HomeMy WebLinkAbout210 E Burke Ave_BLD993542_2025 . .
~\
/
DRAINAGE, CALCULATIONS
FOR THE
WINDE'RMERE BUILDING
ARLING'TON, WASHINGTON
I . I ,
September 21, 1999
¥)-3S'-(:)_·
Prepared For: RECEIVED
Gene Bryson I
Winderemere Real Estate
/ 515 N. Olympic Avenue SEP 2 31999
Arlington, Washington 98223
· CITY OF ARLINGTON
Prepared By:
Bryant 0. Merci!, P.E.
R
EXPIRES 8/27/2000
ENGINEERING, INC. 1721 Hewitt Avenue, Suite 401
L , Everett. WA 98201
~(425) 252-2826 lax: 252-9551.
TABLE OF CONTENTS
Introduction: 1
Summary of Results: 2
Basin Summaries: 4
Runoff Curve Number and Time of Concentration: 6
Design Data- Water Quality Tank and Infiltration Basin: 9
Drainage Area Map: 13
Geotechnical Investigation Report: Appendix
INTRODUCTION
The following report presents the design of a storm water infiltration system for the Windermere
Building. The proposed development consists of the construction of a new 5,910 square foot
office building with associated parking areas. The 0.344-acre project site is located on the
southeast quadrant of the intersection of Broadway at Burke A venue in the City of Arlington.
PRE DEVELOPED DRAINAGE CONDITIONS
The project site is presently developed with a single family home with associated driveway, shed
and gravel parking areas. Ground cover on the remainder of the site consists of grass. The site
drains from southeast to northeast with flat slopes. The site is bordered on the north and west by
sidewalks at elevations higher than the site. These higher elevations create a closed depression in
the northwest comer of the site.
PROPOSED DRAINAGE CONDITIONS
As shown on the grading and storm drainage plan, runoff from the building and parking areas, as
well as runoff from portions of an existing alley along the south boundary will drain via a series
of catch basins and storm drain pipe to a new infiltration facility. The facility will consist of
three rows of 8-inch perforated ADS pipe set inside of a rock filled basin. The facility has been
designed to infiltrate the runoff for design storms up to and including the 100-year event. Water
quality will be provided in a 48-inch CMP water quality tank designed in accordance with State
Department of Ecology Criteria.
The boundary of the proposed drainage area tributary to the infiltration basin is delineated on the
drainage area map at the end of this report. The "Waterworks" program with the Santa Barbara
Unit Hydrograph (SBUH) Method and Type IA rainfall distribution was used to design the
proposed facility.
SUMMARY OF RESULTS
PROPOSED WATER QUALITY TANK
Total Area of Project Site: 0.344 Acres
Plus Offsite Area Tributary to Tank (Alley): 0.069 Acres
Plus Offsite Area Tributary to Tank (Broadway and Burke Avenue): 0.039 Acres
Less Site Area Not Tributary to Tank: 0.142 Acres
Equals Total Area Tributary to Water Quality Tank: 0.310 Acres
WATER QUALITY {6-MONTH) STORM
Total Volume of Runoff: 1,002 cf
Design Water Surface Elevation: 101.20
Approximate Volume of Storage Provided: 1,035 cf
PROPOSED INFILTRATION BASIN
Total Area of Project Site: 0.344 Acres
Plus Offsite Area Tributary to Infiltration Basin (Alley): 0.069 Acres
Plus Offsite Area Tributary to Infiltration Basin (Broadway and Burke Avenue): 0.039 Acres
Less Site Area Not Tributary to Infiltration Basin: 0.006 Acres
Equals Total Area Tributary to Infiltration Basin (Retained Area): 0.445 Acres
2YEARSTORM
Peak Inflow to Infiltration Basin: 0.16 cfs
Proposed Release Rate: 0.15 cfs
Design Water Surface Elevation: 100.86
Approximate Volume of Storage Provided: 79 cf
l0YEARSTORM
Peak Inflow to Infiltration Basin: 0.24 cfs
Proposed Release Rate: 0.21 cfs
