WALL HEATER WITH TEMPERATURE CONTROLLER(SET 65F). fY r F1 2 8 x 8 [II ( 0 i -I�.,. SD8f� ,��I'.' I Z -� z 130 W Q J la I ! o w �� Imo% Q, ^ li. Cf \ D 100 I _ �` Q 425 RG 1 $0 W W -150 V BREAK 121 --- -- RG 1 120 8 aZ O130 > f.--- IT SD 100 JW W � l .. 325 ® ? H - I(- - - 0 :I SD 12(� to 375 w Lo .. - 03 a T SD 8o ram. 100 r _..._ ..._. Q ME. UCSCRIPn" 10103124 Permit Issue i — 0 NEW MECHANICAL RCP SCALE:114"=1'-0" -- ...-.... L n..I._.......,,...._ YRUF.Cr MANACEN UrSTCNFU$V �......... ,,--... All AH aenxry�n � crrrarm sr AH ......_� IS I I =GCE Nn�E�N,a AS NOTED 2020430 3 ---- -- - NEW MECHANICAL PLAN _._-....._.__..- _._. I I I I i I -------------'--------------- ------ --. ..._----�—_—_.__ ///''' I I M-2 2OF4 . f 6 1.i s vo�R xTw�are[ aouNr ex�=PIS 22407 61st Ave SE Bothell,WA 98021 PARAPET WALL Phone:(425)399-0811 GOOSENECK EXHAUST Contractor's License No.:FIVESSC881L2 HP-1 (SEE DETAIL#3) GOOSENECK �— VA Ww.flvestarcaanfort.cam j OUTSIDE AIR I ROOF r- 77 INSULATED ENVELOPE PROVIDE EXTERIOR R-6 INSULATION 1"LINER DROPS iQy 1 SUSPEND"ERV"WITH "G ALL-THREAD ROD Q 0 80 F_ C ERV-1 C : Z _j Z --T-BARCEILING _ n Il Q U o lesseeM a Z Q Uj Uj W _ EXTERIOR GRADE FINISHED FLOOR �IRV ' 1 V CL D OSECTION CUT SCALE:1/4"=1'-0" Q Z Z T_ METALLC OR NON-METALLIC !� BAND OVER!NSULATION(TYP) HIGH EFFICIENCY TAKEOFF EXTERNALLY INSULATED WITH VOLUME DAMPER AND DAMPER LOCK 1AA`H EXTENSION INSULATED DUCT FOIL TAPE AT INSULATION JOINT s 10/03/24 Permit Issue SEE NOTE#1 t _. PRE-INSULATED FLEXIBLE DUCT AS REQ.INSTALL PERMANENTLY SEALED AND SUPPORTED TO UNIT GASKET PREVENT KINKING&SHAPE TURNS SEISMIC HOLD-DOWN CLIP ECONOMIZER - — - 9 ROOFTOP UNIT UNIT WOOD NAILER BIRD SCREEN METALLIC OR NON-METALLIC BAND TYP P,t i SEISMIC HOLD-DOWN CLIP � ) CURB INSULATE INSIDE OF CURB SUPPLY(RETURN FACTORY ROOF CURB v` - DUCT DROP RIGID INSULATION PER ENERGY CODE co CEILING DIFFUSER WITH VOLUMN DAMPER CC_LAR M OR COMBINATION VOLUMN/FIRE DAMPER _ ROOFING MATERIALS BY OTHERS -� TALL/ ASHIN-- AS SCHEDULED 73, ROOF F_AS- 0 ROC=- CEILING aH nu ec a ....r� ar AllI e,n er att—�a—r— TRUSSES i� � �I�i Ex arzo ;yAUSTDUCT aH it B �-- CANT STRIP ROOFQ L i NOTES AS NOTED 2020430 ROOFTOP ROOF DECK I SOUND-�JEC 1 EXTeNC RI C METH �C-a0 THAT MAXIMUM FLEXIBLE UNIT SUFF RE i uRN DUCTLN uOES N EXCEED 6'-0".PROVIDE RIGID 90' NEW ROOF PLAN PENETRATIONS THRU __._....-.. SEAL ALL CRACKS AND DR E�BON,A iERE RECU ED TO KEEP FLEXIBLE DUCT WITHIN STRUCTURAL LAYOUT DETAILS. ROOF DECK AS REQ. _ 6 C'LENG H_M ATICN FILLER OSTANDARD CURB DETAIL OROOFTOP UNIT DETAIL OGOOSENECK EXHAUST DETAIL ®CEILING DIFFUSER DETAIL SCALE:N'.T S SCALE:N.T.S. SCALE:N.T.S. SCALE:N.T.S. sir M-4 4OF4 gMicroMetl Date: 10/4/2024 Weight: 45lbs (US) 20.41kg (Metric) Part Number: ECD-SRT12CB-D2DH RTU: Submitted to: Approved by: Notes: Economizer- Economizer- Genesis Ultra Low Leak Economizer, Vertical Orientation, Honeywell Jade W7220 Single/Multiple Speed Electromechanical Controller, Adjustable Dry Bulb Sensor, Honeywell Actuator. Painted Rain Hood With Aluminum Filter, Barometric Relief, All Necessary Panels And Hardware Included. For Differential Return Air Sensor Please Order 9901-2022-DIFF JC2 FOR MODEL NUMBER: 48.'50GC 04 - 06; 48.'50FC 04- 07; 48/50GCO 04 - 06-1 48/50FCo 04 - 07 DETAILS: Model Details FEATURES: NOTE:The ECD-SRT12CB-DZ-H economizer plugs directly into the Vane Axial Unit Control Board(Ill mithout the need for Eitternal gear driven dampers%ill roll forme d blades. jumpers.If installing the economizer on a 48+50 TC.TCQ 03-07;48/50 HC,HCQ 4.04---106;48;50LC•,SC Qa-06 unit,you hill Factory assembled rain hood...ith aluminum w atcr entrainment fille ii need to remove the harness shipped on the controller and replace it with a 9962-0407&9962-0-W7-SAO-•1E_1T harness ordered rater access door supplied with R'IU• separately.For AZ-customers replace it With a 1002-0.V harness ordered separately. Hinged filter access door if required,solid separately. If using a 48/50JC unit,please order the EC D-SRT12C B-DODB-4 economizer pith HoneN well controls. • MMC P/lt for Chassis I-ECD-SRTICA-HDOOR • MMC P/it for Chassis 2-ECD-SRT2CA-HDOOR lliri&cd Filter access door. All harnesses and plugs[ceded are supplied. .old vy,umrteH- Economaer OA and Return dampers are—XICA Class IA fisted. Relief damper is AMCA fisted. \ Motorized relief available,add-M to end of part number Direcl tiKy,kyl i • Ea:ECD-SRTI2CP D2DH-M actuatcK-mount Economizer with smoltc detector available add-S to end of part number • Fie:ECD-SRT12CB-D2DH-S -Control Types IB 9ir, Ho --�� rontrDll1er.actuattor. • O/A HUOD -D2DH )ad ustable�n�g lieu onlrols DEPTH ' 1'.ickirnt tape.I'm Ix•rrnxtudl -D2EH Honeywell controller.actuator.enthalpy controls prior to itnaullutlon. 1 Outside sir wrlwr For Differential Sensor•please purchase liit below: ke.dirut Differential Sensor Kit- 9901-2022-DIFF JC': _CY)VOMrl.ER EEONOVAIZER O.D. DEPTH [r����It••������// - � NOR (1 g(�qp ltaKA" ww �// AIR LQ — MErcrroe�uot e 16.�hF. a ® LCONOMIZ.ER e �i O D Compliant Economizer: El 1. Title 24:E_enomczers mew California Energy Commission Title 24-2018:2019 prescriptive section 140.4(damper leakage etc1,and mandatory section 120.2_i for Fault Deteton and Diagnostic controls. ASHRAE 90.1:Economizers meet ASHRAE 90.1-2019 damper leakage requirements as stated in Table 6.4.3.4.3..and meet 2019 Fault Detection and Diagnosis requirements in section 6-4.3.12. 3- IECC:Economizers meet IECC 2018 section C402.4.5.2 and.IECC 2018 sections C4032.4-3 and C403.3.3.5 for outside air,return air,and relief damper(.when providedi leakage requivements.and IECC 2018 section c4032.4-7 for Fault Detection and Diagnostic requirements. AMCA:Outside air and return air Ivolumel dampers are Ali Class 1A rated at 1-w.g.Refer to tficroMed NS2 catalog sheet on web site for details. Relief air dampers are also AMCA rated.Refer to GRl series caiii sheet on w eb site for details. This Document Is The Property Of MicroMetl Corporation And Is Delivered Upon The Express Condition That The Contents Will Not Be Disclosed Or Used Without MicroMetfs Written Consent. Master Revision 0001 A MicroMetl Reserves The Right To Discontinue,Or Change At Any Time,Specifications&Designs Without Any Notice Incurring Obligations. Page Revision 0001 A Indianapolis_3035 N.Shadeland Ave., Indianapolis,IN 46226_800.MMC.HVAC--Sparks_905 Southern Way,Sparks,NV 89431_800.884.4MMC--Longview_201 Kodak Blvd.,Longview,TX 75602_903.248.4800 ►i • • TLGHF030ORVX02A RECOVERYENERGY VENTILATION Job Name: Olympic Equipment System Reference: ERV-1 Date: 10/3/2024 GENERAL FEATURES • Lossnay®cross-flow energy recovery core • Minimal cross contamination between entering and leaving air streams • Stand-alone remote controller(TZ-62DR-EA) • M-NET Connectivity • External input bypass damper control • Stand alone or interlocks connects with all Mitsubishi Electric products • Four fan speeds • High efficiency DC Motor • Standard MERV 7 non-woven fabric filter,washable fiber • Optional high-efficiency MERV 14 and MERV 16 filters Specifications _WM91W_ System Unit Type 0O Capacity CFM[m'/h] 300[510] Power source Voltage,Phase,Hertz 208/230V,1-phase,60 Hz Power Consumption kW 0.111-0.235 Current A 0.017-0.048 Starting Current A 6.1 MCA A 4.3 Maximum Overcurrent Protection(MOCP) A 15 Fan Air Volume CFM[m3/h] 75-150-225-300[127-225-382-510] External Static pressure in.WG 0.06-0.25-0.56-1.0 Temperature % 83-76-70-65.5 Exchange Efficiency Enthalpy Cooling % 65.0-58.0-53.5-50.0 Enthalpy Heating % 81.5-74.0-66.5-63.0 External Finish Galvanized steel sheet External Dimensions In.[mm] 41-7/8 x 41-3/16 x 13-1/32[1,063 x 1,046 x 331] Net weight Lbs[kg] 75[34] Energy Transfer Mechanism LossnW Core Heat Exchange Material Partition,spacing plate-cellulose fiber membrane Heat Exchange System Air-to-air total heat(sensible heat+latent heat)exchange,no moving parts Blower Type 8-3/4 In.diameter centrifugal fan Motor Type EC Motor Entering Air Temperature Operation Range T[°C] 14 to 104[-10 to 40] Sound pressure level dB(A) 18.0-22.0-31.0-37.0 Specifications are subject to change without notice. ©2023 Mitsubishi Electric Trane HVAC US LLC.All rights reserved. ACCESSORIES: TLGHF030ORVX02A Wired Remote Controller Lossnay®ERV Remote Controller ❑ TZ-62DR-EA Control Interface Signal Output Terminal ❑ PZ-4GS-E Duct Accessories Duct Silencer ❑ PZ-200SS-E MERV 14 Filter ❑ PZ-50RFP-E Filter MERV 16 Filter ❑ PZ-50RFP2-E MERV 7 Filter(Included) ❑ PZ-50RF9-E Remote Sensor CO2 Sensor,Built-In ❑ PZ-70CSB-E CO2 Sensor,Wall Mount ❑ PZ-70GSW-E1 Specifications are subject to change without notice. ©2023 Mitsubishi Electric Trane HVAC US LLC.All rights reserved. DIMENSIONS: 1 11 ' 1 4 7/8' (124), Air exhaust fan Position where duct direction change is Possible By-pass damper plate 4 1/2' (875 Ceiling suspension fixture u-) 14-9/16'X13/16' i4-15X201ovah _3 11/32' (85) EA _ ��I��, RA (exhaust air outlet ) ~ Illii° iil � — ~ (return airCO I II II I I } IIII III IIIII LL7 Lo `� � lli �i I II III III III II irT�il o o i�IIIICr 1 II II II L l ll� 111 IIII — o M L7 III III III IIIuI r--1 N � 7I IIII III III Ilf I � IIII III III IIII M 0A III III IIII III IIII _ SA (outside air intake) b illli iilii (supply air) i001 t q Core, o a 3 11/32' (85,) air filter, CO `o Inspection Air Supply fan 1 3/16' (30) High-Efficiency filter, �N 1p5x1ng 1 5ft fan, �� 1450X4501 Control box 13 1/32' c3311 maintenance space d N � r more $ "` o� Maintenance cover Power Supply _ _ _ _� cable opening a 7/8' (124) High-Efficiency filter (sold separately) Lossnay core 34 15/16' attachment Position 3 1/8' (79) (888) 3 1/8' (79) 0HIL" LD M M N Air filtersCD N 6 9 Position where duct direction change is Possible Q1 co r` Co a g UNIT SCALE - a inch(mm) N.T.S ' C Eta �s FORM#TLGHF030ORVX02A-202304 Intertek Specifications are subject to change without notice. ©2023 Mitsubishi Electric Trane HVAC US LLC.All rights reserved. Olympic Equipment HVAC Load Analysis for Olympic Equipment Prepared By: Fire Star Comfort Thursday, October 3, 2024 Chvac-Full Commercial HVAC Loads Calculation Program Elite Software Development,Inc. Five Star Comfort Olympic Equipment Bothell WA 98021 Page 2 Building Summary Loads Building peaks in August at 5pm. t ldg Load Area Sen %Tot Lat Sen Net %Net escriptions Quan Loss Loss Gain Gain Gain Gain Roof 2,097 5,190 9.85 0 7,064 7,064 11.14 Wall 518 1,538 2.92 0 1,975 1,975 3.11 Glass 214 4,979 9.45 0 9,434 9,434 14.88 Floor Slab 700 17,325 32.87 0 0 0 0.00 Skin Loads 29,032 55.08 0 18,474 18,474 29.13 Lighting 2,097 0 0.00 0 7,871 7,871 12.41 Equipment 1,049 0 0.00 7,425 3,935 11,360 17.91 Pool Latent 0 0 0.00 0 0 0 0.00 People 14 0 0.00 3,010 3,643 6,653 10.49 Partition 1,608 5,812 11.03 0 1,535 1,535 2.42 Cool. Pret. 0 0 0.00 0 0 0 0.00 Heat. Pret. 0 0 0.00 0 0 0 0.00 Cool. Vent. 280 0 0.00 -824 9,947 9,123 14.38 Heat. Vent. 280 13,317 25.27 0 0 0 0.00 Cool. lnfil. 0 0 0.00 0 0 0 0.00 Heat. lnfil. 0 0 0.00 0 0 0 0.00 Draw-Thru Fan 0 0 0.00 0 3,291 3,291 5.19 Blow-Thru Fan 0 0 0.00 0 0 0 0.00 Reserve Cap. 0 0 0.00 0 1,249 1,249 1.97 Reheat Cap. 0 0 0.00 0 0 0 0.00 Supply Duct 0 3,030 5.75 0 2,679 2,679 4.22 Return Duct 0 1,515 2.87 0 1,189 1,189 1.87 Misc. Supply 0 0 0.00 0 0 0 0.00 Misc. Return 0 0 0.00 0 0 0 0.00 Building Totals 52,707 100.00 9,611 53,813 63,424 100.00 Building Sen %Tot Lat Sen Net %Net Summary Loss Loss Gain Gain Gain Gain Ventilation 13,317 25.27 -824 9,947 9,123 14.38 Infiltration 0 0.00 0 0 0 0.00 Pretreated Air 0 0.00 0 0 0 0.00 Room Loads 34,845 66.11 10,435 36,708 47,142 74.33 Plenum Loads 0 0.00 0 0 0 0.00 Fan/Duct/Misc Loads 4,545 8.62 0 7,158 7,158 11.29 Building Totals 52,707 100.00 9,611 53,813 63,424 100.00 Check Figures Total Building Supply Air(based on a 16' TD): 2,488 CFM Total Building Vent. Air(11.25% of Supply): 280 CFM Total Conditioned Air Space: 2,097 Sq.ft Supply Air Per Unit Area: 1.1865 CFM/Sq.ft Area Per Cooling Capacity: 396.8 Sq.ft/Ton Cooling Capacity Per Area: 0.0025 Tons/Sq.ft Heating Capacity Per Area: 25.13 Btuh/Sq.ft Total Heating Required With Outside Air: 52,707 Btuh Total Cooling Required With Outside Air: 5.29 Tons C:\Users\andre\OneDrive\Documents\Elite Software\Chvac 8 Projects\Olympic Equipment.CH8 Thursday,October 3,2024, 12:10 PM Chvac-Full Commercial HVAC Loads Calculation Program �{' Elite Software Development, Inc. Five Star Comfort III Olympic Equipment Bothell,WA 98021 Page 3 Air Handier #1 - AHU-1 - Summary Loads Rm Description Area Htg.Loss Sen.Gain Lat.Gain Htg.O.A. Clg.O.A. No Room Peak Time People Htg.CFM Clg.CFM S.Exh Req.CFM Req.CFM Zn No., Flr No. Volume CFM/Sgft CFM/Sgft W.Exh Act.CFM Act.CFM 1 Sales 101 + Corridor 840 8,608 14,281 4,554 5/P, 0.06/ft2 5/P, 0.06/ft2 2pm August 6 354 963 0 80 80 Zn 1, Flr 1 10,080 0.42 1.15 0 69 108 2 Office 102 150 2,538 2,020 693 5/P, 0.06/ft2 5/P, 0.06/ft2 7pm August 2 104 136 0 19 19 Zn 1, Flr 1 1,800 0.70 0.91 0 20 15 3 Office 103 150 2,538 2,020 693 5/P, 0.06/ft2 5/P, 0.06/ft2 7pm August 2 104 136 0 19 19 Zn 1, Flr 1 1,800 0.70 0.91 0 20 15 4 Office 104 168 4,053 5,725 1,243 5/P, 0.06/ft2 5/P, 0.06/ft2 5pm August 2 167 386 0 20 20 Zn 1, Flr 1 2,016 0.99 2.30 0 33 43 5 Office 105 168 3,621 4,517 1,518 5/P, 0.06/ft2 5/P, 0.06/ft2 2pm August 2 149 305 0 20 20 Zn 1, Flr 1 2,016 0.89 1.81 0 29 34 6 Break Room 106 300 3,256 3,511 968 5/P, 0.06/ft2 5/P, 0.06/ft2 7pm August 2 134 237 150 28 28 Zn 1, Flr 1 3,600 0.45 0.79 150 26 27 7 Service 107 65 2,752 1,498 275 5/P, 0.06/ft2 5/P, 0.06/ft2 7pm August 0 113 101 0 4 4 Zn 1, Flr 1 780 1.74 1.55 0 22 11 8 Shipping 109 96 2,404 1,516 693 5/P, 0.06/ft2 5/P, 0.06/ft2 7pm August 2 99 102 0 16 16 Zn 1, Flr 1 1,152 1.03 1.07 0 19 12 9 Women 108 80 2,364 861 275 5/P, 0.06/ft2 5/P, 0.06/ft2 7pm August 0 97 58 65 5 5 Zn 1, Flr 1 960 1.22 0.73 65 19 7 10 Men 110 80 2,711 953 275 5/P, 0.06/ft2 5/P, 0.06/ft2 7pm August 0 112 64 65 5 5 Zn 1, Flr 1 960 1.39 0.80 65 22 7 Room Peak Totals: 2,097 34,845 36,902 11,187 Total Rooms: 10 18 1,433 2,489 280 216 216 Unique Rooms: 10 25,164 0.68 1.19 280 280 280 C:\Users\andre\OneDrive\Documents\Elite Software\Chvac 8 Projects\Olympic Equipment.CH8 Thursday,October 3,2024, 12:10 PM Chvac-Full Commercial HVAC Loads Calculation Program Elite Software Development,Inc. Five Star Comfort Olympic Equipment Bothell,WA 98021 flL Page 4 Air Handler #1 - AHU-1 - Total Load Summa Air Handler Description: AHU-1 Constant Volume- Sum of Peaks Supply Air Fan: Draw-Thru with program estimated horsepower of 1.32 HP Fan Input: 65% motor and fan efficiency with 2.2 in. water across the fan Sensible Heat Ratio: 0.80 ---This system occurs 1 time(s) in the building. --- Air System Peak Time: 5pm in August. Outdoor Conditions: Clg: 103' DB, 64°WB, 28.82 grains, Htg: 25' DB Indoor Conditions: Clg: 70' DB, 30% RH, Htg: 70' DB Summer: Exhaust controls outside air, -----Winter: Exhaust controls outside air. Room Space sensible loss: 34,845 Btuh Infiltration sensible loss: 0 Btuh 0 CFM Outside Air sensible loss: 13,317 Btuh 280 CFM Supply Duct sensible loss: 3,030 Btuh Return Duct sensible loss: 1,515 Btuh Return Plenum sensible loss: 0 Btuh Total System sensible loss: 52,707 Btuh Heating Supply Air: 37,874/(.979 X 1.08 X 25) = 1,433 CFM Winter Vent Outside Air(19.5% of supply) = 280 CFM Room space sensible gain: 35,459 Btuh Infiltration sensible gain: 0 Btuh Draw-thru fan sensible gain: 3,291 Btuh Supply duct sensible gain: 2,679 Btuh Reserve sensible gain: 1,249 Btuh Total sensible gain on supply side of coil: 42,677 Btuh Cooling Supply Air: 42,858/(.979 X 1.1 X 16) = 2,488 CFM Summer Vent Outside Air(11.3% of supply) = 280 CFM Return duct sensible gain: 1,189 Btuh Return plenum sensible gain: 0 Btuh Outside air sensible gain: 9,947 Btuh 280 CFM Blow-thru fan sensible gain: 0 Btuh Total sensible gain on return side of coil: 11,136 Btuh Total sensible gain on air handling system: 53,813 Btuh Room space latent gain: 10,435 Btuh Infiltration latent gain: 0 Btuh Outside air latent gain: -824 Btuh Total latent gain on air handling system: 9,611 Btuh Total system sensible and latent gain: 63,424 Btuh Check Figures Total Air Handler Supply Air(based on a 16° TD): 2,488 CFM Total Air Handler Vent. Air(11.25% of Supply): 280 CFM Total Conditioned Air Space: 2,097 Sq.ft Supply Air Per Unit Area: 1.1865 CFM/Sq.ft Area Per Cooling Capacity: 396.8 Sq.ft/Ton Cooling Capacity Per Area: 0.0025 Tons/Sq.ft Heating Capacity Per Area: 25.13 Btuh/Sq.ft Total Heating Required With Outside Air: 52,707 Btuh Total Cooling Required With Outside Air: 5.29 Tons C:\Users\andre\OneDrive\Documents\Elite Software\Chvac 8 Projects\Olympic Equipment.CH8 Thursday,October 3,2024, 12:10 PM Chvac-Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc. Five Star Comfort Olympic Equipment Bothell WA 98021 a Page 5 Room Detailed Loads At Zone Peak Times Load Unit -SC- CLTD U.Fac Sen. Lat. Htg. Htg. Description Quan CFAC SHGF -CLF- Gain Gain Mult. Loss Room 1-Sales 101 + Corridor- Air Handler 1 AHU-1 Zone 1 peaks sensible in August at 6 m. Roof-1-6-Susp.C-D 840 1.00 65.3 0.050 2,741 2.250 1,890 Wall-3-S-E-D 42 1 57.6 0.060 145 2.700 113 Partition-1-1 432 14/53 0.062 375 3.286 1,420 Partition-2-1 204 14/53 0.062 177 3.286 670 GIs-S-1-90-Tran 102.0 1.000 30 0.380 1,163 21.150 2,157 0%S-2-NS-Solar 102.0 0.400 177 0.360 2,600 Lights-Prof=1 840 1.000 2,866 Equipment-Prof=1 420 1.000 1,433 3,000 People-Prof=1 6.0 1.000 1,380 1,140 Floor slab 70 22.500 1,575 Sub-total 12,880 4,140 7,826 Safety factors: +10% +10% +10% --------- --------- --------- Total w/safety factors: 14,168 4,554 8,608 Room 2-Office 102 -Air Handler 1 AHU-1 Zone 1 peaks sensible in August at 6 m. Roof-1-6-Susp.C-D 150 1.00 65.3 0.050 489 2.250 338 Partition-1-1 120 14/53 0.062 104 3.286 394 Lights-Prof=1 150 1.000 512 Equipment-Prof=1 75 1.000 256 250 People-Prof=1 2.0 1.000 460 380 Floor slab 70 22.500 1,575 Sub-total 1,821 630 2,307 Safety factors: +10% +10% +10% --------- --------- --------- Total w/safety factors: 2,003 693 2,538 Room 3-Office 103 -Air Handler 1 AHU-1 Zone 1 peaks sensible in August at 6 m. Roof-1-6-Susp.C-D 150 1.00 65.3 0.050 489 2.250 338 Partition-1-1 120 14/53 0.062 104 3.286 394 Lights-Prof=1 150 1.000 512 Equipment-Prof=1 75 1.000 256 250 People-Prof=1 2.0 1.000 460 380 Floor slab 70 22.500 1,575 Sub-total 1,821 630 2,307 Safety factors: +10% +10% +10% --------- --------- --------- Total w/safety factors: 2,003 693 2,538 Room 4-Office 104 -Air Handler 1 AHU-1 Zone 1 peaks sensible in August at 6 m. Roof-1-6-Susp.C-D 168 1.00 65.3 0.050 548 2.250 378 Wall-1-S-E-D 120 1 57.6 0.060 415 2.700 324 Wall-2-W-E-D 20 1 60.1 0.060 72 2.700 54 GIs-S-1-90-Tran 48.0 1.000 30 0.380 547 21.150 1,015 0%S-2-NS-Solar 48.0 0.400 177 0.360 1,223 GIs-W-1-90-Tran 16.0 1.000 30 0.380 182 21.150 338 0%S-2-NS-Solar 16.0 0.400 212 0.610 828 Lights-Prof=1 168 1.000 573 C:\Users\andre\OneDrive\Documents\Elite Software\Chvac 8 Projects\Olympic Equipment.CH8 Thursday,October 3,2024, 12:10 PM Chvac-Full Commercial HVAC Loads Calculation Program Elite Software Development,Inc. Five Star Comfort Olympic Equipment Bothell WA 98021 flL Page 6 Room Detailed Loads At Zone Peak Times cont'd Load Unit -SC- CLTD U.Fac Sen. Lat. Htg. Htg. Description Quan CFAC SHGF -CLF- Gain Gain Mult. Loss Equipment-Prof=1 84 1.000 287 750 People-Prof=1 2.0 1.000 460 380 Floor slab 70 22.500 1,575 Sub-total 5,136 1,130 3,685 Safety factors: +10% +10% +10% --------- --------- --------- Total w/safety factors: 5,649 1,243 4,053 Room 5-Office 105 -Air Handler 1 AHU-1 Zone 1 peaks sensible in August at 6 m. Roof-1-6-Susp.C-D 168 1.00 65.3 0.050 548 2.250 378 Wall-1-S-E-D 120 1 57.6 0.060 415 2.700 324 GIs-S-1-90-Tran 48.0 1.000 30 0.380 547 21.150 1,015 0%S-2-NS-Solar 48.0 0.400 177 0.360 1,223 Lights-Prof=1 168 1.000 573 Equipment-Prof=1 84 1.000 287 1,000 People-Prof=1 2.0 1.000 460 380 Floor slab 70 22.500 1,575 Sub-total 4,053 1,380 3,292 Safety factors: +10% +10% +10% --------- --------- --------- Total w/safety factors: 4,459 1,518 3,621 Room 6-Break Room 106 -Air Handler 1 AHU-1 Zone 1 peaks sensible in August at 6 m. Roof-1-6-Susp.C-D 300 1.00 65.3 0.050 979 2.250 675 Partition-1-1 216 14/53 0.062 187 3.286 710 Lights-Prof=1 300 1.000 1,024 Equipment-Prof=1 150 1.000 512 500 People-Prof=1 2.0 1.000 460 380 Floor slab 70 22.500 1,575 Sub-total 3,162 880 2,960 Safety factors: +10% +10% +10% --------- --------- --------- Total w/safety factors: 3,478 968 3,256 Room 7-Service 107 -Air Handler 1 AHU-1 Zone 1 peaks sensible in August at 6 m. Roof-1-6-Susp.C-D 65 1.00 65.3 0.050 212 2.250 146 Wall-1-S-E-D 156 1 57.6 0.060 539 2.700 421 Wall-2-W-E-D 60 1 60.1 0.060 216 2.700 162 Partition-3-1 60 14/53 0.062 52 3.286 197 Lights-Prof=1 65 1.000 222 Equipment-Prof=1 33 1.000 111 250 Floor slab 70 22.500 1,575 Sub-total 1,353 250 2,502 Safety factors: +10% +10% +10% --------- --------- --------- Total w/safety factors: 1,488 275 2,752 C:\Users\andre\OneDrive\Documents\Elite Software\Chvac 8 Projects\Olympic Equipment.CH8 Thursday,October 3,2024, 12:10 PM Chvac-Full Commercial HVAC Loads Calculation Program Elite Software Development,Inc. Five Star Comfort Olympic Equipment Bothell WA 98021 flL Page 7 Room Detailed Loads At Zone Peak Times cont'd Load Unit -SC- CLTD U.Fac Sen. Lat. Htg. Htg. Description Quan CFAC SHGF -CLF- Gain Gain Mult. Loss Room 8-Shipping 