Design Water Surface Elevation: 101.06
Approximate Volume of Storage Provided: 1,26 cf
100 YEAR STORM
Peak Inflow to Infiltration Basin: 0.35 cfs
Proposed Release Rate: 0.25 cfs
Design Water Surface Elevation: 101.61
Approximate Volume of Storage Provided: 275 cf
2
HISTORY OF HYDROGRAPH ACTIVITY
STORM ROUTINGS
Date of Session: 9/21/99 2: 41: 35 pm
LPOOL 1 "BASIN 1-2 YR STORM" DEV-002 DEV-002 STO-1 DIS-1 1
Description MatchQ PeakQ Sta Dis PkStg OutQ hyd Volume
BASIN 1-2 YR STORM 0.00 0.16 STO-1 DIS-1 100.86 0.15 1 78.65 cf
LPOOL 2 "BASIN 1-10 YR STORM" DEV-010 DEV-010 STO-1 DIS-1 2
Description MatchQ PeakQ Sta Dis PkStg OutQ hyd Volume
BASIN 1-10 YR STORM 0.00 0.24 STO-1 DIS-1 101.06 0.21 2 125.57 cf
LPOOL 3 "BASIN 1-100 YR STORM" DEV-100 DEV-100 STO-1 DIS-1 3
Description MatchQ PeakQ Sta Dis PkStg OutQ hyd Volume
BASIN 1-100 YR STORM 0.00 0.35 STO-1 DIS-1 101.61 0.25 3 274.95 cf
3
BASIN SUMMARIES
4
BASIN SUMMARIES
DEVELOPED CONDITIONS
BASIN ID: 6-MONTH NAME: 6-MO STORM DEV. CONDITIONS
SBUH METHODOLOGY
TOTAL AREA : 0.31 Acres BASEFLOWS: 0.00 cfs
RAINFALL TYPE : TYPElA PERV IMP
PRECIPITATION : 1.22 inches AREA .. : 0.04 Acres 0.27 Acres
TIME INTERVAL : 10.00 min CN .... : 68.00 98.00
TC .... : 6.00 min 6.00 min
ABSTRACTION COEFF: 0.20
PEAK RATE: 0.06 cfs VOL: 0.02 Ac-ft TIME: 480 min
BASIN ID: DEV-002 NAME: 2-YR STORM DEV. CONDITIONS
SBUH METHODOLOGY
TOTAL AREA : 0.45 Acres BASEFLOWS: 0.00 cfs
RAINFALL TYPE : TYPElA PERV IMP
PRECIPITATION : 1.90 inches AREA .. : 0.04 Acres 0.41 Acres
TIME INTERVAL : 10.00 min CN .... : 68.00 98.00
TC .... : 6.00 min 6.00 min
ABSTRACTION COEFF: 0.20
PEAK RATE: 0.16 cfs VOL: 0.06 Ac-ft TIME: 480 min
BASIN ID: DEV-010 NAME: 10-YR STORM DEV. CONDITIONS
SBUH METHODOLOGY
TOTAL AREA ....... : 0.45 Acres BASEFLOWS: 0.00 cfs
RAINFALL TYPE .... : TYPElA PERV IMP
PRECIPITATION .... : 2.80 inches AREA .. : 0.04 Acres 0.41 Acres
TIME INTERVAL .... : 10.00 min CN .... : 68.00 98.00
TC .... : 6.00 min 6.00 min
ABSTRACTION COEFF: 0.20
PEAK RATE: 0.24 cfs VOL: 0.09 Ac-ft TIME: 480 min
BASIN ID: DEV-100 NAME: 100-YR STORM DEV. CONDITIONS
SBUH METHODOLOGY
TOTAL AREA : 0.45 Acres BASEFLOWS: 0.00 cfs
RAINFALL TYPE : TYPElA PERV IMP
PRECIPITATION : 4.00 inches AREA .. : 0.04 Acres 0.41 Acres
TIME INTERVAL : 10.00 min CN : 68.00 98.00
TC : 6.00 min 6.00 min
ABSTRACTION COEFF: 0.20
PEAK RATE: 0.35 cfs VOL: 0.13 Ac-ft TIME: 480 min
5
RUNOFF CURVE NUMBER
TIME OF CONCENTRATION
6
SOILS MAP
SCALE: 1" = 2,000'
Reference: Soil Survey of Snohomish County
Sheet Number 15
Soil Type: Symbol 17-Everett Gravelly Sandy Loam, 0% to 8% Slopes
Hydrologic Soil Group A
7
WINDERMERE BUILDING
RUNOFF CURVE NUMBER CALCULATIONS
BASIN NO. 1 - PROPOSED INFILTRATION SYSTEM
POST DEVELOPED CONDITIONS
Soil Name and Cover Description Runoff Curve Area
Hydrologic Soil Group Number (Acres)
Name HSG RCN A RCNxA
Everett A Lawn Areas 68 0.036 2.448
Everett A Impervious Areas 98 0.409 40.082
Totals 0.445 42.530
Runoff Curve Number= (RCN x A)/ A:..................................................................................................... 95.57
Runoff Curve Number Used in Basin Calculations....................................................................................... 96.00
NOTE: The individual areas for each land cover were used in the Waterworks basin file.
TIME OF CONCENTRATION
Total Time of Concentration, Tc (Min.):........................................................................... 6.00
BrysonDetCalc.xls 8 9/22/1999
DESIGN DATA
WATER QUALITY TANK
INFILTRATION BASIN
9
·•.
STAGE STORAGE TABLES
UNDERGROUND PIPE ID No. P-1
Description: 36" CMP (WATER QUALITY TANK)
Diameter: 3. 00 ft. Length: 4. 00 ft.