109 - Air Handler 1 AHU-1 Zone 1 peaks sensible in August at 6 m. Roof-1-6-Susp.C-D 96 1.00 65.3 0.050 313 2.250 216 Partition-1-1 120 14/53 0.062 104 3.286 394 Lights-Prof=1 96 1.000 328 Equipment-Prof=1 48 1.000 164 250 People-Prof=1 2.0 1.000 460 380 Floor slab 70 22.500 1,575 Sub-total 1,369 630 2,185 Safety factors: +10% +10% +10% --------- --------- --------- Total w/safety factors: 1,506 693 2,404 Room 9-Women 108 - Air Handler 1 AHU-1 Zone 1 peaks sensible in August at 6 m. Roof-1-6-Susp.C-D 80 1.00 65.3 0.050 261 2.250 180 Partition-1-1 120 14/53 0.062 104 3.286 394 Lights-Prof=1 80 1.000 273 Equipment-Prof=1 40 1.000 136 250 Floor slab 70 22.500 1,575 Sub-total 775 250 2,149 Safety factors: +10% +10% +10% --------- --------- --------- Total w/safety factors: 852 275 2,364 Room 10-Men 110 -Air Handler 1 AHU-1 Zone 1 peaks sensible in August at 6 m. Roof-1-6-Susp.C-D 80 1.00 65.3 0.050 261 2.250 180 Partition-1-1 120 14/53 0.062 104 3.286 394 Partition-2-1 96 14/53 0.062 83 3.286 315 Lights-Prof=1 80 1.000 273 Equipment-Prof=1 40 1.000 136 250 Floor slab 70 22.500 1,575 Sub-total 858 250 2,465 Safety factors: +10% +10% +10% --------- --------- --------- Total w/safety factors: 944 275 2,711 C:\Users\andre\OneDrive\Documents\Elite Software\Chvac 8 Projects\Olympic Equipment.CH8 Thursday,October 3,2024, 12:10 PM Chvac-Full Commercial HVAC Loads Calculation Program Elite Software Development,Inc. Five Star Comfort Olympic Equipment Bothell WA 98021 A Page 8 Room Detailed Loads At Room Peak Times Load Unit -SC- CLTD U.Fac Sen. Lat. Htg. Htg. Description Quan CFAC SHGF -CLF- Gain Gain Mult. Loss Room 1-Sales 101 + Corridor peaks (sensible) in August at 2pm, Air Handler 1 (AHU-1), Zone 1, Floor Number 1 84.0 x 10.0 Construction Type: 5 (Light) Roof-1-6-Susp.C-D 840 1.00 42.3 0.050 1,775 2.250 1,890 Wall-3-S-E-D 42 1 48.6 0.060 123 2.700 113 Partition-1-1 432 14/53 0.062 375 3.286 1,420 Partition-2-1 204 14/53 0.062 177 3.286 670 GIs-S-1-90-Tran 72.4 1.000 31 0.380 853 21.150 1,532 29%S-2-NS-Solar 72.4 0.400 177 0.650 3,333 SGIs-S-1-90-Tran 29.6 1.000 31 0.380 348 21.150 626 29%S-2-NS-Solar 29.6 0.400 33 0.820 320 Lights-Prof=1 840 1.000 2,866 Equipment-Prof=1 420 1.000 1,433 3,000 People-Prof=1 6.0 1.000 1,380 1,140 Floor slab 70 22.500 1,575 Sub-total 12,983 4,140 7,826 Safety factors: +10% +10% +10% --------- --------- --------- Total w/safety factors: 14,281 4,554 8,608 Room 2-Office 102 peaks (sensible) in August at 7pm, Air Handler 1 (AHU-1), Zone 1, Floor Number 1 10.0 x 15.0 Construction Type: 5 (Light) Roof-1-6-Susp.C-D 150 1.00 67.3 0.050 504 2.250 338 Partition-1-1 120 14/53 0.062 104 3.286 394 Lights-Prof=1 150 1.000 512 Equipment-Prof=1 75 1.000 256 250 People-Prof=1 2.0 1.000 460 380 Floor slab 70 22.500 1,575 Sub-total 1,836 630 2,307 Safety factors: +10% +10% +10% --------- --------- --------- Total w/safety factors: 2,020 693 2,538 Room 3-Office 103 peaks (sensible) in August at 7pm, Air Handler 1 (AHU-1), Zone 1, Floor Number 1, 10.0 x 15.0, Construction Type: 5 (Light) Roof-1-6-Susp.C-D 150 1.00 67.3 0.050 504 2.250 338 Partition-1-1 120 14/53 0.062 104 3.286 394 Lights-Prof=1 150 1.000 512 Equipment-Prof=1 75 1.000 256 250 People-Prof=1 2.0 1.000 460 380 Floor slab 70 22.500 1,575 Sub-total 1,836 630 2,307 Safety factors: +10% +10% +10% --------- --------- --------- Total w/safety factors: 2,020 693 2,538 Room 4-Office 104 peaks (sensible) in August at 5pm, Air Handler 1 (AHU-1), Zone 1, Floor Number 1, 14.0 x 12.0 Construction Type: 5 (Light) Roof-1-6-Susp.C-D 168 1.00 61.3 0.050 515 2.250 378 C:\Users\andre\OneDrive\Documents\Elite Software\Chvac 8 Projects\Olympic Equipment.CH8 Thursday,October 3,2024, 12:10 PM Chvac-Full Commercial HVAC Loads Calculation Program Elite Software Development,Inc. Five Star Comfort Olympic Equipment Bothell WA 98021 a Page 9 Room Detailed Loads At Room Peak Times cont'd Load Unit -SC- CLTD U.Fac Sen. Lat. Htg. Htg. Description Quan CFAC SHGF -CLF- Gain Gain Mult. Loss Wall-1-S-E-D 120 1 58.6 0.060 422 2.700 324 Wall-2-W-E-D 20 1 53.1 0.060 64 2.700 54 GIs-S-1-90-Tran 38.4 1.000 31 0.380 452 21.150 812 20%S-2-NS-Solar 38.4 0.400 177 0.430 1,169 SGIs-S-1-90-Tran 9.6 1.000 31 0.380 113 21.150 203 20%S-2-NS-Solar 9.6 0.400 33 0.790 100 GIs-W-1-90-Tran 15.8 1.000 31 0.380 187 21.150 335 1%S-2-NS-Solar 15.8 0.400 212 0.640 860 SGIs-W-1-90-Tran 0.2 1.000 31 0.380 2 21.150 3 1%S-2-NS-Solar 0.2 0.400 33 0.790 2 Lights-Prof=1 168 1.000 573 Equipment-Prof=1 84 1.000 287 750 People-Prof=1 2.0 1.000 460 380 Floor slab 70 22.500 1,575 Sub-total 5,205 1,130 3,685 Safety factors: +10% +10% +10% --------- --------- --------- Total w/safety factors: 5,725 1,243 4,053 Room 5-Office 105 peaks (sensible) in August at 2pm, Air Handler 1 (AHU-1), Zone 1, Floor Number 1, 14.0 x 12.0 Construction Type: 5 (Light) Roof-1-6-Susp.C-D 168 1.00 42.3 0.050 355 2.250 378 Wall-1-S-E-D 120 1 48.6 0.060 350 2.700 324 GIs-S-1-90-Tran 28.3 1.000 31 0.380 334 21.150 599 41%S-2-NS-Solar 28.3 0.400 177 0.650 1,303 SGIs-S-1-90-Tran 19.7 1.000 31 0.380 232 21.150 416 41%S-2-NS-Solar 19.7 0.400 33 0.820 213 Lights-Prof=1 168 1.000 573 Equipment-Prof=1 84 1.000 287 1,000 People-Prof=1 2.0 1.000 460 380 Floor slab 70 22.500 1,575 Sub-total 4,107 1,380 3,292 Safety factors: +10% +10% +10% --------- --------- --------- Total w/safety factors: 4,517 1,518 3,621 Room 6-Break Room 106 peaks (sensible) in August at 7pm, Air Handler 1 (AHU-1), Zone 1, Floor Number 1 30.0 x 10.0 Construction Type: 5 (Light) Roof-1-6-Susp.C-D 300 1.00 67.3 0.050 1,009 2.250 675 Partition-1-1 216 14/53 0.062 187 3.286 710 Lights-Prof=1 300 1.000 1,024 Equipment-Prof=1 150 1.000 512 500 People-Prof=1 2.0 1.000 460 380 Floor slab 70 22.500 1,575 Sub-total 3,192 880 2,960 Safety factors: +10% +10% +10% --------- --------- --------- Total w/safety factors: 3,511 968 3,256 C:\Users\andre\OneDrive\Documents\Elite Software\Chvac 8 Projects\Olympic Equipment.CH8 Thursday,October 3,2024, 12:10 PM Chvac-Full Commercial HVAC Loads Calculation Program Elite Software Development,Inc. Five Star Comfort Olympic Equipment Bothell WA 98021 A Page 10 Room Detailed Loads At Room Peak Times cont'd Load Unit -SC- CLTD U.Fac Sen. Lat. Htg. Htg. Description Quan CFAC SHGF -CLF- Gain Gain Mult. Loss Room 7-Service 107 peaks (sensible) in August at 7pm, Air Handler 1 (AHU-1), Zone 1, Floor Number 1, 13.0 x 5.0 Construction Type: 5 (Light) Roof-1-6-Susp.C-D 65 1.00 67.3 0.050 219 2.250 146 Wall-1-S-E-D 156 1 55.6 0.060 521 2.700 421 Wall-2-W-E-D 60 1 66.1 0.060 238 2.700 162 Partition-3-1 60 14/53 0.062 52 3.286 197 Lights-Prof=1 65 1.000 222 Equipment-Prof=1 33 1.000 111 250 Floor slab 70 22.500 1,575 Sub-total 1,362 250 2,502 Safety factors: +10% +10% +10% --------- --------- --------- Total w/safety factors: 1,498 275 2,752 Room 8-Shipping 109 peaks (sensible) in August at 7pm, Air Handler 1 (AHU-1), Zone 1, Floor Number 1, 8.0 x 12.0 Construction Type: 5 (Light) Roof-1-6-Susp.C-D 96 1.00 67.3 0.050 323 2.250 216 Partition-1-1 120 14/53 0.062 104 3.286 394 Lights-Prof=1 96 1.000 328 Equipment-Prof=1 48 1.000 164 250 People-Prof=1 2.0 1.000 460 380 Floor slab 70 22.500 1,575 Sub-total 1,378 630 2,185 Safety factors: +10% +10% +10% --------- --------- --------- Total w/safety factors: 1,516 693 2,404 Room 9-Women 108 peaks (sensible) in August at 7pm, Air Handler 1 (AHU-1), Zone 1, Floor Number 1, 8.0 x 10.0 Construction Type: 5 (Light) Roof-1-6-Susp.C-D 80 1.00 67.3 0.050 269 2.250 180 Partition-1-1 120 14/53 0.062 104 3.286 394 Lights-Prof=1 80 1.000 273 Equipment-Prof=1 40 1.000 136 250 Floor slab 70 22.500 1,575 Sub-total 783 250 2,149 Safety factors: +10% +10% +10% --------- --------- --------- Total w/safety factors: 861 275 2,364 Room 10-Men 110 peaks (sensible) in August at 7pm, Air Handler 1 (AHU-1), Zone 1, Floor Number 1, 8.0 x 10.0 Construction Type: 5 (Light) Roof-1-6-Susp.C-D 80 1.00 67.3 0.050 269 2.250 180 Partition-1-1 120 14/53 0.062 104 3.286 394 Partition-2-1 96 14/53 0.062 83 3.286 315 Lights-Prof=1 80 1.000 273 Equipment-Prof=1 40 1.000 136 250 Floor slab 70 22.500 1,575 C:\Users\andre\OneDrive\Documents\Elite Software\Chvac 8 Projects\Olympic Equipment.CH8 Thursday,October 3,2024, 12:10 PM Chvac-Full Commercial HVAC Loads Calculation Program Elite Software Development,Inc. Five Star ComfortA Olympic Equipment Bothell WA 98021 Page 11 Room Detailed Loads At Room Peak Times (cont'd Load Unit -SC- CLTD .Fac Sen. Lat. Htg. Htg. Descri tlon VWC)uan CFAC SHGF -CLF- Gain Gain Mult. Loss Sub-total 866 250 2,465 Safety factors: +10% +10% +10% --------- --------- --------- Total w/safety factors: 953 275 2,711 C:\Users\andre\OneDrive\Documents\Elite Software\Chvac 8 Projects\Olympic Equipment.CH8 Thursday,October 3,2024, 12:10 PM SUBMITTAL Project 6T Pkg HP-460v Date Tuesday, September 10, 2024 6T Pkg HP Project: 6T Pkg HP-460v 09/10/2024 Prepared By: 06:41AM 6T Pkg HP Tag Cover Sheet Unit Report Certified Drawing Performance Report Unit Feature Sheet Packaged Rooftop Builder 1.79e Page 2 of 11 Unit Report For 6T Pkg HP Project: 6T Pkg HP-460v 09/10/2024 Prepared By: 06:41 AM Unit Parameters Dimensions (ft. in.)&Weight(lb.) Unit Model:......................................50FCQM07A2A6-OAOAO Unit Length:.......................................................................6'2.375" Unit Size:.......................................................................07 (6 Tons) Unit Width:......................................................................3' 10.625„ Volts-Phase-Hertz:.......................................................460-3-60 Unit Height:........................................................................3'5.375„ Heating Type:............... ...........................Heat Pump Total Operating Weight:.....................................................765 lb Heat Control:Single Circuit,Two Stage Cooling (07 only) Duct Cfg:................. Vertical Supply/Vertical Return "' Weights and Dimensions are approximate. Weight does not include unit packaging. Approximate dimensions are provided primarily for shipping purposes.For exact dimensions and weights,refer to appropriate product data catalog. Lines and Filters Return Air Filter Type: Throwaway Return Air Filter Quantity: 4 Return Air Filter Size: 16 x 16 x 2 Selection includes construction throwaway filter into the base fan curve. Unit Configuration Direct Drive- EcoBlue-Medium Static AI/Cu -AI/Cu Base Electro-mechanical controls Standard Packaging Warranty Information 5-Year compressor parts(STD.) 5-Year electric heater(STD.) 1-Year parts(STD.) No optional warranties were selected. NOTE: Please see Warranty Catalog 500-089 for explanation of policies and ordering methods. Ordering Information Part Number Description Quantity 50FCQM07A2A6-OAOAO Rooftop Unit 1 Base Unit Direct Drive-EcoBlue- Medium Static None Field Installed Accessories CRHEATER336A00 Electric Heater 1 CRECOMZR103A00 CH 1-2 Vertical ULL Econ w/POL224 1 CRRFCURB001A01 14-inch Tall Roof Curb 1 Packaged Rooftop Builder 1.79e Page 3 of 11 Certified Drawing for 6T Pkg HP Project: 6T Pkg HP-460v 09/10/2024 Prepared By: 06:41AM NOTES: THIS DOCUMENT IS THE PROPERTY OF UTC CLIMATE,CONTROLS SUBMISSION OF THESE DRAWINGS OR DOCUMENTS I SECURITY AxD IS DELIVERED UPON THE EMPRESS CONDITION DOES NOT CONSTITUTE PAHi PERFORMANCE OR 1. DIMENSIONS ARE IN INCHES, DIMENSIONS UNIT J K THA7 HE CONTENTS w"NOT BE ITscLOSED DR us eD ACCEPTANCE DF CONTRACT. IN [ ]ARE IN MILLIMETERS. SOFCO*04 33 3/8 7 7/8 V_�tlWITHOUT wR ITTEu cOxSExT. 2 CENTER OF GRAVITY 18471 12001 50FCO*05 33 3/8 14 7/8 CONNECTION SIZES 3. DIRECTION OF AIR FLOW 50FCO*06 4 18477 I3771 18 5/8 A 1 3/8" 1351 DIA FIELD POWER SUPPLY HOLE 1 3/8 33-3/8 [1051] [472] Iggg] B 2" [51] D[A POWER SUPPLY KNOCKOUT 4. }ALL VIEW DRAWN USING 3RD ANGLE 50FCO+07 [10511 i14721 C 1 3/4" 1441 DIA GAUGE ACCESS PLUG 'r 32-114 ° ECONOMIZER HOOD D 7/8" 1221 DIA FIELD CONTROL WIRING HOLE [8171 (OPTIONAL) E 3/4"-14 NPT CONDENSATE DRAIN 25-5/8 '14071 G 2 112 " [641 DIA POWER SUPPLY KNOCK-OUT I652] RETURN AIR • THRU-THE-BASE CHART THESE HOLES REOUTAED FOR USE o C R BIN,WR008A00, 009ADO THREADED WIRE REO'D HOLE 10-7/8 RETURN CONDUIT SIZE USE SIZES INA X.I [277] AIR W 1/2' 115V 7/8' [22.2] ��+� HORIZONTAL CONFIGURATION X 1/2' 24V 7/8' [22.2] Y + 3/4' POWER 1 1/8" I28.61 E ALT. Z** (009AOO) 112' FIT GAS 1 1/8" I2&61 44-1/8 CONDENSATE I11211 y DRAIN OPENING FOR 'THRU-THE-BASEPAN' FACTORY OPTION, IN BASEPAN 17-314 FITTINGS FOR ONLY X,Y, 1 Z AAE PROVIDED 14111 29-1/2 SUPPLY L SELECT EITHER 114'OR 111' SUPPLY26-5/8 [7 ] AIRFOR POWER, DEPENDING ON WIRE SIZE AIR I6751 HORIZONTALCNFIG URAIION ISOBARS) PROVIDES 3/4' FPT THRU CURB id-1/2 12-1/2 11-1/2 X FLANGE d FITTING. I369] [318] [P931 LTHRU THE SE CHART 10-1/8 2X 23-3/4 3-1/4 [256] [6D3] [81I 2X 25 12-7 [158] [635] TOP L [303 K 18- /8 14661 2X 4-5/8 E STD. 10-1I8 1118] CONDENSATE [275] 1 ELECTRICAL DRAIN I25] DISCONNECT • LOCATION •�{ CONDENSER CONTROL BOX INDOOR BLOWER COIL OPTIONAL ACCESS PANEL ACCESS A,B,G. FACTORY 25-3/4 OPTIONAL it-3/8 [653] Onow FACTORY INSTALLED [441] RETURN FAD INSTALLED DISCONNECT SUPPLY AIR AIR OUTSIDE CONVENIENCE OUTLET J AIR D 1130721'8 3-3/4 19-1/2 11 1 53914 195] [494] 6-5/B FILTER 5-3/4 6-3/8 7 BAROMETRIC 46-5/8 HAIJ7.J HANDLE L146] [161] [177] 5-3/4 RELIEF 111861 14-111 - 26-2I7/8 11461 FLOW LEFT [18891 [6a 31 FRONT 17861 SUPPLY RETURN AIA AIR VERTICAL VERTICAL CONFIGURATION CONFIGURATION RIGHT ITC CLASSIFICATION SHEET DATE SUPERCEDES REV SOFCO 04-01 SINGLE PACKAGE HEAT PUMP 48TC003348 _ U.S. ECCN:NSR 1 OF 3 08/15/19 - Packaged Rooftop Builder 1.79e Page 4 of 11 Certified Drawing for 6T Pkg HP Project: 6T Pkg HP-460v 09/10/2024 Prepared By: 06:41AM THIS DOCUMF XT IS THE PROPERTY OF UTC CLIMATE,CONTROLS SUBMISSION Of THESE DRAWINGS OR DOCUMENTS A589267 CORNEA CORNER CORNER CORNER {.N)WLCI� A SPCUAIT1 AND TS-.11RID UPON THE ENPA CSS CONDITION DOES NOT CONSTITUTE PART PEREORNAXCE OR UNIT WEIGHT (Al WEIGHT (B) WEIGHT ICI WEIGHT IDI C.G. HEIGHT THAT rxE COXTINTS'LL NOT 9F DIscLUSFD OR-D LAW 1Wehe�W/�WITHOUT WAIiiEN CONSEXi. ACCEPTANCE Of CON1RACi. LBS. KG. LBS. KG. LBS. KG. LBS. KG. K Y Z 50FCQ-04126 57 118 53 108 49 115 52 36 19141 22 3/8 15681 16 1/8 14101 SOFCOXOS121 58 119 54 110 50 117 53 36 1914I 22 3/8 I568] 16 1/8 14101 SOFCOXO6160 72 145 66 133 60 146 66 35 3/8 I8981 22 5/16 15511 16 112 14191 SOFCOA07161 73 146 66 134 61 147 67 35 318 18981 22 5/16 [557I 16 1/2 [419] BACK W STANDARD UNIT WEIGHT IS WITHOUT ELECTRIC HEAT AND WITHOUT PACKAGING. WITH ECONOMIZER FOR OTHER OPTIONS AND ACCESSORIES, REFER TO THE PRODUCT DATA CATALOG. BACK R38-1/8 WITHOUT 96eI CORNER A CORNER B ECONOMIZER ECONOMIZER HOOD _ (OPTIONAL) O OPTIONAL DOOR SWING LEFT RIGHT CORNER D � CORNER C , X TOP FRONT i G� NOTE: Z 1. FOR ALL MINIMUM CLEARANCES LOCAL CODES OR JURISDICTIONS MAY PREVAIL. CLEARANCE ® C� SERVICE WITH: SERVICE WITH: OPERATING SURFACE CONDUCTIVE BARRIER NONCONDUCTIVE BARRIER CLEARANCE FRONT 48 [1219mm] 36 [914mm] 18 [457mm] LEFT 48 11219mm] 42 [1067mm] 18 [457mm] BACK W/O ECON 48 [1219mm] 42 [1067mm] 18 [457mm] FRONT BACK W/ECON 36 [914mm] 36 [914mm] 18 [457mm] RIGHT 36 [914mm] 36 [914mm] 18 [457mm] TOP 72 [1829mm] 72 [1829mm] 12 [1829mm] ITC CLASSIFICATION SHEET DATE SUPE RCEDES REV SOFCO 04-07 SINGLE PACKAGE HEAT PUMP 48TC003348 _ U.S. ECCN:NSR 2 OF 3 08/15/19 Packaged Rooftop Builder 1.79e Page 5 of 11 Certified Drawing for 6T Pkg HP Project: 6T Pkg HP-460v 09/10/2024 Prepared By: 06:41AM ,�.../ THIS DOCUMENT IS THE PROPERTY OF UTC CLIMATE,CONTROLS SUBMISSION OF THESE DA AWIXGS OR DOCUMENTS d SECURITY AND IS DELIVERED UPON THE EX PA CSS CONDITION DOES NOT CONSTITUTE PAWL PEAOR DOCUMENTS OR THAT THE COXTFN iO WILL XOi BE DI BCLOSFD OR USED ACCEPTANCE Of COX1RACi. LMM nel�e�o/�WITHOUT WA ITTEN CONSENT. 1 71-1S/8 (INSIDE THE SASEE RAIL 8 SNIRT) 0 41-1/4 OE BA TH o (INSIDE THE BASERAILSI 02-114 [57] V 2% 1-3/4 ® 461 e INSIDE BASERAIL DIMENSIONS BOTTOM 2% 1 2X 1 / 2X 1-7/8 [363]8 1251 [48] 2X 3/4 8] 3-1/4 12,7/B (821 I991 DETAIL C TYP 4 PLCS FILTER ACCESS PANEL CONTROL BOX INDOOR BLOWER (TOOL-LESS) ACCESS PANEL ACCESS PANEL CONDENSER CONDENSER COMP. COIL COIL ACCESS PANEL O INDOOR COIL ACCESS PANEL ��° SEE DETAIL C 00 0 0 1 I 1 00A. 0 1 1 1 1 1 1i 1 1 BACK LEFT 3-1/4 59-3/8 2-3/8 I82.01 [1509.01 7-1/8 TYPS] FROM ao.7l c IRB WDTH ITC CLASSIFICATION SHEET DATE SUPERCEDES REV SOFCO 04-07 SINGLE PACKAGE HEAT PUMP 48TC003348 _ U.S. ECCN:NSR 3 OF 3 08/15/19 Packaged Rooftop Builder 1.79e Page 6 of 11 Certified Drawing for 6T Pkg HP Project: 6T Pkg HP-460v 09/10/2024 Prepared By: 06:41AM 8 7 6 5 4 3 2 1 ROOFCUZB N0US POWERWIRING CO NBROLWIRING ACCESSORYCONVENIENICE ACCESSORY# A 1R00�O iPPEDDLSASSBV13LED CONPECTORPKG.A�. GASCONNECTIONTYPE GASFITTING FITTING FITTING OURETWIRINGCONNECrOR 2.INSULATEDPANELS:25.4[11THK.POLYURETHANEF0AM,44.5[13/4]#DENSITY. OffCILMMADl 14" 3.DIMENSIONSIN[IAREINMILUMETERS. CRBTK4NVF DIADI TFRUTHECURB 3/4"[19]NPT 1 3561 4.ROOFOJ;R18GA(ESTEEL 3/4"[19]NPT 1/2"[12.7]NPT 1P2"[12.7JNPT SATTPLHDUCIYW RODOARB.(FLPNGESOFDUCf RESfONGURBy CKTOLlM02PDI [6" 6.SERVICEGFARWJCE4FEErONEACHSIDE CM14MR9010D1 THRUT EBOTTOM 1/2"[12.7INPT 7. CTIONOFAIRFLOW. 8OJNNECTORPACIWGECRBTK*MFW IPDI BFORTHRLLhECUFW-ASTVPE PP.C}WGECFETAFltiR903oD11SFORTFRU-THEEOTTOMTYPEGaSCONNECTIONS. D [44.51 1.00 5.42" 11.96' [25'41 113/4"[298.5]WIDE [137.71 [303.8] INSULATEDDECKPANELS [552.2I 89/16"[217.51WIDE INSIAATEDDECKPANEL I--13/4" [44.4] G I �I NATE#2 C 4.9" SECTION EE GASSERACEPLATE [427]NSIDE [126 70.8T' SCALE0.2W THRUTHECLR [611180021 DRILLHOLE 0 2"[50.81@ ASSEMBLY(IF REQUIRED) RETLFNAIR (SEEN0TE#8) OPENING 15.19" 01/3/4"[44.5] [385.8] E E 3 [76.2].00" 21.84"[554.7J al 82.9" [817.16] MEWE' CORNERDETAIL 14.W" SUPPLVAIR SUPPLYAIR RENRNIPR /�13/4" [355.6] OPENINIG I407.21 07.2] [44.4] 3W1 44.5] B 1.76' 1"5] 20.411 3.00' GASI�T NIT nAn [518.3] r/fi.2] (SUPPLIEDWIIHCURB) 13.78 L(FIELDSUPPLIED) P50.01 5'7-N8" [1033.5] DUCE TYPICAL(4)SIDES [1711.31 (RELDSUPPLIED) 7/16" [11] 3'A 3/16" NTERRASHING [944.6] (FIELDSUPPLIED) WIGIDINSULATION T SEEVIEW B" IED) �E��" p9 PLIED)[ IAN INGMATERIAL '� C�Kauss.rvv. SUPPLIED) wSDTH3dM1�ID oe Ey - irvis arvinrvoirva irvaoRMnnorvcorvA / WRH ewni°ie°uiHowunwooNMl6N1 }- t- }- }= r3RLYOR - 1041738 CLMASXROOF (FIELDSUPPLIED) - eaGly$a"D NW4.FOCRRNIG 004-007 BpJ HJ15 - - ANffi - OVERALLDIM.5-73/8"WAS6-77/8;18GA T-005,Y-002 A MATERLALWAI6GA;NNLFIELDSUPPLIEDWAS 23 067898 wvFlax ac�x D B WRHCURB 3fFMEFT61 MT,PI%H M/SEL aJ16arOLU3GLY) NFXTOR441HG 301E 06TfdDJ11CN 0'U fa=V R E BY a NPD ECNJO. PUFCH N/A NTu1C Packaged Rooftop Builder 1.79e Page 7 of 11 Performance Summary For 6T Pkg HP Project: 6T Pkg HP-460v 09/10/2024 Prepared By: 06:41 AM Part Number:50FCQM07A2A6-OAOAO ARI EER: 11.00 IEER: 15.0 Base Unit Dimensions Unit Length: 74.4 in Unit Width: 46.6 in Unit Height: 41.4 in Operating Weight Base Unit Weight: 589 lb Accessories Electric Heater: 10 lb CH 1-2 Vertical ULL Econ w/POL224: 51 lb 14-inch Tall Roof Curb: 115 lb Total Operating Weight: 765 lb Unit Unit Voltage-Phase-Hertz: 460-3-60 Air Discharge: Vertical Fan Drive Type: Vane Axial Actual Airflow: 2400 CFM Site Altitude: 0 ft Cooling Performance Condenser Entering Air DB: 95.0 F Evaporator Entering Air DB: 80.0 F Evaporator Entering Air WB: 67.0 F Entering Air Enthalpy: 31.44 BTU/lb Evaporator Leaving Air DB: 57.0 F Evaporator Leaving Air WB: 57.0 F Evaporator Leaving Air Enthalpy: 24.43 BTU/lb Gross Cooling Capacity: 74.99 MBH Gross Sensible Capacity: 59.58 MBH Compressor Power Input: 5.31 kW Coil Bypass Factor: 0.025 Heating Performance Outdoor Ambient Temperature: 47.0 F Entering Air Indoor Coil DB: 70.0 F Leaving Air Indoor Coil DB: 95.1 F Total Heating Capacity: 65.10 MBH Integrated Heating Capacity: 65.10 MBH Heating Power Input: 5.11 kW High Temperature COP: 3.60 Low Temperature COP: 2.40 Electric Heating Capacity: 12.90 kW Unit Leaving Air Temp: 112.1 F Supply Fan External Static Pressure: 0.50 in wg Options/Accessories Static Pressure Electric Heaters: 0.26 in wg Economizer: 0.17 in wg Application External Static(ESP+ Unit Opts/Acc.): 0.92 in wg Fan RPM: 2177 Fan Power: 1.09 BHP NOTE: Selected IFM RPM Range: 253-2530 Selection includes construction throwaway filter into the base fan curve.This filter is not MERV Rated. Packaged Rooftop Builder 1.79e Page 8 of 11 Performance Summary For 6T Pkg HP Project: 6T Pkg HP-460v 09/10/2024 Prepared By: 06:41 AM Electrical Data VoltageRange: ..................... ..................................................................................................................................................414-506 Compressor#1 RLA:... ................................................................................................................................................................................9.2 Compressor#1 LRA: 61 Actual Electric Heater kW: 12.9 Electric Heater FLA: 16.8 Indoor Fan Motor Type: MED Indoor Fan Motor FLA(Total): 2.6 Power Supply MCA: 36 Power Supply MOCP(Fuse or HACR): 40 Disconnect Size FLA: 34 Disconnect Size LRA: 84 Electrical Convenience Outlet: None Outdoor Fan [Qty/FLA(ea)]: 1 /0.8 Electric Heater Part Number: 336A Electric Heater Number of Stages: 1 Control Panel SCCR: 5kA RMS at Rated Symmetrical Voltage Acoustics Sound Power Levels, db re 10E-12 Watts Discharge Inlet Outdoor 