Slope ... : 0. 0000 ft/ft ups tr: dnstr:
STAGE <----STORAGE----> STAGE <----STORAGE----> STAGE <----STORAGE----> STAGE <----STORAGE---->
(ft) ---cf--- --Ac-Ft- (ft) ---cf--- --Ac-Ft- (ft) ---cf--- --Ac-Ft- (ft) ---cf--- --Ac-Ft-
99.00 0.0000 0.0000 100.00 8.2502 0.0002 101.00 20.024 0.0005 102.00 28.274 0.0006
99.20 0.8095 0.0000 100.20 10.561 0.0002 101. 20 22.221 0.0005 102.20 28.274 0.0006
99. 40 2. 2411 0.0001 100.40 12.938 0.0003 101. 40 24.249 0.0006
99.60 4.0257 0.0001 100.60 15.336 0.0004 101.60 26.033 0.0006
99.80 6.0529 0.0001 100.80 17.713 0.0004 101. 80 27.465 0.0006
UNDERGROUND PIPE ID No. P-2
Description: 48" CMP (WATER QUALITY TANK)
Diameter: 4. 00 ft. Length: 65.00 ft.
Slope ... : 0. 0000 ft/ft upstr: dnstr:
STAGE <----STORAGE----> STAGE <----STORAGE----> STAGE <----STORAGE----> STAGE <----STORAGE---->
( ft) ---cf--- --Ac-Ft- ( ft) ---cf--- --Ac-Ft- (ft) ---cf--- --Ac-Ft- ( ft) ---cf--- --Ac-Ft-
99.00 0.0000 0.0000 100.20 206.10 0.0047 101. 40 511.71 0. 0117 102.60 774.30 0.0178
99.20 15.269 0.0004 100.40 254.78 0.0058 101. 60 562.03 0.0129 102.80 801. 55 0.0184
99.40 42.510 0.0010 100.60 305.10 0.0070 101. 80 610. 72 0.0140 103.00 816.81 0.0188
99.60 76.830 0.0018 100.80 356.49 0.0082 102.00 657.13 0.0151 103.20 816.81 0.0188
99.80 116. 30 0.0027 101. 00 4 08. 41 0.0094 102.20 700.52 0.0161
100.00 159.69 0.0037 101. 20 460.32 0.0106 102.40 739.98 0.0170
CUSTOM STORAGE ID No. STO-1
Description: INFILTRATION BASIN
STAGE <----STORAGE----> STAGE <----STORAGE----> STAGE <----STORAGE----> STAGE <----STORAGE---->
( ft) ---cf--- --Ac-Ft- (ft) ---cf--- --Ac-Ft- ( ft) ---cf--- --Ac-Ft- ( ft) ---cf--- --Ac-Ft-
100.50 0.0000 0.0000 101. 00 108.17 0.0025 101. 50 244.99 0.0056 102.00 362.90 0.0083
100.60 21. 634 0.0005 101.10 135. 53 0.0031 101. 60 272. 36 0.0063 102.10 384.53 0.0088
100.70 43.268 0.0010 101.20 162.90 0.0037 101.70 298.00 0.0068 102.17 399.67 0.0092
100.80 64.902 0.0015 101. 30 190.26 0.0044 101. 80 319.63 0.0073
100.90 86.536 0.0020 101. 40 217.63 0.0050 101.90 341.26 0.0078
STAGE DISCHARGE TABLE
DISCHARGE LIST ID No. DIS-1
Description: INFILTRATION BASIN
STAGE <--DISCHARGE---> STAGE <--DISCHARGE---> STAGE <--DISCHARGE---> STAGE <--DISCHARGE--->
( ft) ---cfs-- ------- ( ft) ---cfs-- ------- ( ft l ---cfs-- ------- (ft) ---cfs-- -------
100.50 0.0000 101. 00 0.2000 101. 50 0.2433 101.90 0.2759
100.60 0.0400 101.10 0.2087 101. 60 0.2519 102.00 0.2837
100.70 0.0800 101. 20 0.2173 101. 67 0.2580 102.10 0.2915
100.80 0. 1200 101. 30 0.2260 101. 70 0. 2603 102.17 0.2970
100.90 0. 1600 101.40 0.2346 101.80 0. 2681
10
STAGE STORAGE TABULATION
PROPOSED INFILTRATION TRENCH FOR PARKING LOT
Water Surface lncrem. Storage lncrem. Storage Total Storage
Elevation in Voids (Cu. Ft.) in Pipe (Cu. Ft.) Volume (Cu. Ft.)