63 Hz 92.3 91.3 85.6 125 Hz 83.8 80.9 84.7 250 Hz 78.1 73.0 80.5 500 Hz 75.6 68.1 76.0 1000 Hz 72.5 70.0 72.4 2000 Hz 69.9 60.9 68.0 4000 Hz 65.8 54.5 62.8 8000 Hz 61.4 48.2 59.3 A-Weighted 78.6 73.8 79.0 Advanced Acoustics s i 3 t Advanced Accoustics Parameters 1. Unit height above ground: 30.0 ft 2. Horizontal distance from unit to receiver: 50.0 ft 3. Receiver height above ground: 5.7 ft 4. Height of obstruction:.................................................................0.0 ft 5. Horizontal distance from obstruction to receiver:.....0.0 ft 6. Horizontal distance from unit to obstruction:...............0.0 ft Detailed Acoustics Information Packaged Rooftop Builder 1.79e Page 9 of 11 Performance Summary For 6T Pkg HP Project: 6T Pkg HP-460v 09/10/2024 Prepared By: 06:41 AM Octave Band Center Freq. Hz 63 125 250 500 11k 2k 4k 8k Overall A 85.6 84.7 80.5 76.0 72.4 68.0 62.8 59.3 89.2 Lw B 59.4 68.6 71.9 72.8 72.4 69.2 63.8 58.2 78.5 LwA C 53.2 52.3 48.1 43.6 40.0 35.6 30.4 26.9 56.8 L D 27.0 36.2 39.5 40.4 40.0 36.8 31.4 25.8 46.1 LpA Legend A Sound Power Levels at Unit's Acoustic Center, Lw B A-Weighted Sound Power Levels at Unit's Acoustic Center, LwA C Sound Pressure Levels at Specific Distance from Unit, Lp D A-Weighted Sound Pressure Levels at Specific Distance from Unit, LpA Calculation methods used in this program are patterned after the ASHRAE Guide; other ASHRAE Publications and the AHRI Acoustical Standards. While a very significant effort has been made to insure the technical accuracy of this program, it is assumed that the user is knowledgeable in the art of system sound estimation and is aware of the tolerances involved in real world acoustical estimation. This program makes certain assumptions as to the dominant sound sources and sound paths which may not always be appropriate to the real system being estimated. Because of this, no assurances can be offered that this software will always generate an accurate sound prediction from user supplied input data. If in doubt about the estimation of expected sound levels in a space, an Acoustical Engineer or a person with sound prediction expertise should be consulted. FanCurve \210FM � 1 1500 1M 700FJ M 7 15 P C U � 11 � 1D ^L LL U 90 \ SOBiP Xx 05 0.N �0.75 H I 1\� 00 C2 Q4 06 QB 1D 12 14 16 18 2D 22 24 26 28 30 Airflow(CFM-thousands) RPM=2177 BHP=1.09 MaximumRPM=2836 MaxlmumBHP=3.00 SC-SystemCunve RP-RatedPoint Packaged Rooftop Builder 1.79e Page 10 of 11 Unit Feature Sheet for 6T Pkg HP Project: 6T Pkg HP-460v 09/10/2024 Prepared By: 06:41AM r"M WeatherMaker _ 50 F C Q with�cnblue-technology PACKAGED ROOFTOP ELECTRIC COOLING/ELECTRIC HEATING UNITS 3.4, 5 TONS-13.4 SEER2, 14.0 SEER, 6 TON -15.2 IEER .c..w. - STANDARD FEATURES INCLUDE: Puron(R-410A)HFC refrigerant • Meets or exceeds ASHRAE 90.1 energy efficiency levels • Scroll compressors with internal line break and overload protection • Single-stage cooling capacity 04-06 models,Two Stage on 07 models • SEER2's up to 13.4,HSPF2's up to 7.0 • SEER's to 14.2,SEER2's to 13.4,IEER's to 15.2 • AcutrolTM refrigerant metering system on 04-06 models,TXV on 07 size models • Exclusive non-corrosive composite condensate pan in accordance with ASHRAE Standard 62,sloping design,side or center drain -'- • Standard cooling operation up to 115°F(46°C)and down to 40°F(4°C) - down to 25o F(-4o C)with winter start kit. • Pre-painted exterior panels and primer-coated interior panels tested to 500 hours salt spray protection • Fully insulated cabinet ASHRAF • NEW Direct Drive-EcoBlueTmTechnology Indoor fan system uses Vane Axial fan design and electronically commutated motor �n • New Unit Control Board with intuitive quick fan speed adjustment COMPLIANT • Low pressure and high pressure switch protected. MAINTENANCE FEATURES: • Access panels with easy grip handles • Innovative easy starting,no-strip screws on unit access panels • Two-inch disposable return air filters and Tool-less filter access door • New unit control board to facilitate simple safety circuit troubleshooting WEATHERMAKER SERIES and simplified control box arrangement 50FCQ units are single packaged heat pump,electric units INSTALLATION FEATURES: that are pre-wired and charged with Puron(R-410) • Thru-the-bottom power entry capability refrigerant. The units are factory tested in both heating • Single point electric connections and cooling modes. Units are rated in accordance with • Full perimeter base rail with built-in rigging adapters and fork slots AHRI Standards 210/240(04-06 sizes)and 340/360(07 • Field convertible from vertical to horizontal airflow size).3-5 ton models use single stage cooling capacity control.6 ton model uses two stage cooling capacity STANDARD WARRANTY: control. • 5-year electric heaters • 5-year compressor • 3-tear SystemVUTM • 1-year parts • Many optional upgrades also available OPTIONS INCLUDE BUT ARE NOT LIMITED TO: Approved and certified by: • Intelligent SystemVu communicating controls • RTU Open Multi-Protocol DDC Controls • Supply and Return Air Smoke Detectors,high static motors Louvered condenser coil guards U Disconnect switch and convenience outlet options Use of the AHRI Certified . Corrosion resistant coil coating. TM Mark indicates a C anorae ,ara • MERV-8 and 13 Return Air Filters rj UV m participation in the . Hinged access panels program For verification of cenifir Lion for individual • Integrated economizer system.Low and Ultra Low Leak versions pmducls.rtectory.org. go to www.ahn tl • Phase Monitor Protection • Condensate Overflow Protection For a complete list of options and accessories refer to the Product Data Catalog for this unit. Packaged Rooftop Builder 1.79e Page 11 of 11 Mechanical Compliance Summary https://waenergycodes.com/print_project_summary_form/mec?project_id=29286&form versi... MECHANICAL COMPLIANCE SUMMARY 2021 WSEC Compliance Forms for Commercial Buildings including Group R1,R2,and Group R3&R4 over 3 stories Administered by:02021 NEEA,All rights reserved Project Title Olympic Equipment-2021 WSEC For Building Department Use: Date: Oct 4,2024 17212 51st Ave NE, Project Address A-104 Project&Applicant Arlington,WA 98023 Information Applicant Name Andrey Heichenko Applicant Phone 425-345-6416 Applicant Email andrey@fivestarcomfort.com Mechanical Compliance Summary Scope-Compliance verification provided in this report is limited to code minimum efficiency requirements for mechanical equipment types defined in Tables C403.3.2(1)through C403.3.2(16)of the 2021 WSEC-C.This includes efficiency multipliers for economizer exceptions.Performance criteria for additional energy efficiency and load management measures ARE NOT included in this report.Additional documentation is required to demonstrate compliance with all other provisions of the energy code,including better than code efficiency criteria for Section C406.For questions about this report,contact WSEC Commercial Technical Support at 360-539-5300 or via email at com.techsupport@waenergycodes.com. General Occupancy All Commercial General Building Use Type(s) Office,Other Building Cond.Floor Area 2,215 New Building Project Cond.Floor Area 2,215 General Project Types Tenant Spaces—First Build Out or Addition Single Zone Systems&Equipment Alteration Floors Above Grade 1 Mechanical ScopeMechanical Scope Overall Compliance Path General Prescriptive Mechanical Project Description Install new heat pump and DOAS systems for new office. Project Type Mechanical Scope Economizer Exception(s) DOAS Ventilation Equipment Efficiency Mechanical Compliance Applied? Provided? Compliance Verification Scope and Method Single Zone Systems& Tenant Spaces—First Build Out Yes No COMPLIES Equipment HVAC cooling equipment-5-20%better than code efficiency&improved fan efficiency Additional Energy Efficiency HVAC heating equipment-5-20%better than code efficiency (LDM)Load Management Measures Measures(AEM) No mechanical load management measures included in project Does building include occupancy classifications requiring DOAS? Yes Does project include DOAS equipment? No [Based on project scope do TSPR requirements apply? No Do all systems comply with Appendix D standard reference design No or qualify for an exception to TSPR? Scope&Space Conditioning TENANT SPACES—FIRST BUILD OUT-SINGLE ZONE SYSTEMS&EQUIPMENT Compliance Verification COMPLIES Single Zone Air Systems Category-Heat pump,split&single package,SC,SDHV Air Systems Summary Information Quantity Supply Airflow Ventilation CFM Ventilation Energy Recovery System/Equip ID of Items Control Ventilation Standard (Total if Multiple Air Source Paired with DOAS Ventilation energy recovery Efficiency / Items) (��) HP-1 Staged volume IMC Ventilation 280 Other System Yes per C403.7.6 Energy Recovery 83 HP-1 Staged volume IMC Ventilation 280 Other System Yes per C403.7.6 Energy Recovery 83 Air Systems&Equipment-Cooling Econo Exception Required Cooling Required Part System/ Cooling Capacity Proposed Cooling CE Proposed Part PL Efficiency Compliance Equip ID Cooling System/Equip Type Specific Type per item(Btu/h) Multipliers Efficiency Load Efficiency Efficiency Units Load Efficiency Units Verification (Full/IPLV) (Code Min+Econo) (Code Min+Econo) HP-1 Heat pump,air cooled Single package 74,990 0 0 11.0 13.9 11 EER 15 IEER COMPLIES Air Systems&Equipment-Heating 1 of 2 10/4/2024, 1:23 PM Mechanical Compliance Summary https://waenergycodes.com/print_project_summary_form/mec?project_id=29286&form versi... Heat Pump Cooling Capacity Required Proposed System Heating System/Equip Type Specific Type Heating Capacity Low OSA Low OSA per Item(Btu/h) Required Heat Pump Proposed Heat Pump HPH LTH Efficiency Compliance /Equip ID (Identical to Heating Efficiency Heating Efficiency Units Units Verification per item(Btu/h) Cooling Table) Temp Efficiency Temp Efficiency HP-1 I Heat pump,air cooled,heating Single package 65,100 74,990 3.4 2.25 3.6 COP 2.4 COP COMPLIES Air Systems&Equipment Details System/Equip ID Discrete Area(s)Served Location In Project Documents-Plan/Detail# System/Equip Compliance Path HP-1 2215 M-2 General Prescriptive WSEC Equip Efficiency Reference Table-Cooling:Table C403.3.2(2)Unitary Heat Pumps Economizer Compliance Method:Air-side economizer provided Heating Section/Auxiliary Heating Type:Electric resistance(or None) WSEC Equip Efficiency Reference Table-Heating:Table C403.3.2(2)-Unitary Heat Pumps LTH Units:COP Proposed Low OSA Temp Efficiency:2.4 HP-1 2215 M-2 General Prescriptive WSEC Equip Efficiency Reference Table-Cooling:Table C403.3.2(2)Unitary Heat Pumps Economizer Compliance Method:Air-side economizer provided Heating Section/Auxiliary Heating Type:Electric resistance(or None) WSEC Equip Efficiency Reference Table-Heating:Table C403.3.2(2)-Unitary Heat Pumps LTH Units:COP Proposed Low OSA Temp Efficiency:2.4 2 of 2 10/4/2024, 1:23 PM STRUCTURAL CALCULATIONS FOR: 17212 51 ST AVE NE ( RTU) ARLINGTON, WA CLIENT: FIVE STAR COMFORT OCTOBER 1 , 2024 MASS Q. of was 9 cam, 2! �P 0 z Cl 41206 6 .c� 4"Yq L , MALSAM TSANG STRUCTURAL ENGINEERING 122 S JACKSON ST SUITE 210 SEATTLE WA 98104 206.789.6038 T 1 206.789.6042 F 17212 511T AVE NE (OLYMPIC EQUIPMENT) NEW RTU GENERAL STRUCTURAL NOTES (THE FOLLOWING APPLY UNLESS NOTED OTHERWISE ON THE PLANS) 1. ALL MATERIALS, WORKMANSHIP, DESIGN, AND CONSTRUCTION SHALL CONFORM TO THE DRAWINGS, SPECIFICATIONS, AND THE INTERNATIONAL BUILDING CODE (IBC) 2018 EDITION. 2. DESIGN LOADING CRITERIA SNOW 25 PSF MECHANICAL UNIT HP-1 - 865 POUNDS WIND METHOD - DIRECTIONAL PROCEDURE Kzt=1.0, GCpi=0.18, 98 MPH (RISK CATEGORY II) , EXPOSURE "B" EARTHQUAKE SDI = 0.848 SITE CLASS D to E 3. STRUCTURAL DRAWINGS SHALL BE USED IN CONJUNCTION WITH MECHANICAL DRAWINGS FOR BIDDING AND CONSTRUCTION. CONTRACTOR SHALL VERIFY DIMENSIONS AND CONDITIONS FOR COMPATIBILITY AND SHALL NOTIFY ENGINEER OF ANY DISCREPANCIES PRIOR TO CONSTRUCTION. 4. CONTRACTOR SHALL PROVIDE TEMPORARY BRACING FOR THE STRUCTURE AND STRUCTURAL COMPONENTS UNTIL ALL FINAL CONNECTIONS HAVE BEEN COMPLETED IN ACCORDANCE WITH THE PLANS. CONFORM TO ASCE 37-14 "DESIGN LOADS ON STRUCTURES DURING CONSTRUCTION." 5. CONTRACTOR SHALL BE RESPONSIBLE FOR ALL SAFETY PRECAUTIONS AND THE METHODS, TECHNIQUES, SEQUENCES OR PROCEDURES REQUIRED TO PERFORM THE CONTRACTOR'S WORK. THE STRUCTURAL ENGINEER HAS NO OVERALL SUPERVISORY AUTHORITY OR ACTUAL AND/OR DIRECT RESPONSIBILITY FOR THE SPECIFIC WORKING CONDITIONS AT THE SITE AND/OR FOR ANY HAZARDS RESULTING FROM THE ACTIONS OF ANY TRADE CONTRACTOR. THE STRUCTURAL ENGINEER HAS NO DUTY TO INSPECT, SUPERVISE, NOTE, CORRECT, OR REPORT ANY HEALTH OR SAFETY DEFICIENCIES TO THE OWNER, CONTRACTORS, OR OTHER ENTITIES OR PERSONS AT THE PROJECT SITE. 6. ALL STRUCTURAL SYSTEMS WHICH ARE TO BE COMPOSED OF COMPONENTS TO BE FIELD ERECTED SHALL BE SUPERVISED BY THE SUPPLIER DURING MANUFACTURING, DELIVERY, HANDLING, STORAGE, AND ERECTION IN ACCORDANCE WITH INSTRUCTIONS PREPARED BY THE SUPPLIER. MANUFACTURER'S INSTALLATION INSTRUCTIONS SHALL BE AVAILABLE ON THE 30B SITE AT THE TIME OF INSPECTION FOR THE INSPECTORS USE AND REFERENCE. 7. CONTRACTOR SHALL VERIFY ALL EXISTING DIMENSIONS, MEMBER SIZES, AND CONDITIONS PRIOR TO COMMENCING ANY WORK. ALL DIMENSIONS OF EXISTING CONSTRUCTION SHOWN ON THE DRAWINGS ARE INTENDED AS GUIDELINES ONLY AND MUST BE VERIFIED. 8. CONTRACTOR SHALL VERIFY ALL EXISTING CONDITIONS BEFORE COMMENCING CONSTRUCTION AND/OR DEMOLITION. SHORING SHALL BE INSTALLED TO SUPPORT EXISTING CONSTRUCTION AS REQUIRED AND IN A MANNER SUITABLE TO THE WORK SEQUENCES. DEMOLITION DEBRIS SHALL NOT BE ALLOWED TO DAMAGE OR OVERLOAD THE EXISTING STRUCTURE. LIMIT CONSTRUCTION LOADING (INCLUDING Page 1 of 14 DEMOLITION DEBRIS) ON EXISTING FLOOR SYSTEMS TO 20 PSF. 9. CONTRACTOR SHALL CHECK FOR DRYROT AT ALL AREAS OF NEW WORK. ALL ROT SHALL BE REMOVED AND DAMAGED MEMBERS SHALL BE REPLACED OR REPAIRED AS DIRECTED BY THE STRUCTURAL ENGINEER. 10. ALL 2x LUMBER SHALL BE KILN DRIED OR MC-19, AND ALL LUMBER SHALL BE GRADED AND MARKED IN CONFORMANCE WITH WCLIB STANDARD GRADING RULES FOR WEST COAST LUMBER NO 17. FURNISH TO THE FOLLOWING MINIMUM STANDARDS: JOISTS (2x, 3x, 4x MEMBERS) DOUGLAS FIR-LARCH NO 2 AND BEAMS MINIMUM BASE VALUE, Fb = 900 PSI 11. FASTENERS A. WOOD SCREWS SHALL CONFORM TO ANSI/ASME STANDARS B18.6.1 B. SHEET METAL SCREWS SHALL BE ITW BUILDEX TEKS SELECT TMSELF-DRILLING STRUCTURAL FASTENERS OR AN APPROVED EQUAL. 12. FOR THE CONNECTION OF THE NEW METAL CURB FOR HP-1 TO THE ROOF STRUCTURE THE CONNECTION SHALL BE A MINIMUM OF (3) #12 WOOD OR SHEET METAL SCREWS AT A MAXIMUM SPACING OF 24" ON-CENTER ON EACH SIDE OF THE UNIT. PLACE ONE SCREW AT 6" TO 8" FROM EACH CORNER OF THE UNIT AND THE REMAINING SCREWS APPROXIMATELY EQUIDISTANT BETWEEN THE CORNERS. 13. CONNECT HP-1 TO THE METAL CURB WITH #12 SHEET METAL SCREWS AT 24" ON-CNETER SPACING ON EACH SIDE OF THE UNIT WITH A MINIMUM OF (3) SCREWS PER SIDE. PLACE ONE SCREW AT 6" TO 8" FROM EACH CORNER OF THE UNIT AND THE REMAINING SCREWS APPROXIMATELY EQUIDISTANT BETWEEN THE CORNERS. Page 2 of 14 9/30/24,7:28 PM U.S.Seismic Design Maps USGS web services were down for some period of time and as a result this tool wasn't operational,resulting in timeout error. USGS web services are now operational so this tool should work as expected. �EFs OSH PD Olympic RTU 17212 51st Ave NE, Arlington, WA 98223, USA Latitude, Longitude: 48.1525603, -122.1616071 O VOA Distribution Center Ln 0Stillaguamish 'Athletic Club z m 172nd St Buzz lien Steakhouse NE s31 QAmazon Fulfillment PRC -Arlington 0. Go gle Center PAE2 Map data©2024 Date 9/30/2024,7:28:04 PM Design Code Reference Document ASCE7-16 Risk Category II Site Class D-Default(See Section 11.4.3) Type Value Description Ss 1.059 MCER ground motion.(for 0.2 second period) S1 0.378 MCER ground motion.(for 1.0s period) SMs 1.271 Site-modified spectral acceleration value SM1 null-See Section 11.4.8 Site-modified spectral acceleration value SDS 0.848 Numeric seismic design value at 0.2 second SA SD1 null-See Section 11.4.8 Numeric seismic design value at 1.0 second SA Type Value Description SDC null-See Section 11.4.8 Seismic design category Fa 1.2 Site amplification factor at 0.2 second Fv null-See Section 11.4.8 Site amplification factor at 1.0 second PGA 0.449 MCEG peak ground acceleration FPGA 1.2 Site amplification factor at PGA PGAM 0.539 Site modified peak ground acceleration TL 6 Long-period transition period in seconds SsRT 1.059 Probabilistic risk-targeted ground motion.(0.2 second) SsUH 1.161 Factored uniform-hazard(2%probability of exceedance in 50 years)spectral acceleration SsD 1.5 Factored deterministic acceleration value.(0.2 second) S1 RT 0.378 Probabilistic risk-targeted ground motion.(1.0 second) S1 UH 0.425 Factored uniform-hazard(2%probability of exceedance in 50 years)spectral acceleration. S1 D 0.6 Factored deterministic acceleration value.(1.0 second) https://www.seismicmaps.org Page 3 of 14 1/3 SCREWS AT MAXIMUM SPACING OF 24" ON-CENTER EACH SIDE OF (N)ROOF TOP UNIT UNIT. (3)#12 SCREWS MINIMUM EACH SIDE (N)CURB NEW OR EXISTING FRAMING PROVIDE MINIMUM OF (3)#12 WOOD OR TEK SCREWS EACH SIDE OF CURB TO EXISTING OR NEW FRAMING - 24"oc MAX SPACING DETAIL FOR NEW RTU ATTACHMENT Page 4 of 14 I SET THIS SIDE OF THE ROOF CURB ABOVE ' THE CENTER OF EXISTING LARGE BEAM HP-1 j I f J HHUS 4x8 HHUS I I i i EXISTING TRUSSES PARTIAL ROOF FRAMING PLAN Page 5 of 14 PR,oj Ear DEsczi E-n old U1> 'Tb ICJE- INk%171,,cxZ0 ct1 k -mP OF 'EXtSTtN,(e RsOF 51v-%3CSvaE C�►.x5,s��e� or R�C,�fJ JiV�S�t�TtA►1.c OVER v-50013 DE,cksk -ka OVEZ, B EI.'i��SS�S t.._opd0 S ROOF Truss @ 24" o.c. 3 psf 3/4" Plywood 2.4 psf J�3TA� = NS 2x Decking 5.0 psf Insulation 1.0 psf Gyp Board (5/8") 2.8 psf MEP 1.5 psf 2" Rigid 3.0 psf Total 18.7 psf Use 20.0 psf NEw N'FO �IMCLQOF-b GQfZ$ WT> %+CP.co" x til.l" (-t ►,r y c.ujs) t, c� -H 2, v�L�►-'r p�*n���J � �"ors# -� ��� 5c�t.E,�,.� 1Z.E,C�fJ ��� �ir�� = �o► # -� Cyr s��s �-�Q t2. TF-v-- ScRjF,�S #12 W 000 6CJZ.ET.V ICAP - I8(oz Tom, - ISCDtk T`ROvv0E— (a) EA S%10E ©P OI(ilIT 0.. 2-4"6 c- Mct)C JPEi'Z GEMEE A t. 1-M 1 E S -IF 1:4 Z12 S I-vrAvE_ NE __ _9 1 3o/Zo7y PROJECT DATE PROJECT NO MALSAM - 122 SOUTH JACKSON ST DESIGN SUITE 210 TSANG SEATTLE.WA 98104 Page 6 of 14 S STRUCTURAL T 206.789.6038 ------- - - ENGINEERING MALSAM-TSANG.COM SHEET LATERAL RTU: WIND: ASCE 7 Ref. qZ= 0.00256*Kz*Kzt*Kd*Ke*V2* Ip eq. 26.10-1 Kd = 0.85 Table 26.6-1 KZt= 1.00 26.8.2 Ke= 1.00 Table 26.9-1 KZ= 0.70 26.10-1 V = 98 mph 26.5 Ip= 1.00 qZ= 14.63 psf 26.10.1 qh= 14.63 psf Unit Height (h) 56.00 inches Unit Width (d) 47.00 inches Unit Length (1) 75.00 inches Unit Weight 765.00 pounds Bldg. Height 30.00 feet Af= 29.17 sf 29.4.1 B*h= 188 sf 29.4.1 0.1*B*h= 18.75 sf 29.4.1 Adjustment 0.16 29.4.1 GCr= 1.74 29.4.1 Fh= qh*GCr*Af= 744 pounds eq. 29.4-2 h/d = 1.19 FIG. 29.3.1 Ar= 24.48 sf 29.4.1 B*L= 18.28 FIG. 29.3.1 0.1B*L= 1.83 29.4.1 Adjustment 0.38 29.4.1 Gcr= 1.12 29.4.1 FV= qh*GCr*Ar = 401 pounds 29.4-3 W= 765 > 401 No uplift SEISMIC: FP= (0.4* a *SDS*WP/ RP/ 1p)(1 + 2*z/h) 13.3-1 ap = 2.5 Rp = 6.0 Sds= 0.848 Fp= 324 pounds FP= 0.2*SDS*Wp (vert) 13.3.1.2 Fup= 130 (vert) -, 17212 51 st Ave NE 9/30/2024 Proiect Date Arlington,WA 0524.2024.01 122 South Jackson Proi.No. SAM Suite 210 JRF MAL Seattle,WA 98104 TSANG SAM Desian t 206.789.6038 S2 STRUCTURAL ENGINEERING f 206.789.6042 Page 7 o Sheet Vrl?-MCA`L- C#-lfiCJcS Maw &A t A3#,xk,l kUV E/w (F--) c cMcxnoN1 p L; S3.S'_- w 4,1-4 cm la Sk. `I s N/b WA Xczuw-4E s ��� c:oruo,-n c,#,k 3CnC.c & -I- 1 Co 14 4 yy 0 5 t 384 1t. �,^ 3# 16 314:45 C.0 Pb tz - : Rfotks; , ZiL art = .zz b Tb �c ts�ttvc-cam, �X t s'r►n�, 'T7ZvSS . t�.> C.ow'J�"r1oN &4So 4-1. 12 = 8,4 ;5 tt M= 8s, 155(v- ' c�r C,vl C.ol•ao i-n o to F W 1, w� ' 3.5 3F:S A Rt we 4 SZs�/, w,= 3Coo-'*/. P= G-4b#/. t W(oat +44 W = $Co$ e3R # = 982 tLi�k llat-`►'2F�S� - 614t`� PROJECT DATE PROJECT NO MALSAM --- - ---- - ----- - - - - - - - _ _ 122 SOUTH JACKSON ST DESIGN SUITE 210 Page 8 of 14 TSANG SEATTLE,WA 98104 104 STRUCTURAL T 206.789.6038 - - -- ----- ---- -- - -- - - ---5112S-- ENGINEERING MALSAM-TSANG.COM SHEET FIVE STAR VACOMFORT YOUR HEATING AND COOLING EXPERTS 22407 61st Ave SE Bothell,WA 98021 Phone:(425)399-0811 Contractors License No.:FIVESSC881 L2 W W W.f,Vestarcomfort.com SET THIS SIDE OF THE ROOF CURB ABOVE NEW STRUCTURAL MEMBERS SPECIFIED BY THE CENTER OF EXISTING LARGE BEAM STRUCTURAL ENGINEER — HP-� — z-- --- J (2)LS90 HHUS — 4xj 8 HHUS ------------ — ------ � MAIN SPRINKLER PIPE p IIeee EXISTING TRUSSES Z J Z SKYLITE W Q J EXISTING a cn PURLINS 0 � z Cy a W w O H V cn cn a a w z w O J ( Q z co Ln a N ----------------- II 04 II O r 0 0 DA —CD-"""09/27/24 —CD-"""—CD-"""SET 0 OD STRUCTURAL LAYOUT a D SCALE: 1/4" 1' O" PROJECT MANAGER DESIGNED BY AN AH ORANN BY CHECKED BY AH IB SCAT£ PROJECT NO. AS NOTED 2020430 DRAx�Nc nncs STRUCTURAL LAYOUT I I I sr�EEr NUMeErr I I MS- 1 I I I I . 1 OF 1 Page 9 of 14 Unit Report For 6T Pkg HP Project: 6T Pkg HP-460v 09/10/2024 Prepared By: 06:41 AM Unit Parameters Dimensions (ft. in.)