100.50 0.00
108.17 0.00
101.00 108.17
125.74 57.60
101.67 291.51
108.17 0.00
102.17 399.67
NOTES
Incremental Storage in Voids, Sv = Vr x Lt x Wt x h
Void Ratio in Rock, Vr: 0.33
Length of Basin, Lb (feet):................................................................................................. 59.00
Width of Basin, Wb (feet):................................................................................................. 11.00
Storage in Perforated CMP, Sp= Np x Lp x Ap
Number of Pipes, Np:........................................................................................................ 3.00
Total Length of Pipe per Row, Lin (feet): 55.00
Area of Pipe, Ap (sq. ft. / lin. ft.): 0.35
Diameter of Pipe, Op (inches):............................................................................................. 8.00
STAGE DISCHARGE TABULATION
PROPOSED INFILTRATION TRENCH FOR PARKING LOT
Water Design Design Depth to Depth Hydraulic Length Surface Basin
Surface lnfil. Rate lnfil. Rate Water Table Of Ponding Gradient of Sides Area Outflow
Elevation fd, in\hr fd, cfs L, feet h, feet i, feet Lt, feet As, sf Qout, cfs
100.50 10.00 0.000231 2.00 0.00 1.00 140.00 649.00 0.000
101.00 10.00 0.000231 2.50 0.50 1.20 140.00 719.00 0.200
101.67 10.00 0.000231 3.17 1.17 1.37 140.00 812.80 0.258
102.17 10.00 0.000231 3.67 1.67 1.46 140.00 882.80 0.297
NOTES
Measured Infiltration Rate, fd Obtained From Soil Survey/ Geotech Report
Design Infiltration Rate = 50 Percent of Measured infiltration Rate
Depth to Water Table, L = Bottom of Infiltration Trench - Water Table Elevation
Water Table Elevation (from Geotech Report):......................................................... 98.50
Depth of Ponding, h = Water Surface Elevation - Bottom of Trench
Hydraulic Gradient, i = (h+L)/L
Surface Area, As= (Total Length of Basin Sides x h) + (Width of Basin x Length of Basin)
Basin Outflow, Qo = fd x i x As
BrysonDetCalc.xls 11 9/22/1999
STAGE/STORAGE TABULATION
DETENTION TANK
Water Catch Basin 36" CMP 48" CMP Total
Surface Volume Volume Volume Volume
Elevation (CF) (CF) (CF) (CF)
97.20 0.00 0.00 0.00 0.00
98.20 31.81 8.25 159.69 200.00
99.20 63.62 20.02 408.41 492.00
100.20 95.43 28.27 657.13 781.00
101.20 127.23 28.27 879.65 1,035.00
GOVERNING EQUATIONS:
Water Quality Tank
Length of Tank, Lt (Feet): . 70.00
Number of Tanks, Nt: . 1.00
Diameter of Tank, Dt (Feet): . 4.00
Invert of Detention Pipe at Downstream Catch Basin: . 97.20
Slope of Detention Pipe, Sp (ft/ft): . 0.0000
Diameter of Catch Basin, Db (Feet): . 4.50
Number of Catch Basins: . 2.00
Length of 36" CMP, Lp (Feet): . 4.00
Diameter of 36" CMP, Dp (Feet): . 3.00
BrysonDetCalc.xls 12 9/22/1999
DRAINAGE AREA MAP
13
APPENDIX
GEOTECHNICAL INVESTIGATION
REPORT
\Vestern Geotechnical Consultants, Inc.
4181 Sal/springs Drive • Ferndale, WA 98248
Phone (360) 380-2507 • Fax (360) 380-2507
June 8, 1999
Gene Bryson
515 N. Olympic Ave.
Arlington, WA 98223
Re: Geotechnical site Investigation
212 E. Burke Ave.
Arlington, WA 98223
Western Geotechnical Consultants, Inc. is pleased to present the results of our
geotechnical site investigation, conducted at the above referenced property. On June 3,
1999 a geotechnical engineer from our firm oversaw the excavation of 2 test pits for
development of the site. The site plan is to construct a 6,000 square foot one story
building of wood frame construction with a designed on-site, underground storm water
detention system meeting city standards.
Site Conditions
Surface Conditions
The site is relatively flat and grass and weeds covered the parcel of land at the time of our
investigation. A small one story house and garage were present along the east side of the
lot.
Subsurface Conditions
Subsurface conditions were explored using a rubber tire mounted backhoe. A total of 2
test pits were excavated at the site. The first test pit was excavated at the approximate
building location and the second test pit was excavated v,h;;:r;;; ti,;;; ..:rH.l-:,b;..;i..ad s.orn ..
water detention facility will be located The test pits were continuously logged and soils
encountered were classified using the Unified Soil Classification System (USCS). Edited
tabulated test pit logs are appended to this report together with a description of the USCS.
The general subsurface profile consisted of 20 to 22 inches of topsoil over a brown fine to
coarse sandy GRAVEL (G\V by USCS classification) that extended to 6 feet in Test Pit
2. Below 6 feet the material became siltier (GW/GM by USCS classification). The soil
became saturated at 6.8 feet with heavy seepage occurring at 7.0 feet. From 7.0 feet to
10.6 feet a wet gray SILT (\JL by lJSCSl was encountered. It appears that this silt layer
is acting as an aquitard for a perched groundwater table in the overlying gravelly soils.
Geotechnical Site Investigation Western Geotechnical Consultants, Inc.
212 E. Burke Ave. Arlington, WA 98223
June 8, 1999
(2 0f3)
Groundwater
Based on soil moisture, coloration and the presence of a relatively impermeable silt layer
at 7 feet, it appears that the seasonal high groundwater table is on the order of 5 to 6 feet
below present grade.
Conclusions and Recommendations
Building Foundation support
The site is conducive for foundation support using continuous shallow spread footings.
We recommend that the planned building be supported on isolated spread and continuous
footings founded on undisturbed native sandy, gravelly soil or compacted granular
structural fill. Bearing soil that is disturbed during foundation excavation should be re-
compacted or removed. All soil directly below and around footings should be compacted
to at least 95% of maximum dry density (ASTM D-1557) prior to placement of forms or
reinforcing steel. All continuous and isolated spread footings should have minimum
widths of 18 and 24 inches, respectively, and should be founded 20 inches to 22 inches
below the present grade on the sandy gravel soils or a minimum of 18 inches below final
grade on structural fill. All footings supported on properly prepared native sandy soil or
structural fill may be proportioned using ,1 net allowable bearing pressure of 2,500 psf
The term net allowable bearing pressure- refers to the pressure which can be imposed on
the soil at foundation level due to the total of all dead plus live loads, exclusive of the
weight of the footing or any backfill placed above the footing. These values may be
increased by one-third for transient wind or seismic loading.
Settlement of spread foundation depends on the foundation size and bearing pressure as
well as the strength and compressibility characteristics of the underlying bearing soils.
Assuming construction i3 accomplished as recommended above and for the loads
anticipated, we estimate total settlement of the foundation should be less than about ½
inch and differential settlement between two adjacent load bearing components supported
on competent soils should be less than about half the total settlement estimate. Due to the
coarse grained nature of the foundation soils most of the settlement should take place
relatively rapidly during construction as loads are applied. We recommend that footing
excavations be observed by a geotechnical engineer to confirm that design assumptions
are met.
Based on ground water conditions we recommend that a footing drain be placed around
the perimeter of the building. The drain should be placed at or below the base of the
footing. The drain should consist of a -l-inch diameter perforated pipe surrounded by
washed rock and a separation geotextile such as Mirafi 140N or equivalent should
surround the entire drain.
Geotechnical Site Investigation Western Geotechnical Consultants, Inc.
212 E. Burke Ave. Arlington. WA 98223
June 8, 1999 ·
(3 ~f 3)
Groundwater Detention Facilities
The site has a seasonally perched groundwater table estimated to be at 5 to 6 feet below
grade. The buried water detention facilities should be designed utilizing a seasonal high
groundwater table of about 5 feet below present grade.
Erosion Control:
Erosion control during construction of the proposed retaining wall can be accomplished
through placement of proper sedimentation control facilities. We recommend siltation
control facilities, consisting of either hay bales or silt fences, be fabricated around the
construction area. Typical details for siltation control using either hay bales or silt fences
are attached to this report.
Siltation devices should be placed downgradient of all construction areas and cleared
areas to provide siltation control during construction. All siltation control devices should
be maintained during construction, and left in operable condition until the site has been
revegetated and siltation is no longer a threat. At that time the siltation facilities should
be removed.
\Ve appreciate the opportunity to be of assistance to you on this project. If you have any
questions regarding the contents of this report, or if we can be of further assistance,
please contact our office.
Sincerely,
.. : • .: .. ~ l
~ .- "~. ·.,
cc: Higa Engineering
Attachments:
USCS Classification System
Log of Test Pits ._ _
Typical Erosion Control Facility
File:99671
UNIFIED SOIL CLASSIFICATION CHART (USCS) GRADATION
CHART
GRAPH LETTER
MAJOR DMSIONS SYMBOL SYMBOL lYPICAL DESCAIPllONS
PARTICLE SIZE
MAl[RIAL SIZE
LOWER LIMIT UPPER LIMIT
W[lL -C .. O[D GR•lll"LS, CRAV[L-Y.,10 Mllllt.A(T(RS
Sl(V( SIZ( MllllM[ l(RS Sl[V[ SIZE
,:11,wr1 GW Ulâ– IIJR[S, urur OR NO rlN[S
t llAN CHAV[I.S
lltJ[) ruuu 5ANO
,;1,11vru -( U,,f HO
IIUfS) POORLY-GR-0[0 GRAVCLS, CRA\/[l- FIN[
.074 1200 • 0.42 f40 •
•·,1)11 r, <~'I GP SANO 1.11" IUR( S, uuu OR NO MEDIUM
ftN[S
0 42 140. 7.00 f, l.O. .
COARSE
2.00 fl0 • 4.16
COAW,I Wl•llf llt.A-N ~(J~ ()( 'iJlT'r Cf1AV£LS, CRA"1:l ·•S.t.t10-Sllr
GRAltlf ll (OA~'.( I NA(lllltl CIIAV[LS GM Mlll:FUR(S GRAV[L
SOILS HI~ll) •~4 •L')O l(VOl U WIii! FINES FINE
4 76 f4 • 191 J/4" •
(Al'l'R( CU.fl.( AMOUNl COARSE
191 J/4" • 767 J" •
UI" rttl(~) CtA1fV CRAV(lS. CP.AVll -SA.NO-Cl.>,Y
<12~ GC MIXIUR[S
COAOLES
76 1 J" • J04.8 17".