&Weight(lb.) Unit Model:......................................50FCQM07A2A6-OAOAO Unit Length:.......................................................................6'2.375" Unit Size:.......................................................................07 (6 Tons) Unit Width:......................................................................3' 10.625„ Volts-Phase-Hertz:.......................................................460-3-60 Unit Height:........................................................................3'5.375„ Heating Type:............... ...........................Heat Pump Total Operating Weight:.....................................................765 lb Heat Control:Single Circuit,Two Stage Cooling (07 only) Duct Cfg:................. Vertical Supply/Vertical Return "' Weights and Dimensions are approximate. Weight does not include unit packaging. Approximate dimensions are provided primarily for shipping purposes.For exact dimensions and weights,refer to appropriate product data catalog. Lines and Filters Return Air Filter Type: Throwaway Return Air Filter Quantity: 4 Return Air Filter Size: 16 x 16 x 2 Selection includes construction throwaway filter into the base fan curve. Unit Configuration Direct Drive- EcoBlue-Medium Static AI/Cu -AI/Cu Base Electro-mechanical controls Standard Packaging Warranty Information 5-Year compressor parts(STD.) 5-Year electric heater(STD.) 1-Year parts(STD.) No optional warranties were selected. NOTE: Please see Warranty Catalog 500-089 for explanation of policies and ordering methods. Ordering Information Part Number Description Quantity 50FCQM07A2A6-OAOAO Rooftop Unit 1 Base Unit Direct Drive-EcoBlue- Medium Static None Field Installed Accessories CRHEATER336A00 Electric Heater 1 CRECOMZR103A00 CH 1-2 Vertical ULL Econ w/POL224 1 CRRFCURB001A01 14-inch Tall Roof Curb 1 Packaged Rooftop Builder 1.79e Page 3 of 11 Page 10 of 14 Performance Summary For 6T Pkg HP Project: 6T Pkg HP-460v 09/10/2024 Prepared By: 06:41 AM Part Number:50FCQM07A2A6-OAOAO ARI EER: 11.00 IEER: 15.0 Base Unit Dimensions Unit Length: 74.4 in Unit Width: 46.6 in Unit Height: 41.4 in Operating Weight Base Unit Weight: 589 lb Accessories Electric Heater: 10 lb CH 1-2 Vertical ULL Econ w/POL224: 51 lb 14-inch Tall Roof Curb: 115 lb Total Operating Weight: 765 lb Unit Unit Voltage-Phase-Hertz: 460-3-60 Air Discharge: Vertical Fan Drive Type: Vane Axial Actual Airflow: 2400 CFM Site Altitude: 0 ft Cooling Performance Condenser Entering Air DB: 95.0 F Evaporator Entering Air DB: 80.0 F Evaporator Entering Air WB: 67.0 F Entering Air Enthalpy: 31.44 BTU/lb Evaporator Leaving Air DB: 57.0 F Evaporator Leaving Air WB: 57.0 F Evaporator Leaving Air Enthalpy: 24.43 BTU/lb Gross Cooling Capacity: 74.99 MBH Gross Sensible Capacity: 59.58 MBH Compressor Power Input: 5.31 kW Coil Bypass Factor: 0.025 Heating Performance Outdoor Ambient Temperature: 47.0 F Entering Air Indoor Coil DB: 70.0 F Leaving Air Indoor Coil DB: 95.1 F Total Heating Capacity: 65.10 MBH Integrated Heating Capacity: 65.10 MBH Heating Power Input: 5.11 kW High Temperature COP: 3.60 Low Temperature COP: 2.40 Electric Heating Capacity: 12.90 kW Unit Leaving Air Temp: 112.1 F Supply Fan External Static Pressure: 0.50 in wg Options/Accessories Static Pressure Electric Heaters: 0.26 in wg Economizer: 0.17 in wg Application External Static(ESP+ Unit Opts/Acc.): 0.92 in wg Fan RPM: 2177 Fan Power: 1.09 BHP NOTE: Selected IFM RPM Range: 253-2530 Selection includes construction throwaway filter into the base fan curve.This filter is not MERV Rated. Packaged Rooftop Builder 1.79e Page 8 of 11 Page 11 of 14 Certified Drawing for 6T Pkg HP Project: 6T Pkg HP-460v 09/10/2024 Prepared By: 06:41AM THIS DOCUMF XT IS THE PROPERTY OF UTC CLIMATE,CONTROLS SUBMISSION Of THESE DRAWINGS OR DOCUMENTS A72 CORNEA CORNER CORNER CORNER {.N)WLCI� A SPCUAIT1 AND TS-.11RID UPON THE ENPA CSS CONDITION DOES NOT CONSTITUTE PART PEREORNAXCE OR UNIT WEIGHT (Al WEIGHT (B) WEIGHT ICI WEIGHT IDI C.G. HEIGHT THAT rxE COXTINTS'LL NOT 9F DIscLUSFD OR-D LAW 1Wehe�W/�WITHOUT WAIiiEN CONSEXi. ACCEPTANCE Of CON1RACi. LBS. KG. LBS. KG. LBS. KG. LBS. KG. K Y Z 50FCQ-04126 57 118 53 108 49 115 52 36 1914I 22 3/8 15681 16 1/8 I4101 121 58 119 54 110 50 117 53 36 I914I 22 3/8 I568] 16 1/8 I4101 SOFCOXO6160 72 145 66 133 60 146 66 35 3/8 I8981 22 5/16 15511 16 112 14191 50FCON07161 73 146 66 134 61 147 67 35 318 [8981 22 5/16 [557I 16 1/2 [419] BACK W STANDARD UNIT WEIGHT IS WITHOUT ELECTRIC HEAT AND WITHOUT PACKAGING. WITH ECONOMIZER FOR OTHER OPTIONS AND ACCESSORIES, REFER TO THE PRODUCT DATA CATALOG. BACK R38-1/8 WITHOUT 96eI CORNER A CORNER B ECONOMIZER ECONOMIZER HOOD _ (OPTIONAL) O OPTIONAL DOOR SWING LEFT RIGHT CORNER D � CORNER C , X TOP FRONT i G� NOTE: Z 1. FOR ALL MINIMUM CLEARANCES LOCAL CODES OR JURISDICTIONS MAY PREVAIL. CLEARANCE ® C� SERVICE WITH: SERVICE WITH: OPERATING SURFACE CONDUCTIVE BARRIER NONCONDUCTIVE BARRIER CLEARANCE FRONT 48 [1219mm] 36 [914mm] 18 [457mm] LEFT 48 11219mm] 42 [1067mm] 18 [457mm] BACK W/O ECON 48 [1219mm] 42 [1067mm] 18 [457mm] FRONT BACK W/ECON 36 [914mm] 36 [914mm] 18 [457mm] RIGHT 36 [914mm] 36 [914mm] 18 [457mm] TOP 72 [1829mm] 72 [1829mm] 12 [1829mm] ITC CLASSIFICATION SHEET DATE SUPE RCEDES REV SOFCO 04-07 SINGLE PACKAGE HEAT PUMP 48TC003348 _ U.S. ECCN:NSR 2 OF 3 08/15/19 Packaged Rooftop Builder 1.79e Page 5 of 11 Page 12 of 14 78 DOWEL-TYPE FASTENERS Table 12.213 Cut Thread or Rolled Thread Wood Screw Reference Withdrawal Design Values, W1 Tabulated withdrawal design values, W, are in pounds per inch of thread penetration into side grain of wood member see 12.2.2.1). Specific Wood Screw Number Gravity, 6 7 8 9 10 12 14 16 18 20 24 G2 0.73 209 229 249 268 288 327 367 406 446 485 564 0.71 198 216 235 254 272 310 347 384 421 459 533 0.68 181 199 216 233 250 284 318 352 387 421 489 0.67 176 193 209 226 243 276 309 342 375 409 475 0.58 132 144 157 169 182 207 232 256 281 306 356 0.55 119 130 141 152 163 186 208 231 253 275 320 0.51 102 112 121 131 141 160 179 198 217 237 275 0.50 98 107 117 126 135 154 172 191 209 228 264 0.49 94 103 112 121 130 147 165 183 201 219 254 0.47 87 95 103 111 11 3 152 168 185 201 234 0.46 83 91 99 107 114 130 146 161 177 193 224 0.44 76 83 90 97 19L.X_X1W_7 133 148 162 176 205 0.43 73 79 86 93 100 114 127 141 155 168 196 0.42 69 76 82 89 95 108 121 134 147 161 187 0.41 66 72 78 85 91 103 116 128 141 153 178 0.40 63 69 75 81 86 98 110 122 134 146 169 0.39 60 65 71 77 82 93 105 116 127 138 161 0.38 57 62 67 73 78 89 99 110 121 131 153 0.37 54 59 64 69 74 84 94 104 114 125 145 0.36 51 56 60 65 70 80 89 99 108 118 137 0.35 48 53 57 62 66 75 84 93 102 ill 130 0.31 38 41 45 48 52 59 66 73 80 87 102 1. Tabulated withdrawal design values,W,for wood screw connections shall be multiplied by all applicable adjustment factors(see Table 11.3.1). 2. Specific gravity,G,shall be determined in accordance with Table 12.3.3A. (b) For Roof Sheathing Ring Shank nails (Appen- 12.2.3.4 Nails and spikes shall not be loaded in dix Table L6) or Post-Frame Ring Shank nails (Appen- Withdrawal from end-grain of laminations in cross- dix Table L5) that are uncoated carbon steel, reference laminated timber(Ceg0.0). withdrawal design values determined from Table 12.2E or Equation 12.2-5 shall be permitted to be multiplied 12.2.4 Drift Bolts and Drift Pins by 1.25. Reference withdrawal design values, W, for con- (c) For calculation of the fastener reference with- nections using drift bolt and drift pin connections shall drawal design value in pounds, the unit reference with- be determined in accordance with 11.1.1.3. drawal design value in lbs/in. of ring shank penetration from 12.2.3.2a or 12.2.3.2b shall be multiplied by the 12.2.S Fastener Head Pull-Through length of ring shank penetration, pt, into the wood member. 12.2.5.1 For fasteners with round heads, the refer- (d) For other deformed shank nails, reference with- ence pull-through design value, WH, in pounds for drawal design values shall be permitted to be calculated wood side members shall be determined from Table in accordance with 12.2.3.1. 12.2F or Equation 12.2-6, within the range of fastener 12.2.3.3 Nails and spikes shall not be loaded in head diameters, DH, and net side member thicknesses, withdrawal from end grain of wood(Ceg 0.0). tns, given in Table 12.2F. Reference pull-through design values, WH, shall be multiplied by all applicable ad- justment factors (see Table 11.3.1) to obtain adjusted pull-through design values,W'H. Copyright©American Wood Council. Downloaded/printed pursuant to License Agreement.No reproduction or transfer authorized. AVffd6 JOS ?Off I L 14 of 23 Page 12 of 15 110 DOWEL-TYPE FASTENERS _ Table 12M WOOD SCREWS: Reference Lateral Design Values, Z,for Single Shear (two member)Connections1,2,3 for sawn lumber or SCL with ASTM 653,Grade 33 steel side plate W (tabulated lateral design values are calculated based on an assumed length of UJ wood screw penetration,p,into the main member equal to 10D) Z .E7N6 Y 0 i r2 Z V LLL aO in pn 4 4 C�Q_ LL 0 C V (n Q A N V cc V O M(O O IA In 3 0 MM N 0'1: UNf o 00 0x0 0 o o o o m o a) o u o u a) o o c c�o 3: � cn (D (Dx 0C/) (D� WCJ5 wNULO 0Z tg D O in. in. Ibs. Ibs. Ibs. Ibs. Ibs. Ibs. Ibs. Ibs. Ibs. Ibs. 0.036 0.138 6 89 76 70 69 66 62 60 54 53 52 O (20 gage) 0.151 7 99 84 78 76 72 68 67 60 59 57 0.164 8 113 97 89 87 83 78 77 69 67 66 0.048 0.138 6 90 77 71 70 67 63 61 55 54 53 (18 gage) 0.151 7 100 85 79 77 69 68 61 60 58 0.164 8 114 98 90 89 84 79 78 70 69 67 0.060 0.138 6 92 79 73 72 6 64 63 57 56 54 (16 gage) 0.151 7 101 87 81 79 5 71 70 63 61 60 0.164 8 116 100 92 90 81 79 71 70 68 9 136 116 107 105 00 94 93 83 82 79 0.190 10 146 125 116 114 108 102 100 90 88 86 0.075 0.138 6 95 82 76 75 1 67 66 59 58 57 (14 gage) 0.151 7 105 90 84 82 7 74 72 65 64 62 0.164 8 119 103 95 93 89 84 82 74 73 71 0.177 9 139 119 110 108 103 97 95 86 84 82 0.190 10 150 128 119 117 ill 105 103 92 91 88 0.216 12 186 159 147 145 138 130 127 114 112 109 0.242 14 204 175 162 158 151 142 139 125 123 120 0.105 0.138 6 104 90 84 82 79 74 73 66 65 63 (12 gage) 0.151 7 114 99 92 90 86 81 80 72 71 69 0.164 8 129 ill 103 102 97 92 90 81 80 77 0.177 9 148 128 119 116 111 105 93 91 0.190 10 160 138 128 125 120 113 100 98417 0.216 12 1 168 156 153 146 1 122 1200.242 14 213 183 170 167 159 150 147 132 13026 0.120 0.138 6 110 95 89 87 83 79 77 70 68 67 (11 gage) 0.151 7 120 104 97 95 91 86 84 76 75 73 0.164 8 135 117 109 107 102 96 94 85 0.177 9 154 133 124 121 116 110 107 97 0.190 10 166 144 133 131 125 118 116 104 0.216 12 202 174 162 159 152 143 140 126 124 121 0.242 14 219 189 175 172 164 155 152 137 134 131 0.134 0.138 6 116 100 93 92 88 83 81 73 72 70 (10 gage)r 0.151 7 110 102 100 96 -91 89 80 79 77 0.164 8 1 122 114 112 107 101 99 89 88 86 0.177 9 160 139 129 127 121 114 112 101 100 97 0.190 10 173 149 139 136 130 123 121 109 107 104 0.216 12 209 180 167 164 157 148 145 131 129 126 0.242 14 226 195 181 177 169 160 157 141 139 135 0.179 0.1 M 6 126 107 99 97 92 86 84 76 74 72 (7 gage) 0.151 7 139 118 109 107 102 95 93 84 82 80 0.164 8 160 136 126 123 117 110 108 96 95 92 0.177 9 184 160 148 145 138 129 127 113 111 108 0.190 10 198 172 159 156 149 140 137 122 120 117 0.216 12 234 203 189 186 178 168 165 149 146 143 0.2421 14 251 217 202 198 190 179 176 159 156 152 0.239 0.138 6 126 107 99 97 92 86 84 76 74 72 (3 gage) 0.151 7 139 118 109 107 102 95 93 84 82 80 0.164 8 160 136 126 123 117 110 108 96 95 92 0.177 9 188 160 148 145 138 129 127 113 ill 108 0.190 10 204 173 159 156 149 140 137 122 120 117 0.216 12 256 218 201 197 187 176 172 154 0.242 14 283 241 222 217 207 194 190 170 1. Tabulated lateral design values,Z,shall be multiplied by all applicable adjustment factors(see Table 11.3.1). 2. Tabulated lateral design values,Z,are for rolled thread wood screws(see Appendix L)inserted in side grain with screw axis perpendicular to wood fibers;screw penetration,p,into the main member equal to 1 OD;dowel bearing strength,Fe,of 61,850 psi for ASTM A653,Grade 33 steel and screw bending yield strengths, Fyb,of 100,000 psi for 0.099"<D<0.142",90,000 psi for 0.142"<D<0.17711,80,000 psi for 0.177"<D<0.236",70,000 psi for 0.236"<D<0.273". 3. Where the wood screw penetration,p,is less than 1 OD but not less than 6D,tabulated lateral design values,Z,shall be multiplied by p/1 OD or lateral design values shall be calculated using the provisions of 12.3 for the reduced penetration. Copyright©American Wood Council. Downloaded/printed pursuant to License Agreement.No reproduction or transfer authorized. MIV}E�j d6N{o,QQ�?oJ,Jf);ciL 13 of 23 uPagge 111 of 15 Mechanical Requirements • • of 2021 WSEC Requirements for Commercial Buildings including Group R2,R3&R4 over 3 stories&all R1 -- Administered by @2024 NEEA,All rights reserved The following information is necessary to check a mechanical permit application for compliance with the mechanical systems and equipment requirements in the Washington State Energy Code,Commercial Provisions. For questions about this report,contact WSEC Commercial Technical Support at 360-539-5300 or via email at com.techsupport@waenergycodes.com Project: Olympic Equipment-2021 WSEC 17212 51 st Ave NE, A-104 Arlington,WA 98023 Date:2024-10-04 Applies Code Section Code Provision Compliance Information Required In Permit Location in Building Department Documentation Documents Notes SCOPE YES C103.6.3 Construction For a shell&core or tenant space(first build- M-1 documents-General out)project,indicate if there is no mechanical scope included in the project. C103.1 Construction For an alteration project,indicate if there is documents-General no mechanical scope included in the project. PERFORMANCE CRITERIA&SYSTEM DESIGN NA C403.1 Exempt process Identify equipment used by manufacturing, equipment industrial or commercial processes that are not for space conditioning or maintaining comfort and amenities for occupants;identify provisions applicable to this equipment per C403.1 exception C403.1.1 HVAC total system For systems serving office(including medical performance ratio office),retail,library,or education (TSPR) occupancies,or serving R-2 dwelling units or common areas,provide a TSPR report that demonstrates the proposed design ratio is equal to or greater than the standard reference design ratio,or exception applied YES C403.1.2 Calculation of heating Provide load calculations in accordance with Heat Load and cooling loads ASHRAE Std 183 or equivalent,using design Calculation parameters per C302 and Appendix C; include load adjustments to account for energy recovery NA C403.1.3 Data centers Provide documentation that demonstrates that data center systems comply with the maximum allowed Design MLC and Annualized MLC per ASHRAE 90.4-2019. NA C403.2.1 Zone isolation If there are HVAC zones that are intended to C403.4.2.2 be occupied non-simultaneously,identify isolation zone areas on plans;if multiple zones intended to be occupied simultaneously will be combined into a single isolation zone, include on plans that the combined zone area does not exceed 25,000 sf and does not include more than one floor;or exception applied NA C403.2.1 Zone isolation Indicate locations of associated zone isolation C403.4.2.2 dampers in HVAC and DOAS distribution systems and exhaust systems NA C403.2.1 Zone isolation Refer to HVAC Controls section in C403.4.2.2 Requirements List for applicable automatic setback and shutdown controls requirements Page 1132 Mechanical Requirements • • of 2021 WSEC Requirements for Commercial Buildings including Group R2,R3&R4 over 3 stories&all R1 -- Administered by @2024 NEEA,All rights reserved The following information is necessary to check a mechanical permit application for compliance with the mechanical systems and equipment requirements in the Washington State Energy Code,Commercial Provisions. For questions about this report,contact WSEC Commercial Technical Support at 360-539-5300 or via email at com.techsupport@waenergycodes.com EQUIPMENT SELECTION&PERFORMANCE YES C403.3.2.6 Electric heating/ Verify all packaged and split electric cooling equipment equipment with>6,000 Btu/h cooling capacity and any amount of heating is a heat pump with reverse-cycle defrost and operates in heat pump mode when outdoor air temperature is>25 degree F;include in equipment schedules NA C403.3.2.6 Electric heating/ Verify electric heat in the main supply duct cooling equipment before VAV boxes served by cooling only systems>6,000 Btu/h is a heat pump with reverse-cycle defrost and operates in heat pump mode when outdoor air temperature is >25 degree F;include in equipment schedules. NA C401.3 HVAC Heating Fuel For all heating equipment,identify whether it C403.1.4 qualifies for the C403.1.4 general prescriptive path,a C403.1.4 exception,or for the C401.3 Fossil Fuel Heating path;for equipment qualifying for the C403.1.4 general prescriptive path by exception,document the exception and provide supporting information NA C401.3 HVAC Heating Fuel For projects with equipment utilizing the C403.1.4 C401.3 Fossil Fuel Heating path,provide an C406.1 accounting of the total heating capacity and the C401.3 equipment heating capacity for each distinct area utilized in the C406 calculation. NA C403.1.4 HVAC Heating Fuel, To qualify for exception 2,provide a list of exception 2 Dwelling each separate space in the dwelling or sleeping and sleeping units unit,indicate the number of exterior walls the space has,the presence of fenestration,and the allowed watts;document the heat provided in each space is below the allowed capacity in the space NA C403.1.4 HVAC Heating Fuel, To qualify for exception 5,provide exception 5 Air-to-air documentation that the heat pump is sized to heat pumps meet the heating load at an outdoor air temperature<_32°F and has a ratio of heating capacity at 47°F to supplemental resistance heat capacity>_2.0 in zone 4 and>_ 1.0 in zone 5;indicate unit control by either a thermostat designed for heat pump use,a multistage thermostat with an outdoor air temperature thermostat wired to energize supplemental heat only on the last stage or heating and when the outdoor air temperature is<_32°F,or equipment is NAECA rated with integral control Page 2132 Mechanical Requirements • • of 2021 WSEC Requirements for Commercial Buildings including Group R2,R3&R4 over 3 stories&all R1 -- Administered by @2024 NEEA,All rights reserved The following information is necessary to check a mechanical permit application for compliance with the mechanical systems and equipment requirements in the Washington State Energy Code,Commercial Provisions. For questions about this report,contact WSEC Commercial Technical Support at 360-539-5300 or via email at com.techsupport@waenergycodes.com YES C403.1.4 HVAC Heating Fuel, To qualify for exception 6,provide M-1 exception 6 Air-to- documentation that building heating is water heat pumps provided by air-to-water heat pumps with a heating capacity>_75%of the design heating load at 29'F;indicate controls configured to lock out supplemental heat when the outdoor air temperature is>36°F unless the hot water supply set point has not been maintained for 20 minutes;indicate controls configured to use the compressor as the first stage of heating down to the compressor minimum rated temperature except during start up and defrost NA C403.1.4 HVAC Heating Fuel, To qualify for exception 7,provide exception 7 Ground documentation building heating provided by source heat pumps ground source heat pumps;;indicate controls configured to lock out supplemental resistance heat when the source-side entering water temperature is>_42°F unless the hot water supply set point has not been maintained for 20 minutes;indicate controls configured to use the compressor as the first stage of heating;indicate the ground source heat exchanger shall be sized so heat pump annual output is>_70%for the total annual heating output based upon the final year of a 30-year simulation using IGSHPA listed software NA C403.1.4 HVAC Heating Fuel, To qualify for exception 8,document the exception 8 Small capacity or area served for the electric systems resistance and fossil fuel systems and demonstrate that it is<_5%of the building total heating capacity or area NA C401.3.6 Electrification For all equipment following the fossil fuel readiness path,indicate on plans that spare electrical branch circuit and service entrance conduit is installed and sized to support future conversion of fossil fuel heaters to heat pumps;indicate on plans additional room in the electric room and transformer rooms and vaults be provided and sized to accommodate future service upgrades for conversion of all fossil fuel equipment to heat pumps. YES C403.3.1 Equipment and Indicate that output capacities of heating and M-1 system sizing cooling equipment and systems are no greater than the smallest available equipment size that exceeds the calculated loads;note exceptions applied YES C403.3.2 HVAC equipment Provide equipment schedules on plans and in M-1 C403.9.1 performance WSEC mechanical equipment compliance requirements reports;indicate equipment type,calculated (efficiency) loads,capacity,rated and WSEC minimum efficiencies for all heating and cooling equipment;include supply and ventilation air cfms and operating hours for all air systems; identify heating and cooling equipment that does not have a corresponding WSEC minimum efficiency(manufacturer rated) Page 3132 Mechanical Requirements • • of 2021 WSEC Requirements for Commercial Buildings including Group R2,R3&R4 over 3 stories&all R1 -- Administered by @2024 NEEA,All rights reserved The following information is necessary to check a mechanical permit application for compliance with the mechanical systems and equipment requirements in the Washington State Energy Code,Commercial Provisions. For questions about this report,contact WSEC Commercial Technical Support at 360-539-5300 or via email at com.techsupport@waenergycodes.com C405.8 Electric motor List all motors> 1/12 hp(that are not integral efficiency to a rated piece of equipment)in the mechanical or electrical equipment schedules on plans;indicate motor type and applicable efficiency table,hp,rpm,number of poles and rated efficiency,or exception applied C403.3.2.1 Gas and oil-fired For gas and oil fired forced air furnaces with forced air furnace capacity>225,000 Btu/h and all unit heaters, and unit heaters indicate in equipment schedule intermittent ignition or IID,flue or draft damper,and rated jacket loss C403.3.3 Hot gas bypass For cooling equipment with hot gas bypass, limitation for DX provide either multiple step unloading or cooling equipment continuous capacity modulation;indicate bypass capacity per Table C403.3.3 C403.3.2.7 Humidification For cooling systems with humidification equipment that are also required to have air economizer,indicate humidifier is adiabatic (direct evaporative or fog atomization),or exception applied C403.3.2 Hydronic equipment Refer to Requirements List section Hydronic Systems-Equipment Selection& Performance for selection criteria specific to chillers and boilers C403.9 Heat rejection Refer to Requirements List section Heat equipment Rejection Systems-Equipment Selection& Performance for selection criteria specific to cooling towers,dry coolers and condensers (air-cooled and evaporative) C403.13 Dehumidification in Indicate dehumidification equipment serving spaces for plant plant growth spaces and which C403.13 growth compliance option is met EQUIPMENT SELECTION&PERFORMANCE-DEDICATED OUTSIDE AIR SYSTEMS(DOAS) YES C403.3.5.5 DOAS supplemental If DOAS has heating capability,indicate M-1 C403.7.3 heating and cooling hearing controlled to limit supply air to<_ 55°F.If heating is used for defrost control, indicate heat is to be locked out when outdoor air temperature is<_35'F,modulates to 10% of peak capacity.Provide sizing calculations that show heating capacity sized at design temperatures to prevent damage to unit and heat supply air<_55°F. NA C403.3.5.5 DOAS supplemental If DOAS has cooling capability,indicate heating and cooling cooling coil is used only for dehumidification only,is sized to meet the peak dehumidification requirement at design conditions,and is controlled to maintain supply air or zone relative humidity. Page 4132 Mechanical Requirements • • of 2021 WSEC Requirements for Commercial Buildings including Group R2,R3&R4 over 3 stories&all R1 -- Administered by @2024 NEEA,All rights reserved The following information is necessary to check a mechanical permit application for compliance with the mechanical systems and equipment requirements in the Washington State Energy Code,Commercial Provisions. For questions about this report,contact WSEC Commercial Technical Support at 360-539-5300 or via email at com.techsupport@waenergycodes.com YES C403.3.5 Dedicated outdoor air For buildings with occupancies required to M-1 C403.3.5.4 systems comply with the DOAS provisions per Table C403.3.5,identify on plans all occupancies in the building and indicate which occupied spaces are required to have ventilation air delivered by a DOAS;or exception applied NA C403.3.5 Dedicated outdoor air If natural ventilation exception is applied, C403.3.5.4 systems identify these spaces on plans;indicate operable window area complies with IMC Section 402;provide documentation describing how required ventilation will be provided during all occupied hours,including during inclement weather NA C403.3.5 Dedicated outdoor air If high efficiency VAV exception is applied, C403.3.5.4 systems identify these spaces on plans;refer to Single Zone VAV section for Groups A-1,A-2 and A-3 occupancy classifications,or Multiple Zone VAV for other than Groups A-1,A-2 and A-3(per Table C403.3.5) NA C403.3.5 Dedicated outdoor air If compliance with the DOAS provisions is C403.3.5.6 systems deemed to be impractical,provide documentation that demonstrates the alternate design strategy applied that achieves a comparable level of energy efficiency,as pre- approved by the AHJ NA C403.3.5 Dedicated outdoor air Refer to Requirements List section after systems Multiple-Zone Air Systems for High Efficiency Multiple-Zone VAV Systems exception to C403.3.5 DOAS NA C403.3.5 Dedicated outdoor air Refer to Requirements List section after High systems Efficiency Multiple-Zone Air Systems for High Efficiency Single-Zone VAV Systems exception to C403.3.5 DOAS NA C403.3.5.1 DOAS energy For all DOAS systems,indicate exhaust air recovery method and ER method and basis of rated effectiveness effectiveness (sensible or latent);indicate>_68%sensible or >_60%enthalpy recovery ratio at design conditions;or exception applied YES C403.3.5.2 DOAS fan power For DOAS with no fans or fan arrays with ERV submittal input power>_ 1kW,indicate total system fan power does not exceed 1 watt per cfm YES C403.3.5.2 DOAS fan power For DOAS with any fans or fan arrays with ERV submittal input power>_ 1kW,indicate total system fan power complies with fan power limitation per Section C403.8.1 YES C403.3.5.3 Heating/cooling Indicate systems and equipment associated system fan controls with the delivery of zone level heating and with DOAS cooling(fans,hydronic pumps,primary air dampers,etc.)are configured to shut off,and central equipment is configured to turn down, when there is no call for heating or cooling in the zone they serve Page 5132 Mechanical Requirements • • • of 2021 WSEC Requirements for Commercial Buildings including Group R2,R3&R4 over 3 stories&all R1 -- Administered by @2024 NEEA,All rights reserved The following information is necessary to check a mechanical permit application for compliance with the mechanical systems and equipment requirements in the Washington State Energy Code,Commercial Provisions. For questions about this report,contact WSEC Commercial Technical Support at 360-539-5300 or via email at com.techsupport@waenergycodes.com NA C403.3.5.3 Heating/cooling If applying Exception to heating/cooling fans system fan controls used for air mixing in the space during with DOAS deadband periods,include fan watts per cfm in equipment schedule YES C403.3.5.4 Decoupled DOAS Indicate method of delivery of DOAS supply downstream of main supply air air to the occupied space(directly into space, ductwork downstream of terminal heating/cooling coils);or exception applied NA C403.6.5 Multiple zone DOAS For DOAS serving multiple zones with DDC controls,indicate controls configured to reduce the volume of outdoor air in each zone independently when the zone is unoccupied; or exception applied ADDITIONAL ENERGY EFFICIENCY MEASURE-DEDICATED OUTSIDE AIR SYSTEMS(DOAS) C406.2.2.6 High performance For all building occupancies,to comply with DOAS-Energy this additional efficiency credit,demonstrate recovery compliance withC403.3.5 effectiveness and fan power C406.2.2.6 High performance Indicate energy recovery sensible DOAS-Energy effectiveness of all DOAS is>_80% recovery effectiveness and fan power C406.2.2.6 High performance For each system,indicate that total system fan DOAS-Energy power does not exceed 0.769 watts per cfm or recovery is<_80%of the fan power allowance for a effectiveness and fan constant volume system calculated per power C403.8.1 FANS AND FAN CONTROLS NA C403.8.1.2 Fan power limitation For all HVAC fan systems associated with conditioned space and containing 1 or more fans with electrical input>_1 kW shall provide the total nameplate hp and the fan system electrical input power calculated per C403.8.1.2 in equipment schedules on project plans NA C403.8.1.1 Fan power limitation For all HVAC and DOAS systems associated with conditioned space with 1 or more fans with electrical input power> 1 kW,provide fan system electrical input power calculations per Section C403.8.1.2 to verify it complies with fan power budget per Section C403.8.1.1 NA C403.8.2 Motor nameplate hp For HVAC systems with total fan motor nameplate hp>5hp,indicate fan motors specified are the smallest available motor hp size greater than fan bhp,note exceptions applied Page 6132 Mechanical Requirements • • of 2021 WSEC Requirements for Commercial Buildings including Group R2,R3&R4 over 3 stories&all R1 -- Administered by @2024 NEEA,All rights reserved The following information is necessary to check a mechanical permit application for compliance with the mechanical systems and equipment requirements in the Washington State Energy Code,Commercial Provisions. For questions about this report,contact WSEC Commercial Technical Support at 360-539-5300 or via email at com.techsupport@waenergycodes.com NA C405.8 Fractional hp fan For all fractional hp fan motors(1/12-<1 motors hp),indicate that motors comply with applicable WSEC efficiency tables;if motor type is not listed in an efficiency table, indicate whether fan has an electronically commutated motor,has motor rated efficiency of at least 70%,or exception applied NA C403.8.3 Fan efficiency For individual fans or fan arrays,indicate in equipment schedule that rated FEI for all applicable fans part of a variable-air volume system is>_0.95 and>_ 1.0 in all other systems,or exception applied;indicate these fans are sized at the design point of operation C403.8.4 Low-capacity For all ventilation system fans with motors<_ ventilation fans 1/12 hp,indicate in equipment schedule the fan flow rate and efficacy(cfm/watt),or exception applied;refer to Table C403.8.4 NA C403.2.4 Variable flow For fan motors>_5 hp,indicate method of capacity-fans variable flow control(VSD or equivalent method)in equipment schedule,or exception applied YES C403.8.5.1 Fan airflow control For DX air handling units with cooling HP-1 Submittal capacity>42,000 Btu/h and evaporative and chilled water air handling units with fan>_ 0.25 hp,indicate whether system is single zone or multiple zone and related control method(cooling capacity controlled in response to space temperature,space temperature is controlled by modulating supply airflow,or both) YES C403.8.5.1 Fan airflow control For mechanical cooling systems(includes DX HP-1 Submittal and chilled water coils)that control cooling capacity in response to space temperature- Provide a minimum of two stages of fan control;indicate minimum fan speed is<_ 66%of full speed drawing<_40%of full speed fan power during periods of low cooling or ventilation only NA C403.8.5.1 Fan airflow control For other mechanical cooling systems (includes DX and chilled water coils)that control space temperature by modulating airflow(in lieu of,or in addition to, controlling capacity in response to space temperature)-Provide fan controls for modulating supply airflow;indicate minimum fan speed is<_50%of full speed drawing<_ 30%of full speed fan power during periods of low cooling or ventilation only;or exception applied NA C403.8.6 Large-diameter Where provided,indicate large-diameter ceiling fans ceiling fans to be tested and labeled in accordance with AMCA 230. ADDITIONAL ENERGY EFFICIENCY MEASURE-IMPROVED HVAC TSPR Page 7132 Mechanical Requirements • • i of 2021 WSEC Requirements for Commercial Buildings including Group R2,R3&R4 over 3 stories&all R1 -- Administered by @2024 NEEA,All rights reserved The following information is necessary to check a mechanical permit application for compliance with the mechanical systems and equipment requirements in the Washington State Energy Code,Commercial Provisions. For questions about this report,contact WSEC Commercial Technical Support at 360-539-5300 or via email at com.techsupport@waenergycodes.com C406.2.2.1 Improved HVAC To comply with this additional efficiency TSPR credit,indicate systems are required to provide a TSPR report per C403.1.1; demonstrate that the proposed design ratio is at minimum 5%higher than the standard reference design ratio;for projects prorating the credit the TSPR report must show the proposed design exceeds the claimed increase used for proration ADDITIONAL ENERGY EFFICIENCY MEASURE-MORE EFFICIENT HVAC EQUIPMENT COOLING AND FAN PERFORMANCE C406.2.2.2 More efficient To comply with this additional efficiency cooling and fan credit,provide a list of all cooling equipment performance in the building or credit area and calculations that demonstrate(based on cooling output capacity)that 90%or more of all HVAC cooling equipment serving conditioned floor areas are listed in the tables of Section C403.3.2 YES C406.2.2.2 More efficient In addition to system selection requirement, HP-1 Submittal C406.2.2.2.1 cooling and fan demonstrate that 90%or more of all HVAC performance cooling capacity serving conditioned floor areas in the building or credit area is delivered by equipment at least 5%better than the listed WSEC efficiency,seasonal or annualized where available other wise use full load efficiency C406.2.2.2 More efficient For projects prorating the credit in C406.2.2.2.1 cooling and fan accordance with Equation 4-15 include performance calculations for equipment representing at least 90%of the cooling capacity in the building or credit area that demonstrate the capacity weighted average better than code efficiency;for equipment with multiple requirements the seasonal or annualized efficiency shall be used C406.2.2.2 More efficient In addition to system selection and efficiency C406.2.2.2.3 cooling and fan requirements,if fan energy is not included in performance equipment rating or if it is but the fan has been upsized from rated conditions, demonstrate fan power is<_95%of the allowed fan power in Section C403.8.1. ADDITIONAL ENERGY EFFICIENCY MEASURE-MORE EFFICIENT HVAC EQUIPMENT HEATING PERFORMANCE YES C406.2.2.3 More efficient To comply with this additional efficiency 6%HP-1 Submittal HVAC equipment credit,provide a list of all heating equipment heating performance in the building or credit area and calculations that demonstrate that 90%or more of all HVAC heating capacity serving conditioned floor area is delivered by equipment listed in the tables of Section C403.3.2 Page 8132 Mechanical Requirements • • of 2021 WSEC Requirements for Commercial Buildings including Group R2,R3&R4 over 3 stories&all R1 -- Administered by @2024 NEEA,All rights reserved The following information is necessary to check a mechanical permit application for compliance with the mechanical systems and equipment requirements in the Washington State Energy Code,Commercial Provisions. For questions about this report,contact WSEC Commercial Technical Support at 360-539-5300 or via email at com.techsupport@waenergycodes.com NA C406.2.2,3 More efficient In addition to system selection requirement, C406.2.2.3.2 HVAC equipment demonstrate that 90%or more of all HVAC heating performance heating capacity serving the building or credit area is delivered by equipment at least 5% better than the listed WSEC efficiency, seasonal or annualized where available other wise use full load efficiency NA C406.2.2.3 More efficient For projects prorating the credit in C406.2.2.3.2 HVAC equipment accordance per Equation 4-16 include heating performance calculations for equipment representing at least 90%of the heating capacity serving the building or credit area that demonstrate the capacity weighted average better than code efficiency;for equipment with multiple code requirements the seasonal or annualized efficiency shall be used NA C406.2.2.3 More efficient In C402.1.1 low energy and C402.1.1.2 semi- C406.2.2.3.2 HVAC equipment heated spaces demonstrate that 90%of the heating performance heating capacity in the building or area is provided by electric infrared or gas-fired radiant equipment for localized heating applications. VENTILATION,EXHAUST&ENERGY RECOVERY NA C403.7.1.2 Demand control For each required demand control ventilation ventilation design system,indicate outdoor air automatically changes in response to a CO2 sensor and utilizes a variable speed fan control to reduce systems flow;or exception applied YES C403.2.2.1 Ventilation If mechanically delivered,indicate that M-1 ventilation systems are configured to provide not more than 150%of,but at least the minimum required volume of outdoor air to each zone per IMC,ASHRAE 62.1 or other applicable code(WAC,OSHA,etc.);or exception applied C403.2.2.1 Ventilation If delivered via natural ventilation,identify required elements per IMC including: minimum openable area to the outdoors or qualifying adjoining spaces;criteria for ensuring required ventilation is provided during all occupied hours of the year (including during inclement outdoor conditions) YES C403.2.2.2 Exhaust Indicate that exhaust systems are configured M-2 to provide not more than 150%of,but at least the minimum required volume from each zone per IMC,or other applicable code (WAC,OSHA,etc.);or exception applied YES C403.4.2.4 Exhaust system off- Refer to Requirements List section HVAC M-1 hour controls Controls for off-hour controls requirements for exhaust systems Page 9132 Mechanical Requirements • • 10 of 2021 WSEC Requirements for Commercial Buildings including Group R2,R3&R4 over 3 stories&all R1 -- Administered by @2024 NEEA,All rights reserved The following information is necessary to check a mechanical permit application for compliance with the mechanical systems and equipment requirements in the Washington State Energy Code,Commercial Provisions. For questions about this report,contact WSEC Commercial Technical Support at 360-539-5300 or via email at com.techsupport@waenergycodes.com C403.7.6.1 Balanced ventilation For Group R-2 dwelling and sleeping units, for Group R-2 indicate that each habitable space is provided occupancy with a balanced ventilation system;indicate system is provided with energy recovery with >_60%sensible recovery effectiveness NA C403.7.1.1 Demand control Identify spaces with ventilation provided by ventilation single zone system with air economizer;for each space indicate controls are configured to provide demand controlled ventilation or provide supporting documentation for applied exception NA C403.7.1.1 Demand control Provide list of spaces with IMC ventilation ventilation occupant load and the occupant outdoor airflow rate listed;for spaces with occupant load>_ 15 people/1,000 sf per IMC or occupant air flow rate>_ 15 cfm/person indicate controls are configured to provide demand controlled ventilation or provide supporting documentation for applied exception NA C403.7.2 Occupancy sensors For gyms,classrooms,auditoriums, conference rooms and other spaces with occupant load>_25 people/1,000 sf per IMC, that have an area>500 sf,indicate occupancy- based ventilation air control when space is unoccupied and method(closes outdoor air damper or shuts-off equipment);or alternate means provided to automatically reduce ventilation air when space is partially occupied;or exception applied NA C403.7.3 Ventilation air For ventilation air systems with supplemental heating control heating capacity that operate in conjunction with heating and cooling systems,indicate that ventilation air is tempered(via heating or heat recovery)to no greater than 55'F when the space conditioning system is in cooling mode C403.7.4.2 Ventilation controls Indicate method of ventilation and exhaust for Group R-1 isolation for each guest room and automatic guestrooms controls that are configured to turn off ventilation and exhaust airflow when each room is unoccupied C403.8.4 Group R occupancy Refer to Requirements List section Fans& exhaust fan efficacy Fan Controls C403.7.5 Enclosed loading For enclosed loading docks,indicate C403.7.5.1 dock ventilation ventilation/exhaust system method of activation(gas detection system for CO and NO2,or occupancy sensors),and control method(staged or modulating);if total ventilation system fan motor nameplate horsepower is>5 hp,indicate VSD or equivalent motor drives Page 10132 Mechanical Requirements • • 11 of 2021 WSEC Requirements for Commercial Buildings including Group R2,R3&R4 over 3 stories&all R1 -- Administered by @2024 NEEA,All rights reserved The following information is necessary to check a mechanical permit application for compliance with the mechanical systems and equipment requirements in the Washington State Energy Code,Commercial Provisions. For questions about this report,contact WSEC Commercial Technical Support at 360-539-5300 or via email at com.techsupport@waenergycodes.com C403.7.5 Enclosed parking For enclosed parking garages,indicate C403.7.5.2 garage ventilation ventilation/exhaust system activated by gas detection system for CO and NO2,and control method(staged or modulating);or exception applied;if total ventilation system fan motor nameplate horsepower is>5 hp, indicate VSD or equivalent motor drives NA C403.7.6.2 Ventilation/exhaust For systems with design ventilation air> systems energy 5,000 cfm,or design supply air cfm and% recovery ventilation air exceeding the values in Tables