[HJULD[RS
304.8 11· • ') 14 4
W[l l -(,R.t.()£0 SA.NO":',. l,RAVHl..,
',1111[1 t.1 IAM '.;AtJ[l';; SW "iAtlU";. UI Ill OR tHJ fill£\ , IJ ~ ~IANOARO
• CL[ AR 5QUAR[ QP[NltlGS
Atlll 111111! OH Nil o---~--- ·-------- '., · 12'!':
rn~rs (Sit.I ,..,. CLAY) llllAI Cl.ASS
',i\l·ll>Y ""' \)
',()fl <; <~'l PO<lRs•LY•m-C.~. H•u(ln[IJ u 5•N05. <;R•\/1.ll 1
SP OR ,.,o 11,,rs
I 1,,,,,,,,,,,1
UQP[ IU.AN '>U't Lof
MAl(AW ,s ~'jlU l"'OF-'l u .... ,, ~.n~ f)f Stll'Y WWS. SMlO ',11 I a.m.lURf\
1HAN NO ]Of) 1 (l"R',l ru.ariu,,~ SANDS SM
':-If\/( ~1/r ~'AJ~!Uf.i N() 4 WII II I IN[S PLASTICITY
CHART
s,rvc
I AflPR[Cl-'A..( AMOIINI '///-;:".'~
C" '"'l S)
< (lA't[ f SAttOS. ~.um - n AT 1,.11'1111)UI 'i
I;'~ ·•:';~J::;. SC:
I 101111) I IMI I
·.•-4') /.:.-· / r.0..----.-----,.----.----.-----,----...----..------,---;--,.---~
INflR•,.uuc. ",11 Ir, Alli I Vf Pr r '"'
Ml.. ~.t.tJl1<., H\}(11 111.•l/lJ ',1111 tll-'
I I 6,1, I Hll '.t.•11 ·' P11 •·1 4 ·I ,
',I\ I', llilfH •:, o• ,., • 1 ,\ Ill ,I•
1,11
',II I', .·>>-/. 1>10UGA.ti1( fl>,,) f)I l'JW lfJ Ur(\tllV
f•t.a~lt(llf, 1;nMf ti, t IA1•~ z
IIIJlllU IUJII
/It-Ill LL' • .',,1 IHAU '-11 .-,: ... •✓> CL ';Afl[ll t'.l,At~,. '.I( I I I ( .Ale,. 11 AU 0 .~
If /11·: , ,, / / t'l A•'J
11111 ,,,I :1 ·( ~ ·10
--w·-----
Vl~
z
11111 11•I 1· I OR(".Anrl.-.tC ,s 511 IS .&ti() •Jl-'CA111( •;11 '1 IJl ta.I
::,
GRAU·J[ I I oi. l)f° LOW l'l,A'ill(II., '.\ ::l 'c?
I
I 1 I Ill t..• z ~
ru
SOIi ·; I l11,1.i.l,1tlt1,l,11!,1l ·--·- t. ~ C. .}0
INORC,A.WC ~•l.15. ,,,( A(f ou-; flH 0 -- ◄ " ' ':-.! -
MH ()t.1.IQUA((O\lr, 1,u, ",AU() (IIJ 5 b~ J tv.,, · ...
~lllr sou s
OH
m"" _I
~ }\ ll ]0
0,11 r,·,
or
IJOA{ IH.t.N ~,11't Of llt-1[1 mnRr.1.rnr n.A, s rn 111i:11 er
MAI( RIAL lrJ '.,M.AULJI lhJIJl{J 111,.11I <•
MH
111.v, tHf ."110 t..lA,·'; , .. Fl>ILR lllAtl <n CH PlA')llflh. f/\l I l,/\1'; ..
<i•fvt ',!/( 10
1 • ·-···-·
t----<,-----+----•---
,-,;✓~;,-i/
.· .·. '.· , , ... / ORr.ANI( llAl'S Of Ml{MUU lo 101.U
OL
.. ~- ~ :_;·:':/.:; OH f"tA•jll(ltf, OHf.AWf r,11 I':,
.• .. 0 L......---'-----"'---'----,._
__ ..,_ __ _,_ __ _,, .._ __ _._ __ __.
ll IO 7ll JO
40 ~0 60 70 110 90 I 00
I fl! :1 t/ r , 11,'t :i\f JI•· I 1q' f•f,.1. llllUtl';. t:,WAl.41' ·,1)11 ', 1"1111
PT ltl!.11 f1l•1..l\llll , 11tilj tll',
-- ·---·--·
Western Geotechnical Consultants, Inc. ,--1Zcy
lo 'l'esl p;, Logs Us;ng ll,J
0 8
418 I Sa/rspdngs o,;ve • Ferndale, WA 98248
_l'n i r '."d -8.~'. I ~ l~s~i~~.''.." n :::.'_"'._"_
P/Jone _(3~0) 380~~507 •. Fax (:J.~9) _q_~9._~?_!!._0! i""\111,9-.,
'""~:. NIA __ .. .,. u,,. ..