C403.7.6(1)or(2),indicate exhaust air energy recovery method;or exception applied with supporting calculations NA C403.7.6.2 Ventilation/exhaust For rooms served by multiple systems with systems energy aggregate design ventilation air>5,000 cfm, recovery or aggregate design supply air cfm and% ventilation air exceeding the values in Tables C403.7.6(1)or(2),indicate exhaust air energy recovery method;or exception applied with supporting calculations NA C403.7.6.2 Ventilation/exhaust Indicate energy recovery rated sensible systems energy recovery effectiveness>68%or a enthalpy recovery recovery ratio>60% C403.7.7.1.1 Kitchen exhaust hood Indicate on plans the type,duty,UL rating and C403.7.7.1.2 system exhaust airflow rate of each kitchen hood C403.7.7.1.3 C403.7.7.1.1 Kitchen exhaust hood Provide calculations that show a balanced C403.7.7.1.2 system accounting of total kitchen exhaust(include C403.7.7.1.3 all hoods)with%of:supply air,transfer air from adjacent spaces,and make-up air C403.7.7.1.1 Kitchen exhaust hood For hoods with make-up air drawn directly C403.7.7.1.2 system into the exhaust air cavity of each hood, C403.7.7.1.3 indicate that replacement air does not exceed 10%of hood exhaust airflow rate C403.7.7.1.1 Kitchen exhaust hood For kitchens with total hood exhaust C403.7.7.1.2 system exceeding 2,000 cfm,indicate that each hood C403.7.7.1.3 is UL 710 rated and maximum exhaust airflow rate of each hood is per Table C403.7.7.1.2;or exception applied C403.7.7.1.1 Kitchen exhaust hood For kitchens with total hood exhaust C403.7.7.1.2 system exceeding 2,000 cfm,indicate demand control C403.7.7.1.3 kitchen ventilation configured to a minimum 50%reduction in exhaust and replacement air system flows in response to alliance operation; or exception applied C403.7.7.2 Laboratory exhaust For buildings with total lab exhaust>5,000 systems energy cfm,indicate method of energy recovery used recovery to pre-condition laboratory make-up air; energy recovery effectiveness(min 25'F increase in outside air temperature);or alternative method per exception(VAV exhaust,semi-conditioned makeup,or CERM calculation) Page 11132 Mechanical Requirements • • 12 of 2021 WSEC Requirements for Commercial Buildings including Group R2,R3&R4 over 3 stories&all R1 -- Administered by @2024 NEEA,All rights reserved The following information is necessary to check a mechanical permit application for compliance with the mechanical systems and equipment requirements in the Washington State Energy Code,Commercial Provisions. For questions about this report,contact WSEC Commercial Technical Support at 360-539-5300 or via email at com.techsupport@waenergycodes.com NA C403.7.7.3 Transfer air For spaces where conditioned supply air is utilized as transfer air to balance mechanical exhaust,indicate basis of transfer airflow (supply required to meet loads,health/safety requirement,air that would normally be exhausted);or exception applied NA C403.7.8.1 Shutoff dampers for Indicate locations of outdoor air intake, C403.7.8.3 building isolation exhaust and relief outlet dampers on plans; indicate whether dampers are Class 1 motorized,or gravity and exception applied (include leakage rating,cfm/sf) C403.7.8.1 Shutoff dampers for Indicate location of stairway and elevator C403.7.8.3 stairway and elevator hoistway shaft vent dampers on plans;verify hoistway shaft vents dampers are Class 1 motorized;or exception applied NA C403.7.8.2 Shutoff dampers for Indicate locations of return air dampers that C403.7.8.3 return air are integral to airside economizer operation; verify dampers are motorized;indicate whether dampers are Class 1,or within packaged equipment eligible for leakage rating exception(include leakage rating, cfm/sf) NA C403.7.8.4 Damper actuation Indicate automatic controls configured to close outdoor air intake,exhaust and relief outlet dampers during unoccupied equipment operation;not including economizer cooling, night flush or IMC required outdoor air/ exhaust C403.7.8.4 Damper actuation Indicate method of activation of stairway and elevator hoistway shaft vent dampers(fire alarm or interruption of power) C404.11.4 Exhaust system For buildings with pools or spas with water energy recovery for surface area>200 sf,indicate exhaust air heated indoor pools energy recovery method and use of waste heat and permanent spas (preheat ventilation air,pool water or service hot water);or exception applied C404.11.4 Exhaust system Indicate energy recovery system has the rated energy recovery for effectiveness and is configured to decrease heated indoor pools the exhaust air temperature at design and permanent spas conditions by>_36°F HVAC CONTROLS YES C403.4.1 Thermostatic controls Indicate locations of thermostatic and M-2 (thermostats and humidity control devices and the zones they humidistats) serve on plans,including perimeter system zones Page 12132 Mechanical Requirements • • 13 of 2021 WSEC Requirements for Commercial Buildings including Group R2,R3&R4 over 3 stories&all R1 -- Administered by @2024 NEEA,All rights reserved The following information is necessary to check a mechanical permit application for compliance with the mechanical systems and equipment requirements in the Washington State Energy Code,Commercial Provisions. For questions about this report,contact WSEC Commercial Technical Support at 360-539-5300 or via email at com.techsupport@waenergycodes.com C403.4.1 Thermostatic controls Where adjacent(neighboring)zones are (thermostats and controlled by separate thermostats(including humidistats) perimeter systems used to offset heat gain or loss),and are connected by permanent openings> 10%of either zone sf area, indicate controls configured to prevent adjacent zones from operating in conflicting modes(one in heat,other in cool);applies to adjacent perimeter zones,adjacent nonperimeter zones,and adjacent perimeter and nonperimeter zones C403.4.1 Thermostatic controls If applying Exception 2 to interior zones (thermostats and adjacent to perimeter zones,indicate that humidistats) setpoints and deadband settings in these zones are coordinated so cooling in an interior zone does not occur until the temperature in that zone is 5°F higher than the adjacent perimeter zone temperature in heating NA C403.4.1 Thermostatic If applying Exception 3 for DOAS,indicate controls(thermostats supply air temperature heating setpoint is<_ and humidistats) 65°F and cooling setpoint is>_72°F,or method of supply air temperature reset YES C403.4.1.1 Heat pump Indicate staged heating operation with M-1 supplementary heat compression as the first stage of heating and supplemental heating controlled with outdoor lock-out temperature set to 40°F or less,or indicate exception applied and specify equipment meeting the exception requirements C403.4.1.2 Deadband Indicate zone thermostatic controls configured with 5°F minimum deadband for systems that control both heating and cooling C403.4.1.3 Setpoint overlap If separate heating and cooling thermostatic restriction control devices are used to serve a zone, (thermostats) indicate locations of both thermostatic control devices and the zone they serve on plans C403.4.1.3 Setpoint overlap Indicate a limit switch,mechanical stop or restriction DDC control with programming to prevent (thermostats) simultaneous heating and cooling NA C403.4.1.4 Heated or cooled Indicate thermostatic controls within heating vestibules or cooled vestibules with a heating setpoint<_ 60°F and cooling setpoint>_85'F;indicate controls are configured to turn off heating when outdoor temperature is>45°F;or note exception applied NA C403.4.1.4 Heated air curtains Indicate controls are configured to turn off air curtain heating when outdoor temperature is> 450F Page 13132 Mechanical Requirements • • 14 of 2021 WSEC Requirements for Commercial Buildings including Group R2,R3&R4 over 3 stories&all R1 -- Administered by @2024 NEEA,All rights reserved The following information is necessary to check a mechanical permit application for compliance with the mechanical systems and equipment requirements in the Washington State Energy Code,Commercial Provisions. For questions about this report,contact WSEC Commercial Technical Support at 360-539-5300 or via email at com.techsupport@waenergycodes.com NA C403.4.1.6 Door switches for Doors required to have opening switches for HVAC system HVAC thermostatic control to the outdoors thermostatic control from a conditioned space and are>48 sf, indicate automatic controls configured to setback the HVAC system(s)when the door is open for>5 minutes;indicate method of HVAC system setback control(turns off the HVAC system or resets the heating setpoint to 55°F and cooling setpoint to 85'F),or exception applied(either C402.5.11 or C403.4.1.6) YES C403.4.2 Automatic setback Indicate zone thermostatic controls configured M-1 C403.4.2.1 and shutdown with required automatic setback and manual C403.4.2.2 override functions,setback temperatures,and control method(automatic time clock or 7 day programmable controls);note exceptions applied YES C403.4.2.3 Automatic(optimum) Indicate all HVAC systems are provided with M-1 start and stop automatic start and stop controls;indicate start controls are configured to adjust the equipment start time as required to bring each area served up to design temperature just prior to scheduled occupancy;indicate stop controls are configured to reduce heating setpoint and increase cooling setpoint by at least 2°F prior to scheduled unoccupied periods YES C403.4.2.4 Exhaust system off- For exhaust systems serving conditioned M-1 hour controls spaces in all occupancies other than Group R, indicate method of control and that controls are configured to turn exhaust systems on and off in concert with the ventilation air systems providing their make-up air,or exception applied NA C403.4.2.5 Transfer and For transfer fan or mixing fan systems serving destratification fan conditioned spaces in all occupancies other system off-hour than Group R,indicate method of control and controls that controls are configured to turn fans on and off in concert with the associated HVAC systems,or exception applied NA C403.4.7 Combustion heating For combustion heating equipment other than equipment boilers or radiant heaters with output capacity >225,000 Btu/h,indicate modulating or staged combustion control NA C403.4.7.1 Combustion Indicate controls that are configured to limit decorative vented operation of combustion appliance,fireplace appliance, and fire pit to< 1 hour without override,or combustion fireplace that occupancy sensor controls are provided and fire pit controls Page 14132 Mechanical Requirements • • 15 of 2021 WSEC Requirements for Commercial Buildings including Group R2,R3&R4 over 3 stories&all R1 -- Administered by @2024 NEEA,All rights reserved The following information is necessary to check a mechanical permit application for compliance with the mechanical systems and equipment requirements in the Washington State Energy Code,Commercial Provisions. For questions about this report,contact WSEC Commercial Technical Support at 360-539-5300 or via email at com.techsupport@waenergycodes.com C403.7.4.1 Temperature setpoint For hotels/motels with over 50 guest rooms, controls for Group indicate automatic controls for HVAC R-1 guestrooms equipment serving guest rooms are configured to setback(heating)and set-up(cooling) temperature setpoint by at least 4°F when room is rented and unoccupied,and adjust setpoint to 60°F(heating)and 80°F(cooling) when room is unrented/vacated;indicate control method-activated by room entry, occupancy sensor or networked guestroom control system C403.7.4.2 Ventilation controls Refer to Requirements List section for Group R-1 Ventilation,Exhaust&Energy Recovery guestrooms C403.4.9 Thermostatic controls For primary space conditioning systems, C403.4.10 for Group R2/R3 indicate 5-2 programmable thermostats dwelling units and capable of two setback periods per day; Group R2 sleeping indicate each non-primary system is provided units with at minimum an adjustable thermostat,or exception applied.For all thermostats indicate purpose(heating only,cooling only,or both) and required temperature range;indicate thermostats are configured for at minimum a 5°F deadband NA C403.5.1 DX air handler For DX air handlers with cooling capacity variable cooling 65,000 Btu/h,indicate number of cooling control(Located stages provided and method(multiple under Integrated compressors and/or variable speed Economizer Control) compressors);indicate minimum displacement(capacity reduction)as%of full load;indicate thermostats are configured with the same number of cooling stages and displacement NA C403.5.1 DX air handler Indicate control method(cooling capacity variable cooling controlled in response to space temperature, control(Located space temperature controlled by modulating under Integrated supply airflow,or both) Economizer Control) NA C403.4.11.1 DDC system Provide central and zone level DDC controls C403.4.11.2 applications,controls as required based on system application, C403.4.11.3 and display capacity or size thresholds and other qualification per Table C403.4.11.1 NA C403.4.11.1 DDC system Identify all DDC system input/output control C403.4.11.2 applications,controls points in project documents C403.4.11.3 and display NA C403.4.11.1 DDC system Indicate control capability includes C403.4.11.2 applications,controls monitoring zone and system level demand for C403.4.11.3 and display fan pressure,pump pressure,heating and cooling;indicate capability to transfer demand information from zones to air/hydronic distribution system controllers,and to central plant systems and equipment controllers Page 15132 Mechanical Requirements • • • of 2021 WSEC Requirements for Commercial Buildings including Group R2,R3&R4 over 3 stories&all R1 -- Administered by @2024 NEEA,All rights reserved The following information is necessary to check a mechanical permit application for compliance with the mechanical systems and equipment requirements in the Washington State Energy Code,Commercial Provisions. For questions about this report,contact WSEC Commercial Technical Support at 360-539-5300 or via email at com.techsupport@waenergycodes.com NA C403.4.11.1 DDC system Indicate system has the capability and is C403.4.11.2 applications,controls configured for trending and graphically C403.4.11.3 and display displaying input/output points NA C403.4.11.4 DDC demand For buildings with>780,000 Btu/h of response setpoint mechanical cooling,indicate controls are adjustment configured to automatically increase the cooling setpoint and decrease the heating setpoint>_2°F based upon a binary input to the control system approved by the utility NA C403.4.1.7 Demand responsive Indicate thermostatic controls for heating or controls cooling systems are provided with demand response controls are capable of increasing the cooling setpoint and decreasing the heating setpoint<_4°F;indicate the controls are capable of receiving and responding automatically to a demand response signal. NA C403.2.3 HVAC System Fault For buildings>_ 100,000 square feet,indicate detection and HVAC systems have fault detection and diagnostics diagnostics with sensors and communications to automatically identify HVAC system faults, provide prioritized recommendations for repair,and communicate faults and recommendations to remotely located authorized personnel. ADDITIONAL ENERGY EFFICIENCY MEASURE-DWELLING UNIT HVAC CONTROLS NA C406.2.1 Dwelling unit HVAC To comply with this additional efficiency controls credit,provide control design for a manual main control or occupancy sensor based controls,or provide control specification and product cut sheets demonstrating compliance with learning thermostat or geographic sensing options. ADDITIONAL EFFICIENCY CREDIT-FAULT DETECTION AND DIAGNOSTICS NA C406.2.2.7 Fault detection and To comply with this additional efficiency diagnostics credit,demonstrate HVAC controls comply with items 1 through 6 in Section C403.2.3; only buildings not required to comply with Section C403.2.3 or C403.6.10(16)can use this credit LOAD MANAGEMENT MEASURE-HVAC LOAD MANAGEMENT NA C406.3.2 HVAC load To comply with this additional efficiency management credit,indicate automatic controls connected to central DDC having digital input capable of being activated by external utility signal; where utility real-time demand or pricing program exists indicate system configured to utilize this signal;otherwise indicate building demand monitoring installed and controls configured to utilize demand signals Page 16132 Mechanical Requirements • • 17 of 2021 WSEC Requirements for Commercial Buildings including Group R2,R3&R4 over 3 stories&all R1 -- Administered by @2024 NEEA,All rights reserved The following information is necessary to check a mechanical permit application for compliance with the mechanical systems and equipment requirements in the Washington State Energy Code,Commercial Provisions. For questions about this report,contact WSEC Commercial Technical Support at 360-539-5300 or via email at com.techsupport@waenergycodes.com NA C406.3.2 HVAC load Indicate electric cooling controls configured management to gradually increase the cooling setpoint by at least 30F over 3 hours during summer peak periods;,indicate electric heating controls configured to gradually decrease the heating setpoint by at least 3°F over 3 hours during winter peak periods DUCTWORK,SHAFTS AND PLENUMS YES C403.10.1.1 Duct construction Indicate on plans that all ductwork is M-1 C403.10.2 constructed and sealed per IMC YES C403.10.1.1 Duct construction For outdoor air ductwork,also indicate on M-1 C403.10.2 plans that ductwork meets air leakage requirements per C402.5 and vapor retarder requirements per the IBC YES C403.10.2.1 Duct pressure Identify location of low,medium and high M-1 C403.10.2.2 classifications pressure ductwork on plans C403.10.2.3 NA C403.10.2.3 High pressure duct Indicate high pressure duct leakage testing leakage test requirements on plans;provide test results to jurisdiction when completed YES C403.10.1.1 Duct insulation For outdoor air ductwork located within M-1,M-2 C403.10.1.2 conditioned space(upstream or downstream of shutoff damper),identify climate zone, duct airflow,and indicate ductwork insulation R-value per Table C403.10.1.1 on plans;or exception applied YES C403.10.1.1 Duct insulation For supply and return air ductwork located M-1,M-2 C403.10.1.2 within unconditioned space or outdoors, identify climate zone and indicate ductwork insulation R-value per Table C403.10.1.2 on plans;or exception applied YES C403.10.1.1 Duct insulation For supply air ductwork located within M-1,M-2 C403.10.1.2 conditioned space,identify on plans if design supply air temperature is<55°F or>105°F; indicate ductwork insulation R-value per Table C403.10.1.2 on plans;or exception applied YES C403.10.1.1 Duct insulation For return and exhaust air ductwork located M-1,M-2 C403.10.1.2 within conditioned space(upstream of the shutoff damper)and downstream of an energy recovery media,indicate ductwork insulation R-value per Table C403.10.1.2;or exception applied YES C403.10.1.1 Duct insulation For exhaust and relief air ductwork located M-1,M-2 C403.10.1.2 within conditioned space and downstream of the shutoff damper,indicate ductwork insulation R-value per Table C403.10.1.2;or exception applied NA C403.10.1.1 Shaft and plenum For outdoor air shafts and plenums,indicate C402.1.3 insulation on plans that the R-value of insulation on these elements complies with Table C402.1.3 for steel-framed walls Page 17132 Mechanical Requirements • • i of 2021 WSEC Requirements for Commercial Buildings including Group R2,R3&R4 over 3 stories&all R1 -- Administered by @2024 NEEA,All rights reserved The following information is necessary to check a mechanical permit application for compliance with the mechanical systems and equipment requirements in the Washington State Energy Code,Commercial Provisions. For questions about this report,contact WSEC Commercial Technical Support at 360-539-5300 or via email at com.techsupport@waenergycodes.com PIPING C403.10.3 Piping insulation Indicate design temperature range of fluid conveyed in piping and thickness of insulation (in inches)on hydronic piping plans;or exception applied C403.10.3.1 Protection of piping Indicate method of protection of pipe insulation insulation from damage/degradation on hydronic piping plans NA C403.10.4 HVAC refrigerant Indicate refrigerant piping insulation to be piping insulation installed on all hot gas lines and on some liquid lines per C403.10.4;indicate insulation conductivity<0.26 Btu x in/(h x ft2 x°F) ECONOMIZERS YES C403.5 Air economizer Identify all cooling systems requiring air M-1 required economizer controls in equipment schedules on plans and in WSEC mechanical equipment compliance reports NA C403.5 Air economizer Indicate all systems utilizing air economizer exceptions exceptions in WSEC mechanical equipment compliance report,including those with water- side economizer in lieu of air economizer; indicate on plans and in WSEC mechanical equipment compliance reports all eligible exception(s)taken and measures to comply