I\ II ', I I 'I I
\l'estern Gcotechnical Consultants, Inc.
4181 Saltsprings Drive-• Ferndale, WA 98248
Phone (360) 380-2507 • Fax {360) 380-2507
TahleA-1 filc:9!16711
Loe or Test Pits
~Test Depth uses Soil Description Sample Nol Water Pocket
Pit Interval Class. Depth (feet) Content Pen.
No. (feet) (%) (Kg/sq.
cm)
TP-1 0.0- 1.8 OL Dark brown fine sandy organic 1-1/1.0 24.6%
SILT with some gravel (topsoil)
(soft)
1.8-5.4 GW Brown fine to coarse sandy 1-2/3.0 11.4%
GRAVEL and cobbles (relatively
compact, moist) (gravel is
rounded to subrounded 12 inch
minus) (hard digging below 4
feet)
Notes:
• Test Pit terminated on 5/22/99 .u 5.-l feet
• Test Pit backfilled upon completion
• No ground water encountered.
• No instrumentation installed
Tahle A-1 file:996712
Lou of Test Pits
Test Depth uses Soil Description Sample No.I Water Pocket
Pit Interval Class. Depth (feet)
Content Pen.
No. (feet)
(%) (Kg/sq.
cm)
TP-2 0.0 - 1.7 OL Dark brown fine sandy organic
SILT with some gravel (topsoil)
(soft) (numerous roots)
1.7 - 2.7 Gi\!1:-.U. Orange sandy gravelly SILT to 2-1/2.0 5.3%
silt, GRAVEL
2.7 - 6.0 G\V Brown fine to coarse sandy 2-2/5.0
8.9%
GRAVEL and cobbles (relatively
compact, moist) (Gravel is
rounded to subrounded 12 inch
minus)
6.0 - 7.0 GW/GM Gray sandy gravel with trace to 2-3/6.8 5.9%
some silt ( relatively compact.
saturated :11 G.8 feet. heavy
! SCCD:!~C at 7.U feet)
7.0 - I ,\IL Gr:.1y silt wit h truce line sand 2-âž”/8.0 32.6%
IU.6 I (wet, rcl.uivclv compact) 2-5/10.6 35.6%
Notes:
• Test Pit terminated on 5/22/99 .u IU.G feel
• Test Pit backfilled upon completion
• Ground water encountered at 7.0 feet.
• No instrumentation installed
FILTER FABRIC MATERIAL 60" WIDE ROLLS NOTE: SPACING BETWEEN POSTS
(USE STAPLES OR WIRE RINGS TO NOT TO EXCEED 6'
ATTATCH FABRIC TO WIRE)
•
<O
WIRE MESH SUPPORT FENCE
FOR SLIT FILM FENCES
2" BY 2" BY 1 4 GA. WIRE
FABRIC OR EQUIV. • 0
I
N
0
I
io
PROVIDE 3/ 4" -1 1 /2" N ....
WASHED GRAVEL BACKFILL
IN TRENCH AND ON BOTH
SIDES OF FILTER FENCE
FABRIC ON THE SURFACE
8" MIN.
2" BY 2" WOOD POSTS
(STANDARD OR BETTER
OR EQUIV. ALTERNATES:
STEEL FENCE POSTS)
FIL TEA FABRIC FENCE
NOT DRA~N TO SCALE
Jell NQ.: Western Geotechriicar on u tants, Inc. SEDIMENT CONTROL
FILTER FABRIC FENCE
4181 Saltsprings Drive• Ferndale, WA 98248
0£0([.I) • ., Phone (360) 380-2507 • Fax (360) 380-2507 . DATE: SCoAL£:
1t N/A ~ N/A
1. EXCAVATE THE TRENCH. 2. PLACE ANO STAKE STRAW BALES .
.3. WEDGE LOOSE STRAW BETWEEN BALES. 4. BACKFILL AND COMPACT THE EXCAVATED SOIL.
CONSTRUCTION OF A STRAW BALE BARRIER
NOT DRAVN TO SCALE
POINTS A SHOULD BE HIGHER THAN POINT B
PROPER PLACEMENT OF STRAW BALE BARRIER IN DRAINAGE WAY
NOT DRAVN TO SCALE
,,ce NO.: Western Geotechnical Consultants, Inc. SEDIMENT CONTROL
STRAW BALE BARRIER
4181 Saltsprings Drive • Ferndale, WA 98248
Phone (360) ~80-2507 • Fax {360) 380-2507 · 0•n::
" N/A
,,.