with exception(s) NA C403.4.1 Integrated Indicate air and water-side economizers are C403.5.1 economizer operation configured for partial cooling operation even -air and water where additional mechanical cooling is required to meet the load NA C403.4.1 Integrated For DX air handlers with single or multiple C403.5.1 economizer operation stages of mechanical cooling;indicate controls -air and water are configured with air economizer as the first stage of cooling NA C403.4.1 Integrated Refer to Requirements List section HVAC C403.5.1 economizer operation Controls for additional requirements for DX -air and water air handlers NA C403.5.2 Economizer heating Verify control method of HVAC systems with system impact-air economizers does not increase building and water heating energy usage during normal operation YES C403.5.3.1 Air economizer Indicate modulating outdoor air and return air M-1 capacity dampers are configured to provide up to 100%outdoor air for cooling NA C403.5.1 Air economizer Indicate that economizer controls are C403.5.3.2 controls and configured to provide partial economizer integrated operation cooling when additional mechanical cooling is also required to meet the cooling load NA C403.5.1 Air economizer Indicate that control of economizer dampers C403.5.3.2 controls and is not based only on mixed air temperature;or integrated operation exception applied for systems with cooling capacity<65,000 Btu/h Page 18132 Mechanical Requirements • • 19 of 2021 WSEC Requirements for Commercial Buildings including Group R2,R3&R4 over 3 stories&all R1 -- Administered by @2024 NEEA,All rights reserved The following information is necessary to check a mechanical permit application for compliance with the mechanical systems and equipment requirements in the Washington State Energy Code,Commercial Provisions. For questions about this report,contact WSEC Commercial Technical Support at 360-539-5300 or via email at com.techsupport@waenergycodes.com NA C403.5.3.3 Air economizer high Indicate high limit shut-off control method limit controls and required high limit per Table C403.5.3.3 NA C403.5.3.4 Relief of excess Refer to Requirements List section outdoor air Ventilation,Exhaust&Energy Recovery NA C403.5.3.4 Relief of excess Indicate relief air outlets are sized and outdoor air configured to relieve excess building air during air economizer operation to prevent building over-pressurization NA C403.5.3.4 Relief of excess Indicate relief air outlet are located to avoid outdoor air recirculation into the building C403.5.4.1 Water economizer For eligible systems where water-side capacity economizer may be provided in lieu of air economizer,indicate system is capable of 100%design cooling capacity at 50°F db/ 45°F wb outdoor air temperatures;indicate if threshold for 100%design cooling capacity via economizer must be lowered to 45°F db/ 40°F wb due to dehumidification requirements C403.5.4.2 Water economizer Indicate that the pressure drop across maximum pressure precooling coils and heat exchangers in water drop economizer systems do not exceed 15 feet (4572 mm) YES C403.5.5 DX equipment For DX air handlers with economizer and H-1 Submittal economizer fault cooling capacity>_54,000 Btu/h,provide a detection and fault detection and diagnostics(FDD)system diagnostics to monitor economizer system operation and report faults HYDRONIC SYSTEMS-EQUIPMENT SELECTION&PERFORMANCE C403.3.2.3 Maximum air cooled For chilled water plants and buildings with> chiller capacity 500 tons of cooling capacity,indicate air- cooled chiller capacity is< 100 tons,or exception applied C403.3.2.2 Large capacity For buildings>_300 tons of cooling capacity, cooling systems indicate method of multi-stage or variable capacity control(VSD,multiple staged compressors,or max capacity of any single unit C403.3.2.4 Non-standard water- For water-cooled centrifugal chillers not cooled centrifugal designed for operation at standard conditions, chillers provide calculations documenting maximum full load and part load rated equipment performance requirements C403.3.3 Hot gas bypass For cooling equipment with hot gas bypass, limitation for chillers provide either multiple step unloading or continuous capacity modulation;indicate bypass capacity per Table C403.3.3 C403.4.3 Large capacity boiler For hydronic systems with only a single boiler C403.3.4.4 systems that has>500,000 Btu/h input capacity, indicate multi-stage or modulating burner Page 19132 Mechanical Requirements • • 20 of 2021 WSEC Requirements for Commercial Buildings including Group R2,R3&R4 over 3 stories&all R1 -- Administered by @2024 NEEA,All rights reserved The following information is necessary to check a mechanical permit application for compliance with the mechanical systems and equipment requirements in the Washington State Energy Code,Commercial Provisions. For questions about this report,contact WSEC Commercial Technical Support at 360-539-5300 or via email at com.techsupport@waenergycodes.com C403.4.3 Large capacity boiler For boiler system(single or multiple)with> C403.3.4.4 systems 1,000,000 Btu/h input capacity,indicate turndown ratio per Table C403.3.4.4 and method(multiple single input boilers, modulating boilers,or combination) NA C403.3.4.1 Large capacity boiler For all boiler systems with input capacity>_ systems 2,500,000 Btu/h and all systems where one stack serves 2 or more boilers with a combined input capacity>_2,500,000 Btu/h, indicate combustion air positive shut-off is provided to restrict airflow through the combustion chamber during standby(e.g.flue or vent damper). NA C403.3.4.2 Large capacity boiler For boiler systems with combustion air fans> systems 10 hp,indicate variable speed fan NA C403.3.4.3 Large capacity boiler For boiler systems with input capacity>_ systems 5,000,000 and a steady state full-load combustion efficiency<90 percent,indicate combustion air volume to be automatically controlled to limit stack-gas oxygen concentrations specified in Table C403.3.4.3. List exception if it applies. NA C403.3.4.5 High capacity space For gas hot water space heating systems with C403.3.4.5.1 heating gas boiler >_ 1,000,000 Btu/h and< 10,000,000 Btu/h C403.3.4.5.2 system(new capacity,indicate boiler thermal efficiency>_ buildings) 90 percent;coils and heat exchangers sized at design conditions to have a boiler return water temperature<_ 120°F;values and controls to ensure under all operating conditions the water temperature entering the boiler is<_ 120°F or the supply water recirculating directly into the return system is<20 percent of design flow of the operating boilers. C403.2.4 Variable flow For pump motors>_5 hp,indicate method of capacity-pumps variable flow control(VSD or equivalent method)in equipment schedule,or exception applied NA C403.3.7 Hydronic system flow Indicate chilled water and condenser water rate flow types and operating hours,and maximum flow rates in less than or equal to Table C403.3.7. NA C403.3.8.1 Chilled-water coil Indicate chilled-water coils sized to provide a selection 15°F difference between leaving and entering water temperature and a minimum 57°F leaving water temperature at design conditions.,or exception applied NA C403.3.8.2 Hot-water coil Indicate hot-water coils sized to provide a selection 20°F difference between leaving and entering water temperature and a maximum I I8°F entering water temperature at design conditions.,or exception applied Page 20132 Mechanical Requirements • • 21 of 2021 WSEC Requirements for Commercial Buildings including Group R2, R3&R4 over 3 stories&all R1 -- Administered by @2024 NEEA,All rights reserved The following information is necessary to check a mechanical permit application for compliance with the mechanical systems and equipment requirements in the Washington State Energy Code,Commercial Provisions. For questions about this report,contact WSEC Commercial Technical Support at 360-539-5300 or via email at com.techsupport@waenergycodes.com NA C403.4.12 Pressure independent For heating and cooling water coils with a control valves design flow>5 gpm,indicate modulating pressure independent control values are provided HYDRONIC SYSTEMS-CONTROLS C403.4.3 Boiler sequencing Indicate automatic controls that sequence operation of multiple boilers C403.4.3.2 Two-pipe changeover Indicate changeover deadband is> 15°F systems outdoor air temperature;indicate controls are configured so that heating/cooling modes are active for at minimum 4 hours before changeover and that the delta between heating /cooling supply temperatures at changeover point is C403.4.1.5 Heating water For hot water boilers that provide building temperature setback heating via one-or two-pipe systems,indicate controls that provide heating water temperature setback based on outdoor temperature C403.4.4 Hydronic system part For heating and chilled water systems with>_ load controls and 300,000 Btu/h output capacity,indicate supply-water system controls are configured to temperature reset automatically reset supply water temperature based upon demand;or exception applied C403.4.4 Hydronic system part Indicate automatic pump flow controls are load controls and configured to reduce system flow rate by supply-water 50%,or the maximum allowed by the temperature reset equipment manufacturer,based upon the heating or cooling loads;or describe why not required C403.4.4 Hydronic system part For hydronic systems with output capacity Z load controls and 300,000 Btu/h that serve heating water supply-water systems,chilled water systems and water- temperature reset cooled unitary air conditioners,indicate that pumps are provided with a variable speed drive if one of the following conditions apply: 1)System pump motor hp is>_2 hp and pumps are designed to operate continuously or per time schedule;2)System pump motor hp is>_7.5 hp and pumps are controlled by automatic DDC configured to only operate pumps when there is a call for zone heating or cooling C403.4.4 Hydronic system part Where variable speed drives are required, load controls and indicate system is configured so that pump supply-water motor power is<30%of design wattage at temperature reset 50%of design flow rate;indicate pump flow is controlled to maintain one control valve nearly wide open,or to maintain a minimum differential pressure;or exception applied Page 21132 Mechanical Requirements • • 22 of 2021 WSEC Requirements for Commercial Buildings including Group R2,R3&R4 over 3 stories&all R1 -- Administered by @2024 NEEA,All rights reserved The following information is necessary to check a mechanical permit application for compliance with the mechanical systems and equipment requirements in the Washington State Energy Code,Commercial Provisions. For questions about this report,contact WSEC Commercial Technical Support at 360-539-5300 or via email at com.techsupport@waenergycodes.com C403.4.6 Hydronic system For individual pumps required to have variable pump flow variable speed controls,indicate manner of control pump speed control(differential pressure, static pressure setpoint,zone heating or cooling demand,or based on the relationship between variable speed controller frequency and power) C403.4.5 Chiller/boiler plant Indicate controls are configured to pump isolation automatically reduce overall plant flow and shut-off flow through individual chillers and boilers when not in use C403.4.3.3.1 Water loop heat Indicate method of water loop temperature pump-temperature control(central plant equipment controls are deadband configured to provide>_20'F water supply temperature deadband between heat rejection and heat addition modes,or controls are configured for system loop temperature optimization C403.4.3.3.2 Water loop heat Indicate type of cooling tower(open-or pump-heat rejection closed-circuit)in equipment schedule; equipment indicate whether the cooling tower is used directly in the heat pump loop or in conjunction with a separate heat exchanger; indicate method used to limit system heat loss when heat rejection is not needed C403.4.3.3.3 Water loop heat For hydronic heat pump systems with total pump-isolation system power> 10 hp,indicate 2-way valves isolation valves on each heat pump and variable flow system control HEAT REJECTION SYSTEMS-EQUIPMENT SELECTION&PERFORMANCE C403.9.1.3 Centrifugal fan open- For open-circuit centrifugal fan cooling circuit cooling towers towers with>_ 1,100 gpm capacity,indicate cooling towers comply with efficiency requirements for axial fan open circuit cooling towers HEAT REJECTION&RECOVERY-CONTROLS C403.9.1.1 Fan speed control For each fan powered by an individual motor C403.9.1.2 or array of motors,with total connected fan power>_5 hp(including motor service factor),indicate method of automatic fan speed control(adjusted based on leaving fluid temperature or condenser temperature/ pressure of heat rejection device);verify fan selection provides<_30%design wattage at 50%design airflow C403.9.1.1 Fan speed control For multiple-cell heat rejection equipment C403.9.1.2 with VSD,indicate controls are configured to ramp all fans in unison(not staged on/off operation) Page 22132 Mechanical Requirements • • 23 of 2021 WSEC Requirements for Commercial Buildings including Group R2, R3&R4 over 3 stories&all R1 -- Administered by @2024 NEEA,All rights reserved The following information is necessary to check a mechanical permit application for compliance with the mechanical systems and equipment requirements in the Washington State Energy Code,Commercial Provisions. For questions about this report,contact WSEC Commercial Technical Support at 360-539-5300 or via email at com.techsupport@waenergycodes.com C403.9.1.4 Cooling tower flow For open-circuit cooling towers configured turndown with multiple-or variable-speed condenser water pumps,indicate system is designed so all cells can be run in parallel;indicate method of condenser pump turn down control C403.9.2.1 Heat recovery for For buildings with 24-hour operation and> service water heating 1,500,000 Btu/h of heat rejection capacity and design service hot water load>250,000 Btu/h,indicate condenser heat recovery to pre- heat service water;or exception applied. Provide calculations showing the amount of recovered heat that is utilized(60%of peak heat rejection load or pre-heat service water to 85°F). C403.9.2.2 Steam condensate For buildings with on-site steam heating systems heat recovery systems,indicate condensate water heat recovery and use of recovered heat C403.9.2.2 Steam condensate For buildings that use off-site generated steam systems heat recovery where condensate is not returned to the source,indicate on-site condensate water heat recovery C403.9.2.3 Refrigeration For buildings with food service,meat or deli condenser heat departments that have>_500,000 Btu/h of recovery remote refrigeration capacity for coolers/ freezers,indicate condenser heat recovery and use of captured energy(service water heating, space heating,or dehumidification reheating) C403.9.2.3 Refrigeration For buildings with>40,000 sf conditioned condenser heat floor area and>_ 1,000,000 Btu/h of remote recovery refrigeration capacity,indicate condenser heat recovery to pre-heat service water;indicate remaining recovered heat is applied to space heating or dehumidification reheating C403.9.2.4 Condenser heat For buildings that operate>70 hour per week, recovery for space that are not served by a DOAS with energy heating recovery,and have> 1,500,000 Btu/h of heat rejection capacity and z 0.45 cfm per sf of design minimum supply airflow with reheat, indicate condenser heat recovery is provided for space heating that complies with Sections C403.9.2.4.1 or C403.9.2.4.2 or C403.9.2.4.4 C403.9.2.4.1 Water to water heat Indicate that 90%or more of the total C403.9.2.4.4 recovery building space heating and ventilation air design loads are served by heat energy rejected from either a heat recovery chiller or the cooling loop of water to water heat pump equipment C403.9.2.4.2 Exhaust heat recovery Indicate that waste heat is recovered from least 90%of the total building exhaust airflow such that leaving exhaust air temperature while in heat recovery mode is 55'F dry bulb; note exhaust air systems eligible for exception to this requirement Page 23132 Mechanical Requirements • • 24 of 2021 WSEC Requirements for Commercial Buildings including Group R2,R3&R4 over 3 stories&all R1 -- Administered by @2024 NEEA,All rights reserved The following information is necessary to check a mechanical permit application for compliance with the mechanical systems and equipment requirements in the Washington State Energy Code,Commercial Provisions. For questions about this report,contact WSEC Commercial Technical Support at 360-539-5300 or via email at com.techsupport@waenergycodes.com C403.9.2.4.3 Process heat recovery In spaces with 5 watts per sf year-round cooling loads from lights and equipment, indicate these spaces are served by water- cooled equipment configured for heat recovery C403.9.2.4.3 Process heat recovery If these spaces are served by economizer(air or water),indicate automatic controls are configured to disable economizer operation while system is in heat recovery mode ADDITIONAL ENERGY EFFICIENCY MEASURE-IMPROVED LOW CARBON DISTRICT ENERGY SYSTEMS(10%) NA C406.2.2.4 Improved low-carbon Provide calculations showing 90%or more of district energy the annual service water and space heat systems(10 percent energy use or 90%or more of the annual better). service water heat,space heat and space cooling energy use is met by a district energy exchange system complying with C406.2.2.4.1 or a district energy heating and/or cooling system complying with C406.2.2.4.2;provide documentation the system is operational and is in accordance with this section prior to the final inspection. NA C406.2.2.4.1 Improved low-carbon Provide calculations and documentation that district energy 45%of the annual district-system-net-load- exchange systems(10 met(sum of heating and cooling energy percent better) provided to attached buildings)comes from heat recovery between connected buildings, waste heat,or renewable energy resources; and no more than 25%of the annual heat input to the system comes from fossil fuel or electric-resistance sources. NA C406.2.2.4.2 Improved low-carbon Provide calculations and documentation that district energy distribution losses are less than or equal to 5% heating and cooling of the annual load delivered to buildings or heating only served by the system;and that the system systems(10 percent complies with one of the following: 1)45%of better) the annual district-system-net-load-met(sum of heating and cooling energy provided to attached buildings)comes from heat recovery between connected buildings,waste heat,or renewable energy resources and no more than 25%of the annual heat input to the system comes from fossil fuel or electric-resistance sources,or,2) 10%or less of the system annual heat input to the system comes from fossil fuels,electric-resistance sources,or heat pump sources with an annual COP<3 ADDITIONAL ENERGY EFFICIENCY MEASURE-IMPROVED LOW CARBON DISTRICT ENERGY SYSTEMS(20%) Page 24132 Mechanical Requirements • • 25 of 2021 WSEC Requirements for Commercial Buildings including Group R2,R3&R4 over 3 stories&all R1 -- Administered by @2024 NEEA,All rights reserved The following information is necessary to check a mechanical permit application for compliance with the mechanical systems and equipment requirements in the Washington State Energy Code,Commercial Provisions. For questions about this report,contact WSEC Commercial Technical Support at 360-539-5300 or via email at com.techsupport@waenergycodes.com NA C406.2.2.5 Improved low-carbon Provide calculations showing 90%or more of district energy the annual service water and space heat systems(20 percent energy use or 90%or more of the annual better). service water heat,space heat and space cooling energy use is met by a district energy exchange system complying with C406.2.2.4.1 or a district energy heating and/or cooling system complying with C406.2.2.4.2;provide documentation the system is operational and is in accordance with this section prior to the final inspection. NA C406.2.2.5.1 Improved low-carbon Provide calculations and documentation that district energy 50%of the annual district-system-net-load- exchange systems(20 met(sum of heating and cooling energy percent better) provided to attached buildings)comes from heat recovery between connected buildings, waste heat,or renewable energy resources; and no more than 10%of the annual heat input to the system comes from fossil fuel or electric-resistance sources. NA C406.2.2.5.2 Improved low-carbon Provide calculations and documentation that district energy distribution losses are less than or equal to 5% heating and cooling of the annual load delivered to buildings or heating only served by the system;and that the system systems(20 percent complies with one of the following: 1)50%of better) the annual district-system-net-load-met(sum of heating and cooling energy provided to attached buildings)comes from heat recovery between connected buildings,waste heat,or renewable energy resources and no more than 25%of the annual heat input to the system comes from fossil fuel or electric-resistance sources,or,2) 10%or less of the system annual heat input to the system comes from fossil fuels,electric-resistance sources,or heat pump sources with an annual COP<4 LOAD MANAGEMENT MEASURE-COOLING ENERGY STORAGE NA C406.3.5 Cooling energy To comply with this additional efficiency storage credit,indicate automatic controls connected to central DDC having digital input capable of being activated by external utility signal; where utility real-time demand or pricing program exists indicate system configured to utilize this signal;otherwise indicate building demand monitoring installed and controls configured to utilize demand signals NA C406.3.5 Cooling energy Provide calculation of ice or chilled water storage storage capacity with standby loss< 1.5%per day;indicate automatic controls to activate storage to reduce peak period electric demand;provide calculation of storage capacity MULTIPLE ZONE AIR SYSTEMS Page 25132 Mechanical Requirements • • • of 2021 WSEC Requirements for Commercial Buildings including Group R2,R3&R4 over 3 stories&all R1 -- Administered by @2024 NEEA,All rights reserved The following information is necessary to check a mechanical permit application for compliance with the mechanical systems and equipment requirements in the Washington State Energy Code,Commercial Provisions. For questions about this report,contact WSEC Commercial Technical Support at 360-539-5300 or via email at com.techsupport@waenergycodes.com C403.6.1 Air systems serving Identify supply air systems serving multiple multiple zones zones and the zones they serve on plans; indicate whether system is VAV and method of primary air control;or provide supporting documentation for applied exception to VAV C403.6.1 VAV air terminal Provide equipment schedules on plans that list primary supply all VAV air terminals and types(fan-powered airflow series and parallel air terminals,single duct and dual duct air terminals,etc.) C403.6.1 VAV air terminal For each air terminal include:maximum primary supply primary supply airflow rates during zone peak airflow heating and zone peak cooling;maximum terminal airflow during reheating,recooling or mixing;minimum ventilation airflow rate,and the basis for these values;if IMC or ASHRAE 62.1 multiple zone equation is the basis for minimum flow rates,provide this calculation on plans C403.6.2 Single duct VAV Indicate single duct terminal units are terminal units configured to reduce primary supply air before reheating or recooling C403.6.3 Dual duct systems- For systems with separate warm air and cool terminal units air ducts,indicate terminal units are configured to reduce the flow from one duct to minimum before mixing with air from the other duct C403.6.8 VAV system static- Indicate locations of duct static pressure C403.6.9 pressure sensors and sensors on plans;include at least one sensor DDC set points per major duct branch;verify controller setpoint pressure at each sensor is<_ 1.2 inch w.g. C403.6.8 VAV system static- For systems with zone level DDC,indicate C403.6.9 pressure sensors and controls are configured to monitor zone DDC set points damper positions and reset static pressure setpoint based on the zone requiring most pressure;include control logic that automatically detects and generates an alarm if any zone excessively drives reset logic,and allows building operators to exclude zones from reset logic C403.6.4 VAV system supply Indicate controls automatically reset supply air reset air temperature in response to building loads or outdoor air temperature;or exception applied NA C403.6.4 VAV system supply Indicate zones expected to experience air reset relatively constant loads and that maximum air flow is designed to deliver peak capacity at the fully reset supply air temperature. C403.6.5 Multiple-zone VAV For systems with zone level DDC controls, system ventilation indicate controls are configured to optimization controls automatically reduce outdoor airflow in response to changes in system ventilation efficiency;or exception applied Page 26132 Mechanical Requirements • • 27 of 2021 WSEC Requirements for Commercial Buildings including Group R2,R3&R4 over 3 stories&all R1 -- Administered by @2024 NEEA,All rights reserved The following information is necessary to check a mechanical permit application for compliance with the mechanical systems and equipment requirements in the Washington State Energy Code,Commercial Provisions. For questions about this report,contact WSEC Commercial Technical Support at 360-539-5300 or via email at com.techsupport@waenergycodes.com C403.6.6 Parallel fan powered Indicate controls automatically activate or VAV air terminals shut off the air terminal fan based on call for heating and/or ventilation;indicate controls are configured to activate the terminal fan as the first stage of heating prior to activating the heating coil;indicate control method of primary air during warmup or temperature setback mode HIGH EFFICIENCY MULTIPLE-ZONE VAV SYSTEMS-EXCEPTION TO C403.3.5 DOAS,MUST COMPLY WITH ALL 15 PROVISIONS TO BE ELIGIBLE C403.6.10, Minimum area served Indicate that each high efficiency multiple- Item 1 and zoning zone VAV systems serves an area>_3,000 sf and includes>_5 zones C403.6.10, Air economizer Indicate system is configured for 100%air Item 2 economizer operation and complies with all related economizer requirements per C403.5 (without economizer exceptions) C403.6.10, Direct digital controls Provide DDC controls for all components of Item 3 (DDC) system per C403.4.11 (regardless of system size);identify all DDC system input/output control points;indicate capability for trending and graphical display C403.6.10, Supply and outdoor For systems with minimum required outdoor Items 4 and 5 airflow measurement air>2,500 cfm,provide an airflow and control monitoring station that is configured to measure outdoor air intake under all load conditions;indicate control sequence that increases or reduces outdoor air cfm based on VAV terminal feedback of ventilation efficiency(per C403.6.5 without exceptions) or and DCV(per C403.7.1) C403.6.10, Supply and outdoor Provide a supply airflow monitoring station Items 4 and 5 airflow measurement that is configured to measure supply air and control delivered to VAV terminals under all load conditions C403.6.I0,I Zone isolation and Verify maximum area served by a single VAV tem 6 maximum area served system is<_50,000 sf,or one entire floor, whichever is greater;in addition if a system serves>25,000 sf,that includes areas that are expected to be occupied non-simultaneously, indicate zone isolation controls per C403.2.1 C403.6.10, Interior/exterior Verify that VAV terminals serving interior Item 7 zone design supply air cooling driven loads are sized per a design temperature supply air temperature that is 5'F higher than VAV terminals serving exterior zones while in cooling mode C403.6.10, Maximum air Identify all air terminals with minimum Item 8 terminal inlet velocity primary airflow setpoints>50%of maximum setpoint in mechanical equipment schedule for these air terminals indicate inlet velocity does not exceed 900 fpm Page 27132 Mechanical Requirements • • i of 2021 WSEC Requirements for Commercial Buildings including Group R2, R3&R4 over 3 stories&all R1 -- Administered by @2024 NEEA,All rights reserved The following information is necessary to check a mechanical permit application for compliance with the mechanical systems and equipment requirements in the Washington State Energy Code,Commercial Provisions. For questions about this report,contact WSEC Commercial Technical Support at 360-539-5300 or via email at com.techsupport@waenergycodes.com C403.6.10, Maximum allowable For each fan system serving a multiple-zone Item 9 system brake VAV HVAC,provide calculations that verify horsepower fan system electrical input power is<_90%of the fan power budget in accordance with Section C403.8.1.1 C403.6.10, Fan-powered terminal Indicate all series and parallel fan-powered Item 10 unit motor and terminals have electronically commutated control motors(ECM);indicate DDC control system is configured to vary air terminal fan speed as a function of the load;indicate fan speed during periods of low heating,low cooling,or ventilation-only mode is<66%of peak design air flow,or provide supporting documentation for applied exception C403.6.10, Application of single Indicate VAV terminal types on plans;verify Item 11 duct and fan-powered fan-powered terminal units only serve terminal units perimeter zones with envelope loads and interior zones with high occupant density and DCV per C403.7.1;verify all other zones are served by single duct terminal units C403.6.10, Fan-powered terminal Indicate DDC controls are configured to Item 12 unit primary air reset automatically reset the primary supply air cfm setpoint of all fan-powered terminal units to the minimum required to maintain ventilation during occupied heating or deadband mode, based upon the VAV air handling unit minimum ventilation air fraction C403.6.10, Controls for high For zones> 150 sf with high occupant density Item 13 occupant density (>_25 people/1000 sf),indicate zone is spaces served by a dedicated terminal unit with DCV control that resets terminal unit ventilation setpoint based on measured CO2;also indicate occupancy sensor control that automatically reduces minimum ventilation to zero and sets back room heating and cooling setpoints by>_5°F when space in unoccupied C403.6.10, Dedicated cooling For data centers and server,electronic Item 14 systems serving data equipment,telecom or similar spaces with centers and server, design cooling loads>5 W/sf,indicate spaces electronic equipment are served by dedicated cooling systems that and telecom spaces are independent of the HPVAV systems serving the rest of building C403.6.10, Dedicated cooling Indicate dedicated cooling systems are Item 14 systems serving data configured for 100%air economizer centers and server, operation and comply with all related electronic equipment economizer requirements per C403.5(without and telecom spaces economizer exceptions),or heat recovery per C403.5,Exception 9 C403.6.10, Central plant Indicate whether systems are served by a high Item 15 efficiency efficiency heating water plant,or a high efficiency chilled water plant Page 28132 Mechanical Requirements • • 29 of 2021 WSEC Requirements for Commercial Buildings including Group R2, R3&R4 over 3 stories&all R1 -- Administered by @2024 NEEA,All rights reserved The following information is necessary to check a mechanical permit application for compliance with the mechanical systems and equipment requirements in the Washington State Energy Code,Commercial Provisions. For questions about this report,contact WSEC Commercial Technical Support at 360-539-5300 or via email at com.techsupport@waenergycodes.com C403.6.10, Central plant if complying via high efficiency heating water Item 15 efficiency plant:Indicate all VAV terminals have hydronic heating coils served by a heating water system with either gas-fired boiler(s) with thermal efficiency(Et)Z 92%,air-to- water heat pumps,or heat recovery chillers; indicate hydronic heating coils are sized per a maximum 120°F entering water temperature during peak demand C403.6.10, Central plant If complying via high efficiency chilled water Item 15 efficiency plant:Indicate all VAV air handlers have cooling coils served by chillers with rated IPLV efficiency that exceeds WSEC listed IPLV by at least 25%per Table C403.3.2(7) (note water-cooled IPLV is max,all others are min);indicate smallest chiller or compressor in plant is<20%of the total plant capacity, or provide thermal storage sized for>20%of total plant capacity C403.6.10, Fault detection and Indicate DDC system includes automatic fault Item 16 diagnostics detection and diagnostics(FDD)configured to monitor operation and provide fault reporting of all required parameters for all VAV air handlers and VAV air terminal units in the HPVAV system HIGH EFFICIENCY SINGLE-ZONE VAV SYSTEMS-EXCEPTION TO C403.3.5 DOAS,MUST COMPLY WITH ALL 8 PROVISIONS TO BE ELIGIBLE C403.12, Air economizer Indicate system is configured for 100%air Item 1 economizer operation and complies with all related economizer requirements per C403.5 (without economizer exceptions) C403.12, Direct digital controls Provide DDC controls for all components of Item 2 (DDC) system per C403.4.11 (regardless of system size);identify all DDC system input/output control points;indicate capability for trending and graphical display C403.12, Outdoor airflow For systems with minimum required outdoor Item 3 measurement and air> 1,000 cfm,provide an airflow control monitoring station that is configured to measure outdoor air intake under all load conditions;indicate controls that adjust outdoor air cfm via DCV per C403.7.1 C403.12, Maximum allowable For each fan system serving a single-zone Item 4 fan power VAV system,provide calculations that verify fan system electrical input power is<_90%of the fan power budget in accordance withC403.8.1.1 C403.12, Supply airflow Provide controls that adjust supply airflow Item 5 control based on the heating and cooling loads; indicate control sequence that limits minimum fan speed to 30%of peak design airflow or required ventilation during unoccupied mode, whichever is less Page 29132 Mechanical Requirements • • 30 of 2021 WSEC Requirements for Commercial Buildings including Group R2,R3&R4 over 3 stories&all R1 -- Administered by @2024 NEEA,All rights reserved The following information is necessary to check a mechanical permit application for compliance with the mechanical systems and equipment requirements in the Washington State Energy Code,Commercial Provisions. For questions about this report,contact WSEC Commercial Technical Support at 360-539-5300 or via email at com.techsupport@waenergycodes.com C403.12, Controls for high For zones> 150 sf with high occupant density Item 6 occupant density (>_25 people/1000 sf),indicate DCV control spaces that resets ventilation setpoint based on measured CO2;also indicate occupancy sensor control that automatically reduces minimum ventilation to zero and sets back room heating and cooling setpoints by>_5°F when space in unoccupied C403.12, High efficiency Indicate which system performance option is Item 7 system option applied-high efficiency DX cooling and heat pump or high efficiency gas heating;or heating coils served by a high efficiency heating water plant;or cooling coils served by high efficiency chilled water plant C403.12, High efficiency If complying via high efficiency DX:Indicate Item 7 system option full load and part load rated cooling efficiency exceeds WSEC listed efficiency by at least 15%;if heating is supplied by a gas-fired furnace,indicate thermal efficiency(Et)is>_ 90%;if system is a heat pump,indicate heating efficiency(HSPF or COP)exceeds WSEC listed efficiency by at least 10%; control of cooling and heating coil output shall be configured with a minimum of 2-stages or modulating C403.12, High efficiency If complying via high efficiency heating water Item 7 system option plant:Indicate hydronic heating coils are served by a heating water system with either gas-fired boiler(s)with thermal efficiency (Et)>92%,air-to-water heat pumps,or heat recovery chillers;indicate hydronic heating coils are sized per a maximum 120°F entering water temperature during peak demand C403.12, High efficiency If complying via high efficiency chilled water Item 7 system option plant:Indicate cooling coils are served by chillers with rated IPLV efficiency that exceeds WSEC listed IPLV by at least 25% per Table C403.3.2(7)(note water-cooled IPLV is max,all others are min);indicate smallest chiller or compressor in plant is<_ 20%of the total plant capacity,or provide thermal storage sized for>_20%of total plant capacity C403.12, Fault detection and Indicate DDC system includes automatic fault Item 8 diagnostics detection and diagnostics(FDD)configured to monitor operation and provide fault reporting of all required parameters for all HPVAV single-zone air systems EXTERIOR HEATING SYSTEMS C403.11.1 Heating outside a Indicate systems providing hearing in non- building enclosed outdoor occupied spaces are radiant systems Page 30132 Mechanical Requirements • • 31 of 2021 WSEC Requirements for Commercial Buildings including Group R2,R3&R4 over 3 stories&all R1 -- Administered by @2024 NEEA,All rights reserved The following information is necessary to check a mechanical permit application for compliance with the mechanical systems and equipment requirements in the Washington State Energy Code,Commercial Provisions. For questions about this report,contact WSEC Commercial Technical Support at 360-539-5300 or via email at com.techsupport@waenergycodes.com C403.11.1 Heating outside a Indicate occupancy sensing or timer switch building controls configured to automatically shut off heating system when area served is unoccupied C403.11.2 Snow melt systems Indicate automatic controls configured to shut off system when pavement temperature exceeds 50°F and no precipitation is falling, and when outdoor air temperature exceeds 40°F C403.11.3 Freeze protection Indicate automatic controls to shut off system system controls when outdoor temperature exceeds 40°F,or conditions protect fluid from freezing HVAC EQUIPMENT ENERGY USE METERING C409.3.1 HVAC equipment For new buildings and building additions> energy use metering 25,000 sf,verify energy use metering of all equipment used to provide space heating and cooling,dehumidification and ventilation will be provided per C409;indicate equipment eligible for exception DOCUMENTATION AND SYSTEM SPECIFIC REQUIREMENT TO SUPPORT COMMISSIONING(CX) NA C408.1 Scope of mechanical For buildings with areas required to comply systems with C403.3.5(DOAS)or with>_ 180,000 commissioning Btu/h total output cooling capacity or >240,000 Btu/h total output heating capacity or energy recovery equipment>300 cfm, indicate that all mechanical systems regardless of individual capacity are required to be commissioned;or provide building heating/ cooling capacity calculation demonstrating eligibility for exception NA C408.1 Scope of mechanical Indicate that all systems,equipment and systems controls for which the WSEC requires control commissioning functions and/or configuration to perform specific functions are included in the Cx scope NA C408.1.1 Commissioning Indicate in plans and specifications that Cx C408.1.4.1 requirements in per C408 is required for all applicable construction mechanical systems documents NA C408.1.1 Commissioning Include general summary that includes at C408.1.4.1 requirements in minimum:narrative description of activities, construction responsibilities of the Cx team,schedule of documents activities including verification of project close out documentation per C103.6,and conflict of interest plan(if required) NA C408.1.1 Commissioning Include in general summary that a Cx project C408.1.4.1 requirements in report or Compliance Checklist(Figure construction C408.1.4.1)shall be completed by the documents Certified Cx Professional and provided to the owner prior to the final mechanical inspection. Page 31132 Mechanical Requirements • • 32 of 2021 WSEC Requirements for Commercial Buildings including Group R2,R3&R4 over 3 stories&all R1 -- Administered by @2024 NEEA,All rights reserved The following information is necessary to check a mechanical permit application for compliance with the mechanical systems and equipment requirements in the Washington State Energy Code,Commercial Provisions. For questions about this report,contact WSEC Commercial Technical Support at 360-539-5300 or via email at com.techsupport@waenergycodes.com NA C408.1.2.2 Functional Identify in plans and specifications the performance testing intended operation of all equipment and criteria controls during all modes of operation, including interfacing between new and existing-to-remain systems NA C408.2.2 Air system and Indicate in plans that air and fluid flow rates hydronic system shall be tested and balanced within the balancing tolerances defined in the specifications; indicate systems shall be balanced in a manner to first minimize throttling losses,then adjusted to meet design flow conditions NA C408.2.2.1 Air system balancing Indicate devices that provide the capability to devices balance all supply air outlets,zone terminals and air handling equipment requiring system balancing C408.2.2.2 Hydronic system Indicate devices that provide the capability to balancing devices isolate,balance and measure flow across all hydronic equipment requiring system balancing including heating and cooling coils and pumps;or exception applied PROJECT CLOSE OUT DOCUMENTATION YES C103.6 Documentation and Indicate in plans that project close out M-1 project close out documentation and training of building submittal operations personnel is required for all requirements mechanical components,equipment and systems governed by this code;indicate close out documentation shall include:record documents,O&M manuals,applicable WSEC mechanical equipment compliance reports and calculations Page 32132