'
-,
_.,, ... ,...,. - .. ~•,":•"• .. ,',.",.__ __ .,,,h, .. '-.,, "",,_¾',,,_ '•;,,
',_.-... '\, -, .. ,...,,,.,,,
----~\- N aa·1a•o4'" w 469.91
-----
__ R_/_W_C_EN-TERi:;;:E (1\'P.) J
BURKE AVENUE ~
-,o.,_.___ +104.20
ASBUIL T CENTERLINE (TYP.)_/
~
._ -- _,,,,. - - - - - ~SPHALT PAVEMENT
f -
DRAINAGE DIVIDE
OFFSITE AREA=0.018 ACRES
-OFFSITE
7
I
GRADE LANOSCAPE
AREAS
T(TYPIO DRCAALIN
) TO YARD DRAINS.
RIG-IT-OF-WAY TO BE OEOICA TED
I TO lHE OTY OF ARLINGTON
/ I
/ WALK FLUSH WITH PA\ltMENT I
I
J. I
I
~ CB 2 TYPE 11-114" DIA. ------'--·-"---'---'CB'-"-.:..1 _,TY=P=E_,I_J
\SQ.JO ROUND LOO<ING UO SOLID LOO<IHG UC ;'
~lH GRAlE C0'-1£R
I\E•10J.70 ~:):l;":~ I
RE-...•103.80
IE,- 101.20- ft" I
IE •'1-02.10
IE •'--!IZ,20-38-
- --- - - - 0 I
I MNNT ... N TOP Of' FOUNDATION WALL AT
~L..;:1.:;:j"-----tt-tt-r-e·•ERF.
EJivATION 10U5. INSTALL a- CLEANOUT
ADI o o.oox
W11ij GRATE COIS 'MiERE NEEDED TO
EACH END /
~ P~VIOE OUTl£T FOR DRAINAGE FROM WINDERMERE
BUIU)tNGI CB II TYPE I CONNEC k)N
Sll~WAU<.
I g. 17'~6'" [DS â– 0.~9X LO'M':R
LEVEL: 6046 SF SR10E-. 1G03RA,6TE D CONNECT:roAOS TO
INFlLTRA SYSTEM
STORAGE/MEZZANNINE:
636 SF IE -101.55 Iv IE ~101/ O
~) D.S. (DOIINSPOJ./!)
I
F.F. ELEV
- 104.05
•~-~RllO~Of'~~R~"'~N==-~------
I PROP~EO INFlllRATICN BASIN
I 104.60 d ~ ~! ~E1:!1:~~ 8,°~SET) -------- --
.-- -- - -l(l4_ - _ -~-6-ADS O 0.581: t" I / SEE 9 AILS, SHEET 5 5
. ;1 < JE •102.20
I I I
PROJECT BOUNDARY . ~
/
<
L
/.,,I - __
~ BUILDING NOT TRIBUTARY
TO TANK .;,'
0 < ~ ~
104.ii"3.1 0.136
ACRES 11 I PROPOSED INFILTRATION BASIN/
''
I ~ ~
(/ I / RETAINED AREA=0.445 ACRES
/:: I
104 0" ~
a ~ I
d
uillillj I V1 11 I
~ I I
OF ~ITE AREA~~017 ACRES------
; I
I
0 PROPOSED WATER QUALltj' TANK
WALK FLUSH Wlll-i PAVEMENT
f \ RETAINED AREA=0.310 !ACRES
o.s ·' I
i I
. _.,_ ..
ll I
.
. /
·~~ /
c=:=::=:i c== ==== c:=:::::::::::: c:=:::=..=:t
c======i c::===::::=::i c:::::=:==::J ~ .... /
[QITQ]
[IQiw I I \ I
/
'\ ,.- /
I' /
\ I \
I
I I
\ I
I gtu
\
I ' '
I ---\
~ I
EX. SSMH 1\
/
RE XXX.XX
/
\
/
IE XXX.XX
/
\ ec
✓ /
'3, .,
!-------+---\' .,,.. ss-----~O,...·-. ,+;-~--,ih-,
\ <
\
\
I
I
\ l!...,;,...;.!..l,..::_~W,,.,.,1!i,ll:;,,;i-,,.-a~,.;,...;.,...-l,l!'""'~-ilii''~i1;;'}>..,\:jj
\ ,o"_,.,.
DRAINAGE AREA MAP
\ I .,. ,....
I '/
CB 4 TYPE I CB S TYPE H-14' DIA.
I
sm, GRATE 90UO ROUND LOO<ING UO POST-DEVELOPED
E~. Cl
RE :s 103.50 RE -104.00
IE •101.25 IE -101.20- 8"
RIE E ±1'043.4.48 8
IE - gJ.20-36"
I
CONDITIONS
i---------35' ------~--------\5' ~--1+<----~--J
\ ~
\ ~
FOR
\, /
,"' /
\ /
/
WINDERMERE BUILDING
SCALE: 1 "=20'